First Reading of Ordinance No. 105, 2018, Appropriating Prior Year Reserves in the Cultural Services and
Facilities Fund for Lincoln Center Improvements.
EXECUTIVE SUMMARY
The purpose of this item is to appropriate funds set aside by the Lincoln Center into reserves to replace aisle
lighting in the Performance Hall as part of the seat replacement project.
STAFF RECOMMENDATION
Staff recommends adoption of the Ordinance on First Reading.
BACKGROUND / DISCUSSION
This Ordinance will appropriate additional funding to replace the aisle lighting that was damaged during
demolition as part of the seat replacement project in the Lincoln Center Performance Hall.
The 2018 Budget included one-time Cultural Services reserves of $375,000 to replace the 1,180 seats in the
Lincoln Center that are original to the 1978 opening of the facility. The seats in the Performance Hall are well-
used and worn and were originally planned to be replaced during the 2010 renovation. However, funds were
needed for unanticipated major structural issues. The theater seats directly impact the patron’s experience
and customers constantly comment on the need to replace the seating in audience surveys.
The budget for the seat replacement project covers moving the fixed seating, cutting and patching the existing
seat anchors and installing new seating while simultaneously addressing issues including trenching the
concrete to address the trip hazards of cabling that runs between backstage and front-of-house show control,
light locks for the mezzanine (curtains to stop light bleed from affecting patrons viewing experience) and
required modifications to substantial portions of our assisted listening system.
Unfortunately, the original aisle lighting was damaged when the old seats were removed. The manufacturer is
no longer in business and replacement diodes for this kind of light are no longer available. This appropriation
is needed to complete of the project currently in process.
CITY FINANCIAL IMPACTS
This Ordinance will appropriate $70,779 in Cultural Services reserves to replace the Lincoln Center’s aisle
lighting and egress systems as part of this project.
PUBLIC OUTREACH
Public outreach was completed during the design and development phases of the project. Input was received
Agenda Item 10
Item # 10 Page 2
from multiple stakeholder groups including donors, patrons, subscribers, and volunteers among others.
ATTACHMENTS
1. Lincoln Center Seating Replacement - Budget Estimate (PDF)
-1-
ORDINANCE NO. 105, 2018
OF THE COUNCIL OF THE CITY OF FORT COLLINS
APPROPRIATING PRIOR YEAR RESERVES IN THE CULTURAL SERVICES
AND FACILITIES FUND FOR LINCOLN CENTER IMPROVEMENTS
WHEREAS, the Lincoln Center has been at the center the City’s cultural life since its
opening in 1978; and
WHEREAS, the current 1,180 seats at the Lincoln Center, the original seats that have
been used since its opening, are well-used and worn; and
WHEREAS, the 2018 Budget included one-time Cultural Services reserves funding of
$375,000 to replace the seats in the Lincoln Center (the “Project”); and
WHEREAS, Cultural Services has $70,799 set aside - but not yet appropriated - to also
replace aisle lighting and egress systems as part of the Project; and
WHEREAS, if the funds for aisle lighting and egress systems are appropriated, the
Project will be complete for the Lincoln Center’s 40
th
Anniversary Season; and
WHEREAS, this appropriation benefits public health, safety, and welfare of the citizens
of Fort Collins and serves the public purpose of creating opportunities for cultural appreciation
and community building available to all citizens of Fort Collins; and
WHEREAS, Article V, Section 9 of the City Charter permits the City Council to
appropriate by ordinance at any time during the fiscal year such funds for expenditure as may be
available from reserves accumulated in prior years, notwithstanding that such reserves were not
previously appropriated; and
WHEREAS, the City Manager has recommended the appropriation described herein and
determined that this appropriation is available and previously unappropriated from the Cultural
Services Fund and will not cause the total amount appropriated in the Cultural Services and
Facilities Fund to exceed the current estimate of actual and anticipated revenues to be received in
that fund during any fiscal year.
NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF
FORT COLLINS as follows:
Section 1. That the City Council hereby makes and adopts the determinations and
findings contained in the recitals set forth above.
Section 2. That there is hereby appropriated for expenditure from reserves in the
Cultural Services and Facilities Fund the sum of SEVENTY THOUSAND SEVEN HUNDRED
SEVENTY-NINE DOLLARS ($70,779) for Lincoln Center improvements and appropriated
therein.
-2-
Introduced, considered favorably on first reading, and ordered published this 21st day of
August, A.D. 2018, and to be presented for final passage on the 4th day of September, A.D.
2018.
__________________________________
Mayor
ATTEST:
_______________________________
City Clerk
Passed and adopted on final reading on the 4th day of September, A.D. 2018.
__________________________________
Mayor
ATTEST:
_______________________________
City Clerk
Project: Lincoln Center Performance Hall Estimate Date: 7/3/2018
Location: 417 S Meldrum Project Manager: Chad Mapp
Fort Collins, CO Work Order #:
Project SF:
Project Description:
Replace performance hall seating, new carpet, aisle lighting, cable/wire trench, t-coil modifications
Scope Description Qty Unit Amount Total Sub-Total Vendor Responsbile
General Requirements
Building Permit 1 LS 1500 $ 1,500 Building Dept.
Op Services - Project Manager 250 Hrs 90 $ 22,500 Chad Mapp
Op Services - Facility Designer 40 Hrs 70 $ 2,800 Alison Provenza
Construction Waste Management & Recycling 1 LS 2500 $ 2,500 Waste Management
Construction clean up 1 LS 1250 $ 1,250 Varsity
Security Services for night supervision 60 LS 25 $ 1,500 Code 4 Security
Sub-Total $ 32,050
Environmental Services
Asbestos/Lead paint testing 1 LS 1500 $ 1,500 LT Environmental
Sub-Total $ 1,500
Seating Replacement
Install new seating 1 LS 225750 $ 225,750 Norcon
Add (17) storage carts for stackable chairs 1 LS 18150 $ 18,150 Norcon
Sub-Total $ 243,900
Cable/Wire Trench
X-ray slab 1 LS 425 $ 425 CGRS
Saw-cut & demo concrete 1 LS 5000 $ 5,000 Diamond
Place concrete in bottom of trench 1 LS 2500 $ 2,500 Curley
Install cable/wire trench raceway 1 LS 12500 $ 12,500 Curley Fabricators
Sub-Total $ 20,425
Light Locks
Build wing walls & soffit & relocate sprinklers 1 LS 8000 $ 8,000 Finishing Touch
Curtain & track system (material & install) 1 LS 3200 $ 3,200 TBD
Curtains 1 LS 1750 $ 1,750 TBD
Sub-Total $ 12,950
Carpet Replacement
Install new carpet 1 LS 60000 $ 60,000 Brinker's Flooring
Sub-Total $ 60,000
Concrete Floor Polish/Seal
Polish/seal existing concrete floor 1 LS 20000 $ 20,000 TBD
Sub-Total $ 20,000
Aisle Lighting
Design & engineering 1 LS 7000 $ 7,000 AUW & BG
Tivoli aisle lighting product 1 LS 40000 $ 40,000 The Lighting Agency
Elec service & installation 1 LS 56000 $ 56,000 Interstates
Sub-Total $ 103,000
T-Coil Modications
T-Coil modifications 1 LS 17000 $ 17,000 Assist 2 Hear
Sub-Total $ 17,000
SUB-TOTAL $ 510,825
5% CONTINGENCY $ 13,346
TOTAL ESTIMATED COST $ 524,171
Lincoln Center Contribution
Seating Replacement $ 243,900
General Requirements $ 32,050
Environmental Services $ 1,500
Cable/Wire Trench $ 20,425
Light Locks $ 12,950
T-Coil Modications $ 17,000
Aisle Lighting $ 103,000
SUB-TOTAL $ 430,825
8% CONTINGENCY $ 14,954
TOTAL ESTIMATED COST $ 445,779
Op Services Contribution
Carpet Replacement $ 60,000
Concrete Floor Polish/Seal $ 20,000
SUB-TOTAL $ 80,000
TOTAL ESTIMATED COST $ 80,000