Loading...
HomeMy WebLinkAboutCOUNCIL - AGENDA ITEM - 02/27/2018 - POUDRE RIVER WHITEWATER PARKDATE: STAFF: February 27, 2018 Kurt Friesen, Director of Park Planning & Development Jeff Mihelich, Deputy City Manager WORK SESSION ITEM City Council SUBJECT FOR DISCUSSION Poudre River Whitewater Park. EXECUTIVE SUMMARY The purpose of this item is to review the whitewater park project status, identify and prioritize unfunded features of the whitewater park project, and identify potential funding options for those items. GENERAL DIRECTION SOUGHT AND SPECIFIC QUESTIONS TO BE ANSWERED 1. Is there interest from Council to fund unfunded features of the whitewater park project? a. If so, what features are a priority? 2. What funding sources would Council consider for these features? BACKGROUND / DISCUSSION Project Status The whitewater park will be located south of Vine Drive between College Avenue and the BNSF Railroad. Design and permitting for the project are nearly complete, with construction anticipated to begin Spring 2018, and the project complete in Spring/Summer 2019. A contractor has been selected for the project, and has been working with the team to develop accurate project costs, determine appropriate means and methods for constructing in the River, and identifying value engineering options to bring the project within budget. Funding Sources and Funded Project Elements Current funding for the project is provided from several sources, including the CCIP (Community Capital Improvement Program). Funding Sources Amount Community Capital Improvement Program (CCIP) $4,200,000 Natural Areas $1,000,000 Stormwater $1,000,000 General Fund (property acquisition) $1,000,000 Park Impact Fees (property acquisition) $855,400 Fundraising $1,500,000 Total Available Funding $9,555,400 In addition to the funding sources listed, City staff has been investigating a potential URA (Urban Renewal Area) funding request of $300,000, which has received support from the URA CAG (Citizens Advisory Group) and the Council Finance committee. The funding request to the URA Board is currently on hold until after the Council Work Session. As available funding is not sufficient to fully fund the project as envisioned, the team focused on three primary areas to right-size the project to fit within the available budget: February 27, 2018 Page 2 1. Property Acquisitions. Seven properties were acquired along Vine Drive, opening the site to allow for views towards the river from Vine Drive, providing space for parking, walk connections, and providing for a rare park space adjacent to the Poudre River. Purchasing these properties now was critical, as once the project is complete, the properties will no longer be in the floodway, making the properties unaffordable for the City to purchase later. 2. Vine Drive Improvements. As required by City Code, improvements to Vine Drive will include street improvements for the south half of Vine Drive, including added parking, bike lanes, parkway and walk improvements. These improvements will begin the transformation of Vine Drive into an important street within the Innovation District, as identified by the Downtown Plan. 3. River Improvements. As construction within the River is costly, requiring multiple permits, specialized construction techniques, and can only be accomplished within a limited construction window (winter), it is important that all River improvements associated with the project be completed at one time. River improvements proposed will include significant stormwater enhancements, construction of whitewater features and fish passage elements, bridge abutments for the pedestrian bridge, and ADA access to the river. Optional Features To fully realize the vision and potential of the project, the following features could be added: Project Element Description Approximate Cost 1. Pedestrian Bridge The pedestrian bridge will provide a key connection from downtown to the Old Town North neighborhood and North College businesses, and future crossing of the Poudre Trail $525,000 2. South Bank Wall Enhancements Enhancements to a blank, gray concrete wall facing the river along the south bank. Enhancements may include a patterned/colored texture on the wall or other aesthetic wall treatments. $150,000 3. South Bank Plaza Enhancements South bank plaza enhancements may include improved paving, sandstone benches, seating areas, and improved railing, and an enlarged shelter. $175,000 4. Landscape Enhancements Landscape enhancements include additional trees, shrubs & irrigation in the south bank plaza and park area. $250,000 5. Concrete Walks Concrete walks to replace proposed crusher fine walks that extend from the parking lot and Vine Drive to the river. $175,000 6. Children’s Play Area Lower terrace, stepped sandstone boulders, and handrail designed for children to safely access the river for play. $175,000 7. Site Lighting Additional parking lot lighting, pedestrian light poles adjacent to walks, stairway lighting, $350,000 8. Security Cameras/Emergency Call Station A combined security camera/emergency call station to provide improved security. $60,000 9. Additional Project Contingency (if needed) Additional project contingency for constructing in the river during a limited construction season. The recommended February 27, 2018 Page 3 To date, Natural Areas has contributed $1.75M towards the project ($1M for project costs, and $750,000 for acquisition of the water right at the Coy that makes the project feasible). Stormwater has contributed $1.5M towards the project ($1M for project costs, $500k for flood mitigation and other improvements prior to the project start). Project benefits realized by each department include: Stormwater Benefits • Increased flood conveyance under the College Avenue Bridge • Removal of several parcels of developable land from the 100-year floodway • New storm sewer system that conveys runoff from Vine Drive into a reconfigured water quality pond. Natural Area Benefits • Removal of Coy diversion structure • Fish passage • Stream and bank restoration The total estimated cost of the project, without the optional features is $9,555,400. The total cost of all optional features is $2,025,000. The following chart illustrates a potential cost allocation by funding source, with the option of the Stormwater Department bringing additional funding to the project to share in the total cost of the elements where departmental benefits are realized. Additional Natural Areas funding is not being recommended at this time as staff believes that the current level of contributions is appropriate and aligned with the level of benefit to the Natural Areas Program. Under this scenario, optional features could be funded from CCIP, General Fund, and unidentified philanthropic sources. This potential allocation is conceptual only - more work is needed to determine if additional funds are available and suitable for the purposes described. Cost Allocation by Funding Source Project Elements Total Natural Areas Stormwater CCIP Fundraising Park Impact Fees General Fund URA (funding pending) Philanthropic Support Vine Drive, Parking and Storm Sewer Improvements $513,000 $213,000 $300,000 Property Acquisitions and Cleanup $1,855,400 $855,400 $1,000,000 River Enhancements $3,165,000 $721,666 $721,667 $721,667 $1,000,000 Bridge Abutments & Gathering Areas $1,157,000 $1,157,000 Minimum Landscape Enhancements $233,000 $77,666 $77,667 $77,667 Design, Engineering and Contractor Costs $2,418,000 $129,335 $650,000 $1,138,665 $500,000 Project Contingency February 27, 2018 Page 4 ATTACHMENTS 1. Powerpoint presentation (PDF) 1 Poudre River Whitewater Park Kurt Friesen, Park Planning & Development Director 2/27/2018 ATTACHMENT 1 Council Questions 1. Is there interest from Council to fund currently unfunded features of the whitewater park project? 2. If so, what features are a priority? 3. What funding sources would Council consider for these features? 2 3 Project Funding Sources 4 Community Capital Improvement Program (CCIP) $ 4,200,000 Natural Areas $ 1,000,000 Stormwater $ 1,000,000 General Fund 2015 (Property Acquisition) $ 1,000,000 Park Impact Fees (Property Acquisition) $ 855,400 Fundraising $ 1,500,000 Total Funding $ 9,555,400 Project Focus 1. Property Acquisitions 5 College Avenue Vine Drive 1 2 3 4 5 6 Whitewater Park 7 Project Focus 2. Improved Vine Drive with Additional Parking 6 Existing Condition Project Focus 7 Phase I Improved ½ of Vine Drive 16 New Parking Spaces Future Phase(s) Improved Street with Innovation District Character 2. Improved Vine Drive with Additional Parking Proposed Condition Project Focus 8 3. River Improvements 9 3. River Improvements - Floodway Project Focus Existing Condition 10 3. River Improvements - Floodway Project Focus Proposed Condition Funded Project Elements 11 Vine Drive, Parking and Storm Sewer Improvements $ 513,000 Property Acquisitions and Cleanup $ 1,855,400 River Enhancements $ 3,165,000 Gathering Areas & Bridge Abutment $ 1,157,000 Landscape Enhancements $ 233,000 Design, Engineering & Contractor Costs $ 2,418,000 Contingency $ 214,000 Total Estimated Cost $ 9,555,400 12 Optional Features Pedestrian Bridge Optional Features 13 Pedestrian Bridge Pedestrian Bridge Optional Features South Bank Wall & Plaza Enhancements 14 Optional Features Landscape Enhancements 15 Optional Features Concrete Walks 16 Optional Features Children’s Play Area 17 Optional Features Site Lighting Security Cameras Emergency Call Station 18 Optional Features - Costs 19 Project Feature Estimated Cost 1. Pedestrian Bridge $525,000 2. South Bank Wall Enhancements $150,000 3. South Bank Plaza Enhancements $175,000 4. Landscape Enhancements $250,000 5. Concrete Walks $175,000 6. Children’s Play Area $175,000 7. Site Lighting $350,000 8. Security Cameras/Emergency Call Station $60,000 9. Additional Project Contingency $240,000 Total Estimated Cost $2,025,000 Potential Funding Sources 20 Cost Allocation by Funding Source Project Elements Total Natural Areas Stormwater CCIP Fundraising Park Impact Fees General Fund URA (funding pending) Philanthropic Support Vine Drive, Parking and Storm Sewer Improvements $513,000 $213,000 $300,000 Property Acquisitions and Cleanup $1,855,400 $855,400 $1,000,000 River Enhancements $3,165,000 $721,666 $721,667 $721,667 $1,000,000 Bridge Abutments & Gathering Areas $1,157,000 $1,157,000 Minimum Landscape Enhancements $233,000 $77,666 $77,667 $77,667 Design, Engineering and Contractor Costs $2,418,000 $129,335 $650,000 $1,138,665 $500,000 Project Contingency $214,000 $71,333 $71,333 $71,334 Total Estimated Cost without Optional Features $9,555,400 $1,000,000 $1,733,667 $3,166,333 $1,500,000 $855,400 $1,000,000 $300,000 $0 Optional Features $2,025,000 $1,033,667 $492,335 $498,998 Total Estimated Cost with Optional Features $11,580,400 Current Funding $9,555,400 $1,000,000 $1,000,000 $4,200,000 $1,500,000 $855,400 $1,000,000 Additional Funding Needed $733,667 $492,335 $300,000 $498,998 21 $214,000 $71,333 $71,333 $71,334 Total Estimated Cost without Optional Features $9,555,400 $1,000,000 $1,733,667 $3,166,333 $1,500,000 $855,400 $1,000,000 $300,000 $0 Optional Features $2,025,000 $1,033,667 $492,335 $498,998 Total Estimated Cost with Optional Features $11,580,400 Current Available Funding $9,555,400 $1,000,000 $1,000,000 $4,200,000 $1,500,000 $855,400 $1,000,000 Additional Funding Needed $733,667 $492,335 $300,000 $498,998 contingency for the project is $455,000. Currently, there is $214,000 available. The additional $240,000 would bring the contingency to an appropriate level for a project of this complexity. $240,000 Total $2,025,000