Resolution 2017-069 Authorizing the City Manager to Execute an Agreement between the City of Fort Collins
and New Belgium Brewing Company, Inc. Regarding Temporary Authorization to Use a Portion of Pretreated
Wastewater in Cooling Towers.
EXECUTIVE SUMMARY
The purpose of this item is to consider an agreement to allow New Belgium Brewing Company, Inc. (NBB) to
use a portion of pretreated wastewater from its on-site water treatment plant to run through cooling towers for a
12-month pilot period. NBB has requested permission to gather more data in order to determine the feasibility
of operating the system on a long-term basis. This pilot period also allows Utilities an opportunity to evaluate
this type of system for long term program development. This system was also tested for a period of 30 days
last year in October pursuant to a separate agreement authorized under Resolution 2016-061. During that test
period NBB and Utilities gathered positive data and NBB would like the opportunity to fine tune the system.
NBB agrees to abide by all local and state regulation for the test period and the plan has been reviewed
extensively by City staff.
STAFF RECOMMENDATION
Staff recommends adoption of the Resolution.
BACKGROUND / DISCUSSION
NBB is a customer of Utilities that receives water and wastewater service. NBB pretreats a portion of its
wastewater at an onsite facility, with the “pretreated” wastewater then being sent to Utilities’ water reclamation
facilities for further treatment and (ultimately) discharge to the River. The wastewater pretreated onsite is
brewing process water, spent yeast, out-of-specification beer, and used cleaning chemicals, and is not
domestic wastewater from the facility.
Cooling towers evaporate water to reduce the electric load needed to meet an industrial facility’s’ cooling
needs. This system has operated with treated, potable water to this point, but many facilities across the
country have found success with mixing treated wastewater effluent to reduce the amount of potable water
needed for cooling. NBB has indicated the goal for this project is to manage utility costs as well as meet
corporate goals pertaining to water conservation at its facility. Utilities would also like the additional information
from a longer pilot to understand if designing a permanent program open to other similarly situated
commercial/industrial customers would be feasible.
Last year, NBB conducted a 30-day project whereby a portion of the pretreated wastewater was used in onsite
cooling towers pursuant to a separate agreement authorized under Resolution 2016-061. While the 30-day
pilot was useful and generally a success, NBB would like a longer pilot period to refine how to manage cooling
tower systems with this type of water.
Agenda Item 16
Item # 16 Page 2
NBB has been in discussions with various governmental agencies regarding this project, including the
Colorado Department of Public Health and Environment (CDPHE) (which regulates water quality) and the
Colorado Division of Water Resources (which administers water rights, including the City’s water rights used to
serve NBB and other Utilities’ customers). The CDPHE Hazardous Materials Division has given approval to
the project.
Utilities staff is investigating the possibility of a permanent program involving the use of onsite, treated
wastewater by NBB and other similarly-situated customers. Because such a program would be a shift in
operations, Utilities staff requires extended time to fully analyze the various impacts of such a program as it
relates to water rights, water quality, operation costs, and other considerations in the regulatory landscape.
Authorizing this temporary use of treated wastewater onsite will provide Utilities with more data to aid in
program development.
The agreement with NBB would grant temporary authorization for NBB’s use of the onsite, treated wastewater
subject to various terms and conditions that are required to protect Utilities’ interests, as well as to ensure
Utilities is able to fully benefit from the data acquired through this project.
CITY FINANCIAL IMPACTS
The financial impacts from this temporary authorization would be approximately $3,915 in lost revenue from
fees associated with water not delivered to NBB, and wastewater that would not be treated.
BOARD / COMMISSION RECOMMENDATION
Staff plans to manage the analysis of the temporary project with Water Board prior to providing City Council a
recommendation on a permanent program.
PUBLIC OUTREACH
Outreach for this temporary project is singularly focused with NBB. If the temporary project recognizes a
benefit that warrants a rate ordinance then staff will plan public outreach to customers that would qualify.
-1-
RESOLUTION 2017-069
OF THE COUNCIL OF THE CITY OF FORT COLLINS
AUTHORIZING THE CITY MANAGER TO EXECUTE AN AGREEMENT
BETWEEN THE CITY OF FORT COLLINS AND NEW BELGIUM
BREWING COMPANY, INC. REGARDING TEMPORARY AUTHORIZATION
TO USE A PORTION OF PRETREATED WASTEWATER IN COOLING TOWERS
WHEREAS, the City owns and operates Fort Collins Utilities, which includes a water
utility and a wastewater utility that provide water and wastewater service to customers pursuant
to Fort Collins City Code and other applicable law, rules, and regulations; and
WHEREAS, New Belgium Brewing Company, Inc. (“New Belgium”) is a water and
wastewater customer of Utilities that owns and operates a brewery in Fort Collins; and
WHEREAS, New Belgium owns and operates a process wastewater treatment plant
(“New Belgium PWTP”) at the brewery that discharges “pretreated” wastewater into the City’s
sewer system; and
WHEREAS, pursuant to Resolution 2016-016, the City entered into an agreement with
New Belgium, by which the City authorized New Belgium to use up to 250,000 gallons of such
pretreated wastewater in cooling towers at the brewery over a 30-day period; and
WHEREAS, New Belgium has now requested authorization to use up to 7 million gallons
of such pretreated wastewater in cooling towers at the brewery over a one year period; and
WHEREAS, City Code does not authorize Utilities customers to use pretreated
wastewater from process wastewater treatment plants; and
WHEREAS, the City is willing to authorize New Belgium’s temporary use of pretreated
effluent from the New Belgium PWTP as described herein in order to acquire data, information,
and practical experience related to whether a Utilities-wide permanent program concerning the
use of pretreated wastewater onsite from process water treatment plants is desirable, feasible, and
otherwise consistent with the prudent management and operation of Utilities in light of all
concerns including, but not necessarily limited to, financial considerations and all applicable law.
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF
FORT COLLINS as follows:
Section 1. That the City Council hereby makes and adopts the determinations and
findings contained in the recitals set forth above.
Section 2. That the City Manager is hereby authorized to execute an Agreement
substantially in the form of Exhibit “A”, with such additional terms and conditions as the City
Manager, in consultation with the City Attorney, determines to be necessary and appropriate to
protect the interests of the City or effectuate the purposes of this Resolution.
-2-
Passed and adopted on at a regular meeting of the Council of the City of Fort Collins this
18th day of July, A.D. 2017.
__________________________________
Mayor
ATTEST:
_______________________________
City Clerk
Page 1 of 7
AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND
NEW BELGIUM BREWING COMPANY, INC. REGARDING
TEMPORARY AUTHORIZATION TO USE A PORTION OF
PRETREATED WASTEWATER IN COOLING TOWERS
This Agreement is entered into this __ day of ________, 2017, by the following Parties:
the City of Fort Collins, Colorado, a home rule municipality (“City”); and New Belgium
Brewing Company, Inc., a Colorado corporation (“New Belgium”).
RECITALS
A. The City owns and operates Fort Collins Utilities (“Utilities”), which includes a water
utility and a wastewater utility that provide water and wastewater service to customers pursuant
to Fort Collins City Code and other applicable law, rules, and regulations.
B. New Belgium is a water and wastewater customer of Utilities. New Belgium owns and
operates a brewery in Fort Collins, on Lots 1 and 2 of the Final Plat of the New Belgium
Brewery Fourth Filing, reordered with the Larimer County Clerk and Recorder at Reception No.
2006-0045463 on June 19, 2006, the address of which is 500 Linden Street, Fort Collins,
Colorado 80524 (“New Belgium Site”).
C. New Belgium owns and operates a process wastewater treatment plant (“New Belgium
PWTP”) at the New Belgium Site that discharges treated wastewater into the City’s sewer
system pursuant to Industrial Discharge Permit No. 16002, revised April 15, 2016 (“pretreated
wastewater”).
D. The wastewater sent to the New Belgium PWTP comprises wastewater from the brewery,
such as used process water, spent yeast, out-of-specification beer, and used cleaning chemicals.
The wastewater sent to the New Belgium PWTP does not include domestic wastewater or other
wastewater from the New Belgium Site.
E. Pursuant to Resolution No. 2016-061, the City and New Belgium entered into the
Agreement Between the City of Fort Collins and New Belgium Brewing Company, Inc. regarding
Temporary Authorization to Use a Portion of Pretreated Wastewater in a Cooling Tower, dated
August 18, 2016, by which the City authorized New Belgium to use up to 250,000 gallons of
pretreated wastewater in a cooling tower on the New Belgium Site for a 30-day period.
F. New Belgium has requested authorization to use up to 7 million gallons of its pretreated
wastewater in cooling towers on the New Belgium Site over a 1 year period. Such use would be
effectuated by pumping a portion of the pretreated wastewater from the New Belgium PWTP to
the cooling towers.
G. City Code does not authorize Utilities customers to use pretreated wastewater from
process wastewater treatment plants. New Belgium’s various permits from Utilities likewise do
not purport to authorize New Belgium to use pretreated wastewater from its PWTP. New
Belgium thus requires authorization from the City to use any of its pretreated wastewater.
EXHIBIT A
Page 2 of 7
H. The City is willing to authorize New Belgium’s temporary use of pretreated wastewater
from the New Belgium PWTP as described herein in order to acquire data, information, and
practical experience related to whether a Utilities-wide permanent program concerning the use of
pretreated wastewater onsite from process water treatment plants is desirable, feasible, and
otherwise consistent with the prudent management and operation of Utilities in light of all
concerns including, but not necessarily limited to, financial considerations and all applicable law.
AGREEMENT
1. INCORPORATION OF RECITALS. The foregoing recitals are hereby incorporated
as if fully restated in their entirety.
2. APPROVAL FOR USE OF PRETREATED WASTEWATER. The City hereby
authorizes New Belgium to use up to a total of 7 million gallons of pretreated wastewater from
the New Belgium PWTP in cooling towers on the New Belgium Site over a 1 year period during
the term of this Agreement, pursuant to the terms and conditions of this Agreement. No other
use of pretreated wastewater from the New Belgium PWTP or otherwise is authorized hereby.
New Belgium expressly acknowledges that this Agreement creates no entitlement or expectation
of further analogous or similar authorizations.
3. TERMS AND CONDITIONS. The following terms and conditions shall apply to New
Belgium’s use of its pretreated wastewater.
3.1. METERING. New Belgium shall continuously meter all pretreated wastewater
delivered from the New Belgium PWTP to the cooling towers. Such metering shall be
made with a totalizing flow meter approved by Utilities. The metering of the pretreated
wastewater delivered to the cooling towers shall be made before the remainder of
pretreated wastewater is metered and delivered to the City’s water reclamation facilities
pursuant to Industrial Discharge Permit No. 16002. Such metering shall, at minimum,
measure and account for the continuous flow rate and the daily volume (in gallons) of
pretreated wastewater delivered from the New Belgium PWTP to the cooling towers.
3.2. REPORTING. New Belgium shall deliver all metering data to Dan Clark at
dclark@fcgov.com within ten days of the completion of the 12 month period, as well as
included with the monthly reports to Utilities Billing Group, and further reported to
Utilities as may otherwise be requested by Utilities. Such data shall be delivered in the
format in which it was collected, and shall also include any summaries of such data
prepared by New Belgium.
3.3. INSPECTIONS. New Belgium shall allow Utilities staff to inspect any facilities
associated with the use of the pretreated wastewater within 24 hours of when such a
request is made.
3.4. INFORMATION SHARING. New Belgium agrees to cooperate, in good faith, with
Utilities regarding the evaluation of the use of pretreated wastewater pursuant to this
Page 3 of 7
Agreement. New Belgium further agrees that any and all information provided to the
City under this Agreement may be shared publically.
3.5. REPORTING LEAKS OR SPILLS. New Belgium shall report any leaks or spills of
pretreated wastewater to Utilities immediately upon discovery irrespective of the size of
the leak or spill. New Belgium shall prepare a spill response plan, which must be
approved by Utilities in writing, prior to using pretreated wastewater pursuant to this
Agreement.
3.6. REVOCATION OF AUTHORIZATION. Utilities shall have the right, at its sole
discretion, to revoke this authorization and require New Belgium to immediately cease
any and all use of any and all pretreated wastewater. Notice of such revocation shall be
provided to New Belgium pursuant to Paragraph 11, and to Nick Ampe, at the following
contact information: 500 Linden Street, Fort Collins, CO 80524, (970) 494-7805,
nampe@newbelgium.com.
4. REPRESENTATIONS. New Belgium hereby represents that it has acquired, or will
acquire prior to the use of any pretreated wastewater pursuant to this Agreement, any and all
approvals, authorizations, and permits needed to use pretreated wastewater pursuant to this
Agreement including, but not necessarily limited to, those from the State of Colorado and its
various agencies (such as, by way of example, the Colorado Department of Public Health and
Environment) and the United States and its various agencies (such as, by way of example, the
Environmental Protection Agency). New Belgium shall provide to the City copies of any and all
approvals, authorizations, and permits as soon as practicable pursuant to Paragraph 11.
5. TERM. This Agreement shall be in effect from the date it is last signed by the Parties,
which shall be written on the first paragraph of this Agreement above, for a period of one year.
Any and all use of pretreated wastewater shall thereafter cease.
6. INDEMNIFICATION. New Belgium agrees to indemnify the City (which includes
Utilities), its officers, agents, employees, and representatives, from all claims and liability,
including but not limited to the City’s reasonable legal fees and costs, including attorneys’ fees,
for any and all claims made by third persons (including, but not limited to, administrative and
other actions brought by governmental agencies) associated with New Belgium’s activities under
this Agreement and for any and all actions or omissions by New Belgium in violation of this
Agreement.
7. REMEDIES. If either Party fails to comply with the provisions of this Agreement, the
other Party may seek all such remedies available under Colorado law.
8. NO THIRD-PARTY BENEFICIARIES. This Agreement is entered into between the
Parties for the purposes set forth herein. It is the intent of the Parties that they are the only
beneficiaries of this Agreement and the Parties are only benefitted to the extent provided under
the express terms and conditions of this Agreement.
Page 4 of 7
9. GOVERNING LAW AND ENFORCEABILITY. This Agreement shall be construed
in accordance with the laws of the State of Colorado, insofar as any matter is not regulated by
applicable laws of the United States. Whenever possible, each provision of this Agreement shall
be interpreted in such a manner so as to be effective and valid under applicable law.
10. WAIVER. A waiver of a breach of any of the provisions of this Agreement shall not
constitute a waiver of any subsequent breach of the same or another provision of this Agreement.
11. NOTICES. All notices or other communications hereunder shall be sufficiently given
and shall be deemed given when personally delivered, or after the lapse of five (5) business days
following mailing by certified mail-return receipt requested, postage prepaid, addressed as
follows:
To the City: City Manager
City Hall West
300 LaPorte Avenue; P.O. Box 580
Fort Collins, Colorado 80522-0580
With copy to: Fort Collins City Attorney
300 LaPorte Avenue; P.O. Box 580
Fort Collins, Colorado 80522-0580
epotyondy@fcgov.com
and: Fort Collins Utilities
Attn: Water Resources Manager
700 Wood Street P.O. Box 580
Fort Collins, Colorado 80522-0580
To New Belgium: New Belgium
Attn: Nick Ampe
500 Linden Street
Fort Collins, CO 80524
12. CONSTRUCTION. This Agreement shall be construed according to its fair meaning as
it was prepared by the Parties. Headings in this Agreement are for convenience and reference
only and shall in no way define, limit, or prescribe the scope or intent of any provision of this
Agreement.
13. ENTIRE AGREEMENT. This Agreement constitutes the entire agreement of the
Parties regarding the matters addressed herein. Covenants or representations not contained in
this Agreement regarding the matters addressed herein shall not bind the Parties.
14. REPRESENTATIONS. Each Party represents to the other Party that it has the power
and authority to enter into this Agreement and the individual signing below on behalf of that
Party has the authority to execute this Agreement on its behalf and legally bind that Party.
Page 5 of 7
15. ASSIGNMENT. No Party may assign any rights or delegate any duties under this
Agreement without the written consent of the other Party.
[Remainder of Page Left Blank Intentionally]
Page 6 of 7
CITY OF FORT COLLINS, COLORADO, a Colorado home rule city
By: ______________________________________ Date:
Darin A. Atteberry, City Manager
ATTEST:
By: ______________________________________
City Clerk
APPROVED AS TO LEGAL FORM:
By: ______________________________________
City Attorney’s Office
Page 7 of 7
NEW BELGIUM BREWING COMPANY, INC., a Colorado Corporation
By: ______________________________________ Date:
ATTEST:
By: ______________________________________