Loading...
HomeMy WebLinkAboutCOUNCIL - AGENDA ITEM - 11/03/2015 - FIRST READING OF ORDINANCE NO. 138, 2015, APPROPRIAgenda Item 16 Item # 16 Page 1 AGENDA ITEM SUMMARY November 3, 2015 City Council STAFF Cory Christensen, Police Deputy Chief John Hutto, Police Chief SUBJECT First Reading of Ordinance No. 138, 2015, Appropriating Prior Year Reserves in the General Fund for the Design of the Police Regional Training Facility. EXECUTIVE SUMMARY The purpose of this item is to seek adoption of the appropriation ordinance to fund the design phase of the Police Regional Training Facility. The request is for $810,000 and authorization for funding for the Fort Collins portion of the design phase. STAFF RECOMMENDATION Staff recommends adoption of the Ordinance on First Reading. BACKGROUND / DISCUSSION The City has experienced considerable growth over the past several years, which is expected to continue. Over the next 20 to 25 years it is expected that the population will grow by about 100,000 more citizens. This anticipated growth will need to be met by continued growth in the core services necessary to meet those citizens’ expectations. This means that Fort Collins Police Services will experience considerable growth in personnel in the next 20 to 25 years to meet those needs and expectations. The highest liability areas for providing police services is in the area of skills used by those officers. Three skill areas require regular, consistent and safe training so that officers respond in a controlled and professional manner. All of the skills areas require specialized facilities for the safe and effective training environment necessary to learn and maintain those skills. Those skill areas are weapons (both lethal and less than lethal), arrest control and defensive tactics, and driving. Fort Collins Police Services has been using the same facility for weapons training since 1990. At the time the facility was purchased there were 105 sworn officers; today that number is almost double at 203 sworn officers. That facility has been outgrown and is in need of repair to provide a safe training environment. An upgrade and repair of the facility will still not meet the current needs of Fort Collins Police Services and will cost tens of thousands of dollars. Due to the current inadequate facilities, Fort Collins Police Services has been traveling long distances in order to train on specific weapons in a safe manner. This leads to thousands of miles traveled, as well as valuable training time spent on travel alone. This has resulted in inefficient use of personnel time, wear and tear on police vehicles and extra cost to the organization. Currently officers are required to drive 40 miles, one way, multiple times per year to safely participate in specific weapons training. Fort Collins Police Services has never had a dedicated resource designed specifically to teach driving skills. Officers once practiced their driving skills at the vacant parking lot of the now demolished, dog racing track. When this resource was no longer available Fort Collins Police Services used the closed Fort Collins Municipal Airport runway. Although the resource was sub-par, driving training was possible at this location. That resource Agenda Item 16 Item # 16 Page 2 is no longer available and the only alternative has been to travel 60 miles (one way) to Adams County to use a dedicated driving track. This facility is in very high demand and scheduling is problematic. It was not possible for Fort Collins Police Services to provide any driving training in 2014 due to the scheduling conflicts. Fort Collins Police Services must plan to meet these needs for now and into the future. Options include Fort Collins building or repairing its own venue for these training needs or entering into a partnership to combine resources to build a facility that will meet those needs. Due to the known deficiencies and inadequate training facilities, Fort Collins Police Services has been actively looking for opportunities to relieve this issue. The Loveland Police Department is also facing critical shortfalls in adequate training facilities for both driving and weapons training. Out of these needs a partnership was developed between the two police agencies to explore a joint training facility that would meet the current and future skills training needs of both agencies. The parties have negotiated an Intergovernmental Agreement for the sharing of costs of preliminary design, design development, construction drawings, and construction administration relating to the construction of a joint regional training facility. The Intergovernmental Agreement will be presented for Council approval along with Second Reading of this proposed appropriation ordinance. A comprehensive needs study was completed and conceptual design developed for a facility that provides adequate and safe training for both Fort Collins Police Services and Loveland Police Department. The estimated capital cost to construct this facility is $18.5 million and it is intended that the capital cost be shared equally between the two cities. Though other law enforcement agencies were approached to join the partnership, all have declined. There is some additional capacity to sell facility use time to other partners in the region. This would assist in partially offsetting the operation and maintenance cost of the facility. Letters of intent for using the facility have been signed by 11 additional regional agencies, representing 1,100 officers. The footprint of the training facility is based solely on the needs of Fort Collins Police Services and Loveland Police Department. The training facility takes into account the planned growth in both communities that will also require growth in officers who are in need of this skills training. A comprehensive, and conservative, business plan has been prepared to show the training space needs, capital and ongoing costs and possible offsetting revenue of this facility. The research and planning stages have been completed with a conceptual design for all aspects of the facility, a comprehensive business plan, letters of intent from 11 area agencies and location of the facility. On January 27, 2015, a work session with City Council was held outlining the business plan and future use of this facility. On February 12, 2015, a joint session of Fort Collins City Council and Loveland City Council was held to further discuss the plans and regional nature of the Regional training Facility. On October 6, 2015 Loveland City Council approved $1.075 million to begin work on construction design. CITY FINANCIAL IMPACTS If approved, $810,000 will be appropriated out of the General Fund Reserves to cover the design costs of the facility. Fort Collins’ additional share of the total capital cost would be $8.5 million and would be financed using municipal bonds. Depending on the loan term, the debt service will cost $622,000 to $967,000 per year. Outside user facility rental is expected to generate revenue of approximately $200,000/year; sustaining O&M is approximately $700,000 per year. Fort Collins and Loveland will split the facility cost based on percentage of officers and is expected to be approximately $340,000/year for Fort Collins. Agenda Item 16 Item # 16 Page 3 PUBLIC OUTREACH Considerable outreach has been accomplished over the last 24 months with stakeholders who would use the RTC for a rental fee. ATTACHMENTS 1. Letter from Larimer County re: participation in Range (PDF) 2. Poudre Fire Authority letter re: participation in Range (PDF) 3. Memo re: New Training Campus Informal Survey of Police Services employees (PDF) 4. Work Session Summary, January 27, 2015 (PDF) 5. Powerpoint presentation (PDF) ATTACHMENT 1  &RU\&KULVWHQVHQ 6XEMHFW ):3ROLFH7UDLQLQJ&HQWHU'ULYLQJ5$QJH From: Tom Demint <tdemint@poudre-fire.org> Date: October 14, 2015 at 10:36:07 PM MDT To: "jhutto@fcgov.com" <jhutto@fcgov.com>, Darin Atteberry <DATTEBERRY@fcgov.com> Cc: SLT <SLT@poudre-fire.org> Subject: Police Training Center Driving RAnge Chief Hutto, The PFA has an interest in the driving course possibilities for the new Police Training Center being discussed. We would be interested to know what additional costs would be entailed to build the driving pad sufficient to hold up to the weight of fire apparatus. The PFA does not have sufficient facilities for all of our driver training needs in our current infrastructure. We would be interested in what the additional costs would be and what the cost would be to the authority or other fire service agencies to participate. I have spoke with the Chiefs of Windsor, Greeley and Loveland about this possibility as well. They have expressed an interest but of course would like to know what the additional costs would be and what would the cost to each fire department be along with other logistical questions. I will revisit that with them when I see them again. Of course, the costs to the PFA would need to be considered, approved and budgeted by the PFA Board of Directors. Let me know if I can answer any questions about the fire service interests in this possibility. Courage Leadership Duty Tom DeMint Fire Chief Poudre Fire Authority Fort Collins, CO tdemint@poudre-fire.org 970-566-7274 ATTACHMENT 2 Fort Collins Police Services Professional Standards Unit 2221 S. Timberline Rd. PO Box 580 Fort Collins, CO 80522-0580 (970) 416-2660 Fax (970) 224-6088 MEMORANDUM To: John Hutto, Chief of Police Thru: Cory Christensen, Assistant Chief of Police From: Dan Murphy, Professional Standards Lieutenant Ref: New Training Campus Agency Informal Survey Date: October 15, 2015 As the Professional Standards Unit supervisor in charge of the Training Unit I thought it would be useful to provide you with some agency wide feedback about the new Training campus. I conducted an informal survey through the major training disciplines of driving, firearms and defensive tactics. The results of those surveys were; x 132 sworn employees surveyed - 132 thought the training campus should be a priority for the agency. The question was “Do you believe the training facility should be a priority for the agency?” The Fraternal Order of Police also has approached me and stated they fully support the new facility as a vital part of our agency’s training needs and maintaining quality service. The FOP is in total support for this much needed facility with Loveland in whatever version is approved by both city councils. Some of the comments: The campus would save drive time and lead to more training time. The current indoor range is not suitable for the training needs of an agency our size. The campus would allow for future growth at the site and the addition of new officers who need to be trained. Let me know if you need anything else, the officers are very eager to see this project start. ATTACHMENT 3 Administrative Division 2221 South Timberline Road PO Box 580 Fort Collins, CO 80522 970.221.6540 970.224.6088 - fax fcgov.com M E M O R A N D U M Date: February 3, 2015 To: Mayor Weitkunat and City Councilmembers Thru: Darin Atteberry, City Manager From: John Hutto, Chief of Police Re: January 27, 2015 Work Session Follow Up At the January 27, 2015 work session, several follow up questions were asked of City Staff. Those questions along with the answers are included in this memorandum. Further information on the ability to maintain the rental revenue while still meeting our capacity needs and an adjustment or modification to the Net Present Value. The current financial model for the RTC assumes approximately 25% of the excess capacity, after both partners training needs have been met, will be rented to other agencies within Northern Colorado and north Denver. As a result, capacity utilization of the track and shoot house is anticipated to be about 40%, utilization of the two ranges about 65%, and utilization of the class rooms of about 80%. Staff anticipates rental income can be maintained over the 20 year life for the following reasons 1. Current capacity assessment has been reduced by 20% leaving a degree of cushion in the current capacity analysis 2. The facility can be operated 7 days per week rather than 5 days per week, increasing capacity by 40% 3. If class rooms become the limiter, some class room activity could be conducted within existing classroom space at the current headquarters of each Police Department Adjust the Net Present Value for the Liberty Arms option. Adjusting for the increase in police staffing over time and the impact that has on the NPV. Additional cost was added to the model based on estimates of staff growth to support current levels of service for an expanding population. However, an error in the prior model was identified that significantly reduced the annual cost of the Liberty Arms estimate. The two adjustments canceled each other out and the NPV and Total Cash numbers did not change. ATTACHMENT 4 2 Include the debt service costs into the overall cost picture for Fort Collins. A budget impact page has been included in the Feb 9 th Council Finance Committee presentation and the Feb 12 th Joint Council meeting presentation that includes the estimated $809K of annual debt service associated with financing $11M at 4% over 20 years. Rental rates should include a methodology that incorporates recovery of capital costs of the facility. The rental rates for the use of the Regional Training Campus (RTC) are currently not finalized. The original concept was to use those fees to recover and off set much if not all of the operation and maintenance costs of the RTC. The current O & M estimate does include a 15% capital replacement amount making sure that the upkeep of the facility is funded. It is possible to increase the rental fees to assist in recovering some of the original capital expended by the two Cities. The critical factor in figuring those fees revolves around how much of the original capital will the two cities try to recover through use fees. Once this variable is decided then the per- segment rental fee can be set. The market for those training areas can drive the rental fees for each of the different training venues. As an example, the driving track is expected to be a very desirable venue to the outside agencies and due to that demand should call for a larger rental fee compared to the classroom use. These fees can be adjusted as the market increases or decreases for the needed use. These rates should be driven by the market for using the venues. Is there a model where a smaller or less expensive facility will meet the needs of Police Services? The question has been asked if the currently proposed training facility can be reduced in size or phased in some way and still meet the training needs of both Fort Collins and Loveland. This question is best answered by first examining how the currently proposed project came to be. For several years the City of Loveland has been planning to build a police training facility in order to address some of their ongoing training needs. Fort Collins recognized that we had training needs going unmet as well as needs on the near-time horizon. A regional partnership to address these mutual needs was formed. In order to determine the size and scope of the project the partners enlisted the aid of a nationally known consulting firm specializing in the development of needs assessments and business planning of public safety training facilities. (http://www.theinteractgroup.com/). The Interact Group spent multiple hours with the training staffs from both Departments. The end result of this process was a basic facility design that would meet the immediate needs of both Fort Collins and Loveland. The proposed facility allows for growth in the future through the utilization of unused capacity in each training day. For now, and the immediate future, this unused capacity can be “sold” to outside users to help 3 cover/recapture facility costs. It should be noted that the ability to sell this unused capacity will diminish over time as Fort Collins and Loveland continue to grow. Reducing the size of the driving track is not recommended. The designed size of the driving track is considered very conservative by the consultant and meets our basic needs for emergency vehicle operation training. Similar facilities are larger. For example the driving track at the Flatrock Training Center in Adams County is a full half mile longer. In evaluating the size of the pistol range a reduction from 25 lanes to 20 lanes does offer cost savings while not greatly reducing the effectiveness and efficiency of our training needs and model. Growth in staffing will have an impact on this in the future, but meets today’s needs. This change reduces the overall cost of the campus by 1.5 million. The business plan/use analysis conducted by the Interact Group has determined that the proposed configuration represents the most efficient design to meet needs. For example, it is imperative that we have two different ranges separated by a hard wall. This is necessary in order to conduct two different types of training at once or to allow for two different Departments to be on the range at the same time Staff is of the opinion that there are components of the proposed design that can be phased to a later date or potentially eliminated altogether. This decision was a combined collaboration with the City of Loveland. These components are; the pistol range lane reduction, the street grid, and the vehicle maintenance building reduced in size for storage only. These reductions represent a total of 4 million dollars. An analysis of the outcomes expected with the building of a Regional Training Campus. The question was raised during the work session about the expected outcomes should the proposed training facility be built. The first point to be made is this; the proposed facility is not intended to fulfill a wish list of training that we would like to do but are currently not doing. In developing the business plan and needs analysis for this project only about 7% of the training fell into the category of “nice to have”. Fifty percent of our required training is being done at a satisfactory level. The remaining forty three percent of Fort Collins Police Service’s training is occurring at a minimum, adapted, or altered level. It is this forty three percent that causes the most concern. Our current range facility was built in 1984 to serve non-police, recreational shooters. It is suitable for only one purpose, to stand in a straight line and target practice using static targets. The training needs for police officers have progressed dramatically away from this type of shooting in the last 20 or so years. The change in police training paradigms has been driven by two factors; world events and case law. Our profession is continually mindful of best practices. Events occur on a regular basis that causes us to reexamine the way we train and deploy officers. For example the sniper incident in 1966 at the University of Texas tower was the catalyst for SWAT teams to be formed nationwide. More recently mass shooter incidents like Waco and Columbine, and Aurora have forever changed the way police departments respond. Two significant Supreme Court cases which guide the current requirements around police training are: City of Canton, Ohio v. Harris, and Monell v. Department of Social Services. In City of Canton, Ohio v. Harris, the Supreme Court made it clear that training police personnel is 4 a critical managerial responsibility. Monell v. Department of Social Services allowed municipalities to be sued for failure to train. Numerous sources have affirmed that the cost of training is considered a bargain when the alternative is neglecting it. The courts use the concept of “deliberate indifference” when showing negligence in failure to train tort cases. Training must be specific and mission oriented. The training given to police officers today must reflective of the duties, environment, and situations they are likely to encounter in the course of their employment. Failure to provide training that meets this standard, when we know we should, constitutes an element of deliberate indifference leaving us exposed civilly. With the venues currently available to us our ability to provide the training at the frequency and fidelity that we know we should is either severely limited or absent altogether. Reducing, eliminating, or not providing the right type of training has measurable negative outcomes. One study points out that within 6-18 months of cutting training lawsuits will begin to be filed under Title 42, U.S. Code, Section 1983, for failure to train (Rutledge, D., 2009, Saving Money Through Training, Policing, 33(5), 68-70.) Closer to home, Fort Collins Police Services began to have issues with providing adequate driving training in 2012 caused by the unavailability of a driving venue. Over the five year period prior to 2012 (2007-2011) Fort Collins Police officers averaged 18.8 traffic crashes per year. In the most recent three years that we have had diminished training (2012, 2013, and 2014) our average has been 24.6 crashes per year. Negative events are a likely outcome when training is eliminated, reduced, or not provided at a sufficient fidelity. 1 Police Regional Training Center October 2015 ATTACHMENT 5 History 2 Overview • Jan 2013 - Loveland Council’s top priority; $18.2M in Loveland capital plan • Jul 2013 - Fort Collins joins as 50-50 partner • Sept 2015 - Larimer County declined inclusion as 3rd Capital Partner • Sept 2015 - Loveland City Council appropriated ~$800k to begin design Capital project scope adjustments since 2013 • Original partnership project model included two pistol ranges – $28M • Reduced to one pistol range with track, SWAT, street grid, etc. – $24M • Reduced pistol range; removed street grid, SWAT, classrooms & offices – $17.4M • Classrooms & office added back in; ranges, track, skid pad remain – $18.5M Larimer County Involvement 3 • Fort Collins City Council requested Staff to explore additional partners • August 2015 – County Commissioners discussion • Proposal included: 1/3 Capital Share, 1/3 Lease Share, O&M share based on officer count • September 2015 • Larimer County decided to not join the partnership as other financial matters took priority and Sheriff said this was not high priority Link to Strategic Objectives 4 Within 2014 City Strategic Plan, Training Facility directly ties to 1 strategic objective and relates to 3 others: • SAFE 5.1 - Provide facilities and training capabilities to support a high caliber police force. • SAFE 5.8 - Improve community involvement, education and regional partnerships to make our community safer and stronger. • HPG 7.9 - Improve productivity, efficiency, effectiveness, customer service and citizen satisfaction in all areas of the municipal organization • HPG 7.10 - Implement leading-edge and innovative practices that drive performance excellence and quality improvements across all Service Areas. During current 2015 Strategic Risk Assessment Process, Police identified 2 high priority risks related to Training Need for Police Training Equipment & Facilities: • Building – Excellent • Equipment – Excellent • Training – Barely adequate (More difficult as staff increases) Training is Critical: • Provide World Class Service to our Citizens • Maintain professional level of Police Officers • Training best practices for police profession – Response to current climate • Reduces liability issues – Failure to Train • Increases safety to citizens and officers • Required by POST 5 Current Training Facilities Police Services Building - Good • Classroom • Defensive Tactics – Mat Room Police Indoor Range - Poor • Pistol use only • Limited space • Requires repair • Limited training opportunities Great Guns in Nunn - Poor • Privately Owned – demonstrated by our move to this facility • 25 mile drive one way Driving Training - Poor • Adams County, very limited availability, 60 mile drive • Unable to schedule usable track time in 2015 SWAT - Poor • Trains at various facilities. Castle Rock, Cheyenne, Pawnee 6 Facility Capacity 7 Total Segment Assumptions • 3 segments/day • 5 days/week • 48 weeks/year • 80% efficiency Right Size • Opening at >50% capacity utilization • Officer Count forecast to increase 450 by 2030; 70% utilization • Majority of excess capacity due to track Total Segments 2017 2018 2019 2020 2021 Track/Skid Pad 288 1,152 1,152 1,152 1,152 Ranges (2) ‐ 1,152 1,152 1,152 1,152 Classroom (3) ‐ 1,728 1,728 1,728 1,728 Total Segments 288 4,032 4,032 4,032 4,032 Segments Consumed by FC/Loveland Track/Skid Pad 30 122 125 129 132 Ranges (2) ‐ 654 670 689 707 Classroom (3) ‐ 1,383 1,418 1,457 1,496 Total Segments 30 2,159 2,213 2,274 2,335 Percentage of Segments Used Track/Skid Pad 10% 11% 11% 11% 11% Ranges (2) ‐ 57% 58% 60% 61% Classroom (3) ‐ 80% 82% 84% 87% Total Segments 10% 54% 55% 56% 58% Partnership Assumptions • Facility is jointly owned and operated and build costs split evenly • Facility includes • One 20 lane pistol range (50 yards) and one 10 lane rifle range (100 yards) • 3 classrooms and limited administrative space • .95 miles of high speed driving track & skid pad • Capital Cost - $18.5M • Design & Construction Support - $1.6M • Construction - $16.9M • O&M Costs of approximately $680k year • 3.25 FTEs - $300k • Utilities, supplies, range & track maintenance - $280k • Capital reserve & reinvestment - $100K 8 Aerial looking NW at Range Building 9 Aerial looking NW at Campus 10 Current Proposal Timeline 11 Proposed Timeline III IV I II III IV I II III IV I II III IV Design & Architecture Site Work Construction Track Construction Range & Classroom Construction 2015 2016 2017 2018 Capital Costs – Current Proposal 12 50% Share Fort Collins $ 9,259 Loveland 9,259 Total $ 18,519 Anticipated Capital Need ($K) Financing 13 Original Reduced Current • Total Capital $23.4M $20.4M $18.5M • Anticipated Borrowing - $11M $9M $8.5M • Debt Service - 20 years @ 4% $809k $662k $622k • Debt Service - 10 years @ 2.5% $1,257k $1,028k $967k • Anticipated Structure: • Certificate of Participation • Require pledge of another City Asset • Considerations: • Training facility not considered an essential service • Facility on leased land • Facility co-owned by two partners • Complicated deal, but doable Capital Cost Detail 14 Proposed Cost Detail Feb 12th Feb 12th May 26th July 20th ($ 000's) Original Reduced RTC Revised Current Design & Architecture $ 1,460 $ 1,326 $ 1,195 $ 1,261 Bid & Construction Support 416 377 340 359 Firing Ranges & Support 9,549 7,290 7,290 7,290 Classrooms & Admin & Bldg Support 4,372 1,751 866 1,331 Grossing Factor incl above 2,432 2,187 2,316 Inflation 1,122 1,084 918 1,001 Contingency incl above 1,100 1,050 1,051 Total Range Building $ 16,919 $ 15,360 $ 13,846 $ 14,609 Total Sim/SWAT House 997 $ 931 $ ‐ $ ‐ Driving Track & Skid Pad 1,925 1,411 1,411 1,411 Outbuilding 727 422 72 72 Track Contingency 396 211 211 211 Total Track & Skid Pad $ 3,048 $ 2,044 $ 1,694 $ 1,694 Site Improvements 2,154 1,779 1,653 1,927 Site Contingency 321 265 247 289 Total Site Improvements $ 2,475 $ 2,044 $ 1,900 $ 2,216 Total Project Cost $ 23,439 $ 20,379 $ 17,440 $ 18,519 RTC Net Income – Current Proposal 15 • Revenue estimate lower • Props removed from initial model • Conservative estimate based on user group interest (not all available segments) • Worst case based on $0 Revenue • Land rental cost of $175k/year and potential sale of current range for $500k not included above Training Facility Operating Costs ($ 000's) 2016 2017 2018 2019 2020 2021 Revenue Class Charge to Outside User $ ‐ $ ‐ $ 110 $ 114 $ 117 $ 121 Rental Revenue ‐ ‐ 85 88 92 95 Total Revenue $ ‐ $ ‐ $ 195 $ 202 $ 209 $ 216 Expenses Design 810 ‐ ‐ ‐ ‐ Personnel ‐ 115 302 311 321 330 Operations, Supplies, Maint ‐ 48 312 321 331 341 Capital Reserve ‐ 18 64 66 68 70 Total Expense $ 810 $ 181 $ 678 $ 698 $ 719 $ 741 Training Facility Income/(Loss) $ (810) $ (181) $ (483) $ (497) $ (511) $ (525) Worst Case Income/(Loss) ‐ Based on 0 Revenue $ (810) $ (181) $ (678) $ (698) $ (719) $ (741) Market Rental Data 16 Adams County • 2014 - $150 per 4 hour segment • 2015 - $200 per 4 hour segment Highlands Ranch Training facility • Range $350 plus $10 per shooter (Full Day) • Range $225 plus $10 per shooter (Half Day) • Classrooms range from $140 to $300 (6 classrooms) Fort Collins Loveland Facility • Planned Rental Rate of $350 per 5 hour segment for Range/Track, $175 per segment for Classrooms • Fully Loaded Rental Rate with Capital (per 5 hour segment) • Range – $921 • Track – $206 • Classrooms - $107 Budget Impact Fort Collins – Current Proposal 17 Training Facility Budget Impact ($ 000's) 2016 2017 2018 2019 2020 2021 Design $ (810) FC Share of Loss based on % of Officers (121) (325) (335) (345) (356) FC Savings ‐ ‐ 168 173 178 183 Total Fort Collins $ (810) $ (121) $ (157) $ (162) $ (167) $ (173) Fort Collins Financing Cost ‐ @ 4% 20 yrs (622) (622) (622) (622) (622) (622) Fort Collins Financing Cost ‐ @ 2.5% 10 yrs (967) (967) (967) (967) (967) (967) Budget Impact ‐ FC‐ 20 yr $ (1,432) $ (743) $ (780) $ (785) $ (790) $ (796) Budget Impact ‐ FC ‐ 10 yr $ (1,777) $ (1,087) $ (1,124) $ (1,129) $ (1,134) $ (1,140) • FC Savings primarily driven by vehicle expense (to/from Adams county) and closure of current indoor range Staff Recommendation 18 • Ties to strategic plan • We have a need • We have a partner • Going alone means future costs will be more than double present cost (no partner, inflation, potential loss of land for facility) Back-Up 19 Fort Collins Police Staffing – 1990 to 2030 • 2013 Citizen Survey shows overall satisfaction with current level of service • 1990 staffing was 105 officers, 2015 Sworn staffing is 203 officers • By 2030 population of Fort Collins could increase to over 240,000 • Assuming a 2.37% growth rate • By 2030 Sworn staffing at current service delivery should be 315 officers • Assuming population of 240,000 citizens 105 126 145 163 172 203 240 277 315 1990 1995 2000 2005 2010 2015 2020 2025 2030 Sworn Police Officers 20 Police Training Requirements • Currently conducting 86K hours of training per year for all skill types • Different types of training require different facilities • As staffing grows, it will be increasingly difficult to adequately meet training requirements 21 Categories of Training • 50% of training completed to satisfaction – Category 2 • 43% of training completed at minimal level – Category 1 • Rented Facilities and usage of current inadequate facilities • Make do with less than ideal facilities • Reduced training time for officers • 7% additional skills training desired including; • decision making scenarios infused into the current training 22 Training Facilities Options Refurbish existing Pistol Range • Creates functioning inadequate facility • Does not address Rifle, SWAT or Track needs • Long Term – FC training facilities would need to be built Refurbish existing Pistol Range & Build Drive Track • Long Term – Firearms and SWAT needs to be addressed • Capital for Track (pursuit & skid only) estimated $3 - 3.5M • Land not included - Where do we build it? Private partnerships • Limited availability for training • Costs too high when compared to other options • Capital for track of $3 - 3.5M excluding land Partner with Loveland and others – Build Training Center • Develops a Northern Colorado training center meets all needs • Includes capacity to support future staffing levels 25 years out • Continue to seek other capital partners 23 Why partner with Others Shared capital cost Shared operating cost Other regional opportunities Meet current needs faster 24 Proposed Plan Diagram 25 Outside Rental Assumptions 26 2016 2017 2018 2019 2020 2021 Driving Pursuit Speed Track $ 350 $ 361 $ 371 $ 382 $ 394 $ 406 Driving Skid Pad 350 361 371 382 394 406 Pistol Range 350 361 371 382 394 406 Rifle Range 350 361 371 382 394 406 Classroom 225 232 239 246 253 261 Weighted average $ ‐ $ ‐ $ 358 $ 369 $ 380 $ 392 Driving Pursuit Speed Track 0050515152 Driving Skid Pad 0059606061 Pistol Range 0052535354 Rifle Range 0052535354 Classroom 0023232324 Total Segment Excess/Deficit 0 0 236 238 241 243 Driving Pursuit Speed Track $ ‐ $ ‐ $ 18,566 $ 19,314 $ 20,092 $ 20,902 Driving Skid Pad ‐ ‐ 21,908 22,790 23,709 24,664 Pistol Range ‐ ‐ 19,308 20,087 20,896 21,738 Rifle Range ‐ ‐ 19,308 20,087 20,896 21,738 Classroom ‐ ‐ 5,490 5,711 5,942 6,181 Total Segment Excess/Deficit $ ‐ $ ‐ $ 84,580 $ 87,989 $ 91,535 $ 95,224 Revenue Rent Rate (3% inflation growth/year) Segments Rented (est. 1% growth annually) Training Facility O&M Costs - Current 27 O&M Expenditures Year 1Year 2Year 3Year 4Year 5 Personnel ‐ 3.25 FTEs $ 115 $ 302 $ 311 $ 321 $ 330 Utilities 40 91 94 97 100 Office/Audio/Tele/Supplies 8 16 16 17 17 Range Maint & Consumables 128 132 136 140 Track Maint & Consumables 76 79 81 83 Capital Reserve 18 64 66 68 70 Total Facility O&M $ 181 $ 678 $ 698 $ 719 $ 741 Fort Collins Savings 28 FC Savings 2016 2017 2018 2019 2020 2021 Track Fort Collins Rental Space $ 6 $ 6 $ 7 $ 7 Fort Collins Vehicle / Travel Expense 73 75 77 80 Track Total $ 79 $ 82 $ 84 $ 87 Firing Range Hourly Range Manager $ ‐ $ ‐ $ 27 $ 28 $ 28 $ 29 Lease to Shoot @ Great Guns ‐ ‐ 28 28 29 30 Air Filter Cleaning Service ‐ ‐ 13 13 14 14 Electricity ‐ ‐ 3 3 3 3 Natural Gas ‐ ‐ 4 4 4 4 Sewer ‐ ‐ 0 0 0 0 Storm Water ‐ ‐ 2 2 2 2 Water ‐ ‐ 0 0 0 0 BRM ‐ ‐ 8 8 8 8 Custodial ‐ ‐ 3 3 3 3 HVAC/Sys/Energy Mgmt ‐ ‐ 2 2 2 2 Firing Range Total $ ‐ $ ‐ $ 88 $ 91 $ 94 $ 96 Total FC Savings $ 168 $ 173 $ 178 $ 183 Feb 9th Council Worksession Material 29 Training Capacity Utilized 30 Training Prop Segments Capacity Segments Used Segments Rented % Used Driving Pursuit Speed Track 576 67 111 31% Driving Street Grid 576 139 109 43% Driving Skid Pad 576 49 132 31% K9 Training 576 60 10% Scenario Village 576 245 43% Pistol Range 576 315 67 66% Rifle Range 576 306 66 65% Sims / Shoot House 576 106 118 39% Obstacle Course 576 65 11% Mat Training Room 576 335 60 69% Class Room 1728 1314 104 82% • Training facility size driven by: • Optimal training class size – instructor to student • Optimal training scheduling impact on Police Services • 20 year growth projections of Police Services - 1 - ORDINANCE NO. 138, 2015 OF THE COUNCIL OF THE CITY OF FORT COLLINS APPROPRIATING PRIOR YEAR RESERVES IN THE GENERAL FUND FOR THE DESIGN OF THE POLICE REGIONAL TRAINING FACILITY WHEREAS, the City has been experiencing and will continue to experience a considerable increase in its population, which means that Fort Collins Police Services will need to increase their personnel accordingly in the next 20 to 25 years to continue successfully serving the citizens of this community; and WHEREAS, with an increasing population, it is imperative that police officers regularly participate in weapons, arrest control/defensive tactics and driving training to learn and maintain high skill levels in the areas that have been identified as posing the greatest risk of liability; and WHEREAS, such training should take place in a safe and effective environment, which requires specialized training facilities; and WHEREAS, Fort Collins Police Services purchased a training facility in approximately 1990, and it is still currently being used by officers for some of their training purposes; and WHEREAS, since 1990, the number of sworn officers has almost doubled, and as a result, the training facility is inadequate; and WHEREAS, the training facility needs significant repair that is cost prohibitive, and the facility does not provide a safe environment for weapons or driving training, forcing officers to drive long distances to attend appropriate training; and WHEREAS, the Loveland Police Department is also facing critical shortfalls in adequate training facilities for both driving and weapons training; and WHEREAS, Fort Collins Police Services and the Loveland Police Department have joined together to investigate the feasibility of a joint training facility that would meet the current and future training needs of both agencies; and WHEREAS, over the past year, both agencies have been working together to develop an Intergovernmental Agreement for the sharing of costs of preliminary design, design development, construction drawings, and construction administration relating to the construction of a joint regional training facility; and WHEREAS, the Intergovernmental Agreement will be presented to Council for consideration and approval upon the second reading of this appropriation ordinance; and WHEREAS, a comprehensive study and conceptual design was completed to develop a proposed facility that would provide adequate and safe training for both Fort Collins Police Services and the Loveland Police Department; and - 2 - WHEREAS, the estimated capital cost to construct such a facility is $18.5 million to be shared equally between Fort Collins and Loveland; and WHEREAS, on October 6, 2015, the Loveland City Council approved $1.075 million to begin work on construction design; and WHEREAS, staff is seeking Council’s approval of $810,000 to be appropriated out of the General Fund Reserves to cover the design costs of the facility; and WHEREAS, Article V, Section 9 of the City Charter permits the City Council to appropriate by ordinance at any time during the fiscal year such funds for expenditure as may be available from reserves accumulated in prior years, notwithstanding that such reserves were not previously appropriated. NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF FORT COLLINS that there is hereby appropriated for expenditure from prior year reserves in the General Fund the total sum of EIGHT HUNDRED TEN THOUSAND DOLLARS ($810,000) for the design cost for the Regional Training Facility. Introduced, considered favorably on first reading, and ordered published this 3rd day of November, A.D. 2015, and to be presented for final passage on the 17th day of November, A.D. 2015. _________________________________ Mayor ATTEST: _____________________________ City Clerk Passed and adopted on final reading on the 17th day of November, A.D. 2015. _________________________________ Mayor ATTEST: _____________________________ City Clerk