Item # 5 Page 1
AGENDA ITEM SUMMARY April 21, 2015
City Council
STAFF
Chris Martinez, Budget Analyst
Mike Beckstead, Chief Financial Officer
Lawrence Pollack, Budget & Performance Measurement Manager
SUBJECT
First Reading of Ordinance No. 044, 2015, Reappropriating Funds Previously Appropriated in 2014 But Not
Expended and Not Encumbered in 2014.
EXECUTIVE SUMMARY
The purpose of this item is to reappropriate 2014 appropriations approved by City Council that lapsed at the
end of 2014. The authorized expenditures were not spent and could not be encumbered in 2014 because:
there was not sufficient time to complete bidding in 2014 and therefore, there was no known vendor or
binding contract as required to expend or encumber the monies
the project for which the dollars were originally appropriated by Council could not be completed during
2014 and reappropriation of those dollars is necessary for completion of the project in 2015
to carry on programs, services, and facility improvements in 2015 with unspent dollars previously
appropriated in 2014
In the above circumstances, the unexpended and/or unencumbered monies lapsed into individual fund
balances at the end of 2014 and reflect no change in Council policies.
Monies reappropriated for each City fund by this Ordinance are as follows:
General Fund $ 1,197,690
Golf Fund 40,000
Keep Fort Collins Great Fund 771,519
Light & Power Fund 18,000
Transportation Fund 28,000
$ 2,055,209
STAFF RECOMMENDATION
Staff recommends adoption of the Ordinance on First Reading.
BACKGROUND / DISCUSSION
GENERAL FUND
City Attorney Office
1. Attorney Search Services - $55,000
The City Attorney’s Office requests this reappropriation to cover fees and costs associated with search-related
expenses and outside recruitment services for multiple attorney positions. It is anticipated that two search
Agenda Item 5
Item # 5 Page 2
processes will be needed, although it is possible that further search and recruitment efforts would be
necessary to fill all three of the positions. Efforts to competitively procure attorney recruitment and search
services were initiated in fall 2014. However, the vendor pool contacted regarding the initial Request for
Proposals was not appropriately targeted and the process was restarted with additional potential vendor
outreach in order to ensure that adequate efforts had been made to reach suitable vendor proposers.
City Manager Office
2. Downtown Development Authority Ramps Project - $868
The City and the Downtown Development Authority (DDA) have been asked by a number of Fort Collins
residents to help find a solution to afford disabled access to businesses in the Old Town Historic District.
Business owners will voluntarily pay $75 for a ramp, remote doorbell and accessibility sticker. In a
collaborative effort, the City and DDA will split the remaining costs and delivery fee. A field survey of
thresholds in historic buildings indicated 20 qualified locations - four purchased ramps in 2014. Since limited
requests for ramp installations were made in 2014 we expect the project to continue with more outreach and
interest in 2015.
3. Performance Excellence Consulting - $12,438
The Performance Excellence Consulting funds will be used in Q1 and Q2- 2015 for PDCA (Plan, Do, Check,
Act) Process Improvement training for City staff. The City will use outside consulting to deliver course work and
to assist in a complex process. Intentions are to finish the work in 2015.
Community Development & Neighborhood Services
4. Historic Preservation - $7,642
These funds are used for mailings, printing and similar outreach services in support of Historic Preservation
programs, and will be used to fulfill grant-related requirements to provide a historic context, architectural
survey, and survey report to each owner of property in the 15-block Loomis Addition. Nearing completion, the
grant requires that a copy of this context be provided to each property owner. A copy of each survey form and
the accompanying survey report must also be provided to each property owner. These funds will cover the
costs of producing and disseminating these documents.
5. Nature in the City - $34,964
Nature in the City was approved as a 2-year project, initiated in 2014 and expected to run through 2015.
Throughout 2014, extensive public outreach and visioning processes were employed to develop the project’s
strategic plan, which will be completed in 2015. In addition to the completion of the Strategic Plan, the
remaining funds will be used to complete additional project deliverables, such as the Nature in the City design
guidelines, connectivity analyses for people and wildlife, and associated Land Use Code changes and other
demonstration projects, e.g., the living wall.
Communications and Public Involvement Office
6. Comcast Negotiations - $44,249
These funds are for continued cable franchise consultation and legal fees during negotiations between the City
and Comcast. Consultants with expertise on telecommunications law and franchise negotiation were hired in
July of 2013. Their work and related legal work continues until the new franchise agreement is in place. The
current agreement has been extended until June, 16, 2015 as work and related legal work continues until the
new franchise agreement is in place. The negotiations are going well and, barring unforeseen complications, a
new agreement is anticipated to be finalized prior to that date.
Economic Health
7. Foothills Metropolitan District - $13,750
Any entity wishing to form a Metropolitan District in the City of Fort Collins must submit a $13,750.00 deposit at
the time the City considers the associated service plan. This deposit is intended to offset the legal costs
incurred by the City during the formation process. Alberta Development submitted these funds, per the 2008
Agenda Item 5
Item # 5 Page 3
adopted policy regarding Metro District formation, in 2012. No payments were required in 2014 and funding
requested to be carried forward are intended for any payments due in 2015. These funds have been retained
until after bond issuance by the metro district. Bonds were issued in late 2014. It is anticipated that these funds
will now be returned to the applicant in 2015.
Environmental Services
8. Clean Air Quality Programs - $13,374
The reappropriated funds will be used to provide continued support of the air quality programs including:
working with state agencies to attain the ozone health standard and protect air quality, increasing outreach and
education on ozone issues to empower citizens to reduce ozone precursor emissions, addressing impacts to
air quality from fugitive dust, enhancing the zero-interest loan program to encourage citizens to change out old
wood stoves & install radon mitigation systems. This work will be accomplished using additional resources
including backfilling the vacated 0.5FTE position, funding an hourly program assistant or intern, purchasing
safety equipment and air monitoring equipment. Funds were not fully expended for developing air quality
programs due to the unanticipated amount of staff work on asphalt and oil and gas issues in 2014.
9. Database Consulting - $5,510
This request is for the second half of payment for development of a database to store and manage Community
Diversion Rate data. ITX Project is still moving forward. Purchase Order in place needs to be renewed for
completion in 2015.
10. FortZED Engagement and Administration - $28,576
The remaining 2014 funds will be used to support the FortZED community engagement project, Lose-a-Watt
Energy Prize (aka Georgetown University Energy Prize competition). This two year project will engage the Fort
Collins community to help reduce energy use through energy efficiency as part of a national competition for a
$5M prize purse. This project is well aligned as a strategy to assist the community meet goals set forth by the
Climate Action Plan and the Energy Policy. This project did not fully develop until mid-December 2014; hence
it was not funded as part of the budgeting process.
The 2014 funds lapsed due to the unsuccessful agreement of a scope of work with a third party. These
negotiations occurred at the end of the budget cycle and resulted in the project and funds lapsing. The funds
are intended to be used for a technology platform to provide a data and benchmarking information as part of
the re-developed FortZED website.
11. Innovation Fund Program - $45,866
The Municipal Innovation Fund creates a source of funding to develop efficient, innovative improvements to the
City’s physical plant and operational procedures. These improvements focus on reducing costs, reducing
energy and water use, and reducing the City’s environmental and carbon footprint. Projects will be evaluated
by an interdepartmental team using a triple bottom line approach; however, projects that optimize the three
areas will be given priority. Some projects funded in 2013/2014 are pending final invoices/payments but have
been committed in full. Final requests for payment for these approved projects are expected in 2015.
Human Resources
12. Compensation and Career Path Implementation - $30,000
In 2014, the City embarked on an assessment of the current state of Pay-for-Performance, Compensation, and
Career Progression. The Study identified a number of opportunities for improving key strategies and processes
related to Compensation, Performance Management, and Career Progression. The funds requested will be
used for consulting fees associated with the Implementation phase of this Project. Due to the vacancy of the
Compensation Manager position, the Implementation phase of the project was delayed.
Municipal Court
13. Court-Appointed Defense Counsel - $9,000
In 2014, the budgeted amount for court-appointed defense counsel expenses exceeded the original amount
authorized due to changes in the state law which resulted in increased appointments. The Municipal Court
Agenda Item 5
Item # 5 Page 4
Judge ordered court-appointed attorneys assigned to represent several different defendants whose cases
began in 2014 and have yet to be concluded or were concluded in 2015. The fee paid for such representation
is billed at the rate of $75.00/hour up to a maximum of $1,675.00 if the case does not go to trial or $2,480.00 if
the case goes to trial.
Due to the complexity of circumstances related to the defense cases involved with these appointments, and
the fact that dispositions have not yet been reached or were reached in late December of 2014, the defense
attorneys have either not yet presented the Court with bills or presented the Court with bills that were paid
using 2015 funds instead of 2014 funds.
14. Court Security Officer - $4,815
In April 2014, City Council approved funding for a new Court Security Officer position for the Municipal Court.
Due to the lengthy hiring process required for hiring a limited commission officer, the Court was unable to finish
the hiring process until mid-December of 2014. Personnel and equipment costs were anticipated being used
by the Court in 2014. The Court has not been billed for all of the equipment or costs associated with the hiring
of this officer to date, but anticipate receiving these bills in early 2015.
Natural Areas
15. Northern Integrated Supply Project (NISP) - $85,045
The purpose of these funds is to support the City’s analysis of the Supplemental Draft Environmental Impact
Statement (SDEIS) for the Northern Integrated Supply Project (NISP). Publication of the SDEIS has been
repeatedly delayed by the Army Corps. Staff expects the publication of the SDEIS to be in June or July of
2015.
Operation Services
16. Relocation of the Historic Butterfly Building - $250,000
At present, the Creamery Laboratory building is located on the site for the new Utilities Administration Building.
It will need to be moved and special requirements of the Landmark Preservation Commission (LPC) will need
to be fulfilled. Moving costs and the associated cost to re-purpose this building were not included in the new
Utility Building project budget. These costs are to be funded from Operation Services major maintenance
budget. The Landmark Preservation Commission has made substantial requests for the relocated Creamery
Laboratory building that needs to be completed with the new construction and have it ready to be occupied
along with the new Utilities Administration building.
This process began in mid-2014; however, the complexity of designing the new administration building to
compliment the laboratory building delayed the project. Approval from the LPC to relocate the building was
received on February 11, 2015 and this gives the City a better understanding of the overall costs involved in
the relocation effort.
Parks
17. Median Renovation - $13,423
Median renovation funds are one-time funding for major renovations of medians beyond the amount the Parks
Division receives on an on-going basis for small median renovations. These funds are the remaining budget
for median renovations in 2014. These funds will be added to the 2015 budget for the design work on the East
Horsetooth/South Lemay median renovation project.
18. Lifecycle Funding - $89,610
Lifecycle funds are used for replacement of park infrastructure, and renovating and re-mulching medians.
These specific median lifecycle funds were not spent as anticipated in 2014 due to the high volume of
construction activity in the area making it difficult to obtain bids, contractors and traffic control permits.
Agenda Item 5
Item # 5 Page 5
Social Sustainability
19. Human Services Program - $4,496
The Human Services Program is requesting a total of $4,496 in reappropriation funding of which $1,722 is to
be allocated to the non-profit agency, Education & Life Training Center (ELTC). The agency was awarded
these funds through a competitive process and the agency was unable to spend all funds by close of 2014.
The remaining $2,774 is for printing and the reception to introduce the “Human Service Partners: A Community
Snapshot” report. Due to unforeseen delays in CPIO, the final report was not completed until January 2015.
20. Affordable Housing Fund - $449,064
The Affordable Housing Funds are allocated annually to support critical affordable housing needs in the City of
Fort Collins. They were awarded in the fall cycle of the Competitive Process to housing service providers to
further the goals identified in the City’s Affordable Housing Strategic Plan. The second reading of the
ordinance approving the allocation of the funds occurred on December 10, 2014. Any un-allocated funds are
intended to accumulate in the fund to meet future affordable housing needs.
Although the funds were committed, it wasn’t possible to negotiate and complete project contracts prior to the
year end, which meant that purchase orders could not be established. Some funds are allocated as match
funding for projects receiving federal HOME/Community Development Block Grant (CDBG) dollars. These
projects cannot be contracted until all federal requirements have been met. The Home Buyer Assistance
program is a City managed program to which funds are not contracted or encumbered but wired to closing as
individual loans are approved.
GOLF FUND
21. Golf Driving Range Supplies - $40,000
This request will fund the purchase of range balls at the three City-owned golf courses. These funds were not
expended in 2014 due to delays in finding sponsorships for the range balls. Logos of sponsors are stamped
onto the balls as part of the sponsorship agreements. As of December 2014 sponsorships had not been
finalized.
KEEP FORT COLLINS GREAT FUND
Community Development & Neighborhood Services
22. Design Assistance Program - $1,224
The Design Assistance Program (DAP) was established by Council to address compatibility issues in the
Eastside and Westside Neighborhoods. By incentivizing the use of pre-qualified professionals with success in
context-sensitive historic design, the DAP helps to enhance the compatibility of size, massing, and character of
new construction within the historic core neighborhoods, lessening neighborhood concerns. DAP funds are
limited to $2,000 per project and, in 2014, requests were insufficient to fully utilize the total amount budgeted.
However, with the steady increase in requests being received (5 to date in 2015); it appears that the budgeted
amount will soon be depleted. This reappropriation would supplement the amount available and provide
additional assistance, helping to promote Council’s objective.
23. Historic Preservation Grants - $12,401
These funds are used for mailings, printing and similar outreach services in support of Historic Preservation
programs, and will be used to fulfill grant-related requirements to provide a historic context, architectural
survey, and survey report to each owner of property in the 15-block Loomis Addition. Nearing completion, the
grant requires that a copy of this context be provided to each property owner. A copy of each survey form and
the accompanying survey report must also be provided to each property owner. These funds will cover the
costs of producing and disseminating these documents.
24. Landmark Rehabilitation Program - $14,432
This program provides promised funds for owners who have been given landmark rehabilitation loan awards,
but have not yet completed their work, as well as to fund additional loan awards. Recipients of Landmark
Agenda Item 5
Item # 5 Page 6
Rehabilitation Loans have two years in which to complete the work and request reimbursement. In 2014,
$18,000 in fund requests were received, resulting in the program having unanticipated extra funds. In 2015,
the Commission has received requests for $35,626 in loan funds matched by $78,500 of owner funds, which
will result in $114,000 worth of new sustainable rehabilitation work on older housing stock. One-third of these
requests cannot be funded in 2015 without this reappropriation.
25. Oil and Gas - $46,379
Staff spent the majority of 2013 and 2014 developing policy on the Oil and Gas issue, securing an operator
agreement, legal activities, and conducting interim air quality monitoring. A contract was signed at the end of
2014 with Geosyntec to conduct the groundwater quality monitoring, but the funds were not able to be
encumbered. In addition, the funds will be used for follow up on the baseline inspections conducted at the
existing operations within City limits and to further investigate results, as needed, from the baseline air quality
monitoring in 2014 and groundwater sampling data to be collected.
26. Old Town Neighborhoods Plan - $9,032
This request will utilize the remaining funds from the Lincoln Corridor Plan and to support the Old Town
Neighborhoods Plan. The remaining funds for the Lincoln Corridor Plan were identified for the final phase of
public outreach. This balance will be used for the same purpose in supporting the Old Town Neighborhoods
Plan public outreach process. During this past year, an exhaustive public process led to a Preliminary street
design for the Lincoln Corridor. The public process was extended for several months to provide additional
information in preparation for the final Council hearing in May 2014.
27. West Central Area Plan - $2,260
The West Central Area Plan update process began in January 2014 and was intended to be completed within
a 15-month schedule. Significant work was completed on the plan in 2014, which included extensive public
outreach, consultant services, staff planning tasks, and production costs. Staff is requesting reappropriation of
the remaining funding to complete the project within the first quarter of 2015, in accordance with the original
budget and schedule.
Communications and Public Involvement Office
28. Public Engagement - $22,184
Funding supports implementation of key objectives of the City’s Public Engagement Strategic Plan: to better
equip City staff to successfully manage public engagement projects, foster an engaged citizenry, and ensure
accountability through improved reporting. Funding allocated to support socio-demographic research and
implementation of staff public engagement training was not fully expended due to unanticipated medical leave
of Civic Engagement Specialist in Q4 2014 and Q1 2015. Work is resuming through the City’s Public
Engagement Team and with Civic Engagement Liaison support during remainder of 2015.
Cultural Services/Museum
29. Museum of Discovery Display Cases - $19,250
KFCG funds were designated for the Museum to purchase and install additional museum casework to be
added to the galleries to enhance the visitor experience. Staff focus in 2014 was on the design and installation
of the “FC150 A Sesquicentennial Celebration” exhibit. The KFCG funded cases were designed and bid out in
the third quarter of 2014, but the contract was not signed until the fourth quarter of 2014 with delivery of the
cases scheduled for early 2015.
Environmental Services
30. Road to Zero Waste - $41,107
Part of these funds will be used to pay for development and construction of a trash and recycling enclosure in
Montezuma Fuller Alley at the Oak Street parking lot. It will allow businesses in the area to abide by the
cardboard ordinance, which they currently cannot do due to lack of space for a recycling bin. The project will
also beautify this high-visibility area. Additional projects will also be implemented based on recommendations
Agenda Item 5
Item # 5 Page 7
from the Road to Zero Waste plan. The projects were delayed due to many factors, but are moving forward
now and are expected to be completed in 2015.
Natural Areas
31. Ecosystem Response Model - $56,196
The purpose of these funds is to develop the Poudre River Ecosystem Response Model and to further utilize
the model to help analyze the Northern Integrated Supply Project’s Supplemental Draft Environmental Impact
Statement (SDEIS). Publication of the SDEIS was delayed, but staff expects it to be published in June or July
of 2015.
32. Poudre River Ecological Restoration and Rehabilitation - $256,998
These funds were appropriated for stream restoration and rehabilitation and supported extensive restoration of
the Poudre River channel and bank at several locations, including Sterling Natural Area and McMurry Natural
Area. These KFCG funds were matched by Natural Area’s baseline restoration funds and external funds raised
by our non-profit partner, the Colorado Water Trust.
A combination of efficiencies that kept the project under budget and additional funds brought to the table by
The Colorado Water Trust who partnered with us on the Ames diversion removal represents the savings and
carryover. These funds from 2014 will be used for additional Poudre River restoration as part of the Kingfisher
Point/Poudre River Ecological Restoration project underway in 2015 and 2016.
Parking Services
33. Neighborhood Permit Parking Program - $7,176
This program was created in order to provide close and convenient on-street parking for residents by reducing
the volume and impact of non-resident vehicles parking in the neighborhoods. A purchase order had been
issued for signage for the neighborhoods but was closed at the end of the year. Signage is still being added or
amended in the neighborhoods and this requests the balance of unencumbered funds to be used for signage
needed in the neighborhoods.
34. Parking Garage Major Maintenance/Handicap Parking Spaces - $44,999
These funds provide critically needed maintenance and repairs for the Old Town Parking Structure and for the
installation/upgrades of handicap accessible parking spaces in the downtown area. Although work was
planned for the Old Town Parking Structure in 2014, funds could not be encumbered prior to year-end. In
addition, some funds had been encumbered for the installation/upgrades of handicap parking spaces,
however, the concrete company was sold and the Purchase Order was closed prior to year-end. A new
Purchase Order will be issued for this work in 2015 once the funds are reappropriated for work to be
completed in 2015.
Parks
35. Lifecycle Funding - $217,881
Lifecycle funds are used for replacement of park infrastructure, and renovating and re-mulching medians.
Funding of $217,881 will be used to replace lighting at Edora ball fields. There was not sufficient funding
available in 2014 for the project, so these funds will be added to the 2015 budget to fully fund the project.
Traffic
36. Traffic Signal Network Firewall - $20,000
Funds are intended for the installation of a firewall for the Traffic Signal Network. Currently, the signal network
is protected from unauthorized access via an “access control list”. This is a cumbersome method as we
continue to enhance the traffic signal network. More importantly, IT does not believe that the current set up
provides the necessary level of security. They have determined that a hardware firewall is needed to properly
secure the traffic network. This is an IT project that will be funded by Traffic Operations. IT was not able to
schedule and complete the work in 2014 due to other priorities.
Agenda Item 5
Item # 5 Page 8
LIGHT & POWER FUND
37. Solar Rebate Incentives - $18,000
Solar garden funding was budgeted for $250,000 in both 2013 and 2014. Due to construction delay of four
residential solar electric installations we are requesting reappropriation of 2014 funds so that the awarded
rebate incentives can be paid in 2015.
TRANSPORTATION FUND
FC Moves
38. Transportation Planning and Engineering Consultation - $28,000
The City of Fort Collins, Colorado has contracted with Atkins to perform on-call Transportation Planning
Studies and related analyses to evaluate long range and short term multi-modal transportation needs.
Assignments or tasks will be assigned on an as needed basis. The purpose of this request is to extend this on-
call through the end of 2015, including but not limited to the Larimer County Urban Street Standards and
Master Streets Plan updates, and the Land use code amendments.
The funds were not fully expended in 2014 as the need to utilize this on-call contract did not occur. The
expected tasks for 2015 were initiated internally by staff in 2014 however; the items to be assigned to the on-
call consultants were not scheduled to begin until 2015.
CITY FINANCIAL IMPACTS
This Ordinance increases 2015 appropriations by $2,055,209. A total of $1,197,690 is requested for
reappropriation in the General Fund and $857,519 is requested from various other City funds. Reappropriation
requests represent amounts budgeted in 2014 that were not expended and not encumbered at year-end. The
appropriations are from 2014 prior year reserves.
- 1 -
ORDINANCE NO. 044, 2015
OF THE COUNCIL OF THE CITY OF FORT COLLINS
REAPPROPRIATING FUNDS PREVIOUSLY APPROPRIATED IN 2014
BUT NOT EXPENDED AND NOT ENCUMBERED IN 2014
WHEREAS, City Council authorized expenditures in 2014 for various purposes in the
General Fund, Keep Fort Collins Great Fund, Golf Fund, Light & Power Fund, and
Transportation Fund, a portion of which were not spent or encumbered in 2014; and
WHEREAS, Article V, Section 11 of the City Charter requires that all appropriations
unexpended or unencumbered at the end of the fiscal year lapse to the applicable general or
special fund, except that appropriations for capital projects and federal or state grants do not
lapse until the completion of the capital project or until the expiration of the federal or state
grant; and
WHEREAS, Article V, Section 9, of the City Charter permits the City Council to
appropriate by ordinance at any time during the fiscal year such funds for expenditure as may be
available from reserves accumulated in prior years, notwithstanding that such reserves were not
previously appropriated; and
WHEREAS, it is in the best interests of the City and its residents to re-appropriate funds
for the expenditures below, in furtherance of these expenditures authorized in 2014 for which
such appropriated funds were not expended and not encumbered during 2014.
NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF
FORT COLLINS as follows:
Section 1. That there is hereby appropriated for expenditure from prior year reserves
in the General Fund the sum of ONE MILLION ONE HUNDRED NINETY SEVEN
THOUSAND SIX HUNDRED NINETY DOLLARS ($1,197,690) for the following purposes:
Attorney Search Services $ 55,000
DDA Ramps Project 868
Performance Excellence Consulting 12,438
Historic Preservation 7,642
Nature in the City 34,964
Comcast Negotiations 44,249
Foothills Metropolitan District 13,750
Clean Air Quality Programs 13,374
Database Consulting 5,510
FortZED Engagement & Administration 28,576
Innovation Fund Program 45,866
Compensation & Career Path Implementation 30,000
Court Appointed Defense Counsel 9,000
Court Security Officer 4,815
Northern Integrated Supply Project 85,045
- 2 -
Relocation of the Historic Butterfly Building 250,000
Median Renovation 13,423
Lifecyle Funding 89,610
Human Services Program 4,496
Affordable Housing 449,064
Total General Fund $1,197,690
Section 2. That there is hereby appropriated for expenditure from prior year reserves
in the Golf Fund the sum of FORTY THOUSAND DOLLARS ($40,000) for Golf Driving
Range Supplies.
Section 3. That there is hereby appropriated for expenditure from prior year reserves
in the Keep Fort Collins Great Fund the sum of SEVEN HUNDRED SEVENTY ONE
THOUSAND FIVE HUNDRED NINETEEN DOLLARS ($771,519) for the following
purposes:
Design Assistance Program $ 1,224
Historic Preservation Grants 12,401
Landmark Rehabilitation Program 14,432
Oil and Gas 46,379
Old Town Neighborhoods Plan 9,032
West Central Area Plan 2,260
Public Engagement 22,184
Museum of Discovery Display Cases 19,250
Road to Zero Waste 41,107
Ecosystem Response Model 56,196
Poudre River Ecological Restoration & Rehab 256,998
Neighborhood Permit Parking Program 7,176
Parking Garage Major Maintenance/ADA Parking 44,999
Lifecycle Funding - Parks 217,881
Traffic Signal Network Firewall 20,000
Total Keep Fort Collins Great Fund $771,519
Section 4. That there is hereby appropriated for expenditure from prior year reserves
in the Light and Power Fund the sum of EIGHTEEN THOUSAND DOLLARS ($18,000) for
Solar Rebate Incentives.
Section 5. That there is hereby appropriated for expenditure from prior year reserves
in the Transportation Fund the sum of TWENTY EIGHT THOUSAND DOLLARS ($28,000) to
be used for Transportation Planning and Engineering Consultation.
- 3 -
Introduced, considered favorably on first reading, and ordered published this 21st day of
April, A.D. 2015, and to be presented for final passage on the 5th day of May, A.D. 2015.
__________________________________
Mayor
ATTEST:
_______________________________
City Clerk
Passed and adopted on final reading on the 5th day of May, A.D. 2015.
__________________________________
Mayor
ATTEST:
_______________________________
City Clerk