HomeMy WebLinkAboutCOUNCIL - AGENDA ITEM - 07/07/2015 - FIRST READING OF ORDINANCE NO. 075, 2015, APPROPRIAgenda Item 10
Item # 10 Page 1
AGENDA ITEM SUMMARY July 7, 2015
City Council
STAFF
Jon Haukaas, Water Engr Field Operations Mgr
Phil Ladd, Utilities Customer Accounts Supervisor
SUBJECT
First Reading of Ordinance No. 075, 2015, Appropriating Prior Year Reserves in the Water Fund for 2015
Water Distribution Infrastructure Replacement Projects.
EXECUTIVE SUMMARY
The purpose of this item is to appropriate $745,000 in prior year reserves to be used for water distribution
system infrastructure replacement projects in 2015. The current funding shortfall is due to unanticipated
projects and escalating construction costs. There are sufficient water plant investment fee revenues in reserve
available and appropriately utilized for this purpose, particularly in light of unanticipated fee revenues received
in 2015.
STAFF RECOMMENDATION
Staff recommends adoption of the Ordinance on First Reading.
BACKGROUND / DISCUSSION
The budget needs for Water Distribution System infrastructure replacement projects requested in the 2015-
2016 Budgeting for Outcomes (BFO) process included all known projects at that time. The typical funding
request was significantly reduced in order to draw down account balances in accordance with our most recent
financial operational objectives. At the same time, our asset replacement program for infrastructure
replacement city-wide is being accelerated.
A city-wide Capital Improvement Program (CIP) is still in the development stages. Most of the projects with
unforeseen needs were included in that list. Projects listed in the CIP and approved in the budget process are
often only at the conceptual stages of design. The full impacts cannot be identified until after the preliminary
evaluations of the projects are begun.
The following list of projects identifies the unanticipated funding needs for 2015.
The first six have components with costs assigned to the Water Fund that were not identified until after the
budgeting process was completed and final design work completed.
Staff felt it was prudent to replace the remaining portion of water main across Old Town Square along with
the current renovation to reduce the risk of a main failure in the future.
The Mountain Avenue Water Main Replacement project has higher than anticipated construction costs due
to conflicts with Xcel gas mains, the concrete paving, and construction phases required by the various
events on Mountain Avenue during the summer.
Agenda Item 10
Item # 10 Page 2
Project Location Impact Cost
North College Ave
Reconstruction
Hickory Drive
intersection to the north
Water main relocation due to
conflicts with new storm sewer
$90,000
Arthur Ditch Bridge
Replacement
Wood Street at
Sycamore Street
Water main lowering for new box
culverts
$90,000
Arthur Ditch Bridge
Replacement
Oak Street at Whitcomb
Street
Water main lowering for new box
culverts
$55,000
Arthur Ditch Bridge
Replacement
Olive Street at Loomis St Water main lowering for new box
culverts
$30,000
New Mercer Ditch
Bridge Replacement
Mulberry Street at City
Park Drive
Water main lowering for new box
culverts
$50,000
Roundabout
Construction
Shields Street at Vine
Drive
Water main lowering and valve
relocations
$65,000
Old Town Square
Renovation
Walnut Street to
Mountain Avenue
Replacement of a water main
ahead of new paver construction
$65,000
Mountain Ave Water
Main Replacement
Grant Street to Shields
Street
Escalating construction costs $300,000
Total: $745,000
Adoption of the Ordinance will allow for the implementation of these projects and continuation of our asset
replacement programs.
CITY FINANCIAL IMPACTS
The Ordinance appropriates Water Fund reserves generated by plant investment fees (PIFs) including $5
Excerpt from Unapproved Water Board Minutes June 18, 2015
Appropriation of Prior-Year Reserves for Water Distribution Infrastructure Replacement
Program projects in 2015 and 2016. Re-appropriation of existing funds in the Wastewater
Fund for Drake Water Reclamation Facility Replacement projects
(Attachments available upon request
Jon Haukaas, Water Engineering & Field Services Operations Manager stated the purpose of this
item is to approve Ordinances for the following reasons:
1. Appropriating $745,000 in prior year Reserves to be used for unanticipated water
distribution system infrastructure replacement project expenses and escalating
construction costs in 2015.
2. Appropriating $1,000,000 in prior year Reserves to be used to fund additional water
distribution system infrastructure replacement projects in 2016.
3. Re-appropriating $300,000 in existing funds in the Wastewater Fund from the Collection
System Replacement Project Fund to the Water Reclamation Replacement Project Fund.
This transfer would be used for unanticipated equipment replacement at the Drake Water
Reclamation Facility.
In 2014, plant investment fee revenues were $5 million over budget adding to reserves which can
be utilized for this purpose. The Wastewater Collection System Fund has prior appropriations
above what is needed for projects in 2015.
The unanticipated projects that are the subject of these funding requests are the result of
unforeseen project changes, and projects outside of the Utility (such as road projects) which
impact the Utility infrastructure and for which the Utility is billed by the constructing entity.
Discussion Highlights
A board member inquired about the planned costs of the Mountain Avenue pipeline
replacement project versus its current costs. Mr. Haukaas responded that the project was
initially estimated to cost $800,000 and is now estimated to cost between $1 and $1.2
million.
A board member inquired if funds had been taken out of the Utility budget for water
distribution line repairs and replacement. Mr. Haukaas responded that the modification of
the water distribution line capital projects funding from $2 million annually down to $0.5
million annually was an internal decision within the Utility to draw down reserves.
A board member inquired what would happen if this proposed appropriation measure did
not pass. Mr. Haukaas responded that the City would still have to pay its billed charges
for these unanticipated expenses, and the effect would be to delay other projects that have
been scheduled for 2015.
A board member inquired what lessons could be learned by the Utility moving forward.
Mr. Haukaas responded that the Utility has learned the value in improving
communication between various City departments regarding planned projects, and that
ATTACHMENT 1
more detailed analysis (beyond conceptual) would greatly improve budget estimates for
projects.
A board member inquired how the proposed appropriation of $1.75 million compared
with the total funds available in reserve. Mr. Haukaas and Ms. Webb responded that the
Water Fund currently has $61 million, most of which is dedicated to the Halligan
expansion project, a minimum reserve balance ($4.6 million), and other approved
projects. Within the Water Fund, approximately $5 million is free to spend on projects
and initiatives such as the one proposed. Mr. Haukaas also clarified that this
appropriation would be an expansion of the existing funding request under the Budgeting
for Outcomes (BFO) process, and would proceed to a budget lead team, and then require
City Council approval.
A board member inquired about Phase 3 of the Mountain Avenue water line replacement
project, and whether the unanticipated increased costs for Phases 1 and 2 had been
incorporated into the budget projection for Phase 3. Mr. Haukaas replied that it had been
taken into account.
A board member asked if the use of $5 million from Plant Investment Fees (paid by new
development) to fund replacement projects in areas outside of the new development was
an unsustainable model. The concern is that when development within the City service
area slows, that funding will not be available to fund necessary water infrastructure
replacements. Mr. Haukaas responded that historically there has been an effort to
segregate the use of revenues, with water rates used to fund operation and maintenance
activities and Plant Investment Fees used to fund capital projects, such as replacements.
There was additional discussion on this topic.
Board Member Phyllis Ortman made a motion that the Water Board support the request
for budget adjustments and recommend approval of the Ordinances by City Council.
Board Member Michael Brown seconded the motion.
Vote on the motion: It passed unanimously
- 1 -
ORDINANCE NO. 075, 2015
OF THE COUNCIL OF THE CITY OF FORT COLLINS
APPROPRIATING PRIOR YEAR RESERVES IN THE WATER FUND
FOR 2015 WATER DISTRIBUTION INFRASTRUCTURE REPLACEMENT PROJECTS
WHEREAS, the budget needs for Water Distribution System infrastructure replacement
projects requested in the 2015-2016 BFO process included all known projects at that time; and
WHEREAS, the asset replacement program for infrastructure replacement citywide is
being accelerated; and
WHEREAS, the current funding shortfall in Water Distribution System infrastructure
replacement projects requested in the 2015-2016 BFO process is due to unanticipated projects
and escalating construction costs; and
WHEREAS, this ordinance appropriates $745,000 in Water Fund reserves in the Water
Distribution System Replacement project; and
WHEREAS, Article V, Section 9 of the City Charter permits the City Council to
appropriate by ordinance at any time during the fiscal year such funds for expenditure as may be
available from reserves accumulated in prior years, notwithstanding that such reserves were not
previously appropriated; and
WHEREAS, City staff have determined that the appropriations as described herein are
available and previously unappropriated in the Water Fund.
NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF
FORT COLLINS that there is hereby appropriated for expenditure from revenue in the Water
Fund Reserves the sum of SEVEN-HUNDRED FORTY-FIVE THOUSAND DOLLARS
($745,000) for the Water Distribution System Replacement projects.
Introduced, considered favorably on first reading, and ordered published this 7th day of
July, A.D. 2015, and to be presented for final passage on the 21st day of July, A.D. 2015.
__________________________________
Mayor
ATTEST:
_______________________________
City Clerk
- 2 -
Passed and adopted on final reading on the 21st day of July, A.D. 2015.
__________________________________
Mayor
ATTEST:
_______________________________
City Clerk
million in unexpected PIFs paid in 2014. These PIFs are collected to fund the system improvements and
replacements over time. This matches the specific objectives of the water distribution system infrastructure
replacement program.
Water Enterprise funds will continue to be spent in alignment with the Water Enterprise requirements and
projects approved through the BFO process.
BOARD / COMMISSION RECOMMENDATION
The Water Distribution Infrastructure Replacement program was reviewed by the Water Board during the
budgeting process. The specifics of this special appropriation were discussed with the Water Board at its June
4 work session. At its June 18, 2015 meeting, the Board voted unanimously to recommend adoption of the
Ordinance. (Attachment 1)
ATTACHMENTS
1. Water Board minutes (draft), June 18, 2015 (PDF)