HomeMy WebLinkAboutCOUNCIL - AGENDA ITEM - 03/19/2013 - SECOND READING OF ORDINANCE NO. 042, 2013, AUTHORIDATE: March 19, 2013
STAFF: John Stokes, Daylan Figgs
Tawnya Ernst
AGENDA ITEM SUMMARY
FORT COLLINS CITY COUNCIL 14
SUBJECT
Second Reading of Ordinance No. 042, 2013, Authorizing the Conveyance of a Non-Exclusive Drainage Outfall
Easement and a Temporary Construction Easement on Archery Range Natural Area to Cottonwood Land and
Farms, LLC.
EXECUTIVE SUMMARY
This Ordinance, unanimously adopted on First Reading on March 5, 2013, authorizes the conveyance of a twenty-foot
wide permanent non-exclusive drainage easement and a twenty-foot wide temporary construction easement, both
approximately sixty feet in length across a small portion of Archery Range Natural Area to Cottonwood Land and
Farms. The purpose of the easement is to install a 12-inch buried pipe to convey water from Cottonwood’s East
Rigden Pit to the Cache la Poudre River. The buried outfall pipe crossing Archery Range is part of a larger 2,700 linear
foot drainage outfall pipe constructed on adjacent properties. The project site is located generally on the “Rigden Pit”
property and the “Port of Entry Pit” property northeast of Horsetooth Road and Ziegler Road. Alternatives to this
preferred alignment proved prohibitive both from an economic and engineering standpoint
STAFF RECOMMENDATION
Staff recommends adoption of the Ordinance on Second Reading.
ATTACHMENTS
1. Copy of First Reading Agenda Item Summary - March 5, 2013
(w/o attachments)
COPY
COPY
COPY
COPY
ATTACHMENT 1
DATE: March 5, 2013
STAFF: John Stokes, Daylan Figgs
Tawnya Ernst
AGENDA ITEM SUMMARY
FORT COLLINS CITY COUNCIL 18
SUBJECT
First Reading of Ordinance No. 042, 2013, Authorizing the Conveyance of a Non-Exclusive Drainage Outfall Easement
and a Temporary Construction Easement on Archery Range Natural Area to Cottonwood Land and Farms, LLC.
EXECUTIVE SUMMARY
Cottonwood Land and Farms is requesting a twenty-foot wide permanent non-exclusive drainage easement and a
twenty-foot wide temporary construction easement, both approximately sixty feet in length across a small portion of
Archery Range Natural Area. The purpose of the easement is to install a 12-inch buried pipe to convey water from
Cottonwood’s East Rigden Pit to the Cache la Poudre River. The buried outfall pipe crossing Archery Range is part
of a larger 2,700 linear foot drainage outfall pipe constructed on adjacent properties. The project site is located
generally on the “Rigden Pit” property and the “Port of Entry Pit” property northeast of Horsetooth Road and Ziegler
Road. Alternatives to this preferred alignment proved prohibitive both from an economic and engineering standpoint.
BACKGROUND / DISCUSSION
Cottonwood Land and Farms (Cottonwood) operates the East Rigden Pit (Rigden) gravel mine. The Rigden Pit is
located west of the Lafarge-operated Port of Entry Pit (POE) which is adjacent to the Archery Range Natural Area.
As part of the reclamation of the Rigden Pit, Cottonwood is planning to drain a portion of the gravel pit back into the
Cache la Poudre River. In late 2012, the Natural Areas Department (NAD) was contacted by the Sanitas Group on
behalf of Cottonwood to request a non-exclusive drainage easement across the extreme southwestern portion of
Archery Range (see Attachment 2). The easement will be used to convey the water to the Poudre River via a buried
pipeline.
The current topography does not allow a gravity outfall from Rigden to the River. As a temporary solution, the drainage
from Rigden is currently pumped from the pit into the adjacent POE Pit and eventually released to the River
(Attachment 3). However, the POE pit is currently in the process of being filled, so a long-term drainage system for
Rigden is needed as part of Cottonwood’s mining permit. Numerous alternatives were reviewed as part of the design
process, and the preferred alternative involves the installation of a lift station and a gravity outfall pipe along the north
side of the railroad right of way running east to the River. An easement has already been acquired from Lafarge across
the POE pit site; however the buried pipeline must cross Archery Range to outlet to the River (Attachment 2).
Cottonwood’s project team has met with Larimer County engineering regarding the proposed project, as well as City
of Fort Collins staff regarding the floodplain permitting and master storm drainage concerns, and NAD staff to address
staff’s concerns and to collaborate on mitigation efforts for the project.
Alternative Analysis
The following alternatives were submitted by Sanitas in their alternatives analysis for the project:
Alternative 1 (Preferred):
Cottonwood will install a lift station at the southeast corner of Rigden to lift water from the former mining pit to the top
of bank and outlet the water to the River via approximately 2,700 linear feet (LF) of High Density Polyethylene (HDPE)
pipe. The installation of the pipe will provide enough slope for adequate flow, and the use of a smooth wall HDPE pipe
will minimize the need for extensive maintenance of the system. The lift station will provide automated control of the
water surface elevation. The final 60 linear feet (LF) of the gravity outfall is located on Archery Range at the River, and
will require a permanent 20 foot wide easement, as well as an additional temporary construction easement for access
for construction activities and mitigation efforts.
COPY
COPY
COPY
COPY
March 5, 2013 -2- ITEM 18
Alternative 2:
Installation of a lift station at Rigden will outlet the water into a constructed open channel along the north side of the
railroad to the River. Due to the length of the channel and lack of fall along the stretch, the resulting channel would
have minimal slope, as well as need to be rather deep compared to adjacent grade at the eastern end. The resulting
channel would have a greater impact on Archery Range and require more maintenance when compared to a pipe.
An easement from NAD would still be required. This alternative was determined to not be a reasonable solution due
to the extensive impact associated with constructing the open channel, maintenance needs, and did not avoid Archery
Range.
Alternative 3A:
Provide a gravity outfall to the south beneath the railroad and into a proposed water storage reservoir site. This option
was previously designed and planned for construction. Once the City became interested in purchasing the reservoir
site, this option was no longer feasible due to the City's requirement to prevent additional outside flows from entering
the reservoir.
Alternative 3B:
Construct the gravity outfall beneath the railroad and utilize a lift station to place the flows into an existing storm
drainage channel located south of the railroad. This alternative was not desired by the City due to the impact on the
reservoir site and potential conflicts and issues in relation to the proposed reservoir liner.
Alternative 4:
Leave the site in its current state. Currently, the area is drained by a temporary pump and lifts water over a berm and
into the existing POE Pit and eventually outfalls into the river. This alternative was not considered a long term solution,
as the POE Pit will be filled. Additionally, the temporary pump will need to be replaced with a long term lift station.
FINANCIAL / ECONOMIC IMPACTS
Cottonwood has paid the $1,500 application fee as required in the Natural Areas and Conserved Lands Easement
Policy. Additionally, Cottonwood will pay for the appraised value of the permanent easement, ($109.00 for the 1,898
square foot permanent easement); the value of the temporary easement, ($23.00 for the 2,012 square foot temporary
easement); a restoration fee of $269.00 (based on $3,000 per acre) in addition to $40 in-kind mitigation payments for
the Ecosystem Impact Fees (E.I.F) for lost Ecological Goods and Services (E.G.S.) due to the project.
ENVIRONMENTAL IMPACTS
NAD staff has met on site with Sanitas engineers and the owner of Cottonwood to assess the impacts at the proposed
location of the easements. The location is in an area that was recently flooded (2010) and consists primarily of non-
native species, dominated by crested wheat grass. The entire project is located outside of the ½ mile buffer of a
nearby bald eagle nest. The small section of river bank that will be impacted by the project is armored with broken
concrete. As a condition of the easement, Cottonwood will be required to acquire clearance letters from the US Fish
and Wildlife Service (USFWS) for both Preble’s meadow jumping mouse (Zapus hudonius preblei) and Ute’s ladies
tresses (Spiranthes diluvialis) prior to the execution of the easements and will be subject to any additional surveys and
mitigation required by the USFWS if either species’ habitat is found to be within the project area. The project will be
reclaimed subject to the NAD’s General Resource Protection Standards.
Restoration and Mitigation
In addition to restoring the easement area to native vegetation at the completion of the project, staff has identified in-
kind mitigation efforts that Cottonwood will implement in the project area (Attachment 4). Mitigation efforts will include
willow staking along approximately 40 linear feet of the River bank, removing the concrete armoring and replacing with
topsoil, and reseeding the approximately 3,910 square foot project site with a native seed mix selected by the NAD
to restore the project area to native grasses.
COPY
COPY
COPY
COPY
March 5, 2013 -3- ITEM 18
STAFF RECOMMENDATION
Staff recommends adoption of the Ordinance on First Reading.
BOARD / COMMISSION RECOMMENDATION
At its February 13, 2013 meeting, the Land Conservation and Stewardship Board voted unanimously to recommend
approval of the drainage outfall easement and temporary construction easement on Archery Range Natural Area (see
Attachment 5).
ATTACHMENTS
1. Archery Range Natural Area Location Map
2. Cottonwood Land and Farms Project Location Map
3. East Rigden Pit and POE Pit Location Map
4. Cottonwood Land and Farms Project Mitigation Area Map
5. Land Conservation and Stewardship Board minutes, February 13, 2013
ORDINANCE NO. 042, 2013
OF THE COUNCIL OF THE CITY OF FORT COLLINS
AUTHORIZING THE CONVEYANCE OF A NON-EXCLUSIVE
DRAINAGE OUTFALL EASEMENT AND A TEMPORARY CONSTRUCTION EASEMENT
ON ARCHERY RANGE NATURAL AREA TO COTTONWOOD LAND AND FARMS
WHEREAS, the City is the owner of a parcel of real property known as Archery Range
Natural Area, which is described on Exhibit “A”, attached and incorporated herein by reference (the
“City Property”); and
WHEREAS, Cottonwood Land and Farms, LLC (“Cottonwood”) is the owner and operator
of the East Rigden Pit gravel mine, located west of the City Property (the “Pit”); and
WHEREAS, as part of the reclamation of the Pit, Cottonwood is planning to drain water from
the Pit back into the Poudre River; and
WHEREAS, Cottonwood is requesting from the City a non-exclusive drainage outfall
easement that would be used to convey water from the Pit to the Poudre River via a buried pipeline
across the southwestern portion of the City Property, as well as a temporary construction easement;
and
WHEREAS, the proposed easements are shown and described on Exhibit “B”, attached and
incorporated herein by reference (the “Easements”); and
WHEREAS, Cottonwood has paid a $1500 application fee to the Natural Areas Department
as compensation for City staff’s time to process this request, and would also pay $132 as
compensation for the Easements, a restoration fee of $269, and a $40 mitigation payment for lost
ecological goods and services due to the project; and
WHEREAS, Section 23-111(a) of the City Code provides that the City Council is authorized
to sell, convey, or otherwise dispose of any and all interests in real property owned in the name of
the City, provided that the City Council first finds, by ordinance, that such sale or other disposition
is in the best interests of the City.
NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF FORT
COLLINS as follows:
Section 1. That the City Council hereby finds that the conveyance of the Easements on
the City Property to Cottonwood Land and Farms, LLC as provided herein is in the best interests of
the City.
Section 2. That the Mayor is hereby authorized to execute such documents as are
necessary to convey the Easements to Cottonwood Land and Farms, LLC on terms and conditions
consistent with this Ordinance, together with such additional terms and conditions as the City
Manager, in consultation with the City Attorney, determines are necessary or appropriate to protect
the interests of the City or to effectuate the purpose of this Ordinance, including, but not limited to,
any necessary changes to the legal description of the Easements, as long as such changes do not
materially increase the size or change the character of the Easements.
Introduced, considered favorably on first reading, and ordered published this 5th day of
March, A.D. 2013, and to be presented for final passage on the 19th day of March, A.D. 2013.
_________________________________
Mayor
ATTEST:
_____________________________
City Clerk
Passed and adopted on final reading on the 19th day of March, A.D. 2013.
_________________________________
Mayor
ATTEST:
_____________________________
City Clerk
EXHIBIT B
Permanent and Temporary Easement