Loading...
HomeMy WebLinkAboutCOUNCIL - AGENDA ITEM - 02/26/2013 - RESOLUTION 2013-013 ADOPTING THE STUDENT HOUSING ADATE: February 26, 2013 STAFF: Beth Sowder, Laurie Kadrich Seth Lorson AGENDA ITEM SUMMARY FORT COLLINS CITY COUNCIL 4 SUBJECT Resolution 2013-013 Adopting the Student Housing Action Plan. EXECUTIVE SUMMARY At the direction of City Council and with the adoption of City Plan, staff initiated a Student Housing Action Plan (SHAP or the Plan) project to address the increasing need for multi-family student housing and the potential negative impacts to and compatibility concerns of existing single-family neighborhoods. The project has involved working with Colorado State University (CSU), Front Range Community College (FRCC), neighbors, students, developers, and other stakeholders to identify strategies and recommend action items. The feedback received throughout the public engagement process drove the development of the proposed action items within the Plan. The Plan provides a mechanism to achieve the mission of SHAP by identifying needs and concerns, evaluating existing conditions and future projections, and proposing action items on a variety of housing and behavioral issues related to student housing. The Plan will serve as a guide for addressing student housing issues by City staff, City Council, and the community. BACKGROUND / DISCUSSION The SHAP project began in March 2011 and was most recently discussed at the City Council Work Session on December 11, 2012. City Council directed staff to bring the Plan to City Council for formal consideration on February 19, 2013, and to move forward with the identified action items. Updates were provided to the Affordable Housing Board, the Landmark Preservation Commission, the Air Quality Advisory Board, the Building Review Board, and the Planning & Zoning Board. The Planning and Zoning Board voted to recommend adoption of the Plan. The Plan provides a vision to achieve the overall SHAP mission of developing community driven strategies that encourage quality student housing while maintaining neighborhood quality and compatibility. The City, through the City Plan process, identified a need to address student housing now and into the future. Fort Collins is experiencing an increase in population and student enrollment, very low vacancy rates, a limited supply of multi-family housing, and challenges in addressing neighborhood concerns with new multi-family development projects. These factors drove the need for the development of strategies and action items to help facilitate housing supplies while addressing negative impacts upon existing single-family neighborhoods. The Plan provides background information and data including: • Applicable City Plan policies • Land Supply and Growth policies for Fort Collins • Student Enrollment Data and Projections • Multi-family Vacancy Rates in Fort Collins • Multi-family Average Rents in Fort Collins • CSU On-Campus Housing Supplies (now and into the future) • Off-Campus Housing Supplies and Developments • Student Housing Preferences SHAP implemented a diverse and in-depth process that included a heavy emphasis on stakeholder engagement, background research, data collection, and action item development and implementation time frames. The primary working group included CSU and City staff, stakeholders from CSU, Front Range Community College (FRCC), student government, students/tenants, neighbors, property owners, Fort Collins Board of Realtors, developers/designers, and others. The Center for Public Deliberation assisted with much of the public engagement process including several focus groups (both individual stakeholder groups and combined), surveys, and a large deliberative dialogue. Additional engagement methods included a webpage with current information, presentations February 26, 2013 -2- ITEM 4 and important dates, an on-line survey, use of social media, an open house, and meetings with Boards & Commissions and professional groups. Feedback received through the engagement process shaped the development of the action items in the Plan. Action Items In the spring and summer of 2012, while the SHAP process was underway, City Council directed staff to bring specific action items forward for immediate consideration in an effort to more quickly address concerns raised by residents about the adverse impacts of larger multi-family developments occurring near existing single-family neighborhoods. As a result, some Land Use Code (LUC) amendments that address compatibility concerns were adopted in the fall of 2012. During these discussions, Council referred three items back into the SHAP process for further discussion: Operations, Security and Management Plans; Limit 4+ bedroom units in multi-family developments; and University District or Overlay. SHAP stakeholders discussed these items, and some of their recommendations are included in the identified action items. The action items included in the Plan are split into four categories: • Near-term Action Items (2013) • Longer-term Action Items (2014 and beyond) • Action Items that do not need Formal Council Consideration • Action Items Proceeding in other Processes Near-Term Action Items (2013) The following action items will be brought to City Council and the Planning and Zoning Board for formal consideration in 2013. The first three items can be prepared relatively quickly and will be brought to City Council on March 5, 2013. The last two items need more time fully develop, so formal consideration will happen during the annual Land Use Code (LUC) update in June. Near Term Action Item Concern Addressed 1. Improve understanding of compatibility by modifying the LUC to include clear examples (photos, drawings) of what is allowed in certain zones. Compatibility 2. Amend Medium-density Mixed Use Neighborhood (MMN) district development standards and LUC Sec. 3.8.30 multi-family standards to specify that no vehicular use area can be placed in the said setback from single- and two-family dwellings. Also, consider landscape requirements for this setback. Compatibility 3. Better define and amend the LUC Sec. 3.8.16 (E) (2) requirement that 4+ bedroom developments need to provide additional open space, recreation areas, parking areas and public facilities as are necessary to adequately serve the development and excepting the Transit-Oriented Development (TOD) Overlay Zone. Intensity of 4+ bedroom units, compatibility 4. Define different multi-family housing types (rather than just the broad multi- family definition). The requirement for multiple housing types could be used as a gradient of development between proposed multi-family and existing single-family. Compatibility 5. Confirm that the uses, development standards and density allowances in the Neighborhood Conservation Buffer (NCB) district are consistent with the intent and purpose of the district appropriate sub-area plans in that it provides a transition between residential neighborhoods and commercial-use areas. Compatibility February 26, 2013 -3- ITEM 4 Longer-Term Action Items (2014 and beyond) The following action items need further development and public outreach before bringing them to Council for formal consideration. Longer Term Action Item Concern Addressed 1. Build an above- or below- grade pedestrian/bicycle crossing at or near Shields and Elizabeth Streets. • This item would need two to three years to develop and fund – Requires further involvement and development from Transportation Planning and Engineering and coordination with CSU. Traffic and Safety 2. Consider requiring property managers/owners to provide City ordinance information to their tenants at lease signing. • This could be accomplished relatively quickly (one year) – it would require additional public outreach. Accountability 3. Form an on-going advisory committee made up of City, CSU, FRCC, neighbors, students, property managers, Police, and Associated Students of CSU (ASCSU) to guide City Council on student housing issues. • This could be accomplished relatively quickly (one year) – it would require staff support. Accountability and Education 4. Consider a Rental Licensing Program to ensure health/safety of units, data regarding rentals, increased accountability of the rental business. Require all landlords to take the Landlord Training provided by the City. • Council has considered Rental Licensing and Registration Programs in the past and could be revisited. • Would require one to two years for further research and significant public outreach. Accountability and Education The Plan also includes a number of action items that do not require formal Council consideration that staff will begin implementing. These include increased education about the enforcement process and data related to enforcement, increased enforcement of nuisance and noise ordinances in areas with a high concentration of complaints, increased education to parents of students, and incentives for students to attend educational programs. Lastly, the Plan has several action items that are either moving forward in a separate process or are the responsibility of CSU. CSU has been involved in the SHAP process and is committed to implementing these items. The City’s Parking Plan, West Central Neighborhoods Plan update, and Phase 3 of the Transit Plan are all supported by the Plan and include SHAP recommendations. The items that are the responsibility of CSU include on-campus parking and fees, on-campus housing, options for public/private partnerships, and increased communications about on-campus housing updates. Plan Implementation, Monitoring and Review Implementation of the Plan will occur as indicated below: • Near-Term Action Items Spring 2013 • Longer-Term Actin Items 2014 and beyond • Action Items – No Council Action 2013 • Action Items In Other Processes 2013 and beyond The Land Use Code items will impact new development as it occurs. Other items are new initiatives that will need to be accommodated in future work plans and, if necessary, accommodated into future capital and/or operating budgets. Most items are recommended to be implemented as soon as possible, and some will be implemented immediately. The action items will be monitored regularly to ensure they are meeting the desired outcomes and to recommend any needed changes. February 26, 2013 -4- ITEM 4 FINANCIAL / ECONOMIC IMPACTS Full implementation of the action items in the Plan will have a cost. The action items fall into the following three categories with respect to the need for resources: 1. Existing Resources – Items that can be accomplished with existing resources and will not add costs to the City. These items include all of the Near-term Action Items. Additionally, all of the educational program improvements will be implemented using existing resources. 2. Additional Resources Needed – Some of the action items will need additional resources to be implemented. All of the Longer-term Action Items require some level of additional resources. The details for the costs of these items will be included in the materials provided to City Council when these items are individually brought forward for formal consideration. 3. Resources Identified in other Processes – The action items that are proceeding in other processes will identify funding needs within the process they are moving forward in. For example, the City Parking Plan will identify the funding needs for implementation of that plan. Additionally, the items that are the responsibility of CSU will use CSU resources for implementation. ENVIRONMENTAL IMPACTS The Plan will not have any direct environmental impacts; however, the individual action items will address environmental impacts during the review process for those specific items. STAFF RECOMMENDATION Staff recommends adoption of the Resolution. BOARD / COMMISSION RECOMMENDATION The Planning and Zoning Board voted 5-0 to recommend approval of the Student Housing Action Plan. General support was given by the Landmark Preservation Commission, Building Review Board, and the Air Quality Advisory Board. Although the Affordable Housing Board was primarily supportive, the Board expressed concern on some of the specific action items. PUBLIC OUTREACH Public outreach included the following: • Throughout the process stakeholders, which included Associated Students of CSU (ASCSU), FRCC Student Council and administration, CSU and FRCC students at large, neighbors, Fort Collins Board of Realtors, developers and designers, Northern Colorado Rental Housing Association, property managers/landlords, and property owners were utilized for focus groups, dialogues, and general feedback. • Presentations and updates were provided to several boards and commissions, as well as professional organizations throughout the process. • A website was developed specifically for SHAP to provide detailed information, updates, and to seek input. Additionally, a survey was put onto the website as a more convenient way for the general public to provide feedback about the draft action items. • Social media tools were used to generate interest and direct people to the website. • After the action items were drafted, a public Open House was held to gather more general public feedback on the draft action items. • A student survey of rental housing preferences was conducted in 2011 and 2012 with updates planned to occur annually. February 26, 2013 -5- ITEM 4 ATTACHMENTS 1. Student Housing Action Plan (available online at www.fcgov.com/agendas) 2. City Council Work Session Summaries 3. City Board and Commission Meeting Minutes and Recommendations 4. PowerPoint presentation ATTACHMENT 1 Stude February Neighborh 281 North Fort Collin 970-224-6 fcgov.com For additio ent Hous 19, 2013 hood Services h Collins Aven ns, CO 80521 6046 m/neighborhoo onal copies, p sing Acti s nue ods please downlo on Plan oad from our w website, or coontact us usinng the informaation above STUDENT HOUSING ACTION PLAN 1 CREDITS City Council Karen Weitkunat, Mayor Kelly Ohlson, Mayor Pro Tem, District 5 Ben Manvel, District 1 Lisa Poppaw, District 2 Aislinn Kottwitz, District 3 Wade Troxell, District 4 Gerry Horak, District 6 City Boards and Commissions Air Quality Advisory Board Affordable Housing Board Building Review Board Landmark Preservation Commission Planning and Zoning Board Project Management Team Beth Sowder, Neighborhood Services Ginny Sawyer, Neighborhood Services Work Team Emily Allen, Community Liaison Mary Branton-Housley, Front Range Community College Martin Carcasson, Center for Public Deliberation Jim Dolak, Colorado State University Housing & Dining Services Becca Henry, Communications Laurie Kadrich, Community Planning & Neighborhood Services Courtney Levingston, Planning Seth Lorson, Planning Tom Milligan, CSU External Affairs Jeannie Ortega, Colorado State University Off- Campus Life Ken Waido, Planning Timothy Wilder, Planning Advisory Team Josh Birks, Economic Health Megan Bolin, Economic Health Karen Cumbo, PDT Joe Frank, Social Sustainability Bruce Hendee, Sustainability Karen McWilliams, Historic Preservation Joe Olson, Traffic Operations Pete Wray, City Planner Stakeholder Groups Associated Students of Colorado State University Developers Fort Collins Board of Realtors Front Range Community College Student Council Neighbors Northern Colorado Rental Housing Association Property Managers Property Owners Students 2 STUDENT HOUSING ACTION PLAN TABLE OF CONTENTS Executive Summary ......................... 3 Introduction ...................................................... 3 Mission ............................................................ 3 Purpose of the Student Housing Action Plan .......................... 3 Community Engagement Process .................. 3 Existing Conditions .......................................... 4 City Plan/Plan Fort Collins .............................. 5 West Central Neighborhoods Plan ................. 5 Action Items ..................................................... 6 Section 1 - Introduction ................... 7 Purpose of the Student Housing Action Plan ........................................ 7 Purpose of the Report ..................................... 7 Process and Public Engagement .................... 8 Section 2 - Plan Fort Collins and West Central Neighborhoods Plan . 9 City Plan/Plan Fort Collins .............................. 9 West Central Neighborhoods Plan ............... 10 Section 3 - Existing Conditions ....................... 11 Land Supply & Growth .................................. 11 TOD (Transit-Oriented Development) Overlay District ...................... 11 Student Enrollment Data and Projections .............................................. 12 Multi-Family Demand and Vacancy Rates ....................................... 12 Multi-Family Supply and Development ......... 12 Student Preferences ..................................... 13 Section 4 - Action Items & Implementation ........................... 14 Adopted Action Items .................................... 14 Referred Items .............................................. 14 Action Items.....................................…...16-19 Section 5 - Monitoring and Review...................................... 20 Section 6 - Financial and Resource Implications .................................... 21 Existing Resources ....................................... 21 Additional Resources Needed ...................... 21 Resources Identified in Other Processes ........................................... 21 Appendix A - Existing Conditions Snapshot ......................................... 22 Appendix B - CSU Master Plan Projections 2012-20 .............. 25 Appendix C - Survey Results ............................... 26 Appendix D - Development Proposals ........... Error! Bookmark not defined. STUDENT HOUSING ACTION PLAN 3 EXECUTIVE SUMMARY Introduction In 2010, during the planning effort of Plan Fort Collins, it was apparent there was and is a need to address the student/multi-family housing supply. Fort Collins has and is experiencing an increase in population, a limited supply of multi- family housing, very low vacancy rates, and challenges with addressing neighborhood concerns with proposed development projects. These factors drove the need for development of strategies to help facilitate adequate housing supplies while identifying the infill issues upon existing neighborhoods. Mission Staff and stakeholders developed a mission for this effort: “The Student Housing Action Plan strives to develop community driven strategies that encourage and provide quality student housing while maintaining neighborhood quality and compatibility.” Purpose of the Student Housing Action Plan The purpose of this effort was to work with Colorado State University (CSU), Front Range Community College (FRCC), neighbors, students, property owners, developers, and other stakeholders to identify strategies to address the increasing need for multi-family student housing, identify key issues for development or redevelopment, and identify potential impacts and compatibility issues. Community feedback drove the development and specific recommendations of draft action items of this effort. This plan provides the vision to achieve the mission by identifying needs and concerns, evaluating existing conditions and future projections, and proposes action items on a variety of housing and behavioral issues. This plan will serve as a guide for addressing student housing issues. Community Engagement Process Primarily City and CSU staff made up the working group, and the identified stakeholders included: Associated Students of CSU (ASCSU), FRCC Student Council and administration, CSU and FRCC students at large, neighbors, Fort Collins Board of Realtors, developers and designers, Northern Colorado Rental Housing Association, property managers/landlords, and more. 4 STUDENT HOUSING ACTION PLAN In 2011 and 2012, students were surveyed regarding their rental housing preferences with annual updates planned. Stakeholders participated in numerous focus groups, surveys, and were part of a larger deliberative dialogue. Several boards and commissions, as well as professional organizations, were updated and their feedback sought on this effort at their regular or business meetings. City Council received two memos and discussed this item at their February 14, 2012 and December 11, 2012 work sessions. A website was developed specifically for this topic to provide detailed information, provide updates, and seek input. After the action items were drafted, an open house was held to gather the public’s general feedback on the draft action items. Additionally, an online questionnaire was provided as a more convenient way for the general public to provide feedback about the draft action items. Social media tools were used to generate interest and direct people to the website. Ultimately, everyone in Fort Collins could be a part of this conversation. Existing Conditions The total population in Fort Collins is 144,880 which include students who live in the city limits. CSU enrollment is currently around 27,000 (approximately 23% are housed on campus) with a future enrollment projection of 35,000 in the next 10 to 20 years. FRCC has approximately 6,500 students with no on-campus housing with a flat near future enrollment projection. According to Colorado’s Division of Housing, the vacancy rate for the Fort Collins area during the first quarter of 2012 was 2.6%, one of the lowest in the state. A healthy vacancy rate is around 5%. With such a low vacancy rate, average rents have continued to increase reaching $1,010 for the first quarter of 2012. CSU is currently building more on-campus beds, with plans to build more in the future. They are committed to providing on-campus housing for all freshmen and international students as well as 25% of returning students (second year and beyond). Additionally, the amount of off-campus multi- family student housing projects has increased and there are currently large projects under construction and several more are in development review. Some of the housing needs will be met by the current and proposed development projects, particularly in the next five years or so. A plan, however, is needed to ensure quality housing is available, and that new developments are compatible with existing neighborhoods. STUDENT HOUSING ACTION PLAN 5 City Plan/Plan Fort Collins City Plan is the comprehensive plan for the City of Fort Collins, and it illustrates how Fort Collins is envisioned over the next 25 years and beyond. Plan Fort Collins was the 2010 update to City Plan. The structure is fundamentally based on the City’s budgeting for outcomes (BFO) organizing framework. The BFO process and organization is designed to be simple and easily understood by a variety of audiences. The new City Plan structure is also aligned with the City’s vision to become a world-class community, with supporting principles and policies within the following seven chapters:  Economic Health,  Environmental Health,  Community and Neighborhood Livability,  Safety and Wellness,  Culture, Parks and Recreation,  High Performing Community, and  Transportation. City Plan identified a high priority action item called student housing plan, “Coordinate with Colorado State University, Front Range Community College, and others to develop a plan that identifies future locations and other desirable characteristics of future student housing development.” Other policies in City Plan that directly support a student housing action plan are: Policy LIV 7.2 Develop an Adequate Supply of Housing Encourage public and private for-profit and non- profit sectors to take actions to develop and maintain an adequate supply of single- and multi- family housing, including mobile homes and manufactured housing. Policy LIV 7.7 Accommodate the Student Population Plan for and incorporate new housing for the student population on campuses and in areas near educational campuses and/or that are well- served by public transportation. Policy LIV 6.2 Seek Compatibility with Neighborhoods Encourage design that complements and extends the positive qualities of surrounding development and adjacent buildings in terms of general intensity and use, street pattern, and any identifiable style, proportions, shapes, relationship to the street, pattern of buildings and yards, and patterns created by doors, windows, projections and recesses. Compatibility with these existing elements does not me uniformity. Policy LIV 6.3 Encourage Introduction of Neighborhood- Related, Non-Residential Development Encourage the addition of new services, conveniences, and/or gathering places in 6 STUDENT HOUSING ACTION PLAN Action Items Feedback received through public engagement drove the draft action items to be considered by City Council. Draft action items fall into four specific categories:  near term (2013),  longer term (2014 and beyond),  items that do not need formal Council consideration, and  items proceeding in other processes. During the SHAP planning effort, City Council directed staff to bring some action items forward for consideration on a faster track than the document itself in an effort to quickly address concerns raised by residents about the increasingly adverse impacts of larger multi- family developments. In particular, staff was asked to address developments near existing single-family residential neighborhoods. As a result of this, the following items are already adopted by City Council: Apply elements of the Land Use Code and the City’s development standards for the Medium- Density Mixed-Use Neighborhood zone district to apply to all multi-family projects outside of the TOD (transit-oriented development) Overlay Zone by incorporating those requirements into the general standards of the Land Use Code. Adopted by City Council on September 18, 2012. Modify requirements in the Neighborhood Conservation zone district to restrict 100% secondary uses such as residential development on land parcels of 5 acres or less, rather than the previous allowance of 10 acres or less. Adopted by City Council on September 18, 2012. Require any multi-family project with greater than 50 units or 75 bedrooms to have a Type 2 Hearing. Adopted by City Council on November 20, 2012. STUDENT HOUSING ACTION PLAN 7 SECTION 1 INTRODUCTION Purpose of the Student Housing Action Plan During the 2010 Plan Fort Collins effort, City staff heard and identified a need to address the student/multi-family housing supply. Fort Collins is experiencing an increase in population, very low vacancy rates, and has a limited supply of multi-family housing, and challenges with addressing neighborhood concerns with potential development projects. These factors drove the need for the development of strategies to help facilitate adequate housing supplies while identifying the infill issues upon existing neighborhoods. The purpose of this plan is to work with Colorado State University (CSU), Front Range Community College (FRCC), neighbors, students, property owners, developers, and other stakeholders to identify strategies to address the increasing need for multi-family student housing, identify key issues for development or redevelopment, and identify potential impacts and compatibility issues. Feedback received through the community engagement process drove the development and specific recommendations of draft action items of this project. Staff and stakeholders developed the mission for this project which states: “The Student Housing Action Plan strives to develop community driven strategies that encourage and provide quality student housing while maintaining neighborhood quality and compatibility.” The Plan provides the vision to achieve the mission by identifying needs and concerns, evaluating existing conditions and future projections, and proposes action items on a variety of housing and behavioral issues. The Plan will serve as a guide for addressing student housing issues. Purpose of the Report The purpose of this report is to describe the Student Housing Action Plan (SHAP) process and suggested action items. The SHAP process was comprehensive and collaborative including many stakeholders, and the suggested action items are the result of this work. This report builds on the principles of Plan Fort Collins and the West Central Neighborhood Plan. Primarily, this report focuses on the input, feedback, and information received during numerous focus groups, large group dialogue, an open house, surveys, and other correspondence. 8 STUDENT HOUSING ACTION PLAN Process and Public Engagement The Student Housing Action Plan employed a process similar to other policy development by the City of Fort Collins with a heavy emphasis on stakeholder engagement, and consists of the following components:  research,  data collection,  background information,  stakeholder engagement,  public engagement,  action item development, and  implementation. Stakeholders included CSU, FRCC, student government, students/tenants, neighbors, property owners, property managers, Fort Collins Board of Realtors, developers/designers, and more. The Center for Public Deliberation assisted with the public engagement process which included several focus groups (both with individual stakeholder groups and combined), surveys, and a large group deliberative dialogue. Additional engagement methods included a webpage with on-going information, presentations, important dates, online surveys, social media, public open house, update meetings to Boards & Commissions and professional groups. Feedback received through the community engagement process drove the development and specific recommendations of draft action items of this project. (See Appendix C for survey results.) STUDENT HOUSING ACTION PLAN 9 SECTION 2 PLAN FORT COLLINS AND WEST CENTRAL NEIGHBORHOODS PLAN City Plan/Plan Fort Collins The name Plan Fort Collins refers to the process to prepare major updates to two key documents: City Plan and the Transportation Master Plan. (More information on this effort can be found at fcgov.com/planfortcollins.) City Plan is the comprehensive plan for the City of Fort Collins and illustrates how we envision Fort Collins in the next twenty-five years and beyond, showing us how we can get there step by step. The Transportation Master Plan is a long-term vision document that defines the long- term multi-modal transportation system that Fort Collins desires in the future, and also serves as a comprehensive reference guide regarding transportation issues. Both documents provide policy directions for decision-making and set forth priority actions to make the vision a reality. The 2010 update to City Plan took the spirit of collaboration to the next level, integrating both planning projects into one unified process: Plan Fort Collins. As with earlier collaborations, this integrated process allowed the City to maximize efficiency and share resources. In this update, many of the ideas, principles, and policies from previous versions of City Plan are carried forward, but enhanced to reflect current conditions, new trends, community input, and innovations since the plans were first adopted. City Plan identified a high priority action item called Student Housing Plan – Coordinate with Colorado State University, Front Range Community College, and others to develop a plan that identifies future locations and other desirable characteristics of future student housing development. Other policies in City Plan that directly support the Student Housing Action Plan are: Policy LIV 7.2 – Develop an Adequate Supply of Housing Encourage public and private for-profit and non- profit sectors to take actions to develop and 10 STUDENT HOUSING ACTION PLAN maintain an adequate supply of single- and multi- family housing, including mobile homes and manufactured housing. Policy LIV 7.7 – Accommodate the Student Population Plan for and incorporate new housing for the student population on campuses and in areas near educational campuses and/or that are well- served by public transportation. Policy LIV 6.2 – Seek Compatibility with Neighborhoods Encourage design that complements and extends the positive qualities of surrounding development and adjacent buildings in terms of general intensity and use, street pattern, and any identifiable style, proportions, shapes, relationship to the street, pattern of buildings and yards, and patterns created by doors, windows, projections and recesses. Compatibility with these existing elements does not me uniformity. Policy LIV 6.3 – Encourage Introduction of Neighborhood-Related, Non-Residential Development Encourage the addition of new services, conveniences, and/or gathering places in existing neighborhoods that lack such facilities, provided they meet performance and architectural standards respecting the neighborhood’s positive characteristics, level of activity, and parking and traffic conditions. West Central Neighborhoods Plan The West Central Neighborhoods Plan was developed in the late 1990s and focused on neighborhoods in close proximity to CSU. It is important to refer to and incorporate this plan. An update to the West Central Neighborhoods Plan will occur in 2013. The vision of the West Central Neighborhoods Plan: “Maintain and enhance the diverse character of the West Central Neighborhoods, comprised of long- and short-term residents such as families, senior citizens, and students, as well as small businesses, schools, and public/private institutions and facilities. Strengthen the collaboration between the City, Colorado State University, and the West Central Neighborhoods. Continue to provide housing opportunities, infrastructure, and lifestyle options to meet the needs of this diverse group of neighborhoods. Facilitate and improve existing transportation systems to allow all residents to have good, safe, convenient and multi-modal transportation options. Adapt to meet the needs of the dynamic and ever-changing West Central Neighborhoods and provide balanced opportunities in development, redevelopment, and maintenance.” The West Central Neighborhoods Plan developed goals that were presented in three STUDENT HOUSING ACTION PLAN 11 SECTION 3 EXISTING CONDITIONS Land Supply & Growth According to City Plan growth within the city will be focused to promote a compact development pattern, by directing urban development to well- defined areas within the Growth Management Area (GMA). The compact form of the city will also contribute to preserving environmentally sensitive areas and rural lands, efficiently providing public services, and encouraging infill and redevelopment of existing urban areas. An expanded public transit system is an integral component of this plan. The system is designed to provide for high-frequency transit service along major arterials and Enhanced Travel Corridors. Feeder transit lines will provide connections from all major districts within the city. The City’s compact form will help make comprehensive, convenient, and efficient transit service possible. The City’s form and structure will facilitate pedestrians, bicycles, and transit, as well as cars and trucks. New development will be organized and woven into a compact pattern that is conducive to automobile, pedestrian, bicycle, and public transit travel. Street standards and site planning requirements for new development and redevelopment will ensure that neighborhoods and districts throughout the city will be connected and accessible by all travel modes. TOD (Transit-Oriented Development) Overlay District The City adopted the Transit-Oriented Development Overlay District (TOD) in 2007 after significant public debate and input. The TOD is aimed at reducing sprawl by incentivizing infill development in central areas of town near transit, particularly the Mason Corridor, and frequent destinations. The provisions of the TOD allow for a mix of goods and services within convenient walking distance of transit stations, encourage the creation of stable and attractive residential and commercial environments, and provide for a desirable transition to the surrounding existing neighborhoods. 12 STUDENT HOUSING ACTION PLAN Student Enrollment Data and Projections The total population in Fort Collins is 144,880 which include students who live in the city limits. (See Appendix A) In the fall of 2000, CSU had approximately 23,000 students. The total enrollment for fall 2012 is 26,769. Approximately, 74% are undergraduate (traditional) students, 9% are undergraduate (non-traditional), and 16% are graduate and professional students. Approximately, 23% of students live on campus in the 6,300 beds owned and operated by CSU; 77% require housing off campus. Assuming that same rate, and with a continued strong market position for CSU in Colorado and around the nation, CSU projects enrollment that could be as high as 35,000 in the future (10 – 20 plus years). This would include graduate and undergraduate enrollment (does not include on-line enrollment), and will continually evolve based on funding levels, market conditions and other factors. Front Range Community College (FRCC) total enrollment for spring 2012 was 6,320. FRCC does not provide any on-campus housing, so all of their students live off-campus. For the near future, FRCC expects enrollment to stay flat or to possibly decrease slightly. Multi-Family Demand and Vacancy Rates According to the Colorado Division of Housing, the vacancy rate for the Fort Collins area during the first quarter of 2012 was 2.6%, one of the lowest in the state. With such a low vacancy rate, average rents have continued to increase reaching $1,010 for the first quarter of 2012. The history of vacancy rates and average rents per unit are: FIGURE 1: VACANCY RATES & AVERAGE RENTS Year-Quarter Vacancy Rate Average Rent 2012–1Q 2.6% $1,010.00 2011-3Q 2.2% $946.73 2011-1Q 4.0% $902.87 2010-3Q 2.8% $868.36 2010-1Q 5.2% $837.15 2009-3Q 5.5% $846.37 2009-1Q 4.0% $860.81 2008-3Q 4.2% $854.38 2008-1Q 4.8% $760.21 2007-3Q 4.9% $757.17 2007-1Q 7.0% $758.27 2006-3Q 8.9% $766.14 2006-1Q 8.8% $748.88 2005-3Q 9.5% $730.27 2005-1Q 12.9% $739.79 2004-3Q 11.0% $722.65 2004-1Q 13.9% $725.90 Multi-Family Supply and STUDENT HOUSING ACTION PLAN 13 Student Preferences In 2011 and 2012, a rental housing preference survey was given to CSU students. The results from these surveys show CSU students have the following preferences regarding rental housing. Living Arrangement  currently rent 84%  live in an apartment 38%  live in a house 34%  live within a mile from campus 49%  live between 1-4 miles from campus 42% Transportation 82% brought a car to campus/community when they moved here Method for daily commuting to campus:  Drive their car to campus 25%  Bike to campus 24%  Walk to campus 23%  Ride the bus to campus 15% Important Factors in Choosing a Rental  Price 96%  On-site parking 85%  Quality property management 81%  Number of bedrooms 80%  Type of amenities 79%  Proximity to campus 75%  Size of unit 63%  On-site bike parking 56%  Proximity to public transportation 53% Important Amenities  Full kitchen 82%  Closet/storage space 77%  Washer/dryer in unit 76%  Wi-Fi 58%  Large living room 56%  Large bedroom 54% Rent/Pets/Utilities  Would pay more to have certain amenities 41%  Prefer to live with 2 roommates 31%  Prefer to live with 1 roommate 28%  Prefer to have utilities included in the rent 67%  Believe living with a pet is important 68% Number of Bedrooms Preferred  One 12%  Two 38%  Three 37%  Four+ 22% Housing Preferences  House in a neighborhood – #1 choice for type of residence  Would pay more to live near campus 63%  Stay in Fort Collins during summer months 69%  Feel comfortable living in a building with 1-3 floors 94%  Willing to live in a larger, high-density complex if there are adequate sound barriers 14 STUDENT HOUSING ACTION PLAN SECTION 4 ACTION ITEMS & IMPLEMENTATION Feedback received through the public engagement process drove the draft action items to be considered by City Council. Draft action items fall into four specific categories:  Near Term – 2013  Longer Term – 2014 and beyond  Items that do not need formal Council consideration  Items proceeding in other processes Adopted Action Items During the SHAP planning effort, City Council directed staff to bring some action items forward for consideration on a faster track than the document itself in an effort to address concerns raised by residents about the increasingly adverse impacts of larger multi-family developments. In particular, staff was asked to address developments near existing single- family residential neighborhoods. As a result of this, the following items are already adopted by City Council through the Land Use Code (LUC) Changes Phase 1 & 2. The benefit of the following action items relate directly to compatibility concerns. These changes provide the public the opportunity to give input on a project while it is still in the early stages of development, better design compatibility and a proper mix of housing and commercial uses. FIGURE 2: ADOPTED ACTION ITEMS Action Item Process & Date Adopted Apply MMN (medium-density mixed-use neighborhood) zone standards to all multi-family projects outside of the TOD (transit-oriented development) overlay zone requiring mix of housing, larger setback, building variation and articulation, park or gathering space. LUC Code Changes Phase 1 on 09-18-12 Modify NC (neighborhood commercial) zone to ensure commercial component. LUC Code Changes Phase 1 on 09-18-12 Require Type II Hearing for multi- family developments with 50 units or 75 bedrooms. LUC Code Changes STUDENT HOUSING ACTION PLAN 15 Limit 4+ Bedroom Units in Multi-family Developments During this discussion, it became clear that a limit or percentage restriction is not the best way to address concerns. Instead, stakeholders felt that directly tying mitigation factors to 4-bedroom units would be more beneficial. Examples include greater buffering and providing more parking. Current code requires 2.5 parking spaces for one 4-bedroom unit; however, it requires 1.75 spaces for each 2-bedroom unit (total of 3.5 spaces for two 2-bedroom units but only 2.5 spaces for one 4-bedroom unit). These mitigation requirements would be based on a combination of the number of units, number of bedrooms, or number of 4+ bedroom units and the proximity to single-family residential neighborhoods. This issue is addressed in the near-term action items. University District In talking with stakeholders there was no clear benefit of establishing a University District, although the discussion included the following distinctions: A non-regulatory University District could highlight the uniqueness and qualities of the area – it could be similar to UniverCity Connections or the University District recently created in Greeley. A regulatory University District had many regulations that seemed appropriate city-wide rather than just in a certain geographic area. The City currently focuses resources where they are needed so the areas around campus currently receive greater attention from both police officers and code compliance inspectors; however there is a desire to better address repeat violations and exterior property maintenance (these items are being brought to City Council for consideration through a separate process in March 2013). At this time, adding a University District is not suggested. Future Action Items The plan is based on the feedback received throughout the public process, and the following action items have been developed for implementation through the adoption of the plan. Action Items for Near-term (2013) The following action items will be brought to City Council in 2013 for formal Council consideration. The first three items will be fully developed and brought to City Council for consideration in March 2013. The last three items require further research, internal review, and public outreach before they are brought to Council for consideration later in 2013. 16 STUDENT HOUSING ACTION PLAN FIGURE 3: ACTION ITEMS NEAR TERM (2013) Action Item Concern Addressed Improve understanding of compatibility by modifying the LUC to include clear examples (photos, drawings) of what is allowed in certain zones. Compatibility Amend Medium-Density Mixed-Use Neighborhood (MMN) district development standards and LUC Sec. 3.8.30 multi-family standards to specify that no vehicular use area can be placed in the said setback from single- and two-family dwellings. Also, consider landscape requirements for this setback. Compatibility Better define and amend the LUC Sec. 3.8.16 (E) (2) requirement that 4+ bedroom developments need to provide additional open space, recreation areas, parking areas and public facilities as are necessary to adequately serve the development and excepting the TOD Overlay Zone. Intensity of 4+ bedroom units, compatibility Confirm that the uses, development standards and density allowances in the Neighborhood Conservation Buffer (NCB) district are consistent with the intent and purpose of the district appropriate sub-area plans in that it provides a transition between residential neighborhoods and commercial-use areas. This change will require incorporating the results of the Eastside and Westside Neighborhoods Character Study which is not yet complete. Compatibility Define different multi-family housing types (rather than just the broad multi-family definition). The requirement for multiple housing types could be used as a gradient of development between proposed multi- family and existing single-family. Compatibility STUDENT HOUSING ACTION PLAN 17 FIGURE 4: ACTION ITEMS FOR COUNCIL CONSIDERATION – LONGER TERM (2014 AND BEYOND) The following action items would need further development and outreach before going to City Council for formal consideration. Action Item Concern Addressed Build an above- or below-grade pedestrian/bicycle crossing at or near Shields and Elizabeth Streets. This item would need 2-3 years to develop and fund. It would require further involvement and development from Transportation Planning and Engineering and coordination with CSU. Traffic and Safety Consider requiring property managers/owners to provide City ordinance information to their tenants at lease signing. This could be accomplished relatively quickly (one year). It would require additional public outreach. Accountability Form an on-going advisory committee made up of City, CSU, FRCC, neighbors, students, property managers, Police, and ASCSU to guide City Council on student housing issues. This could be accomplished relatively quickly (1 year). It would require staff support. Accountability and Education Consider a rental licensing program to ensure health/safety of units, data regarding rentals, increased accountability of the rental business. Require all landlords to take the Landlord Education Series provided by the Neighborhood Services. Council has considered rental licensing and registration programs in the past. This could be re-visited if Council supports. Would require 1-2 years for further research and significant public outreach. Accountability and Education 18 STUDENT HOUSING ACTION PLAN FIGURE 5: ACTION ITEMS THAT DO NOT NEED FORMAL COUNCIL CONSIDERATION The following action items do not need formal approval by City Council. Staff is planning to move forward with these items. Action Item Concern Addressed Increase enforcement of nuisance and noise ordinances in areas with a high concentration of complaints. Increased enforcement on repeat nuisance violations. This requires a code amendment–planned for March 2013. Accountability Increase education about enforcement so the community is more aware of the enforcement process and data related to enforcement. Education and Accountability Consider increasing proactive enforcement on noise and occupancy violations. Accountability Increase education efforts about the Party Registration program and ensure it creates benefits to neighborhoods. Education Increase education to students based on current needs/concerns (both on- and off-campus students) include realistic information about what it means to move off campus and into a neighborhood. Education Provide information to parents of students so they are aware of local codes, ordinances, and responsibilities. Repeat messages often especially during peak housing decision times. Education Provide incentives for students to take Renting 101, an existing class that could offer a “preferred tenant” certificate that landlords could recognize. Education and Accountability STUDENT HOUSING ACTION PLAN 19 FIGURE 6: ACTION ITEMS PROCEEDING IN OTHER PROCESSES The following action items are either moving forward in a separate process, or are the responsibility of CSU. CSU has discussed these items and agreed with the CSU-specific items below. No Council action is required for these items through the SHAP process. Action Item Concern Addressed CSU parking fees: CSU will assess as the academic year moves forward. CSU has not seen any downward trend in permit sales which indicates no increased impact on surrounding neighborhoods. CSU will conduct a parking and transportation study during the 2012-2013 academic year. Spill-over parking City Parking Plan implementation: adopted in 2013 budget and proceeding in separate process. Parking Update West Central Neighborhoods Plan: adopted in 2013 budget and proceeding in a separate process. Compatibility, housing, parking, transportation Work with CSU to develop enhanced transit service to surrounding neighborhoods with connection to MAX. Parking and Traffic Phase 3 of the Transit Plan – implementation. Parking and Traffic CSU will strive to provide enough on-campus housing (either in halls or apartments) for all first year and international students as well as 25% of returning students, based on projections and actual CSU enrollment numbers. CSU On-Campus Housing Supply CSU will continue to explore options for public/private partnerships to provide student housing and to look at other examples and best practices. CSU On-Campus Housing CSU will continue to look at alternate sites for student housing as they refine their master plan. CSU On-Campus Housing CSU will present on-campus housing updates annually to the City/CSU Liaison Committee and seek other opportunities to share this information with the community. CSU On-Campus Housing 20 STUDENT HOUSING ACTION PLAN SECTION 5 MONITORING AND REVIEW Implementation of this plan will occur as indicated in Section 4: Action Items and Implementation:  Near-Term Action Items in the of Spring 2013  Longer-Term Action Items in 2014 and beyond  Action Items– No Council Action in 2013  Action Items In Other Processes in 2013 and beyond Some of the Land Use Code changes will impact new development as it occurs. Others are new initiatives that will need to be accommodated in future work plans and, if necessary, accommodated in future capital and/or operating budgets. Most of them are recommended to be implemented as soon as possible, and some will be implemented immediately. The Action Items will be monitored regularly to ensure they are meeting the desired outcomes and to recommend any needed changes. STUDENT HOUSING ACTION PLAN 21 SECTION 6 FINANCIAL AND RESOURCE IMPLICATIONS Full implementation of the Action Items in this plan will have a cost. A cost in terms of expenditures from the City’s Operating Budget or Capital Budget or costs in terms of staff time or need for additional staff. The Action Items fall into three categories with respect to the need for resources. Existing Resources Some of the action items can be accomplished with existing resources and will not add costs to the City. These items include all of the Near-term Action Items. They are all recommended Land Use Code changes in an effort to better ensure compatibility of new projects with existing neighborhoods. Additionally, all of the educational program improvements outlined in the Action Items that do not need formal Council consideration will be implemented using existing resources. Additional Resources Needed Some of the action items will need additional resources to be implemented. All of the Longer- Term Action Items will need some level of additional resources (including a Capital Budget for a pedestrian bridge and an operating budget for rental licensing). The details for the costs of these items will be included in the materials provided to Council when these items are brought forward for formal Council consideration. Resources Identified in Other Processes The action items proceeding in other processes will identify funding needs within the process they are moving forward in. For example, the City’s Parking Plan will identify the funding needs for implementation of that plan. Additionally, the items that are the responsibility of CSU will use CSU resources for implementation. 22 STUDENT HOUSING ACTION PLAN APPENDIX A EXISTING CONDITIONS SNAPSHOT Fort Collins Total Population 144,880 (includes students who live within city limits) CSU Total Enrollment 2011 Fall Semester – 26,735 2012 Fall Semester – 26,769  Undergraduate (traditional) – 19,796  Undergraduate (non-traditional) – 2,504  Graduate & Professional – 4,435 Front Range Community College 2012 Total Enrollment Spring – 6,320 FORT COLLINS MULTI-FAMILY HOUSING VACANCY RATES AND AVERAGE RENTS (Source: Colorado Division of Housing) Year-Quarter Vacancy Rate Average Rent 2012-1Q 2.6% $1,010.00 2011-3Q 2.2% $946.73 2011-1Q 4.0% $902.87 2010-3Q 2.8% $868.36 2010-1Q 5.2% $837.15 2009-3Q 5.5% $846.37 2009-1Q 4.0% $860.81 2008-3Q 4.2% $854.38 2008-1Q 4.8% $760.21 2007-3Q 4.9% $757.17 2007-1Q 7.0% $758.27 2006-3Q 8.9% $766.14 2006-1Q 8.8% $748.88 2005-3Q 9.5% $730.27 2005-1Q 12.9% $739.79 2004-3Q 11.0% $722.65 2004-1Q 13.9% $725.90 2003-3Q 12.5% $721.84 2003-1Q 13.7% $743.27 City of Fort Collins Multi-family Housing (*numbers are not comprehensive – only contains those that will rent to students) Total number of complexes - 57 Total number of Units – 6,507 Total number of bedrooms – 12,077  Studio – 207  1-bedroom – 1,949  2-bedroom – 3,374  3-bedroom – 735  4-bedroom – 242 CSU ON-CAMPUS HOUSING CAPACITY (Source: CSU Housing & Dining Services) Year Design Capacity Program Capacity Opening Capacity 2000 5,016 4,483 4,549 STUDENT HOUSING ACTION PLAN 23 CHANGES IN CAPACITY - FUTURE PROJECTS Year Gain/Loss of Beds Notes 2012 +120 Parmelee 2013 +120 Braiden 2014/2015 +600 Lory Apartments redevelopment CHANGES IN CAPACITY - AFTER 2015 (depending on numbers, financing, economy, etc. – Master Plan calls for) Gain/Loss of Beds Notes +300 Newsom redevelopment will replace 400 beds with 700 new beds +300 Allison redevelopment will replace 400 beds with 700 new beds ? Aylesworth – under review ? Aggie Village North – under review CSU Enrollment - Future Projection Range (Source: CSU Office of External Affairs) In the fall of 2000, we were at roughly 23,000 students. Since then, we have grown to our current level of approximately 27,500. At that same growth rate, and with the continued strong market position for CSU in Colorado and around the nation, we would project enrollment that could be as high as 35,000 students in a decade. We do not anticipate, or plan, to grow beyond that 35,000 student point – it is the outer limit in our current thinking. This would include graduate and undergraduate enrollment (does not include online enrollment), and will, of course, continually evolve based on funding levels, market conditions and other factors. CSU ENROLLMENT FALL 2000 – SPRING 2011 (Source: CSU) Year Semester Total Enrollment % Change Fall Semester 2000 Fall 23,098 2001 Spring 21,740 2001 Fall 23,934 3.6% 2002 Spring 22,669 2002 Fall 24,735 3.3% 2003 Spring 23,220 2003 Fall 25,042 1.2% 2004 Spring 23,468 2004 Fall 25,382 1.4% 2005 Spring 23,730 2005 Fall 24,947 -1.7% 2006 Spring 23,095 2006 Fall 24,670 -1.1% 2007 Spring 22,989 24 STUDENT HOUSING ACTION PLAN  Of the total number of units in the city, 56% were detached single-family units, 9% were attached single-family units (townhomes), 3% were duplexes, 2% were mobile homes, and about 30% were multi-family units.  Of the occupied detached single-family units, 79% were owner-occupied and 21% were renter-occupied. With more research, the percentages of owner-occupied versus renter-occupied detached single-family units in areas near CSU’s main campus could be determined.  Of the occupied attached single-family units, 55% were owner-occupied and 45% were renter occupied. This would seem to indicate that a good number of townhomes are owned by investors for rental purposes.  Most of the duplexes (91%) and most of the multi-family units (89%) were renter– occupied. STUDENT HOUSING ACTION PLAN 25 APPENDIX B CSU MASTER PLAN PROJECTIONS 2012-20 (Source: CSU’s Housing & Dining Services) 26 APPEND SUR DIX C RVEY RRESU LTS STUDDENT HOUSING ACTION PLAN STUDENT T HOUSING AACTION PLAAN 27 28 STUDDENT HOUSING ACTION PLAN STUDENT T HOUSING AACTION PLAAN 29 30 STUDDENT HOUSING ACTION PLAN STUDENT T HOUSING AACTION PLAAN 31 32 STUDDENT HOUSING ACTION PLAN STUDENT T HOUSING AACTION PLAAN 33 34 STUDDENT HOUSING ACTION PLAN STUDENT T HOUSING AACTION PLAAN 35 36 STUDDENT HOUSING ACTION PLAN STUDENT T HOUSING AACTION PLA AN 37 38 STUDDENT HOUSING ACTION PLAN STUDENT T HOUSING AACTION PLAAN 39 40 STUDDENT HOUSING ACTION PLAN STUDENT T HOUSING AACTION PLAAN 41 42 STUDDENT HOUSING ACTION PLAN STUDENT T HOUSING AACTION PLAAN 43 44 STUDDENT HOUSING ACTION PLAN STUDENT HOUSING ACTION PLAN 45 APPENDIX D DEVELOPMENT PROPOSALS ENTITLED & CONCEPTUAL MULTI-FAMILY PROJECTS (Totals for bedroom and parking space counts are underestimated because conceptual proposals provide incomplete information.) All Multi-family Projects Student-Oriented Multi-family Units Bedrooms Parking Units Bedrooms Parking Approved Final Plan/Under Construction/Recently Completed 1,257 2,571 2,147 556 1,497 990 Approved Project Development Plan/Submitted Final Plan 533 1,573 1,389 461 1,461 1,338 Total Approved 1,790 4,144 3,536 1,017 2,958 2,328 Submitted (Project Development Plan or Major Amendment) 203 378 361 141 252 187 Conceptual or Preliminary 1,428 1,601 1,267 247 380 312 Total Submitted, Conceptual, Preliminary 1,631 1,979 1,628 388 632 499 TOTAL 3,421 6,123 5,164 1,405 3,590 2,827 46 STUDENT HOUSING ACTION PLAN APPROVED FINAL PLAN/UNDER CONSTRUCTION/RECENTLY COMPLETED Stage of Project Project Name Units Bedrooms Parking Target Market Comments Recently Completed Pura Vida Place 52 100 49 Students Under Construction Choice Center 219 676 336 Students Under Construction The Grove 218 612 495 Students Under Construction Ram's Crossing K2 40 58 47 Students Final Plan Approved 1409 W Elizabeth Student Apts 27 51 63 Students Pkg for res & comm Subtotal - Student Market 556 1,497 990 Recently Completed Penny Flats (Bldg 4) 30 46 38 Mixed Under Construction Penny Flats (Bldg 3) 21 27 23 Mixed Under Construction Presidio 240 360 436 Mixed Under Construction Caribou Apartments Phase Two 96 156 124 Mixed Affordable Final Plan Approved The Trails at Timberline 314 485 536 Mixed Subtotal - Mixed Market 701 1,074 1,157 Total - Approved FP/Under Construction/Recently Completed 1,257 2,571 2,147 STUDENT HOUSING ACTION PLAN 47 APPROVED PDP/ SUBMITTED FINAL PLAN Stage of Project Project Name Units Bedrooms Parking Target Market Comments PDP Approved District at Campus West 194 658 461 Students PDP Approved Aspen Heights 221 720 786 Students 720 BRs after extra occupancy permit PDP Approved Hellenic Plaza 46 83 91 Students Subtotal - Student Market 461 1,461 1,338 PDP Approved Legacy Senior Apts 72 112 51 Senior Affordable Subtotal - Mixed Market 72 112 51 Total - Approved PDP/Submitted Final Plan 533 1,573 1,389 48 STUDENT HOUSING ACTION PLAN SUBMITTED PDP OR MAJOR AMENDMENT Stage of Project Project Name Units Bedrooms Parking Target Market Comments PDP Submitted West Range/Pike Apts. 15 38 39 Students PDP Re- submittal Required Remington Annex 42 46 unknown Students PDP Submitted Landmark Expansion 84 168 148 Students Subtotal - Student Market 141 252 187 PDP Submitted Block One 12 12 70 Mixed BRs unknown (>12) PDP Submitted Hickory Commons Mixed Use 26 66 53 Mixed Live/work units Major Amendment Submitted One Boardwalk Place 24 48 51 Mixed Subtotal - Mixed Market 62 126 174 Total - Submitted PDP or Major Amendment 203 378 361 STUDENT HOUSING ACTION PLAN 49 CONCEPTUAL/PRELIMINARY (Totals for bedroom and parking space counts are underestimated because conceptual proposals provide incomplete information.) Stage of Project Project Name Units Bedrooms Parking Target Market Comments Conceptual (neighborhood meeting held 10/2012) Carriage House Apts 50 100 52 Students Conceptual - 11/2012 830 S College Mixed Use 20 38 25 Students Pkg for res & comm Conceptual - 6/2012 2300 W. Elizabeth Lofts 27 51 63 Students Conceptual - 6/2012 223 W Prospect Mixed Use 35 54 47 Students Pkg for res & comm Conceptual - 5/2012 615 W Lake 91 113 71 Students Conceptual - 3/2012 Yovanoff Property Multi- family 24 24 54 Students BRs unknown (>24) Subtotal - Student Market 247 380 312 Conceptual (10/2012) Affinity 150 150 unknown Senior BRs unknown (>150) Conceptual (neighborhood meeting held 9/2012) Foothills Mall Multi-family 400 400 Mixed BRs unknown (>400); also considering 800 unit option Preliminary - 9/2012 203 W. Mulberry Mixed Use 51 51 66 Mixed BRs unknown (>51) Conceptual (8/2012) 2537 Research Mixed Use 24 64 Mixed Pkg for res & office Conceptual (6/2012) 301 N Howes 16 16 unknown unknown BRs unknown (>16) Conceptual (5/2012) Lincoln and Lemay Apts 540 540 889 Mixed BRs unknown (>540) Subtotal - Mixed Market 1181 1221 955 Total - Conceptual/Preliminary 1428 1601 1267 50 STUDENT HOUSING ACTION PLAN ATTACHMENT 3 1 1 Resolution 2013-013 Adopting the Student Housing Action Plan February 26, 2013 Beth Sowder, Neighborhood Services Manager Laurie Kadrich, CDNS Director Seth Lorson, Planner 2 Summary • Student Housing Action Plan (SHAP) • City Plan – identified need • Involved Colorado State University (CSU), Front Range Community College (FRCC), neighbors, students, developers, and other stakeholders • Feedback through public engagement drove development of Action Items ATTACHMENT 4 2 3 Background • SHAP project began in 2011 • Discussed at Council Work Sessions (February 14, 2012 and December 11, 2012) • Updates provided to Boards and Commissions • Planning & Zoning Board voted to recommend adoption • Provides a vision to achieve the SHAP mission 4 Background Information & Data • Applicable City Plan policies • Land Supply and Growth policies for Fort Collins • Student Enrollment Data and Projections • Multi-family Vacancy Rates in Fort Collins • Multi-family Average Rents in Fort Collins • CSU On-Campus Housing Supplies • Off-Campus Housing Supplies & Developments • Student Housing Preferences 3 5 Stakeholders • Colorado State University • Front Range Community College • Students/tenants • Neighbors • Property Owners • Developers/Designers • Fort Collins Board of Realtors • Northern Colorado Rental Housing Association • Center for Public Deliberation 6 Action Items • Items already adopted • Items referred back to SHAP • Action Items in Plan: – Near Term Action Items (2013) – Longer Term Action Items (2014 and beyond) – Action Items – Administrative – Action Items Proceeding in other Processes 4 7 Plan Implementation & Monitoring • Near Term Action Items Spring 2013 • Long Term Action Items 2014 & beyond • Action Items – No Council Action 2013 • Action Items in Other Processes 2013 & beyond • Monitoring will occur regularly 8 Public Outreach • Stakeholders – focus groups, dialogues, and general feedback • Boards & Commissions - presentations and updates • Professional Organizations – presentations • Website – detailed information, updates, & on-line survey to seek input • Social media – generate interest • Public Open House • Student Rental Housing Preferences Survey 5 9 Recommendations • Staff recommends adoption • Planning & Zoning Board – voted 5:0 to recommend approval • General support given by: – Landmark Preservation Commission – Building Review Board – Air Quality Advisory Board • Affordable Housing Board – supportive but expressed concern on some specific action items 10 Questions? RESOLUTION 2013-013 OF THE COUNCIL OF THE CITY OF FORT COLLINS ADOPTING THE STUDENT HOUSING ACTION PLAN WHEREAS, upon the direction of the City Council and in accordance with City Plan, City staff has initiated a study for the purpose of generating a Student Housing Action Plan (the “SHAP”) to address the increasing need for multi-family student housing and the potential negative impacts to and compatibility concerns of existing single-family neighborhoods; and WHEREAS, the SHAP provides a vision to achieve the overall mission of developing community-driven strategies that encourage quality student housing while maintaining neighborhood quality and compatibility; and WHEREAS, the City is experiencing an increase in population and student enrollment, along with very low vacancy rates, so that a limited supply of multi-family housing presently exists in the City and there are challenges in addressing neighborhood concerns with new multi-family development projects; and WHEREAS, the SHAP was developed through a diverse and in-depth process that emphasized stakeholder engagement, background research, data collection and action item development; and WHEREAS, the development of the SHAP involved extensive public outreach, not only with Colorado State University and Front Range Community College and their students and administration, but also with the Fort Collins Board of Realtors, developers, designers, rental associations and other interested groups in the community; and WHEREAS, the Planning and Zoning Board, Landmark Preservation Commission, Building Review Board and Air Quality Advisory Board are supportive of the SHAP; and WHEREAS, the Affordable Housing Board is also generally supportive of the SHAP, although its members have expressed concerns about the impact that some of its implementation measures may have on the availability of affordable housing in the City; and WHEREAS, the City Council has determined that the SHAP is in the best interests of the City and should be adopted. NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF FORT COLLINS that the Student Housing Action Plan (SHAP), dated February 19, 2013, a copy of which is on file in the office of the City Clerk, is hereby adopted as a plan of the City. Passed and adopted at an adjourned meeting of the Council of the City of Fort Collins this 26th day of February, A.D. 2013. Mayor ATTEST: City Clerk 2007 Fall 24,983 1.3% 2008 Spring 23,051 2008 Fall 25,011 0.1% 2009 Spring 23,187 2009 Fall 25,413 1.6% 2010 Spring 23,745 2010 Fall 26,356 3.7% 2011 Spring 24,529 2011 Fall 26,735 1.4% Housing Unit and Tenure Data Analysis (Source: 2009 American Community Survey)  In 2009, about 94% of the housing units in Fort Collins were occupied and 6% were vacant.  Of the occupied units, 55% were owner- occupied units and 45% were renter- occupied units. The relatively high percentage of rental units is not unusual for a college town. 2001 5,016 4,790 4,777 2002 5,016 4,584 4,828 2003 5,016 4,904 4,798 2004 5,551 4,985 4,922 2005 5,135 4,784 4,668 2006 5,135 4,772 4,758 2007 5,561 5,165 5,155 2008 5,561 5,240 5,215 2009 5,778 5,359 5,186 2010 5,778 5,355 5,336 2011 5,778 5,184 5,174 CHANGES IN CAPACITY FROM 2004-2009 (Source: CSU Housing & Dining Services) Year Gain/Loss of Beds Notes 2004 +535 Summit Hall 2005 -400 Ellis Hall removed 2007 +165 Academic Village Honors 2007 +261 Academic Village Engineering 2009 +217 Aspen Hall Phase 2 on 11-20-12 Referred Items During the LUC Code Change Phase 1 & 2 discussions, Council directed staff not to define “student housing” or change the TOD boundary. Council did refer three items back to the SHAP process for further discussion: Operations, Security & Management Plan; Limit 4+ bedroom units in multi-family developments; and University District or Overlay. The SHAP stakeholders discussed these three items in detail and provide the following for Council consideration: Operations, Security & Management Plan Amongst stakeholders there was general agreement that the City should not try to regulate business models or items that have limited enforcement effectiveness. The group suggested trying to find ways to incentivize multi-family complexes to have on-site management and a thorough management plan. Suggested ideas included reduced fines for owners with on-site management and possibly increased fines to owners when they do not have professional on- site management. Staff will continue to work with stakeholders to develop methods to encourage the use of thorough Operations, Security and Management Plans. 74% Development According to a rental listing provided by CSU, we know that there are approximately 57 off campus complexes that rent to students that provide around 13,000 bedrooms. In addition to this, many students choose to rent single-family homes. CSU has approximately 6,300 beds provided on campus. CSU is currently building more on- campus beds, and they have plans to build more in the future. They are committed to providing on-campus housing for all freshmen and international students as well as 25% of returning students. (See Appendix B) The private market has also responded to the demand for off-campus multi-family student housing projects; there are currently two large projects under construction and several more are either approved or in the development process. Most, if not all, of the housing needs will be met in the next five to seven years by the increase in on-campus housing and the approximately 3,500 student-oriented multi-family bedrooms currently under construction or in the development process. (See Appendix D.) This housing supply helps meet the need presented in the first part of the SHAP mission – to ensure a supply of quality student housing. Much of the SHAP stakeholder discussions have concentrated on the second part of the mission– to maintain neighborhood quality and compatibility. main categories: Character of the Neighborhoods, Housing, and Transportation. Many of the goals within this plan coincide with the draft action items that have been identified in the Student Housing Action Plan. These goals and action items pertain to Land Use, Neighborhood Appearance and Design, Sense of Community, Housing, Traffic, Transit, and Parking. existing neighborhoods that lack such facilities, provided they meet performance and architectural standards respecting the neighborhood’s positive characteristics, level of activity, and parking and traffic conditions. West Central Neighborhoods Plan The West Central Neighborhoods Plan was developed in the late 1990s and focused on neighborhoods in close proximity to CSU. It is important to refer to and incorporate this plan because the majority of student housing exists in this area. An update to the West Central Neighborhoods Plan will occur in 2013. The vision of the West Central Neighborhoods Plan: “Maintain and enhance the diverse character of the West Central Neighborhoods, comprised of long- and short-term residents such as families, senior citizens, and students, as well as small businesses, schools, and public/private institutions and facilities. Strengthen the collaboration between the City, Colorado State University, and the West Central Neighborhoods. Continue to provide housing opportunities, infrastructure, and lifestyle options to meet the needs of this diverse group of neighborhoods. Facilitate and improve existing transportation systems to allow all residents to have good, safe, convenient and multi-modal transportation options. Adapt to meet the needs of the dynamic and ever-changing West Central Neighborhoods and provide balanced opportunities in development, redevelopment, and maintenance.”