HomeMy WebLinkAboutCOUNCIL - AGENDA ITEM - 11/19/2013 - MASTER PLAN FOR BLOCKS 32 AND 42, DOWNTOWN FORT CODATE: November 19, 2013
STAFF: Ken Mannon,Operations Services Director
Mike Beckstead,Chief Financial Officer
Ken Mannon,Operations Services Director
Lance Smith,Strategic Financial Planning Manager
Wayne Sterler,Utilities Health Safety & Security
Manager
WORK SESSION ITEM
City Council
SUBJECT FOR DISCUSSION
Master Plan for Blocks 32 & 42, Downtown Fort Collins and Utility Building Expansion Update.
EXECUTIVE SUMMARY
The purpose of this work session is twofold:
1. Part A is intended to provide City Council with an update on the Master Plan for Blocks 32 and 42
and how the proposed new Utility Customer Service and Administration building fits into this plan.
2. Part B is intended to provide City Council with an update on the proposed new Utility Customer
Service and Administration Building and renovation of the existing Utility Service Center at 700
Wood Street.
Part A - Master Plan for Blocks 32 and 42
The City of Fort Collins is looking towards development of its downtown property to meet future building
capacity and improve efficiencies between departments. Most City buildings are at or near capacity, and
the City is looking at ways to use Blocks 32 and 42 and plan how the City of Fort Collins should function
as the area is developed over the next 15 -20 years and prepare for future growth for the next 50 plus
years. RNL Design leads the team which is looking at these properties, determining how the various
departments interact, and helping us develop a conceptual master plan.
The design and building project teams have developed two final design options presented here, along
with staff recommendation.
Part B - Utilities Building Update
A new Utilities Customer Service and Administration building is being proposed for construction beginning
in May 2014. This building would be located in Block 32 on Mason Street and would house the customer
service and senior management of the Fort Collins Utilities Service Area. Space initially unused by Utility
staff would be leased in this building to the City's Sustainability Services Area in the near term until it is
needed by Fort Collins Utilities.
In addition to the new building on Mason Street there are operational needs to renovate existing space at
700 Wood Street. Such a renovation would also improve the building’s security and energy efficiency.
Together, the construction of the new building and the renovation of the existing building are expected to
cost $20M. Currently, the Light & Power Fund has $4.5M in Reserves for this effort leaving a need for
$15.5M to be financed.
A revenue bond is recommended to finance this project. It is recommended that a single bond issuance
be made through the Light & Power Enterprise Fund.
1
Packet Pg. 3
November 19, 2013 Page 2
GENERAL DIRECTION SOUGHT AND SPECIFIC QUESTIONS TO BE ANSWERED
1. Does the Council support the conceptual design of Diagram # 9 for the master plan of Blocks 32
and 42?
2. Does the Council support locating the new Customer Service Building in the southwest corner of
Block 32 and moving forward with the proposed renovation of 700 Wood Street to create needed
space for the light & power crews and improve building performance and efficiencies?
BACKGROUND / DISCUSSION
Part A - Master Plan for Blocks 32 and 42
The City of Fort Collins has made purchases to acquire property on Block 32 following the 1996 Civic
Center Master Plan which can be found online at: <http://citynet.fcgov.com/opserv/files/Downtown>
CCMasterPlan.pdf. The first purchase on Block 32 was from Trillium Corporation in July of 1996 and that
purchase was for the east half of Block 32. The City continued acquisitions through December of 2008
when the City purchased the Haiston Oil site on the NW quarter of the block.
City Staff and the design team conducted a visioning session and developed the following guiding
principles for using both blocks to create a City of Fort Collins civic campus:
World Class Leadership: becomes a point of community pride in performance, innovation and
regenerative design that sets an example for the private sector in its reflection of Fort Collins’
character and culture.
Vibrant community spaces: contribute nature and ecology to the city while establishing places
for public engagement that promote social and individual health.
Resilient design: lasting quality that is climate adaptive, accommodates growth and flexibility,
and a universal community.
Intuitive Organization: support and activate site connectivity, externally and create a
collaborative environment, internally.
Enhance the civic heart: physical embodiment of the city’s mission and plan that meet
immediate needs; establish a vision that can be invested in and realized.
After many interviews, discussions and tours of various City departments to determine future building
needs, a three day charrette was conducted. Two design concepts were selected out of nine options
originally presented for development of Blocks 32 and 42.
The City of Fort Collins currently owns both Blocks 32 and 42.
The two final conceptual designs #3 and #9 are aligned with the guiding principles. Conceptual Design #9
is the staff’s recommendation for moving forward because it combines a strong urban design, a vibrant
community event space, best opportunity to incorporate buildings having historic significance and the best
future growth looking at the next 50-100 years.
The location of the new Utility Customer Service and Administration building will influence the final
building design. Design #9 has this building in the southwest corner of Block 32. Design #3 has this
building in the northwest corner of Block 32.-
Part B - Utilities Update
1
Packet Pg. 4
November 19, 2013 Page 3
The Utility Service Center at 700 Wood Street has grown over its lifetime through several additions to its
current 75,000 square foot capacity. These additions have been made as needed by each utility resulting
in a building that currently is one of the most energy in-efficient buildings owned by the City and which
lacks sufficient security. Light & Power crews have single-gender facilities inconsistent with the size and
makeup of the current workforce. To address this immediate need, the Light & Power Enterprise Fund
has appropriated $4.5M already. Together with the ongoing space needs of all of the utilities, these
issues led to the consideration of another addition and renovation of the existing building.
A 24,000 square foot addition was evaluated along with significant renovations of the existing structure.
The estimated cost of this addition and renovation was $15.5M. While such an addition would satisfy
short term needs and improve the energy efficiency of the building, long term space needs along with the
current age of the Utility Service Center and the location of it relative to where the City has grown over the
past few decades suggested that it may be better to build a new building downtown rather than expand
the existing building.
A new building downtown would also allow for the consolidation of the Customer Connections
Department into one office. Currently the Utilities Customer Connections department is located partially
in the Utility Service Center and partially at 117 North Mason in space being leased from the City.
Several challenges exist with the 117 North Mason facility as well as some re-development interest in the
property. Those challenges include insufficient parking along Mason for customers to readily access the
office, poor lighting, security and making costly tenant renovations to a building that will likely not exist
when re-development does occur.
As an alternative, a new Utilities Customer Service and Administration building is being proposed to be
located in Block 32 on Mason Street. This building would house the Customer Connections Department
and senior management of the Fort Collins Utilities Service Area. At 35,000 square feet, this building
would meet the long term space requirements of the Customer Connections and administrative functions
that would be relocated from both the Utility Service Center and 117 North Mason. The estimated cost of
this new building is $11.7M. Space initially unused by Utility staff would be leased in this building to the
City's Sustainability Services Area in the near term until it is needed by Fort Collins Utilities.
The new building on Mason Street would relieve some of the space needs at the Utility Service Center.
However, there remains an operational need to renovate existing space at 700 Wood Street. Such a
renovation would modify some existing space to meet the Light & Power crew needs as well as improve
the building’s security and energy efficiency. The existing HVAC system is at the end of its lifecycle and
will require significant investment in the next few years. Incorporating the HVAC investment into a more
comprehensive renovation of the entire building envelope will substantially improve the energy efficiency
of the building. Relocating the Customer Connections department downtown will make additional space
within the Service Center available for Light & Power field crews without requiring additional construction
at the Wood Street location. Renovations at the Service Center include new locker rooms for Light &
Power Crews and increased space for crew workstations which currently are approximately 9 square feet
per four person crew and additional facilities for operational and safety training. Security will be
enhanced to better protect property and personnel. The renovation is projected to cost $8.3M.
Together, the construction of the new building and the renovation of the existing building are expected to
cost $20M. Currently, the Light & Power Fund has $4.5M in Reserves for this effort leaving a need for
$15.5M to be financed.
A revenue bond is recommended to finance this project. It is recommended that a single bond issuance
be made through the Light & Power Enterprise Fund rather than separate issuances from each of the
utility Enterprise Funds. A presentation was made to the Council Finance Committee on the Block 32
Master Plan and the financing of this project on September 16, 2013.
ATTACHMENTS
1
Packet Pg. 5
November 19, 2013 Page 4
1. #: Master Plan Powerpoint presentation (PDF)
2. #: Triple Bottom Line Synthesis (PDF)
3. #: Triple Bottom Line Analysis Map (PDF)
4. #: Utilities Building Powerpoint presentation (PDF)
5. #: Utilities Building Triple Bottom Lline Synthesis (PDF)
6. #: Utilities Triple Bottom Line Analysis Map (PDF)
1
Packet Pg. 6
Block 32/42 - Civic Center
Existing Conditions
Meldrum
Howes St
Mason St
215 N MAson
City Hall
Ops Services
Park Shop
Haiston Oil
214 N Howes
Eco-
Thrift
Wellness
Annex
Real
Deals
Bike
Library
Block 32/42 - Civic Center
Vision Plan
Charette Process
Block 32/42 - Civic Center
Vision Plan
Guiding Principles
World Class Leadership: becomes a point of community
pride in performance, innovation, and regenerative design that
sets an example for the private sector in its reflection of Fort
Collins’ character and culture.
+
Vibrant Community Spaces: contribute nature
and ecology to the city while establishing places for public
engagement that promote social and individual health.
+
Resilient Design: lasting quality that is climate adaptive,
accommodates growth, flexibility, and a universal community.
+
Intuitive Organization: support and activate site
connectivity externally and create a collaborative environment
internally.
+
Enhance the Civic Heart: physical embodiment of the
city’s mission and plan that meets immediate needs; establish a
vision that can be invested in and realized.
+
Block 32/42 - Civic Center
Vision Plan
Nine Original Diagrams
Diagram 1 Diagram 2 Scheme 4 Scheme 5
Diagram 8
Diagram 3
SelecteD
Diagram 6
SelecteD
Diagram 7
SelecteD
Diagram 9
SelecteD
Block 32/42 - Civic Center
Vision Plan
Selected Diagrams
Diagram 3 Diagram 9
Diagram 9
Block 32/42 - Civic Center
Vision Plan
Customer
Service
Building
215 N.
Mason
Parking
and retail
Transit
City Hall Center
Ops Services
West Wing East Wing
Repurpose
old City
Hall West
Future
parking
structure
City/Private
Future
developmentt
City/Private
Future
developmentt
Mason Street
Howes Street
Wellness
Center/
Eco
Education
Penny
Flats
Justice
Center
Laporte Avenue
Maple Street
Block 32/42 - Civic Center
Vision Plan
Illustrative Plan
0’ 125’ 250’ 500’
Diagram 9
community/Data center
(Existing office portion of City Hall -
25,000 SF)
Ops Service Building
(Existing Building - 26,000 SF)
city Hall - West Wing
(3 Stories - 25,750 SF)
• HR
• IT
• Finance
• Risk Management
city Hall - council chambers
(4 Stories - 68,000 SF)
• City Attorney
• City Clerk
• City Manager
• CPIO
city Hall - east Wing
(3 Stories - 25,750 SF)
• Municipal Court
• Sustainability
1
2
3
4
5
1
6
2
3
8
7
9
4
5
Private Development
Laporte Avenue
Maple Street
Mason Street
Howes Street
Block 32/42 - Civic Center
Vision Plan
Program - Part A: Buildings 1-5
0’ 125’ 250’ 500’
Diagram 9
Wellness Center/Eco-Education
(1 Story - 2,500 SF)
Utilities Customer Service Bldg
(3 Stories - 35,000 SF)
Structured Parking
(4 Decks above grade - 400 Spaces)
• Levels +1-4
- Visitor/Staff Parking (400 Spaces)
• Ground Level
- Retail (11,000 SF)
- Eco-District Infrastructure (15,000 SF)
- Parking Services Office (3,300 SF)
215 N. Mason Street
(3 Stories - 70,000 SF - Existing Build-
ing)
• Building & Development Srvc.
(58,000 SF)
• Flex Space (13,000 SF)
7
6
8
9
1
6
2
3
8
7
9
4
5
Private Development
Laporte Avenue
Maple Street
Mason Street
Howes Street
Block 32/42 - Civic Center
Vision Plan 0’ 125’ 250’ 500’
Program - Part B: Buildings 6-9 Diagram 9
Laporte Avenue
Maple Street
Mason Street
Howes Street
Block 32/42 - Civic Center
Vision Plan
Land Use
Retail
Government Buildings
Public Buildings
Office
p p
p
Parking Structure
0’ 125’ 250’ 500’
Diagram 9
civic
Green
civic
Green
Urban
Farm
Fleet
Parking
courtyard courtyard
courtyard
laporte Avenue
Pedestrian Improvement
Pedestrian Connection
to Downtown
Maple Street
Mason Street
Howes Street
Laporte Avenue
Block 32/42 - Civic Center
Vision Plan
Conceptual Open Space Plan
Native Planting
Permeable Hardscape
Turf Field
Stormwater Corridor
0’ 125’ 250’ 500’
Diagram 9
PV
Geo-exchange
PV
PV
eUI
25
eUI
15
eUI
45
eUI
20
eUI
25
eUI
1000
eUI
25
eUI
1
eUI
45
eUI
20
eUI
10
energy Use:
Energy Generation:
Mason Parking:
Net Generation:
-2,896 MWh
+2,213 MWh
-682 MWh
+938 MWh
+255 MWh
Maple Street
Mason Street
Howes Street
Laporte Avenue
Block 32/42 - Civic Center
Vision Plan
Energy Use and Generation
0’ 125’ 250’ 500’
Photovoltaic Panels (PV)
Geo-Exchange
EUI = Energy Use Intensity
Diagram 9
Rain Garden
Porous Paving
Porous Paving
living Machine
Detention
Bio-Swale
Laporte Avenue
Maple Street
Mason Street
Howes Street
Block 32/42 - Civic Center
Vision Plan 0’ 125’ 250’ 500’
Storm Drainage and Water Treatment System Diagram 9
Laporte Avenue
Maple Street
Mason Street
Howes Street
Block 32/42 - Civic Center
Vision Plan
Pedestrian Movement
Building Access
Internal Pedestrian Paths
Sidewalk
Downtown Connector
Main Building Entrance
0’ 125’ 250’ 500’
Diagram 9
Park Shop
Haiston Oil
City Hall 214 N. Howes
Social &
Sustain.
Bldg
215 N.
Mason
Customer
Service
Building
Phase 1 Plan
• Deconstruct Eco-Thrift, Wellness
Annex, and Real Deals building
• Relocate Bike Library building
• Build 35,000 SF Customer Service
Building
• Provide temporary parking
between Customer Service Building
and 214 N. Howes building
• Open space/public realm
improvements around Customer
Service Building
Temporary
Parking
Ops Services
Laporte Avenue
Maple Street
Mason Street
Howes Street
Block 32/42 - Civic Center
Vision Plan
Construction Area
Current Phase Public
Realm Improvements
Deconstructed Buildings
Current Phase
Building Construction
0’ 125’ 250’ 500’
Phase 1 - Construction of Utility Customer Service Building Diagram 9
Customer
Service
Building
Haiston Oil
Park Shop
City Hall 214 N. Howes
Social &
Sustain.
Bldg
215 N.
Mason Previous Phase
Construction Area
Current Phase Public
Realm Improvements
Deconstructed Buildings
Current Phase
Building Construction
Parking
Garage +
Retail
Phase 2A Plan
• Build Parking Garage and Retail on
the northeast corner of Block 32
• Open space/public realm
improvements around Parking
Garage and Retail
• Open space/public realm
improvements around 215 N.
Mason
Ops Services
Laporte Avenue
Maple Street
Mason Street
Howes Street
Block 32/42 - Civic Center
Vision Plan 0’ 125’ 250’ 500’
Phase 2A - Construction of New Parking Structure Diagram 9
City Hall
Social &
Sustain.
Bldg
215 N.
Mason Previous Phase
Construction Area
Current Phase Public
Realm Improvements
Deconstructed Buildings
Current Phase
Building Construction
Customer
Service
Building
Parking
Garage +
Retail
Phase 2B Plan
• Deconstruct 214. N. Howes and
Park Shop buildings
• Re-alignment of Howes Street
• Public realm improvements around
new Howes Street couplet
Haiston Oil
Ops Services
Laporte Avenue
Maple Street
Mason Street
Howes Street
Block 32/42 - Civic Center
Vision Plan 0’ 125’ 250’ 500’
Phase 2A - Construction of New Parking Structure Diagram 9
City Hall
Social &
Sustain.
Bldg
215 N.
Mason Previous Phase
Construction Area
Current Phase Public
Realm Improvements
Deconstructed Buildings
Current Phase
Building Construction
Customer
Service
Building
Parking
Garage +
Retail
West Wing East Wing
Repurpose
old City
Hall West
Phase 2c Plan
• Deconstruct Parks Shop Building
• Build City Hall and adjacent East
and West Wings
• Open Space and Plaza
Improvements around City Hall and
within Civic Green
• Build Wellness Center/Eco-
Education Building
• Deconstruct council chambers in
existing City Hall, repurpose west
portion of existing building for
community and/or data center use
Haiston Oil
Ops Services
Wellness
Center/
Eco
Education
Laporte Avenue
Maple Street
Mason Street
Howes Street
Block 32/42 - Civic Center
Vision Plan 0’ 125’ 250’ 500’
Phase 2C - Construction of New City Hall Diagram 9
215 N.
Mason
Phase 3 - Future Construction/Development
215 N.
Mason
215 N.
Mason Previous Phase
Construction Area
Current Phase Public
Realm Improvements
Deconstructed Buildings
Current Phase
Building Construction
Parking
Garage +
Retail
City Hall
Repurpose
old City
Hall West
City/Private
Future
development
City/Private
Future
development
Future
parking
structure
Phase 3 Plan
• Build future parking structure
• Build future buildings. Buildings
uses and ownership (City/private)
to be determined based on market
demand at that time. Building uses
can be multi family residential or
commercial/City function offices.
• Relocate Haiston Oil Office and
Garage buildings
• Open Space and Plaza
Improvements around future
parking garage and residential or
office buildings
Customer
Service
Building
West Wing East Wing
Ops Services
Wellness
Center/
Eco
Education
Laporte Avenue
Maple Street
Mason Street
Howes Street
Block 32/42 - Civic Center
Vision Plan 0’ 125’ 250’ 500’
Diagram 9
Diagram 3
Block 32/42 - Civic Center
Vision Plan
Customer
Service
Building
215 N.
Mason
Parking
and retail
Penny
Flats
Justice
Center
Transit
Center
City Hall
Cultural
Building/
Pavillion
Laporte Avenue
Maple Street
Mason Street
Howes Street
Wellness
Center/Eco-
Education
Block 32/42 - Civic Center
Vision Plan
Illustrative Plan
0’ 125’ 250’ 500’
Diagram 3
cultural/community Structure
(1 Story - 13,000 SF)
Utilities Customer Service Building
(3 Stories - 35,000 SF)
Wellness Center/Eco-Education
(1 Story - 6,000 SF)
city Hall - Public
(4 Stories - 53,250 SF)
• Municipal Court
• City Attorney
• City Clerk
• City Manager
• Sustainability
council chambers
(1 Story - 10,000 SF)
city Hall - Internal Services
(3 Stories - 52,000 SF)
• HR
• IT
• CPIO
• Finance
• Risk Management
1
1
2
2
4
4
3
7
3
8
5 5
6
6
Laporte Avenue
Maple Street
Mason Street
Howes Street
Block 32/42 - Civic Center
Vision Plan
Program - Part A: Buildings 1-6
0’ 125’ 250’ 500’
Diagram 3
Structured Parking
(4 Decks above grade, 1 below grade -
450 Spaces)
• Levels +1-4
- Visitor/Staff Parking (400 Spaces)
• Ground Level
- Visitor Parking (50 Spaces)
- Retail (11,000 SF)
- Parking Services Office (3,300 SF)
• Sub-Grade Level
- Eco-District Infrastruct. (9,000 SF)
- Secure Fleet Parking (60 Spaces)
215 N. Mason Street
(3 Stories - 70,000 SF - Existing Building)
• Building & Development Srvc.
(58,000 SF)
• OPS Services (13,000 SF)
1
2
4
7
3
7
8
8
5
6
Laporte Avenue
Maple Street
Mason Street
Howes Street
Block 32/42 - Civic Center
Vision Plan
Program - Part B: Buildings 7-8
0’ 125’ 250’ 500’
Diagram 3
Laporte Avenue
Maple Street
Mason Street
Howes Street
Block 32/42 - Civic Center
Vision Plan
Land Use
Parking Structure
Retail
Government Buildings
Public Buildings
p
p
0’ 125’ 250’ 500’
Diagram 3
Focal Point
Structure
Mid-Block
crossing
Native
Garden
laporte Avenue
Pedestrian Improvement
Pedestrian Connection
to Downtown
Internal
civic Greenway
Green
Ice Rink
Urban
Farm
courtyard
courtyard
Maple Street
Mason Street
Howes Street
Laporte Avenue
Block 32/42 - Civic Center
Vision Plan
Conceptual Open Space Plan
Native Planting
Permeable Hardscape
Turf Field
Stormwater Corridor
0’ 125’ 250’ 500’
Diagram 3
PV
Geo-exchange
PV
eUI
20
eUI
1
eUI
45
eUI
20
eUI
15
eUI
45
eUI
10
eUI
25
eUI
1000
energy Use:
Energy Generation:
Mason Parking:
Net Generation:
-3,175 MWh
+2,476 MWh
-699 MWh
+938 MWh
+239 MWh
Mason Street
Howes Street
Laporte Avenue
Maple Street
Block 32/42 - Civic Center
Vision Plan
Energy Use and Generation
0’ 125’ 250’ 500’
Photovoltaic Panels (PV)
Geo-Exchange
EUI = Energy Use Intensity
Diagram 3
Rain Garden
Porous Paving
Porous Paving
living Machine
Porous Plaza
Detention
Bio-Swale
Laporte Avenue
Maple Street
Mason Street
Howes Street
Block 32/42 - Civic Center
Vision Plan
Storm Drainage and Water Treatment System
0’ 125’ 250’ 500’
Diagram 3
Mason Street
Howes Street
Laporte Avenue
Maple Street
Block 32/42 - Civic Center
Vision Plan
Pedestrian Movement
Building Access
Internal Pedestrian Paths
Sidewalk
Downtown Connector
Main Building Entrance
0’ 125’ 250’ 500’
Diagram 3
Customer
Service
Building Temporary
parking for
CSB
Phase 1 Plan
• Relocate Haiston Oil Garage and
office buildings
• Build 35,000 SF Customer Service
Building
• Open Space and public realm
improvement around Customer
Service Building
• Depending on timing with private
development, space on the north
and east of Block 32 can be utilized
for temporary parking for Customer
Service Building and existing visitor
parking
Park Shop
214 N. Howes
Eco
Thrift
Wellness
Annex
Ops Services
City Hall
Social &
Sustain.
Bldg
Real
Deals
Bike
Library
215 N.
Mason
Laporte Avenue
Maple Street
Mason Street
Howes Street
Block 32/42 - Civic Center
Vision Plan
Construction Area
Current Phase Public
Realm Improvements
Phase 1 - Construction of Utility Customer Service Building
Deconstructed Buildings
Current Phase
Building Construction
0’ 125’ 250’ 500’
Diagram 3
Ops Services
Phase 2A Plan
• Build Parking Garage and Retail on
the northeast corner of Block 32
• Open Space and public realm
improvement around parking
garage and retail building
Park Shop
Eco
Thrift
Wellness
Annex
City Hall
Social &
Sustain.
Bldg
Real
Deals
Bike
Library
215 N.
Mason
214 N. Howes
Previous Phase
Construction Area
Current Phase Public
Realm Improvements
Deconstructed Buildings
Current Phase
Building Construction
Parking
Garage +
Retail
Customer
Service
Building
Laporte Avenue
Maple Street
Mason Street
Howes Street
Block 32/42 - Civic Center
Vision Plan
Phase 2A - Construction of New Parking Structure
0’ 125’ 250’ 500’
Diagram 3
Phase 2B Plan
• Deconstruct Eco-Thrift, Wellness
Annex, 214. N. Howes, and Real
Deals buildings
• Relocate/Repurpose Bike Library
• Build City Hall Building
• Open Space and public realm
improvement around City Hall
Park Shop
City Hall
Social &
Sustain.
Bldg
215 N.
Mason Previous Phase
Construction Area
Current Phase Public
Realm Improvements
Deconstructed Buildings
Current Phase
Building Construction
Customer
Service
Building
City Hall
Parking
Garage +
Retail
Ops Services
Laporte Avenue
Maple Street
Mason Street
Howes Street
Block 32/42 - Civic Center
Vision Plan
Phase 2B - Construction of New City Hall
0’ 125’ 250’ 500’
Diagram 3
Phase 2c Plan
• Deconstruct Parks Shop Building
• Construct Open Space and Plaza
Improvements
• Build Wellness Center/Eco-
Education Building
City Hall
Social &
Sustain.
Bldg
215 N.
Mason Previous Phase
Construction Area
Current Phase Public
Realm Improvements
Deconstructed Buildings
Current Phase
Building Construction
Parking
Garage +
Retail
Customer
Service
Building
Wellness
Center/
Eco
Education
City Hall
Ops Services
Laporte Avenue
Maple Street
Mason Street
Howes Street
Block 32/42 - Civic Center
Vision Plan
Phase 2C - Construction of Wellness Center/Eco-Education
0’ 125’ 250’ 500’
Diagram 3
City Hall
Parking
Garage +
Retail
Customer
Service
Building
Cultural
Building
Pavillion
Wellness
Center/
Eco
Education
Phase 2D Plan
• Deconstruct Social Sustainability,
Old City Hall, and Ops Services
Buildings - Ops Services could be
repurposed
• Construct Open Space and Event
Space
• Build Cultural Building/Pavillion
• Complete public realm
improvements on Block 42
215 N.
Mason Previous Phase
Construction Area
Current Phase Public
Realm Improvements
Deconstructed Buildings
Current Phase
Building Construction
Laporte Avenue
Maple Street
Mason Street
Howes Street
Block 32/42 - Civic Center
Vision Plan
Phase 2D - Construction of Pavillion
0’ 125’ 250’ 500’
Diagram 3
Phase 3 Plan
• Expand Customer Service Building
via an added south wing
• Additional Expansion potential can
occur over the Parking Structure
215 N.
Mason
Phase 3 - Future Growth Possibilities
Previous Phase
Construction Area
Current Phase Public
Realm Improvements
Deconstructed Buildings
Current Phase
Building Construction
City Hall
Parking
Garage +
Retail
Cultural
Building
Pavillion
Customer Service
Building Expansion
Customer
Service
Building
Future
Expansion
Future
Expansion
Laporte Avenue
Maple Street
Mason Street
Howes Street
Block 32/42 - Civic Center
Vision Plan 0’ 125’ 250’ 500’
Diagram 3
Preliminary analysis indicates that there is no significant cost
difference between these two options if completed as shown.
Is Council supportive of moving forward using the conceptual
master plan of diagram #9?
Is the Council supportive of moving forward with the design
for the new Customer Service Building being located in the
southwest corner of Block 32?
Block 32 - Civic Center
Vision Plan
+
+
+
TRIPLE BOTTOM LINE ANALYSIS
Derived from a TBLAM Brainstorm on
DOWNTOWN DEVELOPMENT OF BLOCKS 32 AND 42
In Collaboration with the BUILDING TEAM and VARIOUS CITY STAFF
Purpose: To extract key triple bottom line information from a TBLAM, and use that information to
offer recommendations on key indicators and suggested action items for the proposed new
development of Blocks 32 and 42 between Mason + Meldrum and LaPorte + Maple.
I. General Observations from TBL Analysis Map (TBLAM):
A. The TBLAM is generally well balanced, with a good variety of strengths and limitations identified for
both options A and B.
B. Many considerations crossed into many columns, and rows.
1. Crossing columns indicates excellent depth of discussion and debate.
2. Crossing of rows indicates potential for conflicting values.
C. More discussion after this or additional TBLAM exercise(s) will provide more granular detailed data for
economic strengths and limitations. However,
1. Option B secures much needed Civic space for the many events currently held in downtown Fort
Collins.
2. Option B better provides for future growth for the next 50 years.
D. The Social, Environmental, and Economic component of the TBLAM was discussed in detail during this
analysis, for both City staff and for the public user, and both options have very positive impact provided
Option A does not involve selling off Block 42.
E. One limitation included ensuring sufficient parking for the new downtown Customer Service structure
that would also allow for good public access until the parking garage is completed in phase 2.
F. Opportunities and Threats should be further explored – will the structures built be ones of size appropriate
well into the future/its’ expected use? How will it mesh into our community/downtown development and
traffic growth? Does an opportunity exist to better use (increase the use of the Transit Center) or take
pressure off of other City offices (currently spread amongst several buildings in several locations).
G. No fatal flaws discovered at the time of the TBLAM – (Note: economic factors will be further evaluated
post TBL with a thorough other appropriate economic analysis).
II. Conclusions Offered:
A. Additional effort for a thorough TBLAM is recommended, with basic economic factors considered
including design, space per employee and expected public, renovation costs of the building to be re-
purposed, etc.
B. Clarity should be offered in the AIS as to the two options being presented and the recommended or
preferred Design #9.
III. Potential Key Indicators Suggested:
A. The main limitation expressed by the Building Team was that the City should look to develop Blocks 32
and 42 using high performing buildings and systems with the need for having proper building orientation.
B. Additional TBLAM effort would be useful – and can include ideas emanating from the City’s conceptual
review in November.
1. Any new City structure will require a communication plan & public engagement plan.
2. Must determine how to sell the vision and details of how the public will be better served will be
important.
3. Will need to determine how to handle the building located on Blocks 32 and 42 have historic
significance.
1.b
Packet Pg. 42
#1.b: Triple Bottom Line Synthesis (Utilities Building Update and Blocks 32 - 42 Master Plan)
Form Completed Oct 28, 2013
Triple Bottom Line Analysis Map (TBLAM)
Project or Decision: Blocks 32 & 42 – Master Plan Evaluated by:
Utilities Building
Team & City Staff
Social
Environmental Economic
Workforce/FLEX Community
STRENGTHS:
Design #3 – City Buildings on one Block:
Design #9 – City Buildings across both blocks:
More secure during the day.
Provides for future growth of City departments for
the next 50 years with additional space for future
buildings.
Both designs:
Provides all buildings in one central location. Easy
access for employees.
Provides good interaction between City
departments for collaboration.
Good access between new building Downtown
and 700 Wood St.
Provides improved wellness programs with open
space.
STRENGTHS:
Design #3 – City Buildings on one Block:
Ties in well with the current urban development so it
walks the talk of the City for development.
Howes remains as a through street for the public
use.
Jewel of the community as genuine civic park of
sufficient scale to meet Community needs in
downtown Fort Collins.
Giving back to the citizens a public square/civic
space. Place for community.
Design #9 – City Buildings across both blocks:
Provides a secure place for the public when using
the Civic Center area with the buildings surrounding
the area.
Provides a tie between the CSU oval and the
relationship the City has with the University.
Provides a buffer to the residential neighborhood
from the Civic space.
Both designs:
Have a large dedicated open space for Civic events.
Provides all City Customer Services in a central
location for one stop shopping.
Extends from the existing diagonal walkway through
the existing civic park.
STRENGTHS:
Design #3 – City Buildings on one Block:
Higher density minimizes the impact with smaller
development footprint and maximizes the open space.
Buildings are on smaller footprint which results in less
building surface area.
Design #9 – City Buildings across both blocks:
This design allows for the best sustainable practices to be
implemented.
Both designs:
Potential site for geo-thermal systems which can serve the
Form Completed Oct 28, 2013
LIMITATIONS:
Design #3 – City Buildings on one Block:
Lack of expandable space and departmental
growth with current design.
Design #9 – City Buildings across both blocks:
Building users and customers will have Howes
street to cross when going between the various
buildings.
Both designs:
Lack of parking for City employees, until parking
garage is constructed.
LIMITATIONS:
Design #3 – City Buildings on one Block:
Connection with residential neighborhood with the
large civic space and noise.
Design #9 – City Buildings across both blocks:
Splitting of Howes street will create some concerns
for the public with having to cross the street for
access to the various buildings.
Both designs:
Unsure of how much use the Civic space will see
from the public.
LIMITATIONS:
Design #3 – City Buildings on one Block:
Geo-thermal systems would need to be placed under new
structures unless there is commitment to maintain Civic
space for this use.
More challenging to design the east/west building
orientations.
Design #9 – City Buildings across both blocks:
Having Howes street go through the development creates
car centric environment.
Installation of the eco water system for the entire
development with the street running through the
development.
Both designs:
Must deal with the existing detention pond in NE corner of
development.
LIMITATIONS:
Design #3 – City Buildings on one Block:
Challenge to get building efficiency if east/west orientation is
not maintained.
Ability to secure and maintain boundaries on all four sides of
the Civic space for events.
Future growth of City departments for the next 50 years does
not provide for future buildings.
Design #9 – City Buildings across both blocks:
Losing potential lease for FoCo on Block 32 (Depends on
timeline for phase 2).
Both designs:
Lose Eco-thrift as block is developed.
OPPORTUNITIES:
Works for both designs:
Create relationships across the various building
departments.
Potential to provide City employee functions
(picnic) locally so employees would be able to
come and go as available.
OPPORTUNITIES:
1
Utilities Facility Upgrade
Nov 19, 2013
1.d
Packet Pg. 45
#1.d: Utilities Building Powerpoint presentation (Utilities Building Update and Blocks 32 - 42 Master Plan)
2
1.d
Packet Pg. 46
#1.d: Utilities Building Powerpoint presentation (Utilities Building Update and Blocks 32 - 42 Master Plan)
3
117 N Mason – Customer Service Center (CSC)
• Parking – Challenging for customers to find adequate parking on Mason
• Space Design – old building with poor lighting, security and layout
• Opportunity for Development – interest in West Mountain Ave
Wood Street
• Energy Efficiency:
• One of the City’s most energy in-efficient buildings
• HVAC, windows, skylights, external sealing - requires significant upgrades
• Has not meet fundamental space needs for many years:
• Operations & Crew space limited, poor condition, single gender capacity
• Utilities requires additional space – estimate current need of 24K sq ft
• Security:
• Increasing security requirements post 9/11 difficult to meet with public access
to Wood St building
• Long Term – ideal to have operations center more centrally located vs. on the
north end
Challenges with Existing Utilities Building
1.d
Packet Pg. 47
#1.d: Utilities Building Powerpoint presentation (Utilities Building Update and Blocks 32 - 42 Master Plan)
4
• Leave Customer Service as is at 117 N Mason
• Build an additional 24k square feet of space at Wood St.
• Renovate the majority of the existing Wood St.
• Upgrade mechanicals, energy efficiency, and crew facilities
• Cost Estimate – Total $15.5M:
• Wood St. Renovation - $7.5M
• New Space - $8M
• Given security, 117 N Mason issues and long term view of Wood St.
Question was raised about the possibility of a new building downtown as
more cost effective and providing better service to the community
Original Proposal
1.d
Packet Pg. 48
#1.d: Utilities Building Powerpoint presentation (Utilities Building Update and Blocks 32 - 42 Master Plan)
5
Community Benefits of Downtown Utilities Building
• New downtown building would house:
• Utility executive staff – close together and close to City hall
• Customer Service – easier public access, better security
• Customer Connection – public access to various programs
• Utility Development Review – improved public access, close to 281 N. College
• Services remaining at 700 Wood St
• All Utility crews, Health & Safety, Water Resources
• IT, Regulatory, Finance
• Light & Power engineering & controls
• Public one-stop shopping of City services
• Clerks office, municipal court, utilities, parking, PDT all within 2 blocks
• Create an attractive municipal campus over time
• Municipal campus connected to Justice Center & County building
1.d
Packet Pg. 49
#1.d: Utilities Building Powerpoint presentation (Utilities Building Update and Blocks 32 - 42 Master Plan)
6
Long Term Utilities Space Needs
• Current Utilities space & staff Sq Ft. Staff
• 117 N Mason 8,000 35
• 700 Wood St – moving 70
• 700 Wood St – remaining 75,000 200
• New Building - current
• 700 Wood St – remaining 75,000 200
• New Building – Utilities staff 23,000 105
• New Building – Sustainability 12,000 35
• New Building – 25 years out
• 700 Wood St – remaining* 75,000 235
• New Building Utilities staff 35,000 140
• Sustainability – move to new location 0 0
*or relocated to more central location
1.d
Packet Pg. 50
#1.d: Utilities Building Powerpoint presentation (Utilities Building Update and Blocks 32 - 42 Master Plan)
7
Anticipated Project Scope & Cost
• Remodel 700 Wood St - $8M cost
• Energy efficiency upgrades – mechanical, skylights, windows, building envelope
• Renovate interior to house Light and Power crew and improve work processes
• General office upgrades to approximately 65,000 square feet - small amount of
shared space for visiting utility staff
• Security enhancements – Security fence around employees parking, guard post
at entrance
• New Building - $12M cost
• 35,000 square feet of space in 3 stories – NW corner or SW corner of block 32
• Work stations size based on current cube and fixed wall office standards
• Small amount of flex space for utility staff
• Utility customer service/billing – account set up, bill pay, and closing
• Development review, public meeting space, etc.
• Total Project Cost - $20M
1.d
Packet Pg. 51
#1.d: Utilities Building Powerpoint presentation (Utilities Building Update and Blocks 32 - 42 Master Plan)
8
Financial Implications of a New Downtown Building
• Project Funding ($ millions):
• Existing budget within L&P $ 4.5
• Revenue Bond issued by L&P 15.5
• Total Funding Requirement $20.0
• Annual Debt Cost $1.3M over 20 years*: Debt Service
• L&P $650,000
• Water 325,000
• Waste Water 162,000
• Storm Water 162,000
• Sustainability Rent* 170,000
* Internal MOU for payment terms between Utilities and Sustainability Services
• Facility Operating Costs Current New/Renovated
• 117 N Mason St $86,200 $ 0
• 700 Wood St 336,700 $259,200
• Sustainability 28,800 0
• New Building – Utilities/Sustainability 0 $113,200
$451,700 $372,400
1.d
Packet Pg. 52
#1.d: Utilities Building Powerpoint presentation (Utilities Building Update and Blocks 32 - 42 Master Plan)
9
Financial Comparison
• Remodel Wood St and new 24,000 sq ft building addition
• $15.5M initial capital investment + $1.5M in 5-7 years – Water Utilities
• $450K annual operating expense
• NPV = $24.3M
• Remodel 700 Wood St and New Building downtown on Block 32
• $20M capital investment
• $370K annual operating expense
• NPV = $26.3M
• Other Considerations
• Long-term, may be desirable to move operations to a more central location
• If relocation is an option, a new 24k sq ft addition at 700 Wood St. is not cost
effective in our long range planning
• Long-term, 700 Wood St property may be more valuable with other uses
• A Downtown building provides long-term central facility for external utility
customer services.
• While a rate increase is not specifically requested to support the associated
debt, it is acknowledged that without additional debt, a future rate change would
be slightly reduced
1.d
Packet Pg. 53
#1.d: Utilities Building Powerpoint presentation (Utilities Building Update and Blocks 32 - 42 Master Plan)
10
Estimated Time Line
• Q4 2013 Council Work Session Review
• Q4 2013 Energy & Water Advisory Board Review
• Q2 2014 Design Complete / Notification to Major Customers
• Q2 2014 Electric Enterprise Board (Council) Debt Authorization
• Q2 2014 Debt Closing / Appropriation of Bond Proceeds
• Q3 2014 Construction Begins
• Q3 2015 Construction Complete
1.d
Packet Pg. 54
#1.d: Utilities Building Powerpoint presentation (Utilities Building Update and Blocks 32 - 42 Master Plan)
11
Council Consideration
• Is Council supportive of Utilities moving forward with a revenue
bond offer to support the design, build and remodel efforts?
1.d
Packet Pg. 55
#1.d: Utilities Building Powerpoint presentation (Utilities Building Update and Blocks 32 - 42 Master Plan)
TRIPLE BOTTOM LINE ANALYSIS
Derived from a TBLAM Brainstorm on
DOWNTOWN CUSTOMER SERVICE BUILDING AND
RENOVATED UTILITY SERVICE CENTER
In Collaboration with the BUILDING TEAM
Purpose: To extract key triple bottom line information from a TBLAM, and use that information to
offer recommendations on key indicators and suggested action items for the proposed new
City Building to be located near Mason + LaPorte
I. General Observations from TBL Analysis Map (TBLAM):
A. The TBLAM effort so far (performed late in the project team’s discussions of this project) was generally
well balanced, with a good variety of strengths and limitations identified.
B. The TBLAM exercise placed future opportunities in with strengths and future threats into limitations.
C. Many considerations crossed into many columns, and rows.
1. Crossing columns indicates excellent depth of discussion and debate.
2. Crossing of rows indicates potential for conflicting values.
D. More discussion after this or additional TBLAM exercise(s) will provide more granular detailed data for
Economic strengths and limitations. However,
1. New building offers much needed space as well as centralization of City Utility Customer services.
2. Made very clear during the TBLAM effort is the inefficiency and limited space offered by the current
USC buildings; urgency expressed not to lose track of the need to renovate this facility.
E. The Social component of the TBLAM was exceptionally vigorous during this analysis, for both City staff
and for the public user, and outweighed either the Environmental or Economic components of TBL.
F. One limitation included ensuring sufficient parking for this new downtown structure that would also
allow for good public access.
G. Opportunities and Threats should be further explored – will the structure built be the one that is
appropriate well into the future/its’ expected use? How will it mesh into our community/downtown
development and traffic growth? Does an opportunity exist to better use (increase the use of the Transit
Center) or take pressure off of other City offices (currently spread amongst several buildings in several
locations).
H. No fatal flaws discovered at the time of the TBLAM – (Note: economic factors will be further evaluated
post TBL with a thorough B/C or other appropriate economic analysis, unless this been done already by
the Team).
II. Conclusions Offered:
A. Additional effort for a thorough TBLAM is recommended, with basic economic factors considered
including design, space per employee and expected public, renovation costs of USC, etc. added as general
inputs since these were not expressed explicitly but may have been accounted for in the new Building
discussion history (see notes section of TBLAM).
B. Clarity should be offered in the AIS as to where TBL discussions occurred.
1. Make sure that the history of the team’s decision to go with a new structure and the importance of
such as well as renovating USC is explained here (see notes section of TBLAM).
III. Potential Key Indicators Suggested:
A. The main limitation expressed by the Building Team was that the City should not lose sight that the
current USC structure needs to be renovated with or without a new City building downtown.
B. Additional TBLAM effort would be useful – and can include ideas emanating from the Building Team
charrette in October if those ideas are not simply green-washing the existing plan.
1. Any new City structure will require a communication plan & public engagement plan.
2. Must determine how to sell the vision, but details of how the public will be better served will be
important.
C. Question for the Building Team – please return any feedback to the TBL Team.
1. Was this useful? Did this help?
2. What came from the discussion? How will you use this?
3. How could the TBL brainstorm be improved?
4. Would you like the TBL Team involved in any future TBLAMs for this project?
1.e
Packet Pg. 56
#1.e: Utilities Building Triple Bottom Lline Synthesis (Utilities Building Update and Blocks 32 - 42 Master Plan)
Form Drafted: August 15, 2012 This form is based on research by the City of Olympia and Evergreen State College
Triple Bottom Line Analysis Map (TBLAM)
Project or Decision:
New Building Master Plan near Mason + LaPorte –
seeking approval for building and funding plan
Evaluated by:
Building Team
& TBL Team, 9-9-13
Social Environmental Economic
STRENGTHS:
Customer Service Building (CSB)
o New building provides more space for an already
cramped workforce
o Combines customer service functions of the Utility to one
location near other customer service units; creates a 1-
stop shop / campus
o Easier to manage security with visitors, contractors and
vendors in one building
o Supports City Management desire to increase
collaboration potential among customer service providers
o Cogeneration with FortZED; allows Utility to become an
engaged neighbor & help support the FortZED ideal
o Frees up 3 other buildings so services can be optimized
by proximity, allowing customers to more efficiently move
between departments
o Centralizes development review functions as a 1-stop
shop between different departments
Utility Service Center (USC)
o Will give crew members adequate room to operate
o Employee comfort inside USC building can improve
morale and efficiency / productivity
Both CSB and USC
o Utilities will fund project without a rate increase
o Purchasing RR spur between new building and USC
provides a walkable path between structures; encourages
employee wellness
STRENGTHS:
Customer Service Building (CSB)
o Construction of new building can be more efficient
than a USC renovation with LEED standards and
others
o Will be located near FortZED; allows Utility to become
a responsible neighbor
o Located near the Transit Center and along the Mason
MAX
o Parking limitations encourage alternative forms of
transportation
Utility Service Center (USC)
o Renovation of USC will reduce overall environmental
footprint through energy-efficiency
o USC is one of the least-efficient buildings in the City;
needs renovation
Both CSB and USC
o Utilizes space the City already owns; reusing sites
o New geothermal opportunities are available
o Purchasing RR spur between new building and USC
provides a walkable path between structures;
encourages employee wellness
STRENGTHS:
Customer Service Building (CSB)
Form Drafted: August 15, 2012 This form is based on research by the City of Olympia and Evergreen State College
o Future Threat; if we do not create crew space, we will
have lost the original vision for the effort
building we will need?
o Future Threat; Do not want to lose commitment
to renovating the USC as part of the master
plan
o Future Threat; if we do not create crew space,
we will have lost the original vision for the effort
NOTES: The exercise documented above was completed September 9, 2013, with intent to capture discussions that have occurred over an extended period of time. It is
important to note that these projects, as currently envisioned, have evolved extensively over the last twelve months. This note describes key steps in that history:
The Light and Power crew building (Building C at 700 Wood Street) has been identified as deficient in meeting the needs of staff for many years. An addition to the
service center to address crew needs AND limited office space was partially through a design process in December 2012. Through an informal TBLAM process, it was
recognized that adding “another” piece to the USC would likely exacerbate building performance issues because it was not well integrated into the building form, layout or
mechanical systems.
The building team subsequently began to look at options to instead build a stand-alone new building which would accomplish the goals of improving office and crew
spaces. In discussions with senior management, the next logical step was to ask the question, “if we are going to build a new building, where should it be located?”
Answering this question led to looking at a number of City owned sites in the downtown area.
1.f
Packet Pg. 58
#1.f: Utilities Triple Bottom Line Analysis Map (Utilities Building Update and Blocks 32 - 42 Master Plan)
Utility Service Center (USC)
o Renovation of USC will save money by creating
a more energy-efficient building
o Employee comfort inside building can improve
morale and efficiency / productivity
Both CSB and USC
o Utilizes space the City already owns
o Frees up 3 other buildings for lease, sale or
redevelopment
o New geothermal opportunities save HVAC
costs
o Utilities can fund project without a rate increase
LIMITATIONS:
Both CSB and USC
o May split collaboration opportunities when finance group
and crews are removed from a single building
o Further factures the Utility across town further than we
are today
o Public perception of use of funds for employee building
can be detrimental
o Parking limitations for CSB downtown
o Future Threat; plan well enough or is building obsolete
when it opens? Is this enough space to provide a
functional building?
LIMITATIONS:
Both CSB and USC
o New construction will have an immediate impact on air
and water quality, and will utilize fossil fuel resources
at a higher short-term rate
o Limited parking downtown (CSB) forces people to use
more fossil fuels while searching for parking
o Future Threat; Do not want to lose commitment to
renovating the USC as part of the master plan
LIMITATIONS:
Both CSB and USC
o Larger building than originally planned costs
more in new construction
o Public perception of use of funds for employee
building can be detrimental
o Charge to build an efficient and responsible
building comes with a higher price
o Parking – immediate needs downtown will be a
challenge
o Future Threat; plan well enough or is building
obsolete when it opens? Can we afford the
1.f
Packet Pg. 57
#1.f: Utilities Triple Bottom Line Analysis Map (Utilities Building Update and Blocks 32 - 42 Master Plan)
Design #3 – City Buildings on one Block:
Potential to bring in some new larger events with
having approximately 6 acres available.
Design #9 – City Buildings across both blocks:
New street layout could provide three separate
areas for multiple venues to use Civic space.
Works for both designs:
Opportunity for the public and City to engage on
more frequent basis.
OPPORTUNITIES:
Design #9 – City Buildings across both blocks:
Could upsize the relocated stormwater pipe and use it as a
water retention system.
Works for both designs:
Great potential for education of the sustainable systems
incorporated into the design.
Lead by example and show the public what is possible.
Potential to create an eco-grid for a particular district.
Reduce the use of personal transportation with many City
services located next to public transportation.
OPPORTUNITIES:
Works for both designs:
Retail space at parking garage.
Allows for employees and customers to use City transit
system for access to many services.
THREATS:
Works for both designs:
Many employees will need to adjust to cubical
spaces.
THREATS:
Design #3 – City Buildings on one Block:
The potential for City of Fort Collins to sell off the
open civic space for private development.
Design #9 – City Buildings across both blocks:
Loss of current Washington Park and trees.
Potential security issues with Civic space not visible
from LaPorte or Maple streets.
Works for both designs:
A negative perception by the Public of the open civic
space.
Potential security concerns between buildings.
THREATS:
Design #3 – City Buildings on one Block:
More challenging to achieve Net Zero with development of
one block.
Works for both designs:
Portion of this development is in the 100 year flood plain.
Doing away with the buildings having historic significance.
THREATS:
Works for both designs:
Not getting the funding to complete the development of
Block 32 and 42 as designed.
NOTES:
1.c
Packet Pg. 44
#1.c: Triple Bottom Line Analysis Map (Utilities Building Update and Blocks 32 - 42 Master Plan)
entire block.
Design works well using sustainable practices.
STRENGTHS:
Design #3 – City Buildings on one Block:
Six acres will bring in additional events which is revenue
generation for the City of Fort Collins.
Potential sell of Block 42 with all City functions on Block 32.
Design #9 – City Buildings across both blocks:
Repurposing Ops Services and City Hall to be used for
another 25+ years.
Design provides locations for private buildings lots to be
developed.
Both designs:
Add retail to the outer edge of development is revenue for
the City of Fort Collins.
Great use of City owned property.
Potential revenue generation for eco- grid system.
Catalyst for re-development of the surrounding area.
1.c
Packet Pg. 43
#1.c: Triple Bottom Line Analysis Map (Utilities Building Update and Blocks 32 - 42 Master Plan)