HomeMy WebLinkAboutCOUNCIL - AGENDA ITEM - 07/15/2014 - FIRST READING OF ORDINANCE NO. 103, 2014, AUTHORIZAgenda Item 11
Item # 11 Page 1
AGENDA ITEM SUMMARY July 15, 2014
City Council
STAFF
Lindsay Kuntz, Real Estate Specialist
Jason Stutzman, Civil Engineer III
SUBJECT
First Reading of Ordinance No. 103, 2014, Authorizing the Conveyance of a Non-Exclusive Waterline
Easement and Temporary Construction Easement on City Property to the North Weld County Water District
and the East Larimer County Water District.
EXECUTIVE SUMMARY
The purpose of this item is to authorize the conveyance of easements on City Property to the East Larimer
County Water District and the North Weld County Water District for their NEWT II Water Transmission Pipeline
Project.
The City of Fort Collins Park Planning Department acquired a parcel of old railroad right of way located east of
Taft Hill Road and north of Vine Drive (the “City Property”) for future trail use through the national “Rails to
Trails” program. The East Larimer County Water District and North Weld County Water District (collectively,
the “Districts”) have begun the second phase of a multi-phase water transmission pipeline project (the NEWT II
Project) for the purposes of conveying treated water from the Districts’ Soldier Canyon Filter Plant to their
drinking water distribution systems. The alignment of the pipeline will cross a section of the City Property,
which is managed by the City Park Planning Department. As such, the Districts have requested a waterline
easement from the City for their project.
STAFF RECOMMENDATION
Staff recommends adoption of this Ordinance on First Reading.
BACKGROUND / DISCUSSION
The City Property, identified as parcel number 97032-00-949, was an old railroad right of way purchased in
1990 from Burlington Northern Railroad Company. The property was acquired by the City Park Planning
Department as part of the Rails to Trails program to be used for future trail purposes, and the property remains
vacant.
The Districts’ NEWT Project began in 2009, with the first phase being completed in 2010. The second phase
of the project (NEWT II) will connect the western end of the pipeline from phase one to the Districts’ Soldier
Canyon Filter Plant. This connection will involve the installation of 19,000 feet of 42” diameter waterline. The
Districts have requested a waterline easement and temporary construction easement for the new pipeline
alignment that crosses the City Property. The installation of the pipeline on the City Property will be done by
open trenching of the area. The Districts will then restore the City Property to its original condition after their
work is complete including grading and reseeding of the area. The anticipated schedule for the NEWT II
Project is September 2014 to May 2015. The work on the City Property will take approximately four to six
weeks and is likely to occur between November 2014 and April 2015. The Districts will be required to notify
the City prior to beginning construction activities on the City Property. No above ground improvements will be
installed in the easement areas. Park Planning staff has evaluated the proposed easements and does not
Agenda Item 11
Item # 11 Page 2
believe the conveyance of the easement will interfere with the intended future use of the City Property for trail
purposes.
FINANCIAL / ECONOMIC IMPACTS
Real Estate Services reviewed comparable sales information and recent appraisal information of nearby
properties to estimate a fair market value for the easements. The estimated just compensation for the
permanent easement, temporary construction easement, and fee for processing the easement request is
$2787.
ATTACHMENTS
1. NEWT II Easements Location Map (JPG)
2. NEWT II Project Summary and Easement Detail (PDF)
East Larimer County Water District and North Weld County Water District
NEWT II Water Transmission Pipeline Project
Project Summary
Project Description:
The NEWT II project is the second phase of a multi-phase water transmission pipeline project that will
convey treated water for the East Larimer County Water District (ELCO) and North Weld County Water
District (NWCWD) (collectively, the Districts) from the Soldier Canyon Filter Plant, located at the Soldier
Canyon Dam of Horsetooth Reservoir, to the Districts’ drinking water distribution systems. The primary
reasons for installation of the waterline are 1) provide transmission line redundancy and 2) provide
additional transmission line capacity to serve current and future customer needs.
The first phase of the project (NEWT I) was completed in 2010. NEWT II involves the installation of
approximately 19,000 feet of 42” diameter waterline from the Soldier Canyon Filter Plant to the vicinity of
Lincoln Junior High, approximately ½-mile west of North Shields Avenue and a ¼-mile north of Vine Drive.
This second phase will connect to the western end of the previously completed NEWT I pipeline. Figures
1 and 2 show the general area of the eastern end of the NEWT II pipeline and the location of the
easement to be acquired. Figure 3 is the pipeline design drawing showing the crossing of the City
property.
Duration of Project on City Property:
Actual pipe installation pace varies depending on terrain and complexity of installation at a specific
location. Due to the topography, crossing of a ditch and installation of an access bridge on the property
immediately adjacent to the City property, it is anticipated that work in this area may last from four to six
weeks.
Type of Work/Disturbance That Will Occur on City Property
The type of work will involve surface grading, trenching, pipe installation and backfilling. After the pipe is
installed the ground will be brought back to its original grade and seeded/reclaimed. The contractor will
also be using the easement for access to areas to the east and west for construction of the pipeline along
those segments.
Expected Schedule of Work
The overall project schedule is September 2014 through May 2015. No exact schedule of when the
contractor will be working on the property is available at this time because a contractor has not yet been
hired. Once a contractor is hired (anticipated to be by August 1, 2014), they will submit a schedule for
construction activity. However, the adjacent irrigation ditch has limits on the time the pipeline construction
can cross, those time limits being November 1 through April 1. Because of this time limit for the ditch
crossing it is likely safe to assume the work across the City property will be done sometime within that
time frame.
East Larimer County Water District North Weld County Water District
970-493-2044 970-356-3020
"UUBDINFOU
1BHFPG
NEWT II Water Pipeline Project
N2-13 – City of Fort Collins Old RR Right-of-Way Easement
Project Description
Planned Mitigation
The property will be restored to its original grade and reseeded as required by the City. No wetlands or
other environmentally sensitive areas will be crossed on the City property and therefore no other
circumstances requiring specific mitigation measures are known to exist.
East Larimer County Water District North Weld County Water District
970-493-2044 970-356-3020
2
"UUBDINFOU
1BHFPG
"UUBDINFOU1BHFPG
NEWT II East
Terminus - Connects
to Existing NEWT I
Pipeline
Figure 1 - General Vicinity Map
NEWT II Alignment
Old RR Right-of-
Way
Taft Hill Road
"UUBDINFOU1BHFPG
City of Fort Collins/
Old RR Right-of-
Way
NEWT II Alignment
Figure 2 - Easement Map
Area of easement
to be acquired
WIRE FENCE
WIRE FENCE
ELECTRIC FENCE
WIRE FENCE
FLOWLINE SWALE
IRRIGATION DITCH
DISPOSAL AREA
UNA
100' COMMUNICATION TRANSMISSION EASEMENT
TO BURLINGTON NORTHERN RAILROAD COMPANY.
(REC. NO. 90023707)
30' COMMUNICATION EASEMENT
THE MOUNTAIN STATES TELEPHONE
AND TELEGRAPH COMPANY
(BOOK 1175 PAGE 415)
T T T
65'
TEMPORARY
CONSTRUCTION
EASEMENT
40'
PERMANENT
EASEMENT
40'
PERMANENT
EASEMENT
40'
TEMPORARY
CONSTRUCTION
EASEMENT
15'
TEMPORARY
CONSTRUCTION
EASEMENT
42" DIP
42" DIP
CONTRACTOR SHALL
COORDINATE CONSTRUCTION
IN AREA OF OVERHEAD
POWER LINE WITH UTILITY.
APPROXIMATE LOCATION
OF NEW TRENCH AREA
ARTHUR DITCH CROSSING
(SEE SHEET C18 FOR
CROSSING DETAIL)
40'
TEMP CONSTRUCTION
EASEMENT
CONTRACTOR SHALL REMOVE
FENCE TO INSTALL WATERLINE
AND THEN REPLACE TO IMPROVED
OR IN-KIND CONDITION.
CONTRACTOR SHALL REMOVE
FENCE TO INSTALL WATERLINE
AND THEN REPLACE TO IMPROVED
OR IN-KIND CONDITION.
+00 173+00 174+00 175+00 176+00 177+00 178+00
179+00
180+00
181+00
- 1 -
ORDINANCE NO. 103, 2014
OF THE COUNCIL OF THE CITY OF FORT COLLINS
AUTHORIZING THE CONVEYANCE OF A NON-EXCLUSIVE WATERLINE EASEMENT
AND TEMPORARY CONSTRUCTION EASEMENT ON CITY PROPERTY TO THE
NORTH WELD COUNTY WATER DISTRICT AND THE EAST LARIMER COUNTY
WATER DISTRICT
WHEREAS, in 1989, the City and Burlington Northern Railroad Company (BNSF)
entered into an Offer to Purchase and Interim Trail Use/Railbanking Agreement (the
“Railbanking Agreement”) in accordance with Section 8(d) of the National Trails System Act, 16
U.S.C. Section 1247(d); and
WHEREAS, the purpose of the Railbanking Agreement was to allow the City to
purchase, for recreational trail purposes, a portion of BNSF’s rail line between Fort Collins and
Laporte that BNSF otherwise intended to abandon; and
WHEREAS, in 1990, pursuant to the Railbanking Agreement, BNSF quitclaimed to the
City a parcel of real property located in Fort Collins, Colorado, identified in County records as
parcel number 97032-00-949 (the “City Property”); and
WHEREAS, in 1993 the District Court for Larimer County ruled in Case No. 91CV474-3
that the City’s interest in the City Property amounted only to an easement, that BNSF still
retained the underlying title to the City Property, and that property owners adjacent to the City
Property have a right of reverter in the City Property if the Railroad ever formally abandons its
interests there; and
WHEREAS, BNSF has advised the City, through its attorney, that it disagrees with the
District Court’s ruling and believes that it no longer has any interest in the City Property; and
WHEREAS, the North Weld County Water District and the East Larimer County Water
District (the “Districts”) have requested two easements on the City Property: a waterline
easement consisting of .104 acres as described on Exhibit “A”, attached and incorporated herein
by reference, and a temporary construction easement consisting of .167 acres, as described on
Exhibit “B”, attached and incorporated herein by reference (together, the “Easements”); and
WHEREAS, the proposed Easements would be used to install an underground pipeline to
connect the Soldier Canyon Water Filter Plant to the Districts’ distribution systems as part of
their North Weld - ELCO Water Transmission Pipeline - Phase II (“NEWT II”) Project; and
WHEREAS, the Districts will compensate the City $2,787.00 for the estimated fair
market value of the Easements and for staff processing time; and
WHEREAS, City staff has identified no negative impacts to the City expected to result
from the granting of the Easements; and
- 2 -
WHEREAS, City staff has advised the Districts that the City may not be the only owner
of property interests in the City Property, and that the City can only grant the Easements to the
extent of its ownership interest and cannot warrant its title to the City Property; and
WHEREAS, Section 23-111(a) of the City Code provides that the City Council is
authorized to sell, convey, or otherwise dispose of any and all interests in real property owned in
the name of the City, provided that the Council first finds, by ordinance, that such sale or other
disposition is in the best interests of the City.
NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF
FORT COLLINS as follows:
Section 1. That the conveyance of the Easements on the City Property to the Districts
as provided herein is in the best interests of the City.
Section 2. That the Mayor is hereby authorized to execute such documents as are
necessary to convey the Easements to the Districts on terms and conditions consistent with this
Ordinance, together with such additional terms and conditions as the City Manager, in
consultation with the City Attorney, determines are necessary or appropriate to protect the
interests of the City, including, but not limited to, any necessary changes to the legal descriptions
of the Easements, so long as such changes do not materially increase the size or change the
character of the Easements.
Introduced, considered favorably on first reading, and ordered published this 15th day of
July, A.D. 2014, and to be presented for final passage on the19th day of August, A.D. 2014.
__________________________________
Mayor Pro Tem
ATTEST:
_______________________________
City Clerk
Passed and adopted on final reading on the 19th day of August, A.D. 2014.
__________________________________
Mayor
ATTEST:
_______________________________
City Clerk
#
#
#
#
182+00
183+00
184+00
HORIZONTAL DEFLECTION
STA. 178+72.99,
N 1462757.92
E 3110091.92
HORIZONTAL DEFLECTION
STA. 178+92.99,
N 1462758.66
E 3110111.90
HORIZONTAL DEFLECTION
STA. 179+12.99,
N 1462759.92
E 3110131.86
HORIZONTAL DEFLECTION
STA. 179+32.99,
N 1462761.71
E 3110151.78
42"~22 1/2° BEND
STA. 179+52.99,
N 1462764.02
E 3110171.65
42"~45° BEND
STA. 182+84.37,
N 1462925.30
E 3110461.13
COMBINATION AIR VALVE
WITH VAULT - 12"
(SEE DETAIL SHEET CD3)
STA. 177+66.62,
N 1462758.31
E 3109985.55
HORIZONTAL DEFLECTION
STA. 183+58.14,
N 1462905.12
E 3110532.09
BLOWOFF
(SEE DETAIL SHEET CD2)
STA. 174+38.92,
N 1462759.51
E 3109657.85
5010
5006
5006
5012
5012
5006
5010
5010
5010
A A
B
B
STA: 182+84.37
42"~45° HORIZONTAL BEND
EXISTING GRADE
AT PIPE CENTERLINE
42" PIPE
42" PIPE
PROPOSED GRADE
AT PIPE CENTERLINE
(FILL EXISTING TRENCH AREA TO
PROPOSED GRADE SHOWN.
USE DIRT FROM NEW TRENCH
AREA DESIGNATED ON PLAN VIEW)
STA: 174+38.92
BLOWOFF
STA: 177+66.62
COMBINATION AIR VALVE WITH VAULT - 12"
ARTHUR
DITCH
SEE SHEET C18 FOR
CROSSING DETAIL
CROSSING TO INCLUDE
CONSTRUCTION OF PERMANENT
CONCRETE BOX CULVERT
STA: 179+52.99
42"~22 1/2° HORIZONTAL BEND
STA: 179+70.65
EXISTING TELEPHONE LINE
(ELEVATION UNKNOWN)
TYPE 3
TRENCH
(FOR DIP)
TYPE 3
TRENCH
(FOR DIP)
TYPE 4
TRENCH
(FOR DIP)
FLOW FILL
TOP STA 177+66.62 TRENCH
ARTHUR DITCH
CROSSING BID ITEM
180+75 TO 181+50
5032.87
5031.16
5028.88
5026.58
5025.04
5023.83
5024.44
5026.31
5029.36
5032.47
5033.92
5032.78
5030.28
5036.10
5031.12
5027.15
5021.34
5017.44
5010.99
5014.75
5006.31
5005.04
5003.48
5007.59
5006.70
5005.61
172+00 173+00 174+00 175+00 176+00 177+00 178+00 179+00 180+00 181+00 182+00 183+00 184+00
5010
5020
5030
5040
5
5
5
5
5021.00
5021.00
5021.00
5021.00
5021.00
5021.00
5023.26
1+00 2+00 3+00 4+00 4+70
EXISTING GRADE
PROPOSED GRADE
TRENCH AREA SECTION A
SCALE: 1" = 50'
5010
5020
5030
5040
5010
5020
5030
5040
5029.48
5021.00
5019.44
5+00 6+00 6+63
EXISTING GRADE
PROPOSED GRADE
TRENCH AREA SECTION B
SCALE: 1" = 50'
Reviewed:
Book No.:
Date:
Design/Drawn:
# Date: Description:
Field:
WATER TRANSMISSION
PLAN & PROFILE
172+00 - 184+50
RL
RCS
C15
- -
0
SCALE: 1"=50'
25 50 100
GROUP
www.f-w.com
Engineers | Architects | Surveyors | Scientists
1612 SPECHT POINT ROAD, SUITE 105
FORT COLLINS, COLORADO 80525
(970) 484-7477 / info@f-w.com
Project No.:
05-29-2014
0131430.00
NORTH WELD COUNTY
WATER DISTRICT /
NEWT II WATER
TRANSMISSION
PIPELINE
KEY MAP
EAST LARMIER COUNTY
WATER DISTRICT
4970
4980
5000
4990
5010
5020
5030
5040
4970
4980
5000
4990
5010
5020
5030
5040
MATCHLINE 184+50
SEE SHEET C16
MATCHLINE 172+00
SEE SHEET C14
MATCHLINE 172+00
SEE SHEET C14
MATCHLINE 184+50
SEE SHEET C16
NOTES:
1. CONTRACTOR TO PLACE ONE-FOOT (1') OF COMPACTED CLAY ON
SMALL LATERAL DITCH SIDES AND BOTTOMS TO EXTENTS OF DISTURBED
AREA DUE TO PIPELINE CONSTRUCTION.
2. CONTRACTOR SHALL PLACE TWELVE INCHES (12") OF CLASS 6
AGGREGATE BASE COURSE ON ALL GRAVEL ROAD/DRIVEWAY
CROSSINGS. COMPACTION REQUIREMENTS IN SPECIFICATIONS SHALL BE
MET OR EXCEEDED.
3. CONTRACTOR SHALL MAINTAIN DRAINAGE IN SMALL LATERAL DITCHES
DURING CONSTRUCTION, AND RECONSTRUCT AFTER WATERLINE
CONSTRUCTION. THIS INCLUDES WORKING WITH CULVERTS.
4. ALL MONITORING WELLS SHALL NOT BE DISTURBED DURING
CONSTRUCTION.
DISPOSAL AREA
BID ITEM
ARTHUR DITCH
CROSSING BID
ITEM
"UUBDINFOU1BHFPG