HomeMy WebLinkAboutCOUNCIL - AGENDA ITEM - 06/03/2014 - RESOLUTION 2014-048 APPROVING EXPENDITURES FROM THAgenda Item 20
Item # 20 Page 1
AGENDA ITEM SUMMARY June 3, 2014
City Council
STAFF
Ellen Martin, Visual Arts Administrator
SUBJECT
Resolution 2014-048 Approving Expenditures from the Art in Public Places Stormwater Utilities Account to
Commission an Artist to Create Art for the West Vine Basin Project.
EXECUTIVE SUMMARY
The purpose of this item is to approve expenditures from the Art in Public Places Stormwater Utility Account to
commission an artist to create art for the Art in Public Places West Vine Basin Project. The expenditures of
$24,960 will be for design, materials, fabrication, installation and contingency for an artist to create an
interactive and interpretive plaza at the West Vine Basin site.
STAFF RECOMMENDATION
Staff recommends adoption of the Resolution.
BACKGROUND / DISCUSSION
Section 23-303 of the Code, which was added in 1995, established the Art in Public Places Reserve Account,
and designated it for use in acquiring or leasing works of art, maintenance, repair or display of works of art,
and administrative expenses related to the Art in Public Places Program, in accordance with the Art in Public
Places Guidelines adopted by the Council in Ordinance No. 047, 1998. The Council permanently adopted the
Art in Public Places Program, and reenacted City Code Chapter 23, Article IX, with certain modifications in
2012.
The Art in Public Places (APP) Board selected artist Joe McGrane to work with the project team to develop
artwork to be integrated into the West Vine Basin Project. The design concept and budget were reviewed and
recommended by the Project Team and the APP Board at the Board’s March 26, 2014 meeting.
APP artist Joe McGrane will create a public art piece, entitled “Water Crossings”, an interactive and
interpretive plaza highlighting historic crossings and events in the Basin. It provides a place for people to
connect with each other and learn about the history of this site. The history of this area can be read in the
crossing of the Poudre River and its tributaries. Trails, trestles, dams, and diversions trace the evolution of
Soldier Creek from the foothills stream to urban floodway.
The center piece to the plaza is a hand carved sandstone floodway table that maps the West Vine Basin and
the floodway. Streets and the floodway are carved into the surface of the stone. Five graphic panels illustrate
the significant historical crossings of Soldier Creek, including the Overland Stage Route, Spring Canyon Dam,
and current bike path.
FINANCIAL / ECONOMIC IMPACTS
The funds for this item have been appropriated in the Art in Public Places Stormwater Utility Fund. The Art in
Public Places program has a maintenance fund for the long-term care of the APP art collection.
Agenda Item 20
Item # 20 Page 2
The APP West Vine Basin Project budget is $ 24,960 for design, materials, fabrication, installation and
contingency for this project.
ENVIRONMENTAL IMPACTS
The APP artist has been collaborating with the project team on this project. The artwork is integrated in the
overall design of the project.
BOARD / COMMISSION RECOMMENDATION
At its March 26, 2014 meeting, the Art in Public Places Board reviewed and recommend the design concept
and budget for this project.
ATTACHMENTS
1. Written Description and Images of Proposed Artwork (PDF)
2. Art in Public Places Board Minutes, March 26, 2014 (PDF)
3. Project Site Map (PDF)
ƌƚŝŶWƵďůŝĐWůĂĐĞƐWƌŽŐƌĂŵ
tĞƐƚsŝŶĞĂƐŝŶWƌŽũĞĐƚ
ƌƟƐƚ͗:ŽĞDĐ'ƌĂŶĞ
“WATER CROSSINGS”
dŚĞŚŝƐƚŽƌLJŽĨEŽƌƚŚǁĞƐƚ&ŽƌƚŽůůŝŶƐĐĂŶďĞƌĞĂĚŝŶƚŚĞĐƌŽƐƐŝŶŐƐŽĨƚŚĞWŽƵĚƌĞ
ZŝǀĞƌĂŶĚŝƚƐƚƌŝďƵƚĂƌŝĞƐ͘dƌĂŝůƐ͕ƚƌĞƐƚůĞƐ͕ĚĂŵƐ͕ĂŶĚĚŝǀĞƌƐŝŽŶƐƚƌĂĐĞƚŚĞĞǀŽůƵͲ
ƟŽŶŽĨ^ŽůĚŝĞƌƌĞĞŬĨƌŽŵĨŽŽƚŚŝůůƐƐƚƌĞĂŵƚŽƵƌďĂŶŇŽŽĚǁĂLJ͘
/ŶƚŚĞϭϴϲϬƐ͕ƚŚĞĐƌĞĞŬǁĂƐĂůĂŶĚŵĂƌŬĨŽƌƐŽůĚŝĞƌƐǁŚŽŐƵĂƌĚĞĚƚŚĞKǀĞƌůĂŶĚ
^ƚĂŐĞZŽƵƚĞƚŽ>ĂƉŽƌƚĞ͘ /ƚǁĂƐŶĂŵĞĚǁŚĞŶƚŚƌĞĞĐĂǀĂůƌLJĐŽĂƚďƵƩŽŶƐǁĞƌĞ
ĨŽƵŶĚŽŶĂƐŬĞůĞƚŽŶŝŶƌŽĐŬƐĂůŽŶŐƚŚĞĐƌĞĞŬďĞĚ͘dŚĞƌĞĂƌĞƌĞŵŶĂŶƚƐŽĨƚŚĞ
ϭϴϴϬƐ'^>ΘWƌĂŝůĐƌŽƐƐŝŶŐƚŚĂƚĂĐĐĞƐƐĞĚƚŚĞ^ƚŽƵƚƋƵĂƌƌŝĞƐƐƵƉƉůLJŝŶŐƐƚŽŶĞĨŽƌ
ĂŐƌŽǁŝŶŐƚŽǁŶ͘/Ŷϭϵϱϲ͕ƚŚĞ^ŽůĚŝĞƌĂŶLJŽŶĂŵƐƉĂŶŶĞĚƚŚĞĐƌĞĞŬƚŽŚŽůĚ
ŝƌƌŝŐĂƟŽŶ ǁĂƚĞƌ ŝŶ ,ŽƌƐĞƚŽŽƚŚ ZĞƐĞƌǀŽŝƌ͘ dŽĚĂLJ͕ ƌĞĐƌĞĂƟŽŶ ƚƌĂŝůƐ ŵĂƌŬ ƚŚĞ
ĐƌŽƐƐŝŶŐŽĨĂŶĞǁƐƚŽƌŵǁĂƚĞƌĐŚĂŶŶĞůƚŚĂƚƉƌŽƚĞĐƚƐƌŽĂĚƐĂŶĚƌĞƐŝĚĞŶĐĞƐĨƌŽŵ
ŇŽŽĚŝŶŐ͘
dŚĞ ƉƵďůŝĐ Ăƌƚ ƉŝĞĐĞ͕ WATER CROSSINGS, ŝƐ ĂŶ ŝŶƚĞƌĂĐƟǀĞ ĂŶĚ ŝŶƚĞƌƉƌĞƟǀĞ
ƉůĂnjĂƚŚĂƚŚŝŐŚůŝŐŚƚƐƚŚĞƐĞŚŝƐƚŽƌŝĐĐƌŽƐƐŝŶŐƐĂŶĚĞǀĞŶƚƐ͘/ƚƉƌŽǀŝĚĞƐĂƉůĂĐĞĨŽƌ
ƉĞŽƉůĞƚŽĐŽŶŶĞĐƚǁŝƚŚĞĂĐŚŽƚŚĞƌĂŶĚƚŚĞĞǀŽůǀŝŶŐŚŝƐƚŽƌLJŽĨ&ŽƌƚŽůůŝŶƐ͘
Description:
dŚĞƉůĂnjĂŝƐůŽĐĂƚĞĚĂƚƚŚĞĐŽŶŇƵĞŶĐĞŽĨƚŚĞŶĞǁ^ŽůĚŝĞƌƌĞĞŬŇŽŽĚǁĂLJĐŚĂŶͲ
ŶĞůĂŶĚƚŚĞWŽƵĚƌĞZŝǀĞƌ͕ǁĞƐƚŽĨ^ŚŝĞůĚƐ^ƚƌĞĞƚ͘/ƚŝƐũƵƐƚŽīƚŚĞďŝŬĞƉĂƚŚ͕ĞĂƐƚ
ŽĨƚŚĞŶĞǁĨŽŽƚďƌŝĚŐĞ͘dŚĞƉůĂnjĂĐŽŶƐŝƐƚƐŽĨĂƐƚĂĐŬĞĚƐĂŶĚƐƚŽŶĞďŽƵůĚĞƌĂŵͲ
ƉŚŝƚŚĞĂƚĞƌŽǀĞƌůŽŽŬŝŶŐƚŚĞƌŝǀĞƌĂŶĚŶĞǁŝŶĮůƚƌĂƟŽŶĐŚĂŶŶĞů͘dŚĞĐĞŶƚĞƌƉŝĞĐĞ
ŝƐĂϭϬ͛džϲ͛džϮϰ͟,ŚĂŶĚͲĐĂƌǀĞĚƐĂŶĚƐƚŽŶĞ͞ŇŽŽĚǁĂLJ͟ƚĂďůĞƚŚĂƚŵĂƉƐƚŚĞtĞƐƚ
sŝŶĞĂƐŝŶĂŶĚƚŚĞŇŽŽĚǁĂLJ͘^ƚƌĞĞƚƐĂŶĚƚŚĞŇŽŽĚǁĂLJĂƌĞĐĂƌǀĞĚŝŶƚŽƚŚĞƐƵƌͲ
ĨĂĐĞ͘^ĐŚŽŽůƐĂƌĞŵĂƌŬĞĚǁŝƚŚĞŶŐƌĂǀĞĚďƌĂƐƐĐĂƉƐ͘&ŝǀĞƐƚĞĞůĨƌĂŵĞĚ͕ƉŽƌĐĞůĂŝŶ
ĞŶĂŵĞů ŐƌĂƉŚŝĐ ƉĂŶĞůƐ ŝůůƵƐƚƌĂƚĞ ƚŚĞ ƐŝŐŶŝĮĐĂŶƚ ŚŝƐƚŽƌŝĐĂů ĐƌŽƐƐŝŶŐƐ ŽĨ ^ŽůĚŝĞƌ
ƌĞĞŬŝŶĐůƵĚŝŶŐƚŚĞKǀĞƌůĂŶĚ^ƚĂŐĞZŽƵƚĞ͕ƚŚĞ'^>ΘW͕^ƉƌŝŶŐĂŶLJŽŶĂŵ͕ƚŚĞ
ĐƵƌƌĞŶƚďŝŬĞƉĂƚŚ͕ĂŶĚĂŐĞŶĞƌĂůǀŝĞǁŽĨƚŚĞƌĞƐŝĚĞŶƟĂůŝŶƚĞƌĨĂĐĞ͘dŚĞŐƌĂƉŚŝĐ
ƉĂŶĞůƐĂƌĞĂƩĂĐŚĞĚƚŽƚŚĞƚĂďůĞĂŶĚĂƌĞƐƵƉƉŽƌƚĞĚďLJĂƐƚĞĞůĐĂďŝŶĞƚƚŚĂƚŝƐ
ůĂƐĞƌĐƵƚǁŝƚŚĂĐƌŽƐƐŝŶŐƉĂƩĞƌŶ͘ƌŝĐŬƉĂǀŝŶŐďĂŶĚƐǁŝƚŚĞŶŐƌĂǀĞĚ ƐƚƌĞĞƚ
ŶĂŵĞƐƌĞƉƌĞƐĞŶƚƚŚĞ&ŽƌƚŽůůŝŶƐƐƚƌĞĞƚŐƌŝĚĂŶĚƉƌŽǀŝĚĞĂůŽĐĂƟŽŶĂůƌĞĨĞƌĞŶĐĞ͘
ATTACHMENT 1
ATTACHMENT 2
West Vine Basin Project
City of Fort Collins Art in Public Places Program
The Project
The West Vine Outfall Project is located in Fort Collins extending from Vine Drive to the Cache
la Poudre River approximately 500-feet west of Shields St. on the south end and 1,200-feet west of
Shields on the north end. The purpose of the project is to provide flood mitigation and water quality
improvement for the West Vine Stormwater Basin. The project is the first phase in a system of
improvements identified in the West Vine Stormwater Master Plan.
Location for the artwork is within the red oval, near the river.
- 1 -
RESOLUTION 2014-048
OF THE COUNCIL OF THE CITY OF FORT COLLINS
APPROVING EXPENDITURES FROM THE ART IN PUBLIC PLACES
STORMWATER UTILITIES ACCOUNT TO COMMISSION AN ARTIST
TO CREATE ART FOR THE WEST VINE BASIN PROJECT
WHEREAS, the City is in the process of constructing the West Vine Basin Project (the
“Project”); and
WHEREAS, pursuant to Sections 23-303 and 23-304 of the City Code, one percent of the
funds appropriated for the Project has been set aside for use in the acquisition, installation and
maintenance of works of art in accordance with the Art in Public Places Guidelines adopted by
the City Council in Ordinance No. 47, 1998 (the “Guidelines”); and
WHEREAS, the Art in Public Places Board (the “Board”) selected artist Joe McGrane
(the “Artist”) to work with the Project team to develop design concepts appropriate to the Project
site; and
WHEREAS, the Board evaluated the Artist’s designs at its regular meeting on March 26,
2014, pursuant to the Guidelines; and
WHEREAS, based on that evaluation, the Board is recommending the Artist’s proposal
for one artwork for the Project site consisting of an interactive and interpretive plaza that
highlights historic waterway crossings and events, incorporating stonework, brass, and
illustrations detailing the significance of various West Vine Basin crossings; and
WHEREAS, the budget for the Art Project, including design, materials, fabrication,
installation, and contingency for the Art Project, is $24,960; and
WHEREAS, the funds described above are already appropriated and will be used to
provide for the Artist’s design fees, materials, fabrication, installation and contingency for the
Art Project; and
WHEREAS, Section 23-308 of the City Code requires that the Board’s selection of the
recommended art be presented for Council review and approval because the cost of the art
exceeds $10,000.
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF
FORT COLLINS that the City Council hereby authorizes the expenditure of up to TWENTY
FOUR THOUSAND NINE HUNDRED SIXTY DOLLARS ($24,960) from the Art in Public
Places Stormwater Utility Account, for the Art Project proposed by the Artist, the conceptual
design for which was reviewed and approved by the Art in Public Places Board on March 26,
2014.
- 2 -
Passed and adopted at a regular meeting of the Council of the City of Fort Collins this 3rd
day of June, A.D. 2014.
__________________________________
Mayor
ATTEST:
_____________________________