Loading...
HomeMy WebLinkAboutCOUNCIL - AGENDA ITEM - 03/01/2011 - ITEMS RELATING TO THE GREEN BUILDING PROGRAM DATE: March 1, 2011 STAFF: Brian Janonis, John Phelan _ Felix Lee, Mike Gebc • • • Items Relating to the Green Building Program. A. First Reading of Ordinance No. 030, 2011,Amending Chapter 5,Article 11, Division 2,of the City Code for the Purpose of Amending the 2009 International Building Code as adopted. B. First Reading of Ordinance No. 031,2011,Amending Chapter 5,Article II, Division 2, of the City Code for the Purpose of Amending the 2009 International Energy Conservation Code as Adopted. C. First Reading of Ordinance No. 032, 2011,Amending Chapter 5,Article 11, Division 2,of the City Code for the Purpose of Amending the 2009 International Residential Code as Adopted. D. First Reading of Ordinance No. 033, 2011, Amending Chapter 5, Article IV, of the City Code for the Purpose of Amending the 2009 International Mechanical Code as Adopted. E. First Reading of Ordinance No. 034, 2011, Amending Chapter 5,Article IV, of the City Code for the Purpose of Amending the 2009 International Fuel Gas Code as Adopted. F. First Reading of Ordinance No. 035; 2011, Amending Chapter 5, Article V of the City Code for the,Purpose of Repealing the Uniform Plumbing Code and Adopting a Local Amendment to the Colorado Plumbing Code to Establish Water Flow Rate Restrictions on Certain Fixtures. EXECUTIVE SUMMARY Implementation of the Fort Collins Green Building Program has the primary goal of better aligning the built environment with community goals of reduced carbon emissions, reduced energy use and reduced water use. The Green Building Program framework is designed to support market transformation through a combination of regulatory and voluntary elements. Green Building Program work over the past year has focused on developing a package of "green amendments"for incorporation into the Fort Collins Building Code. This process has been led by staff,working closely with stakeholders. The proposed amendments address opportunities with regard to resource efficiency, energy efficiency,water efficiency, indoor and outdoor environmental quality,and buildings operation and maintenance. The benefit cost analysis shows an overall net positive benefit compared with buildings constructed to current Code requirements. The changes in Code requirements are projected to increase initial design and construction costs by 1% to 2% for residential buildings and 1% to 4% for commercial buildings. Among other benefits, the proposed changes will provide energy, water and carbon savings compared with buildings constructed to current Code requirements. Staff recommends the green amendments become effective January 1, 2012, with the exception of the amendments establishing more stringent requirements for electrically heated buildings, to be effective upon adoption. BACKGROUND / DISCUSSION Implementation of a Green Building Program was identified as a City Council priority during the 2010—2011 budget process,with a primary goal of better aligning Fort Collins'built environment with community goals of reduced carbon emissions, reduced energy use and reduced water use. Green building has a strong policy basis with the 2008 Climate Action Plan, 2009 Energy Policy and 2009 Water Conservation Plan. The Utilities department is leading the effort of developing the Green Building Program in close collaboration with Community Development and Neighborhood Services (CDNS). March 1, 2011 -2- ITEM 28 The Green Building Program framework is designed to support market transformation through a combination of regulatory and voluntary, market-driven elements. Green Building Program work to date has focused on developing a package of"green amendments" for incorporation into the Fort Collins Building Code. Green Amendment Development Process After review of national model green building codes and standards, staff recommended to City Council at the July 13, 2010 Work Session that the project focus on developing a strategic selection of effective amendments to further ..green"the existing Building Codes. A majority of Council members supported the recommendation. Developing a green amendment proposal was the focus of the project from July through November 2010. (The 2009 International Codes(I-Codes) package, adopted by Council in September 2010, is the baseline for these amendments.) The green amendment development process closely involved two Technical Review Advisory Committees, one focused on the residential sector, the other on the commercial sector. Members were invited to participate based on their technical and market expertise. Each committee typically met twice a month from May through November 2010. Attachment 5 lists committee members. Attachment 12 lists comments from committee members on the green amendment proposal. ' At the December 14, 2010 Work Session, staff presented a draft of the proposed green building practices under consideration as amendments, along with four additional `options," a proposed implementation schedule and a preliminary benefit cost summary. A majority of Council supported the direction and directed staff to finalize the proposal and develop ordinances for adoption in March 2011 (Attachment 4). Since the December Work Session, staff has refined details of the proposal, developed ordinances to amend the Building Code, finalized the benefit cost analysis and reviewed the,proposal with boards and commissions. Community Outreach In addition to the community involvement via the technical review advisory committees,other community engagement activities have included: Web site. Information and opportunities to provide input have been available via the project web pages at fcgov.com/gbp. Public meetings. All advisory committee meetings have been open to the public. Meetings have been listed on the project web pages and City web calendar. Board,commission and other stakeholder meetings. Staff has presented multiple updates to City boards and commissions and the Green Building Program Advisory Committee(Attachment 5), as well as to several other stakeholder groups by request. Board and commission recommendations regarding adoption of the green amendment ordinances are itemized below. Public Open House. A public open house was held on November 17, 2010. The associated summary of feedback was included in the December Work Session Agenda Item Summary. Attachment 10 is a log of community engagement activities. Green Amendments Proposal The green amendments proposal has changed little from the draft package presented to City Council at the December 14,2010 Work Session."Amend ment-proposals-at-a-glance"—listing the proposed green building practices with brief descriptions, for the residential and commercial sectors—are included as Attachments 1 and 2. Additional details about each practice are available at the Green Building Program web pages, www.fcgov.com/gbp. Proposal refinements made since the December Work Session are as follows: Occupancy sensor controls of lighting in defined spaces. This measure was added to the commercial amendment proposal, applicable to commercial and multi-family residential buildings. The proposed amendment would require automatic reduction of connected lighting power by at least 50% in corridors, enclosed stairwells, parking garages and other intermittently used spaces, when these spaces are unoccupied. This measure was added as a low-cost practice for reducing electric energy use and carbon emissions. March 1, 2011 -3- ITEM 28 Certified wood. A requirement for sustainable forestry certification of wood products used in construction was in the"option"category at the December 14, 2010 Work Session. A subset of this has been developed as a proposed amendment. Tropical hardwoods, used in both residential and commercial projects,would be required to have Forest Stewardship Council certification. Staff recommends this as an appropriate step for regulation that will help to stimulate more attention and thought toward the"upstream impacts"of extracting and processing building materials. Since tropical hardwoods are rarely used in entry-level projects,this does not represent an added expense to the most cost-sensitive portion of the market. Building envelope requirements for electrically heated residential buildings. The December 2010 draft package included more stringent thermal requirements for attics,frame walls,windows,crawl spaces and air leakage of electrically heated buildings, reflecting the significantly higher cost to heat with electricity versus natural gas. The refinements increase stringency for basement walls, slab-on-grade foundations and mass walls as well, to more comprehensively address electrically heated buildings. Effective date for electric heat buildings amendments. Based on Council direction at the December 14, 2010 Work Session, the amended envelope requirements for electrically heated buildings are proposed to become effective upon adoption of the amendment ordinances. The proposed effective date for the balance of the amendments is proposed as January 1, 2012. Other"options" discussed with Council at the December 14, 2010 Work Session, not included in the final proposal, are: Envelope requirements for gas-heated homes. Staff recommends that thermal requirements for gas- heated residential buildings not be increased beyond those in the recently adopted 2009 I-Code package. In staffs experience, the more important next step in achieving thermal envelope efficiency is increased focus on the details necessary to install components so they deliver rated performance. This is what drives the amendments regarding insulation installation standards and installation procedures forwindows,skylights and doors, as well as plans for training and developing field guides that clearly illustrate important thermal envelope details. Staff expects to recommend that the next steps in thermal envelope requirements be taken with the 2012 I-Codes package, currently planned for adoption in 2013. Renewable energy. Staff recommends that renewable energy requirements remain in the voluntary,market- driven realm at this time, because they represent a much larger increase in first cost than anything else included in the proposal. For example, the installed cost of a typical solar electric system for residential use, three kilowatt peak capacity, is on the order of$18,000. This would add about 7%to the cost of the residential prototype house used for the benefit cost analysis, far greater than the total estimated cost increase associated with the green amendment proposal as a whole (see "Financial/Economic Impacts" below). It would produce about half of the electrical energy used by a typical customer. The average cost of the electricity produced by the photovoltaic system (over a 20-year life, with a 7%discount rate), would be about $0.40 per kilowatt-hour, compared to the current Fort Collins Utilities' residential rate of about$0.08/kWh. The same-sized system on the commercial prototype would add about 1% to the cost of the building, while meeting only about 3% of annual electrical needs. The $18,000 cost assumes no tax incentives or utility rebates. Higher performance requirements for larger homes. Staff recommends that variable green requirements, based on house size, not be incorporated as part of the Building Code. Though a case can be made that larger homes built to the same standards as smaller homes have a larger environmental footprint,preliminary discussion at stakeholder meetings suggested that mandating stricter standards would be very controversial. This approach is incorporated in the national,voluntary green building rating systems as well as the updated ENERGY STAR® Homes standard that will be effective in January 2012. As other portions of the Green Building Program develop,the City may offer increasing levels of recognition and/or incentives based on some of these programs. Staff recommends gaining more experience through the voluntary approaches before addressing this through a Code requirement. Attachment 7 provides data on the sizes of single-family homes built in Fort Collins from 2005 through 2010. Proposed ordinances have been developed to incorporate the green practices as amendments to the existing Fort Collins Building Codes. T able 1 itemizes the specific Codes that will be amended and how they apply to different building types. March 1, 2011 -4- ITEM 28 Table 1: Building Code and Green Amendment Applicability, by Building Type Building Type Building Code Residential: Single-Family Detached Residential: All Commercial Duplexes Multi-family 1-Story Mulltifamily 4-Story Townhouses to 3-Story and Higher International Building Code Applies Applies International Residential Code Applies International Energy Applies (Chapter 4) Applies (Chapter 4) Applies (Chapter 5) Conservation Code International Mechanical Code Applies Applies Colorado Plumbing Code Applies Applies International Fuel Gas Code Applies Applies Green Building Practices Not Included in Proposed Amendments Green building practices that were considered in the development process but not included in the proposed amendment package are listed in Attachment 6. Many of these practices are already addressed to some extent by current Fort Collins Codes or will be promoted through voluntary Green Building Program elements (education, training, recognition, incentives). Some will likely be reviewed in the future for inclusion in other parts of the City Code or the Land Use Code. Implementation Planning Staff recommends a high level of support be provided for a smooth transition to the new Code requirements. A proposed effective date of January 1, 2012 for all but the electric heat amendments was supported by Council at the December 14, 2010 Work Session. The period between adoption and implementation provides time to detail certification requirements and testing protocols, develop new submittal forms and templates associated with the amendments, develop field guides illustrating acceptable techniques for compliance, and provide training for contractors and enforcement staff. Utilities and CDNS will closely work together in support of a successful transition. Table 2 outlines general City responsibilities, by department: Table 2: Implementation Roles and Responsibilities Description Community Development Utilities and Neighborhood Services Energy Services Development of verification procedures Primary Secondary Development of support materials Secondary Primary Training and education (contractors, inspectors, public) Secondary Primary Day-to-day implementation (plan review, field inspections, Primary Secondary administration) (technical support) Monitoring and evaluation of the implementation process Secondary Primary and results March 1, 2011 -5- ITEM 28 FINANCIAL / ECONOMIC IMPACTS Benefit Cost Analysis A benefit cost analysis of the proposed green amendments considers benefits and costs related to owners/occupants, the building sector and the community/ecosystem. The report, Attachment 3, describes the methodologies and assumptions used in the analysis. Results show: • The proposed green amendments align with Fort Collins community goals embodied in the Energy Policy (2009), Water Conservation Plan (2009) and the Climate Action Plan (2008), while providing a variety of benefits for building owners and occupants. • Costs incurred at the individual, building sector or community/ecosystem levels can produce benefits at multiple levels. • Near-term cost increases, associated with the design and construction of a building project, are balanced by recurring benefits delivered over the life of the building. Other community-level benefits improve the economic picture. • Initial cost increases projected for building projects are not insignificant, but represent relatively small percentage increases(1%to 4%); these are within typical variance ranges for construction. It is anticipated that increased design and construction costs incorporated in this analysis will decrease as contractors gain experience and infrastructure matures. There are exemplary green,h ig h-performance buildings in Fort Collins that deliver a strong array of benefits with little or no cost increase compared with conventional construction. • Reductions of energy,water and carbon are projected on the order of 5%to 10%for residential projects and 20% to 30%for commercial projects. • The proposed green amendments do not provide a quick"payback"for building owners,based on a traditional view of utility savings compared with increased design and construction costs. • Increases in Code enforcement time are estimated on the order of 45%for residential projects and 25% for commercial projects, requiring additional staffing. Using generally conservative assumptions and the elements quantified to date,total benefits are projected to exceed total costs, with a benefit-to-cost ratio of 1.3. There are direct costs to the City in two areas: • Development of support materials and training. These pre-implementation phase costs, estimated at $100,000, will primarily be incurred in 2011. They are one-time costs. The planned materials and training, discussed above under "Implementation Planning," will support a smooth transition to the new Code requirements. Funds covering these needs have been appropriated in the Utilities 2011-2012 budget. • Enforcement. The amendments will represent increased enforcement staff time. This cost has been accounted for in the benefit cost analysis. Council recently allocated funding from Amendment 2B revenues to cover increased enforcement staffing, for 2011 and 2012. This means that, in this time frame, building permit fees will not increase as a result of the green amendments. Appraisal/valuation The benefit cost analysis documents ranges of increased initial design and construction costs associated with the proposed green amendments for prototypical buildings. Staff is aware of potential appraisal and underwriting challenges related to these cost increases. Residential appraisal procedures have become much more tightly regulated since the recent mortgage foreclosure crisis, leaving appraisers little latitude in recognizing non-standard features. These challenges can be real for any building containing features which have not yet been widely implemented in the market. The challenges are not specific to Fort Collins or green building;they are national in scope and part of the challenges buyers face when trying to secure financing for a home they wish to build or buy. Efforts are underway at the state and national level to modify regulations to make it possible to more readily recognize the benefits of green features in the appraisal process. "Green fields" were recently added to the Multiple Listing Service database serving Northern Colorado. Education and public awareness building in Fort Collins will also help to increase market recognition of these benefits. March 1, 2011 -6- ITEM 28 The proposed green amendments are not unlike other Code updates that have occurred on a regular basis for many years. Typically, Code updates include increased requirements related to health, safety and energy, many of which are not immediately recognized by the marketplace. The most recent Fort Collins Code update went into effect in October 2010 with, for example, increased prescriptive insulation requirements for single-family homes. Appraisal and valuation issues have not generally been an issue for previous Code updates in Fort Collins. Development trends Some stakeholders have expressed concern that adding new regulations to construction in Fort Collins may drive development to nearby communities with less stringent building codes. This, in turn,could potentially undermine the green intent of the proposed amendments by increasing vehicle miles traveled and associated environmental effects. These stakeholders have pointed out that construction activity is currently very low in Fort Collins and that the proposed amendments may cause a further decline. Council members asked staff to provide information on development trends in Fort Collins, regionally and nationally to help better understand these dynamics. Relevant data is summarized in Attachment 8. Construction activity in Fort Collins,while currently low, is not as low as comparable Northern Colorado communities; it has actually outperformed the comparables in 2008 to 2010. As indicated in the benefit cost analysis, concerns about higher initial costs associated with increased Code requirements are balanced by a variety of other factors. A higher profile for green building can increase a community's competitive advantage, attracting development and business. The U.S. Green Building Council outlines a business case for green building for commercial building owners(Attachment 9). This information suggests that green building is a competitive differentiator, mitigates risk, attracts tenants, is cost-effective and increases rental rates. All of these factors bolster the City's economic health. ENVIRONMENTAL IMPACTS The proposed amendments provide a variety of environmental benefits. Though construction will continue to have environmental impacts, buildings meeting the proposed amendments will have less impact than buildings built to the current code. • Energy savings.These are projected at 5%to 10%of annual use for residential construction and 24%to 36% for commercial construction. • Water savings. These are projected at 5%to 10% of total annual use for residential construction and about 20% of indoor water use for commercial construction. Less water use translates to reduced wastewater treatment needs. Carbon reduction.These are projected at 5%to 10%of annual emissions for residential construction and 17% to 26% for commercial construction. • Landfill diversion. The construction waste recycling amendment will divert materials from the landfill. Enhanced durability anticipated to result from several amendments will reduce maintenance requirements and associated waste disposal. These benefits have not been quantified. • Sustainable forests. The certified wood amendment will require tropical hardwoods used in construction projects to be obtained from sustainably managed forests. Benefits will be"upstream,"in the areas from which the lumber is harvested, rather than in Fort Collins. Impacts have not been quantified. More information is provided in the benefit cost analysis report(Attachment 3). r STAFF RECOMMENDATION Staff recommends adoption of the Ordinances on First Reading. March 1, 2011 -7- ITEM 28 BOARD / COMMISSION RECOMMENDATION The Green Building Team gave presentations to boards and commissions regarding the green amendments proposal during February 2011. Excerpts of minutes reflecting each boards'discussion on this topic are included in Attachment 11.(Recommendations from boards and commissions,that are received after this Agenda Item Summary is submitted will be included in the Council meeting "read before" packet on March 1) The recommendations from boards and commissions to which presentations were made prior to submission of this Agenda Item Summary are as follows: • Electric Board (February 2) recommended adoption (5-1) • Affordable Housing Board(February 3)recommended against adoption(5-1). Additional recommendations: • Ask that City Council consider making these proposed changes to the Code voluntary (rather than mandatory code) with a reward of reduced fees or approval delays if the project meets stringent green building Code guidelines. o If Council declines to make these Codes voluntary, and instead adopts them as part of Code, ask that Council consider waiving these requirements for projects that qualify as Affordable Housing. o Alternatively, ask that Council consider funding the Affordable Housing Fund an additional amount ($50,000) that would be set aside just for"green" projects, so that qualified "green" Affordable Housing projects could apply for and use these funds to offset the increased costs in the new Code. • Landmark Preservation Commission (February 9) recommended adoption (6-0) Presentations are scheduled to the following boards and commissions prior to the March 1, 2011 Council meeting; their recommendations will be forwarded to Council in the "read-before" packet: • Economic Advisory Commission (February 16) • Natural Resources Advisory Board (February 16) • Water Board (February 17) • Building Review Board (February 24) • Air Quality Advisory Board (February 28) ATTACHMENTS 1. Residential Building Code Green Amendments Proposal at a Glance 2. Commercial Building Code Green Amendments Proposal at a Glance 3 Benefit Cost Analysis 4 City Council Work Session Summary—December 14, 2010 re: Green Building Program Update 5 Membership of Stakeholder Advisory Committees 6 Green Building Practices Not Included in Green Amendments Proposal 7 Fort Collins New Home Size, 2005 to 2010 8. Development Trends 9. Business Case for Green Building 10. Community Engagement Log 11. Boards and Commission Minutes 12. Advisory Committee Member Comments 13. Powerpoin presentation ATTACHMENT Proposed Residential Code Green Building Amendments ( Prescriptive) These amendments apply to single-family detached housing , duplexes, townhomes and low-rise (one- to three-story) multifamily housing . City of 2/9/2011 F6rt Collins # GB Practice Description * Intent Applicability Type** RESOURCE EFFICIENCY Construction waste • Submit recycling plan (who, what, where, how) before project begins Divert construction waste New: Yes 1 recycling • Implement recycling (non-landfill ) for wood, metal , concrete and from landfill Addition: Yes New cardboard Alteration : No Support sustainable New: Yes 2 Certified wood Sustainable forestry certification required for all tropical hardwoods forestry practices Addition: Yes New Alteration : Yes Windows , skylights, New: Yes Increased detailing regarding integration of fenestration with exterior Reduce potential for 3 doors : drainage plane exterior moisture damage Addition : Part Refine installation Alteration : No ENERGY EFFICIENCY Building envelope: More rigorous insulation and air sealing specifications for electric-heat Save energy and reduce New: Yes Reinstate 4 thermal specifications Addition: Part for electric-heat homes homes (beyond 2009 International Residential Code requirements) peak electrical demand Alteration : No + Refine Set stage for energy- New: Yes 5 Basement windows : Basement windows with comparable performance to windows on main efficient, comfortable living Addition: Part Refine thermal specifications living levels space when basement is Alteration : No finished • Whole-building air leakage: 4.0 ACH50 maximum energy,Capture p gy, comfort, New: Yes Air sealing : • Increased focus on effective sealing between house and attached Reinstate 6 tight construction garage durability and health Addition: Part + Refine • Performance testing required benefits Alteration : Part Insulation installed to the Residential Energy Services Network Insulation : (RESNET) Grade I standard Install insulation so it New: Yes 7 delivers rated energy Addition: Part Refine installation Exceptions for which RESNET Grade II is acceptable: performance Alteration : Part • Rim joists • Exterior walls with continuous rigid insulating sheathing, R-5 minimum . Added requirements for permit application : Design heating and • Heating + cooling design load calculations include room-by-room cooling systems that Heating + cooling New: Yes loads satisfy comfort needs and a systems : Addition : Part Refine design • Air-Conditioning, Heating , and Refrigeration Institute (AHRI) matched perform in accordance Alteration : Part evaporators, condensing units and furnaces (AHRI certificate required) with manufacturer • Document key design parameters specifications Heating , ventilation, air Performance testing of heating , cooling and ventilation systems, aligned New: Yes conditioning ( HVAC) with Air Conditioning Contractors of America (ACCA) 5 "Quality Verify that HVAC systems Addition: Part Refine 9 systems : Installation" procedures. Systems operating out of tolerance compared perform as designed + New commissioning with design specifications will be adjusted and re-tested until they pass. Alteration : Part WATER EFFICIENCY Toilets, showerheads and lavatory faucets must meet Environmental New: Yes 10 Water-efficient fixtures Save water and energy Addition : Part New Protection Agency (EPA) WaterSense® standards. Alteration : Part Page 1 of 2 ATTACHMENT INDOOR ENVIRONMENTAL QUALITY (IEQ) Atmospherically vented combustion appliances (furnaces, boilers, water Eliminate potential health Safer combustion heaters, fireplaces) must be placed outside the pressure boundary of and safety hazard of New: Yes 11 appliances : new the house and pass combustion safety test. Addition : Part New construction (This requirement may also be met with safer combustion appliances: combustion products Alteration : No power-vented , sealed-combustion or direct-vent.) spilling into house Safer combustion Atmospherically vented combustion appliances must pass combustion Reduce potential health New: No 12 appliances : existing safety test under "natural conditions." (Applies when combustion and safety hazard of Addition : Part New buildings appliances are replaced and when other changes are made to house combustion products Alteration : Yes that may affect pressure balance in combustion appliance zone. ) spilling into house Interior materials meet maximum VOC emissions standards: • Sealants + adhesives Low-Volatile Organic • Resilient flooring Improve indoor air quality New: Yes 13 Compound (VOC) • Carpeting for construction workers Addition : Part New materials • Paints, stains, varnishes and other site-applied finishes and occupants Alteration : Part • Structural wood panels, hardwood veneer plywood , particle board , and fiber board • Insulation Provide whole-house, controlled, mechanical ventilation system , designed to meet ASHRAE 62.2 requirements. New: Yes 1a Whole-house ventilation Improve indoor air quality Addition : No New Air handlers used to move ventilation air must be equipped with efficient Alteration : No blower motors. OUTDOOR ENVIRONMENTAL QUALITY (OEQ) Exterior lighting: Increase security New: Yes 15 fixture design Install "dark-sky friendly" exterior lighting fixtures Reduce light pollution and Addition : No New light trespass Alteration : No OPERATIONS + MAINTENANCE + EDUCATION Educate owners about New: Yes Building owner their home and other 16 education "green" choices they can Provide operations and maintenance manual for building owner Addition: Part New make Alteration : Part * Visit the City of Fort Collins Green Building Program web site (www.fcgov.com/qbp) for more information: • Fort Collins Building Code Green Amendments - context for this evolving proposal • Expanded descriptions of each proposed green building practice • Benefits and Costs of Proposed Building Code Green Amendments ** Classifies how the proposed amendment relates to the existing building code: New: not previously addressed in Fort Collins code Refine: already addressed in Fort Collins code; the amendment provides more detail or takes it further Reinstate: similar provision existed in the Fort Collins code prior to fall 2010 update. Page 2 of 2 ATTACHMENT Proposed Commercial Code Green Building Amendments ( Prescriptive) City 0f These amendments apply to commercial buildings and high-rise (four-story and more) multi-family housing . Fit Collins2/11 /2011 `ram # I GB Practice Description* I Intent jApplicability RESOURCE EFFICIENCY Construction waste ' Submit recycling plan (who, what, where, how) Divert waste from landfill . New: Yes 1 • Implement recycling (non-landfill ) for wood , metal , concrete and Potential disposal cost Addition : Yes recycling cardboard savings Alteration : No Support sustainable New: Yes 2 Certified wood Sustainable forestry certification required for all tropical hardwoods forestry practices Addition : Yes Alteration : Yes ENERGY EFFICIENCY + CONSERVATION Energy distribution Each electrical panel supplies only one of the following electricity use measurement and Provides means for New: Yes s types - Heating, Ventilation , and Air Conditioning (HVAC), Lighting, Addition : Part design miscellaneous loads, plug loads , & process loads. verification leading to Alteration: No potential enery savings Saves energy, improves Building envelope: air Require continuous air and thermal barrier per The American Society of occupant comfort, New: Yes a Heating , Refrigerating and Air-Conditioning Engineers (ASHRAE) improves building Addition : Yes barrier standard 189. 1 . Appendix B durability, reduces pest Alteration : No problems Building envelope : Higher specifications for electric-heat buildings beyond 2009 Save energy, reduce peak New: Yes 5 electrically heated electrical demand , improve Addition : Yes buildings International Energy Conservation Code (IECC) requirements occupant comfort Alteration : No Building envelope : Stud cavity insulation installed to Residential Energy Services Network Improves performance of New: Yes B installed insulation (RESNET) Grade I standard . Grade II allowed if exterior insulation insulation - energy savings, Addition : Yes standards installed to Grade I . better occupant comfort, Alteration: Yes better building durability Control of loads in Lighting , switched outlets, and televisions will be controlled when guest Energy savings, operations New: Yes 7 hotel/motel guest rooms are unoccupied . HVAC set point will be relaxed by at least 5 F and maintenance savings Addition : Yes rooms when room is unoccupied . through increased equipment life Alteration: Yes Outdoor lighting o Electricity savings, CO2 New: Yes 8 controls Reduce outdoor lighting by 50 /0 2 hours after business closes reduction Addition : Part Alteration: No Occupant sensor controls to automatically reduce connected lighting New: Yes Occupancy sensor power by at least 50% in corridors, enclosed stairwells, storage and Electricity savings, CO2 9 controls stack areas not open to the public, and parking garages when reduction Addition : Part Alteration: No unoccupied. Energy assessments Energy assessments required prior to building alterations. No-cost Identify energyefficient New: No 10 9y 9Y q p g � y Addition : No for alterations assessment provided by Fort Collins Utilities. opportunities Alteration : Yes WATER EFFICIENCY + CONSERVATION Water Efficient New: Yes 11 Fixtures See table ( based on Water Sense standard ) Water savings Addition : Part Alteration : Part (continued on other side) Page 1 of 2 ATTACHMENT # GB Practice Description* Intent Applicability INDOOR ENVIRONMENTAL QUALITY (IEQ) Protect ducts from contamination during construction Avoid introducing New: Yes Air handling system access & ability to clean and maintain contaminants into supply 12 HVAC IAQ Design Addition : Yes No friable materials in air plenums air and provide means for Alteration: Yes maintaining air quality. Flush out building contaminants by operating at prescribed outside air Remove pollutants New: Yes 13 Building flush-out generated from outgassing Addition : Part setting for 14 days. of new materials Alteration: Part Interior materials meet maximum VOC emissions standards : • Sealants + adhesives Low-Volatile Organic • Resilient flooring Improve indoor air quality New: Yes 14 Compound (VOC) • Carpeting for construction workers Addition : Part materials • Paints, stains , varnishes and other site-applied finishes and occupants Alteration : Part • Structural wood panels, hardwood veneer plywood , particle board , and fiber board Requirements for exterior-to-interior sound transmission , interior sound Reduce noise disturbances New: Yes 15 Acoustical control transmission , and background sound levels. for occupants Addition : Part Alteration : No COMMISSIONING / OPERATIONS + MAINTENANCE Provide Fundamental Commissioning with addition of commissioning Ensure that building New: Yes 16 Commissioning systems are installed and Addition : Part building envelope materials and assemblies. operate per owner's intent Alteration: No *Visit the City of Fort Collins Green Building Program web site (www.fcciov. com/cibp) for more information : • Fort Collins Building Code Green Amendments • Expanded descriptions of each proposed green building practice • Benefits and Costs of Proposed Building Code Green Amendments Page 2 of 2 ATTACHMENT 3 Benefits and Costs of Proposed Building Code Green Amendments Executive Summary The intent of the benefit cost analysis of the proposed building code green amendments is to consider benefits and costs related to owners/occupants, the building sector and the community/ecosystem. Results show: • The proposed green amendments align with Fort Collins community goals embodied in the Energy Policy (2009), Water Conservation Plan (2009) and the Climate Action Plan (2008), while providing a variety of benefits for building owners and occupants. • Costs incurred at the individual, building sector or community/ecosystem levels can produce benefits at multiple levels. • Near-term cost increases, associated with the design and construction of a building project, are balanced by recurring benefits delivered over the life of the building. Other community-level benefits improve the economic picture. • Initial cost increases projected for building projects are not insignificant but represent relatively small percentage increases (one to four percent); these are within typical variance ranges for construction. It is anticipated that increased design and construction costs incorporated in this analysis will decrease as contractors gain experience and infrastructure matures. There are exemplary green, high-performance buildings in Fort Collins that deliver a strong array of benefits with little or no cost increase compared with conventional construction. • Reductions of energy, water and carbon are projected on the order of five to ten percent for residential projects and on the order of 20% to 30% for commercial projects. • The proposed green amendments do not provide a quick "payback" for building owners, based on a traditional view of utility savings compared with increased design and construction costs. • Increases in code enforcement time are estimated on the order of 45% for residential projects and 25% for commercial projects, requiring additional staffing. Using generally conservative assumptions and the elements quantified to date, total benefits are projected to exceed total costs. A benefit-to-cost ratio of 1 . 3 is projected. 1. Introduction Staff has developed proposed building code green amendments for City Council consideration. One package of amendments addresses residential buildings, the other addresses commercial buildings. Staff worked with a consultant, The Brendle Group, to develop a benefit cost analysis for the proposed amendments. The charge from City Council to staff regarding "greening" the Fort Collins building code was to develop amendments that align with City goals around reducing energy use, water use and carbon emissions, while also addressing other green building opportunities such as improved indoor air quality. Buildings complying with the proposed amendments will deliver additional benefits compared with buildings complying with the current code. The changes also will, for many projects, mean higher initial costs. This analysis has been prepared to support Council' s decision-making process by outlining and 1 of 11 ATTACHMENT 3 quantifying, where feasible, the range of benefits and costs associated with the proposal. Benefits and costs are approached from a "triple-bottom-line" perspective, reflecting social, economic and environmental impacts . This report describes categories of benefits and costs related to green building, the analysis methodology and results. Appendices provide additional detail. "Amendments-at-a-Glance" summaries of the proposed packages and in-depth descriptions of each individual amendment (including benefits and costs) are available on the Building Code Green Amendments web page at www. fcgov.com/lzbp. There are many ways to design and build buildings. Tabulating benefits and costs is an imprecise science. In developing the analysis, a generally conservative approach was taken so that benefits would not be overstated and costs would not be understated. 2. Benefit Cost Categories Figure 1 illustrates categories of benefits and costs related to green building. They occur at three inter- related scales, represented by concentric circles: • Individual. A specific project, where the impacts are traced to an owner or tenant. • BuildingSector.ector. The building services industry, which includes design and construction professionals and product suppliers. • Community/Ecosystem. Local, regional or global costs or benefits. Costs are shown on left-hand side of the diagram, benefits on the right-hand side. Each category is described below. 2of11 ATTACHMENT 3 Figure 1 : Benefit Cost Categories COSTS BENEFITS COMMUNITY / ECOSYSTEM I *,** **** environment BUILDING SECTOR / ♦ w - l ` / INDIVIDUAL building valuation ✓ BEST PLAES / z TO LIVE utility jobs training I , I savings 1 1 economic + support I I I health materials 1 maintenance ► 1 1 training , savings g 1 ` near-term carbon reduction health - productivity ' $ ' building sector 4 enforcement investment / other costs Oinfrastructure QA + evaluation 3of11 ATTACHMENT 3 Cost Categories (see Figure 1) • Individual, Near-term. Increased, one-time cost to design/build a building. The "$" signs get smaller in the graphic to represent decreasing costs as the industry moves along a prototypical learning curve. The varying size of the "$" signs also represents the range of initial cost increases, depending on the starting point of the construction team. • Building Sector, Training. Building sector costs related to training on new construction techniques and compliance requirements. These are near-term costs that will be amortized over many projects. • Building Sector, Other. Other building sector costs, such as buying new tools or obtaining and maintaining new certifications. These are primarily near-term costs that will decrease over time based on market development, competition and adaptation. • Community, Training + Support Materials. Pre-implementation phase (prior to the January, 2012 effective date of the green amendments in) costs borne by the City cover the development of support materials, staff training and subsidization of industry training. • Community, Enforcement. Increased implementation costs related to the City' s day-to-day enforcement of the green amendments. These could be borne by building owners (through building permit fees) or by the community as a whole or a combination. • Community, Quality Assurance + Evaluation. Implementation costs, borne by the City, for on-going quality assurance and program evaluation. Benefit Categories (see Figure 1) • Individual, Utility Savings . Lower utility costs for electricity, natural gas, water and wastewater. • Individual, Maintenance Savings. Some green amendments will result in reduced maintenance costs, which will accrue to the occupant and/or owner of the building. • Individual, Building Valuation. Green buildings are expected to command an increased value in the marketplace compared with conventional buildings. • Individual, Occupant Health + Productivity. The green amendments will lead to improvements in indoor environmental quality (improved thermal comfort, improved indoor air quality) . These, in turn, will improve occupant health and productivity. • Building Sector, Jobs. The building sector will realize an increase in job activity for a given amount of construction activity. The green amendments support the expansion of related infrastructures, higher-level contractor skills, increased demand for green services and increased demand for green products. • Building Sector, Investment. The building sector will realize increased investment through the supply chain development cycle. Beyond the direct job impact described above, direct suppliers, indirect suppliers, products and materials vendors will develop and mature, resulting in reduced cost premiums over time. • Community, Economic Health. The green amendments support the community' s values, pride and identity as a vibrant, environmentally conscious place to live. The community' s reputation as such also supports economic health as by attracting outside investment and local economic development. Progressive public policy has been shown to increase activity in many instances related to green building and clean energy. 4of11 ATTACHMENT 3 • Community, Infrastructure. Direct benefits of green building (reduced energy use, water use and waste) have indirect impacts on community infrastructure requirements, such as extending the life of existing investments in power supply, water supply and landfills. • Community, Carbon Reduction. The direct results of green building (reduced energy use, water use and waste) contribute directly to the community' s goals to reduce carbon emissions. • Community. /system, Environment. In addition to carbon reduction, the green amendments reduce environmental impacts associated with construction (resource use, waste, outdoor environmental quality). 3. Analysis and Results Benefits and costs have been quantified where feasible. They were assigned value using either of two approaches : • Component analysis. The impacts of each proposed amendment were analyzed to develop building- specific benefits and costs, and code enforcement costs. • Community-scale analysis. This approach, which included applying the results of research performed elsewhere to Fort Collins, was used to estimate benefits related to building valuation, occupant health and productivity, economic health and carbon reduction. Other types of costs and benefits have not been quantified. Tables 1 and 2 show generally how each category was handled in the analysis. More information follows in Sections 3 . 1 and 3 .2 . The quantified elements have been compared to develop a benefit-to-cost ratio. It must be emphasized that the benefit cost analysis is approximate, reflecting uncertainties in accurately quantifying both benefits and costs. The analysis focused on new construction. Existing building scenarios (alterations and additions, from minor to very large) are too varied to be analyzed with this approach and timeframe. Also, many of the proposed amendments do not apply to existing buildings or apply only in part (see "Applicability" information in the "Amendments-at-a-Glance" summaries and the detailed description of each proposed practice at www.fcgov. com/gbp). 5of11 ATTACHMENT 3 Table 1 : Quantified Benefits and Costs Benefit Cost Category Analysis Approach COST: Individual , Initial Component analysis COST: Community, Training + Support Materials Estimated COST: Community, Code Enforcement Component analysis BENEFIT: Individual , Utility Savings Component analysis BENEFIT: Individual , Building Valuation Community-scale analysis ; national studies applied BENEFIT: Individual , Occupant Health + Productivity Quantified in part using community-scale analysis ; national studies applied to estimate part of the benefit BENEFIT: Building Sector, Jobs BENEFIT: Building Sector, Investment Community-scale analysis ; these three categories are represented as part of "economic impact' multiplier. BENEFIT: Community, Economic Health BENEFIT: Community, Carbon Reduction Community-scale analysis ; calculated based on utility savings Table 2 : Non-Quantified Benefits and Costs Benefit Cost Category Notes COST: Building Sector, Training Primarily near-term costs amortized over many projects . COST: Building Sector, Other Primarily near-term costs that will decrease over time . COST: Community, Quality Assurance + Evaluation Quality assurance and evaluation plans to be developed BENEFIT: Individual , Maintenance savings Larger maintenance costs are episodic and challenging to quantify. Savings could be significant over life of building . Non-quantified "people" benefits related to health and BENEFIT: Individual , Occupant Health + Productivity productivity have been tabulated for certain amendments; see detailed description of each amendment at www .fcqov.com/qbp . Incremental benefits from greener building add to benefits BENEFIT: Community, Infrastructure from other conservation / efficiency / renewables efforts for potentially significant cumulative impact. Non-quantified "environment' benefits have been tabulated BENEFIT: Community/Ecosystem , Environment for each proposed amendment; see detailed description of each amendment at www.fcgov . com/qbp . 6of11 ATTACHMENT 3 3 . 1 Quantified Elements Costs and benefits quantified via component analysis and community-scale analysis are described in the Subsections 3 . 1 . 1 and 3 . 1 .2, respectively. Results are summarized and combined to calculate the benefit- to-cost ratio in Subsection 3 . 1 .3 . 3. 1 .1 Component Analysis Primary benefits and costs of the proposed green amendments for typical projects were quantified via component analysis. Primary benefits are the reduced utility costs (electricity, natural gas, water and wastewater). Primary costs are increased design and construction costs. The analysis reflected each proposed amendment. Important aspects of the analysis include: • Benefits and costs are generally presented as ranges. This reflects that, for each proposed code amendment, there are often multiple ways to comply; different contractors have a range of experience and a range of costs for products and labor; there is uncertainty in estimating benefits and costs of building projects. • It is assumed that all increased first costs are passed directly to the owner of the building. • "Cost" represents retail cost • Data sources included architects, builders, trade specialists, product suppliers, staff experience, energy modeling, other studies and analyses. • Generally, conservative values have been chosen so as to not overstate benefits or understate costs. Building-specific benefits and costs were developed for two prototypical buildings to which the majority of the proposed amendments could be applied: • Residential - 1 ,600 square foot ranch over full basement (3 ,200 sf conditioned area) - Natural gas heat - $250,000 sales price, financed with a 6%, 30-year mortgage - $2,600 annual utility cost • Commercial - 15 ,000 square foot office building, two stories - Natural gas heat - $ 162 per square foot construction cost ($2 .4 Million) - $ 14,000 annual utility cost The team recognizes that these are limited examples of the many types and sizes of buildings in the market. These were developed to provide a more tangible reference for benefits and costs. Benefits and costs associated with each proposed amendment are provided in Appendix 1 (residential) and Appendix 2 (commercial) . Totals are shown in Tables 3 and 4, representing the set of applicable green building practices for each project. The base case is the prototype project meeting current Fort Collins code requirements . 7of11 ATTACHMENT 3 Table 3 : Quantitative Results — Residential Prototype (1 ,600 square foot ranch) Description Range ($) Range (%) Sales Price Increase $2,800 to $5 , 600 1 % to 2% of sales price Monthly Mortgage Impact $ 17 to $34 1 % to 2% of monthly payment Annual Utility Cost Savings $65 to $171 3% to 7% of utility cost Energy Savings -- 5% to 10 % of annual use Water Savings -- 5% to 10 % of annual use Carbon Savings -- 5% to 10% of annual emissions Table 4 : Quantitative Results — Commercial Prototype (15,000 square foot office building) Description Range ($) Range (%) Construction Cost Increase $30 , 000 to $ 100,000 1 % to 4% of construction cost Annual Utility Cost Savings $ 1 ,800 to $3 ,400 13% to 25% of utility cost Energy Savings -- 24% to 36% of annual use Water Savings -- 20% of annual indoor use Carbon Savings -- 17% to 26% of annual emissions Enforcement costs were also estimated using component analysis. The Building Official evaluated the impact of each proposed amendment on the time required for plan review, field inspection and administrative tasks. Estimated increases versus the workload associated with the existing codes are on the order of 45% for residential projects and 25% for commercial projects (see Appendix 3 for more detail). The increased workload translates to an additional 1 .5 full-time equivalent positions in the Building Department, valued at approximately $ 158K annually for salary and benefits. 3. 1 .2 Community-Scale Analysis The consultant reviewed published regional and national studies of green building benefits and costs relative to individuals as well as communities, economies and ecosystems . The consultant also spoke with City economic development staff. This research indicates there are many benefits associated with green, high-performing buildings, including energy and environmental awareness, economic health, community pride and the opportunity to hedge against utility rate increases. Based on the available information, the consultant quantified four benefits with sufficient confidence to inform the Fort Collins analysis. These are summarized here; additional information is provided in Appendix 4. Note that all of these analyses should be considered "order-of-magnitude" in nature. Because there are many uncertainties when applying the research to the green amendments proposal, conservative assumptions have been made. • Building valuation. Studies show that labeled "green buildings" command higher value in the marketplace than their conventionally built counterparts. For this analysis, a one-percent increase in valuation was applied. • Occupant health and productivity. Research has shown that occupants of green buildings tend, on average, to be healthier and/or more productive. The consultant extrapolated the research results to estimate the 20-year net present value of health cost savings for occupants of residential buildings 8of11 ATTACHMENT 3 ($28 per person) and increased productivity of commercial building occupants ($4. 61 per square foot). • Economic health. This term reflects increased local economic activity associated with increased construction spending. It ties to three of the benefit categories illustrated in Figure 1 : Building Sector, Jobs; Building Sector, Investment; and Community, Economic Impacts. Based on conversations with City economic development staff, the consultant used an economic multiplier of 0. 5 of the increased construction cost. In other words, 50% of the increased cost attributed to the green amendments is re-injected into the local economy • Carbon reduction. Carbon savings are the only ecosystem benefit quantified in this analysis. Though carbon is not yet widely traded in the United States, a variety of research provides a basis to estimate the likely market value of savings. The consultant used a value of $20 per metric ton of carbon savings. 3. 1 .3 Benefit-to-Cost Ratio The benefits and costs that have been quantified can be totaled and compared. This was done using the following approach and assumptions : • A net present value approach was used to account for the stream of future benefits (such as annual utility savings and improved occupant productivity) and compare them against costs incurred when the building is built. Consistent with many building analyses, a term of 20 years was used. A 7% discount rate, including 2% general inflation of goods and services, was assumed. • Utility rates are assumed to stay constant at today' s values. • Construction activity is assumed to be 200 new homes and 10 new commercial office building projects per year (other commercial construction is not reflected in the analysis). Actual construction activity is difficult to predict; the analysis model is readily scalable. Tables 5 and 6 summarize the data reported above, as extrapolated to the community scale using the construction activity assumptions in the previous bullet. These summaries represent the benefits and costs associated with one year of construction. Table 6 includes a roughly estimated cost ($ 100K) associated with training and development of support materials prior to the effective date of the green amendments. It is important to recognize that the quantitative analysis only tells part of the benefits and costs story. Non-quantified aspects are discussed in the next section. 9of11 ATTACHMENT 3 Table 5 : Community-scale Benefit Summary ("K" = thousand, "M" = million, "NPV" = Net present value) Benefit Commercial Residential Total Notes Individual , Utility Savings $273K $250K $523K NPV of recurring benefits Individual , Building Valuation $243K $500K $743K One-time benefit at time of sale Individual , Occupant Health $69K $22K $91 K NPV of recurring benefits + Productivity Community, Economic $331 K $420K $751 K One-time benefit at time of Health construction Community, Carbon $76K $50K $ 126K NPV of recurring benefits Reduction Total benefits $2 .23M Table 6 : Community-scale Cost Summary ("K" = thousand, "M" = million) Cost Commercial Residential Total Notes Community, Training + Support Materials $ 100K One-time cost (mostly in 2011 ) Individual , Initial $662K $840K $ 1 . 50M One-time cost at time of construction Community, Enforcement $ 158K One-time cost at time of construction Total costs $ 1 . 76M Given the many assumptions underlying the data presented in this section, the ratio of benefits to costs for the proposed green amendments is $2 .23 Million to $ 1 . 76 Million, equaling 1 .3 . 3.2 Non -Quantified Elements As described above, not all benefits and costs have been quantified. Table 2 lists those that were not and includes brief comments for each. Some of these categories could be quantified with more information. Others are more inherently qualitative, such as the benefits of a darker night sky. Non-quantified benefits associated with each proposed amendment are listed under the "People" and "Environment" benefit headings in the detailed descriptions available at www.fcgov. com/gbp. Many of these benefits can be grouped into categories such as improved comfort (from improved building envelopes and better-performing heating and cooling systems), better indoor environmental quality (from building materials with lower pollutant emissions, safer combustion appliances, whole-house ventilation, building flush-out, acoustic requirements), improved outdoor environmental quality (Dark- Sky lighting fixtures), and conservation of resources for future generations (energy-efficiency measures and construction waste recycling) . Some of these benefits will accrue to the individual owner or occupant while others are community benefits. Non-quantified costs primarily reflect the process of change from conventional practices. 10 of 11 ATTACHMENT 3 4. Discussion The proposed building code green amendments involve many types of benefits and costs . This analysis suggests: • Benefits and costs can be associated with individuals, the building sector, the community and ecosystem. Costs incurred at one level can produce benefits at multiple levels . • Near-term cost increases, associated with the design and construction of a building project, are balanced by recurring benefits delivered over the life of the building. Other community-level benefits improve the economic picture. • Initial cost increases projected for building projects are not insignificant but represent relatively small percentage increases (one to four percent); these are within typical variance ranges for construction. • The proposed green amendments align with Fort Collins community goals embodied in the Energy Policy (2009), Water Conservation Plan (2009) and the Climate Action Plan (2008), while providing a variety of benefits for building owners and occupants. • The proposed green amendments do not provide a quick "payback" for building owners, based on a traditional view of utility savings compared with increased design and construction costs. • The relative magnitude of utility savings and associated carbon reduction is considerably higher for commercial buildings than for the residential sector. The commercial opportunities are greater because building code has lagged in addressing key opportunities in the areas of building envelope and commissioning. • The three largest projected benefits are utility savings, economic health gains and higher building valuation. Making this latter benefit a reality will require education of the market and progress in removing barriers in the appraisal and underwriting processes. Based on the elements quantified to date, total benefits are projected to exceed total costs. While there are uncertainties in accurately quantifying both benefits and costs, the intent of this analysis was to capture the essence of the benefits and costs within the scope, budget and timeframe of this proj ect. To avoid overstating benefits or understating costs, the analysis team has generally made conservative assumptions. For example, building cost increases used in the analysis generally reflect the current situation in Fort Collins, in which some of the proposed amendments address practices for which many contractors have little experience and the infrastructure to efficiently implement the practices is not well developed. Experience with past code changes suggest that many costs are likely to significantly decrease over time, as contractors move up the learning curve and infrastructure matures. It should also be noted that there are exemplary green, high-performance buildings in Fort Collins that deliver a strong array of benefits with little or no cost increase compared with conventional construction. 11 of 11 ATTACHMENT 3 Appendix 1 Component Analysis Summary : Residential Prototype Direct Owner Financial Impact 2/15/2011 Initial Cost Impact Range Net Utility Savings Range ($/yr) Maintenance / # GB Practice Notes Low High Notes Low High Durability Impacts ( 1 ) Construction waste Net change = increased 1 recycling cost less decreased $0 $200 $0 $0 N/A recycling landfill cost 2 Certified wood No tropical hardwoods used $0 $0 $0 $0 N/A in entry level home Windows skylights Potential to avoid large maintenance/repair , , 3 $250 $350 $0 $0 costs related to exterior water leakage at doors: installation fenestration openings Building envelope: N/A for gas-heated prototype N/A for gas-heated 4 thermal specifications, home $2,200 $2,500 prototype home $300 $400 N/A electric-heat homes (2) Avoid significant window replacement cost Basement windows: when basement is finished 5 thermal specifications $45 $75 $3 $6 Reduced maintenance costs related to condensation on windows Hypothetical savings vs 2009 IRC requirement (7.0 Field study shows most new $100/yr Hypothetical: less maintenance / repairs to A100/yr gas heat, $250/yr building due to moist air condensing in 6 Air sealing : homes already tighter than $50 $200 elec heat $0 $25 building cavities tight construction proposed standard Reality for most houses: $0 Reality: Typically $0 (already captured by (already captured by even tight construction) ti hter construction 7 Insulation: $200 $350 $30 $60 Minor savings possible Installation 8 Heating + cooling systems: design Evaluate benefits + costs for Equipment running within manufacturer Heating, ventilation, air Evaluate benefits + costs for $400 $500 these two measures $30 $60 spec will need less maintenance and last 9 conditioning (HVAC) these two measures together together longer. systems: commissioning 10 Water-efficient fixtures $50 $200 Saves water, wastewater, $40 $60 N/A natural qas Low = sealed, tested Safer combustion mechanical room Low = less air leakage 11 appliances: new $1 ,300 $2,500 $12 $60 Health benefits = maintenance savings construction High = safer furnace + water High = 90 AFUE furnace heater Safer combustion 12 appliances: existing N/A for new construction N/A for new construction Health benefits = maintenance savings buildin s 2 Health benefits = maintenance savings Low-Volatile Organic 13 Compound (VOC) $200 $400 $0 $0 No info regarding durability of low-VOC materials products versus conventional. Higher or lower maintenance? 14 Whole-house ventilation Exhaust-only system $150 $400 Operating cost INCREASE ($60 rather than savings ) ($120) Health benefits = maintenance savings 15 Exterior lighting: $40 $120 Assume no change in lamp $0 $0 N/A fixture design I I Iwattage 16 Building owner education $150 $300 $10 $20 Properly operated and maintained eqpt should yield maintenance savings. INITIAL COSTS UTILITY SAVINGS BENEFIT ( 1 ) TOTALS for new construction, prototype home (2) Low High Low High Purchase price $2,835 $5 ,595 increase $65 $ 171 Annual utility bill decrease 1 ,600 sq ft ranch over full basement (3,200 sq ft total) $ 17 $34 Monthly mortgage Natural gas heat payment increase $5 $ 14 Monthly utility bill decrease $250,000 sales price, 6%, 30-yr mortgage o Percent of base price o 0 $2,600 annual utility cost 1 . 1 o/o 2 .2 /0 or payme 2.5 /0 6.6 /o Percent of base utility bill nt (1 ) Savings due to reduced maintenance / enhanced durability are not quantified or reflected here. They would improve the economic case for the building owner. (2) Two measures not applicable to new, gas-heated prototype home are not included in total costs or benefits. ATTACHMENT 3 Appendix 2 Component Analysis Summary : Commercial Prototype Direct Owner Financial Impact 2/16/2011 Initial cost impact range Net utility savings range ($/yr) Maintenance I # GB Practice Notes Low High Notes Low High Durability Impacts ( 1 ) Net change = 1 Construction & Site increased recycling $0 $600 $0 $0 N/A waste recycling cost, decreased landfill cost. 2 Certified Wood $0 $0 $0 $0 N/A Requires next step of Allows monitoring of specific Energy Distribution installed monitoring 3 Design Requirements $1 ,650 $1 ,950 equipment to realize $0 $0 systems, potentially leading to savings maintenance savings. Less infiltration and thus less 4 Building Envelope: Air ;$2,250 11 .250 $22,500 $750 $1 ,050 moisture transport through Barrier building envelope resulting in better durabilityBuilding Envelope: Does not apply to gas- Does not apply to 5 electrically heated heated building - not $3,750 gas-heated building - $450 $600 buildin s f21 included in total not included in total Building Envelope: May improve building durability 6 Installed insulation $0 $0 $255 $315 by reducing condensation sites standards within the envelope. Control of loads In Assumes 15,000 SF of 050 $23100 $2250 $2850 Assumes 15,000 SF Longer life for lamps and 7 Hotel/Motel guest rooms. $16, , of rooms. . , equipement being controlled. rooms 2 8 Outdoor lighting Cost for controls $450 $600 $ 180 $210 Longer life for lamps being controls controlled. 9 Occupancy sensor Utility incentives would $1 ,200 $1 ,500 $60 $75 controls reduce cost Energy assessments Assessement cost Savings result only if 10 covered by Fort Collins $0 recommendations $0 $0 for alterations (2) Utilities. are implemented. Water savings only - 11 Water-efficient fixtures $0 $0 does not include $30 $330 natural gas or store water. Potentially improves 12 HVAC [Act Design $0 $0 $0 $0 maintainability of HVAC e ui ement. Costs represent HVAC Small one-time cost 13 Building Flush-out tech time to reprogram $900 $1 ,050 penalty for extra $0 $0 system. energy used to condition outside air. Health benefits = maintenance savings Low-Volatile Organic 14 Compound (VOC) $0 $1 ,500 $0 $0 No info regarding durability of materials low-VOC products versus conventional. Higher or lower maintenance? Depends on baseline A building envelope enhanced 15 Acoustical Control (2) $0 $25,500 $0 for acoustic purposes may also building envelope. be more durable. Based on complexity of Improved operations & 16 Commissioning systems to be $15.000 $75,000 S585 $1 ,455 maintenance for commissioned commissioned. I I systems. TOTALS for new construction, INITIAL COSTS UTILITY SAVINGS BENEFIT ( 1 ) prototype commercial office building (2) Low High Low High 15,000 sq ft office building $309450 $104,700 Construction $1 ,860 $3,435 Annual utility bill Natural gas heat cost increase decrease $2.4 Million construction cost Percent of $14,000 annual utility cost 1 . 3% 4.4% construction 13% 25% Percent of base utility cost bill (1 ) Savings due to reduced maintenance / enhanced durability are not quantified or reflected here. They would improve the economic case for the building owner. (2) Some practices apply only to unique situations or specific buildling types and were not included in the totals for the representative building. ATTACHMENT 3 Appendix 3 Component Analysis Summary : Enforcement Costs Enforcement costs were estimated using component analysis. The Building Official evaluated the impact of each proposed amendment on the time required for plan review, field inspection and administrative tasks, for the same prototype buildings used to estimate building-specific benefits and costs. Results are summarized in Tables 1 and 2 . Table 1 : Residential Enforcement Time Impacts Scenario Plan Review Field Inspection Administrative Total Current codes 6 . 0 to 8. 0 hrs 3 . 1 to 5.3 hrs 2 hrs 11 to 15 hours Additional time for proposed 1 .6 to 2. 8 hrs 1 . 9 to 3.2 hrs 1 hr 5 to 7 hours green amendments Total time with green 7 . 6 to 10 .8 hrs 5. 0 to 8.5 hrs 3 hrs 16 to 22 hours amendments Approximate percentage 30% 60% 50% 45% time increase Table 2 : Commercial Enforcement Time Impacts Scenario Plan Review Field Inspection Administrative Total Current codes 16 to 24 hrs 5 . 9 to 9. 1 hrs 2 hrs 24 to 35 hrs Additional time for proposed 2 . 3 to 3 . 8 hrs 2 .2 to 3 . 3 hrs 1 hr 6 to 8 hrs green amendments Total time with green 18 to 28 hrs 8 to 12 hrs 3 hrs 29 to 43 hrs amendments Approximate percentage 15% 40% 50% 25% time increase 1 ATTACHMENT 3 Appendix 4 Community-Scale Analysis To provide insight to complement the component analysis approach, the consultant reviewed published regional and national studies of green building benefits and costs relative to individuals as well as communities, economies and ecosystems. The consultant also spoke with City economic development staff. This yielded additional information that supported the community-scale analysis. The community-scale benefits and costs are challenging to quantify, given the range of variables and factors involved. Based on the available information, the consultant felt that four benefits could be quantified with sufficient confidence to inform the Fort Collins analysis: building valuation, occupant health and productivity, economic health, and carbon reduction. This appendix provides information about data sources and how the information they provided was applied to estimate each of these benefits. The studies used in this analysis represent often-referenced sources (e.g. , by U. S . Green Building Council) and/or sources referred through the green amendment development project (by members of the advisory committees and other stakeholders) on green building benefits and costs. They do not represent an exhaustive literature search. Because there are many uncertainties when applying the research to the green amendments proposal, conservative assumptions have been made and the numbers generated through this approach should be considered "order-of-magnitude" in nature. 1. Building Valuation Two green building studies were used to inform the residential valuation analysis: • ICF Incorporated (Nevin and Watson), Evidence of Rational Market Values for Home Energy Efficiency, The Appraisal Journal, October 1998 . • Earth Advantage Institute (Ann Griffin), Certified Home Performance: Assessing the Market Impacts of Third-Party Certification on Residential Properties, May 2009. The first study' s findings indicate a $20 increase in market value for every $ 1 in annual energy savings. The second study reports three to five percent higher selling price for homes with a third-party sustainable certification such as ENERGY STAR and LEED for Homes. For the Fort Collins analysis, the method in the first study was used to calculate a one percent increase in home value based on the estimated utility savings. This method is more conservative than the second study and also reflects that no third-party certification is associated with the proposed amendments. Two green building studies were used to inform the commercial building valuation analysis: • McGraw-Hill - Business Benefits of Green Buildings SmartMarket Report: Building & Occupant Performance Driving Green Investment in Existing Commercial Buildings, November 2010 • University of California Energy Institute (Eichholtz, Kok, and Quigley), Doing Well by Doing Good — Green Office Buildings, August 2006 1 ATTACHMENT 3 These studies indicate that green high-performing buildings typically have increased value in the marketplace compared with their conventionally built counterparts. According to the first study, green buildings have a five percent higher valuation and occupancy rates, and one percent higher rental incomes. The second study reports two percent higher rents; when adjusted for occupancy-level, this translates into six percent higher effective rents. Because the proposed green amendments do not address all of the green attributes in the buildings studied and the regulatory approach does not include visible building labels, a conservative value of 1 % was chosen to represent the increase in valuation. Building valuation benefits tabulated in the benefit cost report were derived by applying the one percent increase to the values used for the prototype buildings, multiplied by numbers of projected new buildings. These benefits are considered one-time occurrences. 2. Occupant Health and Productivity These studies were used to value occupant health and productivity: • US Green Building Council (Gregory Kats), Greening America 's Schools — Costs and Benefits, October 2006. • Gregory Kats, The Costs and Financial Benefits of Green Buildings - A Report to California 's Sustainable Building Task Force, October 2003 . Overall, the studies were conducted on buildings that featured indoor air quality improvements related to ventilation and controls for temperature and pollutant sources. The first study, for schools, was used to estimate the health benefits for the residential sector. The study indicates 20-year net present value (NPV) savings of $ 8 per square foot for reducing asthma and colds/flu. A conservative 10% proration of this benchmark, multiplied by an estimated 35 square feet per child (in a school setting), was used to calculate a dollar-per-person value that could be applied to the prototype home. This approach yields a 20-year NPV benefit of $28 per person, $ 112 per home, for health cost savings. The second study, which indicates 20-year NPV productivity benefits of $37 to $55 per square foot for LEED-certified buildings, was used to value increased productivity in commercial buildings. Because the proposed green amendments are not as extensive as LEED requirements, a conservative 10% proration to the average of the study findings, or $4.61 per square foot, was used. This rate per square foot was then multiplied by the prototype commercial building size to estimate a 20-year NPV of $6,900 per building for productivity gains. 3. Economic Health The economic health benefits of the code amendments were based on information provided by the City' s Economic Advisor, Josh Birks, relative to a model used to assess the Mason Corridor. This information included multipliers for direct, indirect and induced benefits. Direct benefits represent the actual amount spent or invested. Indirect benefits (incremental) are defined in this model as increases in economic health, by local suppliers, necessary to support local impact. Induced benefits are defined as impacts on all local industries from wages derived from both direct and indirect impacts. The total multiplier for all three benefits is 1 . 5 , based on 1 .0 for direct and 0 . 5 for indirect and induced. 2 ATTACHMENT 3 To ensure a conservative approach, only multipliers for indirect and induced benefits were used to value the local economic benefits of the incremental cost to implement the proposed amendments for new buildings (both commercial and residential). The result is an economic benefit of $2,000 per home and $31 ,000 per commercial building. These benefits are considered one-time occurrences. 4. Carbon Reduction Projected utility savings (electricity and natural gas) were used to calculate carbon dioxide equivalent (COze) emissions reductions for both residential and commercial buildings. Point Carbon' s report, Carbon 2010 Return of the Sovereign, March 2010, indicates an expected carbon price of $ 10 to $20 per metric ton if trading is instituted in the United States. The Stern Review of the Economics of Climate Change, March 2007, estimates the social cost of carbon to be $85 per metric ton. Based on these two reports, $20 per ton, or the high end of the range in the Point Carbon approach, was used to assign value to the carbon reduction benefit of utility savings. The annual value was then converted to a 20-year NPV. 3 ATTACHMENT 4 utilities City of eleotria - sturmwater • wastewater water 700 Wood Street Fort Collins PO Box580 Fort Collins, CO 80522 970.221 ,6700 /0000 970.221 .6619 - fax 970.224.6003 - TDD utilities ®/cgov.com icgov.cowulditles Memorandum DATE: December 17, 2010 TO : Mayor and City Council Members THRU : Darin Atteberry, City Manager Kevin Gertig, Acting Utilities Executive Directoic FROM : Patty Bigner, Utilities Customer and Employee Relations Manager fig John Phelan, Utilities Energy Services Manager Felix Lee, Utilities Green Building Codes Project Manager—::5r ^ � L Steve Dush, Community and Neighborhood Services Director N7 RE : Work Session Summary — December 14, 2010 Update on Green Building Program and Proposed Building Code Green Amendments On December 14, 2010, City Council held a Work Session regarding an update on the development of the Green Building Program and proposed building code green amendments. All Council members were present. Staff members making presentations and answering questions were Utilities staff Brian Janonis, John Phelan, Doug Swartz, Gary Schroeder, and Felix Lee; Community Development and Neighborhood Services (CDNS) staff members Steve Dush and Mike Gebo ; and, Deputy City Manager Diane Jones. There was extensive discussion and many clarification questions regarding the information presented. Each Councilmember provided their individual perspective and feedback. Council was generally supportive of the objectives of green building, and a majority supported moving ahead with the approach proposed by staff as specified below: • Residential and Commercial amendment packages. A majority of Council supported the proposed packages of building code green amendments and requested staff provide a more detailed benefit and cost analysis. • Options. Several Council members requested that the four green amendment options be further developed , including detailed costs and benefits for each option. Several Council members also requested staff to consider voluntary, incentive-based approaches as well as regulatory approaches for implementing the options. • Timeline. Council supports a March 2011 adoption date for building code green amendments and a January 2012 implementation date for most provisions. • Electrically heated building requirements. Council members requested staff to prepare the proposed specifications for electrically heated buildings as soon as feasible. ATTACHMENT 4 Fort Collins • Implementation resources. Council has already approved funding to support additional staffing resources in the Building Division to administer and enforce the proposed building code green amendments. • Green Building Program. Council encouraged staff to move ahead with developing voluntary elements of an integrated Green Building Program to accelerate green building in Fort Collins. Next Steps • Develop building code green amendment ordinance language for the proposed residential and commercial packages for City Council adoption on March 1 and March 22, 2011 . • Deliver to Council a more detailed benefits and costs analysis for the building code green amendments including a review/analysis of potential impacts . • Deliver to Council information regarding development trends in Fort Collins, our region and nationally. • Develop and deliver to Council a clearer description of the four green amendment options, including benefits and costs. • Provide a list of green building amendment provisions that were considered by staff and the technical review committees but were not included in the recommended packages. • Review proposed ordinance with appropriate City boards and commissions, seeking their recommendations for adoption, in January and February 2011 . • Continue Green Building Program development, including building code green amendment I mplementation activities (training, education, etc.) and voluntary program elements. ATTACHMENT 5 Membership of Stakeholder Advisory Committees Commercial Technical Review Advisory Committee Member Company Expertise Aller Lingle Massey Brad Massey Architects PC Architect Steve Steinbicker Architecture West Architect Beaudin-Gauze Consulting Corey Rhodes Engineers Mechanical engineer Rick Coen Sun Electric Systems Renewable energy Gino Campana Bellisimo Inc. Construction management Angela Milewski BHA Design Landscape design/LEED Josh Guernsey/ Peter Kast Brinkman Partners Real estate Doug Dohn Dohn Construction Construction management Greg Fisher Fisher Architecture Architect Institute for the Built Josie Plaut Environment LEED/green building Green building/facility Pete Hall PSD management Starwood Construction Sandy Willison Mgmt Construction management HVAC systems /facility Matt Horner Trane management Building Officials* Jurisdiction Representative Larimer County Tom Garton Safe Built Russ Weber City of Longmont Chris Allison City of Fort Collins Russell Hovland * Building Officials were invited to attend both residential and commercial TRAC meetings. I of 4 ATTACHMENT 5 Residential Technical Review Advisory Committee Member Company Expertise Jeff Schneider Armstead Construction Builder / new + remodel Gil Paben Aspen Construction Builder / new + remodel, radon mitigation contractor Rob Sabin Aspen Homes of Colorado Builder / production homes Energy efficiency + Alex Blackmer The Atmosphere Conservancy renewable energy, custom builder Chadrick Martinez Fort Collins Housing Authority Affordable housing developer and owner Dana McBride Dana McBride Custom Homes Architect and builder / custom homes Michelle Jacobs Fort Collins Board of Realtors Real estate Bob Hand / John Habitat for Humanity Affordable housing builder Sailer Gordon Winner HighCraft Builders Remodel contractor Laura Barrett / Institute for the Built Green building education and Mark Benjamin Environment consulting (students) Larry Buckendorf J&J Construction of Northern Developer and builder / Colorado production homes Michael Bello Larkspur Homes, LLC Builder and project manager Rob Ross Merten Design Studio Project architect Neil Kaufman National Center for Deconstruction and training Craftsmanship Dennis Sovick Sovick Design Builders Designer and builder / custom homes + remodel Lara Williams The Green Team Real Estate Real estate James Mitchell The Group Real Estate Real estate Linda Ripley Vaught-Frye-Ripley Design Master planning + landscape architecture Terence Hoaglund Vignette Studio Developer / landscape architect / designer / builder 2 of 4 ATTACHMENT 5 Green Building Program Advisory Committee Organization/Company Representative American Institute of Architects/Colorado North Fred Roberts Appraisal Institute/Colorado Chapter Marge Moore Community for Sustainable Energy Andrew Michler CSU-Institute for the Built Environment Brian Dunbar Fort Collins Board of Realtors Todd Gilchrist Fort Collins Chamber of Commerce Ann Hutchinson Fort Collins Housing Authority Mike Salza Fort Collins Sustainability Group Andrew Michler International Facilities Management Association Matt Horner Northern CO Commercial Association of Realtors Peter Kast / Joshua Guernsey Home Builders Association of Northern CO Bob Peterson Northern Colorado Renewable Energy Society John Fassler Poudre School District Mike Spearnak Rocky Mountain Sustainable Living Association Kellie Falbo Sierra Club/Poudre Canyon Group Shane C Miller USGBC-Northern CO branch Bill Hofinann Individuals Everitt Companies David Everitt Sage2 Bill Franzen Involved citizen Mark Wanger Boards and Commissions Affordable Housing Board Mike Sollenberger Air Quality Advisory Board Rich Fisher Building Review Board Alan Cram Commission on Disability Mike Devereaux Economic Advisory Commission Stu MacMillan Electric Board John Graham Landmark Preservation Commission Bud Frick Natural Resources Advisory Board Glen Colton Planning & Zoning Board Andy Smith Water Board Phil Phelan City Management Neighborhood & Building Services Steve Dush Economic Development Mike Freeman 3 of 4 ATTACHMENT 5 City Manager's Office Helen Migchelbrink Natural Resources John Stokes Fort Collins Utilities Patty Bigner Fort Collins Utilities - Light & Power Steve Catanach Fort Collins Utilities - Water Jon Haukaas Fort Collins Utilities - Water Kevin Gertig Advance Planning Joe Frank Operations Services Ken Mannon Neighborhood and Building Services Mike Gebo 4 of 4 ATTACHMENT 6 Green Building Practices Considered but Not Included in Proposed Amendment Package The residential list does not include numerous additional National Green Building Standard green building practices that were initially coarsely screened in the early review process ; it focuses instead on the development of prescriptive amendments beginning July 2010 . The commercial list is more inclusive , reflecting the wide range of practices embodied in the International Green Construction Code . Residential Practices Not Included GB Description Intent Reason not Practice included Continuous R-5 rigid insulated sheathing OR Structural insulated panel systems OR Insulated concrete forms OR Double wall framing OR 2009 IRC requires some Reduce Advanced framing including : Increase thermal of these details . Rely on thermal • All corners: R-6 insulated , 3 stud max AND integrity of the education and training to bridging • All headers : R-5 above windows + doors AND building envelope move this further. • Framing limited at all windows + doors AND • All int/ext wall intersections insulated AND • Stud spacing : 16" for 2x4, 24" for 2x6 framing , no more than 5% undocumented studs • Decrease solar The typical high- gain contribution performance glazing now to summer cooling in use has about half the Maximum % of un-shaded glazing area to floor load . solar transmittance of the Solar control area , for E through S through W elevations. clear glass that used to • Increase prevail . The penalty of summertime larger, un-shaded glass thermal comfort areas has been significantly reduced . High cost increment because these motors are typically only Heating + packaged with furnaces cooling with other high-end systems : Air handlers must incorporate efficient (DC) Save energy and features . In current efficient air blower motors reduce peak proposal, the efficient handler electrical demand motors are required only blower motor when the air handler is used to move ventilation air, meaning many more hours of operation than for heating/cooling . Properly Goal : get right The HVAC designed amount of air to commissioning and Visual check by building inspectors to identify each register, amendment will measure installed , and eliminate common duct installation maintain the installed performance tight problems . conditioned air and provide the feedback ductwork temp throughout needed to improve duct system installation practices. 1 of 9 ATTACHMENT 6 GB Description Intent Reason not Practice included Irrigation systems are seldom installed at time High Reduce water of building construction efficiency Landscape irrigation systems must be low consumption for and have not been volume/high efficiency systems approved by the landscape regulated through the irrigation irrigation . automatic City. building permit process . This opportunity is being pursued through other channels. Landscape design has not been regulated Reduced turf Establish limits for maximum proportion of a yard Reduce landscape through the building area that could be planted as turf. irrigation water permit process. This use opportunity is being pursued through other channels. Improve indoor air Most expensive low-VOC Low-VOC quality for item considered . prefabricated Prefabricated interior cabinetry must meet CDPH construction Standards are in flux. cabinetry 01350 standard workers and Address via education for occupants now. Commercial Practices Not Included The first column includes references to sections in the International Green Construction Code . GB Practice Description / Intent Reason not included 502.2 Post constr. waste Storage areas provided in bldgs. for Difficult to define/enforce. recycling recycling Insignificant impact. 502.3 Storage of lamps , Storage areas provided for items requiring No significant impact batteries & electronics special disposal 503.2 Material selection Stipulates 55% Total materials in each bldg . Difficult to track, hard to tie to permit project must be a combination of following or C .O . Makes more sense as materials practices to be incentivized . 503.2 . 1 Used materials See 503. 1 see 503 .2 503.2 .2 Recycled content At least 25% post- & pre-consumer material see 503 .2 building materials 503.2 .3. Recyclable building materials manufactured to be recycled with See 503 .2 . Also, difficult to define materials . at least 30% recovery rate the recyclability of a material . 503.2 .4 Bio-based materials 50% bio-based content or certified wood see 503 .2 503.2 .5 Indigenous Materials from 500 mi . radius see 503 .2 Materials 503.3 Environmental 75% of total materials must comply with Difficult if not impossible to track that stewardship requirements for this section . Provide source of production meets clean equivalent. requirements to the US or air, water, resource conservation country produced , harvested , processed standards. manuf. Whichever stricter: clean air; clean water; resource conservation ; noise control 504. 1 Low mercury lamps Comply with 504.2 or 504.3, not more than Intent already met by most 5 mg of mercury/lamp manufacturers . Difficult to enforce from a documentation aspect. 2 of 9 ATTACHMENT 6 GB Practice Description / Intent Reason not included 505. 1 Building service life To be included in constr. Document — sets Challenging and onerous to plan design service life not less than 60 years document. Components as a except BSLP of 25 years is permitted when system are more important than the approved by code official individual materials . Good materials assembled poorly could have a very short service life and vice versa. 505. 1 . 1 Service life of core, See Table 505 . 1 . 1 See 505. 1 shell and site hardscape components 505. 1 .2 Interior Requires plan to accommodate See 505. 1 reconfiguration , dismount. , & disassembly — part of BSL plan 506. 1 Storage and handling Stored onsite must comply With Standard practice - Minimal impact of materials manufacturer recommendation for storage and handling — to prevent moisture damage during constr. 506.2 Constr. phase Protect materials from moisture damage Standard practice - Minimal impact moisture control 507.2 Waste management materials diverted from landfill Increased by Intent covered by construction waste project elective 20% management practice 507.3 Material selection 50% , 80% of materials meet criteria of sec. This increases the requirement of project electives 503 the base practice (503 .2), which wasn't accepted. 507.4 Multi-story building Credit for reducing footprint by 45% , 70% There are much larger factors project electives through stacking stories. driving whether or not a multi-story project is built. 507.5 Reduced building Reduce floor-to-floor height Based on C-TRAC feedback, these volume project elective heights would be too restrictive. This could also limit daylighting possibilities. 507.6 Service life project Extended service life beyond 505. 1 Base practice (505. 1 ) was not electives accepted . This goes beyond that requirement. 507.7 Moisture control Protect materials from moisture damage This is a standard building practice. project elective 602. 1 TANEU Choose TANEU level TANEU too difficult to understand and calculate (removed from ver. 2 of IGCC 602.3 Compliance Paths Bldgs. > 25 kSF use performance-based Not applicable to GB prescriptive compliance , others can use Prescriptive or amendments Performance 602.3 . 1 Prescriptive-base TANEU-based requirement compliance 602.3 .2 Performance-based TANEU-based requirement compliance 602.4 Documentation & Cannot exceed energy use of existing bld . Too restrictive . Requires verification for exist. Bldgs . After alterations . measurement-based 3rd-party verification . Significant additional expense for builder. Could hold up C. O. 603. 1 Energy use, peak methods for calculating energy, demand , & Based on TANEU . Difficult to demand , & Co2e CO2e understand . 603. 1 . 1 Annual Energy Use Energy use converted to consistent units , Unconventional conversions, difficult TANEU defined . to understand . 3 of 9 ATTACHMENT 6 GB Practice Description / Intent Reason not included 603. 1 .2 Peak energy proposed design demand < 0.90 times Would have to model a base case . demand demand of reference design Uncertainty in modeling . Difficult to prove until after the fact. 603. 1 .3 CO2e emissions re. Confusing calculations . Better to electricity reference energy savings in kWh and Therms and make conversion from that. 603. 1 .4 CO2e emissions re. Doesn't fit in context of other CO2 non-renewable fuels reporting . 603.3 Calculation Per 506 .5 of IECC Does not add any significant value Procedures to IECC 2009 requirements . 603.4 Qualified software Per 506 .6 of IECC Covered in IECC 2009 603.5 Design professional registered design professional in charge of Design professional certification is for energy simulation energy simulation not clear. 604. 1 Buildings with tenants Metering collected for entire bldg . AND Electric metering already required . each tenant. Tenant access to utility info. Water metering would be too expensive for the value realized . 604.2 Intent Verify ongoing compliance with sections Not really a GB practice - just 602 and 603 - relates to commissioning clarifying intent 604.4 Energy type metering Bldgs. provided w/ capability to determine Smart meters will provide this energy use and peak demand for all fuel types (604 .4. 1 -604 .4.7) 604.5 Energy load type sub Bldgs. w/ 25,000 sq .ft. total bldg . floor area Added expense. No guarantee sub- metering and larger all energy types must be sub- metered data will be maintained or metered used. 604.5. 1 Bldgs. <25,000 Designed for future installation of sub- 604. 3 captures the spirit of this sq .ft. metering system 604.6 Minimum energy Meters and sub meters must be connected Relates to sub-metering measurement and to data management system requirements above verification 604.6. 1 Annual emissions Data management system provides data Billing kWh and Therm data will necessary to calculate annual CO2e provide the same information . emissions . Mechanism not in place for CO2e reporting . 604.7 Energy Display Permanent, readily accessible and visible Added expense that requires display of energy use maintenance . Needs to be set up properly. It has not been straight forward to implement these on existing projects that wanted to. 605 Automated Demand This has been very difficult to Response infrastructure implement on a voluntary basis. Is out of scope for code - issues with design , implementation , verification , monitoring , and control. 605. 1 Establishing Bldg . control system integrated with Same as 605 infrastructure automated demand response relay 605.2 Software clients Demand response software clients Same as 605 communicate with demand response automation server 605.3 HVAC systems System capable of reducing bldg . peak This capability is available at some cooling HVAC demand by at least 25% level with Utilities' Load Management Program . Smart grid will enable enhanced features. 605.3 . 1 Rebound Avoidance Strategy w/ gradual return to normal HVAC Same as 605 operation 4 of 9 ATTACHMENT 6 GB Practice Description / Intent Reason not included 605.4 Lighting reduce total connected power of lighting in Can be component of voluntary group B office spaces by 30% Load Management Program 605.5 Bldg . component reduce aggregate electric loads from Can be component of voluntary specific strategies miscellaneous bldg . equipment by 25% Load Management Program 607. 1 Prescriptive Comply with IECC requirements and Already in adopted IECC 2009 Compliance provisions of this section for mechanical systems 607.2 HVAC equipment Comply with federal standards/IECC No change from base requirements 607.3 Ventilation Provided in accordance with Chapter 4 of No change from base requirements the International Mechanical Code 607.4 Duct and plenum Air ducts, plenums, air handlers and filter No change from base requirements insulation , sealing and boxes are insulated and sealed in testing accordance with IECC. 607.4 . 1 Testing System leak-testing . Rate of air leakage Most large duct systems are already shall be 156.0 as determined by IECC tested as required by IECC 2009 . equation 5-2. This adds lower pressure ducts, which are a much smaller percentage of leak issues . 607.5 HVAC piping Piping systems are insulated to reduce heat Piping insulation already required in insulation gain/loss IECC. This just increases the requirement. Codes will be progressing over time. 607.6 Economizers Economizer on systems >54,000 Btu/h (4 .5 Already required in IECC 2009, tons) where the requirement is also simpler to understand . 607.7 Variable air volume VAV required for fans with motors 1 .0 hp Looking at just the motors does not (VAV) fan control and greater consider the balance of the HVAC system (VAV boxes, etc. ). Considered this from building-size perspective, but it is largely already covered in the existing codes 607.8 Kitchen Exhaust Meet the provisions of the IECC with Does not apply to all buildings. Systems qualifications Difficult to enforce, but this may make sense to implement in future. 607.9 Laboratory exhaust Meet the provisions of the IECC Most new labs have well designed systems exhausts stems . 608. 1 Prescriptive Meet the provisions of the IECC and No change from base requirements Compliance Provisions for this section 608.2 Service water heating Equipment shall comply with federal No change from base requirements equip . performance standards and IECC 608.3 Pools, hot tubs and Meet the efficiency requirements of IECC No change from base requirements spas 608.3. 1 Pools in conditioned 25% of annual energy consumption and Very expensive to meet this space 50% peak design space HVAC shall be met requirement. Very long payback, by renewable energy or heat recovery both financially and for embodied systems. energy 608.4 Snowmelt Systems Comply w/ IECC + get 25% of energy from This could be expensive to meet for renewables (50% for electric systems) a system that is rarely on . Good controls are more important. Minimal community impact. 608.5 Rough-ins for future Provide for future installation of solar hot C-TRAC felt this was not a good solar hot water water system investment. Most buildings can accommodate solar and it is difficult to plan for futures stems . 5 of 9 ATTACHMENT 6 GB Practice Description / Intent Reason not included 608.6 Waste waster energy Recover heat from waste water for Fairly large expense for return on recovery system incoming system. investment. Revisit this in the future. 608.7 Service water heating Thermal insulation for service water piping . This is largely covered in IECC piping insulation 608.8 Circulating hot water Circulating systems must have automatic or This is largely covered in IECC systems accessible, manual controls to turn off the system when not in use. 609.4 .2 Exterior lighting and Lighting of building facades, signage, and Too controversial to require signage shutoff landscape is controlled by time switch and businesses to turn off signs . is shut off after one hour after building closing or after midnight. 609.5 Automatic daylight Automatic daylight controls and minimum IECC 2009 requires automatic controls fenestration provided . daylighting controls in daylit zones. 609.6 Plug Load Controls Use of occupancy sensors and time switch This is complex. There is a danger controls to reduce energy use of turning off computers or other important loads. 609.7 Fuel Gas lighting Count fuel gas lighting in lighting power minimal impact system calculations 609.8 Electrical system efficiency for transformers, voltage drop in The transformer efficiencies listed efficiency feeders are the same as the national standards. 609.9 Exterior lighting Comply with IECC Covered in IECC 2009 609. 10 Verification of lamps Confirmation of compliance with IECC prior This is an unnecessary burden on and ballasts to C.O . inspectors for something that should be handled during commissioning 610.2 Permanent Elevators, escalators, food service equip . , Adds unnecessary complexity to appliances and equipment conveyors inspection process . Some of this equipment is not attached to the building 610.3 Portable appliances Requires Energy Star portable appliances - Independent appliances don't fit with and equipment humidifiers, room AC, washer/dryers, the building code. Difficult to consumer electronics, and office machines . regulate . 611 . 1 Renewable energy Requires on-site renewables and/or RECs. Too expensive to require at this systems requirements Performance = 2% or greater, Prescriptive time . Better addressed through = 2% or greater or rated at . 5 W/SF, 4% incentives/recognition programs . from RECS 611 .2 Solar photovoltaic PV provides at least 2% of the total See 611 . 1 systems estimated annual electric energy consumption of the building or collective bldgs. on a site. 611 .3 Wind Energy systems Wind energy systems provide at least 2% of Not adequate average wind speed in the total estimated annual electric energy Fort Collins for this. consumption of the building or collective bldgs. on a site. 611 .4 Solar water heating At least 10% of the bldgs. annual estimated Seemed like too much to require PV equipment hot water energy usage. & solar hot water. 611 .5 Renewable energy Systems are metered and monitored to See 611 . 1 system performance assess power generation . monitoring and metering 6 of 9 ATTACHMENT 6 GB Practice Description / Intent Reason not included 612. 1 Mechanical systems Prior to passing the final mechanical Covered in commissioning commissioning and inspection a registered design professional requirement completion requirements must provide evidence of system commissioning . Cx plan & TAB 612.2 Lighting and Electrical Prior to issuance of the C .O . a registered Covered in commissioning systems commissioning and design professional must provide evidence requirement completion requirements of lighting and electrical systems commissioning 613.2 Post C.O . TANEU , Ongoing TANEU , energy demand and Goes beyond practices that were not energy demand , and CO2e CO2e emissions reporting is required . accepted emissions reporting 613.3 TANEU reduction Gain elective credit for lowering the number Goes beyond practices that were not project electives of TANEU points below the maximum value accepted allowed 613.4 Building thermal Language and requirement unclear. Dropped from second version of envelope systems project IGCC elective. 613.5 Mechanical systems Elective credit for efficient mechanical Adequately covered in IECC project elective systems 613.6 Passive design Achieve 40% of the energy conserved in Difficult to regulate due to varied project electives the proposed design . design options. IgCC 702.2 - Leakage limits Tub spout leakage from combination Minor impact on combination tub/shower tub/shower valves not more than 0 . 1 gpm . valves. IgCC 702 .8 - Efficient hot Water in piping between hot water source C-TRAC expressed concerns stating water distribution system. and hot water outlet is 87 oz. maximum . that it would be very difficult to meet this requirement. ASHRAE 189 . 1 Section Hydrozoning of automatic irrigation systems Defer to Land Use Code (LUC) 6 .3. 1 .2 - Water conserving to water different plant materials such as irrigation design . turf grass versus shrubs required . Landscaping sprinklers not permitted to spray water directly on building or within 3 ft. of a building ASHRAE 189 . 1 ; Section Landscape sprinklers controlled by smart Defer to LUC 6 .3. 1 .3 - Controlled controllers that uses evapotranspiration rate landscape sprinklers. ET and weather data to adjust irrigation schedules IgCC 702 . 14 , 702 . 15, At least 50% of rinse water is reused for To be considered as addition to 702. 16 - Efficient vehicle washing . Self-service spray wands limited Muni code wash facilities. to a maximum of 3 gpm . ASHRAE 189 . 1 6.3 .3. 1 ; Measurement devices with remote Sub-metering recommended for strip IgCC 705.2 - Water communication capability shall be provided malls and 2, 3, & 4-plexes - add to consumption management. to collect water consumption data for utility water metering standards in domestic supply to the building . next update of Muni code Potable and reclaimed water entering the building project—monitored or sub- metered . Rentals in excess of 50,000 sq ft. separate sub meters. ASHRAE 189 . 1 6.4 .2.2 - ENERGY STAR dishwashers; Appliances not part of building code Commercial Food Service boilerless/connectionless food steamers no Operations Water Use more than 2 .0 gph ; ENERGY STAR air- Reduction . cooled ice machines. 7 of 9 ATTACHMENT 6 GB Practice Description / Intent Reason not included IgCC 801 .2 - Indoor Air A plan that addresses procedures used Focused code on a few specific Quality ( IAQ) Management during design and construction of a building items Plan with respect to IAQ to ensure compliance with sections 802 and 805. IgCC 805 - Asbestos use The use and installation of asbestos in Difficult to impossible to verify control building construction is prohibited . IgCC 808, ASHRAE 189 . 1 , Prescriptive and performance paths for Quality daylighting design is difficult LEED 2009 - Daylighting daylighting to put into code. Needs to be incentive-based 1003.2 . 1 - HVAC 1 . Fix non-functioning t-stats Concern from C-TRAC of added 2 . Seal leaking ducts burden to alterations 3. Fix OA dampers, controls , & linkages 4. Fix HW & steam leaks, traps, valves, & controls 5. Fix CHW leaks 1003.2 .2 - Service water 1 . DHW < 110'F at point of use May be unnecessarily low for some systems 2 . no leaks in pipes applications . 1003.2 .3 - Motor-driven No leaks in compressed air or pumped Need specific metric for leaks. equipment water systems Nearly impossible to eliminate all leaks . 1003.3 .2 - Metering devices Provide at least one metering device for Minimal impact and difficult to electricity, water, natural gas, lighting , implement motors, chiller, cooling , economizer, boiler, process, irrigation . 1003.3 .3 - HVAC 1 . Time control Concern from C-TRAC of added 2 . OA economizers for >6- 1 /4 tons cost and time to alterations . Issues 3 . HVAC piping and duct insulated per code can be identified in energy 4 . Tune furnace combustion units assessment. 5. Boilers - clean & tune 6. Boilers - equip with outdoor air lock 7. Chiller - clean and tune 8. 5-yr. phase out plan for CFC refrigerants 9. BAS installed if equipment has capability 1003.3 .4 - Service water 1 . R-6 insulation Concern from C-TRAC of added systems 2 . Insulate pipes per code cost and time to alterations . Issues 3. Seismic requirements can be identified in energy 4. Time clock on circulation systems assessment. 5. Fixture flow rates per code 1003.3 .5 - Lighting Per IECC Concern from C-TRAC of added cost and time to alterations . Issues can be identified in energy assessment. 1003.3 .6 - Commercial 1 . Cleaned & tuned for efficiency Concern from C-TRAC of added refrigeration 2 . Cases equipped with doors or strip cost and time to alterations . Issues curtains can be identified in energy assessment. 8 of 9 ATTACHMENT 6 GB Practice Description / Intent Reason not included 1003.3 .7 - Motor-driven Maintenance Concern from C-TRAC of added equipment cost and time to alterations . Issues can be identified in energy assessment. 1003.3 .8 - Swimming pools 1 . Equip with cover Concern from C-TRAC of added & spas 2. Time clock control for recirc. Pumps cost and time to alterations . Issues 3. Heaters tuned for efficiency can be identified in energy assessment. 1003.3 .9 - Attic insulation Bring up to code if accessible Concern from C-TRAC of added cost and time to alterations . Issues can be identified in energy assessment. 9 of 9 ATTACHMENT 7 Fort Collins New Single Family Home Size, 2005=2010 Data provided by Fort Collins Building Department Number of New Homes Square footage 2005 2006 2007 2008 2009 2010 0-999 3 1 1 2 1 0 11000- 15999 243 196 221 137 76 111 27000-21999 359 188 102 98 58 50 32000-31999 61 38 29 8 3 4 4 , 000-41999 5 5 5 2 2 4 52000-51999 3 1 1 1 0 1 61000-65999 1 2 0 0 0 0 Average size 2240 2161 2005 2038 1972 1980 Total # homes 675 431 359 248 140 170 Total # homes 3, 000 sf and larger 70 46 35 11 5 9 Average New SF Home Size , FC 2005 =2010 3000 2500 2240 0 2161 0 2005 2038 c 1972 1980 2000 0 w =a c 0 a R 1500 a Q 1000 2005 2006 2007 2008 2009 2010 ATTACHMENT 7 New SF Homes Size Distribution , FC 2005 =2010 400 M < 1000 sf ■ 1000- 1999 sf ❑ 2000-2999 sf 300 ❑ 3000-3999 sf ■ 4000-4999 sf y M 5000-5999 sf A ■ 6000-6999 sf Q 200 a E 0 z 100 0 2005 2006 2007 2008 2009 2010 New Homes 3 , 000 Sq Ft and Larger, FC 2005 =2010 70 60 50 ❑ 3000-3999 sf 40 ■ 4000-4999 sf o- ❑ 5000-5999 sf 30 E ■ 6000-6999 sf z 20 10 0 Flm� 17-ism 2005 2006 2007 2008 2009 2010 ATTACHMENT 8 Development Trends 2005 to 2010 The following information is intended to give a quick overview of the construction and inspection activity that has occurred in Fort Collins , as well as other Northern Colorado jurisdictions , over the past five years . It includes data on total number of permits issued , residential construction , commercial construction and building inspections . It also touches very briefly on national construction trends . Total Permits Issued Fort Collins saw a steady decline in number of permits issued from 2005-2008 . The numbers started to rebound slightly in 2009 and continued in 2010 . 2010 total permits issued were 13% below 2005 totals . Fort Collins Building Permits - 2005-2010 All Permits 7500 6750 6000 5250 4500 3750 ■ All Permits 3000 2250 - 1500 750 0 2005 2006 2007 2008 2009 2010 Year Fort Collins Building Permit Valuations ($M ) 2005 - 2010 350 300 $272 250 �. 200 c 150 116 E 100 Q 50 0 2005 2006 2007 2008 2009 2010 Year - lof5 - ATTACHMENT 8 Although overall permit issuance has remained quite high , the types and values of permits have changed significantly. 2010 Fort Collins permit valuation was 51 % below 2005 , resulting in significantly less revenues . Other Northern Colorado jurisdictions , for the most part, followed the same pattern as Fort Collins , with numbers declining from 2005 until modest increases were realized in 2009 and 2010 . Fort Collins fell in the top two jurisdictions for total permits issued for all six years , and led in numbers two of the six years . All Permits Issued Comparison 2005-2010 10000 8000 LM 6000 3 4000 z 2000 0 - - Itki 2005 2006 2007 2008 2009 2010 Year ❑ Broomfield ■ Fort Collins ❑ Greeley ❑ Larimer County ■ Longmont ❑ Loveland ■ Thornton ❑ Westminster Residential Construction New construction for both residential and commercial projects has seen the largest declines since 2005 , declining steadily through 2009, with a slight rebound in 2010 . Fort Collins Residential Building Permits 2005 - 2010 1400 1200 a 1000 ❑ 2005 v ■ 2006 N 800 - w ❑ 2007 600 ■ 2008 E ■ 2009 Z 400 ❑ 2010 200 - Ffi 0 New Residential Dowelling Units Additions/Alterations Miscellaneous Type of Permit Total 2010 permits issued for new residential construction were 76% below 2005 totals . Dwelling units - 2 of 5 - ATTACHMENT 8 have followed suit, with 2010 totals 73% below 2005 totals . In contrast, residential additions/alterations have stayed quite strong ; 2010 totals are only 4% below 2005 totals. Other Northern Colorado jurisdictions , for the most part, followed the same pattern as Fort Collins for new construction , with numbers declining from 2005 until slight increases were realized in 2010 . Fort Collins fell in the top four jurisdictions for all six years . Results for residential alterations/additions differed amongst the communities . Fort Collins fell in the top four jurisdictions for all six year for this construction type , and in the top two jurisdictions for three of the six years . Residential - New Construction Comparison 2006-2010 1400 1200 L 1000 £ 800 3 600 Z 400 200 0 2005 2006 2007 2008 2009 2010 Year ❑ Broomfield ■ Fort Collins ❑ Greeley ❑ Larimer County ■ Longmont ❑ Loveland ■ Thornton o Westminster Residential - Alteration/Addition Comparison 2005-2010 1400 1200 1000 800 3 600 Z 400 200 0 " " ,UIAA 2005 2006 2007 2008 2009 2010 Year ❑ Broomfield ■ Fort Collins ❑ Greeley ❑ Larimer County ■ Longmont ❑ Loveland ■ Thornton ❑ Westminster - 3 of 5 - ATTACHMENT 8 Commercial Construction Fort Collins Commercial Building Permits 2005 - 2010 350 300 250 ❑ 2005 w 3 ■ 2006 N 200 ❑ 2007 150 ■ 2008 E ■ 2009 3 Z 100 ❑ 2010 50 0 New Commercial Additions/Alterations Miscellaneous Type of Permit Commercial new construction has declined steadily from 2005 through 2010 . Total 2010 permits issued for new commercial construction were 77% below 2005 totals . In contrast, commercial additions/alterations have stayed strong ; 2010 permit numbers are actually 20% above 2005 totals . Commercial - New Construction Comparison 2005=2010 70 — 60 L 50 40 30 Z 20 10 0 iA 144 2005 2006 2007 2008 2009 2010 Year * Broomfield ■ Fort Collins ❑ Greeley ❑ Larimer County ■ Longmont ❑ Loveland ■ Thornton ❑ Westminster Other Northern Colorado jurisdictions followed similar patterns for new commercial construction , with numbers declining from 2006 . Only two jurisdictions are seeing increases in new commercial construction . Fort Collins fell in the top four jurisdictions for all but one of the six years . - 4 of 5 - ATTACHMENT 8 Commercial Addition/Alteration Comparison 2005=2010 600 500 a� 400 £ 300 z 200 100 - A 0 2005 2006 2007 2008 2009 2010 Year ❑ Broomfield ■ Fort Collins ❑ Greeley ❑ Larimer County ■ Longmont ❑ Loveland ■ Thornton ❑ Westminster Results for commercial alterations/additions differed amongst the communities . Fort Collins fell in the top three jurisdictions for all six years for this category. National Trends On a national basis , residential construction has followed the same trends . According to the Census Bureau , during 2009 , 433 , 600 single family homes were started in the U . S . This compares to 1 . 75 million new homes starts in 2005 . New housing starts are not yet available for 2010 . As of April 2010 , the Mortgage Bankers Association forecast new single-family housing starts to total 556 , 000 for 2010 , 790 , 000 in 2011 and 1 , 058 , 000 in 2012 . According to the Congressional Budget Office , the number of housing starts over the next few years will depend on three factors : 1 . The underlying demand for new housing units ; 2 . Cyclical and financial conditions such as unemployment rates and lending standards ; and 3 . The number of excess vacant units that are available . Commercial construction has seen severe reductions in retail centers and malls but relatively strong growth in hotel/motels , higher education , health care and office facilities . The slowing economy has had an impact. According to the Census Bureau , non-residential construction valuation reached $357 billion in 2007 and $410 billion in 2008 . The adjusted number for 2010 had dropped to $302 . 7 billion . It is anticipated that over the long term , there will be continuing demand from the health care sector for new or remodeled properties as the percentage of Americans over age 65 continues to grow, increasing demand for medical care . Resources for this information : 1 . http://www . plunkettresearch . com/real %20estate%20construction %20market%20research/industr y%20overview 2 . http://www . cbo. gov/ftpdocs/98xx/doc9885/ 11 - 17- HousingStarts . pdf - 5 of 5 - ATTACHMENT 9 The Business Case for Green Building Source : U. S . Green Building Council web site, www.us bg c.or isplUPage. aspx?CMSPaaeID=2331 1 . COMPETITIVE DIFFERENTIATOR Green buildings with lower operating costs and better indoor environmental quality are more attractive to a growing group of corporate, public and individual buyers. Green features will increasingly enter into tenants' decisions about leasing space and into buyers' decisions about purchasing properties and homes. 2. MITIGATE RISK Green building certification can provide some measure of protection against future lawsuits through third-party verification of measures installed to protect indoor air quality, beyond just meeting code- required minimums. Faster permitting or special permit assistance can also be considered a type of risk mitigation. Another risk management benefit of green buildings in the private sector is the faster sales and leasing of such buildings, compared to similar projects in the same town. Green buildings tend to be easier to rent and sell, because educated tenants increasingly understand their benefits. 3. ATTRACT TENANTS Today's savvier tenants understand and are looking for the benefits that green building spaces have to offer. The new Class A office space is green; lease-up rates for green buildings typically range from average to 20 percent above average. 4. COST EFFECTIVE The cost per square foot for buildings seeking LEED certification falls into the existing range of costs for buildings not seeking LEED certification. An upfront investment of 2% in green building design, on average, results in life cycle savings of 20% of the total construction costs — more than ten times the initial investment. Additionally, building sale prices for energy efficient buildings are as much as 10% higher per square foot than conventional buildings. 5. INCREASE RENTAL RATES A 2008 CoStar Group study, which found that green buildings outperform their non-green peer assets in key areas such as occupancy, sale price and rental rates — sometimes by wide margins. According to the study, LEED buildings command rent premiums of $ 11 .33 per square foot over their non- LEED peers and have 4. 1 percent higher occupancy. Rental rates in Energy Star buildings represent a $2.40 per square foot premium over comparable non-Energy Star buildings and have 3 . 6 percent higher occupancy. ATTACHMENT 10 Green Building Program Community Engagement Log Updated -2/16/2011 Event / Setting / Date Staff Stakeholder(s) Venue Notes Ann Hutchison , FC ES GB Chamber of Team , Patty Commerce and Met, at request of Michelle and Ann , to Bigner, Jeff Michelle Jacobs , FC discuss general ideas about ramping green 9/28/2009 IScheick Board of Realtors City Hall building efforts back up . ES GB Team , At WB's request sent cover memo with copy Robin of 9/30/09 GBP update memo to Council via 9/30/2009 Pierce Water Board 700 Wood St. CMO . City Hall / regular Heads-up about evolving GBP plans 12/2/2009 FL , DS Electric Board meeting including code element Heads-up about evolving GBP plans including code element. Concern expressed Natural Resources 215 N . Mason /regular about process taking too long and will the 12/16/2009 FL , GS Advisory Board meeting NGBS be watered down . Heads-up about evolving GBP plans including code element. Concerns about how the NGBS would impact the limited City Hall / regular buildable lots and interface with the IECC as 12/17/2009 IFL , DS Building Review Board meeting a mandated code . Heads-up about evolving GBP plans Planning and Zoning 281 N . College / work including code element. Concerns about 12/4/2009 FL , GS Board session costs to certify projects as with LEED . Heads-up about evolving GBP plans including code element. Some serious concerns about adding small % cost increase will exclude many buyers in our market. One member very concerned builders had not yet been included in discussions . Staff reassured that the Affordable Housing 281 N . College / industry will be well-represented at the table 1 /7/2010 IFL , GS Board regular meeting when the public dialogue begins . Heads-up about evolving GBP plans including code element. Board members concerned about the NAHB as the primary Air Quality Advisory 215 N . Mason /regular development organization created 12/21 /2009 FL , JP Board meeting excessively low performance stds . ES GB City Council + citizens City hall / Work GBP development plan presented , feedback 1 /12/2020 Team , Patty (via Ch 14 and City session gathered . See Work Session Summary. including opportunity for possible code Commission on City Hall / regular amemdment that awards incentive points for 1 /14/2010 FL , GS Disability meeting " Universal Design " features in SF homes . Invited by Ann Hutchison . Presented GBP plans that had just been given the green FC Chamber of light by Council . Lots of questions and Commerce Legislative FC Chamber of comments , some cautionary, some 1 /15/2010 IDS , FL, JP Affairs Committee Commerce supportive . Invited by Mike Gebo . Presented GBP plans with additional focus on how the GB code I-Code Review 281 N . College / element will proceed . Lots of questions and 1 /26/2010 DS , FL Committee regular meeting comments . Page 1 of 3 ATTACHMENT 10 Patti Mason , Director Met, at request of Patti , to discuss GBP 2/5/2010 DS , FL, GS of Advocacy, USC plans and potential roles for USGBC Citizens (including via Sustainability Plus GBP plans briefly mentioned by one of the 2/10/2010 DS Ch 14 and City web program , Residential panelists , DS available to answer questions DS (+ Green Drinks Green Drinks monthly Brief presentation on GBP plans , DS 2/24/2010 others?) participants gathering , InSitu available to answer questions Ken Waido received original invite to talk Community for about Plan Fort Collins ; he asked me to join DS (+ Ken Sustainable Energy CFORSE invitation to him to address Green Building Program . 4/8/2010 Waido ) (CFORSE ) visit at their office Few questions specifically on GBP . Begin series of focused meetings on GB code review and development with R-TRAC and C-TRAC , each meeting approximately 4/28/2010 GB Team TRAC meetings begin Most at Streets Facility 2x/month . News release re Costs + Benefits meeting 5/ 17/2010 and upcoming TRAC 5/7/2010 Lisa Kokes Media + public meetings GB Team + Brendle Costs + Benefits Fort Collins Utilities / Proposed methodology and survey tool 5/17/2010 Group Analysis public meeting presented ; feedback solicited Landmark Preservation 5/26/2010 JP Commission Update on Green Building Program 6/17/2010 DS & FL Water Board Update on Green Building Program Staff available to answer questions on the 6/17/2010 FL I-Code Open House 215 Community Room GBP Plan Fort Collins Open 6/29 & 6/30 AS , FL House Drake Centre Staffed table with information on the GBP . Affordable Housing 7/1 /2010 FL Board Update on Green Building Program GB Program Advisory Update on Green Building Program and 7/7/2010 GB Team Committee Meeting Planned Costs and Benefits . Landmark Preservation Update on GB program and amendment 11 /10/2010 FL &DS Commission proposal Downtown Update on GB program and amendment 11 /12/2010 JP , GS , DS Development Authority proposal Planning and Zoning Update on GB program and amendment 11 /12/2010 DS Board work session proposal Air Quality Advisory Update on GB program and amendment 11 /15/2010 FL , GS Board proposal Economic Advisory Update on GB program and amendment 11 /17/2010 FL , JP Committee proposal GB Program Advisory Update on GB program and amendment 11 /17/2010 ALL Staff Committee Meeting proposal Update on GB program and amendment 11 /17/2010 IALL Staff Community Open House proposal ; Approximately 20 attendees . Natural Resources Update on GB program and amendment 11 /17/2010 JP Advisory Board proposal Update on GB program and amendment 11 /18/2010 DS , GS , FL Building Review Board proposal Update on GB program and amendment 12/ 1 /2010 JP Electric Board proposal Affordable Housing Update on GB program and amendment 12/2/2010 FL , DS Board proposal Page 2 of 3 ATTACHMENT 10 Chamber of Commerce Legislative Update on GB program and amendment 12/10/2010 FL , JP Committee proposal Update on GB proposal and Benefits/Cost 1 /27/20111 FL , DS Building Review Board Summary Update on GB proposal and Benefits/Cost 2/2/2011 JP , DS Electric Board Summary Affordable Housing Update on GB proposal and Benefits/Cost 2/3/2011 FL , DS Board Summary Landmark Preservation Update on GB proposal and Benefits/Cost 2/9/2011 FL , DS Commission Summary USGBC Green and 215 N . Mason - 2/9/2011 DS , GS , FL Grub Community Room GB program overview and update Fort Collins Board of 2/15/2011 DS , AS Realtors 110 Harvard Street GB Program Update Economic Advisory Update on GB proposal and Benefits/Cost 2/16/2011 Scheduled Committee Summary Natural Resources Update on GB proposal and Benefits/Cost 2/16/2011 Scheduled Advisory Board Summary Update on GB proposal and Benefits/Cost 2/17/2011 Scheduled Water Board Summary GB Program Advisory Update on GB proposal and Benefits/Cost 2/23/2011 Scheduled Committee Meeting Summary Recommendation on and discussion of code 2/24/2011 IScheduled Building Review Board proposal Air Quality Advisory Update on GB proposal and Benefits/Cost 2/28/2011 Scheduled Board Summary Downtown Update on GB proposal and Benefits/Cost 3/10/2011 Scheduled Development Authority lSummary Page 3 of 3 ATTACHMENT 11 Draft Affordable Housing Board Minutes CITY OF FORT COLLINS AFFORDABLE HOUSING BOARD DRAFT MEETING MINUTES 281 N. College Ave. Conference Rooms A & B Fort Collins, Colorado February 3 , 2011 4 : 00 — 6 : 00 PM Chair: Ben Blonder Staff Liaison : Ken Waido, 970-221 -6753 City Council Liaison: Lisa Poppaw Board Members Present: Ben Blonder, Mike Sollenberger, Dan Byers, Wendy Robinson Board Members Absent: Karen Miller, Marie Edwards Advance Planning Department Staff Present: Ken Waido, Council Members Present: Other Staff Present: Doug Swartz, FTC Utilities, Felix Lee, FTC Utilities Others : Marilyn Heller, League of Women Voters Meeting called order by Ben Blonder at 4 : 07 PM. A. Open Public Discussion : Marilyn announced a new coalition website and handed out printed copies of the site . B. New Business. Approval of Minutes of the January 6, 2011 Meeting. Dan Byers made a motion to approve the January minutes, Mike Sollenberger seconded. Passed Unanimously. Green Building Program — Recommendation to the City Council : Presenter Doug Swartz: 1 of 22 ATTACHMENT I We are going to City Council for the first reading. This is an update on the refinements, and to give you some costs that will interest you. We are asking for support of the proposal from the Affordable Housing Advisory Board. Your recommendations will be forwarded to the City Council. This program is intended to match with City goals . We want to make decisions to build buildings and provide benefits to green design buildings that are with us a long time. This is the Green Building framework to balance regulation and voluntary measures that will move everything forward and gradually create a market transformation. Due to a push from council we have been focusing on the code piece and we are hopefully getting close to the voluntary part as well. Instead of proposing a new code we are proposing to amend the existing code to make it greener. For the residential side it is primarily the IRC . Last time we showed you specific details on the proposals. This is a reminder of looking at amendments in terms of a systems approach trying to hit all of the important bases . Most want a performance based approach, and a broader approach to green as council directed. Since December we have been to council and they gave us the green light on the same track. We have been defining the proposal with a flushed benefit costs analysis . Felix has been spearheading the effort to translate it into ordinance language. The three refinements on the residential side are: Low VOC materials (cabinets excluded), Certified tropical hardwood, and envelope requirements for electrically heated buildings Blonder: I didn't see anything about drywall. Since we had the Chinese issue with drywall, I wondered how that is addressed. Swartz: It is not addressed specifically because they felt it was an anomaly. Blonder: It is phased out now, but it has been a big issue. Swartz: We have exclude cabinets because of availability. We did not want to make it a formidable barrier. We wanted to provide a lot of push on the bottom end with regulation and pull on the top end with information. We had some options in December that we took to council for a preliminary reaction. The only one going forward is the Certified from some agency coming from a sustainable managed forest. We went for the one that was the most critical eco system impact. Plus, these woods are not used typically in a low level project. This is a small step and similar to the previous one in that it will help get people talking about certification and why we are concerned about upstream issues. We are pushing the envelope requirements for insulation, electrical heat (resistance heat) and cost, not ground force heat pumps . Electric resistance heat is a more expensive heat source. Cost & benefits: There are three scales that interrelate and have different cost components at each level. This is just an overview. It has a lot of pieces to consider and it is not an exact science. There are some assumptions and we used methodologies about how to put numbers 2 of 22 ATTACHMENT I around this. We came at this from two directions. The component analysis (bottom up cost and benefits) on new prototype buildings and a community scale analysis. We tried to be conservative in the assumptions . Some things could be quantified, but others could not. Others have ranges to use different builders. This is an overview of the numbers . • Energy water carbon savings • Benefits at multiple levels • Near-term costs, recurring long-term benefits • Initial cost increases: Residential 1 % to 2% • Commercial 1 % to 4% • No quick payback for owners • Increased enforcement time + cost • Total benefits exceed total costs. Sollenberger: Have homes here or anywhere with new requirements been observed to see if this works in practice or is it just theory? Swartz: There are a lot of volunteer green building programs around the country that incorporate a lot of the same concepts. Sollenberger : I just wondered if this has this been tested, or has it been proven to do what you say it will? I would hate to see something implemented that did not do what we purport. Swartz: I do not know of anything on the list that has not been used elsewhere for several years. Sollenberger : For example: a certain efficiency furnace has been tested to save energy over other furnaces. Swartz: A lot of this is coming from volunteer programs . These are modest steps to try to codify based on City Council ' s direction. We are encouraging the market to go beyond this on a volunteer basis. Blonder: Is this coming from LEED or Energy Star? Swartz: Some ideas are from national green building standards. We have listed several sources. Some ideas are from Energy Star' s new version, which are addressing some problems seen in housing here. Blonder: The second class point increased the cost. Is that a cost of the City, or is that a cost that will be passed on to the home builders? Swartz: It can be either or both. In the short terms, 2011 - 12, the City is covering that piece with the 2B tax revenue. The City Council has stated that starting in March, the 3 of 22 ATTACHMENT 11 enforcement part will be covered. The Building Department is in a position where it needs to review costs and revenue as a whole. Sollenberger: So, these changes raise the threshold on the existing code. Have you asked the entry level builders what it will do to the product they are already building? Swartz: We had some builders on our residential advisory committee, so we had that feedback all the way through. Sollenberger: Are they already complying with this? Swartz: Journey did not stick with us on the committee due to time constraints, so we have gotten very little feedback from them in the last six months . There will be some increases that will vary by builder. Habitat is a leader and is doing some of this already. Big picture: These numbers represent one year of construction with both residential and commercial together. It is the costs over one year and benefits over a 20 year period. $2 .2 Million in benefits to $ 1 . 8 Million in costs after one year of construction. Residential + commercial, quantified elements only. Costs summary: $ 1 . 8 Million most in initial costs, next enforcement + one time costs for materials and training. Benefits: Utility savings over 20 years, Building Valuation (will have a higher value in the market place), Health + Productivity (hard to find national numbers on this), Economic Health is a reflection that when you spend more money on construction that will revolve in the economy counted as conservative . 5 multiplier which is .25 value. The carbon reduction is hypothetical because nobody is buying carbon right now. It is based on an expectation of the near future. Sollenberger: I have a concern. Your costs are nailed down but this is a lot of assuming and to base our decision on this is a leap . Blonder : I like that you are being conservative. I think the building valuation increase in value is extremely conservative. I know many buyers want the green buildings. Swartz: National suggested 1 % to 5 %. Code does not have the instant recognition like LEED . Part of this is to provide that market place recognition. Mike, I agree there are many assumptions and we tried to mark them and where they come from. Sollenberger : The hard costs we know, but the hard benefit is the blue. The rest has some softness . 4 of 22 ATTACHMENT 11 Swartz: Our goal was to present what we knew to decision makers and help them understand what we think is the big picture. Speaker Unknown : The problem is that we are used to looking at hard dollars and return on investment. Swartz: (Screen on acronyms on "Return on Green".) The decisions we make when we decide to build green reflect on our health and quality of life. We tried to put numbers to them. Sollenberger : What is the ROI? Swartz: We could calculate based on our numbers and we can give it to the public. However, it would not be attractive if you just look at the cost benefits. Sollenberger : I think it is something the public should know. Byers : Would the cost per month be greater than the cash benefit? Sollenberger : Yes, what are the costs up front? When do the increases in costs get returned? Lee: That depends on the financing time. The finance costs could be greater than the benefits over 20 years. Blonder : Wasn't the utilities cost inflation rate very conservative? Swartz: We tried to nail it down, but then we took the center of those numbers. Blonder: There is a lot to all of this . Some will be very expensive. It seems like your numbers are really low. Swartz: Some are refinements of what is already in the code. The costs side will be highest in the first days of the code. After a couple of years it is less and infrastructure is improved and costs come down. We are trying to reflect day one costs . In reality, after a couple of year' s refinement it will be considerably lower. Blonder: I appreciated Appendix 1 . It is well broken down. Do you think you will exceed these numbers? Swartz: No, we don't think so. Sollenberger: Using high side puts it at $5600 which give it a 2-3 year payback plus other benefits . Byers : What have you found looking at other cities? Is it in code or is it voluntary? 5 of 22 ATTACHMENT 11 Swartz: Use is on the increase. Santa Fe, Longmont, Boulder, Albuquerque, (others listed) has adopted varied green building codes. We have not looked at them in detail. We have been honing in to our own codes . Byers : Have you considered adopting a reward program for voluntary compliance instead of a code? Swartz: Council is looking at a combination of both. To move the market we want to reward builders who go beyond this. Council said to look at pushing the bottom end quicker. These are small steps . Not radical. Blonder: Under# 4 in Appendix 1 is one of the highest dollar items on the list. Is that included in the ROI? Swartz: That is not included as said in the footnote. For example: The Campus Crest development is very contentious. We keep hearing they are proposing electric heat, and people are concerned. Recently the owners approached CSU and said we need to learn about green building. They said they are beginning to understand that Fort Collins is different. A design cheret was held about three weeks ago and we participated. There were about 60 people there. The owners were very clear that they misread what they were getting into. They will have to go back and redesign the project to meet the expectations of this community and apply it to other projects they take around the country. Message is that Fort Collins is recognized as a leader in this kind of change. This is one step along that path. We will be looking at ways to significantly reward builders that go beyond the basic code. Swartz: Next steps : We are taking this to Boards and Commissions January and February. The City Council reading is in March. Byers : It is hard to see a proposal like this and not see a conflict with the Affordable Housing community. How do we reconcile this increase in costs even though they are good things? Can we exempt some affordable housing construction in town for some of this? Swartz: There is no easy answer. I have not seen sentiment to exempt affordable housing. The feeling is that all need the benefits that come from this . Maybe we need to look at more creative financing approaches that can help take this into account? We are seeing some of the affordable housing builders are some of the leaders and already implementing some of these codes. Sollenberger: All of those items were covered with a grant. The CDBG and some Housing Authority rehabs were grant covered. They are a leader when it is free money. And those costs are not passed on to tenants. Swartz: Challenge is reconciling the individual cost vs. the benefit to community. 6 of 22 ATTACHMENT I Sollenberger: It is hard for us to find balance. The other problem is the tax that is not presented as a tax and it will increase mortgage and annual payment. They did not get to vote on this. I have a problem because the people are getting hurt and we can't vote on it. I am not swayed by council ' s desires . They are out in three months. I do not want to ram it through on their watch. We should have more time. It is hard for me to be supportive. Blonder: Do you see this as a 1 -2% increase in rent for tenants? Swartz: I think it would carry through the same way. Sollenberger: One of the problems with gas forced air in units is they do not make units for the down size in the apartments. If we did multi-family units, it would be a less favorable picture. Swartz: After the Council adopts the Green Building, we want to make sure the builders have enough support for the transition. If adopted in March, it will be effective the next January. We want to have enough time to figure out the details and train the building industry and put into place a quality assurance plan beyond the classroom training. Next Steps: • Alternative compliance path details • Certification requirements • Performance testing protocols • Compliance forms, templates • Fact sheets, field guides • Staff + contractor training • QA/mentoring plans Blonder: I think the city should participate more in the costs of the project. Waido: Currently the Affordable Housing Fund is to help compensate for the increase in costs. They could put more money into the fund to help people buy houses. If you increase the cost of housing, you immediately wipe out a segment of population from getting into home ownership. They might not be there long enough to recover the costs. Sollenberger: We are not suggesting that the owner will be there 33 years. Just that someone will be there the life cycle of the structure (33 years), then it is the first owner who is standing that cost increase. Byers : I like the idea to increase the Affordable Housing fund. Sollenberger : Yes, it needs to be done if you are going to mandate people to do this. Qualified affordable is definable. Can we exempt out or something? The nonprofits are eligible for all of that stuff. A private builder is not. 7 of 22 ATTACHMENT 11 Waido : There is an increase in costs, yet one of the benefits is that there will be a market demand in the future. What if a qualified low-income buyer had that house discounted and didn 't have to pay into that, would they pay for the increase in costs? Sollenberger : The builder can bank that. It is no different than our down payment assistance. That gets repaid. Waido : This adds 1 % to cost of housing. On a $200,000 house that is $2000. Low income pays $ 198 ,000 and not the $200,000 until they sell at an appreciated $206,000 for example. Just a question. I don't have the answer. Swartz: Regulation: In 201 lwe will have pre-implementation with refinements to City Council. It will be implemented in January with Quality Assurance in 2012 . There will be Amendments down the line. Some ideas are water metering for units vs. the building, and land use code amendments ideas that were handed off to the Planning Department. Next land use code update with Plan Fort Collins would consider some of these things . Waido: Some examples could be like lot size and orientation. Swartz: In review last year we decided to work on greening our code because regulations are already supporting these concepts . Even though a lot of this is new in other places, much of it is not new in Fort Collins. So the idea was to review and see where the opportunities lay and take steps in other areas. Incentives, Recognition, Education + training, regulation, costs + benefits are all above code. Please vote on this. Proposed Motion: The affordable housing board recommends the proposed building code green amendments for residential and commercial construction be adopted by council. Sollenberger: How else does it affect the buyer? (Quick math on sample costs.) Possibly a $ 17-34 difference in a monthly bill. Byers : What we are talking about is $204 or $ 12/month at 6% . Utility savings is $65/year. It will look at costs at the low end $ 165/year. That is a fairly small number. (Discussion around the increase costs to renters or low income home buyers .) Blonder : Worse for tenants than owners. Byers : Rent is based on income. If it is city subsidized, the renter would not have to bear the costs. Blonder: I am more worried about the renters. Waido: There is a city subsidy in town. City paid 10% at Province Town from CDBG. 8 of 22 ATTACHMENT 11 Sollenberger: Tax payers are not shelling out for that, it is HUD money. Robinson: I like the idea of green, and that is where we need to go, but I don't want to see a family not get a home because of this extra expense. I would at least want to see a back-up plan for them, like a waive. At least propose this feedback to Council even if they are already going to pass it. Sollenberger: This is a more altruistic thought process, that we should do it for the benefit of the people even if some can' t afford it. Blonder: It is an image thing as well. Sollenberger: Are we looking for a decision tonight? Lee: It would be good to have something to put in the Council packets before March 1 . Blonder : Let' s draft it and send it out by email. Byers : Can we ask for a potential increase in the Affordable Housing funds . Waido: We have rarely done any rental assistance, but no mortgage assistance program. We could use homebuyer assistance to help buy down the interest rate or increased costs. Many 1 " time buyers are only buying condos and townhomes. They can't afford a house. Sollenberger : We are really only talking about the impact on the rentals . Byers : The builders can 't pass the costs on to affordable housing renters because their rent is based on income and they are maxed out. (Discussion about construction of rental apartments and the justification of building.) Sollenberger: Market rents just don't work in Affordable Housing. Rents have to be above 1 .25/sq. ft. Does it make any difference? No one is building single family homes that qualify for affordable. We are looking at apartment buildings only. I would like to recommend it. Byers : Council needs to know that this could have an effect on Affordable Housing in Fort Collins . Blonder: It is such a small amount. I agree with Mike and I agree with most of this. Byers : I think it needs to be voluntary only. Sollenberger : I agree. 9 of 22 ATTACHMENT I Robinson : I would like to think it will make Fort Collins more attractive and bring in more jobs . (Short discussion.) Byers : We should write a memo to support it, but these are our concerns and thoughts. Sollenberger: Let' s mull it over and get feedback to Ben by February 11 ? Members agree to draft a recommendation and present it by February 11 , 2011 . Plan Fort Collins Update : Presenter Ken Waido : The next steps : Plan adoption is Feb 15 . The paperwork is to go to the council and staff is presenting the updates to City Plan, Transportation Master Plan, and Pedestrian Plan for adoption. Some land use code implementation items will be on March 1 first readings, March 22 second readings. Regarding the ordinances, we talked about the changes to the L and M zone. The density ranged is being changed at both ends. There are some changes in terms of housing mix % requirements and what qualifies as a housing mix. Different lot sizes. (2000 sq ft difference, above 5000 and below 5000 .) Can't do it in a single housing type. Only with 3 housing types or more. The part of what has been up to this point is being carried forward is the change in density in urban estate zone. P&Z meeting county people were totally against it. Board will not recommend to the council. This is an optional thing. The board has had a lot of comments sent previously. Do you want to make a recommendation or just say something as comments? Sollenberger: I don' t think it affects us from product type. We would assist with projects that are small. Waido : The Affordable Housing strategic plan is affecting us the most. Robinson : Was the plan updated last year? Waido : Yes, in July. Blonder : Does anyone want to make a recommendation? Maybe Ken and I can meet on this . Waido : I am 70% devoted to Affordable Housing. My time is totally consumed by Plan Fort Collins and will be until the end of March. Then I will be able to pick up some more Affordable Housing projects. I want to look at the 6-month planning calendar. Some months are blank and I am asking you what else you want to put on this such as discussion interviews. The incentives is a good one. 10 of 22 ATTACHMENT 11 Sollenberger: Have a member of the attorney staff explain why they think the Housing Authority has to have a controlling interest before they give a tax credit. That will shut down the Housing Authority participating in tax credit deals . Waido: The June Meeting is schedule for June 2 and I will need to be out of the office. We might have to look at rescheduling to another date. Ben won't be here for August meeting. C. Other Business Waido : Donna Murton is changing her Union Place project. It will be a senior rental project. I think it will be 50-60 units but I have not seen the final numbers . Sollenberger: If a manufactured product has a HUD stamp can it ignore local code? That has a lower standard on everything than FTC has . Lee: I do not know. D. Next Month' s Agenda 1 . Please refer to the AHB 6 Month Planning Calendar. E. Future Meetings 1 . Any additions to the AHB 6 Month Planning Calendar? Meeting Adjourned at 6 : 45 PM. 11 of 22 ATTACHMENT I DRAFT ELECTRIC BOARD MINUTES 11 .2-2 Board Present Board Members Tom Barnish, John Harris, John Graham, Peggy Plate, Ed DeCourcey, and Steve Wolley Board Absent Vice Chairperson Steve Yurash Staff Present Steve Catanach, Ellen Switzer, Robin Pierce, Tom Rock, Kraig Bader, Katy Bigner, Jenny Lopez-Filkins, Patty Bigner, John Phelan, and Felix Lee Guests Rick Coen Selection of Board Member to Chair Meeting Wolley Call Meeting to Order 5 : 32 p.m. Officer Elections Chair nominations : Steve Wolley, Ed DeCourcey Wolley by a vote of 4 to 1 (Wolley abstained) Vice Chair nominations: Steve Yurash (incumbent), Ed DeCourcey DeCourcey by a vote of 4 to 2. Approval of Minutes Page 2, paragraph about letters received by the Mayor. "Most of these citizens were part of a group who favor of tiered rates, who believe they could be . . . . ". Page 1 , "If significant changes are made . . . ". Page 2, third paragraph. "Staff will recommend a more rapid implementation schedule for the electric heat amendments than the other code amendments." Board Member Barnish moved to approve as modified; Board Member Graham seconded the motion. It passed unanimously. Monthly Financial Report (Presentation available upon request) Utilities Financial Operations Manager Ellen Switzer presented the Monthly Financial Report. Ms. Switzer noted the information has not been audited yet. , and purchase power expense increased 8 . 7 percent above 2009 . Figures exclude depreciation and grants. Operating revenues represent revenue from meter reading activity. 12 of 22 ATTACHMENT 11 Key Financial Results: How does the Southwest Annexation cost match up with the amount budgeted_ _ _ . would like to see this information included each month. Part of the -4. 8 percent variance for capital additions relates to less cable replacement than anticipated, as well as managing projects low and delaying. Is it an issue for the Utility to not spend capital money? We have identified revenue and expenditures, which should balance. We 've been budgeting a loss in the last few years to draw down reserves. Two types of capital budgets: lapsing (those funds if not used in the year, they are not available to spend the next year, but do go into reserves); non-lapsing (the funds stay with the life of the project). Energy and Demand by Month: Planning Engineering Manager Bob Micek uses this information to report to Platte River Power Authority. It was suggested to normalize the annual peak demand by reflecting average temperature; interest in seeing how much it fluctuates over time. Operating Revenue: In 2010, operating revenue increased 11 percent from 2009 due to a 7 .4 percent rate increase and increased kWh sales in the residential class. Non-Operating Revenue: Sale of equipment and parts, repair of damaged equipment; interest income. How are grant revenues tracked? Only available for the grant projects, so it is tracked with the project but not in the budget. Capital Projects (non-lapsing budgets) : Total project cost compared to budget. 2010 Total Revenue Compared to Expense : Purchase power represents 70-80 percent of our total expenses. Would like to see the top three items that account for the reason why we came in under budget. 2010 Summary: Additional appropriations approved by Council are required if we need to spend over our budget. Contingency funds for unexpected events are placed in one line item of the budget for ease in keeping track of where they are. Philosophy of not spending just because we have the budget. Ms . Switzer thanked board members for their suggestions and will make those changes . 13 of 22 ATTACHMENT 11 Building Code Green Amendments (Presentation available upon request) Green Building Code Project Manager Felix Lee and Energy Services Manager John Phelan presented this topic to the Board. Council directed staff to develop mandatory building code green amendments to be integrated into the City' s existing building codes for residential and commercial construction. Council will consider the proposed "green" amendments to the Fort Collins building code at their March 1 and March 22 meetings. The purpose of the Green Building Program is to align . . . . (from presentation slide). The substance of the proposed amendments remains the same since staff provided an update to the Board at the December 1 , 2010, meeting. Refinements to the proposal since that time include: - Low-VOC materials : cabinets excluded - Daylighting deleted - Occupancy control of lighting in defined spaces - Certified tropical hardwood - Special provisions for electrically heated buildings (increase envelope insulation requirements) The Board received a comprehensive benefits and cost summary. The benefit-to-cost ratio represented as one year of construction, residential and commercial, quantified elements only with a 0 percent inflation rate, costs total $ 1 .76 million, and benefits total $2 .23 million. Benefits include carbon reduction, utility savings, building valuation, health and productivity, and economic impact on the community. Mr. Phelan explained the concept of economic multipliers . Staff will round to boards and commissions through February. More information can be obtained by visiting www. fcgov.com/gbp . Was there consideration at making these voluntary rather than codifying them ? There was a lot of discussion around this. Staff proceeded to develop those things that make sense to codify and represent minimum standards. Some of the example codes staff was comparing to revolutionary or evolutionary? Mr. Lee, as a code official, was initially supportive of the two sets of standards in the marketplace until he closely examined them. This change is evolutionary. Did the City and stakeholders examine whether this would prevent developers from coming to Fort Collins ? Staff discussed this factor and determined this is not a big driver, compared to other costs such as infrastructure, etc. This is not viewed to be a strike against new business . Upgrade to Foothills Fashion Mall? If an addition was added or changing out major systems, it may come under some of these code changes, but when the footprint does not change, it normally wouldn't. 14 of 22 ATTACHMENT I Six to twelve month lead times and bureaucracy in Fort Collins would be prohibitive when developers can go elsewhere and build much quicker. Mr. Phelan noted planners would counter that people want to live and develop here for the very reason of our high standards. Energy Services and Development Review are both investing in time with our community contractors to teach them how to get through the planning and permitting processes. Fees from developers to Development Review will help support this program. Concern that adding these products puts a home with these upgrades out of a lot of people 's reach. It was noted one of the only remaining entry level residential builders in the community would see no cost increase from these amendments; they are already incorporating these measures in their products . What was the stakeholders ' biggest issues ? It varied between the residential to commercial groups. "Greening our code" in comparison to adopting a green building model code was the biggest challenge for the residential group. The commercial group was concerned about the practicality of enforcing these changes and implementing the program. Motion: Board Member Graham moved that the Electric Board recommends the proposed building code green amendments for residential and commercial construction to be integrated into the City' s existing building codes. Vice Chairperson DeCourcey seconded the motion. Vote on the motion: 5 for; 1 against. Reason for nay vote : Board Member Barnish voted against out of concern that it will cost the community too much (see other concerns above). Board Member Graham recognized the effort put in by staff to develop this. 15 of 22 ATTACHMENT 11 Landmark Preservation Commission Memo Fort Collins Memorandum DATE : February 16, 2011 TO : Mayor and City Council Members THRU : John Phelan - Energy Services Manager Doug Swartz - Energy Services Engineer FROM: Karen McWilliams - Landmark Preservation Commission staff RE : Landmark Preservation Commission Green Building Recommendation On February 9, 2011 , Green Building Staff members attended the Landmark Preservation Commission meeting to provide an update on the Green Building Program and the building code green amendment proposal. After the presentation and discussion, the Landmark Preservation Commission voted unanimously to recommend that Council adopt the code changes, as proposed. Thank you, Karen McWilliams Historic Preservation Planner Community Development and Neighborhood Services 16 of 22 ATTACHMENT 11 Draft Building Review Board Minutes The Building Review Board will provide a final recommendation for Council following the Board's February 24`h meeting. Minutes to be approved by the Board at the February 24, 2011 Meeting FORT COLLINS BUILDING REVIEW BOARD Regular Meeting — January 27, 2011 1 . 00 P. M. Chairperson: Alan Cram IlPhone : 472- 1752(H) Council Liaison: Kelly Ohlson IStaff Liaison: Mike Gebo (416-2618) A regular meeting of the Building Review Board was held on Thursday, January 27, 2011 in the Council Chambers of the Fort Collins Municipal Building at 300 LaPorte Avenue, Fort Collins, Colorado. BOARD MEMBERS PRESENT: Alan Cram Andrea Dunlap Brice Miller Jim Packard Rick Reider Jeff Schneider George Smith BOARD MEMBERS ABSENT: None STAFF MEMBERS PRESENT : Delynn Coldiron, Customer & Admin. Services Manager Russ Hovland, Plans Analyst — Permit Plan Review AGENDA: 1 . ROLL CALL The meeting was called to order and meeting instructions given. 2 . APPROVAL OF MINUTES A motion was made to approve the November 18, 2010 minutes as written. The motion was seconded. 3 . Green Building Program Update The presenter stated they would provide information on work that has been accomplished on the ordinance language and the benefit cost analysis. The green building team will meet with the 17 of 22 ATTACHMENT 11 Building Review Board again on February 24 h to review the ordinance language. They will be looking for board input at that time. The presenter reviewed the green building program goals which are to align with the city policies of reduced carbon emissions, reduced energy and water use, to create better buildings, to avoid lost opportunities and to continue our leadership role in Fort Collins. The green building code amendments are a component of the larger green building program. As the code development work is completed, the City will move to more market based recognition and incentive type programs. The amendments can be clustered into different categories, but the City is focusing on a system approach. The presenter discussed changes that have taken place since the last presentation to the Board. Cabinets have been removed from the low VOC proposal. The commercial and multi- family list no longer contains a day lighting measure, and there is an additional measure for occupancy control for specific spaces — mostly corridors and stairwells. Also, lighting in those areas will be reduced to 50% when those areas are unoccupied. The presenter stated that four options were previously being considered. Three of those options have been removed. The remaining option is certified tropical hardwoods. The proposal for higher electric heat building requirements would be implemented before January 1 , 2012. The presenter also discussed changes that will be made to the 2009 I-Codes. Amendments have been made to the ICR which governs single family homes and duplexes. Residential three-plex to multi-family three story structures are covered under Chapter 4 of the IECC, and Chapter 5 of the IECC covers multi-family buildings that are greater than three stories. Amendments have been made to those two chapters of the IECC. The presenter referenced benefit cost categories in Figure 1 . The green building team looked at things from an individual perspective, from the building sector perspective, and the community or the ecosystem. He added that the cost analysis is an inexact science. There are many moving parts, and also many limitations on staff s time and resources. Staff has done the best they can, but there is some variability. A component analysis and a community scale analysis were completed. The component analysis looked at each specific proposal and analyzed it. There are some studies and different pieces of information to look at on the community scale analysis. There are both quantified and nonquantified costs and benefits. Some are straight forward and easy to quantify. Some are difficult to quantify; i.e. , benefits of a dark night sky from dark sky pictures. The results were presented in ranges, recognizing that different builders would have different levels of experience and different access to resources. The same is true with benefits. There are a lot of moving parts, different size buildings, different configurations, so there is no single number. They used prototype buildings for new residential and commercial construction to give grounding to the numbers. The costs for the most part are near term costs, and the benefits are recurring long-term benefits. The presenter also discussed cost increases. They range from 1 % to 2% on the residential side and from 1 % to 4% on the commercial side. There is no quick direct payback to owners, and there will be increased enforcement time and costs. Overall analysis shows that total benefits do exceed the costs, and the total benefit cost ratio is 1 . 3 . This is based on the analysis of one year 18 of 22 ATTACHMENT 11 of construction. There are some enforcement costs and then some training and support materials. The training and support materials are really a one time cost, so they are a little different. Regarding benefits, utility savings are about a quarter of the benefits, followed by building valuation which is another big piece of the pie. Economic health, carbon reduction, and health and productivity fill in the smaller wedges. City Council will have the first reading of the ordinance on March lst. The second reading will be March 22nd. Activities to be completed in 2011 include testing protocols and forms, templates, fact sheets, training for staff and contractors and setting up a quality assurance program to use when the program is implemented. The amendments will be implemented in 2012 . There may also be a few instances where the ordinance needs further revision. Those tweaks could be accomplished late in 2011 . Once that is completed, staff will address the market driven aspects of the program with recognition incentives, education, and training. There is a lot of information on the website that addresses green building practice summaries, benefit cost analysis, and minutes from the track meetings. Chair Cram asked if any of the audience participants wished to speak Axel Severts stated that he works for W.J. Bradley in Fort Collins. He is a lender. Mr. Severts stated that his biggest concern is that the cost of new buildings will increase with the green building program. In order for a remodeled house to get appraised with the added costs, there would need to be similar green houses in the exact same neighborhood in order for FANNIE and FREDDIE to accept the value. FANNIE and FREDDIE would actually have to change their guidelines in order for lenders to add a line on the appraisal form to adjust it for a house that' s green. Mr. Severts stated that his biggest concern is how homeowners would ever get an appraisal to account for the green build remodels. In a new subdivision that is entirely green, the appraiser could simply use the house next door. Mr. Severts stated that he felt first time home buyers would be priced out of those neighborhoods because they are the most sensitive about price. They are struggling to get into that first home regardless of whether it is or is not green. There currently is discussion about FANNIE and FREDDIE trying to get the green guidelines into their product mix, but there is also talk about them going away. Every investor in the country underwrites to their guidelines. If it goes private, how would green built ever get added to the appraisal form? Board members addressed questions to the presenters. A Board member commented that he has found a number of inconsistencies in the cost analysis figures. A range of 1 % to 4% has been discussed, but 1 % to 2% is referenced for residential land and up to 7% for commercial. So, 1 % to 4% doesn't jive with anything else in the rest of the document. Another example is the initial costs in Appendix 1 . One percent of $250,000 is $2,500, but the calculation is $2,835 . If staff is using 1 % as the low figure, then the rest of the tables should match that concept. The presenter suggested that perhaps they could review those specific areas with the Board member. A Board member asked if anyone from the Board of Realtors and the real estate community has been contacted for their comments and concerns. A presenter responded they have been represented on the green building program advisory committee and some members from the real 19 of 22 ATTACHMENT 11 estate community have been on both the residential and commercial tracks. Staff realizes what a challenge the underwriting will be. A Board member questioned the cost impacts, ranges, and utility savings that were arrived at based on the prototypes. He stated that the ranges are based on an entry level home in Fort Collins, but the code will impact everyone across the range for construction. An example would be that in a home that sells for $200,000 to $250,000, vinyl windows would be used for the basement as well as the upper levels of the house. But in a $ 1 million home that uses Andersen Windows, that impact could be significant. He would want to ensure that everyone knows the project costs are based on a $200,000 to $250,000 home. The Board member also discussed construction waste recycling. The low is zero and the high is 200. He asked if the Brendle Group or staff is assembling the numbers. A presenter responded that they are most concerned about the cost impact to the entry level buyer. They did think that if they put costs in percentage terms, even for a more expensive home, they would probably not see a huge different range of percentages. They were clear in the report about the prototype that was used, and the numbers for more expensive homes can be scaled up. They talked with builders, contractors, subcontractors and service providers. They attempted to bracket the range in a reasonable value that they were confident about. On construction waste recycling, the reason the low is zero is because some services will be paid for related to recycling construction waste. Less material will also be sent to the landfill. They are aware of some projects that have actually saved money by implementing construction waste recycling. They also did not attempt to quantify the existing construction, the remodels, and the additions because there were just too many different combinations. The Board member also asked about those alterations that don't require a building permit. In those instances, the City will not know if the home owner installed a water efficient fixture. Hovland stated that the intent has always been that the green code is applied to new construction and then alterations with a permitted alteration. The City will never see a nonpermitted item. The Board member stated that the philosophy behind the code program is to help conserve electricity, conserve water, and reduce carbon emissions. Why wouldn't it also be mandatory for all citizens in Fort Collins regardless of the work that' s being done? He stated he did not understand why staff is looking at only one portion of it. A presenter responded that it is a practical cut-off point. He added that the green building codes go above the baseline codes of life, health and safety. The Board member disagreed, saying that the definition needs to be changed because the new code is mandating that these changes occur on new construction; therefore, the new code is the minimum standard for life, health, and safety. A presenter added that the intent of the green building program is market transformation. It is a bit of the 80/20 rule. We are getting the lions share of the savings for most buildings. Overall the market is changing and water efficient fixtures will be the fixtures that are available at Home Depot two years from now. It is going to be difficult for the consumer to purchase a toilet that isn't 1 .28 gallons per flush. A member asked if the additional interest that will be paid over 30 years on the increased loan amount was considered in the calculations for the cost of those items or if it was just calculated on the basis of how much more an item will cost. A presenter responded that the interest piece is shown in the mortgage payment. It is best summarized at the bottom of the page on Appendix 1 . A member also asked if the record-keeping and bookkeeping costs to the contractor have been calculated. A presenter said they haven't explicitly quantified that, but they do reflect the 20 of 22 ATTACHMENT 11 contractor margin in the estimated costs so they are accounting for some of that burden. The goal behind the code changes is not to increase burden. Staff is very interested in working with the building community to try to make this as easy as possible. The goal is better buildings, not more paperwork. A Board member asked what percentage of costs for administration will be for the building department. A presenter referenced Appendix 3 and stated there will be a substantial increase in staff time. The funds for the additional staff have been appropriated by City Council so it is available should they adopt the amendment. The Board member asked if the presenter was comfortable with those numbers. The presenter responded that they felt the numbers were conservatively high. The 45% falls within the national average for this program. There have been some recent discussions that it may not have been enough. He added that these costs as well as the initial costs will probably come down as staff becomes more experienced. Staff is trying to represent in the cost estimate what' s going to happen in the near term. Based on passed experience, watching other code changes, we will find this easier and less expensive than it seems looking at it in the future. The Chair thanked the Green Building Team for presenting today. He stated they are making headway in producing a living viable document that works for everyone. 4. Election of Officers Alan Cram was nominated for Chair. Jeff Schneider was nominated as Vice-Chair. The motion was seconded. Vote : Yeas : Cram, Dunlap, Miller, Packard, Schneider, Smith Nays : None. Abstain: Reider 5 . 2010 Annual Report A member made a motion to accept the 2010 Annual Report as presented. The motion was seconded. Vote : Yeas : Cram, Dunlap, Miller, Packard, Reider, Schneider, Smith Nays : None. 6. Follow-Up Reports: • A & J Construction — Coldiron reported that this was the gentlemen who was struggling with the English language that was at a previous meeting with John Estabrook. The board required that he frame a house within the City of Fort Collins. This has been done, and he passed inspection. The City has finalized his full framer license at this point based on the Board' s recommendation. • February meeting — Coldiron announced that a luncheon is planned for the February meeting. She offered to contact the City Manager' s office and invite Kelly Ohlson. Paul Eckman will be invited to offer some coursework in board duties and responsibilities. Rick Reider will 21 of 22 ATTACHMENT 11 also be formally welcomed to the Board. A decision was made to start the meeting at noon. A member suggested that lunch be kept simple and light to contain costs. • Code Class — Coldiron stated the code class has been delayed so the green building amendments could be included. She will schedule a room that will hold 200 to 250 people and try to have it videotaped so it meets the ordinance requirements that the City has for contractors who need to either take a class or take the amendments exam. That video could be available to show quarterly to meet the needs of contractors. 7. Other Business • Members provided Coldiron with new contact information. • A Board member suggested that it would be helpful if it could be determined before the Board meetings how many of the Board members will be attending. Coldiron stated that staff would confirm attendance in the future. • Coldiron reported that a new Building Development Review Tech has been hired. Board member Schneider participated in 12 interviews with perspective applicants. Molly Packard will be joining staff on February 22. Meeting adjourned at 2 : 00 p.m. Mike Gebo, Chief Building Official Alan Cram, Chair 22 of 22 ATTACHMENT 12 Advisory Committee Member Comments In the most recent meetings of the Technical Review Advisory Committee and Green Building Program Advisory Committee meetings, members were asked to individually comment about their sense of the proposed building code green amendment package. Residential Technical Review Advisory Committee ♦ No items in particular seem like they would be a problem. It would be great to see some order of what has the best payback. ♦ Concerned about a prescriptive code. Certified wood, DC blower motor, commissioning and safe combustion are adding cost to the house. ♦ Cost is a big deal - especially in this economy. Whole-house ventilation is a big concern because you are requiring a high efficiency, expensive fan because that is the only way to meet energy requirements. Also, this negatively pressures the house and essentially gets rid of heat recovery ventilation systems in Fort Collins. ♦ This is a good start. Not surprisingly, with such a diverse group of stakeholders, the final package is predictably diluted. ♦ The proposal is on the right track. ♦ Agreed: this is on the right track. Electrical efficiency seems like it was left out of the code proposal, though. Energy-efficient lighting package not addressed. Could include requirements around daylighting and phantom load controls . These options could be easy and low cost. ♦ The standards could be further increased beyond the proposal. Electric heat versus gas heat requirements may push people to use a non-renewable energy source (gas) as opposed to an electric system that could be powered by renewable energy. ♦ The code proposal is not too heavy-handed; it strikes a good balance. Makes improvements but won't create a big push back. Convince the council that this is a good place to start and then monitor it to make sure it is working and how it could be improved. ♦ This is a good start. Electric heat homes are viable. ♦ From the enforcement side this is all very doable. This is going to increase cost on the industry's part. Would like to have the building department verify compliance for the new measures as opposed to requiring third-party verification. 1 of 5 ATTACHMENT 12 ♦ This is a good start. It' s not as heavy-handed as it looked like it might be. Builders may have some challenges document that materials are low-VOC or certified wood. When do additions or remodels come in? Whole house ventilation should be considered when looking at HVAC system design. It is not a simple, stand-alone item. ♦ Concerns about the cost to the customer and impacts on affordable housing. For someone who is just getting into the market, a big upfront cost may be too much and drive them out of the community. Remodels need to be addressed. Cost and length of inspections is a concern. This will be a lot of information for the inspectors. ♦ Recycling plan needs to have a template to provide consistency. Insulation installation requirement could be a judgment call on behalf of the inspector. Commissioning should be verified by the City. Low-VOC material list is going to be difficult to verify and enforce. ♦ The proposal sets a good direction. Be sure to think through the implementation details carefully so that it works. The builder has little control when it comes to interior lighting/material selections. ♦ If City Council wants a prescriptive code then this is a good start. A points-based system would encourage people to look at green building from a broader perspective. We have spent a lot of time on new construction - how is this code going to affect remodels and infill? ♦ Some sections may be more appropriate to incentivize instead of mandate. A points- based system would foster creativity. ♦ The code is well balanced and hits a lot of different topics. Remodel aspect of the code is huge. Training and education are important and should be considered for the implementation plan. Will the low-VOC requirements really have that much of an effect? Perhaps the code should focus on the material that off-gas for the longest period of time. ♦ The code proposal should also include future items that staff would like to include in the next version. This will allow the market to plan ahead and possibly change faster than the next round of code adoptions. ♦ The timeline for this project seemed short at some points but it kept the group and process focused. It would have been great to get builders in the room who are building to lower standards. The amendments are a good start to pushing green building in the building community. ♦ City Council should not have asked for a prescriptive code. It would have been better to have a voluntary green building program. The enforcement of some of these 2 of 5 ATTACHMENT 12 amendments will add cost to both the City and builders. The City needs to be careful about requiring too much documentation. ♦ It seems like increasing regulations causes a negative reaction from some developers. Voluntary and educational programs can have a more positive impact on the development community. Fortunately, the regulations that did come out of this process do not seem like they are too onerous. Commercial Technical Review Advisory Committee ♦ Some of the items are very important and some are becoming the building standard. It would be interesting to do a prioritization exercise to identify key items from the proposed code that should not be discarded. Incentives are important as well as implementation and enforcement. ♦ This is the beginning of a cultural shift in the industry. Hate to carry a stick around to make people do things but in today's economy it may be necessary. This is a good place to start. The biggest potential in our community will be in the existing building side of things . The requirement for energy assessments prior to alterations is a good start. That will help building owners see where the improvements can be made. ♦ Construction waste management, building envelope, insulation are all important to green building. Some good steps have been made but I still worry that this is not enough to really catch us up but making us less behind. When this is presented to Council, Staff should focus on other values to society not just capital investments. ♦ This is starting out at a good spot. It is taking a step in the right direction but not adding too much burden to economy. Some more documentation of first costs and savings is important. ♦ The City is headed in the right direction. Stakeholder process is important and staff did a great job of including the community. ♦ We are up in front at looking at this type of code. This is a strong beginning to create a green building code. Glad IGCC was thrown out and that staff was able to see how the code could apply additions, remodels, etc. Also glad staff looked at local impacts to builders . Didn't want the code to be too cumbersome. ♦ This is a fragile place in the economy. This proposal is a positive start. Education is important. The market is going this direction. As long as builders know what to do and have all of the available resources, this is a good start. ♦ This is a good common ground for items that have a lot of impact. Building envelope is critical to the GB code. Many builders are uneducated about it and it is being done wrong over and over again. Education is important for these items. Worried that the 3 of 5 ATTACHMENT 12 City is not going to fund the building department to implement this code. You should not necessarily have to save money to do the right thing. ♦ Building envelope is huge. From an inspection standpoint, staff has been learning how the systems integrate. It is going to take a lot of time and training to understand how it all works. The process does work but sometimes it is a cultural change that you can't really put a solid savings to. Integrated design is important. ♦ Don't want to be so far out that we get ourselves in trouble. This puts us in front but not too far in front. ♦ Wish that there was more of a push. The challenges that we face as a society are so big and the changes that we are proposing are so small. It is difficult to create change in the current system because we need more radical change. This is a step in the right direction but it is not big enough. Green Building Program Advisory Committee ♦ Education and incentives are extremely important to the success of this program. The costs to the City and building community should be seriously considered. ♦ The City' s energy policy goals will be very difficult to achieve without some of the mandates that are outlined in the amendment proposal. This also supports other City goals. ♦ Council is going to need more specific information before they can make a decision. Overall, the amendment proposal is on the right track. Deconstruction should be considered for the proposals. ♦ Staff has done a great job of summarizing everything. Some of these items will add cost but they are on the lighter side of green building regulations. Integration is important for these proposals. If builders look at each item as something that has to be added it is going to cost more than if these practices are integrated into the design and construction. ♦ The code proposals are a great compromise between people who want more and those who want less. The TRACs worked hard to find items that would make a difference but not push things too far. A market for green does exist in our community. ♦ Council needs to be careful about putting too much burden on the building community. Existing homes need to be addressed in this code. ♦ A lot of gaps exist in the information that is available in the proposals and cost and benefit information. These are all good measures, but more information is needed for Council to make an informed decision. 4 of 5 ATTACHMENT 12 ♦ The City could research how other existing programs, like ENERGY STAR New Homes and National Green Building Standard, could be used in our community. ♦ From a realistic, practical standpoint from the residential sector, this code is pushing things too far. The market is starting to move this way but a lot of people are not ready to pay more for " green. " ♦ The adoption of this code should be delayed to give staff and the community more time to understand the details and decide if it is the right move. ♦ The financial piece and how this code will impact the business community is a big concern. Incentives are important to help move green building forward and address the existing building stock in Fort Collins. ♦ City Council is looking for something that is more aggressive. The C-TRAC really tried to find practices that could be implemented as soon as possible and have big impacts. The IGCC would have been a huge burden on builders and owners . These proposals are a great compromise. It should be up to City Staff and City Council to decide when the code should be implemented. 5 of 5 ATTACHMENT Green Building Program and Building Code Green Amendments City Council Meeting March 1 , 2011 Green Building Program • Provide incentives Voluntary, . Recognize innovation and success market-driven , above-code • Provide education and training Regulation • Building Code Green Amendments • Research local costs and benefits Foundation • Metrics and quality assurance • Address City barriers 2 Building Code Green Amendments Residential and Commercial Practices • GB Practices — Building Envelope Performance — Mechanical Systems Performance — Indoor Environmental Quality — Energy Efficiency — Water Efficiency — Construction Waste Recycling — Owner Education 3 Ftff Tonight' s Council Session First Reading of Building Code Green Amendments • Ordinances amending sections of: — International Building Code — International Energy Conservation Code — International Residential Code — International Mechanical Code — International Fuel Gas Code — Colorado Plumbing Code 4 i `rt_fl Green Building : Moving Towards Sustainability IZero Mandatory Market Driven Building Performance Requirements BuildingVoluntary Programs (GB practices Impacts becoming code) Building Code Green Amendments 11 ' I -Codes Today Future `''Collin ' 5 Benefit Cost Analysis • Component and community-scale analysis , based on : — Prototype residential and commercial buildings — One year of typical construction activity — Twenty year benefits , net- present-value — Conservative assumptions 6 Benefit Cost Analysis Summary • Near-term costs , recurring long -term benefits • Energy , water, carbon savings • Initial cost increases — Residential 1 % to 2 % — Commercial 1 % to 4 % • No quick payback • Increased ( City) verification time / cost • Total benefits exceed total costs — B/C ratio 1 . 3 City of 7 i.tf� ollin Implementation • Education and Training — Design professionals , — Contractors — Staff • Support — Alternative compliance paths — Certification requirements — Performance testing protocols — Compliance forms , templates — Fact sheets , field guides • Quality assurance 8 ,: rtfi Next Steps — Regulation Jill • Water metering amendments • Provide incentives (2011 /2012 ) • Recognize innovation and success Land Use Code • P education and training amendments • Regulation (2011 /2012 ) • 2012 I -Codes (2013) • Research local costs and benefits • Metrics and quality assurance Green amendments • Address City barriers update (2013) city or Fort Collins J 9 Next Steps — Market-Driven • Adjust existing programs for new • Provide incentives code baseline • Recognize innovation and success • Provide education and training Develop and implement new • Regulation pieces to accelerate market • Research local costs and benefits transformation • Metrics and quality assurance • Address City barriers 10 rtfl Green Amendments = Outcomes • The Green Amendments are the next steps towards making GB practices mainstream , by: — Establishing GB practices in code — Advancing the performance of buildings • Building Code Green Amendments — part of a larger picture — Implementation support — Regular code updates — Market elements C or 11 Questions - F�or"tll 12 ORDINANCE NO . 030, 2011 OF THE COUNCIL OF THE CITY OF FORT COLLINS AMENDING CHAPTER 5 , ARTICLE II, DIVISION 2 , OF THE CODE OF THE CITY OF FORT COLLINS FOR THE PURPOSE OF AMENDING THE 2009 INTERNATIONAL BUILDING CODE AS ADOPTED WHEREAS, the City Council has determined that it is in the best interests of the health, safety and welfare of the City and its citizens to better align Fort Collins ' built environment with community goals of improved indoor environmental quality, protection of the natural environment, reduced carbon emissions, reduced energy use and reduced water use; and WHEREAS, City staff has conducted a significant public outreach program, working with three advisory committees comprised of representatives from the residential and commercial construction industries, housing industry, real estate and appraisal industries, construction recycling industry, specialized-trade contractors, and regional code officials ; and WHEREAS , on February 2 , 2011 , the substance of the amendments was presented to the Electric Board, and the Electric Board recommended approval of the amendments ; and WHEREAS , on February 3 , 2011 , the substance of the amendments was presented to the Affordable Housing Board, and the Affordable Housing Board recommended against approval of the amendments ; and WHEREAS , on February 9, 2011 , the substance of the amendments was presented to the Landmark Preservation Commission, and the Landmark Preservation Commission recommended approval of the amendments ; and WHEREAS, on February 16, 2011 , the substance of the amendments was presented to the Economic Advisory Commission, and the Economic Advisory Commission recommended approval of the amendments; and WHEREAS, on February 16, 2011 , the substance of the amendments was presented to the Natural Resources Advisory Board, and the Natural Resources Advisory Board recommended approval of the amendments ; and WHEREAS, on February 17, 2011 , the substance of the amendments was presented to the Water Board, and the Water Board considered water related elements and recommended approval of those amendments ; and 1 WHEREAS, on February 24, 2011 , the substance of the amendments was presented to the Building Review Board, and the Building Review Board ; and WHEREAS , on February 28 , 2011 , the substance of the amendments was presented to the Air Quality Advisory Board, and the Air Quality Advisory Board ; and WHEREAS , based on input obtained through this outreach process, together with City Council and advisory board review and comment, staff has developed proposed amendments to the 2009 International Building Code ("IBC") as set forth in this Ordinance ; and WHEREAS , the City Council has determined that it is in the best interests of the health, safety and welfare of the City and its citizens that the IBC as adopted be amended. NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF FORT COLLINS as follows : Section 1 . That the opening paragraph of Section 5 -27 of the Code of the City of Fort Collins is hereby amended to read as follows : Sec. 5-27. Amendments and deletions to code. The 2009 International Building Code adopted herein§ 5-26 is hereby amended in 4he following respeetsto read as follows : Section 2 . That Subsection ( 16) of Section 5 -27 of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph which reads in its entirety as follows : ( 16) Section 202. DEFINITIONS, teffns hereby amended Ito add the following definitions in alphabetical sequence it the folio cii. r . as follows : "The term " COMMISSIONING " is hereby added to read as follows : "COMMISSIONING. A process to verify and document that the selected building and systems have been designed, installed, and function in accordance with the construction documents, manufacturers ' specifications, and minimum code requirements. " "The term " VOLATILE ORGANIC COMPOUND (VOC) " is hereby added to read as follows : "VOLATILE ORGANIC COMPOUND (VOC) : "Any compound of carbon, excluding carbon monoxide, carbon dioxide, carbonic acid, metallic carbides or carbonates, and ammonium carbonate, which participates in atmospheric photochemical reactions . VOCs include a variety of chemicals, some of which may have short-and long-term adverse health effects emitted as gases from certain solids or liquids . " 2 Section 3 . That Section 5 -27 of the Code of the City of Fort Collins is hereby amended by the addition of a new subsection which reads in its entirety as follows : A new chapter is hereby added to read as follows : "CHAPTER 36 SUSTAINABLE BUILDING CONSTRUCTION PRACTICES SECTION 3601 GENERAL 3601 . 1 Scope. The provisions of this chapter shall govern sustainable building construction practices for new construction and additions that require a building permit, unless otherwise noted. SECTION 3602 RESOURCE EFFICIENCY 3602. 1 Construction waste management. A construction waste management plan, acceptable to the Building Official, including recycling of concrete, wood, metals and cardboard, is required at the time of application for a building permit for new construction. The construction waste management plan shall be implemented and conspicuously posted on the construction site. Substantive changes to the plan shall be subject to prior approval by the Building Official. 3602.2 Certified tropical hardwood. All tropical hardwoods used in new construction, additions and alterations requiring a building permit, shall be certified by the Forest Stewardship Council or other approved agency. Certification demonstrating compliance shall be required with delivery of such materials and shall be available for inspection. "SECTION 3603 INDOOR ENVIRONMENTAL QUALITY (IEQ) 3603. 1 Indoor Air Quality (IAQ) 3603. 1 . 1 Heating, Ventilating, and Air Conditioning Design . Prior to and during construction, reasonable efforts shall be made to minimize the release and accumulation of debris and particulates, and the specific requirements of this section shall apply. 3603 . 1 . 1 . 1 Air handling system access. The arrangement and location of air handling system components including, but not limited to, air handler units, fans, coils and condensate pans shall allow access for cleaning and repair of the air handling surfaces of such components. Piping, conduits, and other building components shall not be located so as to obstruct the required access. 3603. 1 . 1 .2 Durability of air handling surfaces. Surfaces exposed to airflow 3 within air handling systems shall be constructed of materials that are resistant to deterioration and will not break away, crack, peel, flake off, or show evidence of delamination or continued erosion when tested in accordance with the erosion test in UL 181 . 3603 . 1 . 1 .3 Airstream surfaces. Materials exposed to airflow within ducts, within air plenums, or on top of suspended ceilings, shall not break away, crack, peel, flake off, or show evidence of delamination or continued erosion when tested in accordance with the erosion test in UL 181 . 3603 . 1 .2 Building pollutant flush-out. After all interior finishes are installed, the building shall be flushed-out by ventilating at a minimum rate of 0 . 30 cftn per ft2 of outside air or the design outdoor airflow rate determined from Chapter 4 of the IMC, whichever is greater, for at least 14 days while maintaining an internal temperature of at least 60°F, and relative humidity not higher than 60 percent. Occupancy shall be permitted to start one day after start of the flush-out, provided that flush-out continues for the full 14 days . The building shall not be "baked out" by increasing the temperature of the space above the occupied set point. Where continuous ventilation is not possible, the aggregate of flush-out periods shall be equivalent to 14 days of continuous ventilation. Flush-out reports shall be provided to the Building Official prior to issuance of a permanent Certificate of Occupancy. Exception : All residential buildings . 3603 .2 Low-volatile organic compound (VOC) materials. Construction materials, floor coverings and site-applied finishes, including sealants and adhesives, resilient flooring, carpeting and pad, site-applied paints, stains and varnishes, structural wood panels, hardwood veneer plywood, particle board and fiber board building products, and insulation shall meet specified volatile organic compound (VOC) emissions limits in accordance with relevant standards California Department of Public Health (CDPH) 01350 ; GREENGUARD Environmental Institute GGPS . 001 standard for building materials and finishes ; and Green Seal® standards . Documentation demonstrating compliance shall be required with delivery of such materials and shall be available for inspection. 3603 .3 Acoustical control. Minimum requirements for exterior-to-interior sound transmission, interior sound transmission, and background sound levels in new construction and additions thereto, except as noted hereunder, shall be provided as specified herein. 3603 .3. 1 Sound transmission. Buildings and tenant spaces shall comply with the following sound transmission requirements : Exceptions . I . Portions of buildings or structures that have the interior environment open to the exterior environment. 4 2 . Concession stands and toilet facilities in Group A-4 and A- 5 occupancies . 3603 .3 . 1 . 1 Exterior sound transmission. Where a Group Al , A3 , E and I occupancy building, a Group B occupancy building used for educational purposes, or a Group R occupancy building is constructed at a location listed herein, the wall and roof-ceiling assemblies making up the building thermal envelope shall have a composite sound transmission class (STC ) rating of 40 or greater in the following locations : 1 . within 500 feet (300 m) of a multi-lane highway (road) designed for high-speed travel by large numbers of vehicles, and having no traffic lights, stop signs, nor other regulations requiring vehicles to stop, fire station, heavy industrial or manufacturing zone or facilities, commercial storage facility with back-up alarms, outdoor music amphitheater, or sports arena or stadium; 2 . within 250 feet ( 150 m) of a truck route roadway containing four or more traffic lanes ; or 3 . within 1 ,000 feet (900 m) of an active railway. 3603 .3 . 1 .2 Interior sound transmission. Interior wall and floor/ceiling assemblies, separating interior rooms and spaces shall be designed in accordance with the following requirements : 1 . Wall and floor-ceiling assemblies separating adjacent tenant spaces, tenant spaces and public places, hotel rooms, motel rooms, and patient rooms in nursing homes and hospitals and adjacent classrooms shall have a composite STC rating of 50 or greater. 2 . Wall and floor-ceiling assemblies separating classrooms from rest rooms and showers shall have a composite STC rating of 53 or greater. 3 . Wall and floor-ceiling assemblies separating classrooms from music rooms, mechanical rooms, cafeteria, gymnasiums, and indoor swimming pools shall have a composite STC rating of 60 or greater. Exception : Residential Group R occupancies addressed in Section 1207 of this code . 3603 .3. 1 .3 Background Sound. The average background sound levels within unoccupied rooms (from heating, ventilating and air conditioning and other building systems) shall be below the maximum A-weighted sound level for specific 5 occupancies from Table 3603 below. This shall be confirmed by spot checks during the commissioning process . TABLE 3603 MAXIMUM ALLOWABLE BACKGROUND SOUND IN ROOMS Occupancy Maximum A-weighted sound level (dB.) Small auditoriums (<500 seats) 39 Large auditoriums, large live indoor theaters, and large churches (for very good speech articulation) 35 (>500 seats) TV and broadcast studios (close microphone pickup only) 35 Small live indoor theaters (< 500 seats) 35 Private residences: Bedrooms 39 Apartments 48 Family rooms and living rooms 48 Schools: Lecture and classrooms Core learning space with enclosed volume < 20,000 cu ft (<566 cu m) 35 Core learning space with enclosed volume > 20,000 cu ft (>566 cu m) 40 Open-plan classrooms 35 Hotels/motels: Individual rooms or suites 44 Meetingibanquet rooms 44 Service support areas 57 Office buildings : Offices executive 44 small, private 48 large, with conference tables 44 Conference rooms Large 39 Small 44 Open-plan areas 48 Business machines, computers 53 Public circulation 57 Hospitals and clinics Private rooms 39 Wards 44 Operating rooms 44 Laboratories 53 Corridors 53 Public areas 52 Movie theaters < 500 seats 48 Churches, small (<500 seats) 44 Courtrooms 44 Libraries 48 Restaurants 52 Light maintenance shops, industrial plant control rooms, kitchens, and laundries 62 Shops and garages 67 6 SECTION 3604 COMMISSIONING, OPERATIONS & MAINTENANCE 3604. 1 Building commissioning. For new buildings and additions with a gross floor of greater than 15 ,000 ft2 ( 1 , 395 in ), commissioning shall be performed in accordance with this section. A commissioning process shall be incorporated into the design and construction of the building project that verifies that the delivered building and its components, assemblies, and systems comply with the documented owner project requirements (OPR) . Procedures, documentation, tools and training shall be provided to the building operating staff to sustain features of the building assemblies and systems for the service life of the building. This material shall be assembled and organized into a systems manual that provides necessary information to the building operating staff to operate and maintain all commissioned systems identified with the building project. The owner shall retain the system manual and final commissioning report described below. An electronic formatted copy of the final commissioning report shall be provided to the Building Official. The following commissioning activities shall be completed prior to issuance of a permanent Certificate of Occupancy: 1 . Designate an approved project commissioning authority (CxA) to lead, review, and oversee completion of the commissioning process activities . 2 . The owner, in conjunction with the design team as necessary, shall develop the owner 's project requirements (OPR) to guide the CxA. The OPR will be distributed to all parties participating in the project programming, design, construction, and operations, and the commissioning team members . 3 . The design team shall develop the basis of design (BOD) . 4. The CxA shall review the both the OPR and BOD for clarity and completeness. 5 . Construction phase commissioning requirements shall be incorporated into project specifications and other construction documents developed by the design team. 6 . Develop and implement a commissioning plan containing all required forms and procedures for the complete testing of all equipment, systems, and controls included in Section 3604 . 1 . 1 . 7 . Verify the installation and performance of the systems to be commissioned. 8 . Complete a final commissioning report satisfactory to the Building Official. 9 . Verify the owner requirements for training operating personnel and building occupants are completed. 10 . Verify that a system manual in a form satisfactory to the Building Official has been prepared. At a minimum, the system manual shall include operations and maintenance documentation and full warranty information, and shall provide operating staff the information needed to understand and operate the commissioned systems as designed. 3604. 1 . 1 Systems. The following systems, if included in the building project, shall be commissioned: 1 . heating, ventilating, air-conditioning, indoor-air-quality, and refrigeration systems 7 and associated controls ; 2 . building thermal envelope systems, components, and assemblies to verify thermal, air, and moisture integrity; 3 . all lighting controls and shading controls ; 4 . service water heating systems ; 5 . renewable energy systems ; and 6 . background sound levels . " Section 4 . That Section 5 -27 of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph which reads in its entirety as follows : Chapter 35 REFERENCED STANDARDS is hereby amended by adding the following additional referenced standard in alphabetical sequence : "CDPH California Department of Public Health 1615 Capitol Avenue Sacramento, CA 95814 CDPH 01350 Standard Method for Testing VOC emissions from indoor sources Referenced in Amended 09 IBC Section 3603.2 Maximum Allowable Background Sound in Rooms" "FSC Forest Stewardship Council U. S . (FSC-US) 212 Third Avenue North, Suite 504 Minneapolis, MN 55401 " "GEI GREENGUARD Environmental Institute 2211 Newmarket Parkway, Suite 110 Marietta, GA 30067 GGPS . 00I . GREENGUARD IAQ Standard for Building Materials, Finishes and Furnishings Referenced in Amended 09 IBC Section 3603.2 Maximum Allowable Background Sound in Rooms" "Green Seal® 1001 Connecticut Avenue, NW Suite 827 Washington, DC 20036-5525 GS- I I Paintings and Coatings GS-43 Recycled Content Latex Paints Referenced in Amended 09 IBC Section 3603.2 Maximum Allowable Background Sound in Rooms" Section 5 . That all subsections in Section 5 -27 of the Code of the City of Fort Collins are hereby renumbered in sequential order as they appear in the IBC . 8 Section 6 . That the requirements set forth herein above will be effective as to all applications for building permits filed on or after January 1 , 2012 . Introduced, considered favorably on first reading, and ordered published this 1st day of March, A.D . 2011 , and to be presented for final passage on the 22nd day of March, A.D . 2011 . Mayor ATTEST : City Clerk Passed and adopted on final reading on the 22nd day of March, A . D . 2011 . Mayor ATTEST : City Clerk 9 ORDINANCE NO . 031 , 2011 , OF THE COUNCIL OF THE CITY OF FORT COLLINS AMENDING CHAPTER 5 , ARTICLE II, DIVISION 2 , OF THE CODE OF THE CITY OF FORT COLLINS FOR THE PURPOSE OF AMENDING THE 2009 INTERNATIONAL ENERGY CONSERVATION CODE AS ADOPTED WHEREAS, the City Council has determined that it is in the best interests of the health, safety and welfare of the City and its citizens to better align Fort Collins ' built environment with community goals of improved indoor environmental quality, protection of the natural environment, reduced carbon emissions, reduced energy use and reduced water use, and; WHEREAS , City staff has conducted a significant public outreach program, working with three advisory committees comprised of representatives from the residential and commercial construction industries, specialized-trade contractors, housing industry, real estate and appraisal industries, construction recycling industry, and regional code officials; and WHEREAS , on February 2 , 2011 , the substance of the amendments was presented to the Electric Board, and the Electric Board recommended approval of the amendments ; and WHEREAS , on February 3 , 2011 , the substance of the amendments was presented to the Affordable Housing Board, and the Affordable Housing Board recommended against approval of the amendments ; and WHEREAS , on February 9 , 2011 , the substance of the amendments was presented to the Landmark Preservation Commission, and the Landmark Preservation Commission recommended approval of the amendments ; and WHEREAS , on February 16, 2011 , the substance of the amendments was presented to the Economic Advisory Commission, and the Economic Advisory Commission recommended approval of the amendments ; and WHEREAS , on February 16 , 2011 , the substance of the amendments was presented to the Natural Resources Advisory Board, and the Natural Resources Advisory Board recommended approval of the amendments ; and WHEREAS , on February 17, 2011 , the substance of the amendments was presented to the Water Board, and the Water Board considered water related elements and recommended approval of those amendments ; and 1 WHEREAS , on February 24, 2011 , the substance of the amendments was presented to the Building Review Board, and the Building Review Board ; and WHEREAS , on February 28, 2011 , the substance of the amendments was presented to the Air Quality Advisory Board, and the Air Quality Advisory Board ; and WHEREAS , based on input obtained through this outreach process, together with City Council and advisory board review and comment, staff has developed proposed amendments to the 2009 International Energy Conservation Code ("IECC") as set forth in this Ordinance ; and WHEREAS , the City Council has determined that it is in the best interests of the health, safety and welfare of the City and its citizens that IECC as adopted be amended. NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF FORT COLLINS as follows : Section 1 . That the opening paragraph contained in Section 5 -31 of the Code of the City of Fort Collins is hereby amended to read as follows : Sec. 5-31 . Amendments and deletions to code. The 2009 International Energy Conservation Code adopted min § 5 -26 is hereby amended in the following respects : Section 2 . That Section 5 -31 of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph which reads in its entirety as follows : Section 101. 4. 3. 1 is hereby added to read as follows : " 101 .4.3. 1 Energy assessment. Prior to any alterations, an energy analysis of the entire building shall be required and submitted to the Building Official . Exceptions : Energy assessments are not required in the following cases . 1 . First-time interior finishes . 2 . A building that has undergone an energy assessment within the previous three years . 3 . Alterations with a construction valuation of less than $30,000 . " Section 3 . That Section 5 -31 of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph which reads in its entirety as follows : 2 Section 202 DEFINITIONS, is hereby amended to add the following definitions in alphabetical sequence as follows : "CONTINUOUS AIR BARRIER. The combination of interconnected materials, assemblies, and flexible sealed joints and components of the building thermal envelope that provides air tightness to a specified permeability. ELECTRIC HEAT. An indoor environmental primary heat source that is electric . A ground-source electric heat pump designed by a licensed professional engineer to operate without the use of supplemental electric resistance heat shall not be considered electric heat. NON-ELECTRIC HEAT. An indoor environmental primary heat source that is gas or that is a ground-source electric heat pump designed by a licensed professional engineer to operate without the use of supplemental electric resistance heat. " Section 4 . That Section 5 -31 of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph which reads in its entirety as follows : Section 401. 2 is hereby amended in its entirety to read as follows : "401 .2 Compliance. Compliance shall be demonstrated by conforming with mandatory Sections 401 , 402 . 2 . 12 , 402 .4, 402 . 5 , 403 , 1 , 403 .2 .2 , 403 . 2 . 3 , and 403 . 3 through 403 . 9 . Section 5 . That Section 5 -31 of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph which reads in its entirety as follows : Section 402, TABLE 402. 1. 1 is hereby amended in its entirety to read as follows : "TABLE 402. 1 . 1 INSULATION AND FENESTRATION REQUIREMENTS BY COMPONENT HEATING FENESTRATION SKYLIGHT" GLAZED CEILING WOOD MASS FLOOR BASEMENT` SLABa CRAWL` SYSTEM U-FACTOR" U-FACTOR FENESTRATION R-VALUE FRAME WALL R- WALL R- SPACE TYPE SHGC WALL R- VALUEe R-VALUE VALUE WALL R-VALUE VALUES & R- DEPTH VALUE Non- 0.35 0.60 NR 38 20 or 13/17 30 10/ 13 10, 2 10/ 13 electric 13+5f ft heat Electric 0.30 0.60 NR 49 20+5 15/19 30 15/ 19 10,4 15/ 19 heat I I ft For SL• 1 foot + 304. 8mm a. R-values are minimums. U-factors SHGC are maximums. R- 19 batts compressed into a nominal 2x6 framing cavity such that the R-value is reduced by R- 1 or more shall be marked with the compressed batt R-value in addition to the full thickness R-value. b. The fenestration U-factor column excludes skylights. The SHGC column applies to all glazed fenestration. C. " 15/19" means R- 15 continuous insulation on the interior or exterior of the foundation wall or R- 19 cavity insulation at the interior of the foundation wall. " 15/19" shall be permitted to be met with R- 13 cavity insulation on the interior of the foundation wall plus R-5 continuous insulation on the interior or exterior of the foundation wall. "10/13" means R- 10 continuous insulation on the interior or exterior of the foundation wall or R- 13 cavity insulation at the interior of the foundation wall. d. R-5 shall be added to the required slab edge R-values for heated slabs. e. Or insulation sufficient to fill the framing cavity, R- 19 minimum. 3 f. " 13+5" means R- 13 cavity insulation plus R-5 insulated sheathing. If structural sheathing covers 25 percent or less of the exterior, insulating sheathing is not required where structural sheathing is used. If structural sheathing covers more than 25 percent of the exterior, structural sheathing shall be supplemented with insulated sheathing of at least R-2. g. The second R-value applies when more than half the insulation is on the interior of the mass wall. Section 6 . That Section 5 -31 of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph which reads in its entirety as follows : Section 402 TABLE 402. 1. 3 is hereby amended in its entirety to read as follows : "TABLE 402. 1 .3 EQUIVALENT U-FACTORSa HEATING FENESTRATION SKYLIGHT CEILING FRAME MASS FLOOR BASEMENT CRAWL SYSTEM U-FACTOR U-FACTOR R-VALUE WALL WALL U- WALL SPACE TYPE U- U- FACTOR U-FACTOR WALL FACTOR FACTOR` U- FACTOR Non-electric 0.35 0.60 0.030 0.057 0.082 0.033 0.059 0.065 heat Electric heat 0.30 0.60 0.026 0.043 0.060 0.033 0.050 0.055 a. Non-fenestration U-factors shall be obtained from measurement, calculation or an approved source. b. When more than half the insulation is on the interior, the mass wall U-factor shall be the same as the frame wall U- factor." Section 7 . That Section 5 -31 of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph which reads in its entirety as follows : Section 402. 2. 12 is hereby added to read as follows : "402.2 . 12 Specific insulation requirements. All insulation shall be installed to meet Residential Energy Services Network (RESNET) Grade I standard. Exceptions : RESNET Grade II is acceptable for: 1 . cavity insulation in exterior walls that include continuous rigid insulating sheathing and/or insulated siding with a minimum R-value of 5 ; and 2 , rim joists" Section 8 . That Section 5 -31 of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph which reads in its entirety as follows : TABLE 402. 4. 2 title is hereby amended to read in its entirety as follows : "402.4.2 Air sealing verification. Building thermal envelope air tightness shall be demonstrated to comply with either Section N1102 .4 .2 . 1 (new construction) or Section N1102 .4 .2 .2 (existing buildings) : 402.4.2. 1 Performing testing. In new construction, air sealing compliance shall be demonstrated through performance testing by an approved agency in accordance with the methods and standards specified herein. Documentation of testing results shall be submitted to the Building Official prior to receiving a Certificate of Occupancy. When 4 tested with a blower door at a pressure of 50 pascals (33 . 5 psf), the maximum building thermal envelope air leakage rate shall not exceed: 1 . three air changes per hour (ACH) in buildings with electric heat; or 2 , four air changes per hour (ACH) in buildings with non-electric heat. Isolation of attached garages from adjoining conditioned areas shall be verified with an approved differential pressure test. Testing shall occur after rough-in and after installation of penetrations of the building thermal envelope, including but not limited to penetrations for utilities, plumbing, electrical, ventilation and combustion appliances. During testing : 1 . exterior windows and doors , fireplace and stove doors shall be closed, but not sealed; 2 , dampers shall be closed, but not sealed, including exhaust, intake, makeup air, backdraft, and flue dampers ; 3 , interior doors shall be open; 4, exterior openings for continuous ventilation systems and heat recovery ventilators shall be closed and sealed; 5 , heating and cooling system(s) shall be turned off; 6 , heating, ventilating and air conditioning ducts shall not be sealed; 7 , supply and return air registers shall not be sealed; 8 , combustion air inlets shall not be closed or otherwise obstructed; and 9 . garage doors to the exterior shall be closed. 402.4.2.2 Visual inspection. In additions or alterations to existing buildings, air- sealing compliance shall be considered acceptable when the items listed in Table N1102 .4 .2 , applicable to the method of construction, are field-verified. " Section 9 . That Section 5 -31 of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph which reads in its entirety as follows : Section 402. 5 is hereby amended to read as follows : "402.5 Maximum fenestration U factor and SHGC. The area-weighted average maximum fenestration U factor permitted, using trade-offs from International Residential Code Section N1102 . 1 . 3 or N1102 .4. 5 , shall be 0 .40 for vertical fenestration and 0 . 75 for skylights. " Section 10 . That Section 5 -31 of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph which reads in its entirety as follows : Section 403. 6 is hereby amended as follows : 5 11403.6 Heating and cooling systems. Heating and cooling systems shall be designed in accordance with International Residential Code Section M1401 . 3 and performance will be verified in accordance with International Residential Code Section M1507 .4 . " Section 11 . That Section 5 -31 of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph which reads in its entirety as follows : Section 404. 2 is hereby added to read as follows : "404.2 Occupant sensor controls. In multifamily buildings, occupant sensor controls shall be provided to automatically reduce connected lighting power by not less than 50 percent during periods when occupants are not present in common corridors and common enclosed stairwells . Lighting in means of egress shall comply with the luminance or uniformity criteria required by the International Building Code when occupied. Exception : Automatic power reduction shall not be used to control battery back- up emergency lighting and exit signage ." Section 12 . That Section 5 -31 of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph which reads in its entirety as follows : Section 502. L is hereby amended by adding the following : "502. 1 General. All insulation shall be installed to Residential Energy Services Network (RESNET) Grade I standard. Exception : RESNET Grade II is acceptable for cavity insulation in exterior walls that include continuous exterior insulation as specified in Table 502 .2( 1 ) installed to RESNET Grade I standard. " Section 13 . That Section 5 -31 of the That Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph which reads in its entirety as follows : An exception to Section 502. 1. 1 is hereby added to read as follows : "Exception : For buildings using electric heat at the power density of 1 . 5 Watts per square foot or greater, building thermal envelope values in Table 502 .2(3 ), shall be mandatory. " Section 14 . That Section 5 -31 of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph which reads in its entirety as follows : An exception to Section 502. 1. 2 is hereby added to read as follows : "Exception : For buildings using electric heat at the power density of 1 . 5 Watts per square foot or greater, building thermal envelope values in Table 502 .2(3 ), shall be mandatory. " 6 Section 15 . That Section 5 -31 of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph which reads in its entirety as follows : TABLE 502. 2(3) is hereby added to read as follows : "TABLE 502 .2 (3) BUILDING THERMAL ENVELOPE REQUIREMENTS FOR ELECTRIC HEAT Opaque Elements Assembly Max. Insulation Min . R-Value Roofs Insulation Entirely above Deck U -0 . 039 R-25 . 0 ci Metal Building U -0 . 035 R- 19 . 0 + R- 11 . 0 Ls Attic and Other U -0 . 021 R-49 . 0 Walls , Above Grade Massa U -0 . 080 R- 13 . 3 ci Metal Building U -0 . 052 R- 13 . 0 + R- 13 . 0 ci Steel Framed U -0 . 055 R- 13 . 0 + R- 10 . 0 ci Wood Framed and Other U -0 . 051 R- 13 . 0 + R-7 . 5 ci Wall , Below Grade Below Grade Wall C-0 . 092 R- 10 . 0 ci Floors Mass U -0 . 064 R- 12 . 5 ci Steel Joist U -0 . 032 R-38 . 0 Wood Framed and Other U -0 . 026 R-30 . 0 + R-7 . 5 ci Slab-On -Grade Floors Unheated F-0 . 540 R- 10 for 24 in . Heated F-0 .440 R- 15 . 0 for 36 in . + R-5 ci below Opaque Doors Swinging U -0 . 400 Non-Swinging U -0 . 400 Fenestration Assembly Max. U Vertical Fenestration , ( up to 40% of Wall maximum ) U-0 . 25 Nonmetal framing : alIb U-0 . 35 Metal fr: curtainwall/stonefront° U-0 . 70 Metal framing : entrance door° U-0 .45 7 Metal framing : all other' Skylight ( up to 3 % of Roof maximum ) Uaii-0 . 60 The following definitions apply: ci = continuous insulation, Ls = liner system, NR = No (insulation) requirement. ' Mass walls with a heat capacity greater than 12 Btu/fe-'F which are unfmished or finished only on the interior do not need to be insulated. b Nonmetal framing includes framing materials other than metal with or without metal reinforcing or cladding. Metal framing includes metal framing with or without thermal break. The "all other" subcategory includes operable windows, fixed windows, and non-entrance doors." Section 16 . That Section 5 -31 of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph which reads in its entirety as follows : Section 502. 4. 3 is hereby amended by adding the following : "502.4.3. 1 Design requirements . The building thermal envelope shall be designed and constructed with a continuous air barrier that complies with the following requirements to control air leakage into, or out of, the conditioned space . All air barrier components of each building thermal envelope assembly shall be clearly identified on construction documents and the joints, interconnections, and penetrations of the air barrier components shall be detailed and comply with the following : 1 . The air barrier shall be continuous throughout the building thermal envelope (at the lowest floor, exterior walls, and ceiling or roof), with all joints and seams sealed and with sealed connections between all transitions in planes and changes in materials and at all penetrations . 2 . The air barrier component of each assembly shall be joined and sealed in a flexible manner to the air barrier component of adjacent assemblies, allowing for the relative movement of these assemblies and components . 3 . The air barrier shall be capable of withstanding positive and negative combined design wind, fan, and stack pressures on the air barrier without damage or displacement, and shall transfer the load to the structure, and shall not displace adjacent materials under full load. 4. The air barrier shall be installed in accordance with the manufacturer's instructions and in such a manner as to achieve the performance requirements . 5 . Where lighting fixtures with ventilation holes or other similar objects are to be installed in such a way as to penetrate the continuous air barrier, provisions shall be made to maintain the integrity of the continuous air barrier. 502.4.3 .2 Compliance. Compliance of the continuous air barrier for the opaque building thermal envelope shall be demonstrated by the following : 8 1 . Materials. Using air-barrier materials that have an air permeability not to exceed 0 . 004 cfm/ft2 under a pressure differential of 0 . 3 in. water ( 1 . 57 lb/ft2) (0 . 02 L/sam2 under a pressure differential of 75 Pa) when tested in accordance with ASTM E2178 ; 2 . Assemblies . Using assemblies of materials and components that have an average air leakage not to exceed 0 . 04 cfm/ft2 under a pressure differential of 0. 3 in. water ( 1 . 57 lb/ft2) (0. 02 L/sm2 under a pressure differential of 75 Pa) when tested in accordance with ASTM E2357 or ASTM E1677 ; 3 . Building. Testing the completed building and documenting that the air leakage rate of the building thermal envelope does not exceed 0 .25 cfm/ft2 under a pressure differential of 0 . 3 in. water ( 1 . 57 lb/ft2) (0. 02 L/s oM2 under a pressure differential of 75 Pa) in accordance with ASTM E779 or an equivalent approved method." Section 17 . That Section 5 -31 of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph which reads in its entirety as follows : Section 505. 2. 2. 1 is hereby amended in its entirety to read as follows : "505.2.2. 1 Occupant sensor controls. In new construction and additions that require a building permit, occupant sensor controls shall be provided to automatically reduce connected lighting power by not less than 50 percent during periods when occupants are not present in the following locations : 1 . corriders and enclosed stairwells; 2 , storage stack areas not open to the public ; 3 , library stack areas; and 4 . parking garages. Lighting in means of egress shall comply with the luminance or uniformity criteria required by the International Building Code when occupied. Exception : Automatic power reduction shall not be used to control battery back- up emergency lighting and exit signage . " Section 18 . That Section 5 -31 of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph which reads in its entirety as follows : Section 505. 2. 3 is hereby amended in its entirety by adding the following : "505.2.3 Sleeping unit controls. In hotels and motels with over 20 guest rooms, the lighting switched outlets, permanently wired luminaires, television, and heating, ventilating and air conditioning system equipment serving each guest room shall be automatically controlled so that lighting, switched outlets, permanently wired luminaires, and televisions will be turned off and the heating, ventilating and air conditioning system 9 set point raised at least 5 degrees Fahrenheit (3 degrees centigrade) in the cooling mode and lowered at least 5 degrees Fahrenheit (3 degrees centigrade) in the heating mode whenever the guest room is unoccupied. 505.2.3 . 1 Sleeping unit bathroom controls. All permanently wired luminaires located in bathrooms within sleeping units in hotels, motels, boarding houses or similar buildings shall be equipped with occupant sensors that require manual intervention to energize circuits . " Section 19 . That Section 5 -31 of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph which reads in its entirety as follows : Section 505. 2. 4 is hereby amended in its entirety by adding the following : "505.2.4 Exterior lighting controls. In addition to any other applicable requirements of this IECC, all outdoor lighting controls shall comply with the following requirements : For lighting of building fagades, parking lots, garages, canopies (sales and non-sales), and all outdoor sales areas, automatic controls shall be installed to reduce the sum of all lighting power (in Watts) by a minimum of 50 percent two hours after normal business closing and to turn off outdoor lighting within 30 minutes after sunrise. Exceptions . 1 . Lighting required by a health or life safety statute, ordinance, or regulation, including but not limited to, emergency lighting. 2 . Lighting that is controlled by a motion sensor and photo-control. 3 . Lighting for facilities that have equal lighting requirements at all hours and are designed to operate continuously. 4. Temporary outdoor lighting. 5 . Externally illuminated signs and signs that are internally illuminated or have integral lamps . " Section 20 . That Section 5 -31 of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph which reads in its entirety as follows : Section 505. 8 is hereby added to read as follows : "505.8 Electricity distribution design requirements and load type isolation . Electric distribution systems within, on or adjacent to and serving a building shall be designed in such fashion that each primary panel supplies only one electricity load type as defined in Sections 505 . 8 . 1 through 505 . 8 . 5 . The energy load type served by each distribution panel shall be clearly designated on the panel with the use served, and adequate space shall be provided for installation of metering equipment or other data collection devices, 10 temporary or permanent, to measure the energy use associated with each distribution panel. Exceptions : 1 . Buildings with less than 15 ,000 square feet of floor area are exempted from this requirement. 2 . Electrical systems that are designed and constructed in such fashion that the total usage of each of the load types as described in Sections 505 . 8 . 1 through 505 . 8 . 5 shall be permitted to be measured through the use of installed sub-meters or other equivalent methods as approved. 505.8. 1 Heating, ventilating, and air conditioning system electric load. This category shall include all electricity used to heat, cool, and provide ventilation to the building including, but not limited to, fans , pumps, and cooling energy. 505.8.2 Lighting system electric load. This category shall include all electricity for interior and exterior lighting used in occupant spaces and common areas . 505.8.3 Plug loads. This category shall include all electricity use by devices, electric appliances and equipment connected to convenience receptacle outlets . 505.8.4 Process loads. This category shall include all electricity used by any single load associated with activities within the building, such as, but not limited to, data centers, manufacturing equipment and commercial kitchens, that exceed 5 % of the total energy use of the whole building. " 505.8.5 Miscellaneous loads. This category shall include all electricity use for all other building operations and other operational loads . " Section 21 . That Section 5 -31 of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph which reads in its entirety as follows : Chapter 6 REFERENCED STANDARDS is hereby amended by adding the following additional referenced standard in alphabetical sequence : "Under the heading of ICC : IgCC PV 2- 10 International Green Construction CodeO. . . . . . . 609 . 3 " "RESNETO Residential Energy Services Network, Inc . P . O . Box 4561 Oceanside, CA 92052-4561 http : //resnet.us RESNETO reference standard Grade I and Grade II Insulation" Referenced in Amended 09 IECC Section 502. 1 General. Section 22 . That all subsections in Section 5 -31 of the Code of the City of Fort Collins are hereby renumbered in sequential order as they appear in the IECC . 11 Section 23 . That the requirements of Sections 3 , 4 , 5 , 6, 13 , 14 and 15 of this Ordinance will be effective as to all applications for building permits filed on or after the effective date of this Ordinance. Section 24 . That the requirements of Sections 2 , 7 , 8 , 9, 10, 11 , 12, 16, 17, 18 , 19, 20 and 21 of this Ordinance will be effective as to all applications for building permits filed on or after January 1 , 2012 . Introduced, considered favorably on first reading, and ordered published this I st day of March, A.D . 2011 , and to be presented for final passage on the 22nd day of March, A.D . 2011 . Mayor ATTEST : City Clerk Passed and adopted on final reading on the 22nd day of March, A.D . 2011 . Mayor ATTEST : City Clerk 12 ORDINANCE NO . 032, 2011 , OF THE COUNCIL OF THE CITY OF FORT COLLINS AMENDING CHAPTER 5 , ARTICLE II, DIVISION 2 , OF THE CODE OF THE CITY OF FORT COLLINS FOR THE PURPOSE OF AMENDING THE 2009 INTERNATIONAL RESIDENTIAL CODE AS ADOPTED WHEREAS, the City Council has determined that it is in the best interests of the health, safety and welfare of the City and its citizens to better align Fort Collins ' built environment with community goals of improved indoor environmental quality, protection of the natural environment, reduced carbon emissions, reduced energy use and reduced water use, and; WHEREAS , City staff has conducted a significant public outreach program, working with three advisory committees comprised of representatives from the residential and commercial construction industries, housing industry, real estate and appraisal industries, construction recycling industry, specialized-trade contractors, and regional code officials ; and WHEREAS , on February 2 , 2011 , the substance of the amendments was presented to the Electric Board, and the Electric Board recommended approval of the amendments ; and WHEREAS , on February 3 , 2011 , the substance of the amendments was presented to the Affordable Housing Board, and the Affordable Housing Board recommended against approval of the amendments ; and WHEREAS , on February 9, 2011 , the substance of the amendments was presented to the Landmark Preservation Commission, and the Landmark Preservation Commission recommended approval of the amendments ; and WHEREAS , on February 16, 2011 , the substance of the amendments was presented to the Economic Advisory Commission, and the Economic Advisory Commission recommended approval of the amendments ; and WHEREAS , on February 16, 2011 , the substance of the amendments was presented to the Natural Resources Advisory Board, and the Natural Resources Advisory Board recommended approval of the amendments ; and WHEREAS , on February 17, 2011 , the substance of the amendments was presented to the Water Board, and the Water Board considered water related elements and recommended approval of those amendments ; and 1 WHEREAS , on February 24, 2011 , the substance of the amendments was presented to the Building Review Board, and the Building Review Board ; and WHEREAS , on February 28, 2011 , the substance of the amendments was presented to the Air Quality Advisory Board, and the Air Quality Advisory Board ; and WHEREAS, based on the input obtained through this outreach process, together with City Council and advisory board review and comment, staff has developed proposed amendments to the 2009 International Residential Code ("IRC") as set forth in this Ordinance; and WHEREAS , the City Council has determined that it is in the best interests of the health, safety and welfare of the City and its citizens that the IRC as adopted be amended. NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF FORT COLLINS as follows : Section 1 . That the opening paragraph of Section 5 -30 of the Code of the City of Fort Collins is hereby amended to read as follows : Sec. 5-30 Amendments and deletions to code. The 2009International Residential Code adopted hefeinin § 5 -26 is hereby amended in the following respects : Section 2 . That Section 5 -30 of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph which reads in its entirety as follows : Section R303. 3 is hereby amended in its entirety to read as follows : "R303.3 General. Mechanical ventilation systems shall be required as specified hereunder. R303.3 . 1 . Bathroom ventilation. Mechanical ventilation of bathrooms shall be provided in accordance with Section M1507 . 3 . Ventilation air from the space shall be exhausted directly to the outside. R303.3 .2. Kitchen ventilation. Mechanical ventilation of kitchens shall be provided in accordance with Section M1503 and Section M1507 . 3 . R303.3 .3. Whole dwelling unit ventilation. Mechanical ventilation of the whole dwelling unit shall be provided in accordance with Section M1507 .4 . " Section 3 . That Section 5 -30 of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph which reads in its entirety as follows : A new section is hereby added to read as follows : 2 "SECTION R324 RESOURCE EFFICIENCY R324. 1 Construction waste management. A construction waste management plan, acceptable to the Building Official, including recycling of concrete, wood, metals and cardboard, is required at time of application for a building permit for new construction. The construction waste management plan shall be implemented and conspicuously posted on the construction site . Substantive changes to the plan shall be subject to prior approval by the Building Official. R324.3 Certified tropical hardwood. All tropical hardwoods used in new construction, additions and alterations requiring a building permit, shall be certified by the Forest Stewardship Council or other approved agency. Certification demonstrating compliance shall be required with delivery of such materials and shall be available for inspection. " Section 4 . That Section 5 -30 of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph which reads in its entirety as follows : A new section is hereby added to read to read as follows : "SECTION R325 INDOOR ENVIRONMENTAL QUALITY (IEQ) R325. 1 Low-volatile organic compound (VOC) materials. Construction materials, floor coverings and site-applied finishes, including sealants and adhesives, resilient flooring, carpeting and pad, site-applied paints, stains and varnishes, structural wood panels, hardwood veneer plywood, particle board and fiber board building products, and insulation shall meet specified volatile organic compound (VOC) emissions limits in accordance with California Department of Public Health (CDPH) 01350 ; GREENGUARD Environmental Institute GGPS . 001 standard for building materials and finishes ; and Green Seal® standards . Documentation demonstrating compliance be required with delivery of such materials and shall be available for inspection. " Section 5 . That Section 5 -30 of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph which reads in its entirety as follows : A new section is hereby added to read as follows : "SECTION R326 OUTDOOR ENVIRONMENTAL QUALITY (OEQ) R326. 1 Exterior lighting. All exterior lighting fixtures associated with new construction shall have the "Fixture Seal of Approval" from the International Dark-Sky Association or meet equivalent criteria approved by the Building Official. " Section 6 . That Section 5 -30 of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph which reads in its entirety as follows : 3 A new section is hereby added to read as follows : "SECTION R327 OPERATIONS AND MAINTENANCE AND BUILDING OWNER EDUCATION R327. 1 Operations and maintenance manual. A building operation and maintenance manual, in a form satisfactory to the Building Official, shall be provided for the building owner and/ or occupant at time of or prior to issuance of a Certificate of Occupancy. " Section 7 . That Section 5 -30 of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph which reads in its entirety as follows : Section R703. 8. 1 is hereby added to read as follows : "R703 .8. 1 Fenestration installation. All fenestration installations shall be in accordance with American Architectural Manufacturers Association (AAMA) Standards/ Specifications for Windows, Doors and Skylights and shall be supervised and inspected by an individual certified as an Installation Master by Architectural Testing, Inc. (ATI), or other approved agency. (Also see Section R612) " Section 8 . That Section 5 -30 of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph which reads in its entirety as follows : Section N1101. 2 is hereby amended in its entirety to read as follows : "N1101 .2 Compliance. Compliance shall be demonstrated by conforming with the requirements of the International Energy Conservation Code conforming with the requirements of this Part IV — Energy Conservation. Climate Zone 5b shall be used in determining the applicable requirements thereunder. N1101 .2. 1 Electric heat. For buildings with electric heat, envelope values in Tables N1102 . 1 and N1102 . 1 .2 shall be mandatory. " Section 9 . That Section 5 -30 of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph which reads in its entirety as follows : Section N1102, TABLE NII02. 1. 1 is hereby amended in its entirety to read as follows : "TABLE N1102. 1 . 1 INSULATION AND FENESTRATION REQUIREMENTS BY COMPONENT HEATING FENESTRATION SKYLIGHT" GLAZED CEILING WOOD MASS FLOOR BASEMENT` SLAB$ CRAWL` SYSTEM U-FACTOR" U-FACTOR FENESTRATION R-VALUE FRAME WALL R- WALL R- SPACE TYPE SHGC WALL R- VALUE R-VALUE VALUE WALL R-VALUE VALUES & R- DEPTH VALUE Non- 0.35 0.60 NR 38 20 or 13/17 30 10/ 13 101 2 10/ 13 electric 13+5f ft heat Electric 0.30 0.60 NR 49 20+5 15/19 30 15/ 19 1054 15/ 19 heat ft For SL• 1 foot + 304. 8mm 4 a. R-values are minimums. U-factors SHGC are maximums. R- 19 batts compressed into a nominal 2x6 framing cavity such that the R-value is reduced by R- 1 or more shall be marked with the compressed batt R-value in addition to the full thickness R-value. b. The fenestration U-factor column excludes skylights. The SHGC column applies to all glazed fenestration. C. " 15/19" means R- 15 continuous insulation on the interior or exterior of the foundation wall or R- 19 cavity insulation at the interior of the foundation wall. " 15/ 19" shall be permitted to be met with R- 13 cavity insulation on the interior of the foundation wall plus R-5 continuous insulation on the interior or exterior of the foundation wall. " 10/13" means R- 10 continuous insulation on the interior or exterior of the foundation wall or R-13 cavity insulation at the interior of the foundation wall. d. R-5 shall be added to the required slab edge R-values for heated slabs. e. Or insulation sufficient to fill the framing cavity, R- 19 minimum. f. " 13+5" means R- 13 cavity insulation plus R-5 insulated sheathing. If structural sheathing covers 25 percent or less of the exterior, insulating sheathing is not required where structural sheathing is used. If structural sheathing covers more than 25 percent of the exterior, structural sheathing shall be supplemented with insulated sheathing of at least R-2. g. The second R-value applies when more than half the insulation is on the interior of the mass wall. Section 10 . That Section 5 -30 of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph which reads in its entirety as follows : Section N1102, TABLE N1102. 1 is hereby amended in its entirety to read as follows : "TABLE N1102. 1 EQUIVALENT U-FACTORSa HEATING FENESTRATION SKYLIGHT CEILING FRAME MASS FLOOR BASEMENT CRAWL SYSTEM U-FACTOR U-FACTOR R-VALUE WALL WALL U- WALL SPACE TYPE U- U- FACTOR U-FACTOR WALL FACTOR FACTOR` U- FACTOR Non-electric 0.35 0.60 0.030 0.057 0.082 0.033 0.059 0.065 heat Electric heat 0.30 0.60 0.026 0.043 0.060 0.033 0.050 0.055 a. Non-fenestration U-factors shall be obtained from measurement, calculation or an approved source. b. When more than half the insulation is on the interior, the mass wall U-factor shall be the same as the frame wall U- factor." Section 11 . That Section 5 -30 of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph which reads in its entirety as follows : Section N1102. 2. 12 is hereby added to read as follows : "N1102.2 . 12 Specific insulation requirements. All insulation shall be installed to meet Residential Energy Services Network (RESNET) Grade I standard. Exceptions : RESNET Grade II is acceptable for: 1 . cavity insulation in exterior walls that include continuous rigid insulating sheathing and/or insulated siding with a minimum R-5 value; and 2 . rim joists" Section 12 . That Section 5 -30 of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph which reads in its entirety as follows : Section N1102. 4. 2 is hereby amended to read as follows : "N1102.4.2 Air sealing verification. Building thermal envelope air tightness shall be demonstrated to comply with either Section N1102 .4 .2 . 1 (new construction) or Section 5 N1102 .4 .2 .2 (existing buildings) : N1102.4.2. 1 Performance testing. In new construction, air sealing compliance shall be demonstrated through performance testing by an approved agency in accordance with the methods and standards of this Section. Documentation of satisfactory testing results shall be submitted to the Building Official prior to receiving a Certificate of Occupancy. When tested with a blower door at a pressure of fifty (50) pascals (33 . 5 psf) , the maximum whole-building air leakage rate shall not exceed: 1 . three air changes per hour (ACH) in buildings with electric heat; or 2 . four air changes per hour (ACH) in buildings with non-electric heat. Isolation of attached garages from adjoining conditioned areas shall be verified with an approved differential pressure test. Testing shall occur after rough-in and after installation of penetrations of the building thermal envelope, including but not limited to penetrations for utilities, plumbing, electrical, ventilation and combustion appliances . During testing : I . exterior windows and doors, fireplace and stove doors shall be closed, but not sealed; 2 , dampers shall be closed, but not sealed, including exhaust, intake, makeup air, backdraft, and flue dampers ; 3 , interior doors shall be open; 4. exterior openings for continuous ventilation systems and heat recovery ventilators shall be closed and sealed; 5 . heating and cooling system(s) shall be turned off; 6 , heating, ventilating and air conditioning ducts shall not be sealed; and 7 . supply and return air registers shall not be sealed. 8 , combustion air inlets shall not be closed or otherwise obstructed. 9 . garage doors to the exterior shall be closed. N1102.4.2.2 Visual inspection. In additions or alterations to existing buildings, air sealing compliance shall be considered acceptable when the items listed in Table N1102 .4 . 2, applicable to the method of construction, are field-verified. " Section 13 . That Section 5 -30 of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph which reads in its entirety as follows : Section N1102. 5 is hereby added to read as follows : "N1102.5 Maximum fenestration U factor and SHGC. For new construction and additions that require a building permit, the area-weighted average maximum fenestration U factor permitted using trade-offs from Section 6 N1102 . 1 . 3 or NI 102 .4 . 5 shall be 0.40 for vertical fenestration, and 0 . 75 for skylights ." Section 14 . That Section 5 -30 of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph which reads in its entirety as follows : Section N1103. 6 is hereby amended as follows : "N1103 .6 Heating and cooling systems. For new construction and additions that require a building permit, heating and cooling systems shall be designed in accordance with Section M1401 . 3 and performance shall be verified in accordance with Section M1309 . " Section 15 . That Section 5 -30 of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph which reads in its entirety as follows : Section M1309 is hereby added to read as follows : "M1309 Performance verification. Installed heating, cooling and ventilation systems shall be performance-tested by an approved agency and adjusted to operate within design specifications, in accordance with ANSUACCA QI 5 -2007 HVAC Quality Installation Specification. Documentation of results shall be submitted to the Building Official prior to receiving a Certificate of Occupancy." Section 16 . That Section 5 -30 of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph which reads in its entirety as follows : Section M1401. 3 is hereby amended in its entirety to read as follows : "M1401 .3 Heating and cooling system design. The design of heating and cooling systems shall meet the requirements of this Section. Design documents shall be submitted to the Building Official at the time of application for a building permit. M1401 .3 . 1 Equipment sizing. Heating and cooling equipment shall be sized in accordance with ACCA Manual S, based on design building loads calculated in accordance with ACCA Manual J, or other equivalent methodology approved by the Building Official, using thermal design parameters in Table NI 10 1 . 1 as amended. The total equipment output capacity shall be between the following limits, as applicable for the equipment type : I . 95 % and 115 % of calculated system cooling load, for air conditioners and heat pumps; 2 . 95 % and 125 % of calculated system cooling load, for heat pumps with winter heating dominated requirements ; 3 . 100% and 140% of calculated system heating load, for warm air systems, unless dictated by the cooling equipment selection; and 4. 100% and 115 % of calculated system heating load, for heating boilers . Where no available equipment is within the applicable capacity limits, the next largest nominal piece of equipment that is available may be used. 7 M1401 .3 .2 Room loads. Room-by-room design heating and cooling loads shall be calculated. Exception. Equipment replacement in an existing building. M1401 .3 .3 Matched components. Air-conditioning, Heating and Refrigeration Institute (AHRI) matched evaporators, condensing units and air handlers shall be required. " Section 17 . That Section 5 -30 of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph which reads in its entirety as follows : Section M1503. 1 is hereby amended to read as follows : "M1503 . 1 Exception : Excluding range hoods serving gas ovens as required by Section G2447 . 6, , d14r#iog .q ,.,, ,, .v hoods s�. , ii ,, .t i,o , o,,, , ;, oa to a ; s h ,, .o to the ,, , ta , ,, Misted and labeled ductless range hoods shall not be required to discharge to the outdoors for which mechanical or natural ventilation is otherwise provided. " Section 18 . That Section 5 -30 of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph which reads in its entirety as follows : Section M1507. 3 is hereby amended to read as follows, TABLE M1507 . 3 remains unchanged: "M1507.3 Exhaust ventilation. Kitchen exhaust systems that are vented to the outside and bathroom mechanical exhaust systems shall be designed to have the capacity to exhaust the minimum air flow rate determined in accordance with Table M1507 . 3 . Exhausts shall have gravity dampers that close when the ventilation system is not operating. Design documents shall be submitted to the Building Official at the time of application for a building permit. Performance of installed mechanical ventilation systems shall be verified in accordance with Section M1309 . " Section 19 . That Section 5 -30 of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph which reads in its entirety as follows : Section M1507. 4 is hereby added as a new section to read as follows : "M1507.4 Whole dwelling unit ventilation. A mechanical exhaust system, supply system, or combination thereof shall be installed for each dwelling unit to provide whole- dwelling unit ventilation. Such system shall comply with Sections M1507 .4 . 1 through M 1507 .4.4 . M1507.4. 1 Whole dwelling unit ventilation rate. The mechanical ventilation system shall provide outdoor air at no less than the rate specified in Table M1507 .4. 1 . 1 8 TABLE M1507.4. 1 . 1 DWELLING UNIT VENTILATION AIR REQUIREMENTS, CFMI CONDITIONED NUMBER OF BEDROOMS FLOOR AREA (square feet) 0- 1 2-3 4-5 6-7 > 7 < 11500 30 45 60 75 90 11501-31000 45 60 75 90 105 31001-41500 60 75 90 105 120 41501-61000 75 90 105 120 135 61001-7500 90 105 120 135 150 > 7, 500 105 120 135 150 165 1 .Equation M1507 .4 . 1 can be used as an alternative to Table M1507 . 4 . 1 . 1 Equation M1507.4. 1 : Qfan = O. OlAfloor + 7 . 5 (Nbr + 1 ) Where : Qfa„ = fan flow rate in cubic feet per minute (cfm) . Afloor = conditioned floor area in square feet (ft) . Nbr = number of bedrooms ; not to be less than one. M1507.4.2 System design. The design of the required whole-dwelling unit ventilation system shall comply with the requirements of this Section. System design documents shall be submitted to the Building Official at the time of application for a building permit. M1507.4.2. 1 System type. The system shall consist of one or more supply or exhaust fans, or a combination thereof, and associated ducts and controls . Exhaust fans shall be permitted to be part of a mechanical exhaust system. Outdoor air ducts connected to the return duct of a forced air furnace shall be sized to provide adequate mechanical ventilation in accordance with ASHRAE 62 . 2 and shall meet the manufacturer' s requirements for minimum return air temperature to the furnace heat exchange . M1507.4.2.2 Outdoor air intakes. Outdoor air intakes shall have automatic dampers that close when the ventilation system is not operating . M1507.4.2.3 . Exhausts. Exhausts shall have gravity dampers that close when the ventilation system is not operating. M1507.4.2.4. Air circulation fan motors. Motors for air circulation fans used in the ventilation system, rated at one-quarter horsepower or greater, shall meet at least one of the following criteria: 1 . Where the furnace serves as an air handler for the ventilation system, the furnace shall be certified as an "electrically Efficient Furnace" by the Air-conditioning, Heating and Refrigeration 9 Institute (AHRI) . 2 . The blower motor shall be specified as a `Brushless DC" (BL or BLDC) motor by the manufacturer. 3 . The blower motor shall be specified as `Brushless Permanent Magnet" (BPM) motor. 4. The blower motor shall be specified as "Electronically Commutated Motor" (ECM)". 5 . The blower shall meet equivalent criteria acceptable to the Building Official . M1507.4.2.5. System controls. The mechanical ventilation system shall be provided with readily accessible and labeled controls that enable occupant override. M1507.4.2.6. Sound ratings for fans. Whole-dwelling unit ventilation fans shall be rated for sound at a maximum of 1 . 0 sone, in accordance with the procedures of the Home Ventilating. Institute (HVI 915, Procedure for Loudness Rating of Residential Fan Products) . Exception : Heating, ventilating and air conditioning air handlers and remote-mounted fans need not meet sound requirements . To be considered for this exception, a remote-mounted fan must be mounted outside the habitable spaces, bathrooms, toilets and hallways, and there must be a least 4 ft ( I m) of ductwork between the fan and the intake grille. M1507.4.3 System installation. The installation of the whole-dwelling unit ventilation system and equipment shall be carried out in accordance with the manufacturers ' design requirements and installation instructions . M1507.4.4 Performance verification. Performance of installed mechanical ventilation systems shall be verified in accordance with Section M1309 . " Section 20 . That Section 5 -30 of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph which reads in its entirety as follows : Section G2406. 2 is hereby amended to read as follows : "G2406.2 Prohibited locations. For new buildings and new appliances within additions, natural draft appliances shall not be located within the building thermal envelope or be located in a space where the only access to that space is from sleeping rooms, bathrooms, toilet rooms, or storage closets. Exceptions . 6 . Where natural draft appliances are located in an enclosed mechanical room and sealed to air flow from adjoining conditioned area and the following conditions are met: a. The access to the mechanical room is through a self-closing, 10 gasketed door; b. No other exhaust appliances are located within the mechanical room; c . The mechanical room is provided with outside combustion air as specified in this code ; d. The isolation of the mechanical room from adjoining conditioned areas is verified with a differential-pressure test performed by an approved agency; e . Such natural draft appliances pass a combustion safety test under worst-case depressurization conditions conducted by an approved agency, in accordance with Building Performance Institute (BPI) Technical Standards for the Heating Professional ; and f. Documentation of satisfactory testing results are submitted to the Building Official prior to receiving a Certificate of Occupancy. 7 . Natural draft fireplaces that pass a combustion safety test, under worst- case depressurization conditions, conducted by an approved agency, in accordance with the Building Performance Institute (BPI) Technical Standards for the Heating Professional, prior to issuance of a permanent Certificate of Occupancy." Section 21 . That Section 5 -30 of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph which reads in its entirety as follows : Section G2408. 1 is hereby amended by deleting the second paragraph and replacing it to read as follows : "Where natural draft appliances are replaced in existing buildings, such appliances shall pass a combustion safety test under natural conditions, conducted by an approved agency in accordance with the Building Performance Institute (BPI) Technical Standards for the Heating Professional . Such appliances shall also be combustion safety tested under worst-case depressurization conditions, by an approved agency in accordance with Building Performance Institute (BPI) Technical Standards for the Heating Professional. Should an appliance not pass such test, a disclosure form reporting the test results shall be provided to the homeowner. A copy of such disclosure form, signed by the homeowner, shall be submitted to the Building Official prior to issuance of a Letter of Completion. " Section 22 . That Section 5 -30 of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph which reads in its entirety as follows : Section P2903. 2 is hereby amended to read as follows : "P2903.2 Maximum flow and water consumption. The maximum water consumption flow rates and quantities for all plumbing fixtures and fixture fittings shall be in 11 accordance with Table P2903 .2 and such fixtures shall be Environmental Protection Agency (EPA) WaterSense® labeled fixtures . " Section 23 . That Section 5 -30 of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph which reads in its entirety as follows : Section P2903. 2 TABLE P2903. 2 is hereby amended to read as follows : "TABLE P2903.2 MAXIMUM FLOW RATES AND CONSUMPTION FOR PLUMBING FIXTURES AND FIXTURE FITTINGSb PLUMBING FIXTURE PLUMBING FIXTURE OR FIXTURE FITTING OR FIXTURE FITTING Lavatory faucet 1 .5 gpm at 60 psi Shower heads 2.0 gpm at 80 psi Sink faucet 1 .8 gpm at 60 psi Water closet 1 .28 gallons per flushing cycle, with minimum MaP threshold of 350 grams For SI: 1 gallon per minute (gpm) = 3 .785 L/m. 1 pound per square inch (psi) = 6.895 kPa a. A handheld shower spray is also a shower head b. Consumption tolerances shall be determined from referenced standards." Section 24 . That Section 5 -30 of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph which reads in its entirety as follows : Chapter 44 REFERENCED STANDARDS is hereby amended by adding the following additional referenced standards in alphabetical sequence : "Add the following referenced title standard to ACCA; ANSI/ACCA QI 5 -2007 HVAC Quality Installation Specification. Referenced in Amended 09 IRC Section M1309 Performance verification "ATI Architectural Testing, Inc . 130 Derry Court York, PA 17406 Installation MastersTM Testing and Certification Program Referenced in Amended 09 IRC Section R703.8. 1 Fenestration installation "CDPH California Department of Public Health 1615 Capitol Avenue Sacramento, CA 95814 CDPH 01350 Standard Method for Testing VOC emissions from indoor sources Referenced in Amended 09 IRC Section R325. 1 Low-volatile organic compound (VOC) materials." "FSC Forest Stewardship Council U. S . (FSC-US) 12 212 Third Avenue North, Suite 504 Minneapolis, MN 55401 " "GEI GREENGUARD Environmental Institute 2211 Newmarket Parkway, Suite 110 Marietta, GA 30067 GGPS . 00I . GREENGUARD IAQ Standard for Building Materials, Finishes and Furnishings Referenced in Amended 09 IRC Section R325 . 1 Low-volatile organic compound (VOC) materials." "Green SealO 1001 Connecticut Avenue, NW Suite 827 Washington, DC 20036-5525 GS- I I Paintings and Coatings GS-43 Recycled Content Latex Paints Referenced in Amended 09 IRC Section R325 . 1 Low-volatile organic compound (VOC) materials." "HVI Home Ventilating Institute 1000 N Rand Rd, Ste 214 Wauconda, IL 60084 USA HVI referenced standard HVI 915 , Procedure for Loudness Rating of Residential Fan Products Referenced in Amended 09 IRC Section M1507.4.2 .6. Sound ratings for fans." "IDA International Dark- Sky Association 3225 N. First Avenue Tucson, Arizona 85719 IDA fixture seal of approval (FSA) third-party certification for luminaires that minimize glare, reduce light trespass, and don 't pollute the night sky. Referenced in Amended 09 IRC Section R326. 1 Exterior Lighting." "RESNETO Mortgage Industry National Home Energy Rating Systems Standards Residential Energy Services Network, Inc. P . O . Box 4561 Oceanside, CA 92052-4561 http : Hresnet.us RESNETO reference standard Grade I and Grade II Insulation Referenced in Amended 09 IRC Section N1102 .2 Specific insulation requirements." Section 25 . That subparagraph (61 ) of Section 5 -31 of the Code of the City of Fort Collins is hereby deleted in its entirety as follows : 13 " 1%11401 .3 Sizing and testing. Heating and eooli � A I A 4 shall be sized based ofl. methodologies . The total sensible eapaeity of the cooling equipment shall not exee-e total sensible lead by mofe than 15 petvent for- eoofing only appfie4ions ; of by fflofe dueted aif distfibution heating and cooling systems shall be sized using eooling loads . All. applieable- pfotoeols established by the building official and ifl. aeeofdanee- with the ehanieal eode adopted by the City. " Section 26 . That all subsections in Section 5 -31 of the Code of the City of Fort Collins are hereby renumbered in sequential order as they appear in the IRC . Section 27 . That the requirements of Sections 8 , 9 and 10 of this Ordinance will be effective as to all applications for building permits filed on or after the effective date of this Ordinance . Section 28 . That the requirements of Sections 2 through 7 inclusive and I I through 25 inclusive of this Ordinance will be effective as to all applications for building permits filed on or after January 1 , 2012 . Introduced, considered favorably on first reading, and ordered published this 1st day of March, A.D . 2011 , and to be presented for final passage on the 22nd day of March, A.D . 2011 . Mayor ATTEST : City Clerk 14 Passed and adopted on final reading on the 22nd day of March, A.D . 2011 . Mayor ATTEST : City Clerk 15 ORDINANCE NO , 0335 2011 OF THE COUNCIL OF THE CITY OF FORT COLLINS AMENDING CHAPTER 5 , ARTICLE IV OF THE CODE OF THE CITY OF FORT COLLINS FOR THE PURPOSE OF AMENDING THE 2009 INTERNATIONAL MECHANICAL CODE AS ADOPTED WHEREAS, the City Council has determined that it is the best interests of the health, safety and welfare of the City and its citizens to better align Fort Collins ' built environment with community goals of improved indoor environmental quality, protection of the natural environment, reduced carbon emissions, reduced energy use and reduced water use, and; WHEREAS , City staff has conducted a significant public outreach program, working with three advisory committees comprised of representatives from the residential and commercial construction industries, housing industry, real estate and appraisal industries, construction recycling industry, specialized-trade contractors, and regional code officials ; and WHEREAS , on February 2 , 2011 , the substance of the amendments was presented to the Electric Board, and the Electric Board recommended approval of the amendments ; and WHEREAS , on February 3 , 2011 , the substance of the amendments was presented to the Affordable Housing Board, and the Affordable Housing Board recommended against approval of the amendments ; and WHEREAS , on February 9 , 2011 , the substance of the amendments was presented to the Landmark Preservation Commission, and the Landmark Preservation Commission recommended approval of the amendments ; and WHEREAS , on February 16, 2011 , the substance of the amendments was presented to the Economic Advisory Commission, and the Economic Advisory Commission recommended approval of the amendments ; and WHEREAS , on February 16, 2011 , the substance of the amendments was presented to the Natural Resources Advisory Board, and the Natural Resources Advisory Board recommended approval of the amendments ; and WHEREAS , on February 17 , 2011 , the substance of the amendments was presented to the Water Board, and the Water Board considered water related elements and recommended approval of those amendments ; and 1 WHEREAS , on February 24, 2011 , the substance of the amendments was presented to the Building Review Board, and the Building Review Board ; and WHEREAS , on February 28, 2011 , the substance of the amendments was presented to the Air Quality Advisory Board, and the Air Quality Advisory Board ; and WHEREAS, based on the input obtained through this outreach process, together with City Council and advisory board review and comment, staff has developed proposed amendments to the 2009 International Mechanical Code ("IMC") as set forth in this Ordinance; and WHEREAS , the City Council has determined that it is in the best interests of the health, safety and welfare of the City and its citizens that the IMC as adopted be amended. NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF FORT COLLINS as follows : Section 1 . That the opening paragraph of Section 5 - 107 of the Code of the City of Fort Collins is hereby amended to read as follows : Sec. 5-107 Amendments and deletions to code. The 2009International Mechanical Code adopted heroin in § 5 - 106 is hereby amended in the following respects : Section 2 . That Section 5 - 107 of the Code of the City of Fort Collins is hereby amended by the addition of a new subsection (8) which reads in its entirety as follows : (8) Section 202 GENERAL DEFINITIONS, is hereby amended to add the following definitions in alphabetical sequence as follows : "MULTIFAMILY. Any building housing group R- 1 , R-2 or R-4 occupancies . Section 3 . That Section 5 - 107 of the Code of the City of Fort Collins is hereby amended by the addition of a new subsection (9) which reads in its entirety as follows : (9) Section 407 is hereby added to read as follows : "SECTION 407 WHOLE-DWELLING UNIT VENTILATION. 407. 1 Whole-dwelling unit ventilation compliance . A mechanical exhaust system, supply system, or combination thereof shall be installed for each dwelling unit to provide whole-dwelling unit ventilation. Such system shall comply with Sections 407 . 1 . 1 through 407 . 5 . 2 407. 1 . 1 Whole-dwelling unit ventilation rate. The mechanical ventilation system shall provide outdoor air at no less than the rate specified in Table IRC M1507 .4. 1 . 1 , TABLE 407. 1 . 1 . 1 DWELLING UNIT VENTILATION AIR REQUIREMENTS, CFMI CONDITIONED NUMBER OF BEDROOMS FLOOR AREA (square feet) 0-1 2-3 4-5 6-7 > 7 < 11500 30 45 60 75 90 11501-31000 45 60 75 90 105 31001-41500 60 75 90 105 120 41501-61000 75 90 105 120 135 61001-7500 90 105 120 135 150 > 7, 500 105 120 135 150 165 1 . Equation M1507 . 4 . 1 can be used as an alternative to Table M1507 . 4 . 1 . 1 Equation M1507.4. 1 : Qfa„ = O. OlAfloor + 7 . 5 (Nbr + 1 ) Where : Qfan = fan flow rate in cubic feet per minute (cfm) . Afloor = conditioned floor area in square feet (ft) . Nbr = number of bedrooms ; not to be less than one. 407.2 System design. The design of the required whole dwelling unit ventilation system shall comply with the requirements of this Section. System design documents shall be submitted, as required by the Building Official, at the time of application for a building permit. 407.2 . 1 System type. The system shall consist of one or more supply or exhaust fans, or a combination thereof, and associated ducts and controls . Exhaust fans shall be permitted to be part of a mechanical exhaust system. Outdoor air ducts connected to the return duct of a forced air furnace shall be sized to provide adequate mechanical ventilation in accordance with ASHRAE 62 .2 and shall meet the manufacturer' s requirements for minimum return air temperature to the furnace heat exchange . 407.2.2 Outdoor air intakes. Outdoor air intakes shall have automatic dampers that close when the ventilation system is not operating. 407.2.3. Exhausts. Exhausts shall have gravity dampers that close when the ventilation system is not operating. 407.2.4 Air Circulation fan motors. Motors for air circulation fans used in the ventilation system, rated at one-quarter horsepower or greater, shall meet at least one of the following criteria: 3 1 . Where the furnace serves as an air handler for the ventilation system, the furnace shall be certified as an "electrically Efficient Furnace" by the Air-conditioning, Heating and Refrigeration Institute (AHRI) . 2 . The blower motor shall be specified as a `Brushless DC" (BL or BLDC) motor by the manufacturer. 3 . The blower motor shall be specified as "Brushless Permanent Magnet" (BPM) motor. 4. The blower motor shall be specified as "Electronically Commutated Motor (ECM)" . 5 . The blower shall meet equivalent criteria acceptable to the Building Official. 407.2.5 System controls. The mechanical ventilation system shall be provided with readily accessible and labeled controls that enable occupant override. 407.2.6 Sound ratings for fans. Whole-building ventilation fans shall be rated for sound at a maximum of 1 . 0 sones, in accordance with the procedures of the Home Ventilating. Institute (HVI 915, Procedure for Loudness Rating of Residential Fan Products) . Exception : Heating, ventilating and air conditioning air handlers and remote-mounted fans need not meet sound requirements . To be considered for this exception, a remote-mounted fan must be mounted outside the habitable spaces, bathrooms, toilets and hallways, and there must be at least 4 ft ( 1 m) of ductwork between the fan and the intake grille. 407.3 System installation. The installation of the whole-dwelling unit ventilation system and equipment shall be carried out in accordance with the manufacturers ' design requirements and installation instructions . 407.4 Performance verification. Performance of installed mechanical ventilation systems shall be verified in accordance with International Residential Code Section M 1309 . " 407.5 Multifamily buildings. In multifamily buildings, all doors between dwelling units and common hallways shall be gasketed or otherwise substantially airtight with weather stripping, except when the ventilation system explicitly requires transfer air from corridors into units . " Section 4 . That Section 5 - 107 of the Code of the City of Fort Collins is hereby amended by renumbering subsections 8 through 17 accordingly. Section 5 . That the requirements will be effective as to all applications for building permits filed on or after January 1 , 2012 . 4 Introduced, considered favorably on first reading, and ordered published this 1 st day of March, A.D . 2011 , and to be presented for final passage on the 22nd day of March, A.D . 2011 . Mayor ATTEST : City Clerk Passed and adopted on final reading on the 22nd day of March, A.D . 2011 . Mayor ATTEST : City Clerk 5 ORDINANCE NO , 0345 2011 OF THE COUNCIL OF THE CITY OF FORT COLLINS AMENDING CHAPTER 5 , ARTICLE IV OF THE CODE OF THE CITY OF FORT COLLINS FOR THE PURPOSE OF AMENDING THE 2009 INTERNATIONAL FUEL GAS CODE AS ADOPTED WHEREAS , the City Council has determined that it is the best interests of the health, safety and welfare of the City and its citizens to better align Fort Collins ' built environment with community goals of improved indoor environmental quality, protection of the natural environment, reduced carbon emissions, reduced energy use and reduced water use, and; WHEREAS , City staff has conducted a significant public outreach program, working with three advisory committees comprised of representatives from the residential and commercial construction industries, housing industry, real estate and appraisal industries, construction recycling industry, specialized-trade contractors, and regional code officials ; and WHEREAS , based on the input obtained through this outreach process, together with City Council and advisory board review and comment, staff has developed proposed amendments to the 2009 International Fuel Gas Code ("IFGC") as set forth in this Ordinance; and WHEREAS , on February 2 , 2011 , the substance of the amendments was presented to the Electric Board, and the Electric Board recommended approval of the amendments ; and WHEREAS , on February 3 , 2011 , the substance of the amendments was presented to the Affordable Housing Board, and the Affordable Housing Board recommended against approval of the amendments ; and WHEREAS , on February 9, 2011 , the substance of the amendments was presented to the Landmark Preservation Commission, and the Landmark Preservation Commission recommended approval of the amendments ; and WHEREAS , on February 16, 2011 , the substance of the amendments was presented to the Economic Advisory Commission, and the Economic Advisory Commission recommended approval of the amendments ; and WHEREAS , on February 16, 2011 , the substance of the amendments was presented to the Natural Resources Advisory Board, and the Natural Resources Advisory Board recommended approval of the amendments ; and WHEREAS , on February 17, 2011 , the substance of the amendments was presented to the Water Board, and the Water Board considered water related elements and recommended approval of those amendments ; and 1 WHEREAS , on February 24, 2011 , the substance of the amendments was presented to the Building Review Board, and the Building Review Board ; and WHEREAS , on February 28, 2011 , the substance of the amendments was presented to the Air Quality Advisory Board, and the Air Quality Advisory Board ; and WHEREAS, the City Council has determined that it is in the best interests of the health, safety and welfare of the City and its citizens that the IFGC as adopted be amended. NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF FORT COLLINS as follows : Section 1 . That the opening paragraph of Section 5 - 112 of the Code of the City of Fort Collins is hereby amended to read as follows : Sec. 5-112 Amendments and deletions to code. The 2009 International Fuel Gas Code adopted min § 5 - 111 is hereby amended in the following respects : Section 2 . That subparagraph (7) contained in Section 5 - 112 of the Code of the City of Fort Collins is hereby amended to read as follows : (7) P­iwhibikod EleletiHgENGeptiORS « » an �—'. "303 .3 Prohibited locations. For new buildings and new appliances within additions, natural draft appliances shall not be located within the building thermal envelope or be located in a space where the only access to that space is from sleeping rooms, bathrooms, toilet rooms, storage closets, or surgical rooms. Exceptions . 1 . Where natural draft appliances are located in an enclosed mechanical room and sealed to air flow from adjoining conditioned area and the following conditions are met: a. The access to the mechanical room is through a self-closing, gasketed door. b. No other exhaust appliances are located within the mechanical room. c . The mechanical room is provided with outside combustion air as specified in this code . d. The isolation of the mechanical room from adjoining conditioned areas is verified with a differential-pressure test performed by an approved agency. e . Such natural draft appliances pass a combustion safety test under worst-case depressurization conditions conducted by an approved 2 agency, in accordance with Building Performance Institute (BPI) Technical Standards for the Heating Professional. f. Documentation of satisfactory testing results are submitted to the Building Official prior to receiving a Certificate of Occupancy. 2 . Natural draft fireplaces that pass a combustion safety test under worst- case depressurization conditions conducted by an approved agency, in accordance with the Building Performance Institute (BPI) Technical Standards for the Heating Professional. , prior to receiving a Certificate of Occupancy. " Section 3 . That Section 5 - 112 of the Code of the City of Fort Collins is hereby amended by the addition of a new subsection ( 10) which reads in its entirety as follows and all subsequent subsections renumbered accordingly: (10) Section 305 . 1 General is hereby amended by adding the following paragraphs : "Where natural draft appliances are replaced in existing buildings, such appliances shall pass a combustion safety test under natural conditions, conducted by an approved agency in accordance with the Building Performance Institute (BPI) Technical Standards for the Heating Professional . . Such appliances shall also be combustion safety tested under worst-case depressurization conditions, by an approved agency in accordance with Building Performance Institute (BPI) Technical Standards for the Heating Professional. . Should an appliance not pass such test, a disclosure form reporting the test results shall be provided to the homeowner. A copy of such disclosure form, signed by the homeowner, shall be submitted to the Building Official prior to issuance of a Letter of Completion. " Section 4 . That Section 5 - 112 of the Code of the City of Fort Collins is hereby amended by the addition of a new subsection which reads in its entirety as follows : Chapter 8 REFERENCED STANDARDS is hereby amended by adding the following additional referenced standard in alphabetical sequence : BPI - Building Performance Institute 107 Hermes Road, Suite 110 Malta, NY 12020 BPI 104 Envelope Professional Standard Referenced in Amended 09 IFGC Section 303 .3 Prohibited locations and Section 305. 1 General BPI Technical Standards for the Heating Professional Referenced in Amended 09 IFGC Section 303 .3 Prohibited locations and Section 305. 1 General 3 Section 5 . That the requirements will be effective as to all applications for building permits filed on or after January 1 , 2012 . Introduced, considered favorably on first reading, and ordered published this 1 st day of March, A.D. 2011 , and to be presented for final passage on the 22nd day of March, A.D . 2011 . Mayor ATTEST : City Clerk Passed and adopted on final reading on the 22nd day of March, A.D . 2011 . Mayor ATTEST : City Clerk 4 ORDINANCE NO , 035 , 2011 OF THE COUNCIL OF THE CITY OF FORT COLLINS AMENDING CHAPTER 5 , ARTICLE V OF THE CODE OF THE CITY OF FORT COLLINS FOR THE PURPOSE OF REPEALING THE UNIFORM PLUMBING CODE AND ADOPTING A LOCAL AMENDMENT TO THE COLORADO PLUMBING CODE TO ESTABLISH WATER FLOW RATE RESTRICTIONS ON CERTAIN FIXTURES WHEREAS , the City Council has determined that it is in the best interests of the health, safety and welfare of the City and its citizens to better align Fort Collins ' built environment with community goals of improved indoor environmental quality, protection of the natural environment, reduced carbon emissions, reduced energy use and reduced water use, and; WHEREAS , City staff has conducted a significant public outreach program, working with three advisory committees comprised of representatives from the residential and commercial construction industries, housing industry, real estate and appraisal industries, construction recycling industry, specialized-trade contractors, and regional code officials ; and WHEREAS , on February 2 , 2011 , the substance of the amendments was presented to the Electric Board, and the Electric Board recommended approval of the amendments ; and WHEREAS , on February 3 , 2011 , the substance of the amendments was presented to the Affordable Housing Board, and the Affordable Housing Board recommended against approval of the amendments ; and WHEREAS , on February 9 , 2011 , the substance of the amendments was presented to the Landmark Preservation Commission, and the Landmark Preservation Commission recommended approval of the amendments ; and WHEREAS , on February 16, 2011 , the substance of the amendments was presented to the Economic Advisory Commission, and the Economic Advisory Commission recommended approval of the amendments ; and WHEREAS , on February 16, 2011 , the substance of the amendments was presented to the Natural Resources Advisory Board, and the Natural Resources Advisory Board recommended approval of the amendments ; and WHEREAS , on February 17 , 2011 , the substance of the amendments was presented to the Water Board, and the Water Board considered water related elements and recommended approval of those amendments ; and 1 WHEREAS , on February 24, 2011 , the substance of the amendments was presented to the Building Review Board, and the Building Review Board ; and WHEREAS , on February 28, 2011 , the substance of the amendments was presented to the Air Quality Advisory Board, and the Air Quality Advisory Board ; and WHEREAS, based on the input obtained through this outreach process, together with City Council and advisory board review and comment, staff has developed proposed amendments to the 2009 International Plumbing Code as amended and adopted by the State of Colorado pursuant to Title 12 , Article 58 , of the Colorado Revised Statutes (the "Colorado Plumbing Code" or "CPC") to adopt local water flow rate restrictions on certain fixtures, as set forth in this Ordinance; and WHEREAS, the City Council has determined that it is in the best interests of the health, safety and welfare of the City and its citizens that the CPC as adopted by the State of Colorado be amended. NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF FORT COLLINS as follows : Section 1 . That Section 5 - 125 of the Code of the City of Fort Collins is hereby amended to read as follows : Sec. 5- 125. Adoption of standards. Pursuant to the authority conferred by Article 11, Section 7 of the Charter and Section 31 - 16- 2021 C .R. S . , there is hereby adopted by the City for the purpose of providing for the protection of public health and safety and for the purpose of regulating the installation, alteration or repair of plumbing and drainage systems in the City that certain code known as the Colorado Unifo Plumbing Code, 3 Colorado Code of Regulations 720- 1 , 1 nn�tion, as published by saalv1ethe appendices, and except such portions as are hereafter deleted, modified or amended by § 5 - 126. The plumbing code is adopted and incorporated as fully as if set forth at length herein and the provisions shall be controlling within the City. Section 2 . That Section 5 - 126 of the Code of the City of Fort Collins is hereby deleted . The Unifofm Plumbing Code adopted in § 5 125 is hereby amended to read as follows : n Ceetiein 20. 2 is amended by adding pai4s (g) and (h) to vend as follows .: 11 1 Yl(yL t MpY.l 1 •lied .&OF of it 1n ffi.Ae d. at the pr-oyisiAmft; o •1h0 14n 4fAYN'. 2 Plumbing (cede do not apply or that the trice intent and meaning of the rode has anneal siieh deeision to the Colorado Examining Board of Dlufnbevs as pfovided fof itt Section 12 58 104 . 5 , C .R. S . 11 (h) To Whom Permits May Be issued No permit shall be issued to any person to do �r to eause t6 be, done plumbing of dr uge 3ATOfk Fegula4ed by the ! the eity and the Code adopted hefeby except to a pefsovt 121 holding n valid masts plumbefI pt!ovided in this / Sectio�€f 3itT€quit!ed by the Code of citymay be � C1 Celled �!1 any pefs IN to Elo any plumbing l m i It of Elfa nags wofl/ feg la4eE y thPC 1 ode, o the eity in a single family dwelling used exclusively fot! 11 f1cluding ^g et��that�. ]•��� the bona occupant of any sued eity' s watef mains which senTe only fife pt!otection systems afe not 3A ratet! setvice. lines of building supplies as Ele fi 'L the, TN4form Plumbing l mbi g I ode . Dp l l•1 •'�' s AOf fife pfotection 3ATatef supply lines may be issued to a duly licensed specialty supply is tapped fFom the fife litte, that portion of the piping fFom the pf!opet!ty line II "Any 1 AyFefson eorp eofation who shall violate any of the pvo%x 7101 ok" . f this Code.of the city II e . r 11 traps , when sueh systems . " d . SeMOH 30. 4 (a), Schedule of-ftes, is amended by adopting the fee sehedule as set 7 Fees , of the Beilding Cede of the 7 the minimum fee f6f any peffnit fegulated hefein shall not be less than fifteen dollafs (S15 . ) , and a pefmit f6r- a lawn iffigation system supplied ffom a siiigle dwelliiig unit shall be fifteen dollars ($ l 5 1 (2) Can O ] 0 7 (n) is amended to read as follows : 11 1 / (� 11 �-y� L 1 1 1 'Y Zoning g of the eity and is •lr(�he f a led fop f] esentatiy ( ) Ce6lj(9 708 (A) iS am e�� � �� +A read as Tll�llAWArS : ill 1 � 11/1 � �111 J . 11 sand, ) gfease of othef eontafflinafits shall be installed in aeeordanee with the eify' s « Taber Utility speeifieatiens fof siieh devices '—" ( 4 ) Cep OH 711 is amended to rend as follows - 3 " Grease 1 for such uc devices . " 11 11 ' (a) New const-fuetion inter4of ng. All new water- consuming fixtufes in builitings shall meet the fol ASS in.9 roAlllrom o rAc+ • 11 j 7�) gallons per- flush exeept that water- elesets and u6nals with t4tish Nzalves may be installed; 11 (2) Shower- heads shall contain flow contfol inserts, valves, devices or orifices t YOP�Y1 / � TIASSI tA A MnNimllm AT Appr-ex mately three 13 \ gal A" o Hpr m1N11te • 11 Kitehen and !a-vator-y faueets shall have aerators or- laminaf flow deviees toge with TTAv Contfol ifisefts, valves, ediees of vrirr ees at fes tfIC�t T vw t6zc maximum AT appFAvlmately two (2) gallons per- minute 11 (b) Existing buildings in existing buildings of! 1TATThich plumbing fixtufes af!e eo'"nservation tkevIees . Section 3 . That a new Section 5 - 126 is hereby added to Article V of Chapter 5 of the Code of the City of Fort Collins, as follows : Sec. 5426 Amendments and deletions to code. The Colorado Plumbing Code as adopted is hereby amended in the following respects : (1) Section 604 TABLE 604. 4 is hereby amended as follows : "Section 604.4 Maximum flow and water consumption. The maximum water consumption flow rates and quantities for all plumbing fixtures and fixture fittings shall be in accordance with Table 604 .4 and such fixtures shall be Environmental Protection Agency (EPA) WaterSense® labeled fixtures . " "SECTION 604 TABLE 604.4 MAXIMUM FIXTURE AND FITTING FLOW RATES FOR REDUCED WATER CONSUMPTION PLUMBING FIXTURE PLUMBING FIXTURE OR FIXTURE FITTING OR FIXTURE FITTING Lavatory,private 1 .5 gpm at 60 psi Lavatory, public (metering) 0.25 gallon per metering cycle Shower head 2.0 gpm at 80 psi 4 Sink faucet 1 .8 gpm at 60 psi Urinal 0.5 gallons per flush Water closet 1 .28 gallons per flushing cycle, with minimum MaP threshold of 350 grams Prerinse Spray Valves Must meet federal requirements (food service industry) Bar sinks 2.2 gpm at 60 psi (food service industry) For SI: 1 gallon per minute (gpm) = 3 .785 L/m. 1 pound per square inch (psi) = 6.895 kPa a. A handheld shower spray is also a shower head b. Consumption tolerances shall be determined from referenced standards. Section 4 . That the requirements of this Ordinance will be effective as to all applications for building permits filed on or after January 1 , 2012 . Introduced, considered favorably on first reading, and ordered published this 1st day of March, A.D. 2011 , and to be presented for final passage on the 22nd day of March, A.D . 2011 . Mayor ATTEST : City Clerk Passed and adopted on final reading on the 22nd day of March, A.D . 2011 . Mayor ATTEST : City Clerk 5