HomeMy WebLinkAboutCOUNCIL - AGENDA ITEM - 07/05/2011 - FIRST READING OF ORDINANCE NO. 077, 2011, APPROPRIDATE: July 5, 2011
STAFF: Steve Catanach
Jon Haukaas
AGENDA ITEM SUMMARY
FORT COLLINS CITY COUNCIL 13
SUBJECT
First Reading of Ordinance No. 077, 2011, Appropriating Unanticipated Revenue in the Light and Power, Water and
Wastewater Funds for Capital Projects to Relocate Utility Facilities in the Mason Corridor Bus Rapid Transit Project
and Transferring Existing Light and Power Appropriations into the Light and Power Utility Relocation Capital Project.
EXECUTIVE SUMMARY
This Ordinance appropriates capital project funding for the Utilities to relocate existing electric, water and wastewater
facilities to accommodate the Mason Corridor Bus Rapid Transit (BRT) Project. Light and Power will also supply power
to the bus stations along the corridor. The Utilities are being viewed by the MAX/BRT Project as independent
contractors and will be reimbursed by the MAX/BRT Project funds for the relocation expenses upon completion. The
MAX/BRT Project will also pay for the cost of electric power supply to the bus stations. The Ordinance provides new
capital appropriations in the Light Power Fund ($620,000), Water Fund ($625,000) and Wastewater Fund ($1,150,000)
for the relocation work. Following completion of the construction, the Utilities will invoice the MAX/BRT Project based
on actual costs and will receive the unanticipated revenue being appropriated by the Ordinance.
In addition to electric duct bank relocation, Light and Power will use this opportunity to upgrade the capacity of the duct
bank. These system upgrade costs have been budgeted in Light and Power’s existing 2011 lapsing appropriation.
The Ordinance transfers $400,000 of the existing Light and Power lapsing budget into the new BRT electric
relocation/upgrade capital project. The costs of the upgrade will not be reimbursed by the MAX/BRT Corridor Project.
BACKGROUND / DISCUSSION
This Ordinance appropriates the following funds related to utilities work to accommodate the Mason Corridor Bus
Rapid Transit Project. The amounts shown are construction estimates. The MAX/BRT Corridor Project will pay the
Utilities based on actual design and construction costs. Relocation work will not proceed until authorization is issued
by the MAX/BRT project manager.
$400,000 Light and Power Fund – New Capital Project Appropriation
This portion of the appropriation is fifty percent of the $800,000 cost to relocate and upgrade existing electric facilities
for the MAX/BRT Project Corridor Project. This phase will involve the relocation of the duct bank between Drake and
Prospect. The duct bank is being relocated due to logistical conflicts with the Mason Street Corridor guide way.
Construction on this phase is anticipated to be completed by year-end. This $400,000 expense will be reimbursed
by the MAX/BRT Project funding.
$400,000 Light and Power Fund – Transfer of Existing 2011 Appropriation
The Light and Power Fund will bear fifty percent of the cost for the $800,000 upgrade and relocation because this
project will enlarge capacity for the electric system as well as move the existing system to accommodate the MAX/BRT
Project. This portion of the appropriation is to be transferred from the existing 2011 Light and Power appropriation into
the new Light and Power capital project. There will be no reimbursement for this half of the expense.
$220,000 Light and Power Fund - New Capital Project Appropriation
This is the estimated cost to provide electric service to the bus stations along the MAX/BRT Project Corridor. This
electric construction is planned for 2012 and 2013. One hundred percent of the station power costs will be reimbursed
by MAX/BRT Project.
July 5, 2011 -2- ITEM 13
$625,000 Water Fund - New Capital Project Appropriation
$1,150,000 Wastewater Fund - New Capital Project Appropriation
With the construction of the MAX/BRT Project beginning in 2011, the Utility is faced with as many as 18 separate
locations where the MAX/BRT crosses or parallels existing water and sewer infrastructure. This will impact the integrity,
serviceability, longevity and safety of the operation of both the Utility pipelines and the MAX/BRT. Because of potential
negative impacts to the Utility infrastructure (both immediately and in the future) or future impacts to the MAX/BRT,
this is the opportunity to improve, modify and/or protect the water and sewer lines before the BRT improvements are
built. The project has a short lead time with design scheduled to be done by early fall and construction completed by
early in 2012. One hundred percent of the Water and Wastewater Utility’s expenses will be reimbursed by MAX/BRT
Project funding.
FINANCIAL / ECONOMIC IMPACTS
These projects facilitate the construction of the MAX/BRT Corridor Project which will enhance both public
transportation and economic development opportunities.
The Water and Wastewater Funds will be fully reimbursed for all expenses related to the project. The Light and Power
Fund will be reimbursed for all but $400,000. The portion that will not be reimbursed was included in the 2011 budget
for electric system upgrades. Aging infrastructure will be upgraded during the relocation improving the future reliability
of the system for customers.
ENVIRONMENTAL IMPACTS
No significant impacts are anticipated for the relocation of facilities. Electric loads will increase slightly when the bus
stations are operational.
STAFF RECOMMENDATION
Staff recommends adoption of the Ordinance on First Reading.
BOARD / COMMISSION RECOMMENDATION
At its May 4, 2011 meeting, the Electric Board voted unanimously to recommend approval of the appropriation in the
Light and Power Fund.
At its May 26, 2011 meeting, the Water Board voted unanimously to recommend approval of the appropriation.
ATTACHMENTS
1. Electric Board minutes, May 4, 2011
2. Water Board minutes, May 26, 2011
3. Electric Relocation Map
4. Water and Sewer Relocation Map
Attachment 1
Excerpt from Electric Board Minutes–May 4, 2011
Appropriation Request for Relocation of Utilities in Mason Corridor
Mr. Catanach presented this information. The proposed ordinance appropriates capital project
funding for the Utilities to relocate existing electric facilities to accommodate the BRT (Bus
Rapid Transit)/Mason Corridor Project. Light and Power will also supply power to the stations.
Since Light and Power will be upgrading and enlarging the existing facilities in addition to
relocating the duct bank, only fifty percent of these costs will be reimbursed by the Federal
funds. The remaining costs have been budgeted in the existing 2011 lapsing appropriation. The
ordinance transfers $400,000 of the existing budget into the new BRT electric relocation capital
project.
Is duct bank work contracted out? No, Light and Power staff will be installing the duct bank.
How much duct bank is being relocated? The area between Drake Road and Prospect Road is
being relocated.
Motion: Board Member Yurash moved that the Electric Board recommend that the
City Council approve the proposed appropriation ordinance to fund electric additions
and relocations in the BRT/Mason Corridor. Vice Chairperson DeCourcey seconded the
motion. It passed unanimously.
Attachment 2
Excerpt from Water Board Minutes, May 26, 2011
Appropriation Request for Relocation of Utilities in Mason Corridor
(Attachments available upon request).
Water Engineering and Field Operations Manager Jon Haukaas introduced the topic. Staff is
seeking Water Board endorsement of an ordinance appropriating unanticipated revenue in the
Water and Wastewater Funds for new capital projects to relocate water and wastewater facilities
in the BRT (Bus Rapid Transit)/Mason Corridor. The cost of the relocations is to be reimbursed
by the City to the Utilities through federal funding of the Mason Corridor Project.
The Mason Corridor project involves relocating facilities from the South Transit Center location
along to the Downtown Transit Center. City of Fort Collins Utilities has looked at what impact it
will have on their services and infrastructure and have identified eighteen projects for possible
protection or upgrades. The BRT project is a federal grant project and Utilities is treated as an
outside agency. The BRT project team will make requests to Utilities at the necessary time to
make the improvements. Utilities currently needs the funding for the design work and
implementation. The request is to appropriate the anticipated revenues for 2012.
Board discussion:
Are any of the items work that Utilities would liked to have completed regardless of the project?
Some of the work is direct opportunity work. For example, casings under the railroad need to be
extended. Additional fill material will alter manholes. Some isolation valves will be added. The
projects represent both a mix of opportunities for improvements and necessary work for the
project.
The water lines and wastewater lines will stay in the same place? There may be one or two
relocations, but generally they will remain in the same place.
Would any of the projects have been cheaper if other work had already commenced? Not really;
the majority of the work is surface work other than the fill areas and the retaining walls.
Beyond this, is there other work to be done from other funding? This represents most of the work
to be done.
Is the money in the Reserves fund? Yes.
Is there any fiscal impact on taking the money now and paying it back later? No, it is money that
is in the Reserves fund.
Is the federal funding that is paying for the project part of the big picture? Utilities is not making
significant improvements to the systems, just focusing on additional protections.
Does anything need to be upsized with crossings? No, trunk lines have already been sized.
How old are the lines? The lines in Downtown Fort Collins are approximately 80 - 100 years
old. The lines in the south part of town are approximately 20 years old.
Is it feasible to upgrade the older lines? No, it is not feasible. It is not an appropriate cost to the
BRT project. Utilities is taking the opportunity while doing these projects to investigate and
evaluate the lines.
Are the lines west of the railroad tracks? The lines cross east to west. One or two of the lines are
linear.
Board Member Eccelston moved that the Water Board recommend that City Council
approve the proposed appropriation ordinance to fund the relocation of water and
wastewater facilities in the BRT/Mason Corridor. Board Member Goldbach seconded the
motion. It passed unanimously.
c-)
-
Total
$1,020,000
t
Harmony
Rd.
Fairi4’ay
Ln.
Mason
Corridor
-
Approximate
Project Boundary
FELSBU
RU
HOLF
U
L
L E
\I
C
ATTACHMENT
3
—
Electric
Duct
Bank
Relocation
and Station Power
Che
fl
Laurel
St.
Pros
+1-
55
mu
es
Duct
Bank
Relocation
between
Prospect
and
Drake
$800,000
1
Drake
Rd.
I
Electrical
Power
to
BRT
Stations
$220,000
Horsetooth
Rd.
No
S SHIELDS ST
S LEMAY AVE
W DRAKE RD
E DRAKE RD
W HARMONY RD
W PROSPECT RD
E PROSPECT RD
W HORSETOOTH RD
E HORSETOOTH RD
RIVERSIDE AVE
E HARMONY RD
S LEMAY AVE
0 1,000000 2,000 4,Feet
BRT- Mason Street
Corridor Utility Crossings
Water casing and extensions Sewer projects
Cost: $172,000
Water casing and extensions Sewer projects
Cost: $377,000
Water casing and extensions, Sewer projects manhole replacements,
& Cost:installation valve $262,000
Water manhole and replacements Sewer projects & valve installation
Cost: $964,000
Total WaterC:osts $625,000
Wastewater: $1,150,000
ATTACHMENT 4 - Water and Wastewater Project
ORDINANCE NO. 077, 2011
OF THE COUNCIL OF THE CITY OF FORT COLLINS
APPROPRIATING UNANTICIPATED REVENUE IN THE LIGHT AND POWER,
WATER, AND WASTEWATER FUNDS FOR CAPITAL PROJECTS FOR
UTILITY FACILITIES IN CONNECTION WITH THE MASON CORRIDOR
BUS RAPID TRANSIT PROJECT AND TRANSFERRING EXISTING LIGHT AND
POWER APPROPRIATIONS INTO THE LIGHT AND POWER UTILITY RELOCATION
CAPITAL PROJECT
WHEREAS, Utility Services currently has certain electric, water and wastewater
infrastructure that needs to be either relocated, installed, or improved to accommodate the
construction of improvements that are being installed for the Mason Corridor Bus Rapid Transit
(“BRT Project”); and
WHEREAS, for reasons independent of the BRT Project, certain other electric
infrastructure also needs to be relocated, and the relocation work to be undertaken in connection
with the BRT Project also provides an opportunity to generally upgrade the electric system
infrastructure; and
WHEREAS, the total cost of the work to relocate and upgrade the electric facilities is
$800,000; and
WHEREAS, the relocation portion of the work is considered an expense of the BRT
Project, and Utility Services will be reimbursed for such work by the BRT Project fund in the
amount of $400,000; and
WHEREAS, the $400,000 needed for the electric system upgrades are not expenses to be
charged to the BRT Project; and
WHEREAS, the funds needed for such upgrades may be obtained by transferring existing
appropriations from the Light and Power operating budget to the Light and Power Utility
Relocation capital project budget; and
WHEREAS, Utility Services will also be installing infrastructure that will provide
electric service to the BRT stations and the cost of this work is $220,000, which cost will be
reimbursed by the BRT Project; and
WHEREAS, Utility Services also has existing water and wastewater infrastrucutre in the
BRT Project corridor; and
WHEREAS, because the BRT Project may impact the integrity of the water and
wastewater infrastructure, and may negatively affect the ability to service the infrastructure,
Utility Services desires to make improvements to the infrastructure prior to the construction of
the BRT Project; and
WHEREAS, the estimated total cost of the water and wastewater infrastructure
improvements is estimated to be $1,775,000, which cost will be reimbursed by the BRT Project;
and
WHEREAS, Article V, Section 9, of the City Charter authorizes the City Council to
make supplemental appropriations by ordinance at any time during the fiscal year, provided that
the total amount of such supplemental appropriations, in combination with all previous
appropriations for the fiscal year, does not exceed the current estimate of actual and anticipated
revenues to be received during the fiscal year; and
WHEREAS, Article V, Section 10, of the City Charter authorizes the City Council to
transfer by ordinance any unexpended and unencumbered amount or portion thereof from one
fund or capital project to another fund or capital project, provided that the purpose for which the
transferred funds are to be expended remains unchanged; and
WHEREAS, City staff has determined that the appropriation of the reimbursement
amounts described herein will not cause the total amount appropriated in the Light and Power
Fund, the Water Fund, or the Wastewater Fund to exceed the current estimate of actual and
anticipated revenues to be received in the funds during the fiscal year; and
NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF
FORT COLLINS as follows:
Section 1. That there is hereby appropriated from unanticipated revenue in the Light
and Power Fund the sum of FOUR HUNDRED THOUSAND DOLLARS ($400,000) for
expenditure in the Light and Power Utility Relocation capital project account to relocate existing
electric facilities in the Mason Corridor.
Section 2. That the unexpended appropriated amount of FOUR HUNDRED
THOUSAND DOLLARS ($400,000) is hereby authorized for transfer from the Light and Power
operating budget to the Light and Power Utility Relocation capital project account to perform
upgrades to electrical system infrastructure in the Mason Corridor.
Section 3. That there is hereby appropriated from unanticipated revenue in the Light
and Power Fund the sum of TWO HUNDRED TWENTY THOUSAND DOLLARS ($220,000)
for expenditure in the Light and Power Utility Relocation capital project account to provide
electric service to the BRT bus stations.
Section 4. That there is hereby appropriated from unanticipated revenue in the Water
Fund the sum of SIX HUNDRED TWENTY FIVE THOUSAND DOLLARS ($625,000) for
expenditure in the Water Fund Distribution System Replacement capital project account to
improve, modify and/or protect the water lines before the BRT Project improvements are built.
Section 5. That there is hereby appropriated from unanticipated revenue in the
Wastewater Fund the sum of ONE MILLION ONE HUNDRED FIFTY THOUSAND
DOLLARS ($1,150,000) for expenditure in the Wastewater Fund Collection System
-2-
Replacement capital project account to improve, modify and/or protect the sewer lines before the
BRT Project improvements are built.
Introduced, considered favorably on first reading, and ordered published this 5th day of
July, A.D. 2011, and to be presented for final passage on the 19th day of July, A.D. 2011.
_________________________________
Mayor
ATTEST:
_____________________________
City Clerk
Passed and adopted on final reading on the 19th day of July, A.D. 2011.
_________________________________
Mayor
ATTEST:
_____________________________
City Clerk
-3-