HomeMy WebLinkAboutCOUNCIL - AGENDA ITEM - 11/02/2010 - ITEMS RELATING TO UTILITY RATES AND CHARGES FOR 20 DATE: November 2, 2010 AGENDA ITEM SUM RY
STAFF: Brian Janonis _
Ellen Switzer
T COLLINS CITY COUN IL
SUBJECT
Items Relating to Utility Rates and Charges for 2011.
A. First Reading of Ordinance No. 112, 2010, Amending Chapter 26 of the City Code to Revise Water Rates,
Fees and Charges.
B. First Reading of Ordinance No. 113, 2010, Amending Chapter 26 of the City Code to Revise Wastewater
Rates, Fees and Charges.
C. First Reading of Ordinance No. 114, 2010, Amending Chapter 26 of the City Code to Revise Electric Rates,
Fees and Charges.
D. First Reading of Ordinance No. 115, 2010, Amending Chapter 26 of the City Code to Revise Electric
Development Fees and Charges.
EXECUTIVE SUMMARY
The Ordinances propose the following rate increases for monthly utility billings:
% Increase
Water 3.0% across the board
Wastewater 9.0% across the board
Electric 6.5% on average)
The changes would take effect for billings with meter readings on or after January 1, 2011.
The water and wastewater rate increases are across the board to all customer classes. The electric rate increase is
proposed to vary by rate class from 0% to 10%. There is no change in the monthly rate for stormwater. A typical
single family customer's monthly bill will increase $8.91 from $129.75 to$138.66 or 6.9%.
A small reduction(1-3%)in electric development fees for 2011 is also proposed. No changes in plant investment fees
are planned for water, wastewater or stormwater.
BACKGROUND / DISCUSSION
A. Monthly Water Rates (Ordinance No. 112, 2010)
Ordinance No. 112,2010, proposes a 3%water rate increase. The increase is across the board and applies to all rate
classes. A cost of service study was conducted in 2009 and the 2010 water rate classes were realigned based on
the study. With the proposed rate,a typical single family residential customer's monthly bill will increase 3%as shown
in the table below:
Single Family 2010 Monthly Proposed 2011
Typical Use Water Bill Monthly Water Bill $ Increase % Increase
January- 5000 gallons $23.43 $24.13 $0.70 3%
July-21,000 gallons $63.22 $65.11 $1.89 3%
Monthly Average based on
seasonal use of 117,131 $34.83 $35.87 $1.04 3%
gallons per year
November 2, 2010 -2- ITEM 16
Although 3%water rate increases were implemented in 2007 and in 2010,water operating revenues decreased 13.4%
between 2006 and 2009. The reduction in use is thought to be a combination of conservation,weather and economic
factors. The proposed 2011 rate increase is required to fund operations, capital improvements and maintain debt
service coverage.
B. Monthly Wastewater Rates (Ordinance No. 113, 2010)
Ordinance No. 113, 2010, proposes a 9%wastewater rate increase. The increase is across the board and applies
to all rate classes. A 2009 cost of service study was conducted and wastewater rate classes were realigned in 2010.
With the proposed increase, a typical residential customer's bill will increase from $26.23 to $28.59 or $2.36 per
month. The typical customer is based on 4,800 gallons of winter quarter water use.
Council has approved a series of annual wastewater rate increases starting in 2008. The prior rate increases,as well
as the proposed 2011 increase,are necessary to fund wastewater operations and meet the increase in long term debt
service obligations for a major capital project to replace the trickling filter, make odor control improvements and to
prepare for future regulation based improvements at the Mulberry Water Reclamation Facility. An 8% increase is
projected for 2012.
In addition, staff is proposing a clarification to the Code to set a default winter quarter water use for residential
customers who did not establish a winter quarter average(WQA)during the prior January-March. The winter quarter
water use approximates the customer's indoor water use and is defined in Section 26.206 of the City Code as "the
average monthly amount of water billed to the user during the preceding months of January, February and March."
City Code does not address customers who have not been at the premise to establish a WQA. Current administrative
practice is to assign such single family customers a default WQA of 5,200 gallons. The 5,200 gallons was based on
a historic average water use. With the lower water use during the last few years, the average WQA for single family
residential customers has dropped to 4,800 gallons per month. Winter quarter water use for duplexes and multifamily
units is also now lower than historical averages. Based on this trend of reduced winter quarter water use, staff is
recommending that the Code be amended to specify.the default amounts for all residential customer classes as
follows:
Default Winter Quarter Average
Current Administrative Default Proposed To Be Included
Residential Rate Class Practice In City Code
Single Family 5,200 gallons WQA 4,800 gallons WQA
Duplex 8,500 gallons WQA 7,200 gallons WQA
Multi Family 4,200 gallons/unit WQA 3,400 gallons/unit WQA
These default amounts will only be used for customers who have not established a WQA for the premise during the
previous January, February and March. The reduction in default WQA amounts will result in the loss of about$38,000
per year.
C. Monthly Electric Rates (Ordinance No. 114, 2010)
A system average 6.5% electric rate increase is proposed for 2011. This rate increase will not be applied to all
customer rate classes across the board. Based on a cost of service study conducted by staff in 2010, the rates are
proposed to vary by rate class as follows:
Proposed Electric Rate Increase for 2011
Residential Energy Rate 10.0%
Residential Demand Rate 10.0%
General Service small commercial 0.0%
General Service 50 medium commercial 5.1%
General Service 750 (large commercial, industrial 5.6%
Traffic Signals 6.7%
Floodlights 0.0%
Average System Increase 6.5%
November 2, 2010 -3- ITEM 16
The above recommendations are based on modified cost of service results but are capped with a limit of no more than
a 10% increase for any customer class. The Council Finance Committee reviewed the results of the electric cost of
service study and the staff recommendations at its September 20, 2010 committee meeting and supported this
modified cost of service implementation.
Fort Collins' electric rates will remain among the lowest in the state. The impacts of these rate recommendations for
typical residential and commercial customers are shown in the following table:
2011 Electric Rate Impacts on Typical Customers
Average
Proposed Rate Class
Rate Class 2010 2011 $ Inc. % Inc. % Inc.
Residential
700 kWh/month $54.43 $59.94 $5.51 10.1% 10.0%
Residential Demand
1,400 kWh/month, 10 kW $102.00 $112.42 $10.42 10.2% 10.0%
General Service
2,300 kWh/month $193.61 $194.41 1 -$2.20 -1.1% 0.0%
General Service 50
54,000 kWh/mo, 140 kW $3,277 $3,443 $166 5.1% 5.1%
General Service 750
2,000,000 kWh/month 3600 kW $98,932 $104,453 $5,521 5.6% 5.6%
The 6.5% system-wide increase is due to an increase in purchase power rates and the second year of the Energy
Policy implementation. The majority of the rate increase results from a 6.1%wholesale rate increase from Platte River
Power Authority. This increase in purchase power cost equates to a 4.7% retail rate increase. Secondly, as part of
the 2010 budget,Council approved a significant increase to the Utilities'energy services budgets in orderto implement
additional programs targeted to meeting Energy Policy and Climate Action Plan goals. In 2010, half of this energy
services budget increase was funded from reserves with the remainder funded from a 1.8%rate increase. The 2010
plan called for a second 1.8% rate increase in 2011 to continue the energy conservation and efficiency programs at
the 2010 level.
Platte River's 2011 6.1% purchase power rate increase is due to several key factors:
• Reduced surplus energy sales
• Increased operations and maintenance costs
o Major maintenance work at Craig Unit 1
o Ongoing O&M of aging plants
o Environmental costs—primarily mercury removal at Rawhide
• Increased fuel expense due to higher utilization of natural gas peaking plants
• Increased financing and depreciation expense for transmission put into service
• Decrease in interest income
• Capital investment
The proposed electric rate Ordinance also deletes an outdated reference to rental charges for traffic equipment. The
rental charges related to an early traffic signal system(1970s era)which was purchased by the Light and Power Fund
and then repaid by the traffic department through the referenced rental charges.
November 2, 2010 -4- ITEM 16
Monthly Rate Increase Summary
The following chart summarizes the impact of the proposed rate changes on a typical residential customer:
2011 Utility Rates—Im act to TypicaI Single Family Customer
Current Proposed $
2010 2011 Increase % Increase
Electric
700 kWh per month $54.43 $59.94 $5.51 10.1%
Wastewater
4,800 al/mo WQA $26.23 $28.59 $2.36 9.0%
Stormwater
8,600 sq ft lot, light run off $14.26 $14.26 $0.00 0.0%
Water
Monthly Average based on seasonal use of
117,131 gallons per year $34.83 $35.87 $1.04 3.0%
Total Typical Monthly Utility Bill $129.75 $138.66 8.91 6.9%
The following graphs compare Fort Collins current 2010 and proposed 2011 rates with the current 2010 and estimated
2011 rates of several surrounding communities. The graphs are based on the same typical customer shown in the
table above with the exception of water,which is based on 21,000 gallons,a typical July use. The estimated 2011 rate
increases for the comparison cities are based on information obtained by staff through phone inquiries. These are
not approved rates for any of the cities or Xcel. Denver wastewater and stormwater rates have not been released and
so the 2011 graph reflects 2010 wastewater and stormwater rates for Denver.
2010 Rates
2010 Residential Rate Comparison
July Water Use 21,000 Gallons
$250
$200
E $150
c
0
$100
$50
O O m O32
U O O N C N N (D ` O` N
0 LL m X U X C7 X v� Q X
0
U
OElectric ®Water ❑Wastewater ❑Stormwater
November 2, 2010 -5- ITEM 16
2011 Estimated Rates
Estimated 2011 Residential Rate Comparison
July Water Use 21,000 Gallons
$250
$200
$150
C0
C
69 $100
$50
T
N O O. Wj O ci
x x x
c 6 Oa
J J mX 7 vHcOil
LL p
W Q W
p Electric 0 Water 0 Wastewater 0 Stormwater
D. Electric Development Fees (Ordinance No. 115, 2010)
Electric development fees recover both actual on-site costs(building site charges)and allocated off-site costs(electric
capacity charges)to serve commercial or residential development. These fees are typically adjusted annually to reflect
cost increases; however, some material costs have decreased slightly and labor costs have remained constant. The
proposed 2011 Electric Development Fee Ordinance(Item D)reflects a 1-3% reduction in costs. The following table
shows the impacts on a sample residential and commercial development.
Typical Single Family Lot
8600 square feet, 70 foot of street frontage, 150 amp service, 4/0 secondary service
Current 2010 Proposed 2011 $ Change % Change
$3,221 $3,139 -$83 -2.6%
Model Commercial Development
82,000 sq ft, 1900 ft street frontage, 250 ft primary srv, 600 amps, 208Volt, 3-phase, 1-transformer
Current 2010 Proposed 2011 $ Change % Change
$31,361 $31,079 -$282 -0.9%
Water,wastewater and stormwater plant investment fees were revised for 2010. There are no changes recommended
for 2011.
November 2, 2010 -6- ITEM 16
FINANCIAL / ECONOMIC IMPACTS
The rate Ordinances are projected to increase 2011 annual operating revenues of the Water Fund by 3%, the
Wastewater Fund by 9%,and the Light and Power Fund by 6.5%. The projected revenue from the rate increases was
included in the 2011-2012 budget projections.
The proposed rate ordinances will increase costs for typical residential customers by$8.91 per month if their water
and electric use remain unchanged. Utility programs can help customers to reduce their water and electric use to
lessen the financial impact of the rate increases.
ENVIRONMENTAL IMPACTS
Funding from the proposed electric rate increase will allow the Utilities to continue programs and services aimed at
meeting the goals and objectives of the Energy Policy and Climate Action Plan. Water and wastewater rates provide
funding for conservation programs, and environmental regulatory compliance.
STAFF RECOMMENDATION
Staff recommends adoption of the Ordinance on First Reading.
BOARD / COMMISSION RECOMMENDATION
The Water Board recommends approval of the Water, Wastewater and Stormwater budget and rate increases for
Water and Wastewater by unanimous vote (7-0).
The Electric Board recommends against the approval of the Light and Power budget and electric rate ordinances by
a vote of 3-2. Two of the three Electric Boardmembers voting against approval stated that they believed the City
should reduce budgets for energy efficiency during this period of citywide budget reductions. One of the Electric
Boardmembers voting against approval expressed a concern that an increase in employee salaries should have been
included in the budget in order to retain qualified staff.
Minutes from both Board meetings are attached.
PUBLIC OUTREACH
Postcard notification of the proposed electric rate changes was mailed to out-of-city electric customers on October
13, 2010 and notice was published in the Coloradoan on October 17. Preliminary utility rate increases were shown
in the recommended budget document. The Utilities has planned additional outreach for all customers prior to the
effective dates of the rate changes.
ATTACHMENTS
1. Water Board Minutes, September 16, 2010
2. Electric Board Minutes (draft), October 6, 2010
3. Finance Committee, excerpt from minutes, September 20, 2010
3. Power Point presentation
ATTACHMENT
Excerpt from Approved Water Board September 16, 2010, Minutes
2011-2012 Budget
(Presentation available upon request)
Water Resources and Treatment Operations Manager Kevin Gertig thanked Phil Ladd
and Rita DeCourcey, utilities financial analysts, Ellen Switzer, utilities financial
operations manager, and Bill Switzer, utilities rate analyst, who have put in very hard
work on this year's budget during the absence of a Utilities Finance and Budget Manager.
Board discussion:
Water fund 2011 operating revenues are projected to be 6 percent lower than budgeted 2010.
Revenue projections for 2011 have been revised down to 150 gpcd (gallons per person per
day) compared to the previous projections of 155 gpcd. Projections were decreased to
recognize the significant drop in consumption in 2009. Projected 2009 use was 155 gpcd and
actual consumption was 135 gpcd, a 13 percent decrease. Most of the drop in demand is
attributed to the wet summer(precipitation was 140 percent of average), although water
conservation and the economy likely played a part in it as well. After reviewing revenue
collections through July 2010, demand is projected to be at 140 to 145 gallons per capita per
day for 2010.
Is consumption only going down due to conservation? What about weather, leak
detection, etc.? It's difficult to tell what all is driving this, but the weather, water
conservation and likely the economy are all factors. The number of customers likely
plays a part as well, but it is difficult to determine due to student fluctuations and
seasonal irrigation customers.
Utilities will lose our largest wastewater contract customer at the start of 2011, costing
$1.7 million in lost revenue annually. They've elected not to discharge to our system due
to the success of their own system which they have developed over time. Other
commercial customers have the option to meter their flows now, which will also result in
reductions. Rates for typical users are still based on domestic loads.
The Wastewater fund is not keeping pace with our cumulative rate increases on total
operating revenue.
The Legislative, Finance and Liaison (LFL) Committee met on September 14 to discuss
the 2011-12 budget. During that meeting, there was discussion as to why Fort Collins'
monthly residential rates are higher than other regional cities. Committee members felt
these cities may be borrowing from the future and not providing a good example to
follow.
Stormwater operating revenues are stable. Debt issues were paid off in 2008 and 2009;
four remain for future pay off. Capital projects decrease from $3.5 million in 2011 to $1
million in 2012 with the last installment of the Canal Importation and Pond Outfalls
(CIPO) project taking place in 2011.
Stormwater revenue does not see much growth, but some will occur with taking on a few
more customers in the Southwest Annexation. Stormwater revenues do not change unless
there are rate changes or developable areas increase.
- 1 -
The residential customer impact with a 10.1 percent electric rate increase, 9.0 percent
wastewater increase and 3.0 percent water increase means a high bill month would
increase about $9.76 or 6.17 percent.
Mr. Gertig shared about the future challenges for Utilities:
• A succession planning initiative is beginning, which has an indirect impact on the
budget.
• Nutrient requirements are coming for removing phosphorus and nitrogen from
wastewater. Neither plant'is set up for advanced removal of these elements. Staff
will bring this to the Board and Council with impact to rates.
Board Member Connor shared the LFL Committee's recommendations with the full
Board:
1) A 3 percent water rate increase is appropriate or perhaps too low. A
progressive increase in rates is the favored approach, and the Board may want
to consider recommending a 3 percent rate increase in 2012 rather than 0
percent, and recommending more than 3 percent in both 2011 and 2012.
2) Utilities staff undertakes long term analysis of future needs and develops
projections, given the future climate of revenue decreases.
3) The committee recommends that serious consideration for going to a"pay as
you go" system to retire debt.
Board discussion:
How much debt is the water system faced with now and are reserves being used?
Reserves are not being used. Ms. DeCourcey will forward the debt data to Board
members.
What is the time frame and anticipated cost on the nutrient requirements?
A 5-8 year time frame is coming on the nutrient requirements. The upgrades could run
around $50 million for each plant.
Motion: Board Member Connor moved that the Water Board recommends to
City Council that they support the proposed 2011-2012 budget for the Water,
Wastewater, and Stormwater funds. Board Member Brown seconded the motion.
Board members discussed concepts for how an incremental increase might be devoted,
such as early debt retirement versus incentive programs.
Discussion on the motion:
Vice Chairperson Balderson remarked about the expectation in business that budgets
remain flat. It's not a matter of failure to recognize that it takes that much to run the
Utilities and address these critical needs, but the organization must not do some other
things if necessary.
Vote on the motion: It passed unanimously.
- 2 -
Staff note (not included in minutes): In follow up with Water Board Chair Gina Janett,
the above motion recommending the overall budget was intended to include the
recommended rate increases for both water and wastewater.
Motion: Board Member Connor moved that the Water Board recommends to
City Council that they support a 3 percent rate increase in the Water fund for
2012 and consider small increases both in 2011 and 2012 in all three sectors of the
Water Utility—Water, Wastewater, and Stormwater—in anticipation of future
needs and to avoid large rate increases in the future. Board Member Eccleston
seconded the motion.
Discussion on the motion:
Board Member Connor understands the issues caused when increases happen, but feels
it's important to avoid significant increases all at once. By getting ahead of the curve and
eliminating interest payments, it allows lower rates in perpetuity. The interest payments
are over and above the money needed to keep pace with future needs.
Chairperson Janett noted we will be learning about the cost to address deferred
maintenance when more data comes forth from the asset management initiative.
Vote on the motion: It passed unanimously.
Motion: Board Member Connor moved that the Water Board recommends to
City Council that they take a portion of the increased rates to accelerate debt
service. Board Member Brown seconded the motion.
Vote on the motion: It passed unanimously.
*** Board Member Dornfest left the meeting at 5:11 p.m.
Chairperson Janett inquired about the I percent of construction capital projects donated to
Art in Public Places funding. For Utilities' capital projects where art cannot be directly
associated to the project and the public has no access, such as underground pipe
replacements, pumps, etc., can this requirement be eliminated in those cases?
Motion: Chairperson Janett moved that the Water Board recommends to City
Council that they consider eliminating the Art in Public Places funding for Utility
projects not accessible to the public. Board Member Bovee seconded the motion.
Discussion on the motion:
Staff was asked to develop the figure represented by this type of change.
Vote on the motion: It passed unanimously.
- 3 -
ATTACHMENT
Excerpt from Unapproved Electric Board Minutes, October 6, 2010
2011-2012 Budget, Rates and Cost of Service Study
(Presentation available upon request)
Utilities Executive Director Brian Janonis introduced this topic by referring to the
September budget meeting for boards and commissions, as well as the start of the
Council work sessions on the budget.
2011-2012 Budget
Utilities Financial Operations Manager Ellen Switzer presented the details of the 2011-
2012 Light and Power Budget.
Board discussion:
• A concern was expressed about placing all renewables in a discretionary fund, as
discretionary"items can be a target. This is an undesirable term. (Staff replied
that the renewable offers were made to the Enviromnental Health Outcome
because it met that team's request for results. This did not indicate that the
renewable offers were considered discretionary.)
• In response to Council's question related to our rate increases and how they
compare with the other Platte River Power Authority (Platte River) partner cities,
Platte River analyzed retail rates back to 2005. Longmont increased 11.6 percent,
Loveland increased 10.5 percent, Fort Collins increased 12.4 percent, and Estes
Park increased 16.1 percent.
• A board member expressed concern with remarks that Fort Collins' rate is lower
than Xcel Energy's rate. If the rate minus the wholesale rate is compared, Fort
Collins and Xcel Energy rates are about the same. The gap has been closed on the
distribution rates. Can we cut our distribution costs if costs out of our control,
(such as the wholesale rate from Platte River) go up? Separation of these costs
helps the board's understanding.
• Will the same solar rebate be continued, even if the price of solar cells decreases
50 percent?
• Last year, part of the Energy Services increase was funded from reserves. The
Automated Metering Infrastructure (AMI) program begins to have an impact in
2013 when fully installed. A board member expressed concern that the City is
cutting costs everywhere they can, and it seems to be counter to that effort to
increase an area, such as Energy Services, which may be considered discretionary.
• A board member shared his sense that Council is supportive of rate and sales
tax increases.
1
Cost of Service and Rates
Utilities Rate Analyst Bill Switzer presented details of the electric cost of service study
upon which rate recommendations were based. The last Cost of Service study was
completed in 2002 and is normally completed every five years, typically in conjunction
with a rate increase. A new study was completed now to provide a foundation, as the
Electric Utility will be asked to look at many types of rate structures in the coming years.
• The scale of our goals is such that energy savings in all classes must be
considered, not just those classes, such as commercial, where it's easier to realize
more benefit.
• If all classes were moved to full cost of service this year, and again next year, it
may cause a lack of stability. The true cost of service is a target that changes as
our customers change.
• When presented on September 20, Council Finance Committee agreed with
limiting the percent rate change to 10 percent.
• The distribution slice of the rate structure absorbs the differential when not
adjusting to full cost of service.
• Council has asked us to present rate structure alternatives in the IQ 2011.
Development Fees
• How does Fort Collins fare against neighboring communities on fees?
Mr. Janonis responded that our development fees overall are a little higher.
However, the portion being driven by Utilities is normally lower than our
neighboring communities. Our raw water fees are very low comparatively.
• A board member recommended that terminology, "on average", be added to the
monthly electric rate increases as it's defined for the community.
• Board members were very pleased with the level of analysis done by Utilities
Finance and Budget staff. It provides the necessary logic for recommending the
changes, and they appreciated seeing the allocation data.
Board members discussed some of their concerns with portions of the proposed budget
and potential basis for voting against recommending the budget.
. 2
Motion: Board Member Graham moved the Electric Board recommends to the
City Council that the Council approve the City Manager's recommended 2011-
2012 budget for the Light and Power Fund, the proposed cost of service-based
2011 electric rate increases, and 2011 electric development fee reductions. Board
Member Bihn seconded the motion.
Vote on the motion: 2 for, 3 against. The motion fails.
Board Member Barnish stated his reason for voting against the motion. In this time of
tight budgets in the City, there should also be budget cuts in discretionary areas of the
budget, namely Energy Services. He would be inclined to vote for the budget and any
necessary, modest increase if Energy Services spending was restored to 2009 levels
during this two-year budgeting cycle.
Board Member Harris voted against the motion for the following reason. He is
concerned about the across-the-board salary freezes, which impact Light and Power
employees. He sees this as impacting the Electric Utility's ability to recruit and retain
quality, experienced Light and Power employees, causing a significant and prolonged
unfavorable effect on our system, e.g. reliability.
Vice Chairperson Yurash voted against the motion, because he feels the size of the rate
increase for Energy Services should have been reduced.
3
ATTACHMENT
Excerpt from the minutes of the September 20, 2010 Council Finance Committee
meeting:
Utility Rate Increases Update
Ellen Switzer advised committee members of the current rate increase status
• Proposed electric rate increases
— 2011 +6.5%
— 2012 +6.2%
— Recommended increases vary by rate class per cost of service study recommendations
vary from 0% to 1O%
• Components of the 2011 retail rate increase:
— PRPA rate increase (6.1% wholesale) 4.7% retail inc
— 2 Phase of energy policy implementation 1.8% retail inc
If approved, effective for meter readings on or after January 1, 2011
3 Electric Rate Options
1. Implement a 6.5 percent rate across the board for all customer classes
2. Implement the full cost of service increases and decreases
3. Implement the cost of service with no class increasing more than 10 percent and no class
decreasing (modified COS)
What is Cost of Service?
A COS fills in the blanks in our electric rate tariffs
a Fixed charge x$/per account
a Demand (purchase power) charge x$/kWh or kW
+ Distribution Facilities charge x$/kWh or kW
4 Energy (Purchase Power) Charge $/kWh
4 PILOTS 6% of above
The following costs come mostly from the budget:
—Purchased Power
—Operations Et Maintenance
—Administrative Et General / Billing Et Collections
—Customer Assistance/Energy Services
—Average 10 Year Capital
—Non-Operating Income (credit)
—Change to reserves (difference between COS and revenue target +6.5%)
Cost of service recommendations:
• Rate classes more closely aligned with costs
• Rate class cost components accurately identified
• Foundation is laid for analyzing impacts of various future proposed rate structures
The Utility staff asked if the Council Finance Committee supports these cost of service
recommendations and the proposed 10 percent cap on 2011 electric rate increases.
1
ATTACHMENT
Doug Hutchinson stated that the hybrid approach recommended by the Utility staff makes
sense and he supports it. Ben Manvel stated that he agreed.
2011 Summary
— Monthly Electric Rate Increases +65% (Vary by rate class per cost of service in 2011
(0% -10%)
— Monthly Water Rates +3%
— Monthly Wastewater Rates +9%
— Monthly Stormwater Rates -- no change
— Electric Development Fees Reduction of 1% to 3%
— Water, WW, SW Plant Investment Fees -- no change
Darin suggested sending a one page summary to all of council explaining the
highlights.
2
ATTACHMENT 4
2011 Utility Rates
Electric Development Fees
Fort Collins City Council Meeting
November 2 , 2010
r,�t_ Collins
1
Monthly Utility Rates
City of
Fort Collins
1
2011 Proposed Electric Rates
Electric rates are proposed to increase 6 . 5 % on average
Components of the 2011 retail rate increase :
• PRPA wholesale rate increase (6 . 1 % ) 4 . 7%
• 2nd phase of energy policy increase 1 . 8 %
2011 proposed monthly increase includes a 6 . 5%
revenue adjustment and a cost of service adjustment
to align revenues with costs
Proposed rate adjustments vary by customer class
of
r,�tf
3
2011 Proposed Electric Rates
Residential ( Both Energy & Demand Rates) 10 . 0%
General Service (Small Commercial ) 0 . 0%
General Service 50 (Medium Commercial ) 5 . 1 %
General Service 750 (Large Com , Industrial ) 5 . 6%
Traffic Signals 6 . 7%
Floodlights 0 . 0%
Average System Increase 6 . 5%
City of
Fort Collins
2
Electric Rates Remain Among the Lowest in the State
(All Rate Classes — Residential (graph), Small & Large Commercial and Industrial)
Colorado Utilities Electric Rate Increases Since 2005 Avg coop
$9O a, PM.
Avg. Investor
$8$
$80
$75 A . Muni leas PRPA
2i.996
8
= $70
Estes Park
N
$65 1g.196
c
a
9
$60
Fort Collins
$55 iz.496
Q
$50 Loveland 10.5%
Longmont
$45
$4O
Jan 05 July 05 Jan 06 Jul06 Jan 07 Jul07 Jan O8 Ju108 Jan 09 Jul09 Jan 10 Jul 10
5
Proposed 2011 Water Rates
Water rates are proposed to increase 3 %
across the board
* Increase needed to fund operations , capital improvements , and
maintain debt service coverage
•2009 water operating revenues were $3 .4 M ( 13% ) less than in
2006
*Conservation , weather, economy may all be contributing to lower
sales
City of
F�prt Collins
`�`
6
3
Proposed 2011 Water Rates
Impact to Typical Single Family Customer
Proposed
2010 2011 $ %
Monthly Monthly Increase Increase
Water Bill Water Bill
January $23 .43 $24 . 13 $0 . 70 3%
5,000 gal.
July $63 . 22 65 . 11 $ 1 . 89 3%
21 ,000 gal .
Mo. Average
(Total of $34 . 83 $35 . 87 $ 1 . 04 3%
117, 131 gal .
per year)
Fort Collins
7
Proposed 2011 Wastewater Rates
W W Rates are proposed to increase 9 % across the
board
• Rate increases to fund capital improvements , maintain debt service
coverage
•W W billings are based on water use and continue to decline
* Revenue reductions anticipated for commercial customers
metering consumptive flows
Fort Collins
8
4
Proposed 2011 Wastewater Rates
Impact to Typical Single Family Customer
Actual Proposed $
2010 2011 Increase % Increase
Monthly Monthly Monthly Monthly
WW Bill WW Bill WW Bill WW Bill
4800
Gal/Mo $26 . 23 $28 . 59 $2 . 36 9 %
W Q Avg
r� of
t` Collins
f�
9
Winter Quarter Water Use
Wastewater Code Addition
• Used for residential Wastewater billings & defined in Code as :
". . . the average monthly amount of water billed to the user during
the preceding months of Jan . , Feb. and March. "
• Current procedure : Single family wastewater customers who have
not established a winter quarter water use are charged for 5 ,200
gallons/month
— This is an historical average & is not in Code
— Single family winter quarter use has decreased to �4 , 800gal/mo
— Duplex & multi family winter quarter use has also declined
• Code addition would set default amounts for residential customers
who have not established winter quarter water use :
— Single Family 4 , 800 gal/mo
— Duplex 7 , 200 gal/mo
— Multi Family 3 ,400 gal/unit/mo C;tyof
F�prt Collins
`�`
10
5
2011 Stormwater Rates
Staff is not recommending any changes for
stormwater rates .
�.F�t_ Collins
11
Impact to Typical Single Family Customer
Current Proposed $ Increase % Increase
2010 2011 from 2010 from 2010
Electric
700 kWh per month $54 .43 $59 . 94 $5 . 51 10 . 1 %
Wastewater
4 ,800 gallons/month
winter quarter use WQA $26 .23 $28 . 59 $2 . 36 9 . 0%
Stormwater
8 ,600 s .ft. lot, light runoff $ 14 .26 $ 14 . 26 $0 . 00 0 . 0%
Water
Annual Average 117K al/ r $34 .83 1 $35 . 87 $ 1 . 04 3 . 0%
Total Typical Monthly Ut Bill $129 .75 $ 138.66 $8 .91 6.9%
City of
Fort Collins
12
6
Front Range Rate Comparison = 2010
Typical Single Family Customer - Electric, Water, Wastewater and Stormwater
2010 Residential Rate Comparison
July Water Use 21 ,000 Gallons
$250
$200
t $150
c
f
w $100
$50
2
o m O 3 U> O i X
J
■ Electric ■ Water ❑ Wastewater ■ Stormwater r
t Collins
13
Front Range Rate Comparison - Estimated 2011
Typical Single Family Customer - Electric, Water, Wastewater and Stormwater
Estimated 2011 Residential Rate Comparison
July Water Use 21,000 Gallons
$250
$200
t $150
c
0
w $100
$50
w
ry W E W W W v X �
ry W W V 10 X
O O) U = X c in CID ` X O 2 to
U
J J ` li m v W Q W
■ Electric ■ Water o Wastewater ■ Stormwater
CItyOFort Collins
14
7
Development Fees
City of
ZOv
15
Electric Development Fees
• Fees will be reduced : - 1 % to -3 %
— Lower material costs
— No increase for labor
— If approved , effective January 1 , 2011
�,�rof
t` Collins
16
8
Plant Investment Fees
• Water , Wastewater, and Stormwater Plant
Investment fees were revised in 2010
• No changes are recommended for 2011
City of
Fort Collins
17
2011 Utility Rates & Fees Summary
• Monthly Rates :
— Electric +6 . 5% on average , rate classes vary 0% - 10%
— Water +3% across the board
— Wastewater +9% across the board
— Stormwater no change
• Development Fees and PIFs
— Electric Development Fees -- reduction of 1 % to 3 %
— Water, WW, SW Plant Investment Fees -- no change
City of
Fort Collins
18
9
ORDINANCE NO . 112, 2010
OF THE COUNCIL OF THE CITY OF FORT COLLINS
AMENDING CHAPTER 26 OF THE CODE OF THE CITY OF FORT COLLINS
TO REVISE WATER RATES , FEES AND CHARGES
WHEREAS , the City Council is empowered and directed by Article XII, Section 6, of the
Charter of the City of Fort Collins, Colorado, to time fix, establish, maintain and provide for the
collection of such rates, fees or charges for utility services furnished by the City as will produce
revenues sufficient to pay the costs, expenses and other obligations of the water utility, as set forth
therein; and
WHEREAS , Section 26- 118 of the Code of the City of Fort Collins, requires that the City
Manager analyze the operating and financial records of the water utility during each calendar year
and recommend to the City Council the user rate fees to be in effect for the following year; and
WHEREAS , the Water Board considered the proposed water rates, fees and charges for 2011
at its September 16, 2010 meeting, and recommended approval as proposed by unanimous vote ; and
WHEREAS , the City Manager has recommended to the City Council that the following
water rates, fees and charges be imposed for the billing year beginning January 1 , 2011 .
NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF FORT
COLLINS as follows :
Section 1 . That Section 26- 127 of the Code ofthe City of Fort Collins is hereby amended
to read as follows :
Sec. 26-127 . Schedule B, meter rates.
(a) Residential Rates.
( 1 ) Residential customers with one ( 1 ) dwelling unit.
a. Base Charge. Residential customers with one ( 1 ) dwelling unit shall
pay a base monthly charge of twelve dollars and fbrty-si eighty-
three cents ( 6 $ 12 . 83 ) .
b. Quantity Charge. Residential customers with one ( 1 ) dwelling unit
shall pay a monthly quantity charge as follows :
For the first seven thousand (7 ,000) gallons used per month, a charge
of one dollar and -two alid eight-tei ninety-eight and six-
tenths cents (fig $ 1 . 986) per one thousand ( 1 ,000) gallons.
For the next six thousand (6 ,000) gallons used per month, a charge of
two dollars and -one and six-teiitl twenty-eight and two-
tenths cents ($-2 .2t6 $2 .282) per one thousand ( 1 ,000) gallons .
For all additional gallons used per month, a charge of two dollars and
fifty-four - sixty-two and five-tenths cents
($2 . 549$2 . 625 ) per one thousand ( 1 ,000) gallons .
(2) Residential customers with two (2) dwelling units .
a. Base Charge. Residential customers with two (2) dwelling units shall
pay a base monthly charge of f6urtee fifteen dollars and sixty-thTcc
seven cents ($ 14 . 63$ 15 . 07) .
b. Quantity Charge. Residential customers with two (2) dwelling units
shall pay a monthly quantity charge as follows :
For the first nine thousand (9 ,000) gallons used per month, a charge
of one dollar and - - inety-one and three-
tenths cents ($ f . 857$ 1 . 913 ) per one thousand ( 1 ,000) gallons .
For the next four thousand (4,000) gallons used per month, a charge
of two dollars and thirteen and five-tenthsnineteen and nine-tenths
cents ($2 . t 3 5$2 . 199) per one thousand ( 1 ,000) gallons .
For all additional gallons used per month, a charge of two dollars and
forty-five and six-teii fifty-three and zero-tenths cents
($2 .456$2 . 530) per one thousand ( 1 ,000) gallons .
(3 ) Residential customers with more than two (2) dwelling units .
a. Base Charge. Residential customers with more than two (2) dwelling
units shall pay a base monthly charge of twelve dollars and thirty-si
seventy-three cents ($i -2 . 36$ 12 . 73 ) for the first dwelling unit and
four dollars and twelve twenty-four cents ($4-.1-2$4 .24) for the second
and each additional dwelling unit.
b. Quantity Charge. Residential customers with more than two (2)
dwelling units shall pay a monthly quantity charge of one dollar and
seventy-nine mid f6ur-tenths eighty-four and eight-tenths cents
($ 1 . 794$ 1 . 848) per one thousand ( 1 ,000) gallons used in the winter
season months of November through April. They shall pay a monthly
quantity charge of two dollars and - -
thirty-one and zero-tenths cents ($2 .-243 $2 . 310) per one thousand
( 1 ,000) gallons used in the summer season months of May through
October. The meter reading date shall generally determine the
-2-
seasonal monthly quantity charge; however, no customer shall be
billed more than six (6) full billing cycles at the summer quantity
charge .
(b) Nonresidential Rates.
( 1 ) Base charge. Nonresidential customers shall pay a base monthly
charge based on meter size as follows :
Meter Size (inches) Monthly Base Charge
3/4 f f . 15 $ 11 .48
1 3 f . f 0 32 . 03
1 '/a S4 . 56 87 . 10
2 4 131 .26
3 194 . 38 200 .21
4 305 . f 5 314 . 30
6 609 . 72
8 5 11077 , 12
(2) Quantity charges. Nonresidential customers shall pay a monthly
quantity charge of one dollar and fifty-five fifty-nine and seven-
tenths cents ($1—. 55$ 1 . 597) per one thousand ( 1 ,000) gallons used in
the winter season months of November through April . They shall pay
a monthly quantity charge of one dollar and ninety-thTee and eight=
tenths ninety-nine and six-tenths cents ($ f . 938 $ 1 . 996) per one
thousand ( 1 ,000) gallons used in the summer season months of May
through October. The meter reading date shall generally determine
the seasonal monthly quantity charge ; however, no customer shall be
billed more than six (6) full billing cycles at the summer quantity
charge .
(3 ) Charges for excess use. Monthly water use in excess of the amounts
specified in the following table shall be billed at two dollars and
twenty-nine and five-tenths cents ($2 .2-2g
$2 .295) per one thousand ( 1 ,000) gallons used in the winter season
months of November through April. Monthly water use in excess of
the amounts specified below shall be billed at two dollars and
-cight mid six-tMiths eighty-seven and zero-tenths cents
($Z 786$2 . 870) per one thousand ( 1 ,000) gallons used in the summer
season months of May through October. The meter reading date shall
generally determine the seasonal billing excess quantity charge;
however, no customer shall be billed more than six (6) full billing
cycles at the summer excess quantity charge.
-3 -
Meter Size (inches) Specified Amount (gallons per month)
3/4 100,000
1 3005000
1 '/2 6255000
2 1 ,200,000
3 11400,000
4 255009000
(c) Service outside the City. The monthly charge for water taken through a meter
by a user outside the City limits shall be the same as for like service within
the City limits as specified in Subsections (a) and (b) of this Section.
(d) Rates by special water services agreement. The rate structure and associated
charges for water service pursuant to a special water services agreement
approved by the City Council pursuant to § 26- 130 shall be as set forth in
said agreement.
Section 2 . That the amendments to the Chapter 26 of the City Code contained herein
shall go into effect for all billings based on meter readings after January 1 , 2011 .
Introduced, considered favorably on first reading, and ordered published this 2nd day of
November, A.D . 2010, and to be presented for final passage on the 16th day of November, A.D .
2010,
Mayor
ATTEST :
City Clerk
Passed and adopted on final reading on the l6th day of November, A.D . 2010 .
Mayor
ATTEST :
City Clerk
-4-
ORDINANCE NO . 113 , 2010
OF THE COUNCIL OF THE CITY OF FORT COLLINS
AMENDING CHAPTER 26 OF THE CODE OF THE CITY OF FORT COLLINS
TO REVISE WASTEWATER RATES, FEES AND CHARGES
WHEREAS , the City Council is empowered and directed by Article XII, Section 6, of the
City Charter to fix, establish, maintain and provide for the collection of such rates, fees or charges
for utility services furnished by the City as will produce revenues sufficient to pay the costs,
expenses and other obligations of the wastewater utility, as set forth therein; and
WHEREAS , City Code Section 26-277 requires that the City Manager analyze the operating
and financial records of the wastewater utility during each calendar year and recommend to the City
Council the user rate fees or adjustments to be in effect for the following year; and
WHEREAS , City Code Section 26-277 further requires that the user rates be revised as
necessary to assure equity of the rate system established and to assure that sufficient funds are
obtained to adequately operate and maintain the wastewater system; and
WHEREAS , the Mulberry Wastewater Reclamation Plant is undergoing a upgrade of the
plant's treatment processes, to prepare the plant for future regulation-based improvements and to
make odor control improvements; and
WHEREAS , such improvements are not related to growth and will require increased user
rates to generate sufficient revenues to repay the debt necessary to finance these improvements; and
WHEREAS , the Water Board considered the proposed wastewater rates, fees and charges
for 2011 at its September 16, 2010 meeting, and recommended approval as proposed by unanimous
vote ; and
WHEREAS , the City Manager has recommended to the City Council that the following
wastewater rates be imposed for the billing year beginning January 1 , 2011 .
NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF FORT
COLLINS as follows :
Section 1 . That Section 26-280 of the Code of the City of Fort Collins is hereby amended
to read as follows :
Sec. 26-280. Service charges established by category.
The schedule of rates for each category described in § 26-279 shall be as
follows :
Category Class of Customer Rate
A Single-family residential $28 .66 $31 .24 per month
user (flat rate)
Single-family residential $ 12 . 80 $ 13 . 95 per month plus $2 .488 $2 . 712 per
user (metered water use) 1 ,000 gallons of either winter quarter water use or
3 ,000 gallons, whichever is greater. For single family
customers who have not established a winter quarter
water use at the service address, a system average of
4, 800 gallons per month shall be billed.
B Duplex (two-family) $44. 75 $48 . 78 per month
residential users (flat rate)
Duplex (two-family) $ 16 . 58 $ 18 . 07 per month plus $2 .488 $2 . 712 per
residential users (metered 1 ,000 gallons of either winter quarter water use or
water use) 4,000 gallons, whichever is greater. For duplex
customers who have not established a winter quarter
water use at the service address, a system average
7 ,200 gallons shall be billed.
C Multi-family residential $2.4$8 $2 . 712 per 1 ,000 gallons of winter quarter
user (more than two water use, plus a base charge of $i�5 $2 . 13 per month
dwelling units including per dwelling unit served. For multi family customers
mobile home parks) and who have not established a winter quarter water use at
winter quarter based the service address, a system average of 3 ,400 gallons
nonresidential user per living unit shall be billed.
D Minor nonresidential user $2 .488 $2 . 712 per 1 ,000 gallons of water use,
measured sewage flow or winter quarter water use,
whichever is applicable, plus the following applicable
base charge :
Size of water meter (inches) Base
charge
3/a or smaller �g $7 . 83
1 i 6 . 5 g 18 . 07
1 '/z 33 . 37 36 . 37
2 57 .09 62 .23
3 9f .z2 99 .43
4 H4 . 06 157 . 03
6 63f. 5f 688 . 35
8 794 . 80
-2 -
E and F Intermediate nonresidential S2488 $2 . 712 per 1 ,000 gallons of water use,
user and Significant measured wastewater flow or winter quarter water use,
industrial user whichever is applicable; plus a surcharge of $2 . 574
$2 . 805 per million gallons for each milligram per liter
of suspended solids in excess of 235 milligrams per
liter; plus a surcharge of $2 . f 43 $2 . 336 per million
gallons for each milligram per liter of BOD in excess
of 265 milligrams per liter or a surcharge of Sf . 353
$ 1 .475 per million gallons for each milligram per liter
of COD in excess of 400 milligrams per liter, or a
surcharge of $4 . 007 $4 . 367 per million gallons for
each milligram per liter of TOC in excess of 130
milligrams per liter, whichever is applicable . The user
shall pay this calculated amount plus the applicable
base charge set forth below :
Size of water meter (inches) Base
charge
3/a or smaller g $7 . 83
1 16 , 58 18 .07
1 %z 33 , 37 36 . 37
2 57 , 69 62 .23
3 91 .22 99 .43
4 144,06 157 . 03
6 63t , 5f 688 . 35
8 729 , 17 794 . 80
G User outside City limits The rate for users outside the City limits shall be the
same as for like service inside the City limits as is
specified in Categories AF and H in this Section
H Special with agreement The rate pursuant to a special wastewater services
agreement approved by the City Council pursuant to §
26-290 shall be set forth in said agreement.
Section 2 . That Section 26-282 (a) of the Code of the City of Fort Collins is hereby
amended to read as follows :
Sec. 26-282. Wastewater strength or industrial surcharges and categories
established.
(a) The schedule of wastewater strength surcharge for customers located either
inside or outside the City limits shall be as follows :
-3 -
Parameter Excess over (mg/l) Rate per
1, 000 gallons
BOD 265 $9 , 002143 $0 , 002336
COD 400 $00t353 0 , 001475
TOC 130 0 , 004007 0 , 004367
TSS 235 0 . 002574 0 . 002805
Section 3 . That Section 26-289 of the Code of the City of Fort Collins is hereby amended
to read as follows :
Sec . 26-289 . Miscellaneous fees and charges .
The following is a schedule of miscellaneous fees and charges :
Description Amount
( 1 ) Connection fees and service charges Fees shall be set forth as in § 26-
712(b)
(2) Industrial discharge permits :
a. Administration $76 . 00 annually
b . Surveillance Determined for each user
annually, based on direct cost
plus 15 % indirect costs, billed
monthly
(3) Laboratory support services Determined on a case-by-case
basis based on direct cost plus
15 % indirect costs
(4) Determined on a case-by-case basis Cost plus 15 %
based on direct cost plus 15 % indirect costs
(5) Charges for disposal at the Fort Collins
Regional Sanitary Waste Transfer Station :
a. Septic tanks, vaults, privies,
portable toilets :
Generated within Larimer County $0.061 $0 . 066 per gallon
Generated outside Larimer County $0. 09-2 $0 . 100 per gallon
b . Recreational vehicle sanitary
waste holding tanks :
Residential customers of the City No charge for single disposal
of Fort Collins Wastewater Utility
Others $2-. 60 $2 . 18 base fee plus $0 . 061
$0 . 066 per gallon
(6) Miscellaneous fees Determined on a case-by-case
basis based on direct costs plus
15 % indirect costs
-4-
Section 4 . That the amendments to the Chapter 26 of the City Code contained herein
shall go into effect for all billings after January 1 , 2011 .
Introduced, considered favorably on first reading, and ordered published this 2nd day of
November, A.D . 2010, and to be presented for final passage on the 16th day of November, A.D .
2010.
Mayor
ATTEST :
City Clerk
Passed and adopted on final reading on the 16th day of November, A.D. 2010 .
Mayor
ATTEST :
City Clerk
-5 -
ORDINANCE NO . 1141 2010
OF THE COUNCIL OF THE CITY OF FORT COLLINS
AMENDING CHAPTER 26
OF THE CODE OF THE CITY OF FORT COLLINS
TO REVISE ELECTRIC RATES, FEES AND CHARGES
WHEREAS , the City Council is empowered and directed by Article XII, Section 6, of the
City Charter to fix, establish, maintain and provide for the collection of such rates, fees or
charges for utility services furnished by the City as will produce revenues sufficient to pay the
costs, expenses and other obligations of the electric utility, as set forth therein; and
WHEREAS , Platte River Power Authority costs are increasing due to reduced surplus
sales, increased operating costs for aging plants and environmental mitigation, increased natural
gas expenses for peaking plants, increased financing costs, and continuing capital investment;
and
WHEREAS , Platte River Power Authority will increase the City ' s wholesale cost of
power approximately 6 . 1 % in 2011 ; and
WHEREAS , the increased wholesale power costs will require a 4 . 7% increase in the
City ' s electric rates ; and
WHEREAS, a 1 . 8% electric rate increase was approved in 2010 as the first of two
required to fund the associated costs with funding energy efficiency programs for meeting the
goals of 2009 Energy Policy; and
WHEREAS , a final 1 . 8% rate increase is required in 2011 to provide the remainder of
funding for the implementation of the 2009 Energy Policy; and
WHEREAS , the Electric Board considered the proposed electric rates at its October 6,
2010 meeting, and voted 3 to 2 against recommending approval, based on concerns about the
lack of reduction in energy efficiency program expenditures and the lack of salary increases for
employees ; and
WHEREAS , the City Manager and staff have recommended to the City Council the
following adjustments to the electric rates for all billings issued with meter readings on or after
January 1 , 2011 ; and
WHEREAS , based on the foregoing, it is the desire of the City Council to amend Chapter
26 of the City Code to revise electric rates, fees and charges .
NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF FORT
COLLINS as follows :
Section 1 . That Section 26-464(c) of the Code of the City of Fort Collins is hereby
amended to read as follows :
Sec. 26-464. Residential energy service, schedule R.
(c) Monthly rate. The monthly rates for this schedule are as follows :
( 1 ) Fixed charge, per account: Three dollars and ifinety- six ninety-one cents
($3-:% $ 3 . 91 ) .
(2) Demand charge, per kilowatt-hour: Two and cighty-nine eighty-four one-
hundredths cents ($0. 0-289$0 . 0284) .
(3 ) Distribution facilities charge, per kilowatt-hour: O=-Two and seventy-si�
twenty one-hundredths cents ($0. 0f76$0 . 0220) .
(4) Energy charge, per kilowatt-hour: Two and tie forty-eight one-
hundredths cents ($0. 0212$0 . 0248) .
(5 ) In lieu of taxes and franchise : a charge at the rate of six and zero-tenths
(6 . 0) percent of all monthly service charges billed pursuant to this Section.
Section 2 . That Section 26-465 (c) of the Code of the City of Fort Collins is hereby
amended to read as follows :
Sec. 26-465. Residential demand service, schedule RD.
(c) Monthly rate. The monthly rates are as follows :
( 1 ) Fixed charge, per account: Six dollars and €fifty-three thirty-two cents
($6,53 $ 6 , 32) ,
(2) Demand charge, per kilowatt: Four Three dollars and twenty-oneeighty-
seven cents ( > $ 3 . 87) .
(3 ) Distribution facilities charge, per kilowatt-hour: One and twenty-eight
eighty-eight one-hundredths cents ($0:0f28 $0 . 0188) .
(4) Energy charge, per kilowatt-hour: Two and twee-forty-eight one-
hundredths cents ($0.0212 $0 . 0248) .
(5 ) In lieu of taxes and franchise : a charge at the rate of six and zero-tenths
(6 . 0) percent of monthly service charges billed pursuant to this Section.
Section 3 . That Sections 26-466(c) and (f) of the Code of the City of Fort Collins are
hereby amended to read as follows :
Sec. 26-466. General service, schedule GS.
(c) Monthly rate. The monthly rates for this schedule are as follows :
-2-
( 1 ) Fixed charge, per account :
a. Single-phase, two-hundred-ampere service : Three dollars
and frve twenty-one cents ($3-. 05$3 .21 ) .
b. Single-phase, above two-hundred-ampere service : Eight
Nine dollars and one forty- six cents (*$.$1-$9 .46) .
c . Three-phase, two-hundred-ampere service : Four dollars
and ninety-fiveeighty-eight cents ( 5$4 . 88).
d. Three-phase, above two-hundred-ampere service : Nine
Eleven dollars and thirty- eight fifty-six cents ($9-3-8$ 11 . 56) .
(2) Demand charge, per kilowatt-hour:
a. First two thousand (2,000) kilowatt-hours : Four mi
sixteenThree and sixty-two one -hundredths cents
($0:046$0. 0362) ,
b . Next five thousand (5 ,000) kilowatt-hours : One and ninety-
six seventy-eight one-hundredths cents ($6:6f96$0 . 0178) .
C. All additional kilowatt-hours : Zero ($0 . 00) .
(3 ) Demand charge, per kilowatt:
a. All kilowatts billed in excess of twenty-five (25) kilowatts :
Seven Six dollars and - fifty-seven cents
($3=27 $ 6 . 57) .
(4) Distribution facilities charge, per kilowatt-hour: One and sixty fifty-eight
one-hundredths cents ($0. 0f60$0 . 0158) .
(5 ) Energy charge, per kilowatt-hour: Two and twee forty-eight one-
hundredths cents ($0.0212$ 0 . 0248) .
(6) In lieu of taxes and franchise : a charge at the rate of six and zero-tenths
(6 . 0) percent of all monthly service charges billed pursuant to this Section.
(f) Standby service charges. Standby service, if available, will be provided on
an annual contract basis at a level at least sufficient to meet probable service
demand (in kilowatts) as determined by the customer and approved by the utility
according to the following :
-3 -
( 1 ) The monthly standby distribution charge shall be three dollars and zero
two cents ($53-66$3 . 02) per kilowatt of contracted standby service . This
charge shall be in lieu of the distribution facilities charge . For all metered
kilowatts in excess of the contracted amount, the standby distribution
charge shall be nine dollars and zero six cents ($9�-. @6$9 . 06) per kilowatt.
(2) In the event the contractual kilowatt amount is exceeded, the beginning
date of the contract period will be reset. The first month of the new
contract period will become the current billing month and such month's
metered demand shall become the minimum allowable contract demand
for the standby service . Requests for standby service may be subject to a
waiting period. An operation and maintenance charge may be added for
special facilities required to provide standby service .
Section 4. That Sections 26-467(c), and (f) of the Code of the City of Fort Collins are
hereby amended to read as follows :
Sec. 26-467. General service 50, schedule GS50.
(c) Monthly rate. The monthly rates for this schedule are as follows :
( 1 ) Fixed charge, per account: Twenty-sixEighteen dollars and eighfy-
sixthirty-six cents ($26. 86$ 18 . 36) . An additional charge of forty dollars
and zero cents ($40 .) may be assessed if telephone communication service
is not provided by the customer.
(2) Coincident demand charge, per kilowatt: Thirtect Twelve dollars and
eighteen eighty cents ($ 13 . f 8 $ 12 . 80) but not less than one cent ($ . 01 ) per
kilowatt-hour.
(3 ) Distribution facilities demand charge, per kilowatt: Four dollars and
seventy-seveeighty-two cents ($4—. 77$4 . 82).
(4) Energy charge, per kilowatt-hour: Two and tie forty-eight one-
hundredths cents ($0. 02i2$0 . 0248) .
(5 ) In lieu of taxes and franchise : a charge at the rate of six and zero-tenths
(6 . 0) percent of all monthly service charges billed pursuant to this Section.
(f) Standby service charges. Standby service, if available, will be provided on
an annual contract basis at a level at least sufficient to meet probable service
demand (in kilowatts) as determined by the customer and approved by the utility
according to the following :
( 1 ) Standby distribution charge.
-4-
a. The monthly standby distribution charge shall be four three
dollars and ninety-one cents ($ -.0+$ 3 . 91 ) per kilowatt of
contracted standby service. This charge shall be in lieu of
the distribution facilities charge. For all metered kilowatts
in excess of the contracted amount, the standby distribution
charge shall be twelve eleven dollars and seventy-three
cents ($f2 . 03 $ 11 . 73 ) per kilowatt.
b. In the event the contractual kilowatt amount is exceeded,
the beginning date of the contract period will be reset. The
first month of the new contract period will become the
current billing month and such month's metered demand
shall become the minimum allowable contract demand for
the standby service . Requests for standby service may be
subject to a waiting period. An operation and maintenance
charge may be added for special facilities required to
provide standby service.
(2) Standby generation and transmission charge . All charges incurred by the
utility under Platte River Power Authority's applicable tariffs, as may be
amended from time to time, will be billed to the customer as a standby
generation and transmission charge.
Section 5 . That Sections 26-468(c) , (f), and (g) of the Code of the City of Fort Collins are
hereby amended to read as follows :
Sec. 26-468. General service 750, schedule GS750.
(c) Monthly rate. The monthly rates for this schedule are as follows :
( 1 ) Fixed charge, per account: T+firty--twoFifty-four dollars and ei -
scveiieleven cents ($32.87$54 . 11 ) .
a. Additional charge for each additional metering point:
Twenty-five Forty-seven dollars and ninety-two eighty-one
cents ( 2$47 . 81 ) .
b. An additional charge of forty dollars and zero cents ($40 .)
for each metering point may be assessed if telephone
communication service is not provided by the customer.
(2) Coincident demand charge, per kilowatt: Twelve dollars and ninety-
cightsixty-one cents ($12-. %$ 12 . 61 ) but not less than one cent ($0 . 01 ) per
kilowatt-hour.
(3 ) Distribution facilities demand charge, per kilowatt:
-5 -
a. First seven hundred fifty (750) kilowatts Four dollars and
seventy-five cents ($4-.-70$4 . 75) .
b. All additional kilowatts : Three Two dollars and
seventeeneighty-four cents ($3-.1-7$2 . 84).
(4) Energy charge, per kilowatt-hour: Two and nineforty-five one-hundredths
cents ($0 . 0-209$0 . 0245) .
(5) In lieu of taxes and franchise : a charge at the rate of six and zero-tenths
(6 . 0) percent of all monthly service charges billed pursuant to this Section.
(f) Standby service charges. Standby service, if available, will be provided on
an annual contract basis at a level at least sufficient to meet probable service
demand (in kilowatts) as determined by the customer and approved by the utility
according to the following :
( 1 ) Standby distribution charge.
a. The monthly standby distribution charge shall be tlnee two
dollars and thirteen ninety- seven cents ($3-. 1-5$2 . 97) per
kilowatt of contracted standby service . This charge shall be
in lieu of the distribution facilities charge . For all metered
kilowatts in excess of the contracted amount, the standby
distribution charge shall be nine eight dollars and thirtq=
nine ninety-one cents ($9-.3r9$ 8 . 9 1 ) per kilowatt.
b. In the event the contractual kilowatt amount is exceeded,
the beginning date of the contract period will be reset. The
first month of the new contract period will become the
current billing month and such month's metered demand
shall become the minimum allowable contract demand for
the standby service . Requests for standby service may be
subject to a waiting period. An operation and maintenance
charge may be added for special facilities required to
provide standby service.
(2) Standby generation and transmission charge. All charges incurred by the
utility under the Platte River Power Authority's applicable tariffs , as may
be amended from time to time, will be billed to the customer as a standby
generation and transmission charge.
(g) Excess circuit charge. In the event a utility customer in this rate class
desires excess circuit capacity for the purpose of controlling the available electric
capacity of a backup circuit connection, this service, if available, will be provided
on an annual contract basis at a level at least sufficient to meet probable backup
-6-
demand (in kilowatts) as determined by the customer and approved by the utility
according to the following :
( 1 ) The excess circuit charge shall be sixty-five sixty-three cents ($ .-6-5$0 . 63 )
per contracted kilowatt of backup capacity per month. For any metered
kilowatts in excess of the contracted amount, the excess circuit charge
shall be one dollar and ninety-five eighty-nine cents ($1-. 9-5$ 1 . 89) per
kilowatt.
(2) In the event the contractual kilowatt limit is exceeded, a new annual
contract period will automatically begin as of the month the limit is
exceeded. The metered demand in the month of exceedance shall become
the minimum contracted demand level for the excess circuit charge .
Section 6 . That Section 26-470(c) of the Code of the City of Fort Collins is hereby
amended to read as follows :
Sec. 26-470. Traffic signal service, schedule T.
(c) Monthly rate. The monthly rates (including a six-and-zero-tenths-percent
charge in lieu of taxes and franchise) are as follows :
( 1 ) Fixed charge, per account: Sixty-three dollars and cighty_
twoiinety cents ( 2$63 . 90) .
(2) Charge, per kilowatt-hour: Five and twenty-twofifty-five one-hundredths
cents ($0. 0522$0 . 0555) .
(3 ) > will be determined by Cost
analysis by the Service extensions and signal installations made by
the utility shall be paid for by the City General Fund, subject to material
and installation costs at the time of installation.
Section 7 . That the amendments to Chapter 26 of the City Code contained herein
shall go into effect for all billings based on meter readings after January 1 , 2011 .
-7-
Introduced, considered favorably on first reading, and ordered published this 2nd day of
November, A.D . 2010, and to be presented for final passage on the 16th day of November, A.D .
2010 ,
Mayor
ATTEST :
City Clerk
Passed and adopted on final reading on the l6th day of November, A.D . 2010 .
Mayor
ATTEST :
City Clerk
- 8 -
ORDINANCE NO . 115 , 2010
OF THE COUNCIL OF THE CITY OF FORT COLLINS
AMENDING CHAPTER 26
OF THE CODE OF THE CITY OF FORT COLLINS
TO REVISE ELECTRIC DEVELOPMENT FEES AND CHARGES
WHEREAS , the City Council is empowered and directed by Article XII, Section 6, of the
City Charter to fix, establish, maintain and provide for the collection of such rates, fees or charges
for utility services furnished by the City as will produce revenues sufficient to pay the costs,
expenses and other obligations of the electric utility, as set forth therein; and
WHEREAS , the City Council has determined that it is appropriate for new development to
contribute its proportionate share of providing capital improvements ; and
WHEREAS , Section 26-471 of the City Code requires that the electric development fees be
reviewed annually by the City Manager and that the fees be presented to the City Council for
approval no less than annually; and
WHEREAS , on October 20, 20091 the City Council adopted Ordinance No . 118 , 2009, which
established the electric development fees now in effect; and
WHEREAS , the Electric Board considered the proposed electric fees and charges at its
October 6, 2010 meeting, and voted 3 to 2 against recommending approval based on concerns about
the lack of reduction in energy efficiency program expenditures and the lack of salary increases for
employees ; and
WHEREAS , the City Manager and staff have recommended to the City Council the
following adjustments to the electric development fees and charges for all invoices paid on or after
January 1 , 2011 ; and
WHEREAS , based on the foregoing, it is the desire of the City Council to amend Chapter
26 of the City Code to revise electric development fees and charges .
NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF FORT
COLLINS as follows :
Section 1 . That Section 26-472(b) and (c) of the Code of the City of Fort Collins is
hereby amended to read as follows :
Sec. 26-472. Residential electric development fees and charges.
(b) The ECF shall be the total of the site footage charge, dwelling charge and
systems modification charge, to be determined as follows :
( 1 ) The site footage charge shall be the combined total of:
a. Four and nine hundred silty-eight- fifty-four thousandths
cents ( $0.04968 $0 . 04954) per square foot of developed site
square footage, including all applicable tracts but excluding
the area dedicated public rights-of-way; and
b. Nine Eight dollars and ninety seventy-eight cents (
$ 8 . 78) per lineal foot of the developed site abutting a
dedicated street or roadway.
(2) The dwelling unit charge shall be as follows :
a. For a single-family panel size with one-hundred-fifty-amp
service (nonelectric heat), one thousand two hundred severity-
eight- eighty-five dollars ( $ 1 ,278 . $ 1 ,285 . ) per dwelling unit;
b. For a single-family panel size with two-hundred-amp service
or with one-hundred-fifty-amp service (electric heat), two
thousand one hundred sixty-five seventy-six dollars ( $2 , 1fr5
$2, 176 .) per dwelling unit;
c . For a multi-family panel size with one-hundred-fifty-amp
service (nonelectric heat), eight hundred fifty-two fifty-six
dollars $ 856 .) per dwelling unit;
d. For a multi-family panel size with two-hundred-amp service
or with one-hundred-fifty-amp service (electric heat), one
thousand five hundred twenty-six dollars ($i , 5-20. $ 1 , 526 .)
per dwelling unit.
(3 ) A system modifications charge will apply when a new or modified service
will require infrastructure in addition to or different from the standard base
electrical system model . The differential costs associated with such system
modifications will be included in the calculated ECF .
(c) A Building Site Charge ("BSC ") for any new or modified residential service
shall be paid prior to issuance of a building permit for the related construction or
modification. The BSC shall be based upon the current rates as of the time of
issuance of the building permit. The BSC shall be the total of the secondary service
charges , and any additional charges, determined as follows :
( 1 ) The secondary service charge shall be as follows :
-2 -
Secondary Charge (up to 65 feet) Plus Per Foot Charge For Each
Service Size Foot Over 65
1 /0 service $ 666-00 $639 , 00 $4.$4 $4 . 66/Foot
4/0 service $82-3 . 00 $ 813 . 00 55 . 80 $5 . 83/Foot
350 kCM Service $9}6-00 $ 830 , 00 $ 's@ $6 . 56/Foot
1 /0 Mobile Home $ 5 -20 . 00 $499 . 00 N/A
Service
4/0 Mobile Home $ 649 . 00 $638 , 00 N/A
Service
(2) Actual special costs to the utility of installation of secondary service resulting
from site conditions shall be included in the BSC as additional charges . Such
conditions may include, but are not limited to, frozen or rocky soil, concrete
cutting and asphalt replacement.
Section 2 . That Section 26-473 (b) and (c) of the Code of the City of Fort Collins is
hereby amended to read as follows :
Sec . 26-473. Nonresidential electric development fees and charges.
(b) The ECF shall be the total of the site footage charge, WA service charge and
systems modification charge, to be determined as follows :
( 1 ) The site footage charge shall be the combined total of:
a. Four and nine hundred sib-cight- fifty-four thousandths
cents ( $0.04968 $0 . 04954) per square foot of developed site
square footage, including all applicable tracts but excluding
the area of dedicated public rights-of-way; and
b. Thirty-eight dollars and twenty zero cents ( $38 .2-0 $38 . 00)
per lineal foot of the developed site abutting a dedicated
street or roadway.
(2) The WA service charge shall be determined as follows .
a. For customer electric loads served by the utility the WA
service charge shall be :
i. Utility owned transformers : The kVA service charge
shall be fifty-nine dollars and fifty-four six cents
($59 .54 $ 59 . 06) per kilovolt-amp (kVA) of service
load rating.
-3 -
ii. Customer owned transformers : The kVA service
charge shall be (arty-nine- forty-eight dollars and
forur sixty-one cents ($49 .44 $48 . 61 ) per
kilovolt-amp (kVA) of service load rating.
b. For the utility to receive customer generation in excess of the
customer' s electric service provided by the utility, the
following KVA service charge will also apply:
i. Utility owned transformers : The kVA service charge
shall be forty-eight dollars and fi irty-sixty-four cents
( 6 $48 . 64) per kilovolt-amp (kVA) of generation
service rating in excess of the service load rating as
paid per subparagraph (2)a.i. above. Such ratings
shall be determined by the General Manager.
ii. Customer owned transformers : The kVA service
charge shall be thirty-eight dollars and twen
nineteen cents ($3-8 .26 $38 . 19) per kilovolt-amp
(kVA) of generation service rating in excess of the
service load rating paid per subparagraph
(2)a. ii. above . Such ratings shall be determined by the
General Manager.
(3 ) A system modifications charge will apply when a new or modified service
will require infrastructure in addition to or different from the standard base
electrical system model. The differential costs associated with such system
modifications will be included in the calculated ECF .
(c) A Building Site Charge ("BSC") for extending primary circuitry to the
transformer for any new or modified nonresidential service shall be invoiced and
paid in the same manner and at the same time as the ECF is invoiced and paid
pursuant to Subsection (a) of this Section. The BSC shall be the total of the primary
circuit charge, transformer installation charge and any additional charges, determined
as follows :
( 1 ) The primary circuit charge for service from the utility source to the
transformer shall be as follows :
a. For single-phase service, a charge of eight dollars and ninety
seventy-six cents ( $ 8 .76) per foot of primary circuit;
-4-
b. For three-phase service, a charge of nineteen eighteen dollars
and forty-three cents ( 0 $ 18 .43 ) per foot of primary
circuit.
(2) The transformer installation charge shall be as follows :
a. For single-phase service, a charge of one thousand three
hundred seventeen eighteen dollars ($ 1 ,3 f 7 . $ 1 ,318 .) per
transformer;
b. For three-phase service, a charge of two thousand four
hundred nine- twenty-one dollars ($2,409 . $2 ,421 .) per
transformer.
(3 ) Actual special costs to the utility of installation of service resulting from site
conditions shall be included in the BSC as additional charges . Such
conditions may include, but are not limited to, frozen or rocky soil, concrete
cutting and asphalt replacement.
Section 3 . That the amendments to Chapter 26 of the City Code contained herein shall
go into effect for all invoices paid on or after January 1 , 2011 .
Introduced, considered favorably on first reading, and ordered published this 2nd day of
November, A.D . 2010, and to be presented for final passage on the 16th day of November, A.D .
2010 ,
Mayor
ATTEST :
City Clerk
-5 -
Passed and adopted on final reading on the l6th day of November, A.D . 2010 .
Mayor
ATTEST :
City Clerk
-6-