HomeMy WebLinkAboutCOUNCIL - AGENDA ITEM - 03/20/2007 - SECOND READING OF ORDINANCE NO. 037, 2007, APPROPR ITEM NUMBER: 7
AGENDA ITEM SUMMARY DATE: March 20, 2007
FORT COLLINS CITY COUNCIL STAFF: Marty Heffernan
SUBJECT
Second Reading of Ordinance No. 037, 2007, Appropriating Prior Year Reserves Designated for
Library Improvements in the Capital Improvement Expansion Fund for Transfer to the City's Capital
Projects Fund to Construct a Southeast Branch Library and the General Fund to Purchase Library
Books and Materials.
RECOMMENDATION
Staff recommends adoption of the Ordinance on Second Reading.
EXECUTIVE SUMMARY
This Ordinance, unanimously adopted on First Reading on March 6, 2007, appropriates available
library impact fees to pay for the design and construction of the Southeast Branch Library at Front
Range Village, as well as for the Library collection.
ATTACHMENTS
1. Copy of the First Reading Agenda Item Summary- March 6, 2007.
ATTACHMENT 1
ITEM NUMBER: 26 A-C
AGENDA ITEM SUMMARY DATE: March 6, 2007
FORT COLLINS CITY COUNCIL TIFF: Marty Heffernan
SUBJECT pf
Items Relating to the Southeast Branch Library.
RECOMMENDATION
Staff recommends adoption of the Resolutions and the Ordinance on First Reading.
FINANCIAL IMPACT
Approximately$5.8 million is aCbb
o 1 1 1 rov ent expansion fees collected
from new residential constructio lins s c fees are collected to pay for the
impact of growth on the quality ce F ds must spent within a reasonable time
of collection (approximately 10 pro a li mat or facilities. Staff anticipates
construction and furnishings, including the library's collection, will cost about$5.5 million.
Recent ballot language authorized the newly formed library district to operate a southeast branch
library once it is constructed. The annual operating budget would be approximately $750,000 -
$1,200,000 depending on the level of staffing needed.
EXECUTIVE SUMMARY
A. Resolution 2007-020 Authorizing an Exemption to the Competitive Process for the City to
Enter into a Contract with Bayer Properties for the Construction of the Southeast Branch
Library.
B. Resolution 2007-021 Au rizi g Ex ti he petitive Process for the City to
Enter into a Contract with ller-L'n e Ar to s to Com ete Architectural Services of the
Design and Construction P of t uth Bran brary.
C. First Reading of Ordinance No. 037, 2007, Appropriating Prior Year Reserves Designated
for Library Improvements in the Capital Improvement Expansion Fund for Transfer to the
City's Capital Projects Fund to Construct a Southeast Branch Library and the General Fund
to Purchase Library Books and Materials.
March 6, 2007 -2- Item No. 26 A-C
Resolution 2007-020 will allow the City to coordinate construction of the Southeast Branch Library
at Front Range Village with Bayer Properties.
Resolution 2007-021 authorizeCompr
ac A n A 'tects, already under a City
purchasing contract, to provid8 sive c to a e 'ces through the design and
construction phases of the proje
Ordinance No. 037, 2007, appropriates available library impact fees to pay for the design and
construction of the Library and the collection.
BACKGROUND
The City is working with Bayer Properties to include a 16,000 square-foot library in the Front Range
Village development. The library will be located on the second floor of an attractive, centrally
located building. The library will be owned by the City and will provide convenient and much
needed library services for the community.
Area voters recently approved the new library district,including new funds to pay for the operation
of the SE Branch Library. Existing funds collected from impact fees are sufficient to pay for the
construction and furnishing of a 16 quo cot khY56krs
ch will help meet the goals
identified in the Library Capital prov t Pl o 0apita and .7 square feet per
capita of library space by 2015. c libr is c nter capita and .4 square feet
per capita.
Resolution 2007-020
Bayer Properties has retained a construction contractor for all the buildings in the Front Range
Village development, including the core and shell of the building the library will occupy. By
coordinating the construction of the library core and shell through Bayer, the City will realize
efficiencies,benefit from economies of scale and expedite the completion of the library. The core
and shell includes the foundation, walls, roof and associated elements of the building. Because
Bayer's contractor will be constructing the first floor core and shell, it would be difficult and
inefficient to bring in a separate contractor to build the core and shell for the second floor. Having
two contractors working on the structure of the same building would also create significant
coordination issues and cause confusion regarding responsibility for warranty work. The cost of the
library's portion of the core and shell will be determined by the final design of the library space but
is not anticipated to exceed $1.5 th 's t with Bayer, the City must
approve the design and all costs socia a ith n c n t core and shell on a line item
basis. The City has hired an ind endent timat t enfy the asonableness of all costs.
Staff intends to utilize a competitive process to select a contractor to finish the library space. The
finish work includes the entire interior space of the library, everything from drywall and electrical
to carpeting, lighting and shelving.
• Partnering with Bayer on the Library project maximizes use of the impact fees designated
for library services and materials. Bayer's contribution to the library project is substantial.
March 6, 2007 -3- Item No. 26 A-C
• Bayer is providing the land for the library building and paying for the infrastructure costs
associated with bringing necessary utilities and streets to the development and to the library
building itself.
• Bayer is also providing *i4a )cosPings
ktYtCIt
ng the associated offsite
development costs and f
• Operation Services has esti tecthay by partnering with Bayer
is approximately 2.2 million dollars compared to the cost of the City building a stand alone
branch library.
Resolution 2007-021
Because the City is under extreme time pressures to complete the construction of the library in
conjunction with the construction of the Front Range Village, City Purchasing has made a
determination per Section 8-161(d)(1)(b)of the Code of the City of Fort Collins,that although there
exists more than one(1)responsible source, a competitive process cannot reasonably be used or, if
used, will result in a substantially higher cost to the City, will otherwise injure the City's financial
interests or will substantially impede the City's administrative functions or the delivery of services
to the public. The Purchasing Agent has submitted the requisite justification to the City Manager
for approval and the City Manager a revi ed and concurred in that determination for this
acquisition.
Section 8-161(d)(3)requires Cou a o of ePoYteompetitive process over One
Hundred Thousand Dollars ($100,000)prior to acquisition.
Bayer Properties intends to begin construction of its development next month and open the new retail
center in June of 2008. Due to the aggressive timeline for construction of the building that will
include the library,Aller-Lingle Architects, already under City of Fort Collins purchasing contract,
was consulted for preliminary plans required by Bayer to begin the core and shell design. Aller-
Lingle sub-contracted for library design expertise from Joseph Montabano of Studiotrope in Denver.
Phase One was completed for $41,000 and allowed Bayer Properties architects to begin drawings
for the core and shell of the building.
To insure the integrity of the Southeast Branch Library project, from conceptual design through
completion,City staff is asking to hire Aller-Lingle to provide comprehensive architectural services
through the design and construction phases of the project, including mechanical, electrical and
library design. The estimated cos es a 0. ler Lingle Architects P.C.'s
design team is the most appropri for co nuin a es or the new Fort Collins branch
library because:
The team of Aller Lingle Architects P.C. and Studiotrope has been working with the library
staff for the programming and conceptual design phases of the project, including
coordination with Bayer Properties, and has full knowledge and understanding of the
functional and aesthetic needs of this library branch.
• Studiotrope was selected by the library staff as the library design consultant based upon its
experience and skill in library planning and design.
March 6, 2007 -4- Item No. 26 A-C
• Aller Lingle Architects P.C.has a 20-year working relationship with the City of Fort Collins,
including such major projects as the Downtown Transit Center and the Northside Aztlan
Community Center.
• Aller Lingle Architects P . has ex 'encPrthside
D edited projects, including both
the Utilities Vehicle Sto a faci i and tlan Community Center for the
City.
• Aller-Lingle Architects P.C. has a working knowledge of the City's Design Standards
Manual, specifying the design and maintenance requirements of all city facilities.
• Aller-Lingle has retained the services of Joseph Montalbano, an award-winning architect
with ten years of experience designing libraries in Colorado and elsewhere. He has worked
on public libraries in Littleton,Aurora,and Walsenburg as well as Reno,Nevada. He spent
seven years working with the Denver firm Brendle AVP.
Ordinance No. 037, 2007
The City would use available library impact fees to pay for the design and construction of the library
and for the library collection.
• The City would own the n n C7�0
ium ed Bayer is providing.
• All off-site development costs, parking, utility infrastructure to the building, streets, green
space and numerous site amenities will be provided by Bayer without cost to the library
project.
• The City will pay for construction of the second floor library space and related infrastructure,
including a first floor lobby, elevators, a stairway and book drops.
• The branch library will be operated by the new Fort Collins Regional Library District under
the terms worked out in the intergovernmental agreement.
It is anticipated that construction of the new library will be completed by June 2008 so it can be
opened at the same time the shopping center opens.
ORDINANCE NO. 037, 2007
OF THE COUNCIL OF THE CITY OF FORT COLLINS
APPROPRIATING PRIOR YEAR RESERVES DESIGNATED FOR LIBRARY
IMPROVEMENTS IN THE CAPITAL IMPROVEMENT EXPANSION FUND
FOR TRANSFER TO THE CITY'S CAPITAL PROJECTS FUND TO CONSTRUCT A
SOUTHEAST BRANCH LIBRARY AND THE GENERAL FUND TO PURCHASE LIBRARY
BOOKS AND MATERIALS
WHEREAS, the City of Fort Collins has recognized and addressed the issue of requiring
future growth and new development to contribute its proportionate share of the cost of providing new
capital facilities and infrastructure required to maintain the City's level of services to its residents;
and
WHEREAS,on May 21, 1996,the City Council adopted Ordinance No.051, 1996 amending
the City Code by adding a new article pertaining to the imposition of capital improvement expansion
fees to be used to fund capital improvements for the library, community parkland, police services,
fire services, and general governmental facility services; and
WHEREAS, the capital improvement expansion fees imposed under the provisions of the
aforementioned section of the City Code, including a Library Capital Improvement Expansion Fee,
went into effect on July 1, 1996, and the City has since been receiving those fees as a condition of
the issuance of building permits; and
WHEREAS, on July 21, 1998, the City Council adopted on second reading Ordinance No.
121, 1998, increasing the library capital improvement expansion fee to reflect the increased level of
service resulting from the opening of the Harmony Library at Front Range Community College; and
WHEREAS,City Code Section 7.5-27(a)requires that library capital improvement expansion
fee funds be used only for capital improvements related to the provision of general library services,
as such improvements may be identified in the capital improvements plan for library services; and
WHEREAS, on May 19, 1998, the City Council adopted Resolution 1998-83 creating the
Capital Improvements Plan for the library, which plan recommends the library strive to provide 4.0
books per city resident and provide 0.7 square foot per capita; and
WHEREAS, the construction of a new southeast branch library and the purchase of books
and other library materials needed for the new branch library is consistent with the Capital
Improvements Plan; and
WHEREAS, Library staff has determined that savings of approximately$2,200,000 will be
realized by partnering with Bayer Properties for the construction of a 16,000 square foot branch
library located over retail space planned for the Front Range Village, located near the intersection
of Harmony and Ziegler Roads; and
WHEREAS,the estimated cost to construct a 16,000 square foot branch library including the
purchase of books and materials is $5.5 million; and
WHEREAS,library staff recommends appropriating library capital improvement expansion
fee revenues, in the amount of$5.5 million, to be used to construct a 16,000 square foot branch
library including the purchase of books and materials, located at the proposed Front Range Village;
and
WHEREAS, the request for appropriation of fees is consistent with the uses of the fees set
forth in Chapter 7.5 of the City Code; and
WHEREAS, Article V, Section 9, of the Charter of the City of Fort Collins permits the City
Council to appropriate by ordinance at any time during the fiscal year such funds for expenditure as
may be available from reserves accumulated in prior years,notwithstanding that such reserves were
not previously appropriated; and
WHEREAS, it is the desire of the City Council to appropriate the sum of$5.5 million from
prior year reserves designated for library capital improvements in the Capital Improvement
Expansion Fund for transfer as follows:
To the Capital Projects Fund for Construction of a Branch Library $ 4,500,000
To the General Fund for Books and Materials 1.000.000
Total $ 5,500,000
for appropriation therein, as set forth in the Library Capital Improvements Plan.
NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF FORT
COLLINS as follows:
Section 1. That there is hereby appropriated from prior year reserves designated for library
capital improvements in the Capital Improvement Expansion Fund, the sum of FOUR MILLION
FIVE HUNDRED THOUSAND DOLLARS($4,500,000),for transfer to the Capital Projects Fund-
Southeast Branch Library capital project, and appropriated therein, to be used to construct a 16,000
square foot branch library at the proposed Front Range Village.
Section 2. That there is hereby appropriated from prior year reserves designated for library
capital improvements in the Capital Improvement Expansion Fund, the sum of ONE MILLION
DOLLARS ($1,00,000), for transfer to the General Fund, and appropriated therein, to be used to
purchase books and materials for the new branch library at the proposed Front Range Village.
-2-
Introduced and considered favorably on first reading and ordered published this 6th day of
March, A.D. 2007, and to be presented for final passage on the 20th day of March, A.D. 2007.
Mayor
ATTEST:
City Clerk
Passed and adopted on final reading this 20th day of March, A.D. 2007.
Mayor
ATTEST:
City Clerk
-3-