AGENDA ITEM SUMMARY DATE: October 3, 2006
FORT COLLINS CITY COUNCIL STAFF: Matt Baker
SUBJECT
First Reading of Ordinance No. 154, 2006, Appropriating Unanticipated Revenue in Street
Oversizing Contributions-in-Aid in the Street Oversizing Fund for the Drake and Zeigler Road
Improvements, Phase 2.
RECOMMENDATION
Staff recommends adoption of the Ordinance on First Reading.
FINANCIAL IMPACT
This Ordinance appropriates $659,438 in unanticipated revenue from contributions-in-aid-of-
construction in the Street Oversizing Fund (received from the Rigden Farm Development), and
$250,000 in unanticipated revenue from contributions-in-aid-of-construction in the Street Oversizing
Fund(received from the Sidehill Development)in order to construct arterial roadway improvements
for the Drake and Zeigler Road Project, Phase 2, from Environmental Drive to Horsetooth Road.
This appropriation of developer contributions will allow ditch relocation and structure improvements
to go to bid this winter. Funds will be appropriated as follows:
Rigden Farm Development $659,438 Contribution-In-Aid
Sidehill Development $250,000 Contribution-hi-Aid
Additional appropriations into this project from the Street Oversizing Fund and the Stormwater
Utility for roadway construction will take place in early 2007.
EXECUTIVE SUMMARY
Arterial street improvements are planned for Ziegler Road, from Environmental Drive south to
Horsetooth Road (approximately 4,500 linear feet). These street improvements will include
realigning and constructing Ziegler Road to a minor arterial street standard,relocating a portion of
the Fossil Creek Inlet Ditch ("FCRID") to accommodate the arterial roadway, the construction of
a bridge over the Foothills Channel, the construction of a bridge over the FCRID, and the
construction of an outfall channel from the existing Rigden Pond to the Poudre River. In order to
facilitate the roadway construction in 2007,the relocation of the FCRID and the construction of the
bridge structures need to be completed this winter, prior to irrigation season.
October 3, 2006 -2- Item No. 19
In meeting City requests for off-site improvements,developers are able to choose between actually
building the improvements or paying the City an equivalent amount that the City then spends when
it determines it is most appropriate to do so. These payments are referred to as the"contributions-
in-aid-of-construction." This appropriation of the contributions-in-aid-of-construction will allow
engineering and bid documents to be prepared and construction of the structures and ditch relocation
to be awarded prior to the 2007 construction season. Staff has coordinated this project with the
planned construction of a new trunk sewer line to be constructed by the City's water and wastewater
utility. This is the second phase of the Drake Road and Ziegler Road Improvement Project. The
first phase consisted of roadway improvements on Drake Road from Timberline to Environmental
Drive.
BACKGROUND
This second phase of construction will realign Ziegler Road to the west side of the Fossil Creek
Reservoir Inlet Ditch and replace the existing substandard CR-13 (County Road#13, now named
Ziegler Road). The new alignment will meet minor arterial standards and will eliminate the current
substandard roadway with its narrow one lane bridges. This portion is funded through the Street
Oversizing Program and developer contributions.
The project includes an outfall channel for stormwater detention from the Rigden Pond to the Poudre
River. Funding for the outfall channel is by developer contributions from Rigden Farm and Sidehill
Developments.
The project also includes two structures: A bridge over the Foothills Channel for Zeigler Road
funded through the Street Oversizing Program, and a second bridge over the FCRID for access to
the McDowell property, funded by developer contributions.
IIIII,I�y�f[IF,i� ���j C
= -1
_ 111
�_ �� i1M11 �' • �/!� LTt �r�i�► N� „�tUir t
�� 1 t�lr ■■. ■f0 tttl
S �� O{� �7�r ��� -■� May�#i�, � '"
�� w� � F y ��.�� � � � � +�S .ram •�,
kamlWINNUOUT,
1 �l■10
VMS
�.# �wu — � ��* .a1� �if�� dJQlr11 1111■ �C ayni�
Z/xral III ��_.�: ti.#t►. i►1na..:..�■.:.. ... n»
.11,.. .a►• +'iy�;." fl�lli::uiiliiiij� ale ' W
Illllx�
riuur* �' ♦ •{+►�+1I1�1 y#IIIII s� - = �r
■ ;r'� �/#x11 * *M �►'+! I. �O III
1 ��r 1 1111 �� ►1►�11111101
�wMMMMMw a�+<
►iM+t :►� •M �f�
�Iiqua
�_ml s>tMr r mm ♦ w��
- �'�- • • �:• =CL 11111►�Li :Ia 1r 1■ qiR► y1 I'�f �`'►ih'�
1 � ��♦�Ii w�*�1M11#1#� ii ' �11#1 ## ##f' I jIF1,j#/iq1 UIIII
■ 1
1►.■ �� #u���a..■#yi . aasul�sli*twl � �. s. r. �■ �1. ►1
�1 �i 1%. ::����pr►►��ii`:�i�his MEN
t� `i�►� i''is+►i"is+�r'�i'ti1 I
__ {.� r ..w _ a■ .�'_�a► ..ate '�►'4 d1 HA 1
-■ 11.
ORDINANCE NO. 154, 2006
OF THE COUNCIL OF THE CITY OF FORT COLLINS
APPROPRIATING UNANTICIPATED REVENUE
IN THE STREET OVERSIZING FUND FOR TRANSFER
TO THE CAPITAL PROJECT FUND - DRAKE
AND ZIEGLER ROAD IMPROVEMENTS PROJECT, PHASE II
WHEREAS,Phase I of the Drake Road and Ziegler Road Improvements Project resulted in
the construction of improvements to Drake Road, from Timberline east to Environmental Drive,
including the widening of Drake Road to minor arterial street standards, and the construction of the
Environmental Drive connection; and
WHEREAS, the aforementioned improvements, constructed in 2005, included the
installation of curb-and-gutter, sidewalks, asphalt paving, bike lanes, and storm sewers; and
WHEREAS Phase II of the Drake Road to Ziegler Road Improvements Project will include
g P realigning and constructing Ziegler Road to minor arterial standard,relocating a portion of the Fossil
Creek Reservoir Inlet Ditch("FCRID")to accommodate the arterial roadway, constructing bridges
over the Foothills Channel and the FCRID, and constructing an outfall channel from the existing
Rigden Pond to the Poudre River(the"Project'); and
WHEREAS,Section 3.7.3(E)ofthe Fort Collins Land Use Code allows developers to choose
to build or supply funding for required development of transportation facilities; and
WHEREAS,the developers of the Rigden Farm Development and the Sidehill Development
have chosen to contribute funds in lieu of building the necessary transportation facilities; and
WHEREAS, the appropriation of developer contributions, totaling $659,438 from Rigden
Farm Development and $250,000 from Sidehill Development, will allow engineering and bid
documents to be prepared, and the construction of the bridges and ditch relocation to be awarded
prior to the 2007 construction season; and
WHEREAS, additional appropriations needed to complete construction of the Project will
be requested early in 2007, once Project costs have been finalized; and
WHEREAS, Article V, Section 9, of the Charter of the City of Fort Collins (the"Charter")
permits the City Council to make supplemental appropriations by ordinance at any time during the
fiscal year,provided that the total amount of such supplemental appropriations,in combination with
all previous appropriations for that fiscal year does not exceed the current estimate of actual and
anticipated revenues to be received during the fiscal year; and
WHEREAS, City staff has determined that the appropriation of the developer contributions
from the Rigden Farm and Sidehill Developments as described herein will not cause the total amount
appropriated in the Street Oversizing Fund budget to exceed the current estimate of actual and
anticipated revenues to be received during the fiscal year; and
WHEREAS, it is the desire of the City Council to appropriate the sum of$909,438 from
developer contributions within the Street Oversizing Fund,for transfer to the Capital Projects Fund-
Drake and Ziegler Road Improvements Project, Phase II, for appropriation therein to be used to
construct arterial roadway improvements for the Drake Road and Ziegler Road Improvements
Project, Phase II.
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF FORT
COLLINS that there is hereby appropriated from unanticipated revenue in the Street Oversizing
Fund, the sum of NINE HUNDRED NINE THOUSAND FOUR HUNDRED THIRTY-EIGHT
DOLLARS ($909,438) for transfer to the Capital Projects Fund - Drake and Ziegler Road
Improvements Project, Phase II, and appropriated therein, to be used to construct arterial roadway
improvements for the Drake Road and Ziegler Road Improvements Project, Phase II.
Introduced, considered favorably on first reading, and ordered published this 3rd day of
October, A.D. 2006, and to be presented for final passage on the 17th day of October, A.D. 2006.
Mayor
ATTEST:
City Clerk
Passed and adopted on final reading on the 17th day of October, A.D. 2006.