Loading...
HomeMy WebLinkAboutCOUNCIL - AGENDA ITEM - 10/20/2009 - SECOND READING OF ORDINANCE NO. 096, 2009, APPROPR ITEM NUMBER: 8 AGENDA ITEM SUMMARY DATE: October 20, 2009 FORT COLLINS CITY COUNCIL STAFF: Jin Wang SUBJECT Second Reading of Ordinance No. 096, 2009, Appropriating Unanticipated Grant Revenue In the Capital Projects Fund for the East Harmony Road Bridge Replacement Project. RECOMMENDATION Staff recommends adoption of this Ordinance on Second Reading. EXECUTIVE SUMMARY This Ordinance, unanimously adopted on First Reading on October 6, 2009, appropriates funds received from the Colorado Department of Transportation for the replacement of the East Harmony Road Bridge. ATTACHMENTS I. Copy of First Reading Agenda Item Summary - October 6, 2009. (w/o original attachments) ATTACHMENT 1 ITEM NUMBER: 13 AGENDA ITEM SUMMARY DATE: October 6, 2009 . FORT COLLINS CITY COUNCIL STAFF: Jin Wang SUBJECT Items Relating to the East Harmony Road'Brid'ge Rlepl�ace em nt Pr ject. RECOMMENDATION J� Staff recommends adoption of the Resolution and the Ordinance on First Reading. FINANCIAL IMPACT The East Harmony Road Bridge Replacement Project is funded by a combination of City Bridge Program funds and a Surface Transportation Program STP-Metro) grant from the Colorado Department of Transportation`((CDOTN). In August 2009, CDOT awarded the Ci $1,600,n in STPPMetro funds for the East Harmony �� �� Road Bridge Replacement Project. The following table summarizes the allocation of the funds: Federal Funds (82.79% of participating costs $1,932,600) $1,600,000 Local Agency Match (17.21% of participating costs $1,932,600) $ 332,600 Local Agency Overmatch $ 267,400 TOTAL BUDGETED FUNDS (� j �U( $2,200,000 The local matching funds total of$600,000 will be provided from the City Bridge Program Fund. EXECUTIVE SUMMARY A. Resolution 2009-094 Authorizing the Mayor to Enter into a Contract with the Colorado Department of Transportation for the Construction of the Harmony Road Bridge Replacement. B. First Reading of Ordinance No. n§6, 201P Appropriating Unanticipated Grant Revenue In the Capital Projects Fund.f`oorr the�Ea`sstt HarmoJny Road Dyidge Replacement Project. October 6, 2009 -2- Item No. 13 This funding contract between the City and Colorado Department of Transportation will allow for the replacement of a structurally deficient East Harmony Road Bridge. BACKGROUND The East Harmony Road Bridge was built in 1968 and is one of ten structurally deficient bridges located within the City. The bridge is inadequate to handle the volume of traffic that travels the Harmony Corridor,does not meet�curfent,safety standards and'is not wide enough to accommodate /i r1 It 1I o three full travel lanes, pedestrian facilities and a bicycle'lane�The bridge replacement will correct these deficiencies. This new bridge will obe\designed to current standards, which include three full travel lanes,an eight-foot wide bicycle lane;an eight=foot wide-sidewalk and a guard rail. The new bridge is consistent with the vision of the Harmony Road Corridor as shown in the City Master Street Plan and the updated Harmony Corridor Plan. The replacement of the East Harmony Road Bridge will span two construction seasons. The construction of the bridge will begin in late 2009 to take advantage of the low flow season of the irrigation waters it spans. The bridge construction will be completed in May 2010. The total cost of the bridge replacement is estimated at$2.2 million. The local match of$600,000 from the City's Bridge Funds will augment the $4;?6--million'from the°GDOT ,granpto fully fund the project. Upon completion of this project,the total inventory of structurally deficient bridges located within the City will be reduced to nine bridges Y, J1 ATTACHMENTS 1. Location map 2. Photo of existing bridge ORDINANCE NO. 096, 2009 OF THE COUNCIL OF THE CITY OF FORT COLLINS APPROPRIATING UNANTICIPATED GRANT REVENUE IN THE CAPITAL PROJECTS FUND FOR THE EAST HARMONY ROAD BRIDGE REPLACEMENT PROJECT WHEREAS, the Colorado Department otTransportation has awarded the City a Surface Transportation Program ("STP") grant in the amount of$1,600,000 for the East Harmony Road Bridge Replacement; and WHEREAS, the East Harmony Bridge (the "Bridge") was built in 1968 to span the Fossil Creek Reservoir Inlet Ditch (the "FCRID") and has been identified as one of ten structurally deficient bridges located within the City; and WHEREAS, the existing eastbound bridge will be replaced with a new bridge that will accommodate three travel lanes, a bike lane and a sidewalk and is consistent with the vision of the Harmony Road corridor as shown in the City Master Street Plan and updated Harmony Corridor Plan; and WHEREAS, the total cost of the new Bridge is estimated at $2,200,000; and WHEREAS, the STP grant requires local matching funds in the amount of$332,600 which are currently appropriated in the City Bridge Program Project; and WHEREAS,the STP grantalso requires local overmatching funds in the amountof$267,400 which are also currently appropriated in the City Bridge Program Project; and WHEREAS, Phase One of the Bridge construction will occur late in 2009 to take advantage of the low-flow in irrigation waters in the FCRID; and WHEREAS, Article V, Section 9, of the City Charter permits the City Council to make supplemental appropriations by ordinance at any time during the fiscal year, provided that the total amount ofsuch supplemental appropriations,in combination with all previous appropriations for that fiscal year, does not exceed the current estimate of actual and anticipated revenues to be received during the fiscal year; and WHEREAS, City staff has determined that the appropriation of the revenue as described herein will not cause the total amount appropriated in the Capital Projects Fund to exceed the current estimate of actual and anticipated revenues to be received in that fund during any fiscal year. NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF FORT COLLINS that there is hereby appropriated from unanticipated revenue in the Capital Projects Fund the sum ofONE MILLION SIX HUNDRED THOUSAND DOLLARS($1,600,000)forexpenditure in the Capital Projects Fund-City Bridge Program Project for the East Harmony Road Bridge Replacement Project. Introduced, considered favorably on first reading, and ordered published this 6th day of October, A.D. 2009, and to be presented for final passage o e 20th day of October, A.D. 2009. i AM ATTEST: City Clerk Passed and adopted on final reading on the 20th day of October, A.D. 2009. Mayor ATTEST: City Clerk