HomeMy WebLinkAboutCOUNCIL - AGENDA ITEM - 11/03/2009 - HEARING AND SECOND READING OF ORDINANCE NO. 115, 2 DATE: November 3, 2009 SUMMARYAGENDA ITEM
STAFF: Steve Catanach _T COLLINS CITY COUNCIL
'
Ellen Switzer
SUBJEqT
Second Reading of Ordinance 115, 2009 Amending Chapter 26 of the City Code to Revise Electric Rates, Fees
and Charges.
EXECUTIVE SUMMARY
This Ordinance adopts monthly electric rates effective for all billings on or after January 1, 2010. Based on the
direction received from City Council on First Reading of the Ordinance on October 20,2009,and the very recent award
announcement offunding from the Department of Energy Smart Grid grant,a second option is presented for Council's
consideration on Second Reading.
Option A is the Ordinance as approved on First Reading. It increases electric rates for all customer classes by 9.5%.
The 9.5%increase is based on increased costs for purchase power,renewable energy,and enhanced energy services
to meet Energy Policy and Climate goals. Also included in the 9.5%is 2.08%to fund Light and Power's portion of the
Advanced Metering Infrastructure(AMI)capital project. With this option,a typical single family residence's electric bill
would increase$4.82 from $50.66 to$55.48.
Option B raises electric rates by 7.42% for all customer classes. The increase related to AMI funding has been
eliminated. The 7.42%increase continues to fund purchase power,renewable energy and enhanced energy services.
A typical single family residential electric bill would increase$3.77 from $50.66 to$54.43 with Option B.
BACKGROUND/ DISCUSSION
OPTION A
A 9.5% electric rate increase was included in the City Manager's recommended budget. The increase applied to all
customer classes. The 9.5% rate increase is made up of the following components:
Retail Electric 2010
Rate Increase
Purchase Power 4.79%
Purchase Power—Renewables 0.82%
Energy Services 1.81%
Advanced Metering Infrastructure (AMI) 2.08%
Total Electric Rate Increase 9.50%
Platte River's increases are due to several factors:
• Capital investments = $335 million over ten years: transmission approximately $149 million, production
approximately$179 million, general at approximately$7 million(cost of materials is increasing, underground
transmission).
• Craig coal costs have increased.
• Reserve requirements increasing.
• Xcel Energy is beginning to charge for ancillary services.
November 3, 2009 -2- ITEM 30
• Surplus sales are decreasing (the margin from surplus sales subsidizes the rate to the municipalities) as
municipal energy consumption increases.
• Interest income has decreased due to lower interest rates.
Platte River's wholesale premium charge for renewable energy will increase from$0.012 per kWh to$0.019 per kWh.
The increase is due primarily to increasing the amount of generation plant compared to renewable energy credits as
directed by Platte River's Board approved Renewable Policy.
The Energy Services increase will fund additional conservation programs and customer initiatives to support Energy
Policy goals.
If the appropriation is approved, the Advance Metering Infrastructure (AMI) project is estimated to cost$21.5 million
with Lightand Power's share at$17.5 million. A 2.08%increase was requested for AMI. While longterm savings were
projected, cash flow projections required a rate increase to fund the AMI project on a pay-as-you-go basis while
keeping reserves at minimum levels. A second 2.08% increase for AMI was projected for 2011.
Option A is no longer recommended by staff. On October 27, 2009 the City was notified that it had been awarded a
Smart Grid Energy grant as part of the American Recovery and Reinvestment Act(ARRA). The City's portion of the
grant is approximately$15.4 million. An ordinance related to this grant appropriation will be presented to Council at
a later date when the grant award is finalized. Staff will present options to fund the required match at that time but it
will not require the 2.08% rate increase for AMI.
OPTION B
The Ordinance-Option B eliminates that portion of the proposed electric rate increase attributable to the AMI project.
The October27,2009 award of stimulus funding eliminates the need for the 2.08%increase for AMI. The Utilities was
awarded Federal stimulus funding in the amount of$15.4 million in support of projects totaling$30.8 million. Projects
include AMI, several smart grid enhancements and implementation of several long-range IT projects related to AMI.
The grant requires a 50% match by the Utilities. Financing options, including debt financing, for the match will be
presented to Council once the award negotiations are complete and an appropriation is requested.
Option B eliminates the 2.08% increase in 2010 reducing the total electric rate increase from 9.5%to 7.42%. If the
Ordinance-Option B is approved,staff will return to Council at a later date with additional specifics related to the grant
award and funding options, including debt financing, for the project. Appropriations for the AMI project could be
approved at that time.
The chart below provides Council with the projected rate increases given the following considerations:
Option A—9.5%, Ordinance as approved on first reading 10/20/2009.
Option B—7.42%, Ordinance revised to exclude rate increase for AMI.
Electric Rate Options for 2010
Cost for 700
kWh - $ Increase from % Increase
Residential Rate 2009 from 2009
2009 Rate $50.66
2010 Option A-- 9.5% $55.48 $4.82 9.5%
2010 Option B -- 7.42% $54.43 $3.77 1 7.4%
With either option, Fort Collins electric rates remain competitive with those of surrounding utilities.
November 3, 2009 -3- ITEM 30
Electric Rate Comparison -700 kWh per Month
Data August 2009
$100
$90 $76.93 $75.53
C $80 $66.27
$62.35
6F, $60 $48.83 $52.51 $50.66 $54.43 $55.48
$50
$40
Q $20
$10
$-
Longmont Loveland FtC 2009 FtC 201) FtC 20b CoSprs 20'D PVREA Xcel-Wnter Xcel-
201)Est 2010 est OPT B OPT A Est 2009 2009 Summer
2009
FINANCIAL IMPACTS
The rate Ordinance is projected to increase the annual operating revenues of the Light and Power Fund by
approximately 9.5% (Option A) or 7.42% (Option B).
The annual electric bill for typical residential electric customer(700 kilowatt-hours per month)would increase$57.84
with Option A and $45.24 with Option B.
SUSTAINABILITY: ECONOMIC, ENVIRONMENTAL AND SOCIAL IMPACTS
Environmental—Each option includes funding to enable the utilities to move toward meeting the goals and objectives
of the Energy Policy including the targeted reduction in consumption of 1.5%and the City's carbon reduction goal to
reduce carbon emissions to 80% of 2005 levels by 2020.
Economic—The proposed increase in electric rates will increase the cost of living for our customers, however, the
rates for all customer classes remain among the lowest in the State. To lessen the financial impact,customers have
the ability to reduce their energy use to lower their utility bill. AMI will provide additional information to customers to
help them manage their usage.
Social-The rate increase will allow the Utilities to continue to provide safe reliable power for the benefit of the citizens
and businesses of Fort Collins.
STAFF RECOMMENDATION
The award of the American Recovery and Reinvestment Act funding for the smart grid/AMI projects has eliminated
the need for a 2.08%rate increase for the AMI project. Staff recommends that City Council adopt Option Bon Second
Reading.An appropriation of the grant award and matching funds will need to be considered by Council following the
finalization of the award negotiations. Options that staff will present for funding the matching grant requirement will
include debt financing.
November 3, 2009 -4- ITEM 30
BOARD /COMMISSION RECOMMENDATIONS
Electric Board voted 4-2 approve the proposed 9.5%increase monthly electric rates at their September 14,2009 board
meeting (See Attachment 2). The Board has not discussed Option B.
PUBLIC OUTREACH
Notice of the proposed rate charges and related public hearings was mailed to.out ofcity electric customers on October
2, 2009 and published in the Coloradoan on October 4, 2009. The proposed electric rate changes were posted on
fcgov.com under public notices on October 2, 2009. An article on the proposed rate increase was also published in
the October issue of City News. Public outreach has been based on Option A.
ATTACHMENTS
1. Copy of First Reading Agenda Item Summary-October 20, 2009
2. Electric Board Minutes—excerptfrom September 14,2009 meeting relating to budget,rates,and electricfees.
ATTACHMENT 1
ITEM NUMBER: 28 A-G
AGENDA ITEM SUMMARY DATE: October 20, 2009
FORT COLLINS CITY COUNCIL STAFF: Brian Janonis
Terri Bryant
SUBJECT
Items Relating to Utility Rates and`61�arges fo 0�0.
RECOMMENDATION
Staff recommends adoption of the Ordinances on First Reading.
The Water Board reviewed the 2009-2010 Water Utilities' budgets, water, sewer and stormwater
plant investment fee changes, and monthly water and wastewater rate increases at its August 27,
2009 Board meeting. The Board voted 7-2 to approve the proposed budget and rate and fee changes.
The Electric Board reviewed th 00�3�2 � Li ) t o bud and the proposed increases to
the electric rates and develop ent fees and ch g ;s a its me�ng on September 14, 2009. The
Board voted 5-1 to support th ro o e bud t d voted 4 2 to support the proposed rate and
PP P,s pp P P
development fee changes.
FINANCIAL IMPACT
The rate Ordinances are projected to increase the annual operating revenues of the Wastewater Fund
by 10%,the Water Fund by 3%,and the Light and Power Fund by 9.5%. There are no rate increases
to stormwater monthly rates. The . biped- tility ees fo i al-single family residence during
the high usage summer month will incr ase $ 95 er on .
Proposed water, wastewater an• sto wa er an nvestmen fees (PIFs) are updated to reflect a
new customer's impact on the system and maintain existing customers' equity in the system.
Proposed electric development fees and charges cover costs of new commercial and residential
development.The financial impacts vary by the size and nature of the development. If the proposed
fees are adopted,water,wastewater and stormwater plant investment fees,and electric development
fees and charges will increase. The combined utility development fees for a typical single family
residence(exclusive of raw water requirements which are not changing)will increase from$10,696
to $11,509 or 7.6%.
The proposed fees will be effective aUu0py
October 20, 2009 -2- Item No. 28 A-G
EXECUTIVE SUMMARY
A. First Reading of Ordinance No. 113,2009,Amending Chapter 26,Article III,Division 4 of
the City Code Relating to User Rates and Charges for Water.
B. First Reading of Ordinance No. 114,2009 Amending Chapter 26 of the City Code Relating
to Wastewater Rates and Charges.
C. First Reading of Ordina ce,•Nq�11 ;-2009 pedin, Cha ter 26 of the City Code to Revise
Electric Rates, Fees and Charge .'D. First Reading of Ordinan �11 ;�20 9, eenig.chapter 26 of the City Code to Revise
Water Plant Investment Fees.
E. First Reading of Ordinance No. 117,2009,Amending Chapter 26 of the City Code to Revise
Sewer Plant Investment Fees.
F. First Reading of Ordinance No. 118,2009,Amending Chapter 26 of the City Code to Revise
Electric Development Fees and Charges.
felG. First Reading of Ordin ce No. 11(-,20 lin <Char 26 of the City Code to Revise
Stormwater Plant Investment Fees.
Three Ordinances (A, B & C) establish monthly water, wastewater and electric rates.
Four Ordinances (D, E, F, & G) adopt revised water, sewer and stormwater plant investment fees
and electric development fees. The fees are one-time charges paid by developers or builders for the
cost of the utility infrastructure needed to serve new development. Per Council direction, plant
investment fees are reviewed on an annual basis and revised during the biennial budget cycle. Plant
investment fees(PIFs)for water,wastewater and stormwater were last updated with the 2008-2009
budget. Electric development fees and charges are updated annually.
BACKGROUND 0 P y
PLANT INVESTMENT FEES (PIFs)
• WATER PLANT INVESTMENT FEES
The water plant investment fees are developed to recover the current value of past investment and
the current value of future growth-related investment through 2040. This method includes
calculating net water system equi capaci units and determining the net system equity per unit
as follows:
1. The water syste assets val ed eplacer jht cost adjusted,by the construction
cost index as published by Engineering News Record.
October 20, 2009 -3- Item No. 28 A-G
2. The net system equity is determined by subtracting outstanding debt principal from
total replacement costs and adding projected growth related to capital improvement
projects.
3. The result is divided by the future total plant capacity to determine unit cost.
The investment in plant increased only slightly compared to the prior study. Residential and multi-
family usage characteristics remain unchanged, resulting in no recommended increase in PIFs for
2010. Commercial use characteristics increased, resulting in higher PIF charges for 2010.
The following schedule details'�PIFs for LArear o� spqu6mdsses.
WATER PLANT-INVESTMENT FEES BY Ct�STOMER CLASS
2009 PIFs 2010 Proposed
Peak Day Current Peak Day Proposed
Customer Class/Meter Size Usage d Charge Usa e d Charge Change
Residential:
Single Family
Inside Use 191 $ 730 191 $ 730 0%
Outside Use-$/S .Ft. y��ryA 864 $ 0.36 864 $ 0.36 0%
V
Multi-Family(per unit r{
Inside Use M1133 —490 71 133 $ 490 0%
Outside Use-$/S . Ft. V263 ] 0.27 263 $ 0.27 0%
Non-Residential meter size
'/.inch 1,730 $ 6,970 1,850 $ 7,530 8.0%
1 inch 5,110 $ 20,590 5,340 $ 21 730 5.5%
1 1/2inch 10,300 $ 41,510 11,130 $ 45 300 9.1%
2 inch 16,210 $ 65 330 16,970 $ 69,070 5.7%
3 inch 35,370 $142 540 38,800 $157,920 10.8%
>than 3 inches Based on specific customer requirements
*differences due to rounding
The impact to a typical single f. ily res-den�ce r rm ins a_ theme 009 rate of$3,826(8,600 sq.ft. lot).
• WASTEWATER PL�NUIJINVESTMEI�ES
The wastewater plant investment fees are developed using a similar method to the water PIFs, by
assessing new customers based on an allocation of the costs of the existing facilities and the
projected growth-related improvements. While the gallons per day treated decreased slightly for
most customer classes, the increased investment in plant resulted in increased PIFs for each
customer class for 2010.
r
0
P
October 20, 2009 -4- Item No. 28 A-G
The proposed fees are shown in the following tables:
WASTEWATER PLANT INVESTMENT FEES
Customer Class/Meter Size Existing 2009 Pro osed 2010
Volume Current Volume Proposed
G d Charge G d Charge Change
Single Family 321 $ 3,194 300 $ 3,550 11.1%
Multi-Family/Per Unit 208 $ 2,069 210 $ 2,490 20.3%
Non-Residential metersize
/'�<inch A624 a$ 6,2 6} 600/ $ 7,100 14.4%
lolI inch 1,644 $ '6 351' 1 1'0 $ 17,880 9.3%
li'/2 inch , ,854 7$ Y8,396 2 60 $ 31,490 10.9%
'21ineh 5 122s" $--50-,963 4; 70 $ 55,290 8.5%
3 inch 12 209 $121,484 12 680 $150,130 23.6%
4 inch and above assessed on individual basis
Wastewater plant investment fees for a typical single-family residence in 2010 would increase from
$3,194 to $3,550, or 11.1%.
• STORMWATER PLANT INVESTMENT FEES
Plant investment fees for storm a er ea8'opf d Te!
i de basis. All new development must
provide on-site detention as •ecifiedritllthe mt R ibnal elements are sized to handle
existin flows and to work in cordinatiowlth n- tentio`f in new develo ments. Stormwater
PIFs pay for a developer's propportionate sh�te ofstem infrastructure as it exists at the time
they develop.
The unit of measure used to allocate the value of the existing system between new customers and
existing customers is acres of developed land,adjusted with a runoff coefficient(a measure of how
water runs off various surfaces). Proposed development fees are calculated by dividing the value
of the current system, less outstanding debt, by the total acres of land (existing developed and
developable)in the service area. This number is then adjusted by the average runoff for the system.
The result is the unit value of th exigting�system�per.-acre-gfgdevloped land.
Stormw_ater Plant I Ye§ ment Fire
2009 010 % L
Current --Proposed Change
Fees Fees
$4 420 $6 313 42. %%
The significant increase in fees is due to the large investments in stormwater infrastructure over the
last few years. A typical single family residential stormwater PIF would increase from $749 to
$1,069, or$320.
• ELECTRIC PLANT INM li
Electric development chazge(�nclude a al oc a and a ralcosts to the utility for each
commercial or residential develc n-fit. o compone> these charges are the Electric
Capacity Fee for the off-site electric system, and the Building Site Charge for the on-site electric
costs. The electric development charges are typically increased annually to adjust for inflation and
October 20, 2009 -5- Item No. 28 A-G
cost increases. Increases average from 1% for residential and 1.9% for commercial development
in 2010.
The following tables compare current fees with proposed fees for residential and commercial
development for customer electric loads served by the utility where the Utility owns the transformer:
ELECTRIC DEVELOPMENT FEES AND CHARGES-RESIDENTIAL
Category Charge 2009 2010 % Inc
Per square foot $0.04919 $0.04968 1.0%
Per lineal front foot $9.77 $9.90 1.3%
t7 n 150 amp Single
C Family(Non Elec
�• " Heat) $1 262 $1 278 1.3%
Electric 20 amp Single
Capacity Family(&Elec
Fee* Heat 150 am $2 143 $2 165 1.0%
150 amp Multi-
Family(Non Elec
Heat) $842 $852 1.2%
200 amp Multi-
Family(&Elec
Heat 150 am $1 505 $1 520 1.0%
Building Site Secondary 1/0 $658 $666 1.2%
Charges Service 4/0 $817 $823 0.7%
a
ELECTRIC DEVELOPMENT FEES&CHARGES
COMMERCIAL
2009 2010 %
Category Charge Existing Proposed Change
Per square foot $0.04919 $0.04968 1%
Per lineal front foot $37.64 $38.20 1%
Electric Service 208V I-ph $1,202 $1 238 3%
Capacity Fee*
Entrance(per 240V I-ph $1,386 $1,429 3%
100 amps) 208V 3-ph $2 081 $2 145 3%
Utility
Owned 240V 3-ph $2 401 $2 475 3%
Transformers 480V 3-ph $4 803 $4 950 3%
Building Site Primary Circuit 1 phase $8.90 $8.90 0%
Charges Primary Circuit phase $19.12 $19.00 -1%
Transformer Install l phase $1257 $1317 1 5%
Transformer Install 3 phase $2 335 $2 409 3%
*Utility Owned Transformer
The impact to a typical single family residence(8,600 sq. ft. lot, 150 amp service)is an increase of
$37 from $3,027 to $3,064, or 1%.
In addition,when the customer owns the transformer, the proposed WA service charge is reduced
by $10.10 per kilovolt-amp (k service oa ra " 9Ti' ele ric capacity fees for customer
electric loads served by the utiLty. Prop 'used re 'sio Mod a iiguage also identify the applicable
kVA service charge for the utili, to.5ei a cust m generatio in excess of the customer's electric
service provided by the utility niece the ilit, do not If substation capacity for this
customer owned generation, the WA service charges are reduced by$11.24 per WA.
October 20, 2009 -6- Item No. 28 A-G
SUMMARY OF PIF CHANGES AND COMPARISONS
The following table shows the overall impact of the proposed Plant Investment Fees and Electric
Development Charges on a typical single family residence.
Impact on Single Family Residential
Current Proposed Change
2009 2010
Water* $ 3,826 $ 3 826 0.0% $ 0
Raw Water** $ 5, 03, $v- 203-w- 0.0% $ 0
Wastewater $ ;3 194 � $ X550 ' 11.1% $ 356
Stormwater*** 749 � R �-- '$ 1, '69 43.0% $ 320
Electric* $'%3 027 $ 3,064 1.0% $ 37
Total $15 90 A $16.11-1- 4.6% $ 713
*Typical,based on lot size of 8,600 sq. ft., 70 foot frontage, 150 amp service
**No increase for Raw Water
***8,600 sq. ft. lot plus estimated 6, 156 sp. ft common area and right-of-way, light runoff coefficient
Comparison to other utilities is difficult due to differences in customer use patterns, the unique
capital needs of each utility,and different policy direction from governing bodies: The question of
how Fort Collins Utilities compare to other area utilities often arises. The graph below compares
water, wastewater, and stormwater-P.IFs and-r. Ovate requirements for a single family residence
for some neighboring communfs.
J 3 y
Wastewater, Stormwater and Water Plant Investment Fees
(Including Cash in Lieu of Raw Water Fees)
$30,000
$25,000
$20,000
$15,000 'mOWO
a
$10,000
N
OR, 4 �
� `.°e
$5,000
ImER
$ Ft Collins Loveland Boulder Longmont Greeley Windsor
Prop 2010
0 Raw Water Fees $5,203 $5,203 $5,229 $- $7,530 $5,615 $13,500
Water PIF $3,826 $3,826 $5,470 $11,507 $8,244 $10,100 $6,725
■Storm Drainage PIF $749 $1,069 $489 $4,025 $709 $227 $632
®Wastewater PIF $3,194 $3,550 $2,420 $2,561 $3,310 $4,500 $3.700
0 Wastewater PIF ■Storm Drainage PIF 111 Water PIF o Raw Water Fees
October 20, 2009 -7- Item No. 28 A-G
*Assumptions and data sources:
a. Building Type: Single Family Residential
b. Building Square Footage: 2,200 sq.ft.
c. Dwelling units: 1
d. Lot Size: 8,600 sq.ft,(Stormwater at 14,756 sq. ft.gross)
e. Water Tap Size: 1/4"residential
f. Does not include the cost of tap and meter fees or development review fees
g. Data obtained from city web sites and/or staff of each city.
Note: Greeley drainage fees vary by basin. High is$704,Low is$69, Median is$280,Mean is$227. Raw water is
dedicated prior to development.
MONTHLY RATES
The City contracted with Red Oak Con01tingcon uct Yervice study for the water and
wastewater rates. Cost of service is a process to determine a customer class's proportionate share
of a utility system's annual costs. Best practices within the water utility industry recommend
performing cost of service analysis on a regular basis to ensure proper cost recovery from the
various rate classes.
Water Rates
Ordinance No. 113,2009,propoessl'ncreasegtlte ater uti;ti furid's revenue by 3%. The increase
includes a cost of service adjustment an VariesSlow
c sto er clas With the proposed rate,a typical
single family residential custoiffeir's mynthly }ll increase from $60.90 to $63.22 or$2.32 per
month in 2010. This is based on atypical singl6fam l -residen.all summer usage of 21,000 gallons.
During lower use in the winter (5,000 gallons per month), the average bill will increase
approximately$0.86. The rate increase is needed to generate revenues to fund capital replacement
projects. The chart below shows the impact of the cost of service adjustments to the proposed rate
increase by customer class:
WATER UTILITY
Proposed(])
20 04 � � Rate Increase
Customer Pr posed Re enue C st of�Se�pvice by Customer
Class Adjustmet� Adjustment Class
Residential 3.0% 0.8% 3.8%
Duplex/Multi- 3.0% (2.9)% 0.0%
family
Commercial 3.0% (1.3)% 1.7%
(1)Adjustments are cumulative
Wastewater Rates
Ordinance No. 114,2009,propos`" es to in
ew terIn"ue by 10%. The increase includes
a cost of service adjustment anvarie 'by ust•me class. WiPh the proposed rate, a typical single
family residential customer's monthly bill will increase from$24.48 to $27.28 or$2.80 per month
in 2010. This is based on a system average of 5,200 gallons per month winter quarter average
October 20, 2009 -8- Item No. 28 A-G
(WQA)water use. Council approved monthly wastewater rate increases in 2008 and 2009 at 12%
and 11%, respectively, to fund wastewater operations and meet the increase in long-term debt
service obligations for a major capital project to replace the trickling filter, make odor control
improvements and prepare for future regulation-based improvements at the Mulberry facility. A 9%
increase is proposed for 2011 and 8%in 2012 to maintain reserve requirements,meet debt service,
and continue operations and maintenance functions. The following table shows the impact of the
wastewater cost of service adjustment by customer class:
WAST WATER UTILITY
Proposed(1)
201 Rate Increase
P. o used Reyenn Cost of ervice by Customer
Customer.Class Adjustment Adjustment Class
Residential 10.0% 1.30% 11.5%
Duplex/Multi-family 10.0% (.20)% 9.80%
Commercial 10.0% (2.5)% 7.30%
(1)Adjustments are cumulative
Electric Rates
C`s-mfiade
�The Utilities are proposing an rate increaP0l1oW1A
5% ' 2010 for all customer classes and
8.6% in 2011. The rate increa up-o�heing-components:
Recommended Retail Electric 2010 2011
Rate Increase
Purchase Power 4.79% 4.71%
Purchase Power—Renewables 0.82% 0.00%
Energy Services 1.81% 1.81%
Advanced Metering Infrastructure AMI 2.08% 2.08%
Total Electric Rate Increase _ ____9.5010 1 8.60%
Platte River's increases are d 'e to several fact rsP
• Capital investments = $335 million over ten years: transmission approximately $149
million,production approximately$179 million, general at approximately$7 million(cost
of materials is increasing, underground transmission).
• Craig coal costs have increased.
• Reserve requirements increasing.
• Xcel Energy is beginning to charge for ancillary services.
• Surplus sales are decreasing (the margin from surplus sales subsidizes the rate to the
municipalities) as municipal energy consumption increases.
• Interest income has decreas"se due o 1 ePble
s ates.
Platte River's wholesale premi charg for rener will increase from$0.012 per kWh
to $0.019 per kWh. The increas s due p `maricreasing the amount of generation plant
October 20, 2009 -9- Item No. 28 A-G
compared to renewable energy credits as directed by Platte River's Board approved Renewable
Policy. This increases Fort Collins annual cost to purchase renewable energy by$708,000 per year.
The Energy Services increase will fund additional conservation programs and customer initiatives
to support Energy Policy goals.
The Advance Metering Infrastructure (AMI)project is estimated to cost $21.5 million, with Light
and Power's share at$17.5 million. In order to fund the AMI project and keep reserves at minimum
policy levels, a 2.08%rate increase in retail electric rates is required for both 2010 and 2011. Each
2.08%rate increase is projectedAo g iterate ap rox "-W ely$�66�nillion of revenue per year—not
the full cost of the project. AN I will also be fur de R 4ugh depletion of the reserves. While long
term savings from the AMI proJ ect are p,o�ecctted, the initial cash flows require a rate increase to
maintain reserves at minimal levels over the next f 4ee years. Federal stimulus funding is also being
pursued and, if obtained, the rate impact would be reduced.
Electric Rate Options
The chart below provides Council with the projected rate increases given the following
considerations:
Option 1 —9.5%, Recommended�Budgenpv
Option 2— 7.42%, Budget wito'C AMI
EIcctr is Ra c Optio s for 20Y'0
Cost for 700 kWh - $ Increase % Increase
Residential Rate from 2009 from 2009
2009 Rate $50.66
Option 1 -9.5% $55.48 $4.82 9.5%
Option 2 - 7.42% � $j4�,3 $3.77 7.4%
The Electric Rate Ordinance in"eluded i `stthe rel. en ation 's based on Option 1.
`�'
0 P
Y
October 20, 2009 -10- Item No. 28 A-G
Monthly Rate Summary
The following table summarizes the impact of the proposed rate increases on a typical single family
residential customer's monthly utility bill. In total,a"typical"customer's summer bill will increase
$9.94 per month.
Typical Residential Customer— onthl Util ty Bill
Current Proposed $ %
2009 2010 Increase Increase
Electric
700 kWh per month je�'k$x 50�'667 N$_748�� $4.82 9.5%
Wastewater
5,200 gallons/month '
winter uarter use It $ 27.A8- $2.80 11.5%
Stormwater
8,600 s .ft. lot, light runoff $ 14.26 $ 14.26 $0.00 0%
Water
January 5,000 gallons $ 22.56 $ 23.43 $0.86 3.8%
July 21,000 gallons $ 60.90 $ 63.22 $2.32 3.8%
Total January Monthly Utility Bill $111.96 $120.45 $8.49 7.6%
Total July Monthly Utility Bill $150.30 $160.24 $9.94 6.6%
1
October 20, 2009 -11- Item No. 28 A-G
The following charts compare water,wastewater,stormwater and electric utility costs for eight Front
Range cities. They include the recommended 2010 increases for Fort Collins,Loveland,Longmont
and Colorado Springs, and 2009 known rates for Denver, Boulder, Greeley, and Aurora.
Residential,Utilities 2009 Rate Comparison
July Water Use 21,000 Gallons
$250
$200
$150
$100
$50
Loveland Longmont Ft.Collins Co.Sprs'10
'10 Est '10 Est Boulder'09 110 Denver'09 Greeley'09 Aurora Est
®Stormwater $10.39 $7.13 $6.95 $14.26 $7.40 $5.27 $7.70 $6.00
O Wastewater $19.15 $20.20 $20.72 $27.28 1 $20.28 $20.70 $16.22 $32.59
■Water $37.54 $60.41 $57.03 $63.22 $63.62 $67.01 $114.80 $123.34
9 Electric $52.51 $48.83 $75.53 $55.48 $75.53 $75.53 $75.53 $66.27
Residential Utilities 2009 Rate Comparison
January Water Use-5,000 Gallons
$140
$120
$100
$80
$60
$40
$20
$ Longmont Loveland Ft.Collins Co.Sprt
'10 Est '10 Est Denver'09 Boulder'09 Greeley'09 110 Aurora'09 Est
®Stormwater $7.13 $10.39 $7.40 $6.95 $5.27 $14.26 $7.70 $6.00
*Wastewater $20.20 $19.15 $20.28 $20.72 $20.70 $27.28 $16.22 $32.59
■Water $13.85 $12.17 $13.96 $18.85 $21.25 $23.43 $35.72 $25.92
9Electric $48.83 $52.51 $62.35 $62.35 $62.35 $55.48 $62.35 $66.27
Note: Boulder, Denver, Greer and �otg ra electtriC provide by Xcel 2009 summer and winter
rates shown. �•�
October 20, 2009 -12- Item No. 28 A-G
Customers can reduce their monthly bills through conservation. A 10% reduction in usages for a
typical residential customer would impact their monthly utility bill as follows:
Typical Residential Customer-Monthly Utility Bill
(With and Without 10% Reduction in Use)
Current Proposed $ % Proposed $Increase %
2009 2010 Increase Increase 2010 (Decrease) Increase
from from from 2009 (Decrease)
2009 2009 from 2009
No change in use 10% reduction in use*
Electric
700 kWh per
month $50.66 1 $55.48 $4.82 9.5% 1 $50.36 $0.30 -0.6%
Wastewater
5,200
gallons/month
winter quarter
use W A $24.48 $27.28 $2.80 11.5% $25.91 $1.43 5.9%
Stormwater
8,600 sq.ft. lot,
-light runoff $14.26 1 $14.26 $0.00 0.0% 1 $14.26 $0.00 0.0%
Water
January-5,000
-gallons $22.56 $23.43 $0.86 3.8% $22.40 $0.16 -0.7%
July-21,000
gallons $60.90 $63.22 $2.32 3.8% $57.55 $3.36 -5.8%
Total January Mo.
-Utility Bill $111.96 $120.45 $8.49 1 7.6% $112.94 $0.98 0.9%
Total July
Monthly Utility
Bill $150.30 $160.24 $9.95 6.6% $148.08 $2.22 -1.5%
* 10% reduction in
use:
Electric 630 kWh per month
Wastewater 4,680 Winter Qua errt" Gal/Mo
Water:January 4,500 gallons,Julyel=8,900 gallons P Y
No change to Stormwater
ATTACHMENTS
1. Water Board Minutes excerpt from August 27, 2009 meeting relating to budget, rates and
PIFs.
2. Electric Board Minute ,excerpt OmSeo be 14, 2'*Q meeting relating to budget,rates,
and electric fees. /
3. PowerPoint presentation -"
ATTACHMENT 2
Excerpt from Approved Electric Board September 14, 2009, Minutes
Recorded by Meagan Peil, Customer Service Representative, Utilities
2010-2011 Budget Presentation
(Presentation available upon request)
Utilities Finance and Budget Manager Terri Bryant introduced Utilities Financial
Operations Manager Ellen Switzer to present the proposed 2010-2011 Light and Power
Budget.
Summary
In summary, the 2010 budget is $115, 985, 597, and the 2011 budget is $115,343, 797.
There is a proposed monthly rate increase of 9.5 percent in 2010 and 8.6 percent in 2011
which can be offset by conservation. The electric development fees will increase 1.2
percent for residential and 1.8 percent for commercial. Also, staff are exploring
codification for the billing error policy.
Motion:
Board Member Barnish moved that the Board recommend that City Council
approve the codification of the billing error policy.
Board Member Harris seconded the motion.
The vote on the motion was unanimous. Motion passed.
Electric Board Approved Minutes—Excerpt 1
September 14, 2009
OPTION A - Code Changes including AMI,
Adopted on First Reading
ORDINANCE NO . 115 , 2009
OF THE COUNCIL OF THE CITY OF FORT COLLINS
AMENDING CHAPTER 26
OF THE CODE OF THE CITY OF FORT COLLINS
TO REVISE ELECTRIC RATES, FEES AND CHARGES
WHEREAS , the City Council is empowered and directed by Article XII, Section 6, of the
City Charter to fix, establish, maintain and provide for the collection of such rates, fees or
charges for utility services furnished by the City as will produce revenues sufficient to pay the
costs, expenses and other obligations of the electric utility, as set forth therein; and
WHEREAS , Platte River Power Authority ("Platte River") has increased the City ' s
wholesale cost of power approximately 6 . 3 % in 2010 ; and
WHEREAS , Platte River has increased the premium cost of renewable power from one
cent to 1 . 9 cents per kilowatt hour in 2010; and
WHEREAS , the costs associated with funding the energy efficiency and other programs
described in the Council-approved Energy Policy and the Advanced Metering Infrastructure
project will require additional revenues ; and
WHEREAS , the City Manager and City staff have recommended to the City Council the
following adjustments to the electric rates for all billings issued with meter readings on or after
January 1 , 2010 ; and
WHEREAS , based on the foregoing, it is the desire of the City Council to amend Chapter
26 of the City Code to revise electric rates, fees and charges .
NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF
FORT COLLINS as follows :
Section 1 . That Sections 26-464(c) and 26-464(d) of the Code of the City of Fort
Collins are hereby amended to read as follows :
Sec. 26-464. Residential energy service, schedule R.
(c) Monthly rate. The monthly rates for this schedule are as follows :
( 1 ) Fixed charge, per account : Three- Four dollars and sixty-nine four cents
($3-69 $4 . 04) .
(2) Demand charge, per kilowatt-hour: Two and eighty-eight eighty-nine one-
hundredths cents ($0. 0288 $0 . 0289) ,
(3 ) Distribution facilities charge, per kilowatt-hour: One and fifty- six eighty-
nine one-hundredths cents ($$-6f 56 $0 . 0189) .
(4) Energy charge, per kilowatt-hour: One Two and fix-twelve one-
hundredths cents ($0. 0 t 86 $0 . 0212) .
(5 ) In lieu of taxes and franchise : a charge at the rate of six and zero-tenths
(6 . 0) percent of all monthly service charges billed pursuant to this Section.
(d) Renewable resource. Renewable energy resources, including but not
limited to energy generated by the power of wind, may be offered on a voluntary
basis to customers at a premium of one and nine-tenths cents ($ . 019) per kilowatt
hour. The utility may establish and offer voluntary programs designed to increase
and enhance the use of energy generated by renewable energy resources in
support of Council adopted policy applicable to the utility.
Section 2 . That Sections 26-465 (c) and 26-465 (d) of the Code of the City of Fort
Collins are hereby amended to read as follows :
Sec. 26-465. Residential demand service, schedule RD.
(c) Monthly rate. The monthly rates are as follows :
( 1 ) Fixed charge, per account: Six dollars and eight sixty-seven cents (56r.
$6 , 67) ,
(2) Demand charge, per kilowatt: Four dollars and ninctec twenty-one cents
(" $4 .21 ) .
(3 ) Distribution facilities charge, per kilowatt-hour: One and twee forty-one
one-hundredths cents ($0. 0tt2$0 . 0141 ) ,
(4) Energy charge, per kilowatt-hour: E)nc Two and eighty-si twelve one-
hundredths cents ($0. 0186 $0 . 0212) .
(5 ) In lieu of taxes and franchise : a charge at the rate of six and zero-tenths
(6 . 0) percent of monthly service charges billed pursuant to this Section.
(d) Renewable resource. Renewable energy resources , including but not
limited to energy generated by the power of wind, may be offered on a voluntary
basis to customers at a premium of one and nine-tenths cents ($ . 019) per kilowatt
hour. The utility may establish and offer voluntary programs designed to increase
-2-
and enhance the use of energy generated by renewable energy resources in
support of Council adopted policy applicable to the utility.
Section 3 . That Sections 26-466(c) , (d) , and (f) of the Code of the City of Fort
Collins are hereby amended to read as follows :
Sec. 26-466. General service, schedule GS.
(c) Monthly rate. The monthly rates for this schedule are as follows :
( 1 ) Fixed charge , per account :
a. Single-phase, two-hundred-ampere service : T-wo-Five dollars and
eighty-four one cents (�Sz$4 $ 5 . 01 ) .
b. Single-phase, above two-hundred-ampere service : rNine
dollars and €arty-siix sixty-three cents ($ G $9 . 63 ).
c . Three-phase, two-hundred-ampere service : Fam Six dollars and
sixty-one seventy-eight cents ($4frf$6 . 78) .
d. Three-phase, above two-hundred-ampere service : Ei& Ten
dollars and seventy-dirce ninety cents ($$ma's $ 10 . 90) .
(2) Demand charge, per kilowatt-hour:
a. First two thousand (2 ,000) kilowatt-hours : Four and fourteen
sixteen one-hundredths cents ( 4 $0 . 0416) .
b. Next five thousand (5 ,000) kilowatt-hours : One and ninety-five
ninety-six one-hundredths cents (WH95 $0 . 0196) .
c . All additional kilowatt-hours : Zero ($0. 00) .
(3 ) Demand charge, per kilowatt:
a. All kilowatts billed in excess of twenty-five (25 ) kilowatts : Seven
dollars and twenty-four twenty-seven cents (57. $7 . 27) .
(4) Distribution facilities charge, per kilowatt-hour: One and forty-two sixty-
six one-hundredths cents ($6:6t42 $0 . 0166) ,
-3 -
(5 ) Energy charge, per kilowatt-hour: 6ne Two and eighty-si twelve one-
hundredths cents ($0.0186 $0 . 0212) .
(6) In lieu of taxes and franchise : a charge at the rate of six and zero-tenths
(6 . 0) percent of all monthly service charges billed pursuant to this Section.
(d) Renewable resource. Renewable energy resources , including but not
limited to energy generated by the power of wind, may be offered on a voluntary
basis to customers at a premium of one and nine-tenths cents ($ . 019) per kilowatt
hour. The utility may establish and offer voluntary programs designed to increase
and enhance the use of energy generated by renewable energy resources in
support of Council adopted policy applicable to the utility.
(f) Standby service charges . Standby service, if available, will be provided on
an annual contract basis at a level at least sufficient to meet probable service
demand (in kilowatts) as determined by the customer and approved by the utility
according to the following :
( 1 ) The monthly standby distribution charge shall be two three dollars and
fifty-five zero cents ( 5 $3 . 00) per kilowatt of contracted standby
service . This charge shall be in lieu of the distribution facilities charge .
For all metered kilowatts in excess of the contracted amount, the standby
distribution charge shall be seven nine dollars and sixty-five zero cents
($3 6r5 $9 . 00) per kilowatt.
(2) In the event the contractual kilowatt amount is exceeded, the beginning
date of the contract period will be reset. The first month of the new
contract period will become the current billing month and such month's
metered demand shall become the minimum allowable contract demand
for the standby service . Requests for standby service may be subject to a
waiting period. An operation and maintenance charge may be added for
special facilities required to provide standby service .
Section 4 . That Sections 26-467(c), (d), (f), and (g) of the Code of the City of Fort
Collins are hereby amended to read as follows :
Sec. 26-467. General service 50, schedule GS50.
(c) Monthly rate. The monthly rates for this schedule are as follows :
-4-
( 1 ) Fixed charge, per account: - Twenty-seven dollars and zero
seventeen cents ($ -5 $27 . 17) . An additional charge of forty dollars and
zero cents ($40. ) may be assessed if telephone communication service is
not provided by the customer.
(2) Coincident demand charge, per kilowatt: Thirteen dollars and twelve
eighteen cents ($ t3 . f2 $ 13 . 18) but not less than one cent ($ . 01 ) per
kilowatt-hour.
(3 ) Distribution facilities demand charge, per kilowatt: Four Five dollars and
thirty-one twenty cents ( 1 $5 . 20) .
(4) Energy charge, per kilowatt-hour: Eire Two and eighty- six twelve one-
hundredths cents ($0.0186 $0 . 0212) .
(5 ) In lieu of taxes and franchise : a charge at the rate of six and zero-tenths
(6 . 0) percent of all monthly service charges billed pursuant to this Section.
(d) Renewable resource. Renewable energy resources, including but not
limited to energy generated by the power of wind, may be offered on a voluntary
basis to customers at a premium of one and nine-tenths cents ($ . 019) per kilowatt
hour. The utility may establish and offer voluntary programs designed to increase
and enhance the use of energy generated by renewable energy resources in
support of Council adopted policy applicable to the utility.
(f) Standby service charges. Standby service, if available, will be provided on
an annual contract basis at a level at least sufficient to meet probable service
demand (in kilowatts) as determined by the customer and approved by the utility
according to the following :
( 1 ) Standby distribution charge.
a. The monthly standby distribution charge shall be three— four
dollars and sixty-two thirteen cents ($3-. 62 $4 . 13 ) per kilowatt of
contracted standby service. This charge shall be in lieu of the
distribution facilities charge. For all metered kilowatts in excess of
the contracted amount, the standby distribution charge shall be ten
twelve dollars and eighty-six thirty-nine cents ($ f 0. 86 $ 12 . 39) per
kilowatt.
b. In the event the contractual kilowatt amount is exceeded, the
beginning date of the contract period will be reset. The first month
of the new contract period will become the current billing month
and such month's metered demand shall become the minimum
-5 -
allowable contract demand for the standby service . Requests for
standby service may be subject to a waiting period. An operation
and maintenance charge may be added for special facilities
required to provide standby service .
(2) Standby generation and transmission charge. All charges incurred by the
utility under Platte River Power Authority's applicable tariffs, as may be
amended from time to time, will be billed to the customer as a standby
generation and transmission charge.
(g) Excess circuit charge. In the event a utility customer in this rate class
desires excess circuit capacity for the purpose of controlling the available electric
capacity of a backup circuit connection, this service, if available, will be provided
on an annual contract basis at a level at least sufficient to meet probable backup
demand (in kilowatts) as determined by the customer and approved by the utility
according to the following :
( 1 ) The excess circuit charge shall be weighty-six cents
(W-75$0 . 86) per contracted kilowatt of backup capacity per month. For
any metered kilowatts in excess of the contracted amount, the excess
circuit charge shall be two dollars and twenty-frvefifty-eight cents ($2�.
$2 . 58) per kilowatt.
(2) n the event the contractual kilowatt limit is exceeded, a new annual
contract period will automatically begin as of the month the limit is
exceeded. The metered demand in the month of exceedance shall become
the minimum-contracted demand level for the excess circuit charge.
Section 5 . That Sections 26-468(c), (d), (f) , and (g) of the Code of the City of Fort
Collins are hereby amended to read as follows :
Sec. 26-468. General service 750, schedule GS750.
(c) Monthly rate. The monthly rates for this schedule are as follows :
( 1 ) Fixed charge, per account: Thirty-two dollars and shy seventy-seven
cents ($30.60 $32 , 77) ,
a. Additional charge for each additional metering point : Twenty- five
dollars and ninety-two cents ($25 . 92) .
-6-
b . An additional charge of forty dollars and zero cents ($40 .) for each
metering point may be assessed if telephone communication
service is not provided by the customer.
(2) Coincident demand charge, per kilowatt: Twelve dollars and nincty-two
ninety-eight cents ( 2 $ 12 . 98) but not less than one cent ($0 . 01 ) per
kilowatt-hour.
(3 ) Distribution facilities demand charge, per kilowatt:
a. First seven hundred fifty (750) kilowatts : Roar Five dollars and
twenty-five twelve cents ( 5 $ 5 . 12) .
b. All additional kilowatts : Two Three dollars and
seventy-one cents ($2-.91- $ 3 . 71 ) .
(4) Energy charge, per kilowatt-hour: E)nc and cighty-thice Two and nine-
one-hundredths cents ($0. 0183 $0 . 0209) .
(5) In lieu of taxes and franchise : a charge at the rate of six and zero-tenths
(6 . 0) percent of all monthly service charges billed pursuant to this Section.
(d) Renewable resource. Renewable energy resources , including but not
limited to energy generated by the power of wind, may be offered on a voluntary
basis to customers at a premium of one and nine-tenths cents ($ . 019) per kilowatt
hour. The utility may establish and offer voluntary programs designed to increase
and enhance the use of energy generated by renewable energy resources in
support of Council adopted policy applicable to the utility.
(f) Standby service charges. Standby service, if available, will be provided on
an annual contract basis at a level at least sufficient to meet probable service
demand (in kilowatts) as determined by the customer and approved by the utility
according to the following :
( 1 ) Standby distribution charge.
a. The monthly standby distribution charge shall be two three dollars
and eighty-fou thirty-nine cents ($I-.ft4 $3 . 39) per kilowatt of
contracted standby service . This charge shall be in lieu of the
distribution facilities charge. For all metered kilowatts in excess of
the contracted amount, the standby distribution charge shall be
eight ten dollars and fifty-two seventeen cents ($8—. 52 $ 10 . 17) per
kilowatt.
-7-
b. In the event the contractual kilowatt amount is exceeded, the
beginning date of the contract period will be reset. The first month
of the new contract period will become the current billing month
and such month's metered demand shall become the minimum
allowable contract demand for the standby service. Requests for
standby service may be subject to a waiting period. An operation
and maintenance charge may be added for special facilities
required to provide standby service .
(2) Standby generation and transmission charge. All charges incurred by the
utility under the Platte River Power Authority's applicable tariffs, as may
be amended from time to time, will be billed to the customer as a standby
generation and transmission charge.
(g) Excess circuit charge. In the event a utility customer in this rate class
desires excess circuit capacity for the purpose of controlling the available electric
capacity of a backup circuit connection, this service, if available, will be provided
on an annual contract basis at a level at least sufficient to meet probable backup
demand (in kilowatts) as determined by the customer and approved by the utility
according to the following :
( 1 ) The excess circuit charge shall be fifty-nine seventy-one cents (�9
$0 . 71 ) per contracted kilowatt of backup capacity per month. For any
metered kilowatts in excess of the contracted amount, the excess circuit
charge shall be one two dollars and seventy- seven thirteen cents ($ �
$2 . 13 ) per kilowatt.
(2) In the event the contractual kilowatt limit is exceeded, a new annual
contract period will automatically begin as of the month the limit is
exceeded. The metered demand in the month of exceedance shall become
the minimum contracted demand level for the excess circuit charge.
Section 6 . That Section 26-469(b) of the Code of the City of Fort Collins is hereby
amended to read as follows :
Sec. 26-469. Special area floodlighting, schedule FL.
(b) Monthly rate . The monthly rates (including a six-and-zero-tenths-percent
charge in lieu of taxes and franchise) are as follows :
( 1 ) Charge per lamp, mercury vapor:
-8-
a. One-hundred- seventy-five-watt: Fifteen Seventeen dollars and
seventy-si twenty-six cents ($ 15 . 76 $ 17 .26).
b. Two-hundred-fifty-watt: Eighteen Twenty dollars and fifty-six
thirty-two cents ($ t $ 56 $20 . 32) .
c . Four-hundred-watt : Twcnty- fotr Twenty-six dollars and thirty--
three sixty-four cents ($24 . 33 $26 . 64) .
(2) Charge per lamp, high-pressure sodium:
a. Seventy-watt: Six Seven dollars and sixty-six twenty-nine cents
($6 66 $ 7 ,29) ,
b . One-hundred-watt: Nine Ten dollars and two thirty-one cents
($+4-2 $ 10 . 31 ) .
C. One-hundred-fifty-watt: Fourteen Sixteen dollars and ninety thirty-
two cents ($f4 . 90 $ 16 , 32) ,
d. Two-hundred-fifty-watt: Nincteen Twenty dollars and eighty-one
cents ( $20 . 81 ) .
e. Four-hundred-watt: Tie Twenty-seven dollars and ten
forty-eight cents ($25 . 10 $27 .48) ,
Section 7 . That Section 26-470(c) of the Code of the City of Fort Collins is hereby
amended to read as follows :
Sec. 26-470. Traffic signal service, schedule T.
(c) Monthly rate. The monthly rates (including a six-and-zero-tenths-percent
charge in lieu of taxes and franchise) are as follows :
( 1 ) Fixed charge, per account: Forty-nine Fifty-one dollars and fifty-one
eighty-two cents ($ f$ 51 . 82) .
(2) Charge, per kilowatt-hour : Farr Five and eighty-si thirty-two one-
hundredths cents ($0. 0486 $0 . 0532) .
(3 ) Equipment rental charges, when applicable, will be determined by cost
analysis by the utility. Service extensions and signal installations made by
-9-
the utility shall be paid for by the City General Fund, subject to material
and installation costs at the time of installation.
Section 8 . That the amendments to Chapter 26 of the City Code contained herein
shall go into effect for all bills issued with meter readings on or after January 1 , 2010.
Introduced, considered favorably on first reading, and ordered published this 20th day of
October, A. D . 2009, and to be presented for final passage on the 3rd day of November, A.D .
2009 ,
Mayor
ATTEST :
City Clerk
Passed and adopted on final reading on the 3rd day of November, A.D . 2009 .
Mayor
ATTEST :
City Clerk
- 10-
OPTION B -7.42 % INCREASE (No increase for AMI)
ORDINANCE NO . 115 , 2009
OF THE COUNCIL OF THE CITY OF FORT COLLINS
AMENDING CHAPTER 26
OF THE CODE OF THE CITY OF FORT COLLINS
TO REVISE ELECTRIC RATES, FEES AND CHARGES
WHEREAS , the City Council is empowered and directed by Article XII, Section 6, of the
City Charter to fix, establish, maintain and provide for the collection of such rates, fees or
charges for utility services furnished by the City as will produce revenues sufficient to pay the
costs, expenses and other obligations of the electric utility, as set forth therein; and
WHEREAS , Platte River Power Authority ("Platte River") has increased the City ' s
wholesale cost of power approximately 6 . 3 % in 2010 ; and
WHEREAS , Platte River has increased the premium cost of renewable power from one
cent to 1 . 9 cents per kilowatt hour in 2010; and
WHEREAS , the costs associated with funding the energy efficiency and other programs
described in the Council-approved Energy Policy; and
WHEREAS , the City Manager and City staff have recommended to the City Council the
following adjustments to the electric rates for all billings issued with meter readings on or after
January 1 , 2010 ; and
WHEREAS , based on the foregoing, it is the desire of the City Council to amend Chapter
26 of the City Code to revise electric rates, fees and charges .
NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF
FORT COLLINS as follows :
Section 1 . That Section 26-464(c) and (d) of the Code of the City of Fort Collins is
hereby amended to read as follows :
Sec. 26-464. Residential energy service, schedule R.
(c) Monthly rate. The monthly rates for this schedule are as follows :
( 1 ) Fixed charge, per account: Three dollars and sixty-nine ninety-six cents
($3-,-69 $ 3 , 96) ,
(2) Demand charge, per kilowatt-hour: Two and cighty-eigh eighty-nine one-
hundredths cents ($0. 0-288 $0 . 0289) .
(3 ) Distribution facilities charge, per kilowatt-hour: One and fifty-si seventy-
six one-hundredths cents ($0. 0156 $0 . 0176) .
(4) Energy charge, per kilowatt-hour: 9ne Two and twelve one-
hundredths cents ($0. 0 t 86 $0 . 0212) .
(5 ) In lieu of taxes and franchise : a charge at the rate of six and zero-tenths
(6 . 0) percent of all monthly service charges billed pursuant to this Section.
(d) Renewable resource. Renewable energy resources, including but not
limited to energy generated by the power of wind, may be offered on a voluntary
basis to customers at a premium of one and nine-tenths cents ($ . 019) per kilowatt
hour. The utility may establish and offer voluntary programs designed to increase
and enhance the use of energy generated by renewable energy resources in
support of Council adopted policy applicable to the utility.
Section 2 . That Sections 26-465 (c) and(d) of the Code of the City of Fort Collins are
hereby amended to read as follows :
Sec. 26-465. Residential demand service, schedule RD.
(c) Monthly rate. The monthly rates are as follows :
( 1 ) Fixed charge, per account: Six dollars and eight fifty-three cents (56r.
$6 , 53 ) ,
(2) Demand charge, per kilowatt: Four dollars and ninctecn twenty-one cents
( 9 $4 .21 ) .
(3 ) Distribution facilities charge, per kilowatt-hour: One and twelve twenty-
eight one-hundredths cents ($0. 0 f f 2$0 . 0128) .
(4) Energy charge, per kilowatt-hour: E)nc Two and eighty-sip twelve one-
hundredths cents ($0.0186 $0 . 0212) .
(5 ) In lieu of taxes and franchise : a charge at the rate of six and zero-tenths
(6 . 0) percent of monthly service charges billed pursuant to this Section.
(d) Renewable resource. Renewable energy resources , including but not
limited to energy generated by the power of wind, may be offered on a voluntary
basis to customers at a premium of one and nine-tenths cents ($ . 019) per kilowatt
hour. The utility may establish and offer voluntary programs designed to increase
-2-
and enhance the use of energy generated by renewable energy resources in
support of Council adopted policy applicable to the utility.
Section 3 . That Sections 26-466(c) , (d) , and (f) of the Code of the City of Fort
Collins are hereby amended to read as follows :
Sec. 26-466. General service, schedule GS.
(c) Monthly rate. The monthly rates for this schedule are as follows :
( 1 ) Fixed charge , per account :
a. Single-phase, two-hundred-ampere service : Two Three dollars and
eighty-four five cents ( $4 $3 . 05 ) .
b. Single-phase, above two-hundred-ampere service : Seven Eight
dollars and €arty-si one cents ( 6 $ 8 . 01 ) ,
c . Three-phase, two-hundred-ampere service : Four dollars and sixty-
one ninety-five cents ($4. 6+$4 . 95) .
d. Three-phase, above two-hundred-ampere service : Ei& Nine
dollars and - thirty-eight cents (�� $9 . 38) .
(2) Demand charge, per kilowatt-hour:
a. First two thousand (2 ,000) kilowatt-hours : Four and fourtect
sixteen one-hundredths cents ( 4 $0 . 0416) .
b. Next five thousand (5 ,000) kilowatt-hours : One and ninety-five
ninety-six one-hundredths cents (WH95 $0 . 0196) .
c . All additional kilowatt-hours : Zero ($0. 00) .
(3 ) Demand charge, per kilowatt:
a. All kilowatts billed in excess of twenty-five (25 ) kilowatts : Seven
dollars and twenty-four twenty-seven cents ( 24 $7 . 27) .
(4) Distribution facilities charge, per kilowatt-hour: One and Porto sixty
one-hundredths cents ($6:6t42 $0 . 0160) ,
-3 -
(5 ) Energy charge, per kilowatt-hour: 6ne Two and eighty-si twelve one-
hundredths cents ($0.0186 $0 . 0212) .
(6) In lieu of taxes and franchise : a charge at the rate of six and zero-tenths
(6 . 0) percent of all monthly service charges billed pursuant to this Section.
(d) Renewable resource. Renewable energy resources , including but not
limited to energy generated by the power of wind, may be offered on a voluntary
basis to customers at a premium of one and nine-tenths cents ($ . 019) per kilowatt
hour. The utility may establish and offer voluntary programs designed to increase
and enhance the use of energy generated by renewable energy resources in
support of Council adopted policy applicable to the utility.
(f) Standby service charges. Standby service, if available, will be provided on
an annual contract basis at a level at least sufficient to meet probable service
demand (in kilowatts) as determined by the customer and approved by the utility
according to the following :
( 1 ) The monthly standby distribution charge shall be two three dollars and
fifty-five zero cents ( 5 $3 . 00) per kilowatt of contracted standby
service . This charge shall be in lieu of the distribution facilities charge .
For all metered kilowatts in excess of the contracted amount, the standby
distribution charge shall be seven nine dollars and sixty-five zero cents
($3 6r5 $9 . 00) per kilowatt.
(2) In the event the contractual kilowatt amount is exceeded, the beginning
date of the contract period will be reset. The first month of the new
contract period will become the current billing month and such month's
metered demand shall become the minimum allowable contract demand
for the standby service . Requests for standby service may be subject to a
waiting period. An operation and maintenance charge may be added for
special facilities required to provide standby service .
Section 4. That Sections 26-467(c), (d), (f) , and (g) of the Code of the City of Fort
Collins are hereby amended to read as follows :
Sec . 26-467. General service 50, schedule GS50.
(c) Monthly rate. The monthly rates for this schedule are as follows :
-4-
( 1 ) Fixed charge, per account: - Twenty-six dollars and zero
eighty-six cents ($2sr. $26 . 86) . An additional charge of forty dollars and
zero cents ($40. ) may be assessed if telephone communication service is
not provided by the customer.
(2) Coincident demand charge, per kilowatt: Thirteen dollars and twelve
eighteen cents ($ t3 . f2 $ 13 . 18) but not less than one cent ($ . 01 ) per
kilowatt-hour.
(3 ) Distribution facilities demand charge, per kilowatt: Four dollars and
thirty-one seventy-seven cents (fir $4 , 77) ,
(4) Energy charge, per kilowatt-hour: One Two and eighty-six twelve one-
hundredths cents ($0.0186 $0 . 0212) .
(5 ) In lieu of taxes and franchise : a charge at the rate of six and zero-tenths
(6 . 0) percent of all monthly service charges billed pursuant to this Section.
(d) Renewable resource. Renewable energy resources, including but not
limited to energy generated by the power of wind, may be offered on a voluntary
basis to customers at a premium of one and nine-tenths cents ($ . 019) per kilowatt
hour. The utility may establish and offer voluntary programs designed to increase
and enhance the use of energy generated by renewable energy resources in
support of Council adopted policy applicable to the utility.
(f) Standby service charges. Standby service, if available, will be provided on
an annual contract basis at a level at least sufficient to meet probable service
demand (in kilowatts) as determined by the customer and approved by the utility
according to the following :
( 1 ) Standby distribution charge .
a. The monthly standby distribution charge shall be tie— four
dollars and sixty-two one cents ($3-6-2 $4 . 01 ) per kilowatt of
contracted standby service. This charge shall be in lieu of the
distribution facilities charge. For all metered kilowatts in excess of
the contracted amount, the standby distribution charge shall be ten
twelve dollars and eighty-sip three cents ( 6 $ 12 . 03 ) per
kilowatt.
b. In the event the contractual kilowatt amount is exceeded, the
beginning date of the contract period will be reset. The first month
of the new contract period will become the current billing month
and such month's metered demand shall become the minimum
-5 -
allowable contract demand for the standby service . Requests for
standby service may be subject to a waiting period. An operation
and maintenance charge may be added for special facilities
required to provide standby service .
(2) Standby generation and transmission charge. All charges incurred by the
utility under Platte River Power Authority's applicable tariffs, as may be
amended from time to time, will be billed to the customer as a standby
generation and transmission charge.
(g) Excess circuit charge. In the event a utility customer in this rate class
desires excess circuit capacity for the purpose of controlling the available electric
capacity of a backup circuit connection, this service, if available, will be provided
on an annual contract basis at a level at least sufficient to meet probable backup
demand (in kilowatts) as determined by the customer and approved by the utility
according to the following :
( 1 ) The excess circuit charge shall be eighty-three cents
(W-75$0 . 83 ) per contracted kilowatt of backup capacity per month. For
any metered kilowatts in excess of the contracted amount, the excess
circuit charge shall be two dollars and tvvetity-five forty-nine cents ($2�.
$2 .49) per kilowatt.
(2) In the event the contractual kilowatt limit is exceeded, a new annual
contract period will automatically begin as of the month the limit is
exceeded. The metered demand in the month of exceedance shall become
the minimum contracted demand level for the excess circuit charge.
Section 5 . That Sections 26-468(c) , (d), (f), and (g) of the Code of the City of Fort
Collins are hereby amended to read as follows :
Sec. 26-468. General service 750, schedule GS750.
(c) Monthly rate. The monthly rates for this schedule are as follows :
( 1 ) Fixed charge, per account: Thirty-two dollars and sixty eighty-seven cents
($30 ,60 $ 32 , 87) ,
a. Additional charge for each additional metering point : Twenty- five
dollars and ninety-two cents ($25 . 92) .
-6-
b . An additional charge of forty dollars and zero cents ($40 .) for each
metering point may be assessed if telephone communication
service is not provided by the customer.
(2) Coincident demand charge, per kilowatt: Twelve dollars and nincty-two
ninety-eight cents ($+2 :92 $ 12 . 98) but not less than one cent ($0 . 01 ) per
kilowatt-hour.
(3 ) Distribution facilities demand charge, per kilowatt:
a. First seven hundred fifty (750) kilowatts : Four dollars and twenty-
five seventy cents ($-.2-5 $4. 70) .
b. All additional kilowatts : Two Three dollars and
seventeen cents ($2-. 9+ $3 , 17) ,
(4) Energy charge, per kilowatt-hour: E)nc and cighty-thice Two and nine-
one-hundredths cents ($0. 0183 $0 . 0209) .
(5) In lieu of taxes and franchise : a charge at the rate of six and zero-tenths
(6 . 0) percent of all monthly service charges billed pursuant to this Section.
(d) Renewable resource. Renewable energy resources , including but not
limited to energy generated by the power of wind, may be offered on a voluntary
basis to customers at a premium of one and nine-tenths cents ($ . 019) per kilowatt
hour. The utility may establish and offer voluntary programs designed to increase
and enhance the use of energy generated by renewable energy resources in
support of Council adopted policy applicable to the utility.
(f) Standby service charges. Standby service, if available, will be provided on
an annual contract basis at a level at least sufficient to meet probable service
demand (in kilowatts) as determined by the customer and approved by the utility
according to the following :
( 1 ) Standby distribution charge.
a. The monthly standby distribution charge shall be two three dollars
and eighty-four thirteen cents ($-2-$4 $3 . 13 ) per kilowatt of
contracted standby service . This charge shall be in lieu of the
distribution facilities charge. For all metered kilowatts in excess of
the contracted amount, the standby distribution charge shall be
eight nine dollars and fifty-two thirty-nine cents ($$ .-52 $9 . 39) per
kilowatt.
-7-
b. In the event the contractual kilowatt amount is exceeded, the
beginning date of the contract period will be reset. The first month
of the new contract period will become the current billing month
and such month's metered demand shall become the minimum
allowable contract demand for the standby service. Requests for
standby service may be subject to a waiting period. An operation
and maintenance charge may be added for special facilities
required to provide standby service .
(2) Standby generation and transmission charge. All charges incurred by the
utility under the Platte River Power Authority's applicable tariffs, as may
be amended from time to time, will be billed to the customer as a standby
generation and transmission charge.
(g) Excess circuit charge. In the event a utility customer in this rate class
desires excess circuit capacity for the purpose of controlling the available electric
capacity of a backup circuit connection, this service, if available, will be provided
on an annual contract basis at a level at least sufficient to meet probable backup
demand (in kilowatts) as determined by the customer and approved by the utility
according to the following :
( 1 ) The excess circuit charge shall be fifty-nine sixty-five cents ($ .59 $0 . 65)
per contracted kilowatt of backup capacity per month. For any metered
kilowatts in excess of the contracted amount, the excess circuit charge
shall be one dollars and - ninety-five cents ($i:=�7 $ 1 . 95) per
kilowatt.
(2) In the event the contractual kilowatt limit is exceeded, a new annual
contract period will automatically begin as of the month the limit is
exceeded. The metered demand in the month of exceedance shall become
the minimum contracted demand level for the excess circuit charge.
Section 6 . That Section 26-469(b) of the Code of the City of Fort Collins is hereby
amended to read as follows :
Sec. 26-469. Special area floodlighting, schedule FL.
(b) Monthly rate. The monthly rates (including a six-and-zero-tenths-percent
charge in lieu of taxes and franchise) are as follows :
( 1 ) Charge per lamp, mercury vapor:
-8-
a. One-hundred-seventy-five-watt: Fifteen Sixteen dollars and
seventy-si ninety-three cents ($ 15 . 76 $ 16 . 93) .
b. Two-hundred-fifty-watt: Eighteern Nineteen dollars and fifty-six
ninety-four cents ($i 8 . 56 $ 19 . 94) .
c . Four-hundred-watt : err Twenty-six dollars and thirty--
three fourteen cents ($24.33 $26 . 14) .
(2) Charge per lamp, high-pressure sodium:
a. Seventy-watt: Six Seven dollars and sixty-six fifteen cents
$7 , 15),
b . One-hundred-watt: Nine Ten dollars and ferny-two twelve cents
($+4-2 $ 10 . 12) .
C. One-hundred-fifty-watt: Fanrteern Sixteen dollars and ninety one
cents ($14:90 $ 16 . 01 ) ,
d. Two-hundred-fifty-watt: Nineteen Twenty dollars and forty-one
cents ( $20 .41 ) .
e. Four-hundred-watt: Tie Twenty-six dollars and tern
ninety-six cents ($25 . i 0 $26 . 96) ,
Section 7 . That Section 26-470(c) of the Code of the City of Fort Collins is hereby
amended to read as follows :
Sec. 26-470. Traffic signal service, schedule T.
(c) Monthly rate. The monthly rates (including a six-and-zero-tenths-percent
charge in lieu of taxes and franchise) are as follows :
( 1 ) Fixed charge, per account: Forty-nine Fifty-one dollars and one
eighty-two cents ($ f$ 51 . 82) .
(2) Charge, per kilowatt-hour: F-ow Five and eighty- six twenty-two one-
hundredths cents ($0. 0486 $0 . 0522) .
(3 ) Equipment rental charges, when applicable, will be determined by cost
analysis by the utility. Service extensions and signal installations made by
-9-
the utility shall be paid for by the City General Fund, subject to material
and installation costs at the time of installation.
Section 8 . The amendments to Chapter 26 of the City Code contained herein are
proposed to go into effect for all bills issued with meter readings on or after January 1 , 2010 .
Introduced, considered favorably on first reading, and ordered published this 20th day of
October, A. D . 2009, and to be presented for final passage on the 3rd day of November, A.D .
2009 ,
Mayor
ATTEST :
City Clerk
Passed and adopted on final reading on the 3rd day of November, A.D . 2009 .
Mayor
ATTEST :
City Clerk
- 10-