HomeMy WebLinkAboutCOUNCIL - AGENDA ITEM - 10/24/2006 - DOWNTOWN RIVER DISTRICT TRANSPORTATION AND UTILITY DATE: October 24, 2006 WORK SESSION ITEM STAFF: Kathleen Bracke Matt Robenalt FORT COLLINS CITY COUNCIL SUBJECT FOR DISCUSSION Downtown River District Transportation and Utility Design Project Update—Fall 2006. GENERAL DIRECTION SOUGHT AND SPECIFIC QUESTIONS TO BE ANSWERED 1. Which transportation/utility design alternatives does Council prefer for Willow, Linden, Lincoln, and Jefferson Streets? 2. What are the preferences for the streetscape enhancements,intersection improvements,and strategies to address parking and transit options within the Downtown River District? BACKGROUND The Downtown Development Authority (DDA) and the City's Transportation Planning, Traffic Operations, Engineering, Advance Planning, Current Planning, Natural Resources, and Utility Departments continue to make good progress on the Downtown River District Design Project to address the lack of sufficient public infrastructure to support infill development and redevelopment in the Downtown River District area. This Project has been funded by the DDA and is co-managed by the City and the DDA. The Downtown River District Design Project includes the development of conceptual engineering plans and cost estimates for needed transportation and utility improvements for the area, including Jefferson, Willow, Lincoln, and Linden Streets. The transportation and utility improvements that come about through this Project will help this area achieve the visions and goals set forth by City Plan and the Downtown River Corridor Implementation Program. This Project will determine infrastructure improvements needed to support existing conditions as well as provide a framework for future development within this important area of downtown Fort Collins. The designs will address interim and ultimate levels of improvements and include cost estimates and a recommended phasing process as well as potential funding strategies for the construction of the high-priority improvements. The Project includes an extensive public involvement process, including potentially affected interests such as the property and business owners within the Project area, multiple City Departments,the City's Transportation Board,Planning and Zoning Board,Landmark Preservation Commission, Land Conservation and Stewardship Board, City Council, Downtown Development Authority, Downtown Business Association, Colorado Department of Transportation, Chamber of Commerce, and various community organizations such as Rotary and the Board of Realtors. In addition, the City's Channel 14 Studio 14 program for the month of October provides insight into October 24, 2006 Page 2 the Downtown River District Project to help share the key points about the Project with the community. The Project team has developed a set of design alternatives for each of the streets within the District as well as concepts for streetscape enhancements, intersection improvements, and strategies to address parking and transit options. These alternatives and concepts have been shared with the community during the most recent round of public meetings and outreach efforts. Input from these public open house events and presentations to various community groups has provided the Project team with many creative suggestions and feedback on the draft alternatives for enhancements to the Downtown River District. Staff will share the community feedback received on the draft design alternatives and concepts with Council. In addition, the Downtown Business Association has provided a letter of support for the Project, which specifies its preferences for uniquedesign features and alternatives. The Downtown gn Development Authority is meeting on October 18th and will also be providing a letter to Council regarding its preferences for the Project. Based on the Council input and the community feedback on these various design options,the Project team will refine the preferred alternatives and develop conceptual level cost estimates over the next several months. Once the final set of alternatives is determined, updated cost estimates will be provided and used to help prioritize the recommended list of improvements for the area. The prioritization process will consider which improvement projects are most crucial to facilitating new infill and redevelopment within the District. The Downtown River District Design Project is anticipated to be completed by Spring 2007. The timing of the actual construction of the recommended improvements will be determined based upon available funding sources and development activity within the Project area. ATTACHMENTS 1. Letter of support from the Downtown Business Association. 2. Letter of support from the Downtown Development Authority. 3. PowerPoint Presentation. ATTACHMENT t � 3 Honorable Mayor ' and Members of City Council City of Fort Collins gUSINE55 gSSOCIgTIOp 300 LaPorte Avenue Fort Collins, CO 80521 Mr. Pete Graham P.E., Region Project Engineer/Program Manager Colorado Department of Transportation-Region 4 1420 2nd Street Greeley, Colorado 80631 Honorable Mayor, Members of City Council, and Pete Graham: On the morning of October 11, 2006 the Downtown Business Association met at its regular monthly meeting to consider the Downtown River District Infrastructure Plan. In that presentation various alternatives were presented to the Board regarding street patterns, paving materials, on-street parking possibilities, and intersection improvements. The Board of the DBA was excited by the presentation and it voted unanimously to endorse the effort. In addition, it expressed unanimous support for certain of the specific design proposals. These were: 1. It endorsed the roundabout solution for the intersection of Jefferson/Riverside and Mountain Avenue/Lincoln. The Board believes this to be a dynamic and effective solution to move traffic efficiently along the Jefferson/Riverside • corridor and into the central business district via Jefferson and Mountain Avenue. It also believes the roundabout provides a wonderful opportunity to construct a beautiful gateway at the intersection as an introduction into the downtown neighborhood. 2. It endorsed the use of brick as the paving material for Willow and Linden streets. The Board recognized the increased expense of using brick but it believes the extended life of a brick paving surface would more than outweigh the initial construction cost. Further,the use of brick has historic precedent and it will distinguish the area between Jefferson and the River as a special downtown district. 3. The Board endorsed the construction of the mill race in the Willow Street right-of-way. As with the brick,the mill race is a wonderful historic touch and it allows for the introduction of a water feature into the district without impacting the Poudre River. In more general terms, the DBA Board also supported roundabouts at other locations within the study area, it preferred Jefferson Street as a two-lane road with medians,turn lanes at intersections(assuming roundabouts are not used), and parking on both sides of the street. On Willow the Board conceptually preferred a street cross section that included diagonal parking in the middle of the street. The Board of Directors wants to thank City staff,DDA staff, CDOT staff, and the consulting team for the creative, professional work that has gone into this study and for the truly exciting options it presents for the future of downtown. Thank you! 9tta 11, President and on behalf of the Board of Directors • Downtown Business Association i9 Old Town Square • Suite 230 • Fort Collins,CO 80524 tel 970.484.6500 fax 970.484.eo69 RESOLUTION 2006=08 OF THE BOARD OF DIRECTORS OF THE FORT COLLINS, COLORADO DOWNTOWN DEVELOPMENT AUTHORITY ENDORSING THE DOWNTOWN RIVER DISTRICT INFRASTRUCTURE PLAN AND SPECIFYING CERTAIN PREFERRED DESIGN ELEMENTS WHEREAS, the Fort Collins, Colorado Downtown Development Authority has been duly organized in accordance with the Colorado Revised Statutes 31 -25 -804, as amended; and, WHEREAS, the DDA Board of Directors considered a presentation by City and DDA staff regarding progress on the Downtown River District Infrastructure Study at its scheduled meeting October 18, 2006; and, WHEREAS, the Council of the City of Fort Collins seeks input from various boards, commission, and the public regarding the Study. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE FORT COLLINS, COLORADO DOWNTOWN DEVELOPMENT AUTHORITY that it endorses the findings and specific design alternatives of the Downtown River District Infrastructure Study as follows : 1 . A roundabout solution for the intersection of Jefferson/Riverside and Mountain Avenue/Lincoln. The Board believes this to be the most simple, most elegant, and most efficient method to accommodate traffic in the Jefferson/Riverside corridor and into the central business district via Jefferson and Mountain Avenue. Further, the Board finds that a roundabout offers the best opportunity to install a significant gateway into the central business district. Installation of gateways has been cited by the Downtown Plan, the Downtown Structure Plan, and the Downtown Plan of Development. 2 . The use of brick as the paving material for Willow and Linden streets. The Board cited the beauty of brick, its long useful life, and its unique but historic character. 3 . Center parking for Willow Street which picks up on the College Avenue parking design and serves as a traffic calming device. 4. The construction of the mill race in the Willow Street right-of-way. This water feature has its roots in the history of Fort Collins and allows for the introduction of a waterway in the central business district without impact on the Poudre River. 5 . Two lanes of traffic on Jefferson Street with a median strip, curbside parking, curb bulges at intersections, pedestrian crossings at Chestnut and Pine, and left turn lanes to access Linden Street. 6 . A general preference for roundabouts at other intersections in the study area. Passed and adopted at a regular meeting of 4theoard of Directors of the Fort Collins, Colorado Downtown Development Authority this 1ay of October, 2006 . Steve lor, Chair ATT T: Carey Hewitt, cretary r * t Dow wn Ri* ver D * st ic Improveme , Proj ect Fall 2006 Update Downtown River District InWrovement Proj ■ City & DDA Partnership ■ Infrastructure Analysis & Design Project ■ Transportation & Utilities . Current Infrastructure Deficiencies ■ Future Infill & Redevelopment ■ Draft Alternatives Based Upon : ■ Downtown River Corridor Implementation Program . Prior Public Meetings — Spring 2006 Downtown River District Improvement Project ■ Extensive Public Involvement Process ■ DDA & DBA ■ Area Property & Business Owners ■ Community Outreach ■ City Council & Boards DOWNTOWN RIVER DISTRICT IMPROVEMENT PROJECT — INFRASTRUCTURE DESIGN goo { r. • - it a� > 1 i s i ..�''4. _ i E � r. .. ' ( .( • At 0 It • . : '� � � / J 1. � ..,� I * ' %� � y'•? �^ � ���� = t � ' JAL An Aid i - LEG41D LINDEN. WILLOW. AND LINCOLN / JEFF ERSOWRIVERSIDE LINCOLN AVENUE BRIDGE LWOEWJEFFERSON STREETSGAPE IMPROVEMENTS STREETSCAPE IYPROYEMEHTS, PART OF STREETSCAPE INTERSECTION PROJECT (IST PRIORRYI PORTION ALONG JEFFERSON ONLY IMPROVEMENTS II ST PRIORITY) IIST PRIORITY) (IST PRIORITYI Cin aF For COIILu Downtown River District Improvement Pro ect i ■ Design of Improvements will address : . Streetscape . Traffic Circulation , Capacity , & Safety • Autos , Pedestrians , & Bicyclists ■ Parking — on- street & off- street . . ■ Utilities — Stormwater, Water/Waste Water, etc . ■ Linkages with Downtown & Surrounding Areas ■ History of the River District Area ■ Project Schedule : . Mid - 2005 through Spring 2007 Draft Alternatives ■ Willow Street ■ Linden Street ■ Lincoln Avenue ■ Jefferson Street/ SH14 ■ Intersections ■ Streetscape Concepts ■ Parking ■ Transit Willow Street ALTERNATIVE 1 ALTERNATIVE 2 ALTERNATIVE 3 ALTERNATIVE 4 r. r r' 3D SKETCH 1WO d� r4T• / 1 "r lip TYPICAL SECTION - r I t t ROADWAY FEATURES Number of Lanes 2 2 2 2 Median (Raised or Striped) None Yes, (12' wide) Yes; Striped ( Diagonal Non* Parking), Pedestrian Islands @ Intersections On-Street Parkin Diagonal, South Side Parallel, Both Sides Parallel, Both Sides Diagonal, Both Sides 9 Parallel, North Side (126 spaces) Diagonal , Center (240 spaces) (182 spaces) (246 spaces) ® Yes, 6' Bike Lane Yes, Lanes (S') Yes , Bikeway Yes, Lanes (6') Bicycle Lanes and 5' Bikeway Sidewalk Attached, Attached , Attached, Attached , 22' with Mill Race 20' with Mill Race 20' with Mill Race 15' with Mill Race 15' South Side 10' South Side 10' South Side 15' South Side PLAN VIEW Existing ROW = 100' Existing ROW = 100' Existing ROW = 100' Existing ROW = 100' ( RIGHT-OF-WAY) Proposed ROW 1DO' Proposed ROW = 100 ' Proposed ROW = 100' Proposed ROW = 100' downtown river district streetscape project . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Linden Street Lincoln Avenue ALTERNATIVE 1 ALTERNATIVE 2 3D SKETCHx TYPICAL SECTION ROADWAY FEATURES Number of Lanes 2 4 2 Median ( Raised or Striped) None Yes, Raised Yes, Raised On-Street Parking Diagonal , Both Sides Parallel , In Place Parallel, In Place ( 100 spaces) of Tree Lawn of Tree Lawn y ( 16 spaces) ( 16 spaces) Bicycle Lanes Yes , Bikeway Yes , Lanes ( 8 ' ) Yes , Lanes (6 ' ) Sidewalk Attached , Both Sides Detached , Both Sides Detached , Both Sides 1\ � � PLAN VIEW Existing ROW = 100 ' Existing ROW = Existing ROW = ( RIGHT-OF-WAY) Proposed ROW = 100 ' varies from 70' to 100 ' varies from 70 ' to 100 ' Proposed ROW = 115' Proposed ROW = 86 ' downtown river district streetscape project . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Jefferson Street ALTERNATIVE 1 ALTERNATIVE 2 ALTERNATIVE 3 West of Linden East of Linden _ ` _-(,`• lifer 3D SKETCH � A All r . TYPICAL SECTION ROADWAY FEATURES Number of Lanes 2 2 2 3 (2 NO* 1 SO) Median (Raised or Striped) Two-Way Raised ( 18 ' wide ) Two -Way None Left-Turn Lane Left-Turn Lane On-Street Parking Parallel , Both Sides None Parallel , Both Sides Parallel , Both Sides ( 130 spaces) (65 spaces) (65 spaces) Bicycle Lanes None Yes , Lanes (6 ' ) None None Sidewalk Attached , Both Sides Attached , Both Sides Attached , Both Sides Attached , Both Sides 101 dda PLAN VIEW Existing ROW = 58 ' Existing ROW = 58 ' Existing ROW = 58 ' Existing ROW = 58 ' ( RIGHT-OF -WAY) Proposed ROW = 58 ' Proposed ROW = 58 ' Proposed ROW = 58 ' Proposed ROW = 58 ' downtown river district streetscape project . . . . . . . . . . . . . . . . F r Jefferson Street EXISTING ALTERNATIVE 4 ALTERNATIVE 5 ALTERNATIVE 6 4WCN r. 3D SKETCH .x - ` , ' ' • _ ^ . r - r r low �- TYPICAL SECTION t . . . . . d _ . . . .. .� ... .y ROADWAY FEATURES Number of Lanes 4 4 4 4 Median ( Raised or Striped ) None None Raised& 10 Feet Wide None On -Street Parking Parallel , Both Sides None None Parallel, South Side (96 spaces ) (54 spaces) Bicycle Lanes None None None None Sidewalk Attached , Both Sides Attached , Both Sides Attached, Both Sides Attached , Both Sides PLAN VIEW Existing ROW = 58 ' Existing ROW = 58' Existing ROW = 58 ' Existing ROW = 58 ' (RIGHT-OF -WAY) Proposed ROW = 58 ' Proposed ROW = 58 ' Proposed ROW = 58' Proposed ROW = 58 ' downtown river district streetscape project . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Intersection Improvements C C — , 0 s O J � O t s Roundabout Roundabout Roundabout Roundabout m 1 . Increases capacty 1 . Improves 1 . Increases intersection 1 . Consistent with 2. Improves safety pedestrian Flow capacity urban design 3- Provides gateway 2 Provides gateway 2 Provides gateway 2 . Beneficial to feature feature feature pedestiran safety 4. Necessary with 3. Provides gateway two-lane Jefferson feature alternatives Traffic Signal Traffic Signal Stop-Controlled Stop-Controlled 1 . Fits within existing 1 . Fits within existing 1 . Fits within existing 1 . Fits within existing ROW ROW ROW ROW 2. Would be less 2. Would be less 2. Would be less 2 . Would be less expensive expensive expensive expensrve 3. Averts railroad @► j '1'� crossing issues downtown river district streetscape project . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . POUDRE STREET MILL RACE It1 < '' ��� , BRICK STREETS BICYCLE LANES, I 6hi �Ar, TRAILS 3 ` 'Ili = : . ` Design Features WALKABLE `/ ; , ENVIRONMENT rY ; Creative Alternatives TRAFFIC CALMING CENTERLINE TRANSIT ALONG WILLOW TRUCK PARKING STOPS r - -r�� -• Center Island chicane Ilk - r Narrowing Textured Par<1r.� -, . RAISED BARRIER ALONG JEFFERSON Grade Separated over Bridge Over the Poudre ® Jefferson street a UPRR (Wdlow street to Oxbow I - Speed Tables Raised Intersection - 113 Ntaade CnIm M 1 ctmmt ul and pow Sweats numinwin river district streetscape project . I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Parking Supply and Demand Existing Parking Supply Current Supply = 821 spaces This includes --> 661 off-street spaces and - ---> 160 on-street spaces Future Parking Needs 805 Total parking spaces will be needed . ► 243 - 488 spaces could be accommodated on-street ► 562 - 317 spaces would need to be accommodated off-street The estimated 805 spaces was based on projected land use intensity from the Downtown Strategic Plan; Intensity of redevelopment will drive the need for the ultimate number of spaces . How Can Parking Demands Be Accommodated ? ON -STREET PARKING OPTIONS' P. Implement computerized parking enforcement ► Increase geographical coverage of enforcement. system I Install parking meters ► Increase number of enforcement officers . ► Implement escalating fine structure . ► Implement longer hours of enforcement. MORE TURNOVER, MEANS MORE PEOPLE CAN PARK! OFF -STREET PARKING OPTIONS' ► Encourage a "shared use" parking program for both ► Implement smart growth strategies such as one that public and private structures and lots. would encourage development of new surface lots ► Locate future long-term parking structures on the on footprints that would allow for potential future periphery of Downtown and short term parking throughout parking structure . the Downtown district. ► Implement "Fee In-Lieu of Parking " program , which ► Incorporate ground floor commercial activity into all new allows a developer to pay a fee instead of providing parking structures. parking spaces as required by zoning . ( Revenue ► Encourage parking in conjunction with development projects. generated by these fees would go towards public parking and/or other area specific needs.) _, - , u..».rr sna.p. . .r.+rs r r an rary a...r� •a+/ vra aeaa f.r�� IT n caw r w Ds.•�.ra�.w. .downtown river district streetscape project . . . . . . . . . . . . Transit Facilities f �l dd � -C R yy Y r 'w ^i low . 1L LV • it: Sr tilipO l�nm &.s Rapid Trnroi Srvq 11 ♦ J t- V :�• - Evttitg Imrrt Swim (Rare 3) firt YC� `• �.: � ! . •--- 6uttinq Tarea $mna (Paae ia) F; - Ensng Tmr Stop (Pone E) zrop ee8 SKr (Pane lej -JlPV 6 IV Vic' y � � r _ � . • ' a 1 � a _ / , 1\ tl � Li wn river district streetscape project . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Next Steps ■ Select Preferred Alts • ... `` Sept — Oct ' 06 on I y �I ���� •I a - ■ Refine Alts Design g - . f - Nov ' 06 — Jan ' 07 •f _ ■ Finalize Designs , Cost Estimates & Priorities • Feb - March ` 07 r * t Dow wn Ri* ver D * st ic Improveme , Proj ect Fall 2006 Update Downtown River District InWrovement Proj ■ City & DDA Partnership ■ Infrastructure Analysis & Design Project ■ Transportation & Utilities . Current Infrastructure Deficiencies ■ Future Infill & Redevelopment ■ Draft Alternatives Based Upon : ■ Downtown River Corridor Implementation Program . Prior Public Meetings — Spring 2006 Downtown River District Improvement Project ■ Extensive Public Involvement Process ■ DDA & DBA ■ Area Property & Business Owners ■ Community Outreach ■ City Council & Boards DOWNTOWN RIVER DISTRICT IMPROVEMENT PROJECT — INFRASTRUCTURE DESIGN goo { r. • - it a� > 1 i s i ..�''4. _ i E � r. .. ' ( .( • At 0 It • . : '� � � / J 1. � ..,� I * ' %� � y'•? �^ � ���� = t � ' JAL An Aid i - LEG41D LINDEN. WILLOW. AND LINCOLN / JEFF ERSOWRIVERSIDE LINCOLN AVENUE BRIDGE LWOEWJEFFERSON STREETSGAPE IMPROVEMENTS STREETSCAPE IYPROYEMEHTS, PART OF STREETSCAPE INTERSECTION PROJECT (IST PRIORRYI PORTION ALONG JEFFERSON ONLY IMPROVEMENTS II ST PRIORITY) IIST PRIORITY) (IST PRIORITYI Cin aF For COIILu Downtown River District Improvement Pro ect i ■ Design of Improvements will address : . Streetscape . Traffic Circulation , Capacity , & Safety • Autos , Pedestrians , & Bicyclists ■ Parking — on- street & off- street . . ■ Utilities — Stormwater, Water/Waste Water, etc . ■ Linkages with Downtown & Surrounding Areas ■ History of the River District Area ■ Project Schedule : . Mid - 2005 through Spring 2007 Draft Alternatives ■ Willow Street ■ Linden Street ■ Lincoln Avenue ■ Jefferson Street/ SH14 ■ Intersections ■ Streetscape Concepts ■ Parking ■ Transit Willow Street ALTERNATIVE 1 ALTERNATIVE 2 ALTERNATIVE 3 ALTERNATIVE 4 r. r r' 3D SKETCH 1WO d� r4T• / 1 "r lip TYPICAL SECTION - r I t t ROADWAY FEATURES Number of Lanes 2 2 2 2 Median (Raised or Striped) None Yes, (12' wide) Yes; Striped ( Diagonal Non* Parking), Pedestrian Islands @ Intersections On-Street Parkin Diagonal, South Side Parallel, Both Sides Parallel, Both Sides Diagonal, Both Sides 9 Parallel, North Side (126 spaces) Diagonal , Center (240 spaces) (182 spaces) (246 spaces) ® Yes, 6' Bike Lane Yes, Lanes (S') Yes , Bikeway Yes, Lanes (6') Bicycle Lanes and 5' Bikeway Sidewalk Attached, Attached , Attached, Attached , 22' with Mill Race 20' with Mill Race 20' with Mill Race 15' with Mill Race 15' South Side 10' South Side 10' South Side 15' South Side PLAN VIEW Existing ROW = 100' Existing ROW = 100' Existing ROW = 100' Existing ROW = 100' ( RIGHT-OF-WAY) Proposed ROW 1DO' Proposed ROW = 100 ' Proposed ROW = 100' Proposed ROW = 100' downtown river district streetscape project . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Linden Street Lincoln Avenue ALTERNATIVE 1 ALTERNATIVE 2 3D SKETCHx TYPICAL SECTION ROADWAY FEATURES Number of Lanes 2 4 2 Median ( Raised or Striped) None Yes, Raised Yes, Raised On-Street Parking Diagonal , Both Sides Parallel , In Place Parallel, In Place ( 100 spaces) of Tree Lawn of Tree Lawn y ( 16 spaces) ( 16 spaces) Bicycle Lanes Yes , Bikeway Yes , Lanes ( 8 ' ) Yes , Lanes (6 ' ) Sidewalk Attached , Both Sides Detached , Both Sides Detached , Both Sides 1\ � � PLAN VIEW Existing ROW = 100 ' Existing ROW = Existing ROW = ( RIGHT-OF-WAY) Proposed ROW = 100 ' varies from 70' to 100 ' varies from 70 ' to 100 ' Proposed ROW = 115' Proposed ROW = 86 ' downtown river district streetscape project . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Jefferson Street ALTERNATIVE 1 ALTERNATIVE 2 ALTERNATIVE 3 West of Linden East of Linden _ ` _-(,`• lifer 3D SKETCH � A All r . TYPICAL SECTION ROADWAY FEATURES Number of Lanes 2 2 2 3 (2 NO* 1 SO) Median (Raised or Striped) Two-Way Raised ( 18 ' wide ) Two -Way None Left-Turn Lane Left-Turn Lane On-Street Parking Parallel , Both Sides None Parallel , Both Sides Parallel , Both Sides ( 130 spaces) (65 spaces) (65 spaces) Bicycle Lanes None Yes , Lanes (6 ' ) None None Sidewalk Attached , Both Sides Attached , Both Sides Attached , Both Sides Attached , Both Sides 101 dda PLAN VIEW Existing ROW = 58 ' Existing ROW = 58 ' Existing ROW = 58 ' Existing ROW = 58 ' ( RIGHT-OF -WAY) Proposed ROW = 58 ' Proposed ROW = 58 ' Proposed ROW = 58 ' Proposed ROW = 58 ' downtown river district streetscape project . . . . . . . . . . . . . . . . F r Jefferson Street EXISTING ALTERNATIVE 4 ALTERNATIVE 5 ALTERNATIVE 6 4WCN r. 3D SKETCH .x - ` , ' ' • _ ^ . r - r r low �- TYPICAL SECTION t . . . . . d _ . . . .. .� ... .y ROADWAY FEATURES Number of Lanes 4 4 4 4 Median ( Raised or Striped ) None None Raised& 10 Feet Wide None On -Street Parking Parallel , Both Sides None None Parallel, South Side (96 spaces ) (54 spaces) Bicycle Lanes None None None None Sidewalk Attached , Both Sides Attached , Both Sides Attached, Both Sides Attached , Both Sides PLAN VIEW Existing ROW = 58 ' Existing ROW = 58' Existing ROW = 58 ' Existing ROW = 58 ' (RIGHT-OF -WAY) Proposed ROW = 58 ' Proposed ROW = 58 ' Proposed ROW = 58' Proposed ROW = 58 ' downtown river district streetscape project . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Intersection Improvements C C — , 0 s O J � O t s Roundabout Roundabout Roundabout Roundabout m 1 . Increases capacty 1 . Improves 1 . Increases intersection 1 . Consistent with 2. Improves safety pedestrian Flow capacity urban design 3- Provides gateway 2 Provides gateway 2 Provides gateway 2 . Beneficial to feature feature feature pedestiran safety 4. Necessary with 3. Provides gateway two-lane Jefferson feature alternatives Traffic Signal Traffic Signal Stop-Controlled Stop-Controlled 1 . Fits within existing 1 . Fits within existing 1 . Fits within existing 1 . Fits within existing ROW ROW ROW ROW 2. Would be less 2. Would be less 2. Would be less 2 . Would be less expensive expensive expensive expensrve 3. Averts railroad @► j '1'� crossing issues downtown river district streetscape project . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . POUDRE STREET MILL RACE It1 < '' ��� , BRICK STREETS BICYCLE LANES, I 6hi �Ar, TRAILS 3 ` 'Ili = : . ` Design Features WALKABLE `/ ; , ENVIRONMENT rY ; Creative Alternatives TRAFFIC CALMING CENTERLINE TRANSIT ALONG WILLOW TRUCK PARKING STOPS r - -r�� -• Center Island chicane Ilk - r Narrowing Textured Par<1r.� -, . RAISED BARRIER ALONG JEFFERSON Grade Separated over Bridge Over the Poudre ® Jefferson street a UPRR (Wdlow street to Oxbow I - Speed Tables Raised Intersection - 113 Ntaade CnIm M 1 ctmmt ul and pow Sweats numinwin river district streetscape project . I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Parking Supply and Demand Existing Parking Supply Current Supply = 821 spaces This includes --> 661 off-street spaces and - ---> 160 on-street spaces Future Parking Needs 805 Total parking spaces will be needed . ► 243 - 488 spaces could be accommodated on-street ► 562 - 317 spaces would need to be accommodated off-street The estimated 805 spaces was based on projected land use intensity from the Downtown Strategic Plan; Intensity of redevelopment will drive the need for the ultimate number of spaces . How Can Parking Demands Be Accommodated ? ON -STREET PARKING OPTIONS' P. Implement computerized parking enforcement ► Increase geographical coverage of enforcement. system I Install parking meters ► Increase number of enforcement officers . ► Implement escalating fine structure . ► Implement longer hours of enforcement. MORE TURNOVER, MEANS MORE PEOPLE CAN PARK! OFF -STREET PARKING OPTIONS' ► Encourage a "shared use" parking program for both ► Implement smart growth strategies such as one that public and private structures and lots. would encourage development of new surface lots ► Locate future long-term parking structures on the on footprints that would allow for potential future periphery of Downtown and short term parking throughout parking structure . the Downtown district. ► Implement "Fee In-Lieu of Parking " program , which ► Incorporate ground floor commercial activity into all new allows a developer to pay a fee instead of providing parking structures. parking spaces as required by zoning . ( Revenue ► Encourage parking in conjunction with development projects. generated by these fees would go towards public parking and/or other area specific needs.) _, - , u..».rr sna.p. . .r.+rs r r an rary a...r� •a+/ vra aeaa f.r�� IT n caw r w Ds.•�.ra�.w. .downtown river district streetscape project . . . . . . . . . . . . Transit Facilities f �l dd � -C R yy Y r 'w ^i low . 1L LV • it: Sr tilipO l�nm &.s Rapid Trnroi Srvq 11 ♦ J t- V :�• - Evttitg Imrrt Swim (Rare 3) firt YC� `• �.: � ! . •--- 6uttinq Tarea $mna (Paae ia) F; - Ensng Tmr Stop (Pone E) zrop ee8 SKr (Pane lej -JlPV 6 IV Vic' y � � r _ � . • ' a 1 � a _ / , 1\ tl � Li wn river district streetscape project . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Next Steps ■ Select Preferred Alts • ... `` Sept — Oct ' 06 on I y �I ���� •I a - ■ Refine Alts Design g - . f - Nov ' 06 — Jan ' 07 •f _ ■ Finalize Designs , Cost Estimates & Priorities • Feb - March ` 07