HomeMy WebLinkAboutCOUNCIL - AGENDA ITEM - 03/24/2009 - UPDATE FROM POUDRE RIVER PUBLIC LIBRARY DISTRICT, DATE: March 24, 2009
Presented by: WORK SESSION ITEM
Ken Dreaves, Interim Executive
Director, Jeff Barnes, Finance FORT COLLINS CITY COUNCIL
Officer, Mary Atchison, Board
President, Mike Liggett, Board Vice
President
SUBJECT FOR DISCUSSION
Update from Poudre River Public Library District, Including Current Funding, Strategic Planning,
Facility Planning and Impact Fee Continuation.
EXECUTIVE SUMMARY
The Poudre River Public Library District,f.k.a.the Fort Collins Regional Library District,provides
library services to approximately 170,000 residents of northern Larimer County— 90% of which
reside within the Fort Collins Urban Growth Area. Funding is primarily provided by a property tax
rate of 3 mills and a portion of the City's sales tax approved for the Building on Basics agenda. For
2009,total revenue is forecast to be$8.4 million and the approved expenditure budget is$8 million.
Since 1996, the City has imposed an impact fee on residential building permits as a means for
growth to fund the increased demand for library services required by a growing community. The
construction of the new Council Tree Library was substantially funded from the accumulation of
these impact fees. The Intergovernmental Agreement between the City and the District provided
that the impact fees would continue until the completion and payment for the costs of constructing
this library.
GENERAL DIRECTION SOUGHT AND SPECIFIC QUESTIONS TO BE ANSWERED
Council will receive a general update on District activity. The Board would like Council's input on
the following:
1. Does Council have any comments or input into the District Facility Master Plan currently
in process?
2. What are Council's thoughts concerning the continuation of the library impact fee?
BACKGROUND
Since 2007, the Library District has continued to provide high quality library services that were
provided to the general public by the City from 1904 until 2006. In 2008, the District provided
1,400 programs to almost 54,000 participants. Circulation of library materials exceeded 2.3 million
March 24, 2009 Page 2
items, a 6% increase, and hits to the District website (2.1 million) increased 8%. 71% of the
population are cardholders.
Since formation of the District, services to the public have been improved through the expansion
of open hours,reinstatement of book drops,the addition of more programming staff,and conversion
of materials management to radio frequency identification (RFID). The District has also adopted
a Strategic Plan which identified the seven highest service priorities as seen by a community group
made up of a wide variety of library users, has gone through a branding process which resulted in
a name change and a new logo and is in the process of completing a Facilities Master Plan which
will identify short and long term facility needs and recommend solutions to meet those needs.
The District does have substantially more revenue from its own funding sources than it had as a City
department. In 2007 and 2008, this additional revenue enabled the District to convert the material
management technology to RFID and to establish working capital and other reserves. As of
December 31,2008,the District had fund balances of approximately$4.7 million. However,various
restrictions on that balance reduce the amount that is unrestricted to $1.4 million. The 3 mill
property tax levy approved by the voters provided for the improvement of services and the opening
of the new library. It did not provide funding for major facility improvements or expansions. With
the opening of Council Tree Library and the service enhancements made, the operating mill levy
for 2009 is substantially all committed.
The Council Tree Library will open March 28, 2009. This new facility in the Front Range Village
shopping area will provide more convenient library services to the residents of southeast Fort
Collins. This library was constructed by the City using library impact fees. Library impact fees
were established by the City in 1996. The fee applies only to residential dwelling units and ranges
from $292 to $682, depending on square footage. Annual collections have ranged from a low of
$248,000 in 1997 to $729,000 in 2001. Collections in 2008 were $285,700. The Library Board is
asking the City to continue this fee after the Council Tree Library is completed. The same rationale
for maintaining this fee exists, whether library services are provided by the City or the District.
However,the District does not have the ability to impose a similar fee directly. The Board is having
similar discussions with Larimer County. In January 2009,the Board met with the County Manager
to discuss the issue of implementing a county impact fee and will be meeting with the Board of
County Commissioners for a work session on March 30th.
ATTACHMENTS
1. Summary of Facilities Master Plan Draft.
2. Powerpoint presentation.
Poudre River Public Library District Attachment 1
Facilities Master Plan
Summary
March 2009
In November 2008, the Poudre River Public Library District contracted with the library
consulting firm of Aaron Cohen Associates Ltd (ACA)to develop a Facilities Master
Plan. The purpose of the plan was to identify both short-term and long-term facility
needs and to make recommendations on how those needs could best be met.
Representatives of Aaron Cohen Associates met with the Board of Trustees, District
management and staff, and members of the general public during the week of November
17, 2008. Public input was obtained through Visual Scan®meetings conducted by ACA.
Participants in those meetings included individuals representing a wide range of ages,
ethnic backgrounds, interests, library service usage, and residence locations across the
District. In addition to this input, information was obtained from the City of Fort Collins
Long-Range Planning Office, the City's GIS service, and published state and national
reference data.
Facility Service Model Considerations
In determining the types, sizes and locations of facilities to recommend, the consultants
took into consideration the unique urban/rural nature of the District. The District
boundaries are roughly the same as those of the Poudre School District. It includes the
city of Fort Collins and the towns of LaPorte and Timnath but excludes the town of
Wellington and the area served by Red Feather Mountain Library District. The District
serves a large geographical area of 1,780 square miles. However, 80% of the District
population resides within the Fort Collins city limits- roughly 51 square miles.
Technology makes many library services available to the District cardholders online
regardless of their location. Two primary service models were considered—a large main
library supplemented with a number of smaller branch libraries (a centralized system),
and a regional library system where library services are provided by fewer, similarly
sized libraries (decentralized).
The decentralized system was deemed most appropriate for the Poudre River Public
Library District. The District currently has two roughly equally sized libraries—the Main
Library in Old Town with 34,000 square feet and the Harmony Library on the Front
Range Community College campus with 30,000 square feet. In late March 2009 the new
Council Tree Library will open in the Front Range Village shopping center and will
contain 17,400 square feet. The recommendation is to continue with this approach and
add another regional library of 34,000 square feet in the next five to ten years. This
1
approach provides equal full-service facilities throughout the densely populated area of
the District.
The decentralized system is supplemented by a recommendation to add a support service
center for support/administrative staff. This 15,000 square foot facility could be at the
same location as the next regional library or a stand alone facility. As a stand alone
facility, the District would have the option to acquire existing/vacant real estate that
might be more cost effective and centrally located than available by building new space.
The centralized system was not considered appropriate for the District for a number of
reasons:
■ Adding a number of small, neighborhood branches would not be efficient from a
staffing standpoint.
■ The need for fiber optic connectivity limits the location of library facilities.
■ Operating costs of branches are not efficient.
■ There would be only one location where all library services would be available.
■ Expanding an existing library to be one large main library is not practical from a
land, cost and parking perspective.
Facility Recommendations
Having determined that a decentralized system would best serve the District, the
consultants recommended the following additions/enhancements to the current facilities:
■ Main Library— 1-3 years—remodel and moderately expand
■ Carnegie Building—3-5 years—determine the District's ability to use/acquire this
building from the City of Fort Collins to be used for program and community
meeting space and make improvements to Library Park.
■ Harmony Library— 5-10 years—work with Front Range Community College
representatives to determine improvements needed, expand meeting space and
develop funding options.
■ New Regional Library and Support Service Center— 5 - 10 years—add another
regional library including a support service center for support staff.
The improvements at the Main Library are suggested in the short-term due to an urgent
need to expand the children's section of the library, expand meeting space and provide
additional space for staff. By filling in the overhangs where the second floor extends
beyond the first, 5,625 square feet would be added. Some compact storage shelving on-
site is suggested in order to relieve space congestion in the public areas and provide more
seating space but still have the collection accessible to staff. Before the additional square
footage could be added, the restriction on the amount of Library Park land that can be
used for the library building would have to be rescinded or modified by the voters. The
cost to add the 5,625 square feet is estimated at $1.4 million and the cost to remodel the
existing 34,000 square feet is estimated at$2.55 million.
2
The City of Fort Collins Museum currently occupies the Carnegie Building. This was the
original Fort Collins Library from 1904 until 1976. The Museum is scheduled to move to
a new location in 2011. While the ultimate use of the Carnegie Building is to be
determined, from a library perspective, ACA suggested it be converted to auditorium
space for library and community programs, large group functions, small conferencing
facilities and study spaces. They also saw potential for a cafe and Friends of the Library
bookstore. In redeveloping this space and improving Library Park in general, adding an
inviting landscaped plaza or courtyard with an energy efficient, covered walkway
between the two buildings was suggested. The entrance to the Main Library could be
moved to the west side of the library building providing more direct access from Old
Town and better pedestrian traffic flow. The cost of improvements of the Carnegie
Building is estimated at $5.1 million. Special community fund raising and historical
grants are options to consider for funding this project.
Immediate improvements to the Harmony Library were not considered necessary. This
location was graded higher overall than the Main Library as part of the Visual Scano
process. However, as the 11 year-old facility continues to age, as the delivery of library
services evolves and the community continues to grow, it is anticipated that the need for
improvements will occur in five to ten years.
Additional space was identified as a current need. However, economic realities are such
that adding an additional library is not recommended until the five-to-ten year timeframe.
Population growth within the District between now and then will determine the best
location for another library. At this point, a library north of Fort Collins in the Mountain
Vista area or northwest in the Laporte area are reasonable locations to consider. Either
location could take some pressure off of the Main Library and provide service to the
outlying, rural population in that area.
In order to consolidate administrative functions, create efficiencies and maximize the
amount of public space in the actual libraries, a support service center is recommended.
It is also recommended that this facility include a shared community space that could
provide low or no cost meeting space to the general public and provide sizable space for
library programs. The support services center would house the administrative staff,
technical services and IT staff, Friends of the Library, Library Foundation/Trust staff and
some program staff. Room would be available to take advantage of existing and future
technologies such as automated check-in of materials using the District's RFID
capabilities.
The sizes of the new facilities suggested are 34,000 square feet for the new regional
library, 15,000 square feet for the service center and 10,500 square feet for the shared
community meeting space. In total, the cost of these 59,500 square feet is $20.2 million.
Solving the need for library services in the rural areas of the District by building outlying
branch libraries is not recommended. Other options and technological solutions are
suggested as better, more cost efficient means to enhance services to the rural areas.
These options include book/media dispensers, virtual library kiosks, books by mail and
3
additional book drop locations. These options would provide some library services to
rural residences without the need to come to one of the libraries in town.
Financing Considerations
A number of funding options were suggested for financing needed facility improvements.
The continuation of impact fees by the City and the establishment of such fees by
Larimer County and the Town of Timnath were encouraged. Grant funding, particularly
for historical preservation, is common for projects such as the Carnegie Building.
Community fund raising is an effective means to not only raise funds for expansion
projects but to increase support for library services in general. The issuance of
Certificates of Participation (COPS) is the most common means in Colorado to raise
funds for library capital projects. The payment of the COPS is then funded by mill levy
increases.
4
ATTACHMENT 2
Presentation for the
March 24, 2009
City Council Work Session
1, r POUDRERIVER
PUBLIC LIBRARY
DISTRICT
City Council Update
• Library District 2008 Annual Report
• Current Library District Funding
• Facilities Master Plan
• Library Impact Fee Discussion
�POUDRERIVER
s" 0 PUBLIC LIBRARY
DISTRICT PRIT a<•.,
1
2008 District Activity
• The Stats
— Provided 1,394 programs to 53,797 participants
— Circulated 2.3 million items — an increase of 6%
from 2007
— 2.1 million website hits - an increase of 8%
— 118,331 cardholders — 71% of District population
` � 43 POUDRE RIVER
PUBLIC LIBRARY
DISTRICT
2008 District Activity
• Charting the District's Course
— Developed a strategic plan related to public services
SPOUDRE RIVER
PUBLIC LIBRARY
DISTRICT
2
Strategic Plan 2008-2011
• Through the use of a 19 member Community Planning
Committee, 7 service priorities were identified.
— Create Young Readers
— Satisfy Curiosity
— Stimulate Imagination
— Connect to the Online World
— Be an Informed Citizen
— Express Creativity
— Build Successful Enterprises
m rr v N f .
POUDRE RIVER
—' PUBLIC LIBRARY
5 "e DISTRICT
2008 District Activity
• Charting the District's Course
— Developed a strategic plan related to public services
— Completed a branding process resulting in a name
change to better reflect the entire district
— Began a Facilities Master Plan project
— Converted the collection management technology to
RFID
R w'n POUDRE RIVER
PUBLIC LIBRARY
i, ♦! V.`' �� DISTRICT
3
2008 District Activity
• Awards and Innovations
— Gates Foundation grant for upgrade of publicly used
computers
— Library Services and Technology Act Grant for Books
Express — a pilot books-by-mail program for needy
children
— Services to a Diverse Population Award from the
Colorado Association of Libraries
z POUDRE RIVER
- PUBLIC LIBRARY
S4 DISTRICT
Library District Funding
• A property tax levy of 3 mills ($59 on a $250,000
house) is the primary funding source
• Mill levy was approved to
— Fund the new district
— Restore service cuts and book drops
— Provide operating money for the new branch
• Property taxes fund 87% of the District's budget
r SPOUDRERIVER
PUBLIC LIBRARY
DISTRICT
4
Library District Funding
Year ended December 31,2008 2009
Budget
Revenue Actual Budget Difference Budget
Property taxes $6,626,877 $6,667,700 $ (40,823) 6,734,400
Specific ownership taxes 560,135 582,400 (22,265) 550,000
Investment earnings 151,949 75,000 76,949 60,000
Fines 162,912 125,000 37,912 125,000
Donations-other 178,643 100,500 78,143 156,100
Total Operating Revenue 7,680,516 7,550,600 129,916 7,625,500
Intergovernmental 1,213,288 814,000 399,288 744,000
Total Revenue 8. 993.804 8. 664,600 529.204 8.3 99.500
�y'F� r tlrSz
�POUDRERIVER
a
{ PUBLIC LIBRARY
y p
t•, 4.q' �� �, y. (� DISTRICT
Library District Funding
• The library system does have more revenue available to
operate as a District than it had as a City department
• The increase in available funds has provided for
— Increased library hours
— Restoration and expansion of book drops
— Additional programming staff and the offering of more programs
— Council Tree Library operations
— Materials conversion to RFID
— General administrative costs for operating as a separate entity
— Operating and capital reserves
• With these changes, the current funding level is close to
being fully committed
��' � POUDRERIVER
' " PUBLIC LIBRARY
5
Library District Funding
2007 2008 2009
Revenue- Actual Actual Budget
Operating $7,100,180 $7,680,516 $7,625,500
Intergovernmental 98.825 1,213,288 744,000
Total 7,199,005 8.893,804 8,369,500
Expenditures-
Operating 4,522,162 6,305,674 7,896,300
Capital 506,510 100,000
Total 4,522,162 6,812184 7,996,300
Net 2,676,843 2,081,620 373,200
Fund Balance-Beginning - 2,676,843 4,018,900
Fund Balance-Ending $2,676,843 $4 758 463 $4,392.100
wz
r SPOUDRERIVER
. 0 PUBLIC LIBRARY
Library District Funding
Ending Fund Balance 12-31-08
Reserved Balance $1,694,000
Designated Balance 1,673,900
Unreserved/Undesignated 1,390 563
Ending Fund Balance 141513.463
POUDRERIVER
PUBLIC LIBRARY
it
oisTPU
6
Facilities Master Plan
• Recommends a Regional Library approach
rather than a large central library with a number
of smaller branches
— Each library would be a full service location
— More cost effective than staffing and operating many
branches
— Anticipates another regional library within 5-10 years
— Short-term recommendation is to remodel and
expand the Main Library
P�NPOUDRERIVER
r�✓ Y;.,,_ PUBLIC LIBRARY
DISTRICT
Facilities Master Plan
• Main Library Improvements
— Build down the overhangs
,} P�s
PUBLIC LIBRARY
DISTRICT
POUDRERIVER
7
Facilities Master Plan
1 1�
71v •;
M ,
1 1.
Y
fy POUDRERIVER
PUBLIC LIBRARY
DISTRICT
Facilities Master Plan
• Main Library Improvements
— Build down the overhangs
— Enlarge Children's section
— Increase meeting space
— Provide more seating
— Increase library by up to 5,625 square feet (16%)
— Funded from existing reserves
�POLIDRERIVER
{ •, PUBLIC LIBRARY
DISTRICT
Facilities Master Plan
• Estimated costs for projects total $29 million
— Main remodel and expansion - $4 million
— Potential remodel/conversion of Carnegie building -
$5 million
— New facilities including a third regional library,
administration space and community meeting space -
$20 million
POUDRE RIVER
OoI PUBLIC LIBRARY
N• 3';% :yg DISTRICT
Library Impact Fees
• The City of Fort Collins implemented a Library
Impact fee in 1996.
• The fee is a one time payment for residential
dwelling units only and is paid as part of the
building permit process.
• As with other impact fees, this fee is a means for
growth to pay its own way.
• Through 2008, $6 million has been collected
from this fee.
' POLIDRERIVER
PUBLIC LIBRARY
DISTRICT
9
Library Impact Fees
• The City's fee ranges from $292 to $682
depending on building size.
• Other Colorado library impact fees include
— Loveland - $644
— Boulder - $425 (Detached), $275 (Attached)
— Johnstown - $137 (Detached), $109 (Attached)
— Longmont - $500 public building fee Residential),
$0.13 per square foot fee (Commercial)
> ;� 5.r �POUDRE RIVER
PUBLIC LIBRARY
1 � �� b DISTRICT
Library Impact Fees
• The new Council Tree Library was built
substantially from the proceeds of this fee
• Any unspent impact fees once the new library is
fully paid for will be turned over to the District
and will retain the restrictions currently in effect.
• The Facilities Master Plan recommends
expanding and remodeling the Main Library as
the first, short-term priority. The use of these
impact fees to improve this downtown facility is a
very appropriate use of these fees.
'N POUDRE RIVER
PUBLIC LIBRARY
NDISTRICT
10
Council Work Session
Discussion
r r! r POUDRERIVER
.]� q �PUBLIC LIBRARY
7y.•' iy:, DISTRICT
11