HomeMy WebLinkAboutCOUNCIL - AGENDA ITEM - 12/19/2000 - FIRST READING OF ORDINANCE NO. 190, 2000, AMENDING AGENDA ITEM SUMMARY ITEM NUMBER: 26
FORT COLLINS CITY COUNCIL DATE: December 19, 2000
10 STAFF: Matt Baker
SUBJECT:
First Reading of Ordinance No. 190, 2000, Amending Chapter 7.5 of the City Code Relating to
Street Oversizing Capital Expansion Fees.
RECOMMENDATION:
Staff recommends adoption of the Ordinance on First Reading.
FINANCIAL IMPACT:
Staff is proposing a recalculation of the Street Oversizing Fee schedule, in order to keep it current
with updated information from the Institute of Traffic Engineers, the North Front Range Regional
Transportation Plan, and recent updates to the City Master Street Plan. Also included in the
recalculation is a 3.1% increase to adjust for inflation. The single family fee will increase from
110 $1480 to $1624 per dwelling unit. Industrial fees will increase on average $0.10 per square foot of
building size, from $1.06 to $1.16 per square foot. Retail fees will increase on average $$0.08 per
square foot of building size, from $3.95 to $4.03 per square foot. For most types of development,
fees will increase.For several categories of development fees will remain the same or decrease.The
General Fund contribution will increase from the current $500,000 per year to $550,000 per year.
EXECUTIVE SUMMARY:
Since the last modifications to the Street Oversizing Program were adopted in 1998, a significant
amount of transportation improvements have been constructed.
Staff is proposing an increase to the Street Oversizing fee for the following reasons:
I. The adopted Mountain Vista Sub Area Plan and Fossil Creek Reservoir Area Plan
have added more arterial and collector streets to serve new development.
2. Inflation has increased construction costs by 3.1% over the last two years.
3. Additional funds are necessary to recover costs for outparcel right-of-way, needed
for roadway widenings.
A recalculation of the Street Oversizing Fee results in an increase of$144 per single family dwelling
unit,$0.10 per square foot of industrial use,and$0.08 per square foot of retail use(on average).The
following table gives a sampling of the fees under the current and proposed schedules.The complete
fee schedule is attached.
DATE: December 19, 2000 2 ITEM NUMBER: 26
Current Proposed
Single-Family per DU* $1480 $1624
Apartment per DU $ 926 $1041
Lt. Industrial per sq. ft. $ 1.06 $ 1.16
Office per sq. ft. $ 2.47 $ 2.71
Commercial per sq. ft. $ 3.95 $ 4.03
* DU= Dwelling Unit
Staff believes this recalculation and fee increase is necessary to account for the recently adopted
Mountain Vista Sub-Area Plan and Fossil Creek Reservoir Area Plan, and to keep pace with the
inflation of construction costs. The methodology of the Street Oversizing Capital Expansion Fee
remains the same; only the calculations have been updated to reflect the revised data.
During the Council Study Session for this item,staff was asked to look at the single family housing
category of the impact fee. Staff will be gathering information over the next few months to propose
a differentiation in fees for different single family housing types.
Detailed information can be found in the attached memorandums to the Transportation Board.The
Street Oversizing Impact Fee Study Update, dated November 28, 2000, will amend the adopted
Street Oversizing Impact Fee Study, July 15, 1997.
BACKGROUND:
The Street Oversizing Program underwent significant modifications in 1998. These modifications
included a fee increase, the addition of alternate modes of transportation (such as transit, walking,
and bicycling) and a change in methodology to assess fees based on trip generation.
In the two years since the modifications went into effect, the Street Oversizing Program has
i
constructed many transportation improvements while maintaining its financial stability. The
construction of Shields Street from Horsetooth to Harmony, the Drake Road Project at the Centre
for Advanced Technology, and the Harmony Road Realignment are three significant Street
Oversizing projects which improved arterial street segments with travel lanes,bike lanes,sidewalks,
bus stops and landscaped medians.The Program also reimbursed developer projects that improved
portions of Overland Trail and Ziegler Road, and completed the Centre Avenue link. The Program
has increased the capacity at intersections by adding right turn lanes to mitigate the impacts of new
development.
In 1999,construction costs remained constant;however,analysis of the current year 2000 costs have
shown an inflation increase of 3.1%. In addition to increased costs,two planning studies(Mountain
Vista Sub-Area and Fossil Creek Reservoir Area) have made revisions to the City's Master Street
Plan and Growth Management Areas.
The Street Oversizing Capital Expansion Fee is an impact fee calculated from the amount of
improvements needed with new development. When there are significant changes to the amount of
transportation improvements needed,such as with the Mountain Vista Sub Area Plan,a recalculation
of the fee is indicated.
DATE: December 19, 2000 3 ITEM NUMBER: 26
Two other documents used to calculate the Street Oversizing Capital Expansion fee were revised
since the original study was completed. First, the North Front Range Regional Transportation Plan
was updated with the latest traffic modeling for Fort Collins. Second, the Institute of Traffic
Engineers released the 6th Edition of the Trip Generation Manual.Both of these revised documents
were included in the recalculation of fees.
The Street Oversizing Program continues to be a financially viable program to construct
transportation infrastructure in newly developing areas.This recalculation is necessary to update the
fee to account for the improvements that the program will be constructing, and to keep pace with
inflation.
I
f
I
I
I
i
i
ORDINANCE NO. 190, 2000
OF THE COUNCIL OF THE CITY OF FORT COLLINS
AMENDING CHAPTER 7.5 OF THE CODE OF THE CITY OF FORT COLLINS
RELATING TO STREET OVERSIZING CAPITAL EXPANSION FEES
WHEREAS, the most recent modifications to the City's street oversizing program were
adopted in 1998, and subsequent to said time, a significant amount of transportation improvements
have been constructed in the city; and
WHEREAS,the adoption of the Mountain Vista Subarea Plan and the Fossil Creek Reservoir
Area Plan have added more arterial and collector streets in the city to serve new developments; and
WHEREAS,inflation has increased construction costs by approximately 3.1%over the past
two years; and
WHEREAS, additional funds are necessary to recover costs for outparcel right-of-way
needed for roadway widenings; and
WHEREAS,for the foregoing reasons,the Council has determined that it is necessary,in the
interests of the protection of the public health, safety and welfare, that the street oversizing fee be
increased.
NOW,THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF FORT
COLLINS as follows:
Section 1. That Section 7.5-16 of the Code of the City of Fort Collins shall be amended
to read as follows:
Sec. 7.5-16. Intent.
The provisions of this Article are intended to impose certain fees to be
collected at the time of building permit issuance in an amount calculated as shown
herein for the purpose of funding the provisions of additional capital improvements
as the city'spopulation increases. The imposition of said fees is intended to regulate
the use and development of land by ensuring that new growth and development in
the city bear a proportionate share of the costs of capital expenditures necessary to
provide community park, library, police, fire and general government and trans-
portation capital improvements. Said fees shall not be used to collect more than is
necessary to fund such capital improvements. The fees provided for in this Article
are based on the city's Capital Improvement Expansion Cost Study, dated May 21,
1996,as amended;the city'sStreet Oversizing Impact Fee Study,dated July 15, 1997,
}995 updateand Street OversiiinR Impact Fee Study,Update, dated November 28,
2000, as amended; and" e"ITE Trfp`"`fr$z4eta tvie tYlaxuti;t,';6th `Editz t, 1997,
. published by the Institute of Traffic Engineers, as amended, which establish a fair
and equitable allocation of costs and recognize past and future payments for new
development, as well as credits for construction, dedication of land or cash
contributions. Funds collected from said fees shall not be used to remedy existing
deficiencies, but only to provide new capital improvements which are necessitated
by new development.The amount of revenue generated by said fees shall not exceed
the cost of providing the capital improvements for which they are imposed, and the
same shall be expended solely to provide the specified capital improvements.
Section 2. That Section 7.5-19 of the Code of the City of Fort Collins be amended to
read as follows:
Sec. 7.5-19. Imposition,computation and collection of fees.
Payment of the fees imposed under the provisions of this Article shall be
required as a condition of approval of all development in the city for which a
building permit is required. The amount of such fees has been calculated using
current levels of service and the data and methodologies described in Capital Im-
provement Expansion Cost Study,dated May 21, 1996,as amended;the city'sStreet
Oversizing Impact Fee Study, dated July 15, 1997,
e#
ld
59aiai
i
9ft"Ln, _ . , published by the Institute of
Traffic Engineers, as amended.The fees due for such development shall be payable
by the feepayer to the Building Permits and Inspector Division Director prior to or
at the time of issuance of the first building permit for the property to be developed,
unless an agreement has been executed by the city which provides for a different time
of payment. If the building permit for which a fee has been paid has expired,and an
application for a new building permit is thereafter filed,any amount previously paid
for a capital improvement expansion fee and not refunded by the city shall be
credited against any additional amount due under the provisions of this Article at the
time of application for the new building permit.
Section 3. That Section 7.5-32 of the Code of the City of Fort Collins shall be amended
as follows:
Sec. 7.5-32. Street oversizing capital improvement expansion fee.
(a) There is hereby established a street oversizing capital improvement expansion
fee which shall be imposed pursuant to the provisions of this Article for the purpose
of funding street oversizing improvements related to the provision of transportation
services. Such fees shall be payable prior to the issuance of any building permit for
a residential, commercial or industrial structure. The amount of such fee shall be
determined as follows:
2
Avetag.W,.kd$r
Residential er tt tpe, dwelling
SF set=tea gas $1,48e-6 i re E).U.
6759 $f;621-96 per)}F3
e:7O $t,348.83perRom
Apmbrient 6-12 $9$9-93 pm D.U.
Retitement 3736 $51f.62 per${3-
2-t5 $333.33 perms
5.96 $968.66 per9H-
hex 3-te $1,i i3.P pens.U.
19*nm ereial
f3 tk 32.69 $3-12 P" Sq-Ft.6E-A
-5001E 6b 38.65 $3-:75 PerS4.Ft.fah
- 266fE 61=Pc 54.59 $5--29 P"S4-Ft-6h
- 5ek&EA 9i 65 $6.12 Pm Sq.Ft.E;E;
movie Theater 77-79 $' Per S4. Ft.
H.94 $1-55 feet S4. Ft.
Buy e c 67.06 $4.47-Persq.Ft..
6om...nent6f6ce 68.93 $6.69 Pet-Sq.Ft.
Post E)ffice 86-7s $8.43 per 84.FtBuilding Sfatetiais&umbm .
3666 $2:97-pm Sq.Ft..
SPccialtYRea*l 4668 $3.95 Pm Sq. Ft
71.16 $4-:75
36-19 $3.5 t Per S+ Ft.
268.96 $13.4i P" S4. Ft.
633-F3 $42.i9 Pm Sq.Ft.
eal Sales 47.52 $+63 Per Sq. Ft.
_I IV i, +33-66 t=T $8,877-56 Per Pump
1e8-e6 tst $',208.?,9 Per Stall
SnPerllturket H5.59 $8.38- Pei Sq. Ft.
887-66 $59-21-PcrS4. Ft
Famitme-Store d-35 $6.42-PC' 54. Ft.
t mrk i 89.95 $i 2.69 Pet S4. Ft
orive=h,Bm,k 29 i.i i $19.43- Pet Sq.
1 isti ft ce Building -i i.45 $h 11 Pet S4.
i
3
ses Rate.
P.i....I Destinations
Manufacturing 3:t15 $e:59-Peru-Ft:
Warehousing 4sfl $8-74 Pl- 84.Ft.
bight Endustrin! 6 94 $1-96 Per Sq.Ft.
3efitti-Wmelrovse z1.61 $0.46 Pa sq-Ft..
Business Park }4 ' $2.t8 Per 84.Ft.
senczaf Office
—266f£6FA 1}5$ $t :15 Per6q-Ft.6FA
58K 6Frt 16.31 $2`47 Persq-Ft sF�c
---WK sFfc $439 $PerSq-Ft Grfc
Reeheational 3f4 fnc $552.f4 Pet Acre
Eitp Park 3-.66 Mc $555.22-Per mete
6olffoutsc 6.33me $1,263.66 Pet Acre
£lemenrmy-school tB3 istudent W6.25-Per student
elmfclysynagogue 97% $F.-17 Pet Sj-Ft.
L-ibtary 4530 $6.98 Pet Sq.Ft.
ifospitaf f6.69 $2`53 Per S4.Ft.
Nulling Home 2-.W/bed $393:99 Per Bed
Medical clinic 23.79 $3.61 Per ST Ft.
Hvtr Rate k.lationfo, ench it....band m,the pwdact vy'Nu,rbo qf Weekday 1�ip., Ti 0
STREET OVERSIZING CAPITAL EXPANSION FEE SCHEDULE
Average Weekday Transportation
Vehicle Trips Impact Fee Rate
Residential (Per Housine Unit)
SF Detached 9.55 $1,624 per D.U.
MF and Other Housing 6.59 $1,120 per D.U.
Hotel/Motel 8.70 $1,479 per Room
Apartment 6.12 $1,041 per D.U.
Retirement Community 3.30 $561 per D.U.
Assisted Living 4.52 $769 per D.U.
Congregate Care Facility 2.15 $366 per D.U.
Residential Condominium 5.86 $996 per D.U.
Duplex 7.18 $1,221 per D.U.
Townhome 5.86 $996 per D.U.
Mobile Home 4.92 $837 per D.U.
4
� w
V�icte 7'Hps
Non=Residential Pee. 0011 Sa.Ft
�
Cotom/Shop 4111.: enter
IQ441 32.09
3$65 $313
4L6,5 $ +1
F#tn �q�itat�"itib 17,14 $I�E'q�SEYt�t
4 719
W 'Phtl
11 i
sm
R �l5
ffis•. 4 80 $t1 Y F q fit,
Dtetrsgt�iti, ter) 30,08 $3${ Per�q t
Sit s't k. ..
l3owre.m Res rant
13434 $8$ Pek9 Fi
Fast"Fact llie5faurant wl Drivemp A9t512 $24,d3' Per Sq.Ft
Car Sales 37.50 $3:41t,PGr Sq Ft
Service Atatia+ 16$:56!pump $7 410$j le'i;'Puntp
Wholesale ltiti°Store 20.3t $2:t!PertSq.Ft
S,glf� arli'ast �v5:79/stall $240;Ei2Pcjr:Sta11
Superrnarket Yl 1;51 $7 59,Pe(Sq. t:
Convenience" arket 737.99 $3Q69 Per Sq.Ft;
Furniture Store 5.06 $0.84 Per Sq.Ft..
Bank 189.95 $7.35 Per Sq.Ft.
Drive-In Bank 265.21 $11.03 Per Sq.Ft.
Insurance Building 11.45 $1.22 Per Sq.Ft.
Manufacturing 3.85 $0.64 Per Sq.Ft.
Warehousing 4.96 $0.83 Per Sq.Ft.
Light Industrial 6.97 $1.16 Per Sq.Ft.
Mini-Warehouse 2.50 $0.42 Per Sq.Ft.
Business Park 14.37 $2.39 Per Sq.Ft.
General Office
200K GFA 11.54 $1.92 Per Sq.Ft.GFA
50K GFA 16.31 $2.71 Per Sq.Ft.GFA
1OK GFA 24.39 $4.06 Per Sq.Ft.GFA
Recreational 3.64/ac $605.59 Per Acre
City Park 3.66/ac $608,91 Per Acre
Golf Course 5.04/ac $838150 Per Acre
Elementary School 1.02/student $169.70 Per Student
Church/Synagogue 9.11 $1.52 Per Sq.Ft.
• Library 54.00 $8.98 Per Sq.Ft.
5
SIM $525�Pa, i -
M icit inic
iteirk bqid ' t�th -'04CUO U"0"" fw, �rb PSI
Tt d, ,W "" (N�tor,and
z
Yw
Pays,, -aclxuttm-hk_ Wil w.ten
Introduced and considered favorably on first reading and ordered published this 19th of
December, 2000, and to be presented for final passage on the 2nd day of January, A.D. 2001.
Mayor
ATTEST:
City Clerk
Passed and adopted on final reading this 2nd day of January, A.D. 2001.
Mayor
ATTEST:
City Clerk
6
Transportation Services
a Engineering Department
4
City of Fort Collins
TO: Transportation Board 01�
THRU: Ron Phillips, Executive Director of Transportation Servic
Gary Diede, Director of Traffic Operations
Cam McNair, City Engineer } W n
FROM: Matt Baker, Street Oversizing Program Manager) `
DATE: October 17, 2000
RE: Street Oversizing Fee Update
The Street Oversizing fee schedule underwent significant revisions in 1998. These
revisions included:
• Increase of fees to recover costs of the newly adopted Street Standards.
• Inclusion of all modes of transportation.
• Use of trip generation as a more equitable way to allocate fees.
Since the revisions were adopted in 1998, the Street Oversizing Program has constructed
19 lane miles of roadway, including 51 auxiliary turn lanes; 2.3 miles of landscaped
medians; 14.9 miles of bike lanes; 6.4 miles of sidewalks; 17 enhanced crosswalks; 7 bus
pads (3 with shelters); and 18 traffic signals or signal upgrades. In addition, several major
street segments are slated to be improved with development over the next two years. The
Street Oversizing Program has begun the implementation of the City Plan vision to make
choices for transportation a real possibility.
Over the past year, there have been planning efforts that have made significant changes to
the City's proposed transportation network. The Mountain Vista Sub-Area Plan, adopted
in 1999, set policies and zoning for the Northeast area of the City. Included were
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 • FAX (970) 221-b378
•.vwwv.ci.fort-collinsxo.us
revisions of the City's Master Street Plan that laid out a modified grid system of collector
and arterial streets.
The Fossil Creek Reservoir Area Plan was ajoint City/County planning effort that
resulted in 4,300 acres of unincorporated Latimer County being included in the City's
Urban Growth Area.
These two planning efforts, as well as other Master Street Plan changes, such as the
realignment of Vine Drive between College Avenue and Lemay Avenue, indicate the
need for a slight recalculation of the Street Oversizing fee.
Proposed Fee Modifications
Staff is proposing a recalculation of the Street Oversizing Fee using the following data:
• Inclusion of the Mountain Vista and Fossil Creek Reservoir Area Plans
• Inflation of construction costs
• Addition of expenditures for out-parcel right of way
These items will increase the Street Oversizing Fee $144.00 per single family dwelling
unit, and adjust the industrial and retail fee rates by minus $0.16 to plus $0.24 per square
foot.
Mountain Vista Sub Area
The recently adopted Mountain Vista Sub Area Plan set policies and land use for the
Northeast Area of the City. The transportation element of the plan envisions a modified
grid system of streets to provide connectivity. The major entryways are Mountain Vista
from the East, Timberline from the South, and Vine Drive from the West. A realignment
of Mountain Vista and Timberline is proposed in the area of the activity center. The rest
of the street network would be minor(2-lane) arterials and collector streets. The
Mountain Vista Sub Area Plan made significant changes to the Master Street Plan in this
area.
2
The number of lane miles increased in the Mountain Vista Sub Area from 46.6 to 116.3
lane miles. This increase in the amount of streets, bike lanes, and sidewalks necessary to
serve the area results in an increase to the Street Oversizing fees.
Fossil Creek Reservoir Area
In 1999, The City of Fort Collins and Larimer County adopted the Fossil Creek Reservoir
Area Plan, which expanded the boundaries of the City's Growth Management Area. The
transportation element of the plan did not significantly change the street classifications.
The lower densities are expected in this area because of the large lake and surrounding
natural areas.
The Fossil Creek Reservoir Area would actually lower the Street Oversizing fees, due to
the addition of developable land subject to the collection of fees, without a significant
increase in the lane miles of oversized streets. The number of lane miles stays constant in
the Fossil Creek Reservoir Plan area, 78.8 before, and 79.4 after.
Inflation of Construction Costs
The Consumer Price Index (CPI) is an indicator of inflation across a broad spectrum of
the consume market. There is a more specialized inflation indicator for construction
materials and labor costs published by the Engineering News Record (ENR) for the
Denver region. In addition, staff tracks unit expenditures on roadway construction
projects, including projects with Street Oversizing Program participation. The Street
Oversizing Program has enjoyed relatively constant street construction costs over the last
few years, even with a slight material price increase for concrete. However, staff has seen
price increases in asphalt materials this year due to the high oil prices encountered last
summer and has been notified of future increases in 2001. The increase to the fee for
inflation of construction costs is 3.1 percent, which is consistent with the ENR
Construction Cost Index.
Landscaped medians were adopted as an element of the City Arterial Street Standard in
• 1996 and have been included in Street Oversizing construction projects since 1997. The
3
City Parks and Recreation Department, which maintains the medians, CDOT, which has
jurisdiction over the State Highway System, and the City Engineering Department, have
all made revisions to the landscaped median standards. These revisions have added
significant costs to the construction of landscaped medians. Two of the revisions with the
most impact on construction costs are irrigation taps and a subdrain/liner system.
1. The Parks Department is adapting new development standards for median
landscaping construction, specifying spray or bubbler irrigation systems. Because
spray type systems are less tolerant of pressure drops to maintaining efficiency,
additional water taps are needed to irrigate landscaped medians. Approximately seven
taps per mile of median are indicated with spray systems, versus three taps previously
used. This has increased costs approximately $40,000 per mile for tap fees and
installation.
2. The City Engineering Department and Colorado Department of Transportation have
expressed concerns over irrigated medians saturating roadway foundations, leading to
premature pavement failures.New requirements include plastic or rubber liners to
keep water from migrating out of the median area, and subdrain systems to collect
excess water from the median and carry it underneath the roadway into existing storm
water systems. Staff estimates these requirements to add an additional $60,000 per
mile of landscaped medians.
Traffic signal costs have also risen dramatically over the last few years. New technology
such as LED light heads, high-speed controller circuits, pedestrian push buttons in
medians, and video traffic detection have increased safety, reliability, and operational
efficiency. However, average costs have risen from $60,000 to $80,000 per signalized
intersection.
Staff is proposing that the Street Oversizing Capital Expansion Fee be increased to
recover the inflation of construction costs as noted above.
4
Out-Parcel Right of Way (ROW)
As the City grows, there are areas annexed into the City that were previously developed,
usually as single family residences fronting the arterial street. In addition, there are
county developments enclaved and force annexed into the City, which did not dedicate
ROW or improve the arterial street frontage. In many cases, the responsibility for ROW
and improvement becomes a City Capital Project, using sales tax funding. Under current
ordinances and impact fee legislation, this is the proper method of correcting existing
deficiencies. However, there are certain instances where the impacts of new development
require the acquisition of ROW from existing out-parcels. To the extent possible,
development should contribute for its impacts for ROW acquisition costs. Staff is
proposing an increase to the Street Oversizing Capital Expansion Fee to include a minor
level of out-parcel ROW acquisition.
Citv General Fund Contribution to the Street Oversizing Fund
The City's Street Oversizing Program is an impact fee program that assigns
transportation costs to development based on trip generation. There is a certain portion of
these transportation costs, which are not attributable to new development. These are
"pass-by" trips or existing background traffic from existing residents. With any increase
in development impact fees, there must be a corresponding increase in the City's General
Fund contribution to maintain proportionality. Currently the City contributes $500,000
per year to the Street Oversizing Fund. This contribution is calculated to rise to $550,000
per year with the adoption of the currently proposed Street Oversizing Capital Expansion
Fee increase.
Adding it All Up
Staff has recalculated the Street Oversizing Capital Expansion Fee based on the change to
the Master Street Plan from the Mountain Vista and Fossil Creek Reservoir Areas, Out-
Parcel ROW, and the inflation of construction costs used to construct City roadways. A
partial comparison of fee rates is as follows:
5
Current Fee Proposed Fee
Single Family $1,480 per Dwelling Unit $1,624 per Dwelling Unit
Multi Family $1,021 per Dwelling Unit $1,121 per Dwelling Unit
Light Industrial $1.06 per sq. foot $1.16 per sq. foot
General Office
200K Gross Floor Area $1.75 per sq. foot $1.92 per sq. foot
50K Gross Floor Area $2.47 per sq. foot $2.71 per sq. foot
IOK Gross Floor Area $3.70 per sq. foot $4.06 per sq. foot
Shopping Center Retail
IOOOK Gross Floor Area $3.12 per sq. foot $2.98 per sq. foot
500K Gross Floor Area $3.75 per sq. foot $3.59 per sq. foot
200K Gross Floor Area $5.29 per sq. foot $5.06 per sq. foot
50K Gross Floor Area $6.12 per sq. foot $6.24 per sq. foot
City's GF Contribution $500,000 per year $550,000 per year
In recalculating the fee, Staff has included the 1999 update to the Northern Front Range
Regional Transportation Plan, ITE Trip Generation 6`h Edition, and Hitchens, (ITE
Compendium). These updates contain the latest data available for Fort Collins, and more
accurately reflect development projects for certain land uses. However, they have
minimal effect on the fee rates calculated.
Trip adjustment factors were analyzed to assess "pass by" and diverted-link trips for
commercial and neighborhood retail, mixed use buildings, and daycare centers. The result
was a slightly lower trip adjustment factor for most retail uses.
Summary
Staff is recommending an increase in the Street Oversizing Capital Expansion Fee to
reflect recently adopted Master Plan changes to developing areas, Out-Parcel ROW, and
for the inflation of construction costs. This is in keeping with the City of Fort Collins'
policy to require new development to pay for growth related impacts on public facilities.
6
Impact fees are one-time payments that fund the development or expansion of public
facilities needed to accommodate new development. The intent is for new development to
pay for its "proportional share" of the capital costs of additional infrastructure capacity.
Impact fees may not be used to correct existing deficiencies in public facilities. Impact
fees cannot be used to fund operating costs. Impact fees can be imposed without a vote of
the people, but are subject to legal standards of proportionality.
The Street Oversizing Program has been a successful implementation of an impact fee
program in Fort Collins. Since its implementation in 1979, over 47 miles of the Arterial
and Collector street network in Fort Collins have been improved through the program,
having a value of 43.6 million dollars. The Street Oversizing Program has been a viable
funding option to improve street infrastructure with new development.
•
7
Transportation Services
Engineering Department
44a
City of Fort Collins
TO: Transportation Board
THRU: Ron Phillips, Executive Director of Transportation Service
Gary Diede, Director of Traffic Operations
Cam McNair, City Engineer /}Am
FROM: Matt Baker, Street Oversizing Program Manager/}t,�
,/ I
DATE: October 17, 2000
RE: Questions and Answers on the Street Oversizing Program Update
Issues about the proposed update to the Street Oversizing Capital Expansion Fee are
presented in question and answer format.
It has been two years since the Street Oversizing Fees were last increased. Why
. wasn't there an inflation adjustment in 1999?
Staff analyzed the cost and inflation indicators last year. Even though there were
increases in certain construction materials, such as concrete, 1999 street construction
costs remained constant. The Street Oversizing Program implemented several cost
saving measures. One strategy was to combine several developments into one roadway
construction project. This minimizes the impact of multiple construction periods on the
travelling public and has realized significant cost savings due to economies of scale.
Another successful strategy was to fully close an arterial roadway during the construction
period. In certain locations having adequate detour routes, full roadway closures for
construction can save 30% to 40% over the cost of working under traffic conditions. And
finally.. active management of projects by the Street Oversizing Program rather than
passive inspection and acceptance has resulted in all Street Oversizing Projects over the
last two years being completed ahead of schedule and 5% to 15% under budget. The
result vas that street construction costs for the Street Oversizing Program did not
increase in 1999 and is showing a modest (3.1%) increase in the year 2000.
Is the inflation increase to the Street Oversizing Fee based on the Consumer Price
Index (CPI)?
No. The CPI is based on a broad range of consumer goods, which does not accurately
reflect the inflation in street construction costs. In fact, the CPI is higher than the rise in
construction prices. There are other indicators that are much more representative, such as
the Denver Regional Construction Cost Index, published by the Engineering News
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 • FAX (970) 221-b378
wwwo.fort-collins.co.us
Record (ENR). In addition, staff tracks unit costs on all Street Oversizing projects. Staff
uses a combination of the ENR and actual Fort Collins street construction costs to
determine the inflation factor adjustments needed.
Have alternative sources of funding been considered?
There are limited options on alternative funding for arterial street improvements with
development. Although development excise and other taxes have been considered,
current City goals and objectives indicate development impact fees as the preferred
method to finance public facilities for new development. These goals and objectives are
articulated in the City Comprehensive Plan. An important philosophy in the City
Comprehensive Plan is that new development's proportionate share of street
improvements be reasonable and equitable. Staff believes that basing a new
development's share on the trip generation formula more equitably distributes the costs of
transportation improvements.
The City needs to take the"all modes" concept seriously.
The Street Oversizing Program will make "all modes" capital improvements related to
new development but will not correct existing deficiencies in other travel modes. The
City has other programs such as the Capital Improvements Program and the Pedestrian
Access Program to address such deficiencies.
More funds should go toward transit. How will the impact fee increase affect
transit?
A portion of the impact fee collected is used for construction of bus pull-outs and shelters
on new arterial streets. Another portion will be used to help purchase buses and pay other
capital costs necessary to extend transit to newly developed areas.
Will an increase in the Street Oversizing fees deter commercial stores from building
where the new neighborhoods are? This would not promote the idea of
neighborhood commercial that the City Plan states.
The slight increase to the Street Oversizing Fees is necessary to recover the costs of
transportation infrastructure of the adopted City Plan and the new Street Standards. A
neighborhood commercial store is convenient to the neighborhood with transit stops,
pedestrian pathways and bicycle corridors allowing residents a choice of travel
alternatives. The update to the Street Oversizing Program has modified the trip
adjustment factors used for both neighborhood commercial retail and service uses.
Because neighborhood uses have much smaller market area, a higher amount of pass by
and diverted link trips is justified. This results in slightly lower neighborhood
commercial fees.
This fee increase could be supported more easily if it were more than just new
development paying. The increase in traffic is not solely due to new development.
The methodology of the Street Oversizing Capital Expansion Fee calculates the impact of
new development based on the increase in traffic attributable to new development. There
is also a traffic increase due to"travel behavior" which is attributable to existing residents
driving more and making longer trips. This portion of the cost of improvements has
never been included in the Street Oversizing Capital Expansion Fee calculations. Instead,
it is paid for by an annual contribution from the City's General Fund to the Street
Oversizing Fund. This annual General Fund contribution also needs to increase from
$500,000 to $550,000 per year to cover costs. A supplemental budget request for this
increase has been submitted by staff for Council consideration. It is not just new
development paying, but everyone paying their fair share.
Has it been considered to adjust the fees based on the distance new development is
from the City center?
Staff looked at adjusting the fees based on vehicle miles traveled by existing residents.
This type of fee adjustment is better suited to larger cities where the infrastructure is
complete. The City of Fort Collins' core infrastructure has not yet been completed, so the
methodology chosen for the modified program (projected trip generation of new
development) is better suited to a growing city like Fort Collins.
Existing elements of the Street Oversizing Program, such as the criteria for participation
in oversizing streets, is one of the City's primary methods for discouraging leap-frog
development. This policy requires that streets needed to serve new development be
constructed or paid for at the time building permits are issued. It also tries to avoid the
chronic congestion of streets resulting from development approval issued without regard
to the availability of traffic capacity. This policy, along with Adequate Public Facilities
(APF) ordinances, zoning and open space acquisition can be effective tools in achieving
land use objectives.
When distinguishing fee categories, is it possible to distinguish affordable housing
from others?
Basing the fee calculation on trip generation does not distinguish affordable housing from
other types. Affordable housing units constructed by the Fort Collins Housing Authority
are exempt from Street Oversizing Fees. There is a provision to defer the payment of
Street Oversizing Fees from building permit to Certificate of Occupancy issuance for
affordable housing units, but this only helps with a builders cash flow, not relieve any fee
payments.
Is there a way for development to minimize the fee through innovation in reducing
• vehicle trips or instituting Transportation Demand Management (TDM) programs?
Any capital improvements of a TDM program that are included in the Street Oversizing
Program can be directly credited against any Street Oversizing fees due for a particular
development project. For instance, any bus stops, additional transit routes, pedestrian
ways or bikeways built with the development to encourage alternative transportation can
be credited against Street Oversizing fees.
Transportation Services
�l Engineering Department
City of Fort Collins
Street Oversizing
Impact Fee Study
Update
City of Fort Collins
Transportation Service Area
Engineering Department
November 28, 2000
281 North College Avenue • P.O. Box 580 • Fort Collins,CO 80=-0580 • (970) 331-v605 • FAX (970) 2=1-6378
wWw.ci.fort-collins.co.us
Street Oversizing Impact Fee Study
City of Fort Collins Engineering
November 28, 2000
Purpose of This Study
The adoption of significant changes to the City's Master Street Plan with the Mountain
Vista Sub-Area Plan and the recent expansion of the City's growth management area into
the Fossil Creek Reservoir Area indicate a need to recalculate the transportation
improvements required with new development.
In addition, the Street Oversizing Fee needs to be adjusted for slight construction cost
increases, as well as for acquisition of rights-of-way where needed to complete
continuous road segments (i.e., county out-parcels).
And finally, some of the underlying data used in the original impact fee study has
undergone recent revisions, including a new edition of the Institute of Traffic Engineers'
Trip Generation Manual, and an update of the Northern Front Range Regional
Transportation Plan. These should be included in the impact fee model to more accurately
reflect the proportion of costs.
The purpose of this update is to recalculate the Street Oversizing Capital Expansion Fee
with the most recent data available, to adequately capture the actual costs of the Street
Oversizing Program.
General Methodology
Staff has evaluated the methodology used in the July 15, 1997 Street Oversizing Impact
Fee study (attached), and finds it appropriate. It acknowledges the functional
transportation capacity created by multi-modal improvements (e.g. bike lanes and transit)
in transportation infrastructure needed to serve new development.
Street Oversizing Capital Expansion Fee
The estimated costs to complete the arterial and collector street network (including bike
lanes and pedestrian ways) have been revised to correspond with the latest update to the
Master Street Plan (March 21, 2000).
Significant revisions to the Master Street Plan since the original fee study include the
Mountain Vista Sub-Area, Fossil Creek Reservoir Area, and the realignment of Vine
Drive at College Avenue.
The infrastructure costs include streets, bus bays and shelters, commuter bicycle lanes,
sidewalks and ADA ramps, and other improvements that increase the modal capability of
the street into a transportation corridor. Inflation of construction costs since the original
study was included in the revised estimates. Trip rates were revised according to the
Street Oversizing Impact Fee Study
City of Fort Collins Engineering
November 28, 2000
. latest edition of the manual titled Trip Generation (6"), published by the Institute of
Traffic Engineers.
Trip adjustment factors were looked at to more accurately assess "pass by" and directed
link trips for commercial neighborhood retail, mixed use buildings, and daycare centers.
Primary trip factors for shopping centers, drive-in banks, fast food restaurants and
convenience stores are from the ITE manual. Daycare center primary trip factor from
Hitchens, ITE Comperdium. Primary trip factors for other retail uses interpolated by
market area. The result was a slightly lower trip adjustment factor for these uses based
on the ITE formula less 10% for diverted link trips.
All other studies and adopted plans used in the original Street Oversizing Impact Fee
Study remain unchanged.
This update revises the following attachments to the July 15, 1997 Street Oversizing
Impact Fee Study.
List of Attachments:
Replace Street Oversizing Impact Fee Study, July 15, 1997, attachments with the
following revisions:
1. Street Oversizing Capital Expansion Fee Calculation: Projection for Growth-
Related Transportation Costs and Calculation of Cost per Trip Capacity.
2. Street Oversizing Capital Expansion Fee Schedule.
13. List of future out-parcel right-of-way acquisitions.
Street Oversizing Capital Expansion Fee:
Projection of Transportation Costs to the Year 2015
Trans ortation Projects Needed Sol el to Serve New De o ment
Local Access Portion
(Developer Attributable to
Responsibility) Changed Travel Impact Fee
2015 Total Behavior . Portion
Street Construction $184,334,637 $71,890,509 $28,111,032 $84,333,097
Bicycle Lanes $17,381,483 $6,778,778 $2,650,676 $7,952,028
Pedestrian Facilities $14,740,710 $11,792,568 $737,036 $2,211,107
Grade Separations $8,670,000 $2,167,500 $6,502,500
Transit $7,806,095 $1,951,524 $5,854,571
Outparcel ROW $2,559,150 $1,279,575 $1,279,575
TOTAL $235,492,075 $90,461,855 $36,897,343 1 $108,132,878
Tri2 Increase 442,614 110,653 331,961
Subtotal Cost Per Trip Capacity $326
Transportation Costs Attributable to LOS Increase*
Transit Level of Service Increase $9,540,783
Bike/Pedestrian LOS Increase $11,370,000
Neighborhood traffic mitigation $2,280,000
Credit for Sales Tax ($14,418,000)
TOTAL $8,772,783
Total Projected Vehicle Trips 1,224,972
Average Cost Per Trip (8,772.783 divided by 1,224,972)= $7
Total Cost per Unit of Trip Capacity $333
*Note: The only portion of the LOS cost increase that is included in the fee calculations
is that portion attributable to the impacts of new development.
Transportation Impact Fee Schedule
Trip Adjustment Factors
Residential 0.511
Comm/Shop Ctr 0.32
Other Non Residential 0.5
Neighborhood Service 0.125
Neighborhood Mixed Use 0.22
Cost Per Unit Of Trip Capacity $332.74
Average
Weekday Transportation
Vehicle Trips Impact Fee Rate
Residential .Per Housina Unit
SF Detached 9.55 $1,624 per D.0
MF and Other Housing 6.59 $1,120 per D.0
Hotel/Motel 8.70 $1,479 per Room
Apartment 6.12 $1,041 per D.0
Retirement Community 3.30 $561 per D.0
Assisted Living 4.52 $769 per D.0
Congregate Care Facility 2.15 $366 per D.0
Residential Condominium 5.86 $996 per D.0
Duplex 7.18 $1,221 per D.0
Townhome 5.86
$996 per D.0
Mobile Home
4.92 $83737 per D.0
Average
Weekday
Vehicle Trips
Non Residential Per 1,000 Sa.Ft.
Comm/Shopping Center
1000K GLA 32.09 $3.18 Per Sq. Ft.
500K GLA 38.65 $3.83 Per Sq. Ft.
200K GLA 54.50 $5.40 Per Sq. Ft.
50K GLA 91.65 $6.24 Per Sq. Ft.
Movie Theater 77.79 $7.70 Per Sq. Ft.
Fitness/Racquet Club 17.14 $1.83 Per Sq. Ft.
Day Care 79.26 $3.30 Per Sq. Ft.
Government Office 68.93 $7.34 Per Sq. Ft.
Post Office 86.78 $9.24 Per Sq. Ft.
Building Materials/Lumber 39.71 $3.93 Per Sq. Ft.
Specialty Retail 40.68 $4.03 Per Sq. Ft.
Discount Club 41.80 $4.14 Per Sq. Ft.
Nursery(Garden Center) 36.08 $3.84 Per Sq. Ft.
Sit Down Restaurant 130.34 $8.87 Per Sq. Ft.
Fast Food Restaurant w/Driveup 496.12 $20.63 Per Sq. Ft.
Car Sales 37.50 $3.99 Per Sq. Ft.
Service Station 168.56 /pump $7,010.83 Per Pump
Wholesale Tire Store 20.36 $2.17 Per Sq. Ft.
. Self Service Car Wash 5.79 /stall $240.82 Per Stall
Supermarket 111.51 $7.59 Per Sq. Ft.
Page 1
Convenience Market 737.99 $30.69 Per Sq. Ft.
Furniture Store 5.06 $0.84 Per Sq. Ft.
Bank 189.95 $7.35 Per Sq. Ft.
Drive-In Bank 265.21 $11.03 Per Sq. Ft.
Insurance Building 11.45 $1.22 Per Sq. Ft.
Manufacturing 3.85 $0.64 Per Sq. Ft.
Warehousing 4.96 $0.83 Per Sq. Ft.
Light Industrial 6.97 $1.16 Per Sq. Ft.
Mini-Warehouse 2.50 $0.42 Per Sq. Ft.
Business Park 14.37 $2.39 Per Sq. Ft.
General Office
200K GFA 11.54 $1.92 Per Sq. Ft.
50K GFA 16.31 $2.71 Per Sq. Ft.
10K GFA 24.39 $4.06 Per Sq. Ft.
Recreational 3.64 /ac $605.59 Per Acre
City Park 3.66 /ac $608.91 Per Acre
Golf Course 5.04 lac $838.50 Per Acre
Elementary School 1.02 /student $169.70 Per Student
Church/Synagogue 9.11 $1.52 Per Sq. Ft.
Library 54.00 $8.98 Per Sq. Ft.
Hospital 16.78 $2.79 Per Sq. Ft.
Nursing Home 2.60 /bed $432.06 Per Bed
Medical Clinic 31.45 $5.23 Per Sq. Ft.
*Note:Rate calculation for each item based on the product of Number of Weekay Trips, Trip Adjustmer
Factor, and Cost Per Unit of Trip.
Page 2
OutyarceI ROW
DRAKE ROAD between Overland Trail and Taft Hill
5 county parcels on South side
1 county outparcel on North side at Overland and Drake
HORSETOOTH between Overland Trail and Taft Hill
Horse farm on North side
13 lots on South side at Imperial Estates
TAFT HILL South of Harmony Realignment
West Side at subdivision(Taft Canyon)
5 lots on West side
Old County dump
Open space areas
HARMONY ROAD between College and Shields
4 lots on South side
F.R.C.C.
HARMONY ROAD between Shields and Taft Hill
. The Ridge
Comer property
TIMBERLINE ROAD Horsetooth to Harmonv
7 lots on West side
TRILBY ROAD between Lemay and Shields
8 lots on South side (including trailer park)
18 lots on North side
LEMAY North of Mulberry
5 county subdivisions
Realignment of Lemay
ZIEGLER ROAD Drake to CR36
4 lots West Side
1 county subdivision and 2 lots East Side
ELIZABETH Taft to Overland
9 lots North side
SHIELDS STREET Harmonv to Fossil Creek
3 lots West Side
Natural area