HomeMy WebLinkAboutCOUNCIL - AGENDA ITEM - 11/30/2004 - BUILDING ON BASICS 2005 CAPITAL IMPROVEMENT PROGRA DATE: November30, 2004 STUDY SESSION ITEM
STAFF: Diane Jones/ FORT COLLINS CITY COUNCIL
Ann Turnquist
SUBJECT FOR DISCUSSION
Building on Basics 2005 Capital Improvement Program.
GENERAL DIRECTION SOUGHT AND SPECIFIC QUESTIONS TO BE ANSWERED
1. Pavement Management Program:
a. Does Council still want to target the April 2005 ballot for renewal of the
Pavement Management Program?
b. What should be the tern of the tax-8-10 years? 20 years? 25 years? Permanent?
2. Community Enhancements 1/4 cent Extension:
a. What projects should be included?
b. Should Operations and Maintenance costs be included within or in addition to the
1/4 cent tax?
3. Additional 1/4 cent tax:
a. Should an additional 1/4 cent be considered?
b. If so, in April 2005 or November 2005?
c. If in April, what projects should be included?
4. Timing of the ballot measures:
a. April or November?
b. Implications of grocery tax and/or other potential ballot measures
BACKGROUND
On September 14 staff and City Council met in a study session to discuss the Building on Basics
2005 capital improvement program. Previous Study Sessions regarding this program were held
in December 2003, March 2004, and May 2004. At the September Study Session, Council
provided staff with direction on a variety of issues, including the following direction:
• Proceed with plans to place a 1/4 cent extension on the April ballot for the Pavement
Management Program
• Proceed with plans to place a 1/4 cent extension on the April ballot for Community
Enhancements
• Continue citizen outreach to identify projects for the Community Enhancements package
4> Not including anew Downtown Civic Center Library
q> Not including a new Performing Arts Center
November 30, 2004 Page 2
'b Conduct a statistically valid citizen survey to provide Council with additional
information
• Consider a new 1/4 cent sales tax for a future election, possibly November 2005
• Include Operations and Maintenance costs in the funding strategy for the program
Since the September Study Session, staff has worked on developing its recommendations to
Council regarding how to proceed with the Building on Basics program. Staff has developed
several options for Council consideration for capital projects and Operations and Maintenance
costs.
The focus of this study session will be to address several issues:
1. Does Council have questions about the staff recommendation?
Staff has developed several options for Council's consideration. Staff recommends renewal
of the Pavement Management Program tax at the April 2005 election. Also, for the capital
items, Option A includes a project list for the Community Enhancements program, includes
14 capital projects and Operation and Maintenance funding within the 1/4 cent renewal
package. Option B includes the same 14 projects plus the North College Improvements, and
a separate, additional tax for O&M costs. Staff recommends selecting either Option A or B,
as both are viable funding strategies. Option C includes projects that staff recommends
should be considered if a new tax were proposed, in addition to the renewals. A more full
discussion of the staff recommendations is included below.
2. What term should be proposed for the renewal of the Pavement Management
Program?
Council has previously directed staff to assume that the Pavement Management Program tax
renewal will be placed on the April Municipal Election ballot. This funding method has been
in place since 1984, with renewals to the funding in 1989 and 1997. The program and its 1/4
cent sales tax funding source could either be renewed for a short term (8-10 years), a long-
term renewal such as 20 years, or a permanent renewal. Staff suggests that City Council
consider a term of 20-25 years for this renewal. Such a long-term renewal would
acknowledge that the Pavement Management Program is an on-going need, with no other
funding source at this level ($5-6 million/year) available.
3. Priority Setting:
Staff has compiled Council feedback on priorities from the priority setting exercise and is
providing that information to Council as Attachment B. Based on the summary of this
feedback, do some projects emerge for Council as areas of agreement for inclusion?
Does Council agree on some projects that should be excluded from further
consideration? Are there any additional projects not on the list which should be
considered?
Staff has scheduled a statistically valid survey of voters to be conducted in December. The
purpose of the survey will be to seek citizen input on support or opposition to the renewal,
support of specific projects, and willingness of voters to support various options under
consideration. Are there specific projects that Council would like to have feedback on
November 30, 2004 Page 3
from a citizen survey? Are there other specific questions that Council would like
information regarding, such as the timing of the election?
Staff has also presented some options for addressing the Operations and Maintenance Costs
created by any new projects funding through the BOB taxes. Options A and B in the
attached recommendations represent two different approaches to funding these costs: one
includes the O&M costs within the 1/4 cent, the other includes a new tax for funding the
O&M. The result is, in Option B, an additional $8 million project is included. Does Council
have any reactions to or direction regarding these O&M funding strategies?
4. Does Council wish to consider an additional 1/4 cent tax, or defer any consideration of a
tax increase until at least the November 2005 election?
Option C in the staff recommendation provides an option for consideration if a new 1/4 cent
tax were placed on the ballot. Such a package could be placed on the April ballot, or
deferred until at least the November 2005 election. Such a tax could be considered for
additional high priority capital projects from a variety of service areas, or it could be
allocated to one large project, such as a new Performing Arts Center or Downtown Main
Library.
5. Does City Council have any concerns about the timing of placing the tax renewals on
the April ballot, considering the grocery tax repeal measure that is already on the
ballot?
STAFF RECOMMENDATION:
Since the September Study Session, staff has worked on developing its recommendations to
Council regarding how to proceed with the Building on Basics program. Staff has specifically
focused on workable options for the capital program and the issue of funding Operations and
Maintenance costs, and has developed several options for Council consideration.
City Council and the community have been considering a narrowed list of 32 proposed capital
projects for the Building on Basics 2005 capital program. With an unfunded cost of these 32
projects totaling nearly $150 million, and approximately $5.5 million per year of revenue from a
1/4 cent sales tax, the list of projects to take for voter approval must now be narrowed. The full
list is included as Attachment A-4.
Staff recommends that Council place the Pavement Management Program on the ballot as a
renewal of the full 1/4 cent BCC tax that is currently dedicated to Pavement Management and
other Transportation projects. This should yield approximately $5.5 million per year for the
street maintenance program.
In addition, staff has developed three optional packages of capital projects for City Council's
consideration. Staff recommends placing either Option A or B on the ballot as a package of
community enhancement capital projects. (See Attachments A-1 and A-2) These options
represent a renewal of the Community Enhancement BCC 1/4 cent tax and each addresses the
issue of funding new Operations and Maintenance costs. Option C represents an additional 1/4
November 30, 2004 Page 4
cent sales tax package of community enhancements, beyond the renewal of the two taxes set to
expire in 2005. (Attachment A-3) Staff does not recommend placing the Option C package on
the ballot at the April 2005 election because of the other tax issues scheduled to appear on that
ballot.
Option A:
A package of 14 projects, totaling $47 million in capital construction. The 14 projects cover
several community services, including Transportation multi-modal projects, bike and pedestrian
projects, parks, library, police and natural areas projects. A mix of projects provides some
progress on a variety of needs and an attractive package to a variety of voters. (Attachment A-1)
This package includes O&M as part of the 1/4 cent; therefore no tax increase would be required
to cover the on-going costs of the capital projects. Voters could be asked to make the O&M
portion of the tax (0.037%) an on-going part of the City's sales tax.
0.215% Renewal of BCC tax with sunset provision
+0.035% On-going tax for O&M
0.250% Total tax renewal
Pros: Cons:
• An attractive package to a variety of • Fewer projects can be accomplished if
voters 10 years of O&M costs are included in
the package
• Addresses basic needs in several • Leaves many high priority needs
categories unfunded
• Incorporates O&M costs within the • A mixture of projects within one
scope of the '/a cent renewal package may be criticized for
"bundling"
• Addresses some critical deficiencies • Funding O&M with dedicated revenues
reduces flexibility in future years
Option B:
A package of 15 projects, totaling $55 million in capital construction. This option includes the
same projects as Option A, plus the North College Improvements project. This package would
require an additional, earmarked sales tax or other funding source for O&M costs. If voters were
asked to approve both a 1/4 cent capital tax and the on-going O&M tax of .0375%, the total tax
amount for the package would be 0.2875%. (Attachment A-2)
0.25% Renewal of BCC tax
+0.036% New tax for O&M
0.286% Total New BOB tax (or round to 0.29%)
November 30, 2004 Page 5
Pros: Cons:
• An attractive package to a variety of • A tax increase for O&M may be more
voters difficult to pass
• Addresses basic needs in several • Leaves many high priority needs
categories unfunded
• Addresses critical deficiencies • A mixture of projects within one
package may be criticized for
"bundling"
• Adds North College Improvements to • Funding O&M with dedicated revenues
the package reduces flexibility in future years
Option C:
This option proposes an additional 1/4 cent sales tax to accomplish 14 additional projects,
substantially in the Transportation Services categories. By including the New Transit Vehicles
project, the package would lead to significant new O&M costs ($1.2 million per year). Staff is
not recommending this option because of the other items on the April 2005 ballot. (Attachment
A-3)
Pros: Cons:
• Provides many more high priority • A tax increase may be difficult to pass
capital needs in a variety of service
areas
• Addresses basic needs and some • A mixture of projects within one
"quality of life" projects package may be criticized for
"bundling"
• Addresses more critical deficiencies • Higher O&M cost projects are included
in this package
• Packages could be split so that similar • Some may object to funding transit
projects are together services through such a ballot measure
Changes in Project Scope from Proposed Projects to Staff Recommendation:
In order to develop a package of projects that could be funded by a 1/4 cent tax over a 10 year
period, the scope of several projects has been adjusted in the staff recommendations. Changes
include:
❖ Pedestrian Plan was reduced from $5.28 million to $3.4 million
❖ Intersection Improvements and Traffic Signal Pool was reduced from $16 million to $10
million ($1 million per year)
❖ River Habitat Restoration was proposed at $10 million for the full scope of the project. It
was reduced to $5 million for the short list and then cut to $2.5 million to accomplish just
November 30, 2004 Page 6
the downtown (Lincoln to Linden) portion of the project and not the area around the
Pickle Plant
Bike Program Plan implementation was reduced from$7.1 million to $3.75 million
❖ Southeast Branch Library operation and maintenance funding of$705,000 was requested,
but that amount was reduced to $323,000 in Options A and B. The library would be
opened as a reduced service branch, but additional funding would allow a more complete
facility.
❖ At City Council's direction, the New Downtown Main Library and Performing Arts
Center projects were not included in the recommendations.
By reducing the scope of several projects, some progress can be made on more projects.
Additional needs within the reduced packages (e.g. intersection improvements, etc.) might then
be addressed if City revenues and the local economy improve in future years.
Timing of Ballot Measures:
The City has two options for seeking renewal of the Building Community Choices sales taxes
prior to their expiration. A November Election or the April 2005 Municipal Election are the only
options available under TABOR restrictions. Capital sales taxes have generally been placed on
Municipal Election ballots because voters tend to focus more on local issues at that time.
Seeking renewal at that time would also allow the City to consider a different renewal measure
at the November election, if an April measure were to fail.
Though April elections have been used in the past, the uncertainty created by the inclusion of the
grocery tax repeal may raise questions about the timing of the Building on Basics renewals.
Issues to consider may include:
• Would a repeal measure and a renewal tax measure confuse voters?
• Will the grocery tax measure bring a disproportionate number of anti-tax voters to the
polls?
• Would the inclusion of renewal taxes on the ballot suggest that the City can afford to
forego the grocery tax revenues?
• Would postponing either renewal just postpone funding of critical needs?
ATTACHMENTS
A-1-3. Staff Recommendation Excel Spreadsheets
A-4. Master Project List
B. Summary of Council feedback from Exercise (will be provided via e-mail as soon as it is
collected)
Brief project descriptions
Full project sheets
Tax rate comparisons —total tax rate and municipal tax rates
Full List of Options, Capital Program Operations and Maintenance Cost Funding
Citizen and Board and Commission input—Transportation Board, Air Quality Board,
Senior Advisory Board
Attachment A-1
Building on Basics 2005
Option A
Staff Recommendation Including O&M within 1/4 cent Renewal
Tax= .215% Capital, .035% O&M
Unfunded Total New
Cost (in O & M Costs,
thousands) Annual
Total of Projects Selected: $ 47,207 $ 780
Total Cost with 10 yrs. O&M: $ 55,002
Includes Tax Required for O&M: 0.035%
Libraries
Library Technology $ 4,472 $ -
Southeast Branch Library $ 1,450 $ 323
Parks and Recreation
Community Park Upgrades and Enhancements $ 2,500 $ 40
Neighborhood Park Upgrades and Enhancements $ 700 $ 55
Restroom, Office and Irrigation at Roselawn Cemetery $ 275 $ 5
Community Planning and Environmental Services Projects
Cache La Poudre River Habitat Restoration $ 2,500 $ -
Police Services Projects
Police Services CADReplacement Project $ 600 $ 219
Roads/Multi-Modal Transportation Projects
Harmony- Seneca to College $ 3,700 $ 22
Intersection Improvements and Traffic Signals $ 10,000 $ 6
Lemay Avenue, Lincoln to Conifer $ 9,832 $ 28
Timberline -Drake to Prospect $ 3,105 $ 18
Transit
Replacement Buses Transit Fleet $ 923 $
Bike/Pedestrian Enhancements
Fort Collins Bicycle Program Plan Implementation $ 3,750 $
Pedestrian Plan and ADA Improvements, Continuation $ 3,400 $ 64
Total of Projects Selected: $ 47,207 $ 780
11/23/200410:40 AM WWWWORD\BOB 2005\Project Planning\Staff Recommendation\Staff recommendation v3
Attachment A-2
Option B
Staff Team Recommendation with Additional Tax for O&M
Total Tax = 0.286%
Unfunded Total New
Cost (in O & M Costs,
Sales Tax amount: .25% + .036%= .286% thousands) Annual
Total of Projects Selected: $ 55,487 S 787
Total Cost with 10 yrs. O&M: $ 63,352
Amount of Additional Tax Required for O&M: 0.036%
Libraries
Library Technology $ 4,472 $ -
Southeast Branch Library $ 1,450 $ 323
Parks and Recreation
Community Park Upgrades and Enhancements $ 2,500 $ 40
Neighborhood Park Upgrades and Enhancements $ 700 $ 55
Restroom, Office and Irrigation at Roselawn Cemetery $ 275 $ 5
Community Planning and Environmental Services Projects
Cache La Poudre River Habitat Restoration $ 2,500 $ -
Police Services Projects
Police Services CADReplacement Project $ 600 $ 219
Roads/Multi-Modal Transportation Projects
Harmony- Seneca to College $ 3,700 $ 22
Intersection Improvements and Traffic Signals $ 10,000 $ 6
Lemay Avenue, Lincoln to Conifer $ 9,832 S 28
North College Avenue--Vine Drive to Conifer Street $ 8,280 $ 7
Timberline- Drake to Prospect $ 3,105 $ 18
Transit
Replacement Buses Transit Fleet $ 923 $
Bike/Pedestrian Enhancements
Fort Collins Bicycle Program Plan Implementation $ 3,750 $
Pedestrian Plan and ADA Improvements, Continuation $ 3,400 $ 64
Total of Projects Selected: $ 55,487 $ 787
11/23/200410:40 AM
Attachment A-3
Option C
Staff Team Optional Additional Tax Recommendation
Unfunded Total New
Cost(in O & M Costs,
thousands) Annual
Total Capital Cost: $ 45,232 $ 1,814
Total Cost with 10 yrs. O&M: $ 63,367
Amount of Additional Tax Required for O&M: 0.082%
Libraries
Library Materials $ 2,548 0
Cultural Facilities
Fort Collins Museum Expansion $ 6,500 300
Fort Collins Museum Storage Facility $ 2,400 20
Police Services Projects
Police Services Automated Vehicle Locators (AVLs) $ 487 66
Roads/Multi-Modal Transportation Projects
East Drake Road--Harvard to Stover $ 2,073 2.5
Intersection Improvements at College Ave. and Harmony $ 4,140 2.5
North College Avenue--Vine Drive to Conifer Street $ 8,280 7
Prospect- Poudre River to I-25: 4 Lane Arterial $ 5,382 19
Streets Facility Expansion $ 1,300 60
Timberline--Mulberry to Mountain Vista $ 4,554 28
Traffic Signal Replacement Project (ATMS)Enhancement $ 2,000 47.5
Transit
New Vehicles for Transit Fleet $ 618 1234
Bike/Pedestrian Enhancements
Bike/Ped Trail--Spring Creek to Laurel (MTC) $ 3,450 12
Bike/Ped Underpass at Troutman and BN RR(MTC) $ 1,500 15
0
Total of Projects Selected: $ 45,232
11/23/20041 0:4 0 AM
Attachment A-4
Building on Basics 2005
Master Project List
Unfunded Annual
Cost (in Additional
thousands) O&M
Libraries
Library Materials $ 2,548 $
Library Technology $ 4,472 $ -
Southeast Branch Library $ 1,450 $ 323
Cultural Facilities
Fort Collins Museum Expansion $ 6,500 $ 300
Fort Collins Museum Storage Facility $ 2,400 $ 20
Parks and Recreation
Community Park Upgrades and Enhancements $ 2,500 $ 40
Fort Collins Senior Center Expansion $ 8,480 $ 255
Neighborhood Park Upgrades and Enhancements $ 700 $ 55
Recreation Center at Fossil Creek Community Park $ 20,988 $ 1,665
Restroom, Office and Irrigation at Roselawn Cemetery $ 275 $ 5
Community Planning and Environmental Services Projects
Cache La Poudre River Habitat Restoration $ 5,000
Police Services Projects
Police Services CADReplacement Project $ 600 $ 219
Police Services Automated Vehicle Locators (AVLs) $ 487 $ 66
Roads/Multi-Modal Transportation Projects
Drake Road--BNSF RR Grade Separation $ 10,350 $ 3
East Drake Road--Harvard to Stover $ 2,073 $ 3
Harmony- Seneca to College $ 3,700 $ 22
Intersection Improvements and Traffic Signals $ 16,000 $ 6
Intersection Improvements at College Ave. and Harmony $ 4,140 $ 3
Lemay Avenue, Lincoln to Conifer $ 9,832 $ 28
Mulberry St./SH 14 Park and Ride--Mulberry/125 $ 1,000 $ 100
North College Avenue--Vine Drive to Conifer Street $ 8,280 $ 7
Prospect-Poudre River to I-25: 4 Lane Arterial $ 5,382 $ 19
Streets Facility Expansion $ 1,300 $ 60
Timberline- Drake to Prospect $ 3,105 $ 18
Timberline--Mulberry to Mountain Vista $ 4,554 $ 28
Traffic Signal Replacement Project(ATMS) Enhancement $ 2,000 $ 48
Transit
Replacement Buses Transit Fleet $ 923 $ -
New Vehicles for Transit Fleet $ 618 $ 1,234
Bike/Pedestrian Enhancements
Fort Collins Bicycle Program Plan Implementation $ 7,100 $ -
Bike/Ped Trail--Spring Creek to Laurel (MTC) $ 3,450 $ 12
Pedestrian Plan and ADA Improvements, Continuation $ 5,280 $ 100
Bike/Ped Underpass at Troutman and BN RR(MTC) $ 1,500 $ 15
Total Unfunded Cost: $ 146,987 $ 4,652
11/23/200410:40 AM
Attachment B
•
Council Member Priority Setting Exercise
Summary information will be provided to Council
via email as soon as it has been collected
• November 23,2004
•
5
Attachment C
i • 1
'1.,.e.LevLkfoan
rrmeca.msmnbkwmbvla �� '
39inYFaeXy P,paar \ Z
s Imsa<rmrl €
mommv.mnnbmsgrPm I ( \ z t V
e raQsa.M,wl�r.avbveaio®s.. I� L
9 Rez Yn,es GDR.pmFnv Pejea L ��
rs w.cb...wrakrdrrikry
n RgY.'menlsm rrmunN
1]it Cain9ci[k R ADAA nNP/ngl#vr
13 PebTn Rnme,O,lmpaemnp
IL/NNeI I _
11 hufi'^Y4WCeMe � �i
13 G[Mla Pwtlre Pva rbpfYRe4aMn �
r8 fmmmiy gM(IgpeaxtlFM[meN
Il fTCdba Weeum54aaJe[etlfl] , r
.,
+s m.}reaw>or �J i
m lermrsrr:,
21 R�Clke mabyrm.r {\ {
Rae„m��sR. Ir'
u wkmis nn.a R« _
a wmm,�maam.l,e.wnmsewvN
}.mm..moallrpm...,eamrrxs STllPm !
ss swamsr,.mmmmmb nir>fxagrpa
a YMasYnbpwarmibMp,9TtlrW \
n Ilm.emmlrwrmm.ar.arras.svwvm
x v,e...smlammmrmewn.Is.sprnPm
• n Rr.m..eml.Plmm.,k,lerrNosk.lwe a nNm,.reo'llr.rwm.,m„,unals�sywlm �+ 1
]1 DA'q NriN-$Yy OpeYbWrtl \ vl I
MQ
3}Nmu0n4gyp„amyyaMTDftS .
D laenbNFrpwmvtlaaMTYRc$�W{M \ )
]a GmmmTr MIIFD�`<aMFaycmv4
8 INnztiblr�pmmaM W 1Ne[9pMrby
]B RgreG Ra..FbYe Rrvubl.E,Tkre Nb.Y1 i t� 1 \ \ '
3I Irlp yulrgpmpp aM iNe[S —
M Cbnv^p PN Ulgebmtl PMxw�up 1-1
b FmlfdM4ly fetle'6WrMi � , U i
IO Ykrsm]mingmnrmpaNiryec9pul Rd /
r Pa4 R1.M5f RR Wah Sgr4n /
.]IM.sY'nllrpumngstlirffi[S}IialPM I
NEVWM-MnYYb9m'er � �;
ITnmlanNpperWamYiyra SpJgy
4'liNw4e-RM1eb Rglavl
M�rMIIm BFpRa<gkn lltlnPra[YBS IM
Q Y1m.xlanlnAm'erMeMTYrc AIbIPW �i
Y rlkmnl.empb(Ylp1 `I 1
tl Il.abatinppMrip.>aMiryh SpW qW 1
owmrkmp 1 ;i
el lipralytl.Nat
us,arr.woa rsra.ar�ma.aronm sP.IPN � � ��
9 Ir3anvlbnF�
s.ewNna6mNLbary I
M R4�vASCnhr alFmiGMCpmutypyll ; i
w uu«n�vrwmmre.w am rras.swlPm..� e. . � '__••\�Y ii
_ — 2
Bu
onW� Ing,4
si
� 1 . 1
11 .
r :^'s- x t=.;Y.a • ,.. Wg1p-.. ^ x, e�y r.�.
TIMBERUNE DRAKE TO PROSPECT
(� Protect peacripgoa Wtdpn 1-mile ofTirRbedmeRoad t_o 4lahe arterial Sn'C,et
I�i')
� vx[cvcv upgrad standaNSr mclti$ing recpostrgsyon of lheTtmberlm0t�pros�,C�erse�f"iprr:•.
I * { i Thelrolectalso',ijtclude;asl rrfjr t6nAge Alder nga7$piin$. e,k ah
ilk\ 1. I e and wid'srtmg iii t 6rea't Westen512R%c bs iitg. .
f uuteraar sr ____) Prolett[mtralrot� Tim arbng lYoad, 46 fdrellta`ka lnterSe¢¢on to
justnorth Rftl_E rospecttntersecti .,
Whyrsthis Pjrq eeilga? f
aos cr ao •Congeson milrgation r fail{ng levels of service'.
•Public safety ti�gh ae[admtigCeyntetsichoa"-
— •Inadequate facilities foiyedestn`an"s and¢irycljsrs
•Air quahry. ,
NJ,. ` Prolect Costs: FUNDED S8,¢94,000
UNFI*,DE : S;4105i00,¢
ESTIMAT$�TOT�cbST,fS 111991l�f
i oa rrooru ao PROSPECT WAD' POUD,RE RIV. If Ti}`�2
�'--� P{oletNDelxrlRtion Wtdenlirgles ofP'asl Erosliecfl[ifad to 4ime1a,7ypaF
T s0eerctandard.4•,.
Rrleet L«itioni East Prospect Road from Sharp)'`oini Dnva`lo the Y-25 west j
flj, p fyro'otage road.
Project ed?
n 5 3, d61 ety. ,ra ,r
milig4 °.r g ty h e.
_ a ewa9m the 3,$ ..
gycentu 4nndiC rvrce�ral de
id at the 1-Z5 mte[bhang§.,,
:f ttP,-tact stns•d8 FUNDEUS2, 9g,000,v '.,
' UNFUNDED: S 5,382,000
E�TIMATED TOTAL COST: $8,280,000
Prpjett Description:Construct a new de-icing materials storage and
loading facility for materials used in winter snow and ice control.
Project includes restoration of old materials warehouse for equipment
storage.
t t n Project Location:Streets Operations Facility,Lemay at Vine
r
F - Why is this Project Needed?
•Public safety and comen ence warrant effective mow and ice control.
•Snow and ice operations require materials that must be sheltered.
s
+ •Presently de-icing materials are kept in a historic brick warehouse.
3 .� It was not designed for this purpose and is deteriorating.
•The current operation is labor imensive and not eKiciem.
•There is inadequate shelter for Streets Operations vehicles.
Project Costs: FUNDED: $700,000
UNFUNDED: S 1,300,000
ESTIMATED TOTAL COST S2,000;000
w s::
r$
f
8
• t
M im wt
HARMONY - SENECA TO COLLEGE
1 I Project Description:Widen 1.7 miles of West Harmony Road to 4-lane.arterial street
ortenr so standards including bike lanes,sidewalks and a complete reconstruction of the
I I ` "armory-Shields intersection.
fi _ 3•:
—T' Project Locations:Harmony Road,from College Avenue west through the Shields
'.! nonerr olx^Ro . _� 'l I � intersection to Seneca Street
r Why is this Project Needed?
_ s a J •Public safety-Harmony Q Shields is the City's highest accidem rate intersection.
" `--s ( �� •Congestion mitigation and air quality and promote alternative travel modes.
'� _ •Support to a public institution-Front Range Community College.
i How will Needs 6e Mel?
(� _ •Reconstruct the Harmony@ Shields intersection to provide turn lanes,signal
improvements,crosswalks,curb ramps,bike lanes and pedestrian refuge medians.
•Widen Harmony Road to 4-lane arterial street standards with bike lanes,landscaped
i. medians and parkways,and sidewalks
1 •Upgrade the RR crossing just west of Mason Street
f •Retrofit bike lanes between College Avenue and the RR crossing.
Project Costs: FUNDED: S 5,201,000
UNFUNDED: S 3,700,000
Iy ESTIMATED TOTAL COST $8,901,000
=1 IoARPt"'rR tip COLLEGE AT HARMONY INTERSECTION IMPROVEMENTS
Project Description:Reconstruct this intersection to provide needed nun lanes,
crosswalks,curb nimps,pedestrian refuge medians,bike Imes,signal improvements,
and concrete paving for its ultimate configuration.
• Project LOeatipna:College Avenue(US Highway 287)at Harmony Road(State
Highway 68).
• Whyis thra isiject Needed?
•Cvongestrgn nmigation and mobility improvements for all travel modes
•Publicsafeeltyyk
•'fiaisnngpaJ%ent is seriously coned.
How will NeeN.bbe Met?
`Complete roc
onsmiction of the inteisectiott
•Configure for future 6-lane College and Harmom intersection.
•Install ram lanes,crosswalks,curb ramps,pedestrian refuge medians,bike lanes and
signal improvements.
•Use concrete pavement for best durability and most cost-effective life-cycle treatment.
Project Costs: FUNDED: SO
UNFUNDED: S4,140,000
ESTIMATED TOTAL COST: S 4,140,OW
Project Description:AIMS will enhance the new traffic management
system so that new and improved technologies can be utilized to further
Project Locations:City-wide improve traffic Flow.
•Install advanced delection along the major corridors so than new
Project Costs: FUNDED: so timing plans can be dynamic to changing traffic conditions.
UNFUNDED: S 2,000,000 •Install variable message signs along the major corridors so that real
ESTIMATED TOTAL COST: $2,000,000 time travel information can be conveyed to the motoring public.
•Develop a real-time traffic web-site so the public can have real-time
information regarding traffic conditions.
BU� lit r
®nt�iSIS
9
1 . IFILVA M11 .
LfMAY -LI1a� er4
oucus reo tr � t�S<
Prorial s e ,��4rr 4, o �et gAlu and:�pA'-J$ne; .
arterial str a oc a-a a n, v Ar 11SF
u '� a RR tiackstatj `�mQiDdrFy sd'a1f5ffy>t�YOt in.8 'imay
iniersectiori.J� �n approxth�t?Tk Y�� ,.-p 51g`.cOrJey4t`�3hPri,.
�� a W ..- - Proiect Lp`p5b$h''�lgnl).enyvy AvFrure.4�LJieolraArajue dnSfGgjlilSr,Sireet.
LLO% LN OU }PIN VIS
•Protect 'MP1Pnettei (iodicp,�ds f3opYtlYe'antfAlt2Vista).:I � L r � (AnOe
�' •PIIb11C S
OHIEEP 5] •CWgei tl
•Alf Q11011 l ""l ( >
•,1 A F 'r Y a 2Y Y.
NE DP ProJcet �S} 3 rr �a "
ESTI
ULBEFRY si # •'a45'tY
NORTH Ct�E ViMT(fT�IWI�ER
- Project Docnpd s Goy Fops frrrltle;0�'Ng3Ui,CollEgeAvepue to 4;1'ah'C aitenal street
3 ;; �1 -., standards
PeOSPECT Ro PYOjeet LAlT4 " ��5Udb3y"�e IO�Camfe6�SFISeek
Why is th
•Public
Con fi
•$Lm1118 x � `e(9"m111COYln tlle'gfP.a'. ,
.a' P'�£JSS. o$�t3:` • F17t�6ED
FUNDED $8,280,000 .:
' TOTAL T; 88,280,
x�
T Q TA V t
r sc ti rn lea - T line to fan$. 'd
(o s r e`rpasc`s Jof NtNSP
in ve.
-
y, `ea thin:Timberline Road,from East Mulbany Street(State Highway 14)to
Vista Drive.
#i
is Project Needed?
� 1G ely,toreduce conflicts at the RR crossing.
pacts to the historic Plummer Schoolhouse
the Mountain Vista area master plan.
evelopment in Northeast Pon Collins and supports the Anheuser-Busch facility,
oats: FUNDED'$19,216,000
UNFUNDED: S,4;554,000
s� ''�'y 1 a r a a tl }, • TED TOTAL COST: S 22,770,000
PeojeetDescription; An approximately 3 acre"Park and Ride"lot
�. Project Locations:Mulberry SLISH 14 Park&hide-Mulberry St/SH
14 and 1-25 Interchange.
F1T, ;r a Project Costs: FUNDED' so
UNFUNDED: S1,000,000
T #" T f@Ir �r""�"5'tts'( 'rop�" •'h +� ESTIMATED TOTAL:COST: $1,000,000
1# ,r tax''tnr>a'^,Asy es
s5�'
�✓14'Av 4 ��?! "j
?fi b P
10
' 1
DRAKE ROAD - BNSF RR GRADE SEPARATION
Project Description:Construct an underpass for Drake Road to cross under the Burlington.
—j Northern Santa Fe(BNSF)railroad hacks
u>Oe?E�E \ Project Location:Approximately 1,000 feet west of College Avenue on West Drake Road_
— _� uuEaicar sr Why is this Project Needed?
u •Public safety.
•Congestion mitigation.
•Air quality,
1 R;rsrht D Project Cosh: FUNDED: s0
UNFUNDED SIZOO,:
ESTIMATED MAL UST.$1
MF E RD
EAST DRAKE ROAD - HARVARD TO'STOVER
t 1 I vORS'T iR� Project Description:Widen%rude of Drake Road to provide bike lanes,better sidewalks,
I "34 and left-turn lanes. .. _
Project Locahon:.On.East Drake Road,lust east of College A enue.
` i 1 j ,aJ Why is this Project Needed?
`uuour RD r -"®— •Promote use of alternate travel nodes.
' •Public safety,-Congestion Congestion mitigation,
-Air quality.
Project Costs: FUNDED:. so
UNFUNDED $2,073,000
ESTIMATED TOTAL COST S 2,073,000
• - „ Y i.
INTERSECTIOt�s�NCIt vWfNT ANp Tk €FIC SIGNAL R00,L,; Ar
Pralect DRseriptlL"n Thugpro ect is rnt'p`nd in irppD;'c JAu"e traffic, owrkafety and
capamty num$Lrof elPstin artenal3nt o11uu�)ltmugbout me conorq od y
Iihprovementrinchlde�6iu[are ' 1'jimied to toIlSi3mg
Constriction ofnew or upgraded tr 6 Ir If
Por leftd aff r signals, 1 1
CaepossiionofngMlacintlefltum lanes with
intersections, --
•The possubiliry ofreplaangiraRc ngnals.wtih modem roundabouts, —i, 'ay'd I 1
•Pedestrian and bicycle improvements,and l cM1_ °`"-`f �1 L-a=�
•Pavmg intersections in concrete for greater;durability.
-
Project Costs:ESTIMATED TOTAL COST$2,million per year
Project Locations:Candidate locations are,bid not him
led the following:
•Shields @ Harmony •Mulberry @,Shields r S •j
•Taft Hill Q Elizabeth •Mulber y'@ Taft Hill
•Lemay @ Trilby -Prospect Q College 11'�a ! 1 * T s
•Overland Q Drake •Prospect@ Lemay, IE
•IFK Q Troutman .Prospect@Timbeiline
•Mu16anY @Prospect
Canyon •Drake®Lemay
•Overlaid QProspect -Taft Hill®Laporte
•Lemay @ Harnony +Harmony Q.Mwon
•Laporte Laporte@ Shields 1 _ �• , I
B1It .
OYl
FORT I RI YCI.E PRmGRAM DEAN IMt?LEMENTATION
Project Ues nopN)jd�plem@ntapo�,o lga tiyFlF)mpigvamenlrin aGCpplarice,wikh the
adopted Fo�[c}„'c1aP.ro rPJaq(19y5l soidfdatedTranspbnsnon blaster ,.
e- Plan(20p4) Pfoleefs nt(¢jr mcl�i�'eelay dnd�byetpa@ses,on streeCbrke lanes,and;
ofP-ma :.mulY�plu "e lFgtlS
Project Loi1v
, dCony is tl n respon{tiwaolranonChoice. Bit�3stefficient,b4e�ra( j (,'andi[ nq cu ms`pjf on sXs{sm K39lhy dltlec
streets and arkptinonm �Ig``mnot nabpsatibr equate b�kefadli$es,
r Project CosCsr r F Ep; S0'
:e ESTIMA T ;T. S7,10A Qo0_.
_ 1 r 1 3 ru r txv, es,
o�sthx oti:l%�keC" LhD£dtfi4rm.36aS.Pttos , _
A4n o�6Y�6q�tAe �No?q,Yern SerataFe ._
a "g�'"nn"32[o1dKC)udes° l6xf a rWl'eF'd(``staYd'9=
" �iidsia�t'kdirmY° ossmg
9y $-
v
ki �yc fw' A'I.C OOIG ry
Pr61a�t'Uescrip on:Provides bt ped' eqs under the urlington.
WNW INN Northern Santa Fe Railroad Connecting thaMT bike/ped.trail and the
Troutmanaeighborhood to the Commercial and mploymant areas along
r+i Smith Mason Street and South College Ave.
ct"`+ax Project Cosh: FUNDED: "S 0
UNFUNDED: $I i00.000
ESTIMATED TOTAL COST: S1,300,000
RE, AT±{b FIA14LIIP Mt€�1,' TINUATION
imbilities Act(ADA) --
a erupdaled
Access Program,
r ude sidewalks,safer
pe improvements.
jlla�zg
tr¢ ek¢ !_g.o a "".i r to create a walkable
R k {gl ety and viability of
a ds and removing
to that children
5�t an
ycee e £ h i Oi`y.
lTo 4 6
r
rypvf P ..
Y t ,�, n1 Si pYR} {'aDiYV.
'=R
12
;— — REPLACEMENT BUSES TRANSIT FLEET
Project Description:Twentysiz(26)buses are scheduled for
replacement This includes 14 mini-buses,8 full size coaches,and 4
service vehicles.
j - Why is this Project Needed? project will continue an uninterrupied
t adequate level of capital equipment support for the on-going transit
services in Fort Collins, The current fleet is exceeding the cost effective
life of the vehicles art$-some aiepast due on the replacementscbeddle.
. newest technology to
improve operating costs add e8ictencics..
'>. How will Needs be Mit?The replacement chicle,will include the state-
o&the-art safety equipment,alternative fuel ppommim,,emission
controls,passengerassist lifts,:lighting,and easing.
Project Costs: .FUNDED S'3,690, • (Projected federal grant)
-� UNFUNDED $923,
--- ESTIMATED TOTAL COST: S 4,613,0
• NEW VEHICLES FOR TRANSIT FLEET
Pmj"l Description:This e ro ct would P P 1, acquire 10 new vehicles to be used to prowde 1
additional transit service,including increased frequency on Route 1,extending the
FoxTrot route to continue to the Downtown Transit Center,and adding new service to i the PmspectTmberline area and the Harmony Road condor. s 2
Why is this Project Needed? - -
•Provides mobility choices to the public i
•Provides transit service in Iwo areas,Prospect?imberline and Harmony Road,where s
there is no current service
• Increases the bus frequency along College Ave.to 10 minutes -'--
•Reduces the requirement to transfer between bus routes
• Improves the air quality y rIr
D
i
How will Needs be Met?New vehicles would be used to provide transit service b the t i
unserved areas Additional buses will be added to Route I and the ForsTrol route to
increase the service levels.Requests for federal giants will be submitted bassist in the �.
financing of the capital and O&M ex �-
g p pensa: This transit service will initially generate
over 400,000 annual rides.
Project Costs: FUNDED_ S 2,473,000• (Projected federal grant) - 1
UNFUNDED: S6I8,000
ESTIMATED TOTAL.CAPITAL COST. $3,091,000 ,•; ! �i
FUNDED: $665,000• (Projected federal grant) -
UNFUNDED $1 34,000 �' I
ESTIMATED ANNUAL O&M COST: $1,899,000
- ' ' —t vs•.0 "
't
Bu-
w-
o°n as
13
Po Police services objcetice is to pros We a safe, secure
eommunitc encirounoent for all residents bN prolectin-
Iite & ploper h, preserving peace & order. presenting
Services
� �\�// ��� m& detecting crime, enforcing lass & ordinances, and
prooting safe use of floc Cites streets and l,iglossa%s.
_.
Fi
Lk ♦♦ NC JJ y �
e� 0 p -I � �•) 91�,.
K W� -
Y:tii
III
r
IN V�
a
ire
® s
f 9 LI 6T s"��� ;J� k Y�•, n hp�'
- - ----- FORT COLLINS SENIOR CENTER EXPANSION/PARKING
Project Description: The facility expansion is a two-level,30,000 square
j foot facility for multi-generational use.Facilities include.craft rooms,kiln
room and storage,outdoor kiln courtyard,workout rooms,locker/rmi,mms,
office and storage space,and more. Addition of 5045 parking spaces on 2
i acres for the facility expansion and 75-100 parking spaces on the
Rarmree/Shields site.
fI Project Locations: 2 City-owned acres southwest of the current Senior
Catter;and urdtase.md deielopmmtofthe northwest comerofRairibm,
nvean r imet or ng expanst
Why.is this project needed?
Parking.
j -Lack of parking-spaces dunng high tt matthe Senior Centerhas
(t been a ma/or problem since the Senior C ter opened in 1995-
• Expansion of the parking lot to the east w�uld allow for adding more
handicap parking:
Facility Expansion:
•There is an ever-increasing demand for mere exercise and workout
space in the Senior Center,which currents has no cardio or workout
equipment
•Pottery program expansion would occur a pan of the senior center
,expanstort ,.... .,.. -
• ^,Consolidation ofans and crafts activities djacent to the senior center
would enhurc'j)amcrpatmn.
PrbjectCash FUNDED: so
UNFUNDED: S ,000,000
RECREATION CENTER`AT ESTIMATED TOTAL COST g',000,000
FOSSIL CREEK COMMUNITY PARK ESTIMATED O&M COSTS 480,000
Project Description:'60,000 square foot building with a partial second f
floor for multi-generational use Famines mcil6Ae indoor an8'outdobn _
pools, /gauce Toms,kitchen-'_
,}ockerre0•n9,classrooms;
activity/game room,kitchen;oRices,and more."
Why is this Project needed?
•The majonry of recent city growth has ocanred to the south.
•There are no public recreation facilities in:the southern pan of the city_
•Fort Collins is lacking in indoor recreationfacihhes compared to other --
Front Range cities.
•Parks and Recreation Policy Plan identifies a recreation center in every
community park.
•Landm been set aside for a recreation center in Fossil Creek
Community Park. �-
Project Costs: FUNDED: so `i rt•
UNFUNDED:s 19,800,000 `
ESTIMATED TOTAL CAPffALCOST: s19,8000o0
ESTIMATED O&M COSTS: S 1,188,W0 E, j
i
Bontasis ®
15
PTtgKC�FS lib-€NIfiA"fFI� B Y
��ce� tlYµenRuan
Par cr sefplgnfr�e plazan'ear ihcotd all
¢n�,gailmrjhsg6t6V'e���i1Y '.
3?2 n Fs'�rr.R�1h&nem dl� 'R '.
4 �ktlSd�Prk[d1oY+5µd1�fM1Y¢t�tfrl
( �e'm�}4arIE'wrtb''!Imrb mgSY io�}�v}�a1T$>indsntrp
@tSg9U!Ia1:Ak1[d&3ra[ks.;
1� �built
a 6C
qIN
y 2 ploy6 a`lm�tfiR]+ys �.
06
q—
z,
Y iDe Wri 1 0l will ifstrla:t a restroom,md office
1 aswell new round i gation system_
ct Costs: `E so
UNMNDED $300,000
ESTIMATEDT©TAL(j S300,000
3i' �. I •;4 �F Y P t✓. 4'w
9 � Cy5@
t ___ryppp`//yw e 4b '`3' f i 1:� !✓a� �' 71���'. � <r- p•%
1S
58
.i
tv
B F kd
� ents
r�
a
i
u
`i7
16
LIBRARY TECHNOLOGY
' Project Description:Continuation of funds to pay for the library's computers,software
and maintenance costs.
t
4. t Why is this pmjat needed?The funding for all existing library technology was
r ,f provided by Building Community Choices taxes which expire in 2005_Technology is
{ - ._rssmUaLlOAh library,_bility-laprmideNgh.quality.lihraq services to a growing
II population.
I All access to library services is dependent on keeping compuL access up to date:
finding and borrowing materials,communicating with patron'about theiraccounts,
home access to the library's databases and collection and ac to the Internet when
f! doing research in the library. IIIIII
f Project Costs: FUNDED. so
UNFUNDED: $4,472,000
ESTIMATED TOTAL COST: $4,472,000
#inject,Description:S3441000annually-for new ibrary materials to
,iacreac i the collection by;26,000 items;Cimulatio ,City population and
- `- operational costs have all steadily risen while-xpe i inirea for library
materials have decreased. Fort Collins has2 7 per capita,nearly the
same as during the 1939s. These funds would allgW us 10 raise our average
books per capita to 3 5. 1
• Project Costs: FUNDED: So
UNFUNDED: S 2,�48,000
ESTIMATED TOTAL COST. $2, 48,000
• Project Description:a 20,000 square foot bran library located in the
Southeast section of Fort Collins to provide neighborhood access to the
most popular collections and services for nearby residents.
Project Costs: FUNDED: $3,000,000
UNFUNDED: S 1,450,000
NEW DOWNTOWN CIVIC CENTER LIBRARY ESTIMATED TOTAL COST: S4,d50,000
Project Description:100,000 square foot state-of-the-art facility to replace the 28 year
old main library which is 34,000 square feet and one of the smallest in Colorado
serving cities of similar size to Fort Collins. } Ili
Why is this project needed?We are currently below average at.5 square feet per
capita compared to the Colorado State Library recommended 1A2 square feet per
capita.This new main library would provide adequate space to serve Fort Collins
residents beyond the completion of City Plan.Voter approved funding from Building
Community Choices was used to purchase land on the northeast comer of Howes and
Laporte for the Civic Center Library for this purpose.
Project Cows: FUNDED: S 1,000,000
UNFUNDED: S 39,000,000 I
ESTIMATED TOTAL COST. $40-000-(Nq
— — __ __ `
i
BWasi
in r --- — ---- ��
s �®
17
w }
era a� ��)�a kS7i3p53�ark
G r
u . F D
R. ,;,FlN &yl,U0lFitlVlO
x
T
p�Ik d 3h
Y , t
vv.iw
35,600 Object artifact coltecdon
yp w Project Coate:» FUN ` so
\9ikt �' I'T x 9 ttHNf' �2, 000
D TDTA`L 2>4`n00 flPT
ANNUAL. S�2o
rl t ' cl
-anal promote local
dMS, s ('
�: 4l
ces a a new 1
al site sttialy, Gi
fot'Block31
i
ti
s SFkYtneH the
t denlaiS mmnceHalt S
� d �
'-
}Jb
tFy.. ..w ........e
v�gk 4�t;C�
18
CACHE LA POUDRE RIVER HABITAT RESTORATION
Projeet Descriptiow-.Restonngeend enhancing the banks of the Cache la
a Poudre Weer m the downtovvp atea„impmYmg tfie wild ife movement
winLot,enhansing dquati11
c babitat,restoring the native vegetafionebng
the river and gteatly:improvtnY�theseen is v4ties;Uthe rivet Costs for.
the ever restorapon mthpkdpwntpyyn;area are estimated'W the
�5`fP,06Q(f00 tlui,,,,,,}},,lyEt Wses anvuual R6�e-ofSi ltbQODD' ^.
ary' or'�u rye 2ylYenueUti 'pearn to
Wliy ij lhu protec[heeded>'7}ie pverb anEtiverchatmelmdtie
Do "'qwn Area a[e'thpoRtcbndWon,Co eiadeb�fs$tt�Atltet v
ha} ►tett dumped ifFgng�dhenvetltatJis an Ote rivet ilunnet m
attompt to sWbd�ee ks d cgnrot�1 m.gg��'I7iesr�gy'�itqa!s dvpp
U"yearshave�e$raQ th�bfet�abt dasnsgyalsds of l
er.
li�TIMATEDT vTC COST $S;OQ6; 0=
6` t
• ta
, a
4"
i
Bu
an�awsi�s�
19
Attachment D
Project Information Summary
006 Library Materials Unfunded
Cultural, Library and Recreational DeptJProgram: Library
Services
Project Description:
Funds would be dedicated to improving the existing library collection at the Main and
Harmony Libraries and any additional branches added during the duration of the tax.
Project Location:
Library Facilities
Why is this Project Needed?
Each year the library has less to spend on books. Currently we spend less than 10%of our
operating budget on books while the library standard is 17%. These funds would allow us to
reach and maintain the appropriate level of purchases for our community. It would also allow
the collection to be improved with newer copies of materials that are in short supply. The
average publishing date is 1991 for the current collection.
Other Related Projects:
All Construction,Planning and Associated Costs (X$1,000)
Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post2012 Total
364 364 364 364 364 364 364 2,548
Total: 364 364 364 364 364 364 364 2,548
�ay,November 08,2004 Section D-2 Unfunded Project Detail Page 10 of 82
21
Project Information Summary
43001 Library Technology Unfunded
Cultural, Library and Recreational Dept./Program: Library
Services
Project Description:
To maintain the current service level, funding is needed to continue the 1998 BCC initiative
for library technology. These funds will cover maintenance contracts and upgrades of
computers, servers, and software; funding for technology training, online databases, and
OCLC subscriptions. Funding will include a technology replacement fund so that we may
replace our automated library system in 6 years.
Project Location:
Main Library and Harmony Library
Why is this Project Needed?
Library technology is essential to maintain our current service level. Funding was provided in
1997 through Building Community Choices for library technology through the year 2004.
This funding allows for replacement of the automated system in 2005, but does not provide
the library long-range funding for technology.
Other Related Projects:
This project will directly impact the new Main Library project. Technology will be an
essential piece of the new Main Library, existing and future branches. Technology must be
funded to operate the libraries.
All Construction,Planning and Associated Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
559 559 559 559 559 559 559 559 4,472
Total: 559 559 559 559 559 559 559 559 4,472
Monday,November 08,2004 Section D-2 Unfunded Project Detail Page 9 of 82
22 2
Project Information Summary
60003 Southeast Branch Library Partially Funded
Cultural, Library and Recreational Dept./Program: Library
Services
Project Description:
A branch of up to 20,000 square feet is needed to serve the growing population in southeast
Fort Collins. This branch, in combination with a new Civic Center Library of approximately
100,000 square feet , and the Harmony Library, will provide space for library services to the
community through 2020.
Project Location:
In the area of Harmony and Timberline.
Why is this Project Needed?
Currently Fort Collins is below the Colorado average for libraries in respect to collection size,
number of staff to provide services and space for the community to meet, utilize the collection
and do research. According to the Colorado State Research Service report for the top 12
libraries with a budget greater than $675,000 in 2000, Fort Collins ranked 9th in staff per
1,000 served, loth in volumes per capita, but 3rd in the number of materials circulated.
These numbers illustrate the existing need for expanded library facilities. This branch will
• provide neighborhood access for a large number of families, educational opportunities for
children, and self-directed lifelong learning for adults. The public library standard for branch
libraries is to provide facilities that require no more than 15 minutes to travel from one library
to another. In attaining this standard, Fort Collins will provide vital library services to a large
segment of the population in their neighborhood.
Other Related Projects:
New downtown Civic Center Library and Library Technology
All Construction,Planning and Associated Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
Construction 3,000
3,000
Land and Design 550 _ -. - — _
550
Library Materials 900 --- --�-- -�- 900
Total: 4,450 4,450
Annual Operation&Maintenance Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
Materials 50 50 50 50 50 50 50 50 400
Cher 175 175 175 175 175 175 175 175 1,400
Personnel 480 480 480 480 480 480 480 480 3,840
day,November 08,2004 Section C-2 Partially Funded Project Detail Page 5 of 35
23 3
Project Information Summary
Total: 705 705 705 705 705 705 705 705 5,640
Funding Source (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
Capital Exp.Fee 3,000 3,000
Total: 3,000 3,000
Monday,November 08,2004 Section C-2 Partially Funded Project Detail Page 6 of 35
24
,,&roject Information Summary
001 Fort Collins Museum and Cultural Center Unfunded
Expansion
Cultural, Library and Recreational Dept./Program: Arts/Museum
Services
Project Description:
10,000 square foot addition to existing museum building
Project Location:
Library Park, 200 Mathews
Why is this Project Needed?
The Museum has made great strides in improving its current facility to make the best use of
existing space. However, the Museum is unable to meet the needs of the community.
Attendance continues to increase, summer programs are filled to capacity within days of
registration, galleries are too small to accommodate national traveling exhibits or display
more than a fraction of the 35,000 object collection, and the facility lacks educational
classrooms, or program space. The expansion of the Museum would enrich the community
and enhance economic development, servicng as a destination for downtown. Benefits also
include increased partnership opportunities with schools, community groups, and tourism.
• The expanded Museum would be able to fulfill its role as a gathering place, an educational
resource, a cultural experience, and provide the community with a sense of identity and
belonging.
The new construction consists of a two-story, 10,000 square foot addition over the east
parking lot and a centralized entrance off the newly renovated Heritage Courtyard. The
interior will contain a new 4,000 square food gallery, large enough to acccomodate nationally
traaveling exxhibitions, educational programming and classroom space, exhibit preparation
and loading areas, bathrooms, staircae and freight elevator. The two buildings will be tied
together by a glassatrium and pass through area, so as not to disturb the historic integrity or
site lines of the existing historic building.
Other Related Projects:
In order for this project to be completely in its entirety, it is directly linked to the public
library relocating from 201 Peterson Street to a new downtown location and the 201 Peterson
facility becoming a part of the Museum expansion project. Also related is a new storage
facility for the Museum, which would allow the Museum to relocate much of the on-site
artifact storage off-site.
All Construction,Planning and Associated Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
Construction,design, 4,400 4,400
engineering
Way,November 08,2004 Section D-2 Unfunded Project Detail Page 4 of 82
25 �/
Project Information Summary
Master Plan 100 t00
Stan up costs 2,000 2,000
Total: 100 4,400 2,000 6,500
Annual Operation&Maintenance Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
300 300 300 300 300 300 300 2,100
Total: 300 300 300 300 300 300 300 2,100
Monday,November 08,2004 Section D-2 Unfunded Project Detail Page 5 of 82
26 F
Project Information Summary
2005 Fort Collins Museum Storage Facility Unfunded
Cultural, Library and Recreational Dept./Pro ram: Arts/Museum
Services
Project Description:
This project includes the construction of a new 10,000 square foot storage facility to house the
Museum's 35,000 object artifact collection.
Project Location:
To Be Determined
Why is this Project Needed?
One third of the old Trolley Car Barn (Cherry& Howes Streets) was retrofitted into Museum
storage in 1995. The 3,000 square foot space has been expanded through the construction of a
mezzanine. When the 30,000 objects were re-housed into this space, it became apparent that
the space was too small to accommodate the existing collection. The addition of a mezzanine
has not relieved the overcrowding. The collection will continue to grow as the Museum
fulfills its mission to preserve the heritage of the city. The Trolley Car Barn as an historic
structure itself also offers unique difficulties in trying to create a climate-controlled
environment, free of pests,pollutants, and water. A new storage building will be designed to
more appropriately house the artifact collection, provide a more stable environment, and
is
require less maintenance.
Other Related Projects:
The facilities Department has also been considering developing a new storage facility. The
two needs could be addressed on the same property. However, the Museum Storage requires
strict access, high-level security, and regulated humidity and temperature climate controls,
requirements not generally needed for facilities storage.
All Construction,Planning and Associated Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post2012 Total
100 2,000 300 2,400
Total: 100 2,000 300 - 2,400
Annual Operation&Maintenance Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post2012 Total
General Fund 20 20 20 20 20 20 20 20 160
Total: 20 20 20 20 20 20 20 20 160
laday,November 08,2004 Section D-2 Unfunded Projecl Detail Page 6 of 82
27
Project Information Summary
41067 Community Park Upgrades and Unfunded
Enhancements
Cultural, Library and Recreational DeptJProgram: Parks and Recreation
Services
Project Description:
The City has four older community parks: City Park, built in 1911; Edora Park,built in 1971;
Lee Martinez Park, built in 1976; and Rolland Moore Park, built in 1984. these parks are very
popular and they experience a high level of use. Aging parks need to be upgraded and
enhanced to keep them useful, enjoyable and attractive.
This project includes a redevelopment of City Park that includes: creating a pedestrian
friendly plaza near the outdoor pool; adds sidewalks to connect the neighborhoods to the
north (neighbors now must walk in the street) adds much needed parking near the golf course,
as well as a restroom, and a basketball court; renovates the tennis courts; and improves the
old-time feel of the park with more moss-rock walls and entry features.
Improvements to the other community parks include new ball field lights; more places to
picnic or read a book, more parking, better shelters,more walking paths, facilities for people
with disabilities and creek habitat restoration.
Project Location:
City Park, Edora Park, Lee Martinez Park and Rolland Moore Park.
Why is this Project Needed?
This project is needed to upgrade aging community park facilities that are deteriorating and to
provide much needed improvements that will greatly enhance the City's community parks.
The parks will be safer, more useful and more attractive.
Other Related Projects:
All Construction,Planning and Associated Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
1,250 1,250 2,500
Total: 1,250 1,250 2,500
Annual Operation&Maintenance Costs (X$1,000)
Line Item; Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
40 40 40 40 40 40 240
Total: 40 40 40 40 40 40 240
Monday,November 08,2004 Section D-2 Unfunded Project Detail Page 28 of 82
28
roject Information Summary
058 Fort Collins Senior Center Expansion Unfunded
Cultural, Library and Recreational Dept./Program: Parks and Recreation
Services
Project Description:
This project includes construction of a two-story building on City-owned land adjacent to the
Fort Collins Senior Center, with an attached parking structure between the new and current
buildings. The building would total 25,000-30,000 square feet. The lower level would house
a pottery and arts/craft studio, including classrooms, electric kiln room, storage, outdoor gas
kiln courtyard, and support space. The upper level would house a workout room with cardio
and weight equipment and exercise rooms. The parking structure would accommodate up to
150 vehicles.
Project Location:
Two and one-half acres of land southwest of the current senior center were purchased in 1993
with the intent of expanding the senior center to accommodate additional services requested
by senior citizens.
Why is this Project Needed?
The current senior center does not have much space dedicated to cardio-vascular equipment
(i.e., treadmills,bicycles) or weight equipment. When the current center was built, a
• conscious decision was made to develop as much space as possible for multiple uses, instead
of tying up many spaces for single uses. This precluded dedicating space specifically for
weight and exercise equipment. As the "baby boomers" (that large population group bona
between 1946 and 1964) continue to turn 50 in record numbers, demand for additional adult
services continues to escalate, especially for fitness and wellness activities. The younger
senior citizens who have been active all their lives are a burgeoning market for these
activities, and they cannot be adequately provided for at the current center.
The current pottery studio continues to deteriorate each year and most of the use is limited to
the first floor, as the facility does not have an elevator. Ventilation and lighting are poor,
classrooms are cramped, and access to the building is limited to on-street parking around the
park and in the neighborhood. Moving this operation to a location adjacent to the senior
center is an opportunity to modernize and expand the facility, improve the safety features
required of this type of operation, and consolidate the arts/crafts activities already offered at
the senior center.
Other Related Projects:
All Construction,Planning and Associated Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
8,480 8,480
- -
day,Novemrn ber 08,2004
Section D-2 Unfunded Project Detail Page 24 of 82
29 G)
Project Information Summary
Total: 8,480 8,480
Annual Operation&Maintenance Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
255 255 255 255 1,020
Total: 255 255 255 255 1,020
Monday,November 08,2004 Section D-2 Unfunded Project Detail Page 25 of 82
30 'V
Project Information Summary
Allk
1068 Neighborhood Park Upgrades and Unfunded
Enhancements
Cultural, Library and Recreational Dept./Program: Parks and Recreation
Services
Project Description:
The City has over 30 neighborhood parks, nearly one for every square mile. Funding to build
these parks comes from new housing construction,but we lack a funding source to upgrade
and improve aging parks. Management plans have been developed for each neighborhood
park. The plans identify needed improvements such as new basketball courts,picnic shelters,
new playground equipment, better access for people with disabilities, and numerous other
enhancements needed to keep our parks useful, enjoyable and attractive.
Project Location:
Neighborhood parks are located throughout the entire Fort Collins community.
Why is this Project Needed?
This project is needed to upgrade aging neighborhood park facilities that are deteriorating and
to provide much needed improvements that will significantly enhance the City's neighborhood
park system. These improvement will make our parks safer, more useful and more attractive.
4Vther Related Projects:
All Construction,Planning and Associated Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
350 350 700
Total: 350 350 ___. _._
700
Annual Operation&Maintenance Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
55 55 55 55 55 55 330
Total: 55 55 55 55 55 55 330
.day,November 08,2004 Section D-2 Unfunded Project Detail Page 29 of 82
31 tl
Project Information Summary
41030 Recreation Center at Fossil Creek Unfunded
Community Park
Cultural, Library and Recreational Dept./Program: Parks and Recreation
Services
Project Description:
This project includes a new multi-generational recreation center built on city-owned land in
Fossil Creek Community Park (located west of SouthRidge Golf Course). This 60,000 square-
foot facility would include a lap/leisure pool, a three-court gymnasium, exercise/weight
equipment room, locker rooms and family change area, classrooms, kitchen, reception
area/lobby, offices, outdoor shallow-water leisure pool with water slides and sundeck, and
parking. Activities would include educational and enrichment classes, youth and adult sports
programs, trips and special events, swimming and ice skating activities, and drop-in activities
for all ages.
Project Location:
Fossil Creek Community Park
Why is this Project Needed?
The City does not have any public indoor recreation facilities in the southern part of the
community. EPIC, opened in 1987 at Riverside and Prospect, and the Senior Center, opened
in 1995 at Shields and Drake, are the most recently-built recreation facilities. The City also
leases a facility for youth and teen activities at 415 East Monroe.None of these facilities is in
the southern part of the city. In the past 5 years, the majority of the growth in Fort Collins has
occurred south of Horsetooth Road. From all current indications, the majority of the growth
will continue toward the south. The Parks and Recreation Policy Plan shows Fort Collins is
lacking in indoor recreation facilities compared to other Front Range communities.
Other Related Projects:
This facility is part of the Fossil Creek Community Park Master Plan. Issues concerning
access, drainage, electrical, and other needs for this facility have been factored into the
planning and site work for the park.
All Construction,Planning and Associated Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
20,988 20,988
Total: 20,988 20,988
Annual Operation&Maintenance Costs (X S1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
General Fund 1,665 1,665 1,665 1,665 1,665 1,665 9,990
Total: 1,665 1,665 1,665 1,665 1,665 1,665 9,990
Monday,November 08,2004 section D-2 Unfunded Project Detail Page I 1 of 82
32
,Xroject Information Summary
]014 Restroom, Office and Irrigation at Unfunded
Roselawn Cemetery
Cultural, Library and Recreational Dept./Program: Parks and Recreation
Services
Project Description:
This project is to construct a restroom and office at Roselawn Cemetery, as well as a new
underground irrigation system.
Project Location:
Roselawn Cemetery
Why is this Project Needed?
Roselawn Cemetery currently does not provide a restroom for customers or staff. The office
area is only for staff and not suitable for dealing with customers. By 2025, Roselawn will be
the primary cemetery used in Fort Collins. At that time, the cemetery office staff will need to
move to the Roselawn Cemetery to work more efficiently with customers. A restroom is
needed as soon as possible to serve both customers and staff. An automatic irrigation system
is needed to cut down on the amount of water wasted with above ground manual piping.
Irrigation needs to be performed at night to diminish evaporative loss.
�ther Related Projects:
This project is not linked to any other City project.
All Construction,Planning and Associated Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
275 275
Total: 275 _. __._. __.._—. . 275
Annual Operation&Maintenance Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
Fees and User Charges 5 5 5 5 5 5 5 5 40
Total- 5 5 5 5 5 5 5 5 40
Oda y,November 08,2004 Section D-2 Unfunded Project Detail Page 20 of 82
33 I 2
Project Information Summary
32002 Cache La Poudre River Habitat Unfunded
Restoration
Community Planning & DeptJProgram: Natural Resources
Environmental Services
Project Description:
The project is intended to restore and enhance the natural habitat conditions and aesthetic
qualities of the channel and riverbanks of the Cache la Poudre River through the downtown
area. Costs for the river restoration in the downtown area have been estimated to be
approximately$10,000,000. The project can be completed in phases and additional funding
can be gained by partnering with private property owners, the Downtown Development
Authority or the Downtown Business Authority. A significant initial phase,perhaps near the
old Pickle Factory could cost approximately$5,000,000.
Project Location:
Degraded riverbanks and river channel from North College to East Mulberry
Why is this Project Needed?
The Cache la Poudre River Habitat Restoration project was identified as one of the high
priority projects in the Downtown River Corridor Implementation Program, adopted by City
Council in July, 2000.
Within the "downtown" section of the Poudre River, the riverbed and riverbanks are in poor
condition. A significant amount of concrete debris and other trash has been dumped along the
riverbanks and within the river channel. There are areas of inappropriate public access to the
river. In addition, weedy and non-native species exist throughout the river corridor.
These problems have degraded the habitat and aesthetic qualities of the river. This project
involves restoring and enhancing the banks of the Cache la Poudre River, improving the
wildlife movement corridor, enhancing aquatic habitat, and improving the riparian habitat
along the river corridor. Much of the restoration is anticipated to take place through the
implementation of projects on lands adjacent to the river.
Other Related Projects:
This project is closely related to, and should be integrated with, four other projects included in
the Downtown River Corridor Implementation Program: (1)recreational river channel
enhancements feasibility study, (2)oxbow acquisition for public use, (3)bank stabilization,
and (4) Cache la Poudre river trail amenities.
All Construction,Planning and Associated Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
500 4,500 5,000
Monday,November 08,2004 Section D-2 Unfunded Project Detail Page 2 of 82
34
�roject Information Summary
Total: 500 4,500 5,000
•
Isday,November 08,20,04 Section D-2 Unfunded Project Detail Page 3 of 82
35 '�
Project Information Summary
51003 Police Services CAD Replacement Unfunded
Project
Police Services Dept./Program: Police
Project Description:
Replacement or significant enhancements of Computer-aided dispatch and Records
Management Systems.
Project Location:
Police Services Building
Why is this Project Needed?
Replacement or major enhancement of the CAD/RMS system is necessary every 5 to 7 years
as technology changes. As the city continues to grow and as new technology and functionality
becomes available, major enhancements to the existing CAD/RMS system will be needed to
continue to provide service to the community and enhance the effectiveness of Police, Fire
and Court personnel. Improvements may include new receptor sites, cables and remodeling of
current facility to accommodate technology and equipment changes.
Other Related Projects:
Coordination with other departments on the receptor sites and cables would be needed.
All Construction,Planning and Associated Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
nardware/Software 1,000 1,000 2,000 4,000
Total: 1,000 1,000 2,000 4,000
Annual Operation At Maintenance Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
219 219 219 219 219 219 1,314
Total: 219 219 219 219 219 219 1,314
Funding Source (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
Equipment 200 200 200 200 200 2DO 200 200 200 1,800
Replacement
Partner Share Payback 1,600 1,600
Total: 200 1,800 200 200 200 200 200 200 200 3,400
Monday,November 08,2004 Section D-2 Unfunded Project Detail Page 31 of 82
36 I /
,roject Information Summary
'qTI001 Police Services Automated Vehicle Unfunded
Locators (AVLs)
Police Services Dept./Program: Police
Project Description:
The project would equip 156 police patrol vehicles with Automated Vehicle Locators and
provide the necessary hardware and software to support it.
Project Location:
Patrol vehicles
Why is this Project Needed?
The use of AVLs will enhance the efficiency of patrol dispatch by enabling them to send the
closest patrol vehicle to the needed destination resulting in a possible reduced response time.
It is important to note that the AVL system monitors the location of the vehicle, not the
officer. The AVL system, complimented by a Geographic Information System overlay, would
provide officers with a directional map that would lead them to their specific destination.
Other Related Projects:
None
Construction,Planning and Associated Costs (X$1,000)
e Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
Equipment/SoRware 487 487
Total: 487 487
Annual Operation&Maintenance Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
66 66 66 66 66 66 66 66 66 594
Total: 66 66 66 66 66 66 66 66 66 594
day,November 08,2004 Section D-2 Unfunded Pmject Detail Page 30 of 82
37
Project Information Summary
77001 Drake Road--BNSF RR Grade Separation Unfunded
Transportation Services Dept./Program: Rail
Project Description:
This project will create a grade-separated underpass for Drake Road to cross under the
Burlington Northern Santa Fe(BNSF) RR tracks.
Project Location:
On West Drake Road, approximately 0.2 miles west of College Avenue (US Hwy 287).
Why is this Project Needed?
This project is important for public safety and congestion mitigation. Drake Road is a
primary east-west corridor at the geometric center of the City, and is a heavily traveled 4-lane
arterial street. The BNSF RR tracks bisect the City north-to-south, and all street crossings
over these tracks (in Fort Collins) are at-grade. Consequently, the trains that pass through the
City approximately 6 to 8 times per day can cause significant delays for vehicles on the east-
west streets. Drake is also a primary route to Poudre Valley Hospital.
The project will reduce potential conflicts between trains and automobiles, and provide great
congestion mitigation and air quality benefits. This project is on the adopted City Master
Street Plan as well as the MPO's Regional Transportation Plan. The BNSF RR line is a
regionally significant rail corridor.
Other Related Projects:
This project is supportive of alternate modes of transportation and in particular the Mason
Transportation Corridor. It will be important to connect the bike lanes and sidewalks on
Drake Road to the Mason Trail.
All Construction,Planning and Associated Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
10,350 10,350
Total: 10,350 10,350
Annual Operation&Maintenance Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
9 9 9 9 9 9 9 9 72
Total: 9 9 9 9 9 9 9 9 72
Monday,November 08,2004 section D-2 Unfunded Project Detail Page 70 of 82
38 C�
Project Information Summary
02041 East Drake Road--Harvard to Stover Unfunded
Transportation Services DeptJProgram: Highway
Project Description:
Widening of this ''/z-mile narrower segment of East Drake Road to 4-lane arterial standards, to
provide adequate bike lanes and sidewalks. Right-of-Way acquisition is expected to be a
significant portion of the expense of this project.
Project Location:
Just east of College Avenue, on Drake Road from Harvard to Stover Streets.
Why is this Project Needed?
This project is important to provide enhanced public safety for bicyclists and pedestrians, as
well as improving vehicular movement. This project is indicated on the City's Master Street
Plan and is included in the Capital Improvement Program of the Transportation Master Plan.
Other Related Projects:
Right-of-Way acquisition will be the primary challenge. This project could be linked (but is
not required to be linked) to intersection improvements at the College—Drake intersection.
All Construction,Planning and Associated Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
• 2,073 2,073
Total: 2,073 2,073
Annual Operation&Maintenance Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
12 12 12 12 12 12 72
Total: 12 12 12 12 12 12 72
Oday,November 08,2004 Section D-2 Unfunded Project Detail Page 63 of 82
39 19
Project Information Summary
72003 Harmony - Seneca to College Partially Funded
Transportation Services Dept./Program: Highway
Project Description:
Widening of West Harmony Road to 4-lane arterial street standards, including bike lanes and
sidewalks, and including a major upgrade to the Harmony/ Shields intersection. This is a high
priority Street Oversizing project that needs a City Capital funding element to pay for gaps at
the Front Range Community College campus and at County out-parcels. The total project
length is approximately 1.6 miles.
Project Location:
West Harmony Road, from Seneca Street on the west to the BNSF RR tracks on the east,
approaching the College Avenue intersection.
Why is this Project Needed?
City capital funding is needed to assist the funding of a Street Oversizing project through the
non-SO contributing sections of this street. This project is extremely important due to the
existing congestion and safety problems in this area. The Harmony— Shields intersection has
the highest accident rate in the City, so this project is absolutely necessary for public safety.
Air quality will also be enhanced by reducing congestion.
This project is on the adopted City Master Street Plan as well as the MPO's Regional
Transportation Plan.
Other Related Projects:
The BNSF RR crossing will need to be upgraded and widened in conjunction with this
project. Also, future plans for the Mason Transportation Corridor will need to be
incorporated. As with all major projects of this nature, extensive coordination with other
agencies (Utilities, FRCC, etc.)will insure that the project is constructed in the most efficient
manner.
All Construction,Planning and Associated Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
8,901 8,901
Total: 8,901 8,901
Annual Operation&Maintenance Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 . 2007 2008 2009 2010 2011 2012 Post 2012 Total
General Fund 60 60 60 60 60 60 60 420
Total: 60 60 60 60 60 60 6D 420
Monday,November 08,2004 section C-2 Partially Funded Project Detail Page 24 of 35
40
Z
Project Information Summary
Wading Source (X S7,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
Capital Exp.Fee 4,451 4,451
General Fund 750 750
Total: 750 4,451 5,201
•
day,November 08,2004 Section C-2 Partially Funded Project Detail Page 25 of 35
41 '2I
Project Information Summary
72004 Intersection Improvements and Traffic Unfunded
Signal Pool
Transportation Services Dept./Program: Highway
Project Description:
A general capital fund intended to pay for various upgrades to intersections,primarily on
arterial streets, in order to improve safety, reduce congestion and increase mobility of the
public. Specific improvements will depend on the intersections selected,but could include
adding turn lanes, building new signals, upgrading signal equipment, installing enhanced
crosswalks with pedestrian refuges, installing bike lanes,paving the intersections in concrete
for greater durability, and possibly replacing signalized intersections with modem
roundabouts.
Project Location:
Various locations across the City, as the needs and opportunities arise. A preliminary study
has been completed that aims to prioritize the intersections needing attention. Potential
projects include:
Shields @ Harmony, Taft Hill @ Elizabeth; Shields @ Elizabeth; Lemay @ Trilby;
Overland @ Drake; JFK @ Troutman; Mulberry @ Canyon; Overland @ Prospect;
LaPorte @ Shields; West Mulberry @ Shields; West Mulberry @ Taft Hill; Mulberry @
College; West Prospect @ Shields; West Stuart @ Shields; Prospect @ College; East
Prospect @ Lemay; East Prospect @ Timberline; Drake @ College; East Drake @ Lemay;
Taft Hill Road @ LaPorte; Harmony @ Mason.
Priorities for implementation will be addressed through the Transportation Master Plan
Update presently underway.
Why is this Project Needed?
This project is needed for public safety and mobility, in order to gradually and systematically
upgrade arterial street intersections on an annual basis. This project supports the Master
Street Plan, the Transportation Master Plan, and the Congestion Management Plan.
Other Related Projects:
This project is linked to the Traffic Signal Replacement Program and the Traffic Management
Center. Coordination with planned utility projects and transportation projects in the vicinity
will make these upgrades occur more efficiently.
All Construction,Planning and Associated Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 16,000
Total: 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 169000
Monday,November 08,2004 section D-2 Unfunded Project Detail Page 48 of 82
42
ZZ
Project Information Summary
nual Operation&Maintenance Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
30 30 30 30 30 30 30 30 240
Total: 30 30 30 30 30 30 30 30 240
•
Way,November 08,2004 Section D-2 Unfunded Project Detail Page 49 of 82
43 2.3
Project Information Summary
72044 Intersection Improvements at College Unfunded
Ave. and Harmony Road
Transportation Services Dept./Program: Highway
Project Description:
The intersection of College Avenue and Harmony Road is the second busiest intersection in
the City of Fort Collins. Compounding the current congestion problem at the intersection is
not only the amount of traffic that enters the intersection each day,but the high tuming
movement volumes that exist during the morning and afternoon peak hours. Improvements at
the intersection are anticipated to include an eastbound right turn lane and an eastbound
double left turn lane. Improvements are expected to the west include auxiliary turning lanes
at the intersection of Mason and Harmony as well.
Project Location:
The intersection of College Avenue and Harmony Road--primarily on the west leg of the
intersection. Pedestrian and bike improvements will be evaluated during the design phase.
Why is this Project Needed?
The intersection improvement at College and Harmony is needed in order to decrease
congestion, increase mobility and increase safety to the traveling public. This project is
supported by the Master Street Plan, Transportation Master Plan, Congestion Management
Plan and the College Avenue Access Control Plan
Other Related Projects:
Traffic signal program and roadway improvement project on Harmony Road from Seneca to
Mason Street.
All Construction,Planning and Associated Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
4,140 4,140
Total: 4,140 4,140
Annual Operation&Maintenance Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
5 5 5 5 5 5 5 5 40
Total: 5 5 5 5 5 5 5 5 40
Monday,November 08,2004 $action D-2 Unfunded Project Detail Page 66 of82
44 ZLF
Project Information Summary
021 Lemay Avenue, Lincoln to Conifer Partially Funded
Transportation Services Dept./Program: Highway
Project Description:
Widening to 4-lane arterial street standards and realignment of approximately 1.2 miles of
North Lemay Avenue, between Lincoln Avenue and Conifer Street. This project includes a
grade-separated (overpass or underpass) crossing of the BNSF RR tracks adjacent to existing
Vine Drive. It also anticipates the relocation of the Vine Drive intersection to a point
approximately V4-mile to the north of its current location. The realignment of this segment of
Lemay is to the east, and is needed to bypass and preserve the integrity of the historic
Andersonville and Alta Vista neighborhoods.
Project Location:
North Lemay Avenue between Lincoln Avenue and Conifer Street.
Why is this Project Needed?
This project is needed for public safety, to reduce conflicts with the existing at-grade RR
crossing. The new grade-separated RR crossing will improve traffic flow, relieve congestion
and improve air quality. It will also improve the efficiency of RR operations at the North
Yard switching area. The project is also extremely important for preservation of two historic
neighborhoods, Andersonville and Alta Vista.
• This project is indicated on the City's Master Street Plan and is included in the Capital
Improvement Program of the Transportation Master Plan. The RR grade-separation is also a
part of the MPO's Regional Transportation Plan in the Rail category, since this is a regionally
significant rail corridor.
Other Related Projects:
The Dry Creek Diversion (Stormwater)project will be an important consideration based on
the floodplain issues that are present in that area today. Railroad operations and work within
the RR right-of-way will also present challenges. As with all major projects of this nature,
extensive coordination with utilities and other agencies will insure that the project is
constructed in the most efficient manner.
All Construction,Planning and Associated Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
23,805 23,805
Total: 23,805 23,805
Annual Operation&Maintenance Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
76 76 76 76 76 76 76 529
day,November 08,2004 Section C-2 Partially Funded Project Detail Page 19 or 35
45 �7�
Project Information Summary
Total: 76 76 76 76 76 76 76 529
Funding Source (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
Other RR Safety? 2,000 2,000
SO and Developer 11,973 11,973
Total- 13,973 13,973
Monday,November 08,2004 Section C-2 Partially Funded Project Detail Page 20 of 35
46 Zv
Project Information Summary
Woo l Mulberry Street/ SH 14 Park and Ride-- Unfunded
Mulberry Street/ I25 Interchange
Transportation Services DeptJPropram: Parking
Project Description:
An approximately 3 acre "Park and Ride" lot adjacent to the Mulberry Street and Interstate 25
interchange.
Project Location:
The northwest corner of Mulberry Street/ SH 14 and 1-25 interchange.
Why is this Project Needed?
When completed, this project will function much like the existing Harmony Transfer Center,
located at the Harmony Road and I-25 interchange in southeast Fort Collins. This facility will
provide secure and convenient access to transit services on East Mulberry Street. This facility
will also encourage car-pooling (within Fort Collins as well as the region) by providing a
secure and convenient meeting place for users. This project will also aid in reducing the
amount of annual vehicle miles traveled by automobile, and will help to improve air quality in
the community.
Other Related Projects:
East Mulberry Corridor Plan, I-25/SH 14 Interchange Area Study and improvements.
Construction,Planning and Associated Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
200 200 200 1,000
Total: 200 200 200 1,000
Annual Operation&Maintenance Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
100 too 100 300
Total: too loo too 300
day,November 08,20,04 Section D-2 Unfunded Project Detail Page 68 of 82
47 �f
Project Information Summary
72040 North College Avenue--Vine Drive to Unfunded
Conifer Street
Transportation Services Dept./Program: Highway
Project Description:
Reconstruction of approximately'/2-mile of North College Avenue to 4-lane arterial standards,
including medians, bike lanes and sidewalks. This project would also implement the
recommendations of the North College Avenue (US-287)Access Management Plan. The
scope of this project does not anticipate realignment of the Conifer-Hickory intersection,
although that is indicated on the Master Street Plan and may become important in the future.
The project scope would need to account for future realignment of the Vine Drive
intersection, to Pinon Street.
Project Location:
North College Avenue (US-287) from the existing Vine Drive (Poudre River) to the existing
Conifer Street.
Why is this Project Needed?
This project is necessary due to the extremely hazardous conditions that presently exist along
the North College corridor. This area has an accident rate that is higher than the statewide
average for this type of roadway facility. Many of the reported accidents (over 80%) could be
attributed to access-related problems. It is also necessary for the safety of pedestrians and
bicyclists,because facilities for alternate travel modes are either non-existent or extremely
sub-standard. The proposed improvements will also allow this corridor to maintain an
acceptable Level of Service (LOS) for vehicular traffic, thus reducing congestion and
improving air quality.
This project is indicated on the City's Master Street Plan and is included in the Capital
Improvement Program of the Transportation Master Plan. The project is also included in the
MPO's Regional Transportation Plan and CDOT's Access Management Plan.
Other Related Projects:
This project will require extensive coordination with Utilities, particularly Stormwater and the
Dry Creek diversion project. Colorado Department of Transportation (CDOT) will also be
heavily involved since this is part of US Highway 287 and State Highway 14.
All Construction,Planning and Associated Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
8,280 8,280
Total: 8,280 8,280
Monday,November 08,2004 section D-2 Unfunded Project Detail Page 61 of 82
48 2�
Project Information Summary
nual Operation&Maintenance Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
19 19 19 19 19 19 19 133
Total: 19 19 19 19 19 19 19 133
•
November 08,2004 — —_il — --
Section D-2 Unfunded Protect Detail Page 62 of 82
49 ��
Project Information Summary
72030 Prospect - Poudre River to I-25: 4 Lane Partially Funded
Arterial
Transportation Services Dept./Program: Highway
Project Description:
The project will upgrade Prospect Road to a 4-lane arterial from the Poudre River to Interstate
25. This project assumes completion of the current the Building Community Choices project
to improve Prospect Road from the Poudre River to Summitview to 2 lanes plus bike lanes.
Project Location:
Prospect Road from the Poudre River to Interstate 25.
Why is this Project Needed?
The capital improvement is aimed at widening a highly trafficked road and a major
connection between Fort Collins and I-25. It will upgrading the existing roadway to four-lane
arterial standards to offer a higher level of service for the road section.
Other Related Projects:
All Construction,Planning and Associated Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
8,280 8,287
Total: - — - _.--_ __._— - — _— 9,280 --- _— 8,280
Annual Operation&Maintenance Costs (X$1,000)
Line Item; Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
53 53 53 159
Total: 53 53 53 159
Funding Source (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
Capital Exp.Fee 2,898 2,898
Total: 2,898 2,898
Monday,November 08,2004 Section C-2 Partially Funded Project Detail Page 23 of 35
50 3�
Project Information Summary
014 Streets Facility Expansion Partially Funded
Transportation Services DeptJProgram: Highway
Project Description:
A new Deicing Materials Storage Facility will be constructed for the Streets Department to
store deicing materials along with liquid tanks and other miscellaneous materials. The
structure will provide a permanent enclosed space to house materials, holding up to 8,000
tons of material. The new structure is designed to be corrosion resistant to all types of deicing
materials that will be stored, including sand, salt, and ice slicer. This structure will replace
the historic warehouse building currently being used to store these materials. That building is
rapidly deteriorating due to the storage of corrosive materials, and it will be restored as an
equipment storage facility.
Project Location:
Vicinity of SW comer, Vine at Lemay
Why is this Project Needed?
De-icing materials storage
Other Related Projects:
Traffic Operations Management Center
Construction,Planning and Associated Costs (X$1,000)
elient: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
2,000 2,000
Total: 2,000 2,000
Annual Operation&Maintenance Costs (X SI,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
80 80 80 80 80 80 80 80 640
Total: 80 80 80 80 80 80 80 80 640
Funding Source (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
Other:Transportation 700 700
Fund
Total- __--_._..___ ____ _ _
700 700
day,November 08,2004 section C-2 Partially Funded Project Detail Page 30 of 35
51 31
Project Information Summary
72034 Timberline - Drake to Prospect Unfunded
Transportation Services Dept./Procram: Highway
Project Description:
Widening one mile of Timberline Road to 4-lane arterial street standards, including
reconstruction of the Timberline—Prospect intersection and significant widening of the
Spring Creek bridge. The project includes installation of bike lanes and sidewalks, and
connections to the Spring Creek Trail system.
Project Location:
On Timberline Road, from just north of Drake Road to north of the Prospect intersection.
Why is this Project Needed?
This project is urgent due to severe traffic congestion and failing levels of service,
contributing to a high accident rate and degrading air quality. The existing conditions restrict
growth and development because of failure to maintain adequate public facilities.
This project is indicated on the City's Master Street Plan and is included in the Capital
Improvement Program of the Transportation Master Plan. The project is also included in the
MPO's Regional Transportation Plan.
Other Related Projects:
This project requires extensive coordination with utility agencies due to existing facilities in
that area and analysis of the impacts to the Spring Creek floodplain. There will also be
historic preservation challenges associated with the Johnson farmhouse. Right-of-way
acquisition challenges will also be extensive (and expensive), especially at the grain silos just
south of Prospect.
This project description and cost estimate assume completion of the proposed SID.
All Construction,Planning and Associated Costs (X$1,000)
Line item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
11,799 11,799
Total: 11,799 11,799
Annual Operation&Maintenance Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
General Fund 46 46 46 46 46 46 46 322
Total: 46 46 46 46 46 46 46 322
Funding Source (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
Monday,November 08,2004 Section D-2 Unfunded Project Detail Page 46 of 82
52 ?
Project Information Summary
0tertal Exp.Fee 6,314 6,314
ntial Developer 21380
Share 2,380
__ __
Total: 8,694 8,694
•
�y,November 08,2004
Section D-2 Unfunded Project Detail Page 47 of 82
53 37
Project Information Summary
72043 Timberline--Mulberry to Mountain Vista Partially Funded
Transportation Services Dept./Program: Highway
Project Description:
Widening to 4-lane arterial street standards of approximately 2 miles of Timberline Road,
between Mulberry Street (SH-14) and Mountain Vista Drive. This project includes a grade-
separated (overpass or underpass) crossing of Vine Drive and the BNSF RR tracks adjacent to
Vine Drive. It also anticipates the realignment of a portion of Timberline at Vine, and urban
interchange type connections between Timberline and Vine. The realignment of this segment
of Timberline is to the east, and is needed in order to avoid impacts to the historic Plummer
Schoolhouse.
Project Location:
On Timberline Road,north of Mulberry Street (SH-14) to Mountain Vista Drive.
Why is this Project Needed?
This project is needed for public safety, to reduce conflicts with the existing at-grade RR
crossing. The new grade-separated RR crossing, coupled with the widening of Timberline
Road, will improve traffic flow, relieve congestion and improve air quality. This will be
especially important as the Mountain Vista area continues to develop. The project is also
extremely important for preservation of the historic Plummer Schoolhouse. This project is
indicated on the City's Master Street Plan and is included in the Capital Improvement
Program of the Transportation Master Plan. The RR grade-separation is also a part of the
MPO's Regional Transportation Plan in the Rail category, since this is a regionally significant
rail corridor.
Other Related Projects:
Railroad operations and work within the RR right-of-way will present challenges. As with all
major projects of this nature, extensive coordination with utilities, irrigation companies and
other agencies will insure that the project is constructed in the most efficient manner.
All Construction,Planning and Associated Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
22,770 22,770
Total: 22,770 22,770
Annual Operation&Maintenance Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
76 76 76 76 76 380
Total: 76 76 76 76 76 380
Monday,November 08,2004 Section C-2 Partially Ftmded Project Detail Page 31 of 35
54 3`f
Project Information Summary
Wing Source (X S1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post2012 Total
Fees and User Charges 18,216 18,216
Total: 18,216 18,216
•
day,November 08,2004 Section C-2 Partially Funded Project Detail Page 32 of 35
55 7
Project Information Summary
75003 Traffic Signal Replacement Project Unfunded
(ATMS) Enhancement
Transportation Services DeptJProgram: TSM
Project Description:
Complete the initial installation of the Advanced Traffic Management System in the outlying
signalized intersections. This project also entail expanding the ATMS to include intelligent
tansporation system technology. These efforts include, but not limited to, advanced detection
for adaptive signal timings, transit pre-empt, video monitoring, web interface for traveler
information, variable message signs and regional coordination efforts.
Project Location:
City-wide
Why is this Project Needed?
As trafffic continues to grow, mobility will increase. New technologies are imperative if
mobility is to increase.
Other Related Projects:
The intersection improvements program.
All Construction,Planning and Associated Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
2,000 2,000
Total: 2,000 2,000
Annual Operation&Maintenance Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
75 75 75 75 75 75 75 75 600
Total: 75 75 75 75 75 75 75 75 600
Monday,November 08,2004 Section D-2 Unfunded Project Detail Page 82 of 82
56 3
Project Information Summary
4010 Replacement Buses Transit Fleet Partially Funded
Transportation Services Dept./Program: Transit
Project Description:
Twenty-six (26)vehicles are scheduled for replacement in the period from 2005-2007. This
includes fourteen (14)mini-buses, one (8) full size coaches and four(4) service vehicles.
Project Location:
Why is this Project Needed?
This project will continue an uninterrupted adequate level of capital equipment support for on-
going transit service in Fort Collins. The replacement vehicles will incorporate the newest
technology to improve operating costs and efficiencies. Transit Staff will be looking to
implement an alternative fuels option for the replacement vehicles. The replacement buses
will provide for a higher level of safety. All Transfort buses are equipped with bicycle racks
and provide multi-modal enhancement by creating many more travel options for travelers
(especially pedestrians and bicyclists). New buses, compared with aging buses, improve the
environmental/air quality conditions in Fort Collins by reducing engine emissions and
creating an environment which attracts additional riders to the bus system. The City of Fort
Collins has a history of matching all federal/state grants for transit related capital
• acquisitions. The implementability of this project is extremely good. This project will
continue a high level of reliable transit service creating a positive economic impact for those
employers which rely on their workers productivity including "timeliness."
Other Related Projects:
If the replacements were to use alternative fuels, this project would be linked with the Fleet
Maintenance's project for an Alternative Fuel Filling Station.
All Construction,Panning and Associated Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
4,613 4,613
Total: 4,613 4,613
Funding Source (X S1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
Other:FTA 3,690 3,690
Total- 3,690 3,690
orday,November 08,2004 Section C-2 Panially Funded Project Detail Page 35 of 35
57 3
Project Information Summary
74009 New Vehicles for Transit Fleet Partially Funded
Transportation Services Dept./Program: Transit
Project Description:
Eight (8) medium size fixed route buses and two (2) mini buses will purchased from 2005-
2007.
Project Location:
Why is this Project Needed?
Transfort plans to increase frequency on Routes IB,1C,2,3,4,5,6 and 22. New service will be
added along Harmony to Ziegler. This service is an integral part of City Plan, Transportation
Master Plan, and the North Front Range Regional Transportation Plan.
In order to provide these additional services, ten (10)new vehicles must be purchased. The
new vehicles will provide a large seating capacity thereby
providing congestion mitigation. Transfort fixed route buses carried an average of 27.6
passengers per hour of operation in 1999.
These buses will provide an enhanced service level by increasing productivity and visibility.
All Transfort buses are equipped with bicycle racks and provide multi-modal enhancement by
creating many more travel options for travelers(especially pedestrians and bicyclists).
With this significant service frequency improvement Transfort will provide greater
opportunities for people to leave their cars at home or in park and ride
areas. This will improve the environmental/air quality conditions in the area
by reducing engine emissions and creating an environment which attracts additional riders
which reduces VMT through shared ride travel. It should be noted that significant gains must
be made in the urban areas to reduce auto travel for the region to realize its overall goals.
The City of Fort Collins has a strong history of matching all federal/state
grants for transit related operating assistance and capital acquisition. The
implementability of this project is extremely good. This project will provide
a high level of reliable transit service within the city creating a positive
economic impact for those workers which rely on transit to traverse the city to
their jobs and employers who rely on their workers productivity including
timeliness.
Other Related Projects:
The Mason Street Corridor is linked to the service frequency along College Avenue. The
Corridor does not have to be completed to increase frequency along College Avenue however,
if the Corridor is completed the College Avenue service could be faster, more direct, and
Monday,November 08,2004 Section C-2 Partially Funded Project Detail Page 33 of 35
58 3�j
Project Information Summary
• more accessible to passengers. Mason Street Corridor completion will permit increased
productivity on cast/west routes by providing more timely, efficient transfers.
All Construction,Planning and Associated Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
3,091 3,091
Total: 3,091 3,091
Annual Operation&Maintenance Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
1,899 1,899 1,899 1,899 1,899 1,899 1,899 1,899 15,192
Total: 1,899 1,899 1,899 1,899 1,899 1,899 1,899 1,899 15,192
Funding Source (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
Other:FrA
2,473
Total: 2,473
•
- _
day,November 08,2004 Section C-2 Partially Funded Project Detail Page 34of 35
59 3
Project Information Summary
71023 Fort Collins Bicycle Program Plan Unfunded
Implementation
Transportation Services DeptJProgram: Bike/Ped
Project Description:
In 1995,the City of Fort Collins adopted the Fort Collins Bicycle Program Plan.
Implementation of this plan has been very gradual since 1995 with a few key projects
completed using grant funding from the North Front Range Transportation &Air Quality
Planning Council. This regional bikeway funding opportunity is being substantially reduced
in the future. Therefore, Fort Collins will need to rely substantially on local funding for
bikeway improvements in order to carry out the remaining projects identified by the
community in the Fort Collins Bicycle Program Plan. These projects are very important in
terms of safety improvements as well as vehicle miles traveled reductions and improved air
quality. Potential updates to schedule and priority for implementation will be addressed
through the Transportation Master Plan update presently underway.
Project Location:
Throughout the community.
Why is this Project Needed?
These bicycle improvements are critical safety improvement projects and will help achieve
the City's goals for increasing the use of alternative modes, reducing traffic congestion, and
improving air quality. These projects are consistent with the City of Fort Collins Master
Transportation Plan, Bicycle Program Plan, Master Street Plan, and the goals of the Land Use,
Transportation & Air Quality committee.
Other Related Projects:
Other City roadway projects could be linked to the bikeway improvement projects as funded
plus additional funding may be available from the NFRT&AQPC. This is not the full list of
projects presented by the Fort Collins'Bikeway Plan; additional projects should also be
considered in the future- this is just the high priority list at this time.
Operation and Maintenance costs for this project are included as a part of the General Street
Maintenance program, therefore, they are not included explicitly in this project as they are
implemented.
All Construction,Planning and Associated Costs (X$1,000)
Line llem: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
Bike Plan 250 450 700 650 850 1,600 1,200 1,400 7,100
Improvements
Total: 250 450 700 650 850 1,600 1,200 1,400 7,100
Monday,November 08,2004 Section D-2 Unfunded Project Detail Page 36 of 82
60 [�D
1
.roject Information Summary
025 Bicycle & Pedestrian Trail, Spring Creek Unfunded
Trail to Laurel Street (MTC)
Transportation Services Dept./Program: Bike/Ped
Project Description:
In 2002,the City of Fort Collins adopted the Mason Transportation Corridor Vision Plan.
Implementation of this plan began in 2001 with the continuation of the design/engineering
phase of the project. The first phase of construction of the MTC bicycle/pedestrian trail is
scheduled to begin in 2004, which includes the segment of trail from the Fossil Creek trail to
the Spring Creek trail. Construction of this segment will be complete in 2005.
The next segment of the MTC project is continuing the trail northward from the Spring Creek
trail through the Colorado State University campus to Laurel Street, including a grade-
separated bike/ped crossing of Prospect Road. This phase of the MTC trail project is critical
to linking the southern portion of the corridor to CSU and to downtown Fort Collins. The
MTC trail project is a very important component of the City of Fort Collins' strategy of
developing a truly multi-modal transportation system. This project will also help to increase
safety for bicyclists, reduce the amount of annual vehicle miles traveled by automobile, and
will help to improve air quality in the community.
�roject Location:
MTC trail, along the Burlington Northern Santa Fe railroad tracks, from the Spring Creek trail
to Laurel Street.
Why is this Project Needed?
The MTC trail offers a critical safety and mobility improvement project for cyclists and
pedestrians of all ages and abilities and will help achieve the City's goals for increasing the
use of alternative modes, reducing traffic congestion, and improving air quality. These
projects are consistent with the City of Fort Collins Master Transportation Plan, Bicycle
Program Plan, Pedestrian Plan, Master Street Plan, MTC Vision Plan, and the goals of the
Landuse Transportation & Air Quality Committee.
Other Related Projects:
Other City projects related to this project include sidewalk and bikelane improvements along
Prospect Road and bikelanes on Laurel Street which could be funded by local funds plus
additional grant funding may be available from the NFRT&AQPC and the Colorado
Department of Transportation.
Operation and Maintenance costs for this project are included as a part of the overall MTC
trail maintenance costs of approximately$43,000 per year for the full 5.5 mile corridor.
(note: this cost could be allocated on a per mile basis of$7,818 if desired with the segment
from Spring Creek trail to Laurel representing approximately 1.5 miles for an annual cost of
0-day,November 08,2004 section D-2 Unfunded Project Detail Page 40 of 82
61 �'
Project Information Summary
$11,727 beginning in 2013)
All Construction,Planning and Associated Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
3,450 3,450
Total: 3,450 3,450
Annual Operation&Maintenance Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
12 12 12 12 48
Total: 12 12 12 12 48
Monday,November 08,2004 Section D-2 Unfunded Project Detail Page 41 of 82
62 ��
Project Information Summary
018 Pedestrian Plan and ADA Improvements, Partially Funded
Continuation
Transportation Services Dept./Program: Bike/Ped
Project Description:
Implementation of the Fort Collins Pedestrian Plan has been very gradual since 1996.
Numerous projects have been completed using funding from Building Community Choices,
as well as general funds for sidewalk maintenance programs and compliance with the
Americans with Disabilities Act (ADA). On-going programs and construction projects build
with BCC funding include Safe Routes to School and Safe Walk Fort Collins programs as
well as the installation of missing or incomplete sidewalks, grade separations, or pedestrian
bridges throughout the City. The BCC funds are also used to address inadequacies in the
pedestrian network that arise as the rest of the City's transportation system is slowly built out.
It is this flexibility that allows Transportation Services staff to tackle new unsafe pedestrian
conditions as travel patterns and behaviors change with new transportation facilities. General
funds are utilized to eliminate hazards and remove pedestrian obstacles, as well as install
pedestrian access ramps, and make minor connections where no walk currently exists to bring
the City into ADA compliance.
BCC funding will end in 2005 and the City will need to find an additional funding source to
• carry out the remaining projects identified in the Pedestrian Plan Update portion of the
Transportation Master Plan. The dollar amounts below account for all pedestrian projects
identified on the Transportation Board's recommended Capital Projects Priority List and the
annual general funds used for ADA compliance and sidewalk maintenance.
Project Location:
Throughout the community
Why is this Project Needed?
These pedestrian improvements are critical safety projects to help achieve the City's goals for
increased use of alternative modes, reduced traffic congestion, and improved air quality.
These projects and programs are consistent with the City's Master Transportation Plan,
Pedestrian Plan, Master Street Plan, Transit Plan, and the goals of land use, transportation and
air quality.
Other Related Projects:
Other City street projects. Additional funding may be available from the NFRT& AQPC.
All Construction,Planning and Associated Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
1,070 1,070 1,070 1,070 1,070 1,070 1,070 1,070 8,560
Total: 1,070 1,070 1,070 1,070 1,070 1,070 1,070 1,070 8,560
day,November 08,2004 Section C-2 Partially Funded Project Detail Page 16 of 35
63 t I�
Project Information Summary
Annual Operation &Maintenance Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
General Fund 100 100 100 100 100 100 100 100 100 900
Total: 100 100 ]00 100 100 100 100 100 100 900
Funding Source (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
BCC Sales Tax 340 340 340 1,020
General Fund 410 410 410 410 410 410 410 410 410 410 410 4,510
Total: 750 750 750 410 410 410 410 410 410 410 410 5,530
Monday,November 08,2004 Section C-2 Partially Funded Project Detail Page 17 of 35
64 4q
Project Information Summary
019 Bike/Ped Underpass at Troutman Unfunded
Parkway and BNSFRR Tracks (MTC)
Transportation Services Dept./Program: Bike/Ped
Project Description:
A bicycle and pedestrian underpass at Troutman Parkway that travels under both the ditch and
railroad tracks. The need,priority and schedule has been evaluated during MTC final design
and the Transportation Master Plan update and this project is one of the top priority elements
that is needed to complete the MTC Bike/Ped trail.
Project Location:
The project is located at Troutman Parkway from Tanager Road to South Mason Street.
Why is this Project Needed?
East to west bike and pedestrian connections are necessary for the Mason Transportation
Corridor to join commuters to activity centers. This underpass is a critical connection for the
Troutman Neighborhood because this segment of the Corridor is the only mile stretch that
does not have an east/west connection at the half-mile. This neighborhood has a large group
of potential transit users who could be discouraged from using the Corridor without this
connection to the transitway. It would also allow bicyclists and pedestrians to safely access
on-street bikeways and sidewalks east of Mason Street. They would connect to the retail
• shops and restaurants along Troutman Parkway. It will make an important improvement to
traffic flow on Harmony and Horsetooth Roads by offering a viable option to automobile use.
Other Related Projects:
The project is linked to the Mason Street Transportation Corridor.
All Construction,Planning and Associated Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
1,500 1,500
Total: 1,500 1,500
Annual Operation&Maintenance Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
General Fund 15 15 15 15 15 75
Total: 15 15 15 15 15 75
Ooday,November 08,2004 Section D-2 Unfunded Project Detail Page 35 of 82
65 ` s-
Project Information Summary
42002 Performing Arts Center Partially Funded
Cultural, Library and Recreational Dept./Program: Arts/Museum
Services
Project Description:
Construction of a new Performing Arts Center which would include a 2,200 seat Performance
Hall, a smaller theatre seating 350-500, and visual arts galleries. The Center would also
include classrooms and arts education spaces.
Project Location:
Block 31
Why is this Project Needed?
The Lincoln Center Performance Hall and Mini Theatre are booked to capacity. The current
stage in the Performance Hall is not big enough to accommodate sets for many touring shows.
The recent downtown strategic plan study shows that a new and expanded performing arts
center would dramatically improve the old town area and stimulate economic growth in Fort
Collins. Funding for the purchase of land was approved through Building Community
Choices and the south half of Block 31 was purchased for the new facility. The new center is
essential to the cultural and artistic life of Fort Collins.
Other Related Projects:
Other capital projects may be linked i.e. new main library
All Construction,Planning and Associated Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
48,760 48,760
Total: 48,760 48,760
Annual Operation&Maintenance Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
Fees and User Charges 768 768 768 768 768 3,840
General Fund 486 486 486 486 486 2,430
Total: 1,254 1,254 1,254 1,254 1,254 6,270
Funding Source (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
Other.Private 6,000 6,000
Total: 6,000 6,000
Monday,November 08,2004 Section C-2 Partially Funded Project Detail Page 3 of 35
66 //�
Project Information Summary
002 New Downtown Civic Center Library Partially Funded
Cultural, Library and Recreational Dept./Program: Library
Services
Project Description:
A 100,000 square foot new downtown Civic Center Library with adjacent parking is planned
to be built on land purchased with money approved by voters in 1997. It will provide space to
double the existing collection, triple reader seating, and for community meeting rooms to
accommodate larger storytimes, classes, speakers, and extensive programming.
Project Location:
Site of Poudre Valley Creamery at Howes and Laporte.
Why is this Project Needed?
Currently Fort Collins is below the Colorado average for libraries in respect to collection size,
number of staff to provide services, and space for the community to meet, utilize the
collection, and do research. The new library will provide the entire community with an equal
opportunity to access information that is vital to their success, intellectual development and
personal enjoyment, thereby enriching the life of the community, one person at a time. The
new library will also create community by bringing people together through events, activities,
lectures, readings and programs.
Other Related Projects:
All Construction,Planning and Associated Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
Construction 26,500 26,500
Furniture and 4,500 4,500
Equipment
Library Materials 9,000 9,000
Total: 40,000 40,000
Annual Operation & Maintenance Costs (X$1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
2,360 2,360 2,360 7,080
Total: 2,360 2,360 2,360 7,080
Funding Source (X S1,000)
Line Item: Prior Years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Post 2012 Total
Capital Exp.Fee 1,000 1,000
Total: 1,000 1,000
day,November 08,2004 Section C-2 Partially Funded Project Detail Page 4 of 35
67 L4-7
Attachment E
• 2004 Colorado C1 Sales Tax Rates
M.
1 Alamosa Taxed 2.000
2 Arvada Taxed 3.210
3 Aspen Taxes 2.200
4 Aurora Exempt 3.750
5 Avon Taxed 4.000
6 Boulder Taxed 3.410
7 Breckenridge Taxed 2.500
8 Brighton Taxed 3.750
9 Broomfield Taxed 4.150
10 Canon City Taxed 2.000
11 Castle Rock Taxed 3.600
12 Central City Taxed 4.000
13 Cherry Hills Village Taxed 3.500
14 Colorado Springs Exempt 2.500
15 Commerce City Exempt 3.500
16 Cortez Taxed 4.050
17 Crested Butte Taxed 4.000
18 Delta Taxed 3.000
19 Denver Exempt 3.500
20 Durango Taxed 2.500
• 21 Edgewater Taxed 3.500
22 Englewood Exempt 3.500
23 Federal Heights Taxed 4.000
24 Fort Collins Taxed 3.000
25 Glendale Exempt 3.500
26 Glenwood Springs Taxed 3.450
27 Golden Taxed 3.000
28 Grand Junction Exempt 2.750
29 Greeley Taxed 3.300
30 Greenwood Village Exempt 3.000
31 Gunnison Taxed 3.000
32 La Junta Taxed 3.250
33 Lafayette Taxed 3.500
34 Lakewood Taxed 2.000
35 Lamar Taxed 3.250
36 Larkspur Exempt 4.000
37 Littleton Taxed 3.000 -->
38 Lone Tree Exempt 1.500 Littleton taxed food
39 Longmont Taxed 2.950 at'I%until last year.
Tax will be ratcheted
40 Louisville Taxed 3.375 down to zero by next
41 Loveland Taxed 3.000 year.
42 Montrose Taxed 3.500
43 Mount Crested Butte Exempt 4.500
44 Northglenn Taxed 4.000
• 45 Parker Taxed 3.000
46 Pueblo Taxed 3.500
47 Ridgway Taxed 3.000
Ta rate attachment
69
2004 Colorado City Sales Tax Rates
Continued
Grocery Food Taxed or General Sales Tax
city Exempt Rate
48 Me Taxed 2.500
49 Silverthome Taxed 2.000
50 Snowmass Village Taxed 3.500
51 Steamboat Springs Taxed 4.500
52 Sterling Taxed 3.000
53 Thornton Taxed 3.750
54 Vail Taxed 4.500
55 Westminster Taxed 3.850
56 Wheat Ridge Taxed 2.000
57 Winter Park Taxed 5.000
58 Woodland Park Taxed 3.000
48 Tax Food 3.136 Average Rate
10 Exempt 3.950 Average Rate
Of the statutory cities that have a sales tax, approximately 82%of them include grocery
food in the tax base.
Of the counties that have a sales tax,over 60%of them include grocery food in the tax
base.
Colorado City Sales Tax Rates
September 2004
s.00%
4.50%
4.00%
3.50%
3.00%
2.50%
2.00%
1.50%
1.00%
0.50%
0.00%
�Sa s�`�r �b¢S �b role e�b P 111
P c �+ O� QP Pia 4°e ° CP� E CA
'e 40�` Sabo
ado
G
T"rote attachment
70
Attachment F
• Full List of Options
Capital Program Operations and Maintenance Cost Funding
September 2004
A major issue of discussion for the Council has been the cost of operating and maintaining
any new capital facilities constructed because of the tax renewal. Council generally agreed
that it wants to consider O&M costs as it decides which projects to include in the ballot
package.
City Staff has developed several O&M funding options for Council to consider as it
reviews proposals for the Building on Basics 2005 capital sales tax renewal. The cost of
O&M on newly constructed capital projects could be substantial,depending on the projects
that are included in the capital program. O&M costs for the projects currently under
consideration range from $3,000 per year to over$2.3 million per year. The projected O&
M cost of the projects on the current project list is included as Attachment D.
O&M funding options include:
Options Needing Voter Approval: Non-Tax alternatives:
1. Companion tax for O&M 8. Continue funding new O&M costs
through revenue growth StatusQuo)
2. Include O&M as art of the '/4 cent 9. T ortation Maintenance Fee
• 3. Mill levy increase 10. Rene otiate natural gas franchise fee
4. Increase to General Fund sales tax rate 11. Park Maintenance Fee
5. Excise tax on restaurant food and liquor 12. Library Authority
6. Sales tax increase on the ongoing rate;
dedicated to two categories of
operations and maintenance: Public
Safety and Capital O&M
7. Occupational Privilege Tax
(Employment Tax
O&M Options Needin¢Voter Aooroval:
Staff has explored several funding options that would require voter approval for
implementation. Sales tax,property tax or other tax increases all require voter approval.
• Option 1: Companion tax for O&M(i.e. renew '/4 cent taxes,plus a new 0.10
cent tax for O&M)(1/10 cent=$2.1 Million year)
Voters could be asked to approve an earmarked sales tax of approximately 0.10
cent for capital project O&M, either as an on-going measure or for a defined time
period. By asking for an additional tax for O&M, a full '/4 cent renewal could be
used for capital construction. A vote for the '/4 cent for capital projects could
• include the 1/1 Os'cent tax increase for O&M, or they could be separate votes.
71
City Council Members
Building on Basics 2005 Update Study Session
September 8,2004
Page 2
Pros: Cons:
Complete package Risk that O&M could fail while capital
tax passes
True picture of actual costs Earmarked funding sources for O&M
limit future flexibility
Assures ability of the City to fund May be difficult to receive voter
O&M approval
Allows more projects to be A tax increase,rather than a renewal
constructed with the Y4 cent tax
revenue
Portion of funding comes from
visitors and regional shoppers
Voters know exactly where
earmarked money is spent
• Option 2: Include O&M as part of the '/4 cent(i.e. .15 cent for capital, .10 cent
for O&M)
The current quarter cent sales taxes are devoted exclusively to capital design
and construction,with no funding provided for O&M costs. By splitting the
renewal between capital and O&M, fewer projects would be constructed.
There are three options for how the '/4 cent could be split:
1. Capital for a limited time, O&M limited time
2. Capital for a limited time, O&M on-going
3. Endowment for O&M (i.e. 0.10 x 10 years equals endowment of$21
million)
Pros: Cons:
Complete package Limits funding for needed construction;
fewer projects
True picture of actual costs Favors low O&M cost projects
re azdless of voter desires
Assures ability of the City to fund Endowment very expensive
O&M
Predictable source of funding Earmarked funding sources for O&M
limit fixture flexibility
Not a tax increase Limited ability to shift dollars
If O&M is funded for a limited time, the
lon -term roblem is only postponed
• Option 3: Mill levy increase(1 mill=$1.3 million per year)
72
City Council Members
Building on Basics 2005 Update Study Session
September 8, 2004
• Page 3
The City's current Property Tax mill levy rate is 9.797 mills. This generates
approximately$12.7 million per year,with the revenue primarily committed to
operations of the Poudre Fire Authority. Voters could be asked to increase the
mill levy rate to provide additional funding for other on-going operations and
maintenance. The City Charter limits the City's mill levy rate to 15 mills.
Pros: Cons:
Predictable and stable revenue May be a regressive tax because it is
stream based on the current value of property,
not on income or spending
Complete package More impact on older citizens with
appreciated ro erty values
True picture of actual costs if Impact on businesses
revenues are dedicated to O&M
Assures ability of the City to fund Doesn't apply to visitors and regional
O&M shoppers/employees
Voters may be confused about the two
separate taxes
• Option 4: Increase to General Fund sales tax rate
• The City's current General Fund sales tax rate is 2.25%. This tax is on-going and
does not sunset. Revenue from the general sales tax are the primary source of
revenue for the General Fund. Voters could be asked to increase the on-going
sales and use tax for general purposes, with the expectation that new projects
could be funded through these revenues.
Pros: Cons:
Recognizes the on-going nature of May be difficult to receive voter
O&M approval
Current sales tax rate relatively Voters may be skeptical if money is not
low compared to other Colo. cities earmarked
Portion of funding comes from
visitors and regional shoppers
Flexible funding source that
wouldn't need to be earmarked to
specific projects
• Option 5: Excise tax on restaurant food and liquor
Voters could be asked to approve an excise tax on restaurant food and liquor
sales. The City of Boulder has a food services tax of.15%,which raises
approximately$375,000 per year.
•
73
City Council Members
Building on Basics 2005 Update Study Session
September 8, 2004
Page 4
Pros: Cons:
Portion of funding comes from May be difficult to receive voter
visitors and regional shoppers approval
Flexible funding source that Limited revenue potential
wouldn't need to be earmarked to
specific projects
• Option 6: Sales tax increase on the ongoing rate; dedicated to two categories of
operations and maintenance: Public Safety and Capital O&M
Voters could be asked to approve a more substantial increase to the City's general
sales tax rate, with revenues earmarked for operations and maintenance of
programs such as Public Safety and capital improvements.
Pros: Cons:
May make sales tax increase more May be difficult to receive voter
attractive to voters approval
Assures ability of the City to fund May be confusing or look like a bait and
O&M switch
• Option 7: Occupational Privilege Tax (Employment Tax)
Voters could be asked to approve an Occupation Privilege Tax or Employment
tax. The tax could be charged for every employee within the community, and
administered through employers. A flat dollar amount could be charged per
employee who works in Fort Collins.
The City of Denver imposes a flat tax amount for all employees within the city,
with portions paid by the employee and portions paid by the employer. The
purpose of Denver's Employee and Business Occupational Privilege Tax is to
generate funds for City facilities and municipal services to Denver citizens and
businesses. Denver's current tax is $9.75 per month and raises approximately$20
million per year. The Cities of Aurora and Greenwood Village have a similar
tax.
Pros: Cons:
Portion of funding comes from May be difficult to receive voter
regional employees approval
Flexible funding source that New concept that may be difficult for
wouldn't need to be earmarked to people to understand and/or accept
specific projects
Used in other communities for Possible negative impact on employers/
many years Denver,Aurora, businesses
74
City Council Members
Building on Basics 2005 Update Study Session
September 8, 2004
Page 5
• Greenwood Village)
May be tax deductible to Regressive tax if charged to employees
employees and businesses directly because it is a flat tax, unrelated
to earnings
People paying have the ability to
a
Non-Tax alternatives:
Staff has explored several funding options that would not require voter approval for
implementation. By identifying options that would not require voter approval, the City
could be more assured of the feasibility of implementation of the options.
• Option 8: Continue funding new O&M costs through revenue growth(Status Quo)
Currently, additional O&M costs for capital projects from programs such as
Building Community Choices have been funded through existing revenue sources.
The O&M cost for new facilities have been forecasted in the 10 Year Budget
Outlook, and funding has been allocated from revenue growth during the budget
year when the new facility becomes operational. Examples from BCC include the
new Fossil Creek Community Park, Gardens on Spring Creek,the future new
. Northside Community Center, etc. New road project maintenance has been
funded by revenue growth in the Street Maintenance Program, funded primarily
by a BCC sales tax.
Pros: Cons:
Does not require separate voter Limited growth in general sales tax
consideration revenues create uncertainty about
funding availabilit
Capital projects compete with other
operational needs
Favors projects with small annual O&M
costs
T
0-Year Budget Outlook already
rojects revenue shortfalls in future
ears
• Option 9: Transportation Maintenance Fee
City Council has previously discussed the option of creating a Transportation
Maintenance Fee for businesses and residences in the community. The purpose of
the fee would be to maintain the City's transportation system, including streets,
sidewalks,bike ways, medians, etc. The fee would be calculated based on trip
generation data, and would vary based upon the use of properties.
•
75
City Council Members
Building on Basics 2005 Update Study Session
September 8,2004
Page 6
Pros: Cons:
Already have court approval of Billing/calculation issues
concept
Frees up General Fund revenues Impact on businesses
for other uses
Revenue source tied closely to cost Citizen resistance to other fees
of service
• Option 10: Renegotiate natural gas franchise fee(Approximately$800,000/year)
The City has a flat gas franchise fee which yields approximately$445,000 per
year. A fee of 3%of gross revenues would yield$1.2-1.5 million per year, or an
addition$755,000—$1 million per year. City Council would need to approve any
change to the franchise agreement. This General Fund revenue could be allocated
to operations and maintenance needs.
Pros: Cons:
Could be enacted by City Council Fee passed on to gas customers
Predictable revenue source
Most Colorado cities have one
Favored by natural gas industry
A 15-20 year franchise agreement
would provide a long-term
revenue source
• Option 11: Park Maintenance Fee
A Park Maintenance Fee, similar to the Transportation Maintenance Fee could be
established by City Council. This fee would be assessed to all residences in the
community and based on the City's current level of service. It would be
calculated based on the actual cost of maintaining the City's park system,
including grounds and facility maintenance, mowing, materials, full-time and
seasonal staffing, equipment, etc.
Pros: Cons:
Revenue source closely tied to cost Citizen resistance to additional fees
of service
Predictable revenue source Billing/calculation issues
Frees up General Fund revenues
for other uses
• Option 12: Library Authority
76
City Council Members
Building on Basics 2005 Update Study Session
September 8,2004
Page 7
• Voters could be asked to create a Library Authority to fund library services
regionally. Two or more local governments(cities and/or counties)would need to
mutually agree to create the authority, and ask voters to approve the Authority. The
Authority could then ask voters to tax themselves for library services, through
property and/or sales taxes. The revenue from the Authority could be used to fund
existing library facilities or to expand those services through additional facilities.
Pros: Cons:
Ability to assess regional users for Requires cooperation with other cities
Library services
Could cover future library projects Must be voter-approved by residents
O&M throughout the district
New legislation is there—no legal
barrier
•
•
77
Attachment G
•
Additional Citizen, Board and
Commission Input
Building on Basics 2005
September-November 2004
•
Bul in
on a s 1 s
•
79
Ann Turnquist-Capital Projects Ranking.doc Page 1
1
MEMORANDUM
TO: Mayor and City Council
FROM: Bruce Henderson,Chair
Transportation Board
DATE: November 18,2004
RE: Capital Improvement Projects
This memo was originally sent to John Fischbach on March 8,2004. It is being re-
sent for you November 30 Study Session. This will hopefully refresh you memory on
the Transportation Board's thoughts about Capital Projects.
At the request of the City Manager,the Transportation Advisory Board has completed
a review of the Capital Improvement Projects listed in the recently updated
Transportation Master Plan. We have prioritized a collection of projects across all
modes that we feel are the best candidates to be included in a new tax initiative,
perhaps as an extension of the Building Community Choices.
As the Council is aware,we are seriously short of transportation capital funding in the
city of Fort Collins. Continued shortfalls in capital investment in the transportation
infrastructure will impact quality of life and may inhibit economic recovery. The
Board supports the idea to secure additional funding.
All of the projects listed in the Transportation Master Plan,which includes projects
beyond the City's existing ten year capital inventory,have merit.In fact,it was
difficult to pick the best of many needed improvements. The following comments
share some of our thinking behind the choices made.
• The Board strongly supports a multi-modal approach to funding our capital
projects. Many of our transportation needs cannot be resolved by adding traffic
lanes,especially in the more congested older sections of the city.
• In establishing the distribution of projects between modes,the Board was guided
by the distribution of projects in the overall Transportation Master Plan. The
modal breakdown of our list approximately reflects the total share of capital need
by mode. If further refinement of the enclosed list is necessary,we recommend a
continuation of that distribution.
ADD Tumquist-Capital Projects Ranking.doc Page 2'
• Many projects on the overall capital needs list, like widening Lemay,are worthy
but come at too high an opportunity cost relative to other needs.
• Funding for the Bus Rapid Transit feature of the Mason Transportation
Corridor project is not included in the priority list.We feel the size of the local
share of that project is large enough to skew the percent too heavily toward transit.
This project should be the topic of its own separate initiative.
• The Transit projects included in our list provide for new and replacement vehicles
only.In recommending this,we assume at least one route will be added to the
current TransFort service: Harmony Road east to I-25 including service to the
medical campus at Timberline and the Park&Ride at I-25. Funding for
additional routes is,of course,not a capital item.
We recommend the Council actively encourage the City Staff to aggressively seek
opportunities to use modern Roundabouts at appropriate intersections throughout the
city.Roundabouts result in a more efficient use of our constrained capital dollars than
do conventional intersections,and can move more traffic with fewer lanes.
The Council should further encourage the City Staff to explore ALL potential
alternative sources for funding that are not currently being used.
At it's December meeting,the Transportation Board will be working to further refine
the attached list of transportation capital projects.
Rep 19,2000
TRANSPORTATION BOARD FINANCE COMMITTEE
CAPITAL PROJECTS PRIORITY LIST FOR APRIL IDOS ELECTION
RaM YeOv Nua1pM OnS FWm To FxWq TYM Desvlptlon CMy CSPM1a u CpXll
RRgrabe
1 RN RRS prte BNSF ara8on slo,m WO tO.,.
UWS.M mx
2 S is R46B Ilamm Sareca C~ a.~w mnh NSrint 51300.W3 13 2M000
irMr¢ec0on
I $beeLL R117 SpvYs EllzabeN roremenb um f+72W 000
bne y
a Sbeett R21 CSAp. pass arems $4,=. $21.M.M
5 PW P52 i WMI. siBe'uBs 550031 f]I)SB
6 T. W]T. tl gmsll W ValltMa f1091031 IId Bdt U1
1Ae
T Blue &l15 NMp. Leary b .id—., 7W,00 IZ5.HI.31
a PWSin P. SSMW,,FNA 25 new hand rNeb" I SI.M.001 U6.591.031
,P C. Mebax aM
e M. 01. rMim TrN Ros ed urge as¢ 21N 000 32B 29t 0]I
PNmNm Plae.ADA
Rarrq ab OMAI,
10 P. P5+ rwenwdi I3600000 fR 091031
11 TIMM TC] IVtllblvs U513 5375U.031
MyadebdL.M
U SIMS R12A C "M Cooler S.M. Mend. um. UI500031
tJ so. Rd0 pNe Wnyd Sbvw dbrle.. $2,M2.5[O fd35M,w
w Mm
N M. R11 Co Xa aagnvnb U.M.000 U7.0. I
Is M. RR16 a Po2 Trpgnen BNSFrad W. pi ed uMe ass fi5N 000 id),0065]I
OYe
1fi Bid BJI MMon LaurN C Web]IdmwRs S1CW000 M.0%,531
17 Pod Pfi] Yoe LrIMn Lem SiM V f211000 L53n 531
1B PM-. Pa C Ibnn C 3Newk5 5
Mg )531
1B PM 50 P Cn iNw.a4s V5 0.M B 2531
20 PM PM Nab . on
w 3Nbnka Sd5 W0 fNJB]531
zt PIS,
PN im RR m C.M, ¢MmaF¢ 1 0M.W0 .N2nl
23 ISM TSMiIO S.. E oremwns 2 M, So d0I U1
33 Pod Sbrr werFz Wo W I531
zd Pee P$6 slwr .]oars ns Boo SB n].vt
bbm.er
a spMN Rul Tag IN PSnMN W.M,531
upaa zL
¢INM m4L aNrbl
wen aMr...dbn ra.
aFynenlaM 0.RyaM
26 $bM4 ftn Lt-av fgrtin dbnearMal Sep, tt5W 000 Sf6 1753I
M1an 2Lrlaial
...
m dLwSy ane
F MS 4m
imPmre ar
S] S.. R132C1 Trr4erne peke P ad dbw artrbl 1l 570277.Ul
N M
ze sbem R22 C~ u9PBabB S74.277.Wll
ml ti
I zF $bae55 RIB Xarmon MMan rxnen6 000000 ]B 2n 5J1
inlMEaflYxr
l0 Sbeels R+2B TMSFI Wow 32900000 fB08])531
O L MWS'
N Sbeeb RIM Yrb enlmb BJ0
1 , 1 '
]S PM Pt ILVaN ENewake 2M 00 N0 817 B]]331
Me A}
ll Stree4 R156 TA. U.250000 T12)U1
trm ow ng
)a 4 M l fY mia.6 I50 000 B)B]]531
M.
IS BL 821 pate c Cie. I000U00 fbB ]]Ut
N PAB B21 laurN NgggC C dMebrrea f)50 fBB.BP s)1
HRRC
cSu
Fm945mantl yaM
)T M. Blli Masm I d0o WJ 8102)SJt
$bb 114�'aY cm
IB 1 TsloC3 I Pafvflira 1 dSe Wes f1W0o3p 9215153,
D Me T03 TerM wrmC 2d.fm f92d51531
N Me 612 EYStlM a6rlirq nN ianW pnaaM6 $m.000 9Ia51.531
df Pad Pd2 Lawn .Nllwsm Buckh sidavaka 2000.0 fB3 15]t
M pi.
N Ba. B22 Lemd M RNeryde bne¢ 11]o0 aa0 f95I51.551
N rr.r5i icd F,tifa SAW lrrancMeqpx 1303.22B Bsbv lst
u9yab M1al dLarbnal
N $be.h R11 L LOY Fussi Gert Xa 6 bne rbrul up'.. ial ""I.,W] I1 W[W)51
uPyaM M1.I Sallerial
.5 S. RAIL Xamxn ilrr5erl5x Le Blane arterial b6LMenalslantlaMs itOp Wa l51
naNaaM
� de
.9rmd
Myp®
N &Re BtN Naenbnd LwRR Pwp irN 51300 W0 31012N.1511
aPyeM dam dL aMMI
d] Tft.,.. Rd]0 Mamwn 2e 135 Blend erNnal b6LMd41 s1andaas 3f01 151
N Trawl iC 10 FatiMa-Wblanar¢M a f]ID q] 101935 28
45 TrMpil TC9 I.. emwrp v fit] IN B62 1
28
5g Trans, TCS flame f1500.ro 102)93]28
51 ParYin PN6 OrMe PNR pNN4wn rrow ML aN webu f2)1 W3 tOJ 3.128
5$ I.N TC2 $MM1FS Pa MNnitiM TrWk 30750 $ID3,ln.478
Sl 1 M
S5d5 PhM wP1o6 q S. AS-.ad.
pi.Ia.S 9aB0 tI W3 1]0111,191
- B buMWb 5 8
SO LW 10 851958
% TnnsB TCB SbNws P Nnwlaea I10]. I0d059458
57 Pad I P29 I.. $NrM.wr sidewaRs ys,m SIN.124,156
y Trinsil iC 11 BW$ Acmet kk6l.adOnS 94a0 IOd IB]93B
TOTALCRYCAPITSI S'..193,9b
Sbeeb $58,.2M')
"am.
TSN f2.gM."
PS,S p $137".
Tr. s10]mAm
&4e f15250.M0
Pad 3fi.bJ6,000
CnM wIN ft0a.19391B
82
RESOLUTION 2004-08
• OF THE FORT COLLINS, COLORADO
DOWNTOWN DEVELOPMENT AUTHORITY
MAKING CERTAIN RECOMMENDATIONS TO
THE FORT COLLINS CITY COUNCIL REGARDING
BUILDING ON BASICS CAPITAL PROJECTS
WHEREAS, the Fort Collins Downtown Development Authority has been duly
organized in accordance with the Colorado Revised Statutes 31-25-804, 1973 as
amended; and,
WHEREAS, the City of Fort Collins is considering projects to be funded by by
an extension of a'/4 cent sales tax to be placed before the voters in April,2005; and,
WHEREAS,the City of Fort Collins has asked for input from the public and
community organizations.
NOW, THEREFORE BE IT RESOLVED BY THE BOARD OF
DIRECTORS OF THE DOWNTOWN DEVELOPMENT AUTHORITY that it
hereby makes the following funding recommendations, in no particular priority,to City
Council.
• 1. Library materials.
2. Library Technology.
3. New Downtown Civic Center Library, subject to the establishment of a
private community support group for public relations and philanthropic fund
raising purposes.
4. Fort Collins Museum Expansion.
5. Fort Collins Museum Storage Facility.
6. Cache La Poudre River Habitat Restoration conditional upon"Open Space,
Yes"tax revenues being considered as the first source of funds to make up
any shortfall because of reallocation of total tax revenues or should the project
cost more than budgeted.
Passed and adopted at a regular meeting of the Board of Directors of the Fort
Collins Downtown Development Authority this 9s'day of September, 2004.
wvv /
Kim Jordan, Chair
Atte
• J ~Meadors, Secretary
83
Mayor
City of Fort Collins
MEMORANDUM
DATE: October 20, 2004
TO: Reginald Herin, Senior Advisory Board
FROM: Ray Martinez, Mayor -(Y
RE: Senior Center Expansion/��
This memorandum addresses concerns and questions you raised during our meeting on October
20,2004.
I. Yes, the Senior Center Expansion project is still on the list of projects that will be considered
by the City Council for the Building on Basics (BOB)capital campaign. The cost of projects
still being considered far exceeds the revenues anticipated from the BOB vote. Consequently,
many projects under consideration will not make it on the ballot. The City Council will decide
the final project list.
2. Yes,City Council did receive the Senior Center petition and letter noting the multiple requests
for expansion. It went to City Council on September 14, 2004 with an additional petition that
Council received on October 7, 2004.
3. Your concerns about more baby boomers in the community needing more workout facilities
are certainly part of the consideration for the expansion.
4_ The Senior Center building was not designed for expansion. The City purchased two acres of
land southwest of the Senior Center building when it purchased the site for the Senior Center. It
was a package deal. This land can be used to expand the Senior Center by building a separate
building on it. This is the project included in the BOB project list.
5. The request for more parking for the Senior Center is included as part of the Senior Center
expansion project proposed for the BOB campaign. If this project makes it on the ballot and if
the ballot is approved by the voters, additional parking will be included with the new annex
building. Also, the property in front of the Senior Center along Shields Street may be purchased
to provide additional parking as well, if it is still for sale.
300 LaPorte Avenue • PO.Box 580• Fort Collins,CO 80522-0580B11(970)221-6505 • FAX(970)224-6107 • TDD(970)224-6001
www-fcgov com
September 8, 2004
• TO: City Council REC�/VED
FROM: Senior Advisory Board Sf P 1 .7 2004
City of Fort Col/ins
SUBJECT: Building on Basics: Senior Center Expansion
Data from a survey completed in the late 1980's indicated a need for a
60,000 square foot building. A 40,000 square foot facility was built. The
Center was near capacity the day it opened in 1995. An average of 1,000
participants a day use the Center and participate in an average of 60+
programs a day.
Many city residents are not aware of the age range and diversity of
participants who use the Center. From the beginning the facility and
programming was for adults 18 and older. However, special attention was
and continues to be given to the 50 and older adults in our city. Participants
range in age from late teens to early 90's, a range of approximately 70 years.
Older people, people with disabilities and special needs, at all age levels,
• participate in classes, recreational programs and activities at the Center.
Eventually disabilities and special needs become part of the aging process
for many of us. The City of Fort Collins can, and does, take considerable
pride in addressing and meeting the needs of all residents. City officials
have worked very hard to insure that facilities are physically accessible and
programs and activities are financially accessible to everyone who wishes to
participate.
The current facility is too small to adequately serve the people it was
intended to serve. Overcrowding has become increasingly difficult to
manage. Storage is inadequate, in short supply, and poorly designed to meet
the needs of participants and instructors
A larger facility is needed. There is a need for better designed rooms
and activity centers, new equipment, much more storage, and better
ventilation for some activities. As a Board we are trying to look ahead, with
a sense of urgency, to meeting the needs of the fastest growing segment of
i
our city.
•
85
Cultural, Library, and Recreational Services
Recreation Division/Fort Collins Senior Center
Qty of Fort Collins
September 2, 2004
Fort Collins City Council
300 LaPorte Avenue
Fort Collins, Colorado 80521
Dear Council Members:
The City of Fort Collins Senior Advisory Board is vitally concerned with maintaining the
quality of life for aging adults. We believe that it is very important to support the Senior
Center as a focal point for programs and services for these citizens. In order for this
resource to remain viable,it must be visible and accessible.
We have been presented with information from time to time over the past few years about
prospective projects to be constructed on the northwest comer of Shields Street and
Raintree Drive. We are very concerned that any project on this property will limit the
visibility of the Senior Center from a main thoroughfare. Additionally we are concerned
that such a project may attract more traffic than can be accommodated easily on that site.
We are also aware that such construction would mean that additional parking spaces
would have to be eliminated from the Senior Center lot to accommodate access. We do
not believe that this would be beneficial to the Center or its participants.
The Fort Collins Senior Center,located at 1200 Raintree Drive,has been open since June
of 1995. The facility averages approximately 1000 participants each day. The parking
lot has 103 spaces, 14 reserved for special needs(10 handicapped, 4 reserved for those
with special needs). There are certainly times when all parking spaces are used including
all available street parking. We believe that this parking limitation impacts business and
participation at the Center. For those who are unable to walk long distances,particularly
in inclement weather,it is definitely a deterrent to use. If there were additional spaces, it
would allow more to be converted to special needs use.
I strongly encourage the City to include the Senior Center Expansion Project which
would include acquisition of the property mentioned above to be developed for additional
parking in the BOB.
Sincerely,
R"dA. )Henn
Senior Advisory Board
RECUUMN-its for life!
1200 Raintree Drive • Fort COMM CO 80526 • (970)221-6644
Ca7Y ( 'oUwu
IJA
In the early 19908 I was a member of the Building Team
that worked with the architect in planning for the new
Senior Center. Two things were left undone or changed, in my
opinion.
1 . Although we convinced the planners to move the stage
from its original site to its present site, there has always
been a need for a "Green Room" - a room where performers
could change costumes and/or wait for their entrance
onstage. The nearby restrooms are not suitable for either,
especially as audiences have increased in numbers.
The Slightly Older Adult Players (SOAP) Troupe believes
that an addition at the west (window) end of the stage would
serve this purpose nicely, and without need for blackout
curtains. A Green Room at this spot would be ideal.
There has been, and is, such demand for space in the
Senior Center that the stage is used by other groups and
classes between shows. An ample, properly planned, Green
Room addition could be used also to store props temporarily
and securely when other groups need the stage between shows.
• 2. During the planning phases, the Building Team
planned for a large well-stocked library. We knew that most
seniors are readers. Study groups such as the Front Range
Forum hoped to have shelf space for books related to their
course work. Reference and other books related to writing as
well as recreational reading needed shelf space, too.
Unfortunately, square footage area for the library was
cut before the Senior Center opened, and computers have
taken up a lot of the space that was left.
Reading, and writing, are activities that have returned
and are encouraged for people of all ages nationwide.local programs as "ReadOn Fort Such
Collins " ReadColorado S and
considered
"Writing Life Stories" are ongoing ,
examples. Has the City
that this library/media center, if expanded could
serve the surrounding community as a branch library?
These
he
expansion ofr the uFort wCollins o of eSenior nCenter.s I e1Thank iyoutfor
considering these recommendations.
Sincerely;—/Aar ..
Marjorie Mc agga a rcrc etary
Fort Collins enior Advisory Board,
•
87
September 8, 2004
TO: City Council
FROM: Senior Advisory Board C
SUBJECT: Building on Basics: Senior Center Expansion
This letter is in reference to the Arts and Crafts classes, programs and
activities sponsored by the Senior Center staff and volunteers.
Quilting, crafts, photography, cartooning, sewing, calligraphy, scrap
booking, spinning, felt making,jewelry making, basketry, acrylic, water
colors, candle making, book making, ceramics, stained glass, rock cutting
and polishing, open shop, and minor repairs are generally taught in Activity
Rooms #'s 1 & 2, wet crafts room, or the studio/shop area. The stage and
Activity Room #3 are used on occasion due to scheduling conflicts.
Scheduling, at is best, is sometimes difficult, frustrating, and a real
headache. There simply are not enough classrooms to meet the current
needs during peak periods.
Setting up equipment, and taking it down and storing it, takes time
and energy and detracts from the instruction and class times. Storage of
materials, supplies, molds for ceramics, and other materials is a horrendous
problem. Storage is compounded by having to also store display units,
props, and equipment used for special activities at the Center.
The wet crafts room and the studio/shop have dust and toxic vapors
which have to be monitored closely for some classes. The dust collection
system in the studio (which also serves as the wood shop)was added after
the building was completed. The ventilation system, for removal of heat
from the kilns and toxic vapors from painting, finishing, and ceramics, needs
to be included in the basic design of a new facility
On occasion the two-activity rooms, wet crafts room, and studio/shop
are used to store chairs from other parts of the building. The activity rooms
may also be used for foot care.
Y
88
September 8, 2004
TO: City Council
FROM: Senior Advisory Board C. L't'L., �Zj�
SUBJECT: Building on Basics: Senior Center Expansion
This letter is in reference to the current exercise/fitness/wellness
programs and activities provided at the Senior Center. There is a second
floor elevator landing and lobby which contains five (5) pieces of exercise
equipment. Participants have to walk through the lobby to enter an adjacent
activity room #3. There is a lot of foot traffic passing through the lobby to
reach the activity room and the indoor track. At times it resemble exercising
in a public area.
Activity room #3 is for fitness and wellness classes and exercising.
The room contains free weights, wall weights and exercise mats. The
• equipment is not available when educational classes are in session or the
room is being used for foot care.
The four corners of the indoor track contain nine (9)pieces of exercise
equipment. The equipment reduces the width of the track considerably at
the corners, which in turn creates a hazard if six (6) to ten (10)people are
using the track at the same time. (The new shock absorbing material on the
track is excellent!)
Most of the exercise equipment has been donated. Some of the
equipment is considerably outdated.
The important aspect of exercising, socializing, and visiting is
curtailed greatly with the scattering of equipment and foot traffic through he
lobby and on the track. Exercising alone is much less desirable and
successful than exercising and Visiting with other people.
•
89
9-'4-04; 5;33PM;SENIOR CENTER
;970 224 6072 F 2/ 18
Support for Fort Collins Senior Center Expansion
We the undersigned support the expansion of the Fort Collins Senior Center and parking lot as
defined in the Building on Basics initiative that will go to the public for approval in April
2005. We encourage the Fort Collins City Council to include these projects in the initiative.
Signature Address
.Phone
377-,f 7j
3. GiCs� , I m2 171 PVV
4.
5. 'DON McLO 512`Ivµa (2�-`i•' Vrcttte ;�D7-1602
6.
7C a85l� Can b in a66-r7Y4
8. �zza
9.
10. ---
2tz o£s�
12.
I4. ZZ/1 LU. p(i=FZZZ —S/6/�
15. �f rO •6D/(�
16. raga. :4 ass y/6 -irs'9
17. r ,4 ti 22-f-- lG,f
1s. 31 0 6 4Ya- 0+07
19. IL Tdi �dSZs' 23 - S'/per
20. �6(!7
C Y
90
9-14-04; 5:33PM;SENIOR CENTER ;970 224 6072 w 4/ 18
Support for Fort Collins Senior Center Expansion
• We the undersigned support the expansion of the Fort Collins Senior Center and parking lot as
defined in the Building on Basics initiative that will go to the public for approval in April
2005. We encourage the Fort Collins City Council to include these projects in the initiative.
Signature Address / �,� Phone
1. S loos as -
3. d/ i :Z� (/£lli6
4. G Ce
5. 06 - v 6�
�S
7.
8. ,V
9. 1-1-10 4eri Gr.% 3M, 5t0
10. 1651 3. 3
11. 20t3 tacwtih 4, Ln. t (a�Y-`j to Y
12. 1QVJ
13. [/fit S1 bwQ-� 2>22
15.
16. 17PI G
17 G/VVY1lW! PiL6L lao I Juniper Ot, Q7o-'fgz-�f06
18 � d13q �r�•a.-`. �11- �-is��
19. ,� 02�17 h/
20. _tX1.fKo. l,JeP. m .14fto PkIcKER DR, RZ3- 3367
91
9-14-04; 5:33GM;SENIOR CENTER ;970 224 6072 N 6/ t8
1
Support for Fort Collins Senior Center Expansion
We the undersigned support the expansion of the Fort Collins Senior Center and parking lot as
defined in the Building on Basics initiative that will go to the public for approval in April
2005. We encourage the Fort Collins City Council to include these projects in the initiative.
Shmature Address Phone _
1
2• 220
3. /,lx SOY E, tDR #3 o 3 9g—D/33
4. 311512;FL- PJ IAPork 2,21 23 63
�-y
5. / o/ 1✓/1 S -" 8
DDa
7.
` 8. / 3s � 1 � + vc a-34/61s
IV
I -
10.
11 > 2¢a ! �3- 72-
12.
13 arm /n� �cpA�i�� �93 - 3Y' 7
14. aYOG
15.
1
17.
18.
19. 73 \ O o
20. ®- f o - /1"a
92
9-14-04: 5:33RM;SENI0R CENTER ;970 224 6072 # e/ 18
Support for Fort Collins Senior Center Expansion
We the undersigned support the expansion of the Fort Collins Senior Center and parldng lot as
defined in the Building on Basics initiative that will go to the public for approval in April
2005. We encourage the Fort Collins City Council to include these projects in the initiative.
Signature Address .Phone
1. sic„ y00AYta. Ave fit-
2. . . . .cn a/i 9av C�t4$--r etc.". y U p 3 5
3. m d �Sv�e �cQ�cLays� Z 7.�c �- j
4,
5.
6. oZ d
$: . e�g
- - z
10. C/� 6 �eut�.E dab-oS 1
11. V.6P
12. . as 2 fig/ J CJ 2 g'a-R
13, .JJvt�`ti.i
�i�J 20 8J�� 9
S-�6
17.
18,.__`_.av st,._.f �-'-'. .� `.. t ��ti/ l.fr �;•-ice � G:./•� 2//� fi .�
19."riP'�`Ei c71 ' s J?C2�`td > l•J., M - iK,..k. '�fJ-i,_ a ' %.t ta. ;r
93 _�
- 9-14-04; 5:33PM;SENIOR CENTER
;970 224 6072 # 10/ 18
• I
Support for Fort Collins Senior Center Expansion
We the undersigned support the expansion of the Fort Collins Senior Center and parking lot as
defined in the Building on Basics initiative that will go to the public for approval in April
2005. We encourage the Fort Collins City Council to include these projects in the initiative.
Si Chature Address phone
1. GLvrJb�f Qyi/ A "'441A
2. , iiutic- 72 z 7/z
3. //J Ti83 y/lo-oB�S
4. y
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18. '
19. I
20.
r•
94
9-14-04; 5:33PM;SENIOR CENTER ;970 224 6072 p 12/ 19
Support for Fort Collins Senior Center Expansion
• We the undersigned support the expansion of the Fort Collins Senior Center and parking lot as
defined in the Building on Basics initiative that will go to the public for approval in April
2005. We encourage the Fort Collins City Council to include these projects in the initiative.
Sienature Address Phone
2 e B= �JqR 1 S2Ssv
3. L a a 2l1 /�i 3LOSL A (=i F[�, t� ,i! a2fij i
1n ppp (� 1 -tnil�
4. (I ,�1�n a :,, to �a Q, w.A,v w7f;r Do i a e9 PDs d`f N 9y -2 9 L s
5.
6.
7.
8_
9.
• 10.
11.
12.
13.
14.
is.
16.
17.
18.
19.
• 20
95
9-14-04; 5:33PM;SENt OR CENTER ;970 224 6072 4 14/ 16
Support for Fort Collins Senior Center Expansion
We the undersigned support the expansion of the Fort Collins Senior Center and parldng lot as
defined in the Building on Basics initiative that will go to the public for approval in April
2005.We encourage the Fort Collins City Council to include these projects in the initiative.
Simnature Address Phone
2.
3.
4. l► Wet `�iFi�lrfan
5. L or iS 1lAclCLr 'lo+/ CHEieo,� E �R. 41q!� 75W5-
6. An
7. 'v ` 4X C,,t. 2 2 3 -5 Z'S
8. 7V V""_ OWk'ki _Sc., 1 2O* V=ra,r,F- �t fir, 3 T7- `-f 2 Zj—�
9. _ L, ,V i v3i . „t 9 - s a - .29(.3 v
10. '� 3Y r G ✓3 �Yf
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
96
- t&tWS RECEIVED
Support for Fort Collins Senior Center Expansion " SEP 1 1 1001
We the undersigned support the expansion of the Fort Collins Senior Center and parkq&46Fpf Collins
• defined in the Building on Basics initiative that will go to the public for approval in April
2005. We encourage the Fort Collins City Council to include these projects in the initiative.
Signature Address Phone
2.
3.
5. �ill u 14 :i cv, iA
6. aw 5-y /er'r' v k'r i2 49 (c �✓ ? �/
7 / i3..li .fQ..✓.•Lk-rr+ j....v' .ZttA-I z- % :i- fwll•'" Y`!� }' .:.r,� .1f 18,, 4z
A fa
8.
9. L 3 / ?C
q 5
10 ...� •"(.-'C .-._...y / .�e'"4 e"r¢. E..Y-.� / , ,�. ;�k- 9� ,-',�. Y i' r. ! v'1 r �"",- '' ! ..,.
J�
a
T
� r
12.
13� 131- �0 „5 t-./4 ,t 0 u1 - 7 1 7 f 1
14.
15.
16.
17.
18.
19.
• 20.
97
In 1988 when discussions were being held about the possibility of building an older adult
4 center as part of that capital improvement package, it was determined that approximately
60,000 square feet of space would be needed in order to meet the needs. This number
was based on national guidelines based on population and the results of a number of
surveys and needs assessment studies conducted at the time. Although we were able to
build a wonderful older adult center, funding allowed for only 40,000 square feet. The
building has been programmed at capacity since the day we opened.
The additional land and the way the building was designed was done so to accommodate
growth as we could afford to do so. We have not lost sight of the need to add to the
existing facility.
The parking facilities are quite limited. The lot accommodates approximately 160
vehicles. The building accommodates approximately 65 events each day which attracts
approximately 1000 participants each day. Most of those individuals drive themselves.
There is a severe shortage of storage space in the Senior Center. Currently most storage
is maintained in a series of sheds on the property. Currently there are six sheds and these
do not hold all the necessary materials. Additionally, it is not practical to put tables,
chairs, fitness mats and other like materials because it is inaccessible and difficult to get
things in and out of these sheds.
Due to space and funding limitations we were not able to build an appropriate kind of
facility for fitness(such as for cardio-vascular equipment, strength building equipment,
etc.), computer programming, arts programming. There is great demand for programs
and services in these areas and we are not able to meet that demand in the current space.
The population of citizens age 65 and older is estimated to increase five (5) fold in the
next twenty years. In order to adequately meet the demand for services, we need to plan
now. We urge City Council to consider expansion of the Fort Collins Senior Center to
meet this need.
98
Ann Tumquist- Renewal of tax Page 1
From: "Linda Hopkins"<lindah@frii.com>
• To: <djones@fcgov.com>, <datteberry@fcgov.com>,"Kurt Kastein"
<kkastein@fcgov.com>,"Eric Hamrick"<ehamrick@fcgov.com>, "David Roy"<droy@fcgov.com>,"Ray
Martinez" <ramartinez@fcgov.com>, "Karen Weitkunat"<kweitkunat@fcgov.com>, "Bill Bertschy"
<Bbeschy@fcgov.com>, "Marty Tharp" <mtharp@fcgov.com>
Date: 9/15/04 4:29AM
Subject: Renewal of tax
Council members and staff--Since the early 70's I've prided myself on
being involved in the community's capital improvement planning process
(DT2)...well as they say, "pride cometh before the fall" so perhaps I
should not be surprised that listening to council and the staff presentation
I was sorely disappointed that community comments were"assumed"to support
a simple continuation of the street maintenance tax.
I for one--and apparently and perhaps, just one--certainly brought up
(and rather emphatically)at the city presentation to LLAC, the notion of
the basic City sales taxes set at a rate that would pay for basic services,
INCLUDING street maintenance. I believe that option should have been an
opportunity for public discussion.
Despite our seemingly insatiable appetite for first class services that
keeps ratcheting the budget demands higher and higher, I believe basic
services including street maintenance should NOT be funded by a periodically
citizen approved special taxes.And I will adamantly reiterate my concerns.
Clearly my comments were either misunderstood or dismissed.
I also had this same rather pointed discussion with Eric H. at his coffee
klatch meetings. Basic taxes should pay for the basic services. "Special
taxes pay for special Cl projects."
• This notion of"BOB" is not building ON basics, in many ways it is simply
"Building Basics" with continuously renewed taxes. Though it doesn't make
quite as clever of an acronym,"BUB" —Building UPON Basics,would be more
truthful and perhaps more exciting. Assuming the basics were provided
within existing tax rates, additional capital improvements or special
projects desired by many citizens and the requisite new and periodically
renewed taxes would be consistent with citizen desire,demands and votes.
"hey, BUB could you spare a dime?? would be our new campaign theme.
----------------------
Linda Hopkins
The Group Inc.
Direct: 970-377-4916
Fx: 970-223-7887
Cell:970-217-1228
CC: "David May"<davidmay@fcchamber.org>
•
99
_Ann Tumquist- BOB Projects Page 1
From: "Joe Looper" <jlooper@frii.com>
To: <bob2005@fcgov.com>
Date: 8/25/04 4:23PM
Subject: BOB Projects
My general approach is to fund some of the badly needed street and highway improvements as a top
priority,without which the City's economy will suffer serious erosion in the coming years.The other
projects should be funded by separate sales taxes,with each standing on its own merits,and supported
by those in the community who provide its principal backing.
Joseph Looper
100
Ann Turnquist- BOB Page 1
From: "Jim Strickland" <samfox59@aol.com>
• To: "Brenda Speake" <bspeake@fcgov.com>, "Kelly Martino"<kdimartino@fcgov.com>,
"Ann Turnquist" <atumquist@fogov.com>
Date: 8/31/04 3:11 PM
Subject: BOB
I am just curious who will determine how"we"
determine how the additional .025%sales tax will
be used. This seems like a back door manner to
replace the 'grocery sales tax'if defeated in
November.
I do not approve of back door politics. Be up
front and say that it is to replace the lost
revenue from the defeated (if, in fact, it is
defeated)grocery sales tax.
I am finding it more and more difficult to vote
for ANY new tax the City offers. This is based
on several recent offerings. The one that is
hardest for me to swallow is the 25 year Open
Spaces tax where the money is being spent on
property faraway from Ft. Collins. I thought
that these funds were to be used in the immediate
'belt'area of Ft. Collins.
I propose that any tax, no matter what it is, is
for a maximum of five(5)years. In this manner
• we have an option to"kill'a tax, if renewal is
aftemted, if it is not benefical to the majority
of City citizens.
Regards.
Jim Strickland
•
101
Ann Tumquist-Fort Collins projects needing funding Page 1
From: "Maya Dobroth"<mdobroth@earthlink.net>
To: 'Brenda Speake"<bspeake@fcgov.com>,"Kelly DiMartino"<kdimartino@fcgov.com>,
"Ann Tumquist" <aturnquist@fcgov.com>
Date: 9/8/04 1:12PM
Subject: Fort Collins projects needing funding
We missed the survey, but want to let you know we
support the funding for BOB projects in Fort
Collins, and especially support completing the
4-lane road on Harmony from Larkbunting to Seneca,
and a Troutman pedestrian and bike underpass.
102
Ann Turnquist-city priorities Page 1,'
From: "sharon bleicher" <sableicher@aol.00m>
• To: "Brenda Speake"<bspeake@fcgov.com>, "Kelly DiMartino"<kdimartino@fcgov.com>,
"Ann Turnquist"<atumquist a@fcgov.com>
Date: 10/15/04 11:55AM
Subject: city priorities
1 feel that additional funds should be directed to
the library esp.for technology and the purchase
of books.
The Ft. Collins museum is a disgrace&should not
be funded until they do a decent job with what
they have. The renovation was horrible.
•
•
103
Pag 811
Anri Turngwst-City busses _
From: "Barbara Nichols"<Babnic2Qcomcast.net>
To: "Brenda Speake"<bspeake@fcgov.com>,"Kelly DiMartino"<kdimartino@fcgov.com>,
"Ann Turnquist" <aturnquist@fcgov.com>
Date: 10/16/04 5:16PM
Subject: City busses
I have lived all over the world,all over the USA,
and have ridden on most every kind of
transportation there is. I can truthfully say I
DETEST city busses more than I can tell you.
Busses mess up traffic,their exhaust is
stiffing,and they don't take you where you
really want to go. They are misserable
hinderences to traffic and dangerous! I believe
rail is less constricting to traffic, more
reliable,and can be put up over or under existing
roads out of the way. I would never vote for more
busses and would discourage anyone I talked with
about it to veto using more of the same. B.
Nichols
104
Ann Turnquist- Fwd: Re: Building on Basics Funding proposals Page 1
From: Darin Atteberry
• To: Ann Turnquist; Diane Jones; Marty Heffernan
Date: 10/31/04 3:13PM
Subject: Fwd: Re: Building on Basics Funding proposals
FYI...
Darin
>>>David Roy 10/29/04 8:54:31 PM >>>
Good evening Katherine;
thank you for sending me your e-mail. I have also forwarded it to the rest of City Council.
Thank you for your interest in the future of Fort Collins.
Please contact me again for any reason.
David Roy
City Council, District 6
Fort Collins, CO
>>>"Katherine Lindgren"<klind7ahotmail.com> 10/29/04 08:44PM >>>
The purpose of this letter is to urge you to include funding for
both Technology equipment and materials for the Fort Collins Public Library
in the"Building on Basics" item to appear on the April ballot.The loss of
this funding with the end of the Building Community Choices funding would be
a critical loss to this community.
• It has been my experience that if library needs are clearly stated
on a ballot issue the public will suport it. 1 spent 3 years and 3000
volunteer hours of my time working with 800 other volunteers to provide
leadership to organize elementary school libraries in the PR1 School
district in the 1960's. Therefore, 1 recognize the public needs to be
educated about tasks and equipment required besides books to operate a
successful library system. Keeping current materials coming is vital even
though it means storing books at another location.
Free public libraries are libararies for a free society. Reliable
information is not free, has never been free, and never will be free as you
know if you subscribe to an on-line information supplier. It must be
selected, obtained and organized. Other public cultural entities have means
of obtaining additional revenue as an itegiral part of their programs.
Museums, orchestras, and athletic events all sell tickets in addtion to
their public funding and volunteers. Libraries cannot do so.
As the late John Eastlick, Head of Denver Public Library, used
to say, "Libraries are the public's universities". People read, listen to
tapes,watch vidieos,view pictures and study maps for myriad reasons.To
find information, relax,escape, be entertained and to learn to do things.
My father was a mechanic not a carpenter. He was determined to live the
American dream and have a house of our own so in 1929 he went to the public
library and borrowed a government document on how to build a house and wire
it for electricity. He built it from foundation to roof and wired it. It
still stands and appears to be in good repair.A tribute to the good use of
a public library.
Sincerely,
•
105
Ann Turnwst-Fwd Re: Building on Basics Funding proposals Page 2''
Kay Lindgren
1513 Independence Road, Ft. Collins, CO 80526-1710
Klind7@hotmail.com
Express yourself instantly with MSN Messenger! Download today- it's FREE!
hthttp://messenger.msn.click-url.com/go/onm00200471 ave/direct/0l/
106
Ann Turnquist- BOB project agenda Page 1
From: "Doug Cecere"<dougcecere@hotmail.com>
• To: 'Brenda Speaks"<bspeake@fcgov.com>, "Kelly DiMartino" <kdimartino@fcgov.com>,
"Ann Turnquist" <atumquist@fogov.com>
Date: 11/16/04 1:15PM
Subject: BOB project agenda
Please, PLEASE, PLIH-LEEZE make the widening of
Harmony Road from College to Seneca a top priority
for upcoming projects! The traffic situation is
bad and getting worse as the area continues to be
developed for additional housing. My family aften
drives out of our way to travel east/west via
Hoorsetooth,just to avoid the Harmony traffic
mess.
Thank you!
Doug Cecere
•
•
107
H ( I
~ a — ro .-. oo 'nvan — t000 va vim rn �o y
O 14 kk' i OCJ r�i �C aTodN -� ni V tV -+ nM Zvi OC
0 � o
1 �,. Vj (A M f9 Vi b9 (A f.9 69 fA b9 fA 69 fA b9 b9 M b9 H � � v �
� m
a — oo — rn 000 moo -I In nA
ea
02E 5g 5
5 � C FCp• � m u o
��4 t�' .,• 69 Vf Vi 69 df{A Vl di M to Vf f/9 Vi 1A fIi W 69 Vf Vi e( � F Q U 6 IL rn
�h Y
vuoovi c }O ag � Q 8S o
O N U N p 0. a •9Kj G �L
� � �t � �°t � d� � O � Q C � p � �1 C � r'1 .� E•i � S
V"y3�
00 '3 Q
bvio n roam ,n vi ro 'n o ao to 6 2
d
C :� Fnwev ss sv usw �n vi ,nw vs w vs vi � � � "�
y x',. ao h o to to v oo vi vi r o .n o o vi B
�co
tV O O R �G tV vm N 00 O N G h O O y�
o lI\R
E u
c�i u U
g a 3 o
o `�. v g, I E � °fir (�
fi um �--n g U >72
'a
Ai
oar I I
dr o a = � hR
n c m 5 m 2.` a �5 c 0 a 23 �i
a, F Q w o o € 7 o $ O E a�a .� •� m vi o °�'
U U o E U ,fib Bg r y 3 s
v o g oo o 0 d 8 8 oB U C
.] .3 Z vi .3 W W R. �, U W z w w, U o R. R. .i eV wj al, F3
108
� I I it I I III II
IIII I
• v - r o
h C O
fq 69 (.9 49 f9 !A Vi 69 Fq Vf 69 W W fq Vi Vi Vf W fy � C
V — O O 0. m Nl O ro W O O
N .-• N _. s a m
�n » �n vs tnwwrnw » viw cs vi cv iA ss usw E Z`o ; �
(, �, u a ... ..
O
UH u c�
H ❑ m c U .�
> Q � E � 9gF�
i rn E o u I
pp �n T
9N O N W � V �o � N
o m
C KU o . u 0 4 E $ u E U F Q gg
wzuna 2EW '�` � - euvie, � � g m
y c[4 0
Ole
c.0 " QU 0
w u ?
• ;� C 9 c S o o
Y i aAwS .. azo. urFFF � 3R CO 0] 4 aw' z �.
O
04
F 3 0
f(
11
O t
ra ^ V N pp
7 h www ✓� cA csw rn an viw w vi svw e �
C 01 b h O `n h O oo N N r 0 M O O h
E
GC 'O fV < v0 a b N � tV op C N C vi Y G y
U y a
E
V
ti
yu
V u " p2c 3 vlo " n a
Q o a C
aa ❑ i° w e d o n: UE
V .o e � � � � a
pe w e
yu. E o
oUs H vU 3 ] `g ca Q o a
c c. Y ' .w. O UQ w.
• F 3 .n .° .0 c n° 0 0 9 c o °
.ter W U U o e E U .mac emu° o e u o�i u d o t E o
� oov Woovvv E' A v ' U 3 N
U r
mUp. za: a oU = a a°
a U a U ao
109
n O ^ oo M i M - xD 0 0 -. N N M O• •D
O (V M �O O P T �'+ M d N -• F nj vi O C
F d - o 4 6 piM Mommoo - N •n xo r - +f1J111 J
C ri o+ � NmaoN . NtV ... nrri _. m dM 1( f
viwwt9wwwwwwwww wwww w M w
� O O
0
�.
C -0 "; C7L' .^4' .•q L' S '�. o C m �" u Z' L. - Ct
N 3 �dv € 8b �
V O N S or Q Q
-az E
'y d5 aa � Q .�' ul
C e y
Ca � cF5 �'
Cl _ O C � Cu �j Q' U4N SSOE $ '$ E >
o_ O Cq O m L' m 57 3 '
j osx53z � ni'- K sew° iE ma �5az f --ra
d O 06;lw C6 F cam• �L
uj
e
q N O •n In -It Oo NNn on
a N e> M - •O N � N ro O
a
� wwww www wwwww w ww u
�oNo •n Nd OR NIn oM o o N
a Q
OO h O
et Q
6
c01i w w w w w w w w w w w w w w w 8 e
yov � E ' er o° add " � "a u < �411
m
4 'M
c c G9 E m c 2SS U LS a,
= f o 6 ��'e
d d
� En � � � � 8
0
z �ppVa2a
3� 9
110 C g
IIIHIM
I
III II
� a — ro — m
O O
r" vf » czwwsv wsv czwvi cs �n rn cs va cv
a .-. o o o. m m o 0o m o o .-. v� vn
nN'1.
V a
w w vi vs we.iw «swv, u9 ww v� wf va w w vi Do ;
T
O
O VI Q y G i=r ye P
v mz y'
�p Z
0� �'o '.'v_' U c u �• E IN
O n E
o8guv °J UFQ C
A
.V. C yx W Q Q ,Ej > v m9 a u av u F
j2
PQ
rB
"" L"A
• a� v .p. j p E E m p� Y Y 'O �' N \
ecK z
d IIII I I o FT+ C bu� ovi viaro �n �nrom o .o vi a
�a '1r cJ C D\ b cV C! N ao O O vi C C C 7
a+ ts
y (A fR fA H f9 df f9 (A (A I9 i9 Vf (9 fA (9 L Cl
LGGCi G
N
V i N V �O O �C N N ap O N C vj V' O
a V
y
v
y v
� oo .2 G
Aj
itle�o a S v T-
p, o � m o 3 T .
`u
• `vs O .`d. � £ Q isN 0 vE: A _u u o o '� `` d .
A d e m 'u .e c eo aui 2.` c ` c 0
v p v W o o € v o a o J rn ti o v E v
r .2 ._
^+ o o o u o o 'u y v E ,u, v U N
U !z. z C4 C4 D U U 4 4
111
L1J
O — m I O — w w M Gl b
l/ p_ LLrr
�Y=` — O
h p F Y
+�. ADZ�E wwwwwwwwwwwww wwww .w w VN ` m
t� —
V EC-: O N T b
V 6 li
u
V,
i k gam' Y _O
� EL3 as o � E � •� U a � u � mC ..mi m o
0
O .
Ji
u k vixmo ' ,j 'c' cx " s aO m � � mc uF
E E
lz
O O a A• .. K m C Q U a ti = y C .�.. G '$ a y u C
-5
T z.-c. $ J M` m 1- F F � u ¢. °l C1 a. 0
y m m m
ry Y
m m
w .n < m .n .nr o .n O bN 6
ts
z _
� A�y w w w w w w w w w w w w w w w c
u `
evi o w w It m w �nr o .n o ow E
C O
y Er �V o
V
y Y J or
Y
Y u ? C y G Y i o
O❑ V u q
� Z °1 c m •{d � u U o � � > m v
u e m m = E W m n u a e
w c z u �y . o
•G m (NH O p. O ' L.. D'. V
c L e a
W ` G
'm
w m .ep s 00 € a o oD o J Nur o r E
ODU10 c rcUs Q � s ti .� _2 3 p U
m m o o '� ++ E m 0 0 _
z c c EU 20. 0. N n`
m o 0
U a U o
112
LLJ
b O O
W A Vi Vi W Vi W W M Yi W Vf Vi Vi ✓i Vi Vi -Vi f9 �'
5 E m
O cV O� �G R N m ao N � N.N .-• f� � � W �} en
e E 5 x s e
? �Sp Emc3 �
(9 (9 iA fA i9 (A VI M i9 (A 69 (9 (A 69 (A 69 (A (9 fA I-• 6 V 6 4 cv
C
v
E
Co a x r rn N U
Z
01 6 u G1
U
CZ,
m
m m
o ti o u u14
V A w x >>' °>> G y'. p
C W
,a 22a0
y z � � aa G'
omodEE � v � �oP4x
p +p = a ' G'u ' rU uW u ril �' .L. � uS u ?.....,� N
b4 " 0Q q .0 y oL � v � oU0. p. E
WW E L el o�f u �
• w _ a � mx e5 € Za` m [= ice [- awo of wa a94Z
o e L „• �
w b N O N K CO N VI
N R m - b 'a �N N W C5 O N O N O O
ts
C n�i
"s y w Vf Vf Vf W (9 vi (9 (A ✓i vi u9 w W Vf O
b N o N N V N Vl r 0 li O O N
N O Ov V b N a N CO O N O N V O
0
S
ts E c >
V L
NESN y % .v U uWi
GG
0
v .:1 o
U o >> - n a
u
U
> > v CjU �c m „y maze
O g c
oo m a
m y c W -� c c u 2.` c •` c U ya VZ � v o. u
• T,0 o a Ef
n o o s E a
.$ A U U o c E U r 8 s y ." v c N
L t L' ".. 3 O U ti
wn°. aX. wa EU = aa°.. ., .•i n` iN-
o n o 0
U a
113
o
W H LL
�.,
II
cn 6 6
cc
q
69 Hi iA (A Vl f9 Vf M Vf W K W V1 f9 Vl Vi W .W �
lC
E
di W vi Vi 69 Vi Vi fA di Vf ✓f W f9 W Vi Vi (9 69 K $$ �a e n
O M ZU aE:
G
h u
G �
C
Ud n u I
� Z
0r v u o c < E n u
s
O a m U u o w `u 0. S u v14
Q m F q e
3 In
ea? Zo � 6 E � me '� a ay m = Y
r p u o o >
pm N 9 `u � u u u U al az b m j Opi
'� y agk7x ,55aX0. m FFF1 aZwP]
4 C 02
u
(Ty C m �no �n �nem �n v� ro � o min n Z
� r N C B �• `� N V N m O N 0 h 0 0 �
e
y
N mv+ o vi :nvm An :nro 12 o o2 E
N Q Ov V m cV C tV m G N C �n V O y
o i
V E
„� «9wssw wwH wssmv� w w ww �
`m
tl e a E u
p O V y
w ° o s u $
«
wu d uU _ cY m as 0 a
iO o
u . o 9 a
'L E
�r
iaaZ. m wwa ,, c� wXcua EU = a. a .. .3 ri
U a U o°
114
Ill I
d v — too -- w mvm — eoo -+ .n r m 6e
O O
UHHHHHHHHH HHViH HHHH -HH
V - 0 0 � 0• m m O ao 0o O O -+ v1 N .O r .- „ U p v
L P fj d
U
HHHH HHHHHHHHHHHViH HH 99Z`25
o ^�
C
yr E c
o N0
W U c
U
G
o
d > 0 o C 0 �. C J u I
U O N i� 9 G F
h C E m tctl U u o
O c
a:
h w o o .1 i v X
aavQ .o w '� � a a u_ m
O e � ati m 'o '0 w m ero @ c u }
F a o
y $
Ei
uL � Gy p9..
y 3C q W c c .u] zn` aiFFF atrC Rl [Ow waZ
• C
C � �
as m aC
G4ts
b tV cj N ao O N C
G y .o v) o n vm .n .nrom o ou, E
O L
U i a
y H H H H H H H H H H H H H H H e
u
iC �
m d u >
O L
EE U
y e c o
y c oWU
� � oC u
v ao v i m "m 415 cv m C
U x 6o y w E E o
°T°UJ u uU � U `oy zyj moo: A 5 a
❑ V
G 3 r� u r , m u c c
mW F . ¢ � av� 'g V 0 a o u u
u � e c m u E` c ` e 4
o a
• F u o o E g oaE ti ti 30 t E o
Q � A U U � q o U Lpp
7 U o U ao
115
o 0
U a II
WCc
vw7 O v — r 6 4 .6
O N M b Pao v� --� M < N
U _ _ o
v — oo — P Mnoma000 -- vi vi �° r — o0 oe
u -of w wvi fnwvi viwwc9 cs wH ss of of zvp/ $ �� o a
tVV/ 12 aU6LLv
C
U
y N O
€° = c p
t-; u ,Z U o
o ti v F .o Z
x v (A S U O W
O
h a e u C Q F
V -0 w5C > > ._ vn. nu u _ •o m
y .a � pfvx ,-c. s .-1z0. viFFF . ,Zwwma exz s
u
CJ y Y
W b y O N v 4 o4 Vl Vl O m O V N n
N V P N� b N N m 6 O 1-1rs
O O Z
N O N CO
-0 a
-cc
16 N CO N w 0 V O t"
p p v < N =
U i E
O
u € E �v d 0
u F /) C p u
pu � C {p
y
y D s o W o ff o o a` J c
c c p w u �.` .e° e U L aS 'Z >' y u n
0-
0
U U c E U o s `
'Y 3 .W. r u U
..1 ,.l Z v> '�' [i li a ° W z wu' E U P°. 0. -. r ri n
e a 1 U a.i U
116
IIII I I III III I III I
I t• a — � o — m n o .n — �o 0 0 — vi h �� o. �p �
•� O N NI �p O G1 W Vl rt K N — t` f'1 .-. v, O O
I
I
a — o o aom oo hhe = E
P ym
,.. 5
e.s vi rf w ,rz sv w ss of w of of v, .sv �f iA df y bf u. S 2.•p e o
•� �� F- d 'Unu. P
U
� � O
^� C O f A
Cp0 m O O
J O p
t �r
N C .y V
p
x _O Z V G
Z
y m w v o J c ¢ E m v E
v� y0 a U C
3 j Q ❑
N y; o u u p g Q o E u E o U F Q
Z a m A
'O w 3
o j > c Q9c m Q F
h m ,.! u a x u u — .o m a v F
anvw "d ' a c m
a E pcp um 1 O r G; aO y`y Tyo+ 0004Q' 2. trR> W V 'O 7 LCA Fy'`
y
O15
m a a9+
• � c o Ywmcg4 W cez �
I O
N K W vl N t� O „1 O b '/1 ' •O. ^
V
�po �n �n Rao v, v, loom o
C 'O N R O R �p N oo O vi
6
tel f9 di 69 Vf Vi iq fq 69 (9 K 69 f9 69 fry q p ti �,,. _..
� u
i
m
a 3
C > x
qu u E U d
U. C ❑ % 00 �O Y
Qtu
t m p
c ... W U o 4 e
c W e v y c c ..
a ° i
U C :? y 0 •p y
U 2' x ° 0
y m W V1 y 4 p E ` p
w 3 c v > > nta 'u U Q y
U W n O o o n a
c U
• p m 4O u a'
o c o f .. m o u
Ov Wo € � co ,pG ._ o :_ J > fnm o d B e
Z-w 7. .,i
117
RECEIVED
Support for Fort Collins Senior Center Expansion y SEP 1 7 zoo,
We the undersigned support the expansion of the Fort Collins Senior Center and parO&OFog Collins
defined in the Building on Basics initiative that will go to the public for approval in April
2005. We encourage the Fort Collins City Council to include these projects in the initiative,
Signature Address Phone
1 .aa hi[�/.cr� �3�5 ,= �✓ /C cad Y ^" t_f mp
2.
3.
4.
5. : q
6. 3 TVX ler, v lo.Ke l� 49 .E- & 3
7.
8
ell
12.
13 �_ I3O� Vi, 5wlt.L.0 377 - 71
14. 4m
�f
Z
15.
16.
+' C
t �` •:
g.
17.
18. t(1 _
19.
20.
118
III 1111
II
ti 0 — oo md ." — o 0 j
o
U
W O V
�/ 0 0
rn ss » Fn sv us ss ai vi of vs cs .» �n w w as vs us '=y p p d
O
O d - o o — a m m o oomoo — n �n v r — E ,u 3 U0>i 9 C CO
E E W y`
G tV O� �C d N o0 00 tV N lV t� m - 00 d NI G^N
V� `v'l lye,-
y » wry w us vi us Fn vi `new us �v � bs vi vi vi Y 1�' o c�'O Co
O
cz o
� �n F� ZZa
� r hN ,
� °� F a v Z ti
Q a n. 3 Q yaj NIl �'td
y :t � 3 m9roU Gam^ aoa_ �❑+ � � E n. � �-
O
N _I «000 U U
> > E O• �jN 9 0.0W G GrW Q �VV
Ci p rW x 3 FC c a $ ¢: = v
79 �
L " �? �S ` VV
O 9wZ o dT 9. ab4 .d W oo; a u � oo
aOw .9 .9 EFt� � ao° COM oat as
•
.W
II III a � O it I
� � II
w v b h V1 h d v1 vi r O m O �O vi
L
Q •�O er hd lV
N d 'st 1G N a0 C ^+ O vi
U � N
O
15
sz cv w� � w vi rn vi ,.s w w to «q p U
y ppa Q 8 B
h s o c E 3 n: 0 W VI
vCC oo eB to
O gRg�
y E ECC
18
• `d �= a (3d a ° U $ a e E 4 o
� � as o �
o � ._ ._ 3 O U
aaaw w z v Zaz EU —Yaa° u
119