Loading...
HomeMy WebLinkAboutCOUNCIL - AGENDA ITEM - 09/28/2004 - NORTHSIDE NEIGHBORHOODS PLAN UPDATE DATE: September 28, 2004 STUDY SESSION ITEM STAFF: Pete Wray/Mark Jackson FORT COLLINS CITY COUNCIL SUBJECT FOR DISCUSSION Northside Neighborhoods Plan — Update of Plan and Lemay Avenue Alternative Alignment Analysis. GENERAL DIRECTION SOUGHT AND SPECIFIC QUESTIONS TO BE ANSWERED The Northside Neighborhoods Plan item is scheduled for this City Council Study Session for staff to provide a general update of the Plan and more specifically,seek direction from Council on Lemay Avenue alignment options. City staff has completed a preliminary analysis of the two alignment options and formulated a recommendation supporting the adopted Master Street Plan. In order to proceed with the remainder of the Plan, direction is needed on the appropriate alignment of Lemay Avenue to determine supporting land uses and other street network requirements. The City staff is seeking Council direction on the following questions: 1. Is Council comfortable with the outlined direction of the Plan? Has staff identified all relevant issues? 2. Is Council supportive of the adopted Master Street Plan re-alignment of Lemay Avenue to the east, including a grade separated crossing of the BNSF railroad tracks? 3. If not, is Council supportive of amending the Master Street Plan and Capital Improvement Program for an alternative Lemay Avenue arterial expansion (existing alignment at grade), directing staff to conduct a more detailed analysis including engineering, cost comparison, neighborhood impacts, acquisition assessment, and public outreach? I. Plan Update The Northside Neighborhoods Plan process,initiated in January 2004,is scheduled for adoption in January 2005. The Plan is still on track for completion within the anticipated 12-month time frame. The City staff and consultant team, in conjunction with the Citizens Advisory Group (CAG), has continued to make progress on developing a draft Plan. Phase I primary tasks include assessment of existing conditions, opportunities and constraints analysis, issues identification and vision and goals. Phase H includes developing a physical framework plan integrating land use, transportation and open lands into a composite map, and policy direction. This work will be reviewed and refined by staff, consultants and CAG over the next 2 months. The final phase in the planning process for this fall focuses on identifying specific implementation strategies for achieving the Plan, based on policy direction identified previously. September 28, 2004 Page 2 In general,the proposed Framework Plan for the Northside Neighborhoods Plan does not represent any significant changes than the City Structure Plan. Approximately half of the study area reflects existing and future business and industrial uses. The remainder reflects existing and future residential use. In three areas, the Plan identifies interface areas to incorporate opportunities for establishing a transition in between existing neighborhoods and industrial businesses (see attached draft Framework Plan). Potential implementation actions to achieve the Plan include: 1. Identifying both short and long-term projects such as infrastructure upgrades to local storm drainage and floodplain mitigation, street upgrades, sidewalks, landscaping and neighborhood parks 2. Re-classification of Vine and Lemay to local streets (coordinated with re-alignment projects) 3. Funding strategies for public improvements 4. Funding options for building rehabilitation/remodeling 5. Access, circulation and pedestrian safety improvements 6. Land Use Code amendments for new development standards (interface areas) H. Lemay Avenue Alternative Alignment Analysis In May, 2004, a few members of the Citizens Advisory Group requested staff assess an alternative to the adopted Master Street Plan for Lemay Avenue (future alignment/grade separated crossing), and expand Lemay Avenue(existing alignment/at grade). During the June 22,2004 Council Study Session,staff identified this issue and informed members of Council that a comparison analysis will be conducted. Staff has examined existing conditions and constraints, and has considered past planning and community outreach efforts. Staff developed several alternative design concepts keeping Lemay on its current alignment for comparative purposes. As a result of assessing these initial concepts, significant issues and impacts were identified. Finally, a preferred alternative was developed to minimize these impacts on adjoining neighborhoods,improve functionality of the street system and reduce costs overall. However, even this alternative, while it reflects a potentially less costly alignment than the adopted MSP alignment, still has significant impacts and issues to be addressed. Option A - Master Street Plan Re-alignment (Grade separated RR Crossing) City of Fort Collins Transportation, Engineering and Planning staff has looked at alternatives for the ultimate design and location of Lemay Avenue for several years. The Northeast Truck Route Study (1994) refined the ultimate location of Lemay on the MSP to an alignment east of the Andersonville and Via Lopez neighborhoods.The subsequent Northeast Fort Collins Truck Route Study (FCTRS/1998) kept the easterly realignment of Lemay and added the Vine Realignment to the north. These alignments were developed with intensive input from surrounding neighborhoods and property owners. These ultimate alignments mitigated impacts of four-lane arterial roadways traveling through the neighborhoods of Alta Vista, Andersonville and Via Lopez, provided for a grade separation (over or under) the railroad tracks, and allowed for greater neighborhood continuity. Based on recommendations from the FCTRS and Mountain Vista Subarea Plan,Council adopted the re-alignments for Vine and Lemay on the MSP in 1999 (see attachment# 2). The re- alignment of Lemay,including grade-separated crossing,is currently ranked as a high priority need September 28, 2004 Page 3 on the recently updated transportation capital improvement project list (# 8 of 192 prioritized projects). Findings: 7. Estimated capital cost of$24 million (Transportation Master Plan 2004) 8. Additional costs of re-alignment project for Lemay address railroad issues and impacts and long- term operational issues 9. MSP represents long-term solution of transportation impacts 10. Solves Adequate Public Facilities and Level Of Service deficiencies in NE 11. Widely supported by businesses and neighborhoods in 1998 12. Represents a solution to improve neighborhood continuity by re-classifying existing Lemay/Vine to local streets 13. Right-of-way dedication in progress for re-alignment between Lincoln Street and Vine Drive (south/east portion) Option B—Expand Lemay Avenue (near existing alignment—at grade) Certain members of the project's Citizens Advisory Group have noted that, in their opinion, the realignment of Lemay Avenue as reflected in the MSP is unattainable and unrealistic in the foreseeable future and that the City should revisit the ultimate alignment of this key north/south arterial. In response, staff first assessed expanding the existing centerline of Lemay Avenue to an arterial status, which would require acquisition of approximately 25 homes and church in both the Andersonville and Alta Vista Neighborhoods (See attachment#3). Staff then developed a second alternative alignment concept that attempts to maximize mobility,consolidate and separate driveway access, and minimize impacts to the properties adjacent to Lemay Avenue. Project staff and consultants, with input from City Engineering and Traffic Operations staff, developed a conceptual-level alternative that widens the current alignment of Lemay Avenue to a four-lane arterial design, while minimizing impacts to nearby residents. Expanding Lemay on its current centerline alignment would result in the acquisition of over 25 properties along the road . Staff then examined options that moved the alignment to the west in order to minimize impacts to residents along Lemay. These alignments necessitate either moving several large Platt River Power Authority (PRPA) power poles and lines, or splitting north-south traffic along either side of the lines. Alternative alignments kept the intersection of the BNSF tracks and Vine Drive at-grade. Some form of protected access or alternative access would be necessary to allow residents along Lemay to exit and access their properties. The least impactful conceptual alternative design requires the movement of several PRPA poles and lines to the west, at an estimated cost of $1 million dollars for construction and right of way acquisition. It is estimated that the total capital cost of this alternative would range between$10412 million dollars. This alternative is depicted in Attachment 4. September 28, 2004 Page 4 Issues: 1. COST: Improving Lemay to a four-lane arterial on its current alignment and at-grade with the Burlington Northern&Santa Fe(BNSF)railroad intersection could potentially save the City of Fort Collins approximately $10412 million dollars in capital construction costs. This appears to be the primary benefit to this alternative. However, this option does not address the long-term issues and impacts of the railroad, thus making it difficult to accurately compare the costs. The majority of the cost for the MSP Option is for the grade separated crossing of the railroad tracks. It must also be noted that the potential to offset City capital costs by using development impact fees and Street Oversizing funds is greater with the adopted MSP alignment than with the current Lemay alignment,due to the level of existing development currently on Lemay. Anticipated additional costs for right of way acquisition may further lessen the potential capital cost savings of the cur-rent Lemay alignment. 2. POLTTICALSOCIALCULTURAL: There are a number of issues that would need to be addressed if the City were to pursue improving Lemay on its current alignment: Neighborhood connectivity has been stressed as an important element of the NNP. Improving the current alignment of Lemay to an arterial design will serve as a barrier between neighborhoods in this area and will exacerbate problems of mobility and neighborhood connectivity and continuity. • The realignment of Lemay was developed in close coordination with residents and property owners in these nearby neighborhoods. Improving Lemay on its current alignment would be seen as the City recanting its earlier commitments to these stakeholders. Many of these people already feel as if the City has promised and reneged on several earlier commitments to improve this area, and this will fuel that sentiment. • Lemay negatively impacts several people who currently reside just east of the road. There is great difficulty in accessing or exiting their properties at peak periods of congestion or when a train is passing by. Improving Lemay on its current alignment will not address these issues and may well result in even more problems for these people. Quality of life degradation will surely be an issue for these residents and property owners. Improving Lemay on its current alignment will result in the acquisition of several impacted properties along the road. • Advance Planning staff is currently working on a project to gain support for designating Buckingham, Andersonville, and Alta Vista neighborhoods as historic neighborhood districts. Acquisition of any of these properties would directly conflict with the intent of this effort. 3. OPERATIONS: Improving Lemay on its current alignment to a four-lane arterial, at-grade with the BNSF, will only temporarily improve north-south mobility and Adequate Public Facility (APF) issues. The additional capacity of the four-lane design will lessen the length of queues during peak periods of congestion in the short term. As the Mountain Vista Subarea develops (as adopted by City Plan), these improvements will gradually diminish. September 28, 2004 Page 5 • Queues and congestion resulting from trains blocking the road will continue. Grade separating Lemay over/under the BNSF tracks is the long-term solution for this problem. • Access problems for people living along Lemay will intensify and will need to be addressed. Controlled access options will be expensive and may not satisfy property owners' expectations. Cross-access issues across Lemay will also need to be addressed. Conclusions/Recommendations: Improving Lemay Avenue on its current alignment to a four-lane arterial only provides a short-term improvement to congestion and queuing issues in this area. This alternative design would not address congestion issues and other impacts caused by trains. Residents along Lemay Avenue would have even greater access problems that would need to be addressed. Quality of life, neighborhood continuity and connectivity issues would also be impacted as a result of keeping Lemay on alignment, at-grade with the BNSF tracks. Finally,previous commitments made to area residents regarding realigning Lemay and mitigating neighborhood impacts will likely be a sore spot and will be seen as another example of the City of Fort Collins reneging on prior promises. Given these issues, and the fact that improving Lemay on its current alignment at-grade does not offer long-term improvement to congestion and queuing problems, or conflicts with trains, project staff questions the feasibility and necessity of pursuing this alternative design further. If Council directs project staff to conduct further, more detailed analysis and public outreach, it is important to note that this effort is not currently on the staff work programs, and funding is not available to support this level of analysis. ATTACHMENTS 1. Northside Neighborhoods Plan Framework Plan and background. 2. Master Street Plan enlargement (Vine/Lemay re-alignment). 3. Lemay Avenue 4-lane Arterial expansion (exist. Alignment at grade). 4. Lemay Avenue Alternative Alignment (alignment shift to west). 5. Transportation Board Memorandum dated September 21, 2004. 6. Letter dated September 17,2004 from Betty Aragon,Margaret Guzman and Richard Dunn. Attachment 1 Drah—September 20,2004 Northside Neighborhoods Plan The Framework Plan is part of the design and PeMnan tti� development stage of the Policies zoning a CodeIbd planning process. It builds Actions Pray.rogn ams on the vision and goals,and Capital Impmm,menss precedes defining the actions Funding M.amnl.ms that the community will take PHASE 1: PHASE 3: PHASE 3: to achieve the plan. Initiation Desipn/Danlop nenf Implernemolion i Adoption Framework Plan Overview: A Physical Plan to How We Developed the Plan Guide Development The Northside Neighborhoods Area is not a The Framework Plan is the physical plan that "blank slate." Major streets,railroads, and will guide our future development and other infrastructure,such as sewer and water physical changes in the Northside lines, are in place. In addition, about half the • Neighborhoods Area. The plan combines land is developed,including existing several different physical planning elements neighborhoods and well-established such as land use, transportation,and open businesses. lands,parks,and trails. This paper describes those key elements of the plan. _ s I2L M aM.I(paNa 1 WF�P_J;r �Ywter..en..rLoeto AnnaIarl0.and •� WbNMs Clones CsmaA sm lemon. _____[.WW.4..____ F� y Existing Neighborhoods This plan also takes into account desires and needs of the residents and businesses in the • Northside Neighborhoods Plan 1 Draft-September 20,2004 si, .M. 29 area today. The City has previously adopted plans that generally address the area, Purpose of the Framework Plan including City Plan and the Master Streets The Framework Plan aims to achieve the Plan. This Framework Plan also builds on the following goals that are consistent with the directions in City Plan and other planning goals and vision for the area: efforts. For the most part the Framework Plan is consistent with City Plan,except for • Conserve existing stable slight changes in types of residential neighborhoods. designations east of Lemay Avenue,and for • Create new neighborhoods that have a new directions regarding the"Interface" range of housing options,clustered areas between industrial and residential around and near services and areas. employment areas. Provide a mix of industrial and The Framework Plan focuses mainly on these residential uses that protects the areas that will change-the areas numbered in residential character of the the diagram below. neighborhoods and honors the traditional coexistence of small -�-F = --- businesses, industry,and neighborhoods. Provide a well-planned transportation �s 0 system(including streets,transit, bicycle and pedestrian paths)that meets the needs of residents in the i area and surrounding areas. .. . ,a. s • ♦ Preserve and enhance open lands and s " t S. ♦ connections between natural areas, yr open lands,and parks. �K Vacant lands•Future arecs of Chcngc A big focus for this plan is in promoting a better interface between the industrial and existing and future residential areas. Northside Neighborhoods Plan 2 Draft—September 20,2004 r • Land Uses Existing Low Density Residential The following land uses are proposed on the Framework Plan for the Northside Existing Neighborhoods—Meadows,Alta neighborhoods area. Vista, Via Lopez/San Cristo, Andersonville, Buckingham • Existing Low Density Residential; The existing neighborhoods are established as • Low Density Mixed-Use Residential existing Low Density Residential (Future); neighborhoods. Thirty-seven acres of existing • Medium Density Mixed-Use neighborhoods are designated. Residents Residential(Future); want to conserve these places and enhance • Industrial; and improve them in some cases(as • Downtown Commercial/Mixed Use; described in"Our Direction'). At the time of and this plan it is uncertain whether the • Several public land use designations, neighborhoods will pursue establishing including Open Lands,Poudre River historic districts for the three historic Corridor, and Public. neighborhoods or for any individual neighborhood. Nevertheless,residents This section describes each land use category express interest in maintaining the character and what it means for the area. A summary of the neighborhoods. table follows that compares the Framework Plan land uses with the Structure Plan and • ,,�I current zoning. Recently upgraded house in Buckingham Homes in Norlhside Neighborhoods Plan 3 Droh—September 20,2004 r , • , Low Density Mixed-Use Neighborhoods Medium Density Mixed-Use Residential WAM Area 1: North of Future Vine Drive Realignment. Area 2: East of Lemay and Part of Area 3: This area remains designated as Low Density North of Vine Mixed-Use Neighborhood(LMN)for The Framework Plan designates these areas predominantly single-family residential uses, as Medium Density Mixed-Use Residential including supporting land uses that serve a (MMN)to allow for more concentrated neighborhood. The 78 acres of planned LMN housing within easy walking distance of will provide up to 340 new housing units and future neighborhood commercial areas and could provide homes for over 1,100 future employment and near transit corridors— residents. This new neighborhood will be Lemay and Vine. Twenty-eight acres of new adjacent to neighborhood centers and less MMN is planned,which could accommodate than a mile from Downtown Fort Collins. approximately 224 housing units and an The new neighborhood should include an estimated 650 new residents in the area. The internally connected street grid,and a mini- new neighborhood east of Lemay should park,open lands,and other amenities to serve include internal streets that connect to future residents. services and the arterials and other amenities to serve future residents. i �k4 et�r3 Example of a Late Density Mired Use Neighborhood Example ofa Medium Density Mixed Use Neighborhood in Fort Collins—Rigden Form. P Example of o Low Density Single Family honsing. Example of a Medium Density Mixed Use Neighborhood in Fort Cohios near Lee Martinez Park. Northside Neighborhoods Plan 4 Draft—September 20,2004 r • Neighborhood Centers Downtown Commercial/Mixed Use Area 2: East of Lemay Area 4: Poudre River Ox Bow Property The plan does not designate a specific The plan designates Downtown Commercial location for a neighborhood commercial for the Ox Bow site. The site is less than one- center because of the proximity to larger half mile from Downtown and is situated shopping centers;however, some small along the Poudre River. The intent is to foster neighborhood retail uses would be a healthy and compatible relationship appropriate near the medium density between the Poudre River, the Downtown, residential areas as part of Area 2. The intent and Buckingham neighborhood. is to design mixed-use neighborhoods that provide a balance of residential,commercial, The 20+acre site is fairly constrained because and other uses within walking distance of of the river bank setbacks and significant each other. Ground floor retail uses with trees. Assuming that 15 acres of the site upper level offices or residential would be develops,it could accommodate appropriate on small sites to function as approximately 100,000 square feet of neighborhood centers. These neighborhood commercial development or a combination of centers would be no larger than five acres. retail space,workshops,community facilities, and housing. In addition,current city standards require • that the area within 100 feet of the drip line of ' the large healthy("significant") trees on the site be preserved and integrated as part of a development plan. PA Example of mixed use neighborhood canter-Lowry, Denver 1 1 � 1 'h k MOW i ., •,�` wiry ___ . .. 'kfmm ten\ knfiYy \ I •^,sea;': �,Rri t � r �oape..:r • Distance from Downtown Northside Neighborhoods Plan 5 Droh—September 20,2004 s ,� Industrial Industrial/Residential Interface Area 3: North of Vine Drive and Area 5: Abutting Vine Drive to the North (West of south of Vine Alta Vista)and South of Vine Drive The plan continues to encourage industry in The plan establishes this new the areas that are zoned Industrial. The Industrial/Residential Interface designation industrial designation currently provides in current zoned industrial areas that abut opportunities for workplaces and residential to promote small-scale industry or manufacturing and a wide range of industry, mixed-use development in these areas. In but not necessarily a mix of uses including essence the designation is an overlay district residential. The properties in this area are and a fine-tuning of the industrial zoning small, and altogether could accommodate district. almost 40 acres of industry, or over 400,000 square feet of building space(including the The designation will no longer allow heavy "Interface" areas described below). industry—that which generates excessive traffic,odors,noise, or that is visually Recent development have used quality incompatible with the neighborhoods. For building design and materials and example,a junk yard would not be allowed landscaping to help"blend in"with the area. in the interface area. However, the designation will provide some greater flexibility to develop a mix of m - industry and housing that is not currently permitted in the Industrial District(without special approval). Loft-style, live-work units or small scale offices are good examples. A mix of live-work units could serve as "transitions"between existing neighborhoods and future and existing Existing Industry in the Area industrial lands. .r_ Example of live-work units in Longmont,Colorado. Northside Neighborhoods Plan 6 Draft—September 20,2004 • In addition the current industrial-residential buffer standards will apply—developers of industrial properties must still adhere to requirements to provide buffers and setbacks near residential properties. Approximately 34 acres are designated as part of the"Interface" area. Public Open Lands The plan does not designate new public open lands.However new developments will set aside some open lands and the Vine Drive realignment and Lake Canal will have corridors for greenspace and drainage. Poudre River Corridor Portions of the Ox Bow property will tie in • with the Poudre River Corridor after flood control improvements to the river bank are complete. The trail will continue along the river through this site. Northside Neighborhoods Plan 7 Draft—September 20,2004 s , Future Land Use Future Land Use NNP Areas Acres Potential New Units Fxistirgl low Density Residential Existing neighborhoods 37 acres n/a (developed) Low Density Mixed-Use Residential 1 —North of Vine 78 acres (new) 390 residential units (URN) 18 acres (developed) Medium Density Mixed Use 2 - East of Lemay 28 acres (new) 225 residential units Residential(MMN) 3-North of Vine Neighborhood Services 2—East of Lemay Two Almost 50,000 square neighborhood feet centers (new) 5 acres each Industrial 3—North of Vine 39 acres (new) _ 260,000 sglsare feet-4, 5—South of Vine 101 acres a (developed) Industrial/Residential Interface 3—North of Vine 34 acres (new) 150,000 square fept,plas ' 5—South of Vine residenfial units Open Lands Along Lake Canal;Along n/a n/a all ditches Poudre River Corridor Along Poudre River n/a n/a Total Summary 610+ housing units 500,000'/- square feet of non-residential business and industry- Northside Neighborhoods Plan 8 NeighborhoodsPlan ..'!� "' fin'^'"_._._ •� y�M.��\�.• � l e S1 11 5 Future � *e hbo E Residential Future (tMN) ResidwtNal- F Residential ' � ) (MMN) l Future Mixed Use 'd Future Industrial/ i (MMN) future Neighborhood Residential Interface Residential (LMN) r+,uaTi l�• xs+ ,psi►""`- ^- r iG _ 1 .S Future IndusMal5y �Sdt O � .Future— . Industrial �t ✓�\ '.::' Future w imMaw s, ined-Use M y _ Furore ` s k' Industrialas � r . I� � �'+E NININNINM terinealaeaell INII • rN IIIY` 6� N SLegend y DRAFT I ' FRAMEWORK i1 PLAN OtherPlan Boundary Future Land Use Straws&Trails City Limits Existing Lev,Density Itsidefflial =Industrial M ktodal(4-Lums) Green(articles and Ditches Existing T.11, M Medium Density Mixed-Use Residential Publit Open Lands 11111 Arterial(24...I Park,(Existing/ Attachment 2 (0 IYr fn L e + � 4% Q +r Q u Q cn • o _ Z IZ �e Q) c) z Ir m m C O zwl i Ise. - i = CD CD pa )� e 0 m O- H 0 w r- m t A m > w" 7. T• Vt y CD cn m 1SIA VllY Z m gy A, m i O .. -- .. r� .., ,•, CD 9TH ST t { MA s J N Q ■II AA« h O �rY y■ypr�_ .MI a nr Ir A -. rs o t - O CD :l< wo lsi+{u .._.h. — CD r' c �. is c (: 1 CD on C- t y to 3 (� m 1 Alt'! 3 _ a mji cr e 0 - C O CD m N .A. +tt yi+q'r MA cn .� N 0 � 4 r c CD 1 -a r CD y + _ D D m' ! "s I to CD m IS Hil� ca £ �uauuia��ld --- Lema Ave - Western Alignment Alternative Northside Neighborhoods Plan Y 9 TN amuse m 3� a � 1 � T IV p i n- fy �f 1 f e f \ n LSA Associates M r ` Z A Attachment 5 City of Fort Collins Transportation Board • Bruce Henderson, Chair City of Fort Collins September 20, 2004 Mayor and City Council Members City of Fort Collins PO Box 580 Fort Collins, CO 80522-0580 Dear Mayor and City Council Members: At the September Transportation Board meeting, the Transportation Staff presented an alternative to the Lemay Avenue realignment shown in the Master Street Plan. The alternative is part of the ongoing Northside Neighborhood Plan process. This proposed • alternative would expand Lemay, in its current alignment, to a four lane arterial. It would also include an at grade rail crossing. In a unanimous vote, the Transportation Board strongly supports the realignment of Lemay as it is shown in the current Master Street Plan. The Board further recommends Staff search for general alternative funding options, such as SID's, that would accelerate the current Master Street Plan Lemay Avenue project. If you would like any clarification, please contact me at 898-4625 or at bruce.henderson @hp.com. Thank you, Bruce Henderson Chair • Attachment 6 G. Richard Dunn TeUFax: 970.494.0974 • 1405 Lindenwood Dr.,Fort Collins, Co. 80524 Mr. Mark Jackson, Planning Manager Transportation Services, City of Fort Collins PO Box 580, Fort Collins, Co 80522-0580 September 17, 2004 Re:.Proposed Change to Master Street Plan Dear Mr. Jackson, Allow me to use this letter as confirmation of my statements to the Transportation Board at their meeting on Wednesday, September 15'", 2004 in regards to the proposed change to the Master Street Plan as affected by a proposed realignment of Lemay Street. I have relayed my comments to Margaret Guzman and Betty Aragon,both members of the Northside Neighborhood Plan Committee, and they have confirmed their concurrence by their signatures below. I opened my comments by stating that I had been requested by two members of the Hispanic Neighborhood to attend the Transportation Board's meeting and express their concern about the proposed Lemay realigrmaeent. I suggested that their request to me was the result of our working together on the Truck Bypass issue and the subsequent ballot initiative in November 1999. The neighborhood cooperation with the Transportation staff resulted in support for the North Side Master Street Plan. There was concern about the the realigned East Vine Drive,but • moving Lemay Street east of the City Housing Authority project will offer sufficient improvement to the general safety and environment that the neighborhood is willing to accept the potential heavier automobile traffic that the realignment might cause. The staff report indicated that 25 residential structures would be impacted along Lemay, with most of the impact being suffered by the Hispanic Neighborhood. I told the Transportation Board I was certain that attempting to change the Master Street Plan in order to widen Lemay Street to flour lanes with the required right-of-way, including the attendant bicycle lanes and walks would be fret with a great deal of resistance. I reminded the Board that the Historic Hispanic Neighborhoods of Alta Vista, Andersonville, and Buckingham received overwhelming citywide citizen support when the Truck Bypass Issue threatened to compromise the neighborhood. I complimented the work of the City Staff on the effort and effectiveness-of working ` closely with the Hispanic Neighborhood on the City Master Street Plan. I closed urging the Transportation Board to follow the City Staffs recommendation of maintaining Lemay and Vine as presently shown on the City Master Plan R�spectf illy submitted, Concurrence by: T,•��- Caires; G. Richard Dunn Margaret Guzman Betty AFagon •