DATE: August 15, 2000
FORT COLLINS CITY COUNCIL STAFF: Link Mueller/
Ron Mills
SUBJECT:
Second Reading of Ordinance No. 84, 2000, Amending Ordinance No. 40, 2000, Authorizing
Acquisition by Eminent Domain Proceedings of Certain Easements for the Locust Street Outfall
Project.
RECOMMENDATION:
Staff recommends adoption of the Ordinance on Second Reading.
EXECUTIVE SUMMARY:
The construction of the Locust Street Outfall project is currently scheduled for the summer and fall
of 2000. The proposed capital improvements include the construction of approximately 4000 feet
of 108 inch pipe, 540 feet of 12' x 6' culvert and 1700 feet of 72 inch pipe. Additional inlets,
necessary curb and gutter replacement,and asphalt replacement will also be replaced with a 27-inch
sanitary sewer, roughly following the route of the proposed storm sewer.
In April 2000,City Council adopted Ordinance No.40,2000,authorizing the use of eminent domain
if necessary to obtain the needed easements. After adoption of Ordinance No. 40, 2000, the legal
description for the temporary construction easement for one of the parcels needed for the Project
changed.
Ordinance No. 84, 2000, which was unanimously adopted on First Reading on July 18, 2000
(Councilmember Weitkunat withdrawn) revises the legal description for the required temporary
construction easement.
AGENDA ITEM SUMMARY ITEM NUMBER: 30
DATE: July 18, 2000
FORT COLLINS CITY COUNCIL Link Mueller/
STAFF: Ron Mills
SUBJECT:
First Reading of Ordinance No. 84, 2000, Amending Ordinance No. 40, 2000, Authorizing
Acquisition by Eminent Domain Proceedings of Certain Easements for the Locust Street Outfall
Project.
RECOMMENDATION:
VL IF
Staff recommends adoption o e Or i ce o i Readin
ar,wFINANCIAL IMPACT:
The City is seeking to acquire a minor amount of additional land for the temporary construction of
the Old Town Master Drainage pi e p 'sals have been completed and
sufficient funds have been app priate d bu t er i e no additional funds expended
110 for this amended temporary c structio ase t.
EXECUTIVE SUMMARY: t
d
The construction of the Locust Street Outfall project is currently scheduled for the summer and fall j
of 2000. The proposed capital im movements include the construction of approximately 4000 feet
of 108 inch pipe, 540 feet of x c ert d fe of inch pipe. Additional inlets,
necessary curb and gutter repl ment, asp r me ll also be replaced with a 27-inch
sanitary sewer, roughly folio th o of e posed st sewer.
In April 2000,City Council adopted Ordinance No.40,2000,authorizing the use of eminent domain
if necessary to obtain the needed easements. After adoption of Ordinance No. 40, 2000,the legal
description for the temporary construction easement for one of the parcels needed for the Project
changed.
Staff has contacted the property owner affected by this change, and with this amendment,believes
a willing seller agreement can be reached with the property owner. However, in order for the
eminent domain authority granted by the City Council in April to conform to the most current project
plans, staff is asking that Council approve this Ordinance revising the legal description for the
required temporary construction easement.