HomeMy WebLinkAboutCOUNCIL - COMPLETE AGENDA - 10/14/2025City of Fort Collins Page 1 of 2
City Council
Work Session Agenda
October 14, 2025 at 6:00 PM
Jeni Arndt, Mayor
Emily Francis, District 6, Mayor Pro Tem
Susan Gutowsky, District 1
Julie Pignataro, District 2
Tricia Canonico, District 3
Melanie Potyondy, District 4
Kelly Ohlson, District 5
Council Information Center (CIC)
300 Laporte Avenue, Fort Collins
Cablecast on FCTV
Channel 14 on Connexion
Channel 14 and 881 on Comcast
Carrie Daggett Kelly DiMartino Delynn Coldiron
City Attorney City Manager City Clerk
CITY COUNCIL WORK SESSION
6:00 PM
Language Services are available for this meeting.
A) CALL MEETING TO ORDER
B) ITEMS FOR DISCUSSION
1. Staff Report: November 2025 Election Voter Information Guide Highlight
The purpose of this item is to share the November 2025 Election Voter Information Guide which
will be available online to the community.
2. Southeast Community Center Update
The purpose of this item is to provide an update on the Southeast Community Center (SECC),
including the current project scope, budget, proposed funding stack with trade-offs, and next
steps. More than a decade in the making, the SECC will provide southeast Fort Collins with a
community recreation center and library, implemented in partnership with Poudre Libraries and
Poudre School District as the final project of the 2015 Community Capital Improvement Program
tax initiative.
Additional materials will be provided on Monday October 13, 2025.
3. 2026 Budget Revision Discussion Follow-Up and Utilities 2026 Budget Revisions & Review
The purpose of this item is to familiarize and seek feedback from Council on the City Manager’s
recommended revisions to the 2026 Budget. Based on direction from Council, the 2026 Budget
Revisions will be combined with the previously adopted 2025-2026 Biennial Budget. The 2026
Annual Appropriation Ordinance is scheduled for 1st Reading on November 3.
This item includes follow-up from the first work session on the 2026 Budget Revisions, as well as
review of two 2026 Utilities revisions proposed for inclusion in the 2026 Budget. There will also be
a review of the utility rates for Council consideration planned for adoption on November 3.
C) ANNOUNCEMENTS
Page 1
City of Fort Collins Page 2 of 2
D) ADJOURNMENT
Upon request, the City of Fort Collins will provide language access services for individuals who have limited
English proficiency, or auxiliary aids and services for individuals with disabilities, to access City services,
programs and activities. Contact 970.221.6515 (V/TDD: Dial 711 for Relay Colorado) for assistance.
Please provide advance notice. Requests for interpretation at a meeting should be made by noon the day
before.
A solicitud, la Ciudad de Fort Collins proporcionará servicios de acceso a idiomas para personas que no
dominan el idioma inglés, o ayudas y servicios auxiliares para personas con discapacidad, para que
puedan acceder a los servicios, programas y actividades de la Ciudad. Para asistencia, llame al
970.221.6515 (V/TDD: Marque 711 para Relay Colorado). Por favor proporcione aviso previo. Las
solicitudes de interpretación en una reunión deben realizarse antes del mediodía del día anterior.
Page 2
File Attachments for Item:
1. Staff Report: November 2025 Election Voter Information Guide Highlight
The purpose of this item is to share the November 2025 Election Voter Information Guide which
will be available online to the community.
Page 3
City Council Work Session Agenda Item Summary – City of Fort Collins Page 1 of 1
October 14, 2025
WORK SESSION AGENDA
ITEM SUMMARY
City Council
PRESENTER
Delynn Coldiron, City Clerk
SUBJECT FOR DISCUSSION
Staff Report: November 2025 Election Voter Information Guide Highlight
EXECUTIVE SUMMARY
The purpose of this item is to share the November 2025 Election Voter Information Guide which will be
available online to the community.
Page 4
Item 1.
File Attachments for Item:
2. Southeast Community Center Update
The purpose of this item is to provide an update on the Southeast Community Center (SECC),
including the current project scope, budget, proposed funding stack with trade-offs, and next
steps. More than a decade in the making, the SECC will provide southeast Fort Collins with a
community recreation center and library, implemented in partnership with Poudre Libraries and
Poudre School District as the final project of the 2015 Community Capital Improvement Program
tax initiative.
Additional materials will be provided on Monday October 13, 2025.
Page 5
City Council Work Session Agenda Item Summary – City of Fort Collins Page 1 of 1
October 14, 2025
WORK SESSION AGENDA
ITEM SUMMARY
City Council
STAFF
LeAnn Williams, Director, Recreation
Dean Klingner, Community Services Director
SUBJECT FOR DISCUSSION
Southeast Community Center Update
EXECUTIVE SUMMARY
The purpose of this item is to provide an update on the Southeast Community Center (SECC), including
the current project scope, budget, proposed funding stack with trade-offs, and next steps. More than a
decade in the making, the SECC will provide southeast Fort Collins with a community recreation center
and library, implemented in partnership with Poudre Libraries and Poudre School District as the final
project of the 2015 Community Capital Improvement Program tax initiative.
Additional materials will be provided on Monday October 13, 2025.
Page 6
Item 2.
File Attachments for Item:
3. 2026 Budget Revision Discussion Follow-Up and Utilities 2026 Budget Revisions &
Review
The purpose of this item is to familiarize and seek feedback from Council on the City Manager’s
recommended revisions to the 2026 Budget. Based on direction from Council, the 2026 Budget
Revisions will be combined with the previously adopted 2025-2026 Biennial Budget. The 2026
Annual Appropriation Ordinance is scheduled for 1st Reading on November 3.
This item includes follow-up from the first work session on the 2026 Budget Revisions, as well
as review of two 2026 Utilities revisions proposed for inclusion in the 2026 Budget. There will
also be a review of the utility rates for Council consideration planned for adoption on November
3.
Page 7
City Council Work Session Agenda Item Summary – City of Fort Collins Page 1 of 7
October 14, 2025
WORK SESSION AGENDA
ITEM SUMMARY
City Council
STAFF
Caleb Weitz, Chief Financial Officer
Kelly DiMartino, City Manager
Joe Wimmer, Utilities Finance Director
Randy Reuscher, Utilities Rates Manager
SUBJECT FOR DISCUSSION
2026 Budget Revision Discussion Follow-Up and Utilities 2026 Budget Revisions & Review
EXECUTIVE SUMMARY
The purpose of this item is to familiarize and seek feedback from Council on the City Manager’s
recommended revisions to the 2026 Budget. Based on direction from Council, the 2026 Budget Revisions
will be combined with the previously adopted 2025-2026 Biennial Budget. The 2026 Annual Appropriation
Ordinance is scheduled for 1st Reading on November 3.
This item includes follow-up from the first work session on the 2026 Budget Revisions, as well as review
of two 2026 Utilities revisions proposed for inclusion in the 2026 Budget. There will also be a review of
the utility rates for Council consideration planned for adoption on November 3.
GENERAL DIRECTION SOUGHT AND SPECIFIC QUESTIONS TO BE ANSWERED
What questions or feedback does Council have on the City Manager’s recommended revisions to the 2026
Budget?
BACKGROUND / DISCUSSION
OVERVIEW: The 2026 Budget Revisions include both reductions to 2026 ongoing expenses within the
Governmental Funds and additional budget revisions for consideration.
The first Council work session on September 23 covered the economic conditions being experienced by
the City. The uncertainty at all levels of government has resulted in lower forecasted growth in ongoing
Sales Tax collections. Additional revenue challenges impacting the General Fund were also reviewed.
On the expense side, although the rate of inflation has decreased closer to the long-term goals of the
Federal Reserve, the increasing prices over the last few years have not subsided. The City also has
expense challenges in personnel costs, primarily from lower than expected turnover than had been planned
in the budget. This is very good from a staff and service delivery perspective, but previous financial
assumptions need to be revised to keep expenditures within the Council approved spending limits.
Although there have been some positive indicators, now the City will need to use the 2026 revision process
to address these revenue and expense challenges.
Page 8
Item 3.
City Council Work Session Agenda Item Summary – City of Fort Collins Page 2 of 7
2026 Utilities Budget Revisions #1 - Halligan Environmental Mitigation Credits
City’s Water Utility requests an additional appropriation of $10,357,500 in the Water Utility Fund to
purchase needed stream credits and wetland credits (collectively referred to as environmental mitigation
credits) in support of City’s Water Utility receiving a finalized mitigation plan by the United States Army
Corp of Engineers (USACE).
The Halligan Water Supply Project will result in impacts to both wetlands and streams. Pursuant to
requirements of the Clean Water Act, City’s Water Utility is required to undertake mitigation. Among the
project mitigation measures that were proposed, USACE directed the City to purchase environmental
mitigation credits from an accredited bank. Required wetlands and stream credit amounts will be part of
the finalized mitigation plan that City’s Water Utility is currently working on with US ACE. The finalized
mitigation plan is required to be approved by USACE for commencement of construction of the Halligan
Water Supply Project.
The USACE prefers mitigation through bank credits as these credits are backed by legal instruments that
ensure long-term protection and monitoring. City’s Water Utility entered into a mitigation credit reservation
and purchase agreement in June 2024 associated with the North Fork Poudre Mitigation Ba nk. The 2024
agreement secured 19.37 acres of wetland credits and 1,220 stream credits and will be revised up to
include a total of 19.9 wetland credits and 1,514 stream credits. The City has spent $1,471,340 to date,
with an additional $6,931,660 to be spent from December 2025 through 2027 dependent on timing of credit
releases for the North Fork Bank. While City’s Water Utility anticipated environmental mitigation credits as
part of the finalized mitigation plan approved by USACE, the proposed quantity has increased substantially
due to recent determinations by USACE that the original preservation/conservation stream mitigation plans
are no longer sufficient to meet current federal requirements.
In response to the additional stream credit requirements, discussions are underway with the Moraine Bank
in Rocky Mountain National Park, and other potential banks on the North Fork, to purchase additional
stream credits. The Water Utility is intending to be under contract prior to 2025 year-end, securing upwards
of 6,834 in stream credits, totaling an estimated $14,020,350.
To keep the dam design work and environmental mitigation projects on schedule, the Water Utility plans
to spend the project’s remaining $7.4 million unencumbered balance by the end of Q2 2026. An additional
$10,357,500 is needed to meet 2026 obligations in purchasing environmental mitigation credits.
In July 2025, the City submitted a request for $100 million under Colorado Water Conservation Board’s
Water Project Loan Program in support of funding the Halligan Water Supply Project. Provided City Water
Utility is successful in the pursuit of $100 million under the Water Project Loan Program, the earliest funds
would be available for appropriation by City Council is August 2026. The Water Fund 2025 reserves are
available for the $10,357,500 appropriation in advance of loan acceptance.
Customer Information System Operational Costs
Utilities requests a 2026 budget revision of $702,480 to support 2026 operational costs for the existing
Utilities Customer Information System (CIS) and billing software. The new CIS continues to be developed
with a new go-live date of May 22, 2026. Due to the project extension, the existing CIS and billing software
needs to be extended through 2026. The $702,480 provides funding for unanticipated operational costs of
the legacy CIS and associated billing software into 2026. The software system supports billing of Utility
customers and tracking of customer payments and amounts due.
Page 9
Item 3.
City Council Work Session Agenda Item Summary – City of Fort Collins Page 3 of 7
2026 Utilities Budget Revisions #2 - Halligan Environmental Mitigation Credits
City’s Water Utility requests an additional appropriation of $10,357,500 in the Water Utility Fund to
purchase needed stream credits and wetland credits (collectively referred to as environmental mitigation
credits) in support of City’s Water Utility receiving a finalized mitigation plan by the United States Army
Corp of Engineers (USACE).
The Halligan Water Supply Project will result in impacts to both wetlands and streams. Pursuant to
requirements of the Clean Water Act, City’s Water Utility is required to undertake mitigation. Among the
project mitigation measures that were proposed, USACE directed the City to purchase environmental
mitigation credits from an accredited bank. Required wetlands and stream credit amounts will be part of
the finalized mitigation plan that City’s Water Utility is currently working on with US ACE. The finalized
mitigation plan is required to be approved by USACE for commencement of construction of the Halligan
Water Supply Project.
The USACE prefers mitigation through bank credits as these credits are backed by legal instruments that
ensure long-term protection and monitoring. City’s Water Utility entered into a mitigation credit reservation
and purchase agreement in June 2024 associated with the North Fork Poudre Mitigation Ba nk. The 2024
agreement secured 19.37 acres of wetland credits and 1,220 stream credits, and will be revised up to
include a total of 19.9 wetland credits and 1,514 stream credits. Based on timing over proposed credit
releases, the City has spent $1,471,340 to date, with an additional $6,931,660 to be spent from December
2025 through 2027. While City’s Water Utility anticipated environmental mitigation credits as part of the
finalized mitigation plan approved by USACE, the proposed quantity has increased substantially due to
recent determinations by USACE that the original preservation/conservation stream mitigation plans are
no longer sufficient to meet current federal requirements.
In response to the additional stream credit requirements, discussions are underway with the Moraine Bank
in Rocky Mountain National Park, and other potential banks on the North Fork, to purchase additional
stream credits. The Water Utility is intending to be under contract prior to 2025 year-end, securing upwards
of 6,834 in stream credits.
To keep the dam design work and environmental mitigation projects on schedule, the Water Utility plans
to spend the project’s remaining $7.4 million unencumbered balance by the end of Q2 2026. An additional
$10,357,500 is needed to meet 2026 obligations in purchasing environmental mitigation credits.
In July 2025, the City submitted a request for $100 million under Colorado Water Conservation Board’s
Water Project Loan Program in support of funding the Halligan Water Supply Project. Provided City Water
Utility is successful in the pursuit of $100 million under the Water Project Loan Program, the earliest funds
would be available for appropriation by Council is August 2026. The Water Fund 2025 reserves are
available for the $10,357,500 appropriation in advance of loan acceptance.
Customer Information System Operational Costs
Utilities requests a 2026 budget revision of $702,480 to support 2026 operational costs for the existing
Utilities Customer Information System (CIS) and billing software. The new CIS continues to be developed
with a new go-live date of May 22, 2026. Due to the project extension, the existing CIS and billing software
needs to be extended through 2026. The $702,480 provides funding for unanticipated operational costs of
the legacy CIS and associated billing software into 2026. The software system supports billing of Utility
customers and tracking of customer payments and amounts due.
The individual Utilities enterprise funds will cover their respective shares of the software costs through a
transfer to the internal Customer Service & Administration Fund.
Page 10
Item 3.
City Council Work Session Agenda Item Summary – City of Fort Collins Page 4 of 7
2026 Utility Rates
The revenues needed to support the ongoing operation and maintenance costs of providing each of the
four utilities services to customers are collected through monthly utility rates. As costs change over time,
it is necessary to adjust rates to reflect those changes. Long-term financial planning is important to ensure
revenues are adequate and reserves are available to maintain and replace infrastructure in a timely fashion
to continue providing high quality and reliable services for our customers. Frequent review and updating of
the cost-of-service allocation models behind the monthly utility rates maintains equity across rate classes
and helps to reduce the impact of higher utility rates on customers by providing gradual, modest rate
adjustments over time rather than less frequent and larger rate adjustments. These actions help ensure
the delivery of current and future utility services occurs in a fiscally responsible manner, balancing both
costs and levels of service with affordability and prudent planning and investments.
There are no proposed changes from what was previously planned and adopted in the 2026 fiscal plan
and included in the 2025-26 Budget. A summary of the proposed rate increases for the four utility services
are shown in the table below.
Electric
Staff are proposing a 6% retail rate increase for the Electric Fund in 2026. This increase is driven by a
combination of an increase in wholesale electric expenses in 2026, as well as an increase to cover
distribution operating and maintenance costs and investments in capital projects. Roughly two-thirds of
costs incurred each year to provide electric service are attributable to wholesale expenses, while the other
one-third is attributable to costs related to operating and maintaining the distribution system.
The portion of the proposed 6% increase that is not applied to wholesale cost increases will be used to
help fund distribution system needs. There are multiple capital projects necessary to meet future needs,
some of which include feeder cable and transformer replacements, streetlighting upgrades, distribution
automation, and demand response technology upgrades.
The largest expense for the electric fund is wholesale power costs. Platte River Power Authority (PRPA)
is planning to increase their wholesale blended rate ($/MWh) by 6.3% in 2026 and is forecasting 7.5%
wholesale rate increases for 2027-28. There is variability in how the increase is applied to individual
component charges.
Fort Collins Utilities participates in the Colorado Association of Municipal Utilities (CAMU) survey each
year. Below are the residential electric rate comparisons for the electric utilities in Colorado that responded
to the survey. Fort Collins is shown in the maroon-colored bar within the graph. Based on the July 2025
Page 11
Item 3.
City Council Work Session Agenda Item Summary – City of Fort Collins Page 5 of 7
survey, Fort Collins Utilities came in towards the lower end of average electric cost within the state,
assuming 700 kWh of consumption in a month, at $100.28, or 12th lowest overall of all responses.
Water
Staff are proposing a 9% retail rate increase for the Water Fund in 2026. Water rate increases are primarily
driven by the cost of capital investment, particularly construction of the Halligan Water Supply Project and
maintaining replacement of the water distribution system.
In the 2026 budget, capital projects account for 38% of the total W ater Fund expenditures. This percentage
is expected to increase in the coming years and is a significant driver for future rate increases in the Water
Fund. Debt financing for the Halligan Water Supply Project will be the major component impacting
substantial water rates over the next 3-5 years while the project progresses towards and starts
construction. Development of the Water Fund’s comprehensive Capital Improvement Plan is underway
and will inform a long-term rate forecast in advance of the 2027-28 budget process.
Wastewater
Staff are proposing an 8% retail rate increase for the Wastewater Fund in 2026. In addition to rate increases
needed for ongoing operational inflationary pressures, the Drake Water Reclamation Facility (DWRF)
recently completed a comprehensive condition assessment and is in need of significant capital investment.
The report indicates that 39% of the plant is beyond it’s useful life, and 45% of the plant is in fair condition
The upcoming 10-year Capital Improvement Plan may include plans for a large revenue bond debt
issuance needed for reconstruction of the DWRF Preliminary Treatment Facility, and the combined
Wastewater-Water Quality Laboratory Project.
Page 12
Item 3.
City Council Work Session Agenda Item Summary – City of Fort Collins Page 6 of 7
Stormwater
Staff are proposing a 6% retail rate increase for the Stormwater Fund in 2026. The Oak Street Stormwater
Improvement Project revenue bond issuance of $40M in 2023 increased debt service payments for this
fund. Additional capital improvement budget capacity is being created to continue capital replacement and
improvements to the stormwater infrastructure system.
Bill Impacts and Front Range Comparisons
The table below shows the impacts of the proposed rate change to the average residential monthly bill.
Under the proposed rate changes, a residential customer’s total utility bill, for a customer receiving all four
municipal utility services, would increase by 7.1%, or $13.49 per month.
The table below compares typical residential electric, water, wastewater, and stormwater monthly utility
bills across neighboring utilities along the Front Range, based on proposed 2026 rate adjustments and
charges. In total, Fort Collins Utilities comes in the lowest at $230.26 for all four services. With proposed
increases for 2026, Fort Collins will remain the lowest overall, as there are known increases proposed
amongst the other bordering utilities for 2026, with some of them being substantially higher than the
percentage increases proposed for customers within our community. Note that community comparisons
use different usage thresholds than the Fort Collins customer averages shown in the bill impact table
above.
Page 13
Item 3.
City Council Work Session Agenda Item Summary – City of Fort Collins Page 7 of 7
CITY FINANCIAL IMPACTS
The 2026 City Manager’s Recommended Budget includes these proposed increases in revenues available
for the budget. The electric increase would offset increased wholesale costs for 2026, as well as contribute
to increasing distribution system operating and maintenance and capital costs. The water, wastewater,
and stormwater increases would contribute to operating and maintenance costs, as well as assisting with
future debt issuances for large capital projects.
BOARD / COMMISSION / COMMITTEE RECOMMENDATION
Review of the proposed changes to the Utilities electric rates are planned for discussion with the Energy
Board on October 9, 2025. Review of the proposed changes to the Utility water, wastewater, and
stormwater rates are planned for the Water Commission on October 16, 2025.
PUBLIC OUTREACH
The required electric outside city limit postcard will be mailed in early October and a notice was posted in
the Coloradoan. Rates and fee presentations will be shared at the Business Accounts meeting for all
commercial customer accounts on November 18, 2025. An annual rate brochure will go out to customers
in late November or early December, along with updated information posted to the utility website.
NEXT STEPS
First reading of the 2026 Annual Appropriations is scheduled for Monday, November 3 (due to elections
on November 4). Second reading is then scheduled for November 18.
ATTACHMENTS
1. Presentation
Page 14
Item 3.
Headline Copy Goes Here
Caleb Weitz
Joe Wimmer
Randy Reuscher
Council Work
Session
2026 Budget
Revisions
10-14-2025
Page 15
Item 3.
Headline Copy Goes Here
2
Agenda
•October 23 work session follow up
•$22k of reduction alternatives for
immigration/legal defense funds
•Utilities update of 2026 Revisions
Page 16
Item 3.
Headline Copy Goes HereFollow up from the October 23 work session
3
Highlights of the questions and requests included in Council’s Thursday Pack
materials on October 9 include:
•Clarity on positions in the hiring freeze vs those proposed for elimination,including detail on
positions in Sustainability Service and Code Compliance in Community Development
•Additional information on the Camera Radar Red Light program
•Comparative staffing data with S&U Tax Audit programs along the Front Range
•Updated chart on Digital Inclusion reserve estimates to cover the 2026 shortfall of the Grocery Tax
Rebate program
•Additional information about the Poudre Flows offer and why staff believes the delay in the planned
2026 funding is not an issue for the City
•Updated information on the community impacts from the proposed reductions in the 2026 Budget
Revisions
Page 17
Item 3.
Headline Copy Goes HereAlternative Reduction Opportunities -$22k
4
•Available 2026 Digital Equity revenue
̵Impact: No impact to the projected positive cash balance in the Digital
Equity Reserve in 2030
•Decrease to Bridge Asset Management Program
̵Impact: Decreased ability to respond to unforeseen repairs and
maintenance needs; and lowered ability to advance design for scheduled
replacements
•Decrease in Parks Operations and Programming
̵Impact: Deeper cuts to currently proposed reductions to 4th of July by
eliminating City programming and/or partial closures of bathrooms in
neighborhood parks
Page 18
Item 3.
Headline Copy Goes Here
Utilities 2026 Budget Revisions
Page 19
Item 3.
Headline Copy Goes Here
6
Direction Sought
What questions does City Council have regarding the proposed
2026 Utilities budget and revisions?01
Page 20
Item 3.
Headline Copy Goes Here 72026 Light & Power Budget
PRPA Wholesale
•6.3% Increase
Capital Investment
•Cable Replacement
•Transformers
Operational Technology
•Distributed Energy
Resource Management
(DERMS)
Purchase Power
PRPA
66%
Capital & Asset
Management
10%
L&P Operations
7%
PILOTs
5%
Cust Serv & Admin
4%
Energy Services
4%
Internal Transfers Out
2%Purchase Power
Community
Renewables
2%
Other Misc
1%
2026 Budget -$183.5M
Page 21
Item 3.
Headline Copy Goes Here 82026 OneWater Budget
Capital Investment
•Halligan Water Supply Project
•Water Main Replacement
Program
•Drake Water Reclamation
Facility Projects
•OneWater Laboratory Design
Operations
•OneWater Operator &
Engineering
•GIS Utility Network
Capital & Asset
Management
38%
Plant Operations
14%
Cust Serv & Admin
14%
Transmission &
Collection
12%
Planning & Sciences
8%
PILOTs
4%
Engineering
3%
Internal Transfers Out
6%Other Misc
1%
2026 Budget -$103.7M
Page 22
Item 3.
Headline Copy Goes Here 92026 Budget Revisions
Halligan Project Mitigation Credits $10,357,500
Wetland Credits Requirement (17.94 acres); est. $3.1M
Stream Credits Requirement (8,348 ft); est. $19.3M
Poudre North Fork Mitigation Bank
•Under contract
•19.9 wetland credits
•1,514 stream credits
RMNP Moraine Mitigation Bank
•6,834 stream credits needed
•Contract pending
Page 23
Item 3.
Headline Copy Goes Here 102026 Budget Revisions
Halligan Project Mitigation Credits: Timeline
•Mitigation plan must be approved before construction
•Record of Decision (ROD) expected:August 2026
•Pending CWCB Water Project Loan ($100M), appropriation of Water
Fund Reserves
Page 24
Item 3.
Headline Copy Goes Here
•Operational budget needed for continuing legacy
systems until go-live
•CIS replacement go-live date May 2026
2026 Budget Revisions 11
Customer Information System (CIS)
Operational Extension $702,480
Page 25
Item 3.
Headline Copy Goes Here 122026 Utility Rates
Utility 2026 Rate Increase
Electric 6%
Water 9%
Wastewater 8%
Stormwater 6%
2025-2026 City Manager's Recommend BudgetPage 26
Item 3.
Headline Copy Goes Here 132026 Utility Rates
Page 27
Item 3.
Headline Copy Goes Here 142026 Utility Rates
Page 28
Item 3.
Headline Copy Goes Here 152026 Utility Rates
Page 29
Item 3.
Headline Copy Goes Here 16Utilities Affordability Assistance
Retrofit Programs
•Larimer County
Conservation Corps
Water and Energy
Program (LCCC)
•Colorado Affordable
Residential Energy
(CARE)
Reduced Rates
•Income-Qualified
Assistance Program
LEAP
&
IQAP
One-Time Payment
Assistance
•Payment Assistance
Fund
•Utilities Emergency Fund
Outreach
•Water Conservation
resources
•Energy Services programs
•Utilities Insights Newsletter
•Direct customer
engagement
Page 30
Item 3.
Headline Copy Goes Here 17Utilities Outlook & Initiatives
2027/28 Budget Preparation
•Capital Planning
•Enterprise Project Management Office (EPMO)
•Strategic Asset Management Plans
•Asset Replacement Analysis
•Major Projects
•Halligan Water Supply Project
•Drake Water Reclamation Facility Preliminary Treatment
•OneWater Quality Lab
•Drake Substation
•PRPA Integrated Resource Plan
•Long-Term Financial Modeling
•Capital Financing
•Long-Term Rate ScenariosPage 31
Item 3.
Headline Copy Goes Here
18
Direction Sought
What questions does City Council have regarding the proposed
2026 Utilities budget and revisions?01
Page 32
Item 3.