Council Finance Committee Hybrid Meeting
CIC Room / Zoom
August 1, 2024
4:00 - 6:00 pm
Council Attendees: Mayor Arndt, Tricia Canonico
Staff: Kelly DiMartino, Tyler Marr, Travis Storin, Ginny Sawyer,
Jacob Castillo, Beth Yonce, Adam Molzer, Wendy Bricher, Drew Brooks
Dean Klingner, Victoria Shaw, LeeAnn Williams, Dana Hornkohl, Brad Buckman,
Eric Keselburg, Nina Bodenhamer, Africa Garcia Farina, Randy Bailey, Dave Lenz,
Jen Poznanovic, Joe Wimmer, Carolyn Koontz
Other: Joe Rowan
Meeting called to order at 4:00 pm
Approval of minutes from July 3, 2024, Council Finance Committee Meeting was postponed to the September 5th
meeting when the committee members who were present at the July 3rd meeting will be in attendance.
A. Grocery Tax Rebate Program
Adam Molzer, Manager, Social Sustainability
EXECUTIVE SUMMARY
The Grocery Tax Rebate program’s 2024 budget affords $165,000 for rebates to qualified residents. Due to
increased participation in the program, the total rebate payouts in 2024 are anticipated to be near $583,000. An
appropriation of general fund dollars of $418,460 would fulfill the budget necessary to meet this obligation. In
addition, $24,000 needs to be allocated to cover an anticipated staffing shortfall due to the Council-supported
personnel conversion to classified status of the Program Coordinator in 2024.
GENERAL DIRECTION SOUGHT AND SPECIFIC QUESTIONS TO BE ANSWERED
1. Does Council Finance Committee support a general fund appropriation request of $442,460 that will make
the Grocery Tax Rebate program budget whole in 2024?
BACKGROUND/DISCUSSION (details of item – History, current policy, previous Council actions, alternatives or
options, costs or benefits, considerations leading to staff conclusions, data and statistics, next steps, etc.)
Program Details:
Established in 1972, the Grocery Tax Rebate is intended to provide financially insecure residents relief from City
sales tax charged on purchased food. The rebate amount is currently $80 per person.
Grocery Tax Rebate qualifications include:
• Resident inside the Fort Collins Growth Management Area (GMA).
• Household income between 0-60% of Area Median Income (AMI).
• Must have a document that aligns the applicant’s identity with a Fort Collins address.
Applications are submitted via the Get FoCo online platform, where staff manually review each application and
the uploaded documentation (EBT card copy, Medicaid card, LEAP letter, Free/Reduced Lunch letter) to verify
income and residency eligibility. This is the third year partnering with Get FoCo and 96% of applications are now
received via the web platform.
One 0.75-FTE staff member assists residents with the application process, manually uploads payment data, and
supports a variety of other program functions to ensure a positive customer experience. This staff position was
converted from hourly to classified status with benefits in January 2024, per Council guidance.
Program Growth:
Between 2020-2023, the number of applications received increased over 95%, and rebates issued grew by 186%.
In 2023, the City processed 1,966 applications. The total amount issued in 2023 for the grocery rebate program
was $354,121. The FY2023 budget afforded $150,000 for rebates.
From January to June 2024, the City has processed 1,553 applications. The total amount issued year-to-date in
2024 is $292,460. The FY2024 budget affords $165,000 for rebates.
If a monthly average of $48,500 is realized for Q3 + Q4 2024, the total rebate obligation for 2024 will reach
$583,460. The monthly average during Q3 + Q4 2023 was $37,333.
Additionally, Council Finance Committee expressed support for the conversion of the Grocery Tax Rebate
Coordinator position from hourly to classified at their 12/14/2023 meeting. This conversion took effect in
January 2024 and the resulting $24,000 personnel budget shortfall needs to be made whole.
An appropriation to meet the 2024 rebate and personnel obligations will require Council approval.
Actual & Anticipated Obligation & Budget
Year Applications Household
Members
Grocery
Rebate Repeat %65+%Single
HH %GetFoco %
2020 1006 1890 $123,435 886 88%509 51%641 64%N/A N/A
2021 948 1758 $117,987 844 89%446 47%588 62%N/A N/A
2022 1281 2626 $181,186 857 67%486 38%686 54%614 48%
2023 1966 4654 $354,121 866 44%453 23%911 46%1572 80%
2024 YTD June 1553 3655 $292,460 643 41%277 18%713 46%1493 96%
* Rebate amounts above are tabulated by application receipt date, resulting in slight variations from the City's fiscal year due to timing.
Personnel Conversion Shortfall + $24,000
FY2024 Rebate Budget (general fund) - $165,000
Estimated Funding Needed $442,460
Lastly, the 2020-2024 data set also reveals the following about program participation trends:
• Increased enrollment of new participants to the rebate program (lower proportion of repeat participants).
• Residents under age 65 are increasingly participating in the rebate program.
• Households with sizes greater than one are increasingly participating in the rebate program.
GENERAL DIRECTION SOUGHT AND SPECIFIC QUESTIONS TO BE ANSWERED
1. Does Council Finance Committee support a general fund appropriation request of $442,460 that will make
the Grocery Tax Rebate program budget whole in 2024?
DISCUSSION / NEXT STEPS
Mayor Arndt; do we charge the same sales tax on food that we do on everything else?
Travis Storin; we do not, the renewables do not apply at the grocery store.
Jen Poznanovic; 2.25 % is the grocery sales tax rate and the full rate is 4.35%
Mayor Arndt; I can’t think of a single thing that is fairer. 0-60% AMI seems fair as well.
Tricia Canonico; what do we see as an uptick rate going forward? Will we see these increases YOY with Get
FoCo? What are we anticipating that we will need to budget in the future?
Travis Storin; one of our primary strategies is to recruit more users. We are up to just shy of 2K households
registered in the app which represents approximately 4,500 residents. We are getting a pretty broad reach now.
Once they are enrolled on the app, the majority tend to enroll in multiple programs. Africa, would you like to
address the engagement strategies you are working with?
Africa Garcia Farnia; we have multiple partners around town including PSD and the Library District. We recruit
partners who can help us get more folks enrolled in Get FoCo. We currently have over 3,000 active accounts on
Get FoCo. Not all have renewed the grocery store rebate for 2024. We are expecting another 1,500.
Travis Storin; before having the Get FoCo tool – it was ads on buses and on radio. We had some limited
efficacity.
Tricia Canonico: moving forward, are we budgeting for an increase with the grocery tax rebate?
Travis Storin; you will see an increase in the Recommended Budget when it is published later this month, it is not
quite to these levels. We may be setting ourselves up to return to this committee for an additional
appropriation this time next year. The grocery sales tax rebate program has a rolling 12-month enrollment.
Tricia Canonico; I know you said most of the folks are receiving it for the first time. Why aren’t we seeing more
folks from previous years? Why aren’t they reapplying?
Adam Molzer; in 2023, 44% were returning applicants, in 2022, it was 67% and 2021 it was 89%. With Get FoCo,
we are still seeing the repeat applications, but they are lower proportionally due to all of the new applicants.
Travis Storin; this program was almost exclusively characterized as being utilized by frequent fliers who were
aware of the program and in a very specific age demographic. We are taking this as a good news story as the
program reaches younger and more diverse residents including families.
Mayor Arndt; what is the total revenue that the grocery sales tax brings in?
Jen Poznanovic; groceries are approximately 20% of our total sales tax revenue.
The grocery sales tax category is one of our larger categories of the 18 categories that we have.
I will get the number and circle back.
Nina Bodenhamer; some of the other communities that offer a rebate in this space adjust the rebate amount
based on other levers. Possibly a conversation going forward might we, do we adjust our payout based on the
volume of participation?
Mayor Arndt; I can see that question coming up – do we go to 50% AMI. I would say increase the budget
versus decreasing the amount refunded or reducing participation.
Travis Storin; $3500 per household member (2.25% of that is the $80) to get the total dollar amount we are
refunding.
Tricia Canonico; do we have any date on how much the average family spends on groceries per year?
Travis Storin; we could canvass our department to see if we have any data. I will take this as a follow up.
Mayor Arndt; this is a great program – forgoing a tax.
Travis Storin; we will bring this to the full Council as soon as practical.
B. Recreation Rebate (Reduced Fee) Program
Victoria Shaw, Senior FP&A Manager, Community Services
LeAnn Williams, Recreation Director, Community Services
EXECUTIVE SUMMARY
The Recreation reduced fee program provides an opportunity for income qualified members of the community
to take part in recreational activities at a discounted rate. The program has been funded at the level of $190,000
per year from the General Fund, however usage and needs have surpassed this allocation. In 2023, the
allocation covered approximately 50% of the usage.
GENERAL DIRECTION SOUGHT AND SPECIFIC QUESTIONS TO BE ANSWERED
Does Council Finance Committee have any feedback for staff on reduced fee program offered by Recreation?
BACKGROUND/DISCUSSION
The reduced fee scholarships offered by Recreation have an ongoing goal of filling the gap for the
community by ensuring anybody that meets the program’s qualifications can access the valuable, engaging,
educational and beneficial programs offered by the Recreation department.
Program Details:
The program offers drop-in passes which allow for unlimited drop-in visits to facilities, and automated discounts
for activity enrollments. By minimizing financial barriers, the recreation department can serve and support the
community with programs that promote health, wellness, and overall well-being.
Eligibility for the program requires participants to reside in the Fort Collins Growth Management Area and meet
income standards. The income standards can be met with proof of income up to 185% of the Federal Poverty
Level or qualification through the Poudre School District free and reduced lunch program.
The passes then allow community members to access additional recreation programs at a discounted rate
without additional approvals. The discounted rates for these services are:
• $50 Family Pass: includes 2 adults and no limit on children in the same household.
• $30 Adult Pass: for those 18-59 years of age (not including those who are currently attending high school).
• $10 Youth/Senior Pass: for those under 18 or 60 and over.
• Beginner/Introductory classes receive 90% discount.
• Intermediate level classes, fitness classes, youth sports leagues, CARA Track & Cross-Country, SuperTots &
Skyhawks receive 70% discount.
• Advanced/Competitive classes receive 10% discount.
Program Participation:
Participation in these offerings has been robust, with a steep decline in 2020 due to the pandemic. Activity
enrollments rebounded to pre-pandemic levels in 2021 and have since increased to 72% above the pre-
pandemic level in 2023, suggesting the need for this program is higher than ever and programs have been more
effective at reaching the qualifying populations.
Similarly, reduced fee pass scans also declined steeply in 2020. They have rebounded to pre-pandemic levels but
have not seen the same degree of growth as the activity enrollments.
3,161
5,285 5,494
2,450
5,556
7,810
9,469
0
2,000
4,000
6,000
8,000
10,000
2017 2018 2019 2020 2021 2022 2023
Recreation Low-Income Activity Enrollments
Participation is tracked for youth and adult programming. The majority of costs (78.5%) are associated with youth
requests. This is driven by the reduced fee childcare and youth programs. The below table breaks down the youth
and adult participation by programs.
Youth Activities Summary # Requests Value of Requests
Swim lessons 784 $39,350
Skating 252 $19,455
Adaptive - $0
Pottery 155 $10,119
Northside Atzlan Youth 1,098 $124,433
Foothills Activity Center Youth 233 $14,822
Sports 926 $67,711
Farm 164 $12,012
Youth Tennis 114 $9,154
3,726 $297,057
Adult Activities # Requests Value of Requests
Aqua fitness 176 $5,164
Adult Swim lessons 19 $599
Adaptive 890 $30,902
Skating 19 $499
Social 9 $174
Arts and Crafts 111 $6,206
Fitness/Wellness 4,131 $13,784
Pottery 103 $11,093
Educational 90 $3,611
Dance 87 $2,881
Adult Tennis 44 $4,559
3,161
5,285 5,494
2,450
5,556
7,810
9,469
0
2,000
4,000
6,000
8,000
10,000
2017 2018 2019 2020 2021 2022 2023
Recreation Low-Income Activity Enrollments
64 $1,852
5,743 $81,322
Program Funding:
The program has not been turning away participants based on available funding. The current funding level of
$190,000 per year is allocated across the actual usage for the program and allows for partial revenue
reimbursement. The Recreation fund by default foregoes any of the revenue not backfilled by the General Fund
funding level. In 2023, this funding level represented about 50% of the General Fund reimbursement, and 50%
foregone revenue to the Recreation fund.
DISCUSSION / NEXT STEPS;
GENERAL DIRECTION SOUGHT AND SPECIFIC QUESTIONS TO BE ANSWERED
Does Council Finance Committee have any feedback for staff on reduced fee program offered by Recreation?
LeeAnn Williams; we used to be PSD as our boundary but now it is our GMA
30% AMI. They are automatically enrolled if they qualify for free / reduced rate lunch program.
Rebounded after the pandemic and has increased Summer camp – daycare. Some communities just do youth.
We have silver sneakers – through their insurance providers
They don’t pay anything – we get reimbursed for up to 10 visits per month
When we build the SE Comm Center – we will see an increase then
We are proud of this program – we don’t limit how much money we spend
Victoria Shaw; the General Fund contributes about a50% reimbursement
Childcare – summer camp – 40% of participation - Nexxus in community for our families
We don’t have a projected shortfall
This is a high priority Aligns with our strategic objectives
Mayor Arndt; makes me feel good. Do we do any City Give work around?
I think this is one of those intangible things that people can’t put their finger on but that makes living in Fort
Collins
Adam Snow donors who very specific with what programs
Access & recreation - He hosted a golf tournament at City Park 9 We usually exceed our revenue projections
Tricia Canonico; great work –I was just talking with my sister-in-law who has 3 little ones about the importance
of childcare which is supplemented for her by her employer.
Travis Storin; those were our two income qualified programs we wanted to review with you today.
C. Engineering Supplemental Appropriations
Brad Buckman, City Engineer
Monica Martinez, Sr. Manager FP&A
Dana Hornkohl, Director, Civil Engineering
SUBJECT FOR DISCUSSION
Engineering Capital Projects – Supplemental Appropriations (4 projects)
EXECUTIVE SUMMARY
Four current transportation capital improvement projects will require additional funding for work to continue
prior to proposed Budgeting for Outcomes (BFO) offers being finalized later this year for appropriation in 2025.
Two of these projects are under construction: Laporte Avenue Multimodal Improvements (Laporte) and College
Avenue – Trilby Road Intersection Improvements (College/Trilby). Two more projects are currently under design:
Zach Elementary School Crossings – Safe Routes to School (Zach SRTS) and College Avenue – Triangle Drive
Intersection Improvements (College/Triangle). Zach Elementary SRTS is scheduled to begin construction later
this year; College/Triangle is scheduled to begin construction early in 2025. The estimated cost to complete
these projects will exceed the currently appropriated budgets. There is sufficient discretionary transportation
funding available to complete these projects if appropriated. It is necessary to 1) appropriate additional funds to
complete these projects, 2) reduce scope, and/or 3) delay final delivery. Reduction of scope will result in
projects that do not fully meet the established project goals or adopted City standards and plans. Delaying final
delivery until other funding becomes available will negatively impact other transportation capital projects in the
delivery pipeline. Staff is recommending supplemental appropriations totaling $4,152,470 which would allow for
completion of the four projects as intended when work began. This request is coming before Council Finance
Committee now to avoid additional cost impacts due to potentially pausing and restarting active construction
and design projects.
GENERAL DIRECTION SOUGHT AND SPECIFIC QUESTIONS TO BE ANSWERED
• Does Council Finance Committee support an off-cycle appropriation of Highway Safety Improvement
Program (HSIP) Grant Funds, Transportation Capital Expansion Fee (TCEF) Funds, and Transportation
Services Fund Reserves as well as a reappropriation of funds from the Laporte Bridges project to
complete the Laporte Avenue Multimodal Improvements project?
• Does Council Finance Committee support an off-cycle appropriation of TCEF Funds, Transportation
Services Fund Reserves, and Community Capital Improvement Program (CCIP) Arterial Intersection
Improvements Fund to complete the College Avenue – Trilby Road Intersection Improvements project?
• Does Council Finance Committee support an off-cycle appropriation of TCEF Funds and Transportation
Services Fund Reserves to complete the Zach Elementary School Crossings – Safe Routes to School
project?
• Does Council Finance Committee support an off-cycle appropriation of Funding Advancements for
Surface Transportation and Economic Recovery (FASTER) Act Grant Funds, Colorado Department of
Transportation (CDOT) Americans with Disabilities Act (ADA) Funds, TCEF Funds, and Transportation
Services Fund Reserves to complete the College Avenue – Triangle Drive Intersection Improvements
project?
BACKGROUND/DISCUSSION
Since the Summer of 2021, the nation, Colorado, and the Denver region have experienced significant inflation in
construction costs (Attachments 1, 2, and 3). The CDOT Colorado Construction Cost Index (CCI) reports an
annual percentage increase in construction costs of 8.03%. These inflationary pressures continue to impact the
City’s transportation capital improvement projects that are in active design and construction. Costs to acquire
real property for right-of-way, permanent easements, temporary easements, and the professional services
associated with acquiring real property have also escalated significantly over the same period.
Laporte Avenue Multimodal Improvements
The Laporte project will provide pedestrian and bicycle side paths in three phases 1) between Taft Hill Rd and
Frey Ave (Bridges), 2) between Frey Ave and Fishback Ave (East), and 3) between Sunset St and Taft Hill Rd
(West). The initial phase of this work (Bridges) was completed in 2023 and replaced two aging bridges in the
corridor. The second phase of this work (East) began earlier this year and is scheduled to be completed later this
summer. The third phase (West) is scheduled to begin in October once property acquisition is complete.
The project delivery method for the East and West phases of the project is Construction Manager/General
Contractor (CM/GC). The chosen contractor held pricing for the East phase despite a delay in beginning
construction due to property acquisition and CDOT approval. The contractor has demonstrated by providing
open book pricing, confirmed by an independent cost estimate, that price escalation has impacted many of the
materials and costs for the West phase. The cost to acquire real property for the West phase has been
significantly higher than was estimated. Construction was broken into an East and West phase to accommodate
the property acquisition schedule introducing additional design cost. During this design effort, the City applied
for and was awarded Fiscal Year 2027 HSIP grant funds to install a Rectangular Rapid Flashing Beacon (RRFB) in
the West phase of the project. CDOT has agreed to provide the funding early so that the RRFB may be included
in the construction. Savings from the Bridges phase ($517,000) can be reappropriated to the West phase.
Including the local match for the HSIP award, it is estimated that an additional $560,055 (including $49,500 in
CDOT HSIP funds) is needed to complete construction on the West phase.
College Avenue – Trilby Road Intersection Improvements
The College/Trilby project will improve safety for current and future traffic levels as growth continues in the
region and will create a safer intersection for all users. Dual use side paths for pedestrians and bicycles are
included throughout the intersection. The intersection will feature dual left turn lanes from S College Ave to
Trilby Rd, right turn lanes for each direction of travel, and a widened Trilby Rd approach to S College Ave.
Right-of-way acquisition costs for the College/Trilby project have been significantly more than was initially
estimated (~$3.0M), with total acquisition costs likely to be ~$4.5M. The primary factor in this increase is land
value escalation over the period of acquisition. As with the Laporte project, the delivery method for the
College/Trilby project is CM/GC. Construction was broken into three phases to take advantage of property that
had been acquired and to lock in lower pricing for early work. Phase 1 work (walls) began earlier this year. Phase
2 construction (utility relocation and storm drainage) will begin in several weeks, with Phase 3 work (sidewalks,
paving, signals, landscaping) following later this Fall. Work is scheduled to be complete next Spring. As with
Laporte, the contractor has provided open book pricing for Phase 2 and 3 that has been confirmed by an
independent cost estimate. The pricing shows escalation for several items including storm drainage
infrastructure. It is estimated that the project will need $1,509,000 to address the construction and acquisition
escalation.
As property around the College/Trilby project redevelops, the redevelopment will trigger repayments to the City
for the eligible costs of the intersection improvements, including right-of-way acquisition. Currently, that total is
estimated to be approximately $1.25M. Reimbursement payments will be due to the City upon execution of any
development agreement.
Zach Elementary School Crossings – Safe Routes to School
The Zach Elementary SRTS project will provide signal and crossing improvements across Kechter Rd at Jupiter Dr
and Cinquefoil Ln. SRTS grant funding was awarded in 2023. After the award, during the design phase, additional
concrete work was identified and included in the project. It was also determined that there was temporary
easement acquisition needed to complete the project that was not originally included in the project budget.
With the additional work, easement acquisition, and construction cost escalation, it is estimated that the project
will need $454,500 to begin construction later this Fall and ending early in 2025.
College Avenue – Triangle Drive Intersection Improvements
The College/Triangle project will install a new traffic signal as well as bicycle and pedestrian improvements
connecting Triangle Dr to the northeast towards the Lakeview on the Rise development and onto Water’s Way
Park. There is severe crash history at this intersection and in 2023 CDOT committed FASTER funding to the City
for signal improvements. CDOT has also committed funding for pedestrian improvements to bring the
intersection into compliance with ADA requirements. Working with a consultant, the City has developed 30%
design documentation and a total cost estimate of $1,628,915 (including $832,211 in CDOT FASTER and ADA
funds).
Staff has identified three alternatives to reach final completion on the four projects.
• Option 1: Secure off-cycle appropriations for the projects to complete design, acquisition, and construction
and avoid additional costs with delaying the work. There is currently sufficient discretionary funding to cover
these proposed appropriations.
• Option 2: Reduce the scope of work for the projects. All four projects have been value engineered to
minimize costs. Additional reduction of scope would potentially compromise project goals or limit the ability
to meet City standards.
• Option 3: Delay final delivery until additional funding can be secured. This option would result in the project
not meeting the identified project goals within the promised timeframe, expose the remaining work to
further inflation, and would impact the schedule and budget for other transportation capital projects in the
design, acquisition, and construction pipeline.
Summary of requested supplemental appropriations for all four projects.
• Grant Funds: $881,711
• TCEF Reserves: $2,220,230
• Transportation Fund Reserves: $450,529
• CCIP – Arterial Intersection Improvements: $600,000
• Total: $4,152,470
Summary of Existing Funding and Proposed Supplemental Appropriations
DISCUSSION / NEXT STEPS;
GENERAL DIRECTION SOUGHT AND SPECIFIC QUESTIONS TO BE ANSWERED
• Does Council Finance Committee support an off-cycle appropriation of Highway Safety Improvement
Program (HSIP) Grant Funds, Transportation Capital Expansion Fee (TCEF) Funds, and Transportation
Services Fund Reserves as well as a reappropriation of funds from the Laporte Bridges project to
complete the Laporte Avenue Multimodal Improvements project?
• Does Council Finance Committee support an off-cycle appropriation of TCEF Funds, Transportation
Services Fund Reserves, and Community Capital Improvement Program (CCIP) Arterial Intersection
Improvements Fund to complete the College Avenue – Trilby Road Intersection Improvements project?
• Does Council Finance Committee support an off-cycle appropriation of TCEF Funds and Transportation
Services Fund Reserves to complete the Zach Elementary School Crossings – Safe Routes to School
project?
• Does Council Finance Committee support an off-cycle appropriation of Funding Advancements for
Surface Transportation and Economic Recovery (FASTER) Act Grant Funds, Colorado Department of
Transportation (CDOT) Americans with Disabilities Act (ADA) Funds, TCEF Funds, and Transportation
Services Fund Reserves to complete the College Avenue – Triangle Drive Intersection Improvements
project?
Staff has identified three alternatives to reach final completion on the four projects.
• Option 1: Secure off-cycle appropriations for the projects to complete design, acquisition, and construction
and avoid additional costs with delaying the work. There is currently sufficient discretionary funding to cover
these proposed appropriations.
• Option 2: Reduce the scope of work for the projects. All four projects have been value engineered to
minimize costs. Additional reduction of scope would potentially compromise project goals or limit the ability
to meet City standards.
• Option 3: Delay final delivery until additional funding can be secured. This option would result in the project
not meeting the identified project goals within the promised timeframe, expose the remaining work to
further inflation, and would impact the schedule and budget for other transportation capital projects in the
design, acquisition, and construction pipeline.
Mayor Arndt; do we pay interest rates on these acquisitions – curious about funding
Kelly DiMartino; we fund it with cash from a variety of sources – always cash on hand.
Off cycle appropriation to complete the first two due to inflation impacts
Grant Funds Local Funds Re-
Appropriation Total Grant Funds TCEF Reserves Trans. Fund
Reserves
CCIP Arterial
Intersection
Fund
Total Increase
Laporte 4,937,500$ 1,365,495$ 517,000$ 6,819,995$ 49,500$ 335,454$ 175,101$ -$ 560,055$ 8%
College/Trilby 13,640,992$ 2,873,513$ -$ 16,514,505$ -$ 908,820$ 180$ 600,000$ 1,509,000$ 9%
Zach Elementary SRTS 745,587$ 187,397$ -$ 932,984$ -$ 179,410$ 275,090$ -$ 454,500$ 49%
College/Triangle -$ -$ -$ -$ 832,211$ 796,546$ 158$ -$ 1,628,915$ N/A
TOTAL 19,324,079$ 4,426,405$ 517,000$ 24,267,484$ 881,711$ 2,220,230$ 450,529$ 600,000$ 4,152,470$ N/A
Previously Appropriated Proposed Supplemental Appropriations
Travis Storin; the dollars are there - reserves in the upcoming 2025 -26 Budget. I commend the team for a
creative approach with the funding stack.
Since we are in the middle delay the cross walk on Impala
Mayor Arndt; that is a drop in the bucket - if we are in the middle of something - we should finish it –it feels like
a higher priority to finish the ones that are in process.
Tyler Marr; funding these inflation impacts are delaying the start of other things which carry an opportunity
cost. Some new things may be delayed.
Tricia Canonico; no upside to delaying or downsizing the project - a lot of grant funding opportunities
It is too bad that we keep seeing the constructions costs increasing. I would support moving forward.
Do we anticipate any stabilization in the coming year for the construction costs increases?
Dana Hornkohl; there has been no indication of that yet. A lot of volatility in concrete and asphalt costs.
Mayor Arndt; I am sure they will talk about tradeoffs in the budget.
D. Parking Supplemental Appropriations
Eric Keselburg, Sr Manager, Parking Services
EXECUTIVE SUMMARY
Parking Services is requesting appropriation of available Parking Reserves to fund the following items. The Civic
Center Parking Structure (CCPS) item will be funded using dedicated CCPS Reserves.
1. The southeast corner public stairwell in CCPS needs to be replaced, as identified during the recent condition
assessment. This stairwell is located on the most heavily trafficked exit from CCPS and has been closed since
June 2020, as design and funding are finalized.
2. Parking Services began sealant work in the Firehouse Alley Garage in 2023. Funds allocated for this project in
2023 were not used due to timing delays and subsequently became part of the Parking Reserves. These
funds are now needed to complete the project.
3. Parking Services presented to City Council in October 2023, to request support to research a sustainable
funding model for the downtown parking system. The scope for the Request for Proposal (RFP) has been
drafted and reviewed by the Downtown Development Authority (DDA); which has agreed to contribute
financially to assist with the Downtown Parking System Strategy Study, and subsequent implementation
plan.
4. The third-party security company, Precision Security, provides security services in the three (3) City-
managed parking structures. The current staffing and hours of coverage are not changing; however, the cost
of service has increased yearly including a 4.5% for 2024 service.
Parking Services is requesting appropriations versus aligning with the standard Budgeting for Outcomes (BFO)
process due to project timing and the need to adjust the current year budget.
GENERAL DIRECTION SOUGHT AND SPECIFIC QUESTIONS TO BE ANSWERED
Parking Services is requesting the appropriation of available Parking Services reserve funding to allow for
movement on the customer experience items, and to allow the RFP to be submitted to begin the downtown
parking study; to gather both partner and community feedback, ahead of Council direction.
BACKGROUND/DISCUSSION
There are a few asks being compiled together. The first being the CCPS stairwell, which following the 2019
condition assessment was found to have repair needs. Due to the pandemic and financial constraints imposed
on Parking Services, the maintenance schedule was paused (approved by the contracted structural engineering
firm). Once the American Rescue Plan Act (ARPA) funding was provided (BFO cycle 2022/2023), Parking Services
resumed maintenance repairs. However, the subsequent and necessary condition assessment performed found
that the southeast stairwell had degraded to an unsafe level; which required it to be closed (June 2022) for
public use. Several design options were discussed and presented; that said, a viable design was submitted, and a
path forward was determined. To complete this project a supplemental appropriation of $1,200,000 is being
requested. These funds will be appropriated from the CCPS Reserves.
The second request is to utilize prior funding which was set-aside in 2023 for necessary parking structure deck
sealant maintenance work in FAPS. This project was planned to bridge funding availability from both 2023 and
2024; due to timing delays, the available 2023 funding was not used and subsequently rolled into the Parking
Reserves. To complete this project a supplemental appropriation of $110,000 is requested. These funds will be
appropriated from Parking Reserves.
The third ask revolves around the following. Parking Services presented to City Council at a work session in
October 2023, specifically pertaining to the current state of the Parking Services operation and the request to
support continuing efforts to develop a new financial and strategic model and related implementation plan for
downtown parking. The identified problem statement showcased that the current parking system model does
not provide the parking choices needed for those who visit the downtown area. As well, it is incapable of
addressing the demand distribution challenges, which frustrates our users, because of the reliance on an
enforcement methodology and the use of low dollar paid parking in undesirable facilities. Also, Parking Services
is unable to fulfill its required goals to fund its maintenance needs because it cannot achieve cost neutrality in its
current model. The scope of the RFP has been drafted and reviewed by the DDA, who agreed to contribute
financially to the downtown parking study. At this time, a supplemental appropriation of $185,000 is requested
to fund this work. The DDA has agreed to reimburse the City for the cost in the amount of $65,000 or up to 50%
of total cost.
The final piece of the request is due to the increased cost of third-party security services provided in the three
(3) City-managed parking structures. Parking Services contracts armed security to ensure the evening and late-
night users of the parking facilities have adequate protection, with armed security at each facility, with added
security staffing during the weekend. The cost of the contract for armed security has increased yearly including
an increase of 4.5% in 2024. Parking has managed past yearly increases within its budget, but cost increases
have now accumulated resulting in this request for $50,000 in supplemental appropriation from Parking
Reserves.
The available reserve balance is sufficient to cover the presented requests and will help to minimize execution,
and advance efforts made to date. As well, the contract increase will provide uninterrupted security coverage
for our downtown customers.
DISCUSSION / NEXT STEPS;
GENERAL DIRECTION SOUGHT AND SPECIFIC QUESTIONS TO BE ANSWERED
Parking Services is requesting the appropriation of available Parking Services reserve funding to allow for
movement on the customer experience items, and to allow the RFP to be submitted to begin the downtown
parking study; to gather both partner and community feedback, ahead of Council direction.
Paused due to pandemic - SE stairwell in the Civic Center Parking structure was closed in 2022
We have identified a path forward – 12-18 months – our goal is summer/ fall for 2025 to reopen the SE
stairway.
Monica Martinez; basically, we had a situation where it should have been put in a Purchase Order per
the standard process, but that did not occur - funding did not get picked up there –
Mayor Arndt; what is the additional $185K for?
Eric Keselburg; we worked with a parking consultant for the downtown parking study leading up to the
presentation to the Council. This would be for the second half of the study where we reach out to
some of the stakeholders which will lead to a recommendation to Council for next steps. The DDA has
agreed to come forward with some funding as well.
Mayor Arndt; I am fine with all of this. The Council is anxious to be helpful in the parking structure
repairs.
Tricia Canonica; we would like to see this moving forward – good to have that stairwell back in service
and to maintain our other parking structures. I am good with this.
Meeting adjourned at 5:05 pm