Aging Infrastructure
Utilities, PDT, Community Services
Planning for Resilience & Continuity
2
What is the problem we are trying to solve?
•Insuring continuous, reliable and high quality
services
•Maintaining reliable infrastructure
•Upgrading services where and when possible
•Anticipating change and preparing to adapt
3
What are the Issues?
•Reliable on-going funding
•Infrastructure monitoring and timely
replacement
•Coordinated scheduling & systems
•Anticipating & preparing for
disruptive changes/events
•Appropriate staffing levels
4
Utilities Asset Management
Electricity
Stormwater
Water
Wastewater
5
Asset Management Program Status
Utilities Division
Preliminary Risk
Assessment
Performance
Metrics
Capital Project
Prioritization
Lifecycle
Management
Plan Implementation Comments
Water Distribution All elements are complete and now in implementation.
Wastewater Collection All elements are complete and now in implementation.
Stormwater Collection All elements are complete and now in implementation.
Water Treatment Facility Implementation is on hold until a new WPG manager is hired.
Water Reclamation Facility All elements are complete and now in implementation.
Light & Power Distribution Preliminary RA is scheduled to start Q4 2014.
Light & Power Substations Preliminary RA is scheduled to start Q4 2014.
Work complete
Work in progress
Work scheduled but not yet started
Work not scheduled
6
Asset Management
Systems vs. Programs
7
Asset Management Systems
8
Strategic Asset Management Programs
9
Asset Management
Capability System Program
Work Order Management System Yes Yes
Work Orders tied to Assets Yes Yes
Automated Preventative Maintenance Work Orders Yes Yes
Assets Mapped in GIS Yes Yes
Asset Register Yes Yes
Risk Register Yes
Asset Management Plans Yes
Asset Condition Assessments Yes
Asset Lifecycle Maintenance Strategy Models Yes
Asset failure analysis / predictive modeling Yes
Asset demographics Yes
Service Level Performance Monitoring Yes
Prioritized Capital Improvement Plans Yes
Risk Management Yes
Strategic Financial Plans Yes
10
Asset Management Tools
Being Developed in Utilities
11
•Asset Management
Plans for all major assets
•Service Level
Scorecards
•Asset Specific Failure
Curves
•Multi-attribute Decision
Analysis Software
•Prioritized 10-year
Capital Improvement
Plans
•Strategic Financial Plan
12
Asset Management Levels of Service
Potable Water Treatment and Distribution
Key Service Criteria Performance Indicator BFO Performance
Measure ID Target Level of Service
Current Performance
(end of 2013 calendar
year)
Score Points
possible
Quality Taste, Odor, and Color
Complaints ENV 27
≤ 1 complaint /month
regarding taste, odor, or
rusty/dirty water
12 complaints for
taste/odor &
visual/rusty water; 1
complaint/month
20 20
Regulatory
Compliance
Maximum
Contaminant Limits &
City Water Treatment
Facility Limits
ENV 1
100% compliance with
Maximum Contaminant Limits
& City Water Treatment
Facility Limits
100% compliance 20 20
Reliability
Number of Outages
Experienced by
Customers
N/A No more than 3 outages per
year TBD 10 20
Availability of
Water to
Customers
Minimum flow
provided to customers ENV 32 Firm yield greater than
demand
Annual demand of
23,367 AF; firm yield
of 30,500 AF.
10 10
Responsiveness
to Outages
Response time to
customer complaints
due to a loss of supply
N/A
Respond to customer
complaints regarding loss of
supply within 30 minutes 99%
of the time
27.4 minute average
response time 20 20
Rate per 1k Gallons of
Finished Water N/A Top Decile of Similar Cities in
Colorado 3rd Decile 7 10
Financials Amount of Annual
Rate Increase N/A ≤ 5%4% for 2013 & 2014 5 5
Percentage of
Household Income for
Water Service
N/A ≤ 1%0.76% for 2013 5 5
Safety DART Rate N/A 2.5 for the City.3.2 for Utility Services
for 2013 N/A N/A
RAF Rate HPG 22 4.7 for the City.6.1 for Utility Services
for 2013 N/A N/A
Total Score 97 110
13
System Replacement Planning
14
Capital Improvement Planning
Source: Expert Choice Decision Support Tool
15
Capital Improvement Planning
Source: Expert Choice Decision Support Tool
16
Capital Improvement Planning
Source: Expert Choice Decision Support Tool
17
Capital Improvement Planning
18
Strategic Financial Plan
Strategic Financial Plan
Strategic
Operational
Plan
Prioritized
Capital Projects
Operating Expense
Analysis
Revenue Analysis
Debt Analysis
Rate
Forecast
19
Additional Elements
•Seeking ISO 55000 audit in 2015.
•Working towards accreditation in near-term.
20
2009-11
Asset
Management
2012-3
Strategic
Financial
Planning
2014-5
Capital
Improvement
Plans
2016 ISO
55000
•Risk Register
•Asset Database
•Capital
Prioritization
•Asset Condition
Assessments
•Asset Lifecycle
Management
Plans
•Draft Strategic
Financial Plan
(SFP)
•Capital
Improvement Plans
& Strategic Financial
Plan audited
•Asset Management
program fully
implemented
•BFO Offers and rate
adjustments
consistent with &
supported by SFP
Water & Wastewater Stormwater Light & Power
•Asset Lifecycle
Management
Plans
•Strategic Financial
Plan
•Maximo
21
Community Operations and Services
•Facilities
•Parks
•Cultural Facilities
•Natural Areas
22
Facilities
•Projected Facilities Maintenance & Repair (M&R)
budget -4% of Current Replacement Value (CRV) of
GF buildings (52) maintained. Actual budget
typically less. (Alterations and new construction not
included.)
•Building Condition Audits conducted to assess the
current and long-term M&R needs–including the
service life/functionality of buildings.
•No dedicated Facilities Maintenance Reserve since
1996.
• Non-general fund departments (Transportation,
Utilities, Fleet) typically budget less than 4% target.
23
Buildings
•Issues for the future
1. Replacement / Disposal / Re-purpose
2. Major Alterations / Additions
3. Funding for full “Cost of Ownership” of
buildings.
• Aging buildings & installed mechanical systems :
Of the 52 buildings Facilities maintains, 23 are > 50
yrs; 15 btwn 50-25; 8 btwn 24-10; 6 < 9 yrs
•Long-Range building space planning for growth and
efficiencies
24
Parks
• Parks has 196 acres of parkland
which has no life cycle funding
including medians & parkways
• Water for existing parks and
future parks will be more difficult to
obtain without additional storage
• Aging structures within parks will
need to be upgraded and
modernized. Great pressure from
citizens for access to these
facilities
• Current irrigation system will
need upgrading and new
technologies may change the way
water is applied
25
•Current irrigation system will need
upgrading and new technologies
may change the way water is
applied
•Field usage will continue to be an
issue with more entities requesting
field usage
•Citizens are requesting more
water features which have high
maintenance issues
Parks
26
•Fleet
•Average age
•Vehicles – 9.2 years
•Equipment – 11.4 years
•Fleet Value – $93,757,259 (cost)
27
Fleet Replacement Guidelines
–Light Duty vehicles – 95,000 miles
–Mowers – 2,000 - 4,000 hours(depending on size)
–Utility Trucksters – 5,000 hours
–Small dump trucks – 120,000 miles
–Tandem Trucks – 150,000 miles
–Backhoes / Loaders – 8,000 hours
–Trailers - 10 years + condition
–Sweepers – 8,000 hrs
–Other equipment – case by case basis
28
Natural Areas
Fort Collins Natural Areas has a Capital Replacement Plan
and Fund to anticipate and pay for major maintenance and
replacement of infrastructure. Staff monitors the condition
of all infrastructure and schedules preventive maintenance
to minimize major maintenance and replacement
costs. Natural Areas contributes over $600,000 annually to
its Capital Replacement Fund which is capped at
$2,000,000, and then replenished annually as needed.
Cultural Services
Cultural Services has three primary facilities: Lincoln
Center; Museum of Discovery; Carnegie Building. The
Lincoln Center renovation upgraded aging infrastructure so
it is in good shape for the near term. The Museum is a new
building and also in good shape for the near term. The
Carnegie Building needs $2 million in infrastructure
improvements and funding is being requested in BOB 2.0.
29
The City currently spends ~$585,000 annually on repair and
replacement of park infrastructure (lifecycle funding). The
amount of annual lifecycle funding needed to keep our
parks in acceptable condition is $770,000, which equates to
$1,000 per acre of developed parkland and a deficit of
$185,000 annually.
The City’s Golf Division is self-funded through user
fees. Fees are not sufficient to fund infrastructure needs for
our three golf courses. The 30 year old irrigation system at
Southridge needs to be replaced at a cost of $2.2 million
and the 35 year old irrigation system at City Park Nine also
needs to be replaced at a cost of $1.2 million. The golf
operation has additional unfunded infrastructure needs of
$3.3 million for parking lots, shelters, bridges, buildings,
netting and restrooms.
30
•The City has had a Computerized
Pavement Management System
Since 1989
•The current system (Deighton)
has been in place since 1997
•This system has been expanded
to include the bridges and
sidewalks
•Has the capabilities to manage all
assets
•This System is fully integrated
with the City’s Geographic
Information System (GIS)
Streets, Bridges,and Sidewalks
31
Deighton Total Asset Management
32
Pavements
•Determination of Level Service
•Customized Pavement Deterioration Curves
•Predictable Maintenance Costs Over Time
•Multi-attribute Decision Analysis Software
•Prioritized 5 year Pavement Maintenance Plan
•Strategic Financial Plan
33
$7.10
$13.59 $14.80 $15.20 $15.10 $15.40
$8.80 $8.99 $8.99 $8.99 $8.99
$0
$10
$20
$30
$40
$50
50
55
60
65
70
75
80
2010 2011 2012 2013 2014*2015*2016*2017*2018*2019*2020*
Fu
n
d
i
n
g
i
n
M
i
l
l
i
o
n
s
o
f
D
o
l
l
a
r
s
Pa
v
e
m
e
n
t
C
o
n
d
i
t
i
o
n
I
n
d
e
x
(
P
C
I
)
Funding and Pavement
Condition Index (PCI)
Total Funding Continued Funding with 1/4 Cent Sales Tax Current Funding without 1/4 Cent Sales Tax *Projected
34
Bridges
•New rating system under development
•Use same inspection items as SR
•Incorporate City functionality
–Sidewalks
–Bike lanes
•Incorporate risk factors
–Age past design life
•City currently uses Level of Service
(LOS) for Pavements
•Goal is to have consistent LOS for all
assets
35
Planning Development & Transportation
•Transportation
36
37
Future Asset Management
Projects
•Cross asset analysis and optimization
•Integrate all of the City's assets into one system for
strategic and tactical planning including
o Traffic Signals
o Pavement Marking
o Transfort
o Utilities
38
Consider
•Should there (can there be)be a single asset
management system for the City?
•Should all departments have a consistent reserve
policy?
•Are we budgeting adequately for continuous
improvement of our infrastructure?
•Can we adapt to disruptive changes/events?
•Should Facilities become an Internal Service Fund
similar to Fleet?