AGENDA
Council Finance & Audit Committee
March 16, 2020
10:00 am - noon
CIC Room - City Hall
Approval of Minutes from the February 24, 2020 Council Finance Committee meeting.
1. Digital Equity Program Review 30 mins. N. Bodenhamer
2. Affordable Housing Support Process (Fees) 20 mins. V. Shaw
N. Currell
Council Finance Committee
Agenda Planning Calendar 2020
RVSD 03/11/20 ck
Mar 16P
th
P
Digital Equity Program Review 30 min N. Bodenhamer
Affordable Housing Support Process (Fees) 20 min N. Currell
V. Shaw
April 20P
th
P
BFO Assumptions 30 min L. Pollack
Suniga/Turnberry ROW/Design 30 min C. Crager
Streets and Traffic Backup Generators 20 min K. Mannon
J. Olson
May 18P
th
P
B-Dam Alternatives and Recommendation 30 min T. Connor
Utility Rebate Consolidation 20 min J. Poznanovic
Code revisions for Self Insurance fund 15 min T. Storin
John Duval
June 15P
th
P
Future Council Finance Committee Topics:
• Park/Median Design Standards & Maintenance Costs – TBD
• Metro District Policy Update – TBD 2020
• BFO Assumptions Review – July 2020
• Annual Adjustment Ordinance – Sep 2020
Finance Administration
215 N. Mason
2nd Floor
PO Box 580
Fort Collins, CO 80522
970.221.6788
970.221.6782 - fax
fcgov.com
Finance Committee Meeting Minutes
February 24, 2020
10 am - noon
CIC Room - City Hall
Council Attendees: Mayor Wade Troxell, Ross Cunniff, Ken Summers
Staff: Darin Atteberry, Jeff Mihelich, Kelly DiMartino, Carrie Daggett, Travis Storin, Jeff
Mihelich, Kelly DiMartino, Nina Bodenhamer, Dave Lenz, Zack Mozer, Katie Ricketts,
Jo Cech, Lawrence Pollack, Noelle Currell, Victoria Shaw, Jennifer Selenske,
Carolyn Koontz
Others: Kevin Jones, Chamber of Commerce
Dale Adamy, RIST. org
_______________________________________________________________
Meeting called to order at 10:01 am
Approval of Minutes from the January 27, 2020 Council Finance Committee Meeting. Ross Cunniff moved for
approval of the minutes as presented. Ken Summers seconded the motion. Minutes were approved unanimously.
A. City Give Portfolio Process Review
Nina Bodenhamer, Director, City Give
SUBJECT FOR DISCUSSION
City Give Portfolio Selection: How does the City identify and select projects for fundraising?
EXECUTIVE SUMMARY
In 2019, the City of Fort Collins launched City Give, a municipal philanthropic initiative that creates a formalized
structure for charitable giving within our City. The enterprise-wide process improvements developed over the
past year create the groundwork for today’s topic: a strategic selection process for the City Give portfolio.
GENERAL DIRECTION SOUGHT AND SPECIFIC QUESTIONS TO BE ANSWERED
Objective: Information and Update Only
BACKGROUND/DISCUSSION
In 2019, the City of Fort Collins launched City Give, a municipal philanthropic initiative that creates a formalized
structure for charitable giving within our City. Over the past year, we’ve worked to get our “charitable house in
order,” and have established a range of financial and operational practices, including but not limited to:
• Financial Governance Policy of Philanthropic Gifts
• System-wide Financial Accounting and Tracking Protocols for Charitable Gifts
• Gift Acceptance Process
2
• Gift Agreements for Charitable Gifts $25K and Above
• Identification of Signature Relationships
This “in-house” approach to philanthropy allows Fort Collins to respond to strategic projects and community
needs that fall outside the normal city budget priorities but are well-positioned for private funding.
The enterprise-wide process improvements, developed in this last year, create the groundwork for today’s topic:
the strategic selection process for the City Give portfolio.
Our 2-step selection process reflects philanthropic best practices and serve as an innovative platform to pair
charitable giving with civic priorities.
1. City Give will serve as a collection point for potential fundraising projects to establish fundraising feasibility.
Feasibility metrics include factors such as: quality of case statement, financial proposition, competing
fundraising landscape, and community resources.
2. Strategic operational selection will evaluate alignment with strategic outcomes, organizational priorities,
audiences served, and resource allocation
Discussion / Next Steps;
Philanthropy does belong in Finance - the default was that it belonged in City Hall – I have learned that for it to
stand and have the accountability a community expects, Finance is the perfect place for this to reside.
Portfolio Selection Process - quarterly selection and review so everything will go through one filter and
fits within community landscape. (feasibility study - more nuanced)
3
Darin Atteberry; I would love for Nina to share her thoughts on how City Give might relate to something like
digital equity. At a large scale as we are talking about digital equity as it relates to Connexion -the role City Give
could play - good topic for folks to hear about.
Ross Cunniff; I appreciate the discussion of wanting to align with overall city objectives. One of my concerns is
that people will give money for things that are not necessarily well aligned with outcomes or that further skew
equity issues in the wrong direction - in the digital equity space
Nina Bodenhamer; a couple of pieces governing that – most importantly, we want to create a system where
there is no pay to play – where there is equity in gift giving and one way to facilitate that is the proactive
Portfolio Review process. Here is where we can accept your gift - we all need to understand and be comfortable
responding that ‘this gift is not for us, but here is where it could go’. This is not in the nature of non-profits to
say that, but we have to be able to say that as a municipality because we cannot accept all gifts. On the smaller
level, the portfolio will protect us to some degree (here is what we are fundraising for..). The municipality has
unique and durable partnerships in each of these spaces. There is a comfort is brokering gifts by introducing
them to non-profits where it might fit. We also have some transparencies in terms of gift acceptance levels - the
larger the gift the more transparent and public the gift becomes (example of a $400K gift tied to a Natural Areas
purchase – at this level there is full council notification- that is a really tough discussion with municipalities – it
is not anonymous but we will protect confidentiality but as elected officials you have the right to see where the
gift is and who it came from.
Ross Cunniff; We have had discussions about this before - Council really does need to know - to avoid any
alignment issue
Darin Atteberry; the alignment issue that Ross brings up is the most critical thing here. City Give is completely
aligned with Council priorities. Because at a minimum it could be a serious distraction for us in accomplishing
our objectives and in the worst case you have a big disconnect between a large enterprise in the community and
people who want to give. This is a reflection of Council and alignment with staff which is very strong and it’s
Nina’s coaching on what she is bringing to the table.
Nina Bodenhamer; even if we align with the strategic outcomes of the city and Council priorities, City Give has
opened the gate to several small interest groups who are looking for a vehicle to organize their fund raising –
they are with great intent but is it the City’s role? No, the more we can institutionalize this process the more I
can offer resources at every step.
Ross Cunniff; it might align with the city’s mission generally but not specifically. Example of wanting to build a
world class children’s play structure - not currently needed at Twin Silo park but let’s look at other parks.
Nina Bodenhamer; Eastside Park example – when that became public, we were approached by several special
interests such as; pets, seniors, they wanted to place something in that park - the more we can strengthen the
relationships and boundaries with our fundraising partners, we can align our portfolio with very specific
definitions of strategic outcomes and Council priorities and operational mission - this is a great idea but that is
not our mission at this moment in time.
Ross Cunniff; givers have the best of intentions - needs over here that could be met with this gift that we don’t
know how to meet otherwise – that will bring the intention full circle.
4
Nina Bodenhamer; it is a balancing act in these first couple of years -people are comfortable with it.
We have met with people who have great capital projects going in in the community. Can I support it in
strategy? Absolutely - if the right donors come to us – it may not be for us - a way for me to keep involved when
we look at community landscape of what capital campaigns are taking place.
Mayor Troxell; City Give = relationship management - those that are fully supportive of our community and have
donative interests - recently, I heard some people thinking about land trust in terms of real estate interests – for
example, if someone has lived in Fort Collins and loves our community may want to donate their house when
they pass. There might be a use for that real estate, or it could be sold and directed toward a Council outcome
such as affordable housing. Donative giving related to affordable housing in our community – not the way the
city traditionally approaches affordable housing through AMI and other structures - that is an opportunity to
think about real estate and what we might do.
Nina Bodenhamer; there are lots of opportunities -a really Interesting scale. A current example - tied to a
Natural Areas purchase - we have a seller who couldn’t agree on the value price that the city offered. City Give
went in to negotiate - is there an opportunity to donate the value instead of the property - that is a capital gains
conversation – really diving in - when did you purchase this property? How is it held (LLC, etc.)? They have
agreed to come public with their story after the signing. A 3P
rd
P generation ranchers who wanted to give but didn’t
have the vehicle to do it - giving to the city is a big piece of their motivation.
Mayor Troxell; I could see that play out in terms of other real estate such as a historic home - with a useful
purpose - historical means in our community
Ken Summers; I appreciate the presentation and the focus. There was some perception going in terms of what
City Give would look like. We have a very focused criteria and selection process. Our goal is to streamline that
various departments to help streamline, coordinate and define city priorities and projects - what is appropriate
on the municipal level. I like the concept - City Gives can function as a matcher between donor interest and the
place where those interests are best met would be a wonderful service that we provide. To say that is not a
priority of the city right now but provide some ideas of where to go to pursue a match. When you look at
allowing for community co-creation - that does give a bit of a challenge in terms of that space -such as the
Eastside Park example where there is donor interest in something specific such as an amenity. There is space for
what we tend to call community co-creation. Can you talk about the agreement with larger donations?
Nina Bodenhamer; a gift agreement is standard best practices for gifts of $20- $25K because there are some
terms that come with it. By nature and definition of legal gifting; once the funds are deposited - they lose the
legal right of control - both parties understand and acknowledge the terms of that gift – also governs how the
gift will be used – which is another layer of control for both parties. The agreement includes any special terms
such as a match met on the table that must be made before the funds are used, any type of recognition or lack
thereof – legally binding and a standard practice. In our organization, a gift of $5K or less can be accepted by a
Departmental Director. There are guidelines regarding how they acknowledge that, how we move that through
City Give business unit. At $5k and above, the City Manager signs off on acceptance of that gift to ensure
transparency, confirm that there is no conflict of interest, very intentional acceptance of the gift.
Ken Summers; estate planning vehicle mentioned by the Mayor - long term – some folks may want to do this.
Nina Bodenhamer; in our portfolio process when we meet in March - there is real opportunity to generate the
opportunity for funds even if we are not actively soliciting funds - we can still lay the groundwork.
5
Mayor Troxell; When we did FortZED the city was the lead, the Dept of Energy - a 50% cost share which came
from various sources within the community – the $500K was collected via the community foundation. Dept. of
Energy grants - a match component - might be from something already being expended. I would see that a City
Give mechanism would be a how to for cost share and match with federal funds. I hope that would be part of
this as well - the community and not just the general fund accomplish those sorts of things like what happened
in FortZED. We are also engaged with funding from state and federal resources; housing / energy / water /
there are many different categories that we participate in as a city organization. City Give is a strategic
mechanism that can accomplish things - moving to something that is more strategic and operational – with the
back-up that can justify that sort of thing. I see the city as being a key partner mechanism. This goes back to
something Ross said some time ago about revenue diversification, a mechanism that can help leverage sales tax
dollars and other things.
Travis Storin; a catalyst - I think about the Bloomberg philanthropy - the state energy office dollars that came in -
I can attribute our winning of the state grant dollars to the Bloomberg dollars and the flexibility of the form of
the match - An example is the Max; the match was almost exclusively in the form of right of way donations
I can’t think of an immediate barrier to the use of donative dollars for a donor match unless there is a legal issue,
or a clause built into the grant. This is an opportunity.
Nina Bodenhamer: Philadelphia created a revenue stream coming into their City Give equivalent - a percentage
of the marathon goes directly into a fund that began as a transportation fund – it sits there as a donative fund
going out to serve as matches or as ancillary funding - they don’t open up as grants – they open up for their own
use - municipalities getting clever about how to leverage this opportunity of matching donor intent and
community goodwill with the solid business of a municipality.
Mayor Troxell; alignment to the mission of Council etc., - large philanthropies that give to specific things such as
Community oriented, environmental, climate, livability, public engagement. With Fort Collins being innovative –
saying let’s try this - we play well in those arenas as well.
Nina Bodenhamer; Yes, we play exceptionally well in philanthropy. I think we will shoot ourselves in the foot if
we come out with our first campaign – we don’t want to quell donor excitement. We do want to funnel
interests productively into the vision of the community. It is a space for all of these good things to come
together with innovation.
Mayor Troxell; Evaluation process is quarterly – some of these things are more opportunistic – we don’t want
the tail wagging dog - being proactive in going after something in a month - for that possibility – there is an
element to that is in line with the federal cost share – pursing funding to do something that might not be a
traditional target. At the Federal level – housing / highways that we may not be pursuing things in Dept of
Energy or some of the other agencies - there is another element of being parts of other people’s proposals that
would be managed - not sure how we do it now - how that is managed? Who manages the relationship?
Travis Storin; as it relates to the pre award side of grants - Katie Ricketts in the Finance Dept. -whether it is
structural or organic – those interactions are already taking place - grant recruitment - donor dollars can go
further with the federal dollars or is it more attractive to the granting agency because they know what we are
doing.
Nina Bodenhamer; conversations are bubbling up, peer to peer at a department level – teams know to bring
6
Katie in. I am working on that with the family foundation side - bringing the team in sooner is always to the
advantage in terms of negotiating any benefits - it is a tag team.
Mayor Troxell; one thing that Nina has done extremely well - create a community of philanthropic entities within
Fort Collins - bringing them together and sharing, talking about best practices.
Nina Bodenhamer; part of city’s role and the city’s service - non-profits that are actively out there working -
sometimes I am being called upon to help bring them strategy as that is something that they do not have
enough opportunity to develop. Building that team locally of those who are in the philanthropic space has been
a very productive by product. You have been very gracious with your time in coming to meet with us and talk
with us.
Mayor Troxell; this is something that is important for our future. We are a very philanthropic community and
we recognize that - people do want to give to the city to accomplish many things. I talked about land and real
estate but what about water rights? How could that be handled?
Nina Bodenhamer; water and minerals can be split off as a philanthropic value. I have been talking with
someone who is deciding what to do with their land - the water is the issue now – he doesn’t want to maintain
the water and he can donate the water now independent of the land / conservation easement.
Mayor Troxell; this is great and very much appreciated. Mayor’s Challenge and the EPIC program -the spirit of
trying to figure something out that works and in some cases crack some tough nuts that can be barriers to that –
that is where the real value to where you are located – the leadership and the spirit of the group to find these
kind of solutions.
Travis Storin; this committee has been flexible in iterative discussions - we are solving it as we go in some
respects.
Mayor Troxell; bring the ability to find solutions and not be too quick to say no - I appreciate the solutions
orientation.
B. Review of the 2020 Re-appropriation Ordinance to appropriate prior year reserves.
Lawrence Pollack, Budget Director
EXECUTIVE SUMMARY
The purpose of this item is to reappropriate monies in 2020 that were previously authorized by City Council for
expenditures in 2019 for various purposes. The authorized expenditures were not spent or could not be
encumbered in 2019 because:
• there was not enough time to complete bidding in 2019 and therefore, there was no known vendor or
binding contract as required to expend or encumber the monies
• the project for which the dollars were originally appropriated by Council could not be completed during
2019 and reappropriation of those dollars is necessary for completion of the project in 2020
• to carry on programs, services, and facility improvements in 2020 with unspent dollars previously
appropriated in 2019 for those specific purposes
In the above circumstances, the unexpended and/or unencumbered monies lapsed into individual fund balances
at the end of 2019 and reflect no change in Council policies.
7
Monies reappropriated for each City fund by this Ordinance are as follows:
General Fund $258,008
Keep Fort Collins Great Fund 71,097
Cultural Services Fund 171,498
Transportation CEF Fund 1,750,000
Transportation Fund 290,000
Parking Fund 30,000
Data and Communications Fund 476,715
Total $3,047,318
GENERAL DIRECTION SOUGHT AND SPECIFIC QUESTIONS TO BE ANSWERED
Does the Council Finance Committee support moving forward with the 2020 Reappropriation Ordinance on the
Consent Agenda at the March 3, 2020 Council meeting?
BACKGROUND/DISCUSSION
The Executive Team has reviewed the Reappropriation requests to ensure alignment with organization priorities
and the Budget staff reviewed the requests to verify that all met qualification requirements. The 2020
Reappropriation requests are as follows, by fund:
GENERAL FUND
Natural Areas
1) Response to the Northern Integrated Supply Project (NISP) - $24,478
UPurpose for fundsU: The purpose of this offer is to fund legal and consulting services in support of the City's
engagement with the NISP permitting process. Given the broad impact NISP will have on this community,
and the complex layers of permits required, the City has prioritized engagement with NISP to ensure it
maximizes its influence to protect City assets affected by NISP.
UReason funds not expensed in 2019U: The City expected the permitting process of NISP to progress more
quickly in 2019 than it actually did. Consistent progress and work have occurred on building collaborations
and negotiating to improve outcomes for the City within the context of NISP. However, the final permitting
phase is still not complete. Staff plans to use these funds to hire external expertise and legal counsel to
support various aspects of our engagement with NISP in 2020. Most specifically in 2020, staff will be
focused on the Adaptive Management framework and governance, integration of technical bases, and
engaging with our community and the permitting authority when the Record of Decision is released
(anticipated early 2020).
City Clerk’s Office
2) Continued Population of Ordinance Repository - $10,000
UPurpose for fundsU: OrdBank is a service available through our codifier, Municipal Code Corporation (MCC),
that allows the City to store, search, and link original ordinances from a Code section's history note,
Supplement History Table, and Code Comparative Table. It allows browsing of a permanent ordinance
repository and affords the City the opportunity to include historical ordinances in the repository. This
provides a "one stop shop" experience beneficial to public and internal customers and is particularly helpful
for research and development of future Code amendments. Appropriation of these funds will add six more
8
years (2006 through 2011) of ordinances amending City Code, Land Use Code and Traffic Code language to
be added to the repository.
UReason funds not expensed in 2019U: The City has been adding to the MCC ordinance repository since 2016
as resources allow. This is typically done near the end of the year when codification (Code amendment) is
winding down and remaining funds are identified. Due to staffing shortages in the 4th quarter of 2019, this
project was delayed.
3) Boards and Commissions Software/Enhancements - $9,000
UPurpose for fundsU: These funds, originally established as ongoing funding for boards and commissions
tracking software, will be used to make enhancements to the chosen product called Engage. Engage is a
custom-built data management platform used to track all City volunteers, and as such, does not immediately
provide all of the functionality specific to managing boards and commissions membership. Fortunately,
additional customization is readily available through Squarei Technologies, the Engage provider. Desired
customization includes additional data fields, enhanced reporting capabilities, and ability to integrate with
other tools (such as the City event calendar).
UReason funds not expensed in 2019U: The Boards and Commissions Coordinator left her position in August,
which remained vacant until December 30. Although other staff members met with the Engage developer
about desired enhancements, there was not adequate time or knowledge to adequately scope needs.
City Manager’s Office
4) Emergency Preparedness and Security - $50,000
UPurpose for fundsU: The 2019 offer provided funding to maintain the current level of service provided by the
Office of Emergency Preparedness and Security (EPS), which benefits residents, visitors and employees of
Fort Collins by providing preservation of life, safety, property conservation and environmental protection in
pre-disaster, disaster and post-disaster periods. EPS is also now responsible for coordinating and providing
internal and external services in the area security, addressing both internal and external security issues and
threats.
UReason funds not expensed in 2019U: In 2019 there was a nationwide search for a Director of Emergency
Preparedness and Security which was not completed until July 2019. During the time of the search there
was a concentrated effort by the interim Director to limit the spending of funds so the new Director could
set the strategic direction of the program. Once the Director was in place, emergency and security
programing was initiated in the fourth quarter and has continued into 2020. This request is to reappropriate
$50,000 to fund critical programming and training that is foundational to daily operations and aligns with
the strategic vision being developed.
Municipal Court
5) Court-Appointed Defense Counsel Funding Request - $18,750
UPurpose for fundsU: In 2019, as required by law, Chief Judge Lane ordered that court-appointed defense
counsel be assigned to represent certain defendants on traffic and non-traffic misdemeanor cases. Defense
counsel was appointed on approximately 330 cases in 2019, several of which are still in progress. The fee
paid by the City for such representation is billed at the rate of $75/hour up to a maximum of $1,675 per case
if the case does not go to trial or $2,480 if the case goes to trial. We are requesting that a portion of the
remaining funds from our 2019 budget be reappropriated into the same expense account for 2020.
UReason funds not expensed in 2019U: Due to the complexity of and circumstances related to these cases, the
Court has 59 outstanding cases with defense counsel appointments that started in 2019 and have not yet
reached final disposition. Therefore, the assigned defense counsel will not be submitting bills to the Court
until the case(s) have been concluded, sometime in the next few weeks/months.
9
Social Sustainability
6) Affordable Housing Programs (AHF) - $105,780
UPurpose for fundsU: The Affordable Housing Funds are allocated annually through the Competitive Process to
support critical affordable housing needs in the City of Fort Collins. Because of the cyclical nature of housing
development, funding may be either unallocated or unexpended during a program year. Pursuant to
ordinance No. 28, 1994, any amounts appropriated by Council and not expended during the fiscal year
should lapse into the Affordable Housing Reserve.
UReason funds not expensed in 2019U: $25,047 represents FY19 funding that was not allocated to an
affordable housing project. $10,434 represents unspent program support costs and $70,299 represents
funding that was previously committed to the Homebuyer Assistance Program but not yet contracted. The
HBA funding cannot be contracted until individual homeowners make application to program for specific
properties under contract. The balance of funds will be added to the Spring 2020 Competitive Process to be
allocated to an eligible affordable housing project.
Environmental Services
7) CAP Energy Policy - $40,000 (plus an additional $15,000 in Keep Fort Collins Great Fund (KFCG) totals
$55,000 for request)
UPurpose for fundsU: These resources support the development and deployment of Our Climate Future, a
combined update to the Climate Action Plan, Energy Policy and Road to Zero Waste updates, which include
an equity-centered planning process and outcomes. The funding will support consultants for the technical
aspects of the planning process ($40,000 General Fund) as well as additional community partners and plan
ambassadors to support community engagement to be coordinated by the City of Fort Collins
Communications & Public Involvement Office ($15,000 KFCG).
UReason funds not expensed in 2019U: Due to the equity-centered planning process, an additional phase was
added to the planning process (entitled "Understanding Community Priorities"). This meant the 2019 focus
was almost entirely on community engagement instead of securing the consultants needed to develop and
analyze the plan's strategies. There is an RFP out for the consultant team as well as additional recruitment
are all underway. All funds are anticipated to be expended in 2020.
KEEP FORT COLLINS GREAT FUND
Natural Areas
8) West Nile Virus - Efficacy Study- $20,000
UPurpose for fundsU: The purpose of this offer is to improve understanding of the efficacy of adult mosquito
control efforts in Fort Collins. The West Nile Virus (WNV) Technical Advisory Committee has identified a
need for field studies to show the efficacy of adult mosquito treatments. Although the WNV program
operates a robust trapping network, the timing of data collection contributes to variability in pre-treatment
and post-treatment efficacy analysis. These funds would decrease the variability and improve understanding
of the causal relation between treatment and vector index reduction.
UReason funds not expensed in 2019U: The Centers for Disease Control initiated preliminary pro-bono work
on developing a treatment efficacy study in 2019. However, due to the impacts of a rain event on the single
2019 adult mosquito treatment event, the CDC could not generate sufficient data. If the 2020 CDC budget
allows, CDC and the City will continue to work together to develop a study. If that is not possible, these
funds will fund an efficacy study performed by a consultant.
Economic Health
9) Business Retention and Engagement- $22,500
UPurpose for fundsU: These funds are intended for the Business Engagement Action Plan team development
of Customer Service Training Tools and Innovation After Hours. Piloting a new Innovation After Hours
10
focusing on workforce and highlighting local companies’ best practices, as well as innovative ways of doing
business.
UReason funds not expensed in 2019U: In 2019, City Manager's Office requested that the Customer Service
initiative be reviewed at the City-organizational level instead of only at the business stakeholder level. Funds
were not expended due to timing of onboarding a new PM. This approach allows for a holistic approach to
customer service.
Environmental Services
10) CAP Energy Policy - $15,000 (plus an additional $40,000 in General Fund totals $55,000 for request)
Please see description in #7 under General Fund.
11) Road to Zero Waste Plan Update- $13,597
UPurpose for fundsU: These resources allow the Waste Reduction and Recycling program area to update the
Road to Zero Waste (RtZW) plan in 2019/2020 as part of the Our Climate Future (OCF) planning process. OCF
is a combined update to the Climate Action Plan, Energy Policy and Road to Zero Waste updates, which
include an equity-centered planning process and outcomes. The Road to Zero Waste plan was originally
adopted by City Council in 2013 and has been a foundational, strategic document for the Environmental
Services Department, the organization, and the community. An evolution of the road map, including a
review of interim Zero Waste goals, is needed to adapt priorities and strategies to changes that have
occurred from the local level all the way to the global level.
UReason funds not expensed in 2019U: Due to the equity-centered planning process, an additional phase was
added to the planning process (entitled "Understanding Community Priorities"). This meant the 2019 focus
was almost entirely on community engagement instead of securing the consultants needed to develop and
analyze the plans' strategies. There is an RFP out for the consultant team as well as additional recruitment
are all underway. All funds are anticipated to be expended in 2020.
CULTURAL SERVICES FUND
Cultural Services
12) Lincoln Center Sustainable Performance Hall Lighting- $171,498
UPurpose for fundsU: This offer will purchase energy-efficient LED lighting for the Lincoln Center Performance
Hall. The new fixtures will reduce energy consumption by 75,000 kWh each year, reduce utility costs by
$12,000 per year, reduce the labor to replace lamps, and reduce electric greenhouse gas emissions by at
least 66 tons each year. This offer replaces the Performance Hall’s 47 house lights with LED lamps and data
distribution and dimming for those units; and integrates house lights with the emergency lighting system,
dramatically improving safety during any evacuation event. The existing system is inadequate and may not
meet current code. Many existing bulbs in the performance hall are failing and need to be replaced on a
regular basis, making this the ideal time to replace this existing system with a more cost-effective and
environmentally sustainable LED lighting system.
UReason funds not expensed in 2019U: Due to turnover in technical staff, Cultural Services did not have the
expertise to complete the project in a timely and cost-effective manner. This was communicated to
executive management in June, resulting in the decision to postpone the project until 2020.
TRANSPORATION CAPITAL EXPANSION FEE FUND
Engineering
13) Transportation Capital Expansion Fee Developer Reimbursements- $1,750,000
UPurpose for fundsU: The purpose of this offer is to appropriate Transportation Capital Expansion Fee (TCEF)
funds for the purpose of reimbursing development for the construction of eligible transportation related
improvements. The TCEF Program will frequently partner with development to construct arterial and
11
collector level roadways adjacent to the development's frontage. After eligible improvements are accepted
by the City, the TCEF program will reimburse the developer for these improvements. The TCEF Program
anticipates several large reimbursements for 2020, including improvements associated with the following
developments: The Crowne at Old Town North, Northfield, Waterfield Fourth, Mountains Edge, Taft Place,
and the Standard. This offer will ensure the TCEF Program's ability to reimburse development for eligible
improvements constructed in 2020.
UReason funds not expensed in 2019U: The TCEF Program reimburses development for eligible improvements
after they are constructed and accepted by the City. Several of the above-mentioned developments did not
meet their anticipated 2019 completion dates and are now expecting to be completed in 2020. The TCEF
Program is still responsible to reimburse these developments for eligible improvements. With these
projects being delayed, TCEF funds budgeted for 2019 need to be re-appropriated to 2020 to accommodate
the anticipated reimbursements.
TRANSPORATION FUND
Streets
14) Hickory SMP- $240,000
UPurpose for fundsU: Streets is requesting $240,000 to be re-appropriated from the 2019 SMP budget to
cover the costs of the Hickory Phase 2 project which was scheduled to be completed in 2019. Phase 2
includes overlay maintenance from the railroad tracks East to College Avenue.
UReason funds not expensed in 2019U: Hickory Street Phase 2 was postponed because Utilities needs to
complete work prior to the street maintenance work being completed. The utilities work will be completed
in 2020, and the Streets department will be able to complete the project in 2020.
Traffic
15) Neighborhood Traffic Mitigation Program - $50,000
UPurpose for fundsU: Traffic in neighborhoods can affect the quality of life for residents, bicycles, pedestrians
as well as drivers. The Neighborhood Traffic Mitigation Program is a collaborative effort between
neighborhoods and City staff to implement traffic calming options. Neighborhoods wanting to install speed
bumps are required to complete a petition before construction can take place. Traffic is requesting $50,000
to be re-appropriated from the 2019 budget to install speed bumps in several neighborhood.
UReason funds not expensed in 2019U: Prior to speed bumps being installed, neighborhood consensus with
super majority support is required. In the fall of 2019, several neighborhoods completed petitions, however
there was not enough time to schedule and install the bumps before the asphalt plants closed for the
season. The streets are Stanford Road, Wabash Street, Caribou Drive and Creekwood Drive. That
construction is now scheduled for 2020.
PARKING FUND
Parking
16) Replacement Signage for Downtown - Flexible Parking Enforcement Hours - $30,000
UPurpose for fundsU: Signage in the downtown area regarding timed public parking spaces needs updated to
be consistent with messaging and to improve aesthetics to help improve the downtown experience. Prior to
updating existing signage, Parking Services wanted to ensure that proper verbiage and messaging was
aligned with long-term needs. Existing signage indicates hours of regulation, and in some signs/areas, days
of regulation. By updating the downtown signage, it will provide the flexibility of enforcement to meet
community needs, which is also supported by the Parking Advisory Board and the Downtown Business
Association. Based on newer parking signs adjacent to the Firehouse Alley Parking Structure, on Chestnut
Street, a similar design would support downtown needs and provide the flexibility to alter/update as
necessary.
12
UReason funds not expensed in 2019U: The reason the approved budget for the downtown signage was not
spent in 2019 was because Parking Services wanted to ensure that the updated sign design in the downtown
area would meet community needs for the longer-term. Inground sensors were installed in the downtown
parking stalls to capture specific data sets, including occupancy, duration of stay, and parking space
turnover. Parking Services had intended to use the parking sensor data collected over 2019 to inform a
decision of the appropriate downtown signage. In lieu of data collection, Parking Services has begun
conversations with community partners, the Parking Advisory Board, the Downtown Business Association,
and the Downtown Development Authority. these funds will be spent in 2020.
DATA & COMMUNICATIONS FUND
Information Technology (IT)
17) Electronic Plan Review - Phase Two - $35,510
UPurpose for fundsU: The purpose of these funds is to continue the development and implementation of
phase two of the Electronic Plan Review system for the Community Development and Neighborhood
Services (CDNS) department as well as Utilities and City Partners including PFA. The funds will be utilized to
support consulting services with True Point Solutions to assist IT and CDNS with system improvements and
increased functionality to the existing Accela system, which includes configuration, scripting, report design
and development, testing, and support. These improvements are intended to help better track and manage
improved building permit processes. This phase of the project is anticipated to be completed by Q1 2020.
UReason funds not expensed in 2019U: Phase two of this project was approved by City Council on October 1,
2019 via Ordinance #112. Per the Agenda Item Summary and Ordinance, this project was slated to go
through Q1 of 2020. Therefore, it was anticipated that these funds would not be fully expensed by the end
of 2019. The City has already encumbered the majority of the funding authorized by Ord #112 with True
Point Solutions. The funds being requested are for any unanticipated ancillary support costs and/or work
order items that may occur through scope changes as the project progresses.
18) Electronic Record Search - $103,000
UPurpose for fundsU: This request is to fund the purchase and implementation of an Electronic Record Search
solution that will enable organizations across the City to collaborate effectively and efficiently when Open
Records and other searches are requested. Open records requests are received throughout the City
organization and at times require exhaustive searches of the records of many different departments in a
strictly limited period of time. The primary departments that take the lead in coordinating and assisting
with records searches for requests that touch on multiple departments are the City Clerk's Office, City
Attorney's Office and Information Technology. It is anticipated that this system will assist departments
throughout the City in complying with the statutory mandate to provide public records upon request by
members of the public. This item was a priority at the time it was initially funded and continues to be critical
to addressing an existing gap in the City's systems for identifying and producing requested records.
UReason funds not expensed in 2019U: The original idea was to bring in a completely new tool to meet
identified electronic search functionality goals and that run concurrently with the Document Management
replacement system. Initially, a tool set within Office 365 was identified as a potential solution, however
after further analysis, the solution would have required additional resources and process rewrite beyond the
scope of the original intent. Shortly after this discovery, the project stalled due to IT bandwidth capacity
issues for supporting higher priority, large scale projects. Recently in 2019, in light of staffing changes and
further dialogue, the primary departments involved in this project intentionally delayed pursuing a
procurement until early 2020 so that the future Chief Privacy Officer would have an opportunity to provide
additional input in identifying the proper tool needed based on the Officer's recommended records
management processes.
13
19) Event Log and Performance Monitoring Tool- $139,300
UPurpose for fundsU: This request would fund the procurement of an Event Log and Performance Monitoring
Tool to quickly evaluate the City's IT systems to pinpoint operational inefficiencies and help detect cyber
threats that can inhibit day-to-day City operations. The tool will also enhance the City's ability to monitor
and provide a proactive response to infrastructure operations and incident resolution, quickly isolate and
resolve issues, and avoid any potential downtime. Funds in this request will also support the need for
professional services to assist in the implementation of this solution.
UReason funds not expensed in 2019U: This project was slated to begin in the 3rd quarter of 2019. However,
the Data Management team's resources were consumed with higher level, priority projects supporting
Connexion and Light & Power, and there wasn't available bandwidth to begin procuring this tool in 2019.
These delays were reported in the quarterly Safe Strategy Map review sessions. The team has had
opportunity for continued analysis of potential solutions and is targeting Q2 of 2020 to procure this tool
with full implementation by Fall of 2020.
20) Network Switch Replacements- $178,615
UPurpose for fundsU: The funds for this reappropriation request will fund the procurement and professional
services needed to replace two core switches along with two other switches that are reaching their end-of-
life cycle in July 2020. This infrastructure equipment is critical in nature in that it connects to the eight
individual fiber rings that supports the City's entire network system. The professional services needed for
this replacement includes the discovery, configuration, implementation, and testing of the cores as this is
projected to be a three-month replacement project.
UReason funds not expensed in 2019U: In mid-2019, Information Technology staff began the evaluation of
replacing the core switches one year before lifecycle expiration. This included multiple discussions with
professional services and presentations on potential solutions to replace the switches. During this same
timeframe, a transition of City Network responsibilities from IT to the Connexion team was being identified
and determined. The timing of the final transition did not leave adequate time for Connexion to evaluate
IT's solution proposal to assess if the proposal would fit within Connexion's network architecture plans. In
light of the timing of the lifecycle deadline, critical nature of these switches, and other competing priorities,
professional services funding needs to be carried into 2020 to complete the replacement of these switches.
21) SharePoint Online - $20,290
UPurpose for fundsU: Funding this offer will enable the continuation of the planning, migration and
implementation of the SharePoint Online collaboration software included with the Office 365 plan which
includes Outlook, Word, Excel, PowerPoint, Publisher, OneNote, OneDrive, MS Teams, and SharePoint
Online. Several of the Microsoft products utilize the SharePoint Online platform for collaboration,
task/project management and storage, and in some cases, cannot function without SharePoint. This tool
will enhance and standardize processes to increase efficiency and reduce costs as expected by City Leaders,
staff, and residents.
UReason funds not expensed in 2019U: Through 2019, the internal team responsible for this project engaged in
the planning foundations, contracted with a vendor, analyzed the infrastructure to help develop standards
and templates, priority sites for migration were identified, and the team deployed MS Teams with
accompanying training currently ongoing into 2020. However, the project experienced intermittent delays
over the course of the year due to higher priority project commitments by team members. These delays
were reported in the quarterly HPG Strategy Map review sessions. Despite these delays, particular elements
and milestones of this project were accomplished. At present, a test migration is scheduled for mid-
February and the project team is targeting Q2 of 2020 for full deployment of the SharePoint
implementation.
14
FINANCIAL/ECONOMIC IMPACTS
This Ordinance increases 2020 appropriations by $3,047,318. A total of $258,008 is requested for
reappropriation in the General Fund, $71,097 from the Keep Fort Collins Great Fund, and $2,718,213 is
requested from various other City funds. Of those other funds, the majority is $1,750,000 in the Transportation
Capital Expansion Fee Fund. Reappropriation requests represent amounts budgeted in 2019 that could not be
encumbered at year-end. The appropriations are from 2019 prior year reserves.
Discussion / Next Steps;
Darin Atteberry; the additional oversight has resulted in the downward curve
Ross Cunniff; some are not in our control
Darin asked Lawrence to go over the $1.7 to make sure everyone understands.
Lawrence Pollack; Development Reimbursements, where they have paid in for part of the project, specifically for
what we used to refer to as ‘Street Oversizing’. When projects are completed, we owe funds back. Historically
we have had larger capital budgets for these to be included. There was intentionality in reducing these budgets
especially in the 2019-2020 budget. There is not enough in the prior appropriations to allow capacity to do this.
We have asked Engineering to go back and verify the ones they think will be requested his year. Going forward,
you will not see this again as this will be incorporated into the non-lapsing aspect of capital projects. Which in
15
hindsight we should have been doing for the last 10 years. This will be a process improvement. This will be
done all at once with the original appropriation.
Travis Storin; size driven by 5 large developments and by what happened in a particular construction season.
Mayor Troxell; this came up in our Election Code Committee meeting. The City Clerk mentioned something that
they are doing with the census and redistricting - would have to be in the next budget cycle. Do you have any
insight?
Carrie Daggett; this has to do with the contract process for funding to hire a consultant to help with the
redistricting process. The Clerk’s office reported that they are not going to be bringing the consultant on board
as early as they thought due to the timing of the census data being available.
Ross Cunniff; I do like Council transparency on things we are not going to see in a particular cycle.
Darin Atteberry; I look at the budget document as a promise. If we are not going to meet that promise - we
need to tell you in advance. We don’t deviate from that process unless we get agreement to do so. The
Quarterly Service Area Reviews and Strategy Map Reviews have been deeply integrated into our processes are
making us better. I remember a day when Council would fund an item and if it wasn’t part of a 1:1 conversation
with a Service Area Director, I didn’t have visibility into the status of these except for if they were not going to
get it done in time. Now there is so much visibility and transparency into our spending and if we are on track to
fulfill these promises. I am much more confident in the fact that we are accomplishing Council’s priorities and
agenda. A lot of that goes toward Council pushing more accountability and Lawrence who has been leading this
for years. It is tight - not perfect, but tight.
GENERAL DIRECTION SOUGHT AND SPECIFIC QUESTIONS TO BE ANSWERED
Does the Council Finance Committee support moving forward with the 2020 Re-appropriation Ordinance on the
Consent Agenda at the March 3, 2020 Council meeting?
Result:
Mayor Troxell, Ross Cunniff and Ken Summers are all supportive of this going forward on the Consent Agenda at
the March 3P
rd
P Council meeting.
Meeting adjourned at 11:01 am
COUNCIL FINANCE COMMITTEE
AGENDA ITEM SUMMARY
Staff: Nina Bodenhamer
Date: March 16, 2020
SUBJECT FOR DISCUSSION
• Digital Equity: A Blueprint for Income-Qualified Internet Rate
EXECUTIVE SUMMARY
The City of Fort Collins is committed to increasing digital equity and reducing the digital divide.
Informed by community poverty benchmarks, today’s presentation is a review of the blueprint
for Digital Equity’s overall program structure, suggested income eligibility, and compatibility
with exciting income-qualified City programs.
GENERAL DIRECTION SOUGHT AND SPECIFIC QUESTIONS TO BE ANSWERED
• Objective: Informational and Update Only
• Desired Outcome: Council input regarding Digital Equity’s overall program elements and
suggested income eligibility.
BACKGROUND/DISCUSSION
An income-qualified rate to increase the equitable access to the internet and reduce the digital
divide is a Council and Leadership priority. Recommendations for a Digital Equity program
includes three (3) core components:
1. Expanded Digital Access to Income-Qualified Households through:
• Reliable, affordable access at high quality and high speeds.
2. Strengthened Digital Inclusion through:
• Promotion and enrollment through the development of user-informed materials.
• Outreach and enrollment via trusted community partners.
3. Coordination with Existing City Income Qualified Programs through:
• Reduced enrollment barriers and complications for clients.
• Leveraged operational efficiencies and economies.
The funding source for Digital Equity is 6% of Connexion revenue paid to the General Fund as
payment in lieu of taxes (PILOT) which drives market parity. Digital Equity launch and reach
will be metered by Connexion’s build out and revenue.
ATTACHMENTS
COUNCIL FINANCE COMMITTEE
MARCH 16, 2020
Today’s Purpose: Review the overall structure and program elements of
the City’s Digital Equity program.
WHEN WE TALK ABOUT DIGITAL EQUITY
The City of Fort Collins is committed to increasing equitable access
to the internet and reducing the digital divide.
HOW IS POVERTY MEASURED?
INCOME BENCHMARKS
I-Q LANDSCAPE
HARDWARE & INCLUSION
Most low-and moderate-income
families have some form of Internet.
But are UNDER CONNECTED.
Inconsistent connectivity: 1/5
have had Internet cut off in the
last year due to lack of payment.
1/3 of families below the FPL have
mobile-only access; And, 3 in 10
report hitting data limits on their
plan in the past year.
Low-and moderate-income families
use the Internet for a broad range of
purposes, but MOBILE-ONLY families
are:
Less likely to use online banking
or bill-paying.
Less likely to apply for jobs or
services online.
Less likely to get news or follow
local events online.
Opportunities for All? Technology in lower-income families. Rideout & Katz, 2018
ALTERNATIVE IQ INTERNET OPTIONS
COMCAST ESSENTIALS, $9.95/mo. for up to 15 Mbps
Income eligibility and verification: SNAP, MEDICAID, LEAP, Public Housing
LIFELINE, FCC, $9.25 toward monthly bill
Income Eligibility: 135% of the FPL
A federal program that lowers the monthly cost of phone and internet.
Many providers, such as CenturyLink, Verizon and AT&T, utilize Lifeline as their
platform to offer reduced rate Internet.
ACCESS from AT&T, $10 per month/10 Mbps
Income Eligibility: SNAP
Includes a Wi-Fi–capable modem or gateway
National surveys project 5% -7% of low to moderate-income families have
ever signed up for discounted Internet service.
Federal Reporting: 6% utilization for households at 185% FPL.
DIGITAL EQUITY PROGRAM STRUCTURE
COSTS OF CORE SERVICES
HOW MANY CAN WE SERVE?
OPERATIONAL NEXT STEPS
DISCUSSION
Data, Sources & References
American Community Survey, Census Bureau
City of Fort Collins Performance and Program Evaluation
City of Fort Collins Income-Qualified Working Group
Community Expertise & Passion
Opportunities for All? Technology in lower-income families.
Rideout & Katz, 2018; Funded by Bill & Melinda Gates,
fielded research by Stanford Social Innovation Review
Pew Research Center, Internet & Technology
With gratitude, Nina
COUNCIL FINANCE COMMITTEE
AGENDA ITEM SUMMARY
Staff: Victoria Shaw, Noelle Currell, Sue Beck-Ferkiss
Date: March 16, 2020
SUBJECT FOR DISCUSSION: Affordable Housing Fee Waiver Process
EXECUTIVE SUMMARY
The purpose of this item is to seek feedback on a proposed change to the City’s process for
waiving eligible fees to support Affordable Housing. Fee waivers are available to subsidize the
development of units which serve families that earn up to 30% of Area Median Income (AMI).
The proposed change would be financially neutral to the City and not alter which units are
eligible to receive a fee waiver but would yield staff time savings and benefit prospective
applicants.
GENERAL DIRECTION SOUGHT AND SPECIFIC QUESTIONS TO BE ANSWERED
1. Is Council Finance supportive of the proposed new administrative structure for
Affordable Housing Fee Subsidy?
BACKGROUND/DISCUSSION
The fee waiver program offered by the City of Fort Collins is currently the City’s only
mechanism to specifically incentivize units which serve households that earn 30% or less of
AMI. These units are the hardest to obtain since they have the largest cost gap. Most mechanisms
to incentivize Affordable Housing are available for units that serve up to 80% of AMI. The table
below illustrates the 2019 AMI thresholds for the Fort Collins – Loveland MSA.
Number of
People/Household Median (100%) 38T80% AMI38T 60% AMI 50% AMI 30% AMI
1 $61,100 38T$48,85038T $36,660 $30,550 $18,350
2 $69,800 38T$55,80038T $41,880 $34,900 $20,950
3 $78,500 38T$62,80038T $47,100 $39,250 $23,550
4 $87,200 38T$69,75038T $52,320 $43,600 $26,150
5 $94,200 38T$75,35038T $56,520 $47,100 $28,250
6 $101,200 38T$80,95038T $60,720 $50,600 $30,350
Fee waivers are currently calculated using the sum of eligible fees, prorated by the percent of the
development’s total units which are restricted to serve ≤30% AMI. Fees historically considered
eligible for waiver include:
• City Development Review Fees
• Building Permit Fees
• City Capital Expansion Fees (Fire, Police, Streets, General Government and Parks)
Other fees collected by the City that are not considered eligible for waivers include fees which
are collected on behalf of other agencies (such as Larimer County, Poudre Fire Authority and
Poudre School District) and plant investment fees for utilities. The detailed breakdown of total
fees and waived fees for a recent project can be found in Attachment 2
Since 2015, the City has issued fee waivers on 5 Affordable Housing developments. Those
projects yielded a total of 169 units serving the ≤30% AMI level. After issuing recent fee
waivers, City staff from Sustainability and Planning, Development, & Transportation Service
Areas mapped out the end-to-end process and identified multiple inefficiencies.
Staff between the Service Areas collaborated to identify opportunities to simplify the process.
The proposed new process would include a flat amount per qualifying unit. This amount would
be deposited into a trust account owned by the City and used by the developer to pay any
balances owed to the City. By providing an offset to fees in this manner, all fees are paid and
therefore there is no need to reimburse City departments with backfill funding.
There is a large benefit to the developer in that they would know early in the project the exact
amount of fee offset they will receive (currently this must be calculated and is not solidified until
later in the project). In addition, there is a benefit to developer cash flows as they would not have
to bring money to the project first and wait for reimbursement. For City Staff there would be no
need to do iterative calculations on waiver amounts nor create a different financial model for
each development. The processing time involved is also greatly reduced by using the trust
account method.
Staff recommends the fee offset amount be set to $13,500 per qualifying unit in a new
development project and $5,500 per qualifying unit in a re-development project. These amounts
are based on analysis which calculated what would have been issued to previous projects if they
were constructed under the updated 2020 fee structure. The results of that analysis are included
in the below table. Fixing the amount of the fee offset per unit would be more predictable for the
City and for prospective developers.
While any Affordable Housing units that serve ≤30% AMI currently qualify for a fee waiver, the
individual requests are evaluated, approved, and appropriated separately by the City Council.
Council can then provide direction on which funding sources to use for the appropriation. This
would continue under the proposed fee offset process.
ATTACHMENTS
1. Staff Presentation
2. Fee Schedule for Village on Horsetooth
Project Year Fee
Waivers
# of 30%
AMI Units
Waiver per
Qualifying Unit
Proforma 2020
Waiver Amount
Proforma Waiver
per Qualifying Unit
Redtail Ponds 2015 274,762$ 40 6,869$ 512,300$ 12,808$
Village on Redwood 2017 100,708$ 13 7,747$ 185,842$ 14,296$
Oakridge Crossing 2018 90,923$ 13 $ 6,994 172,882$ 13,299$
Village on Horsetooth 2018 352,319$ 43 8,193$ 595,737$ 13,854$
Mason Place 2020 326,081$ 60 5,435$ 317,572$ 5,293$
TOTAL 1,144,793$ 169 6,774$ 1,784,333$ 10,558$
Actual Proforma Based on 2020 Fee Updates
1
Affordable Housing Fee Credit Proposed Changes
Victoria Shaw, Noelle Currell, Sue Beck-Ferkiss
Council Finance Direction Sought
•Is Council Finance supportive of the proposed new administrative
structure for Affordable Housing Fee Subsidy?
2
Incentivizing 30% AMI Units
Resource Serves up
to 80% AMI
Serves up
to 30% AMI
Requires Permanent
Affordability
Requires
Ownership
Affordable Housing Capital Fund X
Competitive Process Grant X
Fee Waivers X
Private Activity Bond X
Development Incentives
(Density Bonus, Priority Processing,
Fee Delay)
X
Land Bank Program X X
Land Trust Partnership X X X
Special Taxing District X
3
Current Fee Waivers
4
Development Review
Building Permit
Historically Eligible for Fee Waiver
o Fees collected on behalf of other agencies (County, PSD, other utilities)
o Utilities Plant Investment Fees
Not Waived
Apply % of total units that serve up to 30% AMI against total eligible fees
Waiver Amount Calculation
Capital Expansion (e.g. Fire, Parks, Streets)
Current Fee Waiver Calculation
5
Apply % of total units that serve up to 30% AMI against total eligible fees
•Hypothetical Scenario:
•25 Unit Development; 5 Units serving up to 30% AMI
•Total Fees of $500K; Waivable Fees of $250K
•Waiver approval and appropriation require Council approval
•$50K waiver amount may be backfilled within the City
Qualifying
Units Total Units % Development
≤30% AMI
5 25 20%
Total Fees Waivable
Fees
% Development
≤30% AMI
Waiver
Amount
$500K $250K 20%$50K
Past Fee Waivers & Backfill
•Past 5 Affordable Housing projects with fee waivers:
•28% of Affordable Housing Capital Fund dollars have been expensed
on waivers to date
6
Project Total Waivers % Backfilled Total Backfill General Fund Transportation Fund AHCF
Redtail Ponds 274,762$ 85%233,781$ 274,199$ -$ -$
Village on Redwood 100,708$ 0%-$ -$ -$ -$
Oakridge Crossing 90,923$ 100%90,923$ -$ -$ 90,923$
Village on Horsetooth 352,319$ 83%292,345$ 179,845$ -$ 112,500$
Mason Place 326,081$ 90%294,054$ 190,554$ 3,500$ 100,000$
Total 1,144,793$ 80%911,103$ 644,598$ 3,500$ 303,423$
Backfill SourcesBackfill of Waivers
Proposed Administrative Structure
Proposed Structure
•Grant a lump amount per each unit that serves up to 30% AMI
•Deposit amount into trust account held with City for when permits are
issued
•Developer may use funds from trust account to pay any balances
due to City
Other Considerations
•Amount of per unit subsidy to be updated every 4 years with the fee
update process and tied to historically waivable fees
•Would require code updates to implement
7
Proposed Fee Offset Amount
•To date, waivers for new development construction ranged $7-8K/unit
•2020 Development Review Fee updates coupled with new Capital Expansion
Fees will increase eligible fees
•Staff recommends $13,500 per qualifying new development unit & $5,500 per
qualifying re-development unit
•Recommendations intended to be financially neutral
8
Project Year Fee
Waivers
# of 30%
AMI Units
Waiver per
Qualifying Unit
Proforma 2020
Waiver Amount
Proforma Waiver
per Qualifying Unit
Redtail Ponds 2015 274,762$ 40 6,869$ 512,300$ 12,808$
Village on Redwood 2017 100,708$ 13 7,747$ 185,842$ 14,296$
Oakridge Crossing 2018 90,923$ 13 $ 6,994 172,882$ 13,299$
Village on Horsetooth 2018 352,319$ 43 8,193$ 595,737$ 13,854$
Mason Place 2020 326,081$ 60 5,435$ 317,572$ 5,293$
TOTAL 1,144,793$ 169 6,774$ 1,784,333$ 10,558$
Actual Proforma Based on 2020 Fee Updates
Win-Win
9
City Benefits
•Reduced City staff time
•City holds its own cash in trust account unit permits are issued
Developer Benefits
•Incentive amount is known at the beginning of the process
•Developer does not have to float cash and wait for reimbursement
Council Finance Direction Sought
10
•Is Council Finance supportive of the proposed new administrative
structure for Affordable Housing Fee Subsidy?
ATTACHMENT 2Village on HorsetoothSummary of City of Fort Collins Bills & PaymentsTotal ‐ All 10 BuildingsTypeFee Description Fee Amount Fee Eligible for Waiver % of Qualifying Units Total WaiverBuilding Fees Building Permit Fee w/Subs 79,826$ 79,826$ 45% 35,922$ Capital Expansion Fees Fire Captial Exp (Res) 38,114$ 38,114$ 45% 17,151$ Capital Expansion Fees General Govt. Capt. Exp. (Res) 46,328$ 46,328$ 45% 20,848$ Capital Expansion Fees Parkland: Community 147,056$ 147,056$ 45% 66,175$ Capital Expansion Fees Parkland: Neighborhood 173,368$ 173,368$ 45% 78,016$ Capital Expansion Fees Plan Check Fee 38,435$ 38,435$ 45% 17,296$ Capital Expansion Fees Street Oversizing Fee: Res‐Multi 225,784$ 225,784$ 45% 101,603$ Development Review Fees Police Capital Exp. (Res) 19,004$ 19,004$ 45% 8,552$ Storm Drainage DR Fee Sewer Dev. Review 4,786$ 4,786$ 45% 2,154$ Storm Drainage DR Fee Stormwater Dev. Review 5,442$ 5,442$ 45% 2,449$ Storm Drainage DR Fee Water Dev. Review 4,786$ 4,786$ 45% 2,154$ Building Fees Poudre School District (5 or more Units) 88,920$ ‐$ 45% ‐$ Capital Expansion Fees Larmier County Reg. Road (Res) 21,944$ ‐$ 45% ‐$ Building Fees Sewer PIF 275,330$ ‐$ 45% ‐$ Building Fees Stormwater PIF 22,765$ ‐$ 45% ‐$ Building Fees Water Meter6,943$ ‐$ 45% ‐$ Building Fees Water PIF 177,234$ ‐$ 45% ‐$ Building Fees Water Right 373,802$ ‐$ 45% ‐$ Total ‐ All 10 Buildings1,749,865$ 782,928$ 45% 352,319$