Loading...
HomeMy WebLinkAboutWORK SESSION SUMMARY-03/08/2022-Work Session (2) Utilities electric · stormwater · wastewater · water 222 Laporte Ave. PO Box 580 Fort Collins, CO 80522-0580 970.212.2900 V/TDD: 711 utilities@fcgov.com fcgov.com/utilities M E M O R A N D U M DATE: March 16, 2022 TO: Mayor and City Council Members FROM: Theresa Connor, Interim Utilities Deputy Director Matt Fater, Interim Utilities Deputy Director THROUGH: Kelly DiMartino, Interim City Manager Kendall Minor, Utilities Executive Director RE: March 8, 2022, Work Session Overview - Stormwater Capital Improvement Program Staff presented an overview of the Stormwater Capital Improvement Program (CIP) to City Council members based upon feedback received from the December 14, 2021, Stormwater Utility Overview work session. The discussion focused on a deeper dive into four topics including incorporation of water quality improvements into the Stormwater CIP; the overall cost of the CIP; the emphasis on improvements in the downtown area that are part of the Downtown Stormwater Improvement Plan (DSIP); and the overall timeline for the Stream Rehabilitation Program. Topics of discussion included: x To reduce overall costs of the program, the City would need to consider changing the design criteria of the flood protection program to a lower design storm. x To accelerate the stream rehabilitation program, the City could consolidate the current project list of 55 stream reaches into 22 larger projects that would cost between $3M and $5M. A larger project could be submitted each BFO cycle. x To provide more balance between flood protection, stream rehabilitation, and water quality improvements as well as manage rates in the upcoming 10 year Capital Improvement Program, the City could extend the buildout period of the DSIP. This would allow more capital resources to be applied to the other programs. Three scenarios were presented for consideration: 1. Stay the Course – completing DSIP in 12-15 years, allocating $1.2M a year to stream rehabilitation and incorporating water quality improvements into the other projects. 2. Extend the buildout timeframe of DSIP – extend the timeframe of DSIP so that some debt can be paid off prior to taking on other projects, accelerate the stream rehabilitation program through one consolidated project per BFO cycle and accelerate individual water quality projects in the CIP. This may result in less rate increases as well. This option was recommended by staff.             3. Consider changing the design criteria for the flood protection program – this would manage the overall cost of the stormwater CIP and allow further acceleration of the stream rehabilitation and water quality programs. Five members of City Council indicated support for Scenario 2 above. Council did request a memo with information regarding cost and schedule of a project to analyze modifying the 10- year design storm for the areas of the city that need to be retrofitted. Steps to follow up from this work session include: 1. Providing the requested memo on using the 10-year design storm. Staff will engage partners to determine cost and schedule and send the memo in the next month. This will basically be a high-level master plan effort which is why it takes some effort to complete. The scope will include: x Hydraulic and hydrologic modeling of 10-year storm x Limited surveying x Damage assessment x Selection of alternatives to address damages. x Cost estimating x Hydraulic and hydrologic modeling of 100 year storm with improvements to determine residual risk and floodplain. 2. Revise the CIP to reflect the conditions in Scenario 2. This will be completed this summer after BFO offers are submitted. 3. Bring forward a consolidated stream rehabilitation project in the 2023/2024 budget. 4. Bring forward the construction of the Oak Street Stormwater Project in the 2023/2024 budget. Staff appreciates Council feedback and direction. CC: Lance Smith, Utilities Strategic Financial Manager Ken Sampley, Director of Stormwater Engineering and Development Review