HomeMy WebLinkAboutCOUNCIL - AGENDA ITEM - 02/15/2022 - STRAUSS LAKES METRO DISTRICT CONCEPTUAL REVIEW Agenda Item 25
Item # 25 Page 1
AGENDA ITEM SUMMARY February 15, 2022
City Council
STAFF
Clay Frickey, Redevelopment Program Manager
John Duval, Legal
SUBJECT
Strauss Lakes Metro District Conceptual Review.
EXECUTIVE SUMMARY
WITHDRAWN
The purpose of this item is to conduct a Conceptual Review for the proposed Strauss Lakes Metropolitan
District (Strauss Lakes District). Metropolitan Districts (Metro Districts) must provide public benefits in a variety
of categories to gain approval. Staff evaluates the Metro District’s proposed public benefits with a scorecard.
To provide early direction to applicants, the City’s Metro District Policy requires a Conceptual Review meeting
with Council. This Conceptual Review meeting allows for Council and members of the public to provide
feedback and direction on the Metro District and the proposed public benefits required by the Metro District
Policy.
Also, as stated in the Metro District Policy, this meeting provides the Council with the opportunity to consider a
motion at the conclusion of the meeting to express its opinion whether the application for the service plan of
the Strauss Lakes District, as proposed, should be brought forward to Council for its formal consideration. That
motion may also include any recommendations Council may have concerning what should or should not be
included in the applicant’s formal application. However, the Policy also clearly states that such motion adopted
and any comments, suggestions or recommendations made by any Councilmember concernin g the proposal,
do not bind or otherwise obligate the Council or any Councilmember to any decision in the subsequent formal
application. Sample motions are provided.
Strauss Lakes is a proposed mixed-use development at the northeast corner of Horsetooth Road and Ziegler
Road. Strauss Lakes submitted a Letter of Interest outlining the proposed public benefits in conformance with
the Metro District Policy. Staff finds the applicant’s proposed public benefits to generally conform with the
requirements of the Metro District Policy with one exception. The current proposal for providing affordable
housing would not meet the requirements of the Metro District Policy. Furthermore, many elements of the
proposed public benefits will require more analysis by staff to confirm they meet the requirements of the Metro
District Policy. Staff will provide a final assessment and recommendation on the Strauss Lakes District upon
formal submittal.
STAFF RECOMMENDATION
Staff recommends Council consider adopting a motion addressing whether Council believes the applicant’s
application for Council’s consideration of the service plan for the Strauss Lakes Metro District, as proposed,
should proceed to Council for formal consideration. Based on the information provided in and with this agenda
item summary, the applicant's proposed Metro District appears to satisfy the requirements of the City’s Metro
District Policy apart from the affordable housing element. Therefore, the Council should also consider whether
it wishes to include in its motion any recommendations Council may have for how the applicant might satisfy
this element in its formal application.
Agenda Item 25
Item # 25 Page 2
Sample Motions:
• I move that the City Council recommend to the applicant that it not proceed with its formal application
for Council’s consideration of the proposed service plan for the Strauss Lakes Metro District unless
that application includes the following: [Describe recommended modifications or additions to the
formal application].
• I move that the City Council recommend to the applicant that it proceed with its formal application for
Council’s consideration of its proposed service plan for the Strauss Lakes Metro District.
BACKGROUND / DISCUSSION
Policy Context
Council adopted Resolution 2008-069 in July 2008 to establish policies and guidelines related to forming and
reviewing Metro Districts (2008 Policy). Metro Districts are a special district providing at least two types of
governmental services. Typically, developers form a Metro District to facilitate building, fi nancing, and
maintaining infrastructure. A Metro District service plan is the document that authorizes the establishment of a
Metro District and grants to it the powers it may have to issue debt, impose taxes and fees, construct public
improvements and provide certain governmental services (Service Plan). The Service Plan for a Metro District
to be organized within the City must first be approved by Council. The 2008 Policy provided the City would not
consider Service Plans that proposed Metro Districts to serve only residential development, but instead would
only consider Service Plans for “predominately commercial” developments, meaning developments having an
estimated assessed value for “non-residential uses” of no less than 90% of the entire development.
Since adopting the 2008 Policy, Council has adopted a series of amendments to this policy in 2018, 2019, and
2021. With Resolution 2018-079, Council permitted consideration of Metro Districts that were predominately
residential. Residential Metro Districts must provide public benefits that are secured through Public Benefits
Agreements. Resolution 2018-079 also contained Model Service Plans that served as templates for new Metro
Districts. Resolution 2019-016 amended the Metro District Policy to refine the Council approval process and
add workforce and attainable housing as public benefits.
Council most recently adopted Resolution 2021-045 approving an amended Metro District Policy on April 20,
2021. This new Policy applies to Metro Districts where more than 10% of the estimated assessed value of the
project is residential. To gain approval, applicants must score a certain number of points on a scorecard.
Applications gain points by providing public benefits in a number of categories. As part of this a pproval
process, the new Metro District Policy requires a pre -application meeting with Council called a “Conceptual
Review”. This Conceptual Review meeting allows Council and members of the public the opportunity to
provide direction and feedback on the Metro District’s proposed public benefits prior to submitting a formal
application.
Process Overview
The process for reviewing and considering approval of Metro Districts proceeds as follows:
1. Applicant submits Letter of Interest
2. Staff reviews Letter of Interest and provides response
3. Council Conceptual Review, where Council considers and discusses the public benefits proposed in the
Letter of Interest
4. Applicant submits formal application for Metro District along with Service Plan
5. Staff reviews application and Service Plan
6. Council Finance Committee reviews submittal and provides feedback to applicant
7. Council considers application and Service Plan at a public hearing
Agenda Item 25
Item # 25 Page 3
Staff received the Letter of Interest from the applicant on December 28, 2021. After reviewing the Letter of
Interest, the applicant team and staff review team met to discuss staff’s initial comments on January 11, 2022.
Staff compiled their comments and submitted a formal response to the applicant team on Januar y 14, 2022.
The applicant amended their Letter of Interest based on staff’s feedback and submitted a revised Letter of
Interest on January 26, 2022.
Development Overview
Strauss Lakes is a proposed mixed-use development at the northeast corner of Horsetooth Road and Ziegler
Road. As the applicant states in the Letter of Interest:
Cottonwood’s proposed development plans for the Property contemplate a mixed-use development
with a variety of housing options. While Cottonwood is envisioning a mix of hi gh-quality single-family,
and multi-family residences, it also anticipates that these options will be offered with a diversity of price
points accommodating both market rate attainable housing, as well as affordable housing, all of which
will be made economically feasible through a metropolitan district financing structure.
In addition to the housing outlined above, the mixed-use development proposed would support a
diverse array of business and commercial utilizations, including neighborhood support ser vice uses.
Because Cottonwood’s goal for the development is to create a community where employment and
housing options are harmoniously integrated, these business and commercial uses would be
intentionally developed to complement the surrounding housing options.
Letter of Interest
The applicant’s Letter of Interest contains all of the necessary sections in conformance with the Metro District
Policy. The Letter of Interest indicates that the Strauss Lakes District anticipates meeting the requirements o f
the evaluation scorecard in the following ways:
Category Min.
Points
Required
Points
Expected
Proposed Public Benefits
Housing 5 5 · 2(A) - 10% affordable rental housing - 2 points ·
2(B) - Does not utilize competitive process funding
- 3 points
Energy Conservation and
Renewables
10 10-11 · 1(A) - DOE Zero Energy Ready (ZER) Home
Performance Path Certified with balanced
mechanical whole dwelling ventilation - 4 points ·
2(C) - Air-tight homes with balanced · whole
dwelling ventilation with heat or energy recovery -
1 point · 2(E) - Installing qualified connected
thermostats - 2-3 points · 3(A) - Installing solar to
meet 50-75% of overall energy need - 2-3 points
Indoor Water Conservation 3 3.5 · 4(A) - WaterSense fixtures performing above
Code - 2 points · 4(C) - Sub-metering - 1.5 points
Outdoor Water
Conservation
7 7 · 5(A) - Efficient residential irrigation systems - 2
points · 5(B) - Water efficient landscaping for
residential front yards - 2 points · 5(C) - Separate
drip systems for trees within parkways and
medians - 2 points · 5(D) - Common area water
use performing above Code - 1 point
Neighborhood Livability 5 7 · 1(A) - Off-site trail connections - 1 point · 1(C) -
Level 3 EV charging stations - 1 point · 1(D) -
Trail connection provided to a school - 1 point ·
Agenda Item 25
Item # 25 Page 4
2(B) - Vertical mixed-use buildings - 2 points ·
2(C) - Community gathering spaces - 1 point ·
3(A) - Access to parks & open spaces - 1 point
Staff Comments
The applicant’s proposed means of accumulating points meets the requirements of the evaluation system in
concept with one exception. Section 2(A) under Housing requires 10% of the total units within the development
to be rental units that meet the City’s definition of affordable housing. The Letter of Interest indicates that only
10% of the total units within the CSU portion of the project will be rental units that meet the City’s definition of
affordable housing. As presented, the proposed Strauss Lakes District would not meet the minimum points
threshold for Housing. As such, staff would not be able to recommend approval of the Strauss Lakes District if
presented in its current form.
All methods of scoring points proposed for the Strauss Lakes District will be subject to review by staff upon
formal submittal. Some areas of note include:
• To achieve the points for providing solar energy to the development, Strauss Lakes will have to achieve
the energy generation targets for the development, not just certain phases of the development.
• Staff will require more detail on the proposed air source heat pump water heaters to determine if Strauss
Lakes will score points.
• As the project moves forward, staff will want to understand the size, amenities and qualitative aspects of
each park and open space to ensure each qualifies as a park or open space. Additionally, staff will
evaluate access through an equity lens to ensure all residents have equal access to parks and open space
through an interconnected system of sidewalks, trails, pedestrian bridges, and bike lanes.
ATTACHMENTS
1. Evaluation Table (PDF)
2. Letter of Interest Resubmittal, January 26, 2021 (PDF)
3. Letter of Interest Response (PDF)
4. Powerpoint Presentation (PDF)
ATTACHMENT 1
William P. Ankele, Jr.
Jennifer Gruber Tanaka
Clint C. Waldron
Kristin Bowers Tompkins
Robert G. Rogers
Blair M. Dickhoner
George M. Rowley
Of Counsel:
Kristen D. Bear
K. Sean Allen
Trisha K. Harris
Zachary P. White
Heather L. Hartung
Megan J. Murphy
Eve M. G. Velasco
Audrey G. Johnson
Carey S. Smith V
Erin K. Stutz
Jon L. Wagner
1
January 26, 2021
Economic Health Office
City of Fort Collins
Attention: Clary Frickey, Manager
Via Email: cfrickey@fcgov.com
LETTER OF INTEREST
Strauss Lakes Metropolitan Districts
Dear Mr. Frickey:
Our firm represents Cottonwood Land and Farms, LLC (“Cottonwood”) with respect to
its interest in organizing the proposed Strauss Lakes Metropolitan Districts (the “Districts”). As
required under Section 3.B. of the City of Fort Collins’s (the “City’s”) Policy for Reviewing
Service Plans for Metropolitan Districts (the “Policy”), Cottonwood submits this Letter of Interest
for the City’ review.
1.Summary Narrative of Proposed Development and District
Cottonwood currently owns approximately 185 acres at the northeast corner of
Horsetooth Road and Ziegler Road (the “Property”), in the City, which is proposed to be included
in the Districts. In the past, the Property has been used for sand and gravel mining, as well as a
concrete batch plant. In conjunction with and supported by the proposed Districts, Cottonwood is
proposing to redevelop and change the use of the Property in a way that will have significant
community-wide benefits.
Cottonwood’s proposed development plans for the Property contemplate a mixed-
use development with a variety of housing options. While Cottonwood is envisioning a mix of
high-quality single-family, and multi-family residences, it also anticipates that these options will
be offered with a diversity of price points accommodating both market rate attainable housing, as
well as affordable housing, all of which will be made economically feasible through a metropolitan
district financing structure.
ATTACHMENT 2
In addition to the housing outlined above, the mixed-use development proposed
would support a diverse array of business and commercial utilizations, including neighborhood
support service uses. Because Cottonwood’s goal for the development is to create a community
where employment and housing options are harmoniously integrated, these business and
commercial uses would be intentionally developed to complement the surrounding housing
options.
The proposed development also represents a prime opportunity to increase the
community’s access to recreational opportunities as well as utilization of the City’s open space.
Multimodal transportation options will be highly emphasized. Cottonwood envisions transforming
the property into a walkable and bikeable community with multiple connections from the housing,
business, and commercial uses to the surrounding open spaces, community parks, and trail
systems. Cottonwood will collaborate with the City to coordinate efforts around trail and road
connections to provide appropriate access to these amenities, responsibly maximizing their use
and their beneficial impacts on the community, including the possibility of making this area an
alternative transportation hub for residents with convenient bus access to and from the park and
Colorado State University.
Cottonwood is proposing a multiple metropolitan district structure to accommodate
the diversity of uses within the Districts, as well as the multiple planned phases of development.
As detailed herein, Cottonwood anticipates that the Districts will conform to the City’s Model
Service Plan.
2. Sketch Plan – Please see attached Exhibit 1 for the current sketch plan.
3. Why Districts Are Needed
The development within the Districts (the “Project”) involves and necessitates
construction of significant public infrastructure, including as an example the reconstruction of the
intersection at Horsetooth and Zeigler and several bridges over the Fossil Creek Reservoir Inlet
Ditch (“FCRID”). Considering the extensive investment into public infrastructure required, the
Project would not be workable using solely private financing methods.
The organization of the Districts would enable the development to provide the
necessary capital infrastructure through the issuance of tax-exempt bonds for the Project. The
financing structures that the Districts may access to finance construction of the public
infrastructure make the Project as a whole economically feasible, including the additional Public
Benefits that are only included in the Project because of the Districts. Access to lower cost public
financing enables provision of additional public improvements and extends the project’s capability
to provide valuable public benefits, as described in more detail below.
Additionally, in financing the public improvements through metropolitan district
financing, residents and property owners of the Districts ultimately pay their proportionate share
of the public improvements over a 30 year period of time, as opposed to having those costs front-
loaded through lot prices or premiums or through assessments imposed by a homeowners’
association. Further, those property owners within the Districts itemizing their taxes are able to
deduct their tax payments for the capital infrastructure on their individual tax returns. Further, any
public infrastructure owned, operated, and maintained by the Districts will realize benefits through
the Districts, as opposed to a homeowners’ association or other entity, by means of enhanced
transparency and accountability above and beyond that which is required in the HOA context, the
ability to collect operational revenues through taxes (resulting in the same deduction benefits
referenced above), and reduced, more cost-efficient operational costs.
4. Explanation of Public Benefits and Satisfaction of Residential Evaluation Points
System
The planned development within the Project is anticipated to provide significant
public benefit to the City and the community at large. The dynamic mixed-use ecosystem
contemplated by Cottonwood would directly generate substantial public benefit by increasing the
number of employment opportunities available in the City, as well as potentially decreasing motor
vehicle traffic as compared with the City’s more traditional zoning designations because residents
can work in the same community in which they live. Cottonwood has also pledged to collaborate
with the City to coordinate efforts around trail and road connections to provide appropriate access
to both the new recreation and open space amenities to be created on the Strauss Lakes Property,
as well as existing City resources in the vicinity.
In addition to the substantial public benefits provided by the critical public
infrastructure and extensive public improvements outlined above, the Project will also meet and
exceed the City’s Residential Evaluation Points System (“REPS”) requirements, as detailed
below:
a. Housing – 5 Points Minimum - 5 Points Expected
Cottonwood is exploring the conveyance of approximately 24 acres of the Property
to the Colorado State University System (“CSU”). If accomplished, Cottonwood anticipates this
portion of the Property will be developed by CSU in such a way as to satisfy the City’s Affordable
Rental Housing REPS metrics. The goal for the CSU portion of the Project will be to include at
least 10% of the total dwelling units for the project as affordable rental units serving an income
average that does not exceed 60% AMI, as prescribed under the City’s affordable housing
regulations. While the average within the affordable rental housing category would not exceed
60%, it is expected that individual units would have AMI ranges between 40% and 80%. This
affordable housing commitment would be accomplished without utilizing competitive funding
grants or other sources in an effort to preserve those financial resources for future affordable
housing opportunities in other parts of Fort Collins.
b. Energy Conservation and Renewables – 10 Points Minimum – 10 or 11
Points Expected
Cottonwood is also in negotiations with a well-known national homebuilder to
construct homes within the Project. The homebuilder has indicated that it would likely be able to
incorporate the following Energy Conservation and Renewables benefits into the residential units
within the Project: (1) DOE Zero Energy Ready (ZER) Home Performance Path Certified with
balanced mechanical whole dwelling ventilation (4 points); (2) air tight homes with balanced
whole dwelling ventilation with heat or energy recovery (1 point); (3) qualifying connected
thermostats (1 point); air source heat pump electric water heaters and potential utilization of Fort
Collins Utilities Peak Partners connected air source heat pump water heaters in some phases (2-3
points); and (4) installation of 50-75% of total energy need in solar, depending on the phase of the
project and associated housing type (1-2 points). The development team acknowledges that a total
of 10 points are required in this category, and is planning on a combined total of 4 or more points
between water heater efficiency and solar. However, a number of potential design shifts are
anticipated as the development team and the builder work with city staff through development
application process, and at this stage a final allocation determination between these two categories
has not been made. The development team will have a clearer feasibility picture by the time the
proposed service plan for the metropolitan districts is submitted to the City for consideration, and
a more definitive design and allocation commitment between these two categories will be
incorporated into the proposed service plan at that time.
c. Indoor Water Conservation – 3 Points Minimum – 3.5 Points Expected
Within the Project, Cottonwood intends to include WaterSense fixtures performing
above code, which will include WaterSense toilets that use one gallon or less per flush and shower
heads that will use 1.5 gallons or less per minute throughout the development (2 points) and sub-
metering for individual condo and multi-family units throughout the development (1.5 points) to
promote indoor water conservation.
d. Outdoor Water Conservation – 7 Points Minimum – 7 Points Expected
To achieve the required outdoor water conservation REPS points,
Cottonwood plans to include efficient residential irrigation systems, including WaterSense
certified pressure reducing heads and weather-based irrigation controllers throughout the Project
(2 points), water efficient landscaping for residential front yards, with an average of 10 gallons or
less of water usage per square foot, including high efficiency nozzles, flow sensors and master
valves (2 points), separate drip system for trees in all landscape areas (2 points), common area
water use performing above code, with an average of 14 gallons per square foot or less across the
community common areas (1 point).
e. Neighborhood Livability – 5 Points Minimum – 7 Points Expected
Cottonwood’s plans for the Project are anticipated to exceed the City’s
REPS requirements in the category of Neighborhood Livability. The Project is anticipated to
include numerous off-site trail connections to the Poudre Trail and existing city trails, and the
Project will include trails along William Neal and the two irrigation canals that run through the
project, as well as bike lanes on Ziegler Road (1 point); level 3 EV Charging Stations in the mixed-
use area (1 point); connection to on-street and off-street trails to Fort Collins High School (1 point);
vertical mixed-use buildings anticipated in mixed use area (2 points); neighborhood parks as
discussed in more detail below (1 point); and access to parks and open space through East
Community Park (1 point).
The open space plan for the Project is one that the development team is very proud
of. It has been designed to ensure that every residential unit within the community is located
within 1320 feet (a five-minute walk) or less from at least one of the Project’s four parks. This
design feature is illustrated in Exhibit 2 to this submittal. The four parks within the Project will
be the Silver Poplar Park, Flat Iron Pond Park, Cottonwood Park, and Pollinator Park, and the
Project will include numerous pedestrian and vehicular connections to the City’s East Community
Park. Silver Poplar Park, will be centrally located and named for one of the oldest popular tree
groves in Fort Collins, and silver poplars will be propagated and incorporated prominently into the
landscape design. Flat Iron Park, a site that would qualify for fill and development, would instead
serve as an active recreation site for fishing, canoeing and paddle boarding, and would include
walking trails for residents and the general public. Cottonwood Park will be designated for more
passive recreation, while Pollinator Park will include plants and gardens that are intended to
support pollinator species within the community. Other qualitative aspects of the Open Space Plan
include a plaza/outdoor gathering space in mixed-use area, a number of tree-lined trails, and
intentional placement of landscape along streets with ornamental grasses, low water, and low
maintenance native plants as opposed to traditional turf in tree lawns.
5. Service Plan Specifics
Cottonwood anticipates that the Districts’ powers, purpose and maximum mill
levies will conform to the corresponding provisions outlined in the City’s Model Service Plan.
Likewise, the term of the Districts will conform to the parameters in the City’s Model Service
Plan. Cottonwood anticipates that one or more of the Districts will operate certain of the Public
Improvements not dedicated to other governmental entities, so such Districts would continue to
operate those Public Improvements until such operations are no longer necessary. The build-out
period for the Project is estimated to be twenty (20) years. Cottonwood hopes to work with the
City for approval of the Districts’ Service Plan in time to proceed with an organizational election
on May 3, 2022. As mentioned above, the property within the Project is currently zoned industrial,
and development approvals related to re-zoning of the property for the Project are proceeding
through the City’s review processes concurrently with the City’s review of the proposed Districts.
The Project will require significant public infrastructure, both off-site and on-site.
Based on current plans, and subject to revisions based on discussions with the City’s Planning and
Zoning team, on-site public infrastructure is anticipated to include water, storm and sanitary sewer
(including a lift station), streets, landscaping, parks, recreation, and trail improvements. Off-site
improvements are expected to include reconstruction of the Horsetooth and Zeigler intersection;
demolition and replacement of the Horsetooth Road, Environmental Drive and Percheron Drive
Bridges over FCRID; sidewalk and road improvements to Zeigler Road, Horsetooth Road and
Environmental Drive; construction of two additional bike and pedestrian bridges over FCRID; and
construction of bike and pedestrian trails connecting to the Poudre River Trail and to Rigden Farm.
Based on current plans, and subject to revisions based on discussions with the City’s Planning and
Zoning team, Cottonwood currently estimates the cost of the public improvements related to and
required for the Project will be approximately $68,400,000.
We appreciate the City’s time in reviewing this Letter of Interest and look forward to
answering any questions that you may have. Concurrently with the submittal of this Letter of
Interest, Cottonwood will deliver to the City the Letter of Interest Submittal Fee in the amount of
$2,500. Under the City’s Policy, Staff is anticipated to provide a written response to the Letter of
Interest within 30 days of receipt of the Letter of Interest and related Fee. Please let us know as
soon as possible if the City anticipates that additional time may be needed. Should you have any
questions or need any additional information, please do not hesitate to contact us.
Sincerely,
Robert G. Rogers
WHITE BEAR ANKELE TANAKA &WALDRON
Attorneys at Law
Enclosures
Exhibit 1
Strauss Lakes Sketch Plan
0’200’400’300’
2 12/28/2021 STRAUSS LAKES
LIVE / WORK LOTS
LARGE TOWNHOMES
UBE LOTS
CARRIAGE HOME LOTS
SMALL TOWNHOMES
STRAUSS LAKE CONDOS
EXECUTIVE STUDIOS
CSU APARTMENTS
PAIRED HOMES
8-PLEXES / 6-PLEXES
STRAUSS LAKES
OVERALL MASTER PLAN
RIGDEN RESERVOIR
50’ SETBACK FROM
DITCH (TYPICAL)
BOXELDER DITCH
PERCHERON DRIVE
(COLLECTOR)
WILLIAM NEAL PKWY.
(COLLECTOR)
MIXED
USE
FLATIRON
POND
FOSSIL CREEK
INLET DITCH
50’ SETBACK FROM WET-
LANDS (TYPICAL)
FOSSIL CREEK
PARK
EAST COMMUNITY
PARK
DETENTION
DETENTION
HORSETOOTH ROADZIEGLER ROADPOPLAR
PARK
44
257
82
127
156
228
32
TBD
144
72
1,142TOTAL
LOT SUMMARY
Exhibit 2
Strauss Lakes Open Space Plan
0’200’400’300’
POLLINATOR
PARK
FLATIRON
POND
PROPOSED TRAILS
1,320‘ RADIUS
PROPOSED
CONNECTION
COTTONWOOD
PARK
EAST COMMUNITY
PARK
POPLAR
PARK
Economic Health Office
300 LaPorte Avenue
PO Box 580
Fort Collins, CO 80522
970.416.2170
970.224.6107 - fax
fcgov.com
Dear Robert,
Thank you for submitting the Letter of Interest for the proposed Strauss Lakes Metro District.
We submit this letter to you in accordance with Section 3 (B) of the City’s Metro District Policy.
Our staff team has reviewed the Letter of Interest and seeks clarity on the following elements of
the Letter of Interest. We request a revised Letter of Interest that substantially addresses these
comments. We will submit the revised Letter of Interest for City Council’s consideration as part
of their pre-application meeting for the proposed Metro District on February 15, 2022.
Housing
1.Please clarify how many units out of the total development will be deed restricted and
affordable. To obtain points in Section 2 for rental housing, 10% of the total units in the
development (not just on the proposed CSU parcel) will need to be deed restricted and
affordable for a minimum of 20 years.
2.Thank you for stating the intention to income-average the affordable rental housing to
60% of Area Median Income (AMI). Please include the AMI range you anticipate for the
affordable component of the project as well (for example, units ranging between 30-80%
AMI, income-averaged to 60% AMI).
3.To obtain points in Section 1(B), only single-family detached and single-family attached
units would qualify.
Energy Conservation and Renewables
4.Two of the noted options to meet the point total allow for an additional point (air source
heat pump water heaters utilizing Utilities Peak Partners connected water heaters, and
between 50-75% of the total energy need being met with solar PV). Please provide more
details on which option will be chosen to obtain the required 10 points. Allowing for the
minimum points within the sections noted above would only score 9 points.
5.Energy Services can be available to further discuss and provide more explanation on the
options chosen and/or how the development can best meet the required 10 points.
Indoor Water Conservation
6.Please confirm that all buildings throughout the development will use WaterSense toilets
that use 1.0 gallons or less per flush
7.Please also confirm that you plan to use shower heads throughout the development that
use 1.5 gallons of water per minute or less.
8.To obtain points for sub-metering, all condos and multi-family units that are not
individually metered, should be privately sub-metered. Please confirm this is your
approach for obtaining points in this category.
ATTACHMENT 3
Outdoor Water Conservation
9. WaterSense (WS) Certified pressure reducing heads and weather-based irrigation
controllers are required for all residential irrigation systems. Equipment not certified by
WS, including high efficiency nozzles, flow sensors and master valves, are also required.
Staff will send more details on these standards to you.
10. Staff will calculate the average water use in shared/common space across the entire
development. The average water use of the total common space may be no more than 14
gallons of water per square foot to score 1 point. Additional points may be earned if
average gallons per square foot is less. Estimated water-use for various plants and plant
types may be found on the City’s Recommended Plant list at fcgov.com/vegetation.
11. For residential front yards, staff will calculate the average water use on a lot-by-lot basis.
All residential lots throughout the entire development may use no more than 10 gallons
per square foot to score 2 points.
12. In addition to drip system for trees in parkways and medians, staff encourages drip
systems on trees in all landscape areas to mitigate loss of high-value trees in the event of
water shortage.
13. It is unclear how you plan to score points for stormwater innovation. Please clarify how
you plan to obtain points in this category and how the plan exceeds the City’s existing
stormwater standards. The standard is that development treats 75% of the stormwater it
generates through some sort of filtration device, known as Low Impact Development
(LID) or Green Infrastructure. Staff will evaluate the proposal and determine whether it is
worth 1 or 2 points.
Neighborhood Livability
14. For all of the measures listed in this section, staff encourages the development team to
consider how it plans to guarantee these public benefits through a Public Benefits
Agreement.
15. The purpose of the Metro District Policy is to demonstrate the public benefits of the
project. Based on information provided thus far, it is unclear how you are achieving this
requirement. Please provide additional information under categories in this section that
clearly demonstrate how you are going above and beyond code requirements.
16. Access to Parks and Open Spaces: Please show on a map how all residents are located
within 1320’ of a park and open space. Two access points to East Community Park does
not go above basic requirements. While East Community Park will be an excellent
amenity for the community, the Letter of Intent should demonstrate how the metro
district goes above and beyond providing access to parks and open space within the
development. For example, what contemplative spaces are provided throughout the
development? What are the qualitative aspects of the access routes? Will there be
educational signage? Wider sidewalks? Pollinator gardens? Benches? What is the
experiential qualities of the pedestrian circulation system? How are all residents served
through this access network in an equitable way?
Please let us know if you have any questions, comments, or concerns on the above. We look
forward to receiving your updated Letter of Interest.
Thanks,
Clay Frickey
Strauss Lakes Conceptual Review02-15-22Clay Frickey, Redevelopment Program ManagerATTACHMENT 4
2Background• Council adopted new Metro District policy in 2021• Residential Metro Districts require public benefits• Conceptual Review with Council required• Direction and feedback on proposed public benefits
3Process OverviewLetter of Interest submittalStaff reviews Letter of InterestCity Council Conceptual ReviewFormal submittal of Metro DistrictStaff reviews application and Service PlanCouncil Finance reviewCouncil considers Metro District
Development Overview4
5Proposed Public BenefitsCategoryMin. Points RequiredPoints ExpectedProposed Public BenefitsHousing552(A) – 10% affordable rental housing – 2 points2(B) – Does not utilize competitive process funding – 3 pointsEnergy Conservation and Renewables10 10-111(A) – DOE Zero Energy Ready (ZER) Home Performance Path Certified with balanced mechanical whole dwelling ventilation – 4 points2(C) – Air-tight homes with balancedwhole dwelling ventilation with heat or energy recovery – 1 point2(E) – Installing qualified connected thermostats – 2-3 points3(A) – Installing solar to meet 50-75% of overall energy need – 2-3 pointsIndoor Water Conservation33.54(A) – WaterSense fixtures performing above Code – 2 points4(C) – Sub-metering – 1.5 points
6Proposed Public BenefitsCategoryMin. Points RequiredPoints ExpectedProposed Public BenefitsOutdoor Water Conservation775(A) – Efficient residential irrigation systems – 2 points5(B) – Water efficient landscaping for residential front yards – 2 points5(C) – Separate drip systems for trees within parkways and medians – 2 points5(D) – Common area water use performing above Code – 1 pointNeighborhood Livability571(A) – Off-site trail connections – 1 point1(C) – Level 3 EV charging stations – 1 point1(D) – Trail connection provided to a school – 1 point2(B) – Vertical mixed-use buildings – 2 points2(C) – Community gathering spaces – 1 point3(A) – Access to parks & open spaces – 1 point
7Staff Comments• Conforms to policy generally• Exception: Housing• 10% affordable rental for CSU portion only• Must apply to whole development• More detail required for numerous elements• Energy & Renewables• Neighborhood Livability
8RecommendationStaff recommends Council adopt a motion proceeding with the proposed Strauss Lakes Metro District. Based on the information provided at this meeting, the applicant's proposed Metro District appears to satisfy the requirements of the Metro District policy with the exception of the affordable housing element and with any recommendations Council has for the applicant to satisfy this element in its formal application.