Loading...
HomeMy WebLinkAboutCOUNCIL - AGENDA ITEM - 11/16/2021 - RESOLUTION 2021-105 ADOPTING THE 2021 CIVIC CENTERAgenda Item 19 Item # 19 Page 1 AGENDA ITEM SUMMARY November 16, 2021 City Council STAFF Blake Visser, Senior Facilities Project Manager Ken Mannon, Operations Services Director Tyler Marr, Assistant City Manager Ingrid Decker, Legal SUBJECT Resolution 2021-105 Adopting the 2021 Civic Center Master Plan. EXECUTIVE SUMMARY Moved to Discussion The purpose of this item is to request that the Master Plan that was reviewed and commented on during the July 27, 2021, Work Session be adopted by Council. Additionally, on November 10, 2021, hard copies will be provided for Council review prior to the November 16, 2021, Council meeting. STAFF RECOMMENDATION Staff recommends adoption of the Resolution. BACKGROUND / DISCUSSION In 1996 the first Downtown Master Plan was created. In 2014, the Block 32/42 – Civic Center Vision Plan was produced. This document was generated from the culmination of several meetings, workshops, and discussions regarding the future of the civic heart of Fort Collins, Colorado. The aim of the 2 014 report was to resolve the physical form of the Civic Center. This Vision Plan is based around the spatial needs of a growing government with the aim of making it more connected to the population it governs and to its context in downtown. As the City has grown over the years since the last Master Plan effort, funding was approved for a Civic Center Master Plan. Organizational staffing for City government and the need to strategically house those staff members in buildings is needed. With further growth expected over the next three decades, combined with Council, staff, and the community outgrowing existing space, and with some current buildings not being viewed as ideal to keep as long-term City organization assets, there is a need to strategically plan the spacing for the downtown campus where a large portion of City staff work. As part of the 2021 budget, Council funded an update of the Civic Center Master plan, which is intended to plan the Area of block 32/42, current buildings, Washington Park, an d streets. Including the Civic Center Parking Structure in the Civic Center Master Plan and adopting the updated plan as a part of City Plan will also allow the City to use general government capital expansion fee proceeds to purchase the Civic Center Cond os located in the parking structure. This update will inform the Facilities team and City Leadership of investments required to meet the staffing and community needs as we move into the future. Recognizing that the COVID-19 pandemic gave pause around the future of work, this plan and the assumptions therein were developed with a hybrid model in mind. As one Agenda Item 19 Item # 19 Page 2 specific example, 60% onsite staffing was determined to be the City’s operating model for this plan and moving forward. Other assumptions • 60% Hybrid model (3 days in the office, 2 days remote work) • Additional 15% area factor added to workstations to provide flexibility with overlapping schedules • Greater emphasis on individual breakout spaces, collaboration rooms and conference rooms to meet all meeting type needs Planning Process • Space Planning - Facilities were analyzed with respect to the quality of architecture, mechanical, electrical, and plumbing conditions. Current quantities of space were defined for each building and department. Staff growth projections were established by numerous interviews with department heads and staff. • Development Staff Engaged - Park Planning and Development along with the Planning Department were engaged in early meetings to discuss important considerations related t o city planning, development guidelines and goals. • Charrettes - Three-day design charrettes were held involving the City’s leadership team, department leaders, key staff from across all departments, and the project team. • Public Engagement - The charrette design outcome and survey were shared on OurCity website for comment from the public • Boards and Commissions - A presentation was given regarding the process of the City Master Plan and charrette outcome. The Boards and Commissions representatives were invit ed to ask questions and give feedback. All items have been recorded and are part of the draft for reference in future development of the design. • Interdepartmental Staff Engagement - Park Planning & Development, CDNS, Engineering, Poudre Fire, Police, and Utilities were gathered to give final comments on feasibility of the Master Plan Draft and any other items that are relevant as the design develops further. These comments are available in the draft. Draft Master Plan Concept The concept of the master plan is focused on consolidating City operations for an improved customer experience. 1. Community a. A true front door for customer service to the Fort Collins community. b. Most parking will be kept to the exterior of the site and parking garages, perimeter gatew ays will act as general wayfinding for people arriving to the site through various modes of transportation. c. Central gathering spaces that promote public use during and after hours, on weekends and during holidays. d. Howes Street will support various community events while tying the two blocks together from both a visual and a functional standpoint. e. The overall character of the site reflects Washington Park through the preservation of existing tree canopy and the inclusion of softscape areas that define place s of gathering and circulation. f. Art, landforms, and other site amenities will be used as visual wayfinding throughout the site. g. Howes will remain open to traffic but will become a convertible street for community events. h. Traffic calming elements will be used to create a safe pedestrian environment along Howes while allowing for easy, accessible access to the buildings. 2. City staff a. Improved department adjacencies for more efficient work flow. b. Staff can be re-located out of 281 North College to a more appropriate location on the Civic Center Agenda Item 19 Item # 19 Page 3 campus and allows for the sale of the building. c. Accommodates growth for needed staff as the number of City residents increase. Next Steps 1. As part of the current scope of work, a traffic and parking study is being don e to further refine information on the need and potential timing of the parking structure. 2. Conceptual space planning of new and existing buildings to co-locate adjacencies for City departments for an improved customer experience. 3. Public engagement on current Conceptual Design plan. 4. Develop 50% construction design to determine cost estimates. CITY FINANCIAL IMPACTS This document will provide guidance for future development in the Downtown Civic Center area. BOARD / COMMISSION RECOMMENDATION Representatives from various Boards and Commissions participated in the Master Plan refresh exercise to provide the team input. PUBLIC OUTREACH The CPIO website was used to gather feedback and input from the community. ATTACHMENTS 1. Work Session Summary (PDF) 2. Civic Center Master Plan (PDF) Operation Services 300 LaPorte Ave, Building B PO Box 580 Fort Collins, CO 80522 970.221.6610 970.221.6534 fcgov.com Date: August 3, 2021 To: Mayor and City Councilmembers Thru: Darin Atteberry, City Manager, Kelly DiMartino, Deputy City Manager, Tyler Marr, Interim Director, IES From: Ken Mannon, Director of Operation Services Blake Visser, Senior Facilities Project Manager Re: July 27, 2021, Work Session Summary: Civic Center Master Plan The purpose of this memo is to follow-up on items discussed during the Civic Center Master Plan work session presentation, and in reference to the Center Master Plan DRAFT. More information will be available as we move forward with space planning. There is a budget offer in 2022 to provide funding for the next phase. Councilmember Comments/Questions: x Ensure that the space is open, welcoming, something to be proud of, has accessibility for all abilities, and is safe for everyone. The project goals have been updated to reflect Council comments and are listed on page 10 of the Civic Center Master Plan Document. x Concerns with parking garage. Counterintuitive to promoting commuting, ride share, biking, etc. The concept of the parking garage is intended to allow for retail space on N. Mason St, Maple St., and potentially on the West & South sides of the garage to encourage City staff and public engagement in the new Civic Center space, as well as to support the City Plaza. The team will work collaboratively with FC Moves as outlined in related documents and plans on page 9. x Timeline was discussed, with it being noted that the middle to later part of this decade was desired for construction, depending on various debt management strategies. Council Finance is due to discuss debt capacity and associated timing at their August meeting. x Noted that there should be a sufficient space for employees to address staff that prefer to work from home, as well as those that want to come into the office and have their “own” space. The Master Plan is intended to guide project design. Surveys on Teleworking and subsequent City policy will be incorporated into the design. x Staff expressed they are committed to staying flexible to see what will work in the future as they move forward.         ATTACHMENT 1 x Invitation extended to all Councilmembers to have more detailed conversation about plans with project team members. This can be arranged at Council member convenience. x Is Child Care part of the plan? Yes, consideration for this is reflected in the massing of space for the new Civic Center. x Overall, Council was satisfied with the 60/40 explanation. x Council wants to make sure taxpayer dollars are being spent well, while taking care of employees at the same time. Stewardship for taxpayer dollars is added to the goals section of the Civic Center Master Plan document on page 10. Next Steps: x The plan will come forward for Council adoption this fall, after those councilmembers who wish to discuss further with staff have had the opportunity to do so. x As part of the current scope of work, a traffic and parking study is being done to further refine information on the need and potential timing of the parking structure. x Once the Master Plan is adopted, additional next steps include a space planning study to finalize plans for placement of departments and also preliminary design of the new municipal building, both of which are Offers for consideration in the 2022 budget. Links for Updated Civic Center Master Plan DRAFT, Updated per 7/27/21 Council Work session comments and questions: Full Document: https://drive.google.com/file/d/1fiyhxF0fvD95tPjAlhCu3wW1tSEvEzI9/view?usp=sharing Main Document Compressed: https://drive.google.com/file/d/1pvGHd1eROjO5KmaxvDqXfWkreJUHocbB/view?usp=sharing Appendix Compressed: https://drive.google.com/file/d/1r6VE_uFXSEWF9qa9wUDgWFGdQastHWNK/view?usp=sharing         CITY OF FORT COLLINS: MASTER PLAN NOVEMBER 10, 2021 Fort Collins, Colorado ATTACHMENT 2 2 \ EXECUTIVE SUMMARY INTRODUCTION GOALS AND GUIDELINES PROCESS PLANNING DURING THE PANDEMIC SPACE PLANNING CHARRETTES COMMUNITY ENGAGEMENT RECOMMENDATIONS GROWTH ANALYSIS SPACE TYPES BUILDING + SITE ENERGY + SUSTAINABILITY PROJECT IMPACT CLOSING \ BACKGROUND INFORMATION SITE ANALYSIS CLIMATE ANALYSIS PRECEDENT IMAGES \ SPACE EVALUATIONS SPACE PLANNING PROCESS EXISTING BUILDING ANALYSIS STAFF PROJECTIONS SPACE PROJECTIONS \ CHARRETTE CHARRETTE OVERVIEW CHARRETTE PROCESS SUSTAINABLE CONSIDERATIONS CHARRETTE DAY 1 CHARRETTE DAY 2 CHARRETTE DAY 3 A.9 A.10 A.10 A.12 A.12 A.13 A.13 A.14 A.15 A.16 A.18 A.21 A.21 A.21 A.22 B.25 B.26 B.34 B.38 C.47 C.48 C.56 C.68 C.70 D.83 D.84 D.85 D.86 D.88 D.92 D.96 TABLE OF CONTENT 3 E.103 E.104 E.106 E.118 E.132 F.145 F.146 F.147 F.148 F.149 F.155 F.155 G.157 G.158 G.160 G.162 G.168 G.174 G.186 G.198 G.206 G.276 G.278 G.284 G.286 G.294 G.302 G.304 G.310 \ RECOMMENDATIONS SITE DESIGN DESIGN CONCEPT BUILDING DESIGN CONSTRUCTION STAGES + OPINIONS OF PROBABLE COST \ ENERGY PERFORMANCE SUMMARY ENERGY ANALYSIS BUILDING AND SYSTEMS ENERGY REDUCTION STRATEGIES PHOTO-VOLTAIC SYSTEMS CONCLUSION \ APPENDIX SITE INVENTORY CIVIC CENTER BUILDINGS CULTURE ECOLOGY LAND USE MOBILITY CLIMATE DATA TABLES DEPARTMENT INFORMATION + SPACE PROJECTIONS CHARRETTE DOCUMENTS CHARRETTE OPTION ENERGY ANALYSIS CONSTRUCTION PHASING OPTION 1 - CONSTRUCTION STAGE 1 OPTION 2 - CONSTRUCTION STAGE 1 CONSTRUCTION STAGE 2 ENERGY MODELING TABLES STAKEHOLDER ENGAGEMENT ACKNOWLEDGMENTS This report was prepared by Clark & Enersen, along with our design partners, Energy Studio, Olsson and Northern Engineering, for The City of Fort Collins. Thank you to the following people for their contributions to this report. Current City Council Mayor Jeni Arndt Susan Gutowsky Julie Pignataro Tricia Canonico Shirley Peel Kelly Oholson Emily Gorgol Former City Council Mayor Wade Troxell Susan Gutowsky Julie Pignataro Ken Summers Ross Cunniff Emily Gorgol Executive Leadership Darin Atteberry, City Manager Kelly DiMartino, Deputy City Manager Kyle Stannert, Deputy City Manager Tyler Marr, Deputy Director, IES Teresa Roche, Chief Human Resources Officer Travis Storin, Chief Financial Officer Jacquelin Kozak-Thiel, Chief Sustainability Officer Caryn Champine, Director of PDT Jeff Swoboda, Chief of Police Tom Demint, Former Fire Chief Derek Bergsten, Current Fire Chief John Stokes, Community Services Director Carrie Daggett, City Attorney DeAngelo Bowden, Graduate Management Assistant Civic Center Master Planning Core Team Brian Hergott Blake Visser Ken Mannon Terri Runyan Karen Jackson Tracy Ochsner City Departments City Manager City Clerk City Attorney Municipal Court Operation Services CPIO & FCTV Information Technology Emergency Preparation & Security Financial Services & Safety & Risk Management Human Resources Community Services Planning, Development & Transportation Utilities Broadband Sustainability Services Clark & Enersen Phil Walter Kate Penning Steve Miller Karen Nalow Matt Glawatz Kate Heir William Pokojski Jon Hauck Andrea Anderson Sean Ray Hannah Schafers Brenton Boyer Dan Wroblewski Energy Studio Alexander Skillman Amanda Bogner Northern Engineering Nick Haws Andy Reese Melanie Foslien Olsson Chris Rolling Institute for the Built Environment Josie Plaut Tamara Martin DESIGN AND CONSULTANT TEAM CITY OF FORT COLLINS 6 NOVEMBER 2021 REFERENCES \ RELATED DOCUMENTS PAVED RECREATIONAL TRAIL MASTER PLAN (2013). This Paved Recreational Trail Master Plan covers the paved trails managed by the City of Fort Collins Parks and Recreation and Streets Departments; and focuses primarily on the recreational uses and design of the trail system which supports a wide range of users and trip purposes. POUDRE RIVER DOWNTOWN MASTER PLAN (2014). This Master Plan envisions approximately three miles of sustainable river corridor that provides habitat, recreation, and flood mitigation benefits. This long term plan consists of numerous elements that will take many years to complete. BLOCK 32/42 - CIVIC CENTER VISION PLAN (2015). This Vision Plan is aimed to resolve the physical form of the Civic Center and is based around the spatial needs of a growing government with the aim of making it more connected to the population it governs and to its context in downtown. THE 2017 FORT COLLINS DOWNTOWN PLAN (2017). “This Plan is an inspirational guide for budgets, projects, programs, investments, regulations and other related efforts to keep Downtown vibrant and successful as the vital heart of Fort Collins.” FOCO CREATES: ARTS & CULTURE MASTER PLAN (2019). FoCo Creates builds upon the goals of the first ten year Cultural Plan developed in 2008, while integrating the vision and aspirations of the growing community. FORT COLLINS CITY PLAN (2019). “City Plan is the comprehensive plan for the City of Fort Collins. It articulates the community’s vision and core values, and establishes the overall policy foundation that will be used by the City of Fort Collins organization, its many local and regional partners, and the community at large to work toward the vision over the next 10-20 years.” RECREATE: PARKS & RECREATION MASTER PLAN (2021). “The Fort Collins Parks and Recreation Master Plan examines park and recreation needs in the context of the city’s impressive system of public spaces and articulates an ambitions yet attainable vision for parks and recreation in the future.” FORT COLLINS TRAILS MAP (2018) FORT COLLINS BIKE MAP (2019) 7 FORT COLLINS: MASTER PLAN \ LEGEND + KEY SPACE TYPES STAFF Auxiliary - CAFETERIA + BREAK Auxiliary - GENERAL SPECIAL Auxiliary - COLLABORATION + CONFERENCE SUPPORT Auxiliary - WELLNESS SQUARE FOOTSF GROSS SQUARE FEETGSF NET-TO-GROSS RATIONTG NET SQUARE FEETNSF ACRONYMS EXECUTIVE SUMMARY A.9 FORT COLLINS: MASTER PLAN EXECUTIVE SUMMARYA EXECUTIVE SUMMARY NOVEMBER 2021 A.10 INTRODUCTIONEXECUTIVE SUMMARY \ INTRODUCTION The City of Fort Collins Civic Center Master Plan is the guiding document for the space needs and physical form of the Civic Center to address a growing city, increasing demand for government services, to exemplify timeless urban design within the context of Downtown Fort Collins, and to achieve sustainability and resilience best practices. \ GOALS AND GUIDELINES The City of Fort Collins’ goal for this project is to update the Block 32/42 Civic Center Conceptual Master Plan that was completed in 2015. Additionally, the intent of the project is to update the master plan to align with future city staffing needs and to determine future facility needs at the Civic Center. The Civic Center is located on two city blocks in downtown Fort Collins, bounded by Maple Street on the north, Laporte Avenue on the south, Mason Street on the east, Meldrum Street on the west, and bisected by Howes Street. GOALS. The Guiding Principles for the Civic Center, which were identified in the 2015 master plan and validated by City leadership for this planning effort, are as follows: WORLD CLASS LEADERSHIP: become a point of community pride in performance, innovation, and regenerative design that sets an example for the private sector in its reflection of Fort Collins’ character and culture while being good stewards of City of Fort Collins tax payer dollars. VIBRANT COMMUNITY SPACES: contribute nature and ecology to the city while establishing places for public engagement that promote social and individual health, safety and accessibility for all. RESILIENT DESIGN: create lasting quality that is climate adaptive, accommodates growth, flexibility, and a universal community. INTUITIVE ORGANIZATION: support and activate site connectivity externally and create a collaborative environment internally. ENHANCE THE CIVIC HEART: promote physical embodiment of the city’s mission and plan that meets immediate needs; establish a vision that can be invested in and realized. \ CIVIC CENTER BOUNDARY As shown on Map A.11, the two City blocks (Blocks 32 and 42) between Maple and Laporte going North to South and Meldrum and Mason going East to West make up the boundaries of the Civic Center Area. Within this Area is the Civic Center Core. When the Master Plan is built out, the public will be able to come to the Civic Center Core for most City government needs. Identified on Map A.11 are current City buildings and City buildings to be acquired under this Master Plan. For more information regarding current buildings and buildings to be acquired see appendix page G.160. FORT COLLINS: MASTER PLAN EXECUTIVE SUMMARY A.11 CITY OWNED BUILDINGS CIVIC CORE CIVIC BOUNDARY SITE LOCATION: CIVIC CENTER BLOCKS 32/42 321 Maple OHOWEHOWESSSSSSMELDRUMMASONCOLLEGE119 Fort Collins Municipal Railway Carbarn 281 College FoCo Cafe 300A Laporte 215 M ason Larimer County Justi ce Center Civic Center Parking Garage Downtown Transit Center 222 Laporte 300B Laporte 214 Ho wes St 220 Howes St 117 Mason Street Civic Center Condos- Needed Future Municipal Offices CityCare M APLE LAPORTE MOUNTAIN A.12 EXECUTIVE SUMMARY NOVEMBER 2021 \ PROCESS The seven-month long master plan process started in October 2020 after a significant Covid-19 pandemic-related delay. The remote, yet collaborative process was conducted in four major phases exemplified in the process diagram – Space Planning, Visioning & Brainstorming, Designing, and Engaging. PLANNING DURING THE PANDEMIC. The master planning process was scheduled to begin in March 2020. However, the Covid-19 pandemic which affected Colorado, the United States and the world delayed the project and profoundly affected the way the process was conducted. When the delayed project process began in late October 2020, the Covid-19 pandemic and directed health measures employed to keep the project team, City staff and the Fort Collins community healthy prompted a shift in how we all work and how the project was completed. The majority of work on the project was completed by the project team and the City staff as we worked from home or from remote locations because of directed health measures that mandated remote work. Nearly all meetings with the City departments, the City’s Executive Leadership Team, the City Operations Staff and the project team were conducted via web-based video conferences. In addition, all stakeholder and community engagement activities including, a three-day design charrette, were conducted via web-based video meetings where numerous participants successfully collaborated from remote locations. The most important impact of the pandemic to the project was the outlook of how the work of the City staff may be different in the future. The success of remote working for City staff and for many industries across Colorado and the United States prompted the project team, at the direction of the City, to revise the space needs evaluation to include future remote working scenarios. This analysis, including the prevalent idea for a hybrid work schedule where City staff may work 60 percent of their week in the office and 40 percent remotely, is highlighted in subsequent sections of this plan. SPACE PLANNING ENGAGINGVISIONING + BRAINSTORMING DESIGNING PROCESS DIAGRAM FORT COLLINS: MASTER PLAN EXECUTIVE SUMMARY A.13 SPACE PLANNING. The City of Fort Collins and Clark & Enersen began the process with goal setting for the outcomes of the assessment. Facilities were analyzed with respect to the quality of architecture, mechanical, electrical, and plumbing conditions. Current quantities of space were defined for each building and department. Staff growth projections were established by numerous interviews with department heads and staff. Clark & Enersen used a formulaic approach to determine future space needs for the Civic Center in seven areas of space growth: staffing needs, staff support areas, special requirements, and auxiliary - general, collaboration/conference, cafeteria/break and wellness. These space projections were aligned with the City of Fort Collins guiding principles. The assessment helped to inform the future building needs and siting. CHARRETTES. The first phase of the master planning process concluded with a three-day design charrette including the City’s leadership team, department leaders, key staff from across all departments, and the project team. The charrette was held virtually, via the Zoom video collaboration platform, to comply with directed health measures required because of the Covid-19 pandemic. The outcome of the charrette is a design concept that envisions a new City Hall and renovated existing buildings located around a central gathering space that crosses Howes and connects the two blocks. This space will support various community events while creating a visual and functional front door for the City Campus. The overall character of the site is a reflection of Washington Park through the preservation of existing tree canopy and the inclusion of landscape areas that define places for gathering and circulation. Art, landforms, and other site amenities will be used as visual wayfinding throughout the site. CHARRETTE: DAY 3 ZOOM SESSION A.14 EXECUTIVE SUMMARY NOVEMBER 2021 COMMUNITY ENGAGEMENT. The project team in collaboration with the City staff carried a community engagement process based on a Stakeholder & Community Engagement Plan designed to address the City of Fort Collins’ goals for engagement. The key project stakeholders are City staff. The City’s Executive Leadership Team, department heads, and several staff members with technical expertise in planning, design, engineering and sustainability were involved in over 50 meetings during the space planning and master planning phases of the project. The following outline highlights the three phases of the Stakeholder & Community Engagement Plan, the stakeholders involved, the key messages for each phase, and the engagement strategies used in the process: Phase 1: Space Planning X Stakeholders: City Executive Leadership Team, City department leaders and key staff, City Operations Project Team X Key messages: Vision & Goals for the Master Plan; What are your future space needs? X Strategies: Discovery meetings in-person and virtual Phase 2: Conceptual Master Planning X Stakeholders: ELT, City Project Team, City staff, City Public Involvement Team X Key messages: Space planning is on-going; What are key uses and functions for City Hall facilities and the surrounding Civic Center area? X Strategies: Virtual meetings, multi-day design charrette, project website on OurCity page. Phase 3: Stakeholder Review X Stakeholders: City Boards & Commission members, community stakeholders, City’s interdepartmental staff team, City Council X Key messages: What feedback, comments, improvements do you have for the Preferred Design Concept? X Strategies: Development review meetings, presentation to Board & Commission members, virtual meetings, project website on OurCity page. SPACE PLANNING: DEPARTMENT ZOOM MEETING EXECUTIVE SUMMARY A.15 FORT COLLINS: MASTER PLAN \ RECOMMENDATIONS GROWTH ANALYSIS. Covid-19 not only influenced the process of master planning for the City of Fort Collins, but the space planning guidelines and subsequent staff and space based projections. Due to Covid-19 restrictions, the city was required to reduce in office work and move most of their employees to remote online work. The city found that their staff could be equally productive in a remote work environment as they were in the office. This shift led the city to pursue the scenario of a hybrid remote work schedule, reducing the need for workstations and offices to accommodate 100% occupancy. The graph below shows the projected staff count for the Civic Center of Fort Collins over a 30 year period starting with the current staff count. This is detailed further in the space evaluation section, see section C. STAFF: PROJECTION OF STAFF OVER TIME 612 718 827 923 1,048 1,196 1,368 0 200 400 600 800 1000 1200 1400 1600 CURRENT 5 YR 10 YR 15 YR 20 YR 25 YR 30 YR STAFF (EMPLOYEES) STAFF TREND L I N E A.16 EXECUTIVE SUMMARY NOVEMBER 2021 GROWTH ANALYSIS. Below are the three primary models for space projection used in the master plan process. 100% full time is a conventional model wherein no remote work occurs and the 60% and 60%+ models are distributed workflows which incorporate a 3 day in office, 2 day out of office hybrid work schedule. The distributed work model allows for space saving due to reduced need for full occupancy. The 60%+ model includes the distributed work model as well as additional space allocation across specific staff positions. The graphs, Projection Options 1, 2 and 3, show the space projections of each model over 30 years. The GSF 60%+ chart identifies 281 College and 300A East, short for 300A Laporte - East, as existing spaces that are not to be carried over in the master plan. The city intends to sell 281 College and deconstruct the East side of 300A Laporte. PROJECTION OPTION 2 PROJECTION OPTION 1 117,146 133,973 146,417 159,146 175,862 193,463 213,123 78,751 90,435 98,456 106,257 117,050 128,205 140,880 0 50,000 100,000 150,000 200,000 250,000 300,000 350,000 400,000 CURRENT (100%) 5-YEAR (100%) 10-YEAR (100%) 15-YEAR (100%) 20-YEAR (100%) 25-YEAR (100%) 30-YEAR (100%) RIGHT SIZE 100% COUNT TOTAL PROJECTED AREA NEEDS FULL TIME (100%) GROSS SQUARE FOOTAGE (GSF) TOTAL AREA NEEDS (NSF)TOTAL NON-PROGRAMMED 98,176 111,442 120,322 129,939 142,563 155,370 169,395 64,989 74,062 79,482 85,011 92,817 100,474 109,034 0 50,000 100,000 150,000 200,000 250,000 300,000 350,000 400,000 CURRENT (60%) 5-YEAR (60%) 10-YEAR (60%) 15-YEAR (60%) 20-YEAR (60%) 25-YEAR (60%) 30-YEAR (60%) RIGHT SIZE HYBRID 60% TOTAL PROJECTED AREA NEEDS HYBRID (60%) GROSS SQUARE FOOTAGE (GSF) TOTAL AREA NEEDS (NSF)TOTAL NON-PROGRAMMED EXECUTIVE SUMMARY A.17 FORT COLLINS: MASTER PLAN GROSS SQUARE FOOTAGE: COMPARISON OF GSF, 15 YR AND 30 YR FOCUS WITH THE EXISTING 281 COLLEGE BUILDING AND EAST PORTION OF THE EXISTING 300A LAPORTE PROJECTION OPTION 3 (SELECTED OPTION) 163,766 170,530 226,064 295,433 42,796 12389 0 50000 100000 150000 200000 250000 300000 350000 400000 CURRENT CURRENT (RIGHT SIZED) (60%+) 15 YR (60%+) 30 YR (60%+) GSF (60%+) GSF 281 COLLEGE 300A EAST 218,951 102,445 116,511 126,193 136,344 150,055 163,941 179,234 68,085 77,746 83,751 89,720 98,269 106,713 116,199 0 50,000 100,000 150,000 200,000 250,000 300,000 350,000 400,000 CURRENT (60%+) 5-YEAR (60%+) 10-YEAR (60%+) 15-YEAR (60%+) 20-YEAR (60%+) 25-YEAR (60%+) 30-YEAR (60%+) RIGHT SIZE HYBRID 60% + 15% TOTAL PROJECTED AREA NEEDS HYBRID w/ BUFFER (60%+) GROSS SQUARE FOOTAGE (GSF) TOTAL AREA NEEDS (NSF)TOTAL NON-PROGRAMMED A.18 EXECUTIVE SUMMARY NOVEMBER 2021 SPACE ALLOCATION: 3 PRIMARY SPACIAL AREAS OVER TIME AS PART OF NSF FOR THE 60% + BUFFER WORK MODEL. NOTE: These areas are net square footage values. The net to gross factor is not applied unless noted or referenced.. SPACE TYPES. The planning process produced a space needs evaluation and recommendation for all City departments that will be located in the Civic Center. The plan also includes an update to the conceptual site master plan completed in 2015, with design concepts to address future facility needs, parks, recreation, open space, arts & culture, and sustainability needs for the community. The master plan incorporates updated City design standards and policy changes from several planning efforts that have occurred since 2015. The space diagrams below and to the right express the square footage breakdowns at 15 years and 30 years. With a focus on the 15 year mark, which is the basis for the recommendations section and subsequent building and phasing. 58%27% 15% 38% 40% 22% 39% 41% 20% 40% 44% 16% CURRENT CURRENT RIGHT SIZED (60%+) 15-YR (60%+) 30-YR (60%+) 66,577 NSF 17,980 NSF 39,324 NSF 22,829 NSF 52,974 NSF 27,329 NSF 72,359 NSF 28,729 NSF STAFF/SUPPORT SPECIAL AUXILIARY EXECUTIVE SUMMARY A.19 FORT COLLINS: MASTER PLAN SPACE BREAKDOWN: 15-YR 60%+ WORK MODEL BREAKDOWN, NSF TO GSF 81,527 SF 49,689 SF 37,300 NSF 14,787 SF 17,429 NSF 16,765 NSF 8,567 NSF 226,064 NSF NON-PROGRAMMED AREA Non-programmed spaces required to support program spaces (mechanical, building storage, circulation, bathrooms, etc.) NET USABLE AREA (NSF) Usable floor space for specific programmatic/departmental functions GROSS AREA (GSF) Total of net usable area/square footage and non-programmed area. 55% NTG 55% NTG 8,133 SF 27,329 SF 12,200 SF 26,110 SF 11,735 SF 5,997 SF 44,840 SF 6,654 SF 22,360 SF 5,229 SF 11,190 SF 5,029 SF 2570 SF 36,687 SF 70% NTG 70% NTG 70% NTG 70% NTG 70% NTG STAFF AUXILIARY - CAFETERIA + BREAK AUXILIARY - GENERAL SPECIAL AUXILIARY - COLLABORATION + CONFERENCE SUPPORT AUXILIARY - WELLNESS A.20 EXECUTIVE SUMMARY NOVEMBER 2021 300B LAPORTE 300B LAPORTE PHASE 2A WELLNESS 24,000 SF PHASE 2B EXPANSION 48,000 SF RAISED PEDESTRIAN CROSSING CIVIC PLAZA ENTRANCE COURT ENTRANCE COURT INDOOR + OUTDOOR SURFACE PARKING SURFACE PARKING SERVICE INDOOR + OUTDOOR AMPHITHEATER SITE ACTIVITY NODE / PARK SITE ACTIVITY NODE 322 LAPORTE PHASE 1 NEW BUILDING 93,000 SF INDOOR + OUTDOOR INDOOR + OUTDOOR ENTRANCE COURT + CIVIC PLAZA LAPORTE EXECUTIVE SUMMARY A.21 FORT COLLINS: MASTER PLAN SERVICESERVICE FUTURE PARKING GARAGE SF TBD 215 MASON COMPOSITE MASTER PLAN PEDESTRIAN NODE GREEN SPACE WAYFINDING SPINE - PEDESTRIAN + BICYCLES PEDESTRIAN CIRCULATION FIRE ACCESS ROUTE AMPHITHEATER STORMWATER MANAGEMENT GATEWAYS SURFACE PARKING SERVICE EXISTING TREES CONVERTIBLE STREET (INCLUDES: BIKE LANE, PARKING, TROLLEY) BUILDINGS & SITE. The concept of the Civic Center master plan is focused around a central gathering space that crosses Howes and connects the two blocks. This space will support various community events while creating a visual and functional front door for the City Campus. The overall character of the site is a reflection of Washington Park through the preservation of existing tree canopy and the inclusion of landscape areas that define places for gathering and circulation. Art, landforms, and other site amenities will be used as visual wayfinding throughout the site. The existing buildings along the site’s perimeter will remain steadfast and hold with the surrounding context, while creating gateways to a reimagined Civic experience within. New, multi-story interior structures will prominently address the interior thoroughfare of Howes Street, as well as a prominent east-west civic plaza. Building massing will orient to maximize energy efficiency and sustainability goals, and will utilize stepped facades and setbacks to create additional upper-level outdoor opportunities. The relationship between new and existing structures will create pedestrian nodes and pathways to enhance the vitality of the campus, and create opportunities to reinforce the goals of the Downtown Masterplan. The majority of the parking will be kept to the exterior of the site and perimeter gateways will act as the front doors to the community for people arriving to the site through various modes of transportation. ENERGY AND SUSTAINABILITY. The planning process produced a space needs evaluation and recommendation for all City departments that may be located in the Civic Center. The plan also includes an update to the conceptual site master plan completed in 2015, with design concepts to address future facility needs, parks, recreation, open space, arts & culture, and sustainability needs for the community. The master plan incorporates updated City design standards and policy changes from several planning efforts that have occurred since 2015. A.22 EXECUTIVE SUMMARY NOVEMBER 2021 ALIGN WITH DOWNTOWN MASTER PLANREINFORCE SUSTAINABILITY GOALSIMPROVE WAYFINDINGCENTRALIZE SERVICESIMPROVE & EXPAND LOCAL CULTURAL EXPERIENCES X Centralize Services X Streamline Workflow X Improve Wayfinding X Reinforce Sustainability Goals X Align with Downtown Master Plan X Improve and Expand Local Cultural Experiences X Increase Collaboration X Support Outdoor Wellness & Events X Provide Resiliency X Increase Civic Transparency & Accessibility PROJECT IMPACT. FORT COLLINS: MASTER PLAN EXECUTIVE SUMMARY A.23 CONCLUSION. The recommendations developed through the Master Plan process resulted in a phased design solution that will be implemented to meet the growing needs of City departments in the immediate future and over a 30-year planning horizon. The recommendations, which are described in detail within the Master Plan, include the construction of a new municipal building, deconstruction and renovations to existing buildings, and construction and renovation of outdoor spaces, streets and streetscapes. This building effort will occur in two phases and multiple sub-STREAMLINE WORKFLOWINCREASE COLLABORATIONPROVIDE RESILIENCYINCREASE CIVIC TRANSPARENCY & ACCESSIBILITYSUPPORT OUTDOOR WELLNESS & EVENTS BACKGROUND INFORMATION B.25 FORT COLLINS: MASTER PLAN BACKGROUND INFORMATIONB B.26 BACKGROUND INFORMATION NOVEMBER 2021 BACKGROUND INFORMATION \ SITE ANALYSIS To fully understand the site, its assets, and its connection to the community we started with an extensive inventory of the site and community of Fort Collins. This inventory was based on four main categories: Culture, Ecology, Land Use, and Mobility. Culture included cultural assets, public art, and pedestrian pavers. Ecology included landforms and floodplains. Land Use included zoning, general improvement district and downtown development authority, parks, natural areas, public open space, downtown open space, and convertible streets. Mobility included bus routes and stops, bike routes, and trails. This inventory has been included in the appendix for reference. Through a study of this data, we’ve identified the following key characteristics. SITE CONTEXT. The City of Fort Collins’ Civic Center Master Plan site is located in downtown Fort Collins, and is comprised of two city blocks. The site is bordered to the west by Meldrum Street, to the north by Maple Street, to the east by Mason Street, and to the south by Laporte Avenue. The Burlington Northern Railroad (BNRR) and MAX bus rapid transit lines run parallel in Mason Street along the eastern project boundary. Howes Street bisects the properties between Mason and Meldrum creating two square city blocks. The west half is known as Block 42 and the east half is known as Block 32. To the north of the site is the Cache La Poudre River. This area has become a recreational resource for the City and this plan will capitalize on opportunities to connect to the trail networks along the river and vacated rail line. To the east of the site is historic Old Town and the River District. This area is a cultural center for Fort Collins and an asset to the site. Connectivity to this area will be increased and promoted as part of this plan. South of the site is the main body of the Civic Center District with facilities that serve both the City and the County. These include the Justice Center and Civic Center Park directly south of the site and another block further is the Courthouse. To the west of the site is a residential neighborhood. This is a major shift in land use and scale. The plan will be sensitive to this area and respect the neighborhood’s character and aesthetic with its proposed solutions for the west half of the site. Both blocks have areas within the City’s floodplain and been identified as having 100-year moderate and high-risk flooding as well as portions of the adjacent streets being identified as floodways. The site is relatively flat with mild slopes. There are existing City buildings, drives, parking lots, and landscaping on the two blocks, many of which will be deconstructed as the long-range master plan evolves. Washington Park currently occupies the northeast portion of Block 42, and is generally recommended to remain as a park. SITE CHARACTER. Currently, the site does not act as one cohesive district for the City of Fort Collins. There is a lack of campus environment connecting the current buildings from east to west due to several factors. First, Howes Street, itself, acts as a physical barrier. There is also wide range in the architectural styles used for the existing public buildings and the surrounding plazas, green spaces, and parking. In addition to this, the edges of the block lack a unified design for the streetscapes, with the exception of Mason Street. BACKGROUND INFORMATION B.27 FORT COLLINS: MASTER PLAN LAND USE: ZONING (White Hatch) Civic Center Structures Roads Lakes, Rivers, Streams Rail Road Downtown Med. Density Mixed-Use Neigh. Consrv. Buffer Neigh. Consrv. Med. Neigh. Consrv. Low Industrial Public Open Lands CSU Urban Estate Employment Com. & Neigh. Commercial Limited Commercial DDA Historic Core DDA Campus North DDA Entryway Corridor DDA Innovation DDA Poudre River Corridor DDA River DDA Civic DDA North Mason DDA Canyon Avenue DDA Boundary & Internal Districts Cherry Street Maple Street Laporte Avenue West Mountain Avenue West Mulberry Street North College AvenueN Meldrum StN Mason StS Howes StSouth College AvenueSouth Shields StreetEast Laurel Street East Mulberry Street E Mountain Ave East Lincoln Avenue P o u d r e R i v e rLinden StreetEast Vine DriveNorth Shields Street B.28 BACKGROUND INFORMATION NOVEMBER 2021 TRAFFIC. While Fort Collins has created a remarkably accessible and convenient multi-modal network and seen a significant mode shift as a result, it is expected many person trips to the civic center will continue to be by motor vehicle. Fortunately, this site benefits from not only dispersion of traffic from the downtown street grid, but convenient connections to regionally significant routes like College Avenue (US 287), Jefferson Street (CO 14), and Laporte Avenue. These are all expected to continue to serve as the primary routes to and from the civic center campus. COLLEGE AVENUE: This backbone north-south street in Fort Collins is also US Highway 287. It is a four-lane urban street that carries approximately 22,000 vehicles per day (vpd). Near the campus there is on street diagonal parking and wide sidewalks with building faces adjacent to the street right-of-way. Bikes are prohibited on the street and the sidewalks are considered a dismount zone. MASON STREET: This is a parallel route to College Avenue, carries approximately 3,400 vpd, and is continuous from University Avenue within the CSU campus up to Cherry Street, just north of the civic center. This low-stress alternative to College Avenue is popular for bikes and is the location of the MAX transit line. Though closed to vehicular traffic south of University, this corridor is open to bikes, pedestrians, and transit south to Harmony Street, making it a popular route into downtown by modes other than vehicles. In downtown, the BNSF Railway track runs down the median. While travel along Mason Street in relation to the tracks has been improved with the introduction of the MAX bus line, crossing Mason Street is limited to existing locations because of the tracks. HOWES STREET: This bisects the campus, and like Mason Street runs from the CSU campus to Cherry Street. The current daily traffic is 3,000 vpd. It currently has a single lane in each direction, back-in diagonal parking, bike lanes, and sidewalks. This is planned to be reconstructed as a convertible street as shown in the 2017 Fort Collins Downtown Plan. JEFFERSON STREET: Like College Avenue, this is a primary arterial corridor into and out of downtown. This route which is also Colorado Highway 14 (CO 14) and a truck route has approximately 15,000 vpd. It connects with Mulberry Street and ultimately Interstate 25, making it a strong regional vehicular route into downtown. LAPORTE AVENUE: This is one of the primary local streets connecting the west side of Fort Collins into downtown. The street, which has approximately 6,500 vpd, is a two-lane street with on street parking and bike lanes up to Howes Street. At College Avenue, the street turns southeast and becomes Walnut Street. MAPLE STREET: This low volume local street carries approximately 2,100 vpd and is an alternate east-west route to the civic center campus. It is a two-lane street with on-street parking. There are no centerline markings due to the low traffic volumes, and therefore no marked bike lanes. It is, however, identified as a low stress bike facility due to the low vehicular speeds and volumes. PARKING. Currently the site is served by surface parking lots located throughout the site with the main lots located on the northeast corner, central west, and southwest corner. On-street parking can be found along the perimeter streets with the exception of Mason. The Civic Center Parking Garage, which is located on the block to the southeast of the site, also serves the area. However, a larger number of employees still utilize the neighborhood to the west for parking. As additional buildings are proposed for the site, consideration for replacing the existing surface lots should be taken into account to provide the highest and best use for the land as well as providing for future growth and parking needs. BACKGROUND INFORMATION B.29 FORT COLLINS: MASTER PLAN MOBILITY: DOWNTOWN PARKING [INSERT ZOOMED IN DOWNTOWN PARKING & STREET MASTERPLAN DIAGRAM] [I[I[I[I[I[I[NSNSNSNSNSNSSSSNSSSNSSERERERERERERERERERERETTTTTTTTT ZOZOZOZOZOZOZOZOZOZOZOZOZOMOMOMOMOMOMOMOMOMOMOMOMOMMEEDEDEDEDEDDEEEDEDEE IIIIIIIIII NNNNNNNNNNN DODODODODODODODODOODODODOWNWNWNWNWNWNWNWNWNWNWNWNWNNTOTOTOTOTOTOTOTOTOTOTOTOTOTOWNWNWNWNWNWNWNWNWNWNWNWNWW PPPPPPPPPPPPPPARARARARARARARARARARARARARKIKIKIKIKIKIKIKIKKNGNGNGNGNGNGNGNGNGNGNNNN &&&&&&&&& STSTSTSTSTSTSTSTSTSTSTSTSTSTRERERERERERERERERERREETETETETETETETETETETTET MMMMMMMMMMMM ASASASASASASASASASASASAASTETETETETETETETETETETETTRPRPRPRPRPRPRPRPRPRPRRPPPLALALALALALLALALANNNNNNNNNNNNN DIDDDIDIDDDDDDDAGAGAGAGAGGGGGGGGRARARARARARARARARARARARARARAM]M]M]M]M]MMMM Parking Garage Surface Parking Lot RP3 Zones - Res. Parking 2 Hour Parking Zone 15-30 Min Parking Zone Unsigned Parking Zone Accessible Parking Maple St Laporte Ave W Mountain Ave North College AvenueN Howes StN Mason StSouth College AveLinden StreetCity Hall Observation Service Justice Center Mountain Cafe Court House Global Village Museum Civic CenterParking GarageCity of Fort Collins Utilities Haiston Oil Park Shop Eco-Thrift 215 NMansonWellness Annex Social Sustainability Terracon Penny Flats Downtown Transit Center St. Joseph’s Catholic School Civic Center DDA Boundary B.30 BACKGROUND INFORMATION NOVEMBER 2021 MOBILITY: BIKE AND BUS [INSERT ZOOMED IN DOWNTOWN PARKING & STREET MASTERPLAN DIAGRAM] Maple St Laporte Ave W Mountain Ave North College AvenueN Howes StN Mason StSouth College AveLinden StreetCity Hall Observation Service Justice Center Mountain Cafe Court House Global Village Museum Civic CenterParking GarageCity of Fort Collins Utilities Haiston Oil Park Shop Eco-Thrift 215 NMansonWellness Annex Social Sustainability Terracon Penny Flats Downtown Transit Center St. Joseph’s Catholic School Civic Center DDA Boundary Pace Bike Share Shared Rd: Low Traffic Shared Rd: High Traffic Cyclists Prohibited on Rd Bike Lane GapBike Lane: Low Vol./Sp. Bike Lane: High Vol./Sp.Bus Stop Bus Stop - Accessible MAX Bus Stop - Accessible BACKGROUND INFORMATION B.31 FORT COLLINS: MASTER PLAN CONNECTIVITY. Fort Collins has been developing a robust bike, pedestrian, and transit network. While the site itself does not have strong internal connections, it is set up for a strong connection to the City. Mid-block pedestrian crossings are in place on both Maple Street and LaPorte Avenue. Similarly, the signalized crossings at the northeast and southeast corners of the site provide convenient pedestrian access to the Transfort Downtown Transit Center (DTC) and the commercial areas of downtown. Mason Street, in addition to being a primary transit corridor, is a popular bike route as it is a low-stress alternative to College Avenue with similar north-south continuity. A stronger streetscape design is needed to reinforce the connections to the adjacent land uses, and in particular to Old Town and the southern half of the Civic Center District. GREEN SPACE. From the very beginning of the process, it was apparent that public green space needed to play a significant role in the final design of the site. This is in part due to the limited green spaces currently serving the community in the area. One of which is found on site, Washington Park, a small neighborhood park on the north half of the western block. Due to this lack of green space, there is a strong desire to maintain Washington in some manner. Washington Park is the second oldest park in the city and has a well-established tree canopy. It offers the largest contiguous green space on the site. In addition to maintaining Washington Park, there are several other green spaces on site, including a xeric-scape garden by City Hall and two stormwater management cells on the east block. Due to the community need for additional green space within the area, the existing spaces should be maintain and expanded upon. SITE AMENITIES. Currently on site, the special amenities are limited to a few green spaces on site created to address storm water north of 222 Laporte and northwest of 215 Mason, a xeric-scape garden by City Hall, and Washington Park, all previously mentioned in the public green spaces section. In addition, there are several Art in Public Places installations as well as Transformer Cabinet Murals. There is a strong desire to have a range of outdoor spaces that can be used for both work and recreation as well as art and cultural elements that create a dynamic and vibrant atmosphere. EVENT SPACE. Event spaces are an important part of the culture within Fort Collins. Currently on site, Howes is being utilized for festivals and community events. Similarly, Civic Center Park, to the south, is also used for events. However, the layout of the Civic Center Park limits the size of events that can be held there. There is a City wide need to have a larger event space that can provide a variety of spaces and venues to accommodate the community now and into the future. GREEN INFRASTRUCTURE. Currently on site there several vehicular charging stations as well as photovoltaic cells on the roof of 222 Laporte. The master plan will expand upon these initial steps with a net-zero goal for the campus. EXISTING UTILITIES. EXISTING WATER. Existing water mains surrounding the site include a 16” main in Maple, a 12” main in Laporte, 8” mains in Mason and a portion of the north end of Howes, and 4” mains in Howes and Meldrum. There appears to be sufficient capacity in the nearby water mains that are 8” or larger. While service lines may be abandoned and/or rerouted, no replacement or realignment of water mains are expected as part of the Civic Center Master Plan. B.32 BACKGROUND INFORMATION NOVEMBER 2021 ECOLOGY: PARKS AND GREEN SPACE Cherry Street Maple StreetLaporte Avenue West Mountain Avenue West Mulberry Street N Meldrum StN Mason StS Howes StSouth College AvenueSouth Shields StreetEast Laurel Street East Mulberry Street E Mountain Ave East Lincoln Avenue P o u d r e R i v e rLinden StreetEast Vine Drive (Red Hatch) Civic Center Structures Roads Lakes, Rivers, Streams Rail Road Parks Natural Areas General Green Space Civic Center Park Freedom Square Park Streets Park City Park Main Library Washington Park East Side Park Lee Martinez Community Park Legacy Park Northside Aztlan Community Center Buckingham Park BACKGROUND INFORMATION B.33 FORT COLLINS: MASTER PLAN EXISTING SANITARY SEWER. Existing sanitary sewer mains adjacent to the site include a 12” main in Maple, an 8” main in the mid-block alley that runs north/south between Mason and Howes along the pedestrian spine, and a 6” main located in Howes. There appears to be sufficient capacity in the nearby sanitary sewer mains that are 8” or larger. While service lines may be abandoned and/or rerouted, no replacement or realignment of sewer mains are expected as part of the Civic Center Master Plan. EXISTING STORM DRAINAGE. Existing storm drains include a large 72”x144” concrete box culvert located in the mid-block alley along the pedestrian spine, a 42” storm pipe located in Howes, a 36” storm pipe located in Laporte between Howes and the mid-block alley, a 42” storm pipe located in Laporte between Howes and Meldrum, a 36” storm pipe located in Mason, 15” and 12” storm pipes located in Maple, and a minor storm pipe located in the south half of Meldrum. Other minor storm pipes in the 4” to 12” range are located on Block 32 as part of the existing stormwater treatment facilities and roof drain discharges. Existing storm pipes are expected to continue to serve both Blocks 32 and 42. Replacement or realignment of storm drains is not anticipated with the Civic Center Master Plan. In addition to the underground storm drains, there are also three engineered surface stormwater management facilities in the project area, all of which are located east of Howes on Block 32. 222 Laporte has a rain garden to its southwest and a Porous Landscape Detention (PLD) facility to its north. A water quality pond is located northwest of 215 Mason. The PLDs and water quality pond have specific volumes and operational parameters that need to be preserved. There are currently no inadvertent stormwater storage volumes to maintain nor any regulatory floodplain requirements impacting the Civic Center Master Plan. However, floodplain mapping and requirements can change over time, so it is recommended to consult with the local floodplain administrator prior to each major design phase. Additionally, portions of the adjacent public streets are currently part of the Old Town high-risk floodway and floodplain. This could have design and permitting implications for improvements within the right-of-way of Maple, Meldrum, and Laporte. EXISTING DRY UTILITIES. The following dry utility companies have facilities in the area, including various mains in public right-of-way and utility easements, as well as private service lines: X CenturyLink – broadband/telecommunications (copper and fiber) X Comcast – broadband/telecommunications (coax and fiber) X Fort Collins Connexion – broadband/telecommunications (fiber) X Fort Collins Light and Power – electric power X Xcel Energy – natural gas There appears to be sufficient capacity in the nearby mains. However, early coordination with the respective providers is strongly encouraged. While some on-site service lines, transformers, etc. will likely be relocated, it is not anticipated that significant main line replacement or realignment will be driven by the Civic Center Master Plan. That said, it is imperative to maintain early and ongoing communication with those who own facilities in the area. B.34 BACKGROUND INFORMATION NOVEMBER 2021 \ CLIMATE ANALYSIS The changing climate has impacted Fort Collins and the Front Range greatly over the last few decades. Extreme storm events, wildfires, and the water quality and availability are all issues that will be need to be taken into consideration with regard to the Civic Center Master Plan and its sustainability goals. The City of Fort Collins already has an extensive Climate Action Plan, Energy Policy, and Zero Waste Plan put in place that will be incorporated into the design and features in the buildings and site features of the master plan. The graphs below show climate averages for the city of Fort Collins. Based on a 5-year average (2016-2020), Fort Collins has 6466 heating degree days and 1056 cooling degree days, both using a base temperature of 65 F. The average temperature ranges from lows below 20-degree F to highs near 85-degree F. The high levels of sunshine days per year and the comfortable climate with low humidity allow for opportunity to provide for passive design strategies as well as solar power generation on rooftops and shade structures. For the climate analysis, we started with a high-level concepts and goals for the site, focusing on: GLOBAL FACTOR: Focusing on reduction of greenhouse gases, water conservation, & ways to achieve net zero goals. ECONOMIC FACTOR: Focus on Triple-bottom-line methodology (TBL). Create a culture of sustainability by fostering progressive, environmentally-conscious thoughts and practices in the community. Provide visible opportunities to showcase sustainability on site as an educational tool. SUSTAINABILITY FACTOR: Material Selection focusing on reduction of embodied carbons and zero waste initiatives. HUMAN FACTOR: Creating healthy spaces focused on wellness, mindfulness, diversity & inclusion, universal design, human interaction and connectivity. SITE CONDITIONS CULTURE PEOPLEPROFIT PLANET BUILDING ENVELOPE MASSING + ORIENTATION LIGHTING POWER + CONTROLS BUILDING ENVELOPE THERMAL COMFORT PLUG + PROCESS LOADS HVAC SYSTEM TYPES BACKGROUND INFORMATION B.35 FORT COLLINS: MASTER PLAN AVERAGE WIND: FORT COLLINS, CO AVERAGE TEMPERATURE + PRECIPITATION: FORT COLLINS, CO 100 F JAN FEB MAR APR MAY JUN JUL AUG SEPT OCT NOV DEC PRECIPITATION 80 F 60 F 40 F 20 F 0 F LOW HIGH 9.0 8.0 6.5 5.5 JAN FEB MAR APR MAY JUN JUL AUG SEPT OCT NOV DEC 8.5 7.5 7.2 7 7.5 7.6 6.5 6.3 5.9 5.6 6 6.6 6.8 6.6 7.0 6.0 WIND (MPH) WIND MAX (MPH) B.36 BACKGROUND INFORMATION NOVEMBER 2021 AVERAGE SUNSHINE DAYS: FORT COLLINS, CO AVERAGE WIND SPEEDS: FORT COLLINS, CO 100 30 90 80 60 40 20 30 15 10 5 JAN JAN FEB FEB MAR MAR APR APR MAY MAY JUN JUN JUL JUL AUG AUG SEPT SEPT OCT OCT NOV NOV DEC DEC HUMIDITY (%) SUNSHINE DAYS 70 50 25 20 10 0 0 WIND SPEED BACKGROUND INFORMATION B.37 FORT COLLINS: MASTER PLAN ANNUAL WIND CHARACTERISTICS: FORT COLLINS, CO EASTWEST 40 35 30 25 25 MAX AVG MIN MIN 20 AVG 15 MAX 10 5 00% AVGRH HOURS TEMP WIND SPEED (MPH) 100% 10% 20% B.38 BACKGROUND INFORMATION NOVEMBER 2021 \ PRECEDENT IMAGES Precedent images were utilized to open up conversation about how different types of outdoor spaces could function, look, feel, and connect to adjacent buildings. Specific imagery was selected that conveyed and emphasized the “big ideas” of each initial site layout concept, and was generally broken down into these categories: X Convertible Streets X Event Spaces X Edges and Streetscapes X Arts and Culture X Outdoor Dining X Outdoor Workspace X Wellness X Pedestrian Connections CONVERTIBLE STREETS. Creating a street that can serve multiple functions, not only for driving and parking. The street’s design can serve as a flexible event space, while being pedestrian friendly when used by vehicles. Several examples such as Linden Street have been successful in Fort Collins and provide residents with additional outdoor pedestrian-friendly spaces that can be used for events. BACKGROUND INFORMATION B.39 FORT COLLINS: MASTER PLAN EVENT SPACES. Outdoor spaces that are flexible and can be used for a variety of events. These may include concerts, festivals, movie nights, and art shows. The spaces should function as passive park space when not in use to provide additional green space to residents and users of adjacent buildings. B.40 BACKGROUND INFORMATION NOVEMBER 2021 EDGES + STREETSCAPES. Areas along the perimeter of the site that address the surrounding neighborhood to tie into the adjacent urban fabric. Gateways, nodes, and screening should be located at the perimeter of the site where required, working in conjunction with the design of the new site. These spaces will be multi-functional, providing pass- through corridors, stormwater management solutions, and transit connectivity. BACKGROUND INFORMATION B.41 FORT COLLINS: MASTER PLAN ARTS + CULTURE. The site should be designed with arts and culture in mind. Providing spaces for public artwork, along with future opportunities to add additional art installations should be a priority. Flexible event spaces to allow for cultural events and festivals should be tied into the overall master plan where possible. B.42 BACKGROUND INFORMATION NOVEMBER 2021 OUTDOOR DINING. Opportunity for users to dine outdoors in a variety of spaces should be provided as an amenity. These areas may be part of larger flexible spaces used for events and meetings. Strong connections should be created between indoor and outdoor dining spaces throughout the site. BACKGROUND INFORMATION B.43 FORT COLLINS: MASTER PLAN OUTDOOR WORKSPACES. Flexible outdoor areas for working, having small conferences, and giving small group presentations should be integrated into the site. These spaces can be multi-functional but designed to provide users with multiple options in which they can work. B.44 BACKGROUND INFORMATION NOVEMBER 2021 WELLNESS. Planned active and passive wellness spaces that can be flexible yet provide an important amenity for users. These spaces should provide spaces for a variety of wellness functions, and my also act as passive green space when not in use. BACKGROUND INFORMATION B.45 FORT COLLINS: MASTER PLAN PEDESTRIAN AND BIKE SPINE. Connections to adjacent neighborhoods, and access through the site for pedestrians and cyclists. Although primarily pass-through spaces, they will be key to providing access to the site and will be critical to the project. These spaces should be designed to work in conjunction with adjacent outdoor areas. SPACE EVALUATION C.47 FORT COLLINS: MASTER PLAN SPACE EVALUATIONC C.48 SPACE EVALUATION NOVEMBER 2021 COUNCIL CHAMBERS MUNICIPAL COURT CPIO FCTV EMERGENCY PREP & SECURITY INFORMATION TECHNOLOGY PDT: PARKING SERVICES/ TRANSFORT Department Internal Services Cluster Customer Service Department Outside of Civic Center CITY MANAGER CITY ATTORNEY CITY CLERK \ SPACE PLANNING PROCESS DEPARTMENT STRUCTURE AND ADJACENCIES. Space planning for this master plan incorporates a variety of information sources, but it began with understanding, establishing, and assessing the relationships between the various departments of the City of Fort Collins. Focus was placed on departments in the Civic Center and departments intended to move into the Civic Center, as determined by civic leadership. These department relationships, along with the subsequent space and staff projections in the following pages, are informed by combining input from the following: 1. Individual Department Meetings 2. Department Questionnaires 3. Department Structure and Position Maps - Current and Future 4. City growth trends 5. A shift to a distributed work model The chart to the right represents the relationships and interactions between civic center departments. Connecting lines and line weights identify spatial and functional adjacencies. The small clusters of high activity and interaction identify the collection of sub-departments that create a larger umbrella department. These collections of sub-departments operate and associate with the rest of the Civic Center in a vast network of associations. The identified structure varies from the City’s organizational chart, but is integral to the space planning process and influences the staff projections and future building organization. The associations and clusters shown highlight that certain departments can and do require a closer physical proximity to function in the best possible manner. These relationships are explored further in the recommendations section. SPACE EVALUATION C.49 FORT COLLINS: MASTER PLAN CITY DEPARTMENTS: ADJACENCY AND RELATIONAL STRUCTURE FOR CIVIC CENTER RELATED CITY OF FORT COLLINS DEPARTMENTS FINANCIAL SERVICES: SAFETY & RISK MNGMT HUMAN RESOURCES PDT: CDNS PDT: FC MOVES PDT: ENGINEERING MEDIATION & RESTORATIVE JUSTICE WELLNESS CENTER CITYCARE CLINIC CITY SAFE WELLNESS UTILITIES: ENERGY SERVICES UTILITIES: WATER CONSERVATION UTILITIES: COMMS & MARKETING UTILITIES: COMMUNITY ENGAGEMENT UTILITIES: CUSTOMER CARE & TECH UTILITIES: CUSTOMER ACCOUNTS BROADBAND SS: SOCIAL HEALTH SS: ENVIR SUSTAINABILITY SS: ECONOMIC HEALTH FINANCIAL SERVICES CS: RECREATION CS: PARK PLANNING & DEVELOPMENT CS: CULTURAL SERVICES OP: REAL ESTATE OP: PROJECT MANAGEMENT PLANNING & DESIGN OP: FACILITIES MNGMT SALES TAX C.50 SPACE EVALUATION NOVEMBER 2021 PLANNING PROCESS: THE STEPS AND STRUCTURE OF THE SPACE AND STAFF PROJECTION PROCESS FOR THE FORT COLLINS CIVIC CENTER MASTER PLAN. PROCESS. These pages outline the stages of the space planning process. This process included assessment of existing space, valuation of space, assessment of staff, projection of growth through user and data driven input, and updating existing space standards to align with more appropriate standards ideal for current needs and the selected work model. The subsequent pages identify the standards and associated utilization rates adopted for the space projections. 1 2b 2c 2a = ? = SF CURRENT STANDARDS ASSESSMENT CURRENT POSITIONS ASSESSMENT CURRENT SPACE ASSESSMENT CURRENT DEPARTMENTS ASSESSMENT NE W EXIS TI NG SPACE EVALUATION C.51 FORT COLLINS: MASTER PLAN 3b 4 3c 3a SF SF OVER TIME = = = USER INPUT + DEPT. GROWTH RATES + CITY GROWTH RATES SPACE IDENTIFICATION VALUATION ADDITION FUTURE POSITIONS RIGHT SIZED STANDARDS PROJECTIONS NE W EXIS TI NG C.52 SPACE EVALUATION NOVEMBER 2021 UTILIZATION RATES: FACTORS APPLIED TO TOTAL STAFF COUNTS AND SQUARE FOOTAGE STANDARDS FOR AUXILIARY SPACE PROJECTIONS, SEE APPENDIX FOR FURTHER DETAILSTOTAL S T A F F CIVIC C E N T ERTOTAL S T A F F CIVIC CE N T ERTOTAL S T A F F CIVIC CE N T ERTOTAL S T A F F CIVIC C E N T ERTOTAL S T A F F CIVIC C E N T ER50% 7 % 7 % 6% 6 % 6% 6%WELLNESSCONFERENCEHUDDLE/PHONECAFE/BREAK10% OF 7% - LARGE 7% OF 6% - CAFE/ CAFETERIA 40% OF 7% - MEDIUM 75% OF 6% - BREAK/ KITCHENETTE/COFFEE 40% OF 6% - PHONE 50% OF 7% - SMALL 18% OF 6% - LOUNGE 60% OF 6% - COLLAB SPACE EVALUATION C.53 FORT COLLINS: MASTER PLAN NOTE: THIS CHART SHOWS THE TYPICAL SQUARE FOOTAGE PER PERSON VALUE FOR SPECIFIC SPACE TYPES. NOT EVERY VALUE IS APPLIED TO THE FULL STAFF COUNT OF THE CIVIC CENTER. SEE THE DEPARTMENT PROJECTION SECTION IN THE APPENDIX FOR AN ADDITIONAL BREAKDOWN AND THE MULTIPLIERS APPLIED. 1 TO 1 RATIOS: SQUARE FOOTAGE VALUES PER PERSON TYPICAL THROUGHOUT THE SPACE PLANNING PROCESS 300.00 725.00 175.00 20.00 40.00 21.33 40.00 22.50 45.00 40.00 30.00 80.00 300.00 180.00 140.00 80.00 64.00 64.00 36.00 36.00 13.00 0.04 0 100 200 300 400 500 600 700 800 CAFÉ/BREAK - BREAK/KITCHEN/COFFEE CAFÉ/BREAK - CAFÉ/CAFETERIA CAFÉ/BREAK - LOUNGE CONFERENCE - L - LOWER CONFERENCE - L - UPPER CONFERENCE - M - LOWER CONFERENCE - M - UPPER CONFERENCE - S - LOWER CONFERENCE - S - UPPER CONFERENCE - XL HUDDLE - COLLAB PHONE RECEPTION STAFF WORKSPACE (PO-1) STAFF WORKSPACE (PO-2) STAFF WORKSPACE (WS-1) STAFF WORKSPACE (WS-2) STAFF WORKSPACE (WS-3) STAFF WORKSPACE (WS-4) STAFF WORKSPACE (WS-5) WELLNESS WORK/COPY TYPICAL SQUARE FEET PER PERSON (1:1) C.54 SPACE EVALUATION NOVEMBER 2021 FIELD CREW (WS-5)36 SFFIELD CREW (WS-4)16 SF SERVICE DIRECTOR (PO-1)180 SF SERVICE DIRECTOR (PO-1)180 SF STAFF ALLOCATION: NEW SPACE STANDARD VS 2015 STANDARD FOR STAFF POSITION TYPES (SF PER PERSON) NEW - STAFFPREVIOUS - STAFF DIVISION HEAD (WS-1)80 SF DIVISION HEAD (PO-3)140 SF SUPERVISOR MANAGER (WS-2) SUPERVISOR MANAGER (WS-1)80 SF 64 SF STAFF - TYP (WS-3)64 SF STAFF - TYP (WS-2)64 SF PTE/INTERN/ TEMP/ VOLUNTEER (WS-4) 36 SF PTE/INTERN/ TEMP/ VOLUNTEER (WS-3) 32 SF DIRECTOR DEPARTMENT HEAD (PO-2)140 SF DIRECTOR DEPARTMENT HEAD (PO-2)180 SF SPACE EVALUATION C.55 FORT COLLINS: MASTER PLAN STAFF ALLOCATION: NEW SPACE STANDARD VS 2015 STANDARD FOR CONFERENCE SPACES (SF PER GROUP SIZE) AND THE NEW BREAK SPACE STANDARD (SF PER PERSON) CONFERENCE XL (30+) 1,200 SF 725 SF 300 SF 175 SF L (15-30) 600 SF M (8-15) 320 SF S (4-8) 180 SF PHONE 120 SF COLLAB 60 SF CAFE/ CAFETERIA BREAK/ KITCHEN/ COFFEE LOUNGE BREAK C.56 SPACE EVALUATION NOVEMBER 2021 EXISTING BUILDING ANALYSIS SPACE EVALUATION C.57 FORT COLLINS: MASTER PLAN C.58 NOVEMBER 2021SPACE EVALUATION 215 MASON BUILDING SUMMARY. 215 Mason is a 71,825 SF, 3 story facility without a basement. It was built in 2001 and has undergone many renovations throughout the years to rework areas for the moving and changing of departments. The building primarily houses internal departments that assist the city’s needs. However, the first floor is home to Municipal Court and Parking Services which service the public. Out of the buildings to remain, 215 Mason accommodates the largest wellness area. Functionally, the building struggles to separate the higher safety risk Municipal Court customer service components from the lower risk customer service areas and internal offices. There is no central reception and way finding can be difficult. Collaboration and Conference spaces are primarily owned by individual departments and those that are shared are not adequate for current staff needs. LAPO RTE SPACE EVALUATION C.59 FORT COLLINS: MASTER PLAN Net Square Footage SPACE TYPESAge of Building Year Built Gross Square Footage SUPPORT Overall Condition DEPARTMENTSCollaboration Building Support DEPT - Finance - Accounting DEPT - Comm. Services - Park Plan & Develop. DEPT - Information Technology DEPT - Municipal Court DEPT - Plan, Develop. Trans. - Transfort/Parking DEPT - CPIO - Comm. and City Engagement DEPT - Finance - Safety & Risk Management DEPT - Human Resources DEPT - City Attorney DEPT - Finance - Purchasing DEPT - Comm. Services - Cultural Services Shared Support Circulation DEPT - Finance - Budget DEPT - Comm. Services - Recreation DEPT - Finance DEPT - Emergency Preparedness OTHER - CIRC./MEP/BUILDING SUPPORT AUXILIARY - COLLAB + CONFERENCE AUXILIARY - CAFETERIA + BREAK AUXILIARY - WELLNESS AUXILIARY - GENERAL SPECIAL STAFF Functionality CONDITIONS12345 Poor Excellent 3 % NSF 1 % NSF 13 % NSF 10 % NSF 4 % NSF 29 % NSF 3 % NSF 37 % NSF 20 YRS 2001 71,825 SF 66,479 SF 6,563 NSF 2,726 NSF 1,552 NSF 2,228 NSF 2,130 NSF 1,363 NSF 5,770 NSF 9,849 NSF 3,497 NSF 3,497 NSF 385 NSF 1,555 NSF 518 NSF 2,191 NSF 8,987 NSF 876 NSF 2,169 NSF 4,676 NSF 2,870 NSF THIRD FLOORSECOND FLOORFIRST FLOOR C.60 NOVEMBER 2021 BUILDING SUMMARY. 222 Laporte building, was the result of the 2015 Master Vision Plan. The building was constructed in 2017 and is the newest in the Civic Center. The 44,624 SF facility is 3 stories, without a basement. Known as the Utilities Building, 222 Laporte was built to support the Utilities sub-departments within the Civic Center. Sustainability Services and Broadband plan to share the building, until Utilities needs the entire space. Currently, this building houses the largest conference/training room in the Civic Center. Utilities and Broadband have customer service needs, which are met by reception off the main lobby. Due to the public lobby, the building has required modifications to the elevator to improve security for the floors above. Access is a challenge for interdepartmental meetings. The open office concept is appreciated by staff, but there can be issues with noise and privacy. There is a lack of collaboration and conference room spaces to accommodate privacy and meeting needs. 222 LAPORTE SPACE EVALUATION LAPORTE SPACE EVALUATION C.61 FORT COLLINS: MASTER PLAN Net Square Footage Age of Building SPACE TYPESSUPPORT Year Built Gross Square Footage Overall Condition FunctionalityCONDITION DEPARTMENTSCollaboration Building Support DEPT - Utilities - Community Engagement DEPT - Sustain. Services - Environ. Sustainability DEPT - Utilities - Water Resources DEPT - Sustain. Services - Admin DEPT - Utilities - Customer Support DEPT - Utilities - Energy Services DEPT - Broadband DEPT - Utilities - Customer Connections Admin OTHER - CIRC./MEP/BUILDING SUPPORT AUXILIARY - COLLAB + CONFERENCE AUXILIARY - CAFETERIA + BREAK AUXILIARY - WELLNESS AUXILIARY - GENERAL SPECIAL STAFF DEPT - Sustain. Services - Economic Health Shared Support Circulation DEPT - Utilities - Customer Accounts DEPT - Sustain. Services - Social Sustainability DEPT - Utilities - Communication and Marketing 12345 Poor Excellent THIRD FLOORSECOND FLOORFIRST FLOOR2 % NSF 1 % NSF 1 % NSF 16 % NSF 5 % NSF 31 % NSF 1 % NSF 43 % NSF 6,054 NSF 4 YRS 2017 41,624 SF 37,754 SF 4,468 NSF 2,798 NSF 2,102 NSF 479 NSF 5,850 NSF 1,328 NSF 1,584 NSF 1,753 NSF 255 NSF 1,111 NSF 228 NSF 4,963 NSF 1,419 NSF 1,683 NSF 1,681 NSF C.62 SPACE EVALUATION NOVEMBER 2021 BUILDING SUMMARY. 281 College is outside of the main Civic Center blocks, just to the East on College Avenue. It is the oldest building, dating earlier than 1900s. It began as a livery stable and later became a lumber yard. The city purchased the building in the 1990s. It is 42,680 SF, 2 story building without a basement. The Planning, Development & Transportation department utilizes the entire building. This building sees heavy public traffic due to the nature of the work of the PDT. There are issues with public wayfinding, which leads to staff interruptions, and lack of area for document storage. The building has been divided and separated into many rooms, which is good for quiet workrooms, but difficult for collaboration. The City anticipates selling 281 as part of the Civic Center development. 281 COLLEGE SPACE EVALUATION C.63 FORT COLLINS: MASTER PLAN SECOND FLOORFIRST FLOORNet Square Footage SPACE TYPESAge of Building 1 Year Built Gross Square Footage SUPPORT Overall Condition Collaboration Building Support DEPT - PDT - CDNS - Neighborhood Services DEPT - PDT - CDNS - Building Services DEPT - Plan, Develop, Trans. (PDT) Admin DEPT - PDT - CDNS - Planning Shared Support Circulation DEPT - PDT - FC Moves DEPT - PDT - Engineering OTHER - CIRC./MEP/BUILDING SUPPORT AUXILIARY - COLLAB + CONFERENCE AUXILIARY - CAFETERIA + BREAK AUXILIARY - WELLNESS AUXILIARY - GENERAL SPECIAL STAFF Functionality CONDITIONS234 5 DEPARTMENTSPoor Excellent 2 % NSF 0 % NSF 1 % NSF 9 % NSF 5 % NSF 44 % NSF 1 % NSF 38 % NSF 2,925 NSF 1,551 NSF 4,886 NSF 4,460 NSF 794 NSF 2,788 NSF 87 NSF 7,547 NSF 1,703 NSF 6,791 NSF 121 YRS 1900 42,680 SF 33,532 SF C.64 SPACE EVALUATION NOVEMBER 2021 LAPORTE BUILDING SUMMARY. 300A Laporte is known as City Hall. It is a split level building, with bermed earth around the East side to allow for entry at the main level. The building was built in the 1980s and is 35,007 SF with a basement. The East side, main level, has an open lobby that leads to the City Council Chambers. The East side basement houses FCTV’s television studio. The West portion of the building is primarily offices for the City Manager, City Clerk, and City Attorney. The main server/data center for the campus is within the west offices. The City Council Chambers are not adequate for current needs and technology. There are security issues with the open foyer and lack of central reception. The City intends to deconstruct the East side of 300A Laporte as part of the Civic Center development and relocate the City Council Chambers to another location within the Civic Center. 300A LAPORTE SPACE EVALUATION C.65 FORT COLLINS: MASTER PLAN UPPER LEVELMAIN LEVELLOWER LEVELBASEMENTNet Square Footage SPACE TYPESAge of Building 1 Year Built Gross Square Footage SUPPORT Overall Condition Collaboration Building Support DEPT - Council Chambers DEPT - City Clerk DEPT - City Attorney DEPT - City Manager Shared Support Circulation DEPT - CPIO - FCTV DEPT - Information Technology OTHER - CIRC./MEP/BUILDING SUPPORT AUXILIARY - COLLAB + CONFERENCE AUXILIARY - CAFETERIA + BREAK AUXILIARY - WELLNESS AUXILIARY - GENERAL SPECIAL STAFF Functionality CONDITIONS234 5 DEPARTMENTSPoor Excellent 2 % NSF 0 % NSF 20 % NSF 7 % NSF 6 % NSF 25 % NSF 1 % NSF 39 % NSF 2,139 NSF 5,092 NSF 3,838 NSF 3,388 NSF 4,100 NSF 4,623 NSF 274 NSF 3,687 NSF 2,060 NSF 1,886 NSF 41 YRS 1980 35,007 SF 31,086 SF C.66 SPACE EVALUATION NOVEMBER 2021 BUILDING SUMMARY. 300B Laporte was built in 1957 and is considered historically significant. The building was originally designed as City Hall and held multiple city departments, including the police department, finance, utilities and planning. The building is two levels with a basement. 300B Laporte is now known as the Operation Services Building. The first and second floor contain offices for Operation Services with the basement containing archival storage and a workshop. The building’s Y-shape and structural design limit reconfiguration and flexibility for additional uses. As a historically significant building, it will remain as part of the Civic Center. 300B LAPORTE LAPORTE SPACE EVALUATION C.67 FORT COLLINS: MASTER PLAN 64 YRS 1957 27.815 SF 24,176 SFNet Square Footage SPACE TYPESAge of Building 1 Year Built Gross Square Footage SUPPORT Overall Condition OTHER - CIRC./MEP/BUILDING SUPPORT AUXILIARY - COLLAB + CONFERENCE AUXILIARY - CAFETERIA + BREAK AUXILIARY - WELLNESS AUXILIARY - GENERAL SPECIAL STAFF Functionality CONDITIONS2345 DEPARTMENTSPoor Excellent 4 % NSF 17 % NSF 4 % NSF 10 % NSF 7 % NSF 19 % NSF 0 % NSF 39 % NSF Collaboration 2,308 NSF Building Support 3,154 NSF DEPT - OS - Facilities Mgmt. 2,789 NSF DEPT - Operation Services (OS) - Admin 3,591 NSF DEPT - City Manager Archive 779 NSF DEPT - OS - Archive 3,301 NSF DEPT - City Attorney Archive 386 NSF Circulation 4,181 NSF DEPT - OS - Project Mgmt., Planning and Design 1,696 NSF DEPT - OS - Real Estate 1,991 NSF BASEMENTFIRST FLOORSECOND FLOOR C.68 SPACE EVALUATION NOVEMBER 2021 # DEPARTMENT SUB-DEPARTMENT 1 BROADBAND 2 CITY ATTORNEY 3 CITY CLERK 4 CITY MANAGER 5 COMMUNICATION AND PUBLIC INVOLVEMENT COMMUNICATION AND PUBLIC INVOLVEMENT 6 COMMUNICATION AND PUBLIC INVOLVEMENT FCTV 7 COMMUNITY SERVICES CULTURAL SERVICES 8 COMMUNITY SERVICES PARK PLANNING AND DEVELOPMENT 9 COMMUNITY SERVICES RECREATION 10 EMERGENCY PERPARDNESS AND SECURITY 11 FINANCIAL SERVICES 12 FINANCIAL SERVICES SAFETY AND RISK MANAGEMENT 13 HUMAN RESOURCES 14 INFORMATION TECHNOLOGY 15 MUNICIPAL COURT 16 OPERATION SERVICES ADMINISTRATION 17 OPERATION SERVICES FACILITIES MANAGEMENT 18 OPERATION SERVICES PROJECT MANAGEMENT, PLANNING AND DESIGN 19 OPERATION SERVICES REAL ESTATE 20 PLANNING, DEVELOPMENT, TRANSPORT ADMINISTRATION 21 PLANNING, DEVELOPMENT, TRANSPORT COMMUNITY DEVELOPMENT NEIGH. SERVICES 22 PLANNING, DEVELOPMENT, TRANSPORT ENGINEERING 23 PLANNING, DEVELOPMENT, TRANSPORT FC MOVES 24 PLANNING, DEVELOPMENT, TRANSPORT PARKING SERVICES/TRANSFORT 25 SUSTAINABILITY SERVICES ADMINISTRATION 26 SUSTAINABILITY SERVICES ECONOMIC HEALTH 27 SUSTAINABILITY SERVICES ENVIRONMENTAL SUSTAINABILITY 28 SUSTAINABILITY SERVICES SOCIAL SUSTAINABILITY 29 UTILITY CUSTOMER CONNECTIONS - CUSTOMER SUPPORT 30 UTILITY CUSTOMER CONNECTIONS - ENERGY SERVICES 31 UTILITY CUSTOMER CONNECTIONS - WATER CONSERVATION SUM AVERAGE \ STAFF PROJECTIONS The City of Fort Collins Civic Center is poised to experience steady growth over the next 30 years, adding approximately 756 employees per the projections within this master plan. The projected staff count total by 2050-51 is 1,368 across all departments. This is a 233% increase from 2020-21 and an approximately 151% increase at the 15 year growth mark. The average growth rate for the first five years is the highest among the 30 year period at 5%. This is indicative of the need for expanded services and support staff that has led to this master plan exercise. See the chart below for specific department growth breakdowns over the 30 year interval of this master plan. For further information per department, reference Department Space Projections in the appendix. SPACE EVALUATION C.69 FORT COLLINS: MASTER PLAN STAFF PROJECTIONS: (TOP) PROJECTED STAFF COUNT OF CIVIC CENTER OVER 30 YRS, (BOTTOM) COLLECTIVE REPRESENTATION OF GROWTH FOR ALL DEPARTMENTS’ STAFF CURRENT STAFF #%#%#%#%#%#% 9 138%165%227%307%417%567% 22 26 3% 27 2% 28 2% 29 2% 31 2% 32 2% 8105%112%122%143%163%183% 17 26 14% 30 4% 33 2% 37 3% 43 3% 49 3% 16 18 3% 20 2% 24 4% 27 3% 31 3% 36 3% 660%74%83%92%102%112% 3 7 38% 10 10% 11 2% 14 6% 18 6% 24 6% 8 13 11% 15 3% 15 0% 16 2% 17 2% 19 2% 9 102%112%133%153%173%203% 6 10 11% 11 2% 12 2% 13 3% 14 3% 16 3% 44 46 1% 53 3% 58 2% 64 2% 70 2% 76 2% 10 11 1% 12 3% 13 2% 15 3% 18 3% 20 3% 35 40 3% 46 3% 53 3% 61 3% 70 3% 80 3% 50 63 5% 80 5% 101 5% 116 3% 134 3% 155 3% 19 25 6% 29 4% 31 2% 36 4% 43 4% 51 4% 9 126%132%130%132%142%152% 21 25 4% 30 4% 35 3% 41 3% 49 3% 58 3% 5 810%80%92%114%134%164% 5 6 4% 6 0% 7 3% 8 2% 9 2% 10 2% 4 45%40%40%53%53%63% 87 89 0% 110 4% 119 2% 132 2% 147 2% 163 2% 38 42 2% 46 2% 51 2% 56 2% 62 2% 68 2% 12 15 5% 16 1% 19 4% 22 3% 25 3% 30 3% 30 26 -3% 26 0% 27 1% 27 1% 28 1% 29 1% 455%64%60%64%74%94% 9 115%134%153%184%214%254% 21 26 5% 34 6% 37 2% 43 3% 49 3% 57 3% 11 13 4% 16 5% 19 4% 23 4% 28 4% 33 4% 71 90 5% 99 2% 103 1% 117 3% 133 3% 151 3% 11 12 2% 12 0% 13 1% 14 1% 14 1% 15 1% 12 12 0% 14 3% 15 1% 16 2% 17 2% 19 2% 612 718 827 923 1048 1196 1368 23 5% 27 3% 30 2% 34 3% 39 3% 44 3% DEPARTMENT GROWTH RATES (%) 5-YEAR 10-YEAR 15-YEAR 20-YEAR 25-YEAR 30-YEAR 5-YEAR 10-YEAR 15-YEAR 20-YEAR 25-YEAR 30-YEAR 612 718 827 923 1,048 1,196 1,368 0 200 400 600 800 1000 1200 1400 1600 CURRENT 5 YR 10 YR 15 YR 20 YR 25 YR 30 YR STAFF (EMPLOYEES) STAFF AVERAGE C.70 SPACE EVALUATION NOVEMBER 2021 STAFF MODEL: THIS DIAGRAM EXPRESSES THE SELECTED STAFF PROJECTION MODEL 60%+ IN COMPARISON TO THE 60% AND 100% OPTIONS. SELECTED SPACE MO DEL A PPLIED TO S TAFF P R O JEC TIO N S , BAS I S FO R RECOMMENDED DESIGN \ SPACE PROJECTIONS This section illustrates the current use of space and the projected space required to accommodate the growth of the Civic Center and its departments over the next 30 years. These space projections incorporate department estimates, city growth trends, and the shift from a conventional work model to a distributed work model. The distributed work model used incorporates a more stringent set of space standards for an individual, noted as 60%+ in the following documentation. Note these are projections and as such are subject to alteration and the influence of future conditions. Distributed work models center around flexible work environments that focus on efficiency and flexible work models that are defined by shared workspaces, distance working, flex or alternating schedules, and also the data supported trend in workflows deviating from 1 to 1 ratios for work space to shared work space. The 100% projections are for reference as to the outcome of a conventional work model of a 5 day work week on site. The 60% scenario is the spacial projection of an ideal 3 day in, 2 day out work model and/or 60% on site work week compared to a traditional 100% model. The 60%+ model includes the 60% work model as well as additional space allocation for specific staff work areas. 60% + 15% 60% 100% SPACE EVALUATION C.71 FORT COLLINS: MASTER PLAN GROSS SQUARE FOOTAGE: 15 YR AND 30 YR COMPARISON OF GSF FOR 100% OCCUPANCY AND 60% HYBRID WITH BUFFER WORK MODEL. 115,647 117,146 98,176 102,445 159,146 213,123 136,344 179,234 103,304 78,751 64,989 68,085 106,257 140,880 89,720 116,199 0 50,000 100,000 150,000 200,000 250,000 300,000 350,000 CURRENT CURRENT (100%) CURRENT (60%) CURRENT (60%+) 15-YEAR (100%) 30-YEAR (100%) 15-YEAR (60%+) 30-YEAR (60%+) RIGHT SIZE 100% COUNT HYBRID 60% + 15% TOTAL PROJECTED AREA NEEDS GROSS SQUARE FOOTAGE (GSF) (NET + NON-PROGRAMMED) TOTAL AREA NEEDS (NSF)TOTAL NON-PROGRAMMED 2 65,403 1 7 0,5 30163,1 65 2 1 8 ,951 195,89 7 226,064 2 95,4 33 3 54,004 SUNDAY SUNDAY60%/60%+100%SATURDAY SATURDAY FRIDAY FRIDAY THURSDAY THURSDAY WEDNESDAY WEDNESDAY TUESDAY T UESDAY MONDAY MONDAY 60%+ = 60% + 15% BUFFER C.72 SPACE EVALUATION NOVEMBER 2021 PROJECTION OPTION 2 PROJECTION OPTION 1 117,146 133,973 146,417 159,146 175,862 193,463 213,123 78,751 90,435 98,456 106,257 117,050 128,205 140,880 0 50,000 100,000 150,000 200,000 250,000 300,000 350,000 400,000 CURRENT (100%) 5-YEAR (100%) 10-YEAR (100%) 15-YEAR (100%) 20-YEAR (100%) 25-YEAR (100%) 30-YEAR (100%) RIGHT SIZE 100% COUNT TOTAL PROJECTED AREA NEEDS FULL TIME (100%) GROSS SQUARE FOOTAGE (GSF) TOTAL AREA NEEDS (NSF)TOTAL NON-PROGRAMMED 98,176 111,442 120,322 129,939 142,563 155,370 169,395 64,989 74,062 79,482 85,011 92,817 100,474 109,034 0 50,000 100,000 150,000 200,000 250,000 300,000 350,000 400,000 CURRENT (60%) 5-YEAR (60%) 10-YEAR (60%) 15-YEAR (60%) 20-YEAR (60%) 25-YEAR (60%) 30-YEAR (60%) RIGHT SIZE HYBRID 60% TOTAL PROJECTED AREA NEEDS HYBRID (60%) GROSS SQUARE FOOTAGE (GSF) TOTAL AREA NEEDS (NSF)TOTAL NON-PROGRAMMED GROWTH ANALYSIS. Below are the three primary models for space projection used in the master plan process. 100% full time is a conventional model wherein no remote work occurs and the 60% and 60%+ models are distributed workflows which incorporate a 3 day in office, 2 day out of office hybrid work schedule. The distributed work model allows for space saving due to reduced need for full occupancy. The 60%+ model includes the distributed work model as well as additional space allocation across specific staff positions. The graphs, Projection Options 1, 2 and 3, show the space projections of each model over 30 years. The GSF 60%+ chart identifies 281 College and 300A East, short for 300A Laporte - East, as existing spaces that are not to be carried over in the master plan. The city intends to sell 281 College and deconstruct the East side of 300A Laporte. SPACE EVALUATION C.73 FORT COLLINS: MASTER PLAN GROSS SQUARE FOOTAGE: COMPARISON OF GSF, 15 YR AND 30 YR FOCUS WITH THE EXISTING 281 COLLEGE BUILDING AND EAST PORTION OF THE EXISTING 300A LAPORTE PROJECTION OPTION 3 (SELECTED OPTION) 163,766 170,530 226,064 295,433 42,796 12389 0 50000 100000 150000 200000 250000 300000 350000 400000 CURRENT CURRENT (RIGHT SIZED) (60%+) 15 YR (60%+) 30 YR (60%+) GSF (60%+) GSF 281 COLLEGE 300A EAST 218,951 102,445 116,511 126,193 136,344 150,055 163,941 179,234 68,085 77,746 83,751 89,720 98,269 106,713 116,199 0 50,000 100,000 150,000 200,000 250,000 300,000 350,000 400,000 CURRENT (60%+) 5-YEAR (60%+) 10-YEAR (60%+) 15-YEAR (60%+) 20-YEAR (60%+) 25-YEAR (60%+) 30-YEAR (60%+) RIGHT SIZE HYBRID 60% + 15% TOTAL PROJECTED AREA NEEDS HYBRID w/ BUFFER (60%+) GROSS SQUARE FOOTAGE (GSF) TOTAL AREA NEEDS (NSF)TOTAL NON-PROGRAMMED C.74 SPACE EVALUATION NOVEMBER 2021 GROWTH PROJECTIONS: PROJECTIONS BY OPTION TYPE OVER 30 YRS WITH A FOCUS ON STAFF SPACE TYPES AND QUANTITIES STAFF, SUPPORT AND SPECIAL. The chart below is a summary of the square footage projections explored as part of this master plan. This chart and the selection in the upper right also highlight the breakdown of the Staff category with the updated space standards for staff. Note that the selected distributed work model is highlighted and the Staff category, specifically the W-3 line, is the largest amount of space. The staff space type WS-3 (Work Station 3) is the largest category for number of employees in the civic center. &855(17 &855(17  &855(17  &855(17  <($5  <($5  <($5  <($5  <($5  <($5  <($5  <($5  <($5  <($5  <($5  <($5  <($5  <($5  <($5  <($5  <($5  <($5  727$/352-(&7('$5($1(('6&2817+<%5,'+<%5,' 5,*+76,=(                                                                                                                                                             6833257 :6 6XSHUYLVRU0DQDJHU :6 6WDII7\S :6 37(,QWHUQ7HPS9ROXQWHHU :6 )LHOG&UHZ67$)) 32 6HUYLFH'LUHFWRU 32 'LUHFWRU'HSDUWPHQW+HDG :6 'LYLVLRQ+HDG                               <($5  <($5  <($5  <($5  <($5  <($5  +<%5,' SPACE EVALUATION C.75 FORT COLLINS: MASTER PLAN                                                                 63(&,$/121352*5$00('*526664)7                                                                                                                                  $8;,/,$5<*(1(5$/*526664)7$8;,/,$5<:(//1(66121352*5$00('$8;,/,$5<&$)(7(5,$%5($.$8;,/,$5<&2//$%&21)(5(1&(                                                                727$/$5($1(('6 16) 727$/$5($1(('6 *6) 727$/121352*5$00('<($5  <($5  <($5  <($5  <($5  <($5  +<%5,'                                    :6  :6  :6  32  32  :6                                                                         SELECTED WORK MODEL AND PROJECTED GROWTH SQ. FT. C.76 SPACE EVALUATION NOVEMBER 2021 NET SQUARE FOOTAGE: NSF 60%+, STACKED AREA CHART BY TYPE FOR THE DIVERSIFIED WORK MODEL IN 5 YR INTERVALS, INCLUDING CURRENT AND CURRENT RIGHT SIZED 58,258 31,639 36,273 40,845 8,319 7,596 7,783 7,973 17,980 22,829 27,329 27,329 3,300 10,490 10,490 10,490 16,054 18,128 20,843 23,658 7,801 7,785 9,128 10,5223,935 3,978 4,665 5,377 0 20000 40000 60000 80000 100000 120000 140000 160000 180000 200000 CURRENT CURRENT (60%+) 5-YEAR (60%+) 10-YEAR (60%+) NET SQUARE FOOTAGE (NSF) STAFF AUXILIARY - CAFETERIA + BREAK AUXILIARY - GENERAL SPECIAL AUXILIARY - COLLABORATION + CONFERENCE SUPPORT AUXILIARY - WELLNESS SPACE EVALUATION C.77 FORT COLLINS: MASTER PLAN 44,840 50,091 56,243 63,478 8,133 8,344 8,590 8,88127,329 28,729 28,729 28,72912,200 12,200 13,075 13,07526,110 30,542 34,325 38,769 11,735 13,335 15,207 17,407 5,997 6,814 7,771 8,895 15-YEAR (60%+) 20-YEAR (60%+) 25-YEAR (60%+) 30-YEAR (60%+) C.78 SPACE EVALUATION NOVEMBER 2021 GROSS SQUARE FEET (GSF): Total of net square feet (NSF) and non-programmable area NET SQUARE FEET: Usable floor area of programmed NON-PROGRAMMED AREA: Spaces required to support programmed spaces (e.g. mech, circ., walls, bathrooms). STAFF SUPPORT SPECIAL AUXILIARY - GENERAL AUXILIARY - COLLAB/ CONFERENCE AUXILIARY - CAFETERIA/BREAK AUXILIARY - WELLNESS 115,415 SF 81,527 SF 14,787 SF 49,689 SF 17,419 SF 37,300 SF 16,764 SF 8,567 SF GSF 16,147 SF 52,235 SF 18,679 SF 24,867 SF 12,707 SF 55,384 SF SPACE EVALUATION C.79 FORT COLLINS: MASTER PLAN 30 YR 60%+: SQUARE FOOTAGE TOTALS BY SPACE TYPE (NET SQ. FT. + NON-PROGRAMMED = GSF) 15 YR 60%+: SQUARE FOOTAGE TOTALS BY SPACE TYPE (NET SQ. FT. + NON-PROGRAMMED = GSF) NOTE: Current average net to gross ratios across civic area, 50%-55%. 51,937 SF 36,687 SF 63,478 SF 44,840 SF 7,266 SF 6,654 SF 8,881 SF 8,133 SF 5,604 SF 22,360 SF 28,729 SF 27,329 SF 5,604 SF 5,229 SF 13,075 SF 12,200 SF 7,460 SF 5,029 SF 17,407 SF 11,735 SF 3,812 SF 2,570 SF 8,895 SF 5,997 SF 16,615 SF 11,190 SF 38,769 SF 26,110 SF STANDARD AUXILiARY STANDARD AUXILiARY 55% NTG 70% NTG 55% NTG 70% NTG C.80 SPACE EVALUATION NOVEMBER 2021 SPACE PROJECTION: NSF FOR THE CIVIC CENTER. 31,639, 31% 7,596, 7% 22,829, 22% 10,490, 10% 18,128, 18% 7,785, 8%3,978, 4% RIGHT SIZE (60%+) (NSF) 44,840, 33% 8,133, 6% 27,329, 20% 12,200, 9% 26,110, 19% 11,735, 9%5,997, 4% 15-YEAR (60%+) (NSF) 50,091, 33% 8,344, 6% 28,729, 19% 12,200, 8% 30,542, 20% 13,335, 9%6,814, 5% 20-YEAR (60%+) (NSF) 58258, 50% 8319, 7% 17980, 16% 3300, 3% 16054, 14% 7801, 7%3935, 3% CURRENT (NSF) ,, ,, , , , PART TO WHOLE - SPACE PROJECTION. These circle charts express the required net square footage for the Fort Collins Civic Center in the selected diversified work model (60%+). The circle charts show the current and current right sized net square footage breakdown. The other circle charts express the NSF change over five year intervals for each space type, with focus on the percentage each area represents. This growth path incorporates a 3 day in and 2 day out of office work week along with a 15% buffer. The diversified work model saves on cafeteria, staff and support space over time compared to a conventional model. SPACE EVALUATION C.81 FORT COLLINS: MASTER PLAN SPACE PROJECTION CONT.: BREAKDOWN OVER 5 YR INTERVALS FOR 60%+ WORK MODEL. GRAY MARKERS INDICATE OVERALL ESTIMATED REQUIRED SQUARE FOOTAGE TREND. 36,273, 31% 7,783, 7% 27,329, 23% 10,490, 9% 20,843, 18% 9,128, 8%4,665, 4% 5-YEAR (60%+) (NSF) 40,845, 33% 7,973, 6% 27,329, 22% 10,490, 8% 23,658, 19% 10,522, 8%5,377, 4% 10-YEAR (60%+) (NSF) 56,243, 34% 8,590, 5% 28,729, 18% 13,075, 8% 34,325, 21% 15,207, 9%7,771, 5% 25-YEAR (60%+) (NSF) 63,478, 35% 8,881, 5% 28,729, 16% 13,075, 7% 38,769, 22% 17,407, 10%8,895, 5% 30-YEAR (60%+) (NSF) STAFF AUXILIARY - CAFETERIA + BREAK AUXILIARY - GENERAL SPECIAL AUXILIARY - COLLABORATION + CONFERENCE SUPPORT AUXILIARY - WELLNESS CHARETTE D.83 FORT COLLINS: MASTER PLAN D CHARRETTE D.84 CHARETTE NOVEMBER 2021 \ CHARRETTE OVERVIEW The first phase of the master planning process concluded with a three-day design charrette including the City’s leadership team, department leaders, key staff from across all departments, and the project team. The charrette was held virtually, via the Zoom video collaboration platform, to comply with directed health measures required because of the Covid-19 pandemic. The charrette was designed to be an integrated process incorporating all participants best intentions into the “ideal” design concept for the Civic Center. The “ideal” charrette process is one where all participants “felt listened to.” X The goals for the charrette and the participants were: X To create ownership of the final design concept X To provide for a thorough review against the evaluation criteria X To ensure the design direction is in sync with the Guiding Principles X To come to agreement on the direction toward one final design concept. The Guiding Principles, which were established during the 2014-2015 master planning process, that continue to be relevant in 2021 are: WORLD CLASS LEADERSHIP: become a point of community pride in performance, innovation, and regenerative design that sets an example for the private sector in its reflection of Fort Collins’ character and culture while being good stewards of City of Fort Collins tax payer dollars. VIBRANT COMMUNITY SPACES: contribute nature and ecology to the city while establishing places for public engagement that promote social and individual health, safety and accessibility for all. RESILIENT DESIGN: create lasting quality that is climate adaptive, accommodates growth, flexibility, and a universal community. INTUITIVE ORGANIZATION: support and activate site connectivity externally and create a collaborative environment internally. ENHANCE THE CIVIC HEART: promote physical embodiment of the city’s mission and plan that meets immediate needs; establish a vision that can be invested in and realized. The evaluation criteria established through Phase 1 meetings with City leadership, staff and based on the goals of other pertinent planning documents are: X Outdoor Spaces & Uses – gathering spaces & meeting spaces for staff, city customers, community events, etc. X Building Orientation & Adjacencies X Energy Efficiency X Employee & Community Wellness X Interplay between building program and land use X Stormwater, green infrastructure X Mobility & Transit, including bicycle & pedestrian activities CHARRETTECHARRETTE CHARETTE D.85 FORT COLLINS: MASTER PLAN \ CHARRETTE PROCESS The virtual charrette process was led by a professional charrette facilitator and conducted by the design team of approximately ten architects, engineers, landscape architects and planners. Over 50 stakeholders participated in each session of the three-day, multi-hour process. The agenda of activities for each charrette day was similar and it focused on involving all participants in a collaborative review process with the goal of reaching agreement on a preferred design concept for the Fort Collins Civic Center. After each charrette session, the design team used the expertise and feedback of the stakeholder participants and created updated design concepts. This iterative process enabled the group to gather and incorporate the “best” ideas into a final concept. The following section highlights the agenda for each charrette day and design concepts reviewed for each charrette session. The charrette outcomes are introduced in the Recommendations chapter of this report. D.86 CHARETTE NOVEMBER 2021 \ SUSTAINABLE CONSIDERATIONS During the charrette process the following concepts and ideas were generated with regard to sustainability, taking a holistic environmental design approach to the master plan site and buildings. X Pedestrian access to the Transit Center to encourage mass transit and the reduction of vehicular traffic on site. X Explore options to reduce parking structure if more people opt to work-from-home in future. X Provide shading structures over surface parking lots to provide shading and incorporate photo-voltaic panels to generate renewable energy to help achieve Net Zero goals. X Maximize open space and vegetated green space for geothermal wells. X Integrate nature into the built environment. X Utilize native plants and landscaping to reduce water demand. X Buildings should be orientated along the East-West axis to utilize daylighting and to reduce the amount of solar radiation and heat gain. X Rooftop gardens should be incorporated to reduce heat island effects, and also provide opportunities for biophilic design. X Buildings should be orientated to take into consideration wind speed and direction and to block harsh north winds from pedestrian areas during winter months. X Keep existing buildings if possible, to reduce overall amount of embodied carbon used. X Perform Life Cycle Analysis on existing buildings and new buildings to better evaluate usage and energy costs/ savings. X Consider permeable pavement or green space in lieu of large amounts of hard scape to reduce heat retention and better help with rainwater management. X Achieve daylighting goals by setting luminance targets, controlling glare, increasing window area and location, increase visible light transmittance, implementing interior or exterior light shelves, and increasing internal surface reflectance. X Review programmatic and operational parameters to optimize space and save energy by assessing the following: X Multi-functioning Spaces X Space Allotment per Person X Reduction of Building Area X Operating Schedules X Night Temperature Setback X Occupied Set Point Temperature CHARETTE D.87 FORT COLLINS: MASTER PLAN BUILDING ENVELOPE. During the charrette process the following concepts and ideas were generated with regard to sustainability, taking a holistic environmental design approach to the master plan site and buildings. MASSING AND ORIENTATION. Assess how massing and orientation affect the following: X HVAC Equipment Sizing X Daylight Potential X Renewable Energy Opportunities LIGHTING LEVELS. X Air Temperature X Humidity X Air Speed and Draft X Radiant Temperature THERMAL COMFORT RANGES. X Air Temperature X Humidity X Air Speed and Draft X Radiant Temperature PLUG + PROCESS LOAD NEEDS. Assess reducing the plug and process loads through programmatic solutions X Plug Load Controls X Equipment + Purchasing Policies X Layout Options X Thin Client Computing Fenestration Performance Wall Performance Slab Performance WWR Roof Performance Summer Solstice Winter SolsticeSpring + Autumn Equinox 64 °F 73 °F 84 °F North E S W D.88 CHARETTE NOVEMBER 2021 CONCEPT 1 - CANYON CORRIDORS X Projected space needs are addressed by constructing two, multistory buildings on the east side of Howes X Three primary north-south connections are identified – a primary pedestrian connection mid- block between Meldrum & Howes; a predominant vehicular connection on Howes; and a multi-use trail connection mid-block between Howes & Mason X The primary plaza & pedestrian node is located on Howes and creates a predominant east-west connection from 300A Laporte to the plaza between the new buildings X Hard scape plazas form the passages between the buildings on the east block and open space & green space are dominant features on the west block CONCEPT 2 - STORMWATER RIBBON X Projected space needs are addressed by constructing two new buildings facing each other and fronting on Howes; additional space is constructed in an addition to the east side of 300A Laporte X A potential second parking structure is located on the southwest corner of the Civic Center at Meldrum and Laporte X A dominant pedestrian plaza connects the two new buildings on Howes and forms the front door to the Civic Center; a potential trolley track may be placed parallel to Howes in this Concept X Smaller plazas connect the new buildings to 300A Laporte and 215 Mason X Green infrastructure – both hard scape and soft scape – create a stormwater collection system that is the foundation for the pedestrian circulation system in the Civic Center X Like Concept A, hard scape plazas form the passages between the buildings on the east block and open space & green space are dominant features on the west block CHARRETTE DAY 1 Welcome & Overview Master Plan Design Concepts Presentation Break-Out Groups Set Up Review Design Concepts Report Back Next Steps AGENDA + OUTLINE. February 23, 2021 1:30 - 4:30 PM CHARETTE D.89 FORT COLLINS: MASTER PLAN CONCEPT 3 - PEDESTRIAN COURT X Projected space needs are addressed by constructing two new buildings – one is located on the east side of and front toward Howes and the second would replace 300A Laporte, which would be deconstructed X Like Concept B, two parking structures are identified X Howes is the dominant north-south vehicular connection but it would be rebuilt with a curve to provide a traffic calming/urban design feature; in addition, a trolley track may be located on the east side of Howes X A multi-use trail forms the dominant north – south connection mid-block between Howes and Mason X A large plaza is proposed between the two new buildings and would be built on a northwest – southeast axis X Like Concept A, hard scape plazas form the passages between the buildings on the east block and open space & green space are dominant features on the west block CONCEPT 4 - PARK CAMPUS X Projected space needs are addressed by constructing two new buildings located on the east side of Howes and by an addition on the east side of 300A Laporte X Howes is the dominant north-south vehicular connection but it would be rebuilt with a curve to provide a traffic calming/urban design feature X A multi-use trail forms the dominant north – south connection mid-block between Howes and Mason and secondary gateways to the Civic Center are located at Maple and Laporte X A large plaza is proposed between the opening between two new buildings and 300A Laporte; this area is the dominant east-west pedestrian connection and forms the main gateway to the Civic Center X Like Concept A, hard scape plazas form the passages between the buildings on the east block and open space & green space are dominant features on the west block D.90 CHARETTE NOVEMBER 2021 CONCEPT 1 - CANYON CORRIDORS X Consensus to eliminate this option CONCEPT 2 - STORMWATER RIBBON X Good presence towards the street X Good feeling of balance on the site X Little restrictive for use for events X Not ideal for parking or circulation CHARRETTE DAY 1 TAKE AWAYS + COMMENTS February 23, 2021 1:30 - 4:30 PM CHARETTE D.91 FORT COLLINS: MASTER PLAN CONCEPT 3 - PEDESTRIAN COURT X Liked the pedestrian court between buildings X Positives and negatives towards the curve in Howes (traffic calming) X Disliked presence to West neighborhood CONCEPT 4 - PARK CAMPUS X Identifiable focus of site in the central plaza X Liked that plaza was mixed with green space X Positive and negative towards most program on east side of site D.92 CHARETTE NOVEMBER 2021 1 2 2 3 4 OPTION B/C REVISED X Project space needs are addressed in the construction of two new buildings, one on each side of Howes; both are oriented toward Howes X The east building accommodates City Hall and the Municipal Court and the west building houses a Customer Service Center and a Wellness Center X A dominant pedestrian plaza is located on the east side of Howes and identifies the main entrance to the new municipal building X Howes is proposed as a boulevard and is the primary vehicular north-south connection; a potential trolley track may be located on the west side of Howes too X A multi-use trail forms the dominant north-south connection mid-block between Howes and Mason X Like the Day 1 concepts, hard scape plazas form the passages between the buildings on the east block and open space & green space are dominant features on the west block; the west block also features a potential amphitheater which is a primary gathering area CHARRETTE DAY 2 Welcome & Overview Master Plan Design Concepts Presentation Break-Out Rooms/Groups Review Design Concepts Groups Report Back AGENDA + OUTLINE. February 24, 2021 2:00 - 4:00 PM CHARETTE D.93 FORT COLLINS: MASTER PLAN 21 4 3 OPTION D REVISED X Project space needs are addressed in the construction of three new buildings, two on the east side of Howes connected by a skywalk and one on the west side of Howes that is a major addition to 300A Laporte X The buildings on the east side accommodate City Hall and the Municipal Court and the west building houses a Customer Service Center and a Wellness Center X A dominant pedestrian plaza is located on the east side of Howes and identifies the main entrance to the new municipal building complex X Howes is proposed as a curved street and is the primary vehicular north-south connection X A multi-use trail forms the dominant north-south connection mid-block between Howes and Mason X Like the Day 1 concepts, hard scape plazas form the passages between the buildings on the east block and open space & green space are dominant features on the west block D.94 CHARETTE NOVEMBER 2021 OPTION B/C REVISED X Expanded Park Open Space X Front door – a sense of arrival X Importance of wayfinding X Building connection to parking garage and short-term parking X Howes as a shared, multi-modal, event-friendly street X Separation of Municipal Courts and City Hall, but internal building connections X Phase I on east block X Bring in retail, especially food options, coffee carts, etc. CHARRETTE DAY 2 TAKE AWAYS + COMMENTS February 24, 2021 2:00 - 4:00 PM CHARETTE D.95 FORT COLLINS: MASTER PLAN OPTION D REVISED X Overall site design refinement – landscaping, traffic, access, wayfinding, etc. X Refining building locations, massing, especially energy and daylighting and potential for geothermal X Refining phasing and adjacencies X Approach to Howes Street and trolley D.96 CHARETTE NOVEMBER 2021 COMPOSITE OPTION A X Project space needs are addressed in the construction of two new buildings, one on each side of Howes; both are oriented toward Howes X The east building accommodates City Hall and the Municipal Court and these ground floor elements are connected by a north-south oriented multistory element X The west building houses a Customer Service Center and a Wellness Center X A dominant pedestrian plaza is located on the east side of Howes and identifies the main entrance to the new municipal building X Howes is proposed as a boulevard and is the primary vehicular north-south connection; a potential trolley track may be located on the west side of Howes too X A multi-use trail forms the dominant north-south connection mid-block between Howes and Mason X Like the Day 1 concepts, hard scape plazas form the passages between the buildings on the east block and open space & green space are dominant features on the west block X The west block also features a potential Civic Plaza which is a primary gathering area that is linked to a prominent entrance court on the east side of Howes CHARRETTE DAY 3 Welcome & Overview Master Plan Design Concept Presentation Break-Out Rooms/Groups Review Design Concepts Groups Report Back AGENDA + OUTLINE. February 25, 2021 1:00 - 3:00 PM CHARETTE D.97 FORT COLLINS: MASTER PLAN COMPOSITE OPTION B X This Design Concept is the same as Option A except that the east building, which accommodates City Hall and the Municipal Court has ground floor elements that are connected by a single-story, upper-level skywalk and has upper stories that have an east-west orientation D.98 CHARETTE NOVEMBER 2021 COMPOSITE OPTION A X Both designs visually pleasing X Entrance to City Hall from Meldrum is not ideal for neighborhood X Connection to Howes is improved X Ideal for maintaining tree canopy X Concern that Phase 1 building to too removed from Howes Street X Wayfinding is better addressed with nodes and entry points CHARRETTE DAY 3 TAKE AWAYS + COMMENTS February 25, 2021 1:00 - 3:00 PM CHARETTE D.99 FORT COLLINS: MASTER PLAN COMPOSITE OPTION B X Phase 1 building preferred due to better energy performance D.100 CHARETTE NOVEMBER 2021 Phase 2B Expansion 48,000 SF Phase 2A Wellness 24,000 SF Civic Plaza Amphiteater Raised Pedestrian Crossing E C Entrance Court Surface Parking Operation Services Repurposed Old City Hall Indoor/ Outdoor Indoor/ Outdoor Parallel ParkingParallel ParkingTrolleyProtected Bike LaneService 'URS2ႇEntrance Court Howes Street CHARETTE D.101 FORT COLLINS: MASTER PLAN Phase 1 New Building 93,000 SF Future Parking Garage SF TBD Entrance Court/ Civic Plaza Utility Administration Building 215 N. Mason Surface Parking Service/ Loading Indoor/ Outdoor Indoor/ Outdoor Service Indoor/ Outdoor RECOMMENDATIONS E.103 FORT COLLINS: MASTER PLAN RECOMMENDATIONSE E.104 RECOMMENDATIONS NOVEMBER 2021RECOMMENDATIONS SITE DESIGN RECOMMENDATIONS E.105 FORT COLLINS: MASTER PLAN E.106 RECOMMENDATIONS NOVEMBER 2021 \ DESIGN CONCEPT CONCEPT OVERVIEW. The concept of the Civic Center master plan is focused around a central gathering space that crosses Howes and connects the two blocks. The concept was inspired by Washington Park to the North. This space will support various community events while creating a visual and functional front door for the City Campus. The overall character of the site is a reflection of Washington Park through the preservation of existing tree canopy and the inclusion of landscape areas that define places for gathering and circulation. Art, landforms, and other site amenities will be used as visual wayfinding throughout the site. The existing buildings along the site’s perimeter will remain steadfast and hold GREEN SPACE: LEGEND STORM WATER MANAGEMENT AMPHITHEATER GREEN SPACE PLAZA EXISTING TREE CANOPY OUTDOOR WELLNESS ACTIVE SITE NODE ACTIVE SITE NODE 300A LAPORTE PHASE 2A WELLNESS PHASE 2B EXPANSION 300A LAPORTE 222 LAPORTE 215 MASON FUTURE PARKING GARAGE NEW BUILDING LAPORTE STORMWATER MANAGEMENT WASHINGTON PARK RECOMMENDATIONS E.107 FORT COLLINS: MASTER PLAN with the surrounding context, while creating gateways to a re-imagined Civic experience within. New, multi-story interior structures will prominently address the interior thoroughfare of Howes Street, as well as a prominent east-west civic plaza. Building massing will orient to maximize energy efficiency and sustainability goals, and will utilize stepped facades and setbacks to create additional upper-level outdoor opportunities. The relationship between new and existing structures, as well as interior and exterior work and gathering spaces, will create pedestrian nodes and pathways that will enhance the vitality of the campus, and create opportunities to reinforce the goals of the Downtown Master Plan. The majority of the parking will be kept to the exterior of the site and perimeter gateways will act as the front doors to the community for people arriving to the site through various modes of transportation. \ PUBLIC GREEN SPACE As noted earlier in the document, this area of the community is currently underserved by public green space. These areas are often the heart of the community and are there to serve all people. To provide for this, Washington Park is not only being preserved as park space, it is also the driving force of the overall design concept by extending the park space throughout the site and using it as a unifying element for the campus. OUTDOOR WELLNESS. While the green space provided by Washington Parks plays in important part in the overall concept of the site, it also lends itself to supporting outdoor wellness activities that are either programed activities or passive interactions. There is the opportunity to have a direct connection to the Wellness Center and provide additional and programmable flex space to support the interior uses of the building. Wellness activities held in this area can support the larger community, from yoga on the green to a trail with mile markers. TREE CANOPY. The trees on site serve as a tremendous asset to the Civic Center and the Community of Fort Collins. Due to this, we recommend minimizing the removal of any of the establish tree canopy with the exclusion of ash trees. The City’s Downtown District Emerald Ash Borer Treatment Plan should be followed to address the ash trees on campus. Additional provisions should be made to add to the tree canopy overtime to provide biodiversity as well as a range in age of the tree canopy to ensure its life is extended well into the future. STORMWATER MANAGEMENT. The existing stormwater mitigation areas on Block 32 serves both a functional aspect as well as creating a visual amenity and landmark on the site. It is our recommendation that these remain on site in some fashion. We also recommend continuing the use of Low-Impact Development techniques for water quality in a manner that can continue to enhance the environment of the campus such as permeable pavers and bio-retention. Please refer to the Propose Utility Section below for additional information. NATIVE PLANT MATERIAL. The integration of Washington Park also creates an opportunity to not only extend the tree canopy but also create areas for a wider range of planting types. The site can become a showcase for the native plant material of the front range as well as a class room for how this plant material can be used in conjunction with xeric- scaping, rain gardens and to soften and define plaza/ hardscape areas. E.108 RECOMMENDATIONS NOVEMBER 2021 \ CONNECTIVITY Connectivity within the site as well as connections to Old Town, the rest of the Civic Center District, and the greater community of Fort Collins is important for the success of this campus. As the analysis shows there is a tremendous existing framework for multi-modal transportation. PEDESTRIANS: As a downtown setting, there are wide sidewalk present throughout the study area. Marked pedestrian crossings present at intersections and mid-block locations surrounding the site give convenient, comfortable options to access the pedestrian network. CONNECTIVITY: SITE CIRCULATION TRAFFIC DENSITY: VEHICLES PER DAY (VPD) PEDESTRIANS SPINE - PEDESTRIANS + BICYCLES EMERGENCY ACCESS ROUTE CONVERTIBLE STREET (INCLUDES: BIKE LANE, PARKING, TROLLEY) HIGH VDM MEDIUM VDM LOW VDM REDUCTION OF HOWES VPD 300A LAPORTE PHASE 2A WELLNESS PHASE 2B EXPANSION 300A LAPORTE 222 LAPORTE 215 MASON FUTURE PARKING GARAGE NEW BUILDING LAPORTE RECOMMENDATIONS E.109 FORT COLLINS: MASTER PLAN BICYCLES: Bike lanes are present along LaPorte Avenue up to Howes Street and along the popular Mason Street corridor. There are also numerous other low stress options along streets like Maple Street and N Meldrum Street. Bike lanes are also currently present on Howes Street through campus. With the reconstruction to a convertible street, they may be omitted. This promotes the street as shared space. Furthermore, the low vehicular speeds and volumes allow for most users to feel comfortable in mixed traffic. TRANSIT: The DTC, directly to the east of the site, and aforementioned pedestrian crossings at Maple Street and LaPorte Avenue create great connectivity to this facility. Sidewalks are in place between the DTC and campus. The combination of these facilities creates a comfortable route to access transit, which is key in promoting its use. In addition, a future MAX station may be located on the west side of Mason as well as a new bus stop along Laporte Ave, adjacent to the Operations Service building, which will further enhance the connectivity of the site. MOTOR VEHICLES: The primary vehicular routes to the campus including LaPorte from the west, College Avenue from the north and south, and Jefferson Street from the west naturally direct vehicles to the southwest and northeast corners of the site. These are the locations of parking. This siting will allow people traveling to the campus to park immediately without having to circulate through campus, thus improving the ability for drivers to efficiently access the street network. TROLLEY: The historic trolley currently runs along Mountain Ave with Howes as it’s eastern terminus. Currently it’s use is limited to the weekend. Discussions have been held regarding extending the trolley line north on Howes to connect to the original trolley barn north of the Civic Center Site. Due to the logistics of this, further discussions and study is needed to determine the future changes to the trolley route. TRANSPORTATION HUB: Existing connectivity of the site can be built upon by providing a transportation resource center on site which provides easy access to various modes of transportation already discussed. This can include bike share, electric scooters, bike storage, TNC pick-up, and electric vehicle borrow or car share with access to showers and commuter information. This will further encourage city staff to not drive single occupancy cars to work. HOWES AS A CONVERTIBLE STREET. Consistent with the Downtown Master Plan (2017), Howes will remain open to traffic, but will be redesigned as a convertible street which can temporarily be closed to vehicular bike and traffic for community events. It will go from dividing the campus into two sites to tying the two blocks together from both a visual and a functional standpoint. Traffic calming elements, such as narrowed travel way, raised pedestrian crossings, and streetscaping, will be used to create an inviting pedestrian environment while allowing for easy, accessible access to the buildings from Howes. Additionally, intersection treatments like those at the endpoints of the convertible segment of Linden Street can serve as gateways into the campus, signaling drivers of the increased human-scale activity within the street. Additional design features should include space for on-street parking, bike lanes and amenities, potential trolley line, and curb bump outs for rain gardens. Re-imagining Howes as convertible street creates not only the opportunity to use it as event space, but also to integrate it into the campus as a space open to all users of the multi-modal transportation network. E.110 RECOMMENDATIONS NOVEMBER 2021 CIRCULATION. As noted previously, central to the concept of pedestrian circulation across the campus is shifting the focus of Howes Street to pedestrians. This will be done in two ways. The first is by emphasizing it as a shared space through reshaping it into a convertible street. The second is to provide strong pedestrian connections across it. A signalized crossing at La Porte Avenue as well as a crossing at the stop-controlled intersection at Maple Street provide controlled crossings today. Enhancements as part of reconstructing Howes Street as a convertible street are expected to further enhance pedestrian safety and comfort. Furthermore, the mid-block crossing will be improved to emphasize it as the central pedestrian connection on campus. Treatments should include: CONNECTIVITY: PEDESTRIAN CENTERED PEDESTRIAN CONNECTIONS RAISED PEDESTRIAN CROSSING PEDESTRIAN NODES EMERGENCY ACCESS ROUTE SPINE - PEDESTRIAN + BICYCLES PEDESTRIAN CIRCULATION 300A LAPORTE PHASE 2A WELLNESS PHASE 2B EXPANSION 300A LAPORTE 222 LAPORTE 215 MASON FUTURE PARKING GARAGE NEW BUILDING LAPORTE RECOMMENDATIONS E.111 FORT COLLINS: MASTER PLAN SIGNING AND MARKING: reinstall pedestrian crossing signs and crosswalk markings consistent with the requirements in the Manual on Uniform Traffic Control Devices (MUTCD). CURB EXTENSIONS: shorten the crossing distance and improve line of sight to oncoming vehicles for pedestrians waiting to cross. RAISED CROSSWALK: changes the hierarchy of the street, giving emphasis to the pedestrian and providing a vertical change to slow vehicular traffic. PARKING RESTRICTIONS: prohibit on street parking within 40 feet of the crossing on either side to avoid cars blocking line of sight to approaching pedestrians. REMOVE DRIVEWAYS: whereas the existing crossing is bounded by driveways, the future crossing should not have driveways nearby, thus eliminating potential conflicts with turning vehicles. SPINE. In the previous 2015 Master Plan a Pedestrian Spine was identified to connect the Larimer County Courthouse to the Lee Martinez Park to the north. This trail will be located mid-block between Howes and Mason Streets. While parts of the Spine have been constructed it has not been completed it its full potential. This plan shows how it can become an integral component of the site that offers not only circulation, but also gathering spaces and plaza spaces, as well as, extensions of the interior uses. This spine should also align with existing mid-block crossings at LaPorte Avenue and Maple Street, extending the corridor into adjacent compatible uses like the Larimer County building. Because the connection across Laporte Avenue has the potential to be high traffic and Laporte is four lanes wide here, the crossing should be considered for enhanced control like a rectangular rapid flashing beacon (RRFB). These have been successfully deployed throughout downtown, such as along Mountain Avenue at Remington Street, and could provide benefit to people walking between the CFC campus and Larimer County campus. Emergency and service access should be maintain and supported through the use of clear zones, thicker pavement and bollard placement to control access. Please see the Emergency Access segment for additional information. PEDESTRIAN CONNECTIONS. Pedestrian circulation through the site should be intuitive, convenient, and comfortable. Much has been said about the crossing of Howes Street and the pedestrian-focused Spine. In addition, the current plan focuses on strong connections within the site to Washington Park and among shared outdoor spaces. EMERGENCY ACCESS. Providing emergency access throughout the site is imperative for the life safety of all on site. Poudre Fire Authority has outlined the following items this will need to be addressed for each project: Aerial fire apparatus access, perimeter access fire lanes, appropriate turning radii, appropriate pavement surfaces and slopes, building identification, roof access, and water supply throughout the site. Reference the appendix for more details regarding these requirements. E.112 RECOMMENDATIONS NOVEMBER 2021 SITE AMENITIES: LEGEND INDOOR OUTDOOR EVENTS ENTRY GATEWAYS OUTDOOR WORKSPACE WAYFINDING / ARTS & CULTURE PLAZAS + GATHERING SPACES EDGES + STREETSCAPESAMPHITHEATER OUTDOOR DINING \ SITE AMENITIES Site amenities play an important part in expressing the sense of place and the character of a space. Key areas of the site where this should be expressed are outlined below. PLAZAS AND GATHERING SPACES Plazas and Gathering spaces play an important role in the entry sequence of the site and buildings. They also provide visual cues as to where people should be entering buildings or navigating the campus. They become nodes throughout the site that are tied together through the circulation pattern of the site. These spaces should function from a day-to-day standpoint, while being designed in a flexible manner that allows for them to support events and festivals. 300A LAPORTE PHASE 2A WELLNESS PHASE 2B EXPANSION 300A LAPORTE 222 LAPORTE 215 MASON FUTURE PARKING GARAGE NEW BUILDING LAPORTE ACTIVE SITE NODE ACTIVE SITE NODE RECOMMENDATIONS E.113 FORT COLLINS: MASTER PLAN OUTDOOR DINING During this process we heard numerous times of the desire to extend the interior space out into the site. Outdoor dining is one area where the interior can seamlessly flow to the exterior. Consideration should be made for security of the space and access to the building. This can be done by providing these spaces on an upper-level exterior space or by utilizing planting beds, walls, or other site features to clearly delineate the space. OUTDOOR WORKSPACES In addition to physically extending interior space to the exterior. The idea of providing outdoor space that could be used in a number of ways was requested. To provide for this, we recommend a range of outdoor spaces that can be used for conferences, meetings, one on one discussions, as well as individual work spaces. Due to the nature of meetings and conference space, security should also be a consideration. As noted with outdoor dining, this can be accommodated through the design of the space and site amenities. Consideration should be given to power, wifi, and other technical requirements for these spaces to function properly. EVENTS Public space and events are an important foundation to the Community of Fort Collins. Because of this, the Civic Center must offer a range of multifunctional spaces that can be used to support these gatherings while still functioning on a day-to-day basis for the Civic Center. To achieve this, the plan is building upon the use of Howes as a convertible street by extending the space currently being used for events and enhancing the overall character of the events. In addition to this, the public green space, noted above, can play an important role in extending the event space and allowing for flexibility in size, use, and aesthetics. The flexibly built within this plan will make this a desirable location for a wide range of community events. Consideration should be given to the location(s) for the back of house and staging for these events as well as the technical requirements, such as power and water. EDGES & STREETSCAPES Edges and streetscapes become the defining boundary of the space and should therefore be a reflection of the site’s character as well as serving as the physical connection to the adjacent uses. As part of the streetscape, we recommend the development of gateways that act as entrances into the site from a vehicular, pedestrian, and cyclist standpoint. These would also be opportune areas to locate art or other iconic or cultural landmarks. The intersection of Howes and Laporte as well as the intersection of Howes and Maple should be the main entrance to the site from a vehicular standpoint. While pedestrian and cyclist can have gateways at the north and south ends of the spine on Maple and Laporte. A secondary pedestrian entrance can be located along Mason and the neighborhood connections can be found along Meldrum. ARTS & CULTURE The location of art within a campus can act as wayfinding while at the same time reinforcing that sense of place and community. As a part of this plan, key areas have been identified where art, cultural, landscape, or interactive elements can be located throughout the campus. Areas like the intersection of Howes and Maple, and Howes and Laporte are opportunities for elements that support the vehicular gateway into campus. Areas like the nodes along the streetscape at the Spine and along Mason can support the pedestrian gateways, while internal locations will pull people through the campus and into gathering areas or building entrances. E.114 RECOMMENDATIONS NOVEMBER 2021 \ PROPOSED UTILITIES PROPOSED WATER. The Future Parking Garage is expected to pull water and fire services from Maple Street. It is anticipated that the 8” water main in Howes will be extended south to allow new water and fire services to the Phase 1 building. The existing water service supplying 300 Laporte from Maple Street could remain depending on how the Phase 2A/2B building and repurposing of old City Hall develop. Should new services prove necessary, they are anticipated to come from the larger mains in Howes, Laporte, or Maple as opposed to the 4” main in Meldrum. The smaller sized water mains in Meldrum and the southern portion of Howes may limit the ability to provide water and fire services without upsizing the existing water mains. It is worth coordinating with the Water Utility’s long-range master plan and asset management program relative to any upgrading or replacement of nearby water mains. UTILITIES: LEGEND SEWER STORM WATER 300A LAPORTE PHASE 2A WELLNESS PHASE 2B EXPANSION 300A LAPORTE 222 LAPORTE 215 MASON FUTURE PARKING GARAGE NEW BUILDING RECOMMENDATIONS E.115 FORT COLLINS: MASTER PLAN PROPOSED SANITARY SEWER. The Future Parking Garage is expected to take sanitary sewer service from Maple Street, while it is anticipated that the Phase 1 building will gain sewer service from the 8” mid-block main. The existing sanitary sewer service supplying 300 Laporte from Maple Street could remain depending on how the Phase 2A/2B building and repurposing of old City Hall develop. Should a new sewer service prove necessary, it is anticipated to come from Maple. PROPOSED STORM DRAINAGE. The Civic Center Master Plan is anticipated to reduce the overall impervious area of Blocks 32 and 42. As such, stormwater detention quantity and flood mitigation is not expected. The actual phase- by-phase net change in impervious area will need to be assessed as the master plan develops to ensure runoff volumes are properly addressed. While detention storage is not anticipated, water quality treatment and compliance with the City of Fort Collins Low- Impact Development (LID) regulations will be required. The LID techniques should be closely coordinated with the building architecture and landscape architecture designers such that they become multi-purpose features enhancing the function and experience of the Civic Center. It is also encouraged to leverage the opportunity for research, learning, teaching, and other forms of education and interpretation that the LID features can provide. Ultimately, stormwater runoff will leave the site through the existing storm drains and gutters. PROPOSED DRY UTILITIES. Both long-range and phase-by-phase dry utility design will be a collaborative effort with the building designers and the respective providers and owners of facilities in the area E.116 RECOMMENDATIONS NOVEMBER 2021 \ SUSTAINABLE DESIGN PRELIMINARY MECHANICAL SIZING. Mechanical equipment must be sized appropriately in order to have adequate capacity to heat and cool a building. Early sizing calculations for this projected were performed by the engineering design team. Using these minimum heating and cooling capacity values, expected minimum bore field size, depth, and spacing for the geothermal loop were determined. This was estimated using data collected from thermal conductivity tests performed at the East Park Maintenance facility. Having an appropriately sized bore field is critical to ensuring that enough heat can be collected from or rejected to the ground in order to keep the loop field temperatures maintained within a usable range over the long-term use of the facility. The following table outlines the estimated cooling and heating capacity of each project phase as well as the accompanying bore field size: PHOTOVOLTAIC + GEOTHERMAL: LEGEND POTENTIAL AREAS FOR PHOTOVOLTAIC EXISTING PHOTOVOLTAIC POTENTIAL AREAS FOR GEOTHERMAL 300A LAPORTE PHASE 2A WELLNESS PHASE 2B EXPANSION 300A LAPORTE 222 LAPORTE 215 MASON FUTURE PARKING GARAGE NEW BUILDING RECOMMENDATIONS E.117 FORT COLLINS: MASTER PLAN PHASE 1 NEW BUILDING - ASSUMPTIONS Note, bore field sizing estimated with 400 ft depth and 20 ft spacing. PROJECT PHASE COOLING CAPACITY (MBH) HEATING CAPACITY (MBH) BORE FIELD SIZE (BORE QUANTITY) Phase 1b 2,402 2,696 15 x 15 Phase 2a 782 899 9 x 9 Phase 2b 1,705 2,035 13 x 13 Total 4,890 5,630 22 x 22 PHOTOVOLTAIC SYSTEMS. In order to reach net-zero status for this project, it will be necessary for some renewable energy to be generated on site. This would most likely come through the addition of photovoltaic arrays (aka, “solar panels”) mounted on the roofs of the two buildings. There is also potential to use any nearby buildings also owned by the city. PV panels can also be placed over surface parking lots to generate renewable energy as well as provide shaded parking areas. This could help to offset the buildings energy usage and reach a design the produces as much energy as it consumes over the course of a year. Using Sun Angles & Shadow Maps not only helps identify best possible locations for the placement of photovoltaic panels, it utilizes elements of permaculture design by identifying potential microclimates on the site. This helps aid the design of the building and planting areas. Solar panels need maximum exposure to the sun to harvest the most energy that they can. It will help minimize energy usage and maximize plant productivity also. Sqft of total usable roof space Solar Modules kW Solar Array Size (7) kW Energy Production (1,2,3,4) kWh/Year Energy Production (1,2,3,4) Annual Generated Energy Value (5) 10,052 570 228 37.85 331,548.48 $24,558.00 [ 1 ] A System efficiency of 16.6% [ 2 ] Fixed Rack Open System [ 3 ] PV Module Tilt of 20 degrees [ 4 ] PV Module directed facing the South [ 5 ] Value derived from National Renewable Energy Laboratories PVWatts Calculator [ 6 ] Based on an estimate of $2.80 per Watt [ 7 ] Based off a 400W Solar Module Rating PHASE 1 NEW BUILDING - ASSUMPTIONS Sqft of total usable roof space Solar Modules kW Solar Array Size (7) kW Energy Production (1,2,3,4) kWh/Year Energy Production (1,2,3,4) Annual Generated Energy Value (5) 17,327 983 393 60.95 533,886.96 $39,243.00 [ 1 ] A System Efficiency of 15.5% [ 2 ] Fixed Rack Roof System [ 3 ] PV Module Tilt of 10 degrees [ 4 ] PV Module directed facing the South [ 5 ] Value derived from National Renewable Energy Laboratories PVWatts Calculator [ 6 ] Based on an estimate of $2.80 per Watt [ 7 ] Based off a 400W Solar Module Rating Sqft of total usable roof space Solar Modules kW Solar Array Size (7) kW Energy Production (1,2,3,4) kWh/Year Energy Production (1,2,3,4) Annual Generated Energy Value (5) 28,929 1,642 657 101.80 891,803.04 $65,603.00 PHASE 2 NEW BUILDING - ASSUMPTIONS [ 1 ] A System Efficiency of 15.5% [ 2 ] Fixed Rack Roof System [ 3 ] PV Module Tilt of 10 degrees [ 4 ] PV Module directed facing the South [ 5 ] Value derived from National Renewable Energy Laboratories PVWatts Calculator [ 6 ] Based on an estimate of $2.80 per Watt [ 7 ] Based off a 400W Solar Module Rating E.118 RECOMMENDATIONS NOVEMBER 2021RECOMMENDATIONS BUILDING DESIGN RECOMMENDATIONS E.119 FORT COLLINS: MASTER PLAN E.120 NOVEMBER 2021 PHASE 1 NEW BUILDING 93,000 SF PHASE 1 - NEW BUILDING 300A LAPORTE 300B LAPORTE 222 LAPORTE LAPORTE A new 93,000sf multistory structure is planned to accommodate campus growth and will be located mid-block on the east side of Howes Street. Divided at ground level, the design forms two separate masses housing differing pubic and shared staff uses, including new Council Chambers and a Customer Service Center. Upper floors are contiguous and span across the ground-level divide to create internal connectivity and promote cross-department collaboration. The form of the building should primarily address Howes Street. Lower floors will extent towards Howes and carry the appropriate setback. Upper floors will step back to create occupiable exterior space while maintaining adequate scale in accordance with Downtown design standards. At the eventual construction of an adjacent multi-story parking structure, an elevated walkway is planned as a connector between these two structures. RECOMMENDATIONS E.121 FORT COLLINS: MASTER PLAN STATSPHASE 1 DEPARTMENTSPHASE 2 DEPARTMENTSAvailable Gross Square Footage City Attorney City Attorney 4,916 SF 5,312 SF 93,000 SF Planning, Development, Transfort Planning, Development, Transfort Floors Financial Services Financial Services 6,575 SF 8,017 SF Storage / Receiving / General Storage / Receiving / General Auxiliary Shared Spaces Auxiliary Shared Spaces Age of Building CIPO CIPO - 3,725 SF Wellness Center Wellness Center City Cares City Cares 8,567 SF - 3,750 SF - 5,964 SF 5,964 SF 26,605 SF 28,492 SF City Manager City Manager 15,071 SF 16,321 SF 3 Cafeteria Cafeteria 4,107 SF 4,107 SF FCTV FCTV 4,885 SF 5,111 SF City Clerk City Clerk 3,022 SF 3,549 SF New Parking Services / Transfort Parking Services / Transfort 2,511 SF 2,642 SF Safety + Risk Management Safety + Risk Management 1,526 SF 2,076 SF Human Resources Human Resources 4,921 SF 7,073 SF FUTURE PARKING GARAGE SF TBD 215 MASON E.122 NOVEMBER 2021 215 MASON 300A LAPORTE 300B LAPORTE 222 LAPORTE 215 Mason will undergo substantial renovations during Phase 1 to maximize open and flexible work environments that will accommodate department relocation and right-sizing. The conclusion of Phase 1 will house departments at a 15-year growth capacity. Further Master Plan development throughout Phase 2 will see additional department relocation, and will satisfy expanded department growth over the next 30 years. PHASE 1 NEW BUILDING 93,000 SF LAPORTE RECOMMENDATIONS E.123 FORT COLLINS: MASTER PLAN STATSPHASE 1 DEPARTMENTSPHASE 1 DEPARTMENTSCommunity Services Community Services Administration Administration Administration Administration Parking Service / Transfort Parking Service / Transfort 8,40 SF 9,61 SF 970 SF - 2,437 SF Emergency Preparedness + Security Emergency Preparedness + Security 3,487 SF 3,846 SF Recreation Recreation CIPO CIPO 1,215 SF 1,775 SF 2,867 SF - FC Moves FC Moves Auxiliary Meeting + Collaboration Spaces Auxiliary Meeting + Collaboration Spaces 15,746 SF 13,454 SF Park Planning + Development Park Planning + Development 2,306 SF 2,580 SF Engineering Engineering Environmental Sustainability Environmental Sustainability Social Sustainability Social Sustainability 4,761 SF 6,056 SF - 4,964 SF - 3,215 SF Cultural Services Cultural Services 1,357 SF 2,437 SF Community Development + Neighborhood Services Community Development + Neighborhood Services Economic Health Economic Health 11,616 SF 15,179 SF - - Municipal Court Municipal Court 15,845 SF - Planning, Development, Transfort Planning, Development, Transfort Sustainability Services Sustainability Services 2,301 SF 3,161 SF - 215 MASON Available Gross Square Footage 71,825 SF Floors Age of Building 3 20 YRS FUTURE PARKING GARAGE SF TBD E.124 NOVEMBER 2021 222 LAPORTE RECOMMENDATIONS 300A LAPORTE 300B LAPORTE 222 LAPORTE 222 Laporte is the newest building on the Civic Campus and thus will undergo minimal renovations during Phase 1 to accommodate department relocation and right-sizing to satisf y expanded department growth over the next 30 years. PHASE 1 NEW BUILDING 93,000 SF LAPORTE RECOMMENDATIONS E.125 FORT COLLINS: MASTER PLAN STATSPHASE 1 DEPARTMENTSPHASE 2 DEPARTMENTSBroadband Broadband 2,294 SF 5,242 SF Environmental Sustainability Environmental Sustainability 3,444 SF - Sustainability Services Sustainability Services Energy Services Energy Services 1,344 SF 1,521 SF Customer Support Customer Support 11,911 SF 15,781 SF Auxiliary Meeting + Collaboration Spaces Auxiliary Meeting + Collaboration Spaces 8,687 SF 6,332 SF Water Conservation Water Conservation 1,505 SF 1,770 SF Utilities Utilities Social Sustainability Social Sustainability 2,065 SF - Administration Administration 716 SF - Economic Health Economic Health 1,506 SF - 215 MASON Available Gross Square Footage 41,624 SF Floors Age of Building 3 4 YRS FUTURE PARKING GARAGE SF TBD E.126 NOVEMBER 2021 300A LAPORTE RECOMMENDATIONS 300A LAPORTE 300B LAPORTE 222 LAPORTE 300A Laporte is comprised of east and west wings that currently house the City Council Chambers as well as several other City Hall departments. These entities are slated to relocate to the new municipal building during Phase 1, after which the west portion of 300A will undergo renovations while the east portion will be deconstructed to accommodate Phase 2 construction. Phase 1 renovations will accommodate department relocation and right-sizing to satisfy expanded department growth over the next 30 years. PHASE 1 NEW BUILDING 93,000 SF LAPORTE RECOMMENDATIONS E.127 FORT COLLINS: MASTER PLAN STATSPHASE 1 DEPARTMENTSPHASE 2 DEPARTMENTSAvailable Gross Square Footage Information Technology Information Technology 11,072 SF 16,013 SF 35,007 SF Floors Age of Building 2 Auxiliary Meeting + Collaboration Spaces Auxiliary Meeting + Collaboration Spaces 215 MASON 3,258 SF 4,749 SF 41 YRS FUTURE PARKING GARAGE SF TBD E.128 NOVEMBER 2021 PHASE 2 NEW BUILDINGS RECOMMENDATIONS 300A LAPORTE 300B LAPORTE 222 LAPORTE PHASE 2A. As growth begins to approach the 15-year mark, additional space will be needed within the Phase 1 municipal building. Additional staff and use will also require more robust resources from Wellness and CityCare. This will necessitate the relocation and growth of the two uses to better accommodate the campus over the next 15+ years. With the east block having completed build-out and site improvements, Phase 2 will focus efforts on the west civic block. The first portion of Phase 2a will see the deconstruction of the east portion of 300A Laporte, once housing Council Chambers and FCTV. A new addition is proposed onto the east portion of 300A Laporte that will house expanded Wellness, CityCare, and Meeting/Collaboration uses. The addition’s form is intended to create a strong axial connection across campus and form a PHASE 1 NEW BUILDING 93,000 SF PHASE 2A NEW BUILDING 24,000 SF PHASE 2B NEW BUILDING 48,000 SF LAPORTE RECOMMENDATIONS E.129 FORT COLLINS: MASTER PLAN PHASE 2ADEPARTMENTSPHASE 2BDEPARTMENTSCity Cares Auxiliary Shared Spaces 5,000 SF Wellness Center 12,707 SF 6,332 SF Municipal Court Auxiliary Shared Spaces 32,441 SF 15,037 SF 215 MASON STATSAvailable Gross Square Footage 2a 24,000 SF / 2b 48,000 SF Floors Age of Building 3 NEW FUTURE PARKING GARAGE SF TBD relationship to a new Civic Plaza as well as the new municipal building on the east block. Building and site layout should also accommodate indoor/outdoor wellness activities to the north that integrate with the newly developed civic park. This multi-story addition is projected to be between 20,000 and 25,000sf and will serve the campus for the foreseeable future. PHASE 2B. The projected 30-year growth and function of Municipal Court will not be able to be fully accommodated within 215 Mason. Phase 2b will include a second addition to 300A Laporte which is planned to house expanded Municipal Court functions as well as additional meeting, collaboration, and auxiliary spaces. The multi-story addition is projected to be between two and three stories, and should complement the adjacent Wellness addition while providing a strong connection to the new Civic Plaza on the west block and provide intuitive public entrance points that connect to the Plaza as well as to public parking on the southwest corner of the block. The projected space requirements for this addition is in the 45,000sf to 50,000sf range and will serve the needs of Municipal Cour t and the civic campus for the foreseeable future. E.130 NOVEMBER 2021 300B LAPORTE RECOMMENDATIONS 300A LAPORTE 300B LAPORTE 222 LAPORTE 300B Laporte is one of the oldest structures remaining on the Civic Campus and holds historical value and sentiment that restricts any option of removing this structure to make way for new construction. During Phase 1, the interior of 300B will undergo extensive interior renovations to accommodate depar tment right-sizing to satisfy expanded department growth over the next 30 years. Renovations will be mindful of the historic nature of the building and will strive to preserve the quality of character of the existing structure. PHASE 1 NEW BUILDING 93,000 SF LAPORTE RECOMMENDATIONS E.131 FORT COLLINS: MASTER PLAN STATSPHASE 1 DEPARTMENTSPHASE 2 DEPARTMENTSFacilities Management Facilities Management 1,244 SF 1,892 SF Operation Services Operation Services Project Management, Planning + Design Project Management, Planning + Design Administration Administration Real Estate Real Estate Archive / Shop Archive / Shop Auxiliary Shared Spaces Auxiliary Shared Spaces 1,594 SF 1,840 SF 1,486 SF 1,733 SF 2,836 SF 4,156 SF 4,714 SF 4,749 SF 3,258 SF 4,749 SF 215 MASON Available Gross Square Footage 27,815 SF Floors Age of Building 3 64 YRS FUTURE PARKING GARAGE SF TBD E.132 RECOMMENDATIONS NOVEMBER 2021RECOMMENDATIONS CONSTRUCTION STAGES + OPINIONS OF PROBABLE COST RECOMMENDATIONS E.133 FORT COLLINS: MASTER PLAN E.134 RECOMMENDATIONS NOVEMBER 2021 RIGHT SIZE + RENOVATE EXISTING. Stage 1A prioritizes the initial right- sizing of all existing departments in their current place over the first five years to meet growth projections for 5 to 15 years depending on location and department. This effort involves vacating 214 Howes, and the Park Storage building and moving their departments and contents elsewhere on campus or off site to clear space for a new structure to be completed during Phase 1B. Concurrently, the campus will experience right-sizing for departments across 215 Mason, 222 Laporte, 300A Laporte, and 300B Laporte. This stage also involves vacating 281 College and temporarily relocating these departments to 117 Mason, which is owned and operated by the City as flex space. NEW BUILDING. Stage 1B prioritizes the development and construction of new site and building elements on the eastern civic block bound by Mason, Laporte, Howes, and Maple Street over three years (years 6 through 8) and is intended to satisfy department growth for 15 to 30 years. This stage includes deconstruction of 214 Howes, Park Storage, and non-historic city-owned structures on the northern boundaries of the site, site preparation, and construction of a new 93,000sf building located mid-block along Howes street. Other work planned during Stage 1B includes all site, landscape, hardscape, and plaza development within the Stage 1 boundaries. A skybridge is planned to provide connection to a future planned parking structure. Stage 1B will see several departments relocate permanently to the new 93,000sf building from 215 Mason and 300A Laporte, freeing additional space for future growth and allowing PDT to relocate to 215 Mason, satisfying department growth STAGE 1B STAGE 1A \ OPTION 1 - CONSTRUCTION STAGE 1 222 LAPORTE 214 HOWES PARK STORAGE 300B LAPORTE 300B LAPORTE 215 MASON 222 LAPORTE 300B LAPORTE 300A LAPORTE FUTURE PARKING GARAGE PHASE 1 NEW BUILDING 93,000SF 215 MASON LAPORTE LAPORTE RECOMMENDATIONS E.135 FORT COLLINS: MASTER PLAN OPTION 1 COMPOSITE. The time frame for Option 1 Stage 1 is approximately 8 years. This assumes that design efforts for Stage 1B commence during the 5-year-span for Stage 1A. This approach presents several complexities, mainly around the need for multiple departmental moves during the initial right- sizing as well as additional moves upon completion of Stage 1B. Front-loading the right sizing efforts may also introduce temporary construction needs to facilitate the adjusted departments; work that may need to be redone near the conclusion of Stage 1B to accommodate future growth and movement. HOWES STREET IMPROVEMENTS. Stage 1C includes the redevelopment of Howes street to improve traffic calming, cyclist traffic safety, pedestrian access, landscape improvements, and other site, wayfinding, and pedestrian amenities. This stage may also include the extension of a historic trolley line north through the Civic Center site. STAGE 1 COMPLETE STAGE 1C 222 LAPORTE 300B LAPORTE 300A LAPORTE 215 MASON FUTURE PARKING GARAGE PHASE 1 NEW BUILDING 93,000SF 222 LAPORTE 300B LAPORTE 300A LAPORTE FUTURE PARKING GARAGE PHASE 1 NEW BUILDING 93,000SF 215 MASON LAPORTE LAPORTE E.136 RECOMMENDATIONS NOVEMBER 2021 NEW BUILDING. Option 2, Stage 1A begins by relocating departments and storage located at the middle of the eastern civic block to make way for site prep for the new building. 214 Howes and Parks Services will be relocated and minor changes in departments and spaces will take place in 215 Mason and 300A Laporte to accommodate these shifts. The existing mid-block buildings are then deconstructed and site prep begins for new construction. 281 College is vacated by relocating PDT to 117 Mason. This work is anticipated to be completed during year 1. The remaining buildings and departments undergo no changes for the next 3 years and also must work to limit potential growth during this timeframe. Year 2 and 3 will see the construction of the new 93,000sf civic building allowing for relocation and growth of several departments as well as new amenities and workspace. Concurrently, new east-block site work including landscape, hardscape, and HOWES STREET IMPROVEMENTS. Stage 1B includes the redevelopment of Howes street to improve traffic calming, cyclist traffic safety, pedestrian access, landscape improvements, and other site, wayfinding, and pedestrian amenities. This stage may also include the extension of a historic trolley line north through the Civic Center site. STAGE 1B STAGE 1A \ OPTION 2 - CONSTRUCTION STAGE 1 222 LAPORTE 222 LAPORTE 300B LAPORTE 300B LAPORTE 300A LAPORTE 300A LAPORTE FUTURE PARKING GARAGE FUTURE PARKING GARAGE PHASE 1 NEW BUILDING 93,000SF PHASE 1 NEW BUILDING 93,000SF 215 MASON 215 MASON LAPORTE LAPORTE RECOMMENDATIONS E.137 FORT COLLINS: MASTER PLAN OPTION 2 COMPOSITE. The second phasing option aims to shorten the overall time frame and cost for Phase 1 and will save a potential of 2 years compared to Option 1 by prioritizing the construction of a new 93,000sf building that will facilitate department right-sizing and movement upon its completion over a shortened 6-year time frame. This option presents a higher up-front cost that Option 1, but spreads it across a shorter time line, thereby reducing overall escalation costs over the duration of the project. By delaying right-sizing and relocation of departments until a new structure is complete, we will simplify the moving process, while minimizing prolonged renovation of existing buildings and reducing overall construction costs. RIGHT SIZE + RENOVATE EXISTING. Year 4 will see the completion of construction and occupancy for the new civic structure. This will facilitate the relocation and right- sizing of several departments from 215 Mason and 300A Laporte into the new building. Once these departments have moved, one-time renovations will begin in the newly cleared spaces in both 300A Laporte and 215 Mason. These renovations will accommodate further departmental right-sizing. Years 5 and 6 will see additional renovation and right-sizing efforts to accommodate 15-to-30-year growth for the remaining buildings and departments on campus. The exception to right-sizing during Stage 1 will be Municipal Court and Emergency Preparedness which currently have planned renovations in-place and will be further accommodated during Stage 2. STAGE 1 COMPLETE STAGE 1C 222 LAPORTE 300B LAPORTE 300B LAPORTE FUTURE PARKING GARAGE PHASE 1 NEW BUILDING 93,000SF 215 MASON 222 LAPORTE 300B LAPORTE 300A LAPORTE FUTURE PARKING GARAGE PHASE 1 NEW BUILDING 93,000SF 215 MASON LAPORTE LAPORTE E.138 RECOMMENDATIONS NOVEMBER 2021 TOTALSCONSIDERATIONS. X 281 College can be sold early X Higher Phasing Complexity X Existing Building remodels are prioritized with lower escalation X New Building pushes to 2026 once Stage 1A is complete X Escalation on New Building exceeds cost of Stage 1A PROJECT $91,405,000 - $104,526,798 CONSTRUCTION $69,374,781 - $79,341,315STAGE 1BBUILDING NEW SF $/SF $/SF COST (CONSTRUCTION) SOFT COST TOTAL PROJECT COST LOW HIGH % LOW HIGH NEW BUILDING 93,000 450 500 $41,850,000 $46,500,000 30% $54,405,000 $60,450,000 YEAR ESCALATION (%) ESCALATION ($)ESCALATION ($) 2022 6% $2,511,000 $2,790,000 $44,361,000 $49,290,000 30% $57,669,300 $64,077,000 2023 6% $2,661,660 $2,957,400 $47,022,660 $52,247,400 30% $61,129,458 $67,921,620 2024 6% $2,821,360 $3,134,844 $49,844,020 $55,382,244 30% $64,797,225 $71,996,917 2025 6% $2,990,641 $3,134,844 $52,834,661 $58,517,088 30% $68,685,059 $76,072,214 2026 6% $3,170,080 $3,322,935 $56,004,740 $61,840,023 30% $72,806,163 $80,392,029 TOTAL $14,154,740 $15,340,023 $56,004,740 $61,840,023 $72,806,163 $80,392,029 STAGE 1CHOWES STREET IMPROVEMENTS COST (CONSTRUCTION) SOFT COST TOTAL PROJECT COST LOW HIGH % LOW HIGH $700,000 $800,000 30% $910,000 $1,040,000 YEAR ESCALATION (%) ESCALATION ($)ESCALATION ($) 2022 6% $42,000 $48,000 $742,000 $848,000 30% $964,600 $1,102,400 2023 6% $44,520 $50,880 $786,520 $898,880 30% $1,022,476 $1,168,544 2024 6% $47,191 $53,933 $833,711 $952,813 30% $1,083,825 $1,238,657 2025 6% $50,023 $53,933 $883,734 $1,006,746 30% $1,148,854 $1,308,769 2026 6% $53,024 $57,169 $936,758 $1,063,914 30% $1,217,785 $1,383,089 TOTAL $236,758 $263,914 $936,758 $1,063,914 $1,217,785 $1,383,089 STAGE 1ABUILDING RENOVATED $/SF $/SF COST (CONSTRUCTION) SOFT COST TOTAL PROJECT COST LOW HIGH % LOW HIGH 215 40000 75 125 $3,900,000 $6,500,000 30% $5,070,000 $8,450,000 222 41624 10 15 $499,488 $749,232 30% $649,334 $974,002 300B 18568 175 200 $4,224,220 $4,827,680 30% $5,491,486 $6,275,984 300A 20863 175 200 $4,746,333 $5,424,380 30% $6,170,232 $7,051,694 TOTAL $13,370,041 $17,501,292 $17,381,053 $22,751,680 \ OPTION 1 - CONSTRUCTION STAGE 1 X Departments will need to move multiple times to accommodate early right-sizing X Multiple Moving Costs not accounted for in current cost data X Howes Street improvements occur concurrent to Stage 1B New Building and incur increased escalation costs X 8+ Year Timeline RECOMMENDATIONS E.139 FORT COLLINS: MASTER PLAN CONSIDERATIONS. X 281 College can be sold early X New Building breaks ground in 2022 reducing escalation costs X Lower Phasing Complexity X Existing Buildings experience little change during Stage 1A and Stage 1BTOTALSBUILDING RENOVATED $/SF $/SF COST (CONSTRUCTION) SOFT COST TOTAL PROJECT COST LOW HIGH % LOW HIGH 215 40000 85 140 $4,080,000 $6,720,000 30% $5,304,000 $8,736,000 222 41624 12 17 $549,437 $778,369 30% $714,268 $1,011,879 300B 18568 196 225 $4,003,261 $4,595,580 30% $5,204,239 $5,974,254 300A 20863 196 225 $4,498,063 $5,163,593 30% $5,847,482 $6,712,670 TOTAL $13,130,760 $17,257,541 $17,069,989 $22,434,804 STAGE 1CPROJECT $75,703,889 - $87,614,204 CONSTRUCTION $58,233,760 - $67,395,541 \ OPTION 2 - CONSTRUCTION STAGE 1 X Most departments only move/right-size one time reducing cost and complexity X Howes Street Improvements occur earlier concurrent to Stage 1A X 6+ Year Timeframe (Reducing construction by up to 2 years)STAGE 1BHOWES STREET IMPROVEMENTS COST (CONSTRUCTION) SOFT COST TOTAL PROJECT COST LOW HIGH % LOW HIGH $700,000 $800,000 30% $910,000 $1,040,000 YEAR ESCALATION (%) ESCALATION ($)ESCALATION ($) 2022 6% $42,000 $48,000 $742,000 $848,000 30% $964,600 $1,102,400 TOTAL $42,000 $48,000 $742,000 $848,000 $964,600 $1,102,400 STAGE 1ABUILDING RENOVATED $/SF $/SF COST (CONSTRUCTION) SOFT COST TOTAL PROJECT COST LOW HIGH % LOW HIGH 93000 450 500 $41,850,000 $46,500,000 30% $54,405,000 $60,450,000 YEAR ESCALATION (%) ESCALATION ($)ESCALATION ($) 6% $2,511,000 $2,790,000 $44,361,000 $49,290,000 30% $57,669,300 $64,077,000 TOTAL $2,511,000 $2,790,000 $44,361,000 $49,290,000 $57,669,300 $64,077,000 E.140 RECOMMENDATIONS NOVEMBER 2021 \ CONSTRUCTION STAGE 2 WELLNESS. As growth begins to approach the 15-year mark, additional space will be needed within the Stage 1 municipal building. Additional staff and use will require more robust resources from Wellness and CityCare. This will necessitate the relocation and growth of the two uses to better accommodate the campus over the next 15+ years. With the east block having completed build-out and site improvements, Stage 2 will focus efforts on the west civic block. The first portion of Stage 2a will see the deconstruction of the east portion of 300A Laporte, once housing Council Chambers and FCTV. A new addition is proposed onto the east portion of 300A Laporte that will house expanded Wellness, CityCare, and Meeting/ Collaboration uses. The addition’s form is intended to create a strong axial connection across campus and form a relationship to a new Civic Plaza as well as the new municipal building on the east block. Building and site layout should also accommodate indoor/ outdoor wellness activities to the north that integrate with the newly developed civic park. This multi-story addition is projected to be between 20,000 and 25,000sf and will serve the campus for the foreseeable future. EXPANSION. The projected 30-year growth and function of Municipal Court will not be able to be fully accommodated within 215 Mason. Stage 2b will include a second addition to 300A Laporte which is planned to house expanded Municipal Court functions as well as additional meeting, collaboration, and auxiliary spaces. The multi-story addition is projected to be between two and three stories, and should complement the adjacent Wellness addition while providing a strong connection to the new Civic Plaza on the west block and provide intuitive public entrance points that connect to the Plaza as well as to public parking on the southwest corner of the block. The projected space requirements for this addition is in the 45,000sf to 50,000sf range and will serve the needs of Municipal Court and the civic campus for the foreseeable future. STAGE 2B STAGE 2A 222 LAPORTE 222 LAPORTE 300B LAPORTE 300B LAPORTE FUTURE PARKING GARAGE FUTURE PARKING GARAGE 300A LAPORTE 300A LAPORTE PHASE 2A WELLNESS 95,000SF PHASE 2A WELLNESS 24,000SF PHASE 1 NEW BUILDING 93,000SF PHASE 1 NEW BUILDING 93,000SF PHASE 2A EXPANSION 48,000SF 215 MASON 215 MASON LAPORTE LAPORTE RECOMMENDATIONS E.141 FORT COLLINS: MASTER PLAN STAGE 2 COMPLETE222 LAPORTE 300B LAPORTE FUTURE PARKING GARAGE 300A LAPORTE PHASE 2A WELLNESS 24,000SF PHASE 1 NEW BUILDING 93,000SF PHASE 2A EXPANSION 48,000SF 215 MASON LAPORTE E.142 NOVEMBER 2021RECOMMENDATIONSRECOMMENDATIONS 300B LAPORTE 300B LAPORTE PHASE 2A WELLNESS 24,000 SF PHASE 2B EXPANSION 48,000 SF RAISED PEDESTRIAN CROSSING CIVIC PLAZA ENTRANCE COURT ENTRANCE COURT INDOOR + OUTDOOR SURFACE PARKING SURFACE PARKING SERVICE INDOOR + OUTDOOR AMPHITHEATER SITE ACTIVITY NODE / PARK SITE ACTIVITY NODE L NE INDOOR + OU INDOOR + OUTDOOR ENTRANCE COURT + CIVIC PLAZA LAPORTE RECOMMENDATIONS E.143 FORT COLLINS: MASTER PLAN SERVICESERVICE 322 LAPORTE PHASE 1 W BUILDING 93,000 SF FUTURE PARKING GARAGE SF TBD 215 MASON UTDOOR + R COMPOSITE MASTER PLAN PEDESTRIAN NODE GREEN SPACE WAYFINDING SPINE - PEDESTRIAN + BICYCLES PEDESTRIAN CIRCULATION FIRE ACCESS ROUTE AMPHITHEATER STORMWATER MANAGEMENT GATEWAYS SURFACE PARKING SERVICE EXISTING TREES CONVERTIBLE STREET (INCLUDES: BIKE LANE, PARKING, TROLLEY) ENERGY PERFORMANCE F.145 FORT COLLINS: MASTER PLAN ENERGY PERFORMANCEF F.146 ENERGY PERFORMANCE NOVEMBER 2021 \ ENERGY MODELING SUMMARY. In 2013, the city of Fort Collins, Colorado published its first edition of the Municipal Sustainability Plan. While it has been updated over the years, the general principal remains the same: to be the guiding document that provides direction for the coming decades to advance sustainability efforts. In updating the Block 32/42 Civic Center Conceptual Master Plan, emphasis was placed on ensuring that the new designs aligned with the goals set forth by the sustainability plan. The six goals outlined in the sustainability plan are as follows: X We Are Resilient: City operations are prepared for and adapt to climate change and disruptive events of all scales. X Our Public Lands Thrive: Our public lands support a healthy ecosystem and are resilient to climate and population growth pressures. X We Are Water Smart: We sustainably manage our water resources and lead Colorado in water efficiency. X We Are Zero Waste: We responsibly manage goods, products, and services throughout their life cycle to achieve waste reduction outcomes. X We Are Carbon Neutral: Our transportation systems, energy production, and facilities lead the nation in sustainable performance and resource efficiency. X We Are A World Class Workplace: The City is a high performing and resilient organization that has a culture of sustainability. Developing buildings that consume less energy or are classified as “net-zero” buildings (those that produce as much renewable energy as they consume over the course of a year) is an excellent way for the city to achieve these sustainability goals. Using less energy helps to minimize a given buildings impact on the environment and have a decreased carbon footprint. In time, these practices can help to slow climate change and preserve the planet’s ecosystem, in Fort Collins and beyond. The energy modeling outlined in this report investigated the impact of various strategies that could be implemented in order to reduce building energy usage. These strategies were broken into three primary categories: Building Envelope, Electrical, and Mechanical. The building envelope primarily includes the roof, walls, and windows. These structures serve as the primary thermal barrier between the conditioned interior and the exterior environment. A higher performing envelope resulted in a building that required less energy to heat and cool to a comfortable level. Heating and cooling energy was also reduced through the use of mechanical strategies such as improved efficiency of HVAC equipment. Electrical strategies in particular showed a large impact on building energy usage. For example, less installed lighting power directly resulted in less electrical energy being consumed by these fixtures, and therefore the building as a whole. A total of 13 different energy conservation measures were investigated, packaged into 5 bundles. Each of these bundles was then compared to the minimum performance required by local energy code (the “baseline). This helped to show the impact of each strategy in terms of Energy Usage Intensity (total energy consumed per building area per year) and the energy savings (percent reduction relative to the baseline). CLIENT NAME: PROJECT TITLE ENERGY PERFORMANCE F.147 Table 1. Bundle Performance Summary BUNDLE EUI (kBtu/sf-yr) ENERGY SAVINGS Baseline 43.4 N/A Z-01 21.3 32.2% Z-02 21.2 32.5% Z-03 18.5 41.1% Z-04 16.5 47.7% Z-05 16.2 48.4% The project team targeted a goal of 15 EUI for the two buildings themselves with the potential to reach net-zero performance through the addition of the potential energy produced by photovoltaic arrays. While none of the bundles presented reach this 15 EUI goal, reaching net-zero performance may still be possible through the inclusion of additional photovoltaic (PV) arrays mounted on the roofs of this project or surrounding buildings on site. In summary, the proposed energy cost reduction strategies presented have the potential to provide a high-performing building that aligns with the sustainability goals set forth by the City of Fort Collins, Colorado. ENERGY ANALYSIS. The project consists of two “phases” totaling roughly 165,000 square feet. “Phase 1b” contains a new 93,000 square foot, multistory structured located to the east of Howes Street and North of the Utility Administration building. “Phase 2” is comprised of two structures. “Phase 2a” contains a 24,000 square foot expansion to the repurposed old city hall building while “Phase 2b” will be a 48,000 square foot multistory structure situated directly across Howes Street to the west of Phase 1. Both of these phases are comprised primarily of office space as well as necessary building support areas. The City of Fort Collins has established an Energy Usage Intensity (EUI) goal of 15 kBtu/sf-year. EUI represents the total energy consumed per square foot of building area in a typical year. This value represents a very high performing building. For reference, Energy Star (part of the US Environmental Protection Agency) currently lists the median EUI of an existing non-medical office building at 52.9 kBtu/sf-year. In order to approach this aggressive target, multiple energy conservation measures (ECM) will need to be utilized. The modeling effort to this point represents the building massing as developed during the multi-day charrette. This building data was then input into the energy modeling software to calculate and compare the annual energy cost savings associated with various proposed ECMs. These measures and how they contribute to the improved energy performance are outlined in the Building and Systems section of this report. The baseline model as referenced in this report represents the minimum performance the building must achieve in order to be complaint with the 2018 International Energy Conservation Code via the Total Building Performance pathway. This performance was calculated by modeling the project buildings with a certain mechanical system, envelope construction, and other parameters as specified in the code. F.148 ENERGY PERFORMANCE NOVEMBER 2021 \ BUILDING AND SYSTEMS BUILDING ENVELOPE. The building envelope refers to the physical construction of the walls, roof, and windows of a building. Energy simulation results indicated that it plays a key role in determining the energy required to adequately heat and cool a building. Increased insulation on the roof as well as in the walls proved to be highly beneficial. The wall construction in particular showed improvement from more insulation not only between the studs, but also from continuous insulation (c.i.) on the exterior of the studs to prevent thermal bridging. As windows make up a significant portion of the building exterior, project glazing with decreased thermal transmittance contributed greatly to improved building performance. Glazing was also tested that allows less solar radiation to pass through, reducing the heat gain within the space. Another strategy investigated was that of decreased air infiltration (air leakage). This helped reduce the amount of energy required by the mechanical system to condition the building. Finally, the impact of electrochromic glazing (aka “smart glass”) was evaluated. This technology dynamically alters the opacity of the glass in order to decrease solar radiation transmission when it is advantageous for building performance. For example, a darker glass can reduce solar gain on a warm summer day to help decrease the energy required to cool a space. During winter, a clearer glass permits more solar gain to assist in heating spaces. Table 2. Building Envelope ECM Values ECM Baseline Value Proposed Value Roof Construction R-30 (U-0.032) R-60 (U-0.016) Exterior Wall Construction R-13 + 7.5 c.i. (U-0.064) R-13 + 19 c.i. (U-0.037) Fenestration Thermal Transmittance U-0.42 U-0.14 Fenestration Solar Heat Gain SHGC-0.40 SHGC-0.21 Infiltration 0.40 cfm/SF exterior wall area 0.25 cfm/SF exterior wall area Electrochromic Glazing N/A Included ELECTRICAL SYSTEMS. The installed lighting power had a significant impact on the amount of electrical energy consumed by the buildings. Reducing the average installed wattage per square foot of building area directly resulted in less energy consumed. The impact of individual task lighting provided at workstations permitted further reduction of installed general lighting. Additional electrical power savings was made available through the use of plug controls in office areas either tied to workstation occupancy sensors or controlled via timer. This reduced excess power consumption by office equipment (e.g., computers, printers) while the workstation was not in use. Regenerative elevators were also tested. This allowed some of the electrical energy used to raise the elevators cars to be recovered on descent. CLIENT NAME: PROJECT TITLE ENERGY PERFORMANCE F.149 Table 3. Electrical ECM Values ECM Baseline Value Proposed Value Lighting Power Density 0.79 W/SF 0.50, 0.40, 0.30 W/SF Task Lighting 0.0 W/SF 0.10 W/SF Regenerative Elevators N/A Included Workstation Plug Load Controls N/A Included (controls 50% of workstation power) MECHANICAL SYSTEMS. The primary mechanical system for the project is ground source heat pump (GSHP) served by a vertical bore wellfield on site. The baseline mechanical system required by IECC 2018 is a water source heat pump system. Where the proposed design utilized a ground loop, the baseline system required a boiler and chiller system to add or reject heat from the water loop. This resulted in the proposed design showing significant energy savings, particularly in heating mode due to the 80% efficient natural gas boilers in the baseline. Cooling and heating efficiency values for the heat pumps in the proposed design were selected to reflect the performance of currently available high efficiency variable speed GSHP. This system offers significantly better performance than the minimum heat pump performance required by IECC 2018. Ventilation air is supplied to the building via an energy recovery ventilator (ERV) with a rotary air-to-air enthalpy wheel to regain energy from the exhaust air stream. Supplementing this system with natural ventilation strategies showed a reduction in the amount of energy required to supply and exhaust outside air. Table 4. Mechanical ECM Values ECM Baseline Value Proposed Value GSHP Cooling Energy Efficiency Ratio 16 EER 36 EER GSHP Heating Coefficient of Performance 4.3 COP 4.8 COP Natural Ventilation N/A Included (30% ERV fan power reduction) ENERGY REDUCTION STRATEGIES. Various ECMs were combined in order to create several different bundles as detailed below. This allowed the various synergies and conflicts between multiple strategies to be more apparent. Bundles Z-01 and Z-02 offered moderate energy savings while Bundles Z-03, Z-04, and Z-05 showed progressively more aggressive strategies. Each bundle is outlined in detail below. F.150 ENERGY PERFORMANCE NOVEMBER 2021 BUNDLE Z-01. This scenario achieved an energy use reduction of 32.2% over the baseline case model with a site EUI of 21.3 kBtu/ft2/yr. This scenario incorporated the following five ECMs: X Roof Construction: U-0.016 X Exterior Wall Construction: U-0.037 X Fenestration Thermal Transmittance: U-0.14 X Fenestration Solar Heat Gain Coefficient: SHGC-0.21 X Lighting Power Density: 0.50 W/SF F.151 FORT COLLINS: MASTER PLAN ENERGY PERFORMANCE BUNDLE Z-02. This scenario achieved an energy use reduction of 32.5% over the baseline case model with a site EUI of 21.2 kBtu/ft2/yr. The following four ECMs were the same as seen in Bundle Z-01: X Roof Construction: U-0.016 X Exterior Wall Construction: U-0.037 X Fenestration Thermal Transmittance: U-0.14 X Fenestration Solar Heat Gain Coefficient: SHGC-0.21 Bundle Z-02 contains the following three additional measures: X Lighting Power Density: 0.40 W/SF X Task Lighting: 0.10 W/SF X Outside Air Infiltration: 0.25 cfm/SF exterior wall area Note, Z-02 showed little to no savings as compared to Z-01. While overhead lighting power is reduced, the addition of task lighting negated some of those savings. Reduced infiltration also showed minimal impact on overall performance. F.152 ENERGY PERFORMANCE NOVEMBER 2021 BUNDLE Z-03. This scenario achieved an energy use reduction of 41.1% over the baseline case model with a site EUI of 18.5 kBtu/ft2/yr. The following six ECMs were the same as seen in Bundle Z-02: X Roof Construction: U-0.016 X Exterior Wall Construction: U-0.037 X Fenestration Thermal Transmittance: U-0.14 X Fenestration Solar Heat Gain Coefficient: SHGC-0.21 X Task Lighting: 0.10 W/SF X Outside Air Infiltration: 0.25 cfm/SF exterior wall area Outside Air Infiltration: 0.25 cfm/SF exterior wall area Bundle Z-03 contains the following three additional measures: X Lighting Power Density: 0.30 W/SF X GSHP Cooling Energy Efficiency Ratio: 36 EER X GSHP Heating Coefficient of Performance: 4.4 COP This scenario showed larger savings than the previous two bundles. This is due in large part to decreased interior lighting power and less energy required by the heat pumps for space heating and cooling. F.153 FORT COLLINS: MASTER PLAN ENERGY PERFORMANCE BUNDLE Z-04. This scenario achieved an energy use reduction of 47.7% over the baseline case model with a site EUI of 16.5 kBtu/ft2/yr. The following nine ECMs were the same as seen in Bundle Z-03: X Roof Construction: U-0.016 X Exterior Wall Construction: U-0.037 X Task Lighting: 0.10 W/SF\ X Fenestration Thermal Transmittance: U-0.14 X Fenestration Solar Heat Gain Coefficient: SHGC-0.21 Bundle Z-04 contains the following three additional measures: X Regenerative Elevators: Included X Workstation Equipment Power Density: 0.288 W/SF X Electrochromic Glazing Bundle Z-04 showed moderate savings over Z-03. Workstation equipment power and regenerative elevators directly resulted in decreased electricity usage. Electrochromic glazing helped to reduce the mechanical load. X Outside Air Infiltration: 0.25 cfm/SF exterior wall area X Lighting Power Density: 0.30 W/SF X GSHP Cooling Energy Efficiency Ratio: 36 EER X GSHP Heating Coefficient of Performance: 4.4 COP F.154 ENERGY PERFORMANCE NOVEMBER 2021 BUNDLE Z-05. This scenario achieved an energy use reduction of 48.4% over the baseline case model with a site EUI of 16.2 kBtu/ft2/yr. The following eleven ECMs were the same as seen in Bundle Z-04: X Roof Construction: U-0.016 X Exterior Wall Construction: U-0.037 X Fenestration Thermal Transmittance: U-0.14 X Fenestration Solar Heat Gain Coefficient: SHGC-0.21 X Task Lighting: 0.10 W/SF X Outside Air Infiltration: 0.25 cfm/SF exterior wall area Bundle Z-05 contained the following additional measure: X Natural Ventilation: Included Bundle Z-05 showed a slight savings over Z-04 thanks to the addition of natural ventilation strategies. This was seen as a decrease in energy used by ventilation fans. Z-05 was the best performing bundle out of all those tested. X Lighting Power Density: 0.30 W/SF X GSHP Cooling Energy Efficiency Ratio: 36 EER X GSHP Heating Coefficient of Performance: 4.4 COP X Regenerative Elevators: Included X Workstation Equipment Power Density: 0.288 W/SF X Electrochromic Glazing F.155 FORT COLLINS: MASTER PLAN ENERGY PERFORMANCE \ PHOTOVOLTAIC SYSTEMS In order to reach net-zero status for this project, it will be necessary for some renewable energy to be generated on site. This would most likely come through the addition of photovoltaic arrays (aka, “solar panels”) mounted on the roofs of the two buildings. There is also potential to use any nearby buildings also owned by the city. When combined with a bundle of ECMs as described above, this could help to offset the buildings energy usage and reach a design the produces as much energy as it consumes over the course of a year. Note, the energy performance summary graphs listed with each bundle include an example amount of PV arrays. This amount is equal to that which would be consumed by the two buildings if they had an EUI of 15. \ PRELIMINARY MECHANICAL SYSTEM SIZING Mechanical equipment must be sized appropriately in order to have adequate capacity to heat and cool a building. Early sizing calculations for this projected were performed by the engineering design team. Using these minimum heating and cooling capacity values, expected minimum bore field size, depth, and spacing for the geothermal loop were determined. This was estimated using data collected from thermal conductivity tests performed at the East Park Maintenance facility. Having an appropriately sized bore field is critical to ensuring that enough heat can be collected from or rejected to the ground in order to keep the loop field temperatures maintained within a usable range over the long-term use of the facility. The following table outlines the estimated cooling and heating capacity of each project phase as well as the accompanying bore field size: Note, bore field sizing estimated with 400 ft depth and 20 ft spacing. PROJECT PHASE COOLING CAPACITY (MBH) HEATING CAPACITY (MBH) BORE FIELD SIZE (BORE QUANTITY) Phase 1b 2,402 2,696 15 x 15 Phase 2a 782 899 9 x 9 Phase 2b 1,705 2,035 13 x 13 Total 4,890 5,630 22 x 22 CONCLUSION. The energy modeling in this report indicated that there is vast potential for the Block 32/42 Civic Center Conceptual Master Plan project to achieve a high performing, energy efficient design. Each of the bundles proposed resulted in significant energy savings. Bundle Z-05 resulted in the best overall energy performance. It showed an EUI of 16.2 kBtu/ft2/yr and an energy use reduction of 48.4% over the IECC baseline model. Bundle Z-04 also resulted in very similar performance with 16.5 EUI and 47.7% savings. The only difference between the two bundles was the addition of natural ventilation strategies. While none of these bundles reached the initial goal of 15 EUI, achieving a net-zero design is still possible through the use of PV systems. APPENDIX G.157 FORT COLLINS: MASTER PLAN G APPENDIX G.158 APPENDIX NOVEMBER 2021APPENDIX SITE INVENTORY APPENDIX G.159 FORT COLLINS: MASTER PLAN G.160 APPENDIX NOVEMBER 2021 CIVIC CENTER BUILDINGS \ ACQUIRED BUILDINGS Buildings to be acquired under this Master Plan include the Civic Center Parking Garage Condominiums (Condos). The City’s acquisition of the Condos is planned to occur by the end of 2021 and will be purchased at a cost of approximately $975,000 using appropriated reserves from the City’s general government capital expansion fee account in the capital expansion fee fund. The Condos will be acquired to house the offices for City Parking Services which will move from its current offices in 215 North Mason Street. This move will open up space for the Municipal Court offices to expand at 215 North Mason Street. Once the leases of the current commercial tenants in the Condos expire, other City offices will likely be located in that space. \ BUILDINGS TO BE SOLD As part of this Master Plan, 281 College intends to be sold. 281 College currently houses Planning, Development and Transportation (PDT). The occupants will relocate into the core Civic Center blocks 32/42. Additional information re- garding this move can be found in the recommendations section. \ HISTORICALLY SIGNIFICANT BUILDINGS The intent of the Master Plan is to maintain all historically significant buildings within the core Civic Center blocks. 300B Laporte, also known as the Operation Services Building, is not a Fort Collins Landmark but it has been identified as a potential for Landmark eligibility by City of Fort Collins Historic Preservation. Due to this classification, 300B Laporte will remain as part of the Civic Center Campus. The FoCo Cafe building, was originally the Continental Oil Company Property. It is a Fort Collins Landmark, designated in 2017. A portion of the detached garage is historic. The additions onto the historic garage are not considered historic and are proposed to be removed with the Master Plan. The Butterfly Cafe, which sits at the southwest corner of 222 Laporte is also a Fort Collins Landmark. It was moved to it’s new location when 222 Laporte was constructed. The building will remain as it is currently. \ BUILDINGS TO BE DECONSTRUCTED The east side of City Hall, 300A Laporte, is intended to be renovated and utilized as part of the Master Plan. However, the west side of the building will be deconstructed to allow for future additions and additional city programming. 214 and 220 Howes are industrial buildings without any historic significance. These two building will be deconstructed under the Master Plan. 321 Maple is another building that will be deconstructed. It is a non descript building, built in 1980. It currently houses the Center for Fine Art Photography administration offices. The Master Plan proposes it as Washington Park expansion. APPENDIX G.161 FORT COLLINS: MASTER PLAN CITY OWNED BUILDINGS CIVIC CORE CIVIC BOUNDARY SITE LOCATION: CIVIC CENTER BLOCKS 32/42OHOWEHOWESSSSSSMELDRUM MASONCOLLEGE119 Fort Collins Municipal Railway Carbarn 281 College FoCo Cafe 300A Laporte 215 M ason Larimer County Justi ce Center Civic Center Parking Garage Downtown Transit Center 222 Laporte 300B Laporte 214 Ho wes St 220 Howes St 117 Mason Street Civic Center Condos- Needed Future Municipal Offices CityCare M APLE LAPORTE MOUNTAIN 321 Maple G.162 APPENDIX NOVEMBER 2021 CULTURE: CULTURAL ASSETS Cherry Street Maple Street Laporte Avenue West Mountain Avenue West Mulberry Street North College AvenueN Meldrum StN Mason StS Howes StSouth College AvenueSouth Shields StreetEast Laurel Street East Mulberry Street E Mountain Ave East Lincoln Avenue P o u d r e R i v e rLinden StreetEast Vine DriveNorth Shields Street(Red Hatch) Civic Center Structures Roads Lakes, Rivers, Streams Rail Road Parks Natural Areas Schools Medical Campus Historic Building Pedestrian Pavers Art in Public Places Transformer Cabinet Mural APPENDIX G.163 FORT COLLINS: MASTER PLAN CULTURE: CULTURAL ASSETS Cherry Street Maple Street Laporte Avenue W Mountain Ave W Mulberry St N College AveN Meldrum StN Mason StS Howes StS College AveEast Laurel Street East Mulberry Street E Mountain Ave East Lincoln Avenue P o u d r e R i v e rLinden StreetEast Vine Drive (White Hatch) Civic Center Structures Roads Lakes, Rivers, Streams Rail Road Parks Natural Areas Schools Medical Campus DDA Boundary CONTENTHistoric Building CONTENTPedestrian Pavers CONTENTArt in Public Places CONTENTTransformer Cabinet Mural CONTENTCONTENT G.164 APPENDIX NOVEMBER 2021 CULTURE: CULTURAL ASSETS Cherry Street Maple Street Laporte Avenue West Mountain Avenue West Mulberry Street North College AvenueN Meldrum StN Mason StS Howes StSouth College AvenueSouth Shields StreetEast Laurel Street East Mulberry Street E Mountain Ave East Lincoln Avenue P o u d r e R i v e rLinden StreetEast Vine DriveNorth Shields Street(Red Hatch) Civic Center Structures Roads Lakes, Rivers, Streams Rail Road Parks Natural Areas Schools Medical Campus Historic Building Pedestrian Pavers Art in Public Places Transformer Cabinet Mural APPENDIX G.165 FORT COLLINS: MASTER PLAN CULTURE: CULTURAL ASSETS Cherry Street Maple Street Laporte Avenue W Mountain Ave W Mulberry St N College AveN Meldrum StN Mason StS Howes StS College AveEast Laurel Street East Mulberry Street E Mountain Ave East Lincoln Avenue P o u d r e R i v e rLinden StreetEast Vine Drive (White Hatch) Civic Center Structures Roads Lakes, Rivers, Streams Rail Road Parks Natural Areas Schools Medical Campus DDA Boundary CONTENTHistoric Building CONTENTPedestrian Pavers CONTENTArt in Public Places CONTENTTransformer Cabinet Mural CONTENTCONTENT G.166 APPENDIX NOVEMBER 2021 CULTURE: GREEN INFRASTRUCTURE Cherry St Maple St Laporte Ave W Mountain Ave North College AvenueN Meldrum StN Howes StN Mason StSouth College AveLinden StreetCity Hall Observation Service Justice Center Mountain Cafe Court House Global Village Museum Civic CenterParking GarageCity of Fort Collins Utilities Haiston Oil Park Shop Eco-Thrift 215 NMansonWellness Annex Social Sustainability Terracon Penny Flats Downtown Transit Center St. Joseph’s Catholic School Structures Roads Lakes, Rivers, Streams Rail Road DDA Boundary ClimateWise Business Partners Electric Vehicle Charging Station Solar Panels Civic Center APPENDIX G.167 FORT COLLINS: MASTER PLAN CULTURE: OUTDOOR EVENT SPACE Cherry Street Maple Street Laporte Avenue W Mountain Ave W Mulberry St N College AveN Meldrum StN Mason StS Howes StS College AveEast Laurel Street East Mulberry Street E Mountain Ave East Lincoln Avenue P o u d r e R i v e rLinden StreetEast Vine Drive (White Hatch) Civic Center Structures Roads Lakes, Rivers, Streams Rail Road DDA Boundary ClimateWise Business Partners Electric Vehicle Charging Station Solar Panels G.168 APPENDIX NOVEMBER 2021 ECOLOGY: LANDFORM Cherry Street Maple Street Laporte Avenue West Mountain Avenue West Mulberry Street North College AvenueN Meldrum StN Mason StS Howes StSouth College AvenueSouth Shields StreetEast Laurel Street East Mulberry Street E Mountain Ave East Lincoln Avenue P o u d r e R i v e rLinden StreetEast Vine DriveNorth Shields Street(Red Hatch) Civic Center Structures Roads Lakes, Rivers, Streams Rail Road 20’ Grade Change (White) 10’ Contours APPENDIX G.169 FORT COLLINS: MASTER PLAN ECOLOGY: PARKS & GREEN SPACE Cherry Street Maple StreetLaporte Avenue West Mountain Avenue West Mulberry Street North College AvenueN Meldrum StN Mason StS Howes StSouth College AvenueSouth Shields StreetEast Laurel Street East Mulberry Street E Mountain Ave East Lincoln Avenue P o u d r e R i v e rLinden StreetEast Vine DriveNorth Shields StreetCivic Center Park Soft Gold Park Freedom Square Park Streets Park City Park Main Library Washington Park East Side Park Lee Martinez Community Park Legacy Park Greenbriar Park Northside Aztlan Community Center Buckingham Park (Red Hatch) Civic Center Structures Roads Lakes, Rivers, Streams Rail Road Parks Natural Areas General Green Space G.170 APPENDIX NOVEMBER 2021 ECOLOGY: CITY & FEMA FLOODPLAINS Cherry Street Maple StreetLaporte Avenue West Mountain Avenue West Mulberry Street North College AvenueN Meldrum StN Mason StS Howes StSouth College AvenueSouth Shields StreetEast Laurel Street East Mulberry Street E Mountain Ave East Lincoln Avenue P o u d r e R i v e rLinden StreetEast Vine DriveNorth Shields StreetCivic Center Park Soft Gold Park Freedom Square Park Streets Park City Park Main Library Washington Park East Side Park Lee Martinez Community Park Legacy Park Greenbriar Park Northside Aztlan Community Center Buckingham Park Structures Roads Lakes, Rivers, Streams Rail Road Parks Natural Areas City - Floodway City - 100 Year High Risk City - 100 Year Mod. Risk FEMA - Floodway FEMA - 100 Year Floodplain FEMA - 500 Year Floodplain FEMA - 500 Year Floodplain (Red Hatch) Civic Center APPENDIX G.171 FORT COLLINS: MASTER PLAN ECOLOGY: CITY & FEMA FLOODPLAINS Cherry Street Maple Street Laporte Avenue W Mountain Ave W Mulberry St N College AveN Meldrum StN Mason StS Howes StS College AveEast Laurel Street East Mulberry Street E Mountain Ave East Lincoln Avenue P o u d r e R i v e rLinden StreetEast Vine Drive Civic Center Park East Side Park Oak Street Plaza Main Library Washington Park Lee Martinez Community Park Northside Aztlan Community Center Legacy Park Structures Roads Lakes, Rivers, Streams Rail Road Parks Natural Areas City - Floodway City - 100 Year High Risk City - 100 Year Mod. Risk FEMA - Floodway FEMA - 100 Year Floodplain FEMA - 500 Year Floodplain FEMA - 500 Year Floodplain (Red Hatch) Civic Center DDA Boundary G.172 APPENDIX NOVEMBER 2021 ECOLOGY: CITY & FEMA FLOODPLAINS Cherry St Maple St Laporte Ave W Mountain Ave North College AvenueN Meldrum StN Howes StN Mason StSouth College AveLinden StreetCity Hall Observation Service Justice Center Mountain Cafe Court House Global Village Museum Civic CenterParking GarageCivic Center Park City of Fort Collins Utilities Washington Park Haiston Oil Park Shop Eco-Thrift 215 NMansonWellness Annex Social Sustainability Terracon Penny Flats Downtown Transit Center St. Joseph’s Catholic School Oak Street Plaza Lee Martinez Community Park Northside Aztlan Community Center Structures Roads Lakes, Rivers, Streams Rail Road Parks Natural Areas City - Floodway City - 100 Year High Risk City - 100 Year Mod. Risk FEMA - Floodway FEMA - 100 Year Floodplain FEMA - 500 Year Floodplain FEMA - 500 Year Floodplain Civic Center DDA Boundary APPENDIX G.173 FORT COLLINS: MASTER PLAN G.174 APPENDIX NOVEMBER 2021 LAND USE: GENERAL IMPROVEMENT DISTRICT & DOWNTOWN DEVELOPMENT AUTHORITY Cherry Street Maple Street Laporte Avenue West Mountain Avenue West Mulberry Street North College AvenueN Meldrum StN Mason StS Howes StSouth College AvenueSouth Shields StreetEast Laurel Street East Mulberry Street E Mountain Ave East Lincoln Avenue P o u d r e R i v e rLinden StreetEast Vine DriveNorth Shields Street(Red Hatch) Civic Center Rail Road GID BoundaryStructures Roads Lakes, Rivers, Streams DDA Boundary APPENDIX G.175 FORT COLLINS: MASTER PLAN LAND USE: ZONING Cherry Street Maple Street Laporte Avenue West Mountain Avenue West Mulberry Street North College AvenueN Meldrum StN Mason StS Howes StSouth College AvenueSouth Shields StreetEast Laurel Street East Mulberry Street E Mountain Ave East Lincoln Avenue P o u d r e R i v e rLinden StreetEast Vine DriveNorth Shields Street(White Hatch) Civic Center Structures Roads Lakes, Rivers, Streams Rail Road Downtown Med. Density Mixed-Use Neigh. Consrv. Buffer Neigh. Consrv. Med. Neigh. Consrv. Low IndustrialPublic Open Lands CSUUrban Estate Employment Com. & Neigh. Commercial Limited Commercial G.176 APPENDIX NOVEMBER 2021 LAND USE: ZONING Cherry Street Maple Street Laporte Avenue W Mountain Ave W Mulberry St N College AveN Meldrum StN Mason StS Howes StS College AveEast Laurel Street East Mulberry Street E Mountain Ave East Lincoln Avenue P o u d r e R i v e rLinden StreetEast Vine Drive (White Hatch) Civic Center Structures Roads Lakes, Rivers, Streams Rail Road Downtown Med. Density Mixed-Use Neigh. Consrv. Buffer Neigh. Consrv. Med. Neigh. Consrv. Low IndustrialPublic Open Lands CSUUrban Estate Employment Com. & Neigh. Commercial Limited Commercial DDA Boundary APPENDIX G.177 FORT COLLINS: MASTER PLAN LAND USE: DOWNTOWN DEVELOPMENT AUTHORITY SUBDISTRICT Cherry Street Maple Street Laporte Avenue W Mountain Ave W Mulberry St N College AveN Meldrum StN Mason StS Howes StS College AveEast Laurel Street East Mulberry Street E Mountain Ave East Lincoln Avenue P o u d r e R i v e rLinden StreetEast Vine Drive (White Hatch) Civic Center Structures Roads Lakes, Rivers, Streams Rail Road Historic Core Campus North Entryway Corridor Innovation Poudre River Corridor River Civic North Mason Canyon Avenue DDA Boundary G.178 APPENDIX NOVEMBER 2021 LAND USE: STRUCTURE PLAN Cherry Street Maple Street Laporte Avenue West Mountain Avenue West Mulberry Street North College AvenueN Meldrum StN Mason StS Howes StSouth College AvenueSouth Shields StreetEast Laurel Street East Mulberry Street E Mountain Ave East Lincoln Avenue P o u d r e R i v e rLinden StreetEast Vine DriveNorth Shields Street(White Hatch) Civic Center Structures Roads Lakes, Rivers, Streams Rail Road Parks & Nat./Pro. Lands Downtown Mixed-Use Urban Mixed-Use Suburban Mixed-Use Neighborhood Mixed-Use Mixed Nbrhd.Mixed Employment District Suburban Nbrhd. Rural Nbrhd. R&D/Flex Employment Dist. Industrial Employment Dist. Colorado State University APPENDIX G.179 FORT COLLINS: MASTER PLAN LAND USE: DOWNTOWN OPEN PUBLIC SPACE & CONVERTIBLE STREETS Cherry Street Maple Street Laporte Avenue W Mountain Ave W Mulberry St N College AveN Meldrum StN Mason StS Howes StS College AveEast Laurel Street East Mulberry Street E Mountain Ave East Lincoln Avenue P o u d r e R i v e rLinden StreetEast Vine Drive (White Hatch) Civic Center Structures Roads Lakes, Rivers, Streams Rail Road DT Public Open Space Convertible Streets Major Paved Trail Minor Paved Trail Unpaved Trail Future Trail DDA Boundary G.180 APPENDIX NOVEMBER 2021 LAND USE: PUBLIC OPEN SPACE MANAGED BY PARKS DEPARTMENT Cherry Street Maple Street Laporte Avenue W Mountain Ave W Mulberry St N College AveN Meldrum StN Mason StS Howes StS College AveEast Laurel Street East Mulberry Street E Mountain Ave East Lincoln Avenue P o u d r e R i v e rLinden StreetEast Vine Drive (White Hatch) Civic Center Structures Roads Lakes, Rivers, Streams Rail Road DT Public Open Space Managed by Park Dept. DDA Boundary APPENDIX G.181 FORT COLLINS: MASTER PLAN LEVEL OF SERVICE BY PARK TYPOLOGY: (RECREATE: PARKS & RECREATION MASTER PLAN) Rectangular Fields — Access Standard — 10 Minute Walk 01/21 2 Miles I-25College AveTaft Hill RdTimberline RdMulberry St Harmony Rd College AveTaft Hill RdTimberline RdMulberry St Harmony Rd Pickleball Courts — Access Standard — 5 Minute Drive 01/21 2 Miles College AveTaft Hill RdTimberline RdMulberry St Harmony Rd Community Gardens — Access Standard — 5 Minute Drive 01/21 2 Miles Playgrounds — Access Standard — 10 Minute Walk 01/21 2 Miles College AveTaft Hill RdTimberline RdMulberry St Harmony Rd College AveTaft Hill RdTimberline RdMulberry St Harmony Rd Dog Parks — Access Standard — 5 Minute Drive 01/21 2 Miles College AveTaft Hill RdTimberline RdMulberry St Harmony Rd Diamond Fields — Access Standard — 5 Minute Drive 01/21 2 Miles Basketball Courts — Access Standard — 10 Minute Walk 01/21 2 Miles College AveTaft Hill RdTimberline RdMulberry St Harmony Rd College AveTaft Hill RdTimberline RdMulberry St Harmony Rd Pools — Access Standard — 5 Minute Drive 01/21 2 Miles Idealized 10-Minute Walk Park Amenity Existing 10-Minute Walk Idealized 10-Minute Walk School Amenity Existing 10-Minute Walk Planned Park Planned School Population Density 2040 CSU Campus Service Gap/ New Amenity Focus Area Service Gap/ Potentially Filled by Securing Access to Existing School Amenity Service Gap/ Potentially Filled by New Amenity in Planned Park G.182 APPENDIX NOVEMBER 2021 POUDRE RIVER: POUDRE RIVER DOWNTOWN MASTER PLAN APPENDIX G.183 FORT COLLINS: MASTER PLAN POUDRE RIVER: POUDRE RIVER DOWNTOWN MASTER PLAN CONTINUED ON NEXT PAGE G.184 APPENDIX NOVEMBER 2021 POUDRE RIVER: POUDRE RIVER DOWNTOWN MASTER PLANCONTINUED FROM PREVIOUS PAGE APPENDIX G.185 FORT COLLINS: MASTER PLAN POUDRE RIVER: POUDRE RIVER DOWNTOWN MASTER PLAN G.186 APPENDIX NOVEMBER 2021 MOBILITY: FORT COLLINS STREET MASTER PLAN Cherry Street Maple Street Laporte Avenue West Mountain Avenue West Mulberry Street North College AvenueN Meldrum StN Mason StS Howes StSouth College AvenueSouth Shields StreetEast Laurel Street East Mulberry Street E Mountain Ave East Lincoln Avenue P o u d r e R i v e rLinden StreetEast Vine DriveNorth Shields StreetStructures Roads Lakes, Rivers, Streams Rail Road (Red Hatch) Civic Center Parks Roundabout Grade Separated Rail Major Arterial 6 Lanes Arterial 4 Lanes Arterial 2 Lanes Collector 2 Lanes Natural Areas Schools Medical Campus APPENDIX G.187 FORT COLLINS: MASTER PLAN MOBILITY: BUS ROUTES & STOPS Cherry Street Maple Street Laporte Avenue West Mountain Avenue West Mulberry Street North College AvenueN Meldrum StN Mason StS Howes StSouth College AvenueSouth Shields StreetEast Laurel Street East Mulberry Street E Mountain Ave East Lincoln Avenue P o u d r e R i v e rLinden StreetEast Vine DriveNorth Shields StreetStructures Roads Lakes, Rivers, Streams Rail Road (Red Hatch) Civic Center Parks Bus Route Bus Stop Bus Stop - Accessible MAX Bus Stop - Accessible Natural Areas Schools Medical Campus G.188 APPENDIX NOVEMBER 2021 MOBILITY: BUS ROUTES & STOPS Cherry Street Maple Street Laporte Avenue W Mountain Ave W Mulberry St N College AveN Meldrum StN Mason StS Howes StS College AveEast Laurel Street East Mulberry Street E Mountain Ave East Lincoln Avenue P o u d r e R i v e rLinden StreetEast Vine Drive Structures Roads Lakes, Rivers, Streams Rail Road Parks Bus Route Bus Stop Bus Stop - Accessible MAX Bus Stop - Accessible Natural Areas Schools Medical Campus (White Hatch) Civic Center DDA Boundary APPENDIX G.189 FORT COLLINS: MASTER PLAN MOBILITY: BUS ROUTES & STOPS Cherry St Maple St Laporte Ave W Mountain Ave North College AvenueN Meldrum StN Howes StN Mason StSouth College AveLinden StreetCity Hall Observation Service Justice Center Mountain Cafe Court House Global Village Museum Civic CenterParking GarageCivic Center Park City of Fort Collins Utilities Washington Park Haiston Oil Park Shop Eco-Thrift 215 NMansonWellness Annex Social Sustainability Terracon Penny Flats Downtown Transit Center St. Joseph’s Catholic School Parks Bus Route Bus Stop Bus Stop - Accessible MAX Bus Stop - Accessible Natural Areas Schools Medical Campus Civic Center DDA Boundary G.190 APPENDIX NOVEMBER 2021 MOBILITY: DOWNTOWN PARKING Cherry St Maple St Laporte Ave W Mountain Ave North College AvenueN Meldrum StN Howes StN Mason StSouth College AveLinden StreetCity Hall Observation Service Justice Center Mountain Cafe Court House Global Village Museum Civic CenterParking GarageCity of Fort Collins Utilities Haiston Oil Park Shop Eco-Thrift 215 NMansonWellness Annex Social Sustainability Terracon Penny Flats Downtown Transit Center St. Joseph’s Catholic School Parking Garage Surface Parking Lot RP3 Zones - Res. Parking 2 Hour Parking Zone 15-30 Min Parking Zone Unsigned Parking Zone Accessible Parking Civic Center DDA Boundary APPENDIX G.191 FORT COLLINS: MASTER PLAN MOBILITY: BIKE ROUTES BY TRAFFIC VOLUME & SPEED Cherry Street Maple Street Laporte Avenue West Mountain Avenue West Mulberry Street North College AvenueN Meldrum StN Mason StS Howes StSouth College AvenueSouth Shields StreetEast Laurel Street East Mulberry Street E Mountain Ave East Lincoln Avenue P o u d r e R i v e rLinden StreetEast Vine DriveNorth Shields StreetStructures Roads Lakes, Rivers, Streams Rail Road (Red Hatch) Civic Center Parks Shared Rd: Low Traffic Shared Rd: High Traffic Cyclists Prohibited on Rd Bike Lane Gap Major Paved Trail Future Trail Future Trail Unpaved Trail Min. Paved Trail Natural Areas Bike Dismount Areas Bike Lane: Low Vol./Sp. Bike Lane: High Vol./Sp. G.192 APPENDIX NOVEMBER 2021 MOBILITY: BIKE ROUTES BY TRAFFIC VOLUME & SPEED Cherry Street Maple Street Laporte Avenue W Mountain Ave W Mulberry St N College AveN Meldrum StN Mason StS Howes StS College AveEast Laurel Street East Mulberry Street E Mountain Ave East Lincoln Avenue P o u d r e R i v e rLinden StreetEast Vine Drive Structures Roads Lakes, Rivers, Streams Rail Road (Red Hatch) Civic Center Parks Shared Rd: Low Traffic Shared Rd: High Traffic Cyclists Prohibited on Rd Bike Lane Gap Major Paved Trail Future Trail Future Trail Unpaved Trail Min. Paved Trail Natural Areas Bike Dismount Areas Bike Lane: Low Vol./Sp. Bike Lane: High Vol./Sp.DDA Boundary APPENDIX G.193 FORT COLLINS: MASTER PLAN MOBILITY: BIKE ROUTES BY TRAFFIC VOLUME & SPEED Cherry St Maple St Laporte Ave W Mountain Ave North College AvenueN Meldrum StN Howes StN Mason StSouth College AveLinden StreetCity Hall Observation Service Justice Center Mountain Cafe Court House Global Village Museum Civic CenterParking GarageCivic Center Park City of Fort Collins Utilities Washington Park Haiston Oil Park Shop Eco-Thrift 215 NMansonWellness Annex Social Sustainability Terracon Penny Flats Downtown Transit Center St. Joseph’s Catholic School Parks Natural Areas Pace Bike Share Civic Center Shared Rd: Low Traffic Shared Rd: High Traffic Cyclists Prohibited on Rd Bike Lane Gap Major Paved Trail Future Trail Unpaved Trail Min. Paved Trail Bike Lane: Low Vol./Sp. Bike Lane: High Vol./Sp. DDA Boundary G.194 APPENDIX NOVEMBER 2021 MOBILITY: 2020 LOW STRESS BIKE NETWORK (2014 BICYCLE MASTER PLAN) Cherry Street Maple Street Laporte Avenue West Mountain Avenue West Mulberry Street North College AvenueN Meldrum StN Mason StS Howes StSouth College AvenueSouth Shields StreetEast Laurel Street East Mulberry Street E Mountain Ave East Lincoln Avenue P o u d r e R i v e rLinden StreetEast Vine DriveNorth Shields StreetStructures Roads Lakes, Rivers, Streams Rail Road (Red Hatch) Civic Center Parks Planned Bike Share Other Crossing Impr. New Trail/Street Con. Signal Improvement Add Signal Low-Stress: Min. St. Low-Stress: Maj. St. Planned Trail/ Shared Use Path 2020 Paved Trail 2-Way Side Path Natural Areas Schools Medical Campus APPENDIX G.195 FORT COLLINS: MASTER PLAN MOBILITY: 2020 LOW STRESS BIKE NETWORK (2014 BICYCLE MASTER PLAN) Cherry Street Maple Street Laporte Avenue West Mountain Avenue West Mulberry Street North College AvenueN Meldrum StN Mason StS Howes StSouth College AvenueSouth Shields StreetEast Laurel Street East Mulberry Street E Mountain Ave East Lincoln Avenue P o u d r e R i v e rLinden StreetEast Vine DriveNorth Shields StreetStructures Roads Lakes, Rivers, Streams Rail Road (Red Hatch) Civic Center Parks Planned Bike Share Other Crossing Impr. New Trail/Street Con. Signal Improvement Add Signal Buffered Bike Lane Protected Bike Lane Priority Shared Lane Bike Lane Signed Route Paved Trails/ Shared-Use Paths 2-Way Side Path Natural Areas Schools Medical Campus G.196 APPENDIX NOVEMBER 2021 MOBILITY: SIDEWALK PRIORITIZATION & TRAILS Cherry Street 1/2 Mile (10 Min Walk) 1/4 Mile (5 Min Walk) Maple Street Laporte Avenue W Mountain Ave W Mulberry St N College AveN Meldrum StN Mason StS Howes StS College AveEast Laurel Street East Mulberry Street E Mountain Ave East Lincoln Ave P o u d r e R i v e rLinden StreetEast Vine Drive Structures Roads Lakes, Rivers, Streams Rail Road 1/4 & 1/2 Mile Distances Major Paved Trail Future Trail Unpaved Trail Min. Paved TrailHighest Priority Higher Priority Medium Priority Lower Priority DDA Boundary (White Hatch) Civic Center APPENDIX G.197 FORT COLLINS: MASTER PLAN MOBILITY: SIDEWALK PRIORITIZATION & TRAILS Cherry St Maple St Laporte Ave W Mountain Ave North College AvenueN Meldrum StN Howes StN Mason StSouth College AveLinden StreetCity Hall Observation Service Justice Center Mountain Cafe Court House Global Village Museum Civic CenterParking GarageCity of Fort Collins Utilities Haiston Oil Park Shop Eco-Thrift 215 NMansonWellness Annex Social Sustainability Terracon Penny Flats Downtown Transit Center St. Joseph’s Catholic School Civic Center 1/4 & 1/2 Mile Distances Major Paved Trail Future Trail Unpaved Trail Min. Paved Trail Highest Priority Higher Priority Medium Priority Lower Priority DDA Boundary G.198 APPENDIX NOVEMBER 2021APPENDIX CLIMATE DATA TABLES APPENDIX G.199 FORT COLLINS: MASTER PLAN G.200 APPENDIX NOVEMBER 2021 Hourly Dry Bulb Temperature Average Monthly Temperature CLIMATE DATA: HOURLY DRY BULB TEMPERATURE CLIMATE DATA: AVERAGE MONTHLY TEMPERATURE RECORDED HIGH - DESIGN HIGH - AVERAGE HIGH - MEAN - DESIGN LOW - RECORDED LOW - COMFORT ZONE SUMMER WINTER (At 50% Relative Humidity) AVERAGE LOW - 20% (Degree F) < 32 DRY BULB TEMP 32 - 69 69 - 81 81 - 100 > 100 20% 11% 6% 0% APPENDIX G.201 FORT COLLINS: MASTER PLAN CLIMATE DATA: RELATIVE HUMIDITY HEAT MAP 5% (Degree F) < 20 RELATIVE HUMIDITY 20 - 40 40 - 60 60 - 80 > 80 25% 27% 27% 16% Relative Humidity Heat Map G.202 APPENDIX NOVEMBER 2021 CLIMATE DATA: ANNUAL WIND CHARACTERISTICS CLIMATE DATA: WINTER WIND CHARACTERISTICS (NOVEMBER-FEBRUARY) (Degree F) < 32 TEMPERATURE 32 - 69 69 - 81 81 - 100 > 100 Winter Wind Characteristics (Nov-Feb) (%) < 30 RELATIVE HUMIDITY 30 - 70 > 70 Annual Wind Characteristics RECORDED HIGH - AVERAGE HIGH - MEAN - RECORDED LOW - (mph) AVERAGE LOW - APPENDIX G.203 FORT COLLINS: MASTER PLAN CLIMATE DATA: SUMMER WIND CHARACTERISTICS (JUNE-AUGUST) (Degree F) < 32 TEMPERATURE 32 - 69 69 - 81 81 - 100 > 100 Summer Wind Characteristics (Jun-Aug) (%) < 30 RELATIVE HUMIDITY 30 - 70 > 70 G.204 APPENDIX NOVEMBER 2021 CLIMATE DATA: SOLAR RADIATION RANGES CLIMATE DATA: AVERAGE DAILY ILLUMINATION Average Daily Illumination RECORDED HIGH - AVERAGE HIGH - MEAN - RECORDED LOW - (footcandles) AVERAGE LOW - DIRECT NORMAL GLOBAL HORIZONTAL RECORDED: Solar Radiation Ranges HOURLY AVERAGES DAYLIT HOURS ONLY RECORDED HIGH - AVERAGE HIGH - MEAN - RECORDED LOW - (footcandles) AVERAGE LOW - DIRECT NORMAL GLOBAL HORIZONTAL RECORDED: TOTAL SURFACE APPENDIX G.205 FORT COLLINS: MASTER PLAN CLIMATE DATA: PSYCHROMETRIC CHART CLIMATE DATA: SKY COVER HOURLY Sky Cover Hourly 52% (percent) < 10 SKY COVER 10 - 30 30 - 60 60 - 80 > 80 10% 11% 4% 23% G.206 APPENDIX NOVEMBER 2021APPENDIX DEPARTMENT INFORMATION + SPACE PROJECTIONS APPENDIX G.207 FORT COLLINS: MASTER PLAN G.208 APPENDIX NOVEMBER 2021 NEEDS: Office/work stations X Designated work stations and private offices Support spaces X Secure storage room X Storage for marketing/event/collateral/give aways X Storage for large event items Collaboration/conference spaces X Large and small groups X Internal and external partner meetings X Touch down spaces Special requirements X Drop box for equipment X Entire space vs sharing Customer interaction X Broadband users X On and Off-site community engagement Security X Inviting and secure spaces X More approachable X Storage security Parking X City/Pool car spaces \ BROADBAND FUNCTION: X Implementing and providing high-speed broadband Internet service.PLAN O/WDEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTH1 1119 ALL (100%)60%115% 8% ALL (100%)60%115% 5% 9 708 497 544 13 972 655 727 16 Service Director PO-1 180 1 180 180 180 1 180 180 180 1 Director/Department Head PO-2 140 0 00000 000 Division Head WS-1 80 1 80 48 55 2 120 72 83 2 Supervisor/Manager WS-2 64 1 64 38 44 2 96 58 66 2 Staff - Typ WS-3 64 6 384 230 265 9 576 346 397 11 PTE/Intern/Temp/Volunteer WS-4 36 0 00000 000 Field/Crew WS-5 36 0 00000 000 174 10.0 108 100 102 14.0 119 106 109 17.0 SEE AUX.Coffee/Break/Café/Lounge FACTOR 136 0.00 9 00013 0 0016 Storage/Files/Resource SET VALUE 0801 80 80 80 1 80 80 80 1 Work/Copy FACTOR 38 0.04 0 28 20 22 0 39 26 29 0 0 000000000 000000 000 000000 000 000000 000 000000 000 ASF 1293 816 597 646 1,091 761 836 GSF (FACTOR - WALLS, MEP, COMMON , CIRCULATION)1754 55%1,484 1,085 1,175 1,984 1,384 1,519 STAFF 91316 SUPPORT TOTAL SPECIAL TOTAL TOTAL STAFF OPT 1 OPT 2 OPT 3 ALL IN (PEOPLE)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)BUFFER (SQ. FT.)5-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)CURRENT RIGHT SIZE #/TYPESPACE STD. (SQ. FT.)SPACE STANDARD MPCURRENT ALL IN (SF)ALL IN (PEOPLE)NEED (SQ. FT.)SPACE STANDARD/TYPE BUFFER (SQ. FT.)CURRENT COUNTCURRENT (SQ. FT.)FACTOR/UTILIZATION RATEHYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) APPENDIX G.209 FORT COLLINS: MASTER PLAN Public/Community engagement X On and off site community engagement activities X Meetings X Speaking events ALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)ALL (100%)60%115% 7% ALL (100%)60%115% 7% ALL (100%)60%115% 7% ALL (100%)60%115% 7% ALL (100%)60%115% 1170 774 863 22 1566 1012 1136 30 2093 1328 1500 41 2821 1764 2002 56 3825 2367 2695 180 180 180 1 180 180 180 1 180 180 180 1 180 180 180 1 180 180 180 0 0000 0000 0000 0000 00 150 90 103 3 210 126 145 4 290 174 200 5 400 240 276 7 552 331 381 120 72 83 3 168 101 116 4 232 139 160 5 320 192 221 7 442 265 305 720 432 497 16 1008 605 695 22 1391 835 960 30 1921 1152 1325 41 2651 1591 1829 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 127 111 115 23.0 143 120 125 31.0 164 133 140 42.0 193 151 160 57.2 233 175 188 0 0022 0 0030 0 0041 0 0056 0 00 80 80 80 1 80 80 80 1 80 80 80 1 80 80 80 1 80 80 80 47 31 35 0 63 40 45 0 84 53 60 0 113 71 80 0 153 95 108 0000000000000000000 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 1,297 885 978 1,708 1,132 1,262 2,257 1,461 1,640 3,014 1,915 2,162 4,058 2,542 2,883 2,358 1,609 1,777 3,106 2,058 2,294 4,103 2,656 2,982 5,479 3,482 3,931 7,379 4,622 5,242 22 30 41 56 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)ALL IN (SQ. FT.)ALL IN (SQ. FT.)10-YEAR 15-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)BUFFER (SQ. FT.)20-YEAR ALL IN (PEOPLE)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)25-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)30-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) G.210 APPENDIX NOVEMBER 2021 NEEDS: Office/work stations X Small offices for privacy and legal matters X Work stations for department growth X Shared spaces to promote interaction Support spaces X Break room inside secured area X Extra storage space for supplies, equipment, books, and legal resources X Shared reception with City Clerk and Manager Collaboration/conference spaces X Use for informal interactions X Small to large conference rooms Special requirements X Arraignment spaces with high security X Separate exit from main front entrance Security X High level of security throughout the whole building at all times X Secured public restrooms and drinking fountains \ CITY ATTORNEY FUNCTION: X Providing legal services to all City officers and employees, represent the City in all legal proceedings, review all contracts and other legal documents, prepare all Council actions, and prosecute municipal offenses in Municipal Court. PLAN O/WDEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTH2 2608 ALL (100%)60%115% 3% ALL (100%)60%115% 2% 22 2636 1654 1875 26 3127 1948 2213 27 Service Director PO-1 180 1 180 180 180 1 180 180 180 1 Director/Department Head PO-2 140 14 1960 1176 1352 17 2380 1428 1642 17 Division Head WS-1 80 3 240 144 166 3 274 165 189 4 Supervisor/Manager WS-2 64 2 128 77 88 2 146 88 101 3 Staff - Typ WS-3 64 2 128 77 88 2 146 88 101 3 PTE/Intern/Temp/Volunteer WS-4 36 0 00000 000 Field/Crew WS-5 36 0 00000 000 913 23.0 405 366 375 27.0 425 378 389 28.0 SEE AUX.Coffee/Break/Café/Lounge FACTOR 228 0.00 22 00026 0 0027 Storage/Files/Resource SET VALUE 591 300 1 300 300 300 1 300 300 300 1 Work/Copy FACTOR 94 0.04 0 105 66 75 0 125 78 89 0 83 000000000 SEE AUX. Reception - Waiting SHARED/CS 83 000000 000 000000 000 000000 000 000000 000 ASF 3604 3041 2020 2250 3552 2326 2602 GSF (FACTOR - WALLS, MEP, COMMON , CIRCULATION)4944 55%5530 3672 4090 6458 4229 4731 STAFF 22 26 27 SUPPORT TOTAL SPECIAL TOTAL TOTAL STAFF OPT 1 OPT 2 OPT 3 ALL IN (PEOPLE)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)BUFFER (SQ. FT.)5-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)CURRENT RIGHT SIZE #/TYPESPACE STD. (SQ. FT.)SPACE STANDARD MPCURRENT ALL IN (SF)ALL IN (PEOPLE)NEED (SQ. FT.)SPACE STANDARD/TYPE BUFFER (SQ. FT.)CURRENT COUNTCURRENT (SQ. FT.)FACTOR/UTILIZATION RATEHYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) APPENDIX G.211 FORT COLLINS: MASTER PLAN X Secured reception and waiting area with direct line of sight X Private and secured access for prosecutors X Secured storage for private files X Security related to viewing through windows Public/community engagement X Significant contact with public X Municipal interaction X City Hall ALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)ALL (100%)60%115% 2% ALL (100%)60%115% 2% ALL (100%)60%115% 2% ALL (100%)60%115% 2% ALL (100%)60%115% 3198 1991 2262 28 3269 2033 2311 29 3358 2087 2373 31 3459 2147 2443 32 3573 2216 2521 180 180 180 1 180 180 180 1 180 180 180 1 180 180 180 1 180 180 180 2380 1428 1642 17 2380 1428 1642 17 2380 1428 1642 17 2380 1428 1642 17 2380 1428 1642 309 185 213 4 343 206 237 5 386 232 266 5 435 261 300 6 490 294 338 165 99 114 3 183 110 126 3 206 124 142 4 232 139 160 4 261 157 180 165 99 114 3 183 110 126 3 206 124 142 4 232 139 160 4 261 157 180 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 428 380 390 29.0 431 381 392 30.3 434 383 395 31.7 438 386 398 33.3 443 389 401 0 0028 0 0029 0 0031 0 0032 0 00 300 300 300 1 300 300 300 1 300 300 300 1 300 300 300 1 300 300 300 128 80 90 0 131 81 92 0 134 83 95 0 138 86 98 0 143 89 101 0000000000000000000 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 3626 2370 2653 3699 2414 2704 3793 2470 2768 3897 2533 2840 4016 2604 2922 6592 4310 4823 6726 4390 4916 6895 4492 5032 7086 4606 5164 7301 4735 5312 28 29 31 32 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)ALL IN (SQ. FT.)ALL IN (SQ. FT.)10-YEAR 15-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)BUFFER (SQ. FT.)20-YEAR ALL IN (PEOPLE)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)25-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)30-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) G.212 APPENDIX NOVEMBER 2021 NEEDS: Office/work stations X Designated private offices X Work stations for future department growth Support spaces X Active and secure long-term file storage X Secure storage for ballots X Dedicated flex space for election Collaboration/Conference spaces X Small and large conference rooms X Centralized work room Special requirements X Space to accommodate elections X Dedicated passport space Security X 24/7 camera security X Spaces flexible for community and city use X Separately secured reception and waiting area \ CITY CLERK FUNCTION: X Manage Council Agenda process and support Council members and City leadership at Council, LPT and ELT meetings; Liquor licensing, Marijuana licensing, passports, board and commissions program management, open records and privacy programs, and City elections and relative initiative and referendum activities.PLAN O/WDEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTH3 1231 ALL (100%)60%115% 5% ALL (100%)60%115% 2% 8 628 449 489 10 756 526 577 11 Service Director PO-1 180 1 180 180 180 1 180 180 180 1 Director/Department Head PO-2 140 0 00000 000 Division Head WS-1 80 0 00000 000 Supervisor/Manager WS-2 64 0 00000 000 Staff - Typ WS-3 64 7 448 269 309 9 576 346 397 10 PTE/Intern/Temp/Volunteer WS-4 36 0 00000 000 Field/Crew WS-5 36 0 00000 000 949 9.0 325 318 320 11.0 330 321 323 12.0 SEE AUX.Coffee/Break/Café/Lounge FACTOR 266 0.00 8 00010 0 0011 Storage/Files/Resource SET VALUE 270 300 1 300 300 300 1 300 300 300 1 Work/Copy FACTOR 413 0.04 0 25 18 20 0 30 21 23 0 705 2 670 670 670 2 670 670 670 2 SEE AUX. Reception - Waiting SHARED/CS 368 000000 000 Vault (File Room) SET VALUE 337 350 1 350 350 350 1 350 350 350 1 Additional Work/Copy SET VALUE 320 1 320 320 320 1 320 320 320 1 000000 000 ASF 2885 1,623 1,437 1,479 1,756 1,517 1,570 GSF (FACTOR - WALLS, MEP, COMMON , CIRCULATION)3354 55%2,951 2,612 2,689 3,193 2,757 2,855 STAFF 81011 SUPPORT TOTAL SPECIAL TOTAL TOTAL STAFF OPT 1 OPT 2 OPT 3 ALL IN (PEOPLE)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)BUFFER (SQ. FT.)5-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)CURRENT RIGHT SIZE #/TYPESPACE STD. (SQ. FT.)SPACE STANDARD MPCURRENT ALL IN (SF)ALL IN (PEOPLE)NEED (SQ. FT.)SPACE STANDARD/TYPE BUFFER (SQ. FT.)CURRENT COUNTCURRENT (SQ. FT.)FACTOR/UTILIZATION RATEHYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) APPENDIX G.213 FORT COLLINS: MASTER PLAN X Ability to securely lock down office area X Secured reception X Secure office suites with second exit Public/community engagement X Service counters X Guidance on Council agendas X Liquor and marijuana licensing X Election-related information ALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)ALL (100%)60%115% 2% ALL (100%)60%115% 3% ALL (100%)60%115% 3% ALL (100%)60%115% 3% ALL (100%)60%115% 820 564 622 12 884 602 666 14 999 671 745 16 1132 751 837 18 1288 845 944 180 180 180 1 180 180 180 1 180 180 180 1 180 180 180 1 180 180 180 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 640 384 442 11 704 422 486 13 819 491 565 15 952 571 657 17 1108 665 764 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 333 323 325 13.0 335 324 327 14.8 340 327 330 16.9 345 330 333 19.3 352 334 338 0 0012 0 0014 0 0016 0 0018 0 00 300 300 300 1 300 300 300 1 300 300 300 1 300 300 300 1 300 300 300 33 23 25 0 35 24 27 0 40 27 30 0 45 30 33 0 52 34 38 670 670 670 2 670 670 670 2 670 670 670 2 670 670 670 2 670 670 670 0 0000 0000 0000 0000 00 350 350 350 1 350 350 350 1 350 350 350 1 350 350 350 1 350 350 350 320 320 320 1 320 320 320 1 320 320 320 1 320 320 320 1 320 320 320 0 0000 0000 0000 0000 00 1,823 1,556 1,616 1,889 1,596 1,662 2,009 1,668 1,745 2,147 1,751 1,840 2,309 1,848 1,952 3,314 2,830 2,939 3,435 2,902 3,022 3,652 3,033 3,172 3,904 3,184 3,346 4,198 3,361 3,549 12 14 16 18 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)ALL IN (SQ. FT.)ALL IN (SQ. FT.)10-YEAR 15-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)BUFFER (SQ. FT.)20-YEAR ALL IN (PEOPLE)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)25-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)30-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) G.214 APPENDIX NOVEMBER 2021 NEEDS: Office/work stations X Offices catered for interaction X Work stations throughout the building for variation in working location X Private executive and council member offices Support spaces X Private restroom X Storage spaces X Lounge area with kitchenette for visitors and employees X Canteen with commercial kitchen X Secured public restrooms and drinking fountains X Secured reception area Collaboration/conference spaces X Small casual gatherings and one on ones X Small to large conference rooms X Acoustic separation for privacy in collaboration and phone rooms \ CITY MANAGER FUNCTION: X Interaction with customers and City Staff. Council interactions and packet coordination. Meetings with external/community members and internal staff.PLAN O/WDEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTH4 2874 ALL (100%)60%115% 14% ALL (100%)60%115% 4% 17 1792 1547 1602 26 2343 1878 1982 30 Service Director PO-1 180 5 900 900 900 5 900 900 900 5 Director/Department Head PO-2 140 2 280 280 280 2 280 280 280 2 Division Head WS-1 80 0 00000 000 Supervisor/Manager WS-2 64 1 64 38 44 2 122 73 84 2 Staff - Typ WS-3 64 8 512 307 353 15 973 584 671 18 PTE/Intern/Temp/Volunteer WS-4 36 1 36 22 25 2 68 41 47 2 Field/Crew WS-5 36 0 00000 000 1367 18.0 572 562 564 27.0 594 575 579 31.0 SEE AUX.Coffee/Break/Café/Lounge FACTOR 128 0.00 17 00026 0 0030 Storage/Files/Resource SET VALUE 981 500 1 500 500 500 1 500 500 500 1 Work/Copy FACTOR 258 0.04 0 72 62 64 0 94 75 79 0 3618 5 5420 5420 5420 5 5420 5420 5420 5 SEE AUX. Reception - Waiting SHARED/CS 181 000000 000 Kitchenette- Visitor SET VALUE 18 20 1202020120 20 20 1 000000 000 City Council Chambers SET VALUE 2242 4000 1 4000 4000 4000 1 4000 4000 4000 1 Council Conference - Board Room SET VALUE 410 650 1 650 650 650 1 650 650 650 1 Kitchenette SET VALUE 30 150 1 150 150 150 1 150 150 150 1 Large Conference (sin CO River) SET VALUE 737 600 1 600 600 600 1 600 600 600 1 000000 000 000000 000 ASF 7859 7,784 7,529 7,586 8,357 7,873 7,982 GSF (FACTOR - WALLS, MEP, COMMON , CIRCULATION)9781 55%14,152 13,689 13,793 15,194 14,314 14,512 STAFF 17 26 30 SUPPORT TOTAL STAFF SPECIAL TOTAL TOTAL OPT 1 OPT 2 OPT 3 ALL IN (PEOPLE)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)BUFFER (SQ. FT.)5-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)CURRENT RIGHT SIZE #/TYPESPACE STD. (SQ. FT.)SPACE STANDARD MPCURRENT ALL IN (SF)ALL IN (PEOPLE)NEED (SQ. FT.)SPACE STANDARD/TYPE BUFFER (SQ. FT.)CURRENT COUNTCURRENT (SQ. FT.)FACTOR/UTILIZATION RATEHYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) APPENDIX G.215 FORT COLLINS: MASTER PLAN Special requirements X Council chambers X Focused for transparency, security, and ease of access X Movable walls for more flexibility Public/community engagement X Drop ins X Council meetings ALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)ALL (100%)60%115% 2% ALL (100%)60%115% 3% ALL (100%)60%115% 3% ALL (100%)60%115% 3% ALL (100%)60%115% 2588 2025 2152 33 2772 2135 2278 37 3042 2297 2465 43 3359 2487 2683 49 3729 2709 2939 900 900 900 5 900 900 900 5 900 900 900 5 900 900 900 5 900 900 900 280 280 280 2 280 280 280 2 280 280 280 2 280 280 280 2 280 280 280 0 0000 0000 0000 0000 00 147 88 102 3 166 100 115 3 195 117 134 4 228 137 157 4 267 160 184 1178 707 813 21 1332 799 919 24 1558 935 1075 28 1823 1094 1258 33 2133 1280 1471 83 50 57 3 94 56 65 3 110 66 76 4 128 77 88 4 150 90 103 0 0000 0000 0000 0000 00 604 581 586 34.0 611 585 591 38.4 622 592 599 43.6 634 599 607 49.7 649 608 618 0 0033 0 0037 0 0043 0 0049 0 00 500 500 500 1 500 500 500 1 500 500 500 1 500 500 500 1 500 500 500 104 81 86 0 111 85 91 0 122 92 99 0 134 99 107 0 149 108 118 5420 5420 5420 5 5420 5420 5420 5 5420 5420 5420 5 5420 5420 5420 5 5420 5420 5420 0 0000 0000 0000 0000 00 20 20 20 1 20 20 20 1 20 20 20 1 20 20 20 1 20 20 20 0 0000 0000 0000 0000 00 4000 4000 4000 1 4000 4000 4000 1 4000 4000 4000 1 4000 4000 4000 1 4000 4000 4000 650 650 650 1 650 650 650 1 650 650 650 1 650 650 650 1 650 650 650 150 150 150 1 150 150 150 1 150 150 150 1 150 150 150 1 150 150 150 600 600 600 1 600 600 600 1 600 600 600 1 600 600 600 1 600 600 600 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 8,612 8,026 8,158 8,802 8,140 8,289 9,084 8,309 8,483 9,413 8,507 8,711 9,798 8,738 8,976 15,657 14,592 14,832 16,004 14,801 15,071 16,516 15,108 15,425 17,115 15,467 15,838 17,815 15,887 16,321 33 37 43 49 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)ALL IN (SQ. FT.)ALL IN (SQ. FT.)10-YEAR 15-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)BUFFER (SQ. FT.)20-YEAR ALL IN (PEOPLE)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)25-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)30-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) G.216 APPENDIX NOVEMBER 2021 NEEDS: Office/work stations X Open cube workstations X Private offices and work stations X Private call/meeting spaces Support spaces X On site equipment storage and work space X Small and large event storage X Photo studio storage X Designated IT storage X Designated print room Collaboration/Conference spaces X Open and closed collaboration spaces X Small meeting room X Large community rooms for public engagement events Special requirements X Photo studio spaces Security X Security consistent through buildings \ COMMUNICATION AND PUBLIC INVOLVEMENT COMMUNICATION AND PUBLIC INVOLVEMENT FUNCTION: X Centralized communication and management of the City’s communications, print, broadcast/video, online website, social media, public engagement, and Access Fort Collins.PLAN O/WDEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTH5 946 ALL (100%)60%115% 3% ALL (100%)60%115% 2% 16 1104 790 861 18 1216 858 938 20 Service Director PO-1 180 1 180 180 180 1 180 180 180 1 Director/Department Head PO-2 140 1 140 140 140 1 140 140 140 1 Division Head WS-1 80 0 00000 000 Supervisor/Manager WS-2 64 0 00000 000 Staff - Typ WS-3 64 10 640 384 442 11 732 439 505 13 PTE/Intern/Temp/Volunteer WS-4 36 4 144 86 99 5 165 99 114 5 Field/Crew WS-5 36 0 00000 000 242 17.0 144 132 134 19.0 149 134 138 21.0 SEE AUX.Coffee/Break/Café/Lounge FACTOR 79 0.00 16 00018 0 0020 Storage/Files/Resource SET VALUE 83 100 1 100 100 100 1 100 100 100 1 Work/Copy FACTOR 80 0.04 0 44 32 34 0 49 34 38 0 243 2 260 260 260 2 260 260 260 2 Photo Studio 163 160 1 160 160 160 1 160 160 160 1 SEE AUX. Reception - Waiting SHARED/CS 80 000000 000 SEE AUX. Storage/dock/general receiving EVENT STORAGE 000000 000 Additional Work/Copy 100 1 100 100 100 1 100 100 100 1 ASF 1431 1,508 1,182 1,255 1,625 1,252 1,336 GSF (FACTOR - WALLS, MEP, COMMON , CIRCULATION)2207 55%2,742 2,149 2,283 2,954 2,276 2,429 STAFF 16 18 20 SUPPORT TOTAL SPECIAL TOTAL TOTAL STAFF OPT 1 OPT 2 OPT 3 ALL IN (PEOPLE)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)BUFFER (SQ. FT.)5-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)CURRENT RIGHT SIZE #/TYPESPACE STD. (SQ. FT.)SPACE STANDARD MPCURRENT ALL IN (SF)ALL IN (PEOPLE)NEED (SQ. FT.)SPACE STANDARD/TYPE BUFFER (SQ. FT.)CURRENT COUNTCURRENT (SQ. FT.)FACTOR/UTILIZATION RATEHYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) APPENDIX G.217 FORT COLLINS: MASTER PLAN Public/community engagement X Manages City’s main communication outlets X Oversees public engagement strategy ALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)ALL (100%)60%115% 4% ALL (100%)60%115% 3% ALL (100%)60%115% 3% ALL (100%)60%115% 3% ALL (100%)60%115% 1328 925 1016 24 1552 1059 1170 27 1741 1173 1300 31 1958 1303 1451 36 2209 1454 1624 180 180 180 1 180 180 180 1 180 180 180 1 180 180 180 1 180 180 180 140 140 140 1 140 140 140 1 140 140 140 1 140 140 140 1 140 140 140 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 823 494 568 16 1006 604 694 18 1160 696 800 21 1338 803 923 24 1542 925 1064 185 111 128 6 226 136 156 7 261 157 180 8 301 181 208 10 347 208 239 0 0000 0000 0000 0000 00 153 137 141 25.0 162 142 147 28.4 170 147 152 32.3 178 152 158 36.7 188 158 165 0 0024 0 0027 0 0031 0 0036 0 00 100 100 100 1 100 100 100 1 100 100 100 1 100 100 100 1 100 100 100 53 37 41 0 62 42 47 0 70 47 52 0 78 52 58 0 88 58 65 260 260 260 2 260 260 260 2 260 260 260 2 260 260 260 2 260 260 260 160 160 160 1 160 160 160 1 160 160 160 1 160 160 160 1 160 160 160 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 100 100 100 1 100 100 100 1 100 100 100 1 100 100 100 1 100 100 100 1,741 1,322 1,416 1,974 1,462 1,577 2,171 1,579 1,712 2,397 1,715 1,869 2,658 1,872 2,049 3,166 2,403 2,575 3,590 2,658 2,867 3,946 2,872 3,114 4,358 3,119 3,397 4,832 3,403 3,725 24 27 31 36 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)ALL IN (SQ. FT.)ALL IN (SQ. FT.)10-YEAR 15-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)BUFFER (SQ. FT.)20-YEAR ALL IN (PEOPLE)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)25-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)30-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) G.218 APPENDIX NOVEMBER 2021 NEEDS: Office/work stations X Dedicated office space X Open work station space Support spaces X On site equipment storage and work space X TV studio storage Collaboration/Conference spaces X Open and closed collaboration spaces X Small meeting room Special requirements X Server room for equipment X Soundproof editing suites X Video studio spaces X Dedicated reception space X Green room X Video viewing room Security X Security consistent through buildings Public/community engagement X Public engagement events and activities \ COMMUNICATION AND PUBLIC INVOLVEMENT FCTV FUNCTION: X Video production and the management of the City’s government access cable channel.PLAN O/WDEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTH6 360 ALL (100%)60%115% 0% ALL (100%)60%115% 4% 6 488 365 393 6 488 365 393 7 Service Director PO-1 180 1 180 180 180 1 180 180 180 1 Director/Department Head PO-2 140 0 00000 000 Division Head WS-1 80 1 80 48 55 1 80 48 55 1 Supervisor/Manager WS-2 64 0 00000 000 Staff - Typ WS-3 64 3 192 115 132 3 192 115 132 4 PTE/Intern/Temp/Volunteer WS-4 36 1 36 22 25 1 36 22 25 1 Field/Crew WS-5 36 0 00000 000 20 7.0 220 215 216 7.0 220 215 216 8.0 SEE AUX.Coffee/Break/Café/Lounge FACTOR 0 0.00 6 0006 0 007 Storage/Files/Resource SET VALUE 20 200 1 200 200 200 1 200 200 200 1 Work/Copy FACTOR 0 0.04 0 20 15 16 0 20 15 16 0 2055 8 1990 1990 1990 8 1990 1990 1990 8 Control Room 526 250 2 500 500 500 2 500 500 500 2 Server 77 100 1 100 100 100 1 100 100 100 1 Studio - Video 670 800 1 800 800 800 1 800 800 800 1 Editing 182 90 3 270 270 270 3 270 270 270 3 Viewing Room 320 1 320 320 320 1 320 320 320 1 SEE AUX. Storage/dock space/general receiving 0 0 0 0 0 0 000 SEE AUX. Equipment Lab 400 000000 000 SEE AUX. Off Site Storage 200 000000 000 00 ASF 2435 2,698 2,569 2,598 2,698 2,569 2,598 GSF (FACTOR - WALLS, MEP, COMMON , CIRCULATION)2458 55%4,905 4,672 4,724 4,905 4,672 4,724 STAFF 667 SUPPORT TOTAL SPECIAL TOTAL TOTAL STAFF OPT 1 OPT 2 OPT 3 ALL IN (PEOPLE)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)BUFFER (SQ. FT.)5-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)CURRENT RIGHT SIZE #/TYPESPACE STD. (SQ. FT.)SPACE STANDARD MPCURRENT ALL IN (SF)ALL IN (PEOPLE)NEED (SQ. FT.)SPACE STANDARD/TYPE BUFFER (SQ. FT.)CURRENT COUNTCURRENT (SQ. FT.)FACTOR/UTILIZATION RATEHYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) APPENDIX G.219 FORT COLLINS: MASTER PLAN ALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)ALL (100%)60%115% 3% ALL (100%)60%115% 2% ALL (100%)60%115% 2% ALL (100%)60%115% 2% ALL (100%)60%115% 550 402 435 8 611 439 477 9 663 470 513 10 720 504 553 11 785 543 597 180 180 180 1 180 180 180 1 180 180 180 1 180 180 180 1 180 180 180 0 0000 0000 0000 0000 00 96 58 66 1 112 67 77 2 125 75 86 2 140 84 97 2 157 94 108 0 0000 0000 0000 0000 00 230 138 159 4 269 161 185 5 301 180 208 5 337 202 232 6 377 226 260 43 26 30 1 50 30 35 2 56 34 39 2 63 38 44 2 71 42 49 0 0000 0000 0000 0000 00 222 216 217 9.0 224 218 219 9.8 227 219 221 10.8 229 220 222 11.8 231 222 224 0 008 0 009 0 0010 0 0011 0 00 200 200 200 1 200 200 200 1 200 200 200 1 200 200 200 1 200 200 200 22 16 17 0 24 18 19 0 27 19 21 0 29 20 22 0 31 22 24 1990 1990 1990 8 1990 1990 1990 8 1990 1990 1990 8 1990 1990 1990 8 1990 1990 1990 500 500 500 2 500 500 500 2 500 500 500 2 500 500 500 2 500 500 500 100 100 100 1 100 100 100 1 100 100 100 1 100 100 100 1 100 100 100 800 800 800 1 800 800 800 1 800 800 800 1 800 800 800 1 800 800 800 270 270 270 3 270 270 270 3 270 270 270 3 270 270 270 3 270 270 270 320 320 320 1 320 320 320 1 320 320 320 1 320 320 320 1 320 320 320 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 0000 2,762 2,608 2,642 2,826 2,646 2,687 2,879 2,678 2,723 2,939 2,714 2,765 3,006 2,754 2,811 5,021 4,741 4,804 5,137 4,811 4,885 5,235 4,870 4,952 5,343 4,935 5,027 5,465 5,008 5,111 8 9 10 11 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)ALL IN (SQ. FT.)ALL IN (SQ. FT.)10-YEAR 15-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)BUFFER (SQ. FT.)20-YEAR ALL IN (PEOPLE)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)25-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)30-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) G.220 APPENDIX NOVEMBER 2021 NEEDS: Office/work stations X Designated offices X Work stations and touchdown spaces for additional staff X Permanent space for finance Support spaces X File storage X Shared storage/print room X Shared reception Collaboration/conference spaces X Spaces to be public facing Public/community engagement X Public facing X City programming X Resident engagement \ COMMUNITY SERVICES CULTURAL SERVICES FUNCTION: Management of multiple Cultural facilities and programs.PLAN O/WDEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTH7 429 ALL (100%)60%115% 38% ALL (100%)60%115% 10% 3 384 358 364 7 640 512 541 10 Service Director PO-1 180 1 180 180 180 1 180 180 180 1 Director/Department Head PO-2 140 1 140 140 140 1 140 140 140 1 Division Head WS-1 80 0 00000 000 Supervisor/Manager WS-2 64 0 00000 000 Staff - Typ WS-3 64 1 64 38 44 5 320 192 221 8 PTE/Intern/Temp/Volunteer WS-4 36 0 00000 000 Field/Crew WS-5 36 0 00000 000 89 3.0 15 14 15 7.0 26 20 22 10.0 SEE AUX.Coffee/Break/Café/Lounge FACTOR 89 0.00 3 0007 0 0010 Storage/Files/Resource SET VALUE 000 0000 0 000 Work/Copy FACTOR 0 0.04 0 15 14 15 0 26 20 22 0 0 000000000 000000 000 000000 000 000000 000 000000 000 ASF 518 399 373 379 666 532 562 GSF (FACTOR - WALLS, MEP, COMMON , CIRCULATION)557 55%726 678 689 1,210 968 1,023 STAFF 3710 SUPPORT TOTAL SPECIAL TOTAL TOTAL STAFF OPT 1 OPT 2 OPT 3 ALL IN (PEOPLE)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)BUFFER (SQ. FT.)5-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)CURRENT RIGHT SIZE #/TYPESPACE STD. (SQ. FT.)SPACE STANDARD MPCURRENT ALL IN (SF)ALL IN (PEOPLE)NEED (SQ. FT.)SPACE STANDARD/TYPE BUFFER (SQ. FT.)CURRENT COUNTCURRENT (SQ. FT.)FACTOR/UTILIZATION RATEHYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) APPENDIX G.221 FORT COLLINS: MASTER PLAN ALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)ALL (100%)60%115% 2% ALL (100%)60%115% 6% ALL (100%)60%115% 6% ALL (100%)60%115% 6% ALL (100%)60%115% 832 627 673 11 896 666 717 14 1095 785 855 18 1363 946 1040 24 1724 1162 1289 180 180 180 1 180 180 180 1 180 180 180 1 180 180 180 1 180 180 180 140 140 140 1 140 140 140 1 140 140 140 1 140 140 140 1 140 140 140 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 512 307 353 9 576 346 397 12 775 465 535 16 1043 626 720 22 1404 842 969 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 33 25 27 11.0 36 27 29 14.1 44 31 34 18.3 55 38 42 23.9 69 46 52 0 0011 0 0014 0 0018 0 0024 0 00 0 000 0 000 0 000 0 000 0 00 33 25 27 0 36 27 29 0 44 31 34 0 55 38 42 0 69 46 52 0000000000000000000 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 865 652 700 932 692 746 1,139 816 889 1,418 984 1,081 1,793 1,209 1,340 1,573 1,186 1,273 1,694 1,259 1,357 2,071 1,484 1,616 2,578 1,789 1,966 3,260 2,198 2,437 11 14 18 24 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)ALL IN (SQ. FT.)ALL IN (SQ. FT.)10-YEAR 15-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)BUFFER (SQ. FT.)20-YEAR ALL IN (PEOPLE)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)25-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)30-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) G.222 APPENDIX NOVEMBER 2021 NEEDS: Office/work stations X Small dedicated work stations X Collaborative design space Support spaces X Shared storage/print room X Shared reception Collaboration/conference spaces X Collaborative team work space X Small meeting areas X Large meeting areas X After hour meeting spaces that are easily accessible Special requirements X Dedicated pin up area Public/community engagement X Community outreach events & meetings X Host Parks & Recreation board meetings X Individual resident or group meetings \ COMMUNITY SERVICES PARK PLANNING & DEVELOPMENT FUNCTION: Planning, design and construction of parks and the paved trail system.PLAN O/WDEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTH8 603 ALL (100%)60%115% 11% ALL (100%)60%115% 3% 8 560 392 430 13 860 572 637 15 Service Director PO-1 180 0 00000 000 Director/Department Head PO-2 140 1 140 140 140 1 140 140 140 1 Division Head WS-1 80 0 00000 000 Supervisor/Manager WS-2 64 0 00000 000 Staff - Typ WS-3 64 6 384 230 265 10 658 395 454 12 PTE/Intern/Temp/Volunteer WS-4 36 1 36 22 25 2 62 37 43 2 Field/Crew WS-5 36 0 00000 000 392 9.0 122 116 117 14.0 134 123 125 16.0 SEE AUX.Coffee/Break/Café/Lounge FACTOR 232 0.00 8 00013 0 0015 Storage/Files/Resource SET VALUE 15 100 1 100 100 100 1 100 100 100 1 Work/Copy FACTOR 145 0.04 0 22 16 17 0 34 23 25 0 523 2 420 420 420 2 420 420 420 2 Charette/Meeting - Open Office 523 320 1 320 320 320 1 320 320 320 1 Additional Work/Copy 100 1 100 100 100 1 100 100 100 1 000000 000 000000 000 ASF 1518 1,102 928 967 1,414 1,115 1,182 GSF (FACTOR - WALLS, MEP, COMMON , CIRCULATION)2707 55%2,004 1,687 1,758 2,571 2,027 2,149 STAFF 81315 SUPPORT TOTAL SPECIAL TOTAL TOTAL STAFF OPT 1 OPT 2 OPT 3 ALL IN (PEOPLE)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)BUFFER (SQ. FT.)5-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)CURRENT RIGHT SIZE #/TYPESPACE STD. (SQ. FT.)SPACE STANDARD MPCURRENT ALL IN (SF)ALL IN (PEOPLE)NEED (SQ. FT.)SPACE STANDARD/TYPE BUFFER (SQ. FT.)CURRENT COUNTCURRENT (SQ. FT.)FACTOR/UTILIZATION RATEHYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) APPENDIX G.223 FORT COLLINS: MASTER PLAN ALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)ALL (100%)60%115% 0% ALL (100%)60%115% 2% ALL (100%)60%115% 2% ALL (100%)60%115% 2% ALL (100%)60%115% 980 644 720 15 980 644 720 16 1045 683 764 17 1115 725 813 19 1190 770 865 0 0000 0000 0000 0000 00 140 140 140 1 140 140 140 1 140 140 140 1 140 140 140 1 140 140 140 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 768 461 530 12 768 461 530 13 827 496 571 14 891 535 615 15 960 576 662 72 43 50 2 72 43 50 2 78 47 54 2 84 50 58 3 90 54 62 0 0000 0000 0000 0000 00 139 126 129 16.0 139 126 129 17.1 142 127 131 18.2 145 129 133 19.5 148 131 135 0 0015 0 0016 0 0017 0 0019 0 00 100 100 100 1 100 100 100 1 100 100 100 1 100 100 100 1 100 100 100 39 26 29 0 39 26 29 0 42 27 31 0 45 29 33 0 48 31 35 420 420 420 2 420 420 420 2 420 420 420 2 420 420 420 2 420 420 420 320 320 320 1 320 320 320 1 320 320 320 1 320 320 320 1 320 320 320 100 100 100 1 100 100 100 1 100 100 100 1 100 100 100 1 100 100 100 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 1,539 1,190 1,268 1,539 1,190 1,268 1,607 1,230 1,315 1,679 1,274 1,365 1,758 1,321 1,419 2,798 2,163 2,306 2,798 2,163 2,306 2,921 2,237 2,391 3,053 2,316 2,482 3,196 2,401 2,580 15 16 17 19 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)ALL IN (SQ. FT.)ALL IN (SQ. FT.)10-YEAR 15-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)BUFFER (SQ. FT.)20-YEAR ALL IN (PEOPLE)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)25-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)30-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) G.224 APPENDIX NOVEMBER 2021 NEEDS: Offices/work stations X Dedicated offices and workstations X Dedicated touchdown spaces Support spaces X Storage garage in Civic Center area X Shared storage/print room X Shared reception Collaboration/conference spaces X Dedicated meeting room Special requirements X On site marking materials Public/community engagement X Public facing X Community/organization meetings with admin \ COMMUNITY SERVICES RECREATION FUNCTION: Civic center hub for recreation. Community resource for keeping the Fort Collins community connected. Offer programs and activities for all ages and abilities. PLAN O/WDEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTH9 989 ALL (100%)60%115% 2% ALL (100%)60%115% 2% 9 596 414 455 10 647 444 490 11 Service Director PO-1 180 0 00000 000 Director/Department Head PO-2 140 1 140 140 140 1 140 140 140 1 Division Head WS-1 80 0 00000 000 Supervisor/Manager WS-2 64 2 128 77 88 2 142 85 98 2 Staff - Typ WS-3 64 4 256 154 177 4 284 171 196 5 PTE/Intern/Temp/Volunteer WS-4 36 2 72 43 50 2 80 48 55 2 Field/Crew WS-5 36 0 00000 000 302 10.0 74 67 68 10.9 76 68 70 11.8 SEE AUX.Coffee/Break/Café/Lounge FACTOR 200 0.00 9 00010 0 0011 Storage/Files/Resource SET VALUE 0501 50 50 50 1 50 50 50 1 Work/Copy FACTOR 102 0.04 0 24 17 18 0 26 18 20 0 157 0 0 0 0 00000 SEE AUX. Reception - Waiting SHARED/CS 157 000000 000 000000 000 000000 000 000000 000 ASF 1448 670 480 523 723 512 559 GSF (w/ factor)2247 55%1,218 873 951 1,314 930 1,017 STAFF 91011 SUPPORT TOTAL SPECIAL TOTAL TOTAL STAFF OPT 1 OPT 2 OPT 3 ALL IN (PEOPLE)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)BUFFER (SQ. FT.)5-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)CURRENT RIGHT SIZE #/TYPESPACE STD. (SQ. FT.)SPACE STANDARD MPCURRENT ALL IN (SF)ALL IN (PEOPLE)NEED (SQ. FT.)SPACE STANDARD/TYPE BUFFER (SQ. FT.)CURRENT COUNTCURRENT (SQ. FT.)FACTOR/UTILIZATION RATEHYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) APPENDIX G.225 FORT COLLINS: MASTER PLAN ALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)ALL (100%)60%115% 3% ALL (100%)60%115% 3% ALL (100%)60%115% 3% ALL (100%)60%115% 3% ALL (100%)60%115% 697 474 524 13 799 535 594 15 918 607 677 17 1060 692 775 20 1228 793 890 0 0000 0000 0000 0000 00 140 140 140 1 140 140 140 1 140 140 140 1 140 140 140 1 140 140 140 0 0000 0000 0000 0000 00 156 94 108 3 185 111 128 3 219 131 151 4 258 155 178 5 305 183 211 313 188 216 6 370 222 255 7 437 262 302 8 517 310 356 10 611 366 421 88 53 61 3 104 62 72 3 123 74 85 4 145 87 100 5 172 103 118 0 0000 0000 0000 0000 00 78 69 71 13.6 82 71 74 15.7 87 74 77 18.1 92 78 81 21.1 99 82 86 0 0013 0 0015 0 0017 0 0020 0 00 50 50 50 1 50 50 50 1 50 50 50 1 50 50 50 1 50 50 50 28 19 21 0 32 21 24 0 37 24 27 0 42 28 31 0 49 32 36 0000000000000000000 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 775 543 595 881 607 668 1,005 681 754 1,153 770 856 1,327 874 976 1,409 988 1,083 1,601 1,103 1,215 1,828 1,239 1,371 2,095 1,400 1,556 2,412 1,589 1,775 13 15 17 20 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)ALL IN (SQ. FT.)ALL IN (SQ. FT.)10-YEAR 15-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)BUFFER (SQ. FT.)20-YEAR ALL IN (PEOPLE)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)25-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)30-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) G.226 APPENDIX NOVEMBER 2021 NEEDS: Office/work stations X Movable furniture for flexibility X Dedicated office spaces X Large open space for designated workstations X Shared open office Support spaces X Secured storage within office X Secured on-site storage space Collaboration/conference space X Potential special events space Special requirements X Access flooring through entire space X Infrastructure in walls for future needs X Tech connectivity between departments Security X FOB access into space X Centralized security system Public/community engagement X Enhancing community use of special events space X Expanding community outreach \ EMERGENCY PREPAREDNESS AND SECURITY FUNCTION: Emergency management and security management for entire city.PLAN O/WDEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTH10 549 ALL (100%)60%115% 11% ALL (100%)60%115% 2% 6 472 355 381 10 676 478 523 11 Service Director PO-1 180 1 180 180 180 1 180 180 180 1 Director/Department Head PO-2 140 0 00000 000 Division Head WS-1 80 0 00000 000 Supervisor/Manager WS-2 64 4 256 154 177 7 435 261 300 8 Staff - Typ WS-3 64 0 00000 000 PTE/Intern/Temp/Volunteer WS-4 36 1 36 22 25 2 61 37 42 2 Field/Crew WS-5 36 0 00000 000 338 7.0 269 264 265 10.5 277 269 271 11.5 SEE AUX.Coffee/Break/Café/Lounge FACTOR 173 0.00 6 00010 0 0011 Storage/Files/Resource SET VALUE 165 250 1 250 250 250 1 250 250 250 1 Work/Copy FACTOR 0 0.04 0 19 14 15 0 27 19 21 0 1052 52 1040 1040 1040 52 1040 1040 1040 52 Volunteer Area 1052 20 52 1040 1040 1040 52 1040 1040 1040 52 SEE AUX. Storage/dock space/general receiving 0 0 0 0 0 0 000 000000 000 000000 000 ASF 1939 1,781 1,659 1,687 1,994 1,787 1,833 GSF (FACTOR - WALLS, MEP, COMMON , CIRCULATION)3009 55%3,238 3,017 3,067 3,625 3,249 3,334 STAFF 61011 SUPPORT TOTAL SPECIAL TOTAL TOTAL STAFF OPT 1 OPT 2 OPT 3 ALL IN (PEOPLE)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)BUFFER (SQ. FT.)5-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)CURRENT RIGHT SIZE #/TYPESPACE STD. (SQ. FT.)SPACE STANDARD MPCURRENT ALL IN (SF)ALL IN (PEOPLE)NEED (SQ. FT.)SPACE STANDARD/TYPE BUFFER (SQ. FT.)CURRENT COUNTCURRENT (SQ. FT.)FACTOR/UTILIZATION RATEHYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) APPENDIX G.227 FORT COLLINS: MASTER PLAN ALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)ALL (100%)60%115% 2% ALL (100%)60%115% 3% ALL (100%)60%115% 3% ALL (100%)60%115% 3% ALL (100%)60%115% 736 514 564 12 794 548 604 13 875 597 659 14 966 652 722 16 1069 714 794 180 180 180 1 180 180 180 1 180 180 180 1 180 180 180 1 180 180 180 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 488 293 337 8 538 323 372 10 609 366 420 11 689 414 476 12 780 468 538 0 0000 0000 0000 0000 00 69 41 47 2 76 45 52 2 86 51 59 3 97 58 67 3 110 66 76 0 0000 0000 0000 0000 00 279 271 273 12.5 282 272 274 13.9 285 274 276 15.5 289 276 279 17.2 293 279 282 0 0012 0 0013 0 0014 0 0016 0 00 250 250 250 1 250 250 250 1 250 250 250 1 250 250 250 1 250 250 250 29 21 23 0 32 22 24 0 35 24 26 0 39 26 29 0 43 29 32 1040 1040 1040 52 1040 1040 1040 52 1040 1040 1040 52 1040 1040 1040 52 1040 1040 1040 1040 1040 1040 52 1040 1040 1040 52 1040 1040 1040 52 1040 1040 1040 52 1040 1040 1040 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 2,056 1,824 1,876 2,116 1,860 1,918 2,200 1,911 1,976 2,295 1,968 2,041 2,402 2,032 2,116 3,738 3,317 3,412 3,847 3,383 3,487 4,000 3,474 3,592 4,172 3,578 3,712 4,368 3,695 3,846 12 13 14 16 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)ALL IN (SQ. FT.)ALL IN (SQ. FT.)10-YEAR 15-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)BUFFER (SQ. FT.)20-YEAR ALL IN (PEOPLE)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)25-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)30-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) G.228 APPENDIX NOVEMBER 2021 NEEDS: Office/work stations X Dedicated offices X Workstations for privacy and focus X Flex offices Support spaces X Dedicated front desk for vendor interaction X Conference room attached to front desk Collaboration/conference space X Large conference rooms X Community room Security X Safety features throughout the building X Panic buttons at reception desk X Lock off area Public/community engagement X Space for community interaction ▷Conference room ▷Paperwork assistance \ FINANCIAL SERVICES FUNCTION: Management of City’s budget, purchasing, accounting, FP&A, sales tax, accounts payable, and payroll.PLAN O/WDEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTH11 4306 ALL (100%)60%115% 1% ALL (100%)60%115% 3% 44 3292 2383 2588 46 3419 2459 2675 53 Service Director PO-1 180 1 180 180 180 1 180 180 180 1 Director/Department Head PO-2 140 6 840 840 840 6 840 840 840 6 Division Head WS-1 80 1 80 48 55 1 84 51 58 1 Supervisor/Manager WS-2 64 1 64 38 44 1 68 41 47 1 Staff - Typ WS-3 64 31 1984 1190 1369 33 2095 1257 1445 38 PTE/Intern/Temp/Volunteer WS-4 36 4 144 86 99 4 152 91 105 5 Field/Crew WS-5 36 0 00000 000 1319 45.0 432 395 404 47.1 437 398 407 53.5 SEE AUX.Coffee/Break/Café/Lounge FACTOR 362 0.00 44 00046 0 0053 Storage/Files/Resource SET VALUE 445 300 1 300 300 300 1 300 300 300 1 Work/Copy FACTOR 512 0.04 0 132 95 104 0 137 98 107 0 280 0 0 0 0 00000 SEE AUX. Reception - Waiting SHARED/CS 280 000000 000 000000 000 000000 000 000000 000 ASF 5905 3,724 2,779 2,991 3,855 2,857 3,082 GSF (FACTOR - WALLS, MEP, COMMON , CIRCULATION)8605 55%6,770 5,052 5,439 7,010 5,195 5,604 STAFF 44 46 53 SUPPORT TOTAL SPECIAL TOTAL STAFF TOTAL OPT 1 OPT 2 OPT 3 ALL IN (PEOPLE)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)BUFFER (SQ. FT.)5-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)CURRENT RIGHT SIZE #/TYPESPACE STD. (SQ. FT.)SPACE STANDARD MPCURRENT ALL IN (SF)ALL IN (PEOPLE)NEED (SQ. FT.)SPACE STANDARD/TYPE BUFFER (SQ. FT.)CURRENT COUNTCURRENT (SQ. FT.)FACTOR/UTILIZATION RATEHYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) APPENDIX G.229 FORT COLLINS: MASTER PLAN ALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)ALL (100%)60%115% 2% ALL (100%)60%115% 2% ALL (100%)60%115% 2% ALL (100%)60%115% 2% ALL (100%)60%115% 3814 2696 2948 58 4163 2906 3189 64 4495 3105 3418 70 4862 3325 3671 76 5269 3569 3951 180 180 180 1 180 180 180 1 180 180 180 1 180 180 180 1 180 180 180 840 840 840 6 840 840 840 6 840 840 840 6 840 840 840 6 840 840 840 98 59 68 1 111 66 76 2 122 73 84 2 135 81 93 2 150 90 103 79 47 54 1 89 53 61 2 98 59 68 2 108 65 75 2 120 72 83 2440 1464 1684 43 2744 1647 1894 47 3035 1821 2094 52 3355 2013 2315 58 3710 2226 2560 177 106 122 6 199 120 137 6 220 132 152 7 244 146 168 7 269 162 186 0 0000 0000 0000 0000 00 453 408 418 59.2 467 416 428 64.6 480 424 437 70.6 494 433 447 77.2 511 443 458 0 0058 0 0064 0 0070 0 0076 0 00 300 300 300 1 300 300 300 1 300 300 300 1 300 300 300 1 300 300 300 153 108 118 0 167 116 128 0 180 124 137 0 194 133 147 0 211 143 158 0000000000000000000 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 4,267 3,104 3,366 4,629 3,322 3,616 4,975 3,529 3,854 5,357 3,758 4,118 5,779 4,012 4,410 7,758 5,644 6,120 8,417 6,040 6,575 9,045 6,417 7,008 9,740 6,834 7,487 10,508 7,294 8,017 58 64 70 76 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)ALL IN (SQ. FT.)ALL IN (SQ. FT.)10-YEAR 15-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)BUFFER (SQ. FT.)20-YEAR ALL IN (PEOPLE)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)25-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)30-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) G.230 APPENDIX NOVEMBER 2021 NEEDS: Office/work stations X Flex space with cubicles X Dedicated office spaces Support spaces X Secure purchasing front desk X Secure accounts payable desks X Storage space X Lockable/secure file storage Collaboration/conference space X Open meeting area ▷ Small groups ▷Storage ▷Private workspace Security X Controlled access to department X Separation for privacy X Panic buttons placed throughout department X Security throughout building \ FINANCIAL SERVICES SAFETY AND RISK MANAGEMENT FUNCTION: Provide occupational safety leadership, training, inspection, and supplies which includes management of safety programs and safety issues. Manage the City’s Risk Management program and insurance portfolio. City Safe clinic provides a space for follow up occupational health visits, DOT physicals, nurse triage, and TRT therapy. PLAN O/WDEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTH12 782 ALL (100%)60%115% 1% ALL (100%)60%115% 3% 10 688 469 518 11 719 487 539 12 Service Director PO-1 180 0 00000 000 Director/Department Head PO-2 140 1 140 140 140 1 140 140 140 1 Division Head WS-1 80 0 00000 000 Supervisor/Manager WS-2 64 0 00000 000 Staff - Typ WS-3 64 8 512 307 353 8 541 324 373 10 PTE/Intern/Temp/Volunteer WS-4 36 1 36 22 25 1 38 23 26 1 Field/Crew WS-5 36 0 00000 000 274 11.0 178 169 171 11.5 179 169 172 13.1 SEE AUX.Coffee/Break/Café/Lounge FACTOR 75 0.00 10 00011 0 0012 Storage/Files/Resource SET VALUE 149 150 1 150 150 150 1 150 150 150 1 Work/Copy FACTOR 50 0.04 0 28 19 21 0 29 19 22 0 96 000000000 SEE AUX. Reception - Waiting SHARED/CS 96 000000 000 000000 000 000000 000 000000 000 ASF 1152 866 638 689 897 657 711 GSF (FACTOR - WALLS, MEP, COMMON , CIRCULATION)1345 55%1,574 1,159 1,252 1,631 1,194 1,292 STAFF 10 11 12 SUPPORT TOTAL STAFF SPECIAL TOTAL TOTAL OPT 1 OPT 2 OPT 3 ALL IN (PEOPLE)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)BUFFER (SQ. FT.)5-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)CURRENT RIGHT SIZE #/TYPESPACE STD. (SQ. FT.)SPACE STANDARD MPCURRENT ALL IN (SF)ALL IN (PEOPLE)NEED (SQ. FT.)SPACE STANDARD/TYPE BUFFER (SQ. FT.)CURRENT COUNTCURRENT (SQ. FT.)FACTOR/UTILIZATION RATEHYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) APPENDIX G.231 FORT COLLINS: MASTER PLAN Public/Community engagement X Limited access to public ALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)ALL (100%)60%115% 2% ALL (100%)60%115% 3% ALL (100%)60%115% 3% ALL (100%)60%115% 3% ALL (100%)60%115% 814 544 605 13 898 595 663 15 1018 667 746 18 1158 751 842 20 1319 848 954 0 0000 0000 0000 0000 00 140 140 140 1 140 140 140 1 140 140 140 1 140 140 140 1 140 140 140 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 630 378 434 11 708 425 489 13 821 492 566 15 951 571 656 17 1102 661 760 44 27 31 1 50 30 34 2 58 35 40 2 67 40 46 2 77 46 53 0 0000 0000 0000 0000 00 183 172 174 14.4 186 174 177 16.4 191 177 180 18.7 196 180 184 21.4 203 184 188 0 0013 0 0015 0 0018 0 0020 0 00 150 150 150 1 150 150 150 1 150 150 150 1 150 150 150 1 150 150 150 33 22 24 0 36 24 27 0 41 27 30 0 46 30 34 0 53 34 38 0000000000000000000 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 996 716 779 1,084 769 840 1,209 844 926 1,354 931 1,026 1,522 1,031 1,142 1,812 1,302 1,417 1,971 1,397 1,526 2,198 1,534 1,683 2,462 1,692 1,865 2,767 1,875 2,076 13 15 18 20 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)ALL IN (SQ. FT.)ALL IN (SQ. FT.)10-YEAR 15-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)BUFFER (SQ. FT.)20-YEAR ALL IN (PEOPLE)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)25-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)30-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) G.232 APPENDIX NOVEMBER 2021 NEEDS: Office/work stations X Private offices Support spaces X Storage space X Confidential and welcoming reception desk X Large waiting area Collaboration/conference space X Collaboration spaces X Outdoor work and meeting space X Confidential technology equipped meeting spaces X Large multi-purpose training room Special requirements X Working windows to increase efficiency X Development Center ▷Training delivery space ▷Classrooms ▷Technology space X Common cafeteria to promote other department interaction X Wayfinding and sense of community Security X Separate entrance for employees \ HUMAN RESOURCES FUNCTION: Management of Benefits, Employee Relations (HRBP’s), Compensation, HR data, Wellness, HRIS, Talent Development, and Volunteer programs; internal and external customer services, personnel records storage, Learning Library/resources and serves as the Volunteer hub.PLAN O/WDEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTH13 3098 ALL (100%)60%115% 3% ALL (100%)60%115% 3% 35 2292 1503 1681 40 2574 1672 1875 46 Service Director PO-1 180 1 180 180 180 1 180 180 180 1 Director/Department Head PO-2 140 1 140 140 140 1 140 140 140 1 Division Head WS-1 80 0 00000 000 Supervisor/Manager WS-2 64 7 448 269 309 8 512 307 353 9 Staff - Typ WS-3 64 21 1344 806 927 24 1536 922 1060 28 PTE/Intern/Temp/Volunteer WS-4 36 5 180 108 124 6 206 123 142 7 Field/Crew WS-5 36 0 00000 000 615 36.0 292 260 267 40.7 303 267 275 46.5 SEE AUX.Coffee/Break/Café/Lounge FACTOR 174 0.00 35 00040 0 0046 Storage/Files/Resource SET VALUE 172 200 1 200 200 200 1 200 200 200 1 Work/Copy FACTOR 269 0.04 0 92 60 67 0 103 67 75 0 134 0 0 0 0 00000 SEE AUX. Reception - Waiting SHARED/CS 134 000000 000 000000 000 000000 000 000000 000 ASF 3847 2,584 1,763 1,948 2,877 1,939 2,150 GSF (FACTOR - WALLS, MEP, COMMON , CIRCULATION)5881 55%4,698 3,206 3,542 5,231 3,526 3,910 STAFF 35 40 46 STAFF SUPPORT TOTAL SPECIAL TOTAL TOTAL OPT 1 OPT 2 OPT 3 ALL IN (PEOPLE)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)BUFFER (SQ. FT.)5-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)CURRENT RIGHT SIZE #/TYPESPACE STD. (SQ. FT.)SPACE STANDARD MPCURRENT ALL IN (SF)ALL IN (PEOPLE)NEED (SQ. FT.)SPACE STANDARD/TYPE BUFFER (SQ. FT.)CURRENT COUNTCURRENT (SQ. FT.)FACTOR/UTILIZATION RATEHYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) APPENDIX G.233 FORT COLLINS: MASTER PLAN Public/community engagement X Dedicated space for volunteer program members X Play structure in outdoor space for employees and children ALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)ALL (100%)60%115% 3% ALL (100%)60%115% 3% ALL (100%)60%115% 3% ALL (100%)60%115% 3% ALL (100%)60%115% 2920 1880 2114 53 3349 2138 2410 61 3822 2421 2736 70 4367 2748 3113 80 4998 3127 3548 180 180 180 1 180 180 180 1 180 180 180 1 180 180 180 1 180 180 180 140 140 140 1 140 140 140 1 140 140 140 1 140 140 140 1 140 140 140 0 0000 0000 0000 0000 00 591 354 408 11 688 413 475 12 795 477 549 14 920 552 634 17 1063 638 733 1772 1063 1223 32 2065 1239 1425 37 2386 1432 1647 43 2759 1655 1903 50 3189 1913 2200 237 142 164 8 277 166 191 9 320 192 221 10 369 222 255 12 427 256 295 0 0000 0000 0000 0000 00 317 275 285 53.7 334 286 296 61.6 353 297 309 70.7 375 310 325 81.3 400 325 342 0 0053 0 0061 0 0070 0 0080 0 00 200 200 200 1 200 200 200 1 200 200 200 1 200 200 200 1 200 200 200 117 75 85 0 134 86 96 0 153 97 109 0 175 110 125 0 200 125 142 0000000000000000000 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 3,237 2,155 2,399 3,683 2,423 2,707 4,174 2,718 3,046 4,742 3,058 3,437 5,398 3,452 3,890 5,886 3,919 4,362 6,697 4,406 4,921 7,590 4,941 5,537 8,622 5,561 6,250 9,815 6,277 7,073 53 61 70 80 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)ALL IN (SQ. FT.)ALL IN (SQ. FT.)10-YEAR 15-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)BUFFER (SQ. FT.)20-YEAR ALL IN (PEOPLE)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)25-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)30-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) G.234 APPENDIX NOVEMBER 2021 NEEDS: Office/work stations X Dedicated offices for firm positions X Dedicated workstations Support Spaces X Quiet spaces X Phone booths X Secure storage spaces ▷Equipment ▷Records ▷Shipments Collaboration/conference space X Touch down spaces with cubicles X Lockable spaces X Small huddle room X Large conference/Event spaces Special requirements X Shared through departments X Potential shipping dock X Innovation lab X Kiosk system Security X FOB access into space \ INFORMATION TECHNOLOGY FUNCTION: Provides customer-driven technology services that enable the business of City government to be conducted. Works in partnership with departments and service providers to plan and implement technology solutions that address the needs of customers, both internal and external.PLAN O/WDEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTH14 5902 ALL (100%)60%115% 5% ALL (100%)60%115% 5% 50 3484 2274 2547 63 4319 2776 3123 80 Service Director PO-1 180 1 180 180 180 1 180 180 180 1 Director/Department Head PO-2 140 2 280 280 280 2 280 280 280 2 Division Head WS-1 80 1 80 48 55 1 102 61 70 2 Supervisor/Manager WS-2 64 9 576 346 397 11 735 441 507 15 Staff - Typ WS-3 64 37 2368 1421 1634 47 3022 1813 2085 60 PTE/Intern/Temp/Volunteer WS-4 36 0 00000 000 Field/Crew WS-5 36 0 00000 000 737 51.0 239 191 202 64.0 273 211 225 80.6 SEE AUX.Coffee/Break/Café/Lounge FACTOR 203 0.00 50 00063 0 0080 Storage/Files/Resource SET VALUE 214 100 1 100 100 100 1 100 100 100 1 Work/Copy FACTOR 320 0.04 0 139 91 102 0 173 111 125 0 1353 3 1000 1000 1000 3 1000 1000 1000 3 SEE AUX. Reception - Waiting SHARED/CS 224 000000 000 SEE AUX. Storage/Shipping & Receiving 231 000000 000 Application Lab 145 200 1 200 200 200 1 200 200 200 1 PC Lab 322 400 1 400 400 400 1 400 400 400 1 Data Center 431 400 1 400 400 400 1 400 400 400 1 000000 000 ASF 7992 4,723 3,465 3,748 5,592 3,987 4,348 GSF (FACTOR - WALLS, MEP, COMMON , CIRCULATION)12014 55%8,588 6,301 6,815 10,168 7,249 7,905 STAFF 50 63 80 SUPPORT TOTAL SPECIAL TOTAL TOTAL STAFF OPT 1 OPT 2 OPT 3 ALL IN (PEOPLE)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)BUFFER (SQ. FT.)5-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)CURRENT RIGHT SIZE #/TYPESPACE STD. (SQ. FT.)SPACE STANDARD MPCURRENT ALL IN (SF)ALL IN (PEOPLE)NEED (SQ. FT.)SPACE STANDARD/TYPE BUFFER (SQ. FT.)CURRENT COUNTCURRENT (SQ. FT.)FACTOR/UTILIZATION RATEHYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) APPENDIX G.235 FORT COLLINS: MASTER PLAN ALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)ALL (100%)60%115% 5% ALL (100%)60%115% 3% ALL (100%)60%115% 3% ALL (100%)60%115% 3% ALL (100%)60%115% 5386 3415 3859 101 6747 4232 4798 116 7748 4833 5489 134 8909 5529 6290 155 10254 6337 7218 180 180 180 1 180 180 180 1 180 180 180 1 180 180 180 1 180 180 180 280 280 280 2 280 280 280 2 280 280 280 2 280 280 280 2 280 280 280 130 78 90 2 166 100 115 2 193 116 133 3 224 134 154 3 259 155 179 938 563 647 19 1197 718 826 22 1388 833 958 25 1609 966 1110 29 1866 1119 1287 3857 2314 2661 77 4923 2954 3397 89 5707 3424 3938 103 6616 3970 4565 120 7670 4602 5292 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 315 237 254 101.7 370 269 292 117.3 410 293 320 135.3 456 321 352 156.2 510 353 389 0 00101 0 00116 0 00134 0 00155 0 00 100 100 100 1 100 100 100 1 100 100 100 1 100 100 100 1 100 100 100 215 137 154 0 270 169 192 0 310 193 220 0 356 221 252 0 410 253 289 1000 1000 1000 3 1000 1000 1000 4 1200 1200 1200 4 1200 1200 1200 4 1200 1200 1200 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 200 200 200 1 200 200 200 1 200 200 200 1 200 200 200 1 200 200 200 400 400 400 1 400 400 400 1 400 400 400 1 400 400 400 1 400 400 400 400 400 400 1 400 400 400 2 600 600 600 2 600 600 600 2 600 600 600 0 0000 0000 0000 0000 00 6,701 4,652 5,113 8,117 5,501 6,090 9,358 6,326 7,008 10,565 7,050 7,841 11,965 7,890 8,807 12,184 8,458 9,297 14,757 10,002 11,072 17,014 11,502 12,742 19,209 12,819 14,257 21,754 14,346 16,013 101 116 134 155 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)ALL IN (SQ. FT.)ALL IN (SQ. FT.)10-YEAR 15-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)BUFFER (SQ. FT.)20-YEAR ALL IN (PEOPLE)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)25-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)30-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) G.236 APPENDIX NOVEMBER 2021 NEEDS: Office/work stations X Dedicated offices X Work stations Support spaces X Waiting room X Customer parking X File storage space X Copy/Print room X Private restrooms for judicial authorities Collaboration/conference space X Probation conference rooms X Pretrial conference area X Private defense council conference room \ MUNICIPAL COURT FUNCTION: Administering the operation of the judicial branch of City government according to the ordinance adopted by City Council. Cases adjudicated in Municipal Court include traffic violations, misdemeanors, petty offenses, and civil infractions.PLAN O/WDEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTH15 1027 ALL (100%)60%115% 6% ALL (100%)60%115% 4% 19 1316 974 1051 25 1611 1151 1254 29 Service Director PO-1 180 1 180 180 180 1 180 180 180 1 Director/Department Head PO-2 140 2 280 280 280 2 280 280 280 2 Division Head WS-1 80 0 00000 000 Supervisor/Manager WS-2 64 2 128 77 88 3 172 103 119 3 Staff - Typ WS-3 64 8 512 307 353 11 688 413 475 13 PTE/Intern/Temp/Volunteer WS-4 36 6 216 130 149 8 290 174 200 10 Field/Crew WS-5 36 0 00000 000 401 20.0 203 189 192 25.5 214 196 200 29.6 SEE AUX.Coffee/Break/Café/Lounge FACTOR 106 0.00 19 00025 0 0029 Storage/Files/Resource SET VALUE 158 150 1 150 150 150 1 150 150 150 1 Work/Copy FACTOR 137 0.04 0 53 39 42 0 64 46 50 0 4356 17 9660 9660 9660 18 14160 14160 14160 18 Additional Work/Copy 100 1 100 100 100 1 100 100 100 1 Intake 1208 1200 1 1200 1200 1200 1 1200 1200 1200 1 Large Municipal Courtroom 4500 1 4500 4500 4500 2 9000 9000 9000 2 Small Municipal Courtroom 1117 1200 1 1200 1200 1200 1 1200 1200 1200 1 Probation Officer Meeting Rooms 353 180 2 360 360 360 2 360 360 360 2 SEE AUX. Reception Need 5 CS windows 359 000000 000 Pretrial Conference 584 120 3 360 360 360 3 360 360 360 3 Defense Conference 120 2 240 240 240 2 240 240 240 2 Jury Deliberation Room 320 1 320 320 320 1 320 320 320 1 Judicial Restroom 40 3 120 120 120 3 120 120 120 3 Jury Kitchenette 60 1606060160 60 60 1 Waiting 735 1200 1 1200 1200 1200 1 1200 1200 1200 1 000000 000 ASF 5784 11,179 10,823 10,903 15,985 15,507 15,614 GSF (FACTOR - WALLS, MEP, COMMON , CIRCULATION)7069 55%20,325 19,677 19,823 29,064 28,194 28,390 STAFF 19 25 29 SUPPORT TOTAL SPECIAL TOTAL TOTAL STAFF OPT 1 OPT 2 OPT 3 ALL IN (PEOPLE)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)BUFFER (SQ. FT.)5-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)CURRENT RIGHT SIZE #/TYPESPACE STD. (SQ. FT.)SPACE STANDARD MPCURRENT ALL IN (SF)ALL IN (PEOPLE)NEED (SQ. FT.)SPACE STANDARD/TYPE BUFFER (SQ. FT.)CURRENT COUNTCURRENT (SQ. FT.)FACTOR/UTILIZATION RATEHYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) APPENDIX G.237 FORT COLLINS: MASTER PLAN X Judicial staff conference room Special requirements X Small and large court rooms X Separate entrances for general public and judge X Employee access to services/exits separate from public X Jury deliberation room X Reception windows ▷Municipal Clerk ▷Check-in ▷Check-out ▷Camera red-light payment Security X High level of security throughout building ▷Panic buttons ▷Screening entrance ALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)ALL (100%)60%115% 2% ALL (100%)60%115% 4% ALL (100%)60%115% 4% ALL (100%)60%115% 4% ALL (100%)60%115% 1827 1280 1403 31 1933 1344 1476 36 2236 1526 1686 43 2602 1745 1938 51 3044 2010 2243 180 180 180 1 180 180 180 1 180 180 180 1 180 180 180 1 180 180 180 280 280 280 2 280 280 280 2 280 280 280 2 280 280 280 2 280 280 280 0 0000 0000 0000 0000 00 204 123 141 3 220 132 152 4 266 159 183 5 320 192 221 6 386 232 267 818 491 564 14 881 528 608 17 1062 637 733 20 1281 769 884 24 1546 927 1066 345 207 238 10 372 223 256 12 448 269 309 15 541 324 373 18 652 391 450 0 0000 0000 0000 0000 00 223 201 206 31.5 227 204 209 37.2 239 211 217 44.0 254 220 228 52.3 272 230 240 0 0031 0 0036 0 0043 0 0051 0 00 150 150 150 1 150 150 150 1 150 150 150 1 150 150 150 1 150 150 150 73 51 56 0 77 54 59 0 89 61 67 0 104 70 78 0 122 80 90 14160 14160 14160 18 14160 14160 14160 19 15360 15360 15360 19 15360 15360 15360 19 15360 15360 15360 100 100 100 1 100 100 100 1 100 100 100 1 100 100 100 1 100 100 100 1200 1200 1200 1 1200 1200 1200 1 1200 1200 1200 1 1200 1200 1200 1 1200 1200 1200 9000 9000 9000 2 9000 9000 9000 2 9000 9000 9000 2 9000 9000 9000 2 9000 9000 9000 1200 1200 1200 1 1200 1200 1200 2 2400 2400 2400 2 2400 2400 2400 2 2400 2400 2400 360 360 360 2 360 360 360 2 360 360 360 2 360 360 360 2 360 360 360 0 0000 0000 0000 0000 00 360 360 360 3 360 360 360 3 360 360 360 3 360 360 360 3 360 360 360 240 240 240 2 240 240 240 2 240 240 240 2 240 240 240 2 240 240 240 320 320 320 1 320 320 320 1 320 320 320 1 320 320 320 1 320 320 320 120 120 120 3 120 120 120 3 120 120 120 3 120 120 120 3 120 120 120 60 60 60 1 60 60 60 1 60 60 60 1 60 60 60 1 60 60 60 1200 1200 1200 1 1200 1200 1200 1 1200 1200 1200 1 1200 1200 1200 1 1200 1200 1200 0 0000 0000 0000 0000 00 16,210 15,641 15,769 16,320 15,707 15,845 17,836 17,097 17,263 18,216 17,325 17,526 18,676 17,601 17,843 29,473 28,439 28,671 29,673 28,559 28,809 32,428 31,085 31,387 33,121 31,500 31,865 33,956 32,002 32,441 31 36 43 51 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)ALL IN (SQ. FT.)ALL IN (SQ. FT.)10-YEAR 15-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)BUFFER (SQ. FT.)20-YEAR ALL IN (PEOPLE)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)25-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)30-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) G.238 APPENDIX NOVEMBER 2021 NEEDS: Office/work stations X Staff supervisor Workstations/touchdown spaces X Open offices X Reception Support spaces X Shared copy/print room Collaboration/conference space X Shared collaboration/conference spaces ▷Conference room ▷Ideation room ▷Centralized shared space ▷Small collaboration spaces X Shared small conference room X Shared large conference room ▷Training room ▷Kitchenette \ OPERATION SERVICES ADMINISTRATION FUNCTION: Provides support to Operation Services department which includes financial management, personnel administrations and record keeping, clerical and secretarial support, reception, general filing, and web page development and upkeep.PLAN O/WDEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTH16 1868 ALL (100%)60%115% 6% ALL (100%)60%115% 2% 9 692 487 533 12 863 590 651 13 Service Director PO-1 180 1 180 180 180 1 180 180 180 1 Director/Department Head PO-2 140 0 00000 000 Division Head WS-1 80 0 00000 000 Supervisor/Manager WS-2 64 2 128 77 88 3 171 102 118 3 Staff - Typ WS-3 64 6 384 230 265 8 512 307 353 9 PTE/Intern/Temp/Volunteer WS-4 36 0 00000 000 Field/Crew WS-5 36 0 00000 000 655 702.0 178 169 171 704.7 178 178 178 932.9 SEE AUX.Coffee/Break/Café/Lounge FACTOR 234 0.00 9 00012 0 0013 Storage/Files/Resource SET VALUE 131 150 1 150 150 150 1 150 150 150 1 Work/Copy FACTOR 290 0.04 692 28 19 21 692 28 28 28 919 194 0 0 0 0 00000 SEE AUX. Reception - Waiting SHARED/CS 194 000000 000 000000 000 000000 000 000000 000 ASF 2717 870 657 705 1,040 767 829 GSF (FACTOR - WALLS, MEP, COMMON , CIRCULATION)3671 55%1,581 1,194 1,281 1,891 1,395 1,507 STAFF 91213 SUPPORT TOTAL SPECIAL TOTAL TOTAL STAFF OPT 1 OPT 2 OPT 3 ALL IN (PEOPLE)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)BUFFER (SQ. FT.)5-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)CURRENT RIGHT SIZE #/TYPESPACE STD. (SQ. FT.)SPACE STANDARD MPCURRENT ALL IN (SF)ALL IN (PEOPLE)NEED (SQ. FT.)SPACE STANDARD/TYPE BUFFER (SQ. FT.)CURRENT COUNTCURRENT (SQ. FT.)FACTOR/UTILIZATION RATEHYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) APPENDIX G.239 FORT COLLINS: MASTER PLAN ALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)ALL (100%)60%115% 0% ALL (100%)60%115% 2% ALL (100%)60%115% 2% ALL (100%)60%115% 2% ALL (100%)60%115% 919 624 690 13 919 624 690 13 976 658 730 14 1038 695 772 15 1104 735 818 180 180 180 1 180 180 180 1 180 180 180 1 180 180 180 1 180 180 180 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 185 111 128 3 185 111 128 3 199 119 137 3 215 129 148 4 231 139 159 555 333 383 9 555 333 383 9 597 358 412 10 644 386 444 11 693 416 478 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 187 187 187 932.9 187 187 187 990.9 189 189 189 1053.4 192 192 192 1120.8 194 194 194 0 0013 0 0013 0 0014 0 0015 0 00 150 150 150 1 150 150 150 1 150 150 150 1 150 150 150 1 150 150 150 37 37 37 919 37 37 37 976 39 39 39 1038 42 42 42 1104 44 44 44 0000000000000000000 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 1,106 810 877 1,106 810 877 1,166 847 919 1,230 886 964 1,299 929 1,012 2,011 1,473 1,594 2,011 1,473 1,594 2,119 1,540 1,670 2,236 1,612 1,752 2,361 1,689 1,840 13 13 14 15 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)ALL IN (SQ. FT.)ALL IN (SQ. FT.)10-YEAR 15-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)BUFFER (SQ. FT.)20-YEAR ALL IN (PEOPLE)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)25-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)30-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) G.240 APPENDIX NOVEMBER 2021 NEEDS: Office/work stations X Dedicated offices X Open office space ▷Access control ▷Controls specialist ▷Energy Manager X Flexible work stations/touchdown spaces X Use for confidential meetings Support spaces X Storage space ▷Lock shop ▷Equipment storage ▷Shared copy/print room ▷Tech parking Collaboration/conference space X Shared collaboration/conference spaces ▷Conference room ▷Ideation room ▷Centralized shared space ▷Small collaboration spaces X Shared small conference room X Shared large conference room ▷Training room ▷Kitchenette \ OPERATION SERVICES FACILITIES MANAGEMENT FUNCTION: Responsibility of maintaining most City owned facilities in an operating and useful condition. PLAN O/WDEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTH17 1102 ALL (100%)60%115% 4% ALL (100%)60%115% 4% 21 912 547 629 25 1086 651 749 30 Service Director PO-1 180 0 00000 000 Director/Department Head PO-2 140 0 00000 000 Division Head WS-1 80 1 80 48 55 1 95 57 66 1 Supervisor/Manager WS-2 64 4 256 154 177 5 305 183 210 6 Staff - Typ WS-3 64 0 00000 000 PTE/Intern/Temp/Volunteer WS-4 36 0 00000 000 Field/Crew WS-5 36 16 576 346 397 19 686 411 473 23 448 22.0 96 82 85 26.0 103 86 90 31.0 SEE AUX.Coffee/Break/Café/Lounge FACTOR 388 0.00 21 00025 0 0030 Storage/Files/Resource SET VALUE 60 60 1 60 60 60 1 60 60 60 1 Work/Copy FACTOR 0 0.04 0 36 22 25 0 43 26 30 0 408 2 409 409 409 2 409 409 409 2 Automation Equipment Shop Basement 299 300 1 300 300 300 1 300 300 300 1 Lock Shop Basement 109 109 1 109 109 109 1 109 109 109 1 000000 000 000000 000 ASF 1958 1,417 1,038 1,123 1,598 1,147 1,248 GSF (FACTOR - WALLS, MEP, COMMON , CIRCULATION)2603 55%2,577 1,887 2,043 2,906 2,085 2,269 STAFF 21 25 30 STAFF SPECIAL TOTAL TOTAL SUPPORT TOTAL OPT 1 OPT 2 OPT 3 ALL IN (PEOPLE)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)BUFFER (SQ. FT.)5-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)CURRENT RIGHT SIZE #/TYPESPACE STD. (SQ. FT.)SPACE STANDARD MPCURRENT ALL IN (SF)ALL IN (PEOPLE)NEED (SQ. FT.)SPACE STANDARD/TYPE BUFFER (SQ. FT.)CURRENT COUNTCURRENT (SQ. FT.)FACTOR/UTILIZATION RATEHYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) APPENDIX G.241 FORT COLLINS: MASTER PLAN ALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)ALL (100%)60%115% 3% ALL (100%)60%115% 3% ALL (100%)60%115% 3% ALL (100%)60%115% 3% ALL (100%)60%115% 1303 782 899 35 1520 912 1049 41 1802 1081 1243 49 2135 1281 1473 58 2531 1519 1747 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 114 69 79 2 133 80 92 2 158 95 109 2 187 112 129 3 222 133 153 366 219 252 7 427 256 294 8 506 303 349 9 599 360 414 11 711 426 490 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 823 494 568 27 960 576 662 32 1138 683 785 37 1349 809 931 44 1599 959 1103 112 91 96 36.0 121 96 102 42.5 132 103 110 50.2 145 111 119 59.3 161 121 130 0 0035 0 0041 0 0049 0 0058 0 00 60 60 60 1 60 60 60 1 60 60 60 1 60 60 60 1 60 60 60 52 31 36 0 61 36 42 0 72 43 50 0 85 51 59 0 101 61 70 409 409 409 2 409 409 409 2 409 409 409 2 409 409 409 2 409 409 409 300 300 300 1 300 300 300 1 300 300 300 1 300 300 300 1 300 300 300 109 109 109 1 109 109 109 1 109 109 109 1 109 109 109 1 109 109 109 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 1,824 1,282 1,404 2,050 1,417 1,560 2,343 1,593 1,762 2,690 1,802 2,001 3,102 2,049 2,286 3,316 2,331 2,552 3,726 2,577 2,836 4,259 2,897 3,203 4,891 3,276 3,639 5,639 3,725 4,156 35 41 49 58 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)ALL IN (SQ. FT.)ALL IN (SQ. FT.)10-YEAR 15-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)BUFFER (SQ. FT.)20-YEAR ALL IN (PEOPLE)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)25-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)30-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) G.242 APPENDIX NOVEMBER 2021 NEEDS: Office/work stations X Private offices X Interior design office X Work stations/touch down spaces ▷Interns Support spaces X Shared copy/print room Collaboration/conference space X Shared collaboration/conference spaces ▷Conference room ▷Ideation room ▷Centralized shared space ▷Small collaboration spaces X Shared small conference room X Shared large conference room ▷Training room ▷Kitchenette \ OPERATION SERVICES PROJECT MANAGEMENT, PLANNING AND DESIGN FUNCTION: Provides the professional design, space management, and project management support required for the construction, renovation and maintenance/repair of City facilities. Services provided include space use programming, budgeting, contract document administration, progress reviews, work inspections, and contract payments.PLAN O/WDEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTH18 782 ALL (100%)60%115% 10% ALL (100%)60%115% 0% 5 336 202 232 8 538 323 371 8 Service Director PO-1 180 0 00000 000 Director/Department Head PO-2 140 0 00000 000 Division Head WS-1 80 1 80 48 55 2 128 77 88 2 Supervisor/Manager WS-2 64 0 00000 000 Staff - Typ WS-3 64 4 256 154 177 6 410 246 283 6 PTE/Intern/Temp/Volunteer WS-4 36 0 00000 000 Field/Crew WS-5 36 0 00000 000 553 6.0 113 108 109 9.0 122 113 115 9.0 SEE AUX.Coffee/Break/Café/Lounge FACTOR 236 0.00 5 0008 0 008 Storage/Files/Resource SET VALUE 0 100 1 100 100 100 1 100 100 100 1 Work/Copy FACTOR 317 0.04 0 13 8 9 0 22 13 15 0 0 1 150 150 150 1 150 150 150 1 Additional Work/Copy 150 1 150 150 150 1 150 150 150 1 000000 000 000000 000 000000 000 ASF 1335 599 460 491 809 586 636 GSF (FACTOR - WALLS, MEP, COMMON , CIRCULATION)1813 55%1,090 836 893 1,471 1,065 1,156 STAFF 588 SUPPORT TOTAL SPECIAL TOTAL TOTAL STAFF OPT 1 OPT 2 OPT 3 ALL IN (PEOPLE)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)BUFFER (SQ. FT.)5-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)CURRENT RIGHT SIZE #/TYPESPACE STD. (SQ. FT.)SPACE STANDARD MPCURRENT ALL IN (SF)ALL IN (PEOPLE)NEED (SQ. FT.)SPACE STANDARD/TYPE BUFFER (SQ. FT.)CURRENT COUNTCURRENT (SQ. FT.)FACTOR/UTILIZATION RATEHYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) APPENDIX G.243 FORT COLLINS: MASTER PLAN ALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)ALL (100%)60%115% 2% ALL (100%)60%115% 4% ALL (100%)60%115% 4% ALL (100%)60%115% 4% ALL (100%)60%115% 538 323 371 9 605 363 417 11 739 443 510 13 902 541 622 16 1102 661 760 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 128 77 88 2 144 86 99 2 176 106 121 3 215 129 148 3 262 157 181 0 0000 0000 0000 0000 00 410 246 283 7 461 276 318 9 563 338 388 11 687 412 474 13 840 504 579 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 122 113 115 10.0 124 115 117 12.0 130 118 120 14.4 136 122 125 17.4 144 126 130 0 009 0 0011 0 0013 0 0016 0 00 100 100 100 1 100 100 100 1 100 100 100 1 100 100 100 1 100 100 100 22 13 15 0 24 15 17 0 30 18 20 0 36 22 25 0 44 26 30 150 150 150 1 150 150 150 1 150 150 150 1 150 150 150 1 150 150 150 150 150 150 1 150 150 150 1 150 150 150 1 150 150 150 1 150 150 150 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 809 586 636 879 627 684 1,018 711 780 1,188 813 897 1,396 938 1,041 1,471 1,065 1,156 1,598 1,141 1,244 1,851 1,293 1,418 2,160 1,478 1,632 2,538 1,705 1,892 9111316 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)ALL IN (SQ. FT.)ALL IN (SQ. FT.)10-YEAR 15-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)BUFFER (SQ. FT.)20-YEAR ALL IN (PEOPLE)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)25-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)30-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) G.244 APPENDIX NOVEMBER 2021 NEEDS: Office/work stations X Flexible office for privacy X Work stations/touchdown spaces Support spaces X File storage X Shared copy/print room X Kitchenette X Off site file storage Collaboration/conference space X Common area for customers, staff, and equipment X Separate conference room X Centralized shared space X Small collaboration spaces X Shared small conference room X Shared large conference room Special requirements X Training room X Ideation room \ OPERATION SERVICES REAL ESTATE FUNCTION: Provide real estate services to other City departments.PLAN O/WDEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTH19 809 ALL (100%)60%115% 4% ALL (100%)60%115% 0% 5 336 202 232 6 403 242 278 6 Service Director PO-1 180 0 00000 000 Director/Department Head PO-2 140 0 00000 000 Division Head WS-1 80 1 80 48 55 1 96 58 66 1 Supervisor/Manager WS-2 64 0 00000 000 Staff - Typ WS-3 64 4 256 154 177 5 307 184 212 5 PTE/Intern/Temp/Volunteer WS-4 36 0 00000 000 Field/Crew WS-5 36 0 00000 000 746 6.0 493 488 489 7.0 496 490 491 7.0 SEE AUX.Coffee/Break/Café/Lounge FACTOR 207 0.00 5 0006 0 006 Storage/Files/Resource SET VALUE 443 480 1 480 480 480 1 480 480 480 1 Work/Copy FACTOR 96 0.04 0 13 8 9 0 16 10 11 0 305 0 0 0 0 00000 SEE AUX. Reception - Waiting SHARED/CS 305 000000 000 000000 000 000000 000 000000 000 ASF 1860 829 690 721 899 732 769 GSF (FACTOR - WALLS, MEP, COMMON , CIRCULATION)2131 55%1,508 1,254 1,311 1,635 1,330 1,399 STAFF 566 STAFF TOTAL SUPPORT TOTAL SPECIAL TOTAL OPT 1 OPT 2 OPT 3 ALL IN (PEOPLE)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)BUFFER (SQ. FT.)5-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)CURRENT RIGHT SIZE #/TYPESPACE STD. (SQ. FT.)SPACE STANDARD MPCURRENT ALL IN (SF)ALL IN (PEOPLE)NEED (SQ. FT.)SPACE STANDARD/TYPE BUFFER (SQ. FT.)CURRENT COUNTCURRENT (SQ. FT.)FACTOR/UTILIZATION RATEHYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) APPENDIX G.245 FORT COLLINS: MASTER PLAN ALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)ALL (100%)60%115% 3% ALL (100%)60%115% 2% ALL (100%)60%115% 2% ALL (100%)60%115% 2% ALL (100%)60%115% 403 242 278 7 470 282 325 8 526 316 363 9 589 354 407 10 660 396 455 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 96 58 66 1 112 67 77 2 125 75 86 2 140 84 97 2 157 94 108 0 0000 0000 0000 0000 00 307 184 212 6 358 215 247 6 401 241 277 7 449 269 310 8 502 301 347 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 496 490 491 8.0 499 491 493 8.8 501 493 495 9.8 504 494 496 10.8 506 496 498 0 007 0 008 0 009 0 0010 0 00 480 480 480 1 480 480 480 1 480 480 480 1 480 480 480 1 480 480 480 16 10 11 0 19 11 13 0 21 13 15 0 24 14 16 0 26 16 18 0000000000000000000 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 899 732 769 969 773 817 1,027 808 858 1,093 848 903 1,166 892 953 1,635 1,330 1,399 1,762 1,406 1,486 1,868 1,470 1,560 1,987 1,541 1,641 2,120 1,621 1,733 78910 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)ALL IN (SQ. FT.)ALL IN (SQ. FT.)10-YEAR 15-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)BUFFER (SQ. FT.)20-YEAR ALL IN (PEOPLE)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)25-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)30-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) G.246 APPENDIX NOVEMBER 2021 NEEDS: Office/work stations X Designated open work stations X Designated open offices Support spaces X Shared secured service counter X Secure storage ▷Equipment ▷Supplies Collaboration/conference space X Shared small to large conference room X Collaboration rooms X Touchdown spaces Special requirements X Centrally located spaces to interact with customers X Private/quiet areas Security X Security throughout area ▷Front of house meeting spaces Public/community engagement X Set back from building entrance ▷Still accessible to public \ PLANNING, DEVELOPMENT, TRANSPORTATION ADMINISTRATION FUNCTION: Provide administration and leadership for the entire PDT service area.PLAN O/WDEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTH20 686 ALL (100%)60%115% 5% ALL (100%)60%115% 0% 4 464 406 419 4 500 428 444 4 Service Director PO-1 180 1 180 180 180 1 180 180 180 1 Director/Department Head PO-2 140 1 140 140 140 1 140 140 140 1 Division Head WS-1 80 1 80 48 55 1 100 60 69 1 Supervisor/Manager WS-2 64 0 00000 000 Staff - Typ WS-3 64 1 64 38 44 1 80 48 55 1 PTE/Intern/Temp/Volunteer WS-4 36 0 00000 000 Field/Crew WS-5 36 0 00000 000 108 4.0 19 16 17 4.5 20 17 18 4.5 SEE AUX.Coffee/Break/Café/Lounge FACTOR 108 0.00 4 0004 0 004 Storage/Files/Resource SET VALUE 000 0000 0 000 Work/Copy FACTOR 0 0.04 0 19 16 17 0 20 17 18 0 0 000000000 000000 000 000000 000 000000 000 000000 000 ASF 794 483 423 436 520 445 462 GSF (FACTOR - WALLS, MEP, COMMON , CIRCULATION)856 55%877 768 793 945 809 840 STAFF 444 STAFF SUPPORT TOTAL SPECIAL TOTAL TOTAL OPT 1 OPT 2 OPT 3 ALL IN (PEOPLE)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)BUFFER (SQ. FT.)5-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)CURRENT RIGHT SIZE #/TYPESPACE STD. (SQ. FT.)SPACE STANDARD MPCURRENT ALL IN (SF)ALL IN (PEOPLE)NEED (SQ. FT.)SPACE STANDARD/TYPE BUFFER (SQ. FT.)CURRENT COUNTCURRENT (SQ. FT.)FACTOR/UTILIZATION RATEHYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) APPENDIX G.247 FORT COLLINS: MASTER PLAN ALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)ALL (100%)60%115% 0% ALL (100%)60%115% 3% ALL (100%)60%115% 3% ALL (100%)60%115% 3% ALL (100%)60%115% 500 428 444 4 500 428 444 5 527 444 463 5 558 463 484 6 593 484 508 180 180 180 1 180 180 180 1 180 180 180 1 180 180 180 1 180 180 180 140 140 140 1 140 140 140 1 140 140 140 1 140 140 140 1 140 140 140 100 60 69 1 100 60 69 1 115 69 79 2 132 79 91 2 152 91 105 0 0000 0000 0000 0000 00 80 48 55 1 80 48 55 1 92 55 63 2 106 63 73 2 121 73 84 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 20 17 18 4.5 20 17 18 4.9 21 18 19 5.3 22 19 19 5.8 24 19 20 0 004 0 005 0 005 0 006 0 00 0 000 0 000 0 000 0 000 0 00 20 17 18 0 20 17 18 0 21 18 19 0 22 19 19 0 24 19 20 0000000000000000000 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 520 445 462 520 445 462 548 462 481 580 481 503 617 503 529 945 809 840 945 809 840 996 840 875 1,054 875 915 1,122 915 961 4556 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)ALL IN (SQ. FT.)ALL IN (SQ. FT.)10-YEAR 15-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)BUFFER (SQ. FT.)20-YEAR ALL IN (PEOPLE)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)25-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)30-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) G.248 APPENDIX NOVEMBER 2021 NEEDS: Office/work stations X Individual offices X Dedicated work stations Support spaces X Centrally located spaces to interact with customers X Shared secured service counter X Copy/print room ▷On-site secured historic preservation files ▷Backlogged materials ▷Planning and zoning server room ▷Mediation and restorative justice ▷Neighborhood services ▷General storage ▷Supplies ▷Work rooms Collaboration/conference space X Shared small to large conference rooms X Collaboration rooms Special requirements X Employee wellness/morale space \ PLANNING, DEVELOPMENT, TRANSPORTATION COMMUNITY DEVELOPMENT NEIGH. SERVICES FUNCTION: Provide a variety of services and programming to promote quality neighborhoods.PLAN O/WGROWTHGROWTHHYBRIDGROWTH21 8507 ALL (100%)60%115% 0% ALL (100%)60%115% 4% 87 5476 3342 3822 89 5600 3416 3907 110 Service Director PO-1 180 0 00000 000 Director/Department Head PO-2 140 1 140 140 140 1 140 140 140 1 Division Head WS-1 80 7 560 336 386 7 573 344 395 9 Supervisor/Manager WS-2 64 7 448 269 309 7 458 275 316 9 Staff - Typ WS-3 64 62 3968 2381 2738 63 4060 2436 2801 78 PTE/Intern/Temp/Volunteer WS-4 36 4 144 86 99 4 147 88 102 5 Field/Crew WS-5 36 6 216 130 149 6 221 133 152 8 1380 88.0 1019 934 953 90.0 1024 937 956 110.8 SEE AUX.Coffee/Break/Café/Lounge FACTOR 193 0.00 87 00089 0 00110 Storage/Files/Resource SET VALUE 777 800 1 800 800 800 1 800 800 800 1 Work/Copy FACTOR 410 0.04 0 219 134 153 0 224 137 156 0 0 1 200 200 200 1 200 200 200 1 Additional Work/Copy 200 1 200 200 200 1 200 200 200 1 000000 000 000000 000 000000 000 ASF 9887 6,695 4,475 4,975 6,824 4,553 5,064 GSF (FACTOR - WALLS, MEP, COMMON , CIRCULATION)13046 55%12,173 8,137 9,045 12,407 8,277 9,207 STAFF 87 89 110 SPECIAL TOTAL TOTAL STAFF SUPPORT TOTAL OPT 1 OPT 2 OPT 3 ALL IN (PEOPLE)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)BUFFER (SQ. FT.)5-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)CURRENT RIGHT SIZE #/TYPESPACE STD. (SQ. FT.)SPACE STANDARD MPCURRENT ALL IN (SF)ALL IN (PEOPLE)NEED (SQ. FT.)SPACE STANDARD/TYPE BUFFER (SQ. FT.)CURRENT COUNTCURRENT (SQ. FT.)FACTOR/UTILIZATION RATEHYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) APPENDIX G.249 FORT COLLINS: MASTER PLAN Security X Secure storage ▷Equipment ▷Supplies X Security throughout buildings ▷Front of house meeting spaces Public/community engagement X Reviews for development and applicants X City board work sessions and hearings GROWTHHYBRIDGROWTHGROWTHHYBRIDGROWTHGROWTHHYBRIDGROWTHGROWTHHYBRIDGROWTHGROWTHHYBRIDALL (100%)60%115% 2% ALL (100%)60%115% 2% ALL (100%)60%115% 2% ALL (100%)60%115% 2% ALL (100%)60%115% 6889 4189 4797 119 7446 4524 5181 132 8262 5013 5744 147 9169 5558 6370 163 10178 6163 7066 0 0000 0000 0000 0000 00 140 140 140 1 140 140 140 1 140 140 140 1 140 140 140 1 140 140 140 708 425 489 10 767 460 529 11 852 511 588 12 948 569 654 13 1053 632 727 567 340 391 10 613 368 423 11 682 409 471 12 758 455 523 13 843 506 581 5019 3011 3463 85 5433 3260 3749 94 6040 3624 4168 105 6714 4029 4633 117 7464 4479 5150 182 109 126 5 197 118 136 6 219 132 151 7 244 146 168 8 271 163 187 273 164 189 8 296 177 204 9 329 197 227 10 366 219 252 11 406 244 280 1076 968 992 119.8 1098 981 1007 132.9 1130 1001 1030 147.5 1167 1022 1055 163.8 1207 1047 1083 0 00119 0 00132 0 00147 0 00163 0 00 800 800 800 1 800 800 800 1 800 800 800 1 800 800 800 1 800 800 800 276 168 192 0 298 181 207 0 330 201 230 0 367 222 255 0 407 247 283 200 200 200 1 200 200 200 1 200 200 200 1 200 200 200 1 200 200 200 200 200 200 1 200 200 200 1 200 200 200 1 200 200 200 1 200 200 200 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 8,164 5,357 5,989 8,744 5,705 6,389 9,593 6,214 6,974 10,536 6,780 7,625 11,585 7,409 8,349 14,844 9,740 10,888 15,898 10,372 11,616 17,441 11,298 12,680 19,157 12,327 13,864 21,063 13,471 15,179 119 132 147 163 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)ALL IN (SQ. FT.)ALL IN (SQ. FT.)10-YEAR 15-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)BUFFER (SQ. FT.)20-YEAR ALL IN (PEOPLE)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)25-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)30-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) G.250 APPENDIX NOVEMBER 2021 NEEDS: Office/work stations X Common office space Support spaces X Centrally located spaces to interact with customers X Shared secured service counter X Secure storage Collaboration/conference space X Conference room X Work rooms shared with other departments X Shared small to large conference rooms X Collaboration rooms X Front of house meeting spaces Special requirements X Parking and vehicle storage ▷Easily accessible for field inspectors Security X Security throughout buildings X Secure storage \ PLANNING, DEVELOPMENT, TRANSPORTATION ENGINEERING FUNCTION: Provides a full range of civil engineering services, with a primary focus on transportation infrastructure projects. From master planning, survey and design; to construction management, project inspection and asset management. Serves as the community’s right-of-way manager.PLAN O/WDEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTH22 4416 ALL (100%)60%115% 2% ALL (100%)60%115% 2% 38 2240 1400 1589 42 2461 1533 1741 46 Service Director PO-1 180 0 00000 000 Director/Department Head PO-2 140 1 140 140 140 1 140 140 140 1 Division Head WS-1 80 6 480 288 331 7 530 318 366 7 Supervisor/Manager WS-2 64 4 256 154 177 4 283 170 195 5 Staff - Typ WS-3 64 14 896 538 618 15 990 594 683 17 PTE/Intern/Temp/Volunteer WS-4 36 0 00000 000 Field/Crew WS-5 36 13 468 281 323 14 517 310 357 16 913 39.0 290 256 264 42.9 298 261 270 46.8 SEE AUX.Coffee/Break/Café/Lounge FACTOR 442 0.00 38 00042 0 0046 Storage/Files/Resource SET VALUE 218 200 1 200 200 200 1 200 200 200 1 Work/Copy FACTOR 253 0.04 0 90 56 64 0 98 61 70 0 476 2 250 250 250 2 250 250 250 2 Vault (File Room)353 200 1 200 200 200 1 200 200 200 1 SEE AUX. Reception - Waiting SHARED/CS 123 000000 000 Additional Work/Copy 50 1505050150 50 50 1 000000 000 ASF 5805 2,780 1,906 2,103 3,009 2,044 2,261 GSF (FACTOR - WALLS, MEP, COMMON , CIRCULATION)7397 55%5,054 3,465 3,823 5,471 3,716 4,111 STAFF 38 42 46 SUPPORT TOTAL SPECIAL TOTAL TOTAL STAFF OPT 1 OPT 2 OPT 3 ALL IN (PEOPLE)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)BUFFER (SQ. FT.)5-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)CURRENT RIGHT SIZE #/TYPESPACE STD. (SQ. FT.)SPACE STANDARD MPCURRENT ALL IN (SF)ALL IN (PEOPLE)NEED (SQ. FT.)SPACE STANDARD/TYPE BUFFER (SQ. FT.)CURRENT COUNTCURRENT (SQ. FT.)FACTOR/UTILIZATION RATEHYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) APPENDIX G.251 FORT COLLINS: MASTER PLAN Public/community engagement X Coordination with public and consultants X Development reviews ALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)ALL (100%)60%115% 2% ALL (100%)60%115% 2% ALL (100%)60%115% 2% ALL (100%)60%115% 2% ALL (100%)60%115% 2682 1665 1894 51 2959 1832 2085 56 3257 2010 2291 62 3587 2208 2518 68 3951 2427 2770 0 0000 0000 0000 0000 00 140 140 140 1 140 140 140 1 140 140 140 1 140 140 140 1 140 140 140 581 349 401 8 644 387 445 9 713 428 492 10 788 473 544 11 871 523 601 310 186 214 5 344 206 237 6 380 228 262 7 420 252 290 7 465 279 321 1085 651 748 19 1203 722 830 21 1330 798 918 23 1471 882 1015 25 1626 976 1122 0 0000 0000 0000 0000 00 567 340 391 17 628 377 434 19 695 417 479 21 768 461 530 24 849 510 586 307 267 276 51.7 318 273 283 56.9 330 280 292 62.7 343 288 301 69.2 358 297 311 0 0051 0 0056 0 0062 0 0068 0 00 200 200 200 1 200 200 200 1 200 200 200 1 200 200 200 1 200 200 200 107 67 76 0 118 73 83 0 130 80 92 0 143 88 101 0 158 97 111 250 250 250 2 250 250 250 2 250 250 250 2 250 250 250 2 250 250 250 200 200 200 1 200 200 200 1 200 200 200 1 200 200 200 1 200 200 200 0 0000 0000 0000 0000 00 50 50 50 1 50 50 50 1 50 50 50 1 50 50 50 1 50 50 50 0 0000 0000 0000 0000 00 3,240 2,182 2,420 3,528 2,355 2,619 3,838 2,541 2,833 4,180 2,746 3,069 4,559 2,974 3,331 5,890 3,967 4,400 6,414 4,282 4,761 6,978 4,620 5,150 7,601 4,994 5,580 8,290 5,407 6,056 51 56 62 68 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)ALL IN (SQ. FT.)ALL IN (SQ. FT.)10-YEAR 15-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)BUFFER (SQ. FT.)20-YEAR ALL IN (PEOPLE)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)25-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)30-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) G.252 APPENDIX NOVEMBER 2021 NEEDS: Office/work stations X Private office space ▷Managers ▷Supervisors X Quiet private spaces X Hot seat hybrid spaces ▷Intern spaces ▷PTEs ▷Collaboration/conference spaces ▷Boards & Commissions ▷Staff meetings ▷Internal and external partners ▷Hosting classes Support spaces X Secure storage ▷Equipment ▷Supplies X Shared secured service counter X Large storage space X Small closet X Work rooms/copy/print X Break room \ PLANNING, DEVELOPMENT, TRANSPORTATION FC MOVES FUNCTION: Responsible for bicycle program, safe routes to school and transportation planning.PLAN O/WDEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTH23 1045 ALL (100%)60%115% 5% ALL (100%)60%115% 1% 12 788 529 587 15 950 626 699 16 Service Director PO-1 180 0 00000 000 Director/Department Head PO-2 140 1 140 140 140 1 140 140 140 1 Division Head WS-1 80 0 00000 000 Supervisor/Manager WS-2 64 3 192 115 132 4 240 144 166 4 Staff - Typ WS-3 64 6 384 230 265 7 480 288 331 8 PTE/Intern/Temp/Volunteer WS-4 36 2 72 43 50 2 90 54 62 3 Field/Crew WS-5 36 0 00000 000 387 13.0 232 221 223 15.7 238 225 228 16.7 SEE AUX.Coffee/Break/Café/Lounge FACTOR 0 0.00 12 00015 0 0016 Storage/Files/Resource SET VALUE 272 200 1 200 200 200 1 200 200 200 1 Work/Copy FACTOR 115 0.04 0 32 21 23 0 38 25 28 0 0 1 180 180 180 1 180 180 180 1 SEE AUX. Storage/dock space/general receiving 0 0 0 0 0 0 000 Additional Work Room 180 1 180 180 180 1 180 180 180 1 000000 000 000000 000 ASF 1432 1,200 930 991 1,368 1,031 1,107 GSF (FACTOR - WALLS, MEP, COMMON , CIRCULATION)1851 55%2,181 1,691 1,801 2,487 1,874 2,012 STAFF 12 15 16 SPECIAL TOTAL SUPPORT TOTAL TOTAL STAFF OPT 1 OPT 2 OPT 3 ALL IN (PEOPLE)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)BUFFER (SQ. FT.)5-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)CURRENT RIGHT SIZE #/TYPESPACE STD. (SQ. FT.)SPACE STANDARD MPCURRENT ALL IN (SF)ALL IN (PEOPLE)NEED (SQ. FT.)SPACE STANDARD/TYPE BUFFER (SQ. FT.)CURRENT COUNTCURRENT (SQ. FT.)FACTOR/UTILIZATION RATEHYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) APPENDIX G.253 FORT COLLINS: MASTER PLAN Collaboration/conference space X Team work/collaborative spaces X Centrally located spaces to interact with customers X Shared small to large conference rooms X Collaboration rooms ▷Small-medium ▷Medium ▷Large X Front of house meeting spaces Special requirements X Event staging Security X Security throughout building X FOB access ALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)ALL (100%)60%115% 4% ALL (100%)60%115% 3% ALL (100%)60%115% 3% ALL (100%)60%115% 3% ALL (100%)60%115% 1004 658 736 19 1171 759 851 22 1356 869 979 25 1573 1000 1129 30 1830 1154 1306 0 0000 0000 0000 0000 00 140 140 140 1 140 140 140 1 140 140 140 1 140 140 140 1 140 140 140 0 0000 0000 0000 0000 00 256 154 177 5 305 183 211 6 360 216 249 7 425 255 293 8 501 300 346 512 307 353 10 611 367 422 11 720 432 497 13 849 510 586 16 1002 601 691 96 58 66 3 115 69 79 4 135 81 93 4 159 96 110 5 188 113 130 0 0000 0000 0000 0000 00 240 226 229 19.5 247 230 234 22.6 254 235 239 26.3 263 240 245 30.7 273 246 252 0 0019 0 0022 0 0025 0 0030 0 00 200 200 200 1 200 200 200 1 200 200 200 1 200 200 200 1 200 200 200 40 26 29 0 47 30 34 0 54 35 39 0 63 40 45 0 73 46 52 180 180 180 1 180 180 180 1 180 180 180 1 180 180 180 1 180 180 180 0 0000 0000 0000 0000 00 180 180 180 1 180 180 180 1 180 180 180 1 180 180 180 1 180 180 180 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 1,424 1,065 1,146 1,598 1,169 1,265 1,790 1,284 1,398 2,016 1,420 1,554 2,283 1,580 1,738 2,589 1,936 2,083 2,905 2,125 2,301 3,254 2,335 2,542 3,666 2,582 2,826 4,151 2,873 3,161 19 22 25 30 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)ALL IN (SQ. FT.)ALL IN (SQ. FT.)10-YEAR 15-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)BUFFER (SQ. FT.)20-YEAR ALL IN (PEOPLE)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)25-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)30-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) G.254 APPENDIX NOVEMBER 2021 NEEDS: Office/work stations X Drop in spaces for staff X Bull pen X Cubicles for Admin, IT support, & Marketing Support spaces X Shared secured service counter X Centrally located spaces to interact with customers X Secure storage ▷Equipment ▷Supplies X Storage spaces ▷Office supplies ▷Court files ▷Tools & spare equipment ▷Locker storage Collaboration/conference space X Shared small to large conference rooms X Front of house meeting spaces Special requirements X Parking & pool cars \ PLANNING, DEVELOPMENT, TRANSPORTATION PARKING SERVICES/TRANSFORT FUNCTION: Customer contact for permit issuance and traffic code citation payment & processing; including navigation of Municipal Court process.PLAN O/WDEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTH24 1470 ALL (100%)60%115% -3% ALL (100%)60%115% 0% 30 1460 876 1007 26 1265 759 873 26 Service Director PO-1 180 0 00000 000 Director/Department Head PO-2 140 0 00000 000 Division Head WS-1 80 1 80 48 55 1 69 42 48 1 Supervisor/Manager WS-2 64 3 192 115 132 3 166 100 115 3 Staff - Typ WS-3 64 9 576 346 397 8 499 300 344 8 PTE/Intern/Temp/Volunteer WS-4 36 0 00000 000 Field/Crew WS-5 36 17 612 367 422 15 530 318 366 15 389 31.0 258 235 240 27.0 251 230 235 27.0 SEE AUX.Coffee/Break/Café/Lounge FACTOR 169 0.00 30 00026 0 0026 Storage/Files/Resource SET VALUE 140 200 1 200 200 200 1 200 200 200 1 Work/Copy FACTOR 80 0.04 0 58 35 40 0 51 30 35 0 758 1 250 250 250 1 250 250 250 1 Locker Room 222 250 1 250 250 250 1 250 250 250 1 SEE AUX. Reception - Waiting SHARED/CS 536 000000 000 000000 000 000000 000 ASF 2617 1,968 1,361 1,498 1,766 1,240 1,358 GSF (FACTOR - WALLS, MEP, COMMON , CIRCULATION)3619 55%3,579 2,475 2,723 3,211 2,254 2,469 STAFF 30 26 26 TOTAL SUPPORT TOTAL SPECIAL TOTAL STAFF OPT 1 OPT 2 OPT 3 ALL IN (PEOPLE)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)BUFFER (SQ. FT.)5-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)CURRENT RIGHT SIZE #/TYPESPACE STD. (SQ. FT.)SPACE STANDARD MPCURRENT ALL IN (SF)ALL IN (PEOPLE)NEED (SQ. FT.)SPACE STANDARD/TYPE BUFFER (SQ. FT.)CURRENT COUNTCURRENT (SQ. FT.)FACTOR/UTILIZATION RATEHYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) APPENDIX G.255 FORT COLLINS: MASTER PLAN ▷Indoor secured parking ▷EV chargers ▷Indoor storage for PEO vehicles Security X Security throughout building ▷Full ballistic glass & window tinting ▷Ballistic exterior glass ▷Security buttons ▷Dual points of exit ▷Secured identified shelter Public/community engagement X Live in-field interactions X Service of citations X Additional translation service ALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)ALL (100%)60%115% 1% ALL (100%)60%115% 1% ALL (100%)60%115% 1% ALL (100%)60%115% 1% ALL (100%)60%115% 1265 759 873 27 1297 778 895 27 1330 798 918 28 1364 818 941 29 1398 839 965 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 69 42 48 1 71 43 49 1 73 44 50 1 75 45 52 1 77 46 53 166 100 115 3 171 102 118 3 175 105 121 3 179 108 124 3 184 110 127 499 300 344 8 512 307 353 8 525 315 362 8 538 323 371 9 552 331 381 0 0000 0000 0000 0000 00 530 318 366 15 544 326 375 15 558 335 385 16 572 343 394 16 586 352 404 251 230 235 27.7 252 231 236 28.3 253 232 237 29.0 255 233 238 29.7 256 234 239 0 0027 0 0027 0 0028 0 0029 0 00 200 200 200 1 200 200 200 1 200 200 200 1 200 200 200 1 200 200 200 51 30 35 0 52 31 36 0 53 32 37 0 55 33 38 0 56 34 39 250 250 250 1 250 250 250 1 250 250 250 1 250 250 250 1 250 250 250 250 250 250 1 250 250 250 1 250 250 250 1 250 250 250 1 250 250 250 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 1,766 1,240 1,358 1,799 1,260 1,381 1,833 1,280 1,405 1,868 1,301 1,429 1,904 1,322 1,453 3,211 2,254 2,469 3,271 2,290 2,511 3,333 2,327 2,554 3,397 2,365 2,597 3,462 2,404 2,642 27 27 28 29 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)ALL IN (SQ. FT.)ALL IN (SQ. FT.)10-YEAR 15-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)BUFFER (SQ. FT.)20-YEAR ALL IN (PEOPLE)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)25-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)30-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) G.256 APPENDIX NOVEMBER 2021 NEEDS: Office/work stations X Private touchdown spaces Support spaces X Private phone rooms Collaboration/conference space X Large meeting space X Smaller/ad-hoc gathering spaces X Conference rooms X Easy access for external users X After hours meeting spaces X Hybrid capable Security X Security related to after hours meetings Public/community engagement X Large gathering spaces to include community members and local leaders X Childcare space \ SUSTAINABILITY SERVICES ADMINISTRATION FUNCTION: Support the Sustainability Services Area/SSA (Environmental Services/ESD, Economic Health/EHO, Social Sustainability/SSD).PLAN O/WDEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTH25 342 ALL (100%)60%115% 5% ALL (100%)60%115% 4% 4 372 295 312 5 420 324 346 6 Service Director PO-1 180 1 180 180 180 1 180 180 180 1 Director/Department Head PO-2 140 0 00000 000 Division Head WS-1 80 0 00000 000 Supervisor/Manager WS-2 64 1 64 38 44 1 80 48 55 2 Staff - Typ WS-3 64 2 128 77 88 2 160 96 110 3 PTE/Intern/Temp/Volunteer WS-4 36 0 00000 000 Field/Crew WS-5 36 0 00000 000 0 4.0 15 12 12 4.7 17 13 14 5.5 SEE AUX.Coffee/Break/Café/Lounge FACTOR 0 0.00 4 0005 0 006 Storage/Files/Resource SET VALUE 000 0000 0 000 Work/Copy FACTOR 0 0.04 0 15 12 12 0 17 13 14 0 0 000000000 000000 000 000000 000 000000 000 000000 000 ASF 342 387 307 325 437 337 359 GSF (FACTOR - WALLS, MEP, COMMON , CIRCULATION)495 55%703 558 591 794 613 653 STAFF 456 SUPPORT TOTAL SPECIAL TOTAL TOTALS STAFF OPT 1 OPT 2 OPT 3 ALL IN (PEOPLE)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)BUFFER (SQ. FT.)5-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)CURRENT RIGHT SIZE #/TYPESPACE STD. (SQ. FT.)SPACE STANDARD MPCURRENT ALL IN (SF)ALL IN (PEOPLE)NEED (SQ. FT.)SPACE STANDARD/TYPE BUFFER (SQ. FT.)CURRENT COUNTCURRENT (SQ. FT.)FACTOR/UTILIZATION RATEHYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) APPENDIX G.257 FORT COLLINS: MASTER PLAN ALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)ALL (100%)60%115% 0% ALL (100%)60%115% 4% ALL (100%)60%115% 4% ALL (100%)60%115% 4% ALL (100%)60%115% 468 353 379 6 468 353 379 6 522 385 416 7 586 424 460 9 663 470 513 180 180 180 1 180 180 180 1 180 180 180 1 180 180 180 1 180 180 180 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 96 58 66 2 96 58 66 2 114 68 79 2 135 81 93 3 161 97 111 192 115 132 3 192 115 132 4 228 137 157 4 271 163 187 5 322 193 222 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 19 14 15 5.5 19 14 15 6.3 21 15 17 7.3 23 17 18 8.5 27 19 21 0 006 0 006 0 007 0 009 0 00 0 000 0 000 0 000 0 000 0 00 19 14 15 0 19 14 15 0 21 15 17 0 23 17 18 0 27 19 21 0000000000000000000 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 487 367 394 487 367 394 543 401 433 610 441 479 689 488 533 885 667 716 885 667 716 987 728 787 1,109 801 870 1,253 888 970 6679 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)ALL IN (SQ. FT.)ALL IN (SQ. FT.)10-YEAR 15-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)BUFFER (SQ. FT.)20-YEAR ALL IN (PEOPLE)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)25-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)30-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) G.258 APPENDIX NOVEMBER 2021 NEEDS: Office/work stations X Team work rooms Support spaces X Central file storage X Private phone rooms X Storage for catering/event/community meetings and education supplies Collaboration/conference space X Formal conference/meeting room with outside business/customers X Informal gathering/collaboration space X Breakout space X Community room Special requirements X Display areas for information on services and accomplishments Security X Security related to after hours meetings Public/community engagement X Individual private meetings X Large board meeting X Business engagements \ SUSTAINABILITY SERVICES ECONOMIC HEALTH FUNCTION: Provide business support, manage the urban renewal authority, and talent/workforce development in the community (Economic Development).PLAN O/WDEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTH26 639 ALL (100%)60%115% 5% ALL (100%)60%115% 4% 9 684 466 515 11 820 548 609 13 Service Director PO-1 180 0 00000 000 Director/Department Head PO-2 140 1 140 140 140 1 140 140 140 1 Division Head WS-1 80 2 160 96 110 2 200 120 138 3 Supervisor/Manager WS-2 64 0 00000 000 Staff - Typ WS-3 64 6 384 230 265 7 480 288 331 9 PTE/Intern/Temp/Volunteer WS-4 36 0 00000 000 Field/Crew WS-5 36 0 00000 000 77 9.0 27 19 21 11.0 33 22 24 13.0 SEE AUX.Coffee/Break/Café/Lounge FACTOR 46 0.00 9 00011 0 0013 Storage/Files/Resource SET VALUE 000 0000 0 000 Work/Copy FACTOR 31 0.04 0 27 19 21 0 33 22 24 0 0 000000000 000000 000 000000 000 000000 000 000000 000 ASF 716 711 485 536 853 570 633 GSF (FACTOR - WALLS, MEP, COMMON , CIRCULATION)1105 55%1,293 882 974 1,550 1,036 1,152 STAFF 91113 TOTAL SUPPORT TOTAL SPECIAL TOTAL STAFF OPT 1 OPT 2 OPT 3 ALL IN (PEOPLE)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)BUFFER (SQ. FT.)5-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)CURRENT RIGHT SIZE #/TYPESPACE STD. (SQ. FT.)SPACE STANDARD MPCURRENT ALL IN (SF)ALL IN (PEOPLE)NEED (SQ. FT.)SPACE STANDARD/TYPE BUFFER (SQ. FT.)CURRENT COUNTCURRENT (SQ. FT.)FACTOR/UTILIZATION RATEHYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) APPENDIX G.259 FORT COLLINS: MASTER PLAN ALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)ALL (100%)60%115% 3% ALL (100%)60%115% 4% ALL (100%)60%115% 4% ALL (100%)60%115% 4% ALL (100%)60%115% 956 629 703 15 1092 711 797 18 1287 828 931 21 1522 969 1093 25 1805 1139 1289 0 0000 0000 0000 0000 00 140 140 140 1 140 140 140 1 140 140 140 1 140 140 140 1 140 140 140 240 144 166 3 280 168 193 4 337 202 233 5 406 244 280 6 490 294 338 0 0000 0000 0000 0000 00 576 345 397 10 672 403 463 13 809 486 559 15 975 585 673 18 1175 705 811 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 38 25 28 15.0 44 28 32 17.9 51 33 37 21.3 61 39 44 25.5 72 46 52 0 0015 0 0018 0 0021 0 0025 0 00 0 000 0 000 0 000 0 000 0 00 38 25 28 0 44 28 32 0 51 33 37 0 61 39 44 0 72 46 52 0000000000000000000 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 994 655 731 1,135 739 828 1,338 861 968 1,583 1,008 1,137 1,877 1,185 1,340 1,807 1,190 1,329 2,064 1,344 1,506 2,433 1,566 1,761 2,877 1,832 2,068 3,413 2,154 2,437 15 18 21 25 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)ALL IN (SQ. FT.)ALL IN (SQ. FT.)10-YEAR 15-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)BUFFER (SQ. FT.)20-YEAR ALL IN (PEOPLE)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)25-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)30-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) G.260 APPENDIX NOVEMBER 2021 NEEDS: Office/work stations X Shared/open workspace X User-friendly cubicles Support spaces X Large storage spaces ▷Catering/event/community meeting material ▷Education supplies X Private phone rooms X Easy access for external participants Collaboration/conference space X Large conference spaces X Collaboration spaces Special requirements X Marketing/program material display space X Outdoor bike storage shelter X Small display area Security X Security related to after hours meetings \ SUSTAINABILITY SERVICES ENVIRONMENTAL SUSTAINABILITY FUNCTION: Provides programs, data and policy to address air quality, climate action, municipal sustainability and waste reduction.PLAN O/WDEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTH27 1148 ALL (100%)60%115% 5% ALL (100%)60%115% 6% 21 1300 836 940 26 1590 1010 1140 34 Service Director PO-1 180 0 00000 000 Director/Department Head PO-2 140 1 140 140 140 1 140 140 140 1 Division Head WS-1 80 3 240 144 166 4 300 180 207 5 Supervisor/Manager WS-2 64 0 00000 000 Staff - Typ WS-3 64 11 704 422 486 14 880 528 607 18 PTE/Intern/Temp/Volunteer WS-4 36 5 180 108 124 6 225 135 155 8 Field/Crew WS-5 36 1 36 22 25 1 45 27 31 2 156 22.0 302 283 288 27.0 314 290 296 35.0 SEE AUX.Coffee/Break/Café/Lounge FACTOR 47 0.00 21 00026 0 0034 Storage/Files/Resource SET VALUE 78 250 1 250 250 250 1 250 250 250 1 Work/Copy FACTOR 31 0.04 0 52 33 38 0 64 40 46 0 0 000000000 000000 000 000000 000 000000 000 000000 000 ASF 1304 1,602 1,119 1,228 1,903 1,300 1,436 GSF (FACTOR - WALLS, MEP, COMMON , CIRCULATION)2122 55%2,913 2,035 2,233 3,461 2,364 2,611 STAFF 21 26 34 SUPPORT TOTAL SPECIAL TOTAL TOTAL STAFF OPT 1 OPT 2 OPT 3 ALL IN (PEOPLE)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)BUFFER (SQ. FT.)5-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)CURRENT RIGHT SIZE #/TYPESPACE STD. (SQ. FT.)SPACE STANDARD MPCURRENT ALL IN (SF)ALL IN (PEOPLE)NEED (SQ. FT.)SPACE STANDARD/TYPE BUFFER (SQ. FT.)CURRENT COUNTCURRENT (SQ. FT.)FACTOR/UTILIZATION RATEHYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) APPENDIX G.261 FORT COLLINS: MASTER PLAN ALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)ALL (100%)60%115% 2% ALL (100%)60%115% 3% ALL (100%)60%115% 3% ALL (100%)60%115% 3% ALL (100%)60%115% 2054 1288 1460 37 2228 1393 1581 43 2561 1592 1810 49 2946 1824 2076 57 3393 2092 2385 0 0000 0000 0000 0000 00 140 140 140 1 140 140 140 1 140 140 140 1 140 140 140 1 140 140 140 396 238 273 5 432 259 298 6 501 300 346 7 581 348 401 8 673 404 464 0 0000 0000 0000 0000 00 1161 697 801 20 1267 760 874 23 1469 881 1014 27 1703 1022 1175 31 1974 1185 1362 297 178 205 9 324 194 224 10 376 225 259 12 435 261 300 14 505 303 348 59 36 41 2 65 39 45 2 75 45 52 2 87 52 60 3 101 61 70 332 302 308 38.0 339 306 313 43.7 352 314 322 50.4 368 323 333 58.1 386 334 345 0 0037 0 0043 0 0049 0 0057 0 00 250 250 250 1 250 250 250 1 250 250 250 1 250 250 250 1 250 250 250 82 52 58 0 89 56 63 0 102 64 72 0 118 73 83 0 136 84 95 0000000000000000000 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 2,386 1,590 1,769 2,567 1,699 1,894 2,913 1,906 2,133 3,314 2,147 2,409 3,779 2,426 2,730 4,338 2,890 3,216 4,668 3,088 3,444 5,297 3,466 3,878 6,026 3,903 4,381 6,871 4,410 4,964 37 43 49 57 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)ALL IN (SQ. FT.)ALL IN (SQ. FT.)10-YEAR 15-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)BUFFER (SQ. FT.)20-YEAR ALL IN (PEOPLE)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)25-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)30-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) G.262 APPENDIX NOVEMBER 2021 NEEDS: Office/work stations X Acoustically sound closed offices X Movable furniture Support spaces X Confidential file storage X Reception/waiting area for walk-in customers X Copy room X Lunchroom/kitchen Collaboration/conference space X Team work rooms X Collaboration spaces X Small meeting spaces X Quiet room Security X Security related to after hours meetings Public/community engagement X Community service provider meetings X Other partner meetings X Trainings, technical assistance, workshops \ SUSTAINABILITY SERVICES SOCIAL SUSTAINABILITY FUNCTION: Housing, homelessness, human services, equity & inclusion, and HUD funded items.PLAN O/WDEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTH28 880 ALL (100%)60%115% 4% ALL (100%)60%115% 5% 11 752 507 562 13 874 581 647 16 Service Director PO-1 180 0 00000 000 Director/Department Head PO-2 140 1 140 140 140 1 140 140 140 1 Division Head WS-1 80 0 00000 000 Supervisor/Manager WS-2 64 3 192 115 132 4 230 138 159 4 Staff - Typ WS-3 64 6 384 230 265 7 461 276 318 9 PTE/Intern/Temp/Volunteer WS-4 36 1 36 22 25 1 43 26 30 1 Field/Crew WS-5 36 0 00000 000 296 12.0 230 220 222 14.0 235 223 226 17.0 SEE AUX.Coffee/Break/Café/Lounge FACTOR 48 0.00 11 00013 0 0016 Storage/Files/Resource SET VALUE 217 200 1 200 200 200 1 200 200 200 1 Work/Copy FACTOR 31 0.04 0 30 20 22 0 35 23 26 0 0 000000000 000000 000 000000 000 000000 000 000000 000 ASF 1176 982 727 785 1,109 804 873 GSF (FACTOR - WALLS, MEP, COMMON , CIRCULATION)1701 55%1,786 1,323 1,427 2,017 1,461 1,586 STAFF 11 13 16 SPECIAL TOTAL TOTAL SUPPORT TOTAL STAFF OPT 1 OPT 2 OPT 3 ALL IN (PEOPLE)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)BUFFER (SQ. FT.)5-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)CURRENT RIGHT SIZE #/TYPESPACE STD. (SQ. FT.)SPACE STANDARD MPCURRENT ALL IN (SF)ALL IN (PEOPLE)NEED (SQ. FT.)SPACE STANDARD/TYPE BUFFER (SQ. FT.)CURRENT COUNTCURRENT (SQ. FT.)FACTOR/UTILIZATION RATEHYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) APPENDIX G.263 FORT COLLINS: MASTER PLAN ALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)ALL (100%)60%115% 4% ALL (100%)60%115% 4% ALL (100%)60%115% 4% ALL (100%)60%115% 4% ALL (100%)60%115% 1058 691 773 19 1241 801 900 23 1480 944 1064 28 1770 1118 1265 33 2123 1330 1508 0 0000 0000 0000 0000 00 140 140 140 1 140 140 140 1 140 140 140 1 140 140 140 1 140 140 140 0 0000 0000 0000 0000 00 288 173 199 5 345 207 238 7 420 252 290 8 511 307 353 10 622 373 429 576 345 397 11 691 414 477 13 840 504 580 16 1023 614 706 19 1244 746 858 54 32 37 2 65 39 45 2 79 47 54 3 96 58 66 3 117 70 80 0 0000 0000 0000 0000 00 242 228 231 20.0 250 232 236 23.9 259 238 243 28.6 271 245 251 34.4 285 253 260 0 0019 0 0023 0 0028 0 0033 0 00 200 200 200 1 200 200 200 1 200 200 200 1 200 200 200 1 200 200 200 42 28 31 0 50 32 36 0 59 38 43 0 71 45 51 0 85 53 60 0000000000000000000 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 1,300 918 1,004 1,491 1,033 1,136 1,739 1,181 1,307 2,041 1,363 1,515 2,408 1,583 1,768 2,364 1,669 1,826 2,710 1,877 2,065 3,161 2,148 2,376 3,710 2,477 2,755 4,378 2,878 3,215 19 23 28 33 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)ALL IN (SQ. FT.)ALL IN (SQ. FT.)10-YEAR 15-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)BUFFER (SQ. FT.)20-YEAR ALL IN (PEOPLE)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)25-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)30-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) G.264 APPENDIX NOVEMBER 2021 \ UTILITIES CUSTOMER CONNECTIONS - CUSTOMER ACCOUNTS NEEDS: Office/work stations X Dedicated office X Cubicles work for collaboration Support spaces X Bill processing, supplies, equipment storage X Break room Collaboration/conference space X Stand up meeting space X Small to large conference rooms X Dedicated customer meeting space X Private rooms for calls FUNCTION: Supports the 6000+ businesses within the utilities service areas including Key Accounts and mid and small sized commercial accounts. CUSTOMER CONNECTIONS - CUSTOMER CARE + TECHNOLOGY NEEDS: Office/work stations X Individual work stations Support spaces X Bill processing, supplies, equipment storage Collaboration/conference space X Small confidential meeting room/alcoves X Small conference rooms FUNCTION: Utilities customer care: starting service through billing, payments and accounts receivable.PLAN O/WDEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTH29 6202 ALL (100%)60%115% 5% ALL (100%)60%115% 2% 71 4824 3190 3558 90 6000 3896 4369 99 Service Director PO-1 180 1 180 180 180 1 180 180 180 1 Director/Department Head PO-2 140 4 560 560 560 4 560 560 560 4 Division Head WS-1 80 0 00000 000 Supervisor/Manager WS-2 64 7 448 269 309 9 577 346 398 10 Staff - Typ WS-3 64 54 3456 2074 2385 70 4451 2671 3071 77 PTE/Intern/Temp/Volunteer WS-4 36 5 180 108 124 6 232 139 160 7 Field/Crew WS-5 36 0 00000 000 1334 72.0 693 628 642 91.0 740 656 675 100.0 SEE AUX.Coffee/Break/Café/Lounge FACTOR 563 0.00 71 00090 0 0099 Storage/Files/Resource SET VALUE 495 500 1 500 500 500 1 500 500 500 1 Work/Copy FACTOR 276 0.04 0 193 128 142 0 240 156 175 0 1184 5 930 930 930 5 930 930 930 5 CE Mud Room 229 230 1 230 230 230 1 230 230 230 1 CC&T Training 248 320 1 320 320 320 1 320 320 320 1 SEE AUX. Reception - Waiting SHARED/CS 335 000000 000 CC&T Secure Print 99 100 1 100 100 100 1 100 100 100 1 CC&T Additional Work Area 100 100 1 100 100 100 1 100 100 100 1 C&M Additional Work Area 173 180 1 180 180 180 1 180 180 180 1 ASF 8720 6,447 4,748 5,130 7,670 5,482 5,974 GSF (FACTOR - WALLS, MEP, COMMON , CIRCULATION)12490 55%11,722 8,633 9,328 13,945 9,967 10,862 STAFF 71 90 99 SUPPORT TOTAL SPECIAL TOTAL TOTAL STAFF OPT 1 OPT 2 OPT 3 ALL IN (PEOPLE)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)BUFFER (SQ. FT.)5-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)CURRENT RIGHT SIZE #/TYPESPACE STD. (SQ. FT.)SPACE STANDARD MPCURRENT ALL IN (SF)ALL IN (PEOPLE)NEED (SQ. FT.)SPACE STANDARD/TYPE BUFFER (SQ. FT.)CURRENT COUNTCURRENT (SQ. FT.)FACTOR/UTILIZATION RATEHYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) APPENDIX G.265 FORT COLLINS: MASTER PLAN CUSTOMER CONNECTIONS - COMMUNITY ENGAGEMENT NEEDS: Office/work stations X Dedicated offices X Acoustical sound work stations Support spaces X Storage spaces Collaboration/conference space X Small and large conference rooms Special requirements X Pool car parking X Area to load can/cars FUNCTION: Coordinates opportunities to ensure the successful and cost effective use of rate-payer funding through interactions with external stakeholders using expanded tools and techniques. CUSTOMER CONNECTIONS - COMMUNICATIONS + MARKETING NEEDS: Office/work stations X Dedicated office X Private cubicle stations Support spaces X Quiet spaces Collaboration/conference space X Small collaborative spaces X Large meeting rooms FUNCTION: Provides support for all Utilities service units, collaborative marketing efforts with other departments on projects and general City initiatives.ALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)ALL (100%)60%115% 1% ALL (100%)60%115% 3% ALL (100%)60%115% 3% ALL (100%)60%115% 3% ALL (100%)60%115% 6556 4229 4753 103 6804 4378 4924 117 7665 4895 5518 133 8648 5485 6196 151 9770 6158 6971 180 180 180 1 180 180 180 1 180 180 180 1 180 180 180 1 180 180 180 560 560 560 4 560 560 560 4 560 560 560 4 560 560 560 4 560 560 560 0 0000 0000 0000 0000 00 638 383 440 10 665 399 459 12 760 456 524 14 867 520 599 15 991 594 683 4921 2953 3396 80 5132 3079 3541 92 5860 3516 4043 105 6692 4015 4617 119 7641 4585 5273 256 154 177 7 267 160 184 8 305 183 211 10 349 209 240 11 398 239 275 0 0000 0000 0000 0000 00 762 669 690 104.0 772 675 697 117.9 807 696 721 133.8 846 719 748 151.9 891 746 779 0 00103 0 00117 0 00133 0 00151 0 00 500 500 500 1 500 500 500 1 500 500 500 1 500 500 500 1 500 500 500 262 169 190 0 272 175 197 0 307 196 221 0 346 219 248 0 391 246 279 930 930 930 5 930 930 930 5 930 930 930 5 930 930 930 5 930 930 930 230 230 230 1 230 230 230 1 230 230 230 1 230 230 230 1 230 230 230 320 320 320 1 320 320 320 1 320 320 320 1 320 320 320 1 320 320 320 0 0000 0000 0000 0000 00 100 100 100 1 100 100 100 1 100 100 100 1 100 100 100 1 100 100 100 100 100 100 1 100 100 100 1 100 100 100 1 100 100 100 1 100 100 100 180 180 180 1 180 180 180 1 180 180 180 1 180 180 180 1 180 180 180 8,248 5,829 6,373 8,506 5,984 6,551 9,401 6,521 7,169 10,423 7,134 7,874 11,591 7,834 8,679 14,996 10,597 11,587 15,466 10,879 11,911 17,093 11,856 13,034 18,952 12,971 14,316 21,074 14,244 15,781 103 117 133 151 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)ALL IN (SQ. FT.)ALL IN (SQ. FT.)10-YEAR 15-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)BUFFER (SQ. FT.)20-YEAR ALL IN (PEOPLE)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)25-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)30-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) G.266 APPENDIX NOVEMBER 2021 NEEDS: Office/work stations X Focused on increased productivity X Privacy X Hybrid approach Support spaces X Shared copy/print room X Outdoor spaces Collaboration/conference space X Small meeting rooms on first floor X Small conference room X Large conference room Public/community engagement X In field at customer sites \ UTILITIES CUSTOMER CONNECTIONS - ENERGY SERVICES FUNCTION: Designs, implements, and evaluates the City’s energy efficiency and conservation programs to track program effectiveness and progress towards meeting the goals of the Energy Policy and Climate Action Plan.PLAN O/WDEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTH30 771 ALL (100%)60%115% 2% ALL (100%)60%115% 0% 11 692 415 477 12 750 450 517 12 Service Director PO-1 180 0 00000 000 Director/Department Head PO-2 140 0 00000 000 Division Head WS-1 80 1 80 48 55 1 87 52 60 1 Supervisor/Manager WS-2 64 1 64 38 44 1 69 42 48 1 Staff - Typ WS-3 64 8 512 307 353 9 555 333 383 9 PTE/Intern/Temp/Volunteer WS-4 36 1 36 22 25 1 39 23 27 1 Field/Crew WS-5 36 0 00000 000 304 12.0 188 177 179 12.9 190 178 181 12.9 SEE AUX.Coffee/Break/Café/Lounge FACTOR 48 0.00 11 00012 0 0012 Storage/Files/Resource SET VALUE 225 160 1 160 160 160 1 160 160 160 1 Work/Copy FACTOR 31 0.04 0 28 17 19 0 30 18 21 0 0 000000000 000000 000 000000 000 000000 000 000000 000 ASF 1075 880 592 657 940 628 698 GSF (FACTOR - WALLS, MEP, COMMON , CIRCULATION)1337 55%1,599 1,076 1,194 1,708 1,141 1,269 STAFF 11 12 12 SUPPORT TOTAL SPECIAL TOTAL TOTAL STAFF OPT 1 OPT 2 OPT 3 ALL IN (PEOPLE)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)BUFFER (SQ. FT.)5-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)CURRENT RIGHT SIZE #/TYPESPACE STD. (SQ. FT.)SPACE STANDARD MPCURRENT ALL IN (SF)ALL IN (PEOPLE)NEED (SQ. FT.)SPACE STANDARD/TYPE BUFFER (SQ. FT.)CURRENT COUNTCURRENT (SQ. FT.)FACTOR/UTILIZATION RATEHYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) APPENDIX G.267 FORT COLLINS: MASTER PLAN ALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)ALL (100%)60%115% 1% ALL (100%)60%115% 1% ALL (100%)60%115% 1% ALL (100%)60%115% 1% ALL (100%)60%115% 750 450 517 13 807 484 557 14 850 510 586 14 895 537 618 15 943 566 650 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 87 52 60 1 93 56 64 1 98 59 68 1 103 62 71 1 109 65 75 69 42 48 1 75 45 52 1 79 47 54 1 83 50 57 1 87 52 60 555 333 383 9 597 358 412 10 629 377 434 10 662 397 457 11 697 418 481 39 23 27 1 42 25 29 1 44 27 31 1 47 28 32 1 49 29 34 0 0000 0000 0000 0000 00 190 178 181 13.8 192 179 182 14.5 194 180 183 15.2 196 181 185 16.0 198 183 186 0 0013 0 0014 0 0014 0 0015 0 00 160 160 160 1 160 160 160 1 160 160 160 1 160 160 160 1 160 160 160 30 18 21 0 32 19 22 0 34 20 23 0 36 21 25 0 38 23 26 0000000000000000000 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 940 628 698 999 664 739 1,044 690 770 1,091 718 802 1,140 748 836 1,708 1,141 1,269 1,817 1,207 1,344 1,898 1,255 1,400 1,983 1,306 1,459 2,073 1,360 1,521 13 14 14 15 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)ALL IN (SQ. FT.)ALL IN (SQ. FT.)10-YEAR 15-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)BUFFER (SQ. FT.)20-YEAR ALL IN (PEOPLE)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)25-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)30-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) G.268 APPENDIX NOVEMBER 2021 NEEDS: Office/work stations X Focused on increased productivity X Privacy X Hybrid approach Support spaces X Shared copy/print room X Reception/waiting room X Outdoor space X Off-site storage Collaboration/conference space X Small meeting rooms on first floor X Small conference room X Large conference room Public/community engagement X Consultant, partner, and contractor meetings X Greater collaboration with other areas of the organization \ UTILITIES CUSTOMER CONNECTIONS - WATER CONSERVATION FUNCTION: Develops and manages programs and projects related to water conservation and efficiency; focused on water demand management.PLAN O/WDEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTH31 768 ALL (100%)60%115% 0% ALL (100%)60%115% 3% 12 644 386 444 12 644 386 444 14 Service Director PO-1 180 0 00000 000 Director/Department Head PO-2 140 0 00000 000 Division Head WS-1 80 1 80 48 55 1 80 48 55 1 Supervisor/Manager WS-2 64 0 00000 000 Staff - Typ WS-3 64 6 384 230 265 6 384 230 265 7 PTE/Intern/Temp/Volunteer WS-4 36 5 180 108 124 5 180 108 124 6 Field/Crew WS-5 36 0 00000 000 242 13.0 276 265 268 13.0 276 265 268 15.0 SEE AUX.Coffee/Break/Café/Lounge FACTOR 48 0.00 12 00012 0 0014 Storage/Files/Resource SET VALUE 163 250 1 250 250 250 1 250 250 250 1 Work/Copy FACTOR 31 0.04 0 26 15 18 0 26 15 18 0 0 000000000 SEE AUX. Storage/dock space/general receiving 0 0 0 0 0 0 000 000000 000 000000 000 000000 000 ASF 1010 920 652 712 920 652 712 GSF (FACTOR - WALLS, MEP, COMMON , CIRCULATION)1595 55%1,672 1,185 1,295 1,672 1,185 1,295 STAFF 12 12 14 TOTAL SUPPORT TOTAL SPECIAL TOTAL STAFF OPT 1 OPT 2 OPT 3 ALL IN (PEOPLE)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)BUFFER (SQ. FT.)5-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)CURRENT RIGHT SIZE #/TYPESPACE STD. (SQ. FT.)SPACE STANDARD MPCURRENT ALL IN (SF)ALL IN (PEOPLE)NEED (SQ. FT.)SPACE STANDARD/TYPE BUFFER (SQ. FT.)CURRENT COUNTCURRENT (SQ. FT.)FACTOR/UTILIZATION RATEHYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) APPENDIX G.269 FORT COLLINS: MASTER PLAN ALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)DEPT. GROWTHALL IN (A)HYBRID (H) (% X A)H-BUFFER (HB) (% x H)ALL (100%)60%115% 1% ALL (100%)60%115% 2% ALL (100%)60%115% 2% ALL (100%)60%115% 2% ALL (100%)60%115% 751 451 518 15 805 483 555 16 868 521 599 17 935 561 645 19 1008 605 695 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 93 56 64 1 100 60 69 1 108 65 74 1 116 70 80 2 125 75 86 0 0000 0000 0000 0000 00 448 269 309 7 480 288 331 8 517 310 357 9 558 335 385 9 601 361 415 210 126 145 6 225 135 155 7 243 146 167 7 261 157 180 8 282 169 194 0 0000 0000 0000 0000 00 280 268 271 16.0 282 269 272 17.2 285 271 274 18.4 287 272 276 19.8 290 274 278 0 0015 0 0016 0 0017 0 0019 0 00 250 250 250 1 250 250 250 1 250 250 250 1 250 250 250 1 250 250 250 30 18 21 0 32 19 22 0 35 21 24 0 37 22 26 0 40 24 28 0000000000000000000 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 0 0000 0000 0000 0000 00 1,031 719 789 1,087 752 828 1,152 791 873 1,223 834 921 1,298 879 973 1,875 1,307 1,435 1,977 1,368 1,505 2,095 1,439 1,587 2,223 1,515 1,675 2,360 1,598 1,770 15 16 17 19 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)ALL IN (SQ. FT.)ALL IN (SQ. FT.)10-YEAR 15-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)BUFFER (SQ. FT.)20-YEAR ALL IN (PEOPLE)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)25-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)30-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) G.270 APPENDIX NOVEMBER 2021 \ AUXILIARY 32 ALL (100%)60%115%ALL (100%)60%115% 31090 550 43879 39366 40381 643 49227 43936 45126 739 Wellness 50.0%3935 13 306.0 3978 3978 3978 358.8 4665 4665 4665 413.6 Archive/Shop 300B Laporte 3300 3300 3300 3300 3300 3300 3300 Reception Per Building 300 7.0 2100 2100 2100 7.0 2100 2100 2100 7.0 Shared Conference 7.0%42.8 50.2 57.9 XL Conference (30+)2349 1200 2.0 2400 2400 2400 2.0 2400 2400 2400 2.0 L Conference (15-30) 10.0%2595 600 4.3 2570 2570 2570 5.0 3014 3014 3014 5.8 M Conference (8-15) 40.0%5637 320 17.1 5484 5484 5484 20.1 6430 6430 6430 23.2 S Conference (4-8) 50.0%3687 180 21.4 3856 3856 3856 25.1 4521 4521 4521 29.0 Huddle Room/ Phone Booth 6.0%36.7 43.1 49.6 Collaboration 60.0%1499 120 22.0 2644 2644 2644 25.8 3100 3100 3100 29.8 Phone/Quiet 40.0%287 80 14.7 1175 1175 1175 17.2 1378 1378 1378 19.9 Coffee/Break/Café/Lounge 6.0%36.7 43.1 49.6 Lounge 18.0%926 175 6.6 1157 694 798 7.8 1356 814 936 8.9 Break/Kitchenette/Coffee 75.0%6875 300 27.5 8262 4957 5701 32.3 9688 5813 6685 37.2 Café/Cafeteria 7.0%725 2.6 1864 1118 1286 3.0 2185 1311 1508 3.5 Storage/dock space/general receiving 3340 1.0 3340 3340 3340 1.0 3340 3340 3340 1.0 CPIO Storage The Cottage 150 FCTV Storage The Cottage 200 FCTV Equipment Lab The Cottage 400 EPS Storage (1-Garage Bay) Ex Offsite (18x30)720 IT Shipping & Receiving 215 Mason 350 FC Moves 214 Howes (18x40)720 Water Conservation Ex Storage Unit 200 Dock 600 CityCare 214 Howes 1750 1.0 1750 1750 1750 1.0 1750 1750 1750 1.0 ASF 31090 43,879 39,366 40,381 49,227 43,936 45,126 GSF (FACTOR - WALLS, MEP, COMMON , CIRCULATION)47978 70%62,684 56,237 57,687 70,325 62,765 64,466 AUXILIARY TOTAL OPT 1 OPT 2 OPT 3 ALL IN (PEOPLE)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)BUFFER (SQ. FT.)5-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)CURRENT RIGHT SIZE #/TYPESPACE STD. (SQ. FT.)SPACE STANDARD MPCURRENT ALL IN (SF)ALL IN (PEOPLE)NEED (SQ. FT.)SPACE STANDARD/TYPE BUFFER (SQ. FT.)CURRENT COUNTCURRENT (SQ. FT.)FACTOR/UTILIZATION RATEHYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) APPENDIX G.271 FORT COLLINS: MASTER PLAN ALL (100%)60%115%ALL (100%)60%115%ALL (100%)60%115%ALL (100%)60%115%ALL (100%)60%115% 54773 48674 50046 824 61482 54679 56042 935 68883 61152 62892 1065 77211 68395 70379 1217 85966 75875 78146 5377 5377 5377 461.3 5997 5997 5997 524.2 6814 6814 6814 597.8 7771 7771 7771 684.2 8895 8895 8895 3300 3300 3300 3300 3300 3300 3300 3300 3300 3300 3300 3300 3300 3300 3300 2100 2100 2100 7.0 2100 2100 2100 7.0 2100 2100 2100 7.0 2100 2100 2100 7.0 2100 2100 2100 64.6 73.4 83.7 95.8 2400 2400 2400 2.0 2400 2400 2400 3.0 3600 3600 3600 3.0 3600 3600 3600 3.0 3600 3600 3600 3474 3474 3474 6.5 3875 3875 3875 7.3 4403 4403 4403 8.4 5021 5021 5021 9.6 5747 5747 5747 7411 7411 7411 25.8 8266 8266 8266 29.4 9393 9393 9393 33.5 10712 10712 10712 38.3 12261 12261 12261 5211 5211 5211 32.3 5812 5812 5812 36.7 6605 6605 6605 41.8 7532 7532 7532 47.9 8621 8621 8621 55.4 62.9 71.7 82.1 3573 3573 3573 33.2 3986 3986 3986 37.7 4529 4529 4529 43.0 5165 5165 5165 49.3 5912 5912 5912 1588 1588 1588 22.1 1771 1771 1771 25.2 2013 2013 2013 28.7 2295 2295 2295 32.8 2627 2627 2627 55.4 62.9 71.7 82.1 1563 938 1079 10.0 1744 1046 1203 11.3 1981 1189 1367 12.9 2260 1356 1559 14.8 2586 1552 1785 11167 6700 7705 41.5 12455 7473 8594 47.2 14153 8492 9765 53.8 16140 9684 11136 61.6 18474 11084 12747 2519 1511 1738 3.9 2809 1686 1938 4.4 3192 1915 2203 5.0 3640 2184 2512 5.7 4167 2500 2875 3340 3340 3340 1.3 4342 4342 4175 1.3 4175 4175 4175 1.3 4175 4175 4175 1.3 4175 4175 4175 1750 1750 1750 1.5 2625 2625 2625 1.5 2625 2625 2625 2.0 3500 3500 3500 2.0 3500 3500 3500 54,773 48,674 50,046 61,482 54,679 56,042 68,883 61,152 62,892 77,211 68,395 70,379 85,966 75,875 78,146 78,248 69,534 71,495 87,831 78,112 80,060 98,404 87,361 89,846 110,302 97,707 100,541 122,809 108,393 111,637 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 OPT 1 OPT 2 OPT 3 HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)ALL IN (SQ. FT.)ALL IN (SQ. FT.)10-YEAR 15-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)BUFFER (SQ. FT.)20-YEAR ALL IN (PEOPLE)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)25-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)30-YEAR ALL IN (PEOPLE)ALL IN (SQ. FT.)BUFFER (SQ. FT.)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT)HYBRID (SQ. FT.) (3 DAYS IN/2 DAYS OUT) G.272 APPENDIX NOVEMBER 2021 100%: VISUALIZATIONS OF SPACE PROJECTIONS NOTE: THIS IS NOT THE MODEL USED IN THE RECOMMENDATIONS SECTION OF THIS MASTER PLAN. THESE GRAPHS ARE AN APPENDIX REFERENCE OF THE 100% MODEL THROUGH VISUALIZATIONS SIMILAR TO THOSE USED TO HIGHLIGHT THE SELECTED MODEL 60%+, WHICH WAS USED AS THE BASIS FOR THE RECOMMENDATIONS IN THIS MASTER PLAN. 58,258 42,412 49,129 55,755 61,544 69,154 78,070 88,556 8,319 8,026 8,288 8,560 8,792 9,096 9,453 9,872 17,980 22,829 27,329 27,329 27,329 28,729 28,729 28,729 3,300 10,490 10,490 10,490 12,367 12,200 13,075 13,075 16,054 18,128 20,843 23,658 26,110 30,542 34,325 38,769 7,801 11,282 13,230 15,249 17,008 19,326 22,040 25,227 3,935 3,978 4,665 5,377 5,997 6,814 7,771 8,895 0 50000 100000 150000 200000 250000 CURRENT CURRENT (100%) 5-YEAR (100%) 10-YEAR (100%) 15-YEAR (100%) 20-YEAR (100%) 25-YEAR (100%) 30-YEAR (100%) NET SQUARE FOOTAGE (NSF) APPENDIX G.273 FORT COLLINS: MASTER PLAN 58258, 50% 8319, 7% 17980, 16% 3300, 3% 16054, 14% 7801, 7%3935, 3% CURRENT (NSF) 42,412, 36% 8,026, 7%22,829, 20% 10,490, 9% 18,128, 15% 11,282, 10% 3,978, 3% RIGHT SIZE (100%) (NSF) 49,129, 37% 8,288, 6%27,329, 20% 10,490, 8% 20,843, 16% 13,230, 10% 4,665, 3% 5-YEAR (100%) (NSF) 55,755, 38% 8,560, 6%27,329, 19% 10,490, 7% 23,658, 16% 15,249, 10% 5,377, 4% 10-YEAR (100%) (NSF) 61,544, 39% 8,792, 5%27,329, 17% 12,367, 8% 26,110, 16% 17,008, 11% 5,997, 4% 15-YEAR (100%) (NSF) 69,154, 39% 9,096, 5%28,729, 16% 12,200, 7% 30,542, 18% 19,326, 11% 6,814, 4% 20-YEAR (100%) (NSF) 78,070, 40% 9,453, 5%28,729, 15% 13,075, 7% 34,325, 18% 22,040, 11% 7,771, 4% 25-YEAR (100%) (NSF) 88,556, 42% 9,872, 5% 28,729, 13% 13,075, 6% 38,769, 18% 25,227, 12% 8,895, 4% 30-YEAR (100%) (NSF) STAFF AUXILIARY - CAFETERIA + BREAK AUXILIARY - GENERAL SPECIAL AUXILIARY - COLLABORATION + CONFERENCE SUPPORT AUXILIARY - WELLNESS G.274 APPENDIX NOVEMBER 2021 15 YR 100%: SQUARE FOOTAGE TOTALS BY SPACE TYPE (NET SQ. FT. + NON-PROGRAMMED = GSF) NOTE: THIS IS NOT THE MODEL USED IN THE RECOMMENDATIONS SECTION OF THIS MASTER PLAN. THESE GRAPHS ARE AN APPENDIX REFERENCE OF THE 100% MODEL THROUGH VISUALIZATIONS SIMILAR TO THOSE USED TO HIGHLIGHT THE SELECTED MODEL 60%+, WHICH WAS USED AS THE BASIS FOR THE RECOMMENDATIONS IN THIS MASTER PLAN. 5,997 17,008 26,110 12,367 27,329 8,792 61,544 0 20000 40000 60000 80000 100000 2,570 7,289 11,190 5,300 22,360 7,193 50,354 020000400006000080000100000 111,898 GSF 15,985 GSF 49,689 GSF 17,667 GSF 37,300 GSF 24,297 GSF 8,567 GSF STANDARD AUXILIARY 55% NTG 70% NTG APPENDIX G.275 FORT COLLINS: MASTER PLAN 30 YR 100%: SQUARE FOOTAGE TOTALS BY SPACE TYPE (NET SQ. FT. + NON-PROGRAMMED = GSF) 3,812 10,812 16,615 5,604 23,506 8,077 72,455 020000400006000080000100000 8,895 25,227 38,769 13,075 28,729 9,872 88,556 0 20000 40000 60000 80000 100000 161,011 GSF 17,950 GSF 52,235 GSF 18,679 GSF 55,384 GSF 36,039 GSF 12,707 GSF STANDARD AUXILIARY 55% NTG 70% NTG STAFF AUXILIARY - CAFETERIA + BREAK AUXILIARY - GENERAL SPECIAL AUXILIARY - COLLABORATION + CONFERENCE SUPPORT AUXILIARY - WELLNESS G.276 APPENDIX NOVEMBER 2021APPENDIX CHARRETTE DOCUMENTS APPENDIX G.277 FORT COLLINS: MASTER PLAN G.278 APPENDIX NOVEMBER 2021 BUILDING PERFORMANCE: ENERGY AND DAYLIGHT SUMMARY ENERGY: HIGH LEVEL SUMMARY Energy Use Intensity Spatial Daylight Autonomy Annual Solar Exposure 28 36 48 34 44 47 33 41 49 27 35 48 0 5 10 15 20 25 30 35 40 45 50 55 60 Concept A Concept B Concept C Concept D Metrics EUI: Annual total energy use per floor area *Current performance reflects code minimum sDA: Percent of occupied area with sufficient daylight ASE: Percent of occupied area with excessive direct light EUI 25 kBtu/sf-yr sDA >55% ASE <10% Concept Pros Cons Concept A: Canyon Corridors Concept D: Park Campus E-W long axis Lower space heating and cooling Lower initial daylight availability Lower direct sunlight exposure Self-shading may reduce daylight potential Likely better energy reduction potential Concept B: Stormwater Ribbon Concept C: Pedestrian Court N-S long axis Higher initial daylight availability Higher space heating and cooling Higher direct sunlight exposure (AM & PM) APPENDIX G.279 FORT COLLINS: MASTER PLAN ENERGY: MODEL ASSUMPTIONS ENERGY: EPA TARGET FINDER BENCHMARKS Building Component Performance Value Source Envelope Roof R-30, U-0.032 (2018 IECC) Walls: steel-frame R-13 + 7.5 c.i., U-0.064 (2018 IECC) Fenestration SEW: U-0.38, SHGC-0.38 N: U-0.38, SHGC-0.51 (2018 IECC) Lighting Office, building area method 0.79 W/sf (2018 IECC) HVAC System type Packaged VAV w/ HW reheat (90.1 Appendix G) Cooling efficiency 10.8 EER (2018 IECC) Heating efficiency 80% (2018 IECC) Fan power 1.05 W/cfm total (2018 IECC) Target Finder Benchmark Site EUI [kBtu/sf-yr] Total GHG Emissions [metric tons Co2e] Median Property 85.3 1,786 Design Target: 75th percentile 59.2 1,240 Design Target: 80th percentile 53.8 1,127 Design Target: 85th percentile 48.0 1,006 Design Target: 90th percentile 41.5 869 Design Target: 95th percentile 33.4 700 G.280 APPENDIX NOVEMBER 2021 CONCEPT A: ENERGY PERFORMANCE AND DAYLIGHT POTENTIAL CONCEPT A: IMPROVED ENERGY PERFORMANCE SCENARIO Concept A Lighting 14% Heating 35% Cooling 10% Fans 11% Service Water Heating 2% Misc. Equipment 28% Energy Consumption by End-Use 48 35 27 0 5 10 15 20 25 30 35 40 45 50 55 ASE [%]sDA [%]EUI [kBtu/sf-yr] ASE <10% EUI 25 kBtu/sf-yr sDA >55% Concept A Lighting 15% Heating 14% Cooling 10% Fans 14% Service Water Heating 3% Misc. Equipment 44% Energy Consumption by End-Use 31 0 5 10 15 20 25 30 35 40 45 50 55 EUI [kBtu/sf-yr] EUI 25 kBtu/sf-yr Building Component Lighting Office, building area method 0.55 W/sf 30% Reduction HVAC Cooling efficiency 14.0 EER 30% improvement Heating efficiency 3.5 COP Fan power 0.85 W/cfm 20% reduction APPENDIX G.281 FORT COLLINS: MASTER PLAN CONCEPT B: ENERGY PERFORMANCE AND DAYLIGHT POTENTIAL CONCEPT C: ENERGY PERFORMANCE AND DAYLIGHT POTENTIAL Concept B Lighting 13% Heating 38% Cooling 10% Fans 10% Service Water Heating 2% Misc. Equipment 27% Energy Consumption by End-Use 49 41 33 0 5 10 15 20 25 30 35 40 45 50 55 ASE [%]sDA [%]EUI [kBtu/sf-yr] EUI 25 kBtu/sf-yr sDA >55%ASE <10% Concept C Lighting 14% Heating 37% Cooling 11% Fans 11% Service Water Heating 1% Misc. Equipment 26% Energy Consumption by End-Use 47 44 34 0 5 10 15 20 25 30 35 40 45 50 55 ASE [%]sDA [%]EUI [kBtu/sf-yr] EUI 25 kBtu/sf-yr sDA >55%ASE <10% G.282 APPENDIX NOVEMBER 2021 CONCEPT D: ENERGY PERFORMANCE AND DAYLIGHT POTENTIAL Concept D Lighting 14% Heating 36% Cooling 10% Fans 10% Service Water Heating 2% Misc. Equipment 28% Energy Consumption by End-Use 48 36 28 0 5 10 15 20 25 30 35 40 45 50 55 ASE [%]sDA [%]EUI [kBtu/sf-yr] EUI 25 kBtu/sf-yr sDA >55%ASE <10% APPENDIX G.283 FORT COLLINS: MASTER PLAN G.284 APPENDIX NOVEMBER 2021APPENDIX CONSTRUCTION PHASING APPENDIX G.285 FORT COLLINS: MASTER PLAN G.286 APPENDIX NOVEMBER 2021 215 MASON • Right-Size Existing Departments • 1st Floor • Parking Services/TransFort • Emergency Preparedness • Municipal Court Remains As Is • 2nd Floor • Human Resources • Financial Services • Safety & Risk Management • 3rd Floor • Information Technology • Community Services • CPIO 215 MASON • Move CityCare from 214 Howes • 1st Floor: • Share/Expand existing Wellness Area • 2nd Floor: • Additional CityCare Space adjacent to Human Resources • Move PDT FC Moves from 281 College • 3rd Floor: • Utilize Additional Space resulting from right-sizing departments 214 HOWES • Relocate FC Moves storage and other uses to temporary off-site location 0-5 YEAR PLAN 0-5 YEAR PLAN \ OPTION 1 - CONSTRUCTION STAGE 1 215 Mason X 215 Mason •Move CityCare from •1st Floor: •Share/Expand •2nd Floor: •Additional Cit Human Resou •Move PDT FC Move •3rd Floor: •Utilize Additio right-sizing de X 214 Howes •Relocate FC Moves to temporary off-site 281 College 214 Howes 215 Mason Off-Site Storage APPENDIX G.287 FORT COLLINS: MASTER PLAN 117 MASON • Move Remainder of PDT to 117 Mason • PDT Administration • PDT Engineering • PDT CDNS 281 COLLEGE • Remove remainder of items • Prepare property for Sale PARKS STORAGE • Relocate to off-site location 0-5 YEAR PLAN 0-5 YEAR PLAN Park Storage Off-Site Location 2281 College 117 Mason G.288 APPENDIX NOVEMBER 2021 222 LAPORTE • Right-Size Existing Departments • Utilities • Sustainability • Broadband • Renovate by floor, shifting departments to accommodate work • All existing departments remain in building • Additional space reserved for future growth of departments 300B LAPORTE • Right-Size Existing Departments • OPS Admin • OPS Facility Management • OPS PMPD • OPS Real Estate • Renovate by floor, shifting depart- ments to accommodate work • All existing departments remain in building • Additional space reserved for future growth of department 0-5 YEAR PLAN 0-5 YEAR PLAN 222 Laporte 300B Laporte APPENDIX G.289 FORT COLLINS: MASTER PLAN 300A Laporte 300A LAPORTE • Right-Size Existing Departments • First Floor: • City Attorney • City Clerk • Second Floor: • Reclaim Emergency Preparedness Space • Reclaim Unused IT Space • City Manager • FCTV Expansion infills IT Space • Existing Council Chambers • Reuse as is for 5 years • Existing FCTV Lower Level • Reuse as is for 5 years • Minimize Renovations during Phase 1 • Short-Term Solution • Satisfies 5-year growth STAGE 1B SITE PREP • Deconstruct 214 Howes • Deconstruct Park Storage • Deconstruct Non-Historic North Garage • Prepare Surface Parking for Future Parking Structure 5-15 YEAR PLAN 0-5 YEAR PLAN G.290 APPENDIX NOVEMBER 2021 STAGE 1B CONSTRUCTION • Construction new Phase 1 New Building mid-block along Howes • Construct new Parking Garage on Northeast corner • Perform Street Improvements and Public Way Improvements along Howes • Construct new Surface Parking on Northwest corner • Develop landscape. hard scape, and site amenities • Create connection between Parking Structure and Phase 1 New Building STAGE 1B OCCUPANCY • New Spaces within Phase 1 Building • Council Chambers • Meeting Rooms • Customer Service Center • Cafeteria • Wellness (upper floor, 10-15 years) • Storage & Receiving Dock • Satisfies 30-Year Projected Need • Wellness will move during Phase 2 5-15 YEAR PLAN 5-15 YEAR PLAN APPENDIX G.291 FORT COLLINS: MASTER PLAN STAGE 1B OCCUPANCY • Move Departments from 300A Laporte to New Building • City Attorney • City Clerk • City Manager • Council Chambers • FCTV STAGE 1B OCCUPANCY • Move Departments from 215 Mason to New Building • Human Resources • CPIO • Financial Services • Safety & Risk Management • CityCare 5-15 YEAR PLAN 5-15 YEAR PLAN 300A Laporte 215 Mason G.292 APPENDIX NOVEMBER 2021 STAGE 1B OCCUPANCY • 215 Mason • Cultural Services Remains/Expands • Emergency Preparedness Remains • Parking Services Remains through Phase 1 • Municipal Court Remains through Phase 1, Expands into freed space STAGE 1B OCCUPANCY • 300A Laporte • Renovate Both Floors of West Building • IT moves from 215 Mason to 300A Laporte 5-15 YEAR PLAN 5-15 YEAR PLAN 215 Mason 215 Mason 300A Laporte APPENDIX G.293 FORT COLLINS: MASTER PLAN STAGE 1B OCCUPANCY • 215 Mason • All of PDT Moves to Freed Space at 215 Mason • 117 Mason is used as flex space or other city use 5-15 YEAR PLAN215 Mason 117 Mason G.294 APPENDIX NOVEMBER 2021 300A Laporte 214 Howes 215 Mason Off-Site Storage Park Storage Off-Site Location 215 MASON/300A LAPORTE • Move portion of IT to 300A Laporte • 750sf to Second Floor unoccupied • Economize remainder of IT in 215 Mason to free up 810sf • Move CityCare from 214 Howes • 1st Floor: • Share/Expand existing Wellness Area • Repurpose Bike Storage & Confer- ence Room (941sf) • 3rd Floor: • Additional CityCare Space adja- cent to Human Resources (810sf) • Need 1,750sf total across floors • No new furnishings/reuse existing space 214 HOWES • Relocate FC Moves storage and other uses to temporary off-site location PARKS STORAGE • Relocate to off-site location YEAR 1 YEAR 1 \ OPTION 2 - CONSTRUCTION STAGE 1 APPENDIX G.295 FORT COLLINS: MASTER PLAN 117 MASON • Complete any potential modifications to 117 Mason at onset of Phase 1A. • SF: 15,500sf • Move PDT to 117 Mason and Right- size departments to current buffer size • PDT Administration • PDT Engineering • PDT CDNS • FC Moves 281 COLLEGE • Remove remainder of items • Prepare property for Sale STAGE 1 SITE PREP • Deconstruct 214 Howes • Deconstruct Park Storage • Deconstruct Non-Historic North Garage • Prepare Site for Phase 1b construction • Prepare Surface Parking for Future Parking Structure YEAR 1 YEAR 1 281 College 117 Mason G.296 APPENDIX NOVEMBER 2021 STAGE 1 CONSTRUCTION • Construction new Phase 1 New Building mid-block along Howes • Construct new Parking Garage on Northeast corner • Perform Street Improvements and Public Way Improvements along Howes • Construct new Surface Parking on Northwest corner • Develop landscape. hard scape, and site amenities • Create connection between Parking Structure and Phase 1 New Building STAGE 1 OCCUPANCY • New Spaces within Phase 1 Building • Council Chambers • Meeting Rooms • Customer Service Center • Cafeteria • Wellness (upper floor, 10-15 years) • Storage & Receiving Dock • Satisfies 30-Year Projected Need • Wellness will move during Phase 2 YEAR 2-3 YEAR 2-3 APPENDIX G.297 FORT COLLINS: MASTER PLAN STAGE 1 OCCUPANCY • Move and Right-size Departments from 300A Laporte to New Building • City Attorney • City Clerk • City Manager • Council Chambers • FCTV • Move IT located in 300A Laporte back to 215 Mason STAGE 1 OCCUPANCY • Move and Right-size Departments from 215 Mason to New Building • Human Resources • Financial Services • Safety & Risk Management • CityCare • Parking Services/TransFort • Wellness YEAR 4 YEAR 4 300A Laporte 215 Mason G.298 APPENDIX NOVEMBER 2021 STAGE 1 OCCUPANCY STAGE 1 RENOVATION • 300A Laporte • Renovate Both Floors of West Building YEAR 4 YEAR 4 300A Laporte APPENDIX G.299 FORT COLLINS: MASTER PLAN STAGE 1B OCCUPANCY • 215 Mason • Renovate Freed Space on available floors • Emergency Preparedness Remain as is • Municipal Court Remains as is STAGE 1B OCCUPANCY • 300A Laporte • Move IT from 3rd floor 215 Mason to newly renovated 2nd Floor of 300A Laporte YEAR 5 YEAR 4 215 Mason 215 Mason 300A Laporte G.300 APPENDIX NOVEMBER 2021 STAGE 1 OCCUPANCY • 215 Mason • Community Services & CPIO right- size in place • Renovate remainder of 3rd Floor • Emergency Preparedness Remains, Renovate for growth • Municipal Court Remains through Phase 1, Expands into renovated 1st floor space • Minor Renovations to Existing Munici- pal Court Space 300B LAPORTE • Temporarily move entirety of OPS to 1st Floor 300A Laporte • OPS Admin • OPS Facility Management • OPS PMPD OPS Real Estate • Renovate 1st and 2nd OPS floors YEAR 5 YEAR 5 215 Mason 300A Laporte 300B Laporte APPENDIX G.301 FORT COLLINS: MASTER PLAN STAGE 1 OCCUPANCY • 215 Mason • Move all of PDT into 215 Mason from 117 Mason • Locate on 2nd and 3rd Floors • Eventual Growth to 1st Floor • 117 Mason is used as flex space or other city use 300B LAPORTE • Move entirety of OPS to back of 300B Laporte and Right Size YEAR 6 YEAR 5 215 Mason 117 Mason 300A Laporte 300B Laporte G.302 APPENDIX NOVEMBER 2021 222 LAPORTE • Right-Size Existing Departments • Utilities • Sustainability • Broadband • No major renovations, shift depart- ments to accommodate FF&E work • All existing departments remain in building • Additional space reserved for future growth of departments STAGE 2A SITE PREP & DECONSTRUCTION • 300A Laporte • Deconstruct Old Council Chamber Addition • Prepare Site for Plaza Extension • Deconstruct Cottage to prepare for Park Expansion 15-30 YEAR PLAN YEAR 6 222 Laporte \ OPTION 2 - CONSTRUCTION STAGE 2 APPENDIX G.303 FORT COLLINS: MASTER PLAN STAGE 2A SITE DEVELOPMENT & WELLNESS • Construct new Wellness & CityCare addition to 300A • Wellness & CityCare move from Phase 1 Building • Provides expansion for departments in Phase 1 Building • Develop Plaza and Site Amenities • Expand Park across North half of site STAGE 2B FUTURE EXPANSION NEEDS • Construct Phase 2B Expansion to 300A • Municipal Court moves from 215 Mason • Provides expansion for other departments to meet 30 Year Plan 15-30 YEAR PLAN 15-30 YEAR PLAN G.304 APPENDIX NOVEMBER 2021APPENDIX ENERGY MODELING TABLES APPENDIX G.305 FORT COLLINS: MASTER PLAN G.306 APPENDIX NOVEMBER 2021 Table 3 Energy Modeling Parameters – General Information Table 4 Energy Modeling Parameters – Envelope Building Element Baseline and Proposed Case Modeling Software eQuest 3.64 Weather File USA_CO_FORT COLLINS AWOS_TMY3.bin Climate Zone 5B Electric Rate $0.1039 / kWh Natural Gas Rate $0.6017 / therm Cooling Setpoint 75 °F occupied / 80 °F unoccupied Heating Setpoint 70 °F occupied / 65 °F unoccupied Operation Schedule M-F: 8am-5pm (heavy use) Sat/Sun: (minimal use) Building Element Baseline Case Proposed Design Roof Construction Description Insulation entirely above deck Insulation entirely above deck Insulation R-30 R-60 Assembly U-value U-0.032 U-0.016 Exterior Wall Construction Description Metal Framed Metal Framed Insulation R-13 + 7.5 c.i. R-13 + 19 c.i. Assembly U-value U-0.064 U-0.037 Slab-on-Grade Floor Construction Description Unheated Identical to Baseline Insulation R-10 for 24” Assembly F-factor F-0.54 Window-to-gross Wall Ratio First Floor % 25% Identical to Baseline All Other Floors % 40% Skylight-to-Roof Ratio % 0% 0% Fenestration Description Fixed Fenestration Fixed Fenestration Assembly U-value U-0.38 U-0.21 SHGC 0.40 0.21 Infiltration CFM/SF Exterior Wall 0.40 0.40 & 0.25 APPENDIX G.307 FORT COLLINS: MASTER PLAN Table 5 Energy Modeling Parameters – Electrical Systems Building Element Baseline Case Proposed Design Interior Lighting Power LPD Method Building Area Building Area Avg. LPD W/ft2 0.79 0.50, 0.40, 0.30 Occupancy controls Spaces Where required by IECC 2018 Identical to Baseline Power Reduction % 100 Time-delay min 20 LPD adjustment % 30 Daylight controls Spaces Where required by IECC 2018 Identical to Baseline Control type Linear Control steps 100%-15% & Full Shut-Off Exterior Lighting Power Lighting Zone Zone 3 Identical to Baseline Tradeable Power kW Not modeled at this time Non-Tradable Power kW Receptacle controls Spaces Whole Building Whole Building Power Reduction % 0% 0% & 50% EPD adjustment % N/A 0% & 28.8%-reduction Equipment Power Density Spaces Whole Building Identical to Baseline Avg. EPD W/ft2 0.75 Elevator* Power kW 17.5 17.5 & 10.0 On-site Renewables Type N/A Photovoltaic Array Equivalent annual generation EUI 15 G.308 APPENDIX NOVEMBER 2021 Motor Efficiency Class Premium Identical to Baseline Cooling Capacity Btuh Autosized Efficiency EER 16 36 Heating Capacity Btuh Autosized Identical to Baseline Efficiency COP 3.8 4.4 Outdoor Airflow Airflow CFM/SF 0.13 Identical to Baseline Airside Economizer Control Type Fixed Fraction High limit Shutoff 65F Supply Air Temperature Reset 60F Energy Recovery Type Enthalpy Wheel Sensible Eff. % 63 Latent Eff. % 63 Building Element Baseline Case Proposed Design GSHP Water Loop Well Field Properties TBD Identical to Baseline Design CHW Temp F Design HW Temp F Loop delta T F Circulation Fluid Pump Qty Pump Flow gpm Pump Head Ft Pump Control Table 6 Energy Modeling Parameters – Air-side Mechanical Systems Table 7 Energy Modeling Parameters – Water-side Mechanical Systems Building Element Baseline Case Proposed Design HVAC System Tag EL-1 Identical to Baseline Type Ground Source Heat Pump Supply Fan Control Variable Airflow CFM Autosized Power inWG 1.5 Pressure Adjustment Devices MERV 13 Filter APPENDIX G.309 FORT COLLINS: MASTER PLAN G.310 APPENDIX NOVEMBER 2021 STAKEHOLDER ENGAGEMENT APPENDIX G.311 FORT COLLINS: MASTER PLAN G.312 APPENDIX NOVEMBER 2021 \ INTERDEPARTMENTAL CITY STAFF REVIEW DEPARTMENT ENGAGEMENT Poudre Fire Authority, Engineering, Traffic, CDNS, Utilities, Forestry, Safety & Risk Management, Police, FC Moves, Park Planning & Development, and Utilities Strategic Planning Department UTILITIES X Projects in close proximity that are being planned for design in 2024-25 and construction in 2025-26 following the Oak St Outfall project will need to be coordinated with on timing for the Civic Center projects. X Need to elevate the building pad and complete a CLOMR/LOMR to remap the floodplain if any of the structures are proposed touching the regulatory floodplain because these are government services buildings which are prohibited in the 100-year floodplain. This is a City floodplain so it would be an extra step in the process and should be accounted for in the timeline, but it would not involve a multi-year FEMA review timeline, it would be a City review that could take a few months of additional back and forth and could be done concurrently with the planning process. TRAFFIC Information to be considered when moving forward with design: X Howes - Between Maple and Laporte ▷How do you plan to transition bikes to one side of the roadway and then back to the north of Maple, and south of Laporte? ▷Is there parking along the protected bike lane, what type of protection? ▷Stripping details and how this will line up to the north of Maple, and south of Laporte? ▷Will the project remove the two way left turn lane, and the turn lanes at the intersections? ▷Will the trolley tracks be placed between the parking and the sidewalk? ▷How do you plan to extend the trolley tracks north of Maple, and south of Laporte? This will require comprehensive signal upgrades at Laporte and potentially Mountain. ▷Are there stops or stations planned in this area? ▷Are there still considerations being made to close this street to vehicles? If so, how do you plan to divert traffic and mitigate issues along adjacent residential areas? X Meldrum ▷Traffic concerns regarding the diversion of traffic off Howes, along with the current issues with this facility being adjacent to a residential area. Are there plans to mitigate traffic on these streets? ▷Meldrum and Maple is already a concern. Are there plans to mitigate this intersection for vehicles/ bike/pedestrians? ▷Meldrum and Laporte. Are any improvements planned for this intersection? X Parking ▷Will the parking garage offset the parking that will need to be removed on street? ▷There is limited access to the parking garage given its location to the railroad tracks and Mason. ▷East access will be right in/right out only. ▷North access- Mason is currently restricted as No Left Turn for northbound. ▷North access is within close proximity to Mason intersection and there could be queuing issues. ▷Will the parking garage be fully public, or will there be reserved spaces to accommodate the City Employees? Will City Owned Vehicles be parked in the garage? Will there be short term parking? How many spots/levels? APPENDIX G.313 FORT COLLINS: MASTER PLAN ▷Will there be back in angle parking anywhere? ▷Will all surface area lots be time restricted? X Pedestrian Connectivity ▷Will there be more east/west pedestrian connectivity through the site to get access the Raised Pedestrian crossing, (i.e. a mid-block trail connecting from Meldrum to Howes-Civic Plaza, and then Howes-Entrance Court/Civic Plaza to Laporte.) ▷Traffic in general ▷We are currently working with the DDA to potentially road-diet Laporte from Howes to College. How will this affect these plans? ▷We will need a Traffic Impact Study to determine the anticipated trips generated with this site and the potential improvements that may be needed to address the issues previously stated. ▷Are there plans to provide drop-off and pick-up areas for deliveries, maintenance services, and such? CDNS X Consistent with the Downtown Plan (2017), Howes will be designed as a convertible street which can be temporarily closed to automobile and bike traffic during events and will function as public gathering area. Elements of the future street design should include space for on-street parking, trolley, car share stations, corner bulb-outs with rain gardens, seating, bike parking integration, EV station with photovoltaic charging, buffered bikes lanes, Xeric/low water use planting in bulb outs, and enhanced landscaping. X Rename Washington Park to Charley Clay or Clay Park to recognize the Clay family residences that were deconstructed in the 1970s on the northwest side of the block. Clay was a formerly enslaved person and a FC pioneer. Could see future events such as annual Juneteenth celebrations in this space, now that it is a federal holiday. X Art and site design in general to incorporate representations of BIPOC community histories (form of acknowledgment/reparation/healing; assertion of commitment that the City serves all residents now) – could do this for indigenous, Latina as well as Black communities on campus X Mark the sites of deconstructed Black neighborhood homes with site design or interpretive signage POUDRE FIRE AUTHORITY Emergency Responder Radio Communication - Amplification System Test X 2018 IFC 510 & 1103.2 New and existing buildings require a fire department emergency communication system evaluation after the core/shell but prior to final build out. For the purposes of this section, fire walls shall not be used to define separate buildings. Where adequate radio coverage cannot be established within a building, public-safety radio amplification systems shall be designed and installed in accordance with criteria established by Poudre Fire Authority. The installation of required ERRC systems shall be reviewed and approved under a separate permit process through PFA. X Local Exception: PFA will waive the testing requirement and system installation in all buildings less than 10,000 sq. ft. and any Type V construction building less than 15,000 sq. ft. PFA policy P15-510.1 Fire Lanes X Fire access is required to within 150 feet of all exterior portions of any building, or facility ground floor as measured by an approved route around the perimeter. For the purposes of this section, fire access cannot be measured from an arterial road. Any private alley, private road, or private drive serving as a fire lane shall be dedicated as an Emergency Access Easement (EAE) and be designed to standard fire lane specifications. In addition, aerial apparatus access requirements are triggered for buildings in excess of 30’ in height. Code language and fire lane specifications provided below. G.314 APPENDIX NOVEMBER 2021 X IFC 503.1.1: Approved fire Lanes shall be provided for every facility, building or portion of a building hereafter constructed or moved into or within the jurisdiction. The fire apparatus access road shall comply with the requirements of this section and shall extend to within 150 feet of all portions of the facility and all portions of the exterior walls of the first story of the building as measured by an approved route around the exterior of the building or facility. When any portion of the facility or any portion of an exterior wall of the first story of the building is located more than 150 feet from fire apparatus access, the fire code official is authorized to increase the dimension if the building is equipped throughout with an approved, automatic fire-sprinkler system Fire Lane Specifications X A fire lane plan shall be submitted for approval prior to installation. In addition to the design criteria already contained in relevant standards and policies, any new fire lane must meet the following general requirements: ▷Fire lanes established on private property shall be dedicated by plat or separate document as an Emergency Access Easement. ▷Maintain the required 20 foot minimum unobstructed width & 14 foot minimum overhead clearance. Where road widths exceed 20 feet in width, the full width shall be dedicated unless otherwise approved by the AHJ. ▷Be designed as a flat, hard, all-weather driving surface capable of supporting 40 tons. ▷Dead-end fire access roads in excess of 150 feet in length shall be provided with an approved turnaround area for fire apparatus. ▷Dead-end roads shall not exceed 660 feet in length without providing for a second point of access. Dead-end access roads in excess of 1320 feet in length require a third point of access. Dead-end access roads in excess of 2640 feet in length require a fourth point of access. ▷The required turning radii of a fire apparatus access road shall be a minimum of 25 feet inside and 50 feet outside. Turning radii shall be detailed on submitted plans. ▷Dedicated fire lanes are required to connect to the Public Way unless otherwise approved by the AHJ. ▷Fire lane to be identified by red curb and/or signage. Fire lane shall be maintained and unobstructed at all times. ▷Fire lane sign locations or red curbing should be labeled and detailed on final plans. Refer to LCUASS detail #1418 & #1419 for sign type, placement, and spacing. Appropriate directional arrows required on all signs. ▷In remote rural applications, fire lane standards may be modified with the approval of the fire marshal; examples might include reduction in road width or road surface. International Fire Code 503.2.3, 503.2.4, 503.2.5, 503.3, 503.4 and Appendix D; FCLUC 3.6.2(B)2006 and Local Amendments. Structures Exceeding 30 Feet In Height X IFC Appendix D105: In order to accommodate the access requirements for aerial fire apparatus (ladder trucks), required fire lanes shall be 26 foot wide minimum on at least one long side of the building. At least one of the required access routes meeting this condition shall be located within a minimum of 15 feet and a maximum of 30 feet from the building, and shall be positioned parallel to one entire side of the building or as otherwise approved by the fire code official. Buildings Four Or More Stories In Height X Roof Access: New buildings four or more stories above grade plane, except those with a roof slope greater than four units vertical in 12 units horizontal (33.3 percent slope), shall be provided with a stairway to the roof. Stairway access to the roof shall be in accordance with IFC 1011.12. Such stairways shall be marked at street and floor levels with a sign indicating that the stairway continues to the roof. Where roofs are used for roof gardens or for other purposes, stairways shall be provided as required for such occupancy APPENDIX G.315 FORT COLLINS: MASTER PLAN classification (IFC 504.3). X Fire Standpipe System: Standpipe systems shall be provided in new buildings and structures in accordance with Section 905 of the 2018 International Fire Code. Approved standpipe systems shall be installed throughout buildings where the floor level of the highest story is located more than 30 feet above the lowest level of fire department vehicle access. The standpipe system shall be capable of supplying a minimum of 100 psi to the top habitable floor. An approved fire pump may be required to achieve this minimum pressure. Buildings equipped with standpipes are required to have a hydrant within 100 feet of the Fire Department Connection (IFC Sections 905 and 913). X Hydrant For Standpipe Systems: Buildings equipped with a standpipe system installed in accordance with Section 905 shall have a fire hydrant capable of providing 1500 gpm at 20 psi residual pressure, located within 100 feet of the fire department connections. Exception: The distance shall be permitted to exceed 100 feet where approved by the fire code official (IFC 507.5.1.1). X Aerial Fire Apparatus Access: In order to accommodate the access requirements for aerial fire apparatus (ladder trucks), required fire lanes shall be 26 foot wide minimum on at least one long side of the building. At least one of the required access routes meeting this condition shall be located within a minimum of 15 feet and a maximum of 30 feet from the building and shall be positioned parallel to one entire side of the building (IFC D105). Fire Containment X The proposed building(s) exceeds 5,000 square feet and shall be sprinklered or fire contained. If containment is used, the containment construction shall be reviewed and approved by the Poudre Fire Authority prior to installation. Commercial Parking Garage X IFC 903.2.10.1: An automatic fire sprinkler system shall be provided throughout buildings used for storage of commercial motor vehicles where the fire area exceeds 5,000 sq. ft. Water Supply X Hydrant spacing and flow must meet minimum requirements based on type of occupancy. A fire hydrant capable of providing 1500 gpm at 20 psi residual pressure is required within 300 feet of any commercial building as measured along an approved path of vehicle travel. For the purposes of this code, hydrants on the opposite side of arterial roadways are not considered accessible to the site. X An exception to this rule pertains to buildings equipped with a standpipe system which require a hydrant within 100 feet of any Fire Department Connection (FDC). X Where a fire hydrant is located on a fire apparatus access road, the minimum road width shall be 26 feet exclusive of shoulders. Key Boxes Required X IFC 506.1 and Poudre Fire Authority Bureau Policy P-13-8.11: Poudre Fire Authority requires at least one key box (“Knox Box”) to be mounted in an approved, exterior location (or locations) on every new or existing building equipped with a required fire sprinkler or fire alarm system. The box shall be positioned 3 to 7 feet above finished floor and within 10 feet of the front door, or closest door to the fire alarm panel. Exception can be made by the PFA if it is more logical to have the box located somewhere else on the structure. Knox Box size, number, and location(s) to be determined at building permit and/or by time of final CO. All new or existing Knox Boxes must contain the following keys as they apply to the building: ▷Exterior Master ▷Riser room ▷Fire panel ▷Elevator key if equipped with an elevator The number of floors determines the number of sets of keys needed. Each set will be placed on their own key ring. G.316 APPENDIX NOVEMBER 2021 ▷Single story buildings must have 1 of each key ▷2-3 story buildings must have 2 of each key ▷4+ story buildings must have 3 of each key For further details or to determine the size of Knox Box required, contact the Poudre Fire Authority Division of Community Safety Services. Premise Identification: Address Posting & Wayfinding X Where possible, the naming of private drives is usually recommended to aid in wayfinding. Addresses shall be posted on each structure and where otherwise needed to aid in wayfinding. Code language provided below. X IFC 505.1: New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible, visible from the street or road fronting the property, and posted with a minimum of eight-inch numerals on a contrasting background. Where access is by means of a private road and the building cannot be viewed from the public way, a monument, pole or other sign or means shall be used to identify the structure and best route. PARK PLANNING & DEVELOPMENT X Emphasize on the purpose and function of the park: serves local neighborhoods, 2nd oldest park in the city, special event space, etc. X Building off of the interconnected building/park relationships. X Creating a park-like environment rich in plants to help provide shade/pedestrian comfort, strengthen campus connections to the park, and exhibit the sustainability ethos of the city organization. X Washington Park as a long term preserved park space in downtown. X Creating a functional outdoor meeting space on the campus for all to use. X Consider the additions of open green courts to offer light/views/LID green spaces X Articulating native areas, shaded/tree zones, storm water areas FC MOVES X Changes in use of 220 N. Howes would impact Safe Routes To School program in terms of essential equipment storage and maintenance. Will need an equally convenient and efficient alternative to continue program operation at the current level. X Parking structure should include ▷ Mixed-use with ground floor retail/restaurant (possible relocation of FOCO Café) ▷Electric charging ▷Bike cage X Incorporation of possible MAX station on the west side of Mason Street X New bus stop on Laporte Avenue directly adjacent to Operation Services building X Including a central transportation resource (like a Mobility Hub) where employees can access various travel modes and TDM resources. Such as bike share or city bikes, electric scooters, bike storage, showers/lockers, TNC pick-up, electric vehicle borrow or car share, commuter information about transit and other city programs. Possibly in parking structure or more centrally located. X Promoting the elimination of SOV trips to lower overall emissions, improve health and equity, and reduce congestion. Parking structure will promote more driving. APPENDIX G.317 FORT COLLINS: MASTER PLAN \ BOARDS + COMMISSIONS REVIEW Attendees Cultural Resources Board (Will Flowers) Downtown Development Authority (Chris Aronson) Parking Advisory Board (Adam Eggleston & Nora Hill) Parks and Recreation Board (Jeff Haber & Mike Novell) Planning and Zoning Board (Ted Shepard & Per Hogestad) Transportation Board (Jerry Gavaldon) X How can we ensure this Master Plan is maintained? X What are the cost implications to the tax payers? X Consideration for Arts + Culture X Need for wellness X Need for large event spaces/big rooms X Landmark architecture ▷Come to see building without needing to be inside of it ▷Significance ▷Non traditional design X Ensuring a welcoming feeling for west side buildings due to the distance from Howes X Preserve existing trees X Possible trolley idea X Multi use event space ▷Proper back of house operations ▷Space for event companies X Back of house for retail X Maintenance of buildings should be considered X What do people in the current neighborhood want in the park? X Creating something that compliments old town square X Exhibit style sculpture garden X Possible place to park food trucks -1- RESOLUTION 2021-105 OF THE COUNCIL OF THE CITY OF FORT COLLINS ADOPTING THE 2021 CIVIC CENTER MASTER PLAN WHEREAS, in 1996 the City Council approved Resolution 96-86 adopting a Civic Center Master Plan as an amendment to the Downtown Plan, which was an element of the City’s then-current Comprehensive Plan (the “1996 Master Plan”); and WHEREAS, the 1996 Master Plan was prepared in cooperation with Larimer County to guide the development of a twelve-block area of downtown, including joint planning of local government facilities such as the Civic Center Parking Structure, the City office building at 215 North Mason, and the Larimer County Justice Center and the County Courthouse Offices building; and WHEREAS, in 2014 the City’s Operation Services Department completed the Block 32/42 - Civic Center Vision Plan regarding future development of City buildings on two blocks in the Civic Center area (the “Vision Plan”); and WHEREAS, the City Council adopted an updated Downtown Plan in 2017, and an updated Comprehensive Plan (“City Plan”) in 2019; and WHEREAS, as part of the 2021 budget the City Council funded an update to the Vision Plan, which is also called the Civic Center Master Plan (“CCMP”) but is focused mostly on a smaller area than the 1996 Master Plan; and WHEREAS, the CCMP is intended to identify space planning needs and efficiencies for current and future City staffing, and develop a new conceptual master plan for Blocks 32 and 42; and WHEREAS the CCMP accounts for City facilities constructed since 2015 and provides a design concept and cost estimates for new City Hall facilities and the Civic Center campus, and it identifies buildings to be acquired by the City and City buildings to be sold and demolished; and WHEREAS, the City Council reviewed the proposed CCMP at its Work Session on July 27, 2021, and provided comments; and WHEREAS, the CCMP is intended to be an amendment to the Downtown Plan, which is an element of City Plan, and is therefore a capital improvements plan for purposes of spending general government capital expansion fee proceeds under Section 7.5-31 of the City Code; and WHEREAS, the City Council has determined that the proposed CCMP is in the best interests of the residents of the City. NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF FORT COLLINS as follows: -2- Section 1. That the City Council hereby makes and adopts the determinations and findings contained in the recitals set forth above. Section 2. That the Civic Center Master Plan dated November 10, 2021, a copy of which is on file in the Office of the City Clerk, is hereby incorporated in and made a part of this Resolution by reference, and adopted as an amendment to the Downtown Plan, which is an element of City Plan, and constitutes a capital improvements plan for purposes of Section 7.5-31 of the City Code. Passed and adopted at a regular meeting of the Council of the City of Fort Collins this 16th day of November, A.D. 2021. __________________________________ Mayor ATTEST: _____________________________ Interim City Clerk