Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout12/14/2017 - Planning And Zoning Board - Agenda - Regular Meeting (2)Jeffrey Schneider, Chair
Jeff Hansen, Vice Chair
Jennifer Carpenter
Emily Heinz
Michael Hobbs
Ruth Rollins
William Whitley
City Council Chambers
City Hall West
300 Laporte Avenue
Fort Collins, Colorado
Cablecast on FCTV Channel 14 & Channel 881
on the Comcast cable system
The City of Fort Collins will make reasonable accommodations for access to City services, programs, and activities
and will make special communication arrangements for persons with disabilities. Please call 221-6515
(TDD 224-6001) for assistance.
Regular Hearing
December 14, 2017
6:00 PM
• ROLL CALL
• AGENDA REVIEW
• CITIZEN PARTICIPATION
Individuals may comment on items not specifically scheduled on the hearing agenda, as follows:
• Those who wish to speak are asked to sign in at the podium.
• The presiding officer
will determine and announce the length
of time allowed
for each speaker.
• Each speaker should
state their name and address and keep
their comments to the allotted time.
• Any written materials
should be provided to the Secretary for
record -keeping
purposes.
• A timer will beep once and the time light will turn to yellow to
indicate that 30
seconds of speaking time
remain and will beep
again and turn red when a speaker's time to speak has
ended.
• CONSENT AGENDA
The Consent Agenda is intended to allow the Planning and Zoning Board to quickly resolve items that are
non -controversial. Staff recommends approval of the Consent Agenda. Anyone may request that an item
on this agenda be "pulled" for consideration within the Discussion Agenda, which will provide a full
presentation of the item being considered. Items remaining on the Consent Agenda will be approved by
the Planning and Zoning Board with one vote.
The Consent Agenda generally consists of Board Minutes for approval, items with no perceived
controversy, and routine administrative actions.
Planning and Zoning Board Page 1 December 14, 2017
1. Draft November 16, 2017, P&Z Board Minutes
The purpose of this item is to approve the draft minutes for the November 16, 2017,
Planning and Zoning Board hearing.
• DISCUSSION AGENDA
2. Trail Head Townhomes
PROJECT This Project Development Plan proposes 89 townhome units on
DESCRIPTION: two tracts of land within the original 2004 Trail Head subdivision.
The tracts are located along the north side of East Vine Drive
between Wagon Trail Road and Campfire Road, flanking
Greenfields Drive where it enters the Trail Head neighborhood.
The tracts total 10.7 acres and are designated for "future multi-
family" development. Proposed buildings are a mix of 2, 3,4, and
5-unit buildings. All units face streets or `Connecting Walkways'
and have rear 2-car attached garages. Additional guest parking is
provided both off-street and on -street.
APPLICANT: JR Engineering
2900 S. College Ave., Ste. 3D
Fort Collins, CO 80525
OWNER: Trail Head, LLC — Stan Scott
5013 Bluestem Court
Fort Collins CO, 80525
STAFF ASSIGNED: Clark Mapes
3, The Union on Elizabeth PDP/FDP 170024
PROJECT This is a request for a Project Development Plan/Final Plan to
DESCRIPTION: construct a five story mixed -use building on West Elizabeth Street.
The project includes a total of 107 units with 402 beds of student
oriented housing and 3,875 square feet of retail space. Amenity
space is provided on the ground level and rooftop of the building.
A main component of the plan is the accommodation of a public
bicycle/pedestrian connection, which runs north/south through the
property, completing the connection from West Elizabeth Street to
West Plum Street to the north. The site is located on 2.3 acres at
1208 and 1220 West Elizabeth Street and is in the Community
Commercial (C-C) Zone District and the Transit -Oriented
Development (TOD) Overlay Zone.
APPLICANT: Stephanie Hansen, Ripley Design
419 Canyon Avenue. Suite 200
Fort Collins, CO 80521
Planning and Zoning Board December 14, 2017
OWNER: Elizabeth Street Co. Manager LLC
999 Shady Grove, Suite 600
Memphis, TN 38120
STAFF ASSIGNED
• OTHER BUSINESS
• ADJOURNMENT
NEW7i�:[: IMT191
Planning and Zoning Board Page 3 December 14, 2017
Agenda Item 1
STAFF
Cindy Cosmas, Administrative Assistant
SUBJECT
Draft November 16, 2017, P&Z Hearing Minutes
EXECUTIVE SUMMARY
The purpose of this item is to approve the draft minutes for the November 16, 2017, Planning and
Zoning Board hearing.
ATTACHMENTS
1. Draft Nov P&Z Minutes (DOC)
Item # 1 Page 1
Attachment 1
Jeff Schneider, Chair
Jeff Hansen, Vice Chair
Jennifer Carpenter
Emily Heinz
Michael Hobbs
Ruth Rollins
William Whitley
City Council Chambers
City Hall West
300 Laporte Avenue
Fort Collins, Colorado
Cablecast on FCTV Channel 14 &
I:670'freMW E:1005KO7it .tZ I ..M,
The City of Fort Collins will make reasonable accommodations for access to City services, programs,
and activities and will make special communication arrangements for persons with disabilities. Please
call 221-6515 (TDD 224-6001) for assistance.
Regular Hearing
November 16, 2017
Member Schneider called the meeting to order at 6:00 p.m.
Roll Call: Carpenter, Hansen, Heinz, Hobbs, Rollins, Schneider and Whitley
Absent: none
Staff Present: Gloss, Yatabe, Schmidt, Shepard, Mounce, Tatman-Burruss, and Cosmas
Chair Schneider provided background on the board's role and what the audience could expect as to the
order of business. He described the following procedures:
• While the City staff provides comprehensive information about each project under consideration,
citizen input is valued and appreciated.
• The Board is here to listen to citizen comments. Each citizen may address the Board once for
each item.
• Decisions on development projects are based on judgment of compliance or non-compliance with
city Land Use Code.
• Should a citizen wish to address the Board on items other than what is on the agenda, time will
be allowed for that as well.
• This is a legal hearing, and the Chair will moderate for the usual civility and fairness to ensure
that everyone who wishes to speak can be heard.
Planning & Zoning Board
November 16, 2017
Page 2
Agenda Review
Planning Director Gloss reviewed the items on the Consent and Discussion agendas, stating that all
items will be heard as originally advertised.
Public Input on Items Not on the Hearing Agenda:
None noted.
Consent Agenda:
1. Draft Minutes from October 19, 20171 P&Z Hearing
2. Eligibility Expansion for Affordable Housing Fee Waivers
3. Three -Mile Plan Update
Public Input on Consent Agenda:
None noted
Chair Schneider reviewed the
items
that are
on consent and reiterated that those items will not have a
separate presentation unless
pulled
from the
consent agenda.
Member Heinz made a motion that the Planning and Zoning Board approve the Consent agenda
for the November 16, 2017, Planning and Zoning Board hearing as originally advertised. Member
Hobbs seconded the motion. Vote: 7:0.
Vice Chair Hansen and Assistant City Attorney Yatabe recused themselves
due to conflicts of interest at 6:05pm. Senior Assistant Attorney Schmidt
continued in Assistant City Attorney Yatabe's place.
Discussion Agenda:
4. Spring Creek Rezone
Project: Spring Creek Rezone
Project Description: This is a request to adjust the location, size and boundary between two zone
districts within a 19.55 parcel located at the southeast corner of South Shields Street and Hobbit Street.
The result of the shift is that the Neighborhood Commercial (N-C) zone is shifted south and reduced by
2.88 acres while the Medium Density Mixed -Use Neighborhood (M-M-N) zone is shifted north and gains
a corresponding amount of land area. As proposed, the N-C zone would be reduced to 6.42 acres and
the M-M-N zone would be enlarged to 13.13 acres. There is no formal development plan currently in the
review process. There is, however, a Concept Plan that is associated with the rezoning that helps to
inform all interested parties as to the development potential of the parcel based on the adjusted zone
districts, and forms the basis for the staff recommendation and the six conditions of approval. The site is
undeveloped and vacant.
Recommendation: Approval
Planning & Zoning Board
November 16, 2017
Page 3
Secretary Cosmas reported that one citizen email had been received from residents in the Sheely and
Wallenburg neighborhoods encouraging the P&Z Board to approve the proposed zoning changes,
assuming they also accept the conditions being presented.
Staff and Applicant Presentations
Chief Planner Shepard provided a brief overview of this recommendation. Steve Schroyer, Director of
Real Estate for Blue Ocean Enterprises, gave a detailed presentation of this project, showing slides of
the overall layout of the area and surrounding neighborhoods. He discussed the previous difficulties of
developing this site, the zoning challenges, the surrounding commercial sites, and density challenges.
He described the processes that had been followed for neighborhood outreach and community
involvement. He also discussed the procedures that had been followed to ensure neighborhood
compatibility with the West Central Area Plan and Nature in the City. Lastly, he described the final
concept plan for development.
Chief Planner Shepard provided a brief analysis of the proposal, recommending approval with the six
conditions listed in the staff report.
Public Input (3 minutes per person)
Per Hogestad, 1601 Sheely Drive, gave a brief history of the prior development attempts for the parcel in
question. He believes that this proposal will be compatible with the surrounding neighborhood, and he
would like to know how many similar developments have been supported in this way. He urged the P&Z
Board to include the concept plan and the conditions being presented.
Deb Applin, 1608
Sheely Drive, is
pleased with the proposal
but
also stressed the importance of
including
the
conditions that have
been proposed;
otherwise
she
would not support this rezoning.
Allan Lamborn, 1929 Sheely Drive, recounted some history of this parcel, sharing his own personal
experience with past processes. He stated the intentions held by the community of finding a mutually -
compatible project. He feels that this proposal is compatible with his neighborhood, provided the
conditions are also recommended. He also believes that this is an extraordinary model of effective
neighborhood/applicant negotiations for future cooperative outcomes.
Rick Hoffman, 1804 Wallenburg, understands that his mountain views will be compromised but is still
willing to work with the developer, who has worked hard to bring consensus rather than conflict. He is
interested in this outcome being a win/win for everyone involved.
Board Questions
Member Rollins asked about the maximum allowable building height; Chief Planner Shepard responded
that the height is dependent on the roof pitch. Chair Schneider praised the Applicant for working with the
citizens; however, he is curious about conditioning at the rezoning level rather than during the Project
Development Phase (PDP). Chief Planner Shepard explained that providing the proper zoning is the
basis for a project, which then prescribes the land uses and standards; therefore, adjustments to the
zoning must be addressed at the point of issue. Chair Schneider expressed concerned with conditioning
now rather than when the plan is being developed in detail. Chief Planner Shepard explained the
reasoning behind the conditions at this time, mainly because the zoning was originally based on a plan
developed in 1987 to accommodate a larger building; those conditions subsequently expired, making
that zoning obsolete..
Planning & Zoning Board
November 16, 2017
Page 4
Member Carpenter asked if it is legally acceptable to condition the rezoning at this time. Sr. Assistant
Attorney Schmidt confirmed that the code allows this now. Chief Planner Shepard provided another
example of a similar situation (rezoning with conditions): Gateway at Prospect.
Board Deliberation
Member Hobbs stated that he will support this proposal. Planning Director Gloss asked the Applicant to
ascertain his acceptance of the conditions. Mr. Schroyer confirmed that he is in agreement with the
community on the conditions proposed, and he stated that Blue Ocean is prepared to follow through as
needed.
Member Rollins is in full support of the conditions, saying she is pleased with the cooperation of the
community and the Applicant. Both Member Whitley and Member Carpenter are in full support, saying
this will set a good precedent for future project cooperation. Member Heinz will also support the
proposal. Member Whitley added his appreciation for the Applicant's methodical approach to presenting
the development process.
Member Hobbs made a motion that the Planning and Zoning Board recommend that City Council
approve the Spring Creek Rezoning #REZ170001, subject to and including the following six
conditions:
• Condition Number One: Development of the M-M-N parcel, as adjusted and enlarged to
13.13 acres by this rezoning application shall include two-family dwellings along the entire
eastern perimeter forming a buffer and transition between any multi -family buildings and
houses in the adjoining neighborhoods as generally indicated on the applicant's Concept
Plan (applicant's exhibit 6) with exceptions made for stormwater facilities, private parks,
landscaping and walkways. M AM
• Condition Number Two: Multi -family development on the M-M-N parcel, as adjusted and
enlarged to 13.13 acres by this rezoning application, shall not contain any dwelling units
that feature a rent -by -the -bedroom leasing model.
• Condition Number Three: Development of the M-M-N zone district parcel, as adjusted and
enlarged to 13.13 acres by this rezoning application, shall be limited to residential
permitted uses and accessory uses only.
• Condition Number Four: The maximum number of multi -family dwelling units shall be 365.
• Condition Number Five. The maximum allowable building height of the two-family
dwellings shall be two stories.
• Condition Number Six: Development of the N-C zone district parcel, as adjusted and
reduced to 6.42 acres by this rezoning application, shall be limited to the primary and
supporting uses as envisioned by Principle LIV 36.1 of City Plan and Section 4.23(B) of the
Land Use Code, and that residential permitted uses shall be limited to Accessory Uses,
Two -Family Dwellings and Mixed -Use Dwellings in accordance with Section 4.23(D)(2) of
the Land Use Code.
This recommendation is based upon the agenda materials, the information and materials
presented during the work session and this hearing, and the Board discussion on this item with
the following findings:
Planning & Zoning Board
November 16, 2017
Page 5
• That the rezoning and the conditions comply with all applicable Land Use Code
requirements as stated in the staff report prepared for this hearing and contained in the
agenda materials.
• That the information,
analysis, findings
of fact,
and conclusions contained
in the staff
report included in the
agenda materials
for this
hearing are adopted by this
Board.
• That the six listed conditions comply with the provisions of LUC Section 2.2.9 in that they
are necessary to accomplish the purposes and intent of the LUC and have a reasonable
nexus to the potential impacts of the proposed rezoning and are roughly proportional in
nature and extent to such impacts.
Chief Planner Shepard asked to amend the motion, under Condition 1, to include the word "entire" prior
to "eastern perimeter" in the reading of the motion; Member Hobbs accepted this amendment. In
addition, Chief Planner Shepard asked to amend the motion, under Condition 6, to include "Principal LIV
36.1" rather than saying "54"; Member Hobbs accepted this amendment.
Member Carpenter seconded. Member Rollins commented that she has a small concern with
Condition 1 in reference to the development of a final Concept Plan. She suggested that parameters be
placed on this, because of the level of detail. Chief Planner Shepard stated that the term "Concept Plan"
is a defined term in the Land Use Code and is a way to address and tie together the conditions at this
stage. Chair Schneider reiterated his reluctance to have conditions at this stage. Vote: 6:0.
Other Business
None noted.
Chair Schneider moved to adjourn the P&Z Board hearing. The meeting was adjourned at 6:53pm.
Cameron Gloss, Planning Director
Jeff Schneider, Chair
Agenda Item 2
PROJECT NAME
TRAIL HEAD TRACTS F & G TOWNHOMES PDP #170035
STAFF
Clark Mapes, City Planner
PROJECT INFORMATION
PROJECT DESCRIPTION: This Project Development Plan proposes 89 townhome units on two tracts
of land within the original 2004 Trail Head subdivision. The tracts are
located along the north side of East Vine Drive between Wagon Trail Road
and Campfire Road, flanking Greenfields Drive where it enters the Trail
Head neighborhood. The tracts total 10.7 acres and are designated for
"future multi -family" development. Proposed buildings are a mix of 2, 3,4,
and 5-unit buildings. All units face streets or `Connecting Walkways' and
have rear 2-car attached garages. Additional guest parking is provided
both off-street and on -street.
APPLICANT: JR Engineering
2900 S. College Ave., Ste. 3D
Fort Collins, CO 80525
OWNER:
RECOMMENDATION
EXECUTIVE SUMMARY
Trail Head, LLC — Stan Scott
5013 Bluestem Court
Fort Collins CO, 80525
Staff recommends approval of Trail Head Cottage Neighborhood PDP
#170035.
Notable aspects of the proposed Project Development Plan (PDP) are:
• This
PDP would
complete the Trail Head
residential
development as previously
approved. Staff
finds
the 89 units
to be consistent with the
approved
designation of `future multi -family'.
• Parking significantly exceeds code requirements.
• Traffic impacts from the 89
dwelling units were reviewed and are
relatively minor. In particular,
impacts to two intersections
with well-known
capacity issues were
reviewed -- Vine
Item # 2 Page 1
Agenda Item 2
Drive/Timberline Road and Vine Drive/Lemay Avenue. This PDP does not trigger the threshold for
any required improvements at Vine/Lemay. For Vine/Timberline, the applicant will provide a
monetary contribution towards a City signalization project that is proportional to their impact.
• A mix of seven different building models is distributed along streetscapes and `Connecting
Walkways'.
• Central outdoor spaces with walkway linkages provide lawn space, picnic tables, bbq grills, and a
gazebo.
• A future City Neighborhood Park site abuts the western tract, on the west side of Greenfields
Drive; and the plan provides additional walkway connections to the park site.
• The PDP includes existing trees which have been carefully evaluated for protection, relocation,
removal, and mitigation for removals.
Staff has
evaluated
the
request
under
applicable sections of the Land Use Code, and finds that the plan
comports
with
City
Plan
and the
Land
Use Code.
STAFF ANALYSIS
1. SURROUNDING ZONING AND LAND USES
Surrounding zoning and land uses are as follows:
Direction
Zone District
Existing Land Uses
North
LMN, Low Density
Mixed
Use
Trail Head subdivision
— single
family
Neighborhood
houses
South
LMN, Low Density
Mixed
Use
Undeveloped land across Vine
Drive
Neighborhood
East
LMN, Low Density
Mixed
Use
Trail Head subdivision
— single
family
Neighborhood
houses
West
LMN, Low Density
Mixed
Use
Trail Head subdivision
— single
family
Neighborhood
houses
2. COMPLIANCE WITH ZONING DISTRICT STANDARDS
Article 4 of the Land Use Code contains standards for the various zoning districts throughout the City.
The subject property is zoned Low Density Mixed Use Neighborhood (LMN), Division 4.5 of the Land
Use Code.
Staff finds that the PDP complies with the applicable zoning district standards.
Applicable standards are discussed below in the order found in the code.
Item # 2 Page 2
Agenda Item 2
Purpose Statement for the LMN Zone - Code Section 4.5 (A)
Staff finds that the proposed project is consistent with the stated purpose of the zone district.
This Section states:
"Purpose. The Low Density Mixed -Use Neighborhood District is intended to be a setting for a
predominance of low density housing combined with complementary and supporting land uses that
serve a neighborhood and are developed and operated in harmony with the residential characteristics
of a neighborhood. The main purpose of the District is to meet a wide range of needs of everyday
living in neighborhoods that include a variety of housing choices, that invite walking to gathering
places, services and conveniences, and that are fully integrated into the larger community by the
pattern of streets, blocks, and other linkages. A neighborhood center provides a focal point, and
attractive walking and biking paths invite residents to enjoy the center as well as the small
neighborhood parks. Any new development in this District shall be arranged to form part of an
individual neighborhood. "
- The project adds a housing choice, and is designed with characteristics that are in harmony with the
neighborhood.
Permitted Uses in the LMN Zone - Code Section 4.5 (B)
- The proposed Single Family Attached residential use is permitted.
Residential Density in the LMN Zone - Code subsection 4.5 (D)(1)
The plan complies.
Density standards limit
development
plans to a
maximum of 9 dwelling units (d.u.) per acre, with any
phase of a multi -phase
development
plan limited
to 12 d.u./acre.
- The plan
density
is 8.3 d.u./acre.
This meets the standards whether considered independently of the
Trail Head
PDP, or
as a component
of Trail Head's overall density.
Building Height in the LMN Zone - Code subsection 4.5 (E)(3)
The plan complies.
The height limit is 2'/2 stories.
- Buildings have 1, 1-1/2, and 2-story portions.
Item # 2 Page 3
Agenda Item 2
3, COMPLIANCE WITH GENERAL DEVELOPMENT STANDARDS FOR ALL DEVELOPMENT
Article 3 of the Land Use Code contains standards for all development city-wide to be used in
conjunction with zoning district standards. Staff finds that the project complies with all applicable
General Development Standards. Applicable standards are noted below in the order found in the Code.
Landscaping and Tree Protection Standards - Code Section 3.2.1
Staff finds that the plan complies.
This Section requires a fully developed landscape plan that addresses relationships of landscaping to
the streets, the buildings, abutting properties, and users on the site. Main plan components are:
- A tree mitigation plan that accounts for existing trees to be removed.
- Tree -lined streets and walkway spines.
- A range of appropriate turf grass and shrub bed areas around buildings, in the central outdoor spaces,
and in perimeter buffer areas.
- Renovation of the existing entry landscape features at the three street entries to Trail Head. These
features are located on the two tracts. Entry signs and fence features are retained, and landscaping will
be adjusted and renovated to coordinate with adjacent buildings and new landscaping.
Note that no street trees are shown along Vine Drive because the owner has previously paid cash -in -lieu
of construction for a larger future street improvement project which will include landscaping along with
curb and gutter to define the street edge.
Access, Circulation and Parking Standards - Code Section 3.2.2
Staff finds that the plan complies.
Code Section 3.2.2 requires safe, convenient, efficient on -site parking and circulation improvements that
add to the attractiveness of the development. Main plan components are:
- Walkways providing direct connections to the central outdoor spaces and the abutting future
Neighborhood Park site.
- Private drive alleys providing access to rear garages and guest parking.
- Bike racks in the central outdoor spaces . (No bike parking is required for the single family units.)
Note that the street network provides the main framework of access and circulation, including
`Connecting Walkways' linking side -loaded buildings to street sidewalks.
Item # 2 Page 4
Agenda Item 2
Parking Standards - Code Section 3.8.10
The plan complies.
Code Section 3.8.10 contains the applicable single family parking requirement of 2 off-street spaces per
unit based on lots less than 40 feet wide. The plan provides:
- A 2-car attached garage with each unit.
- A total of 26 guest parking spaces tucked into bump -outs on the rear private drive alleys.
- New on -street parking on two new segments of Green Lake Drive.
Note that existing on -street parking is also available on Wagon Trail Road and Campfire Drive, and on a
portion of Greenfields Drive.
Site Lighting Standards— Code Section 3.2.4
The plan complies. No exterior site lighting is proposed.
- Lighting on building exteriors will be down -directional, sharp cutoff fixtures in compliance with
standards.
Subdivision Plat Standards — Code Section 3.3.1
The plan complies.
This Section requires a subdivision plat to define buildable lots and dedicate rights -of -way and
easements needed to serve the development.
- A new subdivision plat is provided and meets the requirements.
Building and Project Compatibility Standards— Code Section 3.5.1
Staff finds that the plan complies.
Standards in
Section 3.5.1
require
compatibility with
the
context of the surrounding area in terms of
building size,
massing
proportions,
design character
and
building materials.
- The architectural character proposed is substantially similar to the residential character of houses in
Trail Head.
Residential Building Standards — Code Section 3.5.2
The plan complies.
Item # 2 Page 5
Agenda Item 2
Standards in this Section are intended to promote variety, visual interest and pedestrian -oriented
streets in residential development.
Dwellings
must
be
placed in
direct relation to street sidewalks, without requiring
pedestrians to walk
across parking
lots
or drives.
In the plan:
- All dwellings face streets or `Connecting Walkways' leading directly to sidewalks.
At least three different building models are required. In the plan:
- Seven different building models are provided. Some are placed in mirror -image configurations which
adds further variation.
Mitigation of garage door impacts on pedestrian -oriented streetscapes is required.
- No garages face the streets.
Streets, Streetscapes, Alleys, and Easements - Code Section 3.6.2
The plan complies.
This Section requires street improvements in accordance with the Larimer County Urban Area Street
Standards, and requires necessary easements for utilities and access.
- The plan provides required street improvements in the form of new Green Lake Drive extensions.
- The
plan
provides a sidewalk
along Vine Drive in its
ultimate planned location, with the remainder of
Vine
Drive
improvements to be
part of a larger future
project.
Transportation Level of Service Requirements - Section 3.6.4
This Section requires appropriate mitigation of impacts upon the transportation system. It is closely
interrelated with several other Sections involving streets and other transportation system aspects.
A Traffic Impact Study that addresses mobility for all modes and impact on the transportation system by
this development was completed by the applicant and reviewed by City staff. There are two
intersections in the vicinity of the development that were carefully reviewed:
• The intersection of Vine Drive and Lemay Avenue can be constrained by Adequate Public
Facilities (APF) requirements for developments with significant impact on the intersection. This
development will add very limited traffic to the intersection, well below the threshold for triggering
APF, and the change in delay due to the development is nominal. No mitigation is required.
• The intersection of Timberline and Vine Drive is not constrained by APF, but is experiencing long
delays. This development is adding some traffic to the intersection. The identified improvement
at this intersection is signalization. Due to the complexity of the improvement immediately
Item # 2 Page 6
Agenda Item 2
adjacent to the railroad, the City is undertaking the project. As required for other recently
approved developments in the area:
- This development will provide a monetary contribution for the signalization project that is
proportional to the impact.
No other impacts were identified that warrant additional mitigation beyond the streets, sidewalks and
walkways provided in the plan. Note that future transformation of the major street network in this
northeast portion of the city is envisioned, but is a topic that ranges far beyond the scope of this PDP
Emergency Access - Code Section 3.6.6
The plan complies.
- Poudre Fire Authority has reviewed the development plan to ensure emergency access to and
throughout the site.
4. NEIGHBORHOOD MEETING:
A neighborhood meeting was held on August 28, 2017 with approximately 40 participants.
The most prominent topics involved traffic and parking. Wide ranging discussion included topics of
future growth and change envisioned in this northeast area of Fort Collins, beyond the scope of the
proposed townhome project.
5. FINDINGS OF FACT AND CONCLUSIONS:
In evaluating the request for the Trail Head Cottage Neighborhood Project Development Plan, staff
makes the following findings of fact and conclusions:
A. The PDP complies with the process outlined in Article 2, Division 2.2 - Common Development
Review Procedures for Development Applications.
B. The PDP complies with applicable standards in Article 3 - General Development Standards.
C. The PDP complies with applicable standards located in Article 4, Division 4.5, Low Density Mixed
Use Neighborhood.
6. RECOMMENDATION:
Staff recommends that the Planning and Zoning Board make a motion to approve the Trail Head
Cottage Neighborhood Project Development Plan # 170035 based on the Findings of Fact found in the
staff report.
Item # 2 Page 7
Agenda Item 2
ATTACHMENTS
1. Location Map (JPG)
2. Applicant Narrative (PDF)
3. Site Plan (PDF)
4. Architecture (PDF)
5. Landscape Plan (PDF)
6. Plat (PDF)
7. Neighborhood Meeting Notes (PDF)
8. Traffic Impact Study (PDF)
Item # 2 Page 8
Trail Head Townhomes
Attachment 1
These map products and all underlying dam are developed for use by the City of Fort Collins for its internal purposes only, and were not designed or intended for general use by members
of the pubic. The City makes no representation or warranty as to it accuracy, timeliness, or completeness, and in particular, its accuracy in labeling or displaying dimensions, contours,
property boundaries, or placementof location of any map features thereon. THE CITY OF FORT COLLINS MAKES NO WARRANTY OF MERCHANTABILITY OR WARRANTY FOR
FITNESS OF USE FOR PARTICULAR PURPOSE, EXPRESSED OR IMPLIED, WITH RESPECT TO THESE MAP PRODUCTS OR THE UNDERLYING DATA. Any usersof these map
product, map applications, or data, accepts same AS IS, WITH ALL FAULTS, and assumes all responsibility of the use thereof, and further covenant and agrees to hold the City harmless
from and against all damage, loss, or liability arising from any use of this map pmtluct, in consideration of the Citys having made this information available. Independent verification of all data
contained herein should be obtained by any users of these product, or underlying data. The City disclaims, and shall not be held liable for any and all damage, loss, or liability, whether dimc(
indirect, or consequential, which apses or nay arise from these map products or the use thereof by any person or entity.
N
W
E
S
Fort of
GIS
Attachment 2
Statement of Planning Objectives
Trail Head Cottage Neighborhood Project Development Plan
Introduction
• The proposed site is located along the north side of East Vine Drive between Wagon Trail Road
and Campfire Road and is part of the overall Trail Head Subdivision. The property is comprised
of two existing tracts of land of the Trail Head Subdivision, Tracts F (5.19 acres) and G (5.54
acres) with the total site area of the proposed development being approximately 10.73 acres in
size. The site is currently vacant and has approximately 75 existing trees many of which will be
protected during construction and preserved.
The Trail Head property is currently annexed to the City of Fort Collins and is Zoned LMN -
Low Density Mixed -Use Neighborhood. The proposed use is Attached Single Family
Townhomes which is a Permitted Use within the LMN Zoning District. Given the total number
of proposed bedrooms within the Trail Head Cottage Neighborhood the PDP application will be
considered a Type II Permitted Use which will require Planning and Zoning Board Approval.
The Trail Head Cottage Neighborhood proposes a total of 89 Single Family Attached Dwelling
Units which represents an Overall Gross Density of 8.3 Dwelling Units per Acre. Tract F
proposes 45 Dwelling Units on 5.19 acres at 8.68 DU's/Ac and Tract G proposes 46 Dwelling
Units on 5.54 acres @ 7.94 DU's/Ac. The City's Land Use Code for the LMN Zoning District
allows any single phase of a Multi -Phased Development, which the Trail Head development is
considered, to have a density up to 12 dwelling Units per Acre. The City of Fort Collins Land
Use Code Section 4.5 D I (c) states the following:
"The maximum density of any phase in a multiple -phase development plan shall be twelve (12)
dwelling units per gross acre of residential land, and the maximum density of any portion of a
phase containing a grouping of two (2) or more multi -family structures shall be twelve (12)
dwelling units per gross acre of residential land.
• The intent of the applicant (Trail Head LLC)
is
to subdivide
the
property
into
a total
of 89
individual residential lots. Each homeowner
will
have Deed
of
Title for
each
lot and
each
property will be sold as a Fee Simple Townhome not as a Condominium. The Home Owners
Association (HOA) will own and maintain all of the Tracts within the development and will be
responsible for the initial landscape and irrigation installation on each lot as they are constructed
and sold. Additionally each of the individual lots and will irrigated by way of the existing "Gray
Water" Main line Irrigation System located on site and the HOA will fully maintain the
Landscape and Irrigation on each Lot into perpetuity.
JJ R ENGINEERING
Attachment 2
Development Phasing
• The Trail Head Cottage Neighborhood is proposed to be constructed as two separate phases of
development and shall include the following:
Phase I: Tract G (5.19 Acres) construction is expected to begin at the end of the 2nd
quarter of 2018. Phase I shall include the construction of 45 Townhomes, associated
private alleys with wet/dry utilities as well as Green Lake Drive curb, gutter, sidewalk,
asphalt pavement and all wet/dry utilities from Wagon Trail Road to Greenfields Drive.
Phase II: Tract F (5.54 Acres) construction is expected to begin in the I st quarter of
2020. Phase II shall include the construction of 44 Townhomes, associated private alleys
with wet/dry utilities as well as Green Lake Drive curb, gutter, sidewalk, asphalt
pavement and all wet/dry utilities from Greenfields Drive to Campfire Drive.
Property & Development Ownership
• Trail Head LLC is the current owner of Tracts F and G and has been since late July of 2017.
The ownership of Tract H which is included in the overall plat is the City of Fort Collins.
• Tract H of the Trail Head Second Subdivision is included in the overall plat of the Trail Head
Cottage Neighborhood do to a pending land exchange proposed by the City's Parks department
related to the modification of the North boundary of Tract G. If the land exchange is approved
by City Council the common north/south boundary of Tracts F and H will be modified as shown
on the PDP.
Site Planning and Overall Design Concept
• The Trail Head Cottage Neighborhood site has been designed to help foster the Goals and
Objectives of the City's Land Use Code. As stated in the City's Land Use Code developments
greater than 20 acres in size are required to provide a Mix of Housing Types in order to
promote housing variety and diversity. The overall Trail Head Development currently
provides only two distinct housing types, Single Family Detached Homes with front access
garages and Single Family Detached Homes with rear alley access garages. The Trail Head
Cottage Neighborhood will complete the mix of housing types by providing the third housing
type, Attached Single Family Homes with alley access garages.
• In preparing the development program for Trail Head Tracts F and G the developer wanted to
address the region environmental sustainability and housing affordability issues by building
smaller houses on a small parcel of infill property. The Trail Head Cottage Neighborhood is a
housing style that is based on the idea building "better homes not bigger homes." Cottage style
townhomes are often more acceptable to neighbors than other forms of higher density housing
and are a useful transition from lower density single family detached housing. It makes more
JJ R ENGINEERING
Attachment 2
efficient use of the land thus they can be more affordable and offers better energy efficiency than
traditional single family detached housing, while at the same time providing more privacy than
other forms of attached housing. The Trail Head Cottage Townhome Development is a
collection of small attached single family homes arranged either facing the public pedestrian way
or centered on a community park or green courtyard, with garage being access via a private
alley and screened from public right -of way view. The Trail Head Cottages gain their efficiency
through higher densities than other single family detached homes in the Trail Head community.
They will be built on individual lots and will have attached 2 car garages. The advantages of the
Trail Head Cottage Neighborhood is that it is a much more the efficient use of land and will
make the most the limited amount of space malting them ideal for as an urban infill development.
The Design Team wanted to complete the overall Trail Head Subdivision in a unified and
cohesive fashion, creating a pedestrian friendly environment with public streets that seek to
encourage a cohesive and pedestrian focused environment. The overriding design objective was
to develop a successful Cottage Community that would be "Pedestrian and Neighborhood
Centered". The Cottage Neighborhood Design Concept relies on homes being pedestrian and
green space focused with alley loaded garages that help to subordinate the automobile and
enhance the pedestrian and neighborhood experience. Each single-family attached cottage will
have a two (2) car attached garages accessed by a 20' wide private alley which also provide off-
street parking for guest.
Sustainable Practice & Responsibility: The Trail Head, LLC group is committed to Sustainable
Development Practices for the Trail Head Cottage Neighborhood. This is articulated across both
the Social and Environmental Sustainability spectrum. One of the primary development goals of
the Trail Head Cottage Neighborhood is to build "Right Sized Homes" and not to build in excess.
The community is intended to be Home Owner/Family and Pedestrian focused with homes
centered on community open space, parks, and safe, sustainable pedestrian corridors.
Additionally the site and building design of Trail Head Cottages will be mindful of the use of
sustainable building materials and material excess. This is intended to be a neighborhood that
minimizes impervious surfaces such as asphalt and concrete pavement while at the same time
maximizing usable green open space that is designed to be "Water Wise" and easily
maintainable. The extensive open space area of the development will help reduce the "Heat
Island" affect often associated with suburban infill development. This significant reduction in
hardscape and increased cooling benefits of the extensive open space area will most certainly
aid in reducing the overall carbon footprint of the proposed Trail Head Cottage Neighborhood.
• Safety: The Trail Head Cottage Neighborhood will benefit on several safety levels by providing
the Pedestrian Focused street that when coupled with the 20' private alleyways create a more
cohesive neighborhood with "Safe Streets" and "Safe Pedestrian Spaces" for its residents. First
and foremost is Emergency Vehicle Access via the 20' wide private alley and a 36' wide
JJ R ENGINEERING
Attachment 2
Residential Local Street section. Since each home will include a 2 car garage accessed by a 20'
wide private alley, Emergency Access Vehicles and personnel will have adequate
maneuverability and operational space in both the front and rear of every home this will
actually provide more Emergency Vehicle accessibility than many of the homes within Trail
Head.
• Parking: The Developers of Trail Head plan on restricting homeowner/resident parking to the 2
car garage provided with each home and will do so via the Home Owner Covenants and
Restrictions. Additional Off-street/On-alley surface parking will be provided as well and will be
signed for visitors only. Additional public on -street parking will also be provided on each side of
the proposed 36' wide Green Lake Drive Residential Local Street and along the existing adjacent
Residential Local Streets of Wagon Trail Road and Campfire Drive and also portions of
Greenfields Drive Collector Road if the proposed restriping of Greenfields Drive is approved
with this PDP.
Landscape and Site Design
• Tree Planting Standard — The project will
provide streetscaping
along all public
streets as
well as within the privately owned HOA Tracts
and landscaping of
private lot areas
identified
within the property and surrounding each of
the proposed units.
Tree planting as per city
standards shall be met in order to add to the
urban tree canopy of
the immediate area. Tree
planting will be interspersed throughout the site,
and within LID storm
drainage areas
as shown
on the Landscape Plans.
• Landscape Standards — It is the intent for the development's landscaping to meet or exceed
the City's standards for streetscape, open space and building landscaping. All areas that are
landscaped shall be irrigated with a permanent automatic underground irrigation system unless
they are intended to be non -irrigated. Any areas identified on the Landscape Plan to be non -
irrigated shall be irrigated with a temporary above ground irrigation system and irrigated until
such time that proper establishment of seeded areas has been achieved, a minimum of two
growing season.
• Tree Protection and Replacement — There are currently 73 existing trees within the Trail
Head Tracts F and G development area that will need to be protected, relocated and/or
removed to accommodate the proposed development and its various site improvements. The
Tree Mitigation Plan accurately identify the locations of all existing on -site trees each of which
are appropriately labeled to show the applicant's intent for each tree.
• Bicycle Parking — Bike Parking has been provided in each of the Community Park/Open
Spaces as shown on the PDP Site and Landscape Plans.
41 - J J R ENGINEERING
Attachment 2
• Walkways — Walkways within the development are located and aligned to directly and
continuously connect areas of pedestrian origin and destination. Walkways will link Public
Street and sidewalks with open space areas.
• Direct On -Site Access to Pedestrian and Bicycle Destinations — The on -site pedestrian
and bicycle circulation system is designed to provide, and allow for, direct connections to
pedestrian and bicycle destinations and open space areas.
• Transportation Impact Study — Based on a previously meeting with the City's
Transportation Department it was determined that the proposed development would be
required to submit a Transportation Impact Study which has been included with this PDP
submittal.
• Vehicular Access — Vehicular access to each of the residential unit's private attached garages
shall be provided via a 20' wide private alley connected to at various locations along Green Lake
Drive no direct access to the proposed residential lots will be allowed from Wagon Trail Road,
Campfire Drive or Greenfields Drive. The on -site private alleys have been designed to be safe,
efficient, convenient and attractive, and have been considered for use by all modes of
transportation.
• Trash and Recycling — Trash and Recycling containers shall be provided to each home to
accommodate the collection, separation, storage and pickup of trash and recyclable materials.
Trash and Recycling containers for each residential unit shall be stored inside each of the
individual private garages and shall be put outside for pickup and removal on the designated
trash collection day. The HOA will coordinate with the greater Trail Head Community HOA in
order to designate a Trash Hauling provided that eliminates the need for any additional Trash
Service pickup days.
• Emergency Vehicle Access — To ensure that emergency vehicles can gain access and
maneuver throughout the proposed site, and so that emergency personnel can provide fire
protection and emergency services each of the 20' wide private alleys will be designated as a 20'
wide Emergency Access Easement.
• Parking — The parking needs for each of the residential units will be met with an attached 2 car
garage. In addition to each 2 car garage both on street parking along Green Lake Drive and off
street parking along the 20' wide private alleys has been provided. All required parking is to be
provided on -site. See Sheet I of the Project Development Plan for a detailed accounting of
vehicle parking proposed for development.
5
) J R ENGINEERING
Attachment 2
Architectural Design
• Building and Project Compatibility — Section 3.5.1 of the City's Land Use Code requires
that the physical and operational characteristics of the proposed buildings and their uses be
compatible with the context of the surrounding area. The proposed development, we believe
can be determined to be compatible based upon the residential uses and the architectural
character proposed which will be substantially similar in building scale, form and material
composition with the existing residential structures in close proximity to Filing Seventeen.
• Architectural Character — The architecture of the Trail Head Cottage Neighborhood will be
compatible with and enhance the existing standards of quality of the overall Trail Head
Development. The developer proposes 4 different home models contained within I I different
building groups and each building group will display a distinct architectural elevation so as to
eliminate any repetition within the overall development.
• Building Size, Height, Bulk, Mass and Scale — The proposed residential building size,
height, bulk, mass, and scale are intended to be similar and compatible with the existing
neighborhood's character and quality. Residential homes in the Trail Head Cottage
Neighborhood will be a combination of one and two story structures.
• Building Materials — The Trail Head Cottage Neighborhood will established a distinct
architectural theme, building style, materials and colors within the existing neighborhood.
Similar building forms, architectural detailing, color and texture, shall be utilized throughout the
entire Trail Head Cottage Neighborhood in order to enhance the overall architectural
experience of the neighborhood and to insure continuity throughout the entire development.
• Building Height — The height of all proposed residential structures shall be consistent with
what is allowed by City's Land Use Code in the LMN Zoning District. Effects of this project on
access to sunlight and the effect on desirable views have been considered in the overall site
design and it has been determined that there is minimal to no undesirable affects that are
anticipated by the proposed height or placement of the residential buildings within the proposed
development.
Storm Drainage & LID Design
• The overall design concept related to site drainage is to convey developed runoff through a
series of bio-swales and pre -sedimentation basins which are located throughout the property in
order to accomplish the required LID goals as established by the City of Fort Collins.
Developed runoff from the site will then be conveyed into two existing detention ponds which
were originally designed to meet the detention requirements of a similar project at full build out.
G - J J R ENGINEERING
I
Attachment 2
• The Trail Head Cottage Neighborhood has been designed in such a way as to exceed the City's
desired LID goals which are to treat 50% or more of the new impervious areas. The Grading
and storm drainage design will allow more than 71 % of all the new impervious area of the site to
passes through an LID Stromwater Quality feature thus reducing impacts to the urban
watershed and nearby streams and downstream drainage conveyances systems. The Trail Head
Cottage Neighborhood is a model for Low Impact Urban Stormwater Development.
Development Schedule
• Construction Start: Phase I Summer of 2018; Phase II Winter 2020
• Construction Completion: Winter 2022
Narrative Addressing Concerns Raised at Neighborhood Meeting
A Neighborhood Meeting was conducted on August 28, 2017, at the City of Fort Collins Street
Department. Approximately thirty six (36) neighbors from the notification area attended the meeting.
Questions and concerns were addressed by the applicant's consultant at this meeting. The most
significant issue discussed at this meeting by the neighbors had to do with the existing traffic congestion
and future signalization at Timberline Road and East Vine Drive intersection which was expressed by
many of the neighbors as a problem which has existed for many years. Clark Mapes, with Planning and
Nichole Hahn from Traffic Operations explained to the neighbors that there is a long term plan in place
to address this existing traffic issues at this intersection as well as at the Lemay Avenue and East Vine
drive intersection in the future and indicated that the Trail Head Cottage Neighborhood Transportation
Impact Report will have to address any additional impacts being added to this intersection as a result of
the proposed development in the future. The neighborhood also expressed concerns with the density
of the development. Ken Merritt with JR Engineering explained that the density allowed in the LMN
Zoning District is 12 Du's/Ac. thus allowing up to 129 possible units to be built on the 10.73 acres of
property. It was pointed out during the presentation by Mr. Merritt that the development is only
proposed 89 units with an overall density of 8.3 Du's/Ac. which was well below the density allowed in
the LMN Zone District for attached single family housing located within a multi -phase development as
stated in the City 's Land Use Code.
71 - ) J R ENGINEERING
PROPERTY OWNER
TRAIL HEAD, LLC
ATTN: STAN SCOM
5013 BLUESTEM COURT
FORT COLLI NS, CO 005M
P-9 O0217.4RSS
STAN SCOTT@ME COM
PLAN NER/LANDSCAPE ARCH ITECT
)R ENGINEERING, LLC
ALIN: KEN MERRIM,, APA RIA
2900 SOUTH COLLEGE AVE, SUITE 3D
FORT COLLI NIS, CO BOSES
P—WO BO56754
KMERRITUDSERENGINEERING COM
ARCHITECT
MICHAEU X OLSEN ARCHITECtS
ATTN: MICHAELOISEN, AIA
1169 HILLTOP PKM,, #2O5B
STEAMB0ATSPRING5, CO SM71
P-9708701584
M)KOA)MMOARCH COM
PROJECT DEVELOPMENT PLAN
TRAIL HEAD COTTAGE NEIGHBORHOOD
TRACTS F & G, OF THE TRAIL HEAD SUBDIVISION
ENGINEER
)R ENGINEERING, LLC
ATTN: PM HALOPOFF, PE
2900 SOUTH COLLEGE AVE, SUITE 3D
F0RTC0WN5,C080525
P-97O.491[EBBS
THALOPOFFOJKENGINEERING COM
SURVEYOR
)R ENGINEERING, LLC
AMN:)ARR0DADAMS, PLY
2900 SOUTH COLLEGEAVE, SUITE 3D
F0RTC0WN5,C0BOOZ5
P-3037409393
TRAFFIC ENGINEER
DELICH A550CIATES
ALI N: MATHEW ). DEI CH, PE
2272 GLEN HAVEN DRIVE
LOVEIAND, CO 8O593
P- O6692W1
LAND VSE CHART
EXISTING ZONING: USN
EX15TING USE VACANT
)COPO5ED USE ATTACH ED SINGLE FAMILY TOWNHOMES
TOTAL SITE AREA MFECTS FAND G). 10 73 ACRES
DENSITY
AREA OF)
it
AREA (AO
UNITS
DEN5M( (DLAAQ
TRACT
22EDA) 1
519 1
45 1
969
TRACTG
241,254
534
44
I94
TOTALS
467,204
10.75
89
8.30
AREA COVERAGE
H.O.A
HOME
OWNER
TOTAL
AREA(5F)
TOTALAREA
(ACRES)
%OFGROSS
BOB AREA
TOTAL PRIVATE IOTARFA'
01.
100%
AET62
3e6
546'',
BUILDING COVERAGE (GROUND FLOORAKEA)
0%
100%
122708
292
263%
PUBLIC STREETRIGHTOF-WAYT
NIA
N/A
34,351
09
74%
PRIVATE DRIVES ALLEYS, & PARKINd
iW%
O%
51,497
119
1101.
COMMON OPEN SPACE AREA
iW%
O%
163,524
290
270%
ACTIVE RECREATION AREAa
100%
O%
79,141
182
169%
1. BUILDING COVERAGE IS INCLUDED WITHIN THE TOTAL IDTARFA
2. GREEN TAKE DRIVE I5A PUBLIC ROADWAY WITH A 53' WIDE PVBUC RIGHT-OF-WAY
3 ALLALLEYS IN TI E DEVELOPMENT WILL BE PRIVATE AND SHALL BE OW NEDAND MAINTAINED BYAN HOA. HOMEOWNER
WILL BE RESPONSIBLE FOR THEIR INDINDUAL DRIVEWAY APRON.
4. ACTIVE RECREATION AREA 6 ALSO INCLUDED WITHIN THE TOTAL COMMON OPEN SPACE AREA
UNIT TYPE SUMMARY
BEDROOMS/VNIT ♦UNITS TOTAL PROVIDED I REQUIRED
BEPWOMSI PARKING I PARKING
UNITTYPTUSTOWENDVNID5
3
39
117
79
79
UNIT TYPE 2(RANGI END UNITY) s
2
13
26
]6
25
UNIT TYPE 3R2 MIDW INTERIOR UNTE
3
37
FIT
74
74
L OHMREEf GVESTPARKING
26
89
256
206
176
ING UNITS WILL BE BUILTON A CRAW LSPACE (NO 6ASEA1ENT511'ILL BE BUILD
LOTSUMMARY
♦ LOT$ TOTAL LOTAREA (SF) %OF GROSS
PDP AREA°
TRACT
tW
45
107,414
�D%
44
114,670
89
22R,086
47.5%
AREA-1073 ACRESBVIIDING
HEIGHTMAXIMUM
HEIGHT'
STORIES
35
UNIT TYPE2(RANCH)
30
1
UNITTYPE 3
35
7. FROM FORTCOWNS LAND USE C0DE 43-D hlA"LAIVAI HEIGHi0F 35T0RIE5 AT 12'-9'PERSTORY-3796'MAXFEIGHT
LOT MATRIX
MINIMUM BUMP HER
SETBACK Y
REQUIREMENT
1
2
3
4
5
6
7
10
11
V
13
I4
M
Us
17
IS 19 M 21 22 23 24 25 25 Z2
FROM
1
19
19
19
18
15
16
15
15
is
is
15
15
21
22
22
510E LDt
NO
w0
w0
w
10/
w0
Bn
5/0
W
7/0
w0
w5
1a
0/0
w5
REAR
6
fi
6
6
8
8
8
8
8
8
8
6
6
6
6
FROM
18
19
19
19
18
3
s
3
5
5
5
5
5
5
s
3
3
3
5
3
M
21
20
20
20
s10E 1/R
2
N //
00
w OLIO
/
a50
l
l
0001
/
l
w 50070
l
/
w 7
w O
w Os00
l/
fil 0
WO
w
l
//
o0
l
fi0
/
o6
l
s0
/
BEAR
6
6
6
6
6
6
6
6
j66
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
FROM
20
ID
2D
M
22
22
M
6
8
6
6
8
6
6
8
6
is
16
15
is
16
16
15
3
18/
B/s
s/B
B/a
a/B
w8
w1
fi/B
w8
B/1
18
wB
wfi
w8
a/B
ws
1wB
w8
ws
s/B
B/B
B/B
B/s
BEAR
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
FROM
4
22
23
24
23
22
6
8
6
6
8
8
8
6
15
16
16
16
15
TI
BE
w0
0/0
0/5
5/O
O O
0/5
10/
0/0
0/0
w0
w5
5/0
0/0
0/0
w0
w1
BEAR
6
6
6
6
6
6
6
fi
fi
fi
6
6
fi
6
fi
6
6
6
CITY OF FORT COLLINS
I
cc
I> �
rar:rl
sELFLF 111 I ILFA
1
git
Lr III - LI III
LI tl I
E
,q
I 'r•
EJA Ilbe(ry \ -St
► CG
VICINITY MAP
SCALE: I' OUT
LEGAL DESCRIPTION
TRACTS F & G, TRAILHFADSVBDIVIMON, BEINGAPORTION OFTHE5OVM ONE HAI£0FSECUON4,T0WNSHIP 7 NORTH, RANGEM WER0FTJENCH
PRINCIPAL MERIDIAN, CIIYOF FORTCOW NS
GENERAL SITE PLAN NOTES
1. REFER TO FINAL UTILITY PLANS FOR EXACT IDCATON5 OF ST0RM DRAINAGE STRUCTURES VIRINMAINSAND SERVICES, PROPOSED TOPOGRAPHY, STREET
IMPROVEMENTS.
2. REFER TO THE FINAL CIVIL ENGINEERING PLANS FOR DETAILED INFORMATION REGARDING PROPOSED TOPOGRAPHY VHITYAND STREET IMPROVFMFNIS
3. REFER TO THE SUBDIVISION PIATAND URLITY PLANS FOR EXACT LOCATIONS, AREAS AND DIMENSIONS OFALL EASEMENTS, LOTS FRACAS 3TREEIS WATO
ANDOTHERSVRVAINFORMATON.
4 THE PROJECTSHALL RECONSTRUCTED NACCOROANCEWITi TEE FINAL PLANS. AMFNDMENYST EPLANSMV BEREVIEWMANDAPPROVEDBYTIE
CITY PRIOR TO THE IMPLEMENTATION OFANY CHANGESTO THE PLANS.
5. ALLC0NSRVQI0N WITH THIS IMiUOPMENTPIAN SHALL BE COMPLETED IN ONE PHASEVNLEYAPHASING PLAN ISSH0WN AMID THESEPURP EACH
SINGLE FAMILYATLACHED HOME AND THE IANDSCAPEASSCCIATED WITH EACH TOT SHALL BE CONSTRUCTION PHASESONAN INDI EDERMF A515.
6. ALL ROOFTOP AND GROUND MOUNTED MECHANICAL EOVIPMENTMVST BE XRMNED FROM NEW FROMADJACETPROPERTYAND PUBLIC STWEA IN
CASESWHEREBVRDINGPARAPETSOONOTACCOMPUSHSVFFICIEM ENINGTHENFREE-AANDINGSCREENWALLSMAICHINGTHEPREDOMINANTCOMROF
THE BUILDING SHALLBECONSRVCTED. OTHER MINOR EQUIPMENT SUCH AS CONDUIT, METERSAND PLUMBING VENTS SHALL BE SCREENED OR PAINTED TO MATCH
SVRWVNDING BUILDING SURFACES.
7 ALL EXTERIOR EGHING PROVIDED SHALL COMPLY WITH THE FOOT-CANDLE MMAREMENTS IN SECT0N 324 OFTHE LAND IhE CODEAND SHALL USEA
CONCEALED,NLLYSHIELDEOUGHTSOVRCEWITHSHARPCVT FFCAPABIUTY50ASMMINIMIZEU UCW,SPILLIIGHTGUREANDUNNECESSARYDIF ION.
B 51GNAGE AND ADDRESSING ARE N0T PERMITTED WITH THESE FINAL PLANS AND MUST BEAPPR0AT V SEPARATE CITY PERMITRUORT0 CONSTRICTION.
SIGNS MVSTCOMPLY WITH CItt516N C0DE VNLE55A5PEOFIC VARIANCE SGRANTED BETTE CITY
9. FIRE HYDRANTS MVMMEETOR EXCEED LOIRE FIRE AIRHOMY STANDARDS. ALL BUILDINGSMIATPW0DEANAPPR0V RD aTNGUISHINGM A
MINIMUM OFTWO HOUSING MODELSSHALL BE REQUIRED. THESEHOUSINGMODEUS5 LLMEETOkIX DTHEAANDARDSASOVNNFDIN352C)OFTHEIAND
USE CODE
10. ALLBIKERACJ(SPROVIDFDMUSTBEPFAMANENTYANCHORED.
11. THE H0ME OWNERS AWAFATON IS RESPONSIBLE FOR SN0W REMOVAL ON ALLSTREEf51DEWAL'(SADJACEJTTO EACH RESIDENTIAL LOT
12. COMMON OPEN SPACE AREAS AND LANDSCAPING WITHIN FFHTOF WAYS, SIREETMEDIANS, AND TRAFFIC CIRCIB AMACENTTO COMMON OPEN SPACE
AREAS ARE REQUIRED TO BE MAINTAINED BYA PROPERTY OWNEWASSOCIATON. THE PROPERNOWNITOASYICWTION IS RESP0NSIBLE FOR SNOW RE.IOVALON
ALLADJACEMSTREETMI)EWALRSANDSIDERASHO IN COMMON OPEN MACEARJEA
IS ALLSIDEWAL'(SANDMMPSMVSTCONFORMTOCIWSTANDAFEW ACCMIBLEMMPSMVSTBEPMO DD)ATALLST UANDDRIVEINTERSECTIONSANDAT
ALLDESIGNATEDACCESSABIEPARRERSPACES. ACCESUBLEPARKINGSPACESMD 5T PENOM0RETHAN1481NANVDIRECTION. ALLACCE61B1£FOVIESMDST
SLOPE NO MORE 1TON120IN DIRECTION OF EVCTLAM WITH N0M0RETUN148CROASLOPE
14 PRIVATE CONDITIONS COVENANT, AND RECTRICTONS(CC&R9, 0R ANY OTHER PRIVATE RATRICTVE C0VEJANTIMPOSED ON LANDOWNERS WITHIN THE
OR ENFORCED HAVING THE EFFECTOF PROHIBITING OR LIMITING THE INSTALLATION OF
(IF MOUNTED FLUT UPON ANY ESTABLISHED ROOF ENT), CLOTHES ROD LOCATED IN
DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROTECT, SHALL BE RETRACED OR RESTORED TO CITY OF FORTCOW NS STANDARDS ATTHE DEVELOPERS
IXPENSEPRIORMO EACCEWANCEOFCOMPLETEDIMPROVEMENTAND/ORPRIORTOTHEISSVANCEOFTHEFIRSTCaR RFl IEOFOCCUPANCY
16. PROPOSED GRADES SHALL PROVIDE PASTIME DRAINAGE AWAY FROM BVRDING WHILE PRONDINGA SMOOTH TRANSITION BETWEEN ALLADJACEM
UNDISTURBED GRADES AND ADJACENTPROPERTY GRADES
V JOB 51TETO BE KEPTCREANATALLTMESAND C0NSJRVCT0NARFASARETO BEMAINTAINED FORSAFEE'
18. ANYARFA DISTURBED BY CONSTRUCTION, INCLUDING AREAS OUTSIDE OF CONSTRUCTION LIMIT DUE TO NEW CONSTRCION ARE TO BE REGRADED AND
SVRFACECONDITONSMPAIMPTOANEQVIVARENFCONDMONPRIORMO ARTOFWORK
19 C0NTMROR IS RESPONSIBLE FOR SETUP OF BARRICADES, WARNING SIGNAGE OR OTHER PROTECTIVE DANCES IN ANY EXCAVATIONS ARE FEET EXPOSED
AFTER CONSTRUCTION H0URS
20. THE CONTRACTOR SHALL NOT PROCEED WITH ANY CONSTRUCTION WHEN OBSTRUCTIONS AND/ORGRAM DIFFERENCES EXISTTUT MAY BE IN CONFLICT
WITH THEAPPROVED PLAN. CONTRACTOR SHALL NOTIFY OWNER OR OWNERS REPRESENTATITAND THE CJIY OF FORTCOWNS IF RESATON ARISES AND
22
23 MO EIXT TFEASIBLECO0PEMTVEAGREEMENTSSHALLBEESTABU5HEDWITHAD)ACENTPWPFRNOWNFRSAND/ORTFNANTTHATCRFATESAN
INTEGRATED DEVELOPMENT WHICH ETABUSHES CROSS ACCESS, PARKING, OUTDOOR USE. AND CROSS TMAGKFFMENR BETWEEN ALL PARTIES INCLUDED WTHIN
THIS DE`,MOPMENT
24 FIRELANEMARKING: ARRE NEFMRRINGPIANMVSTBEREVIEWEDANDAPPROVEDBYTHEFIUOFEOALPNORTOTHEISNANCEOFANYCERTRLATE
OF OCCVPANCY�ERE RERE MOORED BY THE HIM CODE OFFICIAL APPROVED SIGNS OR OTHERAPPEOVED NOTICES THAT INCLUDE THE WORDS NO PARKING FIRE
IANEAM BE PROVIDED FOR FIE AINAMM ACCESS SOARS TO IDENTIFY
CONDIROADSOIL PROTLTIM AD BE
OR EFAREE LEE MEANS BYWHICHFlRE
LANE ADEQUA E DEIGNATEDSHALL BE MAINTAINED INACLEAN AND LEGIBLE CONDITONATALLTMEAD 0E REPLACED ORRE➢AIRED WHEN NECE6ARY TO PROVIDE
25 PRITEREIIBIIIN
25. PREOFANENTFICATON ANAOFCCDDRESING PIANISREPMVATDN E15NW ,N NUMO TSIYTHECI YKN UIUDMEAI/fH0R1IYPEIDILETHE
BUTAINEOF LLY RTFICATEOFOCCEP,BVI LNG NVMEPRIVATEDRIVEISNAMINGIDEVMFNTSIGNAGEFMYNAPF IREDTOALIDWWAY_FlNIBN "SI
BVIIDINGS SHALLHAVEADDRES NVM8ER5, BUILDING NVMBE0.5ORAPPROVED BUILDING IDENTIFICATION PLACED INAPO3T1ON TUT6PW NLYLEGIBLE VISIBLE
TO IDENTIFY THE STRUCTURE
SHEET INDEX
1
COVERSHEEF
2
SITE PLAN
3-4
TREEMITIGAPONPIAN
5fi
LVJDSCAPEPIAN
7
LANDSCAPEPIANFLIST&NOTES
8
LANDSCAPEDETAILS
9
HYDROZONEPIAN
10-15
ARCHITECTURAL BUILDING ELEVATIONS
OWNERS CERTIFICATION
THE UNDERSIGNED D0ESIDO HEREBY CERTIFY THAT VAST ARE LAWFUL
OWNERS OF REAL PROPERTY DESCRIBED ON THIS SITE PLAN AND DO HEREBY
CERTIFY THAT IIWE ACCEPT THE CONDITIONS AND RESTRICTIONS SET FORTH
ONSAIDSITEP EEN.
OWNER(SIGNED) DATE
(PRINTNAME)
THE FOREGOING INSTRUMENT WASACKNOWLEDGED BEFORE ME
THIS DAY OF 20 BY
(PRINTNAME)
MY COMMISSION EXPIRES_
WITNESS MY HAND AND OFFICIAL SEAL
PLANNING AND ZONING CERTIFICATION
APPROVED BYTHE DIRECTOR OF COMMUNIN DEVELOPMENTAND
NEIGHBORHOOD SERVICES OF THE CIN OF FORTCOLLINS, COLORADO
ON THIS DAY OF AD., 20
COMMUN ITY DEVELOP MENTAND NEIGHBORHOOD SER9CES DI RECTOR
COVERSHEET
TRAIL H EAD COTTAGE NEIGHBORHOOD
)OR NO. 3914551
SUBMITTAL DATE: O9/12/17
REVISED PER CITY COMMENTS DATED 1011917
SHEET? OF 15
J
R ENGINEERIN
to
AWesftianCcnpmA
Know what's 11@I0W. E,9m.s-Pm,,..a-La,aaoopeoPe AT=IeL.aa-suTreea.,
Call before you dig. CaRTTa 35-740-see • cmab SBAW 7e-W2W
Fat CnFB 9I0-49F9BBB %BBviMma^3'>X^
/ Ilri
-
HR/
�� ;>r �t.9% \ w
us �' // \ \\ _ 4 c //;'p 2� 3h / \ / /; v` i Law _- �a -
\ _---- _RD_ 4s ¢ - _ _ _
-- �s _
\ - -w -
\\� I j 1�7 sa�s - - ROARING -
sasasass _ 4
' ;�I// / �!\\ jy "i bi/ `<rk \ � / �e�R e�ae�r' =amp T o
/\\ apTj
~8�"a'
000>" o
/ice / ;'4 /
_ I y / p; F�aawa
TxuLHEaNTeecFa — // // i \ > w l z ��I z Eaaaaoo'a —_�� � /r/ // / 4 / a
1 Iif`Iol! I 11 11 i A ; f/ \ �1�+®� /i✓ / / r//// \ \ d
/ / \ �BY s
UPS
24 { c,P \ - �o
as �B // /N / ®/ - o GO QD
;!aJI- Y(2 h'aay ___ \ / /
150' IEIIPCRAAT LIMIT Cf DEVELOPMENT i s \\ a `�iR `s ` w l b i 'Rv.<N W i j J a CD o
I,(fEB. 15 - JULY 15 FlRST TEAR CF OEIELCVMENT ONLY) / \ _ ;Za <so / I -JCS ;K GO 0 E-DO
DO
c__� { I �_ ` FUILTlE LItt PARK` OEyEWPER SHPLL RESTRIF£ 11 i /I / �91[NFgos A I / \\ \ �S p/ e/OL.� �"NL'o / I a �MUN1I
Am III, , ---}}},,� ` \ 1RhILHUOSu¢O,VIAory / l I ' v- OR, 5 'FS '1' H
s-aa _ 6GAICE GROVE
DRIVEJR TF6REEN I I l 84 mro \ \ ,/ l/ I
GIACIER CREEK DR. LAKE DRIVETNEFROIRAIL DR ' Il �rwaeavm a'`t" N I
_ it B�ITI'�'a .w 'ma's _ TuaHcnoTnAcr:HPANIRKIN6 I \ \ �-V®.p> 4p; SOSO o In
sp j$_ I 4��C' Nr ` ` (Flm,u CIlYaFz,O TO AL BOTH NGE, OF ROAD I nT&aeElry / b \ \� lLl li lI ) li
II-
r� 150TEMPORARY LIMIT OF CEYELOPMENT 1 / I lI II
(FEEL 15 - JULY 15 FIRST YEAR OF DEVELOPMENT ONLY) FS G^,` \ _ ISN571145 RAFT Lft5 NEST
-(cua!SNF_Y L>1DcclmlI fff I Ni ' s'us ua cweWa'r _ %r
e I ;IY
NHEADSvew ASION III
s rnnI ' I i III ° III r+ma„x�x roo, \ `cam--� e---- "I n=`a 3a' IT ' I .ue.,n.,.rz, ere �•. r. vxw - u Em iL
III R �, II �- -- ® �
elmcls IN N .„... Srnu-snwnx. 1 szx1 II —_ _ ____ -- --
PRGRU'JI REFORM PROPERTY &A' 1NDARr I rps
III swti51o6 SUBELT TO CITY COUNCIL Ai Ad- -/- -__-_ r I Iw---� iNIIN1 rl
1 1 G RGP EO LAND EXCHNSEif
I OMNIx M
�� ,emu,-iF p� I� 31v tl
_� _ seam_•Esw_. I I 1 > g e�rsffwu,Y 1 s n'm� e (%
:..nM ea..rz„
ininl'
IIIII I
B �N B a . 1 IIn0tImIo>i l3II1IpulYI1'I'I; I 1rLI
..LrzBay W--/Mo
s / 1 a n
NaCK14 z e 9
6a` --- —
�1
mm
WhW.I a
e
--GREEN L4KE DR._
w _
v.�wr� wv
----= .r
._______
-
EEN LAKE DR. ' I I
Ir
I I E �I � I _ I I II TRARHFAR,"RKG.A a
4 r
1 TRAILHFARSVBwVLSIory �.. �5 v , 'I- I � w
M,ZCNn ILL.0 3
BE
II Ire I I 11 w �', 2 m
�+ p1,,Im�a it s
Tj
r A L' s N co"muwx om .IIY
\ zQ
0�
l
Tv,ILHvoTw,cr_N
___
I
__-e�y ____________ a'uwzr uoewwn - - uL+'------— ',
__- wcrx wu''[[ E enmwx
g .m ro o \
____ ______ I I - � erzem Nee�s'ros-wla9an, GE PC
uoea. -_ __ �_¢ -- w-_-_-1y_____w _-_ 'j z o s
Ngf5AG5 P259'St
Gx G♦= FORT COwNs— -_6. HIM LGNCfEIE HAMI O&TC'S5� � NR531Y4w2pJ.39' ., � - F ________L____________ - _ea.eo h. - mexsroswmw ____'_--'----
m rv6o'S6'19NJ,366' \ J _ _ _ ________ -F ` b'WDE C.ONLRETE WALK ( y, -S
¢ 1 43sinsw,4a' _
FUNf�TTRIBESWLNm-TIONB, °W16M' ` i �' -5- Y
sTR�rTF�aa IRRlennoN er _ _ EAST VINE DR.A.Lnrwn=LocnnaW _ _ _ _ _ —I zssrvvl<a-.______ a <
Isnrwna LDunoN
_=n y[_ _ _ _ FUNRE TREEL 4IFURI D9l APINS, "'
____________________ EXiOA____ 6 - id .
i _ _ _ _ _ _ EX-EpA STREET TREgi > IRRIGATION BY
a o Z
cr
_ _ EAST VINE DR i I
o
_ ______cItt CP FORT COLLINS
____________
______________
_________
ATITHA VM>EYF/OAJml9 --- -- Z
PUBLIC STREET , AM rAeMsur
32' LEGEND BUILDING GROUPS z
S BOUNDARY LwE --ING Q
f I 6, �, NIA b, A' : I BUILDING
L ING ROUPS (2 VNIT BLDG) � 0 Z
J 4 l VEL. k UNTIL. PROPERTY LINE - - qz _ igVILDING GROUPS (2 UNIT BLDG) - O W
✓'1,. M M ,J-'°y EEKZ N1P(PVML EARNED EASEMENT LINE Z
(AccE55, E1B3ITY9 `E..ML A3: 1BVILDINGGROVPS2UUNITNIT IDG)) OO m
' I r - AGGE55, UTILITY! PROPOSED EASEMENT LINE - A4 18UILDING GROUPS (2 VNITBLDG) (-%= a 0
36' FL - FL y LRMNK£ EASBENn RIGHT OF WAY --- o J O
N� B' : 1 BUILDING GROUPS O VNIT BLDG) d
>ros �B1m' ` GErvIERUNE — - - — gz _ 3BVILDING GROUPS C3 UNIT BLDG) Q m W
CNARKMA
1 &S 1 I MODEM FENCE--X-----X- g._ 6 BUILDING GROUPS C6 UNIT BOG) WS Ii- i
T M3 NIT BL G F T 2VNI BLDG T -n yS" ry 1 GAS MAIN-----C-----o- g< _ i BUILDINGGROVPS C3 VNITBLDG) =0 W
5ARAG£ SARAF£ EXISTING SANITARY SEWER-----s-----s- C': 18VIIDING GROUPS TEL VNITBLDG) - GO 0
IF _ _ _ „ovIni1 PROPOSED SANITARY SEVER 5 5 J W
1 rrxwc.ou L --- ---- - Cz: 2BVILDING GROUPS (4 UNIT BOG) _Z
,mm,yu-, awverz nn l f EXISTING WATER MAIN -----W-----W-
D': 3 BUILDING GROUPS(5 UNIT BLDG) Q W
'��" Pft0Pp5E0 WATER MAIN W W
Dz 3 BUILDING GROUPS CS VNITBLDG) a
- b' b' EXISTING STORM DRAIN 50 25 0 50 100 r
_ __ __ _ __ _ EASY Ib'-5' �"� PROPOSED STORM DRAIN
O
�AJ RTC) � EXISTING CURB AND GUTTER 5TREET TREE NOTE ORIGINAL SCALE (= 50' a
4.5;
A PERMIT MUST BE OBTAINED FRAN THE CITY FORESTER BEFOREANYTREES ORSHRUES AS NOTED ON
Toro. m.MLITYTRff T T' TREEUTILIx �' ROLLOVHE CONC. PROPOSED CURB AND GOTTHIS PLAIN ARE PLANTED, PRUNED OR REMOVED IN THE PUBLICRIGHT OF WAY THIS INCLUDES ZONES
TEN`^5Brz" 20'PRIVATE ALLEY .ue+e.-e,i E5wT. LA1.p1 PARK lR^`RL L^ME PARK LAy1N ESMT. lAIRB>5JTT6t IffAVER
IFEERWEEN THE SIDEWALK AND CURB MEDANSANDOTHERCITYPROPERTYTHS HEOVE
PROTO TYPICAL BUILDING GROUP LAYOUT A GREENLAKEDRIVE(MIDENTIALLOCAL STUM B 20'PRIVATEALLEY IRELOCATINGSHEET 2 OF 15
PULE: NTs. SCA1£NTS SCALE, NTs. OF FORT COLLINS CODE SUBJECT TO CYJ AECTON a1LAND MAY ALSO RESULTN REPLACING OR
TREESANDHOLDONCEITHFICATEOFOCCUPARGY JOB No. 3914551
FRONT ELEVATION
UNIT 3 (REVERSED)
BUILDING TYPE Al (DUPLEX)
2 RIGHT SIDE ELEVATION
in SCALE:11V = 1'-0 6 e ,s
BUILDING TYPE All (DUPLEX) BUILDING TYPE Al (DUPLEX)
3 REAR ELEVATION 4 LEFT SIDE ELEVATION
10 SCALE: VS' = 1'-0' '� O SCALE: Ire- = 1'-0 B
Ar in IF
5 FRONT ELEVATION 6 RIGHT SIDE ELEVATION
10 SCALE:1 = T-0- o a ,s 0 SCALEVS• = 1'-0 o e IF
BUILDING TYPE A2 (DUPLEX) i. BUILDING TYPE A2 (DUPLEX)
7 REAR ELEVATION 8 LEFT SIDE ELEVATION
10 1.,O o C R 1 O sCA E: ire• = 1•L• 0 9 F
COLOR SCHEDULE
O
-
METAL SIDINGFINISH MINTAGE
2OCOLOR:
GREY
BEN.IAMIN MOORE GMGOYIE 1506
ANYLIJNOE
COLOR: WHITE
O
COLOR: WHITE
BENJAMIN MOORE WHITE WHISP 2137-70
0
COLOR: GREEN
BENJAMIN MORE COURTYPRD GREEN SW
OCOLOR
BROWN
BENJNMIN MOORS RWSTEO COFFEE DENNIS 2099-20
COLOR: GREY
BEN.IAMIN MOORE RAINSTORM CSi
6
YELLOW
OCOLOR:
BEN.IAMIN MOORE DAM45HYELLOW CLOJCO
O
BLUE
OCOLOR:
BENJAMIN MORE THOUSAND OCEANS 1W
MATERIAL SCHEDULE
W III
CORRUGATED METAL SIDING
W9B
BOARD 8 BATTON SIDING IN VARYING COLORS
fWVSj
VERRCPL SIDING IN VURYING COLORS
wH5
HORRONTAL LAP SIDING IN VARYING COLORS
F"Rl
CORRUGATED M ETAL HOUR NO
®
ASPHALT COMPOSITE SHINGLES
TRIM -AS SHONTI
FASCw-ASSHCWN
SOFFIT-ASSHOYM
THESE DRAWINGS
DO NOT CONTAIN
THE ELEMENTS FOR
CONSTRUCTION
SAFETY
al Night, liciorred
ancurporrAWdlipman An An mi
offixonvoranni +<M
n M to no usiolany odwerlamr
0
0
0
2
z
O
000
W �
a � m
J �
a��cn
FWOz
z QJ
Z=O
d LLI J U
UU a -0
ULI � F O
w O
3V&"
Ofa.01.1..
Q H
Wu
2 �
J
H
1 MICNAEL AN. OLSEN
® ARCHITECT5
notV NPIL fu W>VI@
yr�Is
ISSUES:
SEPIEMBER 12.2017
PLANNING SUBMNTAL
SHEET TIRE:
BLOGAI EIEVATIONDU
BLDGP2EIEVATION(S)
COLOR SCHEDULE
NUMERIPLSCHEDULE
JOB NO. 11-12
SHEET NO.
10
SHEETS 10-15
BUILDING TYPE A4 (DUPLEX) QL-
1 FRONT ELEVATION
11 SCALE: Ire- = TAY m 0 F 16
BUILDING TYPE M (DUPLEX)
3 REAR ELEVATION
BUILDING TYPE A4 (DUPLEX)
2 RIGHT SIDE ELEVATION
11 SCALE: LB• = IV
BUILDING TYPE M (DUPLEX)
4 LEFT SIDE ELEVATION
BUILDING TYPE B1 (TRIPLEX) " " BUILDING TYPE B1 (TRIPLEX)
5 FRONT ELEVATION 6 RIGHT SIDE ELEVATION
11 SCALE:IIB' = VmV 11 SCALE:IIB' = T-0-
BUILDING TYPE B1 (TRIPLEX)
7 REAR ELEVATION
11 SCALE:1B = 1.4- 0 v e IV
COLOR SCHEDULE
OMEfAL$IpNG
-
FINISH: VIMAGE
0
COLOR: GREY
BENUVWINMOOREGMGOYLE1506
0
VINYLMANUF
COLOR: WILL
COLOR WHITE
BENIAMIN MOORE WHITE WHISP 2137-70
BOCOLOR
GREEN
BENIAMIN MOORE COURTYARD GREEN 516
©
COLOR: BROWN
BENIAMIN MOORE ROASTED COFFEE BENIS 2DIXI
T
GREY
OCOLOR
BENIAMIN MOORE RNNSTORM CSP-50
OCOLOR
YELLOW
BENUVWlNMBOREDPMPSKYELLGW CLP
BLUE
OCOLOR
BENDWIIN MOORE THOUSNND OCEI IM
MATERIAL SCHEDULE
O
CORRUGATED MEfAL51DING
®
BONtGB BRTipI51DING IN VARYING COLptS
FlI
VERTICAL SIDING IN VARYING COLORS
HORIZONTAL Li SIDING IN VARYING COLORS
O
CORRUGATED MEIAL ROONNG
FR:Mj
ASPHALTCOMPOSITESHINGIES
TRIM-ASSHOWN
FASCIA-ASSHOWN
SOFAT-0.55HOWN
UNIT
BUILDING TYPE 81 (TRIPLEX)
8 LEFT SIDE ELEVATION
11 SCALE:IIB' = T-0' a ,c
THESE DRAWINGS
DO NOT CONTAIN
THE ELEMENTS FOR
CONSTRUCTION
SAFETY
NI III Forolorri
lincurrourAWdlinmin An An ni
<M
not to ba used in wn
AT M.,hwl Own
arroutwirrion
0
0
z
O
000
m>
a=m
J �
a��cn
FWOz
z QJ
ZLI
=O
d W J 0
LU -0
LL
1 F O
w O
oV&"
Of a U.
Q I —
Wu
2 �
J
H
1 MICNAEL AK. OLSEM
® ARCHITECTS
n4tV�NPIL iu snmm
�r
ISSUES:
SEPTEMBER 12.2017
PLANNING BUBMNTAL
SHEET TITLE:
BLOGA6 ELEVATION(S)
BLDG B1 ELEVATON(5)
COLOR SCHEDULE
M UERULSCHEDULE
JOB NO. 19-12
SHEET NO.
11
SHEETS 10-15
lz
-IA IN0 IN
in
m --�m
MEN
MEN
m
0
C
8 /..nllllllllo.. ��"
BUILDING TYPE 01 (FIVEPLEX) BUILDING TYPE D1 (FIVEPLEX)
1 FRONT ELEVATION 2 RIGHT SIDE ELEVATION
13 SCAIE: UTP — 1•L• Y f C IF 13 SCALE. 118• — 1•-0• Y f� _` ,6
i
BUILDING TYPE D1 (FIVEPLEX)
REAR ELEVATION
SCALE: W = Vi
GAZEBO PLAN
COMMUNITY PARK PICNIC GAZEBO
SCALE: ur = 1•L•
GAZEBO ELEVATION TP.
18'
RL
R
BUILDING TYPE D1 (FIVEPLEX)
4 LEFT SIDE ELEVATION
13 SCALE: LH• = 1•tl 0 .
It=
MATERIALSCHEDULE
COLOR SCHEDULE
W-WC
CGRRUGUEDMEf SIDING
O
III SIDING -
FINISH: VIMAGE
W9B
BOARD d BATTON SIDING IN VMYING COLORS
O
COLOR: GREY
BENAIMIN LK)ORECAR`OYLE1506
W-VS
VERTCALSIDING IN VARYINGCOLORS
Q
WLOR�YNIUF
ITE
WNS
HORIZCNTPL LAP SIDING IN VARYING COLORS
O
COLOR WHIR
BENJAMIN LK)0RE WHNE WHISP 2131-]0
®
CORRUG4TED MEfALROOFING
SO
COLOR GREEN
BENJAMIN MOORE COURTYARD GREEN 51
RLS
ASPHALTCOMPO.SIIESHINGLES
O
COLOR: BROWN
BENJAMIN MOORE ROASTED COFFEE BEANS 209FA
TRIM -AB BHOWN
OO
COLOR: GREY
BENIMIIN MOORE RAINSTORM CSI
FASCIA -AB SIgNTJ
BO
COLOR: YELLOW
BENJAMIN MOORE CAJUISKVELLOWCLOdW
SOFFR-ASSHOWN
8
GORDON: BLUE
BENJAMIN MOORE THOUSAND OCEANS FEARS
THESE DRAWINGS
DO NOT CONTAIN
THE ELEMENTS FOR
CONSTRUCTION
SAFETY
Al Right, Tani
AuFormation OF Michael Asorn
0
O
z
O
000
Tm >
Q 2 m
J �
a�Ocn
I-W 0z
z QJ
LU Z=O
d W J U
LU >
a - 0O
laam F O
w 0 0
3VOf &o
Q. UL
Q DO
W
2 �
J
H
MICHAEL J.K. OLSEN
® ARCHITECTS
AAq
III "All"1584 ru i
oAr
ISSUES:
SEPTEMBER 12. 2017
PIANNINGSUBIATi
SHEET TIRE:
BLDG DI ELEVATION(S)
COMMUNITY DARK PICNIC
G By)
COLOR SCHEDULE
MATERIPLSCHEOULE
JOB NO. 17-12
SHEET NO.
13
SHEETS 10-15
BUILDING TYPE Ai (DUPLEX)
1 PERSPECTIVE 1
BUILDING TYPE A2 (DUPLEX)
2 PERSPECTIVE 1
14
-IEII E•]l P[HK19=
BUILDING TYPE B1 (TRIPLEX)
4 PERSPECTIVE 1
BUILDING TYPE Al (DUPLEX)
1 PERSPECTIVE 2
BUILDING TYPE A2(DUPLEX)
2 PERSPECTIVE 2
14
BUILDING TYPEA4(DUPLEX)
3 PERSPECTIVE 2
IMA
BUILDING TYPE Bi (TRIPLEX)
4 PERSEPCTIVE 2
THESE DRAWINGS
DO NOT CONTAIN
THE ELEMENTS FOR
CONSTRUCTION
SAFETY
ancurporrAWdInman An An mi
al Right, Roroorred
M to no used,in alle or in raid, for
°w
mour winamn
0
O
z
0
000
m>
a=m
J �
a��cn
W 0z
z aJ
UJ Z=O
D LLI J 0
UJ a -0
Inam F O
w 0 0
3VOf &0
Q. UL
Q h
Wu
2 �
J
H
1 MICHU EL AK. GIU EN
® ARCHITECT5
n4EV�NPIL iu snolm
�r
ISSUES:
SEPIEMIOR 12.2017
PLANNING SUBMNTPL
SHEET TITLE:
BUILDING PERSPECTIVES
JOB NO. 17-12
SHEET NO.
14
SHEETS 10-15
BUILDING TYPE B2 (TRIPLEX)
PERSPECTIVE 1
BUILDING TYPE C2 (FOURPLEX)
2 PERSPECTIVE 1
15
BUILDING TYPE Di (FIVEPLEX)
PERSPECTIVE 1
BUILDING TYPE B2(TRIPLEX)
1 PERSPECTIVE 2
BUILDING TYPE C2 (FOURPLEX)
2 PERSPECTIVE 2
15
BUILDING TYPE Di (FIVEPLEX)
3 PERSPECTIVE 2
THESE DRAWINGS
DO NOT CONTAIN
THE ELEMENTS FOR
CONSTRUCTION
SAFETY
ancurporrAWdlipman An An mi
al Right, Roroorred
M to no used,in alle or in raid, for
°w
mour winamn
0
O
z
0
000
m>
a=m
J �
a��cn
I- W 0 z
z QJ
UU Z=O
d W J C)
UU a -0
LLI
F � F LL
O
w 0 0
Of
Q. LL
Q U)
W�
2 �
J
H
1 MICIMEL AK. GLSEN
® ARCHITECT5
n4EV�NPIL iu snolm
yri�Is
ISSUES:
SEPIEMBER 12.2017
PLANNING SUBMNTPL
SHEET TITLE:
BUILDING PERSPECTIVES
JOB NO. 17-12
SHEET NO.
15
SHEETS 10-15
zF
1
Z
\
3
y
----i
i
NNE
I L
I — — i
I
Y ]
NNA
\\\\\\ p
I
(DD
I
l
\\ N/ \
/ \ \
1
NNE 24�
� Fi
,
1
F- 5^ 11 l \
Ir.�ll
G Y' 3is
0 HER
G Y'
—
—
--------------�
i—
P \ \\F,
2 P
p \
___�
\ RL
________________
,
II1_
_
B
__________________________________
- c 6.1
`
_
11
—
_
V1_I
—
1.5 P
___—
__
_
_____—___
_ `
______
__
___________
_______________
_
------
EAST
VINE
DR.
-
NOTE
TRANSPLANTING TREES A]B, 24, 25, 54, AND 55 SHALL FOLLOW THE
RECOMMENDATIONS OF A QUALIFIED TREE TRANSPLANTING CONTRACTOR IN TERMS
OF SIZE. STAKING. MULCHING. AND IRRIGATION.
LEGEND
TREE DEFENDED (BEER, AP WOO,
NINE)
TREE DIAMETER AT BREAST HEIGHT
NUMBER OF STEMS
6"
F
11 BS
5
N M
X
\
z
RE REMOVE
RP = REPLACE
P PROTECT IN PEACE
RE RELOCATE
FUTURE MITIGATION IF NEEDED DUE
TO REMOVAL
TREE MITGATON REPLACEMENT OUANTTY OR
N/M = NO MITIGATION:
0
S/C = SPECIAL CONDITION
E
TREE SPECIES BY COMMON NAME
C
u
TRFE IGOES NUMBER
EXISTING MINOR 1' CONTOUR
— —
EXISTING MAJOR 5' CONTWR
EXISTING DECIDUOUS TREE TO BE REMOVED
EXISTING DECIDUOUS TREE TO BE REPLACED
�W
EXISTING DECIDUOUS TREE TO REMAIN
</X�)w
EXISTING CONIFEROUS MEE TO BE REMOVED
V
EMSTNG CONIFEROUS THEE TO BE RELOCATED
/V< �)'
{ )
EXISTED CONIFEROUS WEE TO REMAIN
TREESPENES CONDITION I REMOVAL I DIAMETERI REM]VEDOR REMAIN QUANTITY IF
0- w
Id iw„
a awSO MBF
s_NNNi� wwwmz
xamapN� a
aainwwgw"
CIO rc o
FwaawazLjn
D-aaaaoo'a
� N
r 0
�O
Is om wy
U O N RE PT
U
O JJ W OU1�5
Dd
OF M1 m N N F
z
w a7D zzdOi
M BE OU N �I z
a NO ELSE
p O N
IN
G
SD
M
HONEYLOCUST
GOOD
4'1
PERSERVE IN PWCE
1
PEN/
G.
B..
51
HE
HONEYLOCUUT
GOOD
2"
PERSERVE IN PLACE
1
-
5G—BS
\
52
HE
HONEYLOCUUT
FAIR+
4'1
PERSERVE IN PLACE
1
-
\ 1
P
53
US
COLORADO BWEWRUCE
FAIR-
5"
RELOCATE
1
D
Q
<
M
\
Z
Q
Q
54
US
COLORADO BWEWRUCE
GOI
2"
REGULATE
2
D
\
G
ON
55
MSCOIfIRA00
BWE WRVCE
GOOD
fi"
REGULATE
1.5
0
���
Sfi
US
COLORADO BWEWRUCE
GOOD
6'
PERSERVE IN PLACE
1.5
15
P
111
57
US
COLORADO BWEWRUCE
GOOD
2"
REGDJOE
2
0
Q
Q
p
m
---
\\ /
AT
US
COLORADO BWEWRUCE
GOOD
61
PERSERVE IN PLACE
1.5
Z
I1LJ�•
59
US
COLORADO BWEWRUCE
GOOD
6'
PERSERVE IN PLACE
1.5
>
w
O
65
M
FAIR
2"
PERSERVE IN PLACE
1
-
W
FE
HE
TRPEDHONEYLOCUUT
TORPEDOPLAN
PLAN
GOOD
]°
TRYTO RETAIN
2
-
J
<
67
69
E
NINE
EL
ACCOIAOEEIM
GOOD
FA
3"
2'1
NPLA
PERSE RVE IN PLACE
PERSERVE IN PLACE
1
1
-
-
�
-
0
0
69
HE
HOH EYLOFLAT
GDOD
IN DRIVE
]"
REMOVE/REP NCE
2
2
Z
O
V
N
HE
HONEYLCL T
GOOD
]'•
PERSERVE IN PLACE
1.5
-
of
~
A
HE
HONEYLOCUUT
GOOD
]"
PERSERVE IN PLACE
1.5
0
Q
R
LO
UNDER
FAIR
2"
PERSERVE IN PLACE
1
-
Q
m
(7
A
GA
GREEN ASH
GOI
6•
PERMEATE IN PLACE
1.5
-
LEI
=
P—
SUBTOTAL
MTIGATOB TREES REQUIRED (INDEX
AIL]3)
-
-
4
=
�_
TOTAL MIIIGAIRON TREES REQUIRED (INDIXGI-]3)
-
-
IB
J
W
M
STREET TREE NOTE
Q
Z
W
W
A PERMIT MUST HE OBTAINED MOM LEE CITY FORESTER BEFORE ANYTREES UP
30'
15' 0
30RO'
SHRUBS AS NOTED ON THIS PLAIN ARE PLANTED, PRUNED UP TENURED IN THE PUBLIC
AIIIIIIIII�
RRGHT�FMVY THIS INCLUDES ZONES BETWEEN THE SIDEAMIXAND CURB MEDUNTUN
ORIGINAL SCALE:
l'
= 30'
ADD OTHER PON PROPERTY THIS PERMIT
roar
TOBEPITANTED FAILURE TO OBTAIN
COLLINS CODE SUBJECT TO rvTSECTox �731) AND Muorv��umNNr
SHEET
3 OF 15
REPLANDGING OR RELOCATING TREES AND A HOLD ON CERTIFICATE OF OCCUPANCY
JOB
N0.
39145.51
/11m
l
l
l
Id i IIII l- ,� J /( \ 15 P Wm l p
I F- 15 l
i
W
1 \ \ \ 0
\
0 BE �_� � p__ W_=___e�._
I 1 P y _ , _ _ _ _ _ _ _ _ —
T
/ \ I
I i/' /l No"
F AS --
D Y I f
At X II ;
I
I I
\ F r
/ -_
/ P
/ III / / / /___-__
i i$
/��' i r-_ \
_ „E
11
1 P %
/ /� F 2" V
/ /
I /
F+ r
t p
F
mom
\
______
_
e �
\
/
_
F- 2" _
91 - P
F
P / D r��
I SO
RV
D 3'
0 B" -
+ RL F 2"
D {"
I 0 RE
F+ T -
F_ 4^ 115
P
0 P \
\ \ OF
1.5
P _
�_____ _ '1
\ \ —- -�,,\�.E
-\ \ __��___--,__�_1_-___a_ 1 F
—_dNBNNN we
i_I_-_\`�
- - - - EAST VINE DR. -
I
II
III
III
III
0. I
�I
TREE PROTECTION NOTES LEGEND
MR CITY LPND USE LOGE 33J G THE FLLLbNI{i TREE FRDEENCTILN 6PELFIUTILN6
WALL APPLT
1. ALL EXISMO TREES WITHIN THE LIMITS OF THE MARSOPMENTAND WITHIN ANY
NANRALAREA BUFFER ZONES SHALL REMAIN AND BE PROTECTED UNLESS
NOTED ON THESE PLANS FOR REIMJVAL
1 2 WITHIN THE DRIP UNE OFANY PROTECTED EXISTING TREE THERE SHALL BE NO
AUTHOR ELL OVERA FOURINCHDEPTH UNLESS A QUALIFIED ARBORI5TOR
FORESTER HAS EVALUATED AND APPROVED NE DISNRBWJCE
3 ALL PROTECTED EXISTING TREES SHALL BE PRUNED TOME GNOF FORT
COWNSFORERRYSTANDANC TREEPRVNINGANDRFMOVALSHALLBE
PEUORMEDBYABVSINESSTHATHOLDSACVRRE GT OFFORTCOWNS
AMORISTUCENSE WHERE REQUIRED BYCODE
4. PMORTOANDDVRINGCONSTRVCPON,BARRIEMSHALLBEERECTEDAROVND
ALL PROTECTED EXISTING TREES MEE SUCH BARRIERS TO BE OF ORANGE
BUNCH HE MINIMUM OF FOUR(4) FEET IN HEIGHT, SECURED WITH METAL MARC,
NO CLOSER THAN SIX (6) FEET FROM ME MUNK OR ONE-HALF 0M OF
ME DRIP UNE WHICHEVER 15 GREATER M ERE SHALL BE NO STORAGE OR
MOVEMENT OF EQUIPMENT, MARTIN DEBRIS ORFlLL WITHIN THE FENCED
TREE MOTECTON ZONE
5. DURING ME CONSTRUCTION STAGE OF DEVELOPMENT THEAPPUCAMSHALL
PREVENTTHE CLEANING OF EOVIPMENTORAMTWALORTHESFORAGEAND
OI5POSALOF WASTE MATERIALSVCH AS PAINTS, OILS SOLVENTS, ASPHALT,
CONCR,MOTOROILORAWOTHERAMTERIALHARMFVLTOTHEUFEOFA
TREE WITHIN THE DRIP UNEOFANY PROTECTEDTREEORCROVP OFTRE6.
6. NO DAMACINGATTACHMENT WIRE SIGNS CAMERNAMMAY BE FASTENEDTO
)NOTCH (-LOUR FAIR, MOD. DEAD)
AMETiR AT BREAST HEIGHT
OF STEMS
EMOVE
EPLACE
Gj
zp w
aaw pi DpIhf
WAS uSE
m_� ww mz
2<m¢pN
zioi¢wwg�N
w¢KO¢ O
F w66w6�in�
OTECT IN PLACE
F N
LOCATE
�. M
MEGATON IF NEEDED DUE TO REMOVAL
0 M O
TGATCN REPLACEMENT QUANTITY OR
O
y
U O F M w
NO MITIGATION:
L_
]
U O V
5
SPECIAL CONDITION
p
LJ
w U 1�
N
'ECIES BY COMMON NAME
y1�NON
W Z O
O
DEX NUMBER
d
Z J J r M fU/1
a
IrmoU (OI Z
M F D —
p N
InpO
ANVPROTECTEDMEE. _ -- EXISTING MINOR 1' CONTOUR w
]. LARGE PROPERTYAREM CONTAINING PROTECTEDTREEANDSEPARATED _
FROM CONSTRUCTION OR HAND CLEARINGAREN MAD RIGHTS-0FWAYAND \ EXISTING MAJOR 5' CONTOUR
V IIN UEASEMENTS MAY BE'IU BBONEO OFF, RATHER THAN ERECTING
PROTECTIVE FENCING AROUND EACH TREE AS REQUIRED IN DEDUCTION ENO)
ABOVE. ME MAY BEACCOMPUSHED BY PLACING METALT-POSTSTAKEA
MAXIMUM OF FIFTY(50) FEEFAPARTAND KING RIBBON OR ROPE FROMSTAI(ET0.5TAKE pyj EXISTED DECIDUOUS TREE TO BE REMOVED
ALONG THE OMIDE PERIMETER5 OF SUCH AREAS BEING CLEARED. iAY
D. ME I NSTALLATION OF UTILITIES, EDUCATION ]LANE MANY UNDERGROUND EXISTED DECIDUOUS MEE TO BE REPLACED
FIXTURE REQUIRING EXCAVATION DEEPERTIUN BE INCITE SHALL BE
ACCOMPLISHED BY BORING VNDERTHERWTSKIFM OF PROTECTED
WILLING TREE ALA MINIMUM DEPTH OF TWENTY- FOUR CIA) INOITE. ME
AUGER DISTANCE 15 ESTABLISHED FROM THE FACE OF ME MEE (DEIRBARK) EXISTING DECIDUOUS MEE i0 REMAIN
AND IS ANAMD FROM TREE DIAMEIERAT BREAST HEIGHTAS DECNBED IN THE
CHARTBEIDW
EXISTING CONIFEROUS MEE TO BE REMOVED
TREE DIAMETER AT
BREAST HEIGHT (IN)
AUGER DISTANCE FROM
FACE OF TREE (FT)
O-2
1
3-4
2
5-9
5
IC-14
10
15-19
12
OVER 19
15
9 NO TREE SHALL BE REMOVED DVRINOTHE SONGBIRD NRTING SEASON(FEBRVARYI TO
1VLYT) ORCONDUCTASVRVEY OFMEE EN5VRING NOACTIVENESIS IN THEAREA
TREE MITIGATION MATRIX
0 EXISTED CONIFEROUS TREE TO BE RELOCATED
NOTE0 EXISTED CONIFEROUS MEE TO REMAIN
TRANSPLANTING TREES y23, 24, 25, 54, AND 55 SHALL FOLLOW ME
RECOMMENDATIONS CL A QUALIFIED TREE TRANSPLANTINGCONENACTOR
IN TERMS
OF SIZE. STAKING. MULCHING. AND IRRIGATION.
STREET TREE NOTE
A PERMIT MUST BE OBTAINED FROM THE CITY UNRELATED BEFOREANYTREESOR
SHRUBS AS NOTED ON THIS PLAIN ARE PARTIES, PRUNEDOR REDUCED IN THE PUBLIC
RIGHTOFWAY THIS INCLUDES ZONES BETWEEN THE SIDENALKAND CURB, MEDIANS
AND OTHER CITY PROPERTY THIS PERMIT SHALL APPROVE THE LOCATIONS AND SPECIES
TOBEPLANTED FAILURE TO COLLINS CODE SUBJECT TO NSEffIT 3DLSYM FORT
oNCoNANMYAO RESULTlN
REPLACING OR RELOCATING THEN
INA
NN
NN
G
=I=IMIaIa
¢
m
NC
W
w
<
v
<
wfS
IS
w
W Z
U Q
J
0 d
000 Z
U K H
D O Q
Q m U
2 ~ 0
W M
QZ W
W
30, 15, 0 30' 60,
SHEET 4 GF 15
ORIGINAL SCALE: 1" - 30'
JOB N0. 39145.51
No Text
No Text
PLANT
LIST
THE FOLLOWING IB
RAN N BMIRAL
A GENERAL PLANT LIST FROM WHICH FLAM MATERIAL WILL BE SELECTED AT THE TIPS OF THE FINAL DEVELOPMENT LANDSCAPE
CONIFEROUS TREES
TOLERANT IRRIGATED SOD MIX
HYBRID KEN1UCKi x TEXAS BLUEGRASS BEING A MIX OF I00% TEXAS BLUEGRASS HYBRID SEED. THE SEED
SOURCE a TURF BASED MIX FOR SOD SHALL BE APPROVED BY THE LANDSCAPE ARCHITECT BEFORE MSTALLATIpJ
OF BC9.
TURF TYPE B:
DROUGHT TOLERANT IRRIGATED TURF SEED MIX
30% Ig WRAIM CRESTED IIMEATGRASS, 35% CLARE PERENNIAL RYSEGRASS, Zdk SR3300 BLUE RESCUE, 15% REUBENS
CANADA BLIIEGRA99, 10% CHEWINGB MEOW.
TOl B I- MACRE (DRILLED) -BB SEEDB/!F
0
CNS
cupral Nwway Srsuucas
Plcm Abim CuprmslM'
5-6' Hi Mtn.
B16
M
44%
M
6
SAPMR,
FBO
EmmadAiatea lBnpm
IseII ed Arrow ell
EmeraldArr
Pln"pun eIsforFinaldArtwu•
PICM lLcoces
D.-wELi
5'-H' HgLMh
BIB
BB
L
L
�%
15%
GENERAL
LANDSCAPE NOTES
evlt rald
DECIDUOUS TREES
I. RANT QIAL TY ALL RANT MATERIAL SHALL BE A -GRADE OFF NO I G EfR E O ANY DEFECTS ONORMAL rEALTµ HEIGHT,
LEA DENSITY AND SPREAD AFPEVPIMATE TO THE SPECIES AS DEFINED BY THE Arli ASSOCIATION O NUREERTMFN (AAA)
llatSTANDARDS.
ALL TREES SHALL BE BALL AND BURLAP OR EQUIVALENT.
6
A
Acmlede Elm
Wmus )Morton'
3" Cal
SURE;L
15%
]
BO
Burr Oak
Owmou Meaacarpe
]" GI
LOW
L
al
], IRR Tl4 ALL LANOWAM AREAS WITHIN THE SITE BOLLWORMS, NRF, SHRUB BEDS AND TIME A at Iul BE IRRIGATED WITH
33
CO
GIMMil OM
(Lmcus Muenlexcia ll
31, GI
BB
M
5}%
AN AUTOMATIC IR'31GATION SYSTEM THE IRRGATlON PLAN MET BE RE VIEYED AND APPROVED BY TIE CITY O FOR COLLIIffi
4
CW
CNMen Spire ODIC
Wmcue Rcbw'61m',:N TAt'
V Cal
am
M
10%
WATER UTILITIES DEPARTMENT PRIOR TO THE I^SNUANCE O A BUILDING PERMIT. ALL RARE AREAS SHALL BE IRAGATED WIN AN
4
GSL
Grolier Do Ltndm
THIepire' a Cordaur 'Grav
3" Cal
BIB
M
10%
AUTOMATIC FCP-AP IRRGGATION SYSTEM ALL SHRUB BEDS AND TREES, INCLUDING IN NATIVE SEED AREAS SHALL BE FB IGATED
20
KCT
KentM CoKee
Gynrocledus Dlolcus S prmm
2- cal
BA E
L
69%
WITH AN AROMATIC DRIP (TRICKLE) I IMMATION SYSTEM OR WITH AN ACCEPTABLE ALTERNATIVE ARiiOYED Bi THE CITY WITH
N
ME,
unperson Hill 011
GIrM Blloba 'HMcetm Sol
3" GI
BB
L
3.4%
THE IRRIGATION PLANS THE IRRIGATION SYSTEM SHALL BE ADJUSTED TO FRET THE WATER W=IREFBNTS O THE INDINDUAL
IT
el
5naxwerstor ROMMIOCUM
GRel la TliaeYNVa IMrmla'SItlG4maatar' 3" Cal
Bab
L
AS%
PLANT MATERIAL,
4
HIM
wtlbsry
Call occldmbine
r sal
BIB
L
10%
ORNAMENTAL TREES
3. �LIER UTHE
QNQ R REDISSFET�ILAMD LI�SCO DURING CgN$TRICTION ACTIVITY SHALL BE CONSERVED
EAS
n
q. SOIL AMENOMENiS: SOL AHBbHENTS SHLL ABE FRONDMHACCORDANCE
FRONDED AND DENTE , IN ACCOANCE WITH CITY CODE SECTION Q-133.
42
Am
AaW Blllarce Smvlceamy
Am ise ire x Gordirk a 'AUWm dtlbpee'
OP Cal
BB, multi
bwk L
all
THE W IL IN ALL LANDSCAPE AREAS, INCLUDIW PARGUAYS AND PEDIANS, SHALL BE TERSTI WHLY LOOSENED TO A DEPTH O
Q
CAP
Capital pear
parts Callawri CJpltal'
2. Cal
Bffi M
5E%
Q
CP
CIPRIANI Paer
pal Gllaryana 'Oxnticls'
2. Cal
BIB M
3C%
31
ERB
Eaetmn RrALWAs
Cal Caudaculs
0i'Cal
Bffi M
!U%
B
GC
Gladiator Crabapple
Mali Gladiator
q' Cal
Bab M
AT%
30
WFt
Net BASS Maple
Aor Taterlcum'Wt Will
W. CBI
BIB, multi YwkL
see
E
RC
Radler, crabapple
Malue'Radlant'
h. Cal
BIB M
a;%
90
RISC
Red But Crabapple
Melue'Rad BID
61 Cal
BIB M
4.e% 5.
6
REM
Racky EX rtaln Maple
Ace Gletrw
I" GI
am,, 11" surk -
15%
23
W
Bargmt Cracei
Mallforgamtll'
N. Cal
0B M
51%
K
BBC
Sexing Bnou Oebal
Melue'Sprlrg Senn'
115. Cal
00 M
39%
406 Total Ref 6E0%
: �.: � I R J I � h 1 6. MAINTENANCE TREES AND VEGETATION, IFIRGATICN SYSTEMM, FENCES. WALL$ AND OTHER LANDSCAPE ELEMENTS SHALL BE
AUB
Anth" UJI Lpirea
asure" % Bumalda 'An" IyatweY
5 Wait
COIN.
M
19415
Blue Mist Bell
Cary fistai x Glendon e
5 Gel.
COP.
L
BYD
Bud'e Yellow Dogwood
Cmrw Alba 'Bode Tell
5 Gel.
Cars.
M
CEC
Compact European Crarbeny
Viburnum Opulus'Compaetun'
560I.
Coal
L
CF5
Crimson RJgmy Bubmry
Berbw I, Tunbrga 'M4syapwea Nme
5 Wait
COIN.
L
DEC
Dwarr European GerbmryhfM1
Viburnum Pistil Wnun'
5Gal.
Cora.
L
PCP
Cal Kelsey Dogwccd
Corne Rdiccr fora 'Keiery'
5 Gel.
Cars.
M
DI.
Cal Korean Lilac
Syringe Mal Isi
560I.
OCRs,
L
OKA
DPk Knight Splrw i
Cary puwle ClaMcrwla
5 WI,
Cur%,
L
DMM
Dwarr Minnesota Yackorenge
Fhiladelphu x Vlrgg falle'Cuurr Sawrleke'
5Sol.
Cord
L
DNB
Minimal Minimall
uyeob pw �ullfollw'Nercs'
Stet.
CorM1.
L
FOS
First Cblce bell
Cal Carl& x Clarecreele First Cbics'
5 WI.
Cons,
L
FS
Fr06Wl LpIrN
Splma x 5umalda AOwWII'
5 WL
COIN,
M
GC
Optical Duran.
Rbf Aureal
5 Gel.
Cord
L
GFB
Go ANeBpirf
expires x dmtsida 'fildrlens.
5SAL.
Cope.
M
GLS
Gro-Lam Bumc
Rus ArOvi 'Go-Ioi
5 601.
Cons.
M
ID
IUMI Dogwood
Corlua Bald
5Gal.
COCK
M
IHD
Ivory Halo Dogwood
Carus Albs'" Heb'
5 Gel.
Cont.
M
LPD
Little shores Opal
Sexiness Japcnlm 'Little ulrcas'
5 Gal.
Cont.
M
MCB
Magic Carpet Spires
asweea Japcnlso 'wi lbuma'
5 W 1.
Car,
L
RE
Russian &I
Fapvekle ADIMIClfolla
5 GAL.
CORE
L
RBB
Regent BavlcabarN
AmeleMSla AInfole 'RagaM1
5 Gel.
Core.
L
MET
Srubelle Meekorege
PFlladelplas'Bnoubelle
5Sol.
CORE
L
W6
White d4ub9n
&JgJFCYlcarpes Altus
5 W I.
Cda.
L
BJ
Blue Version Junlpa
Ju Nswous Bcopulwum Blue Creeps
5 Sol.
Coss.
L
BMH
Mal Magic Holly
Llf X Meeervme'Bill MagK
5 Gel.
Core,
L
CGH
Concept O'egm tape Jelly
Mandl Agwform'Carpacum'
ill I.
CORE
L
Deals
Dwarf Gldae Ill Spruce
Plua Pagme Glauu GlWcea'
5Gal.
CORE
L
HU
MgMe Juleps,
Junlpaus ExeFc nalls FueFu'
5 Sol.
Cara.
L
MBB
McNtExx my Blue Bpuce
pope "we 'Mmtgail
5 Gel.
Con.
L
MMP
Map,, Mgo pm
Plrw Mgr Maps'
5 OuI.
Cwn.
L
oOJ
Oregon Gape Hell)
Marcos Aq llum
5 Gal,
COCK
L
0BB
Saab Dwarf Blue pPwn
pass Puri '9Ie1m Dusrf
19 Gel.
Cron.
L
SMP
Voum:ouxl Mugo Plne
Flnle NMg 'Slounond'
5 Gel.
Con.
L
TMP
Tammbaum Mugu pm
PIAn M1ge'Taiviesc '
10 Gal.
COIN.
L
)IMP
SHIA Bud Fill PIES
pens Mwgo'Units Bud'
5 Gal,
Cal
L
BG
Blonde Ambltlm Blua Cal
Bwtelow Gectle'Bande AMall
I Gal,
Unt
L
DF5
Desert Fountain Canes
Panaetui Alcpewroldea 'Hari
IGaL
Copt
L
KKa
Karl Feral Gars
Oela OSON tls Acutll Karl Fwai
S Gel,
Coral
L
LEM
Little 61uermn
SdnRdylum Sceparlun 'Too Ill
5Owl.
Curt
L
SBS
Stivm 51ur
Andopagon Sacdarot ow
I Gal.
C t
L
RGH
f loredo Crepe HOUy
Malone Rgaae
ICAL
Cont
L
ON
Coromdo Apeop
AgastacCe Auri ntled'Cwomce Red'
I SOL
Copt
L
CDC
DmK Double CoHni
Coraopels GandlFlwa Tun Ray'
I SHE
Conn
L
DL
exi df Qo Day Lilly
Hanaxellla '5bla de Oo'
I Gal.
U_nt
L
MBG
Me, 6edNsw Wm
Gem: Gilomm Mrs, J, Br daMw'
I GPI.
Cont
L
MFA
MIonN Frlkanb Aster
Astor x FrInke l "Over
I SOL
Oont
H
MY
Toe lm Yarrow
Achllls l MIIlefollun MoanNlne'
I GAL
Cent,
L
NM
Mi Purple Silvis
Will Nwnmae TYy NIgM'
I GaI.
U_nt
L
BOB
Duple Comflwua
EcMmcee Furyuss
I GAI.
Cont
L
RBY
Pod Beauty Yarrow
AcM1ulea Millefollun'Rad SRI
I SOL
Oont
L
RO
Wd Palrla Cwrfbws
Ratlbida ColumRaa
I GAL
Cent,
L
Rio
Rady Mountain Penatoni
Pmatamcn Swlctw
I Gal.
U_nt
L
RRP
Red SOMA Pemraian
Pmeta x Mexicali Rbd Rode
I GPI.
Cont
L
NRB
Ni River III
Betua Fell lie
10 Ge1.
Cont. ili YVRM
BP
Nrvb Potwallb
PotarnllW Frvucef
5 WI.
COP,
L
TIES
TYree Leaf Sume
Rus Tlldaeta
5 Gel.
SOME
L
SO
Will DJrmt
Rbf Gorman
5 Gel.
ZONE
L
W3O
Creeping Rotmn Bard anal
P orl �l Pawrav Buttf
5 Sol,
Cont.
L
O AT
qR TO
IN THE
SINA
1m
;ARE
AILS,
NEAR
AND
STREET TREE NOTES
I. A PERMIT MAST BE OBTAINED FROM THE CITY FORESTER BEFORE ANY TREES OR 5HR1B5 A9 NOTED ON THIS FLAN ARE
T. BEBWaill ANY LANDSCAPE ELEMENT THAT DIES, OR 15 OTtIERWSE REMOVED, SHALL BE FROMPTLY REPLACED BASED ON
THE REQUIRN=TIENTS O THIS SECTION,
S. THE FO.LOSl SEPARATIONS SHALL BE FRONDED BETWEEN TREES/dI AND UTILITIES.
A0 FEET BETWEEN CAWT TREES AND STREET LIGHTS
5 FEET BETWEEN OA'AMENTAL TREE& AND STFEETLKaMB
ID FEET BET) TREES AND RIBLIC WATER SANITARY AND STORM SELLER MAIN LINES
6 FEET BETWEEN TRESS AND PUBLIC WATER SANITARY AND STORM SELLER SERVICE LINES
4 FEET BETIEEN SHRUB$ AND PUBLIC WATER AND SANITARY AND STORM SELLER LINES
4 FEET EMPUM N TREE& AND GAB LINES
4 ALL STREET TREES SHALL SE PL4CED A MINIM M EIGHT (B) FEET ALLAY FROM THE EWES O DRIVEWAYS AND ALLEYS MR LUC
33NDXiXA).
10. RKEMENT O ALL LANDWMING SHALL BE IN ACCORDANCE WITH THE SIGHT DISTANCE CRITERIA AS SPECIFIED BY THE CITY O
FORT GALLINE, NO STRICTURES OR LANDSCAPE ELEMENTS QEATER THAN 24" SHALL BE A -I -Oil WITHIN THE SIGHT DISTANCE
TRIANGLE OR EASETMEHTS WITH THE EXCEFRION O DECIWDYa TREES PROVIDED THAT THE LOWEST BRANCH 16 AT LEAST 6' FROM
GRADE. ANY FENCER WITHIN THE BIGM DISTANCE TRAGLE OR E4 EI MUST BE NOT MORE THAN N' M HEIGHT AND O AN
O£N DESIGN,
11, THE FINAL LANDSCAPE RAN BEALL BE COORDINATED WITH ALL OTHER FINAL PLAN ELEMENTS W THAT THE PROPOSED GRADING,
STORM DRAINAGE, AND OTHER DEYELCPMEINT IMFROVEPENTB DO NOT CONFLICT WITH NCR F'FECLUDE INSTALLATION AND
MAINTENANCE O LANDSCAPE ELEMENTS W THIS PLAN
Q. MINOR O4YGE5 M SPECIES AND PLANT LOCATIONS MAY BE MADE WRItYa CONSTRICTION -- AS REQUIRED BY SITE CONDITIONS
OR RANT AVAILABILITY OVERALL QUANTITY WALITY, AND DESIGN CONOEPT TUBE BE CONSISTENT WITH THE AFFROvi PLANS,
IN THE EVENT O COFLICT WITH THE QUANTITIES INCLUDED N THE RANT LIST, N{CIES AND QUANTITIES ILLUSTRATED SHALL BE
PRAISED AL CHAYES O PLANT SPECIES AND LOCATION MET HAVE WRITTEN 4FPRDV4 BY THE CITY PRIOR TO
INSTALLATION
13, ALL RANTING BEDS SMALL BE MULCHED TO A MINITUM DEPTH O THREE INCHES
IA COMMON OPEN SPACE AREAS AND LANDSCAPING WITHIN RIGHT O WAYS, STREET MEDIANS, AND TRAFFIC CIRCLES ADJACENT TO
CQ9MON OPEN &PACE AREAS ARE REQUIRED TO B: MAINTAINED BY A PROPERTY OWNERS ASSOCIATION, THE PROPERTY OWNERS
ASWCIATIQN IS RESPONSIBLE FOR SHOW REMPAU. ON ALL ADJACENT STREET BIDEWAKS AND W ALL DRIVEWAY$. Feel
SWABS AND PARKING AREA$ WITHIN THE DEVELOPMENT.
15. MAINTAIN A MINIMft O THREE (3) FEET O CLEARANCE ON EACH BIDE O FIRE DEPARTMENT CONNECTION (FDO). NO VEGETATION
OTHER THAN TURF OR GROUND COVERS 8H4LL BE PLANTED IN FRONT O FDC.
16. IF TREES OR &IMMUNE ARM LOCATED ON TOP O FIELD VERFIED UTILITIES, CONTRACTOR SHALL NOTIFY OWNERS TEF'RE&ENTATVE
BEFORE ANY OAKUM COMMENCES. VERIFY WITH OWNER REPRESENTATIVE WHICH 5HRUl TREES NEED TO BE RELOCATED OR
ftM D FROR TO PLANNING.
IT. ALL LANDSCAPE AREAS WHALL ME MAINTAINED, INCLUDING MOWING, WATER AND MIRILIZMG BY CONTRACTOR UNTIL FINAL
INCH AS FENCES AND URi BH4LL BE REPARED ANt50R REPLACED PERODICALLY TO MAINTAIN THE BITE IN GOOD SOWD
CONDITION.
IB EXCAVATED MATERIAL TO BE USED AS FILL WILL HAVE ALL ROOKS, DEBRIS, WATER MATERIAL, FROZEN MATERIAL, VEGETATION
LARSER THAN 3' IN ANY DIMENSION %SMOvED BEFORE PLACEMENT AND C9MPACTION O SOL,
1% PROVIDE POSITIVE DRA NVXE AWAY FROM BUILDING AND WALL FOJNDATIGN9 AND A "Cl TRANSITION BETUREEN ALL ADJACENT
EXISTING GRADES, AND FROPOSED GRADES.
201NIFCRILY COMPACT AND FIFE GRADE ALL AREAS TO BE FLANTED TO A &MOOT) &IF , PRESS FROM IRREGULAR SURFACE
GRADES, FE-CCHPAGT SOFT SPOTS, FILL N LOW AREAS AND FIRM HIGH SPOTS TO COMPLY WITH REQUIRED GRADE TOLERAINGES,
REFER TO CINL RIWB FOR REWIRED FINISH SPOT AND CONTOUR (WRADER.
]I. ONCE ROD IB LAID IT SHALL BE FROMR-Y R'ALED, COMPACTED, AND SCD JOINTS SMALL BE FLSJMV TOGINER TO ELMIN M
ANY GAFFS BETIAMN ROLL EDGES APPLY FERTILIZER IN THESE AREAS PER SOD FARES RECOHIENDATONS.
Zi. ALL MINU'AM PLANT MATERIAL SIZES ARE ggJN IN THE RANT LIST, ALL PLANTS SHALL BE RANTED IN AMENDED EVIL AND
TREES SHALL BE STAKED AS SHOWN IN DETAILS
]3. ALL PLANTING BEDS SHALL BE MJLOHED TO A MNMIAM DEPTH OF THREE INCHES
ZA ALL PLANT MATERIAL EIIALL HAVE WIRE TUNE, INUAKETS BURLAPNND ALL OTHER NON -BIODEGRADABLE CONTAINMENT MATERIAL
REMKAZED FROM THE TRUNK AlmASR ROOT BALL O THE PLANT FRCP TO P-Mi
25, ALL 5141 BEDS WALL HAVE A MINIMUM X CEPTH SHREDDED RE SWOOD BANK WOOD M E CH-NANRAL COLOR AND)OR I-3'
DIAMETER SIOXMH WASHED RIVER RCdC SEE LANDSCAPE PLANS FOR LOCATIONS AND TYPES O MULCH. A CONTINUOS, LAYER
O APPROVED NEED BARRIER LANDSCAPE FABRIC &HALL BE INSTALLED IN ALL S BEDS WIN 6- OVERLAP AT SEAMS WIN
4- STARER 4' 01 IN ALL DIRECTIONS. DO NOT WE USED BARREN WHERE TIMES ARE RANTED IN 1WIF AREAS.
]S.STEELHEADER BETWEEN GRAE$ AND 5411216 BEDS?DCX COBBLE AREAS ETC, SHALL BE HEAVY DU Y STEEL EWER MIN 14 GA X
xx WITH FCLLED TOP 4 DRAINAGE HOLES 1' MINMMM ON CENTER STEEL HEADERS HALL BE BET LEVEL WITH THE TOP O THE
ADJACENT MOD. NO EDGING SHALL BE WED SET WEEN FIR SAW WOOD MULCH AND G1SAAEL COBBLE FIJI TRANSITION&.
ALSO Fall IN
A HOLD ON CERTIFICATE OF
i. CONTACT THE CITY FORESTER TO INSPECT ALL STREET TREE PLANTINGS AT THE COMPLETION W EACH RIASE OF THE
DEVELOPMENT. ALL MST BE INSTALLED AS SHOWN ON THE LANDSCAPE P-M. APFROV41- OF STREET TREE RANtIN3
B REOURBSO BEFORE FMM APPROVAL OF EACH FHASE,
3, STREET LANDSCAPING, INCLUDING STREET TREES, SHALL BE SELECTED IN ACCO®NGE WITH ALL CITY CODES AND
POLICIES. ALL TREE F'RNING AND REMOVAL WORSE SHALL BE REROIRMED BY A CITY W FORT COLLINS, LICENSED
ARBORS UHERE REOUIRED BY CODEAT ET TREES SHALL BE &1FFLIED M0 RANTED BY THE DEVELOPER UBMG A
QUALIFIED LANDSCAPE CONTRACTOR
4. THE DEVELOPER 941 REPLACE DEAD OR DYING STREET TREES AFTER FLANTING DNNL FINAL MAINMENAICE
INBFECTICN AND ACCEPTABLE BY THE CITY OF FORT COLLINS FORESTRY DIVISION ALL STREET TREES IN THE PROJECT
MUST BE ESTABLI5HE0, WITH AN AFFACC ED SPECIES A!m O ACCEPTABLE CONDITION PRDR TO ACCEPTANCE-
5. SUBJECT TO AFPRWA. BY THE CITY FORESTER -- STREET TREE LOCATIONS MAY BE ADJUSTED TO ACCOmG9ATE
DRIVEWAY LOCATIONS, UTILITY SEPARATIONS BETWEEN TRRI STREET BKNB AND STREET LIGHTS STREET TRIBES TO BE
CENTERED N THE MIDDLE O TIE LOT TO THIS EXTENT FEASIBLE. QIARIRKS BHCUN ON RAN MEET Be INSTALLED
UNLESS A REDUCTION 15 AFFR0,I BY THE CITY TO MET SEPARATION STANDARDS.
5TREET TREE NOTE
A PERMIT MUST BE OBTAINED FROM THE CRY FOREENTER BEFOREANYTTLESSOR
STRUBSAS NOTED ON THIS PILMNARE PILANTIED, PRUNEDORREEMPENTED INITIAL PUBLIC
RGLTOFWAY THIS INCLUDES ZONES BETNEEN THE SIDEWALK AND CURB, MEDIANS
AND OTHER CITY PROPERNIFY THIN PERMIT SHALL APPROZE THE LOCATION AND SPECIES
TOBEP-sNTED FAILURE TO OBTAIN THIS PERMIT IS A \AOLAHON OF THE CITY OF EMT
COLLINS CODE SUMATT TO CITATION (SECTION 27�31) AND MAY ALSO RESULT IN
REPILAGING OR RELOCATING NEES AND A HOLD ON CERTIFICATE OF OCCUPANTS
U= w
Rjw„
aawpoD63
?i>- -wmz
tam �p r F
WO w0=1`,I
W0000 O$
RwddWd JRmF
�FaaaaoO'a
N
V
N
�otp Zo
o , ME
o �r
�nz '0
Z
w JJJQ OO
d m O N OF Z
3O a
O N
N 0
1
? 3 0
¢
mZ
a
O
v_
3
m
D
O
IS
W
o
N
W
H
O
II.1
Z
Q
0
OO
U=
�
0o
Q IM
Z
W =
J
_ �
_
a
J W
Of
W
a
Q
�
U
SHEET I OF 15
JOB NO. 3914551
IS' MIN EETHACK FCR I GALLON
F V MIN, EETBAGC PoR 5 GALLO4
DECII 5NIEI5, 4' FCR f/JNREROJB GNI
PLANTING MATERIAL
F%M STEEL HEALER
NRNSS, WALKS.
WALLS, ETC..
1
r EDGE 6 PLANTING /Y8A
PEED BARRIER
Mu cw
VACRILL MATERIAL
x ROO BALL D
RANT MATERIAL CONSTRUCT A
2" HICM WATERNG RING
SCARIFY BIDES
AROUND SHRUB AT EDGE OF
AND III
RANTING PIT, F 1 GALLON
MATERIAL ALONG THE
LANDSCAPE SURER
CGNETROR A 2" X IB' DIA
WATER RING AND MULCH.
A I 5I-IRU5 PLANTING
EH19JB CENTER
�F
EWAL
TRIANGULAR
SPACING
E TRIANGULAR SHRUB SPACING
2 X ROOTBALL DIA
GENERAL NOTES
WY ALL CCNIFERWS TREES
AND ALL DECII TRESS
LARiER THAN 2 IR' CAL.
IN WOOED AREAS, OJT WO IN
CIRCLE AND MULCH.
FOR CONIFERS DUT WO AT
DRP LME CF TEE AND MULCH,
T ELL ..O PPI
BOTTOM TO TOP.
CWT WIRE WITH IIEEBII 1 LOCW
AT FlRHT BRANCIEB (MIN. 5'
ABOVE FINISH GRADE) PROVIDE
A IR" DIA X 2' LONG P,C
SLEEVE ON CWT WINES FOR ALL
TREES IN LAWN AREA
GUY AC TOP OF ANCHOR
TO SEE FLJCH WITH FINISH GRADE
MULCH
III MATERIAL
`JJBGRADE
B I TREE PLANTING AND GUYING
2 X ROOTBALL DIA,
IgENERAL NOTES
SPACE ALL DECIDIlW4
TREES IMP TO AND INCLUDING
2 la. CAL. DO NOT BTAXE
CONIFEROA, TREES.
IN WOOED AREAS OJT WD IN
3 - CIRCLE AND MULCH. FOR
DO41PERS CJT SOD AT DRIP
LINE 6 TREE AND M CH.
MUN3IIG
W TREE. JRAP FROM
BOTTOM TO TOP.
TREE STAKE, AONST TREE
STAKE W THAT TOP IS
LEVEL WITµ 05 JUST
EIELWI PIPET BRANfME4.
MJLGH
III MATERIAL
SJBGRADE
C I TREE PLANTING AND STAKING
4 SPACING MIµ TO WALL,
L HEADER OR TREE T ..
EO I EO. I
♦�S+Y♦�r�r�i+Y♦�r�♦ l+Y
♦ +
2- f ED SAUCER
CQRINIW PLANTING
BED EXTENDING WINDER
RANTS. USE SPECIFIED
RANTM3 SOIL MIX,
BJBGRADE
D I PERENNIAL PLANTING
0 w
a
aawp�p63
sib wwwmz
DIE a
viD�6ww O2M
wppou O
Fwa¢w F�
N
N
jO� gO
c ,9��Oa
w`j1J �r
Woz rv�
S Z
d m(3N 112
a—
O 0
I(2
G
w
N
0
J
0
�0
w
00
0
U
2
x
w
00
w
am
a
w_
=
0
U'
cn
J
ILL!
Z
Q
Z
Q
AM
SHEET H OF S
JOB NO. 3914551
i • I I — II -I. —
ter' T— _
all
\\\ .�••••••• •--ROARI �•
• ssss------ xaissc-aGa$EK DR_••.•.. �f
_______1 It
If
IF
/
w
I Y: 3�I11 I,11
A If
u�: i111
���� II:I•�I 11 ";i if1
i ii rr �
1 -------------
a,
l�GL4CIER CR~DR.-ry�2pX
` J
1
:l-CIFt/
I g� _ R 1 IIf
, Nl s
TO FUTURE CI � III 'IN
fill
O• �1::
lul-I N;I I
IOI- I
mm�um.uunuumil ".
Ni 1
" R
IN
.us. ' �y
m If
w
IN
�. 62
_ � — � — �' w �° --___ .h - :�• - `III /
i
_ •7/ I .1 L
--z---�
°
111
-GREEN LAKE DR._
M--= - : min -- _ — _ _ — - — - — - — -
71 __may GREEN LAKEDR.
`'�cONWNIttJ ya
� !! ti 1 ° Dz B31 PPRK ::•: B2 I `•QI i(Qi 1 II Ip A II gi; {`
II i�ai. ® r: ' I
IpD t
Kq
IIr� aa3
i
isss�--��IIII I I -
°�_—� IAT� A m
\ I o o All I
\ O
al
A
I
fir
✓ p Oil
jeer`;/\ i
iie, \ 'dIV
am �Yi \\\/, )k. It
BfgR laIM,;V
Ait III
All At
Rif
-Aft A It
\ /laktiliffif
11 i / \ ��\ aaae/R9 (DR aaa /!_.;®/p• b/ // //
\ /
IV
/ 1i ,/dill
IAA.(• — — — —
AA �•
D1
L
- v.... �.... -tom.
FUTURE MEELA1w LAlO'1OM11K, T VINE D
EASR _ —
-- _ TREEr TFaEEs a IRwswrloN er
-LIttCFFORTGOUINS— _ _ ___ __L
_ _ _ _ EX{9A
I________________
WATER USE TABLE
WATER NEEDED
ANNUAL WATER
SYMBOL
HYDROZONE
AREA (SF)
(GALLONS/SF)
USE (GALLONS)
HIGH (TURF IN HOA PRIVATE
TRACTS)
J9836
15.0
L30446
HIGH (TURF IN PUBLIC R.O.W)
20135
16O
M2430
MODERATE
23476
10.0
2M760
1 nf
LOW
14945
3.0
11,1635
TOTAL
136192
15.0'
2075473
AVERAGE WATER USE NOT TO EXCEED 15 GAL/SF AVERAGE O4ER THE ENTIRE SITE
'NOTE: WATER USE CPLOULAMONS DO NOT INCLUDE IRRIGATION ON PRIVATE LOT AREAS
rom
DI
EAST VINE DR.
m
a�•�•••O —___
p' ' �• Xf5 9GF 61503 �
y �I11I 5(Yp FA41Wf
aI ";
m
II; I
'il
ll I
III'
III �--
III '
Ili
III I
NII I
II _
IL
i ll J -
Ir -�
IN
u1 —�
IIII
IL_r
I IN
ILI [T—
IN
Y
II I
o � I
II;
I
III II - — —— ®------
�
I C r
RT C0LLI1`15---------------
xawmaznamxnwpzaspp6IX
,wo ww�
�
apImo
p'ioawI�aN
Tw o
�Faa0aoo'
T-N
n=o�K�trIp O
U s
ow �
O JUL_Dw
dWUUOO
t\�
yQ N N N N
a iw?Zo0
I J J J F� OT
d N
Irp
K QMF dF
FK p O
U-
G
LEGEND
Z
BOUNDARY LINE
--
H
CD
Q
PROPERTY LINE
--
Q
J
EXISTING EASEMENT LINE
Q
Q
PROPOSED EASEMENT LINE
c)
=
RIGHT OF WAY
W
Z
CENTERLINE
am
WOODEN FENCE-----x-----x-
N
GAS MAIN-----0-----C-
_X:
O
EXISTING SANITARY SEVER ----
5 ----5-
PROPOSED SMIITARY SERER
S S
JQ
ILLI
Z
}
EXISTING WATER MAIN ----
W -----
W
_
PROPOSED WATER MAIN
W W
EXISTING STORM DRAIN
PROPOSED STORM DRAIN
EXISTING CURB AND GUTTER =
PROPOSED CURB AND GUTTER
50
25 0 SO
100
EXISTING CONIFEROUS TREE TO REMAIN
0
SHEET
9 OF
15
ORIGINAL SCALE: 1' - 50'
EXISTING DECIDUOUS RtEE TO REMAIN
JOB
NO.
3914551
TRAIL HEAD FILING TWO
A RESUBDIVISION OF TRACTS F AND G. AND A PORTION OF TRACT H OF TRAIL HEAD
LOCATED IN THE SOUTH HALF OF SECTION 4, TOWNSHIP 7 NORTH, RANGE 68 WEST OF THE 6TH PRICIPAL MERIDIAN,
CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO
STATEMENT OF OWNERSHIP AND SUBDIVISION,
KNOW ALL PERSONS BY THEY PRESENTS. THAT THE UNDERSIGNED. BEING OWNER(S) OF ME FOLLOWING DESCRIBED LAND:
TRACTS F. G AND H OF MAIL HEAD FIN& PLAT AS RECORDED AT RECEPTION NUMBER 2004012M95 IN THE LARIMER COUNTY CLERK
AND RECORDERS OFFICE. Cltt OF FORT COLLINS. COUNTY OF LARIMER. STATE BE COLORADO
FOR THEMSELVES AND THEIR SUCCESSORS IN INTEREST TRAILHEAD HOMES LLC A COLORADO UMIFM UMUTY COMPANY AND WE CITY
OF FORT GOWNS HAVE CAUSED THE
WN ABOVE DESCRIBED WAND TO BE SUBJECT
AND EASEMENTS
INTO LO15 1RACT$ AND OF ET5 A$
SHOWN ON MIS PLAT TO BE KNOW AS TRAIL HER➢ RUNG TWO, SUBJECT TO ALL PLAT
AND NTH
WAY NOW OF RECORD
OR EXISTING OR INDICATED ON THIS PLAT. WE RIGHTS AND OBLIGATIONS OF WE PLAT SHALL RUN N1TH WE LAND.
CERTIFICATE OF DEDICATION
WE OWNER DOES HEREBY DEDICATE AND CONWY TO WE Cltt OF EMT COLLINS, COLORADO (HEREAFTER 'GIN), FOR PUBUC USE, FOREVER, A
PERMANENT RIGHT—OF—WAY FOR SWEET PURPOSES AND WE "EASEMENTS" AS END OUT AND DESIGNATED ON THIS PLAT: PRONGED. HOWEVER.
NAT (1) ACCEPTANCE BY THE Cltt OF THIS DEDICATION OF EASEMENTS DOES NOT IMPOSE UPON WE Cltt A DUTY TO MAINTAIN THE EASEMENTS
SO DEDICATED AND 2 ACCEPTANCE BY THE Cltt OF THIS DEDICATION OF SWEETS DOES NOT IMPOSE UPON THE CRY A DUTY i0 MAINTAIN
STREETS SO DEDICATED UNTIL SUCH TIME AS WE PROVISIONS OF WE MAINTENANCE GUARANTEE HAVE BEEN FULLY SATSFIED. WE SWEETS
DEDICATED ON THIS PLAT ARE THE PEE PROPERTY BE WE CITY AS PROVIDED IN SECTION 31-23-107 C.R.S. WE CITYS RIGHTS UNDER WE
EASEMENTS INCLUDE WE RIGHT i0 INSTALL, OPERATE, ACCESS, MAINTAIN. REPAIR RECONSTRUCT, REMOVE AND REPLACE WITHIN THE EASEMENTS
PUBLIC IMPROVEMENTS CONSISTENT WIN WE INTENDED PURPOSE OF WE EASEMENTS; WE RIGHT TO INSTALL, MAINTAIN AND USE GATES IN ANY
FENCES NAT CROSS WE EASEMENTS: WE RIGHT TO MARK WE LOCATOR CE WE EASEMENTS ON SUITABLE MARKERS; AND WE RIGHT TO PERMIT
OTHER PUBUC UTILITIES TO E%ERCIY THESE SAME RIGHTS. OWNER RESERVES WE RIGHT i0 USE WE EASEMENTS FOR PURPOSES NAT DO NOT
INTERFERE ON THE FULL ENJOYMENT OF THE RIGHTS HEREBY GRANTED. THE CITY IS RESPONSIBLE FOR MAINTENANCE OF ITS OWN IMPROVEMENTS
AND FOR REPAIRING ANY DAMAGE CAUSED BY ITS ACTIVITIES IN WE EASEMENTS BUT BY ACCEPTANCE OF THIS DEDICATOR WE CITY DOES NOT
ACCEPT WE DUTY OF MAINTENANCE OF WE EASEMENTS, OR OF IMPROVEMENTS IN THE EASEMENTS NAT ARE NOT OWNED BY THE CITY. OWNER
WILL MAINTAIN THE SURFACE OF THE EASEMENTS IN A SANITARY CONDITION IN COMPLIANCE WN ANY APPLICABLE WEED, NUISANCE OR OLDER
LEGAL REQUIREMENTS.
EXCEPT AS EXPRESSLY PERMITTED IN AN APPROVED PLAN OF DEVELOPMENT OR OVER WRITTEN AGREEMENT WN WE CITY, OWNER WILL NOT
INSTALL ON WE EASEMENTS, OR PERMIT WE INSTALLATM ON WE EASEMENTS, OF ANY BUILDING, STRUCTURE, IMPROVEMENT. FENCE. RETAINING
WALL. SIDEWALK. WEE OR OTHER LANDSCAPING (OTHER THAN USUAL AND CUSTOMARY GRASSES AND OTHER GROUND COVER). IN WE EVENT SUCH
OBSTACLES ARE INSTALLED IN THE EASEMENTS, THE CITY HAS THE RIGHT TO REQUIRE THE OWNER TO REMOVE SUCH OBSTACLES FROM THE
EASEMENTS. IF OMER DOES NOT REMOTE SUCH OBSTACLES. WE Cltt MAY REMOW SUCH OBSTACLES KNOUT ANY LIABILITY OR CDLIGATON FOR
REPAIR AND REPLACEMENT THEREOF, AND CHARGE WE OWNER WE CITYS COSTS FOR SUCH REMOVAL. IF WE CITY CHOOSES NOT TO REMOVE WE
OBSTACLES. THE CITY WILL NOT BE LIABLE FOR ANY DAMAGE TO WE OBSTACLES OR ANY OTHER PROPERTY TO MICH THEY ARE ATTACHED. THE
RIGHTS GRANTED TO WE Cltt BY THIS PLAT INURE TO WE BENEFIT OF THE CITYS AGENTS. LICENSEES, PERMITTEES AND ASSIGNS.
MAINTENANCE GUARANTEM
WE OWNER HEREBY WARRANTS AND GUARANTEES TO WE CITY, FOR A PERIOD OF TWO (2) YEARS FROM WE DAIS OF COMPLETION AND FIRST
ACCEPTANCE BY WE CITY OF WE IMPROVEMENTS WARRANTED HEREUNDER, THE FULL AND COMPLETE MAINTENANCE AND REPAIR OF WE
IMPROVEMENTS TO BE CONSTRUCTED IN CONNECTION MN WE DEVELOPMENT WHICH IS WE SUBJECT OF THIS PLAT. THIS WARRANTY AND
GUARANTEE IS MADE IN ACCORDANCE WITH WE CITY LAND USE CODE ANO/CR WE TRANSITIONAL LAND USE REGULATIONS, AS APPLICABLE. THIS
GUARANTEE APPLES TO WE SWEETS AND ALL OLDER APPURTENANT STRUCTURES AND AMENITIES LYING ARRIN THE RIGHTS—C£—WAY, EASEMENTS
AND OTHER PUBUC PROPERTIES. INCLUDING. KNOUT LIMITATION. ALL COMING. SIDEWALKS. BIKE PATHS. DRAINAGE PIPES. CULVERTS, CATCH BASINS.
DRAINAGE DITCHES AND LANDSCAPING. ANY MAINTENANCE AND/OR REPAIR REQUIRED ON UTILITIES SHALL BE COORDINATED WITH THE OWNING UTUTY
COMPANY OR DEPARTMENT.
WE OWNER SHALL MAINTAIN SAID IMPROVEMENTS IN A MANNER TWAT MLL ASSURE COMPLIANCE ON A CONSISTENT BASIS WIN ALL CONSTRUCTION
STANDARDS, SAFETY REQUIREMENTS AND ENARMWENTAL PROTECTION REQUIREMENTS OF THE CITY. THE OWNER SHALL ALSO CORRECT AND REPNR,
OR CAUSE TO BE CORRECTED AND REPAIRED. ALL DAMAGES TO BAD IMPROVEMENTS RESULTING FROM DEVELOPMENT —RELATED OR BUILDING —RELATED
ACTMTES. IN WE EVENT WE OWNER FAILS i0 CORRECT ANY DAMAGES WITHIN THIRTY (30) DAYS AFTER WRITTEN NOTICE THEREOF. WEN SAID
DAMAGES MAY BE CORRECTED BY WE Cltt AND ALL COSTS AND CHARGES BILLED i0 AND PAID BY WE OMER. WE CITY SHALL ALSO HAVE ANY
OLDER REMEDIES AVAILABLE TO IT AS AUTHORIZED BY LAW. ANY DAMAGES MICH OCCURRED PRIOR TO WE END OF SAD TWO (2) YEAR PERIOD
AND MACH ARE UNREPAIRED AT WE TERMINATION OF SAID PERIOD SHALL REMNN WE RESPONSIBNtt OF WE OMER.
REPAIR GUARANTEE.
WE OWNER HEREBY WARRANTS AND GUARANTEES TO THE CITY. FOR A PERIOD OF TWO (2) YEARS FROM WE DAIS OF COMPLETION AND FIRST
ACCEPTANCE BY WE CITY OF WE IMPROVEMENTS WARRANTED HEREUNDER, THE FULL AND COMPLETE MAINTENANCE AND REPAIR OF WE
IMPROVEMENTS TO BE CONSTRUCTED IN CONNECTION MN WE DEVELOPMENT WHICH IS WE SUBJECT OF THIS PLAT. THIS WARRANTY AND
GUARANTEE IS MADE IN ACCORDANCE WIN WE CITY LAND USE CODE AW/OR WE TRANSITIONAL LAND USE REGULATORS, AS APPLICABLE. THIS
GUARANTEE APPLES i0 THE STREETS AND ALL OTHER APPURTENANT STRUCTURES AND AMENITIES LYING WTHIN THE RIGHTS —OF —WAY. EASEMENTS
AND OTHER PUBUC PROPERTIES, INCLUDING, WITHOUT UMITATCR, ALL CURBING, SIDEWALKS, BIKE PATHS, DRAINAGE PIPES, CULVERTS, CATCH BASINS,
DRAINAGE DITCHES AND LANDSCAPING. ANY MAINTENANCE AND/OR REPAIR REQUIRED ON UTILITIES SHALL BE COORDINATED WN! WE OWNING UTILITY
COMPANY OR DEPARTMENT.
WE OWNER SHALL MAINTAIN SAID IMPROVEMENTS IN A MANNER NAT WILL ASSURE COMPLIANCE ON A CONSISTENT BASIS WN ALL CONSTRUCTION
STANDARDS, SAFETY REQUIREMENTS AND ENVIRONMENTAL PROTECTION REQUIREMENTS OF WE CITY. WE OWNER SHALL ALSO CORRECT AND REPNR,
OR CAUSE TO BE CORRECTED AND REPAIRED. ALL DAMAGES TO SAID IMPROWMENTS RESULTING FROM DEVELOPMENT —RELATED OR BUILDING —RELATED
ACTIVITIES. IN THE EVENT WE OWNER FAILS i0 CORRECT ANY DAMAGES WTHIN THIRTY (30) DAYS AFTER WRITTEN NOTICE THEREOF, THEN SAID
DAMAGES MAY BE CORRECTED BY WE Cltt AND ALL COSTS AND CHARGES BILLED TO AND END BY WE OWNER. WE CITY SHALL ALSO HAW ANY
OTHER REMEDIES AVAILABLE TO IT AS AUTHORIZED BY LAW. MR DAMAGES WHICH OCCURRED PRIOR TO WE ENO OF SAID TWO (2) YEAR PERIOD
AND MICH ARE UNREPARED AT WE TERMINATOR CF SAID PERIOD SHALL ROMAN WE RESPONSIBILITY OF WE OWNIM
NOTICE OF OTHER DOCUMENTSI
ALL PERSONS TAKE NOTICE NAT THE OWNER HAS EXECUTED CERTAIN DOCUMENTS PERTAINING TO THIS DEVELOPMENT MICH CREATE CERTAIN
RIGHTS AND OBLIGATIONS OF WE OEWLWMENT, WE OWNER AND/OR SUBSEQUENT OWNERS OF ALL OR PORTIONS OF WE DEVELOPMENT SITE, MANY
OF MACH OBLIGATIONS CONSTITUTE PROMISES AND COVENANTS NAT, ALONG NTH WE OBLIGATIONS UNDER THIS PLAT, RUN WN WE LAND_ WE
SAID DOCUMENTS MAY ALSO BE AMENDED FROM THE TO TIME AND MAY INCLUDE, WWOUT UMITATION. THE DEVELOPMENT AGREEMENT. STE AND
LANDSCAPE COVENANTS, FIN& SITE PLAN, FINAL LANDSCAPE PLAN, AND ARCHITECTURAL ELEVATIONS, WHICH DOCUMENTS ARE ON FILE IN WE
OFFICE OF THE CLERK Of THE CITY AND SHOULD BE CLOSELY EXAMINED BY ALL PERSONS INTERESTED IN PURCHASING MY PORTION OF THE
DEVELOPMENT SITE.
SIGHT DISTANCE EASEMENT RESTRICTIONS.
SIGHT DISTANCE EASEMENT - WE SIGHT DISTANCE EASEMENT IS AN EASEMENT REQUIRED BY WE CITY AT SOME SWEET INTERSECTCNS WERE IT
IS NECESSARY i0 PROTECT WE LINE OF SIGHT FOR A MOTORIST NEEDING i0 SEE APPROACHING TRAFFIC AND TO REACT SAFELY FOR MERGING
THEIR VEHICLE INTO THE TRAFFIC ROW. WE FOLLOWING ARE REQUIREMENTS FOR CERTAIN OBJECTS NAT MAY OCCUPY A RIGHT DISTANCE EASEMENT
FOR LEVEL WADE:
2 FENCES UP TO 42 INCHES IN HEIGHT MAY BE ALLOWED AS LONG AS THEY DO NOT OBSTRUCT WE LINE OF SIGHT FOR MOTORISTS,
3, DECIDUOUS TREES MAY BE ALLOWED AS LONG AS ALL BRANCHES OF THE TREES ARE TRIMMED SO NAT NO PORTION THEREOF OR LEAVES
THEREON HANG LOWER THAN 4X (6) FEET ABOVE THE GROUND, AND WE TREES ARE SPACED SUCH NAT THEY DO NOT OBSTRUCT LINE OF
EIGHT FOR MOTORISTS. DECIDUOUS TREES WN TRUNKS LARGE BOOM TO OBSTRUCT LINE W SIGHT FOR MOTORISTS SHALL BE REMOVED BY
WE OMER.
FOR NON —LEVEL AREAS THESE REQUIREMENTS SHALL BE MODIFIED TO PROVIDE WE SAME DEGREE OF MSIBIUR
FINAL PLAT
E�COUNTY
%
ROAD 50oPROJECT
7
SITE M�
Will
11 �
any
WIN
WIN
WIN
VICINITY MAP
1" - 2000'
OWNERSHIP CERTIFICATION.
TRALLHEAD HOMES LLC A COLORADO UNITED UABILITY COMPANY
SS:
STATE OF
THE FOREGOING DEDICATION AND WE FOREGOING COVENANT AND PLAT RESTRICTION ON CONVEYANCE. SALE OR TRANSFER WERE ACKNOWLEDGED
BEFORE
ME THIS DAY OF 20� BY
AS OF WITNESS MY HAND AND OFFICIAL SEAL.
MY COMMISSION EXPIRES: 20_
TRACT TABLE.
Tad
AREA SF
USAGE
OWNERSHIP
MAINTENANCE
B
%R76
D, 4MPA
TRAIL HEAD HOME OWN ERS ASSOCIATION
TRAIL HEAD HOME OWNERS ASSOCIATION
C
BRRRS
A,R EVA, MU
TRAIL HEAD HOME OWN ERS ASSOCIATION
TRAIL HEAD HOME OWNERS ASSOCIATION
D
993
D, 4MPA
TRAIL HEAD HOME OWN ERS ASSOCIATION
TRAIL HEAD HOME OWNERS ASSOCIATION
E
Ew
QLM
TRAIL HEAD HOME OWN ERS ASSOCIATION
TRAIL HEAD HOME OWNERS ASSOCIATION
F
27,094)
D, 4MPA
TRAIL HEAD HOME OWN ERS ASSOCIATION
TRAIL HEAD HOME OWNERS ASSOCIATION
G
1y90
A,R EVA, MU
TRAIL HEAD HOME OWN ERS ASSOCIATION
TRAIL HEAD HOME OWNERS ASSOCIATION
H
75,W3
D, 4M PA, PI
TRAIL HEAD HOME OWN ERS ASSOCIATION
TRAIL HEAD HOME OWNERS ASSOCIATION
I
Z],IM9
D, 4MPA
TRAIL HEAD HOME OWN ERS ASSOCIATION
TRAIL HEAD HOME OWNERS ASSOCIATION
K
LLRG
A,R EVA, MU
TRAIL HEAD HOME OWN ERS ASSOCIATION
TRAIL HEAD HOME OWNERS ASSOCIATION
L
IRS914
R 4MPA
TRAIL HEAD HOME OWN ERS ASSOCIATION
TRAIL HEAD HOME OWNERS ASSOCIATION
M
3,606
A,R EVA, MU
TRAIL HEAD HOME OWN ERS ASSOCIATION
TRAIL HEAD HOME OWNERS ASSOCIATION
X
21117
D, M, PA,PI
TRAIL HEAD HOME OWI E SASSOCIATIOH
TRMLHEAO HOMEOWNERS ASSOCIATION
P
2,'A3
Iy O, EVA,MV
TRAIL HFAO HOME CWNERSASSOCIATIOH
TRMLHOM HOME OWNERS ASSOCIATION
LEGENDI
A —ACCESS
D—DRAIAAGE
L—LANDSCAPING
EVA—EMERGENCY VEHICLE ACCESS
M—MAINTENANCE
PA —PEDESTRIAN ACCESS
PI —PRIVATE IRRIGATION
J_ RUTY
NOTICE
:d4:14:L1111:PS11*?
1. PER CR.S. 18-04-506, MY PERSON WHO KNOWINGLY REMOI£S, ALTERS OR DEFACES ANY PUBUC IPND SURVEY MONUMENT OR LAND
MONUMENT OR ACCESSORY,CCMMITS A CLAM TWO (2) MISDEMEANOR.
2. ALL REFERENCES HEREON TO BOOKS, PAGES, MAPS AND RECEPTION NUMBERS ARE PUBUC DOCUMENTS FILED IN WE RECORDS OF LARIMER
COUNTYCOLORADO.
3, WERE ARE 69 LOTS AND 14 TRACTS ON THIS SUBDIVISION PLAT.
4. TRACTS I AND 0 HAVE PURPOSELY BEEN METE.
S. PER CA.S. 38-51-106, 'ALL LINEAL UNITS DEPICTED ON MIS LAND SURVEY PLAT ARE U.S. SURVEY FEET. ME METER EQUALS 31 37/12
U.S. SURVEY FEET, EXACTLY ACCORDING TO THE NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY.-
B. ACCESS IS GRANTED HEREWTH OVER AND ACROSS ALL PAVED AREAS FOR EMERGENCY AND PUBLIC VEHICULAR ACCESS.
7. WE PROPERTY OMER SHALL BE RESPONSIBLE FOR WE MAINTENANCE OF ALL DRAINAGE FACILITIES INCLUDING. BUT NOT LIMITED M
AND MATERIALS, AND SHALL BE CHARGED AT 1.25 TIMES THE ACTUAL COST.
B. THIS LAND SURVEY DOES NOT CONSTITUTE A FREE SEARCH BY JR ENGINEERING. LLC TO DETERMINE OWNERSHIP OF THIS TRACT, VERIFY
THE DESCRIPTOR SHOWN, MERRY WE COMPARBIUTY OF THIS DESCRIPTION MN NAT OF ADJACENT TRACTS, OR MERRY EASEMENTS BE
RECORD. FOR ALL INFORMATION REGARDING EASEMENTS RROFT—OF—WAY OR TITLE OF RECORD A ENGINEERING. LLC RELIED UPON TITLE
COMMITMENT NO. FCC25148217-7. PREPARED BY LAND TTLEWARANTEE COMPANY. DATED ALY 26. 2017 AT B00 P.M.
R BASIS OF BEARING: WE SOON LINE OF THE SOUTHWEST ONE —QUARTER OF SAID SECTION 4, BEING MCNWENTED AT WE WEST END BY A
2.5" ALUMINUM CAP STAMPED FEES 28285, 2000' AND AT WE EAST END BY A 2" ALUMINUM CAP STAMPED LS 25372, 1996 ".IS
ASSUMED TO BEAR S8857'05'W BETWEEN BAD MONUMENTS.
10. WERE SHALL BE NO PRIVATE CONDITIONS, COKNANTS OR RESTRICTIONS NAT PROHIBIT OR UNIT WE INSTALLATION BE RESOURCE
CORSERWNG EQUIPMENT OR LANDSCAPING THAT ARE ALLOWED BY SECTORS 12-120 — 12-122 OF WE Cltt CODE.
ATTORNEY'S CERTFICATEI
SECTION 2.23(C)(3)(F) OF WE LAND USE CODE.
ATTORNEY:
ADDRESS'
APPROVED AS TO FORM, CITY ENGINEER, REGISTRATION
BY THE CITY ENGINEER OF WE Cltt OF FORT DOWNS, COLORADO
NIS DAY OF A.D., .
CRY ENGINEER
PLANNING APPROVALI
BY THE DIRECTOR OF COMMUNITY DEVELOPMENT AND NEIGHBORHOOD SERVICES
WE CITY OF FORT DOWNS, COLORADO THIS DAY OF A.D..
DIRECTOR OF COMMUNITY DEVELOPMENT AND NEIGHBORHOOD SERVICES
SURVEYOR'S CERTIFICATE.
ALEX RONDALL PERKINS, A COLORADO REDEEMED PROMMUMAL LAND SURVEYOR DO HEREBY STATE NAT NIS
SUBDIVISION PLAT WAS PREPARED MOM AN ACTUAL SURVEY UNDER MY PERSONAL SUPERN90N. NAT WE MONUMENTATON
AS INDICATED HEREON WERE FOUND OR YT AS SHOWN, AND NAT WE FORGOING PLAT IS AN ACCURATE REPRESENTATION
THEREOF. ALL THIS TO WE BEST OF MY KNOWLEDGE, INFORMATION AND BELIEF.
ALEX RONDALL PERKINS
LICENSER COLORADO LAND SURVEYOR
COLORADO P.L.S. NO. 34176
FOR AND ON BEHALF W JH ENONEERING. LLC
ALL RESPONSIBILITIES AND COSTS OF OPERATED. MAINTENANCE AND RECONSTRUCTION OF WE PRIVATE
STREETS AND/OR DRIVES LOCATED ON WE PRIVATE PROPERTY NAT IS WE SUBJECT W THIS PLAT
SHALL BE BONE BY WE OWNERS OF SAID PROPERTY, EITHER INDIWDUALLY, M COLLECTWILY,
THROUGH A PROPERTY OWNERS' ASSOCIATION. IF APPUCABLE. WE Cltt CF .CRT OCCURS SHALL HAVE
NO OBLIGATION OF OPERATION. MAINTENANCE OR RECONSTRUCTION OF SUCH PRIVATE STREETS AND/OR
DRIVES NOR SHALL THE CITY HAVE ANY OBLIGATION TO ACCEPT SUCH STREETS AND/OR DRIIES AS
PUBUC STREETS OR DRIVES.
FINAL PLAT
TRAIL HEAD FILING TWO
JOB NO. 39145.51
11-03-2017
SHEET 1 OF 4
J•R ENE
A WYNFian Cm any
BY
/; TRAIL HEAD FILING TWO
A RESUBDIVISION OF TRACTS F AND G,AND A PORTION OF TRACT H OF TRAIL HEAD
�� \ C\ AS0. LOCATED IN THE SOUTH HALF OF SECTION 4, TOWNSHIP 7 NORTH,
�� �011 9 / RANGE 68 WEST OF THE 6TH PRICIPAL MERIDIAN,
lI I BLIXNID III / '�, % 9•VBLLTYGSLMLNTJ a°" � /
WAL„oD III / //iR NO.20.2I012 95 , \\ _\ \� FINAL PLAT
I — 10N011J499 _
J I �� I25' PUBL/O AA /� A
\ ROAR --_ ACCESS EASEMENT eLocwS
MO CREEK DRI // REc. NO 2DD4D12J49s
=REL. N0. 200=123495) _ //2�4011JNO
ON
495
\\\ ��
53' No ROW
Q
BLOCK 9 / ��`
\ NIF/EAO l / / �� \ \ \ 5) / RM& NEAR "'VVV
�6" PRIVATE /FR/W INM' EA.LMENr REC Na 2 011J495 / /\ REC
REC NO 1Lg401204195 APO' FNRT C390!
pTY GY T64T 7JUN01 /
AD
TRACT O
RIC NOAlL2LW01234915
_JI GO.
_ REc No. zoaoo9.u42 � � l y / z
I mAcrBAIL 3
REC NO 2IXX0I2Jf95 l f / 5
ygg \
it--,,,_ BL0.'W 19 � 1i , l 6'MVAT
. _ _ , FPR/GAPpL EA.£MENT I 1RA2 HFAO ,
ASO Na 2004O11J495�'� I ' l REC N0. Nwa0l13fa5 LEGEND
10' ORAm•ACE EAQN495 J _ _ _ _ l
BLOCK IJ REC NO TIXH011J495J ``� —T 1
I SET 18' LONG N0, 5 RECAP &1T1
MAIRIO A I ` I' I 1'11 1D BE VAG]EO SY WS PLAT i I 0 1-1/2' ALUM. CAP STAMPED: LS 34176
1iW1011J4
9
5 I I I I aye FOUND ONE-WARTQt CORNER SECTION
CORNER AS NOTED
I II I rr EASEMENT
✓A. 1 0123 5 W N FOUND SECTION CORNER q5 NOTED
TO BE CA FEB BY NIS PLAT I %p ACCESS. DRAINAGE. EMERGENCY VEHICLE
I Q n I A.D.EVA.M.U. ACCESS, MAINTENANCE AND UTILITY
EASEMENT
IJA"�AD
W PAINTEN N ACCESS. LANDSCAPING.
O.LM.PA. MAINTENANCE AND DRAINAGE EASEMENT
PARCEL L/NE S PtA I REO O/AANCE EASEMENT I rL YAGTEO BY Bl/S PLAT I M NO. 2O04W13495 D.L.M. EASEMEN, LANDSCAPING, MPNTENANCE
I TOBE YAL'AnDBY]1H5PLAT EASEMENT
Do'UPOTY EASUI I I II I ,5'VALIrY EASEIIpLT I V`' DRAINAGE. LANDSCAPING. MAINTENANCE,
F' RV Na 2 011Jf95 I RIC NO. 1WI0I13495 --- p.L M.PA PI. PEDESTRIAN ACCESS, PRIVATE
l W BE YACARD BY I I I TO S VACATED BY ws PLAT IRRIGATION EASEMENT
SPARAX ANT
QpREC.NA _ II I — — SECTION pNE
BOUNDARY LINE
------------------ _--' -- EXISTING LOT LINE
_______GREEN LAKE DRIVE_ I 1 RE uW. EA.R'MENr ^�^y
_ _ (OEO/CA1E0 BY— P(AT — I ���_ REC W. 2001O1BJr95 Ix E%ISTNG LOT LINE i0 BE VACATED BY
_ _ \ THIS PLAT
�` TO YAUTm BYOM1
r \� REC NO.paHMENT $p
. m, �W, I �-- �—� 2 EXISTING EASEMENT
RIC NO ` EXISTNG EASEMENT TO BE VACATED BY
2004 12J495 � � —
_ _ _ _ _ _ THIS PLAT
Is'UMIFYEASEMFNT I \�� J
A Ao I AEG NO.jrW012Jr95
TO BE ✓ACATEO BRMS PLAT -- EXISTNG RIGHT-OF-WAY
REc Na I GREEN LAKE DRIVE- -
¢p III ��` ________(CEOICATEOBY TMS RA TJ_ PROPOSED RIGHT-C£-WAY
a'COf0123495 a I —
SSCO ROW
p o lil 1roioi2sr9s
15'VAA I CE EASNENT AND
w a I
PR/YArE IRMG n0.V EASEMENT 15" ORA/NACE EASMENT I
-�REC N0. 2CW012J495 ,PEL NO. 20N012J495
Rl BE VACATED BY NIS PLAT 15' C49AM'ACE EASMENr TO BE VACATED BY INIS PLAT Q rc I I
TO
NO ZEV BY
REC NO 2W4012J495
TO 9E YAGI£D BY Rrv5 PoAT III 15' DRAINAGE FA 12305
\ I T r ^ III TO BE VACA2➢ BY M15 PLAT
l5' AiA/NAGE EA.R'MENT AND / 7 I 64. 00' ROW
PwY FPAI AW EASMENT / I REC NO2N40123495
AS Ul/Ll7)' EASMENT REC NO 20NO12J495 /
REL NI 1004011J495 MBE VACBGD7 BY nKS HAT / /� Y I
III rTO BE VACATED BY 1$' UraOY EASEMENT I np5 HA! ,I I REC NO. 10040123495 F —T
JI _J_1 _____ i M BE VACAGRO BY GAS MAT L_ _______ ___
—___—__—___ __ -- 50 25 0 50 100
o _J ORIGINAL SCALE: 1" = 50'
$ EAST VINE DRIVE B: It
(REC. ND. 20D40123495) w EAST VINE DRIVE
FINAL PLAT
�(REC. ND. 20040123495) " TRAIL HEAD FILING TWO
BAcr eEAxwrs W - — JOB N0. 39145.51 gl y BY anefaer_—__________
m aLme Lr W SWI/a sec A Tm; SHEET OF
2 OF m8wcm PM gl --- --. 'g�--------- _W 2
SHEET 4
SOWN Sr CORNER SG110N 4.
Tm,, R6ew OF n/E SR/ P.M.
RECOVERED AS REBAR AND 25`
8
souw 1/4 CORNER sccnav < I J•R ENGINEMUN
R69W CF 1K 61N P.M. J
RECOVEREO 2" ALUMMAUM CAP gyyaahian CAI
2S P5374 1996.1N A
MOVUMENT BOX PER MO4uMEMT
RECLWO OA BW 6/I3/96 (3LE?ial 35-740-9i93 • C/,by}G.*rgs 79343-2S4i
Ful (uFs 971F991-9BBS • wWwMirecagoTIn
TRAIL HEAD FILING TWO
A RESUBDIVISION OF TRACTS F AND G. AND A PORTION OF TRACT H OF TRAIL HEAD
LOCATED IN THE SOUTH HALF OF SECTION 4, TOWNSHIP 7 NORTH, RANGE 68 WEST OF THE 6TH PRICIPAL MERIDIAN,
CITY OF FORT COLLINS COUNTY OF LARIMER STATE OF COLORADO
T
4
LEGEND
FINAL
PLAT
0
SET 18' LONG NO. 5 REBAR
MR1
I
58815'10"E 92.57'
_ _ I SSE5Y05'E
`£84.03'
aO" 616a t�
I ry �I I 1 FBI
W
~ ry o I 588'57-05'E 84.46' n
G.n N E, 6UTUTY
N 2 e]s F EASEMENT �1
3 N ry N685]b5"W 84.]3'
OGY 1? . 3 1.08'
a
TRAN HEAD O 3' 1,863 SE 11.fi5'�
REC NO c' N8657-05-W 8400'
20040123495
9 UTILITY
EASEMENT
REC NO. ^ i
20040>230.R6 4 O1 ,
_ 3.8345F - h
69. 8'
9'PRIYATE I
REC N0.
zPJ460A32az
-
_"-
L=23.]4
CH
- - -
_ 5895]'OS'E
.21.34'
543'36'OYE
I 1 28.50'
tr891BOC
R=15.00'
ry
21.38'
_
N'^
CH-21.05-
546-2353'W
]0.45
of
5.
2
1550'
3,895 SF
1
w
r 6' UTILITY
BLI1] IRPoOA nON EASEVA MENT EASEMENT
(FAIL L HEAD ,qEC N0. 2 009J24T
REC N0. I N88'57'05'W f
2LMf01 J495 o-01155 ��� 2
�'OC / w 1.905 SF
D9 B'
GV=IoRm' N8557'05W E
mrz� sJ�w 3
- U 1,909 SF
JN88'57b5"W 8
M0.41'56"
R=8973.50' 1 1,911 w
L=109.45' N88-57.05-W 5
CH=109.45' 6'
N01'23'53"E G 0 5 EI
3.027 BE
\ y
\ r N885rOSW MR.
\ \ m FJ.90'
W
n- 1
N n
z I
- - - - - " L------
-- of
N40'56'19"W
& 13.46'
h
I
C
W E�
0
8
SOOIHNEST CORNER SECPW 4 T .. R69w GE THE
6N P.M. RECOWREO g6 REBAR AAD 25' AIW"M
CAP STAMPED 'PLS 292E 20LG' 1N A RAAM BOX
PER MOWMENT RECOJO OA IEO 02IY71 M0
1-1/2 ALUM. CAP STAMPED. LS 34176
FOUND ONE -QUARTER CORNER SECTION
' I I CORNER AS NOTED
SD1'44'50"W RACY H. --- -- _ _ _ _ _ _ --/��I�- }- - - -I- - - - FOUND SECTOR CORNER AS N07D
11 34• NAIL HERO 5'P VA]E / I ACCESS. DRAINAGE, EMERGENCY VEHICLE
REC NO 2 Df23695 /RR/GA PON EASdAENTJ I 1 AG.EVA.M.U. ACCESS, MAINTENANCE AND UTILITY
REC Na "40123495 I 15 U11UTY EASEMENT
588'SJ'OS"E 500.46'
ASEMENT
TRACT B I D.LMAA. PEDESTRIAN ACCESS. LANDSCAPING.
9.976 SF I MAINTENANCE AND DRAINAGE EASEMENT
D.LM.PA -- __
0 NBB'SJ'05W 31 J.2B' 1 I D.L.M. DRAINAGE, LANDSCAPING MAINTENANCE
588-5J05"E 90.59' EASEMENT
TRACT , n r�513'42" I I DRAINAGE, LANDSCAPING MAINTENANCE,
10,945 SF 6' UTUTY L%P w j w 17 I I D.LM.PA.PI. PEDESTRIAN ACCESS, PRIVATE
N885J'05"W 313.28' A.O.EVA.M.V. EASEMENT $ 3.135 SF R-1117'00'
15.08' _22.1]' __3_]58'__ - 3J.58'E
_ __40.p8'-_ __J].59'_ J].58' _ -22.D' _ p2 P n nw 1S' UTUry_ IRRIGA90N EASEMENT
_ a L 101.93 C EASEMENTCH=101.89't121
_ _ SECTIGN LINE
803'39'45'W.2]' _ 11.3]' N88'5JOS"W 88.32' BOUNDARY LINE
cH-12'55'io E%ISTNG LOT LINE
-546T12'S5'n n ry N��.' �.j ri ria 1� ry 1,94T SF E%ISTNG LOT LINE TO BE VACATED BY
5 a 6 ; 7 „ 8 ;n ',w� 10 3 11 3 3 w ^ 1 I�-T NBBsro5'W 87.46' 6'Pmva TE THIS PLAT
J.1B2 SF 1&H SF .''� 3.109 S !^ 3.109 SF Pw p 3,}16 SF !^ 3,109 Si !^ 3,109 SF .'"�' 1: J4 Si =^ L,844 SF 'vnwLL n$nl 1/ 6AAGV EASSMENTE%ISTNG EASEMENT
N9 r Pp p f O 15 REC NO 2004012J495 ' a a s `o P Q^n J, 3 6 U ILItt'T4 SF TiISTPLA EASEMENT TO BE VACATED BY
on o`
n xz n �^j n z n �n o n EASEMENT289_ a�a 1200' J n p--- - ------___ ___________ ___E%ISTNG RIGHT-C£-WAY
oLy_
40.OB' 22.D' 3J.58' J].58' 40.08' 3].58' 3J58' 22.1 ]' J608' 16.2B' S20.00' z J2.00' PROPOSED RIGHT-CF-WAY
559.66'OMEN LAKE DRIVE 9' UTUTY tr9o5D'oo'
DEDICATED By Ti15 PLAT EASEMENT R=15.00' 4 mP go
L=23.55'
F
O
6
3,030 SF
I
1,559 SF
8
2.573 SF
m� _ 5885]'05E 590.20' _ _ _ N46V2'9S �E 42_00 S & I A57' see zir
tr A-1500' S88'S]bYE / S9e'SJ'05'E 36.J8'
ry R=15W' -
6' UTUTY
EASEMENT
TRACT F
27.090 BE
D.L.M.PA.
_, ,..,,.., mw
SLMENT
2.573
BE
'n
a
n
6' UTILITY
�
o
1 EASEMENT
n
5.83'
N8857'0S'1 70d4'
3
30'
in
11
12
n\
2.491 SF
r
1.574 SF
T
I$
I
P
P
10
V
z
n
2685
SF
a
7w
C\
10_89
J
A5.34'
35.08'
22.tY
nw
tr90V0'00'
6'
UTUTY_
R=450P
EASEMENT
L"]069-
LH-63.64'
S435]'05"E
b O jol
3
26J3 SF298814SF
„ s]45
--TRACT H
25,003 SF___
D.LM.PAPI.
EAST VINE DRIVE
NLO.w 'MO1H VARIES)
REC, NO, 20040123495
S LMti DE >K SW I/4 3£i 4 TN RBBw 6M Pv 5865105E 2640,98' MOOD'
BWM Ce' BEAMN45
'n I
117 s 1
L=23.55 8 I aCH_2,.2,•
a
0
N43'57b5'W e
70.34' 2000'.72.00' Oy�g 19 ] W
W
T r.__-__-__- I_
nn FF
22 In $I Q 23 > I
3.030 OF + ii 3.961 SF
S8857'05-E ]O A' I Eq £g N I I
NBBS]'OS'W e7.00' 3 'i 15' UTUTY
2i ¢ .130 EASEMENT
r t,59 sF 1n b o W M0 N.
ry rL
SE; S7'05"E 70,34' n. ry 1.929 SF I mz
3 - N8I5J'05W III ry Qvw
20 hm n m
^1 2,573 SF ��' p_ AI 25 y ^ f
in 3.1835E
55>'OS'E ]O.J4' 15' UTLItt W _ NE I
III UTILITY EASEMENT N - EASEMENT N885Y05'W B].CO' 3 y1 ry
NI 19 I$ ml n p ry
61 2573 SF '^ a 26
n nl 3.1835E
S585rOWE 70.34' 1 6' UTUTY
EASEMENT N
? NSI05"W 870C
rv1 18 In I]OB' I 84.0 NB I
REC. NOXtl4012012J495 _
S 2685 SF / 1 27
10.89' 1 '- �/ 3.099 Y
- /24A
2217'--
TRACT G
a _ N88'S]'OS'W 93.32' I
G �-
w
m J
1
14905 SF
['f
A.D.EVA.M.U.
45915'4
I
L=46.54
In
CURVE TABLE
CURVE
DELTA
RADIUS
LENGTH
CHORD
Cl
010.25"
8973.50'
27.19'
NOIW'07'E 27.19'
C2
OVVW
8973.50'
22.17'
N01-17'34'E 22.I7'
C3
OV8'30"
8973.50'
22.17'
N0126'04-E 22.17'
C4
OY8'30'
897350.
22.17'
NOI-34'33-E 22.17'
C5
9000'00"
2500'
39.27'
S43'57b5E 35.36'
C6
gOVO'Oo'
45.00'
70.69'
N4652'S5'E 63.64'
CJ
91
25.00
39.27'
N4652'55'E 35.36'
CS
30-44'16'
45.00'
24.14
N1625'03'E 23,85'
C9
II106'05"
4500'
9,50'
S07105'57-W 9.49'
DID
90V0'OO'
45.00'
70.69'
S46tl2'55-W 6364'
C11
53'38'00"
60.00'
1 37.44'
52546'WE 35.09'
C13
90T000'
40.00'
6283'
N4357'05-W 56.57'
CI4
91
60.GO
94.25'
N435]'O5'W 84.85'
C15
199'OS'
1117.00-
32.19'
S01'52'27'W 3219'
C16
IVB'16'
1117.00'
22.18'
S0316'08"W 221W
C17
1-4812'
1117.00'
35.16'
SO4-44'22-W 35.18'
C18
058'W
1117.00'
12J9'
So55J'32'W 12.39'
C19
1-33'50'
103300'
28.19-
NOI-49.49-E 28.19'
C20
113'49-
1033.00'
22.18'
NOY13.39-E 22.18'
C21
113'56'
103100
2221'
NW27.31"E 2221'
C22
114b1'
10}},�'
22.24'
NW41'28'E 22.24'
C23
1'ST2]'
1033.00'
35.29'
N07-17'12-E 35.29'
C46
90Y10'W'
IS W'
23.56'
S4357b5-E 2L2l'
C55
90V0'CO"
IiW'
23.56'
S46V2'55"W 21.21-
056
OV6'OS
88]3.50'
15.]6'
S01-41'49-W 15.76'
SAW
S52'05'57-W 56.58'
CH=44.50 T zl r
_____________ ___ N61'25'-- I
1 s'unutt---------61P VA D7 - -�� N43'57'05"W
EASEMENT LRRIOA POV EASEMENT
REC NO. AX4Vl2J495 14.14 30 15 0 30 60
546'02'55'W
14.14'
ORIGINAL SCALE: I' = 30'
8
s
�
I
I
FINAL PLAT
TRAIL HEAD FILING TWO
W
JOB NO. 39145.51
11-03-2017
m
_ _
SHEET 3 OF 4
$
M
J'R ENGINEERING
SOON 114 CORNER SECTILW 4,
TAL, R68w CE THE SOS P.M
A W ftian Cmryny
RECOKREO 2'AL_LM/1NW CAP STAMPED 25
2W3 , l9% 1N A MOKAWSNT 80X P
Colwial 35-740-M • Coamco *rgs 79-593-2W
MLWOMENT RECAPD DARED 6/IJ/96
Fal Collins gryFggl_g - WWMMiNxingown
e`
24
/ 9 i I SJ6Y8'48•E �1
I
2,86
b I I 6 SF
3
O V EA.£PME95 1/ o~ I /% 7618'46•µ. O
'22004012N95 I 1 2W9.29•
4r` SIGHT /NI 2,423 SF
DISTANCE
{J6Y8'46.N, 85.99'
11 -I
II
- - i
�-
IN
b
I
I1=1412'38"
'
R=1033.00'
IN
I
L=262.21'
'
, c W
CH=261.51'
N08'19'13"E
I l 5• UTUTY
EASEMENT
I Iw
- - 1-
_ -
- I 588'S]b5 E 91.02'
6' PR/YAIE I
FAI
I
1; C27
18'SJ'OS
17
3,135 SF
15' Ul`J
EASEMENTI F
Y57'05^W 88.32'
6 II
1.947 Si
15]b5W 8].45Tr
i 15
uT 4314 SF
ITENT 3.89+
(G90G0'CO"
R=15.00'
=z3.56'J
H=255-F
N4fiTl2'S5'Et
690V0'00
Rromclo'
-21.56'
=zt.z1'
N43'57'O5'W
2.00' -
23
3,961 SF
5]'05-W57'05"W 8
24
O 19295F
M. 'J'Os'W 87.W'
IN 3.IB53
x I 1V UoUrY
a EASEMENT
WL 1705"W 87.00'
W
26
3.12E SF
T
T05W 8T00
II
2
099 SF
II
IIT ; r
uI�IJ
5 ET
JIII EASEMEMENNT
LI
a 5'13'42'
R=1117.00'
-L=101.93'
CH=101.89'
11IS03'39'45"W
J
I
n
Q• ^a
pop
H
p oN
h
IS' UTUTY
W
EASEMENT EMENT
pz
W mp
O
r
REC
I 3.184 5F
Ien,oe.
3 / 4
2
REL N2 2C t23495
'330T`
TRACT J
22,069 SF
_-DLM.PA.
UTILITY
-
--T-
-2 039"
R=250D' 12 '
/
L-35.91' 2,912 5F S
Zi
549
UI
N8.957'05-W'OS'W 77.38'
e w
5]05 W 90.59
79ST
nl -' `trtl 11
'I`
1.
2 E�R4N685]'OS'W
1,742 SF
P
>9.682,ONSF
S'9013-
:3�21E��R))�-5
O
L 6UTILITY2003
n p EASEMENT N
N
SF u
V 2 9R0 SF
8' UTILITY
>'OS'W 90.J1'
I J
EASEMENT
__ o
I'36 E(R I u
N66'SJ'OS'W 7q.80'
532'19'10'W
6 In
S86U226FE(-R) - 1
14.33'
2.001 SF o
1
"OS'W 9023'_
n
T2J'16 E(N)
pl 9 h
e
1 2,762 SF
TRACT L
t;
5F
7
NBB5Y05'W
3
D.L.M.PA.
DIM
4,199 SF
598'I8'04 FIR)
n
8
501'02
-
P
'
L_ 22.522.62I
6
O
J
''rt^I 2,666 SF a In
C4z
ryL 2'W5
1
M17'51'P^
C45 C41
--N895J'05'W 76.00'N
R=256.00'
1
I
s2• aI S uNE EAS'ENENr
MESrzRN SZOPE OAS CO S56
BOOR 1441 PACE MY
-
-
51.00'
r____-
3 o-905o'ooa
m
R=25 W'
13
\
al
a
L=392T .
3.119 SF
I.
3`57'0 -W
�
N88'57'05"W 76 OC'
I
NN
14
1,685 SF
i
N%'SY05'W 76.00'
-
6UTILITY
RI
EASEMENi'le
15
I"
I
2.555 SF
n
I
NSE'STOS'W 76.00'
41
1
u
16
•�
2,556 SF
N11 W-5]'GE 5'W 75.00'
+
H
17
'I
1.685 SF
n
6 '----- TRAIL HEAD FILING TWO
A RESUBDIVISION OF TRACTS F AND G, AND A PORTION OF TRACT H OF TRAIL HEAD
LOCATED IN THE SOUTH HALF OF SECTION 4, TOWNSHIP 7 NORTH,
N8a-4s'31E 149s3• SJaYS'G2E�' RANGE 68 WEST OF THE 6TH PRICIPAL MERIDIAN,
_ 1
FINAL PLAT
&1
215
29F
TOG' S
NM'57'ML00
W
24
1,]95 SE
00
nnp
23
1J95 SF
57'05^W 81.00'
UTLITY
ENIN
EASEMENT
u
22
nl
l
212 SE
n
N8857'05^W 81.OU'
21
^
BW SF
d
EASEMENT
_
N851705-W 81 O•
20
NI
m
I,]95 SF
9' UPUTY L- - - HeB'SJ"OS'W 81.00' I
EASEMENT T CH=TGW m M
52p0.\"^ S80101'17^E 18 O
5885T05E I 6' UTILITY n 2,666 SF In 19
34.]i' aD51'3J _ `��� -i EASEMENT _ 5885J'OS"E ]B.W' T 3,198 5E
R-285.00� L_ ____ _ _
L-a
"� NBOOBBAB% EASEMENT s9lbs.28- 5\2Po g• UTLItt BO'41 10.00' 166.4000' B6.00o-90VD'00'
Q' 19.78 C53 C54 �l� EASEMENT GREEN LAKE DRIVE ry 9' UTILITY R-15.00' /
MEDICATED BY THIS PLAT �' L-23.56'
MDJJJ
_ '51'3J'_ EASEMENT
r 3
® l , R=255.00� _ �- - _0_ SBB'5J'05-E 181AV N46L2'55-E
-SE.84'�
1 n PC`1 ^52a0. CH-SPA8' �z �90V0'W'
4,286 SF in ? �� 58091'17'E R ?W -15.00'
n L-23.56'
6' UTILITY CH=zuzr
EASEMENT' NBB'57'05W 76.W' , _ 166.41' N435YOSW
V,
W.41'
NBBSYO5'W 90.20' N o 10 1m - 8.00' 20.00' 86.00'
^ to y17'51'37- N885]05W 6-0(f T r
1,999 SF �ry p ^ 2,668 SF n R=31400 8' UTILITY m ��
� 6' UTL17 L-97.88' $ EASEMENTS m
10 20 1
NBB'SJ'05W 9020' EASEMENT CHCHI4
O 11 n 3,684 SF
NBB'S]b5"W ]6 W' S80D1'O'E ^ n
1.9995E INN n' 9 I� EASEMENTS UEDIELEY 2.6665E
9' DmI
Q N' 1.685 SF Iry NIM5]'05"W 76.00' EASEMENT
NSB'5]'OS"W 90.20' F n n . N885]'05'W ]6.00' Iry ^
y 12 I„ rv685TDs'w etoO'
1.999 SF IN P r a - y 1.685 $P '� n 1.]955F
6 NI 1,655 SF In'nrt ry N885]'05W J6.00'
N885]'OS"W 90.20' - a 1` F 3 NBB'SJ'DS"W 81.00' .. ^I N8857'05'W 76.00' h a „I 13 1- °
rj D� t o N 7 - i n '" 1.685 SF m N n n 1.]96 SF
3,184 SF N p `° 1,685 SE n 6' UTILITY P N NSAW 05'W 76.00' S
N88'57b5'W 90.20' w
N%'SJbSW J6.00' EASEMENT uni N 14 h m i, NEN17GS'W 81.00'
1,685 SF "I 6' EMENT 917
5
_]2.z0 TRACT M 61 �r1 � � "'fUSEMENT 1.J955F '
1 B.00' 1fi065F ry Iwo N88'STOSW J6. W' dN?
A.D.EVA M.U. 6 F F NBE5]b5W SLED
501 Vz'S5"W q 3,046 SE H $ _ n�
Jo.W' se95To5E 80o'u Q al TRACT N of Zw ml Kz
EASEMENT n
588'5]'05"E ]6.W'
31,ID BE
p 15
Fs 9
��'.
¢No
o
16 4
O
O.L.M.PA.PI.
31046 SF
i
a
n
w
N ¢
2.842 SF I
6',RWM4
'(
in
w
•� 7RR/6A ANISE EAsOGOvr I
76.00'
20.00'
SW'S]'OS'E 81.00'
AEC A'2 2004012305is-UT_____________
-
__-5885]b5'E
96C0'
1s' unuTr _______
_ _ _
_____
_l
'OS"W
EASEMENT
___ ________________
z-
14.14'
-J
I 14.14'
laH.aa
EAST VINE DRIVE
N885705W
(RO.W WIDW VARIES)
70.99'
o
REC. NO. 20040123495
„
�
h
I
i
ALVS �ARINOS
SYN .SCJJEEP4. TIN, OF NE
5BB5)'O5T 264298'
AM. /TC2PNER
25' ALUN/NUN
6JH P.M RE W' REBAR AM .5-
$
p
S (pF OF pF SW 1/1. SEc i, TM, R69W 6m pl
DIED
M'A RANGE BOX
LAP SrAMPEO TLS 2B28S W
RED
PEA NA4UMM! RECCNO OAIEO 02/!7/NKO
_
h
1
R=4261'
H=72.1
S05'53' 65 W
I1
I I
II
I
I I
I
p >^m
CON
III
Y. B=
V w
I I
h
0
5685]'0
054 }}
26.50' �2L(
1 Yhh
I I ffi�4
II �
53W' ROW
ADC NQ
FL•04012J495
$ I
F
I
Z I I
I I
I _
I
I -
L
LEGEND
0
SET 15' LONG NO. 5 REGAN WITH
1-1/2- ALUM. CAP STAMPED: LS 34176
FOUND ONE -QUARTER CORNER SECTION
CORNER AS NOTED
+
FOUND SECTION CORNER AS NOTED
ACCESS. DRAINAGE. EMERGENCY VEHICLE
A.D.EVA.M.U.
ACCESS. MAINTENANCE AND UnUTY
EASEMENT
D.L.M.PA.
PEDES71AN ACCESS. LANDSCAPING.
MAINTENANCE AND DRAINAGE EASEMENT
D.LM.
DRAINAGE, LANDSCAPING MAINTENANCE
EASEMENT
DRAINAGE, LANDSCAPING, MAINTENANCE,
O.LMFA.PI.
PEDESTRIAN ACCESS, PRIVATE
IRRIGATION EASEMENT
- -
SECTION LINE
BOUNDARY LINE
EXISTING LOT LINE
--
EXISTING LOT UNE TO BE VACATED BY
THIS PUT
- - - - -
- EXISTING EASEMENT
EXISTING EASEMENT TO BE VACATED BY
- - - ----- - --
THIS PLAT
EXISTING RICAT-OP-WAY
PROPOSED RIGHT-OF-WAY
CURVE TABLE
CURVE
DELTA
RADIUS
LENGTH
CHORD
CIS
1'33'50-
1033.00'
28.19'
H01-49.49"E 28.19'
C20
113'4V
1033.00'
2118'
NO313'3VE 22A&
C21
11354'
1033,00'
22.21'
N04T7'31'E 22,21'
C22
114'01-
1033.00'
2224'
NOS'41-287E 22.24'
C23
157'27-
1033.00'
35.29'
N0]1]Y2'E 35.29'
C24
CO2'07'
1033,00'
72.76'
N1016'59'E 72,74'
C25
1'30'25-
1033.00'
27.17'
H13Y13'16-E 2717'
C26
1'47-04-
103300'
3117'
N14'42'00"E 32.17'
C27
3'16'05'
45.00'
270'
S10�8i8"W 2,70'
C28
8217.39-
45.00'
64.63'
S4954'O5'W 59.22'
C29
1p9'19'
928.00'
18.71'
40610DVE 18.71'
C30
1T2'WE
928.00'
22.28
NOI54'4C'E 22.26'
C31
158'24-
948.00'
32.65'
S07'46'03-W 32.65'
C32
120'42-
948.00'
2215'
S0696'31"W 2225'
C33
21552'
928.00'
36.68'
N05V5'27'E 36.67'
C34
1R0'33-
948.00'
2221'
SOC4653-W 2221'
C35
120-27-
948.00'
2119'
SOY2523'W 22.19'
C36
P42'14'
1 948.00'
28.19'
S015CO2-W 28.19'
C37
215'36'
928.00'
36.60'
1 402'49'43"E M ISR
�5 I S N 1/4 GARNER R nM 4.
7N AW8W OF CW 6n/ P.N.
V IBECOYEREO 2- ALUMLNUN CAP STAMGEO IS
�WPV Nr ANCOE NAW 6L 1BOX PER
p MCWUNE1996* NPO OA RD 6 r Box
L
30
15 0
30
60
ORIGINAL SCALE:
1' =
33'
CURVE TABLE
CURVE
DELTA
RADIUS
LENGTH
CHORD
CJ8
0'39'01-
928.00'
IGBY
H0112.25-E TOLES
ON
7Y2'21'
928.00'
124.81'
SO4'54b5"W 124.7I'
C40
7-4221'
948,00'
127.50'
SO4'54'WW 127.40'
C41
3'43'S5
31CCO'
20.45'
47655714"W 20A5'
C42
t0O9'54'
314.00'
55,71'
N8312'09'W 55SS
C43
Y57'48'
314A0'
21.72'
N73DC22'W 21.72'
C44
90D0'W"
1500'
23.56'
S43'57'05"E 2121'
C45
17'51'37-
314XO'
9T8W
NW'01'17"W 97.48'
C46
34.40'1 B'
45.00'
27.23'
N1 617 1 VW 28 8z'
G]
5519.4r
45.00'
43.45'
N61'I7'14"W 41.7T
C48
90V0'W'
45.00'
70.69'
N439b5W 63.54'
C49
3'22'02'
426.50'
25.07'
302' 3M"W 2586'
C50
620'01-
426.50'
47AT
507'34'57"W 47,12'
C51
V43'38'
256,00'
12V
5]1-2]'17'E 125'
C52
4'37'S3'
256.00'
2069'
374D8'W'E 2069'
C53
1230'O6'
256.00'
55.8W
SB2'42'03-E 55.75'
C54
17'51'37-
25000'
TIED'
N8DV'WW 79A8'
C55
WIDOW
15A0'
21M
546112'55"W 21.21'
C58
]851'34'
45.00'
61.96'
S51'3]'0]'W 5].16'
FINAL PLAT
TRAIL HEAD FILING TWO
JOB NO. 39145.51
11-03-2017
SHEET 4 OF 4
AVPMAFIJ
" ItI'i9i a Y
Attachment 7
F6rt ollins
Development Review Center
281 North College Avenue
PO Box 580
Fort Collins, CO 80522-0580
970-221-6750
fcuov com/DevelonmentReview
NEIGHBORHOOD INFORMATION MEETING NOTES
These notes capture staff's interpretation of questions, comments and ideas from the meeting.
PROJECT: Trail Head Townhomes
DATE: September 12, 2017 (Meeting Date August 28)
PLANNER: Clark Mapes
DEVELOPER TEAM: Ken Merritt, JR Engineering
City Planner Clark Mapes introduced the purpose of the meeting — to share information — and the
development review process, with this meeting being a very preliminary step. Information from the meeting
is to aid the developer in preparing a development plan submittal to the City of Fort Collins. If the project
proceeds to a hearing, the Planning and Zoning Board will be the Decision Maker. Another mailing would be
sent with notice of the hearing.
Ken Merritt explained the proposal for 86 townhomes in 2,3, and 4-unit configurations. Zoning is Low Density
Mixed Use Neighborhood (LMN) which permits the townhomes and requires a mix of housing types which is
partly satisfied in Trail Head by the proposed townhomes.
Parking would be in 2-car garages, along rear alley -style drives, and along Green Lake Drive.
Questions and Discussion:
Q
= Question
R =
Response
C =
Comment
Q:
You mentioned
that this will have its own separate HOA.
How will
this HOA compensate
the existing HOA
for
detention pond
maintenance. This
will
increase water runoff
into
ponds, thus
increasing
maintenance.
R: Good question, have not thought that through but will take it into consideration.
Q: What is the traffic impact at Timberline and Vine? Eastridge is already adding a huge amount of traffic
there ... when you add this development how will you keep it from becoming a standstill?
R: A signal is being planned and designed. The recent Waters Edge development provided partial funding for
that. A Traffic Study will be required to identify the impacts of this development. The developer had a
preliminary study done, and it looks like the proportional impact of this development will be relatively small.
Neighborhood Meeting
Attachment 7
Notes - Page J2
A study will be part of the submittal into the development review process and any mitigation measures will be
determined in the process.
Q: Can you widen Timberline to add lanes?
R: Timberline Rd is shown in the master street plan as a 4 lane arterial from Vine to Mountain Vista. This
widening is not currently funded, and likely will not be required by this development.
Q: What is the plan for Greenfields — will it connect up to the 1-25 interchange at Mountain Vista Drive? Is it
an arterial? Will it connect south to Mulberry? Is there multi family or commercial zoning where it goes down
to Mulberry?
R: It may have been shown as a 'minor arterial' in the past but the current Master Street Plan shows it as a
collector that would extend to the north and east to connect to a future frontage road along 1-25 and to Elgin
Drive in Waterglen.
It will extend
south to Mulberry. There is city
neighborhood
zoning along
with 'Neighborhood Commercial'
zoning, which
is meant to encourage grocery
store -anchored
commercial
services.
C: We moved out here to get away from commercial, don't mind driving to the grocery store.
Q: There's been an increase in trucks — are they counted in the traffic study?
R: Yes
all vehicles are
counted
including trucks. Vehicle turning counts are current and include existing truck
traffic,
but the study
does not
specifically identify vehicle types.
Q: Will this provide streetlights along Vine? More are needed. It's dark, doesn't feel safe.
R: This project will provide for standard edge improvements including street lights according to city standards.
HOWEVER, because there's a larger long term plan to widen Vine, individual projects like this one may escrow
their share of funds for a future, larger project and so the final street width and edge conditions may NOT be
built at the time of development. Exactly what gets built with the development will be determined in the
review process.
C: The landscaping along Vine does not look adequate to make a nice edge where the backs of garages are
lined up along the edge. The Bull Run apartments to the west are an example of the backs of buildings,
storage, etc. being too exposed to the large public street.
R: That is a comment staff has noted in the Conceptual Review of the project. More landscaping will be
needed for screening.
C: It is
very
difficult
with
these attached townhomes
to police the maintenance and keep the units looking
good.
Will
the HOA
take
care of the landscaping and
exteriors?
R: Yes, an HOA will maintain the landscaping and provide irrigation on the private lots.
Attachment 7
Neighborhood Meeting Notes - Page 13
Q: Will the HOA coordinate garbage collection with the rest of Trail Head?
R: Yes, we have already started to coordinate to get same -day service.
Q: How will the Trail Head water allocation be split among HOAs and other users for the landscaping?
R: The development will meet the City's guideline of 15 gal/square foot/year. The water allocation is
adequate for this development.
Q: Will this qualify as Affordable Housing?
R: No. It is meant to be 'Accessible' with pricing as low as possible, aiming for the 300's but that is to be
determined depending on the costs to develop.
Q: Will these have basements?
R: No. It's not for geotechnical reasons, it's for price point. Can't hit that with the cost of basements.
C: Trail Head has basements. This will be different. People will store stuff in their garages and park on the
street if they don't have basements.
R: One thing
being explored is
whether we can have a covenant for parking in the garages. Obviously
enforcement
of that would be
tricky
but we
are looking
into it.
Q: What will the architecture be like? Like Timbervine?
R: It's going to be a little different, creative, but not far outside the box, not metro mod like Timbervine.
C: Can see that parking is going to be extremely difficult. They're going to find their way up to my house
further up on Greenfields. We don't want parking on Greenfields. You can go down to the north sides of
Denver — what a mess.
Q: Can you
keep it owner occupied?
We
don't
want students at this lower price point. If investors buy these,
then you'll
get multiple tenants and
then
have
the
parking problems.
Maybe covenants can do
that.
R: The financing depends on at least 50% owner occupancy. So at least at the beginning you will have at least
50%.
C: We
have talked about parking
on Greenfields, I
want to bring up Campfire Drive. People are going to park
along
there. It already gets a lot
of parking. It's a
narrower street and we don't want to see
more parking.
R: For those 30' wide streets, the Traffic Engineering department has been making them parking on one side
only.
Neighborhood
Attachment 7
Meeting Notes - Page 14
C: I'd like to see the number of units reduced from 86 to 46.
Q: When would this be built?
R: It's aiming for 2018 third quarter to start building, with a 3-year buildout.
C: It would
be great if they
buyer of this
property would maintain it starting now until it gets built. The Trail
Head entry
area is looking
bad, trees are
dying.
R: Not sure how the entry got that way, but we will discuss what to do about that. We would like to at least
keep the trees alive. The whole front landscaping would be re -done with the development.
C: Back to
parking,
this
looks
like Bucking
Horse which has almost exactly
the same kind of townhomes. Can
you check
that and
see
how
it's working?
Is there anything to learn from
that?
R: We can check into that.
[Follow up — the HOA board of Bucking Horse feels that it is all working fantastic. No parking shortage on
streets. The units have driveways long enough to park a car in, and the garages are slightly oversized in
length. The developer is aware of covenants requiring cars be parked in garages, but obviously they are
difficult to enforce and are not used at Bucking Horse.]
C: Not sure you're grasping that we are very concerned about parking. We don't want parking on Greenfields,
Campfire, or Wagon Trail. We would like you to reduce the number.
R: Just for understanding, the first block of Greenfields coming in from Vine has no parking. After that, going
north, Greenfields does have parking available. There's a neighborhood park along there just to the north of
the townhomes and so some of the parking will serve that.
Q: What will this do for snow plowing on Campfire Drive?
R: It will not change anything in that regard.
Attachment 8
DELICH ASSOCIATES Traffic & Transportation Engineering
2272 Glen Haven Drive Loveland, Colorado 80538
Phone: (970) 669-2061 Fax: (970) 669-5034
MEMORANDUM
��.,leeEe``Jxi 6. Yee
TO: Martina Wilkinson, Fort Collins Traffic Operations�� _ . 01c-i
Ken Merritt, JR Engineering
Matt Delich DATE: October 26, 2017
SUBJECT: Trail Head Tracts F & G Traffic Impact Study — All -Way Stop Sign Control
Analysis at Timberline/Vine Intersection (File: 1762ME01)
This memorandum documents requested all -way stop analyses related to the
Timberline/Vine intersection. In the "Trail Head Tracts F & G Transportation Impact
Study (TIS)," dated September 2017, signal control was assumed at this intersection. In
subsequent discussions, the signalization of the Timberline/Vine intersection is not fully
funded and documentation of all -way stop sign control was requested.
Figure 1 shows the short range (2022) background and total peak hour traffic at
the Timberline/Vine intersection (from the cited TIS). It was assumed that the subject
intersection would have single lane approaches on all legs, which is the current
geometry.
Table 1 shows the short range (2022) background peak hour operation at the
Timberline/Vine intersection with all -way stop sign control. Calculation forms for these
analyses are provided in Appendix A. The Timberline/Vine intersection will not meet the
Fort Collins level of service standards in the peak hours with all -way stop sign control.
Table 2 shows the short range (2022) total peak hour operation at the
Timberline/Vine intersection with all -way stop sign control. Calculation forms for these
analyses are provided in Appendix B. The Timberline/Vine intersection will not meet the
Fort Collins level of service standards in the peak hours with all -way stop sign control.
Do not hesitate to contact me if there are questions or if additional information is
required.
C\0
N
(.0
i
lCo q�t
1
43/78
104/251 -
188/243
- 6/12
205/164
165/98
Vine
O
00
O
co
O_
ti
m
M
N
�
N
SHORT RANGE (2022) BACKGROUND
s
L
O
N
CD
i
lM
1
43/78
106/258
188/243
- 8/13
213/167
188/109
Vine
O
00
Co
O
Cfl
N_
ti
m
�
N
Lo
N
SHORT RANGE (2022) TOTAL
SHORT RANGE (2022) BACKGROUND
AND TOTAL PEAK HOUR TRAFFIC
// LDELICH
�71 rASSOCIATES
Attachment 8
N
AM/PM
N
AM/PM
Figure 1
Attachment 8
TABLE 1
Short Range (2022) Background Peak Hour Operation
Intersection
Movement
Level of Service
AM
PM
Timberline/Vine
(all -way stop)
NB LT/T/RT
F
F
SB LT/T/RT
F
D
EB LT/T/RT
F
F
WB LT/T/RT
F
E
OVERALL
F
F
TABLE 2
Short Range (2022) Total Peak Hour Operation
Intersection
Movement
Level of Service
AM
PM
Timberline/Vine
(all -way stop)
NB LT/T/RT
F
F
SB LT/T/RT
F
D
EB LT/T/RT
F
F
WB LT/T/RT
F
E
OVERALL
F
F
//LDELICH
�71 rASSOCIATES
Attachment 8
�_��� 10191PQV_I
Attachment 8
HCM 2010 AWSC
Short
Bkgrd
AM
I Timberline & Vine
Intersection
Intersection Delay, s/veh
114.3
Intersection LOS
F
Movement
EBU
EBL
EBT
EBR
WBU
WBL
WBT
WBR
NBU
NBL
NBT
NBR
Lane Configurations
Traffic Vol, veh/h
0
43
104
188
0
165
205
6
0
227
116
49
Future Vol, veh/h
0
43
104
188
0
165
205
6
0
227
116
49
Peak Hour Factor
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
Heavy Vehicles, %
2
2
2
2
2
2
2
2
2
2
2
2
Mvmt Flow
0
48
116
209
0
183
228
7
0
252
129
54
Number of Lanes
0
0
1
0
0
0
1
0
0
0
1
0
Approach
EB
WB
NB
Opposing Approach
WB
EB
SB
Opposing Lanes
1
1
1
Conflicting Approach Left
SB
NB
EB
Conflicting Lanes Left
1
1
1
Conflicting Approach Right
NB
SB
WB
Conflicting Lanes Right
1
1
1
HCM Control Delay
74.2
117.3
131.5
HCM LOS
F
F
F
Lane
NBLn1
EBLn1
WBLn1
SBLn1
Vol Left, %
58%
13%
44%
1 %
Vol Thru, %
30%
31 %
55%
82%
Vol Right, %
12%
56%
2%
17%
Sign Control
Stop
Stop
Stop
Stop
Traffic Vol by Lane
392
335
376
395
LT Vol
227
43
165
4
Through Vol
116
104
205
325
RT Vol
49
188
6
66
Lane Flow Rate
436
372
418
439
Geometry Grp
1
1
1
1
Degree of Util (X)
1.159
0.964
1.116
1.151
Departure Headway (Hd)
10.5
10.692
10.628
10.376
Convergence, Y/N
Yes
Yes
Yes
Yes
Cap
348
342
347
356
Service Time
8.5
8.692
8.628
8.376
HCM Lane V/C Ratio
1.253
1.088
1.205
1.233
HCM Control Delay
131.5
74.2
117.3
128.2
HCM Lane LOS
F
F
F
F
HCM 95th-tile Q
16.1
10.3
14.6
15.9
Trail Head Tracts F & G 10/26/2017 Synchro 9 Light Report
Delich Associates sb am.syn
Attachment 8
HCM 2010 AWSC
Short Bkgrd AM
I Timberline & Vine
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
SBU
SBL
SBT
SBR
Lane Configurations
Traffic Vol, veh/h
0
4
325
66
Future Vol, veh/h
0
4
325
66
Peak Hour Factor
0.90
0.90
0.90
0.90
Heavy Vehicles, %
2
2
2
2
Mvmt Flow
0
4
361
73
Number of Lanes
0
0
1
0
Approach
SB
Opposing Approach
NB
Opposing Lanes
1
Conflicting Approach Left
WB
Conflicting Lanes Left
1
Conflicting Approach Right
EB
Conflicting Lanes Right
1
HCM Control Delay
128.2
HCM LOS
F
Trail Head Tracts F & G 10/26/2017 Synchro 9 Light Report
Delich Associates sb am.syn
Attachment 8
HCM 2010 AWSC
Short
Bkgrd
PM
I Timberline & Vine
Intersection
Intersection Delay, s/veh
157
Intersection LOS
F
Movement
EBU
EBL
EBT
EBR
WBU
WBL
WBT
WBR
NBU
NBL
NBT
NBR
Lane Configurations
Traffic Vol, veh/h
0
78
251
243
0
98
164
12
0
200
268
101
Future Vol, veh/h
0
78
251
243
0
98
164
12
0
200
268
101
Peak Hour Factor
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
Heavy Vehicles, %
2
2
2
2
2
2
2
2
2
2
2
2
Mvmt Flow
0
87
279
270
0
109
182
13
0
222
298
112
Number of Lanes
0
0
1
0
0
0
1
0
0
0
1
0
Approach
EB
WB
NB
Opposing Approach
WB
EB
SB
Opposing Lanes
1
1
1
Conflicting Approach Left
SB
NB
EB
Conflicting Lanes Left
1
1
1
Conflicting Approach Right
NB
SB
WB
Conflicting Lanes Right
1
1
1
HCM Control Delay
204.9
36.6
215.9
HCM LOS
F
E
F
Lane
NBLn1
EBLn1
WBLn1
SBLn1
Vol Left, %
35%
14%
36%
4%
Vol Thru, %
47%
44%
60%
72%
Vol Right, %
18%
42%
4%
24%
Sign Control
Stop
Stop
Stop
Stop
Traffic Vol by Lane
569
572
274
216
LT Vol
200
78
98
9
Through Vol
268
251
164
156
RT Vol
101
243
12
51
Lane Flow Rate
632
636
304
240
Geometry Grp
1
1
1
1
Degree of Util (X)
1.393
1.367
0.718
0.578
Departure Headway (Hd)
8.857
8.774
10.658
10.939
Convergence, Y/N
Yes
Yes
Yes
Yes
Cap
417
419
341
334
Service Time
6.857
6.774
8.658
8.939
HCM Lane V/C Ratio
1.516
1.518
0.891
0.719
HCM Control Delay
215.9
204.9
36.6
27.9
HCM Lane LOS
F
F
E
D
HCM 95th-tile Q
27.6
26.7
5.3
3.4
Trail Head Tracts F & G 10/26/2017 Synchro 9 Light Report
Delich Associates sb pm.syn
Attachment 8
HCM 2010 AWSC
Short Bkgrd PM
I Timberline & Vine
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
SBU
SBL
SBT
SBR
Lane Configurations
Traffic Vol, veh/h
0
9
156
51
Future Vol, veh/h
0
9
156
51
Peak Hour Factor
0.90
0.90
0.90
0.90
Heavy Vehicles, %
2
2
2
2
Mvmt Flow
0
10
173
57
Number of Lanes
0
0
1
0
Approach
SB
Opposing Approach
NB
Opposing Lanes
1
Conflicting Approach Left
WB
Conflicting Lanes Left
1
Conflicting Approach Right
EB
Conflicting Lanes Right
1
HCM Control Delay
27.9
HCM LOS
D
Trail Head Tracts F & G 10/26/2017 Synchro 9 Light Report
Delich Associates sb pm.syn
Attachment 8
APPENDIX B
Attachment 8
HCM 2010 AWSC
Short
Total
AM
I Timberline & Vine
Intersection
Intersection Delay, s/veh
126.7
Intersection LOS
F
Movement
EBU
EBL
EBT
EBR
WBU
WBL
WBT
WBR
NBU
NBL
NBT
NBR
Lane Configurations
Traffic Vol, veh/h
0
43
106
188
0
188
213
8
0
227
116
54
Future Vol, veh/h
0
43
106
188
0
188
213
8
0
227
116
54
Peak Hour Factor
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
Heavy Vehicles, %
2
2
2
2
2
2
2
2
2
2
2
2
Mvmt Flow
0
48
118
209
0
209
237
9
0
252
129
60
Number of Lanes
0
0
1
0
0
0
1
0
0
0
1
0
Approach
EB
WB
NB
Opposing Approach
WB
EB
SB
Opposing Lanes
1
1
1
Conflicting Approach Left
SB
NB
EB
Conflicting Lanes Left
1
1
1
Conflicting Approach Right
NB
SB
WB
Conflicting Lanes Right
1
1
1
HCM Control Delay
77.1
152.9
138.4
HCM LOS
F
F
F
Lane
NBLn1
EBLn1
WBLn1
SBLn1
Vol Left, %
57%
13%
46%
1 %
Vol Thru, %
29%
31 %
52%
82%
Vol Right, %
14%
56%
2%
17%
Sign Control
Stop
Stop
Stop
Stop
Traffic Vol by Lane
397
337
409
395
LT Vol
227
43
188
4
Through Vol
116
106
213
325
RT Vol
54
188
8
66
Lane Flow Rate
441
374
454
439
Geometry Grp
1
1
1
1
Degree of Util (X)
1.175
0.97
1.216
1.153
Departure Headway (Hd)
10.801
11.06
10.697
10.727
Convergence, Y/N
Yes
Yes
Yes
Yes
Cap
340
330
345
342
Service Time
8.801
9.06
8.697
8.727
HCM Lane V/C Ratio
1.297
1.133
1.316
1.284
HCM Control Delay
138.4
77.1
152.9
130.3
HCM Lane LOS
F
F
F
F
HCM 95th-tile Q
16.3
10.3
17.7
15.7
Trail Head Tracts F & G 10/26/2017 Synchro 9 Light Report
Delich Associates st am allway stop.syn
Attachment 8
HCM 2010 AWSC
Short Total AM
I Timberline & Vine
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
SBU
SBL
SBT
SBR
Lane Configurations
Traffic Vol, veh/h
0
4
325
66
Future Vol, veh/h
0
4
325
66
Peak Hour Factor
0.90
0.90
0.90
0.90
Heavy Vehicles, %
2
2
2
2
Mvmt Flow
0
4
361
73
Number of Lanes
0
0
1
0
Approach
SB
Opposing Approach
NB
Opposing Lanes
1
Conflicting Approach Left
WB
Conflicting Lanes Left
1
Conflicting Approach Right
EB
Conflicting Lanes Right
1
HCM Control Delay
130.3
HCM LOS
F
Trail Head Tracts F & G 10/26/2017 Synchro 9 Light Report
Delich Associates st am allway stop.syn
Attachment 8
HCM 2010 AWSC
Short
Total
PM
I Timberline & Vine
Intersection
Intersection Delay, s/veh
174.6
Intersection LOS
F
Movement
EBU
EBL
EBT
EBR
WBU
WBL
WBT
WBR
NBU
NBL
NBT
NBR
Lane Configurations
Traffic Vol, veh/h
0
78
258
243
0
109
167
13
0
200
268
123
Future Vol, veh/h
0
78
258
243
0
109
167
13
0
200
268
123
Peak Hour Factor
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
Heavy Vehicles, %
2
2
2
2
2
2
2
2
2
2
2
2
Mvmt Flow
0
87
287
270
0
121
186
14
0
222
298
137
Number of Lanes
0
0
1
0
0
0
1
0
0
0
1
0
Approach
EB
WB
NB
Opposing Approach
WB
EB
SB
Opposing Lanes
1
1
1
Conflicting Approach Left
SB
NB
EB
Conflicting Lanes Left
1
1
1
Conflicting Approach Right
NB
SB
WB
Conflicting Lanes Right
1
1
1
HCM Control Delay
221.7
42
246.7
HCM LOS
F
E
F
Lane
NBLn1
EBLn1
WBLn1
SBLn1
Vol Left, %
34%
13%
38%
5%
Vol Thru, %
45%
45%
58%
72%
Vol Right, %
21%
42%
4%
23%
Sign Control
Stop
Stop
Stop
Stop
Traffic Vol by Lane
591
579
289
218
LT Vol
200
78
109
11
Through Vol
268
258
167
156
RT Vol
123
243
13
51
Lane Flow Rate
657
643
321
242
Geometry Grp
1
1
1
1
Degree of Util (X)
1.465
1.405
0.762
0.591
Departure Headway (Hd)
9.04
9.082
11.013
11.411
Convergence, Y/N
Yes
Yes
Yes
Yes
Cap
407
405
331
320
Service Time
7.04
7.082
9.013
9.411
HCM Lane V/C Ratio
1.614
1.588
0.97
0.756
HCM Control Delay
246.7
221.7
42
29.6
HCM Lane LOS
F
F
E
D
HCM 95th-tile Q
30.4
27.6
6
3.6
Trail Head Tracts F & G 10/26/2017 Synchro 9 Light Report
Delich Associates st pm allway stop.syn
Attachment 8
HCM 2010 AWSC
Short Total PM
I Timberline & Vine
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
SBU
SBL
SBT
SBR
Lane Configurations
Traffic Vol, veh/h
0
11
156
51
Future Vol, veh/h
0
11
156
51
Peak Hour Factor
0.90
0.90
0.90
0.90
Heavy Vehicles, %
2
2
2
2
Mvmt Flow
0
12
173
57
Number of Lanes
0
0
1
0
Approach
SB
Opposing Approach
NB
Opposing Lanes
1
Conflicting Approach Left
WB
Conflicting Lanes Left
1
Conflicting Approach Right
EB
Conflicting Lanes Right
1
HCM Control Delay
29.6
HCM LOS
D
Trail Head Tracts F & G 10/26/2017 Synchro 9 Light Report
Delich Associates st pm allway stop.syn
I
I
I
I
I
-- I
- -J
GLACIER CREEK P -
TRAIL HEAD COTTAGE NEIGHBORHOOD
ROARING CREEK I
I I /
I
r
FUTURE CITY PARK
Jilill
lip
Oil M
IL
lot
how
Or
I00000
'll
W Jill
_
n ^ w w I
r�
ti
J•R ENGINEERING
.�
CeilanW 9}7ul • :Limm �R tty9 M
Fm Am 9�Ol • wwxy"Itavnmmm
Agenda Item 3
LA
PROJECT NAME
UNION ON ELIZABETH, PROJECT DEVELOPMENT PLAN/FINAL DEVELOPMENT PLAN,
PDP/FDP170024
STAFF
Jason Holland, City Planner
PROJECT INFORMATION
PROJECT DESCRIPTION: This is a request for a Project Development Plan/Final Plan to construct a
five story mixed -use building on West Elizabeth Street. The project
includes a total of 107 units with 402 beds of student oriented housing and
3,875 square feet of retail space. Amenity space is provided on the ground
level and rooftop of the building.
A main component of the plan is the accommodation of a public
bicycle/pedestrian connection, which runs north/south through the
property, completing the connection from West Elizabeth Street to West
Plum Street to the north.
The site is located on 2.3 acres at 1208 and 1220 West Elizabeth Street
and is in the Community Commercial (C-C) Zone District and the Transit -
Oriented Development (TOD) Overlay Zone.
APPLICANT: Stephanie Hansen, Ripley Design
419 Canyon Avenue. Suite 200
Fort Collins, CO 80521
OWNER: Elizabeth Street Co. Manager LLC
999 Shady Grove, Suite 600
Memphis, TN 38120
RECOMMENDATION: Approval
EXECUTIVE SUMMARY
The Union on
Elizabeth
Project
Development Plan/Final
Plan (FDP)
complies with the applicable
requirements
of the City
of Fort
Collins Land Use Code
(LUC), more
specifically:
Item # 3 Page 1
Agenda Item 3
• The FDP complies with process located in
Division
2.2
— Common Development Review
Procedures for Development Applications
of Article
2 —
Administration.
• The FDP complies with relevant standards located in Division 4.18, Community Commercial
District (C-C) of Article 4 — Districts.
• The FDP complies with relevant standards located in Article 3 — General Development
Standards.
Site Plan Diagram with Major Elements:
—r„REE nI N.E R/tgs TolE
Rf1C(aT�Ad •YJIN EIEVFNTMRTEEN ARARI4ENT6
µ •—fEN1.E SECnim Tom lzroltr:i
RIKEDV[O 1• Am
RELDUTE°KNE'I North
Bike/Ped. Access
RIlCgS� 'LNFARtIbf
• IIXR.#E
• `°�" to W. Plum StreetA.
°r
1 +`• AA
AAAAAAAAAW
S S:DEVARD SETBACK -
_17--V
— I d 1 � �fi ' r
HEM NRE RACK limits of
bridge over --C ',�f�EM N^E 1I
I W RANI,E. tORY) O]i
I -- ground level �L — e 51D Y,
nrr 1 0
' III AI TR KTA6N0 t S~y EF FF
a TIII �IjII�
y' t . —J
caw®wnelRE _ � ,
vehicle access to pkg. garage parking (' ?
TRAS„ N RECVCU„O NOW garage I 1
I JE*E111P1fE
,.,•-.. , � WriND NNIL
� 1 RAINCARDnT wfr*Eu 1
IlkA L•fl:E Y[f RRCK
5RA1
YY Ew
am I
W ROOT OLLVtlMELD E I fC
iaeNaa�
O IA NNfI[Ri%OTf m _ 1 � I �
TLT
I ]C
t V ITIT tRACEbt i F ci T31 ho
LM
TREt aura-m a I
I Y
dJe
HHH,
•— I - ' , CWERt9 „EWtERE RRLit r, y
�5R
4)`
W 1
I
* .l �- V.FCrNt ROWIMW
/ R
_ _ I
1
I 1 �+Or L---- ML_ J' _
1 L `ti rk T
retail V r retail
1 CDa. / .Nt flAIVREW club house voevwucwEx
1 j FMNMTR'r ^j Lµ5(W, y[lE6if1NE & amenities
YRRV EASENvrt - 1 _
IF A9lw VALUE
T �1
1
t--M t�r_--r>_e=_=�_____-_
- _�_ _ 12 ft. sidewalk with street trees
o#wroz[o qow >1wNvr1E„x.wi2:.>1. E.JW 4%il
-
f1YSTE:a RQV LVTRY SI[Ni : A4 i- 3[I'•ii
YOTE„TIK PRIVATE WE 9NRE LIXaTgY —
' � REIOUTE IiWTVOLE -- art-_r x.. -A'e. ..
EA:MNG Flu „YCMAi NRRENT IFLODD
NQIOVtRNCX INI -
4CR`�5w:• n2afD ro — E1:ECTNEEL000NAN-
OMER VEHAI
E u4lNO,REE9 TO crossing to
BE RRESEINED
vehicle Shields
entry ENo E00`n IIIAl1„ElIKA E TRAVUWIFEA W. Elizabeth Street underpass
MW
Item # 3 Page 2
Agenda Item 3
COMMENTS:
1. Background:
The surrounding zoning and land uses are as follows:
Direction
Zone
District
Existing Land Uses
North
(C-C)
Community Commercial
Eleven -Thirteen Apartments (formerly
Cambridge House Apartments)
South
(C-C)
Community Commercial
Campus West Shopping Center
East
(C-C)
Community Commercial
Campus West Shopping Center
West
(C-C)
Community Commercial
Town Square commercial uses
Land Use History:
The site was annexed in 1961 as a part of the South Shields Street Sixth Annexation. The
existing uses on the two properties include St. Paul's Episcopal Church and a commercial
building to the west of the church that included Panhandler's Pizza. Both buildings are proposed
to be removed.
2. Compliance with Community Commercial (C-C) Standards:
The project complies with all applicable C-C standards with the following relevant comments
provided:
A. Section 4.18(A) — Purpose
The proposed mixed -use development is consistent with the purpose of the Community
Commercial District, which is described as follows:
The Community Commercial District provides a combination of retail, offices, services,
cultural facilities, civic uses and higher density housing. Multi -story buildings are encouraged
to provide a mix of residential and nonresidential uses. Offices and dwellings are encouraged
to locate above ground -floor retail and services.
B. Section 4.18(B) — Permitted Uses
The proposed mixed -use project is permitted as a Type 1 use, subject to Planning and Zoning
Board Approval due to the residential use consisting of more than 75 bedrooms.
Item # 3 Page 3
Agenda Item 3
C. Section 4.18(F) — Development Standards for the Transit -Oriented Development
(T.O.D.) Overlay Zone.
The project is located within the T.O.D. Overlay Zone and is subject to the requirements of
Division 3.10 of the L.U.C. Compliance with the relevant provisions of this section is discussed
in subsequent pages of this staff report.
D. Section 4.18(E) — Building Height
The project's 5-story building height is in compliance with this section which limits the height of
buildings to a maximum of 5 stories.
3. Compliance with Article 3 of the Land Use Code — General Development Standards
The project complies with all applicable General Development Standards with the following
relevant comments provided:
A. Section — 3.2.1 Landscaping
• The applicant has consulted with the City Forester to evaluate the existing trees on the
site. The project area contains 30 existing trees within or adjacent to the property. A total
of 4 trees are proposed to be preserved, all of which are existing street trees along the
Elizabeth Street frontage. Upsized mitigation trees are provided in compliance with the
requirements and are accommodated on -site with the proposed landscape plan.
• Foundation planting is accommodated around the building perimeter, with some
additional planting depth provided along the east and west sides of the project to
incorporate tree stocking and low impact development (LID) stormwater drainage
requirements.
• Shade, ornamental, and evergreen trees are provided along the street and building
perimeter in accordance with tree stocking and street tree planting requirements.
B. Section 3.2.2 — Access, Circulation and Parking
Minimum required off-street parking for the project is provided in accordance with the Land Use
Code. A total of 308 parking spaces are provided.
Because the project is located in the TOD overlay zone, mixed use projects may reduce the
required minimum number of parking spaces by providing demand mitigation elements as shown
in the following table:
Item # 3 Page 4
Agenda Item 3
Demand Mitigation Strategy
Parking
Requirement
Reduction
Affordable Housing Dwelling Unit for Sale or for Rent
50%
(equal to or less than 60% Area Median Income)
Transit Passes for each tenant
10%
Car Share
5
spaces per
1
car share
Within 1,000 feet walking distance of MAX Station.
10%
(Walking distance shall mean an ADA-compliant,
contiguous improved walkway measured from the most
remote building entrance to the transit station and
contained within a public ROW or pedestrian easement.)
Bicycle & Pedestrian Level of Service A
10%
As noted in the applicant's plans on the proposed land use table (Sheet C of 5), the project
qualifies for two of the demand mitigation strategies listed, which include transit passes for each
tenant and a Bicycle & Pedestrian Level of Service A.
For the retail component of the project, these demand mitigation strategies may also be applied.
Additionally, the TOD parking standards allow twenty-five (25) percent of the retail square
footage of gross leasable area of such new development, but not to exceed five thousand
(5,000) square feet in the aggregate, to be exempt from minimum parking requirements.
A summary of these parking calculations are provided below for the purpose of providing
information on the quantity of parking that is required, both with and without TOD demand
mitigation, in order to compare these allowances to the amount of parking proposed.
1) Residential:
402 beds x 0.75 spaces per bed
=302 parking spaces required without demand mitigation.
2) Residential demand mitigation deductions:
Pedestrian LOS A and transit passes (20% total deduction permitted)
=60 space reduction.
Item # 3 Page 5
Agenda Item 3
3) Total required
residential
vehicular parking
with demand
mitigation:
302 — 60 =
242 spaces
required
with
TOD
demand
mitigation
4) Minimum commercial parking required without demand mitigation:
Total square feet of retail space proposed: 1366 + 2509 = 3,875 square feet
Per commercial parking standards, at least 5 spaces per 1,000 square feet shall
be provided: 3.875 x 5 = 19.375 = 19 commercial spaces minimum required
without demand mitigation
5) Demand mitigation deductions for commercial parking:
Pedestrian LOS A and transit passes (20% total deduction permitted):
=4 space reduction
TOD Overlay exemption: If new development is proposed within the Transit -
Oriented Development (TOD) Overlay zone, twenty-five (25) percent of the square
footage of gross leasable area of such new development, but not to exceed five
thousand (5,000) square feet in the aggregate, shall be exempt from minimum
parking requirements.
Exemption calculation for this category: 3,875 x .25 = 968 square feet reduction
=2,907 square feet retail @ 5 spaces per 1,000 SF = 14.5 spaces, or 15 spaces
required (equates to an additional 4 space reduction)
6) Summarized from item 5 calculations above, total demand mitigation deductions
for commercial parking:
=8 space reduction per TOD demand mitigation
7) Minimum commercial parking required with demand mitigation included:
19 spaces (baseline minimum item 4 above)
8 space reduction (line item 5 above)
=11 commercial spaces required
8) Summary: total parking required with demand mitigation:
242 (residential) + 11 (commercial retail)
=253 total spaces required with demand mitigation
321 spaces would be required without TOD demand mitigation
Vehicle Parking Summary:
• The project proposes a total of 308 on -site parking spaces in accordance with the
parking standards of this section. This amount exceeds the 242 spaces that may
be permitted with demand mitigation and is 13 spaces less than the amount
required without TOD demand mitigation. While the demand mitigation amount of
Item # 3 Page 6
Agenda Item 3
242 spaces is permitted per the Land Use Code, the applicant is providing
additional parking.
• All of the parking is located within the building structure. Eight handicap parking
spaces are provided in accordance with the minimum requirement in Section
3.2.2(K)(5).
• The project is also in compliance with the minimum required dimensions for off-
street parking areas, as outlined in Table A and B of Section 3.2.2(L).
Bicycle Parking Provided:
• Bicycle parking is provided in excess of the minimum requirements. One space is
required per bedroom, for a total of 402 bicycle spaces.
• 40% or 121 bicycle spaces are required to be in fixed locations and 60% or 281
spaces are required to be enclosed (covered).
• A total of 633 bicycle parking spaces are provided.
402 of these spaces are located within the units on hanging wall racks.
57
spaces are
located
under the portion of the
promenade that is covered
by
the building
bridge
at the northwest portion
of the site.
i 93 covered spaces are located on the ground floor of the parking garage.
i 9 uncovered spaces are located just north of the bridge area.
r 72 uncovered spaces are located east of the building along the rain garden
walkway.
• In summary, the total bicycle parking provided includes:
552 enclosed/covered spaces, with 402 of these covered spaces in the
dwellings. This provides 150 additional covered spaces for residents that
prefer the convenience of these spaces while also providing one space in
each bedroom for residents who may prefer these locations.
v 81 uncovered spaces, primarily along the east side of the building,
generally following the flow of students from the building to campus.
v Total: 633 bicycle parking spaces.
In addition to the 633 bike spaces proposed, there are striped spaces for
42 enclosed bicycle spaces on each level of the 4 upper levels of parking
Item # 3 Page 7
Agenda Item 3
garage that could accommodate an additional 168 covered spaces within
the garage. The applicant proposes that these spaces will be utilized in the
future if the need arises. The total bike parking would then be up to 801
spaces.
B. Section 3.2.4 — Site Lighting
A photometric plan was submitted for the project. As proposed, the project complies with the
lighting design standards in Section 3.2.4. Drive aisle and exterior building lighting is provided by
down -directional and sharp cut-off fixtures.
C. Section 3.2.5 — Trash and Recycling Enclosures
In accordance with the requirements of this section, the project provides a trash and recycling
room and compactor inside the parking garage space, with a separate trash and recycling chute
located in separate rooms on each of the upper floors. In addition to the trash and recycling
collection room, a trash staging area is located west of the building so that containers can be
collected without entering the parking garage.
D. Section 3.4.7 — Historic and Cultural Resources
Due to the age of the church building, the proposed demolition was reviewed under the City's
Demolition/Alteration review process (Municipal Code Section 14-72). This process determines
a building or structure's eligibility to qualify for recognition as a Fort Collins Landmark, and if any
of the buildings or structures are found to be individually eligible for Landmark designation they
would then be reviewed for compliance with LUC Section 3.4.7. This review was completed in
August 2017 with a finding that the features of the church building did not elevate the style of the
building to a level of historic significance. Because of this, no further review is required to
demolish the building and the historic preservation standards contained in LUC 3.4.7 are not
applicable. Additionally, no review of the existing commercial building to the west of the church
was required.
E. Section 3.5.1(G)(1) —Building Height Review and Special Height Review.
The purpose of this Section is to establish a special process to review buildings or structures that
exceed forty (40) feet in height. Its intent is to encourage creativity and diversity of architecture
and site design within a context of harmonious neighborhood planning and coherent
environmental design, to protect access to sunlight, to preserve desirable views and to define
and reinforce downtown and designated activity centers. All buildings or structures in excess of
forty (40) feet in height shall be subject to special review pursuant to this subsection (G).
(a) Review Standards. If any building or structure is proposed to be greater than forty (40) feet in
height above grade, the building or structure must meet the following special review criteria:
Item # 3 Page 8
Agenda Item 3
1. Light and Shadow. Buildings or structures greater than forty (40) feet in height shall be
designed so as not to have a substantial adverse impact on the distribution of natural and
artificial light on adjacent public and private property. Adverse impacts include, but are not limited
to, casting shadows on adjacent property sufficient to preclude the functional use of solar energy
technology, creating glare such as reflecting sunlight or artificial lighting at night, contributing to
the accumulation of snow and ice during the winter on adjacent property and shading of windows
or gardens for more than three (3) months of the year. Techniques to reduce the shadow impacts
of a building may include, but are not limited to, repositioning of a structure on the lot, increasing
the setbacks, reducing building mass or redesigning a building shape.
2. Privacy. Development plans with buildings or structures greater than forty (40) feet in height
shall be designed to address privacy impacts on adjacent property by providing landscaping,
fencing, open space, window size, window height and window placement, orientation of
balconies, and orientation of buildings away from adjacent residential development, or other
effective techniques.
3. Neighborhood Scale. Buildings or structures greater than forty (40) feet in height shall be
compatible with the scale of the neighborhoods in which they are situated in terms of relative
height, height to mass, length to mass and building or structure scale to human scale.
(b) Submittal Requirements. All development plans proposing building or structure heights in
excess of forty (40) feet shall, at a minimum, include the following information:
1. a shadow analysis that indicates, on the project development site plan, the location of all
shadows cast by the building or structure (with associated dates of the year);
2. a summary of the key conclusions of the shadow analysis, and steps to be taken to comply
with the review standards set forth above.
Staff analysis:
Shadowing:
With buildings taller than 40 feet, further review is required based on the criteria described
above. The criteria requires that buildings or structures greater than forty (40) feet in height shall
be designed so as not to have a substantial adverse impact on the distribution of natural and
artificial light on adjacent public and private property. Adverse impacts include, but are not limited
to, casting shadows on adjacent property sufficient to preclude the functional use of solar energy
technology, creating glare such as reflecting sunlight or artificial lighting at night, contributing to
the accumulation of snow and ice during the winter on adjacent property and shading of windows
or gardens for more than three (3) months of the year. Techniques to reduce the shadow impacts
of a building may include, but are not limited to, repositioning of a structure on the lot, increasing
the setbacks, reducing building mass or redesigning a building shape.
Item # 3 Page 9
Agenda Item 3
As can be seen on the shadow study exhibits, shadows are cast onto the Eleven -Thirteen
Apartments property to the north of the Union project, on and near December 21st; however, only
the southern portions of three of the development's six building roofs are affected during portions
of the day. The Eleven -Thirteen Apartments development could still install solar panels on the
buildings throughout the majority of the development. Additionally, while there will be some
shadowing of windows along the Eleven -Thirteen Apartment's southern fagades, it does not
appear that the impacts will be substantial, and natural light will be available along the southern
portion of the Eleven -Thirteen site for the majority of the year. The effects of shadowing are
limited to the winter months and should not affect adjacent landscaping on the site. The
additional shadowing of the Eleven -Thirteen Apartments site could contribute to the
accumulation of snow and ice along the existing southern drive aisle of the development. This
may require that increased measures be taken to clear snow and ice along the southern portion
of the development during the winter months. While this represents a change in current
conditions for the Eleven -Thirteen Apartments site, staff's perspective is that this change in
shadowing is not a unique situation that would represent a substantial adverse impact.
Privacy:
The proposed Union building is set back from the north property line to accommodate canopy
trees along the north property line to enhance privacy and soften views from adjacent properties.
Neighborhood Scale:
The project provides appropriate design elements to address neighborhood scale within the
surrounding context. This is achieved through a combination of design enhancements, including:
• Building step -backs and balconies at the 3rd and 41h building levels;
• A 36 foot
building setback along
West Elizabeth Street, with
outdoor
plaza space
provided
that includes enhanced
materials provided through
the use
of Masonville
sandstone on the walls that define the elevated plaza spaces;
• A 30.5 foot
building
setback along the east fagade
which incorporates a pedestrian spine
and bicycle
parking
area that is enhanced with LID
landscape plantings;
• An appropriate use of masonry and street -facing canopies at the street level;
• The incorporation of the promenade space that functions as a bicycle/pedestrian corridor
which completes the link between West Plum Street and West Elizabeth Street;
• The promenade space also provides a significant break in the building mass along the
Elizabeth frontage, dividing the overall building mass into two sections or wings;
• A different material palette is used for the building wing to the west with unique masonry
used along the west storefront, which helps provide visual variety and an attractive
streetscape within the overall unified architectural theme.
Item # 3 Page 10
Agenda Item 3
F. Section 3.5.2 — Residential Building Standards
• 3.5.2(B) General Standard. The proposed building is in compliance with the general
standard of this section, which requires that buildings include human -scaled elements,
architectural articulation and shall place a high priority on building entries and their
relationship to the street.
• West Central Area Plan (WCAP). The proposed building design meets the mixed -use
design guidelines outlined in the WCAP. Although the Land Use Code and WCAP do not
mandate conformance to a particular building style, the building's proposed massing,
scale and materials appropriately reflect the Elizabeth corridor's architectural character.
Facade step -backs are utilized along West Elizabeth Street to help reduce the apparent
bulk of the building and provide a recognizable, contextually relatable building character
that contributes to the established character in the area. A significant portion of the
building facades incorporate masonry, with a combination of brick and Masonville
sandstone utilized, particularly along the south and east portions of the building which are
most visible to the public.
• As recommended in WCAP, portions of the 5th story are stepped back, as well as portions
of the fourth story along West Elizabeth Street. Both the east and south portions of the
building incorporate these step -backs and masonry features to provide a transition and a
high level of quality at the more visually prominent portions of the building that will be
viewed from both Shields and Elizabeth.
• 3.5.2(D) Orientation to a Connecting Walkway. The project complies with this standard
by providing direct connecting walkways along the south and east plaza spaces, which
are required to be at least 6 feet in width, connecting the building's primary entrances to
the sidewalks on West Elizabeth Street as well as the bicycle/pedestrian connection
which is provided through the property which connects to West Plum Street.
G. Section 3.6.4 — Transportation Level of Service Requirements
A Traffic Impact Study was completed and reviewed for the project. City staff worked closely
with the applicant to ensure that the transportation elements of the project for all modes
(vehicles, bikes, pedestrians, and transit) are consistent with City standards and adopted
plans such as the West Elizabeth Enhanced Travel Corridor (WEETC).
The main improvements that will be provided by the development include a north/south bike
and pedestrian promenade which completes the connection from West Plum Street to
Elizabeth Street. Additionally, vehicular access has been carefully refined, and new curb and
gutter, sidewalks, handicap ramps, plaza space and masonry walls are provided along the
Elizabeth Street frontage. The West Elizabeth Enhanced Travel Corridor Plan shows a
possible future Bus Rapid Transit (BRT) route on Elizabeth in this location. The new route
would be a major capital improvement project (like MAX). The Union site plan notes the
location of a future bus stop and provides an exhibit demonstrating the ability to develop a
stop as shown in the WEETC Plan.
No off -site intersection or street improvements are required.
Item # 3 Page 11
Agenda Item 3
H. Section 3.8.16 — Occupancy Limits; Increasing the Number of Persons Allowed.
This requirement is triggered by the 4 and 5-bedroom units, of which there are 84 units (65 four -
bedroom units and 19 five -bedroom units).
This section limits the maximum occupancy allowed per dwelling unit in a single-family, two-
family or multi -family dwelling to either:
(1) one (1) family as defined in Section 5.1.2 and not more than one (1) additional person;
or
(2) two (2) adults and their dependents, if any, and not more than one (1) additional
person.
The above
limitation
requires that
any units with more than 3
bedrooms address an increase in
occupancy
based on
the following
code provision (underlined
for emphasis):
Increasing the Occupancy Limit.
With respect to multiple -family dwellings, the decision maker (depending on the type of
review, Type 1 or Type 2) may, upon receipt of a written request from the applicant and
upon a finding that all applicable criteria of this Code have been satisfied, increase the
number of unrelated persons who may reside in individual dwelling units. The decision
maker shall not increase said number unless satisfied that the applicant has provided
sufficient additional amenities, either public or private, to sustain the activities associated
with multi -family residential development, to adequately serve the occupants of the
development and to protect the adjacent neighborhood. Such amenities may include,
without limitation, passive open space, buffer yards, on -site management, recreational
areas, plazas, courtyards, outdoor cafes, limited mixed -use restaurants, parking areas,
sidewalks, bikeways, bus shelters, shuttle services or other facilities and services.
Staff Analysis:
The standards of this section are addressed through the provision of an on -site manager and
through the design of the 4 and 5-bedroom units.
On -site Manager:
Given the scope of the development and the increase in occupancy, staff is recommending the
inclusion of an on -site manager as an appropriate, reasonable measure to adequately serve the
occupants and address the standards of this section. The on -site manager is recommended to
help address operational and neighborhood issues that may occur. The intent of the on -site
manager would be to proactively manage and address operational issues as an initial point of
contact for residents of the development, and to be promptly available as a designated, primary
point of contact to communicate with the residents, the public and City staff in order to help
resolve issues related to the development in a timely manner.
Dwelling unit design:
Because multi -family is broadly defined and could include 4-bedroom rental buildings in a
number of contexts, this code provision can be a significant project consideration. However, in
terms of added impacts relevant to this development, additional impacts of the units are more
limited.
Item # 3 Page 12
Agenda Item 3
The remaining impacts of the occupancy are addressed with the unit designs. Detailed unit
designs are attached with this staff report. Within the units, each occupant has an individual
private bedroom, full bath, study area and walk-in closet. Sufficient common area space is also
provided within the units. This unit layout provides sufficient private and shared amenity space to
serve the four occupants.
Other amenity Space:
All bedroom unit types (1, 2, 3, 4 and 5), provide an appropriate amount of space within the units
for the occupants. The amount of amenity and private space provided with the 4 and 5-bedroom
units is not inferior, and there does not appear to be any difference in impact between the 4 and
5-bedroom unit types and other unit types. An equivalent overall building occupancy could be
accommodated with a different mix of units, such as an increase in 2 and 3 bedroom units.
Because of these factors, staff is not recommending a need for additional common areas above
and beyond what is provided on the main level of the building and rooftop amenities to address
the increase in unit occupancy.
Conclusion:
Impacts of the occupancy are addressed appropriately through a combination of unit designs,
common amenity space and on -site management. These measures are also sufficient to address
3.5.1(J) Operational/Physical Compatibility Standards.
L Section 3,10 Development Standards for the Transit Oriented Development (TOD)
Overlay Zone
3.10.4(C) Streetscape. The project complies with this standard by providing improvements along
West Elizabeth Street including a detached sidewalk twelve feet in width with street trees along
the sidewalk frontage.
3.10.5(A) Articulation. The project complies with this standard by providing exterior building
walls that are subdivided and proportioned to a human scale using appropriate storefront
windows, entrance canopies, distinctive materials, and roof overhangs in order to add
architectural interest and variety and avoid the effect of a single, massive wall with no relation to
human proportions. Distinctive masonry patterns provide a series of three storefront themes that
are durable, attractive and add variety at the ground level.
3.10.5(8) Rooflines. The project complies with this standard by providing a flat -roofed building
design at the 5th story with an appropriate cornice treatment on all walls facing or visible from the
adjacent streets.
3.10.5(C) Materials and Colors. The project complies with this standard by providing high quality
exterior building materials including brick, Masonville stone, cast stone, metal panels, vertical
siding and stucco in a manner that highlights the articulation of the massing and the base and
top of the building. Appropriate earth -tone colors are used. The color scheme provided
emphasizes the masonry features of the fagade and uses more subtle colors for the upper
stories help these upper stories recede and appear more subordinate.
Item # 3 Page 13
Agenda Item 3
4, Neighborhood Meeting
A neighborhood meeting was held on July 13, 2017 at St. Paul's Episcopal Church. The meeting
notes are attached to this staff report.
Three key concerns were raised in the meeting:
1. Parking impacts;
2. Traffic congestion concerns in the Elizabeth corridor and West Central area;
3. Building height, mass and scale concerns.
Through the course
of the development review
process prior
to hearing, the applicant has
revised the plans to
address these concerns in
the following
manner:
➢ Reducing the overall height and number of proposed building stories from six stories to
five;
➢ Revising the building design and footprint to provide more significant step -backs at the
upper stories and stronger pedestrian -scale design features at the ground level;
➢ Providing more ground -level retail space and a wider, more open promenade corridor
that is more inviting from West Elizabeth Street;
➢ Reducing
the
overall density
from 121
units and 427 bedrooms to the current proposed
107 units
and
402 bedrooms
in order
to better accommodate other site features and
mitigate the bulk and mass of the building;
➢ Ensuring that the project meets off-street parking and Level of Service requirements;
➢ Revising the vehicular access and circulation to provide access along the west side of the
development which was previously proposed along the east side of the property, and
providing a walkway and bicycle parking corridor to the east.
5. Findings of Fact/Conclusion
The Union on
Elizabeth
Project
Development Plan/Final Plan (PDP/FDP) complies with the applicable
requirements
of the City
of Fort
Collins Land Use Code (LUC):
A. The PDP/FDP complies with the process located in Division 2.2 — Common Development
Review Procedures for Development Applications of Article 2 — Administration.
B. The PDP/FDP complies with relevant standards located in Division 4.18, Community
Commercial District (C-C) of Article 4 — Districts.
C. The PDP/FDP complies with relevant standards located in Article 3 — General
Development Standards.
Item # 3 Page 14
Agenda Item 3
RECOMMENDATION:
Staff recommends that the Planning and
Zoning
Board
approve The Union on Elizabeth
Project
Development Plan/Final Plan PDP/FDP170024
based
on the findings of fact included in
this staff report.
ATTACHMENTS
1.
Vicinity Map (PDF)
2.
Applicant's Planning Narrative
(PDF)
3.
Plan cover sheet (PDF)
4.
Site Plan and Details (PDF)
5.
Landscape Plans (PDF)
6.
Building Perspective Renderings
(PDF)
7.
Building Elevations (PDF)
8.
Building Floor Plans (PDF)
9.
Shadow Analysis Plans (PDF)
10.
Shadow Analysis Narrative
(PDF)
11.
Neighborhood meeting notes
(PDF)
12.
Letter from Resident (PDF)
13.
Letter from Eleven -Thirteen Apts
(PDF)
14.
Occupancy Increase Request
(PDF)
15.
Traffic Impact Study Summary
(PDF)
16.
Traffic Study Memo (PDF)
17.
Utility Plans (PDF)
18.
Plat (PDF)
19.
Photometric Plans(PDF)
Item # 3 Page 15
Attachment 1
Sheldon Lake City Park
W Elizabeth St
JOE
19
d
Q� >I
C Q'
O ++'.
N O'
Y t,i
W Mulberry_St_
Milli III
milli
rch
'I 0
Baystone Dr_y
d
..
Q
3
N
y
m
Q
m
IL
University_Ai
Dr
N
Dr "M
—2
MO
am
U)
Dj
EE 4— E j
Bennett Rd
Bennett Elementary
W Magnolia St
cri
m
�I-FTFIIOIDIIL
vv Laurel w
W Plum St
L
Q
SiteM
O
Colorado State University
r
3
es Ct m
=Hughes Way=
1208/1220 West Elizabeth Street
600 300 0 600 Feet
W Pitkin St
W Lake St
W
Attachment 2
land planning ■ landscape architecture ■ urban design ■ entitlement
Union on Elizabeth Street
PDP/FDP Proiect Narrative:
The Union on Elizabeth development is located in the Campus West area midway between
Shields and City Park Avenues. Located within 500 feet of the Colorado State University
campus, the proposed mixed -use development is a high -quality residential project designed for
a predominantly student population. The development will include a total of 107 dwelling units
with 402 bedrooms and includes a 3,875 sf retail space along Elizabeth Street
The site is bounded by Eleven 13 and Lokal Apartments to the north, Campus West
Commercial to the east and South and commercial to the west; surrounding multi -family
buildings range from three to five stories tall. This project will replace older commercial
establishments and St. Paul's Episcopal Church Building.
Elizabeth Street is classified as an arterial street on the City's Master Street Plan. It contains
two travel lanes in each direction, and center landscape median, striped bicycle lanes and on
street parking is prohibited. Along the project street frontage, sidewalks are both attached and
detached. This project will place tree grates around the trees within the tree lawn to provide a
continuous 12' attached sidewalk as recommended in the West Elizabeth Enhanced Travel
Corridor Plan. A retail space proposed on the first level of the project, will serve both residents
and non-residents and will create a functional urban space along Elizabeth Street. Although
there are multiple private entrances to the buildings, the main entry to the rental office located
on the southeast corner of the building is envisioned to include special paving, a variety of
seating opportunities, lighting, trees and ornamental plant materials. Bike parking will be located
along the east side of the building, within the parking garage, under the building overhang near
the paseo and each bedroom will have a bike hook in the units.
The pedestrian walkway designed within the Union on Elizabeth development was included to
provide a direct connection between the hundreds of residential units to the north and Elizabeth
Street. This paseo creates a midblock accessible walkway between Plum and Elizabeth Street
and allows residents and students traveling along Plum street quick access to amenities such
as public transportation, the future BRT along Elizabeth, and commercial establishments. It also
provides various seating areas, landscape, and decorative lighting.
The building will consist of studio, two, three, four, and five -bedroom units designed using a
modern style architecture with natural stone features and wide overhangs. The units along the
ground floor along the interior courtyard will have individual porches. The five -story building will
have articulated facades and step -backs to mitigate the size of the building and to provide a
transition to the adjoining neighbors.
A setback of 22-6" minimum is provided along the Elizabeth Street frontage as measured from
the current property line. The setbacks ranging from 13'-2" to 31'-7" minimum around
surrounding properties. A private deck and pool will be located on the roof top of the parking
Attachment 2
Union on Elizabeth
Narrative
Page 2 of 2
garage. Amenities may include hot tubs, grills, community table, fire pits and passive seating
areas. There will be a public paseo internal to the project with access in between two retail
spaces. A private fitness, game and study room will be located on the ground floor of the
building.
A parking garage is located internal to the building. Ingress and egress to the parking garage is
from a driveway at the western corner of the building, accessing off of Elizabeth Street with an
existing driveway and alley. It is anticipated that there will be 308 garage parking spaces. The
project is parked at .74 spaces per bed which exceeds the minimum parking requirement when
utilizing demand mitigation strategies.
A neighborhood meeting was held on July 13, 2017. Questions at the neighborhood meeting
created discussion regarding parking, bicycles, increased traffic, effect on surrounding
businesses as well as building size and massing. Nicole Hahn mentioned that a traffic study
would be done with this project. Jason Holland answered planning related questions, including
bus route and building massing questions. The meeting and notes are attached with this
submittal.
Stormwater for the project will be detained in an open vault located within the parking structure
as well as within the aggregate below permeable pavers located within the paseo. All areas of
the roof will be routed to these facilities. Stormwater will then be released into a rain garden
prior to being released at flow rates required by code into Elizabeth Street. Water quality for the
majority of the project will be achieved primarily through the use of a sand filter located in the
detention vault. This sand filter will remove sediment and debris from the stormwater runoff
prior to it leaving the site. Stormwater runoff from lower portions of the project will be collected
in perimeter swales and routed to suitable outfall locations. These areas will not be detained,
however they will receive water quality treatment via bio-swales, rain gardens and landscape
buffers.
LOCATION MAP
UNION ON ELIZABETH
PROJECT DEVELOPMENT PLAN / FINAL DEVELOPMENT PLAN
W. PLUM ST.
�1
0
1u
¢
F
PC
SITE
0
D
O.«..,.,n.......
O
W_
x
01
_U
O
ARIYM
REARMARAMEMEMARAM 0
Ui
e
W. ELIZABETH ST.
e
.x
D
0
0
o1,,
TAM AIR
...,.
III
MMI
I.
0
.....
. ,.-...,..-.
o
OPERATIONS AND MANAGEMENT
I FA
1) ANON -SITE MANAGER OR DESIGNEE SHALL BE PROVIDED AND A PHONE NUMBER SHALL BE POSTED AT THE
BUILDING ENTRIES. THE ONSITE MANAGER OR DESIGNEE SHALL BE PROMPTLY AVAILABLE N HOURS A DAY AND T
DAYS A WEEK TO ASSIST WITH RESOLVING OPERATIONAL MATTERS RELATED TO ME DEVELOPMENT, TENANTS
AND GUESTS.
2) ON-SITEMANAGER,ORDESIGNEE, SHALL CONDUCT ONLY PATROLS OF ALL PUBLIC AREAS AND ENTRANCEAREAS.
ALL TRASH OR OTHER UNSIGHTLY WASTE SHALL BE IMMEDIATELY REMOVED AND CLEANED.
3) QUIET HOURS ARE FROM I IBOW T0]gkm
4) SECURITY CAMERAS SHALL BE PLACED AT ME BUILDING ENTRIES AND EASED ARM
5) IF AN INCIDENT OCCURS WITH A TENANT, AN INVESTIGATION AND WRITTEN WARNING WILL BE GIVEN IF
WARRANTED. IF THERE IS A SECOND WARRANTED COMPLAINT, A FINE WILL BE ASSESSED. IF THERE IS ATHIRD
WARRANTED COMPLAINT. AN ADDITIONAL FINE WILL BE ASSESSED AND THE LEASE MAY BE TERMINATED.
S) LANDSCAPE SHALL BE MAINTAINED BY A PROFESSIONAL LANDSCAPE MAINTENANCE COMPANY.
LAND USE CHART
EXISTING2ANING
AREA COVERAGE
GROSS
AREA (BE)
%
AREA (BE)
%
BUILDINGCOVERAGE
51
52.80
BUILDINGCOVERAGE
53048
53M
DRIVES AND PARKING
(EXCLUDES PUBLIC ROW)
10.07
1007
DRIVES AND PARKING
10,07
1017
OPEN SPACE AND LANDSCAPE
11,031
11.14
OPEN SPACE AND LANDSCAPE
(EXCLVDES PUBLIC HOW)
11031
1102
HARDSCAPE(WA1RS&PISONED
24,901
25.14
TOTAL NET COVERAGE
99,055.00 SF
OUR AC)
100.00
HAROSCAPE
(EXCLUDESPUBLICROW)
N901
24.88
UNITS TOTAL BEDROOMS
%(DU)
PUBLIC STREET WGHT-0E-WAY
1p42.00
1.W
HARDSCAPE
312
DRIVES AND PARKING
138
LPNDSCAPE
SAS
TOTAL GROSS COVERAGE
100,097,00
SF (2.30 AC)
100.0
DWELLING UNIT SREAKDOW N
UNIT TYPE: DWELLING
ONE BEDROOM
9
9
8
TWO BEDROOM
4
8
4
THREE BEDROOM
10
IW
9
FOUR BEDROOM
65
NO
61
FIVE BEDROOM
19
95
10
TOTAL
107
402
100.00
NOTE: PROJECT IS RENT PER BEDROOM.
LEGAL DESCRIPTION
A TRACT OF LAND LOCATED M THE NORTHEAST QUARTER OF SECTION 15, TOWNSHIP T
NORTH, RANGE 69 WEST OF THE 6THPM., CRY OF FORT COLLINS, COUNTY OF LARLNER
STATE OF COLORADO. MORE PARTICULARLY DESCRIBED AS FOLLOWS:
THE WEST 235.E2 FEET OF LOT 3, CAMPUS WEST SHOPPING CENTER, CRY OF FORT
COLLMS, COUNTY OF LARIMER STATE OF COLORADOAND,
THE EAST 12473 FEET OF LOT 4, CAMPUS WEST SHOPFMG CENTER, CITY OF FORT
COLLINS, COUNTY OF LARIMER STATE OF COLORADO
CONTAMS 100097 SQUARE FEET OR 2.299 ACRE$ MORE OR LESS.
ZONING MAP
LNCL
MMN
CSU
CSU
kot now HIF111111111F
MMN
CC =a III„I
_Jpill aaaaaaI
FLOOR AREA RATIO
LOT I, BLOCK
BUILDING AREA ISF)
53ONS
LOT AREA (BE)
1100.097
FLOOR AREA RATIO (LOT I, BLOCK I)
0.53
BUILDING HEIGHT
=='�J�XIMUM
HEIGHT
STORIES
ARM
PRIMECAT PARKING
TOTAL
jair,
... _ _..... _... ..__�.A,___... .__... ..
- 10%FORTRANSITPASSESH30)
- 10% FOR BICYCLE AND PEDESTRIAN LEVEL OF SERNCEAFBI
REWIRED RETAIL SPACES ARE CALCULATED AT TWS SO PAT, OF RESTAURANT
- 25% SQUARE FOOT REDUCTION (-5)
- 10%FORTRANSITPASSESFOREMPLOYEES(-2)
- 10% FOR BICYCLE AND PEDESTRIAN LEVEL OF SERNCEAFBI
`P INCLUDED ARE EIGHT (8) HANDICAPPED PARKING SPACES ONE OF WHICH IS VAN ACCESSIBLE
BICYCLE PARKING
PROVIDED REQUIRED
LOCATED IN UNITS
02
LOCATED AT FIXED RACKS(UNCOVERED)
81
LOCATED AT FIXED RACKS (COVERED)
57 (UNDERBRIDGE)
LOCATED AT FIXED RACKS(COVERED IN GARAGE)
93 (GROUNDFLOOR)
TOTAL
633'
402(241 COVERED, 161 FIXED)
Sheet List Table
Sheet Number
Sheet Title
C
COVER
L-1
TREE MITIGATION
L-2
SITE PLAN
L-3
DETAILS
L-4
LANDSCAPE PLAN
L-5
LANDSCAPE NOTES
A201
ARCHITECTURAL SITE PLAN
A-301-A-305
UNIT PLANS
A401-AR
BUILDING PLANS
A407-AA
ELEVATIONS
A409
MATERIALS BOARD
E-1
SITE LIGHTING PHOTOMETRIC PLAN
E-2
SITE LIGHTING CUT SHEETS
E-3
SITE LIGHTING CUT SHEETS
PLANNING CERTIFICATE
APPROVED ROME DIRECTOR OF COMMUNITY DEVELOPMENT AUTO NEIGHBORHOOD SERVICES OFTHE
CITY OF FORT COLLINS, COLORADO ON THIS DAY OF SO—.
DractorSignature
OWNER'S CERTIFICATION
ME UNDERSIGNED DOESbJ HEREBY CERTIFY THAT INNE ARE THE LAWFUL OWNERS OF THE REAL
PROPERTY DESCRIBED ON THIS SITE PLAN AND DO HEREBY CERTIFY THAT AVE ACCEPT THE
CONDITIONS AND RESTRICTIONS SET FORTH ON MID SITE PLAN,
OWNER (SIGNED) Dale
THE FOREGOING INSTRUMENT WAS ACKNOWLEDGED BEFORE ME
TMS DAY OF AD.. 20_. BY
ARMALAS NUEI
MY COMMISSION EXPIRES:
WITNESS MY HAND AND OFFICIAL SEAL.
UNION ON ELIZABETH
PROJECT
DEVELOPMENT PLAN /
FINAL DEVELOPMENT
PLAN
FORTCOLUNSCQ
APPLICANT/PLANNER
RI DESIGN INC.
Bdlnl• Hare.°
419 Canyon Ana. Soft,
Ann c Loa c0 coul
o. NO 224.5328
1. 87OD256857
ElNebah SireM CO Owner LLC
Rwnay Kind and Dino Daum
ANN BRAD Shady Gm'n Rd., Sub 600
Mamdhla, TN 381M
o. m125ALEED
HUMPHREYS & PARTNER6MCHITECTS, L.P.
Yadwa Yu and Max Manor
140OURSLSud400
DI CO WON
PIT202563145
NORTHERN ENGINEERING
Andy ROOM
301 N.H MNASulkloo
n IAGONG080521
H AT221A159
NOUN SCALE INI 0'
aaaaaa
No.
DESORPTION
DATE
REVISIONS
No
1 OVATE
n=47A
COVER
SEAL:
0a� Q �pG��Od
NSt
GG
PROJECT No: 0.18-051
ORAWN By I SH
REVIEWED BY:
DRAWING NUMBER:
• DOES NOT INCLUDE BIKE SHARE
IN A➢DRION TO THE 633 BIKE SPACES. STRIPED SPACES FOR 42 ENCLOSED BICYCLE SPACES ON EACH LEVEL OF
ME FOUR UPPER LEVELS OF PARKING GARAGE CAN ACCOMMODATE AN ADDITIONAL 160 COVERED SPACES.
THESE SPACES WILL BE UTILIZED IN THE FUTURE IF THE NEED ARISES.
COF5
THREE(3) BIKE RACKS TO BE
LOIUL RELOCATED AS SHOWN tt
(S STCRV) FENCE SECTION TO BE
REMOVED. 1 V MIN.
D BIKE ' "-- _
E`S LINEAR LIGHT
�FIIODRE
OVERHEID.TYP. ` EXISTING 8' WOOD FENCE
.1 ,.
mTV. ' . �1!Lai = �==_--=i!.IIai i!`I•�I . - 7 ._�
innnnMIN=- na
1lim
m
MM
1111111 ES) (72 SPACES)
mm
IF
IS BIKE j
Y
al al
_ _ _
ry
�'nmF6�irtmmaa�_
np q�_R
____ ____ __ _ __
LiJw u _
GO
ME
ME
GO
exe xexxr
'Maa__u�. -r .
OR
�IIDIIIIII
_
-F
ill ...
TV
IIIAII �•'�7,1
I' I I
(III I�
I� 7
__Tull
K.
_ _ __
T i .
�I
T
. I
r
— Ir
I►- - I � �I
—— a
�w
So
II � Ir li!
III
\ all
ar Y, AILS BF
/ — FILE BIKE BACK
Cap— ^, • ''-COVERED HELIX BIKE BACK
III
I
am KI a i� �r nllUp SPACES)
�=I
Man
y l aIIIIIIIII� -
II`I III _ — �17 /!
RETAIL
MAINIENTRY
EASEMENT
IT
Oil ROBERT
OWN
.1 Hill am aaaaaaa,
ENTRY STEPS or ..
f
. �,F•...,� :____gym-�,�i'�it �, �� .i
PROPOSEDRI STORIMBRATERSCUPPERS OLD UT,ROLL OVER CURB, FIRE LXISflNG FIRE HYD CURRIENTIEL DINFAIN
ACCESS ONLY. CLOSED TO TIVE F OODPLAIN
�i''
OTHER VEHICLES Li D)
POTENTIAL FUTURE BUS STOP LOCATION, PENDING IMPLEMENTATION WEST ELIZABETH STREET
OF THE WEST ELIZABETH ENIFLANCED TRAVEL CORRIDOR PLAIN L
________________________________________
SITE PLAN NOTES
UNION ON ELIZABETH
AMENDMENTS
1. THEN R I SHALL BE IN R�CE WITH THENTS TO THE MUST BE
IOF ANY
�I IN TO
2. REFER TO FINAL l PLAINS FDIC EXACT LOCATIONS AND CONSTRUCTION INFORMATION FOR B IN E
STRUCTURES,M MTYBANKADDSE,P,IGEs,PROPOSEDTGPGGRAPHY,STRETIRPROVEENT6
PROJECT
3. REFER I .ENT`SASY A`I�"GALSAREAS E BEENIB.
LOTS,, MINES WAANDOTHEURVEORMATON
DEVELOPMENT PLAN /
A ALL BROTHER AND GROUND MOUNTED MECIRnNICAL EQUIPMENT MUST BE SCREEND FROM VIEW MGM ADJACENT
FINAL DEVELOPMENT
PROPERTY AND PUBLIC STREETS I N Coldind WHERE BUILDI NO PARAPETS 00 NOT ACCOMPLISH SUFFICIENT SCREING
FREE STANDING SCREEN WALLS MATCHING THE PREDOMIART COLOR OFITESURURAL SHALL BECONSTRUCTEDOTHEREN
PLAN
B' REAR YARD SETBACK MINOREQUIPMENT
UCH AS CONDUIT. MELEE AND AND PLUMBING VENTS SHALL BE SCREENS) OFF PALNTED TO MATCH
FORT COUIN6, CO
POUNDING
PREPARED BY
W THIS DEVELOPMENT PLAN MUST BE COMPLETED IN LINE PHASE UNLESS A PMSIE PLAN IS SHOWN
5' SIDEYARD SETBACK THIPLANU
_ wl THHESEPLANS
PROPERTY LINE
_
S SHALL COMPLYWOTH THE HTT TICANDLE REQUIREMENTS IN SECTION ZU40FTHE N
L ALL L$WLLLNUSE
USE CODE AND AOCONCEN1➢E ED, FULLY 8HIELLIGHVIDED
SMMOE WITH SHARP CUNKFF CAPAHILITV 50 AS TO
MINIMIZE UPYCAT, SPILL LIGHT, GLADE AND UNNECESSARY DIFFUSION.
T SEPARATE
cm PERMIT PRIOR iO CONSTRUCTIPERMITTED
N, SIGNS NOV COMEDPLANNING
WITH alY SIGN CODE UNLESS A SPECIFICv�wNI
ED E GITC
E PLPNNEDPARENTHCOD s RANTS MUST MEET OR EXCEED FOUDIRE FIND AUTHORITY STANDARDS ALL SUMARCOS Mutt PROVIDE AN
Z APPROVED
(, STORY) RE ETTNGUISHING SYSTEM.
• land Plan nl Rp•I•MFcxPs,archincNre•
• Urban Malen• amnkmema
G. ALL BIKE PMSPROVIDED MUST BE PErertwnErvnvnnCXMEO.
f
CDMml
Anom'uu me
10.ALL&DEWALKS AND RAMPS MUST CONFORM TO CRY STANDARDS. ACCEs66E RAMPS MUST BE PROVIED AT ALL STEER
N°^r 'mwnl�+-'.nprpugee.em
AN D DRIVE INTERSECTIONS AND AT ALL DESIGNATED ACCESSIBLE PARKING SPACES. ACCEZdAGLE PARKING SPACES MUST
E BIE ROUTES MUST SLOPE NO MURE THAN 120 IN DIRECTION OF
SLOPNO MOREALL ACCESSIBLE
TRAVEL MOST US MOPE
APPLICANT/PLANNER
1, COMINUI CITED SPACE AREAS AND LANDMICARING WILD N RIGHT STREET WAYS
IFL DESIGN INC,
ADJACENTF
TO DI M1KI O SAC AREAS ARE REQUIREQUIREDEM QUD TO MMANE➢TM BY A PROPERTY OWNER.E PROPERTY
G P MI
COMARSRE6PCN51 MR SXJW EMOVAL OR All ADJACENT STREET SIDEWALKS AND SIDEWALKS IN COMMON OPEN
18 Cl AN,
EAGEAEE.
Axi
F cal c0104m
P. NO 224562e
t]nnv DAMAGED CURB. GUTTER AND SIDEWALK Ep6TNG Preare TO CONSTRUCTION A6 WELL AS STREETS SDEWUYS CURe6
1. 870.225680
AND GUITERS, DESTROYED DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHEVILL BE REPLACED OR
EXISTING WALL
RESN TO CITY W FORT COLLINS STANDARDS AT THE DEVELOPERS EXPENSE PRIOR TO THE ACCEPTANCE OF
COMPLETED I MPROSOMENTS ANKOOR PRIOR TO THE ISSUANCE CF THE Fl ET BERTRCITE OF OCCUPANCY .
RAIN GARDEN PLPNTERS
pryryER
I3. FIRE LANE BACKING:A FIRE LANE MARKING PUN MUST BE REV EWEDAND APPROVEDBV THE FIRE OFFICIAL W qi TOME
HELIX BIKE RACK
M EIIUM1 Brad CO OYmar LLD
92S
O SPACES)
OTHER APPROVED FORCES THAT INCLUDE ME �S HE PARKING FIRE LANE STIALL BE PROVIDED FOR FIRE APPARATUS
R v re and Dino DiTubo
ACCESS BOXES iOIDENTIFY SUCH ROADS OR PROHIBIT THEREOF. THE WHICH LINES
8089aM Shady Rd,SuIYBW
Y
_
BE MANTAINED IN A v T23815SLEGIBLE CpMOMTMW AT ALL TIMES AN BE
)E9 GLACEOORF EPREO
Me M1' TN58120
P
WHEN NECESSARY i0 PNOVIOEAOEOWTE VIs B LT'.
P.IIa12x.xs6D
14. PREMISE IDENTIFICATION AN ADDRESSING PLANS REQUIRED AND
OF UNLESS THE PRIVATE NAMED
FIREAUTHORITYI ry PRONTO ANY CERTIFICATEOFOaULDINGSuxLESTEPR VATS DRIVE B NA
OCCUPANCY
TOSSUANCE
BUIL NG
MOXVMENi61GMNGE MAYBE REGVIREDTOALLOW WAY FINDING. ALLBVILD NGs sMN1L INVEnDpRE56NVMBEE, BUILDING
E RHE EQUIREDALLOF
ARGXI EDT
PAATNER6PRCXITECT&, L.P.
NUMBERS OR APPROVED BUILDING IDENTIFICATION PLACED IN A POSITION MET 13 LEGIBLE, N IBLE FROM THE
INCH
STREET OR ROAD FRONTING ME PROFERTV AND Po6TED WITH A MINIMUM OF SIX NUMEMS OLAINLY
A CONTRACTING
CMPHREVnd Rwer
Vuts Mm00
BY MEANS MEANS PRIVATE ANDdlua
BACKGROUND MEREPOLE USED THEBUm NGCANroCTURELT BE VIEWEDMGM THE PURLC
COPY AMOxuMENT POLE qR OMPSIGN oRMENIssRAu 6EG6EOTO CFNTPVMESTXMICTURE
MONUA ON BE
Dal COSLSudd00
N
RED 2M1SOND
P�T2C1E2105
45
YP
q
15 CONCRETE FOUNDATION SHALL BE EXPOSED IM MORE THAN IS.M NRY SHALL STEP DOWN TO FOLLOW CHASEEd
rL y
ENGINEER
H
LEGEND
NORMERN ENGINEERING
NN NN
y
FO80521
0
RMEPDLE PAVE RS (PAT N
FIT Coill
SOL CSS60521
9]0221 <159
1
I
P
Lu
—s
1
PERMEABLE PAVERS(PATTERN BI
2M
MµpSCAPEAREA
1V
p —OW
M
r ADGE668LE ENTRY
o
—"a
<Or
0
LU
BE
{0
0�I
BOLLARDS, TYP. L
SIDEWALKCHASE,
REF. CIVIL—
�ORNAMENTALFENCE
LB'Il CRKEid1
NOUN SCALE INTOW OF
TaTial
Aptudin
No.
DESCAMPRON
DATE
REVISIONS
SITE PLAN
SEAL:
0a� Q �pG��pd
NSt
GO
PRD¢CT No.: 0.16d51
DRAWNBv: 6X
0.EVIEWEDBY:
DRAWING NUMBER:
L-2 OF 5
WALLSERVICKS
AMINIMUM
OF HOT SHOULD BE LEFT
THE LONry SIDE OF LAND
PLACED c SLOE OF THE
RACK.
BWMRCEBERYEEMRA M
HELIX ENDS CAN BE
PIGGED
TOGETHER U LOOK LIKE
BET
SPII CONTINUOUS
SPIRAL.LWITIT PLACED
PAHERSHWNHEACH
OTHER LCIAN ISOMETRIC PPLAN VIEW
BETWEEN
FOR 13' BETWEENNEACH
RACK, MEASURED CENTER
TO CENTER.
O IS
MINIM:
IS SETBACK MINIMUM
DEBASER
AND T EN THE STREET
AND THE (IS
RECOMMENDED
]'
D
SPECIFICATIONS 4'
CAPACITY: 6 BIKES MWMIN6RCUND IF LOCATED WINSUWACE
MATERIAL'. 125 PAVERS (APPROX. 21 RACKS) MWMTO
PIPE IT OD) CONC.
FRONT ELEVATION SIDE ELEVATION
NOTES
t GALVANIZED FINISH
2. INSTALLATION TO BE COMPLETED IN ACCORDANCE NTH MANUFACTURER'S SPECIFICATIONS.
3. ALL INFORMATION CONTAINED HEREIN MUST BE REVIEWED ANDAPPROVED BY THE PRODUCT
MANUFACTURER TO BE CONSIDERED ACCURATE.
0 FOR PRODUCT AND COMPANY INFORMATION VISIT W//wxw.tlero caMprodplTtlN-aW
HELIX BIKE RACK
lLo—ELE
1 N4'x 1 XT x 1/0' ANGLE IRON
IS' NELSON SLUR WELDED TO FRAME
TREE GRATE TYPICAL
1"-1'R'
LSILUKTER0,31
PIPNTING, SEE
LWDSCAPE
DEWLS
TODRNN
FACT-PLAARI
FILE BIKE RACK
W-1'L'
MANUFACTURER: LEND
WWW.LEND COM
12L1R337b129
POTENTIAL FUTURE BUS STOP LOCATION
111E=1L'
CURBREALIGNMENT
FUTURE BUS STOP ISLAND
FUTURE BUS SHELTER
AN FOR
not
RECONFIGUREMEDIA
NAY:•A6 i Nh1 0.1 r I oil 1Mildd li
U
REFERENCE TWICAL LOS STOP ISLAND DESIGN
ENLARGEMENT IN APPENDIX E OF THE WEST ELIZABETH
ENHANCED TRAVEL CORRIDOR PLAN FM MORE
INFORMATION
W-WE1L5
UNION ON ELIZABETH
%1:a 1:101
DEVELOPMENT PLAN /
FINAL DEVELOPMENT
PLAN
FORT COLLINS. CO
m land planning im landscape architecture m
RIPIEY DESIGN INC.
Pored Manager
419 Carry on Ave. Suite 200
Lou COIIIne Go 80521
p. 970 224 M28
[ W02256657
BUSINESS NAME
Cuea]Peaon
ForlCoIRre, 008041
0. 812MSILA I
NORTH SCALE 1110A.
No
DESCRIPTON
LATE
DETAILS
sEAE
t
G
PROIEGTNo: RHO61
pMKN BY SH
RENEWED BY
essississe
DRAWING NUMBER:
L-3 OF 5
UNION ON ELIZABETH
PROJECT
DEVELOPMENT PLAN/
FINAL DEVELOPMENT
PLAN
FORT COLLINS, CO
issississe
PREPARED BY:
m land planning im landscape architecture m
assineWei IF. anoint I
APPLICANFIPLANNER
RIPIEY DESIGN INC.
SePhanle Hansen
419Ga%on Ave. SuW200
Lou Collins, C080521
P.970224 M28
9702256657
EIIxaNeN Street CO Omer LLC
Rodney King and Dino Wolin
NN SoN Shady Grove Rd, SWIa W0
MemFMS IN M120
0.90125925M
HUMPHRE158 PARTNERSARCHRECIS, LP
Yoshi Yu and Mass Roger
10W Lou Suite 400
Denver CC80202
P. 7202562E3
NORTHERN ENGINEERING
Andy Reese
301 N. Howes Suite 1W
FM Codes, C080521
P 970 ZO 4156
0 1 0 a
NORTH SCP1E:1''20'4-
sulgell S issississe
ISSUED
TREE MITIGATION
SEAL
t
G
PRDIEGTHo: RuLl
pMKN BY SH
RENEWED BY
issississe
DRAWING NUMBER:
L-1 OF 5
PLANT SCHEDULE
EVERGREEN TREES CODE STY BOTANICAL NAME/COMMON NAME CONT CAL SIZE
;• } JSV 8 JUNIPERUSSCWULCRUM'SKYROCKET/ SKYROCKET JUNIPER - SHT.
/// PAC HAD 12 PICEA MIES'CUPRESSINA/NORWAY SPRUCE - SHF
OOO /// UPSIZED FOR MITIGATION
ORNAMENTAL TREE CODE OW BOTANICAL NAME/COMMON NAME CONT CAL SIZE
0 PCH 2 PYRUS CALLERTAIA CHANlCLEER'/ CHANTICLEER ORNAMENTAL PEAR B&B 15' -
QRL(M) 1E QUERCUS ROBUR X BICOLOR LONG'/ REGAL PRINCE OAK B&B 25'
UPSIZED FOR MITIGATION
SI (M) 2 SYRINGA RE11CUIVORY SILK/IVORY SILK JAPANESE TREE UTAC B&B 25'
UPSIZED FOR MITIGATION
ON
SHADE TREE GORE Q1Y BOTANICAL NAME/COMMON NAME COW CAL SIZE
MP (M) 2 CATALPA SPECIOSA/ WESTERN CATALPA B&B 3"
CELLSO FOR MITIGATION
COP (M) 8 CEL113D FORMNIGATIO RAIRIE SENl1NEL'/PRAIRIE SENTINEL HACKBERRV B&B 3"
O UPSIZED FOR MITIGATION
GCE 3 GYMNOCIADUS OIOICA'ESPRESSO'/SEEOLE531(EWUCKY COFFEETREE B&B 2'
'./ QCS (M) T QUERCUS'CRIMSCN SPIRE /CRIMSON SPIRE OAK B&B 3-
UPSIZED FOR MITIGATION
TCG 1 TIUACOROATA'GREENSPIRE I GREENSPIRELINDEN Bad 2"
SHRUBS CODE OW BOTANICAL NAME/COMMON NAME SIZE
0 CAA 3 CCRNUS ALGA AAGENTEOMARGINdi/ VARIEGATED DOGWOOD 5CAL
CSK 16 CCRNUS SERICEA'KELSEYII KELSEY DWARF DOGWOOD 5CAL
® NV 19 NASSEUA NRIDUW/ GREEN NEEDLEGRASS 5CAL
O PSO T PHILADELPHUSX'SNOWDELL'/SNOWDELL MOCK ORANGE 5GCL
O PS 2E PHYLLOSTACHYS AUREOSULMLA'SPECTADILIS/ GREENSTRIPED BAMBOO PG4
O PLO 9 PHYSOCARPUS OPULIFOLIUS'LITTLE DEML TM/DWARF NINEBARK 5CAL
Q PPS 15 FRIENDS BESSEYI'PAWNEE BUTTES/SAND CHERRY 5CAL
OPC 3 FRIENDS X CISTENA/ PURPLE LEAF SAND CHERRY 5CAL
(PURPLE LEAVES)
O RW P ROM WOODSII/MOUNTAIN ROSE 5CAL
O SAO 10 SPIRAEAJAPONICA GOLOFFAME/SPIREA 5GCL
^Y' WS < WISTERWSINENSIS I CHINESE WISTERIA 5GCL
BROADLEAVED EVERGREEN CODE QTV BOTANICAL NAME/COMMON NAME SIZE
O BMI 6 BUJ(USMICRWHYLIAINSUIPAIS'WINTERGEM/WINTERGEMBOXWOCO 5GCL
ORNAMENTAL GRASS CODE QTV BOTANICAL NAME/COMMON NAME SIZE
® BOB 46 BWTELOUACAACIUS'BLONDEAMBITION'/BLONDEAMBITIONGRAMAGRASS 1CAL
CAN 38 CMAMAGROSTISXACULFRORA'KAALFOERSTER'/FEATHERREEDGRASS lGAL
OTG 27 DESCHVAPSIA CESPITOSA I TUFTED HAIR GRASS 1CAL
GROUNDCOVERS CODE OW BOTANICAL NAME/COMMON NAME CONT
CTE 151 CERASINM TOMENTOSUM/SNOW IN SUMMER FLAT
NmCP 398 CERATOSTRI PLUMBAGINOIDES/DWARF PLUMMGO FLAT
REFERENCE NOTES SCHEDULE WATER USE TABLE
SYMBOL
DESCRIPTION
1-12"COBBLE
W COBBLE
®'
WOOD MULCH
o°o�o°oo
DECORATIVEROCK
AFTER HARD
WATER NEEDED
(GALLONS5F)
ANNUAL WATER USE (GALLONS)
HIGH
OIIII
18
Bad
MODERATE
51A8Bo
51,C8000
Low
R2300
3
Mighow
ANNUAL WATER USE NOT TO EXCEED 15 GA-JSF. AVERAGE OVER THE SITE
A PERMIT MUST BE OBTAINED FROM THE CITY FORESTER BEFORE
MY TREES OR SHRUBS AS NOTED ON THIS PLAN ARE PLANTED
PRUNED OR REMOVED IN THE PUBLIC RIGHT-OF-WAY THIS
INCLUDES ZONES BETWEEN THE SIDEWALKAND CURB, MEDIANS
AND OTHER CITY PROPERTY. THIS PERMIT SHALL APPROVE THE
LOCATION AND SPECIES TO BE PLWFED. FAILURE TO OBTAIN THIS
PERMIT IS VIOIARON OF THE CITY OF FORT COLLINS CODE
SUBJECT TO CITATION (REST ON 27-31)ME MAY ALSO RESULT IN
REPLACING OR RELOCATING TREES ME A HOLD ON CERTIFICATE
OF OCCUPANCY
TREE PROTECTION NOTES
1. ALL EXISTING TREES WITHIN THE LIMITS OF THE DEVELOPMENT ME WITHIN MY NATURAL AREA BUFFER ZONES SHALL REMAIN AND BE PROTECTED UNLESS NOTED
ON THESE PLOPS FOR REMOVAL.
2. WITHIN THE DRIP LINE OF MY PROTECTED EXAMS TREE, THERE SHALL BE NO CRT OR FILL OVER A FOUR- INCH DEPTH UNLESS A QUALIFIED ARBORIST OR
FORESTER HAS EVALUATED AND APPROVED THE DISTURBANCE.
3 ALL PROTECTED EXISTING TUTEES SHALL BE PRUNED TO THE CITY OF FORT COLLINS FORESTRY STANDARDS. TREE PRUNING ME REMOVAL SHAH BE PERFORMED BY
A BUSINESS FLAT HOLDS A CURRENT CITY OF FORT COLLINS ARBORIST LICENSE WHERE REQUIRED BY CODE.
0. PRIOR TO AND DURING CONSTRUCTION, BARRIERS SHALL BE ERECTED MOUND ALL PROTECTED EXISTING TUTEES WITH SUCH BARRIERS TO BE OF ORANGE FENCING
AMINIMUM OF FOUR (4) FEEL IN HEIGHT, SECURED WITH MEFALT-POSTS, NO CLOSER THAN SIX (6) FEET FROM THE TRUNKCR ONELIAD= NA) OF THE DRIP LINE,
WHICHEVER IS GREATER THERE SHALL BE NO STORAGE OR MOVEMENT OF EQUIPMENT, MATERIAL DEBRIS OR FILL ATHIN THE FENCED TREE PROTECTION ZONE.
5 WRING THE CONSTRUCTION STAGE OF DEVELOPMENT, THE APPLICANT SHALL PREVENT THE CLEANING OF EQUIPMENT OR MATERML OR THE STORAGE ME
DISPOSAL OF WASTE MATERIAL SUCH AS PAINTS, OILS, SOLVENTS ASPHALT, CONCRETE, MOTOR OIL OR MY OTHER MATERML HARMNL TO THE LIFE OF ATREE
WITHIN THE DRIP LINE OF MY PROTECTED TREE OR GROUP OF TREES.
6. NO DAMAGING ATTACHMERTORES, SIGNS OR PERMITS MAY BE FASTENED TO MY PROTECTED TREE.
T. URGE PROPERTY AREAS CONTAINING PROTECTED TREES AND SEPARATED FROM CONSTRUCTION OR LAND CREAKING AREAS, ROAD RIGHTSOF-WAY AND UTILITY
EASEMENTS MAY BE "RIBBONED OFF;' RATHER THAN ERECTING PROTECTIVE FENCING AROUND EACH TREE AS REQUIRED IN SUBSECTION (GK3)ABOVE. THIS MAY BE
ACCOMPLISHED BY PLACING METAL T-POST STAKES MAXIMUM OF FIFTY (50) FEEL APART AND WING RIBBON OR ROPE FROM STAKE-TOSTAKE ALONG THE OUTSIDE
PERIMETERS OF SUCH AREAS BEING CLEARED.
8. THE INSTALLATION OF UFFIFFES, IRRIGATION LINES OR ANY UNDERGROUND FIXTURE REQUIRING EXCAVATION DEEPER THAN SIX (6) INCHES SNARL BE ACCOMPLISHED
BY BORING UNDER THE ROOT SYSTEM OF PROTECTED EXISTING TREES AT MINIMUM DEPTH OF TWENTY{OUR (20) INCHES. THE AUGER DISTANCE IS ESTABUSHED
FROM THE FACE OF THE TREE (OUTER BANK) AND IS SCALED FROM TREE DIAMETER AT BREAST HEIGHT AS DESCRIBED IN THE CHART BROW:
TREE DIAMETER AT BREAST HEIGHT
(INCHES)
AWER DISTANCE FROM FACE OF
FREE (FEET)
0-2
1
36
2
S9
5
10-14
10
1519
12
OVER 19
15
9. NO TREES SHALL BE REMOVED DURING THE SONGBIRD NESTING SEASON
(FEBRUARY 1 TO JULT 31) WITHOUT FIRST HAVING PROFESSIONAL
ECOLOGIST OR WILDLIFE BIOLOGIST COMPLETE A NESTING SURVEY TO
IDENTIFY ANTACNVE NESTS EXISTING ON THE PROJECT SITE. IFACTIVE
NESTSARE FOUND, THE CITY ENVIRONMENTAL PLANNER WILL DETERMINE
WHETHERADDITIONAL RESTRICTIONS ON TREE REMOVALAND
CONSTRUCTION APPLY
UNION ON ELIZABETH
%1:a 1:101
DEVELOPMENT PLAN /
FINAL DEVELOPMENT
FORT COLLINS. CO PLAN
APPLICANDIP ANNER
RIPLEY DESIGN INC.
Stephanie Hansen
419 Canyon Ave. Suite 200
Eon Collins, CO 80521
p. TV 224 sanD
r AV225eon
Elizabeth Street CO Owner LLC
Rodney and and Dino DRnIIIo
B9SoNp Shady Gmve R6, Addison
Man phis, TO M120
A901259ARE
HUMPHREYS B PARTNERS ARCHRECFS, LP
Yaopua Yu and Max Roger
10W Totha Suite 400
Under C08X02
IF 720 2M SUN
NORTHERN ENGINEERING
Andy Reme
301 K Home Suite 100
Fod Codes, CO 60521
P 9702214156
� i1 ii
NORTH SCALE 1'204-
IRSHIRIn
REVISIONS
No
1 HALF
N=M
LANDSCAPE PLAN
SEAL
Z
G
PRGIEGTNo: R16651
CRPWNBY SH
RENEW DBY
DRAWING NUMBER:
QS01;R
POOL DECK PLANTING
GENERAL LANDSCAPE NOTES
1. T QUALITY ALL MATERAL SHALL BE AMADE OR NO.1 GRADE- FREE OF MY DEFECTS, OF NORMAL HEALTH, PucEm SETTOF FISVGA rtcrT xCMR TRAM A3 y.
RHEIGHT, LEAF DENSITY AND SPREAD APPROPRWTE TO THE SPECIES AS DER NED BY THE AM FIT CAR ASSOCIATION OF AGACENT GI E""'1..
RANLL
NOTE: REMOVE DEAD OR DYING ANT NURSERYMEN (AAN)STANDARDS. ALLTREESSHALLBE&4LLANDBURIAPOREQUIVALENT
AT MERWLAMINIMUMOF2XPERYEAA si
TRELLIS OVER OUTDOOR KITCHEN 2.IRRIGATION'. ALL LANDSCAPE AREAS WITHIN THE SITE INCLUDING LURE SHRUB BEDS AND TREE AREAS SHALL BE •HIGH WAR RSAumaYJ
IRRIGATEDWITHANAUTOMATICIRRIGATIONSYSTEM. THEIRRIG4 ONPLWMUSTBEREVIEWEDANDAPPROVEDBYTHE IIIIIIIIIII WW
CRY OF FORT COLONS WATER UFILITIES DEPARTMENT PRIOR TO THE ISSUANCE OF BUILDING PERMIT. ALL TURFAREAS
SHALL BE IRRIGATED WITH AN AUTOMATIC POP-UP IRRIGATION SYSTEM. ALL SHRUB BEDS AND TREES, INCLUDING IN
NATIVE SEMANTICS, SHALL BE IRRIGATED WITH AN AUTOMATIC DRIPHINICKLE) IRRIGATION SYSTEM, OR WITH AN met_w psn�rvGcsau
ACCEPTABLEALTERNARVEAPPROVED BY THE CITY WITH THE IRRIGATION PLANS . THE IRRIGATION SYSTEM SHALL BEMATERIALL WATER THORNMEHLY TO
CLUBHOUSE RESTROOMS ANJUSTEDTO MEET THE WATER REQUIREMENTS OF THE INDIVIDUAL PLANT MATERIAL. aElREANDaEMGVEUFPN(EIS
3. TOPSOIL TOILE MAXIMUM EXIENTFEASIBLE TWSOILTHATISREMOVED DURING CONSTRUCTIONACTMTVSHALLBE
CONSERVED FOR LATER USE ON AREAS REQUIRING REVEGETATION AND IPN0.5CAPING. scwsysoss AND Dssii N xvaAumx
VERTICAL 4 SOILAMENDMENFS: SOIL AMENDMENTS SHALL BE PROVIDED AND DOCUMENTED IN ACCORDANCE WITH CITY CODE
PANELS WITH SECTION I2-132. THE SOIL IN ALL LANDSCAPE AREAS, INCLUDING PARKWAYS AND MEDIANS, SHALL BE THOROUGHLY
VINES LOOSENED TO DEPTH OF NOT LESS THAN EIGHLB) INCHES AND SOIL AMENDMENT SHALL BE THOROUGHLY SHRUB PLANTING DETAIL
INCORPORATED INTO THE SOIL OF ALL LANDSCAPE AREAS TO A DEPTH OF AT LEAST SDSIU INCHES BY RULING, OWING OR /
d-WS OTHER SUITABLE METHOD, AT A KATE OF AT LEAST THREE (3) CUBIC TARES OF SOIL AMENDMENT PER ONE THOUSAND
C NO) SQUARE FEET OF IANDSCAPE AREA. PRIOR TO THE ISSUANCE OF ANY CERTIFICATE OF OCCUPANCY, A WRITTEN
24_PS CERTIFICATION MUST BE SUBMITTED TO THE CITY THATALL PLN TIEDAREAS, OR AREAS TO BE PLANTED, HAVE BEEN
THOROUGHLY LOOSENED AND THE SOIL AMENDED, CONSISTENT WITH THE REQUIREMENTS SET FORTH IN SECTION 12-132.
0 0 ® 5. INSTALIATIONANDGUARPNTEE All LANDSCAPING SHALL BE INSTALLED ACCORDING TO SOUND HORTICULTURAL
[PRACTICES IN A MANNER DESIGNED TO ENCOURAGE QUICK ESTABLISHMENT AND HEALTHY GROWTH. ALL LANDSCAPING
n FOR EACH PHASE MUST BE EITHER INSTALLED OR ME INSFALIAnON MUST BE SECURED WITH AN IRREVOCABLE LETTER
OFCR TO
O A CERTIFICATE
ORE OF OCCUCCOUM FOR125%OF THE NPHASFTHE MATERIALS AND LABOR
'�uy^Ypu�' YpL-j'�'{u�^ IuH^YRu_.Iy IEu�I11yLJ�11 OF
FCPRIOR DI ISSUANCE PERFORMANCE
ND,ORESCROW ACCOUNT
FOR BUI MI IN VARIATION OF
6. MAINTENANCE TREES AND VEGETATION, IRRIGATION SYSTEMS, FENCES, WAUSAND OTHER LANDSCAPE ELEMENTS WITH
THESE FINAL PLANS SHALL BE CONSIDERED AS ELEMENTS OF THE PROJECT IN THE SAME MANNERAS PARKING, BUILDING NO -a _
MATERIALSAND OTHER SITE DETAILS. THE APPLICANT, LANDOWNER OR SUCCESSORS IN INTEREST SHALL BE JOINTLY AND
STEPS ® ® SEVERALLY RESPONSIBLE FOR THE REGULAR MAINTENANCE OF ALL LANDSCAPING ELEMENTS IN GOOD CONDITION ALL RATED THEN FIREL_DGRAGE
LANDSCAPING SHALL BE MNMAINED FREE FROM DISEASE, PESTS, WEEDS AND LITTER, ANDALL IPNDSCAPE STRUCTURES MARK NORETH310-OFTNEE IN
WL SUCH AS FENCES AND WALLS SHALL BE REPAIRED AND REPLACED PERIODICALLY TO MNNTAIN A STRUCTURALLY SOUND _ o
CONDITION �YNORTHA TT"Gs
POOL 8-O"SPA � ].REPLACEMENT: ANY LANDSCAPE ELEMENTTHAT DIES, OR IS OTHERWISE REMOVED, SHALL BE PROMPTLY REPLACED IN WHENED BE POSSIBLE --
30'L' :� �0 ACCORDANCE WITH THE REQUIREMENTS OF THESE PLANS. 2sTRAND12GAUG-GA ARE
a aMELED9�ONSTRPS
B. THE FOLLOWING SEPARATIONS SHALL BE PROVIDED BETWEEN TREESSHRUBSAND UFILRIES.
34-0" ey \o ® ® eAaaaurvGSA¢,.mvEEim'reau UND�M
THREE rvo NCH ONCE POLE STAKES
BOARDWALK 40 FEEL BETWEEN CANOPY TREES AND STREET LIGHTS 0LG IT D a', Pi
15 FEET BETWEEN ORNAMENTAL TREES AND STREE LIGHTS
PRUNING NOTES
NO GOT HEMALY MUNE SHRUB AT CLOTHING
PRUNE ONLY DEAD OR MAKER BRANCHES IF
MULCHING LIGHFULAMPSCILAROUNDTLE
RGETENUDLINSUFTSTOMANDESHRUB DO
GATT ORDER COMPACT AIDED THE PLANTING
RATE HAS BEEN LOCKULDRE POUR WATER
ANDUNDITHROOTBALLTOSETTLETTESOL
IIIII
r./_
6'DEEP L1J 6 FEET BETWEEN n3EES AND PUBLIC WATER, SANITARY AND STORM SEWER SERVICE LINES.
ROD UP TOPPED GOT LL BED M 4
WATER ICI C FEET BETWEEN SHRUM AND PUBLIC WATER AND SANITARY AND STORM SEWER LINES > - - _
7
ICI C FEET BETWEEN TREES AND GAS UNES _ = — aiErsic6 cF
PCON
9. ALL STREET TREES SHALL BE PLACED A MINIMUM EIGHT (8) FEET AWAY FROM THE EDGES OF DRIVEWAYS AND ALLEYS PER BLOOD -BA FIE Iaea OnIF —1 usLcaE
we 3z1(Qgzl(a)_ iNnPE,LL E A Jml 1 1=
AND DMINNERS FROM
1B. PLACEMENT OF ALL ANDSCAPING START BE IN ACCORDANCE WTHE SIGHT DISTANCE CHIT SPECIFIED BY THE zox(e-USEFUL N IT D�:o_oecANIC I � —�RIh eALLANDITUa m^aEswr
TLL RIT
C"OFFORTCOWNS. NO STRUCTURES OR LANDSCAPE ELEMENTS GREATERTHAN 20" SHALL BE ALLOWED WITHIN THE _
FINANCE H TH- - i—a —ICJ
SIGHT DISTANCE NCE OR EASEMENTS WE EXCEPTION OF DECIWOUS TREES PROVIDED THAT THE LOWEST -DFATE�THONOUGHL _ _ATD Mal OR mCCwuIBm SAID
&RANCH ISAT TEAST 6' FROM GMDE. ANY FENCES WILL HIN THE SIGHT DISTANCE nILWGLE OR EASEMENT MUST BE NOT
MORE THAN A2" IN HEIGHTAND OF AN OPEN DESIGN. __ SOIL ABDUCT
_
DEFEND
THREE DA GATT COACH COMPACT WHEN THE
11. ME DEVELOPER SHALL ENSURE THAT THE FINAL IPNOSCAPE PLAN IS COORDINATED WITH ALL OTHER FINAL PLAN PLANTING LOS HAS MEN BAMPLUM
ELEMENTS SO THAT THE PROPOSED GRADING, STORM DRAINAGE AND OTHER DEVELOPMENT IMPROVEMENTS DO NOT FOUMMYTERABBOUNDTLEROPLEALLM
CONFLICT WITH NOR PRECLUDE INSTALLATION AND MAINTENANCE OF LANDSCAPE ELEMENTS ON THIS PLAN. SET11£TNESOL
12. MINOR CHANGES IN SPECIES AND PLANT LOCATIONS MAY BE MADE DURING CONSTRUCTION -AS REQUIRED BY SIDE
HHNEPPPONTRPLNS i�NN MEE EVEENNi OF COONFALL LICTTWIN ilHiE OUuinES INCLUDED IN TIE MUST BE CONSISTENT SPECIES AND ��� TREE PLANTING DETAIL -WOOD POSTS
QUANITTIES ILLUSTRATED SHALL BE FRONDED. ALL CHANGES OF PLANT SPECIES AND LOCATION MUST HAVE WRITTEN APPROVAL
APPROVAL BY THE CRY PRICK TO INSTALLATION. AY SCALE: MS LAID 17
13. ALL PLANTING BEDS SHALL BE MULCHED TO A MINIMUM DEPTH OF THREE INCHES.
14. IRRIGATED TURF SHALL BE ITH AS BLUEGRPSSII(ENTUCKY BLUEGRASS HYBRID VORTEXT BY KOREY SOD LLC OR
APPROVED EQUAL.
15. EDGING BETWEEN GRASS AND SHRUB BEDS SHALL BE UD X<" ROLLED TOP STEEL SET LEVEL WIN TOP OF SOD OR iITEM
PER
FO AWANGs oxsm AE AT EVANS SCHEDURI TRAIN REMOMAT APPE
APPROVED EQUAL.1 SonO O DCAMPER RENE.>aLYSIN INz
NORTH SCALE V-18•_B'• - suss -at ON Now Sim.
FINE ON S W A DE so
STREET TREE NOTES
ENOUGH TO BEER FROM SUPPING ANDON FOR SCIVE TTMK
1. APERMITMUSTBEOBTAINEDFROMTHE CITY FORESTERBEFOREANYTREESORSHRUBSAS NOTED ONTHISPLWARE EacIBTmaE rrW mGRwmrun asTTnat s CUTING PLAIN
PLANTED, PRUNED OR REMOVED IN THE PUBLIC RIGMNDF-WAY. THIS INCLUDES ZONES BETWEEN THE SIDEWALKAND
CURB, MEDIANSAND OTHER CITY PROPERTY. THIS PERM T SHALL APPROVE THE LOCATION AND SPECIES TO BE IS wOaEa THAN EixLsam MADE
PLANTED. FAILURE TO OBTAIN THIS PERMIT IS AMOIAnON OF THE CITY OF FORT COLLINS CODE SUBJECT TO CITATION PRILININGNOTES
TREE SPECIES DIVERSITY (SECTION 2]-31) AND MAY ALSO RESULT IN REPLACING OR RELOCATING TREES AND A HOLD ON CERTIFICATE OF
OCCUPANCY.ONLY CROSSOVER LI DOCOMBANT LEADERS AND
LATERAL BRANCHES My BE PRUNED MWERVERL DO
PERCITY OF FORT COLLINS 321(D)3 PROPOSED PLAN MUST HAVE ASPECIES DIVERSITY OF(1B-19TREES> 2. CONTACTIHECIWFORESIERTOINSPECTALLSTREETIREEPA INGSATIHECOMPLERONOFFACHPHASEOFIHE EnEUOTOTHE EDGElE BUMO TMT
MISS 21F39 TREES> 33%, 4B59 TREES> 25%, 60t TREES> 15%). OF THE 37 TOTAL IREES SURVEYED AND DEVELOPMENT. ALL MUST BE INSTALLED AS SHOWN ON THE LANDSCAPE PLAN. APPROVAL OF STREET TREE PLANTING ISDEEP MULCH RING PLAD ED A MUST Mao
PROPOSED ON SHE, NO SPECIES MAY HAVE MORE THAN 12 QU HN ITY. REQUIRED BEFORE FINAL APPROVAL OF EACH PHASE OOsa wAMETER oALL TRmNOT TIED NK
CE
`TYPE(PROPOSED B EXISTING TO REMAIN) COUNT L839 TRIBES >25"F 3. STREET LANUSCAPING, INCLUDING STREET IREES, SHALL BE SELECTED IN ACCORDANCE WIN ALL CITY CODES AND mm�umEDxrmxmwrs
P9LICIES. ALL FREE PRUNING AND REMOVAL WORKS SHALL BE PERFORMED BYACRY OF FORT COLLINS LICENSED WIDE MORE RCEFORT
AUTHORS WHERE REQUIRED BY CODE STREET TREES SHALL BE SUPPLIED AND PL NTL-0BY THE DEVELOPER USING IIIIII N ®�UNDTLE
SKYROCI(ET JUNIPER 8 14 QUAIFIEDLANDSCAPECONTRACTOR. GLLVWi2mMmlYliSlTOMNImI EEM a✓• SI mm LBAT
IDMDiNTI
WlE NO3WAY5PR110E 12 211 > E(3) oI xL GEmusTAa-s miIIIII6A AREEAU)
FASTIG
A. TILE DEVELOPER SHORT REPLACE DEAD OR DYING STREET TREES AFTER PLANTING UNTIL FINAL MAMENANCE Vm IN124 E1 LILY urtO uIO T-JS ED
REGAL PRINCE OAK 14 24
INSPECTION AND ACCEPTANCE BY THE CITY OF FORT COLLINS FORESTRY DIVISION. ALL STREET MILES IN ME PROJECT
SULDJSLE ao..TeA� _ — sw�w�xoAvuimx
MUST BE ESTABLISHED, WITII AN APPROVED SPECIES AND OF ACCEPTABLE CONDITION PRIOR TO ACCEPTANCE —III III E SOIL
OLaROwicuATEaiu
CHANTICLEER PEAR z 3 TTAMP _ rvG aaE _ __ _rtF
5. SUBJECT TOAPPROVAL BY THE CITY FORESTER -STREET TREE LOCATIONS MY BE ADJUSTED TO ACCOMMODATE LJ.vivOnsLaSE �— — — - ml�`' TN
JA'ANESETUNCTREE 2 3 DRIVEWAY LOCATIONS, UFILITY SEPARATIONS BETWEEN TREES, STREET SIGNS AND STREET LIGHTS. STREET TREES TO
BECENFEREDINTHEMIDDLEOFn ELOTTOn EE WFEASIME. QUANTITIESSHOWNONPLANMUSTBEINSTALLED REMONEA I BURF THOPROUGHLYTOMETURI
—L
WESTERN CATALPA 2 3 nwERmrenu ArvOmwx axauTOM.
UNLESS A REDUCTION IS APPROVED BY THE CITY TO MEET SEPARATION STANDARDSMEET No AN RED PRICARTO
va
.
PROUNDTHEMPUTIVALLINIS
PRAIRIE SENTINEL HACKBERRY 8 14
INMUCKY COFFEE FREE 3 5 aroi FOUR e.ALSH
SETTLEITESOL
OUMSON SPIRE GAK T 12 �1I CONIFER TREE PLANTING DETAIL- WOOD POSTS
GREENSPIRE LINDEN 1 2 SCALE: NTS LaL-1fi
TOTAL TREES 59
'CIFY OF FORT COLLINS CODE SECTION 32RUT3 MINIMUM SPECIES DIVERSITY
UNION ON ELIZABETH
=101:1ei
DEVELOPMENT PLAN /
FINAL DEVELOPMENT
PLAN
FORT COLLINS. CO
He land planning im landscape arshirtenthum He
He urban design im entiffeament He
APPLICANTI%ARRER
RIPIFY DESIGN INC.
ELEMENTS Hansen
019A%on Ave. 5uWND
Fart Collins, PAKISTAN
p.970224 M28
1 9782256657
Euxaeem &rest GG Owner TC
Rodney King and Dino FORMS
WASoN55Dedy Genre Rd, Sude W9
MempLIS IN M120 s
_90125925M
HUMPHREYS& PARTNERS ARCHRECTS, LP
Yal Yu and Mass Relree
10W NORa. Suite 400
DemeT CO80202
p. 7202562TO
NORTHERN ENGINEERING
Andy Reese
301 N. Howes Suite 1W
EST Cost, CO 60521
09702214156
REVISIONS
No
DESCRIPTION
DATE
01
CITY COMMENTS
HDRUNT17
02
CITY COMMENTS
11CARACT
LANDSCAPE NOTES
SEAL
Z
(c�p>o�Fp� `off
G
PROTECTING : R16651
CRPNN BY BH
RENEWED BY
issississe
DRAWING NUMBER:
L-5 OF 5
ml
- IF
16
IPLEY
r-
II'
i. •t
IPLEY
DESIGN INC.
WoIglllllllUIIIIIIIll I _ PF
;-1
kill pp
I t NIP A rA
IK
IPLEY
DE31GN INC.
V
WPIL
I STUCCO 3
, now
P
J I I '.111
"■��■II'
is
Ill
IIIIIIIII�I
�l
rL
JJn
pit^I
IIIIIIIIIIIIII
�q
_n
IIIYIYIIII
_ L
STUCCO 1
Tree Branch
SW 7525
A 7A
STUCCO STUCCO �STUCCO 2
A n STUCCO 3
Queen
STUCCO
Anne Ulac Tony Taupe
SW 0021 SW 7038
WEST ELIZABETH STREET
Note: Color
selections are preliminary
and
subject to change
and may be
adjusted
per city approval
per
final compliance requirements
BRICK
ACME - King Size
Sable Pass Smooth
RAFMIRT of
�STUCCO 2 �STONE 2
STONE 1
Masonville
Buff Ashlar
�.
STONE 2
ReadingRock - 12' z 24"
RockCast Smooth
Chadotte Tan
a,
1 #0 4%
`t
METAL PANEL
Carina - 2' Specing
Fashion Gray
SCALE: 3/32" = 1EI (24" SHEEn
01 16' 32 64' A409
HUMPHREYS & PARTNERS ARCHITECTS, L.P. EDR I I MATERIAL SELECTION I UNION ON ELIZABETH
Fort Collins, GO
5339 Alpha Rd, Suite 300, Dallas, TX 75240 1 972.701.9636 1 MnnM.humphreys.wm
HPPlt 16471
0 CIA _,......... A RARTNERS ARCHITECT..,. T...,...,....1.1 1MI. IRA .. AY ......... A ........ .... ..... ... AMR .AE A.' 1.,..,..... A 1. .... I. ... .A .., I AA I, I........... a a,,,.,. r A I A 1 3 r I A A A A A I A I I I,.,a..,.I......1.,................ I. NA IAI..1..11 1 A R�*.T..,<...I<,.wInI 1.1".
No Text
No Text
AMENITY
POOL
ro to parking level
STLOPET 3
Parkin level 5
STORY 5
STORY 4
Parkin leve14
Parkin level 3
STORY 4
rel
STORY 3
STORY 3
STORY 2
Parkin level
r I el detention area
STORY 2
STORY 1
16' Floor to ceiling
A - A SECTION
g
EDR
EDR
2016471
UNIT TABULATION - 5-STORY BUILDING ONLY
11281`17
UNIT NAME
UNIT TYPE
NET AREA
UNrTCOUNT
BED COUNT
PERCENTAGE
TOTAL AREA
%BREAKDOWN
T4
4br/4.5babwn
1,619
2
8
2%
3238
2%
S1
STUDIO/1ba
516
5
5
5%
2,580
5%
S2
STUDIO/1ba
594
4
4
4%
2,376
4%
Bi
2br2ba
846
4
8
4%
3,384
4%
C1
3br/3ba
1,175
3
9
3%
3,525
9%
C2
3brfta
1,198
7
21
7%
8,388
Di
4br/4ba
1,382
47
188
44%
64,954
59%
D2
46r/4ba
1,584
i6
64
15%
25,344
El
Wfta
1,679
14
70
13%
23,506
18%
E2
NY/5ba
1,679
5
25
5%
8,395
TOTALS
107
1 402
1 100%
145,686
100%
UNIT AVERAGE NET SF:
11362
Or NET AREA G COMPUTED TO INCLUDE SQUARE FOOTAGE FROM EKTERIOR FACE OF ALL EXTERIOR FRAME WALLS THATENCLOSEA,C
SPACE Ir DOESNOT
INCLUDE PATIOS, BALCONIES, PATIOBALCONYSTORAGE.
PROJECTDATA
UNIT AVERAGE NET SF:
1,362
S.F.
PARKING:
GARAGE PARKING-5 story 6 tiers
308
SPACES
SURFACE PARKING
0
SPACES
TOTAL PARKING
308
SPACES
I9TAIN:aki Eel R:krj:l
SCALE: 1".`-20'-10" (24"x36'SHEET)' N i I I is I I I
0' 20' 40' 80, ' SITE PLAN
HUMPHREYS & PARTNERS ARCHITECTS, L.P. I EDR I ARCHITECTURAL SITEPLAN
5339 Alpha Rd., Suite 300, Dallas, TX 75240 1972701 9636 I xvru humphrer cam
November 28, 2017
NI =Ili
DOOR
DEC
'
1�3 _ r
ooa0000i000...%:�a0000ioiooioi� �i,POOL AREA
Izz.mni.»i.»ama ov:ail[eimm aIII
A201
UNION ON ELIZABETH
Fort Collins, CO
EPA#16471
4uuiF1 1711
11 -J
GREAT ROOM
16'-7" X 17'-2"
(Off
(]
� oQ
Ob
0
V
I i
i
1
C. FF,; ,
- - - - - - - - -- D.NJaH.
I _HVAC O
t
BATH , u� c.
H.K.
UNIT S1 (STUDIO/ 113A)
NET - 516 S.F.
SCALE:
1/4" = V-0'
(24"x36"
SHEET)
0'
4'
8'
16'
221-Oa
UNIT S2 (STUDIO / 1 BA)
NET - 594 S.F.
B1(2BR/2BA)
846 SF
A-301
HUMPHREYS & PARTNERS ARCHITECTS, L.P.
5339 Alpha Rd., Suite 300, Dallas, TX 75240 1 972701 9636 1 wvrxhumphreys cam
I
EDR
I
UNITS PLANS
I
UNION
ON ELIZABETCO
Fort Collins, CO
November 28, 2017
HPA#16471
C1 (3BR / 3BA )
15175 SF, 39 UNITS
SCALE:
1/4" = VI
(241
0'
4'
8'
16'
52'-0"
C2(3BR/3BA)
1198 SF
A-302
HUMPHREYS & PARTNERS ARCHITECTS, L.P.
5339 Alpha Rd., Suite 300, Dallas, TX 75240 1 972701 9636 1 vew humphreys cam
I
EDR
I
UNITS PLANS
I
UNION
ON ELIZABETH
Fort Collins, CO
November 28, 2017
HPA#16471
0
N
52'-0"
D1 (4BR/I
11382 SF
BATH 2
BEDROOM
11'-00X13' 2'
-- — a
u BEDROOM 1
10'-9"X11'-4"
PfA[o]
BALCONY
104 S.F.
1
)IJA I.c I II V// W.H.
LIVING ROOM BATH
13'-0"X13'-3"
BEDROOM ❑
11'�4"X10'-9"
W.I.C. — — -
UNIT D2 (114 BA)
NET -1584 S-F-
[l)
KITCHEN_
-- W❑ D.
"
BATH 4 L Or
/ I
BEDROOM
13'-2'X11' 0'
n
SCALE: 1/4" = V-0' (241
o' 4' 8' 16' A-303
HUMPHREYS & PARTNERS ARCHITECTS, L.P. I I UNITS PLANS I UNION ON ELIZABETCO
EDR
5339 Alpha Rd., Suite 300, Dallas, TX 75240 1 972701 9636 1 wvrxhumphreys cam Fort Collins, CO
November 28, 2017 HPA#16471
in
N
E1(5BR/5BA)
1,683 SF
SCALE:
1/4" = V-0"
(24"x36"
SHEET)
0'
4'
8'
16'
NO
BEDROOM
10'-0"X11'-0"
56'-5a
nnins
BEDROOM 2 BEDROOM 3 ❑ qu-
LIVING/DINING
X11'-0' 10'-0"X11'-10" 22'-0"X12'-5"
KITCHEN
W.LC. it
BATH 1
W.I.C.
UNIT E2 (513R / 5BA)
NET -1705 S.F.
BEDROOMS
BATH 5 10'-6"X11'-1"
W.I.C.
W.I.C.
BEDROOM 4
IT-6"XIV-0" L - -
BATH 4 n
F - 1 4 C
A-304
HUMPHREYS & PARTNERS ARCHITECTS, L.P. I I UNITS PLANS I UNION ON ELIZABETCO
EDR
5339 Alpha Rd., Suite 300, Dallas, TX 75240 1 972701 9636 1 wvrxhumphreys cam Fort Collins, CO
November 28, 2017 HPA#16471
22'-0"
T4 ( 4BR / 4.5BA) -1 ST
11619 SF
SCALE:
1/4" = 1'-0'
(24"x36"
SHEET)
0'
4'
8'
16'
F BEDROOM BEDROOM
L 10'-1"X11'-0" 10'-1"X11'-0" J
E)R
J
rATH BATH
0
W
wic
T4 ( 4BR / 4.5BA) -2ND
11619 SF
22'-0"
OF
BEDROOM
BEDROOM
T
J
101-1"X11.0"
10,-1"X11'-0"
J
J
PBATH
0
W'c
WLD
1
T4 ( 4BR / 4.5BA) -3RD
11619 SF
A-305
HUMPHREYS & PARTNERS ARCHITECTS, L.P. I I UNITS PLANS I UNION ON ELIZABETCO
EDR
5339 Alpha Rd., Suite 300, Dallas, TX 75240 1 972701 9636 1 wvrxhumphreys cam Fort Collins, CO
November 28, 2017 HPA#16471
S2
r7
0
R ISER
ialwall
RETAIL @ 1
1366 sf
` ---
luoussusI
Pis
PAWA
/O//%o'aa
1 r
I
'
I
-
E
�o
III
E
�
o F,
RETAIL @ 1 ST
2509 sf
ill
or
1�:
.M u
A SIN
UI�
FIRST FLOOR
SCALE: 111611= VI (241 SHEET)
N
0 161 32, 641 A401
HUMPHREYS & PARTNERS ARCHITECTS, L.P. I I BUILDING PLANS I UNION ON ELIZABETH
EDR
5339 Alpha Rd., Suite 300, Dallas, TX 75240 ! 972701 9636 ! ve w humphri cam Fort Collins, CO
November 28, 2017 HPA#16471
SECOND FLOOR
SCALE: 1116" = VI (241 SHEET)
N
9 16' 32' 641 A402
HUMPHREYS & PARTNERS ARCHITECTS, L.P. I I BUILDING PLANS I UNION ON ELIZABETH
E DR
5339 Alpha Rd., Suite 300, Dallas, TX 75240 1 972701 9636 1 ve w humphreys cam Fort Collins, CO
November 28, 2017 HPA#16471
SCALE: 1116" = 1'-0" (24"X36" SHEET)
N
9 16' 32' 64'
THIRD FLOOR
A403
HUMPHREYS & PARTNERS ARCHITECTS, L.P. I EDR
5339 Alpha Rd., Suite 300, Dallas, TX 75240 1 972701 9636 1 xww humphreys cam
BUILDING PLANS
UNION
ON
ELIZABETH
I
Fort Collins, CO
November 28, 2017
HPA#16471
FOURTH FLOOR
SCALE: 1116" = VI (241 SHEET)
N
9 16' 32' 641 A404
HUMPHREYS & PARTNERS ARCHITECTS, L.P. I I BUILDING PLANS I UNION ON ELIZABETH
EDR
5339 Alpha Rd., Suite 300, Dallas, TX 75240 1 972701 9636 1 ve w humphreys cam Fort Collins, CO
November 28, 2017 HPA#16471
FIFTH FLOOR
SCALE: 1116" = VI (241 SHEET)
N
9 16' 32' 641 A4O5
HUMPHREYS & PARTNERS ARCHITECTS, L.P. BUILDING PLANS I UNION ON ELIZABETH
5339 Alpha Rd., Suite 300, Dallas, TX 75240 1 972701 9636 1 ve w humphri cam E DR Fort Collins, CO
November 28, 2017 HPA#16471
SCALE: 1116" = 1'-0" (24"X36" SHEET)
N
0' 16' 32, 64'
HUMPHREYS & PARTNERS ARCHITECTS, L.P. I EDR
5339 Alpha Rd., Suite 300, Dallas, TX 75240 1 972701 9636 1 xww humphreys cam
ROOF ELEV. = 0' - 0"
ROOFTOP- PARKING AND POOL PLAN
BUILDING PLANS
t November 28, 2017 1
M we
UNION ON ELIZABETH
Fort Collins, CO
HPA#16471
a
I
4
I PLEY
DESIGN INC.
■
I
I PLEY
DESIGN INC.
Attachment 10
land planning ■ landscape architecture ■ urban design ■ entitlement
SHADOW ANALYSIS NARRATIVE
The Union on Elizabeth complies with the Land Use Code 3.5.1 (G) in the following ways:
Building Height Review.
1. Light and Shadow. Buildings or structures greater than forty (40) feet in height shall be designed so
as not to have a substantial adverse impact on the distribution of natural and artificial light on adjacent
public and private property. Adverse impacts include, but are not limited to, casting shadows on
adjacent property sufficient to preclude the functional use of solar energy technology, creating glare
such as reflecting sunlight or artificial lighting at night, contributing to the accumulation of snow and ice
during the winter on adjacent property and shading of windows or gardens for more than three (3)
months of the year. Techniques to reduce the shadow impacts of a building may include, but are not
limited to, repositioning of a structure on the lot, increasing the setbacks, reducing building mass or
redesigning a building shape.
Solar technology is often on rooftops. The only portion of rooftop that is impacted is the
southernmost portion of the ElevenThirteen Apartments and the easternmost portion of the
western property and only for a few hours of the day during the winter months of October to
January.
The property to the west does not have any windows facing this project that would be impacted
by shadowing. The property to the east over 70 feet away and has an overhang blocking the
western sun.
The majority of parking for ElevenThirteen is on the east and west sides of their building and
therefore this project will not create snow and ice buildup on heavily used areas. The overall
building height has been reduced to further mitigate any negative shadowing impacts.
Site lighting has been designed to prevent intrusion to adjacent properties. This is achieved
through pole height and downward direction cutoff fixtures. The lighting plan meets all code
criteria related to overspill on adjacent property.
None of the surrounding properties have gardens.
2. Privacy. Development plans with buildings or structures greater than forty (40) feet in height shall be
designed to address privacy impacts on adjacent property by providing landscaping, fencing, open
space, window size, window height and window placement, orientation of balconies, and orientation of
buildings away from adjacent residential development, or other effective techniques.
Taller trees have been placed along the north property line to provide privacy to its tenants as
well as the adjacent properties. The site was designed so that there are no pedestrian areas
between residential neighbors.
Thinking outside of the box for over two decades.
419 Canyon Ave. Suite 200 ■ Fort Collins, CO 80521 ■ tel. 970.224.5828 ■ fax 970.224.1662
www.ripleydesigninc.com
Attachment 10
3. Neighborhood Scale. Buildings or structures greater than forty (40) feet in height shall be compatible
with the scale of the neighborhoods in which they are situated in terms of relative height, height to
mass, length to mass and building or structure scale to human scale.
This project is located in an area of transition. In the past five years, three five -story buildings
have been approved and/or constructed within 500 feet of this site; one of which is adjacent to
this site to the north. In addition, a development proposal has been submitted for the land
adjacent to this site on the west for a six -story building to the west of this site. The scale of the
neighborhood is changing. Since this will be the first five -story building facing Elizabeth, great
care was taken to improve the streetscape and provide a pedestrian scale.
In addition to complying with the code, the property owner of Lokal is the same as is developing
this site and therefore supportive of a five -story building to the south. They do not see any
negative impacts to their other property due to the construction of this current proposal. The
other property on the north side of this project the ElevenThirteen Apartments. In June of 2017
we sent Bridge Partners, the owner of ElevenThirteen, a description of what was being
proposed. After they reviewed the project we received an email dated July 18, 2017 to express
their support. Since then, the building has been reduced by an entire story thus reducing the
impacts of shadowing.
Thinking outside of the box for over two decades.
419 Canyon Ave. Suite 200 ■ Fort Collins, CO 80521 ■ tel. 970.224.5828 ■ fax 970.224.1662
www.ripleydesigninc.com
Attachment 11
NEIGHBORHOOD MEETING SUMMARY
Project: 1208/1220 Elizabeth Mixed -Use Development
Date: July 13, 2017 6:00pm
Location: St Paul's Episcopal Church
Applicant/Developer Staff Presenting: Stephanie Hansen, Ripley Design and accompanying team
City Staff Present: Jason Holland, Project Planner; Nicole Hahn, Traffic Engineer; Sylvia Tatman-Burruss,
Development Review Liaison
Notes:
Jason begins by explaining the process of development review. Sylvia introduces the liaison position.
Jason reviews the citizen review process, ground rules and the agenda for the meeting.
Stephanie Hansen of Ripley Design begins her presentation of the project. Stephanie begins by
introducing the development team and then introduces the site plan in context of the surrounding
neighborhood. She then explains other comparable, nearby student housing projects including the Lokal
and the District. Stephanie explains that Lokal has 2 Zipcars available on site and there are several bus
stops nearby. She also explains that the proposed project site has several bus stops and increased
access to Colorado State University (CSU) through the newly -constructed Shields underpass.
Stephanie then explains the history of the site. In the past, there was an ice skating rink, a club house
and a swimming pool in the area. In 2013, St Paul's Church asked Ripley Design to complete a feasibility
study and cost estimate for updating their space. The price of the update and the limited parking
availability on the site compelled the church to search for new options. They then asked for developers
to bid on the property and decided to sell. Stephanie then continued by explaining that the land includes
the Panhandler's parking lot and is in the Community Commercial Zone District. The proposed building
will be a mixed -use building with retail on the ground floor and residential units above. Stephanie also
explains that the project must comply with the West Central Neighborhood Plan and the West Elizabeth
Enhanced Travel Corridor (ETC) Plan.
Stephanie goes on to explain that in 2007, the "U+2" occupancy ordinance was updated, suggesting that
students should have more options to live in multi -family dwellings near the University. Since that time,
demand for rental housing has remained high, with average vacancy rates around 2%. Most recently,
the Lokal and District projects have been developed to cater mostly to CSU students. Stephanie explains
that for this proposed project, the developer is still in the conceptual design phase. The current design
includes a pedestrian promenade that would allow pedestrians to walk from Plum to Elizabeth. To
accommodate parking, dwelling units will surround a parking garage. The developer is requesting a
modification to allow for a 6t" story to be built, which would house the clubhouse, pool and several
dwelling units. Stephanie states that the proposed development currently exceeds the Transit Oriented
Attachment 11
Development Overlay District (TOD) parking requirements; the TOD requires 0.75 parking spaces per
bed and the proposed development offers 0.8 parking spaces per bed.
Question and Answer Portion (unless otherwise noted, all questions answered by development team):
1. How many bedrooms in total for the proposed development?
a. 427 beds, 121 units.
2. Will bikes be allowed?
a. Yes, there will be ample parking for bicycles.
3. Parking Garage: how big will it be, and will it be public or private?
a. The garage will be 5.5 stories, mostly private parking.
4. What will the parking be and how will this be addressed for businesses adjacent to the building?
a. Jason Holland (Project Planner): staff is also concerned about this issue in the
neighborhood
b. Stephanie Hansen (developer representative): Because ample parking is provided for
the residents of the building, the addition of the building and the residents should not
affect the adjacent businesses.
5. How will the parking work with the mixed-use/commercial portion of the development? Can
there be more parking to accommodate those extra parking needs?
a. Residents will need to register their cars with the management office, so that should cut
down on parking of residents or visitors of residents.
6. How are you going to deal with the increase in traffic?
7. Nicole Hahn (City Traffic Engineer): Nicole explains that the developer will need to provide a
traffic study for staff to review to determine the impacts of the development. Nicole also
explains that median and pedestrian crossing changes are being made on Elizabeth Street to
accommodate the new Shields underpass. In regard to the construction and parking easement
for the adjacent businesses? What will happen there? It looks as if the access required for the
proposed development will take away parking spaces for the adjacent businesses.
a. The porkchop" median at the entrance will be removed and the parking area is
proposed to be reconfigured, and the parking will stay available.
8. A resident expressed concerns about the development, including the height of the proposed
building creating a visual assault, a concern related to possible displacement of other amenities
in the area and the overall need for affordable housing in Fort Collins. The same resident also
expressed a concern about parking in the area and overall traffic congestion within and
surrounding the area near the proposed development.
9. Is the City considering closing West Elizabeth from Shields to City Park Avenue?"
a. Jason Holland (Project Planner): No, the City is not considering that. That would likely
create more traffic congestion in this area..
b. Nicole Hahn (City Traffic Engineer): 50,000 cars per day pass through the Elizabeth and
Shields intersection. Not as busy as Harmony and Timberline, but the intersection is
very busy. The traffic study for the proposed development will need to be completed
and they will need to meet City traffic standards.
Attachment 11
c. Developer: Could try a car share, also bus service is very good in the area.
10. Is there bus service on Elizabeth and Plum?
a. Jason Holland and Nicole Hahn (City Staff): Yes, there is bus service on both streets;
more bus stops and stop times available on Plum.
11. Bus has been dangerously packed for the past year.
a. Jason Holland (Project Planner): The City is trying to make adjustments to bus routes to
meet increasing demand.
b. Nicole Hahn (City Traffic Engineer): Transfort tries to send another bus out if it is noted
that the existing buses on the route are filling up.
12. What will the height of the building be? Won't it shade and dwarf our one-story building (Krazy
Karl's Pizza)?
a. A shadow study will be completed with the submittal. It is assumed that Krazy Karl's
won't be shaded until late in the afternoon.
b. Jason Holland (Project Planner): Staff has significant concerns regarding the overall
scale and mass of their proposed building.
c. Developer: The economics of the project make for a trade-off between the
paseo/promenade and the extra units on the proposed 61h story/mezzanine. We have
stepped -back the 6th story units to mitigate their effect. The mezzanine level is 20,000
square feet of space and the other floors are 60,000 square feet.
13. How are you really going to capture the parking in this area?
a. We are trying to mitigate the parking impacts with various methods, including the
increase in parking spaces above the TOD parking requirement.
14. For the dwelling units on the 1st floor, who will rent those units?
a. In our experience, those units often lease first given the ease of access from the street
and other potential benefits.
15. Will the fire lane be shared?
a. The fire lane will need to be re -graded and made more easily accessible.
16. Will there be changes to how you exit the parking lot?
a. Nicole Hahn (City Traffic Engineer): We need to look into this in more detail when we
get the traffic study.
17. Are the existing businesses within the development being compensated?
a. Some of the adjacent businesses have already been purchased. No one will be forced
out. The purchase was negotiated and the owners have agreed to a price.
18. It is great that there will be parking made available for the adjacent businesses.
Attachment 12
Jason Holland
From. Jason Holland
Sent: Monday, July 31, 2017 10:33 AM
To: 'Anne Colwell'
Cc: Gerry Horak
Subject: RE: West Elizabeth project proposals
Anne, thank you for coming to the neighborhood meeting and I want you to know that planning staff shares your
concerns regarding both of these proposals. While my role is a part of development review, when it comes to the
Coloradoan, planning staff does not coordinate their reporting topics or influence their reporting in any way — either
directly or indirectly.
In some cases, developers request that design proposals be presented at neighborhood meetings which planning staff
does not support. This is a difficult approach for them as well as the residents of our community, in part because the
neighborhood meeting is a time for staff to listen, answer questions and to get feedback from residents based on what
the developer is presenting. For the 1208/1220 Shields concept, we have explained to the development group that staff
is not supportive of their 6-story building and they requested to have the neighborhood meeting regardless. I did say in
response to a question at the neighborhood meeting that staff had significant concerns regarding the overall scale and
mass of their proposed building, however the Coloradoan did not include this in their article, which is their option. Both
projects need significant design revisions, and I appreciate you sharing your concerns. Please feel free to contact me at
any time.
Thanks,
Jason
Jason Holland, PLA City Planner
City of Fort Collins
281 North College Avenue
Fort Collins, CO 80522
970.224.6126
iholland@fcgov.com
From: Anne Colwell [maiIto: sheofte@yahoo.com]
Sent: Sunday, July 30, 2017 10:32 AM
To: Jason Holland
Cc: Gerry Horak
Subject: West Elizabeth project proposals
Dear Mr. Holland,
Today's "Change in Direction" article in the Coloradoan is worrisome. Honestly, it makes the system look
corrupt. You are out there, I believe, in good faith, holding meetings with the community regarding whether or
not projects will be approved, and the newspaper is writing as though they are "done deals."
Anyway, the article spurred me to write, but I intend to keep it short and objective. I live on Westview Avenue,
in a city landmark in the heart of the neighborhood, and I oppose both the Union and the Hub on Elizabeth in
their current proposed designs.
Though I have concerns regarding population density, traffic, parking, and safety, my number one reason in
both cases is height/size. The land use code makes it clear one consideration in approving or denying a project
is character --mass and scale --compared to other buildings on the street it is facing.
1
The developer seems to think Plum Street, with its brand-new five -story complexes, is thAJjt18HM HI ilsn't.
Elizabeth is the block face for both projects, and it will be the face presented to those of us who live here and
travel the main arteries on a daily basis.
Yes, we need student housing, but we need reasonable planning. Prior projects on Elizabeth have been 2-3
stories; they fit the character of the street, and they did not create huge impacts on transportation/traffic/safety.
Both the Union (which wants an exception to build a 6th story for a swimming pool?) and the Hub violate
standards in Division 3.5 of the land use code.
Thank you for your consideration and your continuing hard work,
Anne Colwell
Sent from my iPad
R
Jason Holland
Attachment 13
From.
Sent:
To:
Subject:
Follow Up Flag:
Flag Status:
Stephanie Hansen <stephanie@ripleydesigninc.com>
Tuesday, July 18, 2017 4:58 PM
Jason Holland
FW: Fort Collins Project
Follow up
Flagged
Jason,
Please see below. We would obviously like this included in the P&Z packet when the time comes. Let me know if you
want them to direct the email to you or if this works.
Thank you,
Stephanie
From: Rodney King [mailto:rking@edrtrust.com]
Sent: Tuesday, July 18, 2017 4:49 PM
To: Stephanie Hansen <stephanie@ripleydesigninc.com>
Cc: Dino DiTullio <dinol@westwarddevelopment.com>
Subject: FW: Fort Collins Project
Stephanie — please see below.
Rodney J. King
Vice President, Development
I
999 South Shady Grove Road, Suite 600
Memphis, TN 38120
(NYSE: EDR)
(901) 259-2500
Direct: (901) 260-2720
Cell: (901) 598-5464
www.EdRtrust.com
From: Luca Mangini[mailto:mangini@bridgepartners.com]
Sent: Tuesday, July 18, 2017 5:39 PM
To: Rodney King <rking@edrtrust.com>
Subject: RE: Fort Collins Project
To Whom It May Concern.
Bridge Partners is the owner of Eleven Thirteen apartments at 1113 W Plum St. We wanted to express our support for
the EDR project located at 1208 and 1220 Elizabeth St.
Luca Mangini
Bridge Partners
1850 Mt. Diablo Blvd, Suite 410
Walnut Creek CA 94596
Office: 925-256-9448 ext 216
1
Cell: 415-307-9438
mangini@bridgepartners.com
www.bridgepartners.com
Attachment 13
z
Attachment 14
Union on Elizabeth
Request for Increased Occupancy
Page 1 of 6
land planning ■ landscape architecture ■ urban design ■ entitlement
November 29, 2017
Union on Elizabeth
Request for Increased Occupancy Limit
The Union on Elizabeth is planned to be a student -oriented mixed -use project that will
include 107 dwelling units and 3,875 square feet of retail/restaurant space. It is located
one block west of the Colorado State University (CSU) campus, fronting West Elizabeth
Street between Shields Street and City Park Avenue. The residential component is
planned to include a mix of one -bedroom through five -bedroom apartments.
In the City of Fort Collins, the maximum occupancy allowed per multi -family dwelling
unit is three unrelated persons, unless the decision maker increases the number of
individuals allowed to reside together. In order to provide 4-bedroom and five -bedroom
units intended to be occupied by four (4) or five (5) unrelated persons, the City's Land
Use Code requires the Applicant to provide a written request as follows:
3.8.16 Occupancy Limits; Increasing the Number of Persons Allowed
(E) Increasing the Occupancy Limit.
(2) With respect to multiple family dwellings, the decision maker (depending on the
type of review, Type I or Type 2) may, upon receipt of a written request from the
applicant and upon a finding that all applicable criteria of this Land Be Code
have been satisfied, increase the number of unrelated persons who may reside in
individual dwelling units. The decision maker shall not increase said number unless
satisfied that the applicant has provided sufficient additional amenities, either
public or private, to sustain the activities associated with multi family residential
development, to adequately serve the occupants of the development and to protect
the adjacent neighborhood. Such amenities may include, without limitation, passive
open space, buffer yards, on -site management, recreational areas, plazas,
courtyards, outdoor cafes, limited mixed -use restaurants, parking areas, sidewalks,
bikeways, bus shelters, shuttle services or other facilities and services.
Thinking outside of the box for over two decades.
419 Canyon Ave. Suite 200 ■ Fort Collins, CO 80521 ■ tel. 970.224.5828 ■ fax 970.224.1662
www.ripleydesigninc.com
Attachment 14
The Union on Elizabeth on Campus
Request for Increased Occupancy
Page 2 of 6
Justification
From its prior experience building student housing communities across the country, the
Applicant has found that four -bedroom and five -bedroom units are a popular lifestyle
alternative for many students. It allows the students residing in these units to share an
apartment in a well -managed environment. It is more secure than most single-family
home rentals and, because higher occupancy units typically rent for less per bedroom,
they offer a more affordable alternative to students on a budget. The tenants that are
likely to occupy these units are also the ones likely to occupy single-family rental
properties near campus. By providing safe, efficient, high quality, and higher occupancy
apartment units, The Union on Elizabeth will simultaneously help to relieve the burden
on surrounding neighborhoods by freeing up affordable rental housing stock to families,
employees of CSU and the greater community.
In support of its request to allow four -bedroom and five -bedroom units in The Union on
Elizabeth, the Applicant offers the following list of project elements that sustain the
activities associated with the project, adequately serve its occupants, and protect the
adjacent neighborhood.
Open Space and Amenities:
Security:
• The Union on Elizabeth provides 24-hour, on -site management services. This
allows management to address noise, maintenance issues, or safety concerns at
any time of day.
• The Applicant's projects incorporate recreational amenities based on the number
of students living in the complex, so the needs of all occupants, including the
four -bedroom and five -bedroom units, are factored into the equation.
Recreation:
• On -site recreational facilities at The Union on Elizabeth will include: a ±8,000
square foot rooftop amenity area with an outdoor pool, kitchen, tables and chairs
for relaxation, conversation, meals and games; a club room; an exercise and
fitness center; and a computer lab with study rooms. The Union on Elizabeth will
also incorporate area on the ground floor for the management/leasing office.
Safe Pedestrian Spaces:
• The streetscape along West Elizabeth Street will add to the urban -lifestyle by
providing street trees, special paving, plaza area, planters, street furniture, water
feature and convenient bike parking.
• In direct path of travel from the new underpass to the main residents entry, there
Thinking outside of the box for over two decades.
419 Canyon Ave. Suite 200 ■ Fort Collins, CO 80521 ■ tel. 970.224.5828 ■ fax 970.224.1662
www.ripleydesigninc.com
Attachment 14
The Union on Elizabeth on Campus
Request for Increased Occupancy
Page 3 of 6
is a second plaza area with plant beds and bike parking.
• The Union on Elizabeth will include a 10,000 square foot paseo through the
center of the project. Benches, tables, upgraded lighting, trees and plant areas
will flank each side of the pedestrian only area.
Retail -
The retail aspect of this project is an amenity not only to the residents of this
project, but also to the community as a whole. The large space allows for a
flexible group of users that range from boutique shops or restaurants.
Contextual Amenities:
• Residents can easily access CSU's Campus Recreation Center and intramural
playing fields, located just one block east of the project on the CSU Main
Campus, either by walking or by biking. The Recreation Center has a pool,
gymnasium, climbing wall, and fitness center.
• Moby Arena is adjacent to the Campus Recreation Center, just one block to the
east of The Union on Elizabeth. CSU hosts games, as well as concerts and
special events there.
• The nearest access point to the CSU's trail system is located 1 block to the east
along West Elizabeth Street. CSU's trail system connects to the Mason and
Spring Creek Trails and provides not only a safe commuting route for students,
but also makes nearby parks and open spaces more accessible. CSU's trail
system also transports users to other multi -use trail connections in the City's trail
system and to the MAX Bus -Rapid -Transit (BRT).
• Residents of The Union on Elizabeth will also live within walking and biking
distance of City Park, which includes 76 acres of open space, tennis courts, ball
fields, basketball courts, public pool and fishing, trails and picnic areas for more
passive recreation. City Park is also adjacent to the City Park Nine Golf Course.
• CSU's new football stadium is a '/2 of a mile east of The Union on Elizabeth. The
plaza space directly surrounding the stadium is open to the public at all times
serving as gathering space. Football games and special events will be hosted
there, and will be conveniently close for students to access.
• Because The Union on Elizabeth's location provides direct access to sidewalks
and trails, all of the off -site recreational opportunities can be reached without
having to go through an adjacent residential neighborhood, thus protecting the
neighbors.
Transportation:
Thinking outside of the box for over two decades.
419 Canyon Ave. Suite 200 Fort Collins, CO 80521 tel. 970.224.5828 fax 970.224.1662
www.ripleydesigninc.com
Attachment 14
The Union on Elizabeth on Campus
Request for Increased Occupancy
Page 4 of 6
• Although only 251 parking spaces are required, 307 are provided. Parking
permits will be available to residents with vehicles and spaces will be designated
in the on -site parking structure. It is anticipated that parking at the proposed ratio
will be more than adequate to serve the needs of students that have cars with
ample spaces left for guest parking, the leasing office and the restaurant/retail
space.
• The applicant is dedicated to encouraging students to be environmentally
responsible by promoting alternative means of transportation including walking,
biking, public transit, and car share options. The site is served by Transfort and
there are multiple near -by bus stops along West Elizabeth Street and Shields
Street. Students can connect to the MAX (BRT) via bike or by using the bus. The
MAX (BRT) provides access to amenities along the Mason Corridor between the
Downtown Transit Center and South Transit Center.
• The site plan also shows where a future BRT bus stop can be constructed
without impacting the proposed amenities.
• The Union on Elizabeth will encourage the use of bicycles by providing bike
parking spaces in every bedroom as well as 81 additional bike parking spaces
located in the east plaza, 57 additional covered spaces located in the paseo
area, and 93 spaces on the ground floor of the parking garage. This totals 633
bike parking spaces when only 402 are required.
• City Council recently adopted the West Elizabeth Enhanced Travel Corridor Plan.
This plan's focus is to emphasize transit, biking and walking in a way that serves
existing and future transportation and land use needs along Elizabeth Street. The
Union on Elizabeth plans to provide an improved sidewalk section as
recommended in the WEETCP which includes a 12' attached sidewalk.
• CSU has recently constructed a pedestrian and bike underpass on West
Elizabeth Street under Shields Street. This underpass provides a safe route to
CSU and connections to bus and trail systems for the students living at The
Union on Elizabeth. The protected mid -block crossing is adjacent to this project
providing a safe route across Elizabeth Street.
Services:
• The proposed site is adequately served with standard public infrastructure
including water, wastewater, police and fire facilities. The existing street network
has adequate capacity to absorb the additional traffic within level of service
standards. See the Traffic Impact Analysis.
• The site is adjacent to the Campus West commercial shopping area that includes
many retail and personal service shops as well as a variety of restaurants and
Fhinking outside of the box for over two decades.
419 Canyon Ave. Suite 200 Fort Collins, CO 80521 tel. 970.224.5828 fax 970.224.1662
www.ripleydesigninc.com
Attachment 14
The Union on Elizabeth on Campus
Request for Increased Occupancy
Page 5 of 6
entertainment venues that are geared towards the student population. Students
are also within one mile from the Taft Hill and Elizabeth commercial shopping
area and 1.5 miles from the commercial shopping area on Drake Road and
Shields Street.
• The nearest grocery and convenience stores are located close -by. Students are
about a mile from King Soopers at the intersection of Elizabeth Street and Taft
Hill Road; less than a mile from the Dollar General and Walgreens on the corner
of Shields Street and Prospect Road; and 2 miles from King Soopers and Whole
Foods on South College Avenue. The CSU campus also offers a small market
place along Plum Street, as well as a variety of other services that cater
specifically to the student population.
• Again, because The Union on Elizabeth has direct access to sidewalks and trails,
the residents will be able to get to off -site services without having to go through
an adjacent residential neighborhood.
Sustainability:
• Locating higher -density housing for students where they can access the campus,
shopping and recreational opportunities without using an automobile is a key
component of being an environmentally responsible community. The Union on
Elizabeth will house 402 students in a location where having a vehicle is not
necessary to have access to all necessary amenities. This is highly desirable
from an environmental perspective and makes attending college more affordable
to students on a budget. The units with increased occupancy are an essential
component of The Union on Elizabeth that allows higher density to work in this
location. Higher density housing protects the adjacent neighborhood by providing
appropriate housing for students in one location, discouraging them from living in
single family neighborhoods.
• The West Central Area Plan encourages a diverse mix of bedrooms per unit in
order to provide greater flexibility and serve a broader range of tenants. See
Policy 1.11. The Union on Elizabeth proposes to provide a mix of studio, one -
bedroom, two bedroom, three -bedroom, four -bedroom and five -bedroom
apartments.
• The units with increased occupancy are more efficient in terms of material usage
and are also more energy efficient. Data obtained from Conservice, a nationwide
utility billing service that analyzes information from many properties and
thousands of units, indicates that electricity usage is an average of 21.25% more
efficient when comparing a 4-bedroom unit to two 2-bedroom units. In other
words, the same four people use less electricity when housed in a 4-bedroom
unit vs. being split up into two 2-bedroom units. Likewise, natural gas is
estimated to be 55.13% more efficient.
Thinking outside of the box for over two decades.
419 Canyon Ave. Suite 200 ■ Fort Collins, CO 80521 ■ tel. 970.224.5828 ■ fax 970.224.1662
www.ripleydesigninc.com
Attachment 14
The Union on Elizabeth on Campus
Request for Increased Occupancy
Page 6 of 6
• Additionally, less construction materials translates into less environmental impact
from a construction standpoint.
In summary, the Applicant requests the Planning and Zoning Board to approve 84
dwelling units of The Union on Elizabeth for occupancy by four (4) or five (5) unrelated
individuals. We believe the 4-bedroom and five -bedroom units will serve the students
by providing an attractive, secure and affordable lifestyle alternative with sufficient
amenities to sustain the activities of the student population without impacting adjacent
neighbors. Upscale urban plazas, a state-of-the-art clubhouse/recreation facility and
roof -top amenities will provide ample recreational opportunities on -site, while the CSU
campus itself as well as surrounding outdoor amenities offer expansive green spaces,
sport fields, water bodies and natural areas nearby. Adequate parking for both cars and
bicycles is conveniently provided on site. There is a variety of shopping, dining,
recreation and entertainment opportunities located within biking and walking distance to
satisfy the student living and recreational needs.
Thinking outside of the box for over two decades.
419 Canyon Ave. Suite 200 ■ Fort Collins, CO 80521 ■ tel. 970.224.5828 ■ fax 970.224.1662
www.ripleydesigninc.com
Attachment 15
UNION ON ELIZABETH
TRANSPORTATION IMPACT STUDY
FORT COLLINS, COLORADO
NOVEMBER 2017
Prepared for:
EDR
999 South Shady Grove Road, Suite 600
Memphis, TN 38120
Prepared by:
DELICH ASSOCIATES
2272 Glen Haven Drive
Loveland, CO 80538
Phone: 970-669-2061
FAX: 970-669-5034
Project #1751
�PDO LICe
�IQN M.O�•.FO
F�`39W6
1/F! 17
o�FSS�ONA�
Attachment 15
TABLE OF CONTENTS
I. INTRODUCTION........................................................................................................ 1
II. EXISTING CONDITIONS.......................................................................................... 2
LandUse.........................................................................................................................2
Roads.............................................................................................................................. 2
ExistingTraffic................................................................................................................. 5
ExistingOperation........................................................................................................... 5
PedestriansFacilities...................................................................................................... 8
BicycleFacilities..............................................................................................................8
TransitFacilities.............................................................................................................. 8
III. PROPOSED DEVELOPMENT.................................................................................9
TripGeneration............................................................................................................... 9
TripDistribution.............................................................................................................11
Background Traffic Projections..................................................................................... 11
TripAssignment............................................................................................................ 11
SignalWarrants............................................................................................................. 11
OperationAnalysis........................................................................................................ 18
Geometry...................................................................................................................... 18
Pedestrian Level of Service........................................................................................... 24
Bicycle Level of Service................................................................................................ 24
Transit Level of Service................................................................................................. 24
Mitigation....................................................................................................................... 25
IV. CONCLUSIONS/RECOMMENDATIONS.............................................................. 26
LIST OF TABLES
1.
Current Peak Hour Operation....................................................................................
7
2.
Trip Generation
.........................................................................................................9
3.
Short
Range
(2022)
Background Peak Hour Operation ..........................................
19
4.
Long
Range
(2035)
Background Peak Hour Operation ...........................................
20
5.
Short
Range
(2022)
Total Peak Hour Operation.....................................................
21
6.
Long
Range
(2035)
Total Peak Hour Operation......................................................
22
�—DELICH Union on Elizabeth TIS, November 2017
rASSOCIATES
Attachment 15
LIST OF FIGURES
1. Site Location............................................................................................................. 3
2. Existing Intersection Geometry.................................................................................4
3. Recent Peak Hour Traffic.......................................................................................... 6
4. Site Plan.................................................................................................................. 10
5. Trip Distribution....................................................................................................... 12
6. Short Range (2022) Background Peak Hour Traffic ................................................ 13
7. Long Range (2035) Background Peak Hour Traffic ................................................. 14
8. Site Generated Peak Hour Traffic........................................................................... 15
9.
Short
Range
(2022)
Total Peak Hour Traffic...........................................................
16
10.
Long
Range
(2035)
Total Peak Hour Traffic............................................................
17
11.
Short
Range
(2022)
and Long Range (2035) Geometry .........................................
23
APPENDICES
A. Base Assumptions form and related information
B. Recent Peak Hour Traffic
C. Current Peak Hour Operation/Level of Service Descriptions/Fort Collins LOS
Standards
D.
Short
Range
(2022)
Background Peak Hour Operation
E.
Long
Range
(2035)
Background Peak Hour Operation
F.
Short
Range
(2022)
Total Peak Hour Operation
G.
Long
Range
(2035)
Total Peak Hour Operation
H.
Pedestrian/Bicycle
Level of Service
—� �---DELICH Union on Elizabeth TIS, November 2017
rASSOCIATES
Attachment 15
I. INTRODUCTION
This transportation impact study (TIS) addresses the capacity, geometric, and
control requirements at and near the proposed Union on Elizabeth. The proposed Union
on Elizabeth site is located north of (adjacent to) West Elizabeth Street, between Shields
Street and City Park Avenue in Fort Collins, Colorado.
During the course of the analysis, numerous contacts were made with the project
developer (EDR), the project engineer (Northern Engineering), the project planning
consultant (Ripley Design), and the Fort Collins Traffic Engineering staff. This study
generally conforms to the format set forth in the Fort Collins transportation impact study
guidelines contained in the "Larimer County Urban Area Street Standards" (LCUASS).
The base assumptions packet is provided in Appendix A. The study involved the following
steps:
• Collect physical, traffic, and development data;
• Perform trip generation, trip distribution, and trip assignment;
• Determine peak hour traffic volumes;
• Conduct capacity and operational level of service analyses on key intersections;
• Analyze signal warrants;
• Conduct level of service evaluation of pedestrian, bicycle, and transit modes of
transportation.
This TIS is a revision of the "Union on Elizabeth Transportation Impact Study"
dated
August
2017.
It addresses City staff comments with regard to the access location
and a
change
in the
number of units/beds.
_LDELICH Union on Elizabeth TIS, November 2017
�7 1 rASSOCIATES Page 1
Attachment 15
II. EXISTING CONDITIONS
The
location of the
Union
on Elizabeth site is
shown in Figure 1. It is important that
a thorough
understanding
of the
existing conditions
be presented.
Land Use
Land uses in the area are primarily institutional (CSU), commercial, or residential.
Land adjacent to the site is flat (<2% grade) from a traffic operations perspective. This site
is west of the center of Fort Collins. Colorado State University is east of the proposed
Union on Elizabeth site.
Roads
The primary streets near the Union on Elizabeth site are West Elizabeth Street,
Shields Street, and City Park Avenue. Figure 2 shows a schematic of the existing
geometry at the West Elizabeth/Shields and West Elizabeth/City Park intersections.
West Elizabeth Street is to the south (adjacent to) of the Union on Elizabeth site.
It is classified as a four -lane arterial street on the Fort Collins Master Street Plan.
Currently, West Elizabeth Street has a four -lane cross section in this area. At the West
Elizabeth/Shields intersection, West Elizabeth Street has eastbound and westbound
left -turn lanes, an eastbound left-turn/through lane, a westbound through lane, and
eastbound and westbound right -turn lanes. At the West Elizabeth/City Park
intersection, West Elizabeth Street has eastbound and westbound left -turn lanes and
two through lanes in each direction. Eastbound and westbound right -turn lanes are
required with the existing traffic volumes at the West Elizabeth/City Park intersection.
Typically with constrained conditions, when turn lanes are shown to be required based
on volumes, they are not built unless the operation at the subject intersection is
determined to be unacceptable. The West Elizabeth/Shields and West Elizabeth/City
Park intersections have signal control. The posted speed limit in this area of West
Elizabeth Street is 30 mph.
Shields Street is to the east of the Union on Elizabeth site. It is a north -south
street designated as a four -lane arterial street on the Fort Collins Master Street Plan.
Currently, it has a four -lane cross section in this area. At the West Elizabeth/Shields
intersection, Shields Street has northbound and southbound left -turn lanes, two through
lanes in each direction, and a southbound right -turn lane. According to LCUASS, a
northbound right -turn lane is required with the existing traffic volumes at the west
Elizabeth/Shields intersection. With regard to this right -turn lane, Shields Street is
considered to be in a constrained condition. The posted speed limit in this area of
Shields Street is 30 mph.
�IA _LDELICH Union on Elizabeth TIS, November 2017
�7 1 rASSOCIATES Page 2
Attachment 15
N
C: a)
(D
Laurel Street
a�
Q U)L^
Y (n co
m N
T C
N fA
U =3
m
Plum Street
Q
0
U
U)
Elizabeth Street
Union on
Elizabeth
SCALE: 1 "=500'
SITE LOCATION
_—// I DELICH
�7 1 rASSOCIATES
Figure 1
Union on Elizabeth TIS, November 2017
Page 3
Attachment 15
L
Co
U)
West Elizabeth Street f
- Denotes Lane
EXISTING GEOMETRY
-�I L—DELICH
�7 1 rASSOCIATES
Figure 2
Union on Elizabeth TIS, November 2017
Page 4
Attachment 15
City Park Avenue is a north -south street designated as a collector street on the
Fort Collins Master Street Plan. Currently, City Park Avenue has a two-lane cross
section with parking on both sides of the street. At the West Elizabeth/City Park
intersection, City Park Avenue has northbound and southbound left -turn lanes and a
through/right-turn lane in each direction. According to LCUASS, a northbound right -turn
lane is required with the existing traffic volumes at the West Elizabeth/City Park
intersection. With regard to this right -turn lane, City Park Avenue is considered to be in
a constrained condition. The posted speed limit in this area of City Park Avenue is 25
mph.
Existing Traffic
Figure 3 shows the recent morning and afternoon peak hour traffic counts at the
West Elizabeth/Shields and West Elizabeth/City Park intersections. Recent count data
at the West Elizabeth/Shields and West Elizabeth/City Park intersections was obtained
in October 2016. Raw count data is provided in Appendix B. Newer counts were not
done since current construction of the pedestrian underpass under Shields Street
affects the traffic in this area.
Existing Operation
The West Elizabeth/Shields and West Elizabeth/City Park intersections were
evaluated using techniques provided in the 2010 Highway Capacity Manual
(2010HCM). Using the peak hour traffic shown in Figure 3, the peak hour operation is
shown in Table 1. The West Elizabeth/Shields and West Elizabeth/City Park
intersections meet the City of Fort Collins Motor Vehicle LOS Standard during the
morning and afternoon peak hours with existing signal control, geometry, and signal
timing except the West Elizabeth/Shields intersection in the afternoon peak hour. At the
West Elizabeth/Shields intersection, the calculated delay for the northbound left -turn
lane was commensurate with level of service F. The calculated delay associated with
level of service F operation is provided in Table 1. Calculation forms are provided in
Appendix C. A description of level of service for signalized and unsignalized
intersections from the 2010 Highway Capacity Manual and a table showing the Fort
Collins Motor Vehicle LOS Standards (Intersections) are also provided in Appendix C.
The Union on Elizabeth is in an area termed "mixed -use district." In areas termed
"mixed -use districts," acceptable operation at signalized intersections during the peak
hours is defined as level of service E or better for the overall intersection, and level of
service E or better for any leg or movement. At arterial/arterial and collector/collector
stop sign controlled intersections, acceptable operation is considered to be at level of
service E, overall and level of service F, for any approach leg. At arterial/collector,
arterial/local, collector/local, and local/local stop sign controlled intersections,
acceptable operation is considered to be at level of service D, overall and level of
service F, for any approach leg.
_l° LDELICH Union on Elizabeth TIS, November 2017
�7 1 rASSOCIATES Page 5
Attachment 15
O
r�
o_
Nt
N
O
ti
JN
i
l�
1
47/77
478/459 —
90/85
- 48/89
175/491
25/86
CM
N
LO
O
00
qqt
O
N
�
West Elizabeth Street
RECENT PEAK HOUR TRAFFIC
LO
N
r`
CD
O
cY
O
N
(0
f
1
298/298
51 /30—sow-
258/326
AM/PM
7/10
5/45
22/84
O
M
�
M
(D
O
O
r
co
00
Figure 3
DELICH Union on Elizabeth TIS, November 2017
Page 6
� 1 rASSOCIATES
Attachment 15
TABLE 1
Current Peak Hour Operation
Intersection
Movement
Level of Service
AM
PM
West Elizabeth/Shields
(signal)
EB LT
D
D
EB LT/T
E
D
EB RT
A
E
EB APPROACH
E
D
WB LT
D
D
WB T
D
D
WB RT
A
D
WB APPROACH
D
D
NB LT
B
F (179.7 secs)
NB T/RT
C
B
NB APPROACH
C
D
SB LT
B
C
SB T
C
B
SB RT
B
B
SB APPROACH
C
B
OVERALL
C
C
West Elizabeth/City Park
(signal)
EB LT
B
B
EB T/RT
B
B
EB APPROACH
B
B
WB LT
B
B
WB T/RT
B
B
WB APPROACH
B
B
NB LT
A
B
NB T/RT
A
B
NB APPROACH
A
B
SB LT
A
B
SB T/RT
A
B
SB APPROACH
A
B
OVERALL
B
B
�/ ' DELICH
rASSOCIATES
Union on Elizabeth TIS, November 2017
Page 7
Attachment 15
It is important to note that, since the West Elizabeth/Shields intersection has an
eastbound left -turn lane, a shared eastbound left-turn/through lane and right -turn lane
on West Elizabeth Street, the signalized analysis, using the Synchro 2010HCM
software, has anomalies using this shared lane combination with large traffic volumes
on the shared lane. The anomalies have been recognized by the City of Fort Collins
Traffic Engineering staff, also. The high volumes occur only in the afternoon peak hour
at the West Elizabeth/Street intersection. These anomalies have not been seen using
the HCS 2010 HCM software. Therefore, the West Elizabeth/Shields intersection
afternoon peak hour was analyzed using the HCS 2010 HCM software in the existing
analysis.
Pedestrian Facilities
There are sidewalks along West Elizabeth Street, Shields Street, and City Park
Avenue.
Bicycle Facilities
Bicycle
lanes exist on
West Elizabeth Street and
Shields Street. City Park
Avenue has no
bicycle lanes.
Bike
lanes are not required on
local streets.
Transit Facilities
This
area of Fort
Collins is served
by Transfort Route 2
on West Elizabeth Street,
Routes 3, 31
and
32 on
Plum Street, and
Routes 7 and 19 on
Shields Street.
—� �—DELICH Union on Elizabeth TIS, November 2017
% rASSOCIATES Page 8
Attachment 15
III, PROPOSED DEVELOPMENT
The Union on Elizabeth development is a student residential development with
402 beds (105 apartment dwelling units) and 3,875 square feet of retail. Figure 4 shows
a site plan of the Union on Elizabeth development. The site plan shows access to/from
West Elizabeth Street. There will be no motor vehicle access to Plum Street. There will
be pedestrian and bicycle access to Plum Street. The Union on Elizabeth development
will replace the St Paul's Episcopal Church and Campus West Shops. The short range
analysis (Year 2022) includes development of the Union on Elizabeth site and an
appropriate increase in background traffic, due to normal growth, and other approved
developments in the area. The long range analysis (Year 2035) includes background
traffic due to normal growth and in general accordance with the Fort Collins Structure
Plan.
Trip Generation
Trip generation is important in considering the impact of a development such as this
upon the existing and proposed street system. A compilation of trip generation information
contained in Trip Generation, 9th Edition, ITE is customarily used to estimate trips that
would be generated by the proposed/expected use at a site. However, the City of Fort
Collins has developed trip generation rates for apartment projects similar to Union on
Elizabeth. The Fort Collins trip generation rates are specifically applied to student housing
projects. Table 2 shows the daily and peak hour trip generation for the Union on Elizabeth
site. It is assumed that alternative modes (pedestrian, bicycle, and transit) have been
considered in the City of Fort Collins rates for apartments. The trip generation of the
Union on Elizabeth development resulted in 1238 daily trip ends, 81 morning peak hour
trip ends, and 180 afternoon peak hour trip ends.
TABLE 2
Trip Generation
Code
Use
Size
AWDTE
AM Peak Hour
PM Peak Hour
Rate
Trips
Rate
In
Rate
Out
Rate
In
Rate
Out
220
Apartment
402 Beds
2.65
1066
0.04
16
0.15
60
0.27
109
0.15
60
826
Specialty Retail Center
3.875 KSF
44.32
172
0.76
3
0.60
2
1.19
5
1.52
6
Total
1238
19
62
114
66
�IA _LDELICH Union on Elizabeth TIS, November 2017
�7 1 rASSOCIATES Page 9
Attachment 15
.. .� 7ma OI BIREM sTO RE
RBO('wTEO.Ii WYY.\N
EBIGE FICTION In BE
RB1quEO. ! 1' Iltll
I FIXTURE
lIGM
OVER
� VETNERIA Iry
UILI. ENTNUTEEN m-MITIENT>
Imo. �_I`I� . 71 I[► {
flat =111111
-==
CROP06W ROW
�
GiY NTDl Bul SNM1E
E.TISTINf,M
EMNY-Mn4
EXIEIEIC REl RHENNR EFRTINf.TREFSTO
ROLL OVER W!". EIRF
RE n'IE':ER�f'1
AC.CEMS OKY CAOSEO TO
.. .. ..
OTHER VEWAES
-577
M,HMLMK OW,: . TO RE
MuYveO RV OrNmr.
SITE PLAN
_//_LDELICH
"R7 1 rASSOCIATES
c
T II _ _ - II MUC,%M tII' oOIE i.F�il
LION iu NEENM
MD RLOOIt CAONLrIG
N Kim YNR) 9ETIVICK
5. iICEYNIJ %7BA1]I
V PROPFRTY LINE — • . — . .
_a - j—
Figure 4
Union on Elizabeth TIS, November 2017
Page 10
Attachment 15
Trip Distribution
Directional distribution of the generated trips was determined for the Union on
Elizabeth site. Figure 5 shows the vehicle trip distribution used for the Union on Elizabeth
site. The trip distribution was agreed to by City of Fort Collins staff in the scoping
discussions.
Background Traffic Projections
Figures 6 and 7 show the short range (2022) and long range (2035) background
peak hour traffic projections at the key intersections. Traffic at the key intersections was
increased at a rate of approximately one percent per year for the short range (2022) and
long range (2035) background traffic forecasts. In addition to this, site generated traffic
from the Kapoor, the Hub, and West Plum Street Apartment developments were
included in the traffic forecasts. Site generated traffic from St. Paul's Episcopal Church
and Campus West Shops were excluded from the traffic forecasts since they will be
razed for the Union on Elizabeth development.
Trip Assignment
Trip assignment is how the generated and distributed trips are expected to be
loaded on the street system. The assigned trips are the resultant of the trip distribution
process. Using the trip distribution shown in Figure 5, Figure 8 shows the assignment
of the site generated peak hour vehicle traffic. The site generated vehicle traffic was
combined with the background traffic to determine the total forecasted vehicle traffic at
the key intersections. Figures 9 and 10 shows the short range (2022) and long range
(2035) total peak hour vehicle traffic at the key intersections. The long range
background and total hour traffic forecasts (Figures 7 and 10) are generally higher than
those reflected in the "West Elizabeth Corridor Plan" at the West Elizabeth/Shields and
West Elizabeth/City Park intersections. The forecasts in this TIS consider
known/approved development projects.
Signal Warrants
As a matter of policy, traffic signals are not installed at any location unless warrants
are met according to the Manual on Uniform Traffic Control Devices (MUTCD). The West
Elizabeth/Shields and West Elizabeth/City Park intersections are currently signalized.
The stop sign controlled intersection at the West Elizabeth/Site Access intersection is not
expected to meet peak hour signal warrants and does not meet signal spacing
requirements.
—� �—DELICH Union on Elizabeth TIS, November 2017
rASSOCIATES Page 11
Attachment 15
5%
35%
Site
West Elizabeth Street
TRIP DISTRIBUTION
—�/ L—DELICH
�7 1 rASSOCIATES
20%
35%
Figure 5
Union on Elizabeth TIS, November 2017
Page 12
5%
Attachment 15
N
(0
N
JN
i
Mt
l
1
54/86
578/561—aw-
95/90
- 50/89
243/607
25/86
rn
00
UM)
00
o
c.0
�
co
Rt
West Elizabeth
Street
SHORT RANGE (2022) BACKGROUND
PEAK HOUR TRAFFIC
Mt
O
J�
f
a�
a�
L
co
w
U)
a
.,
co
Co
(
ti UM)
1
AM/PM
7/11
10/57
23/89
339/332
59/40 — r� o rn
316/378 M N M
CO
Figure 6
DELICH Union on Elizabeth TIS, November 2017
Page 13
� 1 rASSOCIATES
Attachment 15
O
O
M
00
JM
i
UM)
1
60/100
655/650 —
110/105
60/110
270/700
30/105
AM/PM
Rounded to Nearest
5 Vehicles
0
N
CM
O_
O
O
0')
1
10/15
10/65
25/100
West Elizabeth 40(
Street 390/395
O UM) LO 65/45 — UM) IO O
360/450 4 o
`) LO ti c`e
co o
�LO
0
LONG RANGE (2035) BACKGROUND
PEAK HOUR TRAFFIC
Figure 7
DELICH Union on Elizabeth TIS, November 2017
Page 14
� 1 rASSOCIATES
Attachment 15
LO
7/40
a�
Cn
a�
a�
C
Q
U
(n
Q(n
(B
�
n
N
U)
U
3/4
22/23
N
co
I
N
ch
8/45
SITE GENERATED
PEAK HOUR TRAFFIC
11 /69
West Elizabeth
Street
AM/PM
► 1/6
40(
12/13 I`
3/3 — o
22/23
Figure 8
DELICH Union on Elizabeth TIS, November 2017
Page 15
� 1 rASSOCIATES
Attachment 15
a�
Cn
a)
a�
C
Q
U
(n
Q(n
(B
�
n
N
U
V
00
N
i
Mt
1
Ur)
54/86
585/601 —
95/90
- 53/93
265/630
25/86
rn
00
UM)
00
O
C.0
�
co
Rt
co
N
JN
i
co
8/45
702/735 —
11 /69
308/800
West Elizabeth
Street
SHORT RANGE (2022) TOTAL
PEAK HOUR TRAFFIC
T
Co
co
qct
Co CO
f
LO
1
351 /345
62/43—low-
338/401
AM/PM
7/11
11 /63
23/89
r�
o
rn
M
C.0
co
N
0")
M
Figure 9
DELICH Union on Elizabeth TIS, November 2017
Page 16
� 1 rASSOCIATES
Attachment 15
O
O
M
00
JM
i
UM)
1
60/100
660/690 —
110/105
AM/PM
Rounded to Nearest
5 Vehicles
a�
Q
U
(n
(B
�
n
N
U)
U
65/115
295/725
30/105
O
M
JN
i
10/70
350/940
O
N
CM
O
O
O
O
0')
1
10/15
10/70
25/100
10/45 West Elizabeth 40(
405/410
I I Street I I
O UM) LO 800/870 — 70/50 — UM) O O
380/475 o
Li � ti \ Oqqt
cO
0
LONG RANGE (2035) TOTAL
PEAK HOUR TRAFFIC
DELICH
�7 1 rASSOCIATES
Figure 10
Union on Elizabeth TIS, November 2017
Page 17
Attachment 15
Operation Analysis
Operation analyses were performed at the West Elizabeth/Shields, West
Elizabeth/City Park, and West Elizabeth/Site Access intersections. The operation
analyses were conducted for the short range future, reflecting a year 2022 condition and
for the long range future, reflecting a year 2035 condition. The long range (2035)
operational analyses are used for planning and informational purposes only.
Using the short range (2022) background peak hour traffic volumes, the West
Elizabeth/Shields and West Elizabeth/City Park intersections operate as indicated in
Table 3. Calculation forms for these analyses are provided in Appendix D. The key
intersections will meet the City of Fort Collins Motor Vehicle LOS Standard in the
morning and afternoon peak hours, except the northbound left -turn movement at the
West Elizabeth/Shields intersection in the afternoon peak hour.
Using the long range (2035) background peak hour traffic volumes, the West
Elizabeth/Shields and West Elizabeth/City Park intersections operate as indicated in
Table 4. Calculation forms for these analyses are provided in Appendix E. In the long
range (2035) future, the West Elizabeth/Shields intersection does not meet the City of
Fort Collins Motor Vehicle LOS standard in the afternoon peak hour. It is important for
the City of Fort Collins to continue monitoring traffic conditions at this intersection in the
future to determine if and when any additional improvements are needed.
Using the short range (2022) total peak hour traffic volumes, the West
Elizabeth/Shields, West Elizabeth/City Park, and West Elizabeth/Site Access
intersections operate as indicated in Table 5. Calculation forms for these analyses are
provided in Appendix F. The key intersections will meet the City of Fort Collins Motor
Vehicle LOS Standard in the morning and afternoon peak hours, except the northbound
left -turn movement at the West Elizabeth/Shields intersection in the afternoon peak
hour.
Using the long range (2035) total peak hour traffic volumes, the West
Elizabeth/Shields, West Elizabeth/City Park, and West Elizabeth/Site Access
intersections operate as indicated in Table 6. Calculation forms for these analyses are
provided in Appendix G. In the long range (2035) future, the West Elizabeth/Shields
intersection does not meet the City of fort Collins Motor Vehicle LOS standard in the
afternoon peak hour. It is important for the City of Fort Collins to continue monitoring
traffic conditions at this intersection in the future to determine if and when any additional
improvements are needed.
Geometry
The short range (2022) and long range (2035) geometry is shown in Figure 11. As
mentioned earlier, according to LCUASS, a northbound right -turn lane at the West
Elizabeth/Shields intersection and eastbound and westbound right -turn lanes at the
—� �—DELICH Union on Elizabeth TIS, November 2017
% rASSOCIATES Page 18
Attachment 15
TABLE 3
Short Range (2022) Background Peak Hour Operation
Intersection
Movement
Level of Service
AM
PM
West Elizabeth/Shields
(signal)
EB LT
D
D
EB T
D
D
EB RT
D
E
EB APPROACH
D
D
WB LT
D
D
WB T
D
D
WB RT
A
A
WB APPROACH
D
D
NB LT
B
F (118.5 secs)
NB T/RT
C
C
NB APPROACH
C
D
SB LT
B
C
SB T
C
D
SB RT
B
C
SB APPROACH
C
D
OVERALL
C
D
West Elizabeth/City Park
(signal)
EB LT
B
B
EB T/RT
B
B
EB APPROACH
B
B
WB LT
B
B
WB T/RT
B
A
WB APPROACH
B
A
NB LT
A
B
NB T/RT
A
B
NB APPROACH
A
B
SB LT
A
B
SB T/RT
A
B
SB APPROACH
A
B
OVERALL
B
B
�/ ' DELICH
rASSOCIATES
Union on Elizabeth TIS, November 2017
Page 19
Attachment 15
TABLE 4
Long Range (2035) Background Peak Hour Operation
(For Information Only)
Intersection
Movement
Level of Service
AM
PM
West Elizabeth/Shields
(signal)
EB LT
D
D
EB T
D
D
EB RT
D
F
EB APPROACH
D
D
WB LT
D
D
WB T
D
D
WB RT
D
D
WB APPROACH
D
D
NB LT
B
F
NB T/RT
C
D
NB APPROACH
C
E
SB LT
B
C
SB T
C
F
SB RT
B
C
SB APPROACH
C
F
OVERALL
C
F
West Elizabeth/City Park
(signal)
EB LT
B
B
EB T/RT
B
B
EB APPROACH
B
B
WB LT
B
B
WB T/RT
B
A
WB APPROACH
B
A
NB LT
A
B
NB T/RT
A
B
NB APPROACH
A
B
SB LT
A
B
SB T/RT
A
B
SB APPROACH
A
B
OVERALL
B
B
�/ ' DELICH
rASSOCIATES
Union on Elizabeth TIS, November 2017
Page 20
Attachment 15
TABLE 5
Short Range (2022) Total Peak Hour Operation
Intersection
Movement
Level of Service
AM
PM
West Elizabeth/Shields
(signal)
EB LT
D
D
EB T
D
D
EB RT
D
E
EB APPROACH
D
D
WB LT
D
D
WB T
D
D
WB RT
A
A
WB APPROACH
D
D
NB LT
B
F (187.7 secs)
NB T/RT
C
C
NB APPROACH
C
E
SB LT
B
C
SB T
C
E
SB RT
B
C
SB APPROACH
C
E
OVERALL
C
E
West Elizabeth/City Park
(signal)
EB LT
B
B
EB T/RT
B
B
EB APPROACH
B
B
WB LT
B
B
WB T/RT
B
A
WB APPROACH
B
A
NB LT
A
B
NB T/RT
A
B
NB APPROACH
A
B
SB LT
A
B
SB T/RT
A
B
SB APPROACH
A
B
OVERALL
B
B
West Elizabeth/Site Access
(stop sign)
EB LT
A
B
SB LT/RT
B
E
OVERALL
A
A
—/ ' DELICH
rASSOCIATES
Union on Elizabeth TIS, November 2017
Page 21
Attachment 15
TABLE 6
Long Range (2035) Total Peak Hour Operation
(For Information Only)
Intersection
Movement
Level of Service
AM
PM
West Elizabeth/Shields
(signal)
EB LT
D
D
EB T
D
D
EB RT
D
F
EB APPROACH
D
E
WB LT
D
D
WB T
D
D
WB RT
D
D
WB APPROACH
D
D
NB LT
B
F
NB T/RT
C
D
NB APPROACH
C
F
SB LT
B
C
SB T
C
F
SB RT
B
C
SB APPROACH
C
F
OVERALL
C
F
West Elizabeth/City Park
(signal)
EB LT
B
B
EB T/RT
B
B
EB APPROACH
B
B
WB LT
B
B
WB T/RT
B
A
WB APPROACH
B
A
NB LT
A
B
NB T/RT
A
B
NB APPROACH
A
B
SB LT
A
B
SB T/RT
A
B
SB APPROACH
A
B
OVERALL
B
B
West Elizabeth/Site Access
(stop sign)
EB LT
A
B
SB LT/RT
C
F
OVERALL
A
A
�/ ' DELICH
rASSOCIATES
Union on Elizabeth TIS, November 2017
Page 22
Attachment 15
C
C
Q
U
Co
QU)
(B
�
n
N
Co
U
Required Based
on Existing Traffic
Required Based
on Existing Traffic
West Elizabeth
Street
Required Based
on Existing Traffic
- Denotes Lane
SHORT RANGE (2022) AND LONG
RANGE (2035) GEOMETRY
_//_LDELICH
�7 1 rASSOCIATES
Figure 11
Union on Elizabeth TIS, November 2017
Page 23
Attachment 15
West Elizabeth/City Park intersection are required with the existing traffic volumes.
Typically at constrained locations, when turn lanes are shown to be required based on
volumes, they are not built unless the operation at the subject intersection is determined
to be unacceptable. Also a westbound right -turn lane at West Elizabeth/Site Access
intersection is required.
Pedestrian Level of Service
Appendix H shows a map of the area that is within 1320 feet of the Union on
Elizabeth site. The Union on Elizabeth site is located within an area termed as a
"pedestrian district," which sets the level of service threshold at LOS A for all measured
categories, except for street crossing at LOS B. There are four destination areas within
1320 feet of the proposed Union on Elizabeth: 1) the Colorado State University
Campus; 2) the commercial/residential to the south of the site; 3) the
commercial/residential to the west of the site; and 4) the residential uses to the north the
site. The Pedestrian LOS Worksheet is provided in Appendix H. The pedestrian
destination areas meet the LOS requirements for all categories.
Bicycle Level of Service
Appendix H shows a map of the area that is within 1320 feet of the Union on
Elizabeth site. This area is considered to be a community/neighborhood commercial
center. Based upon Fort Collins bicycle LOS criteria, the level of service threshold for
bicycles is LOS B. There are two bicycle destinations within 1320 feet of the Union on
Elizabeth. These are: 1) Colorado State University to the east of the site; and 2) the
commercial center around the site. There are bicycle facilities along West Elizabeth
Street, Plum Street, and Shields Street. The Union on Elizabeth is directly connected to
the bike lanes on West Elizabeth Street and Shields Street, which satisfies the LOS A
criteria. The bicycle LOS Worksheet is provided in Appendix H.
Transit Level of Service
This area of Fort Collins will be served by Transfort Routes 7 and 19 on Shields
Street, Routes 2 on West Elizabeth Street, and Routes 3, 31, 32 on Plum Street.
According to Transfort, the West Elizabeth Street and Plum Street routes have very high
ridership. Route 3 has headways every 15 minutes when CSU is in session and every
30 minutes when CSU is out of session. Route 31 has headways every 10 minutes
when CSU is in session and does not operate when CSU is out of session. Route 32
has headways every 30 minutes when CSU is in session and does not operate when
CSU is out of sessions. Route 2 has headways every 30 minutes. These routes have
an effective headway of 4-5 minutes in this area.
—� �---DELICH Union on Elizabeth TIS, November 2017
% rASSOCIATES Page 24
Attachment 15
Mitigation
A northbound right -turn lane is required at the West Elizabeth/Shields
intersection. The Union on Elizabeth adds no traffic to the northbound right -turn
movement. Eastbound and westbound right -turn lanes are required at the West
Elizabeth/City Park intersection with existing traffic. The Union on Elizabeth adds no
traffic to the eastbound right -turn movement. In the short range (2022) future, the Union
on Elizabeth adds 6 percent to the morning peak hour and 4 percent to the afternoon
peak hour westbound right -turn movement. Although the project does not add
significant traffic to the westbound right -turn movement, the following mitigation factors
will be implemented:
• Residents (students) have Transfort passes that provide access to all Transfort
fixed -routes including MAX and FLEX. The Union on Elizabeth will inform
students regarding this benefit and promote it by making transit maps readily
available in the leasing office and hosting educational programs.
• Six hundred and twelve bicycle spaces will be provided within the development.
Eighty bicycle spaces are uncovered, seventy five bicycle spaces are covered,
and there are fifty five located within a bike storage room within the parking
garage. There will be four hundred and two wall mounted bicycle racks/hooks,
one per bedroom, located within the apartment units. In addition, there will be a
bike rack for the City wide bike share program. Secure bicycle parking and the
bike share program will encourage residents to utilize bicycles as a mode of
travel.
• An enhanced pedestrian/bicycle corridor running north/south will connect to the
Lokal property to the north. This will allow pedestrians and bicyclist from the north
to access the HAWK signal and the Shields Street underpass.
—� �—DELICH Union on Elizabeth TIS, November 2017
% rASSOCIATES Page 25
Attachment 15
IV, CONCLUSIONS/RECOMMENDATIONS
This study assessed the impacts of the Union on Elizabeth development on the
short range (2022) and long range (2035) street system in the vicinity of the proposed
development. As a result of this analysis, the following is concluded:
• The development of the Union on Elizabeth site is feasible from a traffic
engineering standpoint. At full development, the Union on Elizabeth site will
generate approximately 1238 daily trip ends, 81 morning peak hour trip ends,
and 180 afternoon peak hour trip ends.
• Current operation at the West Elizabeth/Shields, West Elizabeth/City Park, and
West Elizabeth/Site Access intersections is acceptable, except the West
Elizabeth/Shields intersection in the afternoon peak hour. At the West
Elizabeth/Shields intersection, the calculated delay for the northbound left -turn
lane was commensurate with level of service F.
• In the short range (2022) future, given development of the Union on Elizabeth
site and an increase in background traffic, the West Elizabeth/Shields, West
Elizabeth/City Park, and West Elizabeth/Site Access intersections will meet the
City of Fort Collins Motor Vehicle LOS Standard in the morning and afternoon
peak hours, except the northbound left -turn movement at the West
Elizabeth/Shields intersection in the afternoon peak hour.
• In the long range (2035) future, given development of the Union on Elizabeth site
and an increase in background traffic, the key intersections will meet the City of
Fort Collins Motor Vehicle LOS Standard in the morning and afternoon peak
hours, except at the West Elizabeth/Shields intersection in the afternoon peak
hour. The long range (2035) operational analyses are used for planning and
informational purposes only.
• The short range (2022) and long range (2035) geometry is shown in Figure 11. A
northbound right -turn lane at the West Elizabeth/Shields intersection and
eastbound and westbound right -turn lanes at the West Elizabeth/City Park
intersection are required with the existing traffic volumes. West Elizabeth/City
Park intersections meet the City of Fort Collins Motor Vehicle LOS Standard without
the required right -turn lanes. Union on Elizabeth added no traffic to the northbound
right -turn lane at the West Elizabeth/Shields intersection.
• Acceptable level of service is achieved for pedestrian, bicycles, and transit based
upon the measures in the multi -modal transportation guidelines.
—� �—DELICH Union on Elizabeth TIS, November 2017
% rASSOCIATES Page 26
Attachment 16
DELICH ASSOCIATES Traffic & Transportation Engineering , f
2272 Glen Haven Drive Loveland, Colorado 80538
Phone: (970) 669=2061 Fax: (970) 669-5034 �71
November 1, 2017
Martina Wilkinson, P.E.
Fort Collins Traffic Engineer
P.O. Box 580
Fort Collins, CO 80522-0580
Dear Martina:
This letter pertains to the short range operation at the West Elizabeth/Shields intersection as it relates to the
Union on Elizabeth development. The °Union on Elizabeth Transportation Impact Study, dated November 2017,
indicated that the northbound left -turn movement will operate at level of service (LOS) F during the afternoon peak hour,
under the background traffic condition and the total traffic condition. According to Section 4.5.3A.3b Intersection Delay in
the Larimer County Urban Area Street Standards (LCUASS), in the 'mixed -use districts° land use category at
signalized Intersections, the LOS thresholds are: Overall — LOS E; Any Leg — LOS E; and Any Movement - LOS E. In
order to mitigate the LOS F condition, two options exist: 1) build dual northbound left -turn lanes; or 2) remove the
eastbound and westbound split phasing at the intersection. Either of these mitigation measures is considered to be an
alternate design as mentioned In the variance process outlined in LCUASS. After discussions with Fort Collins Traffic
Operations staff, it was agreed that a variance should be submitted with regard to the LOS F condition.
The alternate design of building dual northbound left -turn lanes would Include: 1) widen the north and south legs
of Shields Streets to Introduce an additional northbound left-tum lane; and 2) widen the west leg of West Elizabeth Street
to accommodate two westbound lanes to serve the dual left-tum lanes. These improvements have practical difficulties.
Foremost is west leg of the intersection and the proximity of buildings in the area. In order to widen three of the four legs
of the intersection, acquisition of suitable right-of-way would be needed which would impact the Colorado State University
and Campus West commercial uses. Some businesses would likely need to be removed. The required additional right-
of-way and extensive construction is a disproportionate improvement for this development.
The alternate design of removing the eastbound and westbound split phasing at the West Elizabeth/Shields
intersection could be implemented in the future. It is the City desire to continue the split phasing to accommodate
pedestrians and bicycles crossing east/west even with the new pedestrian/bicycle underpass. However, with the new
pedestrian/bicycle underpass the City may find the need to accommodate pedestrian and bicycle significantly reduced.
This is a City decision and will continue to be observed by the City to determine if the need for split phasing is needed.
While the vehicle delay for the northbound left -turn movement is at LOS F, it does not cause the City of Fort
Collins additional maintenance costs. The delay is to the travelling public; however there are altemative routes available
should the motorists decide to use them. It is important to note that this LOS F condition only occurs during one peak
hour on an average weekday and only Impacts one turning movement. It is noted that the northbound left-tum lane was
extended to its maximum length (-350 feet), during the recent improvements to the West Elizabeth/Shieldsintersection.
In light of the above information, it is respectfully requested that the LOS F condition for one traffic movement
during one peak hour be accepted at the West Elizabeth/Shields intersection. The variance will not be detrimental to the
public health, welfare and safety; will not reduce the design life of the existing intersection; and will not cause the City of
Fort Collins additional maintenance costs. Thank you for your consideration of this request.
Sincerely,
oseph M. Delich, P.E.
File: 1751 VAR LT01
PDP/FDP UTILITY PLANS FOR
UNION ON ELIZABETH
BEING A REPLAT OF PORTIONS OF LOTS 3 AND 4 OF CAMPUS WEST SHOPPING CENTER LOCATED IN THE
NORTHEAST QUARTER OF SECTION 15, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH PRINCIPAL
MERIDIAN, CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO
NOVEMBER 2017
LOCATION
VICINITY MAP
NORTH r-Iboe'
PROJECT BENCHMARKS:
PROJECT DANM: NAfull
City of Fort Collins BenMmaA 20.9E
At due Southwest mmerof Wei ELabI and Cons on Ave. onacanuefeka signalbase.
EIEif 505015
City art Collins BenMmaA 139E
At due Southeast comer of Weed Elizabeth and Sidecas St, on a concrete ka signal Base
EIEif 5025.]4
Please Note: This plan set is using NAW%tor a vertical datum. Surrounding reappointments have mod
NGW29 Unadjia Be Mdr wdN ldatum
H NGW29 Unadjusted Datum is required for any puryose, Be following equation should be used
NGW 29 Unadjusted = NAVU%- 318'
Basis of Bearings
The Basis of Bearings is me South line of Lot 3 as beanng Nordin 89.091 West.
ORIGINAL FIELD SURVEY BY:
Nonbem Engineering
Project No. 1252006
Date April 2017
PITS Group
Project No. 16066002
Date: May 2817
SUBSURFACE EXPLORATION BY:
Tenacm Consuitanrs, Inc.
GeoreMnical Engineering Report
EItraMM SrreN Pmled
1208 and 1220 West EI¢ahN Srreed
FM Collins Colorado
Tenamn Project No. 201650%
Dare: November 18, 2016
Revised April 18, 2817
DISCLAIMER STATEMENT:
Trade whand, had. been exm cry the City of roe Coll Cr coupe mrym does rat
byte evessing department the (Cy of For mums Engineer orue Gry m For col' i oaommoy and mwrm ass
imply that
axii ed The my ess shall ads be pronstred or any argon as evolocce of Trend a yearand c by he Cry of join
Coll my bar way anal abandon of burns, when nat may be up. red dun no ne cons mown have,
CERTIFICATION STATEMENT
worst mation plans wee prepared
use my drawar subsewpary in
ery
Of Fed 'a Ins and Sta a of
Colored . . . boards and stopped
reforms y and tat I am Lily
responsible to the woman Of or
announce that I have nothad on
the. piano
CONTACT INFORMATION
PROJECT TEAM:
ElizabaN Street CC Omer, LLC
999 South She* Grave Road, Suite 688
Memphis IN 38120
(901)254zs8o
ARCHITECT
Humphreys 8 Par mPfNitetls, LP.
Max Reiner
71717M SheetSuite 65B W202
(9]2)]81-9536
LANDSCAPE ARCHITECT
Fill
Inc
Stephanie Hansen, Ftq Ai
419 CanyonA
Fort Canyon Avenue Suite 288
Fort) 88513
224s,Colorado
(9I0)P15828
SITE ENGINEER
Northern Engin er N SeMce, Inc.
NORTHERN
Antly Reese
Fort North H aeet Suileloo
ENGINEERING
Fort Collins, raJo Oosn
P14CdoCdo
(9]8)1-0158
SURVEYOR
Northam Engineering SeMce,, Inc.
NORTHERN
PIT
NoMfhrvmsStreet
30 Suite too
ENGINEERING
Fort Collin, Cdoraea 80521
(970)2214158
lferracon
GEOTECHNICAL ENGINEER
m,
ErcAbnon alRE
CafwM1ing Engbwcn, on s n om°
Point mas ed Suite C
1901 Sharp,
Fort cO So52
(970) 484 0359
SHEETINDEX
C001
COVER SHEET
UTILITY CONTACT LIST:'
C002
GENERAL 8 CONSTRUCTION NOTES
UTILITI' COMPANY
PHONE NUMBER
GAS —Xi lsegy
Pal meager (970)225-E840
C100
EXISTING CONDITIONS 8 DEMOLITION PLAN
ELECTRIC City of Fart Collins Light d Paaer—Luke
Unruh (970)416-2IIE
ChAt Commd
Ron pperman (970)567L425
C200
HORIZONTAL CONTROL B PAVING PLAN
TELECOM. CenWryLink
WIIam Johnson (970)3]]b,101
WATEHI City of Fort Collis UglMe
Sharhe Boyle (970)22H6339
C300-C301
UTILITY PLAN
WASTEWATER —City of Fort Collins UtilNg
Sharre Boyle (970)22H6339
STORMWATER- City of Fort Collins WIMm—Sharhe
Boyle (970)2216339
C400
GRADING PLAN
'This list is provided sonH.nonnem Eng.ee„re ee� a. Ino mWnsihiay �,
Me enorMmdvtv.pN�tha it=pIInngany Neair use list woodendue (supposed meponswityfe,
C401-C402
DETAILED GRADING PLAN
all «L�p;batiomPmyaameae.=�y
neemmeeUnryNdhen a.H.a
ColoradouIm.rnbr
C403
RAIN GARDEN GRADING PLAN
C404
SUBGRADE PLAN
C500-0501
UTILITY DETAILS
C502
STORMWATER DETAILS
C503
SITE DETAILS
C600
EROSION CONTROL PLAN
C601
EROSION CONTROL DETAILS
C700
DRAINAGE EXHIBIT
C800
FLOODPLAIN EXHIBIT
L IXN:@1011WIN1,Lai M 1-110Cd7/= 10111 CMl0 7EST _111111111: 10 CC] IOIIII I I: I:
MSP lgneeirg Group, PLLC
1618ENensingnn roup,P
y 078,
Sugar Land, TX E74E9
6pFhwiYLY6vR vx� (832)131-0560
STRUCTURAL ENGINEER
MSP Engineering Grad,, PLIL
1618E nd, TX n By Val La
Sugar Land, TX E]dN
�yJpEgy,yLy rygme saw (832)131-0568
varUTILITY
Loanoo CE
NTER
INcwMaYsbBIOW.
Call before you BigInG
PLAN APPROVAL
Cifill BY:
wham, k Faaleaam, YlWly
Ueb
CHECKED BY.
shd.m.aae many
b.a
CHECKED BY:
Cull BY
Cehe
CHECKED BY:
oi.
air
ea
.=
s=
ad a
8
>«
Law
9:Now
mwas
manPa
N.
NO
W
1
f
J
W
z
O
z
O
W
W
C0
I
\W
O
U
Sheet
C001
1 Of 19
A GENERALNOTES
1. All materiels, workmanship, and constructed of Public improvements shall meet or ex MMe dandsNs and specifications set loM In MeleAmer
County Urban Mae Street Standamis and applicable state and federal regulations. Whom Mare is cra id between Msse plans and Me
specifications , carry applicable standards, Me most selective standard shall apply All milk shall be inspected and approval by the Car ad Fort
Collins.
2. All references to any published standards shall rater to Me latest revision of said standard unless specifically stated otherwise
3. These public improvement condmdion plans shall be valid for a period of three years man Medde of approval by Me City of Fort Collins Engineer.
Use of From plans after Me expiration date All require a new review and approval improves by Me City of Fart Collins prior to commencement of
any milk shown inthem plans.
0. The Nodded "a hI jumpe!Mere plans, W amended anNor seal hard, does berrLy aflrm r WnmNio to Me City of Fort Collins, as
demands which may arise tam arty due and omissions examined in Mom plans.
5. Allstmmsemrcrostructbn,dmilasparverandoNer"My' utility installations, shall mnlarmto Me City dFort Collins standads and
specifications mmM attire date digits l afMe plans by the Cry dFea Collins Engineer.
6. Tberypesee, location and number of all known underground utilities are approximate when sbwm on Me tlrawingsIt shall be Me ms ibiliryd
the Develeperto verity the existence and location of all underground All along Me rude dthe work bdore commencing new conduction. The
Developer shall be responsible for unknown underground utilities.
T. The oevelopu shall contact Me Utility NNlfiallon Center of Colorado (UNCC) at 180011987, atl12 weMing days prier to beginning
axaAmn or grading, to have all registered utility locations added OMmunregAemd dli y enNies (lee. tlON / Imgdion comparry) areM m
loraledbycontactingtorespedivereprveenlafive. Utility service Iatemis are almto be located morto beginning appea n or gradingllshallbe
the responsibility of to Developer to refusal all existing util0ive Mal canOid whin Me Roadbed improvements sbmm on Mesa plans.
8. The oevelopu shall be responsible Mr pmWding all uMOies tlunng candmrdon and Mr marginal with Me appropriate utility company Mr any
AIRY crossings requiretl.
9. If a can0id exi56 between existing and proposed uMNes seem a design nx Mmfi n is required the Derelogr shall mortllnale wM the engineer
tom0fily Medesign. Design modlfimllone)mural M approved by Me City of FM Collins priorto beginning mns ion
10. TM1eDeveloper shall mortllnale and cooperate with Me CRY of Fort Collins, and all utility companies involved to assure Mat Me milk is
amJlided in a timely fashion and with a minimum tlivhyti0n of service. The Developer shall be resporeide far commit in advance, all
paces aRected by any tlbupllon of any utillry service remit as Me utllgy companies
11. No work may commence Milian any public storm water, sanitary sewer 0r p0ta waWrsyslem uaM Me Developer notifies Me uMtty pmvttle.
NotiOmtlon shall be a minimum of 2 working tlays ptat0 mmmencemedda mM At Metliav mdtbewduudkpmv r,a
pre-condrudion meeting maybe required probe cammencementof am At
12. The Developer shall sequence installation of uMNes in such a manner asto Minimize potential AIRY mn0icts. InWneml,sMmseweandsaniWry
sever should be constructed prior to imlallAon dte wand lines and dry uMNes.
13. The minimum mveroverooter lines is 05 Net andtbe maximum buyer's 551cet unless otherwise noted in Me plants and approved by the Water
Utiltry
10. AS WCond donDmalatng Wadewaterobchage Pm ftbmquirMffatewatenngisrequiredinadertoindalludwti orff Bois
dms anted into a dorm sower, cannel, irrigation ditch 0r any waters dtbe United Strive.
15. The Developer shall comply with all Bums and conditions of Me WuoPermO for Storm Wrier Discharge (Conduct Cdaado Department of
Health Quality Control o'rubion, (303) 692 3590), the Slam Water Management Plan, and Me Emotion Control Plan.
16. The City of Fed Collins shall net M responsible for the maintenance dstomm commercia<ilities located on ptvder probably . Maintenance of omfte
drinage auditors shall be Me handful d the property contro j
ii. Probe final inspection and maepance "a of Fort Collins, mvfihation rite drainage facilities byaregistermengineer,mudbe
satisfied to and approved by Me S10mmater Utility Depart mL Cedficati0n shall be submitted to the Slamraater Utility DUmdmenl at leadtan
weeks prior to the release d a ceNOaR or occupancy Mr single family Made Facananercialpropete,m cAonshallbesubmNM10Me
Slomnvater Utility Ccptra l at lead two weeks prior to the release of any Wilding damage in excess dtose allowed prior to mrafificati0n per to
18. The City 0f Tom Collins shall not M responsible for any damages crinjuries o. iaiatl in tle Development as a resuft of groundwater seepage,
whether resulting from groundwater flooding, structural damage or full damage unless such damage or injuries are sustained as a result rite
Cary of Fort Collins hilure to property maintain xis water, vmsfewalep seem storm drainage facilities in the de elopm M
19. All recommendations dthe Final Drainage Report Mr Union on Elizabeth, dome November28, 2017 by NMbem Enynevnng shall be fdlowel and
implementetl.
20. Temporary sodium control during concoction shall ber loco tl as shown on to Erosion Control Plan. All erosion control measures shall be
maintained in good repair by the Developer, and such time as Me care disWNetl areas is stabilized with hard summer 0r Luxemburg
21_ The Developer shall be responsible MmaMr iMe n0 mud 0r debris shall be tracked Onto Me existing public streetsystem Mudanddbrbmsf
be removed within 2E hours by an appropriate mecmdcal method (I a machine broom sweep, light duty demand lower, eir ) 0r as approved by
the the City of Fort Collins street importer.
22. No work may commence within any improved or unimproved public Purl Way until a lgM-d-Way Pe car Development Construction Permit
is obtained, Wappliesbrie.
23 The Developer shall be responsible for obtaining all necessary ponds Mr all applicable agencies priorto management of constructed The
20. The Developer shall be responsible Mr obtaining soils tests man the Public Real Way after rdt dway grading and all
me e ary at fart cmuns adaum pavement miuness sedmn(s). Federal of me option uses, all final smispavemem design record snail be
prepared by a licensed Professional Engineer. The final report shall be submilletl to to Inspector a minimum d 10 Adding days prior to placement
dbam antl asphalt Placement of cut, gutter, sidewalk, base and asphalt shall not occur until Me Cary of Fort Colima Engineer approves to final
report.
25. The contractor shall hire a licensed engineer or land surveyor W survey to conducted dlomain; of to street subgrade and ryner fiOMae at
all tderseNons. Inlets, and offer locations, requested by the Me Cary of Fart Collins Inspector. The engineer or surveyor must ceMy in a IMuto
the City of Fort Collins that these eievallom contmm t0 Me approved plans and specifications Any deviations shall be noted in tle IdBu and M1en
resolved with Me Cary of Fort Collins afore installation dbau course or effidwtll be allowetl on the streets.
26. All utility Installations whin or acrrdste roadbed of new resitlmtial roads mud be completed prior to Me final cages of mad crostr nFar Me
purposes of Mese dandads, arty work except dg damages subgratle is considered final stage w0M NI semce lines cost bedubbetl tothe
property lines and marked so as M reduceMe excavation necessary for building fonnecfi0ns.
27. POaiomdLanmer CountyanewMinaverlaycstrtctr.Re"rimer County Flood Plain Resoludon should a detenWta Mr atltlftional mWna for
roads within these dbmds
28. All road Norma on in areas designated! as Wild Fire Hazard Areas shall be done in dimensional the construction mlena as established In the
Wild Fire Hazard Area MNgdim Regulations in force anteaters of final plat approval.
29. Promo to mmmenu mentof arty mnstre on, Me contractor shall cmMciMe teal Entity ForesierM schedule a site inspection Mr arty tree
removal requiring a permit.
30. The Developer shall be responsible Mr all aspects ofsalm in dutlirg,butndlimtletlto,a vAon, te6ing,sWnng,b cc td,andsecody.
Rekr to OSHA Publication 2226 Expanding and Trial.
31. The Developer shall submit a Construction Traffic Control Plan, inaceatlancemh MUTCD, WMeappropdate MgMaf-Wayau oft (Ibe CRyof
Foa Collins.Lamer Coudµ Coloratle), forappmval,pdortoartym dbnaMrtie in oaffectmg,MemgM-d-Ww The Uevelopersball
be responsible for providing arty and all traffic ormad devices as may be required by to coastal activides,
32. Poor to the commencement of arty construdmn not All skeet trait signs 0t any It Me contractor shall coMad Me Cary of Fort Collins Traffic
Operations Department who will Temporally remove or rd0cale time sign at no cash to Me contractor however, if Me contractor moves the trait
sign then the contractor will be charged Mr Me labor, materials and equipment to reinstall the sign as neetletl.
33. The Developer is responsible for all cods forthe infttal inBIlAon of tic signing and striping Mr to Development relaM to Me Developments
local street operation. In addition, Me De oWis responsideM all cods iobaific signing and striping relatieto krechngtraMc acevesio and
Mom the Oe oMeM
30 There shall be no as coastal atlirNes on Saturdsyer ud¢s spec lly approved by Me City of Fort Collins Engineer, and no see
construction adivNss an Suntlays or holidays, unless More is prior w m appaval by City N Tom Collins.
35 The Developer is sexual far providing all IaWred mderiab necessary for Me completion of the intended improvements, shwmon Mese
dr ngs,orJ gnaWdMbepmvded Indalleq ocaudmded unlessspedtirallynotetlotherwise.
36 Dimensions Mr Layout and mraimdion are not M bescaled from any drawing. If p dneM dimensions are nut shown, moderate Disitant
daiAicafion, antl succeeds Me dimension on the asbuift record tlrawings.
37 the Developer shall have, adds art all fimes,one (1) are copy of the approved plans, am(1) copy 0f the aRegulate standards and
sped tam, and a copy of any permits and extension agreements needed for the job.
38 If, during the abnormal improves, confirmed are encountered which coula initiate a situation that is net idea eat in Me plans or specuficatioas,
Me Developer shall mdact Me Designer and the City or Fort Collins Engineer Immediately.
39 the Developer shall be re sibk Mr recording as built information on a set of ecord drmnngs kept on Me mns on site, and available to Me
farmer County 'a Inspector d all Week Upon completion dMe work, Me mntradored shall submit remd Jmnngs to Me City of Fort Collins
Engineer.
00. the Designer shall provide in this location on the plan the location and desoipticer dihe nearest survey benchmarks (2) for Me project as well as
Me bus's of hearings. The information shall be as allows:
PROJECT DATUM: NAVD88
City of Fort Collins Benchmark 20-9]
AtMe Southwest corner of Wed Ef¢abdb and Cacti mAve. enaconodetraificsignalbase
ELEV-505015
City of Fort Collins Benchmark 19-91
Attire Southeast mmerof West Elizabeth and Sheds St, on a mnodetraMcsignal base.
ELEV. 5025 yE
Please Note: This plan set is using NA 8 Mr a vertical datum. Surrounding developments have mad NGVo29 Unadjusted Mr
Mur vetial datums
If NGW29 Unadjusted Datum is required for arty purpose, the following egation should be used
NGV@91nabdetl=NAVo8 Sky
Bash dmannas
The Bats d Bearings is Me SwM Iihe of Lot 3 as bearing Nart model West
41. All stationing is hazed on anretltne of maAvays unless dberwise notetl.
42. DamagetlmN, gutM and sidewalk existing prior W cbnorma ryas well as existing Word, bees strBets, sitlexaks curbs and gutters,
landscaping structures , and impmvemm6 destroyed damaged or removed due M constrnctkn of this pmjed Mal be replaced or restored in like
kind at the oevd0psr's expense, unless drawing indicated on these plans prior to the acceptance ad remembered! improvements anor prior to the
ssuance of Me first Cedfiate of Occupancy
43. When an exiling asphalt street must be M, Me Bred mud be Nodded t0 a condNon equal to or bider Bonn he original contlion. The misting
Bred condNOn shall be dommedetl by the Cry or Fort Collins Construction Inspector before any m6 are made. Pabling anal be done In
accordance with the Cary of Fort Collins Sked Repair Standards. The finished path shall blend F sm00Mly iM Me exisfing surface. At large
patches shall be paved with an asphalt lay-0 nmachine. In streets more more Man one traffic made, an O yrite entire stree t.
including the patched area, may be required The determination of need Mr a complete ovetlay shall be made by Me "rimer County Engineer
anNor the Cary of Fort Collins Inspector at Me time Me cuts are matle.
E0. Upah mmoObn of consMdon, Me site shall be cleaned and and Ito a condition egeal to, or bidder tan, Mat which existed bdore
construction , car to Me games and condNOn as requiretl by these plans.
45. S Mad Handicap ramp, are to be condmdetl at all curb returns and at all T idemdias.
E6. After acceptance by Me Cary of Tom Collins, pudic improvements depitlel in Make plans shall M guaranteed to M free tom mawdalaM
waMmrship dda Mr a minimum period ofMn And from the dark d acceptance.
07. the City d Fort Collins shall net be responsible err to maintenance d readxay and apputenanf improvements, including dam drainage
dmctures and pipes. No Me MlM ng pmde streets NA
E8. Appmvetl VadancvearelisWdazfdl0 NA
CONSTRUCTION NOTES
A Grading and Er on Card Notes
1. the xesion control inspector mud be nodded at label Mrenfyfiur(26) boom pier W arty construdmn 0n the site.
2. There shall the no eaMdisWNing activity outside the limds desgnded on Me marked plans.
3 All requiretl perimeter sift and construction fencing shall M inB IMF to any land disWNing activity (stockpiling impping,grafing, etc) At
other requiretl erosion control measures shall be installed attire appropriate fime in Me condmdion sequence as indicated in the approved added
schedule, construction plans, and emotion combat report.
0. At all times during conduction, to Developer shall be responsible for preventing and controlling on- site erosion including keeping Me pmp
radica y waded so as to unhandsome! Wave sediment The Developer shall also be responsible Mr installing and maintaining all emsM
coo l Wtlltfies shmvn Berea.
5. PredisWNance vegedon shall be pMedetl and remained wherever possible. Removal or disturbance of existing vegetation shall be limited to to
dreads) required for immWled construction operations, and farce shortest practical pmlM of time.
6. All sails egwsetl during land disturbing activity (sbtpping, grading, utility Installation, stockpiling, filling, de) shall be kept in a roughened coMNOn
by ripping or bisking along land contours and mulch, vegdWj or other performed erceion control Bli are installed No cots in areas outside
prated street rights of my shall remain expOSM by land dis uNing activity for more than Might (30) data Wore required temporary or permanent
erosion control (er g. seMrmulch, landscaping, Ad )'s ind IIW, unless otherwise approved by Me Ciry/County.
y. In order to minimize erosion potential, all temporary (strudural) erosion control meawrm shall:
a. Be inspected d a minimum d0nce everytw0(2) weeks and aflereach sgnMfia ohm event and repairM or re oa me dos nec¢ary in
order to ensure the mina paffirmame of Metr Mended function.
b. Remain in place uMl ouch time as all to surrounding tltsWNW areas are suMdedNdabilzed as deBumaM by Me grade coMOl inspector.
c Beremoved after fire site has been sufficiently stabilized as delermtned by the nodded virtual inspector.
8. When temporary erosion control measures are removed the Developer shall be responsible Mrte dean up and mm lmall additional
debits tam all drainage infrastructure and other public facilities.
9. The contactor shall immediately dean up any constructed damage ina&edenfly deposftW on existing dreds, sitlewalks, orotherpudicdgWof
my, and make sure dreds and walkways are deaned site end preach working day.
10 AuretamMSMWents, partmlaM tics¢ on paved madway surfaces, shall the removed and disposed der a manner and roadbed s0 as motto
cause their release into any Adds 0f Me UnftM States.
11. No mil stockpile shall exceM ten (10)leet in height. All bail designed shall be pmleded ton sedim M"ns by achieve roughening, Aroung,
and Forimed sift fencing. My mil Burkpile remaining after thirty (30) days shall the seeded and mulched!.
12. The stommvder volume apathy m tldeMcn good; All ben omd and dorm sewer lines wills cleaned upon completion mtla project and
before Mbing Me maintenance over to the Ciry/County or HOn ers Association IN CA)
13. CM Odaance and Cclore do Discharge Permit SytemSDPS) requiremeds make R unlawful t0 discharge a allow to discharge m any polmad
c0damtnared wrier ham mmMcUo sites P011mads indMe, bid are not limited to d ndetl budding mderials, concrete fuck washed
chemicals, ail and gas products, lifter, and sanitary waste The developer shall at all limes take whatever measures are necessary t0 assure Me
Roper containment and disposal orpollutants on the site In accordance win any and all applicable Ideal, state, and betleral regulators.
14 A tleslgnated area shall be provided on site for concrete truck chm washout The area shall be con Wdd so asto contain ma Wrmtodal and
local aleast fifty(50) feel away brim any waterway during construction. Upon completion of constre on activities Me concrete washout
mAdal All be removed and properly disposed of pdorto to area being restore.
15. Condon in Me field may warrant erosion control measures in atltlftion to what's shown on Mese Plans. The Developer shall implement whatever
contro care tlderminW necessary, as directed by the Cary.
16. For additional information see separate Barbuda Management Plan Erasion Central Raped for Union an Elzabdh.
B. Sheet Improvement Name
1. At street conduction is subjedto MeRoadbed Nolss cntbe cover s NMese plans as well as Me S O Mpavemertls NNss listed M1ere.
2. A paving section design, signed and damper!by a Colorada li¢nsetl Engineer, must be submMed to Me CRY of FM Collins Engineer for approval,
prior to any street construction acidic Hall depM aspFaft sections are net permiBetl at a JepM greater than 8 inches of asphalt). The job milk shall
be suds derr approval prior to placement of any aspbaft.
3. Where pmpaed paving adjoins existing aspbaft, Me misting asphalt shall be saw cut a minimum distance of 12 inches tom Me existing edge, to
cede a dean dbn joint The Developer Mal be required to remove existing pavement to a octane where a dean con don joint an
be rmle. Meet m6 shall not ber allowed unless approved "a City d Fort Collins Engineer in Fort (All
0. Street subgrades shall be started the top 12 inches and rewmmpaded morto subbase indlatin. NobammdeW allbesidualMe
subgrade has been inspected and approved by Me City dhow Collins Engineer.
5 Ft Collinsonly. Valve boxes and manholes seats be daugM up to grade at the time dpavemed placement an ovetlay. VaWbmadjusfingdg
are not allowed
6. Men anexidingaspba0dredmudbecut Mestredmiai Mreslre Wam MonequalWarb rMan Nonginal condition . Tbendsting
street condition shall be documented by Me Importer before any Ms are made. Cutting and patching shall be done in conformance with Chapter
25,Reconstruction and Repair. The WANT patch shall blend smedMy into the existing surface. The de inalion of need far a complete overlay
shall M made by the City of Fart Collins Engineer. NI ovetlay work shall M cookinade l with adjacent landowners such Mat future projects tle not
cut the new asphalt overlay work
2 At traffic control devices shall be In conformancewgb Mese plans or as otherwise specified in M IT T C o_(including Colorado supplemed)and as
per Me Right of Way Work Permftta cconlml plan_
8 The Developer is required to perform a gdfowaRn flax test In the presence of the City of Tom Collins Inspector and prior to mountain of asphalt
Gutters Mat hold more Man lb inch deep or 5 feet longitudinally , ofwater, shall be mmpldely removed and reconstructed to drain properly.
9. R'w W pLmc M ad H ISP. or concrete within the street and air mdsareltlensiy tests have been taken an Me subgrade material (when a full
de section's proposed arch the subgrade and base material(when a composite section 's Removed, amechanical"proofroll" willberequiretl
The entire subgrade anNO base material shall be rolled AM a heavily loathed vehicle having a Wtal GAS 0t not less Man 50 0001bb. and a single
axle weight rid least 18,000 Me win pneumatic fires inflated to net less that 90 psiq. "Proof roll" vehicles shall not travel at speeds greater Man
C Traffic Signing and Pavement MaMng COnstruchcn Notes
1. At signage and marking is subject W Me General Name on Me over shed dibese plans ,aswell as Me Traffic Signing and MaMing Co dbn
Notes listed M1ere.
2. At symbols, inclu frog mom, ONLYS, crprova lks YW bars, do shall be panBannedMemo-plashc.
3. At signage shall be per Me Cary of Fort (All Slandads and Mese pars or as oMerwbe specified in MUFCo.
0. At Wre lines for aspbaft Jevem shall restive two cods of ldex paint with glass beads.
5. At lane lines for concrete pavement should be gnxy paint.
6. Prior t0 permanent indallAon or traffic striping and rymbOb, the Developer shall place temporary taM orWpe depicting alignment and placement
officialism Their placement shall be approved by Me Cary of Fort Collins Traffic Engineer priorto Permanent installation of striping and symbols
]. PrefomwgHhemoMasfic applications shall be as speefea in From Plans anNor Mese Standards.
8 Epoxy appliaWm shall be applied as specified in SUCH Standard Specifications Mr Read and Bridge Commodore.
9. At surfaces shall be thoroughly deaned prM W indallafun of striping or markings.
10. At sign posts shall utif¢e break- away compares and fffiders par the SlanMade
11. Afidtl inspection or location and installation of all signs shall be performed by the Cry of Tom Cantos Traffic Engineer. All tltscrefancive Nen W
Mang Me field Inspection must be conected Mire to 2-year wanady period will begin.
12 The Developer Installing signs shall be responsible for looking and protecting all underground unties
13 Special are shall be taken in sign batten to ensure an unobstructed view 0f each sgu
16 Change and striping has h Mekadined by lmomeion available at the time of review. Prior to inNakion of Me warranty pekdJbe C'M of Fort
Collins Traffic Engineer reserves the right to require additional signage anchor strong Mom City of Fort Collins Traffic EngnandeBu ine not an
unforeseen contlNm mnants such dgnage according to the MUTCD or to SUCH M and S Standards. All signage and sbtping shall All under Me
scandal dihe 2- year yourself period for new construction (eaxpl fair Am on tratfic markings).
15. Sleeves for sign pods shall be required Mr use in islandshismans. Rekrto CbapWrid,TmMc Conaoloevice,,MratltlNOnaidd I
D. Storm Drainage Name
1. The City of Fort Collins shall rat be responsible Mr Me maintenance ddnrm homing¢ htllNes for W on mvaR legal Maidenancedmsfte
drainage facilities shall ate responsibility of Me Pepsi omega).
2. At recommentldions of Me Final Drainage Rapid for Union on Elizabeth, ddWNovemar28,ID17 by NmM Enginemngs Wl be Mllo and
implementetl.
3. Prior to final Inspection and acceptance by the Cry of Fort Collins, caufiation rite drainage Well by a registered engineer, must by
submitted! t0 and approved! by the SYormwater Utility Department. Ce tfiation shall all submitted to the SYommater Utility oeparanent d least two
weeks prior tote release of a ceNfiate of occupancy for single Emily units . For commercial pmpdWs, unification shall by submNW to Me
Slonnwater Utility Department at least love weeks prior tote release of any building permib in excess of Mass allowed prim ceNfiation per Me
Development Agreement
E Utility Notes
1. Alwderilne and surgery s cone don shall carbonate Me CRY dhow Colin utillry Bandar% and speefiafions mneaio time of
careful
2. The mamum equal overwdulinesb4_Sled and Me maximum coverb 55feet unless dberwise noted in Me plans and apymretl by Mewaler
di ry_
3. Water mains shall the poly supped Dl P, or PVC wM team Are.
0. HOME pipe may aused for 1-12 and 2'1 nor water smiced The Pipe shall meet Me standards of AMA 901, USE Standard 61 and ASIM. TM
HOME pipe shall m Sli having a pressure rating of psi. Slifleners shall be used at all fillings and connections. Tmcdvvm shall a
inB lkd wM Me HWEservice, and shall extend up Me mN stop. Ta mN slop shall a covered wfth a meWl vaN bm and "waW lid per City
Wam DeMII ilA
best dome, R is Impassible t0 fully display suaurli information priori eeamti0n Th's is especially true in areas of
unknown suaurli conditions an have cost and schedule Impli rWm. PnortofiaWm contact terns, R is strongly
demands are required to seat Ad commence and tartars tmparnng sequence otmis t
a made aware of the protocol Mr dealing with such unknown suaurface creditors promo
CALL tFul Fri ENTER OF
COLORADO
10
K m"atsb low.
Call bMmyou logOUL2EAGNINS DAYS IN
PLAN APPROVAL
CHECKED BY:
teen k tomorrow, uWty
Deb
CHEQUE➢ BY
9taomhnter uwuy
0.b
CNECKEO By.
Da
CHECKED BY:
Deb
CHECd(m BY.
oat.
e�
a=
ST
off
8i
vc
u8
1
ff
i
J
w
Z
0
Z
0
II
Sheet
C002
2 of 19
F
CONESOMINIUMS
IN IM24
T
QUENTIMI
FLAGS LINE
DRAIMMUEEMAREMEND
.oeEV.w,Eo
I
BARBUDA UTILINES
TO BE
DEomI P AS NEE
I
I SERVICE TO BE
ABANDONED AT MAIN A
PROPOSED
SABACCUT
TO REMAIN J NRYP,
II
WEST ELIZABETH STREET
(80ROW)
SECTION ME
11:1g79:A1AxN1 W I1\Is] 1:N
!II;III ANN FIGANCEPER RAW
III \DO WS.
o
--s71is:,ij li Ire
rrv—FREE
— I
ASPHALT
��� rsrdww�a®wswvwvae�Ti.�a�q ®/FIFO
P
TO 811 REMOVER)
4 ; i
;mod. o:�ao
�i®mot
rip,i'REMAINED
BLAMED
te
MA MA MA
im
�'/►w�a�y ODOMff:®AM
►�1!OBSERVED BWX_
TO BE REBUFFED UPT I`<.'
;Y 90.1
„ r/.1 `►
EXISTINGCONCRETE
TO BE RESCARED
TOLE BERGSTROM)
JUD.-MPISTING MGM
•
► c
® ��d ,•/
r� P o
✓�LIGHT
o�
r� ,r
i
Dill.
�a ► /
WALLED S_RVCE
fai ,
UT Li— OED-STRIAN Q
TO BE TED c
_ �.R`��o��pr.���rrrise+r �► .� .di��l,���;�I����;�;mod{'I��C�i�a
R_ • tee.., ��� fAt/�I�V►_`1_I`��ad'+AM oInINI&AOrwQ!�\���-��1�1�jR'�� j _ _ itiL�4TFl��EFFEEFFE
TO BE REMAINED TO BE REFLOCATED PRO ED
I BE
TO BE
TO
mWwim SIGN PROP)
.'EFFEEFFE
.JI�AIi.
cPROFFORNED
SAMMURYSEMBEIR
EXISTING IF STAY
E- Aft
1 ALL ANNULAR GREEGINTION THELUSTS OF ME DEVELOPMENT AND ARMIN ABU NATURALAMENUFFER 7
TO REMAIN J NRYP,
II
WEST ELIZABETH STREET
(80ROW)
SECTION ME
11:1g79:A1AxN1 W I1\Is] 1:N
!II;III ANN FIGANCEPER RAW
III \DO WS.
o
--s71is:,ij li Ire
rrv—FREE
— I
ASPHALT
��� rsrdww�a®wswvwvae�Ti.�a�q ®/FIFO
P
TO 811 REMOVER)
4 ; i
;mod. o:�ao
�i®mot
rip,i'REMAINED
BLAMED
te
MA MA MA
im
�'/►w�a�y ODOMff:®AM
►�1!OBSERVED BWX_
TO BE REBUFFED UPT I`<.'
;Y 90.1
„ r/.1 `►
EXISTINGCONCRETE
TO BE RESCARED
TOLE BERGSTROM)
JUD.-MPISTING MGM
•
► c
® ��d ,•/
r� P o
✓�LIGHT
o�
r� ,r
i
Dill.
�a ► /
WALLED S_RVCE
fai ,
UT Li— OED-STRIAN Q
TO BE TED c
_ �.R`��o��pr.���rrrise+r �► .� .di��l,���;�I����;�;mod{'I��C�i�a
R_ • tee.., ��� fAt/�I�V►_`1_I`��ad'+AM oInINI&AOrwQ!�\���-��1�1�jR'�� j _ _ itiL�4TFl��EFFEEFFE
TO BE REMAINED TO BE REFLOCATED PRO ED
I BE
TO BE
TO
mWwim SIGN PROP)
.'EFFEEFFE
.JI�AIi.
cPROFFORNED
SAMMURYSEMBEIR
EXISTING IF STAY
E- Aft
1 ALL ANNULAR GREEGINTION THELUSTS OF ME DEVELOPMENT AND ARMIN ABU NATURALAMENUFFER 7
LARGE PROPERTY AREAS CONTAINING ��D TREESAND SERMUCATED FROM YAMAGUCHI A
AGREES SHALL BE REMOVED DURING THE SONGBIRD NESTING SEASON (FEBRUARY TJUS 311
PROBES WALL REMAIN AMID BE PUBTATED UNUESSAMOTED ON THESE PLANS FOR REMPOWN
LAND ALUMINA AREAS READ RIGHTEREMAYAND UTUDY EARGEMENTS WAY NE RUMORED BEEF
RULING FIRST HARBOR PROFESSIONAL ECOLOGIST OR WILDLIFE MOLOGMT G�M�EA GERMAN
FATHER THAN ERECTING DORMOUSE FEENCANGARMUND COMPUTERS REASUIRED IN WARBURG
SURVEY TO IDENTIFY My ACTIVE NESTS EXISTING ON THE PROJECT GTE FACTIVERNESTRAFTERRUNT
2 WORD ME DRIP LINE OF My PROT�M EXIMINGIREE THERE SHALL BE NO CUT OR FRUL CATERA
AGRACEMAK THIS MAYBE ACCOMPLISHED By PLACING METAL UPPOSTSTAXER AMPARNIUM OF FIELD UP
ME CPU BURUNDI PLANNER CALL DETERMINE BREMER ADDITIONAL RESTRICTIONS ON TRIED
FOUR INCH DEPTH UNLESS AQUALIFIED REFUSAL OR FORBORE UPS RESTATED SAO ARRANGED ME
FEETAPART AGO TYING RIBBON OR ROPE FROM STAKE TO STAKE ALONG ME OURTUARE PERIMETERS OF
REMOVAL AGO CONSTRUCTION APPLY
DISTURBANCE
SUCH ARABS BEING MURRAY
IS
REFERTO LANDSCAPE AMID IRRIGATION PLAINS FOR ADDITIONAL TREE GOVERNOR M���
N ALL PROTECTED EXISTING TREEKS SHALL BE PRUNED TO THE CITY OF FORT COLUMS FORESTRY A
THE INSTRUCTION OF UTILITIES REGARD LIVESOMARY UNDERGROUND BROADCASTING
STANDARDS TREE PRUNINGAND REMOVAL MALL BE PERFORMED BYA BUSINESS THAT HOPES A
EXCOMATION DEEPER THAN SM X) INCHES SHALL BE ACCOMPLISHED By GAINS UNDERTHE ERNST
GER DIST BE IS T "ED FRO' THE FACE OF T TREE ROUND VAROF ARM IS SOARED FROM
I PRIOR TO AGO DURI N A GREATER MON SAUDI BAD SHALL BE ERE GED ANN I ND ALL PROOF MAD
TRIED DAM GLEN AT BREAST HEIGHT A3 DESCRIBED IN THE COAST RURAL
HEI Off SEEN RED WITH A GOT UPSM NO CLOSER THAN SIX PC FEEL FROM THE THUM K OR ENERGY
U) OF THE DRI P LI ME, NUCLEAR IS GREATER IN ENE SHALL BE NO STORAGE OR MOVEMENT OF
ED I ON ENT MATERIAL DEBRIS OR FILL ALL IN IN E FEN CEO TREE NOBLEMAN SON E
I ED RING THE CONSTRUCTION STAGE OF DEVELOPMENT, THE APPLICANT SHALL PRESENT THE CLEANING
OF EQUIPMENT OR MATERIAL OR IN E STOCK BE AND DISPOSAL OF MOORE MATERIAL SU ON AS PAJ SIR
OILS SOLVENTS AMPLAT CON CRETE, MOTOR OIL OR ADS OTHER AUGUST FARM FUL TO TH E LI FE OF
A TREE WILD IN IN E DRIP LIN E OF My PROVE OFF TREE OR UPON P OF TREES
& NO MARGAGANG AMENDMENT MINES, SIGNS OR PERMILTS SAY BE FACTEMEJ TO A" HADIFECTED TRIED
ME E A DIAMETER AT BREAST
HENGNATNMCHEEO
BURGER DISTANCE FROM
FACE OF TREE (FEET)
AM
1
ART
2
AM
6
DARK
10
A
— —
D
_
_
,
City
of Fort Collins, Colorado
UTILITY PLAN APPROVAL
APPROVED:
cry e•im... at,
CHECKED BY:
FALL BUT MY xOTIMPATION ER OF
later ISw"IN"Jee VWIy Vet,
GainnnV
CXECKEO BY
9le.mmbT VIWy OeM
C ECKEO BV:
VeM
ICl Call
Call cerore you alq.
you
CHECKED en
CHECKED BY.
wo .aleINNDAC�
D S,
® NORTH
FEES EGGS
�AMFE
AT:
4:14VIV,
PROPERTY BOUNDARY
EXISTING RIGHT -OF WAY
EXISTING MAJOR COMFOUR
EXISTING MINOR CONTINUUMSTORM
_-5V15-=
EXISTING ORMSER
o-isTixV SE
®mF
EXISTING ELECTRIC VAULT
EXISTING FIRE WDRANT v
EXISTROVALVE
Mz
NGWELEHoEUmd PEDESTAL o
EumxV TRESS VV REMAIN, t
EUSTING TREAS AIO NEREBUFFED)
EUSTING E TO BE �
IY YYIG
EwmT xV ASPHALT
oe REMwEo
27
( ®4 FAiE®
FIELD SURVEY BY:
NORTHERN ENGINEERING
�z
�E�R:OIL m®BB.aor
Ed
PROJECT
DATE MAYS0„
F z
SUBSURFACE EXPLORATION
:
BYTM�CONSULT�S
�—
IRS
O"
GEOUTCHNICAL ENGINEERING
REPORTEMPAUEZEM
STREET PROJECT
Zw
FORT COLORADO
BBB
oMRAGOx
ATE MOVEMBER13, WIG
NOTESSHOWN
➢$
I THE SIZE, TRUE AND LCANNUMON OF ALL KWMGN UNDERGROUND UTILITIES ARE APPROXIMATE WAR
ON THESEDURFUNINGS IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY
m
THE COMMENCING
MEN _ _ _ _ - - DERGROME)
aw
UTILITIES AND SNNU BE BEER FUSIBLE FOR Au UNKNOWN ONGERGEOONO PUT TIES
ow
* CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING D-MOLITION DEMOVALREPLACEM-N-
AND D13POSAL OF ALL FACIF TIES AND MATERIAL
* CONTRACTOR S ENCOURAGED TO PERFORM D-MOLITION IN A DANUBE MUST MAXIMIGES SALVAGE
REAL BE AND AOPRVOORIATE SORTING AND STORING IN
a
:�IT .E_ -
m
AS
AGGREGATE THIS PRODUCT ON IS LGATED AT 138C HOEEMANMLROADANOFANBEREACHEDAT
I:
IN
* ALLSYMBOA ARE ONLY GRAPHICALLY EOANGARECOLLEGFAE
CONTACT THE PERFECT 3URVEYOB FOR AN INQU1RIESRELXTEDTOTLEEMUIMNGSMSURVEA
* LIMITS OF A-REET CJT ARE APOROXIMATE FINAL LIMITS ARE TO BE DETERMINED IN ME FIELD BY THE
a
sIN00
RDANCE AM
STANDARDS
BE
A
UP
BE
MAY REQUIRETO
DEMOVACOOED
AGRaANMA BAON
CHAND
DA BE
NATIONGPWN N
ER�OE
WN221 6700 FOR AFTERINSERVICE
L THE APOR DPARTE PERMITS AND APPROXIMATE HAVE BE-N
CLUDESBUT=NOTL,TO.TGTHEOEMOTMOSTRCRORESAND
T
10
NOTBEES SHALL BE REMDV-D DURING -M CONFUSED NESTING SEASON FEBRUARY I JULY 31)
WITHOUT FIRST HAVING A PDA ES3 CHAT E-OLDG13T OR OV LDLIFE BICLOCIA"COMPLETEA DEALING
STOOD TO D_N_FJ ANY ACTIVE NESTS -XISTING ON TLE PPOJE-T SITE THE SURCEL SLAT BE
U)
SENT TD THE CITY ENVIRONVENTA PLANNER FACT VE NES-S APE FUND THE C TY AT L
COOED NATE WITH RE EXACT STATEAND EDERAL DEPPESENTATIVES TY DE -ERMINE AMMER
Z
ADDITIONA RESTRICTIONS ON TREE REMOVAL AND CON3TRUCTIONALP J
Z
x
,,
B
p
Q
�d
APPIRDPRIATE UTILITY PROPAIDGER PRIOR TO BEGINNING ANY FUDDLE DEMOLITION
M
AI'�
0
ENT STANDARDS3 MaR
N
Z
REOORExENTSOETNERP COMPANY
Zp
14
DOMESTIC WATER SERVICES FROM TLE METER PIT OR CURB OR SHOWN
WERE
w
p
ONTHISDRANING CONTRACTOR STALL REM DOE THEENTREL OF THEP WATER SERNOT VICES ESFROM THE
�
ORS NATION LAN TO TLE -Xsr NG E,MNS.
V15
UTLT"GET_RS SHARP ON -IT S DRAWING TO BE REM FRED ARE SHOWN PER ME TOPOGRAPHIC
STOOD REFORMED DR M_ PROJECT AND ONLY INCLUDE THOSE MIDLAND MUST WERE CLEARLY
o
pp
J
VSIBL_ OR ACCESSIBLE AT THE OF THE SURVEY CONTRACTOR CRAFT NOTE THUSTAIDDITIONAL
EXISTING METEMAY BE RES_ry FROM -HOSE SHOWN AND SHALL ACCOUNT FOR AND REMOOE
z
Z_
EXISTING
O
10
ELEC_R C SERVICES TO EX13TING BJILDINGS -0 B_ REMOVED ARE SHOWN OCR INFORMATION
—
w
THAT ADD T CHAT UNDERGROUND ELECTRIC SERAGES AND
- NI_
B BE
U]
0
_ -
REMOV
CCOOED CITY of PACT COLLINS UTILITIES OE ARTMENT PRIOR TO BEGINNING AND
OOED RATED WMI THE
DEMPOLTTIONS
LLI
17
REFER TD AND COORDIMATTE WITH THE SITE ELECTS CAL PLAINS F DE ALL EFFL®RESCED SITE OR ET
LIGHTING ALL STREET LIGHT R-LOCATIONS SHALL BE COORDINATED BILL THE CRY ANN FORT
COLLINS UTILITIES DEPARTMI PRIOR TO BEGINNING ANY UTILITY DEMOLITIONS
19
APPROVAL OF FLOPSELPLAIN JSE PERMIT SHALL BE REST R-D FOR AT ABANDONMENT PERFORMED IN
THE HOUSE FLOODUEN APOR DVAL OF FLOODIPLY IN JSE PERMIT AND NO RISE CIECUFFICATION! SHALL
Sheet
C100
3 of 19
HUMAN SQUARE
CONDOWNIUMS
PROPONENT
CONCRETE PAN
MATCH EXISTING
PAVEMENT
I
COAL
FORT COLLINS NO LLC
I AN A PLUM BUT
rM1
REARTICALCURD
0
ELECTRICAL
r
L
TRENCH DRAIN
�----
-
I•-----��.
IF!
WFUCH EXISTING
Fin
BEINGBIG �,
WALK
SAWCUT
SIDENAMCULVERT
►�.PROMISED
MATCH COUNTING
EXISI
SIGN RUDER
WEST ELLSABETH STREET
(80'ROM
--.—.--._.--. _�sEcr PINE
SUPPORT
k�
V
--,
GLEN HOLE
Ir
® NORTH
LAN -AD:
LEGEND:
�EMENT -- -
PROPOSED EDGE OF PANARMENT
PwLCDwwETEM.noRK
REDSPAN PRIVATERATCH Ea RK
I
ILL
MOM
I
I
�I
IT SHIELDS
3UBDIV13 ON
'PRO82DSSDU
IE,aS_ c I PERUEADLEPAMmA
TRENCH DRAIN NOTEAILSHEETS FOR ADOITMNAL INFORMATION REDARDINDcuRas AND PAMEMENTSECTIONS
i
9a
:•
; •;
I�
PROPTMENAMN
,��
PROP. .
ySAAGM
0
PROPOSE
111.. .,
* PAVEMENT MAR KINGS SHALL RE PER DRVSTANDARDS AND PROJECT SPECIFICATION MANwL
E
CITENGINEEGINGINSPEZTOR ALL REPAIRS TO BE IN ACCORDANCE WITH CIM STREET REFUM
STANDARDS
MAGEDC EETS.CONSTRUCTION
co
SIDEWALKS CURVE AND PULLED -HAT ARE DESTROYED DAMAGED OR REUMPED DUE TO
z
OF THIS PROJECT SHALL BE REPLACED OR RESTORED IN LIKE KIND ATME
�—
DEVELOPERS EXTREME PRIOR TO -YEACCEPLANCEOCCOMPLECIED IMPROVEMENJUSANDAR PROR
a'
TO THE ISSUANCE OF THE FIRS_ CERTIFICATE OF OCCUPAUNICAY THE UMMSOFTHE REPAIRSWILL BE
DEDUCED IN THE FIELD POLLS CITY ENGINEERING INSPECTOR wIwTO.AND wmTHEcouRSE
ORTHEPRO ECTANDWILL ND_H_ SHOWN ON THE Puxs.
S w
µLPcueuccOMMt ESIDEWALc SHULREY' ICK R
�Z
u AciuoarvEwTHICKNESS CONCRETE TCKN¢suLLSEaAvm ON Eau s PAVEMENT
IN x
* CONTRACTOR SHALL REFER TO AND COORDINATE WITH. LURE APPROVED LANDSCAPE CHEAPER F DR
O� 9
DETAILED SIM CAUSCUTWITHIN THE COUTTLARD AND POCLAREASI IN ADDITION THE CONTRACTOR
SHAVALREFERTONAND EVIDENCE WITH TLEAPPROVEDICANDSCAREMOVINI�W
Q
AiLs'TOP..Puv0.uPEvaLL
ap STAIR AMID DETAILS AND SPECIFICATIONS
* DUE THINK NUMBER OF PROPMETED STREET CJTS I" PLUM aT.mE[rvnREmLLvnD-HcxALL
ERw
BE MILLED AND ovo PRIOR TO PROJECT w ECTnPLETicN
* FOR BUILDING LASUCCUM REFERENCE ARCHITECTURAL PLANS OUTANEDIMENSIONINFORKIATION
S
SHOWN REPRESENTS OUTSIDE FACE OF FOUNDATION ALL(HOTTALOE VENEER) AND IS SHOWN FOR
INFORMATIONONLY BUILDING HUNTS ARE AT CORNERS OF NOMINAL BUILDING FOOTPRINT
CONTRACTOR STAFF CONFIRM ALL BUILDING
CORN_STRUCTURALWITH
A a
ARCHITECTURAL DRnw ws PRIM To STAKING .
* CONTRACTOR STAFF EAITH ovED uxmNurtNSwutxxcs zn
�A
LDETAILSANDO CATIONS
ALL STAIR AMID HANDRMEDT
S�ING CENTER
WEST LLC
1110 IN ELIZABETH AT
11 ME CONTRACTOR SHALL AT ALL TI KI _S D J RI NG AN D A TE R SYSTEM I MAYA TOP OR EVENT
SEDIMEND DRUM AN D D UP FROM ANY SOO HE E FIR OVI ENTERI BIG THE PERM CABLE PAVEMENT
PY
PY
SYSTEM LOOSE MATERIALS STRAIT NOT BE STORED ON THE PERMEABLE PAVEMENT APPEAL MUD ADD
0
SEDIMENT4CBDEN RUNOFF SHOULD BE KEPT AWAY FROM THE PROVEMENT AREA TEMORARRYDRERT
A
RUNOFF OR INSTALL SEDIMENT CONTROL MEASURES AN NECENGEARYTO REDUCE ME AMOUNT OF
SEDIMENT BUFFER TO THE PAGEMENTY SURFACE MODELING COULD INCLUDE GOVERING AREAS OF
eBTHEPAVEMENT
PROVIDING ALTERNATIVE DCLroNVmISLEAaEEE. ANDPROVIDING
mDUTIONTOALL PARTIESwORKwOONENE
12 ME CONTRACTOR SHALL REFER TO THE EROSION CONTROL PLAIN 3HE-TS AND REPORT FOR
MANDA
Y CONTROL MEASURES AND CONSTRUCTION SEQUENCING -YAT SHALL BE
PREVENT �INDDPTHDDHA�EPADIDrAILLSEDIMENTDLaNGCDNSTRLCTIDN
�a
W
PIN
AIS
SO
SO
SITE SIGN LEGEND
.00
-------------
FPARK1NGi,-
IA
THEM CLAS
jSURNOTMG.Ei
Wm
- _ RB-31 J
MATCH COSTING �ManxG sAVlcur INMADUCH EXISTING
—
MnwuxE \ CALL DDLD. La CENTER0
RADO
\ Kn whatsbbelow_
Call VNEANTHEWqRN
WRONG CK
OMME
RAI
City
of Fort Collins, Colorado
UTILITY PLAN APPROVAL
APPROVED:
My r^ilcw
Di
CHECKED BY:
BUD, A, WHANN W Ul ty
Di
CHECKED BY
9termno"Ut ty
Defe
CHECKED BYIF
A-Mbm
CHECKED BY
CHECKED BY.
D.L.
O
m
Z
Q
J
W
O�
Z
QZ_
Z
Zi
0�
z
D
N
O
Sheet
C200
4 of 19
SATURATED
UTITUFFIES
LOT 1, GAMPUS WEST
SHAPPRIGGENTER
HUNG PLC
PROPOSED
VARIANT
'EARCRT `G`°EMAP
WATER NEEDED
PROPOSED I
w..MMERHERE C Vip
09
L __
jss
I=
isPROPOSE
GORE DRILL
MODIFIKI
BENCH TO BE a
WNHAM
STAR
I
T FMIE e SERVICE
I
RESSIDELPFULL
1_�
�®BMBYI
-
1 INVOI
J
RG 51
TRIE
STORMOR
m
I PARKER
CAMBRIDGE HOURS ONES
LOCATED
BRIDGE4RUMBRUDGE UP
THREE
1113 W PLUM SIT
0
CONCRETE PAN
UJULTY EAMEMENT
I �
VAT _ E _ LT2(SOLID LID)
r
L
DE
A AID
ID
BOND
CUTLET As 2 1
iNV L)
SURP UP
INDIA
��
OEM1_
�F ��1
EXISTING IF CELP
ESTIMATION
RESPONDED
P CONCRETE PAN
3iSLID AS
SUBDIVISION
825 S SHIELDS UP
W ex5s SHIELDS ST
SHOWCASED
THENGH MAN
PROPOSED
DEiPNEB DEPOSITED
PROM
ITRIENCH DRAIN
DOMINANT
ry:1641hiA
�z��a..�s
�►Y7U
8. TAPPiNGSADDL GB�i:�.a"*�e-- 1'I wesT eLiueETrl sikeET
L szlNl NEW RO`M1) _
E108731AN o-isiNGs wnTER INV MYAe MARKS BY
MUNIIUL
5AUDI
(PER CKU SOME UNDER REEMAN
_________
y�g
® NORTH
BEEN
1�.m-�:
LEGENDANSTRIGYRATERMAIN
_AI
ANSTixGSAxUARYSEWER
�ss
PROPOSED WATER MAIN
PROPOSED SANITARY SUMMER
PROPOSEDSUBDRAN
PROPOSED ASSET SERVICE _S
PROPOSED WATER SERVICE —W
PROPOSED FIRE BONDS _F
PROPED FIRE H�W
aBT GFREHYDRANT
PROPOSED FIRE DEPARTMENT CONNECTION
ANSTING STORM SEWER
PROPOSED STORM SENIOR
PROPOSED FIBRE CARS _A
PROPOSED GAN
ANSTRIGERAS
PROPOSED CURB& MYTH
PROPERTY BOUNDARY
ANSTING UPTAKE
EACEMENTLINE
PROPOSED B£CTRIA TRANSFORMER �T
PER CM SUNNI UNDER REVIEW)
R CM SLOMR UNDER REVIEW)
NOTES1
THE 9 BE � P_ AND LOCAL DN 0 F ALL CONTRA! ON BANNED UND BUILD AS ARE ANN MAN MATE WHEN
CONSTRUCTION HECON HAD OR SHALL BE RESPONSIBLE FOR LOCATING ALL FOLND
Z
LTimi¢AND SHALL BERSPONEGL_ FOR ALL UNKNOWN LNDEFGROLND LPunEs.
w
r
ALL WALSH AND GAMESCONI SHALL BE -YE FIT OF FACTCOLLINS.GNDAMIO
CON�NGTIONSP-CI VATIONEaTES,ECRLAN2
2 ALL WATER FITTINGS AND VA MESAREONL GRAPHICALLYREPRECLDTEDANDAGENOTTD��
SERVICES4 DRIFT DANISH ONLY GRANT E
.,ESO THEREEPE_TP,EDTG} MATTERS"KAREBNB�EC CHANGENTHE
�$
FIELDD
�
m
s N
MAT G°aLD_AREASM
aw
MAKE OTHE
o�
B ANY s=LDuA .AT.IOLOTDRNBN 1ONBBYLLITY
EACEMENTH. OTHER EASEM_NTS AND OTHER SUFLVEY INFORMATION
SHKAPPING CENTER
WEST YC
CITYCHIGNEERINGINSPECTOR ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR
1110 W ALKALI AT
H'
STANDARDS
8 ANY DAMAGED CURB, GUTTER AND SIDEWALK ENTERING PRIOR TO CONSTRUCTION ASMAELLAS
7vl
CONSTRUCTION OF THIS PROJECT 3HA INS
- - - - _ _OMP
STANDARDS AT THE DEVELOPERS °
Nc
iMPROR VEMENTSANDIDSCHRTOTH-isSUANCEOFCERT CABLE OF OCCUPANCY.
CONFILIMPOCCURS BOTH INS PLUMBING -PASSED AND "LfGwLDrzsk.:aEw"T.CrLD
PRIOR TO INSTAATION OR ORDERING 0=MATERALs.
m
to
10 ALL SANITARY SEGER 3ERX CE C NUNEATON INVERTS AND LOCATIONS BASED ON BEST AVAULABLUE
A2
DATACONTRAC TOOERP.G._ATION PRIOR TO CONSTRUCTION AND POLICY ENGINEER OF ANY
a^
„,
DA
11 PIPE FROTHS AGE CALCULATED FRAM THE CENTER OF MANHO ED AND INLET BOX STRUCTURES
SPECIFIED FROTH OF AIDE INCLUDES -YE ITS -NG LENGTY OF FLARED ENDGEva"S12
ALL GAP SHALL BE CLASS III OR CREATED ' BE MATERIAL BEDDING AND DATA LA ION ALTO
PUBLIC RIGH-S OF WAY SHALL BE G DV_RNED By -YE C T OF FACT COLLINS ATTERNA AS SUCH AS
ENG LEGS ALL JOINTS SHALL BE WATERTIGHT USING APPROPRIATE GASKETS OR TO BY WRAPS 'PER
ASSUM CHUN -877 FOR GOP AND PER ASTM F477 i D3212 FOR PLASTIC PIPE) STORM DRA TV SHOWN ON
UP AS PAT TARIFF CHLORIDE
12 =C
SUBSURFACE RANDr=HALLBENOTFEDOFANYPO POTENTIAL LG S
14 TART E ADD NECESSARY TELEPHONE CAB E FRED
THE ATION TIVE
�nMeRWLD¢°Np xEnDOnes�rvOAL NDELEas.
16 LOCH OPAL GAS E-ESJwT ARCHIRL
ATE RNaLLDUTiDN OF.LLGASAN. E�EcTAtGA�E�A<GATT aRGHiTECT
_=--_,1,=_ �.
.„N�LTMPR DERES
_
10 THE PLUMBING CONTRACTOR 3HA
LRncA_:OF ALL CONNECTION
LFFB
W
Z
RR :,N—FBUILDINGMLESS
OSNT
memmIGSTACNE&EDATANICAMBINGis
DRAWNGs.
m Q
17 REFERTOAPPR0GNDSNEEUMTR1GALPVUMFORAL CONDUITS AND P=IN
N Ja
TING
,�"�SHETHAI
VAST
18 THE VACATION OF PROPOSED DRY ES AS SHONN ON N FOR
D�LNI6_BE
PERFORMED B THE GEATELT . COMPACT
w
Z ~
—
Y OTHERS A ERNETAND TE .SON SERVICE TO BE - CENTURY DESCANT. AN
E OWNERS DBNETONA=LCABL - PROSPECTIVE UTILITY
J
ACTORSI HOWNERUTLr
AOMPANESNTGORANOIDED
Z
20 ALL E AND INTERNET SHALL BE EQUIPPED
�w EAND SATE BY THE WIRE PER-CONTRACTEGPFORKIR AT DNS OF EACH LDILrCOMP.mAND
0
VNHN�M
City
of Fort Collins, Colorado
UTILITY PLAN APPROVAL
APPBOSED:
(i arm",
n.b
CHECKED BY:
ALL" Y w"Is"Hee OWRy
Mb
CHECKED BY
BL"m_bT ULWy
Oeb
CHECKED BY:
CHECKED BY:
D.b
CHECKED BY:
Db
THANSFORMERAND PRIMARY L N_ FSOM TTE CONNECTION POINTATTITEEKIATING MAIN BOARD!
TRANSFORMER THE COST OF THE PRIMARY LINE TGANSFORMERS AND INSTALLATION OF THE
SECONDARY LINE FROM THE TRANSFORMER TO THE BUI DING SHALL BE THE RESPONSIBILITY OF THE
METERS THECO3NOFALLTTE3ERXCE DATA LA ION SHALL BE -YE R-SPONSIBIL TF OPTION
DEXTELOPER
24
CONTRACTORSHALLMORDINATE PULSE SIT- UYL TIES NOT SUDAN ON THESE PRODUCE
INGTDING. BUT NOT LIMITED TO, IRRIGATION PRINATESITEE ECTRICALANDGAS
LCAY VOLTUAGETTELECOMMUNICATIONS, AND 'YOU Ay3T_MS T PONT INSTALLAT ON DEPTH OF SAID
UTILDRIESSIVALLBEADJUSTEDLASNECESPART _OAXODANYPOTENTA CONFLICTS WITH INS
WATER FIRE SANITARYSEADEFLAND STORM DEAD LINES SHOWN ON THESE CIVIL DRAWING
26
A HUMOROUS USE PERMIT
Sheet
C300
2AP
oDA;:HEN'MMUTEEEPAMITANCAT°aN° EDNOM.MAINLDGWILLHE
5of 19
I
PROPOsSTORM DI
sEESHEEEN
II
s�
I
j"g
,LR LED HOPE
sINV
�.re
IEISE
�Q121
NYEAM
.
FLEOL
RG=mIDee
ANCON
ANNY
TRENCH Dwux Ip"VEBI
�I RGDO ME IN
GI
P IPE END AS
IRE L27T
PI PE ED A AN
EG
---------- 7 r
-------- --- Jr,rr�
_=s «LSDH PE®
I
IP RDEUCLGLwI
tsEEOEr.IS— `. �EG�orA.BE
®?00%
@2DTw 010
N
IDEESPETGTDT
® NORTH
(INFEEL)
D.
LEGEND:
ExisRNGSANTARYDEVER _sS
PROPOSED WATER MAIN
PROPOSED SANITARY GABON
PROPOSEDSUBEDMIN
PROPOSED BUYER SERVICE _S
PROPOSED WATER SERVICE —W
PROPOSED FIRE SERVICE •R
PROPOSED FIRE H�W
EXISTING FIRE HUNGARY c
PROPOSED FIRE DEPARTMENT CONNECTION TV
EXISTING STORM SEWER
PROPOSED STORM SENIOR mB
PROPOSED ELECTRIC _E
PROPOSED FIBRE OPHIC _A
PROPOSED GAN
MANGANESE _G_
PROPERTY BOUNDARY
EXISTING
PROPOSED ELECTRIC TRANSFORMER E
OVERRUN IIIIIIIIIIIIIIIIIB
ENiVER
PERK AM ALONG UNDER REVIEW)
NOTES:
URUnEE AND SHALL BE R SEVEREST FOR ALL NKNOWN UNDERGROUND U-wnES
* ALL WALSH AND GAINED -DENI SHALL BE RED -YE UP OF FACT COLLINS STANDARD
REPRESENTED AND NOT TO
ER FITTINGS ANo A�„ESAREONL GRAPHICALLY REPRESENT
5. ALL
* DRIFT SERVICES ARE BLOUNT IN A3CHEMATC FASHION ONLY GREAT LOCATIONS STAFF BE PER JUNE
§
FIELD
m
MOVED
MANSWTERMAINS AND
ew
D. REEERroATHEPI.,TFORRDSA.REA.SSTRA,CTSIZEEUCASEMENTS, LOT D�NSIONSSUTISI�
oh
PAYMENTS, OTHER EA.SEnn_NTS AND OTHER SURVEY INFORMATION* .
CITY ENGINEERING IMPROPER ALL REPAIRS HE BE IN ACCORDANCE BIRTH CITY STREET REPAIR
STANDARDS
PY
PY
ANYDAMAG_DCURB GUTTER AND SIDEWALK FASTER PRIOR TO CONSTRUCTION ASWELLAS
m:
CONSTRUCTI DO OF THIS PROJECT BUY INS
kB
-- - -_ _OMP
vi
s=
STANDARDS AT THE DEVELOPERS °
8.—
iNPRavoaExTSArID.oR PamRTDTH-ISSUANCEOEABET GAVEOROCCUPANCY.
* REFEEIRTOPLUMEMPLANS ORAL NOTED SEDVIRE AND SANITARY SUAVERSERI REACTIONS IF
'AiLE.IGwEERsk.FTGEwxTAOTEa
PRIOR To INSAALATION OR ORDERING 0 CATENATE
C
10 ALL SANITARY SEGER VEND CE C DNN_C_ON INVERTS AND LOCATIONS BASED ON BEST AVARNALT
OsR
DATA CONTRAC-OR TO PER Fy LOCATIONO ENGINEER
^
:APE
PH
NY m
11 NGTHSBECACULATIRDTROFALOEDANDNIIYP11UURES
P
PEEiEiAINCLUDES Ea �CIL
12 ALL GAP SHALL BE CLASS III OR GRANTED ' PE MATERIAL BEDDING AND DATA U, ION ALVIN
PUBLIC RIGH-S OF WAY SHALL BE G DV_RNED By -YE C T OF FACT COLLINS ATTERNA ED SUCH AS
ADS 1 12 OR IT'
OUTSIDE OF THE R 0 A SLAT BE APPROVED IN ADVANCE B THE
_ _ _
ENG ER ALL JOINTS SHALL BE WATERTIGHT USING APPROPRIATE RAPS PER
ASMA PLASTIC NO
PIPE.A. SHOWN ON
THIS DRAW CA AS PAT LEGAL CHLORIEFLVclEMITBEmrta NA
12 CONTRA -TOR SHALL BE RESPONSIBLE FDIC ANY NECESSARY FARE LEDGMES ANN NOTHOLING OF
SUBSURFACE TURNER MERCER AND CITY SIMLL BE NOTIFIED OF AM POTENTIAL -M L C-S
14 CONTRACTOR TELEPHONEFIBER a,vs. AND �ccTRo
ROUTING)B�.L"THERESPECTIV TILTJ PROVID
�"� ERS
16 CONTRACTOR TO EFINAL LOCATION C METERS WITH ARCHITECT
LITY
AND
E Vm0.S10
THE PLUMBING CTERMINATE UTILITYLV-RAIS s OUTSIDE
SIDE OR BURGERBURGERUNLESSsHORimNTALAND
NOTEDOTHEREMSE EXACT VERTICAL) OF ALL UTILITY CONNECTIONSW
JUNE PROPOSED BUILDING DRAFTS GRDINA-ED A M APPROVED MECHAxIGLmILwGING
oMCA
Rn�N�
m
ti� r mLR. P.�c®xms 17 SITE LIGHING DsIIE ELEVTRIcu Pule EORu_mrvouITSArv. POWER LINE CONTRA MR N
J
ANSI _ 18 THE LOCATION OF PROPOSED DRY UUMIN UP AS SHOWN ON TH IS D HAVING _ a
INNERo��aoEDNNIl TAMAGNI ARGUMENTS ONLY AND AGE APPERCLUMATE FINAL PEREDRNEDBYTHEAPPROPRIATEGULTYCOMPANYANDSDRENGINEER D DR� FTDE �,
unuunu�,� zz
imxGEx ����������COMPANIESFALLBE"OVIENEBONS.S CONTRACTOR SHALL COORDINATE WITH OWNER . UTILITY J
alsoUCE
■ ■ ■■ ■ EANDMA,EWIIREPER-YEGPLACED BY THE COMBI FORKIHATDNSDP�HUTILIYCO.PANYAND PHONE AND INTERNET SIMM BE O
walsys
w
uu lRwn ,TIFIGN L ER DE
IclwCalloolymyou
C�allce�re�yoUu du.
City
of Fort Collins, Colorado
UTILITY PLAN APPROVAL
APPROSED:
Pay wm..0
n.M
CHECKED BY:
ALLm Y w"IDWIee DRIVE
Y.Y
CHECKED BY
stum"I" ULWy
DIM
CHECKED BYDII
CHECKED BY:
D.M
CHECKED BY:
DM
TRANSFORMER AMID PRIMARY L I - F B 0 f.1 T J E C ONN GATT ON POI BY AT JUNE PAINTING MAIN TO �
TRANSFORMER THE COST OF THE PRIMARY LINE TGANSFORMEA AND INSTALLATION OF JUNE
SECONDARY LINE FROM TY_ TRANSFORMERTO THE BUI DING SHALL BE THE RESPONSIBILITY OUR THE
22
ELECTRIC _RANI 'AD 3 BE IS APPROXIMATE COORDINI LDFATIONANDSIZEMBF
23
GAS SERVICE TO BE PROV D-D B JUST ENERGY END SHALL DATA L A L GAS SERVICES AMID
METRIC ME COAL OF ALL TLE VEND CE DATA LA ION SHALL BE -YE R-SPONSIBIL TF OF ME
DEVELECEPER
24
CONTRACTOR STAFF COORDINATE OTY_R SIT- ULF TIES NOT SUDAN ON THESE GRANGES
INCLUDING. BILL NOT UNITED TO, IRRIGATION PRIVATE SITE E DONEGAL AND GAS
THUNDER GRAPH BE ADJUSTED, AS NECESSARY -0 ADD D ANY POTENTLY CONFLICTS WITH TY_
WATER FIRE PARTWAY ANGOLA AMID BLUFFS DEAD LINES SHOWN ON THESE CIVIL DRAWINGS
Sheet
CAT°aN°
C301
:LLROo DA;:HE�:'MAUMINEPERMITANN EDADDAMAINmGwIFTEE
11
6 of 19
AN
TOWN POLAND
1
-D-P--E DIN
MA- _ EErrr
II
I
I
I
I
I
I
I
I
\\
I
I
I
I
I
I
\
I I
I
I
I
MATCH EXIENTING
+1
PAR EErry
I�
1
I
cr
, C-E = SEERr
I
I
I
\
ADS T
s-CFPING -ENTER
I
I
IST I
I
I
I
M
l I
III
/
I
1
MATCH/
PAVEMENT
I
I
I
I
XBHLG R
I
9 m
FLCCFPTNN
ARLNo
K
__—___-- .\A
I
1.\E .
'
MANOR
— _
xA MMIM
AM, EN
MATCH Bul
ETOvnxE
_ HnwNEE
_..--
SmEVEALKTPULVER
SLR
III��
I
m�vcur
—"A
I
'I
//
'
IMPUDENTL�..
PROPOSED
DRAIN
RED uarnxsl
1l
q
A
-..-A
PC INFLAW
^�
.
`eLe.i°.N
PROUDCLOSED
III P,
Ai
r (BE SIT co'A />
ADS 47
E=so31a
s'
—�
-
TEAM
A
H
EC
I
E18 m °FE=5o3oso
Y I ERG EN
BESHEDTC
LIAGG.-snwT S
WEST EL2ABETH STREET
(80'ROW) E 'HIM
8
Ll
ORM�BRIME UP
PROPOSED IZ
-_3� ____ _�� AM _ - \ gF & K-ae
Z g °at• n n �� p
_ / r
� _. n —
ED
A.
� Im
8912124
$ �b /II I II :3 CONCRETE x \\
8F
BEEsHFEEaI \�I
® NORTH
LAND >ve
LEGEND:
PROPONCEDCONTUOUR
—9]-
-5015
PROMMEDSTUDIRM
PROPEOGED VERTICAL CUM ADD GUTTER
AN
PRO
EMATIN SHOT ELEVATION W
PR�ED SLOWS 2 (FIT
PER
wGImvcannPY GnAY
14
8uSBH EmE9i \ \_
t.
a
—
PROPOSED 2
1a
SHOWN ON THESE DRAWINGS IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY
rsmexALx
Ase
V
OF ALL UNDERGROJND JTILITIES IN THE AREA OF THE VAGARY BEFORE
- -NG
COMMENC_ _ SHALL BE RESPONSIBLE FDIC LOCATINGALL
L.ENCE
.UTaiEs Arv.SHA°_ BE EEEPONEI.LE FOR FOR ALL UNKNo UNDERGROUND
uoT 'rl2
a
UTIIT E.
tSEEsx_
PROPOSED
/
x
xsiox4 uiwry
/
C
,bm
qVELL
aG
A LR�CHHHUMAFOULLUE
�\
EASEMEVL.STIm BASEMEris. AND Nw SURVEY rv=SCRATCH
aw
d SI
I\
\
\
/
ALL CURB SHOWN ARE EOsurvE ELEVATIONS ALL OTHER soars ARE FINISHED GRADE
ATIs
1�
DAN G ARIDERN
LB
m
\_
`
ISEDsxEDTCw3
1 �',
t
P FORT Cowxs VERTICAL FALLS TRACKS-EmvmSHEET
791
_ _
dB
-w'91-
�- ------
FOR PmwSAPK REFERENCES
\\`\
/
1.
v are
_
'L/
/
° /
____
a
THI MAADNR SHALL GENERALLY FOLLOW FINISHED GRADES THERESTALLBEA
503287\n
'dd
- -
u,AwnunmEre E:.ESs-F CONCRETE BETWEEN THE FINISHED Sw. E,.rvou DISGUST
n
$iI
,EEr D.wl
�.
I
CURBS AND GUFTERS AT THE POINTS OF CONN-CHON SHORT ON TLE P�ANS PRIOR TO DATA LING
/
/ /
°
„EETCA
—_—_
CALTa, LASDRD rvAT ENGINEER TO rrwFscN
IFFE 503290
ISEEx n
\\
Rl
.THE
k
I
7_
ADD NODAL To nmroSE=ONT SURE SFOrE EVAT..x_, AND EDE LESS_. WHESE-FOxcAT-D
x Un/�ARCHITECTUREwixGS
8
CONTRACTOR SHALL CONFIRM AND COORDINATE A TL STAMPED ARCHITECTURAL ANDLLNDSCAPE
L'
I sE&
��m
FOR ALL srePS RANPs urvw..APixGwuis sEATwws auLrvas
'ate
/
I
ANDPUVTERA
__________
9_
- _ _ -
ELEVATIONS AND CAUSE CONDITIONS ALONG BUILDING RIMETER TrvFnrvJt.R_Hx-Cr.
REAL/
VAUL
—
}°reBY
PROHOSE
AND ANNNE_RV) OF ANY DLSotEDxGm AiPRIOR TO MOB LIZATcx
N
HERExw DRAIN
/
tPROTECTED0
THE LOASEST FLOOR, _ LUDING ANY BASEMENT OR CABAL S'ACE AND AT xT
'
l 1-A'RswS
RED FETuisl
REGULATORYHON EL VAT ON
Irma TREADS
�RUCTI
DN ELEMENT IF HE
r
"_m 18
PROPOSEDS a
�
LEEFORHESSLNCW�S
L
PAESEDETCmm
1,7
,FA
P
C
Lf£--90
,,=-1
�`�
'
RA iFx REGARDING WFRH
N
CAMPUS WEST
PAVEMENT
WTHix TH-ancD wxAwDF FCFnAv.
__
—
�`��
�._
aN
COLLINS CAMPUS
€
/
II�DE
��
�xGAARF
ntowESTLL BYL- AT
PROPOSED
TLET STRUCTURE
(sESHEEr c.ml
a� a
(SEED TAIL SHEETC509)'
\—
I Cam.
re
Ate'
z
•%
_
_ ,s
1
I
c'I
PRD Osm
^I
L__
y a
Im I
/
L
_-
L__J
PEE DETAILS)
t
\
PROPOSEDEB
a
—I
`a
C
DETAILS)
—
- --
rt
PROPOSE
/ BEESxEETCAM)
i' /�
�"
W 9h 1
REFORM MASS
-�
(S
WE A30Ad
_
f
/l /
PROPOSED
/T
RISERSriz
LI-aRISEP
TRS D
rnzan9'u
as
snrrcur
I
/
ei&emzai
'LARGEREie99eazs
�
I -
� /
/
if
E
RDPasmr
I _
�
'"
x
I
i
CoxcR ErE PAN
�
nq
%
_I -
'�}EXINTIN
Rumta
rza@_
Sb`
nro
SEEEDECO
\J�O xD
1
_
_ —
A
3�
Ern—
ael
— k
tD.L
ONCADEwx
"Ci
A /
,�� MM�AMIMM
_DID
�e
"ERE
INGw �
I oG
I FAA
Me Go
iS"CA SSHE"'","C.SnJ
cuxe&GLITTER
CLIFF
PULVE
SET
�_
CURE&GLUTER
-----
L1_1GY_HWANELT
---I'
EXPETING WE GNP
REFORM MGM
r
/ tPExvw SHAMIR UNDER ED
\
PRO
TMH
MATCH EKEIG
FLOWEELINE
EXISTING Y
FLOALINE
SPERCELP
CYNERED
1
C LORADO
KR w•t'sbbelow_
Call before NCmqCALLMOMNEMNONINAHMEEUSOPHEYMIJ
RAPAGAVE
City
of Fort Collins, Colorado
UTILM PLAN APPROVAL
ArppavEo:
CRY 6^ilcw
WG
CHECKED BY:
BUD, k was4neW Ul ty
OEM
CHECKED BY
9term M" Ut ty
DeM
CHECKED BYME
A-sbm
CHECKED BY:
RexV�
wt.
CHECKED BY.
DeM
w�
w
=
E
� z
Z
Zw
r
yp
A
Y
Bw
E�
e'
s=
z
a
9A
m
ff
^u
f
J
LU
z
O
z
O
II
Sheet
C400
7 of 19
DETENTION VAULT LAND FILD
NOTE
RERERTOSTRUCTUFAUPLAn
SECTION AA
PARKING GARAGE GRADING DETAIL
® NORTH
FEES
lix E<1
o.
LEGEND:
PROPOSEDCONTIOUR
�9
EXISTINGICONTIOUR
PROMONSEDSTORM
-5013
DARY
Paoo=�ETUATIONEXIONTING SHOT ENERVATION!
ETX°PER DC�2 or
aaw�,
PEaANOM DEaw-- --
NUN�,Vw
I THERIZE TYPE AMD LOCATION OF ALL KNOBAN UNDERGROUND UPLITIES ARE APPROXIMATE WHEN
SHOWN ON THESE DRAWINGS IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO
NOTES: UNDERGROUNDUTCOEEaesvamTOR mnmBeoouu .o2 REF_R TO -HE PLAT F BE LOT AREAS TRACT SIZES BASEMENTS, LOT DIMENSIONS, FULLY
THE EXISTENCE OF ALL UNDERGROJND THITHER IN THE AREA OF THE WORK BEFORE
COMMENCING NEW
CONSTRUCT
N THE
CONTRACTOR RESPONSIBLE
FOR LOCATINGALL
EASEMENTS D-HER BASEMENTS AND D-HER SURVEY I FLOATING
* ALL CURB S'OT3 SHOWN AR_ F ONLINE ELEVATIONS ALL OTHER SPOTS ARE FINISHED AWARE
ELEVATIONS
* ALL REFLECT DA A 13 ON TTE CUT OF FORT COLLIMS VERTICAL FALLS CADDO S-ECOVERSHEET
FOR BENCHMASK REFERENCES
* THEBDTTOMO MASDNR SHALL GENERALLY FOLLOW FINISHED GRADES THERESTLY..,
MMIKIJKIOF12 GNP DSED CONCRETE BETWEEN THE FINISHED GRADE AND AT I ------
CURBS AND Gi AT THE POINTS OF CONN-C-ION SHONN ON TTE P�ANS PRIOR TO HOLY LING
REQUIRED THE CONTRAC-OR SHALL GO DRDICATE AFTH THE ENGINEER TOM DDIFL THE D-SION
* CONTRACTOR SHALL CONFIRM AND COORDINATE A TV STAMPED ARCHITECTURAL AND S LUGGAGE
ARCHITECTURE PROGRAM FOR ALL STEPS RAMPS LANDACNAPMGWALW SEATNALLS DATUMS
* CONTRACTOR SHALL CONFIRM AND COORDINATE "ITT STAMPED STRUCTIL HAL DRANINGSFOR
ELEVATIONS AND GRAND CONDITIONS ADDING BUILDING P_RIME7ER NOTIFOAN_R AR-HT_CT
AND ENG NE_RV) OF ANY DINCIREPANCIES PRIOR TO MOBILIZATION
10 THE LOWEST FLOOR, INCLUDING ANY BASEMENT OR CRAWL S'ACE AND AT HDACEQUIPMENT
SHALL BE FLOOD PROTECTED ABOVE THEREGULATTORTY FLOOD PROT-C-ION EL -VAT ON
11 AFLOVODP�AIN USE PERMITGHA L BE REQUIRED FOR EACH SITE CONSTRUCTION ELEMENT IN THE
AP'RDV_D AT THE -IMF OF BY LUNG PERMFAP'LCAT ON
W THIN THE FLOOD'YON AND F COGNAC
LOAD
is
KrovYwhatsbelow_
Call before NCmqCALMOMNESSICARINANAEBMWANU
UNFIGUM
City
of Fort Collins, Colorado
UTILITY PLAN APPROVAL
.APPROVED:
ntr IMMIDI
oar.
CHECKED BY:
BUD, k FesteneW Ul ty
MANS,
CHECKED BY
9termnat" Ut ty
Dete
CHECKED BYOr
A-sbm
CHECKER) BY
D.te
CHECKM BY.
D.te
q�
Ai
LLJim
"
1
=E
BUSH
o�
zr
Zw�
4�
a
9w
of
\
\
a�snxG� R:N
FLOODPLAIN
REx su CLOMRC
V A AI II I
Ir r J
1.
PRRK
CUR
wT SRI
HUGE
RTD MY
(PER Cw CmmR)
I
I I I r
PROPOSEDRUDER
P/
I a 1 1 MDRAIN
r
a 1 I 1 PEE
ss MEET i
Pe 1 ze rcFBOSDTOM
r
\ / Po'
P D
L7I {-� rr
I aP I mExo x w
oEiAiu,
4 u 9P P l / ISEe PB. I
Iv„ ai B. I as / xe as II
z_4\\ sia �.�
..... J...■■■■■■■■ . INGw.uKLL�'
M:C■.5 ..... �...'li'--EosDA �� — ---- Rom,
. ■
—28B�• r � ■ . —
B
6 6 —
TIENTEXIHUMOROUS
SIIxGVY.w MATCH MOTING
mReaG WEST EL ZABETH STREET ATICH
RANDINE
smexuKaKVERT (81Y ROW) aasa DUTTER CURB&GUIDER ����`
`III
WIN
rl
ABI
Ali
:'
O
y
I
•
II
MrPROARMSEEM
SIDENBURCULVERT
aaJJ
Mir �Y�I
`
`J S
I I Dssn Dm aacoawx I I aM, ��� rr i\ / I I x.
I ND �otffa6UCOnNm I I � I r l $
xD
FFE=3090 I_ J i fCE=xisB I
aw x II UTDIC LLCURB&BUTTE IF ETEPAN
e
srs e P e a l ° �:os T Px
„n .R�
or 31N --____ .. L
TERM Ed 5 xisws _
_ ______ Tnv
u
d
--- _ TA
a 6 ____t_awseTs __
Mlx'TREAOs -„ k ..rz TRE.Ds a 9AM '° �G.r TAV'E ��Ma MATCHUMISTINc
ET
ILLIFT TM
BD. Aa,wE/IIE�,EASEIME. I I wVwE
SI
AccES RAMP
MEMO M
■NOME ■ ■■■\=■■L- _ /� �B sue`\.I & �:1 x __� 3 ERwsx
Y/■Y/■ ■ rD �iB A; MEE
DvcewA Tn
EvsnNGrtavRETOwvaY �°` _ _ _ _ _.__. MAP
ryxx CAUDIGMIO WEST ELIZABETH STREET TTT
aae&GurTEN (80 ROWI
MATCH
FLOATINGG Elwu090 FLO NE \
FRONT ENTRANCE GRADING DETAIL
® NORTH
(INDEED)
NAME D.
LEGEND:
PROPROBSER)CONTIOUR—BB—
EXISTINGCONTIOUR-50ll
PROWMEDVERTICALCURMANEGUTTER
PROPERTMOUNESURY
AS
EXISTINGSPOTDr_MATOONx W
LL
SED
2 BE
O PaacEXISTINGIDAYRF.s LAINREMOVAL
HONG MU CLOUR UNDER
J ERG MU CLOUR UNDER REMOVAL
W
m NOTES:
W
w I THESIZE TYPE AMD LOCATION OF ALL MASON UNDERGROUND UTILITIES ARE APPROMMUNTE WHEN
U) SHOWN ON THESE DRAWINGS IT SHALL BE THE RESPONSIBILITY` OF THE CONTRACTOR TO VERITY
THE EXISTENCE OF ALL UNDERGROJND JIFFIES IN THE AREA OF THE WORY BEFORE
COMMENCING NEA CONSTRUCT ON THE CONTRACTOR SHALL BE RESPONSIBLE FIAT LOCATINGALL
ulUNDERGRDUNDUTLYESANDSHAUL BE UNKNOWN UNDERGROUND
z 2 HERBY TO HHE PLAT F BE LOT AREAS TRACT SIZES BASEMENTS, LOT DIMENSIONS, UTILITY
_1 EASEMENTS CHURL BASEMENTS AND CHURL SURVEY I ORMATION
IE ' ALL CUDNs. ONLINE ELEVAT TSARE FINISHED GRADE
ELEVATI
GLES S-ECOVERSHEEr
VFOR DENALI REFERENCES
ERTICAL
FALLEN THERESTALLBEA
MMIKIJKIOF12 GNP DS-D CONCRETE BETWEEN mOFINISHED Dws LING
CURBS AND Gi AT THE POINTS OF CONN-CHON SHOWN ON TTE P�ANS PRIOR TO RELY REQUIRED THE CONTRAC-OR SHALL AS DRDINATE RUTH THE ENGINEER TOM DRIFT ITS EGRET
7 ADD ASSENTS PROPOSED -ONTDURS SCALE EVA IONS ANDFIFELABE S WHESE-RUNCAT-D
8 CONTRACTOR SHALL CONFIRM AND COORDINATE NV TT STAMPED ARCHITECTURAL AND Z GRENADE
ARCHITECTURE DRAWINGS FOR ALL STEPS CROPS LANDSCRAPINGWALLS SEATHWALLS FALLEN
9 CONTRACTOR SHALL CONFIRM AND COGRODINATTE "ITT STAMPED STRUCTIL HAL DRANINGSFOR
ELEVATIONS AND GRADE CONDITIONS AINANG BUILDING P-RIME7ER NOTIFOAN-R AR-HT_CT
AND END TEBBE) OF ANY DISCREPANCESS PRIOR TO MOBILIZATION
10 THE TARGET FLOOR, INCLUDING ANY BASEMENT OR SHORT S'AZZ AND AT HGAGESQUIPMENT
SHALL BE FLOOD PROTECTED ABOVE THEREGULAUTHORY FLOOD PROT-CHON EL -VAT ON
11 AFLOSONDP�AIN USE PERMITGHA L BE REQUIRED FOR EACH SHE CONSTRUCTING ELEMENT IN THE
AP'RDV-D AT THE HERE OF MY LANE PERNFAT'LICAT ON
12 SEE-YEFLOODIPLAINEXHIST STEE_ CGK� FOR ADDITIONAL FEDERATION REGARDING WORK
ity
of Fort Collins, Colorado
UTILITY PLAN APPROVAL
APPROVED:
BUY r^ilcw
WG
CHECKED BY:
BUD, A, was4neW HOME
DAM
CHECKED BY
9termnetse OtWt9
DATA
CHECKED BY:
�
M
CHECKER) BY
Date
CHECKED BY:
Date
W
W
{{
E
Z
Z
ZW
8
4�4
Y�
i!$
zFIB
9w
oB
RAIN GARDEN A
RAIN GARDEN B
RAIN GARDEN C
® NORTH
(INFEET)
5&
LEGEND:
PROPOSEDCONTUOUR
—se—
PROPOSEDSwue 5013
PROPODEDSTERM
MEMBER VERTICAL CUM ADD COUTTER
PROPERIFTEOUNESURY
PROPOSED SHOP
BA
EXISTING SHOT
PROPOSED o�pSpRR
(PER COU nONG uxom BERENS
(PER COU nndRUNDER ERRS
NOTES: VERIFY
I THESIZE TYPE AMD LOCATION OF ALL CHOSEN UNDERGROUND FILTER ARE APPROXIAWLE WHEN
SHOWN ON THESE DRAWINGS IT SHALL BE THE RESFONSIBILITY OF THE CONTRACTOR TO ORATED TRIPLED IN THE AREA OF THE VKHEY BEFORE
COMMENCING NEW CONSTRUCT ON THE CONTEACTOR SHALL BE RESPONSIBLE PER LOCATINGALL
UNDERWRQDUNDUTLFESANDSHAL BE DESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND
2 DODGE TO -YE PLAT F DS LOT AREAS TRACT SIZES BASEMENTS, LOT DIMENSIONS, UTILLING'
* ALL CURB S'OT3 SHOWN ARE F ONLINE ELEVATIONS ALL OTHER SPOTS ARE FINISHED GRADE
ELEVATIONS
FOR BENI REFERENCES
* THI MAXONR SHALL GENERALLY FOLLOW FINISHED GRADES THERESTALLBEA
MMIKIJKIOF12 GNP DS-D CONCRETE BETWEEN THE FINISHED GRADE AND AL MASONGLY
CURBS AND Gi AT THE POINTS OF CONN-CHON SHORT ON TLE P�ANS PRIOR TO NSTA LING
ANY DF-HENENIMPROVEM-N-S F A CONFLICT BRING AND DRA DESIGN DO
REQUIRED THE CONTRAC-OR SHALL CO DRDINATE BILL THE ENGINEER TOM NEEL ITS D-SION
* CONTRACTOR SHALL CONFIRM AND COORDINATE A TL STAMPED ARCHITECTURAL AND LY NDSCAPE
ARCHITECTURE DRANAINGS FOR ALL STEPS RAMPS LANDSCAPINGWALLS BETRAYS CALNG3
ANDPLANTERS
* CONTRACTOR SHALL CONFIRM AND COORDINATE "ITT STAMPED STRUGHL HAL DRANINGSFOR
ELEVATIONS AND GBADE CONDITIONS ALONG BUILDING P-RIMETER NOTF)OAN_R AR-HT_CT
AND ENG NEGEV) OF ANY DISCREPANCIES PRIOR TO MOBILIZATION
10 THE TARGET FLOOR, INCLUDING ANY BASEMENT OR CRAAL S'ACZ AND AL H,ACESQUIPMENT
SHALL BE FLOOD PROTECTED ABOVE THEIREGULSTORY FLOOD PROT-CHON EL -VAT ON
11 AFLOSOHDP�AIN USE PERMITEHA L BE REQUIRED FOR EACH SHE CONSTRUCTING ELEMENT IN THE
AP'RDV-D AT THE -IMF OF eU LANE PERMI-AP'LICAT ON
COLORADO
is
Knowwhatsbelow_
Call before �you mq_
Vlty
01 Pon UOLICIS, UOIOI'640
UTIL]TY PLAN APPROVAL
APPROVE:
BUY RBRomi
WG
CHECKED BY:
Fide, k Fen4near Utudi
OeM
CHECKED BY
Stermnetee CHURCH,
Bete
CHECKED BY:
CHOKE BY
wt.
CHECKS BY:
eB
s=
BIB
a
Pill
m
Pillp^
Bs
MW
Rod
Z
Q
J
a
x
C�
w
Z
m
p
N
Q
LU
(�
Z
O
Z
w
z
0
O
a
D
Z
�Q
IL
Sheet
C403
9 Of 19
I
..SR
0
€ a;
X eE r� 6
gg A
ra § t liz, CRIB
SM Bit
r N
II r[�JB)jJ
iiF ei �
r 1 -it
&i S
_ L :
I g
teF
003 STORMTECH CHAMBER DETAILS
aw NOT TV
BE
M
" o
E�i
F,
9
p
U,
�A
4
S
s
L
E
d
s
BA
xB
�
s
"MM
Ra
e
UNCUT SAILOR OR
COURSE ALONG PERIMETER
jPRER EDGE RESTRAINT
CONCRETE
SUeGRADE
001 IMPERMEABLE PAVER SECTION No<oKAN
aaA
BASE COURSE
(ASTM N0. 57)
UNCUT SAILOR OR
BELOW ALONG PERIMETER
CPAAEF EDGE RESTRAINS
N MIL PVC GEOMEMBRWIE WITH
COOT CLASS B GEOTExmE
SEPARATOR FABRIC Ai
O BELOW UNFR
` SUBGRADE
NOTTER
KATE MAY BE OMITTED AND A SINGLE LATER OF CLASS
B ROBERT RIC MAY BE USED ALONG PERMETER OF CENTRAL ISLAND.
002 PERMEABLE PAVER SECTION
w TO SUALK
... aa.�
WHENARE INURE TRANS USED?
PIp..ff..®
eYPIBAI INRTADAigNS
DMINNIGHDRUN.L..
OUR
`
a.,....�.,,�
WHEN ARE BRAIN BASINS USED?
I: milli
TYPICAL
004 TYPICAL BASIN INSTALLATION OPTIONS
caw x5�g"�
® NORTH
IN FEELI
D
LEGEND: .
PROPOSED HERE THORM
PROPOSED FINISHED SHALL SPOT ELEVATION
PROPOSEDSOSOR.DE SPD. ELEVATION
BOARDS SPOT ELEVATION ON,
PROPOSED SUBGRADE SLOPES 2 (RE
PERU EASTERNERS
NOTES
1 REFER TO THE FLAT FOR LCTAREAS TRACT PAVER, EASEMENTS LOT DIMENSIONS, UNFLUDY
EASEMENTS OTHER EASEMENTS. AND OTHER SURVEY INFORMATION
• THE NI TYPE AND LOCATION OF ALL KNOWN UNDERGROUND ULF TIES ARE BYRD DX MA E AHI
SHOWN ON THESE DRAWINGS IT SHALL BE THE RESPONSIBLIT OF TLE -ONTRACTOS -0 VERILY
THE EX THENCE 0 ALL UNDERGROUND UTILITIES IN THE AREA OF THE BONN BE ORE
COMM-N-ING N-W CONSTRUCTION THE CONTRACTOR SHALL B_ R_SPONNSIBL_ FOR LOCATING
ALL UNDERGROUND U-ILITI-S AND BHA L B_ R-SPONSIBLE FOR FOR ALL UNKNOWN
UNDERGROUND THUMBS
• ALLS'013 SHOWN AR_ F SH-D GRACE E EVA IONS UNLESS D-HERAISE NOTED
STORMNATER Ji MIN MUM OF ONE BEEF IN ADVANCE SD ASTOALLOW FOR FIELD
SUNSHADE
INSTUALLAT ON OF GEORSHILLE FABRIC
INSTALLATION OF UNDERDRAIN
• SUBGRADE AREAS ARE TO BE FIELD SURGENNED BY A LICENSED PROFESSIONAL THEDIESIGN
ENGINEER MJST CONFIRM THE COLORADO ELECONATIONS AND DIMENSIONS PRIOR TO PLACEMENT
OF GEOTETL_ FABRIC SUB�E,OR�OTHERWTERML
TREND AS RECOMMENDED By MANUFACTURER WITH NO LESS THAN 18 INCHES OF OVESLAP ON ALL
SEDIKI-N- DEBRIS AND D RT FROM ANY SOURE FROM ENTERING THE VAULT SLSTEV
* NEEDS A SHEETS FOR ADDITIONAL DESIGN INFORMATION
LOWER asEDR = RESPECTIVE UTILITY PROVIDERS TO FACILITATE T_
INS ALLATION OF TLE PBOPD3ED GLOOM DRAIN AND UTILITY SERVIC-S
SEDIKI-N- DEBRIS AND D RT FROM ANY 30URE FROM ENTERING THE PERMEABLE PAVEKI-N-
CYCLES LOONBEKIATENA S SHALL NOT BE SLOWED ON THE PERMEABLE 'AVENRENTASEA MUD
AND SEDIM-N- LADEN RUNOFF SHOULD BE KEPT AWAY FROM TLE PAVEKI_N_ AREA TEMPORART
DIVERTRJNOF DR INSTALL BED SENT CON-ROL MEASURES AS NECESSADY-0 REDUCE THE
AMOUNT DF SEDIMENT DUN ONTO THE PAVEM_NT SJRFACE YRD_CT ON COULD INCLUDE
COVERING AREAS OF THE PAVEMENT PROVIDING ALTERNATIVE CONSTRUCTION VEHICLE ACCESS
AND PROVIDING EDUCATION TO ALL FARTIES WORKING ONSIDE
WALL UNFLUR NOTIFICATION CENTER 0
C LORADO
is
"ROWhatsbeflow-
aII before you a dDOGRADE OR
ig
APPROVAL
APPROVED
CHECKED BY:
FSYe k Fen4neW IlWity
Di
CHECKED BY
Rtemmstee Ut ty
Dete
CHECKED BYOF
A-Wbm
CHECKED BY
Date
CHECKED BY:
D.te
NO
9n
AN
TO
ROO
i�
1
ff
J
W
Z
O
Z
O
i
Z
Q
^J
LL
LU
0
NQ
LL
m
D
U)
Sheet
C404
11 Of 19
M
4
3
TRENCH i AS SPECIFTED
IN SECTION 02211
LGAINS AT UP
MARCH WALL
SUGLING
I NET
21N ML
P® PoALINITIAL
LIFT WALL NOT EXCESE) 2 FEET IN DEPTIF
NOS:
GRANULAR B DING MATERIAL SHALL BE A MINIMUM OF A INCHES BELOW
BOTTOM OF PPE AND A MINIMUM OF 12 INCHES All Me OF PIK,
OFPONT MM
.,_ 1m1m
IXYINED
mssore
A/a/il
mmmm
WATER MAIN BEDDING
RBBUIREMENTS (DR' AdVC) P
DETAIL
100 WATER MAIN BEDDING
a Io i-L
Soo
CAST IRON MCCESSEP Lit
RE 9ttWTH MORM LOOK
HIT p IAWALL IN
mAnE E
CAST little THAT
10 IN MAB OF PLASTIC mow MEAN Box
14 IN. Me. ALLOWED
LEON TYPE
INUET GAVE
CONNECISON
MEAN
MEN Ba
TO AUTERNMONS
48 IN OR EXTENSIONS)
�I
CONN DOOR
B mw NO x`TxCOOPER
E'K e$q�pFOR WIN OF 55
IH
PIPING
Po ^6<F%1'P.W.PR'A6AALELMY� 'B. a�AB.
_XO1/i I.)MID�R MFRRp d$��b�o b,
GENERAL NOTES
NOT INSTALL IN MY STREET. ALLEY. PARKING AREA. DRR£WAY. SIDEWALK, DRAINAGE OIrCH OR MENTION
BASIN,2. NO LANDSCAPING (SHRUB$ BWLOER$ ETC) BY STRUCTURES TO BE M1 IN . FEET OF METER BOX, OR
NO TREES MMIN 10 FEET OF METER BOX.
3. SLOPE GROUND SURROUNDING METER BOX AWAY FROM UO AT 2% MINIMUM GRADE.
k MAKE NO PLUMBING CONNECTIONS Ul COUPLINGS. ETC) IN METER BX. O
5. ALL TEES AND CONNECTION FITTINGS TO BE A MINIMUM OF 5 FEET FROM METER BON WALL CN WRET SIDE.
B ID DE ACCEPTANCMOAE FINELE R GMEMIR RADE. BOX INSTALLATION REWIRES THAT THE OMER ADJUST BEER BOX CO.ER
T. IF A PRESSURE REDUCING VALVE IS REWIRED BY PLUMBING CODE. INSTALL VAL`2 INSIDE THE BUILDING.
IMMEDIATELY FOLLOWING THE MAIN SHUT-OFF VALK.
arry or pact
W AWN
GErFf ("i in F - TAM mSTANDARD 6X1'ERIOR Slil'[ING FOR DETAIL
4/11/11
"rLJ^ e`I=-••_es 3/4 IN. AND 1 IN. RATER METERSPAT
TS
CAP, MR,
7
4
im
MINIMUM BEARING SURFACE AREA
(SO FT.)
PIPE
SNDS
MSEAOR
BEARING SURFACES ARE A MINIMUM REQUIREMENT
AND DO NOT RELIEVE DESIGN ENGINEER OF
REMPg1SIBIUTY TO DESIGN EACH THRUST BLOCK
GENERAL NOTES
PMMN
e" F= t Bearing surface event shown In chart are minfil
2. All fittings to be wrapped with polyinthyme.
3, Pipe installed under conditions different mean those
LEASING normally encountered shelf require thrust blocks
FARFAM designed for those particular conditions.
4, must blocks on pipe larger than 15 Fares diameter
shall be designed for conditions existing at the
MMMRSED installation site.
WIL
DEAD END 5, Refer to Section Ol for concrete requirements.
ani
Fri
~ s�
aw
STANDARD
ILNCRMPE
DBPAB.
TRRUST
BIACKS
E
I ® aRaLpsaBEeF
101 STANDARD CONCRETE TRUST BLOCKS
R5T2'S£2F
C5D0
A
AST IRON
TER'
ASPN.LLi
KFLL MElX00
ENDING ON
ON
ATION
VALSVE
tLID
F T a NUT
N RIGHT
RESILIENT
SATVAKFLL
IN 0'
RS AND
TAMP
WATER MUX—
D BACITIILL
IN 3- LAYERS
AND WAR
BI(XgVAhO
A EARIN
SECTIONAA
ALL VALVES TO ME RESIDENT SAT. EPDXY COATED INSIDE AND OUT
PER CITY OR FORT CCWNS AND AWWA SPECS.
ALL VALK BOXES TO BE OF CAST IBM CONSTRUCTION, TWO PIECE
MREACfD ADJUSTABLE DESIGN MR CITY OF FORT COLLINS SPECS.
ALL WLKS TO BE B LOU POLY MAPPED. T-BOLTS. NUM AND RODS
TO BE TAR COATED BEFORE WRAPPED.
104
STANDARD SETTING FOR 3I41N.
AND
105
VALVE ASSEMBLY BOX
C500
1 IN. WATERMETERS
" �
c50D
"arlsEN�
W //tWirzv ST MF ON UN
PAMEMENT
uix
QUA
BEW
54 OWN MIN.
ON INCH All
c==========L —`
CAM STOP
MNERAL NOTES
I. locate curb new
and voter meter according to the approaed utility &A,r e.
2.Compact tram as required by Dnslopment Construction Standard to Apport mim ba".
.{(�'�
JAE^` Ins
(has OF PONT mums
I
°T° a
TRAFFIC-RATBD
T/iT/sa�a
DETAIL
CURBOF STOP I-MWD T10N
�
iW TRAFFICRATEDCURB STOP INSTALLATION
5TTeffi
csoo
ANSI
wl��)
RAW
DESIGNATED
SPRINKLER SERNCE
IMEAM
WFNkCFNI
NEXT DOWITEREAF OF
IT. MR. rr
MR NjxEAJ PONT
(1/wum[uu R
w«'S rm5m
Prow N,°bP NLUN1
..,,ys
ge
MEMO
kY
PIT
SV'
WR
FEME
MAN
SeenKLER TAP
OFF DOMESTIC SERNCE
cm UNIONS
SPRINKLER SYSTEM DETAIL
rt �VH(n:i
DEPAIL
TO WNW
13
—s FL NH
In-
k
.+.°vu fln
v
�g
mr
5u
103 SPRINKLER SYSTEM DETAIL
R8TT6x£2£
cSODCO
vat untrvtolboo CENTEROF
KncwMaYsbBOW.
Call Deroreyou Blq.
By.
te
CILy
Of F'OL'C COLIIX,B, I:OlOPfl00
UTILITY
PLAN APPROVAL
APPROVED:
City Cylnev
Oe4
CHECKED BY:
TIeW k Feeleeeta ULWLY
Deb
CHEO(EO BY
9tarmneter UWItY
0.b
cHEacm
F��
e�
.
.a
9^
m
UP
p^
~
Sheet
V/
W
J
m
_
N
�
W
w
Z
�
O
Z
J
z
�
E I
C500
12 of 19
I To- OAK
11MY Hour
IN HARRY
4 1 HEME SUCE MUSIC
GENERAL NOTES -
I IF A MISSOURI REDUCING VALVE IS REMAINED BY PLUMMO CODE. WHITUAL VALVE INSIDE
. s (dBwNa SEEI MISS)
* � PIPING PENN FAULT STALL SEE MIR, YOU FLAMMED ETHICS, E�7 FOR THE SENSE SLECAS
* GATE VALVES MST OPEN RIGHT AND BE ARMY COADED, RECRUENT SEAT JUM A HAND WHERE ASPIC
5 METER INSTALLATION DESIGN FOR 6 rt aN, AN SUNDETERMINED BY THE UNn. 7 LOCATED AND MYSISMENT OF
VAULT TOP SAM VARY
ST BE
AI I THE FOR
aY rertmY OR FORDBBQuwBTU.IM..M.x� xBTia RBwBTBR A/LI/i1
mumnUnsSTANDARD SNITRlG POR 3 IN. AND
mm, UPS
uSv� v1-rvx 4 IN. RATER 1R.TERB IPUN VIRF) DETAIL
200 STANDARD SETTING FOR 3 IN. AND
csm 41N_ WATER PER, TERS(PLAN VIEW) AL
TREINCH VARYTH AN SPECIFIED
IN SECTION 0MUI
TRIENCHWALL
�
\\
wFE
i6
12 IN MIN
A+
EMPLOY
Dry.
zt �v
HIM MN
D
COMPACTEDGRAMULARMATERIAL
COMPAITTEDGEMPULARMATERIAL
CONFORNMENTOCESTAFAI
BEDDING REOUIRMENTS
���-CCCNNxvvv.�E�
SEWER CONSTRUCTION
DETAE
1
E
DETAILS
A/ /11
WW-1
NN
204 BEDDING REQUIREMENTS
FANNAREM MARKET MY SLOPE
MY
AN
FACED
(S.))
GONEVED
Ic QAa,E
AS ENCASED
E-C OOEvrtowveo)-
FAN
CAR
GWi�
�eec (TYT�c.a)
1, MY NOT INSUALL IN ANY STREET Y.vw
2 NO EARMARKING (OTHERS. SCAS
T) STRUCTURES TO BE WAIN x IFT. mrRES MTHIN 10 sr.
IIW
OF BETTER VALLEY
3 SCENE MCI SURMUI WATER VAULT AWAY PER W AT 21
ADE EST SHATER
4 MAKE NO �SINO CMS(ROES CwwNBs EECT.)Ix rrzpvw Y.
QiA vAovr N N.uSTBAncx REQUIRES THAT FOE(AREA ADJUST BEEN VAULT COVER
TO A IT A PREMIUMS REDUCING VALVE IS FORMED By NB CONE. IT SINE AINSTAaED MADE DE BURMIxa
IMMEDIATELY FOLLOWING THE MAIN SHUT OFF VALM,
FAME
G"rt�CoUlm. "HUGE OR 7
M0 ~STANDARD 88TTINC POR D IN. ANOIII DEfFAME
AD.
I 4 IN. FATRR NRTRRS (SKAN
LE VNi1PI ETD
201 STANDARD SETTING FOR 3 IN. AND
LSO) 41N. WATER METERS ISIDE VIEW) aai2'S[22
B IN. MIN
1
L - li" +j �___
IN
ToMaaQl
ALTERNATE 94SE
CONCRETE ADJUSTMENT SHIMS
EGROUTED INSIDE
PREFORMED FUESTIC GASKET
ACCULTURATE TO BARREL
SECTION ON INSIDE
it
IN
a IN
I
Old
eddd�����!x^ STANDARD MANHOLE
S � SEWER CONSTRUCTION 4/11/11 DETAIL
DETAILS W W-3
xBl
205 STANDARD MANHOLE
C501 xiD"f6Sd
ANN
IN
�`CdUns vufvm ® IBTANDARD 9E1'1'R!G POR G IN. AND I DETAIL
II 4 IN FATRR NETRRS (RND VIEIP) ITC
202 STANDARD SETTING FOR 3 IN. AND
act 41N. WATER METERS (END VIEW)
,Jet
I TRAFFIC RATED CLEANOUT
' SEWER CONSTRUCTION x/ DETAIL
DETAILS / 1
WW-15
NBl
20fi TRAFFIC RATED CLEANOUT
L501 27T1SIOSIT
u
PICMOLE
OPIMSGE
uo PL NVIEW
uI 11 .
PE I ID,
5 3/4-
LID SECTION VIEW
L07A LEM REFERENCE SPECIFICATIONS 15540-5
FOR UP TEST SEAIXW INFORMATION.
B REFERENCE SPECIFICATIONS 03833-2
THROWN 02022-4 FOR LWATgt
VALVE RON SECTION VIEW FDATON BON INFORATION.
�rtaColUnsCU990
TS 411,
MILITIA OPERATIONS P T89T AND LO ATOR 3 ATION ROX MADE,
25
203 UP TEST AND LOCATOR STATION BOX
c5O ATTDIA£A£
vaauTarvCLORADO c[xT[aoF
10
INcwMardfloW.
Call oeloreyou Dig.
I:ILY OE F'On Collins, Colorado
UTILITY PLAN APPROVAL
APPROVED
City Podwv AY
CHECKED BY:
wow h Ra aM Relay o^b
CHECKED BY:
9iermTnw utwty Wte
cnEacm By.ME "
CHECKED BY
h4
CHECKED BY:
E'v1YmM"W PROMPT, Mte
18Z
F�z
e
.
.a
BE
m
00
0M
�w
p^
t!G
i�
ff
f
J
W
z
O
z
O
Sheet
C501
13 Of 19
Il
CLASS A BEDDING
CLASS B BEDDING
W
<1 MENTION m
FRENCH WOM AS sMciBm
LINT OF
ASCII UMIT OF-1
GLORE
4CYE
MACOM�IALDWIGHT
we a
FUSLY
e�MEArtsii
+ WE o
1 '�\
'/• PIPE
SR as r e x+
CGRTEMAL
1iPHIL'�
CONCUR
dBMIND 01
m.w
1EPoAL
94K NSA
M.x
CLASS C BEDDING
ROCK EXCAVATION
Jmxu Wow As SPECEFTED`
PAPER WDI AN WANCITED
OBANCH
' x ws .
STAGEMINwcwp�.%'D�
dY
NFACTED
wRETRALAN
UNIFORMITY
WE OR
44
SELECTED NAMES
uLM� MATEwA
'.,.`
AXimAL
UNSTABLE SUBGRADE
SUBDRAIN DETAIL
E m
r
LOWER OUT OF
wmtX WXw B�MDmr
MENCH
FORMER DEEP OF—DA
FLAT
oSOME ° NOR
OD
COMPATTEDaa°•X°°aX
°,owe °oe°o
COMFOGNTED
o anu
FEATURE OR
UNIFORM GREAMEDen8
+
GREL
+
^'
XARRAL
DanGE�
ILMOT
swTRo PIPEMer
AovW.
MaiIAL
LACKE lX5'
BIF
' TURN
1 aeo)
R.REFFER TO FILE
STUART MUNDANE CONSTRUCTION Dan
SUCTION 6.
bddM 1ENALS' FOR ORLON S
STORMWATER BEDDING
REQUIREMENTS
AlwRahD:
DETAIL
0llxe
y.�oum�w
STORMWATER
m
DAh' I/I�OD
ins
CONSTRUCTON
DETAILS
OREr e<
300 STORMWATER BEDDING
INTl64m
C5o2
KNOWN
BUIRMAT
pec
nl
.E (in t irtj
aEl��.unR
R \
E NNIA
BOB, 4
UK A T
e.
—(iiilll—h liiilly
DRIVE -OVER CURB. CVTIER AND SIDEWALK
X.
THE RUN
�Ba.
.TAX. xWw
p�W
A ART PAN R
�/ '
T�__.ED
IN
AIR.�Trs
MIND6 �T
1 W
`hATCAL 6 IN.
CURB. CUTTER AND SIDEWALK
ACT AT
.�
"Bill ..
IN DIII
I i
°
I T
DUMMY JOINT
6 •
FOR WALKS
a - e•ys
COMBINATON CURB, WRER AND SIDEWALK
'HOLLYWOOD'
(OBSOLETE - FOR REPLACEMENT ONLY)
CURB, GUTTER AND SIDEWALK DETAILS
MPERSTORMWATER
DETAIL
F�"Collins mDESCRIBE
wren is/�
OFF .a.
CONSTRUCTION DETAILS
D-6
AWN Br Na,
em.
,=W
301 CURB, GUTTER AND SIDEWALK
a8TT62£iF
cm3
LL CRY
g
s°ufl e
TO
14 PLATE LADY
GSA F
11EE BOLT
2'
.v,oX�axEamG.�vv.,A"'L,'RE �F1
So TF LED
A
c
\ I
305 DRAIN BASIN wI OUTLET ORIFICE CAP
C502 �
SIDESECTONNEW
A IT
DAY
PUT
MET,
RAN
WHATA
m
STORMTECH VAULT
30fi 30°BASIN GUY WEIR
cmz iff"REMEN
NNI/N����i
■
_
xZlliiiiiiiiiiiiiiiiiiii�
pnnnnn.nnnnn
yid••
S■
nY....Y....Y....RS.Y
YY....Y\\..Y....Y'I.n
L..._........
.Y..Q.Y..Y
immomm
nunnuB
nmm�n
mm
n
,�
,
B...EE
°EY
:.............Y..Y
.Y....YB.L•
iY..n"Iff
enomon
nnBn
"IT
PLACE LOU MODEST
CA
"�V r vwRO
it
A MIT IN
B .
TEFL wArt(ANCROD M-111)
PLAN VIEW
MATCH
IFT ON aim
I RETAIN.
RGECII
1/2 MI
u (A S ON
'Oo-.. '..
Bix.
A.
LFYI
SECTION A —A
a IN
2 FT 0 IN H
�x.
LIZ
IN
n IN.
�E
K.
Ft 0 IN
SECTION B B AM
PLATE
GAME
AT
uuix-i•n. ae
DETAIL"A"
METAL SIDEWALK CULVERT FOR VERT. CURB & GUTTER AND SIDEWALK
�
AIwROXED:
DETAIL
•.
muiBir®
STORMWATER
"Ar" 12/12/00
��
/'
CONSTRUCTON DETAILS
O
UNMMU Mw
DRAWN BUY MEND—�
302 METAL SIDEWALK CULVERT
INTl64m
WEALIPSUCIREEN
SECTION A
To 03 TO A
MELLFIL�RSTM�ENI
IF
X / `,ova : nVALLE1 0' TISCH RACK MOM T X Mk
J�,RADmBOTTO n a)
JusXXM�AB �a nr:l m>
d' En G BOLTS
TO HOLD FIRST IN
UP GUAM WANTO gOrtN� (m..®GG�A9EI
ZPANYTHREADEDBOLT (-FRED� SECTION B-B
GENERAL NOTES
IF I
aA>ESUBDRAIN -A �e B
iXCc
° Uly�.'{y+-1 CITY OF FORT COLLINS UDLITES
SECTION FC I°[�JI 11. STORMWATER CONSTRUCTION DETAILS
P O. BOX SW, FORT COLLINS, CO. 80522
(9701221L700
30] CONCRETE OUTLET STRUCTURE
cm2 ANGneaeAS
LECEND
UNEMAPPARAFRAW
1CJREACTOR
ABBREVIATIONS
OR GLEMARANNE
TOP THBI
ELM ELEVATOR
OFF IMUTTIFFROATE
OF, COURT
PAR OMATTEVURITY
MIN MINIMUM
OF, IMUTTIFFOR"I
AN INTAFED
A DINNER
Up, ADDABLE
9 AT
8
�
p
OF I OF
L
IS
MR
L
IS
MW
ve
TO
NORMAL
MCA
No
*GFROWAS
MCA
WLUM
WATER QUALITY
OUTLET STRUCTURE ., MA Exam
DETAILS (MODIFIED) COLOVIED
r Cox
AHMED
= ova;' D-46 ,
Knvw"BYsIRIOW.
Call cemreyou Dly.
0 BY 0 sssx AaW AdOONFlc[ Curl -.. ORIFICE
INV
ORIFICE PLATE
303 (CONCRETE OUTLET STRUCTURE)
MI
mz
TONS Z:1Zzio
OCT
T CT
o �E
IDCEio
Ca
Ca
GO J
SCREEN SLOT TABLE
ammm
SLOT
si�
AT WIDTH
PER TOM
NOTES
1 SELONTED HOMES AND 'PROPAGATED HERE' SHALIP MILAN THE SAME THING ALLEN
2 ALTERNATE SLOT DIMENSIONS AND APPROPRIATIONS REQUIRE EMPLICITTAPPRICARIP
ENGINEER
3W DIMENSIONS FOR SLOTTED
cmz HOPE PIPE "
Fx��ww A
IFFINI
MAN,
KAUFMAN
NNE mmI
308 PRIVATE UNDERDRAIN BASIN
C5@ xo
T AD Spir
City OE F'On GOn1Y8, Colorado
UTILITY PLAN APPROVAL
APPROVED
GULF �Ywv C•b
CHECKED BY:
watt' a a w.. otwy Det.
ORDERED BY:
91amnXtu YWty 0.b
CHECKED BY:
� 0.b
CHECKED BY:
vX vR Ceb
CHECXm BY:
DBG
a
18Z
F�z
ks
a
FRO
oz
.a
BoI
W
AN:
a"
"s
Frc
t!D
Sheet
C502
14 of 19
Il
zC %I
er/
VERTICAL
ga
III
(LOVELAND)
CURB AND GUTTER
L1RIllER COUNTY CONSTRUCTION REVISION N0: 1 DRAWDNG
URBAN AREA DRARINCS
STREET STANDARDS DATE: 09/O1/02 701
400 CURB AND GUTTER
RvlT64m
cso]
ATTACHED SIDEWALK DETAIL
DETACHED SIDEWALK DETAIL
—I� a
WEAKENED PLANE JOIN EXPANSION JOINF
SIDEWALK DETAIL
IARNO:R COUNTY CONSTRUCTION REVISION NO: 2 DRAWING
URBAN AREA DRAWINGS
STREET STANDARDS DATE: 04/01/UT 1602
404 SIDEWALK DETAIL
i
sx
PX W 1 (ml 1:1
a a<1
LL-;- - g
A
?Hp{
b
$¢¢y
>
E O Q S
J
E HIS3
4g A m8
EE#
�g
sR
z
a
z
a
4z
�
EUp
AM
NE
E
$
A'o
3 4mo
w W
F P Fe$� An � 5
O 0
,: gBp
3§r a
S AN
R sk 28 eA
LA SS a Ei„
OR
EW gz TIC`§ E2B
n Bb o Hs
�,%LAAB�NAdd
e
b 8E I
8 eo9E
C E Ffrfr s
e 'sE �1§
�Y Wlk ap4 @ �mg
aF �S- @$$ 2 �BE
o. TV aBd HIT N
BE unman m I
NOT TO SCALE
ti STANDARD DRIVEWAY APPROACH (HIGH VOLUME DRIVE TYPE III)
IARWER COUNTY CONSTRUCTION REVISION N0: 1 ORAAINC
URBAN AREA DRAWINGS 707.1
STREET STANDARDS DATB: 02/1T/lSZ
401PST STANDARD DRIVEWAY APPROACH
Cm]
405 as TV TxicH THICKENED CONCRETE EDGE
on,"Pal ASPHALT
FILTURAPSWE TIGER
a- PC BASE
MNM�F��KSE� PERMEABLE RAVER SECTION
APPROVED
NOTES
A=STEGRJADPNl RUSSIANS PREPARATION AND PAVING SHALL FOLLOW THE GEOTECHNPCAL RECOMMENDATIONS CONTAINED IN THE
GEOTECTNICAL ENGINEER NO EFFORT EL ZABETH STREET PROJECT 1209 AND 1220CIEST ELIZABETH STREET FOR_-OLLFJN CD ORA-0
PASCAL NO 20185009
nry ,[ FORM osRIDGE
• GO LOWMANU FULLNESS RECOMM-NEATIONS FOR 'AVER SECT ON xuaxpsaPux Tx[s[
RECEDE s
PART FUTURES S RECOMM-NEATIONS AND DE ALSOi
• N D-E THAT THESE PAVING SECTIONS ARE TO BE USED ONLY FOR AREAS OUTSIDE OF PUBLIC RIGHTFOXFORALY PASINIMSECTIONS
;RIGHT OF WAY WILL BE REQUIRED By THE CPU OF FORT COLLINS TO HE PER AN APPROVED PANTERMEALL DESIGN
RECALL
wfi PAVING SECTIONS
C50] xEff64�
XOSTANNEWAIREArda
1
O.-Oi
-i 0i ne
PUN VVIA,
5ff pel acel THAtl
g
HeadM Add
zn
nem
10
uea Mne 41
FAIL Intel
coal edema
to AM VITRO and
from popeMkTO
line mp oe
Mr�eeGed m77 receve screw.
.Ae To He
eae,sm,
SECTION C-C
�&exem'„a Are
nndaePo� a
e -(Aq PlbaM1 e'tle3]
Mai®beh atlas?
COMBINATION CURB, GLATER, AND SIDEWALK
6" VERTICAL CURB, CUTTER, AND SIDEWALK
SECTION A (2 VIEWS)
STANDARD DETAILS FOR DRAINAGE UNDER SIDEWALK
L4RI1�R COUNTY CONSTRUCTION REVISION NO: 1 DRAWING
URBAN AREA
STREET STANDARDS DRAWINGS DATE: 04/01/07 1 709
402 DRAINAGE UNDER SIDEWALK
FeITeffi
cso]
4'
2 2
B"TSLOPE I"/FT SLOPE I"/ET
NOTE.' ..{':.
PROVIDE CONTROL JOINTS AT 10 INTERVALS.
4W 4' CONCRETE CROSS PAN
cw] (PRIVATE ON -SITE) XO109W,,
AS AS
OUT ET
PIPE
L�TH
FRONT VIEW SIDE VIEW
408 CONCRETE COLIAR
C50] HIT To MAGE
B' CBlbj�
400 CURB CUT
cso] Berm-se�
E MR2
GDOE5' 1$
MITI RE, 12 Rl Too
IT
B'
INFALLSECTION OUTFPILSECLON
410 PRIVATE 19a VERTICAL CURB & GUTTER
P Y
:.:.:.:.:.:.A.'.
P tlre]S �wtlk Sii alk
.•.•.•.•.•
. A
I G.
F
O B-0'
FAR
K �me�l
T¢Exoa,�r
sRWmexe
JwN F6Rml
1 F -'
D,malea
SECTION A
NI Siazxalk ➢vhrsa SM1all Be %minimum.
NOTE:
1. 6,cA N 3maexo-allrm,ram
2F_-vvscya I, zryireml W¢ WNSI. OWx C. EenAM To JOB
aT-xa� 1-0 We Fexiaer In (zmxWarcal Drina NOT TOSCALE
STANDARD SIDEWALK
L4RINER COUNTY CONSTRUCTION REVISION N0: 4 DRAWING
URBAN AREA DRAWINGS
STREET STANDARDS DATB: 02/IT/19 1801
4OR STANDARD SIDEWALK
Cm]
BY IP
411 2- CONCRETE PAN
Sol To x
(PRIVATE ON -SITE) xa
wW AB
WCP
IZ EDGE RESTRAINT
412 PAVER EDGE RESTRAINT xoT To xra
MINIMUMId
TO BE MORPOLUFFICALLY ATxao,ACamCONC a0� —� r..P6PAGE ho
vu,Es�
413 T5 RENCH DRAIN
L50] xi�t6�
LnuDO
IN Call bebB OW.
Call oemre�you�
PLAN APPROVAL
�fA
CHECKm BY:
Them k wrimp mla YlWly
Ueb
CHECKm BY
sb.ro..u. uwny
a�
cnEacm By.
P
WUL
CHEI BY:
� ,,
aT.
CHEQVIT BY:
KEA
Ni
Wi
B
Be
AN
z
If
ASHsi
UP
AN
N.
Th
VIA
Ema
LU
J
WW
0
O
W
Z
Fee
O
U)
Z
D
Sheet
C503
15 Of 19
_
_
RI
D
—
_
PROPOSED TRENCH DRAIN PERFORM 2
l� !
-v
DOWNSTREAM
_�___.__
w.ccF
--3 BUR,
i_,I'1�fI�IjI4VII
1
I
I
IIIIII
•
II
IrIfIIIIbbI
•
l
I
••I:
I'I1lIIll
J
IIII
Ii
�
.1.
I\I
IIII
N
.I
iAj
III
�
IIIIIIII
\II
q00111U] . I[Ka] . I I [A] ERNI i.
U
DR,
HIM a
MINIMUM
I MEN,
-
m =UNK
NET
NSA
IMP,__ --. —_ ___ddd,�.
RS
BRUNEI
SIDEASUALFUCLUSTERT
EXISTING
0.Uamy
a
o
WEST ELIZABETH STREET _
NO ROW) i
_______________I��
I _
I
II _I
I I
NjDI
' 1
® NORTH
1b-ON:
LEGEND:
PROPOSED WENT EM
PROPOSEADCONTOW
9]
Id
\
[wmxa ----095]----
PROPOSEDSWATE
o
moroSEDCUaeaxUTTER
S
CS
CROSSBAR BOUNDARY Md Md IIIIIIIIIIINIId
CONSTRUCTION FENCE M ROCK BACK
�:r�
CF
VEHICIETRACIUNG CONFIRM PAD
SUCCESSOR
RS
INETPROTEDIIGN
q�p
1'I
i \
COxmEEwAswuE
a£➢
a
/ \
WATTLE ARE
PAVER FROTECUON
■
PP
Z`�
i
NOTE
\
\`1
PLLBMPSSHOWNS
PLAN AREGRAPHICREPRES
qs
\
ONLY
OBEDENMINEDMITHE OFSIZECT
WEE:
W
AND LOCATION THE CCNIMCTOR
ANDLOETIONS
W
{
9
EDO THE WIRMICSHE
AND DOCUMENTED ON THE OYNAMICSREPWJ.
SW
\
it
BENCHMARK
PROJECT B O�
CRT OF FORT COLLINS BENCHMI BOND
�J z
AT THE
CORNER OF tiffs EAueET AND CONSTRUCTION ARE. oN A CONCRETE muc ELI+Y
SIGNAL BASE
CITY OF FORT COLLINS BENCHMARK
WK
AT THE NORTHEAST CORNER OF
ST
AND SHIELDS OF
BASE
ELPI
PLEASE NOTE THIS PLANSETIS
NG
RAVERTICAL
VELOPMENTS
LANE USED ULESSONUN DATUM DF RTH o��:`P DATUMS TR� � MULCHINGDSHOULD RE �$
o.
USEOD,D
NGR�UNAD,ETEn ��DE „B
GENERAL NOTES:THE CRUNCH MARCOS SAGE in uBSB.wNGNORTHEMRae.EB, f ,
m
BTABADU BEDB� STORES G m:
SIMILARMETHODS,18.ar =_
3 =GT.ADBTD�ED�,EoACRES
AYMPADMINISTRATOR
CI
CMdAny DO
00
* CONNIFFUSCHNOR TO ENGAGE VEHICLE TRACKING CONTROL FOR
RETE
UT ANSI IF
�ETOTH COMMENT
EEDR DRAINAGE PORT FFOR
TUNNONELI �DATE.�. a 0TTBY �
UITION
NFORMUCTION SEE SEPARATE STORMANATER MANAGEMENT PLAN I SENATOR
CONTROL REPORT FOR UNIOETH
—* FOR STRUCTURAL CADMODIFICATION CENTER OF
..._.. _._` CF — —mm NISE y� mmmm.. .mRADo
—
mm
RSMAINSTREAM OF CONSRUG Z
VII
P Q
KR WnBrebe0w_ J
ESHIELDS STREET) TUBE R TECWD Call o fore you oy
IF RE IRIEZ2
\ — — _ — —-
1
ITSHOULDBENCTEDTHATTAR) EROSION MANUEL PLAIN SOURCE ONLY AN AUGUIDELINE TO THE CONTRACTOR S AGING MD DR OMANI RECOMMEND PRINCTRUES
12 ITEMS FACILITIES SHALL BE LOCATED AT LEBENT ONE
—;
NIL
LANDMIMPE �MM
TILITY PLAN APPROVAL
wvADvm:
TYtr rmMun.s
we
CHECKED BY:
Oster k OeeModatm VtWt9
D^,^
CHECKm BY.
9termnetee OtWIY
WG
CHECKED BY
Pvb OR 9eweYm
ppy
CHECKED BY
tteme eepnev
pate
cxmKm BYIII
TABLE OF CONSTRUCTION SEQUENCE AND BMP APPLICATION
Pm'eR uaRD UR Ell
.mrv+•o
�NP
e
f
J
W
Z
O
Z
O
IIOf
EL
Sheet
C600
16 of 19
mvii
.mmCHIIF M NJ -x.. �ND�,-
* WHITE WINES MITI A RODNEY F ACCORD M CNICHM WHOUT AREA IS W PA�ML
* ANS NAVY I NIPPON AT IN DIAMONDS ENHANCE At ME MACKAY I MIND � AM
NEMPEARY TU MURRAY MICAH ME HARBOR AN THE CONCERNS ANCHOUT NASA TO MOHAMED OR
I PRONUNCIATION
CWA O
001 CONCRETE WASHOUTAREA
.lT6 fffi
Cfi01
W� ON YET COULD PULL IT W BE WI
F NET AM D� COMM MAN WAY IT WAY AN
WE WRITE WISCONSIN HE SHAW, III MAW
ft� WE WANT SEE RAT MI
DI WE THAI SMMWT
RESEARCH MICIUM OR ROPER MW THE
SMASH �m� TO ME
Minm
�OTHER AND AM NEW VON OF HE Wk�
m
e 1 RAW ME ME SINES ABROAD WE WINTERS!, STAREM
MITI AM MI EVIL HIRE "i WE
13AWE
(BY w mi
WHAT A PONT A
WANT 0
b.'rz A NET WE HERBERT fM AMAN vmNAe
DIVA NE DIKE
Nxx axo� WD
HAVEN ETHICS MR) MEDIA REPAIR& Oft EVEN
.a.WAn CAYMAN ENMMm. MADUSEMAU a HARPER 'MAx MA CAYMANI WAVE ME TO REMAIN IN PLAN NMI WE CHANCERY VITUMED ANN A3 STARUZED
WARRANT
005 SWALE WATTLE DIKE
csal n m.
e EDITOR
WIN WATCHED �l�T UPON
ROCK SOCK SECTION ROCK SOCK P�N
ANY NOR AT H1NT SHALL AD RUDER AM AN BEER
., . ....AN WANOTACTIT.
11
.
ROCK SOCK JOINTING
awmm
�APON THEME
MY
IND
HIM
PAT
AN
- CROWN by OF MARCH MCNIS
♦n YETIr tiara ME RAW A. mil= NATO RLL ss) AND MALL
otmetCEMENT N WAR MMACY OR MVv T "CH A IMMM• AM HAD SHALL HE WORTH NEW NHROG MIAMI MY WE ME AT SY � BEAR ALL
002 b 2 ROCK SOCK
S£2F
CB01
I .
4� bb ✓4 r � qb"J
^l all 'Ali
I MYTHER MOMENT PADS THEM CHEMIST TH AN HER, ANSTANY THEM SHATTMA IN MAN AND MYSTERY ED WA�NQAND MAN �gMn�KA�UMWrMDAMAMMU�W
NAVY "'. LCANA WHY INI COVER i BY APPLUM AND MEAN TRANN' � MACK � NEWSPRINT MAP MACY NEW ��T I
MAT ME TERMINI MY ME SAM 15 MERCER ENRICHED I A MEAN MS. AT ANDIENAME RECENT MATCH RISEN �� MANY
ANNE AT METHODS AM AN ANN AS MURRAY TO RESPOND EFFECRINNEEN
• MIAMI WAY Mi WITHDRAW SCRED, MATTER CR BRITAIN PRO PARTY %W� HEAR NET AMOVED HARVARD` CRY MY MY I CAN
PAN Wi MY
N
MAP AM To MEAN IN A MAN MY r
AN HISHM WE WM ACCEPT WAS
MIAMI
VTC
AN,®,D. 11 WE SECPON A
003 VEHICLE TRACKING BAG
IAIA'L^R
Cfi01
MAY I
..m,WIS.
.. e....
ANDIn.v.vnYS.c
I
CF
004 CONSTRUCTION FENCE w/ROCK SOCKS
mT6x2£
cool
ti
MCI 00] PAVER PROTECTION
xmT62£2F
_ e teal
ISRAELI �MANNE cui urnmENTER ar
is
\ KwAvywhatsbelow
Call before you dig
MEDICARE E
DENISMULD
PAREMPLAYS WAR,
C
OOfi CURB INLET PROTECTION
C8a1
PLAN APPROVAL
PPPROAD
CII9 fi^ilcev
WG
CHECKED BY
FSYA k Fen4neW IlWlty
EDAM
CHECKED BY
9ter teA Ut ty
Bete
CHECKED Bypyi
It Rmmiatom
DEC,
CHECKED BY
wt.
CHECKED BY.
w1.
TIES
s=
A,
9^
m
MYWmNOT
J
W
z
0
z
O
i
U)
J
H
w
0
J
N0
LL
z
0
z
O
U)
N0
LL
w
Sheet
C601
17 of 19
PROPOSE
OS1FAIR
CON� HISTORICMINIUMS »,TOWN SQUARE SEE DRAUNAGE REPORTo:.a J
CONGI
95
PROPOSED V
CONCRETE PAN
/
I
i
\
I
I
I
I
I
I
II
II
I
I
I
I
I
I
I
I
I
II
I I
I
I
\
I
I
I
I
II
I
I
II
I
i
I
I
1
I
I
I
0.19
�\
II
II
I I
I I
I
I III
, I
I
I
I I
I\
I I
:ES .
.. Euxce��F A_
I
I
I
I I
I
I
I
I
I
II
I
1
I
=
/
I
11
®
I®
t�ll�n
!�_
Beni
mmmI.Emma
=__
--------------
go AlI
SY %aIIIII
%1%11111
62
CNEeRDG_HDUSE GETS
BRIDGE (LESS DG_ LP
Im
YT_
Ir
r
L
Sai
_SmSmiMission —��
— —
__-PROMISED
- ..
PROPOSED
,,
DNA
PROPOSED I
TRENCHINFRUNI d
'STORE
=—
MEMEM
*„►+_�
WEST E112ABIETH STREET
—1--+—
01 om
® NORTH
D AN AT BASE
N FEE
HIDED - zo.
LEGEND:
_ \ \
• 3 e •_ • PROPOSES INLET Emi
CER
PROPOSED CONTOUR gI
PROPOSLDDWALEA.
---
--
GELLER
SE—
PROPERTY
DESIGN POIm
III
PRMOSEDZ
PAN
FLOWARMAN
IT
gMERENE
I
/
1
a9w"'m
PATH
DRuxwE LABEL
r
�,,,,,
IN
n
MA HAS
U
ISUBDIVISION
�I
825 S SHIELDS�
DRAINAGE Essex e°uxDAxv ■ e- e- ■
exs S SHIELDS S.
i
—�
—PROMESED�
PROPOSED SCALE SECTOR
TRENCH DEAN
TES
I RE BE TO INS F NA RA°E ELIUDE,x. DATED RDPExLDRER. 2o,TPOR
'\�--_---
BEONCHMARKR°R
7RA°EIMPORTPORDRIDxDx
o ��
i
___
___—
—
CRT OF FORT COLLINS BEARCHMARK20-97
%AT
THE SOUTHWESTc°RxER OFWEST E„uBETHAND CONSTRUCTION AVE .DIN AcrnwETETRAFFIC
SIGNAL BASE
I
i_
CUM. 053.15
AT THE SO um EAST NO RNER OF WEST EuuBETH AN D SHIELDS ST OR A CONCRETE TABLE IN s GOAL
A
BASE
/
I
DATUM SURROUNDING DEVELONG ExTs
HAVE USE D TOY DDP DNADLRATED FOR THEIR DERT1,L DALLAs
---------
IFMVDM DFACT JSTEA DATUM C BEEF IED FOR ANY PURPOSE THE FOLLOWING EQUATION sxoULD BE
O SED
/
\
NC.D29UNAD.U3TED-NAv°S8-318
POPOSED
/
T
TR NCHDRAIN
BASIS OF BEARINGS
THE BASIS DFBEARINGS IS THE SOUTH LINE Or NOT S AN HEARING NORTH .. mSMWEST.
" I' JUDIALL
LOT 3, CAMELS WEST
VERTICAL CUM & GOTTEN
SHEI CENTER
COLLINS -AM'JS
WEST
,,,DW ELIA�HAT
I/
qIEII
—
I
TRENCH DRAIN
PROMESEDS
WHO CRT
DN
<
i>
\\
smEwuxcxASE
"ISTING NEAR
MACAU
�_�_� ■ —`
INS:
TO
100
No
"74
*
1 2
1 062
1
CITY!
1 14
1
AT
FOR DRAINAGE REVIEW ONLY
NOT FOR CONSTRUCTION
CALL TFULTY NCHMICATION CENTER OF
C LORADO
Kn whatsbelow_
befor
CALYAMNERSINCANUMMoBITAFECU
Call ROETED THEmqFRAGILE OWRADI
City
of Fort Collins, Colorado
UTILITY PLAN APPROVAL
APPROVED:
Cry r^ecw
UaG
CHECKED BY:
END, k We NI
OeM
CHECKED BY
domamit" OtWt9
Date
CHECKED BY:
CHECKED BY
� Nene�
wt.
CHECKED BY:
D.te
=W
€
Z
0�
z
Z w
FIR
.g
ew
o�
lid—
.^F��
as
.atom
pm
ns
wm
Q
LU
N
W
ILL!
LU
O
Q
Z
O
Q
Z
D
Sheet
C700
18 Of 19
—�\ — TENNESSEANS
CONDOMINIUMS/
I qI � 1 II
9 k�
\ I I• I
\ I V I
gp I I I
I I 11 I
1
\ 41
PH
a I I
I
PH A
iI
vv _.II
I /
J 1
LOT 1 CAMPUS VVEST
SHOPPINGGE
i I I:1
1
� 1 I pll
II I. 11
Wp1
1II
TER
INCIC u"
zszw EEMABETx/sT
I 1 I I 1
/ I
A1
l usrm,YR
PCSUCLO PHERAN
_ 1
�>>II
AA
pl II
LORAL
�4FJORT -OLTNI
-_ aD w
UP
_____-
I
I
I
I
FFE=3o 90 1
FFE=30 90
HIT
— —!f'LA —
\
i
Lu
_
FEW
—
k„
\
--------- PUSHING PABYSFUoDONAY
_-----
LERDSGGHu.P)
� - -
/
— �._- _.
---------------a��-------
r_—�
l
FLOODIPLAM
\
BEVDSMCUMIN
r
NORTH
AT AN FUL
LL2 BRUDMACAMBRIDGELP
W as
CAMBRI
—� (I 1„L IN PLUM CUT \ , EL:
LEGEND:
ram— �—_ -- —EXISTING STORM SEENER
PROPOSED STORM SExTR
i PROPOSED STORMINLET
PROPOSED coxrouR
EYSTxGcoxiouR — — w 3__ — — -
PROPOSED ARMY
MI PROPOSED CURB & SUPPER
FFE=30 90
MR
RR
��Y YfK
---� --...=__1
;o —
UMMMMmW
—�---OM I
MIXED -USE BUILDING
SUMMARY -WEST
BUILDING
P"
-REGULATORY
PLUNGE. RESIGNATIONHEAD
CAR
FLOOD
—1
MIXED -USE BUILDING
SUMMARY - EAST
BUILDING
P" -
PLUNGE. DESIGNATIONANSIREGULATORY
PUMP
ELEAVLON
- -
PEDESTRANACGEURAMPS Al
PROPOSED COMPETE
LZE
I
I—�
cross PAN JAY I
.o.1, soxrx
CROSS-SECTION AMr AMR) sc: zoos
SUBDUASION
SBEER AN LC
FGAS
S SHIELDS ATEW
uEvnnax HAVE CIA 5000epz
gEL
l�o@
BASE EittoELEVATION
no
\
.e'8^'KeB
Sm
EXISTING 1SAM FLOODF
PER AM
P'ESTING PAPER a000wAY . — — --- — — .
v
• /� \
B RAMGmNG)
11
FIELD
SURVEY
BY:
Zz
NORTHERN ENGINEERING
EAL"IAaa
US"R
g
la
l — --
nsGROMP
EAx,emG.00z
w
TOTE. MAY ,T
DATE MM
I
z
vvv
��
BENCHMARKS:
rx
\
PROJECT DrtTMM. PASCALCITY
Zw
OF FORT FALLING BENCHMARK GAST
/AT
THE SOUTHWEST CORNER OF WEST EIIUBEIH ROD CwcT"Mxox AVE DNA
-
/
1CONGREETIETRAUFFICSIGNALWASE.
f
ITY OF FORTFALLING BENCHMARK I LIST
CAT
THE SOUTHEAST CORNER OF WEST ECzwLETx AND SHIELDS AT ON AcoxcREPE
TRAUFFICSIGNALBASE
SHAPPING CENTER
§
SURROUNDING
AD
xGvozoTHEIR VERTICAL
DEVELOPMENTSWESTIALC AVE USED FOR
ew
,O w El MUEHST
ANCED xREMSTED DATUM IS CFOR Av PuaPosEmauoxixG
Eno sxaCC aEusEo
05
SPUN NAS
BASISOHE BANF BEARINGS FILE SOUTH LINE OF LOT BUSTORM xORm PVAaeA UEs.
AN
NOTES
m
AN
F
FGT
ENRoNS, TY
�_
,
EASEMENTS OTHER�EMENTSAN�RSU NFORMATION
I
—
z. AEGUUTE LOODWAYAND
DD.FRNGEANDMMBTGGMPAY CHAPTER ..
co mo°EGx
FDA,
ALL _LEVATIOUS DEPICTED IN PLAN REPER THE G GE
��
I
TORT CALLHS VERTICAL CONTROL T3 ELLS HAVC 89)
e^
.A�
4 ANY TMS LOCATED RE F.GGDWAYTxaTCANETOA.,EG PICNIC TABLES B,KERAcK E,G,
MUST BEANcxoREa
IN
Ae
STUFF BE ELEMENT IN THE
MMUNE~ °;OG�. YFORTHEBMLDNGwLLBE
®CONSTRUCTION
APPROVED ATLURE TIME OFBUUa:G PERMxAPPDCATON
a NO
ARA�A��UCT0NHO �
EN:�CANGG}SHAPLANDFEET THE
RDUREEFOR NORGE NTx AY
I\,
.
ER ORTFORG.INONELIABEHDATED.REMBER,L,GF
FOR ADDITIONAL
RDTMEDWnvCxo
NY
c xPRGR0PRFORMNGA
lURBCUT
e. xcEnTFUTEMusT REAPPROVED BEFORE wCERTIFICATEGF
y—
OCCUPANCY WILL eE ISSUED
•
10 ALL L CE PMENT STO BEPuwGG cEDATORABETHE REGULATORYFLOPROMOTION
W
T
1
,,. FOR EONTALCONIRGLCT"OFFaeT COLLINSGROUND MABTERCGNTROL
DO
N Lu
J Z
— LU Q
_ Z J
WEST ELH STREET / _ O
(80 ROM FOR DRAINAGE REVIEW ONLY Z CIUCTION O
NOT FOR CONSTRQ
R
1RA
N PAU�Moffl EQUIPMENT
TO N
is'
MIN.
_
E FLOOD ELEVATION
T�
NERE)
City of Fort Collins, Colorado
UTILrrY PLAN APPROVAL
APPROVED:
Coy INBURI UaG
CHECKED BY:
Now k INGINN W IRWty DATA
CHECKED BY
9temmmatee Unty Bete
CHECKED BYIF A-Mbm
CHECKED BY:
Date
CHECKED BY:
Date
J
LL
Sheet
C800
19 Of 19
NION
NGNN ER IOCAB
ET
BEING A REPLAT OF PORTIONS OF LOTS 3 AND 4, CAMPUSUWEST
ING
ATED IN
THE NORTHEAST QUARTER OF SECTION 15, TOWNSHIP 7 NORTH,
RANGE 69 WEST OF THE 6TH PRINCIPAL MERIDIAN,
CITY OF FORT COLLINS,
COUNTY OF LARIMER, STATE OF COLORADO
Know sit poser by Than premy that the unchanged awards) of Me following demoted land:
.A ran of lend lammed in the Northeast Quarter of Section 15, Township I NoM. Range 69 Wen of the 6th F.M., City of Fen Collie, County of
Latimer, See of Colorado, mere privately ivately described as Retains:
The Wet 23522 feat of Le 3.
Campus Wen Shopping Ccmer,
Ciry of Fort Collins.
C ones of Lorimer. State of Colorado
The East 124.78 feet of Lm 4.
Campus Wen Stropping Center,
City of Fort Cullim,
C'many of Lesions. See ofCobuadO
C marine 100.097 Nmid fat Or 2,298 cores, rat• an hat.
For themselves and their sueoesaas in interest (rollarivety "Ownct have read the abuse described land to be surscyN and subdivided into lots,
ttams ad meter as shown an this Pie to be known as UNION ON ELUFAHETH (the "Dzvelupmei"1, subject wall casements and tighb-of-way now
ofmmaor exisnttgmidiaced on ihio Plat. The rights mtl obligations ofthis Plat site ran with the land.
( LATI FKATE OF DEDICATION
I he Owner does hereby dedicate ad covey to the City of Fear Callir, Colorado 0 - f Cary' L fat public use. forevera persuade fightof--way
he,tomfourrowsandthe E m b lid outdeal designated tin this Plat, pnoidal. 1,,c'nT.that memwce by the Cry of this dedscatian of
I i,cmentsdo" not impose upon the Cityduty ta't' the Eassaincons to dindiceWand (2) mcepuuxc by the City ofTh chdiCadeft of sttws
dues not impose upon the City a dry to maintain srt t so dedicated until such time as provisions of the Masnendce Guinness have been fully
utafieu The sheets dedicated on this Phi are the fee property of the City as provided in Sectid31-23-107 CAS, The City's rights undo the
Easement include The right to ird1, open, access, maintain, repair, reconstruct, remove and replace within the Eremees public improvement
Lon'Limse with me iernrld phgwC of the Easement; the right m install, maintain and use gates in any farm Nat cross the Panamanian: the right to
home the Insured of the resources with suitable mmkm; unit the night to Permit inner public utilities to decreise ibex same rights. Owen rasova the
m to use the Fad b f that ag et renfere to the bull r f the tight hereby ed The C responsible for
g P Nrea j rho g y Ma Cityfeller
maintenance of'ce improvements; add d d tactivitiesto E i b t n ran r at dried the
p ep g r erg byr m tin.
C doe rim the d t ti c Er f" t' the Contract that t d e n C .Owen will
iY M mY P Y iY
maintainN R ofthe Fa L r charmer compliance withapplicableJ F I I t.
rr n rg rn
Except as expressly peen a d'in an improved plan f development other women agreement with the Cry Omner will not iinstall on the Lemming, or
Indeed the installation on the Fr naees of any building, structure, impmv i, f g wall, sidithwalk,e an otherdo p g (other than
sod anal awwmnry parms anal other ground cover). In the event such Obstacles art installed -in the Fractionate, the City has the right to require the
Owner to remove such distance from the Easements. If Owner does net remove such obataelw. the City may named such asset wiNdt any
liability or obligation for repair and replacement thereof and charge the Owner the City's costs far such removal. If the City tougher nor to remove the
m onales, the City with not be liable for any damage to the ob omelets or any other property to which they are attached.
The rights granted to the City by Nis Plat more to the benefit of the Cays agents, licensees, pcianpnec and serious.
OWNER:
M
S LATE OF COLORADO )
The Owner hereby warrant and guarantees to the Ciry, fat a period of two (2) years Earn the date of completion and fire acceptance hr the City of the
improvement warned hdmunder, the fill and complete maintenance and repair of the improvement to be constructed in connection wish the
Development which is the subject of this Plat This warranty and guarantee is made in accordance with theCity Land C.w Gvle and. in Net Transimmal
Land Use Relmlatione, as applicableThis Recruit" applies to the avetti add all Other apartmentstructures and cancrouss,' lying within the
rghmOBway. Easements J other public properties, including wMrmt limitation. II curning. sidevialkebk ptbs drainage paps. coloreds, caen
basins drainage ditches and landscaping. Any maintenance ad/or repair rryu d en widow shall W modinmN with the owning utility company in
dcym6nem
The Owner shall maintain said improvements in a manner that will ansure compliancen'st t basis with all communicate nandards.safety
requirements and carvardermartalp kti y' ts ofth Cty. The Owner shall I J Vapor. or cause to be conwhaland maternal. all
tharringicswad'improvermsents resultingForm J lop t ItJ or b'IJ'g Id activities.I the tthe Coleman falls to t any damages
within thirty (30)days R n thereof thsaid damages may be torratholbythe City ' d all come andchrg btld to addPaid bythe
That ndCity All also have any agree remediesavailable Fond bylaw _Any damages which occurrd prim to the end of said two (2)
year penal and which arc umepaired an the trnnirnon of said persad shall remain rise responsibility of the Owner.
In consideration of the appmvd of this final Plat and other valuable censldermone The Owner does hereby agree to hold the City broads fat a five (5)
year period, commercial; upon the date of cmmpletism ad fire acecpmnce by the City of the improvements 0 h wnalnwtd in determine with the
development which is the subject of this Plat, from any and all claims, damage& Or damands among On account of the deep ad emmmmim of public
unprovernings of the pmprrry shown ficardin and he Owner funoarraw commis to make necessary, rvyvrs to aid public imparessimits. to include.
without Indication the ndma stem fill& embankmrnn attends crom panse sub drain& severe, walls and bddger within the rightuf way, Eawmenb
and Other public properties, resulting from failures eauad by danger and/or dominated defocb. This agreement w hold th City hornless includes
defer in madmals and wodmanshieas well as Jefsas quad by ear admitting of settling eencho, fills mintensities.
Further, the Owner warrants that hieshe owns f simple tide to the property shown bercon and agreas that the City shall net be liable to the Owmr Or
huAer smeasaors'ad ' trachea during the warranty period. tier coy clam of tlamags resulting from negligence in exereising edgwecring techniques and
due arguingin the tonsuueti on t f cross dreasse drives,'r t buildings. the changing of coursoca of decades ad twos. flooding from natural
chances add rovers, and any other header whasioneverprivate property. Any and all mercury liability occurring eager this paragraph Nall be rho
liability 0fihe Owner. Ifnherwn ithailhave Nenghttocunveyaidlandaingto Nis Plm
An powers r take f that the Chavich has executed certain document pertaining to this Development which create when rights add obligations; of
the Development, the Owns author subsequent Owned of all or person; of the Developing re many of which obligaticonstitute Promises and
conventions; that along with the obligations under this Plat run who the land. The said documents may also he amedd from n to time and may
include without limitation, the Development AtWrmTn. Site And Unrelated Covenant. Find Site Plan. Find ladstvpc Plan, ad Architectural
Elevations which doeumcnr an on file in the office of the Cork of the City and should be closely amended by all prom numerical in purchasing
any pumon Of the Development tine.
ATTORNEY'S CERTIFICATION
I hereby certify that this Suesdivpnnn Plat has been duly executed in squid prsudi in Senate 2.2.3(Cp3Na) tluougls (e) inclusive of the land Use
Code of the Ciry of Fort Collins ad than all Perms signing this Sudidsid Plat on behalf of a separation or other eagry are duly anginrisr
signatories undo the laws of the Sam of Colman. This Certification is based union the retards of the Clerk me Reaction of tanmm Coug ry.
Colorado se of the date of creature of the Plat mal other information discovered by me that reronable inquiry and is limier as vuthonsN by
Section 2.2.3(1 of the Land Use Code.
An.
COUNTY OF LARIMER ) Added":
The reasoning irmmment was arMowledgr before ON this day of ,20 .by Address:
as of
Registration Na.:
witness my had ass official adal
its onanamort Notarycorm expires
LIENHOLDER
BY:
STATE OF COLOMBO )
By the City Pnameef of the City of Fort Collins, Colorado this day of AD.,M
PLANNING APPROVAL
COUNTY OF LARIMER I
Thc foagoing remainder was acknowlrgre bef me this day of .20 By the Dimmer of Community Development and Neighbmlrood Services of the City of FM CoWm, COloadothu
nv day of A.D., 20
se of
witness my land and official seal Director of Cod V Development ad Neighbotheod Sessic®
My membrane nine carries:
wtAmme�
slT��nS
F
w abi HST
CSI
i
a
�
e
—
I
1
VICINITY MAP
NORTH ,•-tppp'
NOTES O ES
L The Bats of Brings is the Sdth lee of Lot 3 as hearing North 89d938" What (eammcd baring), me mormemr in sM1mm on
growing.
2. All information reporting teammate, rigMrofway, or Tdc of Record, Northrn Engineering relied out Order Number
NCS4[3139-NAS. prelwrd by Find Amman Title hummnce Company, dad September 19, Min; and ONn Number
NCS4139756NAS, Repel by Fie Amcntan Titk lemma Company, dad March IT, 201T.
3. The lined unit of measurement f this plat is U. S. Survey Far.
4. There shell be dpnvak teagitimu,ewrnanbmreshimi0m nhatpMibit or limit de Nmdhnd ofnawvicewrming
equipment or Iew3naping that arc allowed by Sections 12-120-12-III of me City wtle.
5. All previous lot liras, ngMsef-way and easement as shown and ddirts] by Phi mfCampus idea Slopping Camnwbichm
Ioatd within the bmmdary Ins of this phi are hereby, vacmd arms transaction of this plat and dressed in shown hormn.
1. Robert C. Twenty, a Colorado Register traducement lad Sawyer do hereby time that this SuWivoion Pie was prepared Gan
an actual answer uncle may perwrl supervised That rise hoonatttcmadmin in inmate herwss were fad mar as showne ad that
the frregeirsg plat is an aamare representation thereof all this t0 tle - f my knowlrge. inf non and belief.
�P
For Ili F'�\i
Culmaa T•gistleyir Rufw�nal \=`��'1�
Wd Surveyor No. 3MV
ALL RESPONSIBILITIES AND COSTS OF OPERATION, MAINTENANCE AND
RECONSTRUCTION OF THE PRIVATE STREETS ANDOR DRIVES LOCATED ON THE
PRIVATE PROPERTY THAT IS THE SUBJECT OF THIS PLAT SHALL BE BORKE BY Milli
OWNERS OF SAID PROPERTY, EITHER INDIVIDUAU Y, OR COLLECTIVELY, THROUGH
PROPERTY OWNERS' ASSOCIATION. IF APPLICABLE. ME CITY OF FORT COLLINS SHALL
HAVE NO OBLIGATION OF OPERATION. MAINF ENANCE OR RECONSTRUCTTON OF SUCH
PRIVATE STREETS ANE OR DRIVES NOR SHALL THE CITY HAVE ANY OBlUK ATON TO
ACCEPT SUCH STREETS ANDrOR DRIVES AS PUBLIC STREETS OR DRIVES.
Q
is
pz
Xa
alalit
G
F9
3^vt
Ie
�Y
IvE
a-
U)Q
Z Q
LIJ
N
OO
w�O
U
LLLL
0
Ow
z
}
UU
Sheet
Noery Public
Oft Sheets
UNION
ON ELIZABETH
BEING A REPLAT OF PORTIONS OF LOTS 3 AND 4, CAMPUS WEST
SHOPPING
CENTER, LOCATED IN
THE NORTHEAST QUARTER OF SECTION 15, TOWNSHIP 7 NORTH,
RANGE 69 WEST OF THE 6TH PRINCIPAL MERIDIAN,
CITY OF FORT COLLINS,
COUNTY OF LARIMER, STATE OF COLORADO
FEAR
TIC LAE
CONDOMITOWN NIUMS em� I _wnuevue ,5Nm,
I Fal
=1
pm
:I I E.VEMEAT
I
I
\ al `�SavrlvE
I \y
I I -i-Er E — vsall
mT
II '-
81 `•
"I I ACCESSZFENEN SENCE
Exr
881E
I / I
5 12
81 �L IirM EwF%T \I
T I I
a' `xw
6w 1""
LET
n8 xlppl
z y g1
z Ile III
I I I` I
IT U1I owmwE e
I—r EMERGENNVENO ACCESSEASP
N
it lib
I ACCESS E<SENENT
GAMES WEST
SHOPPING CENTER al -I 5II IIH
w'I 6m
I I nl I
I I 81
gy
wl
MI
^vjl
zl
SECT
LAG
ZS81
a04'20NES 5ENT598_4?�I
I J
ENACCESSASEME
TOPELE6m 0al
11
_____________________________-
� ____L.I I
AuD
1 el
1 I I I
m ctZO
L.. u..0 •uu..u..uu..l aam E9. rt. .
INDIFIREELAR
WOPCILLEG
LOT I
CAAARIDGE
HOUSELOFFS
LOT1
ALTI
m III
m_ wE
owmanommomm
WEST ELIZABETH STREET
INQ' P fl,W,\
PER CAMPUS WEST SHOPPING CENTER
REC. NO. 820W
Ism. _________________�I
i
emU
vm�m TM
I
I
I
I
I
I
I
CURVE TABLE
CLAI
Dan
neplR
LENGTH
eEIPoNG
CORD
ON
wSrIP
Atli
8LE•M6£
Ssw
o
wav¢
Aw
uw
r�waww
ow
G
wbml'
aw
H.Q
8tl'MMW
le<
low
— — LEGE9ND ENT NESPECTRAL LINE
SOUNDARY LINE
LOT LINE
o
TAG ,S,d
PI ® 650ExnpEoan NIWER
I r
pl
m
19
M1 CIIP LESS CYMEn
I
CAWASSWEST
SHOP
I
u
I I
I
I
PING CENTER
I I
Ea�ENT
RZ
I
I I
I 11
I
I
I
I
I
I
RI
bl
IS
Www
qrPipR,
AT A,am I
q� I
E LI
wI
I
81
I vsaumnwwEn
aECTNIx rsTrxw.w�
I ExorxuNxNT=
.LaNNT� I
I
589004'20•E 380.08_ I I Se9.O4'ZO•E 3]a3T
IERRON)aawn�.om N
NEVIEm
,��6nuAE�ram
�T
30 0 20 40 60 Ml
( IN U.& SLA £V FEET )
I II - iC N.
PRELIMINARY
Rohm c Tartly
XRm nd Morarimal LAW survryur
Colowu aeymenm no.)M]U
VmvM on hblfafNoNan
Lnginxrin83E^'im, Irc.
vosE
px=
�Y?
cc
Um
NIX
z NIX
Q
�e
V/O
Zc)
J
J
LU
Of
to
N
O
UJ
XO
W
U
0LL
o
0w
_z
UU
sheet
!`I IGvv TRIAL a
Of 2 Sheets
000 D B Do
to to to
0
to
D
to r
0fiBfio
0
to o b1
0
to o b1
0
to to b1
O
bD o b1
0
to to to
0
fio i10 i11
D
be to b1
0
he he IT
0
he be IT
D
be be IT
0
fio b0 b1
0
fio be b1
0
b be to b1
0
to to b1
0
he be IT
0
bit bI IT
0
fio b1 b2
D
fio b1 b1
0
hit b1 b3
0
h1 h1 b3
0
hI IS b1
0
to to to
0
fio be b0
0
it fio
0
— ( 20' BEYOND PROPERTY LINE
br' bo�0 {10 bit hit bit o B o o o -% �'O o 0 0 "'B TO nT.'6'A�b'o isrB TO iiL�Ri�p �b �b
to b0 hD to to b1 III b1 h1 led b1 bites
it
LINE
to toh1 b1 b1 b1 b2 b1 h2 b2 bit 1 b1 b1 h1 b1 b1 b1 b1 b1 h1 b1 b1 b1 b1 b1 h1 b1 b1 b1 b1 11 h1 b
to he be bit to b0 to he be bit to b0 to he be bit
LIGHTING CALCULATION SUMMARY
CALCULATION AREA
LIGHT LOSS FACTOR
(LLF)
CA LCULATION
TYPE
UNITS
AVERAGE
MAXIMUM
MINIMUM
TO PROPERTY LINE
10
ILLUMINANCE
FOOTLPNDLES
193
256
00
29 BEYOND PROPERTY LINE
10
ILLUMINANCE
FOOTLPNDLES
00
0B
00
PARKING DECK
10
ILLUMINANCE
FOOTLPNDLES
243
113
Tom
be
PD
P2 b1 o
b3 b1 o
b3 b1 0
IT be D
Id I be Po
b1 be
Pe
b1 be �o
bI b0 0
hI be 0
PD
i be
PD
i be
o b0 1 0
111YRLv0
o i10
o b0 0
o be
PD
be be
P�
Id it IT �D
b0 b0 0
b0 bD 0
h0 b0 PD
to to
PD
IT IT
IT bit 0
Id e be 0
50 hit
Pe
To be to
- to b0 to be be to to b0 to be be b�0 to be be
iw "1 i��e--bw ie ie ae alIT—ii"r—abe
0
NORTH
1 SITE LIGHTING PHOTOMETRIC PLAN
SCALE: 1-=Z0'
EXTERIOR LUMINAIRE SCHEDULE
SOURCE
INPUT
INPUT
TYPE
DESCRIPTION
MOUNTING
MANUFACTURER, SERIES
NOTES
CRY
TYPE
COT
CRI
LOAD
VOLTAGE
SA
-
LED
Saw
and
8UNEPR LED PENDANT
26
120
SURFACE'
STRUCTURA INC., AURA LINEAR
1358 UM
PENDANT
#AURA LNR D 8 M SO CA
SB
-
LED
30U]
W.
62" TALL LED BOLARD WITH WOOD FINISH
12
120
BOLLARD
STRUCTURA INC, HAND
435 LM
#MAC 42 Too SO 120 STD
SC
-
LED
Saw
di
outraged LED SCONCE WITH BRONZE FINISH
12
120
WALL
WE£P.
1426
6203528
RED
-
LED
Saw
10+
LED FOLE FIXTURE WITH B LEDa 2101 DRNE CURRENT,
59
120
POLE
HUBBELL OUTDOOR UGHTING, NRO.
57521M
WIDE THROW DISTRIBUTION, AND DARK BRONZE FINISH
NV-R AR E
ASL A 8L 3K 2103 U DB
SEL
-
LED
Saw
10+
LED FOLE FIXTURE WITH B LEDa 2101 DRNE CURRENT,
59
120
POLE
HUBBELL OUTDOOR UGHTING, NRO.
5888 LM
FORWARD THROW DISTRIBUTION, AND DARK BRONZE FINISH
NV-R AR E
ASL A 8L 3K 2104 U DB
SE5
-
LED
30M
10+
LED FOLE FIXTURE WITH B LEDa 2101 DRNE CURRENT,
59
120
POLE
HUBBELL OUTDOOR UGHTING, NRO.
KING UM
SQUARE THROW DISTIRIBEFLON, AND DARK BRONZEFI NI SIT
NV-R AR
ASL A 8L 3K 2105 U DB
Si
-
LED
Saw
10+
134 WIDE LED ARCHITECTURAL EGRESS FI%NREWITH
HI
120
WALL
HUBBELL OUTDOOR UGHTING, GEOPAIC
2377
BRONZE FINISH
TRP112L Sir 3KI 2 U DB
Si
-
LED
3003
10+
WIDELEDH RCHITECTURALEGRESSFMIUREM IH
HI
120
WALL
HUBBELL OUTDOOR LIGHTING, GEOPM
2W1
1
BSR4
BRONZE FIN IS
TRP112L So 3K7 O U DB
UNION ON ELIZABETH
PROJECT
DEVELOPMENT PLAN/
FINAL DEVELOPMENT
FGRTCOLUNS. CO PLAN
a Wad planning is landscape architecture is
is urban design a management is
APPLICANT I PIARNER
RIPLEY DESIGN INC.
Storage Van Cited
419Cmryon Ave Sui
Fort Colllrs, CO OM21
P. 9702245828
L 9702256657
DR am Dim DI1Lmo
Rodney Run and Dino DRwlu
Ae SoNh Shady Gmve Rd., Sure fio]
MemM0., TN 381211
0.901AND 25W
HUMPHREYS B PARTNERSARCHITECTS, LP
YaohuaYu and Max Reiner
10DO15N SL datei00
Denver CO SEMI
R 7202562145
NORTHERN ENGINEERING
Nine Treed
391 N Lease Suite Too
Fort Choy, CO W521
0. 970221 415o
Zeeii
KK
o
770
NORTH S(OdLE 1'21Y
ORIBINN s
ISSUED
No
DESCRIFF ON
DATE
day
put
I eY
day
put
I eY
day
joys,
I eY
REMSIONS
say
day
led
I
day
led
I
day
led
I eY
day
led
I eY
SITE LIGHTING
PHOTOMETRIC PLAN
SEAL:
OaopPo �J `od
a5t
PCRHO T
Addy
m"11E111 MRZ
DRAWING NUMBER:
E1 OF
in
ENzaggeth Stre¢t AOts.
Fort Cl CO
FIHure Type: SA
Aura Illuminated Wooden Epson Pendant
a
de, LED new,mmst
FEATURES
CARE,"I".
el 21004 3MXDK MASS, grant ASIA
areetil
errs rvr.rur prig m,reuvro uvea:mid..
SPECIFICATIONS:
oughowennew for outherne, gypeconal whenew Awarded An At
well S I Lou inglowne, An' A finning 'ran wevelighl,
Aura Un"r -Mmet LishNns 6
counters, eww memory Mare Mounting
cadep.
agent
P
ORDERING Gu IONlih r..a..rrv..vr..o.'L rm 1,11.mes:u iAgeneake
u wam
FEEL Filled
1 2 s a s F ) a F Ed'
jurow
®Rou"And
:1awrow
r.mLighting
o
Noway
Ma[ Wood Body LED Bullard
,in
.eW Y.mMeaNrNlm _rm
• MrasnN WIN Y esso W �M.LrsM W e
S UPIUTMNi
M mmM
Widery, nowerytion, And whownin internal only too
AMR ninhool hoody" .1mong, Lew, too Anyone Able
An "Cute
ELECTS CAL I Al Memory wgwAwy' dolower engage in
rpri AM
mu the All
ten ¢N avm
. ... rpm cmumnq ov.m
w.v vg wool ma
ORDERING GOIOEr.ur.e To
Elizabeth Sheet Apts.
Fart Collins, CO
FIaNn rypu SS
CBIrsicSway --nrm,ee
DLS420 LED
620-3520
IR
DNwadm
FW Dow II07 Mill .... L LEDwPl lumlrcne Nmlmyrainnb
erxE:wer., A....�a. pat minding Pre
anyway S rLegmY Wal us lots wool trot e
Canyon Aly] MDPOPSWSimnu uluminN o osed nwri
BE F_O%LED Cril mmoney led l eo mmn See ar Dvm
rowntS.monly I, hi Al 41.....w Pml
DLS420LED
620-3520
Ea
r*len
npe.at..rre..w
1^DI O
TIDY MIMM.MK
y
F
nmeTNn
ErNl�rls.er
nles°<T
LEM e
Dan lmws latest
W I�I�RSRIY
IEDIma¢ Image
W sanl� ISW
/IAA::�a'v��won
0 .mod
INBrY4ai4a
Wmmnbq mdkaM1mmeePYFWur Mtun
Oeu ormom glev Ym.
Cab:
Summ aboor and
m., a.
RSPalneremrmnm.+mrl
p9ev Pulxr'vn
fB
nowt voIwm
Fn in ming And ALL in Ask ERLSONA a I PONE Er in vi PAI9N1 At M DON RVB119
likul Swnem,„Nmmnew ,vi rnaAwwol.mranbe
lurk inang her Ill Shown
o=
====
YAw.nYNT
s
F
To eimm 5"C
Sri
my. LAID
UNION ON ELIZABETH
PROJECT
DEVELOPMENT PLAN/
FINAL DEVELOPMENT
PLAN
FORTCOLLINS. CO
APPLICANT I PLANNER
RIPLEY DESIGN INC.
AeP nle Van Dylan
419Ca:ryon Ave Sulle31)
Fort China CO OM21
P. 919224 LESS
L 9702256657
FOR amD GTUHo
Rodney Kned andGno GRullio
999 Moir Shady Gmve Rd., Sund G0
M lTN381211
0.9812m25W
HDMPHREYS B PARTNERSARCHITECTS, LP
Yaortua Yu and MaeRelner
14DOput a Su11eaDD
Denver CO WOOD
D 7202552145
NORTHERN ENGINEERING
NICE True
m1N I sSuite 1D9
EM Calms, Go W521
1 970221 4158
KK
one we Len A own hing At
No
DESCRIAT ON
DATE
way
pre
1 Sly
way
Jay
I Sly
way
pay
I Sly
REASALSIONS
No
DESCRIPTION
DATE
Ill
I
An
ELL,
I yon
LIGHTING CUT
SHEETS
SEAL:
OaopPo �J `od
`Oa5<
PROJECT No: R1M
CRAWN SY ARD
RENEWED BY I MRZ
DRAWING NUMBER:
E2 OF
AIRO
LED SERIES
O/FA511FJ1g4D BGMER
!ice
•YI..,bIFiW.T1Mb
Ii
.� nTNeMatla.�Y4
0�b6MLlYrveYYMx
evepvarYY trYMa�
•.m. ®.v�ln[lanl
a4Mvne�e vienpuveM
•.bY,.r.a...M. bfa
We M.r iIXI asp.
a�W rMa.9.wr
M.q N
k.
Fixture
'mm basis, Y.., p....M
ilNpl_pMYprl
naNrawawq+Y+nRa
•�MuaMpnrmm�baM
Wherelso
'van H w � Fq�+mmlmw�s 9 M
-. � � �nwtlOFwfevb
b T]Tf C.®vv W e.W
•1m M.eer..av s
v®
�mm�m
m°�mm:.:eutmaA°`r.e
•vm
.xcWvv4
aY/BIIMlEmifOYlfaf L
MUBBELL
HUBB E L
aoeKLwsLenwaEsnnww
A am FF ne9
� s� ••a..1_Y.41 n w b�4
ffeMRW
"Mae,
M w
�w
I in
OR
:-
rw••^
ew.
Y w
an
Nuansurn
OneOwLysto
WO ORIOWW
Ri"ninantiRi A,
©©III3J©©I�©II�
W14i
IYlbb�as
aa�
raga
WWa
LAeY 1®mmynmw.4orve
-
Y.aaaw
w a.l®sy.i.Mar
Alaan
wadaup mN&M
n�
/ilN
IgablWa.anen Mavn
4
,pall
YYIiY
ffi+iaRaMJYOfTa
hel
WE
AaYfOF
lave
Mul
ars
ami,
OaaMxems
EIImOe[0 Strt AM.
GEOPAK SERIES Fort Collins, CO Huwu�
SIZE1 LED Fooure Type: as auetle: ElEleaYq
MEAD MIN Con5u Inct PngneD,,, l na
itwllAglrtYsl L600 E Ortnard Rd., Suite 150-S 4Fey
Greenwood Signal DO 80111
Yl iaf Sion)", 6000"Final saw,
40
IIIOafraNaW
Mwu A n.M
eMa1.Y�Ye bYn i Nf
E
«b "a
lhtlea.,.".wa.w. ...,.dided;m..wa a., . A a
ackly amu Inxm Wvuumn
CB W
Raybur
WL
in
1210sli
n a MI salaamunce.
s.Ufm ebu
w-1
®em Lprl f M.vmniM u emmadmaa.nmm+rAutn Y
• mWM1.mb. m9r enW
ownm.p..,
MIRROR
III r
n.� , .....I
r�
aavvYerrox
RmwrcnrlwatuTmss.� ® O
®� EK:EaStab®®
man w may TWIN IN olose I III,® M
i Y�
t� am As
IS Wrbac
O rM • 4ufY AN
f� ae
naale.n I..Mo� �•M YpnYe Y.Me.iM4YYYr.nefeN.ON
MerM.
,.„.,., WIG apl rL nm seaa. Y! aYu F a or F F F
E��-�'�r�000r—�t•R�oor�r,:;�� iuoo
is
Red
ff
Los
Red
Nrr
mr
.hn,.GO essi rrvm use
V am.1a Y Xa�
�eMMwe
.p.rvm.m.. nx..m ro�.ibwwee
rnmfErxc r'OR
AN is or
T
nR I 1mn
Trf nF.'Mafaal
QHOiiOMMELL eM,'M'r.�.r..e �rYNMa•o..,aYm..Y,r Ye.enlmr -.,-.rb
UNION ON ELIZABETH
PROJECT
DEVELOPMENT PLAN /
FINAL DEVELOPMENT
FORT COLLINS CC PLAN
in land planning in landscape architecture in
Is urban design in entitlement ,
AWLICAM I RANTER
RIPLEY OESICIN INC.
semame van waver
419C nAt¢Runs Sion
Fort Colors, W 8041
9. 9I0.22a 59ID
[ 970225E6.57
FEE and Dim ONdmo
Runny RON and Dino Dal uulu
999 South Shay Gooe Rd, Suite COD
MempdLA TN W120
e 9012592N
HUMPHREY98PARTNERS ARCHRECIS,LP-
Yaodu9 Yu and Mae Relrer
W W 16th 9L Suite 0W
Inver GO 81
p. 720256.2145
NORTHERN ENGINEERING
NIIX Filed
Sol N. Hnnea Suite 1 an
FM Chains, CO W521
p. 970 SO 4158
KK
WOREW OWWO ROW ROM We
Mom
ODD
©�0
©�0
©�0
0�0
0�m
0�0
0�0
0�0
0�0
0�0
0�0
LIGHTING CUT
SHEETS
SEAL:
S
O�aG
G
PROJECTNo: R16051
DRAWN BY I PAO
RENEWED BY I ad
DRAWING NUMBER:
E3 OF
Attachment 20
EASEMENT RELOCATION AGREEMENT
This Easement Relocation Agreement (this "Agreement") is entered into as of June 20, 20179
by and between COLLINS CAMPUS WEST LLC, a Colorado limited liability company ("CCW"),
and ELIZABETH STREET CO MANAGER LLC, a Delaware limited liability company ("EDR").
RECITALS
A. CCW is the owner of the property municipally known as 1108-1128 West Elizabeth
Street, Fort Collins, CO, being more particularly described as follows (the "1108
Parcel"):
The west 108 feet of Lot 2, and the east 107 feet of Lot 3, Campus West
Shopping Center, City of Fort Collins, County of Larimer, State of
Colorado.
B. EDR or is assignee intends to acquire the property currently owned by Saint Paul's
Episcopal Church municipally known as 1208 West Elizabeth Street, Fort Collins, CO,
being more particularly described as follows (the "1208 Parcel"):
The west 235.22 feet of Lot 3, Campus West Shopping Center, City of
Fort Collins, County of Larimer, State of Colorado.
C. The 1108 Parcel and the 1208 Parcel are subject to that certain Cross Easement
Agreement dated September 20, 2004, of record in the Larimer County, CO Recorder's
Office at Reception No. 20110056971 (the "Cross Easement Agreement"),
D. EDR intends to construct a mixed -use multi -family housing and commercial retail
facility on the 1208 Parcel (the "Project").
E. In connection with the current design plans for the Project, EDR desires to modify the
Access Easement (as defined in the Cross Easement Agreement) located on the 1208
Parcel, which includes the redesign of the parking lot located on the west side of the
1108 Parcel (the "1108 Parking Lot"),
F. CCW and EDR have agreed to set forth their agreements and understandings as to the
relocation of the Access Easement and the redesign of the 1108 Parking Lot,
NOW, THEREFORE, for and in consideration of the mutual covenants and conditions set forth
herein, and for other good and valuable consideration, the receipt of sufficiency of which are hereby
acknowledged, the parties hereto agree and covenant as follows:
1. While the Project is under construction, EDR intends to relocate the Access Easement
(the "Interim Easement Relocation") as shown on the conceptual drawing attached
hereto at Exhibit "A" (the "Interim Design Drawing"). In the event EDR moves
forward with the Interim Easement Relocation, EDR, at its sole expense, shall cause
the 1108 Parking Lot to be redesigned materially in accordance with Interim Design
Drawing (the "Interim Parking Lot Redesign"). EDR represents that it has been told
11
Attachment 20
by the Fort Collins City Planner that the Interim Parking Lot Redesign will not require
an amendment to the existing site plan for the 1108 Parcel. In the event an amendment
is required and EDR still desires to move forward with the Interim Easement
Relocation, EDR shall obtain such amendment at its sole expense, and CCW shall
reasonably cooperate with and assist EDR in EDR's efforts provided that such
cooperation does not obligate CCW make physical improvements, alterations,
dedications of easements or property rights to the City of Fort Collins or any third -
parties, or any other material modifications inconsistent with this Agreement that
impact the current occupancy, use and entitlements for the 1108 Parcel,
2. As part of the final development plans for the Project, EDR intends to relocate the
Access Easement (the "Permanent Easement Relocation") as shown on the conceptual
drawing attached hereto at Exhibit "B" (the "Permanent Design Drawing"). In the
event EDR moves forward with the Permanent Easement Relocation, EDR, at its sole
expense, shall cause the 1108 Parking Lot to be redesigned materially in accordance
with the Permanent Design Drawing and shall grant CCW an easement (the "Parking
Easement") along the eastern portion of the 1208 Parcel to accommodate the parallel
parking spaces (the "Parallel Parking Spaces") shown on the Final Design Plan that
will be partially located on the 1208 Parcel. CCW acknowledges that the Permanent
Design Drawing has not yet been approved by the City of Fort Collins and is subject
to change based on the City's comments and approval conditions. EDR shall
reasonably cooperate with CCW regarding increasing the final width of the northern
entry aisle up to 24 feet wide as necessary to ensure that large vehicles accessing the
1108 Parcel (such as garbage trucks and box trucks) are able to access the 1108 safely
and with reasonable ease. In finalizing the final plat for the Project and obtaining the
City's approval of same, EDR shall also use commercially reasonable efforts maximize
to number of code -compliant Parallel Parking Spaces,
3. In performing the work described in Sections 1 and 2 above (collectively, the
"Easement Relocation Work"), EDR shall use commercially reasonable efforts to
minimize any disturbance the Easement Relocation Work may cause to CCW and its
tenants, licensees and business invitees. EDR and its contractors shall secure general
public liability insurance, including insurance against claims for personal injury, death
or property damage occurring in connection with the performance of the Easement
Relocation Work. The Easement Relocation Work shall be performed in a
workmanlike manner and shall comply with all applicable laws. CCW shall cooperate
with and assist EDR in connection with the Easement Relocation Work as reasonably
necessary.
4. If it becomes necessary in connection with the Easement Relocation Work to relocate
any signage located on the 1108 Parcel, EDR and CCW shall cooperate with one
another to relocate such signage. EDR, at its sole expense, will install all traffic and
directional signage as required by the City of Fort Collins, or at the reasonable request
of CCW. EDR shall also pay for the cost of relocating any existing signage or installing
any replacement signage including but not limited to City of Fort Collins application
and permit fees, but shall not be responsible for the cost of designing or purchasing any
new signage desired by CCW.
ka
Attachment 20
5. The final plat for the Project shall re-establish the Access Easement (as relocated per
this Agreement) and establish the Parking Easement, each of which shall benefit the
1108 Parcel and run with the fee simple title of the 1108 Parcel and 1208 Parcel, and
shall include such other pertinent details commonly associated with these types of
easements such that the final plat shall govern all access and parking easements
benefitting and burdening the 1108 Parcel and 1208 Parcel. The final plat for the
Project shall include language obligating the owner of the 1108 Parcel to maintain and
repair the portion of the 1208 Parcel affected by the Parking Easement (the "Parking
Easement Area") and giving the owner of the 1208 Parcel the right to maintain and
repair the Parking Easement Area at the expense of the 1108 Parcel owner in the event
the 1108 Parcel owner fails to perform such necessary and reasonable maintenance and
repair work. The final plat will include a dedication of an Emergency Access Easement
to the City of Fort Collins, Colorado over that portion of the Permanent Easement
Relocation area located on the 1208 Parcel. Upon recording the final plat, the parties
shall take the necessary actions needed to terminate the Cross Easement Agreement,
6. The final plat for the Project shall also include language specifying that in the event
future development of the 1108 Parcel materially increases the amount of vehicular
traffic accessing the 1108 Parcel via the Access Easement, then the 1108 Parcel owner
shall share equitably in the cost of maintaining and repairing the Access Easement
based on the relative traffic demands of the 1108 and 1208 Parcels.
7. The Cross Easement Agreement shall remain in full force and effect until terminated,
subject to the agreements and understandings set forth herein.
8. All references to "EDR" herein shall include any entity affiliated with EDR that may
ultimately acquire ownership of the 1208 Parcel,
9. This Agreement shall benefit and bind the parties hereto and their respect successors
and assigns.
10. Facsimile or electronic transmission or retransmission of any executed original of this
Agreement shall be the same as the delivery of an original. At the request of either
party, the parties will confirm facsimile or electronically transmitted signatures by
executing an original of this Agreement.
[Signature Page Follows]
3
Attachment 20
EASEMENT RELOCATION AGREEMENT
IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of the date
first written above.
CCw:
COLLINS CAMPUS WEST, LLC,
a Colorad imited liability com any
BY: �C
Name:
Title; wQ44 LLL,
EDR:
ELIZABETH STREET CO MANAGER,
a Delaware,li&ited liabiN't� comnanv
BY:
Name
Title:
T
• .. Brevard
.,
Acquisitions & OffmCampus i
9
Attachment
20
Plettetl By:
SbpM1anie Van Dyken
Layout:
l INTERIM ACCESS
PmNeU On:
&N20173:01 PM
File Na";
Burvey wtlM1 Building Emelopa.tlwg
II I
II 1
it I i
' I
II I
PROPERTY LINE —
Pit
i�
r �
— —I — -- -- �— — R I
-JI
III I I
m I IS
m
II N g o
I In rn
li 2 1 I M W
r 5_ J—
m z
Jl�
I
' I
I
I I '• � I
^> In I I
h< M
�AmmA
I I I 3m=mmy I a m \
. TWO WAY TRAFFIC
r.. .I —I I I 1 :1
l PARKING FOR CAMPUS WEST
' SHOPPING CENTER I ej
\ COVEREOSIOEWALK /^\
ng �° r MU
'n s M mg oma
9N O gaIn M In 0
w H M
m O
0°M
1 N W In
I in x O
I I
I I
$$Q m
Z� Z
z
� � � n Oy :U
0 p
P^y D
Oy IM
€
o
go
T
z
ap
°Ng
R
E
�>
�Hd of M S
Bm3 �n - _ C
mSMg sa S�. <
war
.e $ �!a D _
S �
Attachment
20
Plettetl
By:
Stephanie Van Dyken
Lanni
2 PERMANENT ACCESS
Pill On:&2O20P
3:01
PM
File Name:
I SunmyvnM
Building Emilapt Exg
I
I I
II I I
I I
I I I
I I I
I I
I I I
II
in
I \ I
I
' I I
III o i IF —I I
I
I 20' MINMOM
NERF
I WO..
______________________________________ 1
B
I 5 I 1 1
ill Cn
m
r „ZI
I p
\9
,I W I ismin
III �n I KIM W
l (n o0
m I
mil I
-- --
I I
mill
I
m
>Om AyD
I IT 0
IT pmmp
s N m m m O rvao-waY
S In K y y �' TRAFFIC
O
y l T _
—
m
C� }m ONE-WAY SOUTHin
4 0 o in
O o� in m
Z PUS
PAR SHOPPIR C CEWE WEST
ED SHOPPING CEMER m
In In
III in
O �= OOVEREDSIDEWALK
= p°
7 m- In �fl OA• o $fin og;
III m6 m$
O
Or I m F
F
y i i l I `� n n
❑ I
y I
MOM 0
2IQ m
a9
cz in
a
o aZ
D
0 p= b oy�Po� F;F z
D
M
€
o
o
in
ap
OWg
R
in
E1,1111
1>
ge 6`
6 B3S A
MgR- m
C
R
A
innvn.�gm
g
o
of a
y
Bm3
�J
a
-
e
K
'2
gg-
•a5�
,ten
O
s
a'
m
ea
3:
n
J4
3n
M
D
(
t@
4
gg
•a
r
2
Attachment 21
RECEPTION#: 20110056971r 09/20/2011 at 09:27:34 AM, 1 OF 81 R $46.00 TD Pgs: 0
Scott Doyle, Larimer County, CO
CROSS EASEMENT AGREEMENT
rl� �
THIS CROSS EASEMENT ACYRFEMFNT is made: this : G clay o f septi l er, 2004, by and
between Collins Campus West LLC, a Colorado limited liability company ("Collins Campus West")
and Saiia Paul's Episcopal Church ("Saint Paul's"),
RECITALS
A. Collins Campus West is the owner of the following real property:
The west 108' feet
of Lot 2,
and the. east 107'
of Lot 3, Campus West Shopping
Centel, City of Fort
Collins,
County nJ Larinier,
State af'Colorado
also known as 1.108-1 128 West Elizabeth, Fort Collins, Colorado (hereinafter 1.11e "Collins Campus
West property"),
B. Saint Paul's is the owner of the following real property:
ld/est 235.22 Feet of Lot 3, Campus West Shopping Center, City of Fort Collins,
County of Larimer•, State of Colorado
also known as 1208 West Elizabeth, Fort Collins, Colorado (hereinafter the "Saint Paul's
Property").
C. The Collins Campus West Property and Saint Paul's Property are adjoining parcels of
land located on the north side of West F1izabeth Street, Fort. Collins, Colorado. The Collins Campus
West Property is located immediately cast of Saint Paul's Property as further depicted on the
attached Exhibit .A. The westerly portion of the Collins Campus West Property is currently, and has
historically been, used as ingress and egress and parking for both the Collins Campus Wegt Property
and the :Saint Paul's Property. The easterly portion of the Saint Paul's Property is currently, and has
historically been, used as ingress and egress and parking for both the Collins Campus West Property
and the Saint Paul's Property.
U. The City of Fort Collins, Colorado (hereinafter the "City") is proceeding with a
project known as the West Elizabeth Streetscape Improvement (hereinafter the "Project"). The
Project generally involves the realignment of ingress and egress points to various properties on the
north and the south side of West Elizabeth Street. This realignment impacts both the Collins
Campus Wcst Property and the Saint Paul's Property,
E. The Project's ingress and egress realignment provides that the Collins Campus West
Property and the Sai nt Paul's Property wi11 sh:r.n: joint use of a smolt. ingress and egress easement as
srt. forth nrt 1?xhibit..A. Forexample, visitors to ►he Saint Paul's property will gain access through the
Collins Campus West Propery through a one-way easement across the Collins Campus West
After decorrlftlkr Rerun lo:
J��+�,.f ,tnhlr5nn. Fsyttr+r
,tirnll lfrnnder & rirtS1 PC
32) SonA College Avenue. Suite 1
��� fort C�llieu•, f.:nlurrtdn SO]Z4?B45
(910) 492-4846
Attachment 21
R.ECEPTIONn: 20110056971, 09/20/2011 at 09:27:34 AM, 2 OF 8, Scott Doyle,
Larimer County, CO
Property. Visitors to the Collins Campus West Propciiy will exit through a one•%,vayeasement across
the Saint Paut's Property.
F. Collins Campus West and Saint Paul's have both independently through separate
documents dedicated certain easements to the City to facilitate the Project.
G. This Cross Easement Agreement is necessary to provide continued ingress and egress
access to both the Collins Campus West Property and the Saint Paul's Property, consisient with the:
Project ingress and egress realignment. The parties enter into this Agreement to facilitate the
Project, and in recngnitinn of the fact that the mutual ingress and egress eascment benefits their
respective properties.
NOW, THEREFORE, for and in consideration of the mutual covenants and conditions set
forth herein, and forother good and valuable consideration, the receipt and sufficiency of which are
hereby acknowledged, the parties hereto agree and covenant as follows:
ARTICLE I
DEFINITIONS
1.I General. The following sections define words and phrases which, as used in this
Agreement, hayc the meaning set forth below. Other terms in this Agreement may be defined in
specific provisions of the Agreement and shall have the meaning assigned by such definition,
Defined words and phrases are indicated in this Agreement hycapitalizing the fi.t:5t.lei.terof a defined
word or of each word in a defined phrase.
1.2 "Access Easement." means that the Access Easement intended for vehicular,
pedestrian and bicycle ingress and egress over and across the Collins Campus WestProperty and the
Saint Paul's Property as described in Section 2.1.
1.3 "Common Expenses" means all costs and expenses incurred in maintenance, repair,
restoration, or improvement of the Access Easement which has been approved by mutual agreement
Of the Property Owners.
L4 "Easement Aral" means that portion of the Collins Campus West Property and that
portion of the Saint Paul's Property intended for use as the Access Easement as further described
herein,
1..5 "Owner" means the record Owner, whether one or more persons or entities, of fee
simple title to either the Collins Campus Wcst. Propvrl.y or the; Saint Paul's Property, but excluding
those havi ng such int.ere5ts merely its security for perfurmance of any obligations. And Ownershall
al -go include. ffiv Owner, bl'lll:l.11t:f []rtt: Ur mute (]t'f5(}n5 or entltle5, of fee simple title Co the Nicol
Enterprises Property, but excluding those having such interest merely as security forperformance of
any obligations, if Nicol Enterprises or its successors and assigns, subsequently becomes a party to
this Agreement as provided in Section 2.2 below
P W.IC ZSCAUSS EASUM N': BCiRIM-MUN 1,03100J.ddC
2
RECEPTION4: 20110056971 , 09/20/2011 at 09: 27 : 34 AM, 3 OF 8, Scott Doylettachment 21
Larimer County, CO
I .b "Property" means collectively the Collins Campus West Property and the Saint Paul's
Property, and the.Nicol Enterprises Property, if such Property subsequently becomes subject to this
Agreement as provided in Section 2.2 belol,Li.
ARTICLE
A GREEMEiNT OF EASEMENTS
2.1 Access Easement. Collins Campus West hereby establishes and creates for the
benefit of Saint Paul's a mutual, reciprocal and non-exclusive Access Easement, license, right and
privilege to use and enjoy, for vehicular, pedestrian and bicycle ingress and egress over and across
the Easement Area which has been or may be hereafter constructed on the Collins Campus West
Property, Such Easement Area shall be not less than fifteen (1.5) feet wide on the straight portinns
thereof and have a radius of not less than fifteen (15) feet on the curved portions thereof. The
location of such Easement Area may be wu•ied from time to time by Collins Campus West, so long
as it provides ingress and egress as provided herein, and so long as the requirements as to minimum
width shall be complied with.
Saint Paul's hereby establishes and creates for the benefit of Collins Campus West a
mutual, reciprocal and non-exclusive Access Easement, license, grant and privilcgc to use and enjoy
for the purposes for vehicular, pedestrian and bicycle ingress and egress over and act -ass the
Easement Area which has been or may be hereafter constructed on the Saint Paul's Property. Such
Easement Area shall be not less than fifteen (15) feet wide on the straight portions thereof and have a
radius of not less than fifteen (15) feet on the curved portions thereof. The locanion of such
Easement Area may be varied from time to time by Saint Paul's, so long as it provides ingress and
egress as provided Herein, and so long as the requirements as to minimum width shall be complied
with.
The Easement Area is for the benefit of the owners of both the Collins Campus West
Property and the Saint Paul's Property, their successor and assigns, as well as their respective
employees, tenants, licensees and business invitces.
2.2 Conditional Easement. Saint haul's acknowledges that Nicol Enterprises, LLLP, a
Colorado limited liability partnership (hereinafter "Nicol Enterprises"), an entity with common
ownership with Collins Campus 'Vest, owns property adjoining on the eastern boundary the Collins
Campus West Property. The property owned by Nicol Enterprises is legally described as:
Lot 1, MASSCY MLNOR SUBDIVISION, EXCEPT that pot -Lion conveyed to the City
of Fort Collins by deed recorded May 13, 1994, at Reception Number 94041.850
described as follows: The Easterly 20.00 feet of Lot I, of the said plat of Massey
Minor Subdivision, City of Foil. Collins
also known as 829 South Shields, Fort Collins, Colorado (hereinafter the "Nicol Entcrprises
Property").
r:�xi.ru.rsurnoss rrr,��n:r:•t.,rku:r_ur.�rr,.:a o: a:� �'
r
RECEPTIONII: 201100569711 09/20/2011 at 09:27:34 AM, 4 OF 8, Scott DoylAttachment 21
Larimer County, Co
Saint Paul's acknowledges that Collins Campus West and Nicol Enterprises may
subsequently enter into an agreement for the redevelopment of the Collins Campus West Property
and the Nicol Enterprises Property into a common commercial and/or residential project. Or, that the
Collins Campus West Property and the Nicol Enterprises Property may be combined into one (1)
parcel under common ownership for redevelopment. The Property Owners agree that the Access
Casement granted herein shall also enure to the Mcol F.mtcrpriscs Prnlicrty. This coniingont
easement for the benefit of the Nicol Enterprises Property shall in any event terminate no later than
twenty-nne (2 1 ) years after the death of the last survivor of the group composed of John Carl Nico],
Kathleen C. Nicol, William C. Nicol and Alayne A. Nicol, and those of either John Carl Nicol's,
Kathleen C. Nicol's, William C. Nicol's or Alayne A. Nicol's living issue that survive either John
Carl Nicol, Kathleen C. Nicol, William C. Nicol or Alayne A. Nicol
The Owner of the Nicol .Enterprises Property, its successors or assigns, shall become a party
to this Agreement upon the execution and recording of a statement ratifying without exception all
terms and conditions stated herein.
ARTICLE 3
N1AINTENANC:E AND REPAIR
31 Access Easement. The Owners shall be equally responsible for the timely and
adequate maintenance, repair, restoration or improvement of the Easement Area. ,Such maintenance
and repair shall include; by way of example and not by limitation general maintenance, repair,
restoration, replacement, resurfacing, repaving, cleaning and snow removal.
3.2 Right to .Maintain and Repair, Notwithstanding any obligation under this Agreement,
either Owner shall have the right, but not the obligation, to make such repairs and maintenance to the
Easement Area as such party deems appropri ate without the agreement of the other Owner, provided
that such repairs or maintenance authorized without the agreement of the other Owner shall not
interfere with the nonconsenting Owner's reasonable use of the Easement Area, and provided further
that the Owner authorizing any repairs or maintenance without the agreement of the other Owner
shall be solely responsible for the payment of all costs and expenses incurred in connection with such
repair or maintenance. In such an event, the Owner authorizing such maintenance and repairs shall
indemnify and. hold harmless the nonconsenting Owner from and against anv and all loss, costs, and
expenses, including reasonable attorneys' lees, arising out of any claim which may be made against
the nonconsenting Owner for wort: performed or materials delivered. The Owner authorizing any
such maintenance or repairs without the agreement of the other Owner shall also indemnify the
nonconsenting Owner against all claims, liens, or claims of lien arising directly or indirectly out of or
by reason of any work or activity performed on the Access Easement and shall, within ten (10) days
after the filing of any statement of lien, Fully pay and satisfy the same or post a bond or other
appropriate seCu-ity to obtain the release of such lien.
3.3 Extraordinary Use, Notwithstanding the foregoing, the Owner of each Property shall
be responsible for and. shall hold the other Owner harmless from any costs or damages to and repair
of the Easement Area caused by extraordinary use thereof by any such Owner (including, without
limitation, use of the Easement Area For ingress and egress of construction equipment).
P kX I.r11XS1C4RiJSi rnSr-.V1E9r GR1;FMFN7 o9:31UM14111c
0
na��
Attachment 21
RECEPTTONiI: 20110056971, 09/20/2011 at 09:27:34 P141 5 OF 8, Scott Doyle,
Lar-imer County, CO
ARTICLE 4
DEFAULT REMEDIES
In the event the Oviner defaults under the terms of this Agreement, the non -defaulting Owner
shall have the right to an action for specific performance of damagrs, or both. In the event tl}u
Owners of the Properties, by mutual agreement or as a result of a bona fide emergency, authorize
work to he performed on the Easement Area and in Ilse event an Owner faiIs to pay its proportionate
share of the common expenses, then the non -defaulting Owner may pay the defaulting Owner's share
of the Common Expenses and shall be entitled to reimbursement from the defaulting Owner for the
defaulting Owner's share of the Common .expenses, together with interest at the rate of eighteen
percent (18%) per annum. In addition, the non -defaulting Owner shall have a lien upon the
defaulting Owner's Property for the defaulting Owner's share of the Common Expenses, together
with interest thereon. To evidence such lien, the non -defaulting; Owner shall prepare a written notice
setting forth the amount of the unpaid portion of the Common Expenses, the name of the defaulting
Owner, and a legal description of the defaulting Owner's Property. Such notice shall be signed by
the non -defaulting Owner and shall be recorded in the office of the Cleric and Recorder of Larimer
Countv, Colorado, after having been mailed not less than ten (10) days prior to such recording to the
defaulting Owner. Such lien shall be superior and prior to all other liens and encumbrances, except
liens for general taxes, special assessments, or any mortgage or deed of trust recorded prior to the
date that such lien is recorded in the office of the Clerk and Recorder of Larimer (County, CColorado.
Any lien recorded in accordance with this Article may he enforced by foreclosure of the defaulting
Owner's Property in the same manner as the foreclosure of a mortgage under the laws of the State of
Colorado. The non -defaulting Ownershall have the right and power to bid on the defaulting Owner's
Property at such foreclosure sale. The amount of the Common Expenses due from the defaulting
Owner shall also be the personal and individual debt of the defaulting Owner at the time payment
comes due, and suit ro recover a money judgment for such unpaid portion of the Common Expenses
may be maintained in addition to any other remedy hereunder, with or without foreclosure or waiver
of the lien rights herein set forth.
ARTICLE 5
INSURANCE
Unless othcrwisc mutually agreed by the parties, the Owner of each Property shall be
responsible for securing such general public liability insurance, including insurance against claims
for personal injury, death or property damage occurring in, on or about that portion of the Easement
Area located on such Owner's Property, as the Property Owner's desires, at the sole cost of such
Owncr.
1".X1.FIL}3'i'R;]55 F ' 8.WML.v`r %(;UW.1rhT W 70. 0y Joc
5
Attachment 21
RECEPTION#: 20110056971, 09/20/2011 at. 09:27:34 AM, 6 OF 8, Scott Doyle,
Larimer County, CO
ARTICLE 6
AMENDMENT
This Agreement may be amended, vacated, released or terminated in whole or in part by
instrument executed by all Owners of the Property and by the holders of any First deed of trust or fi rst
tnortgage encumbering any portion of the Property, Any such instrumcnt shall be recorded wish the
Clerk and Recorder of T.-Mrirner Cnunty, Colorado.
ARTICLE 7
ATTORNEYS' FEES
In
the event or
any foreclosure action or
litigation
arising pursuant to this Agreement, the
prevailing
Owner shall
be entitled to recover its
costs and
attorneys' fees.
ARTICLE 8
BENEHTS AND BUIWENS
8.1 Binding Effect. The easement granted herein andthe other provisions hereof shall be
covenants running with the land and shall be binding upon and inure to the benefit of the Owner of
each Property and its respective heirs, personal representatives, successors and assigns.
8.2 Covenant. This Agreement shall constitute a restrictive covenant against the Property
and the Property shall be held, sold, conveyed, transferred, leased, subleased or occupied subject to
the terms, conditions, covenants and limitations set forth in this Agreement, which shall run with the
Property and be binding upon all parties having right, title or interest in the Property or any portion
of the I>roperty.
ARTICLE 9
EFFECTIVE DATE
This Agreement shall be effective as of SeptcmhcQQ , 2004.
DATED the date set Forth above.
11 %X1.J-1U:NV."4 SS h %S1J.IraNt AGRY Emvw M )6G,.d6e
Collins, Campus West 11.C,
a Colorado limited liabil(/y company
By: ,.! "LLC6
.r J1ohn Carl
6
L,
icol, ivlanager
0
RECEPTIONn : 20110056971, 09/20/2011 at 09: 27 : 34 AM, 7 OF 8, Scott Doyle ttaChment 21
Larimer County, CO
Saint Paul's Episcopal Church,
a Colorado non-profit corporation
STATE OF COLOR ADO }
} ss.
COUNTY OF LARLMI ER )
The foregoing instrument was acknowledged to before me this day of September,
2004, by John Carl .Nicol, Manager of Collins Campus West, LL.C, a Colorado limited liability
company,
Witness my hand and official eal.
My commission expires:
STATE OF COLORADO
) sS.
CO LINTY OF LAREVIER
Notary Public
The fare roinD instrument was acknowledged to before me this J7 C day of' September,
2004, bys r- r_�_,e',,r- S of Saint Paul Episcopal Church, a Colorado non-profitcorpuration.
Witness my hand and official seal.
My commission expires.
r�� i t] �PL
...
P:ALTI,.£SC A03S ETSL'S15\,'
Notary Public
Nov. 10, 2W7
7 I."
Attachment 21
RECEPTION41h 20110056971E 09/20/2011 at 09:27:34 AM, 8 OF 8, Scott Doyle,
Lar.imer County, CO
SMY"s ".,ee-a
Z: -fttc; •-•—
II
P
ll
O
_.1
I
I .
it
Elf.
m--
�-
R";
----Lr,
en
0
J
F-
P
zft
ff
pi Nesu
.::.•
e3.� 9 •�:
i:5 � A � r5
r,,al
aid
wvs
te
ID
L.Y.:-:ti• .-so envN.iil 1Y ' •�q_
•�:f;;:e«: ':: ^: Y:a '� n� :J Eri
't�.Y
No
e:•^NO
;:
at
`\
LA
R
«
r
n
e
r
x
U
F
Z
J
]
O
Cl
oz�
N
o
u�U0
v
a
l7
U
ri
a
W
_
W
z
C
z
O
M
W
m
Attachment 22
From: Jim Dougan [mailto:dougan930@aol.com]
Sent: Sunday, December 03, 2017 10:14 AM
To: Jason Holland <JHolland@fcgov.com>; Sylvia Tatman-Burruss <statman-burruss@fcgov.com>
Subject: FDP170024 union on eliz
Thank you for reaching out to solicit neighbors opinions.
As such, we would comment, planned parking for this project is under
provided. You don't mention the parking need generated from the proposed
retail. This should be identified. The 402 beds should require 402 parking
spaces PLUS 40 spaces for visitors PLUS that needed for retail parking. In
congested areas, pedestrian, bike & vehicle traffic need to safely interact,
access onto Elizabeth from the project & ped traffic in front of the project
needs to be examined.
Growing the available housing near campus is a good thing for the city & the
school. Future growth needs to provide ALL of it's own parking generated
needs.
Jim & Jan Dougan
710 City Park
#524
Ft Collins
Attachment 23
From: John S. Olson [mailto:l.s.olson@comcast.net]
Sent: Friday, December 08, 2017 8:40 AM
To: Jason Holland <JHolland@fcgov.com>
Cc: Dino DiTullio <dino@westwarddevelopment.com>
Subject: Campus West Project
Jason Holland;
My name is John Olson. I am the former owner of Panhandler's Pizza and was a tenant at 1220 W
Elizabeth St. for almost 40 years. My wife and I are long-time residents of Fort Collins as well.
I am writing to express my support for the apartment and retail project at 1208 and 1220 W Elizabeth. It
will add much needed apartment housing in a market that, judging from rental rates, badly needs
additional stock. The planned retail space on the ground floor keeps the Campus West area a retail -
centered one. From what I have seen of the building design and plans, I believe the project "classes up"
the area quite a bit.
If you wish to contact me for further comments or have more questions, please feel free.
John S. Olson