Loading...
HomeMy WebLinkAbout02/28/2019 - Building Review Board - Agenda - Regular MeetingBuilding Review Board Page 1 February 28, 2019 Alan Cram, Chair City Council Chambers Tim Johnson, Vice Chair City Hall West Brad Massey 300 Laporte Avenue Bernie Marzonie Fort Collins, Colorado Katharine Penning Justin Robinson Staff Liaison: Russ Hovland Chief Building Official The City of Fort Collins will make reasonable accommodations for access to City services, programs, and activities and will make special communication arrangements for persons with disabilities. Please call 221-6515 (TDD 224-6001) for assistance. Regular Hearing Agenda February 28, 2019 1:00 PM • CALL TO ORDER • ROLL CALL • PUBLIC COMMENT ON ITEMS NOT ON THE AGENDA • DISCUSSION AGENDA 1. Consideration and Approval of the Minutes of the October 25, 2018 BRB Meeting 2. Jason Jones Appeal of Denial of One Time Exemption of Class D1 License to Build a Class C2 License-Level Project (4-Plex Multi-Family) 3. Proposed Building Code Changes to Require Mixed Construction and Demo Waste Be Sent to New County Recycle Sorting Facility 4. Proposed Building Code Change to Allow Short-Term Rentals in Multi-Family Buildings • OTHER BUSINESS o Election of Officers • ADJOURNMENT Building Review Board Packet Pg. 1 Date: Roll Call Johnson Marzonie Massey Penning Vacant Robinson Cram Vote - absent  5 present 1 – Minutes for October Massey Penning Johnson Robinson Vacant Marzonie Cram Yes Yes Yes absent - Yes Yes 5-0 2 - Jason Jones Appeal - Modify CBO Decision Penning Johnson Robinson Vacant Marzonie Massey Cram Yes Yes absent - Yes Yes Yes 5-0 2 - Jason Jones Appeal - Clarification amendment Marzonie Massey Penning Johnson Robinson - Cram Yes Yes Yes Yes absent Yes 5-0 3 - Construction & Demo Waste Code Changes - Support Johnson Robinson Vacant Marzonie Massey Penning Cram Yes absent - Yes Yes Yes Yes 5-0 4 - Short-Term Rentals Code Changes - Support Robinson Vacant Marzonie Massey Penning Johnson Cram absent - Yes Yes Yes Yes Yes 5-0 Election of Alan Cram as Chair and Tim Johnson as Vice Chair Vacant Marzonie Massey Penning Johnson Robinson Cram - Yes Yes Yes Yes absent Yes 5-0 Roll Call & Voting Record Building Review Board 2/28/2019 Building Review Board Hearing Date: 2-28-19 Document Log (Any written comments or documents received since the agenda packet was published.) DISCUSSION AGENDA: 1. Draft Minutes for the BRB October 25, 2018 Hearing 2. Jason Jones Appeal of Denial of One Time Exemption of Class D1 License to Build a Class C2 License-Level Project (4-Plex Multi-Family) • No new documents 3. Proposed Building Code Changes to Require Mixed Construction and Demo Waste Be Sent to New County Recycle Sorting Facility • No new documents 4. Proposed Building Code Change to Allow Short-Term Rentals in Multi- Family Buildings • No new documents EXHIBITS RECEIVED DURING HEARING: Item # Exhibit # Description: 2 A Appellant Bio Agenda Item 1 Item 1, Page 1 AGENDA ITEM SUMMARY February 28, 2019 Building Review Board STAFF Gretchen Schiager, Administrative Assistant SUBJECT CONSIDERATION AND APPROVAL OF THE MINUTES OF THE OCTOBER 25, 2018 BRB MEETING EXECUTIVE SUMMARY The purpose of this item is to approve the minutes of the October 25, 2018 meeting of the Building Review Board. ATTACHMENTS 1. BRB October 25, 2018 Minutes - DRAFT Packet Pg. 2 DRAFT City of Fort Collins Page 1 October 25, 2018 Alan Cram, Chair City Council Chambers Tim Johnson, Vice Chair City Hall West Brad Massey 300 Laporte Avenue Bernie Marzonie Fort Collins, Colorado Katharine Penning Rick Reider Staff Liaison: Justin Robinson Russ Hovland Chief Building Official The City of Fort Collins will make reasonable accommodations for access to City services, programs, and activities and will make special communication arrangements for persons with disabilities. Please call 221-6515 (TDD 224-6001) for assistance. Regular Meeting Minutes October 25, 2018 A regular meeting of the Building Review Board was held on Thursday, October 25, 2018, at 1:00 p.m. in the Council Chambers of the Fort Collins Municipal Building at 300 Laporte Avenue, Fort Collins, Colorado. • CALL TO ORDER Chair Cram was unable to attend. Acting Chair Johnson called the meeting to order at 1:06 p.m. • ROLL CALL PRESENT: Johnson, Massey, Marzonie, Penning, Reider ABSENT: Cram, Robinson STAFF: Hovland, Van Hall, Schiager, Poznanovic, Longstein • PUBLIC COMMENT ON ITEMS NOT ON THE AGENDA None. • DISCUSSION AGENDA 1. CONSIDERATION AND APPROVAL OF THE MINUTES OF THE SEPTEMBER 27, 2018 MEETING. Mr. Marzonie moved to approve the minutes of the September 27, 2018 meeting. Ms. Penning seconded. The motion passed 3:0 with Reider and Johnson abstaining having been absent for the September meeting. Building Review Board ITEM 1, ATTACHMENT 1 Packet Pg. 3 DRAFT City of Fort Collins Page 2 October 25, 2018 2. IMPACT FEE UPDATE Staff Report Jennifer Poznanovic, Revenue and Project Manager, presented a condensed version of the staff report from the September meeting and noted that Council supports the concept of development paying for itself. She stated impact fees can provide revenue only for specific purposes as identified by the fee itself. Ms. Poznanovic outlined the Council-approved impact fees, including six capital expansion fees, which are based on the replacement cost of existing infrastructure, five utility fees, and 45 development review and permit fees. She outlined the fee working group's recommendations, including better communication, outreach, and notice, highlighting the two- to four-year regular intervals for impact fee analysis, and examining progressive fees. Ms. Poznanovic discussed the scenarios should Council opt to not adopt the increased impact fees: new infrastructure and service capacity would be put on hold, levels of service would need to be lowered, and alternative revenue sources, such as tax increases, would need to be examined. Public Input No members of the public were present. Board Questions and Discussion Mr. Reider asked what feedback staff has received on the impact fee update. Ms. Poznanovic replied she has received support of the process; however, there is not as much support for the fee increases, although no alternative funding sources have been identified. Mr. Reider asked about operations and maintenance funding for existing facilities and infrastructure. Ms. Poznanovic replied that is a bit outside of the scope of this item as it relates to new growth paying for new facilities and infrastructure and impact fees are increasing due to replacement costs. Mr. Johnson stated the methodology of this makes sense; however, not having the entire budget story makes it difficult to make a decision on the impact fee increases. Ms. Poznanovic replied she would share the fee position paper with the Board to provide additional detail. Mr. Reider complimented the process and staff's openness and interest in feedback. He stated he is confident in supporting the staff recommendation given his trust in staff and the process. Mr. Massey asked about the opinions of the Affordable Housing Board. Ms. Poznanovic replied the Board was in favor of looking at more progressive fees and additional levels for fee waivers as well as the policy components and levels of service requirements. She stated the Board was generally in favor of the process and its transparency. Mr. Marzonie asked if there were solid numbers as to the impact of a tax increase should these fee increases not occur. Ms. Poznanovic replied that exploration of tax increase options would be the recommendation if there is inadequate support to update these fees to ensure levels of service are maintained for future growth. Mr. Reider commented that implementing additional property taxes would change the philosophy to require the whole community to pay for growth rather than growth paying for itself. Board Deliberation Mr. Reider moved that the Building Review Board express support for the process of the Impact Fee recommendations. Mr. Marzonie seconded. The motion passed 5:0. 3. 2018 I-CODES ADOPTION Staff Report Mr. Hovland presented the staff report and discussed each International Code being adopted. He noted the 2015 Codes were adopted late, in 2017, and the goal is to implement a regular adoption schedule every three years and to adopt the new Codes within 12 months of issuance. ITEM 1, ATTACHMENT 1 Packet Pg. 4 DRAFT City of Fort Collins Page 3 October 25, 2018 Advantages of this schedule will be to minimize the impacts of changes and lessen the degree of construction cost increases as well as lessen ISO insurance rates. Mr. Hovland discussed the process involved in examining the Codes for adoption, which began with the formation of a committee of staff and stakeholders to review the Codes and local amendments. He noted many of the local amendments are now in the Code which allowed about 1/3 of local amendments to be deleted. Mr. Hovland highlighted some proposed local amendments to the Codes. For the International Building Code IBC, an amendment is planned to require a recycling chute next to any provided trash chute in multi-story, multi-family buildings. Additionally, for multi-family buildings, 10% of parking spaces must have a conduit from the electrical room to the front of the parking space for the purpose of installing electric vehicle charging equipment in the future. Mr. Johnson expressed concern about the requirement causing a spider web effect in a small space. Mr. Hovland replied the Committee left flexibility on how the goal is achieved. Mr. Hovland stated an emergency no-fee repair permit for disasters will be added to the IBC as well. Mr. Hovland discussed minimal changes to the International Residential Code. Mr. Hovland went on to discuss changes resulting from yesterday's final Committee meeting, one of which involved sprinkler requirements for in-home daycares of 5 or less children. The City does not receive notification of daycares as they are state regulated facilities; therefore, staff worked with Fire Chief Poncelow to remove the requirement as the home is not changing occupancy and there are 5 or less children. Mr. Reider expressed support for the change and Mr. Hovland noted there are other state fire requirements for such daycares. Mr. Hovland stated City Council has asked about roof shingle waste over the last few years given the number of hail storms. Staff found construction materials, including shingles, make up 50% of landfill materials and there is no place for shingle recycling in Northern Colorado. The Committee discussed impact-resistant shingles at its meeting yesterday and ultimately voted to bring a local amendment to require class four impact-resistant shingles for all asphalt roofs. Mr. Hovland noted the class four shingles would likely still be destroyed in very severe hail storms with larger than golf ball size hail. Mr. Reider expressed support for this amendment and asked if a re-roof would also require the class four shingles. Mr. Hovland replied in the affirmative. Mr. Reider mentioned homeowner's insurance policies can include riders for Code updates which would enable homeowners to get replacement class four shingles. He suggested staff notify area insurance agents. Mr. Massey asked for more detail about class four shingles. Mr. Hovland described the testing process and stated there are two types of class four shingles, one with a rubber backing and one with a fiberglass backing. The rubberized-backed shingles have been found to be much more storm resistant. Mr. Massey asked if it is assumed an older roof structure could handle the weight of class four shingles. Mr. Hovland replied the Committee did not examine the potential weight of the shingles but stated older buildings with 2x4 rafters may need to be examined. He noted there is currently no requirement for a structural analysis unless the roof is concrete tile. Ms. Penning expressed concern with imposing the requirement on older homes. Mr. Hovland replied he would be more concerned with the weight issue if roofs were getting an overlay. He noted the current Code only allows two layers and suggested language could be added to the amendment to require structural evaluation if an overlay is planned. Mr. Hovland stated the next local amendment is to change the showerhead flow rate from 2.0 gallons per minute to 1.8 to lower water consumption. The estimate for water savings at total City build-out is 1.8 million gallons per year. Mr. Reider asked if the Committee considered longer shower use if the flow is decreased. Mr. Hovland replied the Committee ultimately felt the savings was still worth the change and stated the amendment can be reversed in three years if it is found to be an issue. Mr. Hovland noted water conservation staff wanted to require low-flow toilets as well; however, the cast iron and clay sewer systems do not allow waste to get to the main sewer line with these low-flow toilets. Instead, staff opted to require increased MaP scores, which provide an indication of flush performance. ITEM 1, ATTACHMENT 1 Packet Pg. 5 DRAFT City of Fort Collins Page 4 October 25, 2018 Mr. Reider asked if the City has any plans to research the regulation of flushable wipes. Mr. Hovland replied that issue will be examined over the next three years prior to the next Code cycle. Mr. Hovland stated the last local amendment was a request from the Commission on Disability involving an increase to the 30" width required for roll-in showers in multi-family buildings. The Commission requested an increase from 30" x 60" to 36" x 60" minimum. Mr. Marzonie asked about the number of accessible units required in multi-family buildings. Mr. Hovland replied buildings of 26 units must provide one roll-in shower, 55 or 56 units must provide a second, etc. The number of showers required will not change as part of this amendment. Mr. Hovland reviewed the timeline for adoption of the Code changes. Public Input No members of the public were present. Board Questions and Discussion There was no further discussion. Board Deliberation Mr. Massey moved that the Building Review Board recommend the City adopt the 2018 International Codes with the local amendments as discussed. Mr. Reider seconded. Motion passed 5:0. 4. NEW BUILDING ENERGY SCORING REQUIREMENTS Staff Report Kirk Longstein, Energy Services Project Manager, presented the staff report. He provided some background for the Building Energy Scoring (BES) initiative. Mr. Longstein described the three components of BES: Benchmarking, Reporting and Transparency. Benchmarking would require building owners to collect energy and water usage data and enter it into the online EnergyStar Portfolio Manager tool. Reporting would require building owners to report the data annually to the City where it would be verified. Transparency makes the scores publicly available. Mr. Longstein explained the phased implementation approach. Phase 1 would be for commercial buildings, not including industrial, with Benchmarking occurring in 2019, Reporting in 2020, and Transparency beginning in 2021. Multi-family buildings, which refers to large apartment or condominium complexes, would follow the same timeline, but one year later. He discussed consequences of non-compliance, which would include notifications and warnings for 12 months after the reporting is due, followed by a $1,000 fine 60-90 days after the 12-month period. Exemptions and variances from the plan will be offered for industrial buildings, financial distress, partial occupancy and new construction. Other hardship scenarios will be subject to review on a case-by- case basis through an appeal process. Public Input No members of the public were present. Board Questions and Discussion Ms. Penning asked about the new construction exemption. Mr. Longstein explained this was to allow time to collect a year’s worth of data after the Certificate of Occupancy is issued and reach greater than 60% occupancy. Ms. Penning asked if the City would be providing the data collection and reporting tool. Mr. Longstein explained the City would provide training and would have support staff available to use the online Portfolio Manager. Mr. Reider asked how building owners can access usage information since federal laws prohibit Utilities from disclosing tenant energy use, and who would pay for the data collection. Mr. Longstein said the intent is to make the information more readily available by providing aggregate anonymized data for buildings with four or more tenants. He said the only cost to building owners would be the staff time, ITEM 1, ATTACHMENT 1 Packet Pg. 6 DRAFT City of Fort Collins Page 5 October 25, 2018 which is estimated to be four hours the first year and one to two hours for each subsequent year. Mr. Longstein said the City will validate the data through spreadsheet automation using existing staff resources. Mr. Massey asked whether the City intends in the future to require building owners to make changes to reduce usage. Mr. Longstein said that is not the intent of this proposal, but he can’t predict the actions of a future Council. Mr. Massey asked how building owners with fewer than four tenants can access usage data, and who would be responsible for data collection and reporting in a co-ownership situation. Mr. Longstein stated an owner of the building can get easily obtain aggregated data from City, while Xcel has a consent form process which might be more challenging. A shared ownership group can designate someone to be the responsible party. Ms. Penning asked if the data can be auto-generated rather than manually entered. Mr. Longstein said this was possible with City Utilities, but not with Xcel, adding that engagement with the utility bills is what leads to behavioral savings. Ms. Penning expressed concern that building owners may opt to pay the fine in lieu of participating. Mr. Longstein stated non-participation may impact a building owner’s ability to be competitive in the market. Mr. Johnson asked why the owner is responsible for reporting and not the tenant. Mr. Longstein said the market places value in the transparency of information which can serve to incentivize the owner, but tenants are unlikely to make improvements on a rental. Mr. Reider said he would not support this initiative without much more information about the program, its components and the costs. As a building owner who would be personally impacted by the program, he will abstain from voting. Mr. Massey expressed concerned about the uncertainties involving co-ownership. Mr. Johnson sees value in the idea of scoring but is concerned it would become punitive and feels there is a lack of well-defined specifics. Mr. Marzonie asked what feedback has been offered from other groups. Mr. Longstein shared that they have heard concerns about the time and cost involved, the impact on affordability, difficulty accessing data and fear of additional regulation in the future. He has also heard that this is a way for businesses to differentiate themselves in the market, adding that many national brands and big box retailers have already been voluntarily participating for years. Mr. Marzonie asked if there was a possibility of starting as a voluntary program. Mr. Longstein said there is a high cost for incentives to make voluntary programs successful. Other communities who started with voluntary programs have moved to mandatory programs due to issues with predictability and insufficient mass of data. Mr. Reider said people choose a building based on location, rather than minor variations in utility cost. He would be willing to entertain further should they come back with additional information. Board Deliberation Mr. Reider moved that the Building Review Board abstain from making a recommendation for or against Building Energy Scoring Requirements. Mr. Marzonie seconded. The motion passed 5:0. 5. 2019 WORK PLAN Staff Report Mr. Hovland presented the proposed work plan. Public Input No members of the public were present. Board Questions and Discussion Mr. Reider asked a committee would be formed to work on the Property Maintenance Code. Mr. Hovland stated he will explore that. Mr. Reider requested written copy for input. ITEM 1, ATTACHMENT 1 Packet Pg. 7 DRAFT City of Fort Collins Page 6 October 25, 2018 Board Deliberation Mr. Massey moved that the Building Review Board approve the 2019 Work Plan as presented. Ms. Penning seconded. The motion passed 5:0. • OTHER BUSINESS None • ADJOURNMENT Acting Chair Johnson adjourned the meeting at 3:05 p.m. Minutes respectfully submitted by Gretchen Schiager. Minutes approved by a vote of the Board on __________. _________________________________ ______________________________ Russell Hovland, Chief Building Official Alan Cram, Chair ITEM 1, ATTACHMENT 1 Packet Pg. 8 Agenda Item 2 Item 2, Page 1 Staff Report February 28, 2019 Building Review Board STAFF Russ Hovland, Chief Building Official SUBJECT JASON JONES APPEAL OF DENIAL OF ONE TIME EXEMPTION OF CLASS D1 LICENSE TO BUILD A CLASS C2 LICENSE-LEVEL PROJECT (4-PLEX MULTI-FAMILY) EXECUTIVE SUMMARY Summary: Jason Jones currently has a Class D1 license allowing him to build new housing of not more than two (2) dwelling units. Jason has built four (4) new single-family detached homes in city limits and is in good standing. Jason would like to be approved as the permit holder and general contractor (GC) to build a 4-unit multi-family building (4-plex) which requires a higher-level Class C2 license. Appeal: Jason requested from the Chief Building Official (CBO) a one-time exemption for a Class C2 level license to be allowed to perform as the GC for a new 4-plex using his existing Class D1 license. This request was denied by the CBO on February 1, 2019. Jason feels strongly that based on his knowledge and resources he can successfully complete such a project and thinks the request should be approved. See supporting attachments and documentation. The Board’s jurisdiction for this appeal is Municipal Code Section 5-27(11) Section 113.1, which empowers this Board to hear and decide appeals of decisions by the CBO relative to the application and interpretation of the Municipal Code and Section 15-158(a)(2), which relates to the contractor licensing requirements of the City of Fort Collins. Staff recommendation: A 4-plex is a multi-family building under the International Building Code (IBC), and a very different type of construction project compared to a single-family house (dwelling separations, fire sprinklers systems, etc.) built under the International Residential Code (IRC). When GC can show they have supervised the building of at least two (2) multi-family buildings, the CBO does approve a third project under the current lower license and this project can then be used to apply for the higher license with the 3 required project examples. Jason does not have this required experience and needs additional training and guidance on new multi-family construction. I recommend denial of a one-time license exemption for said project. Packet Pg. 9 Agenda Item 2 Item 2, Page 2 Board or Commission may vote to: • Uphold the decision of the CBO and find that the Mr. Jones cannot perform as GC and obtain the permit for this multi-family project. • Overturn the decision of the CBO and allow Mr. Jones to act as the GC and permit holder for this project under his current D-1 license. • Modify the decision of CBO. For example, the Board may allow Mr. Jones to act as GC and permit holder for this project with supervision by a current licensed C contractor (mentorship). ATTACHMENTS 1. Appeal Application 2. Appellant Letter to Board 3. Appellant 4-plex Construction Plans. Packet Pg. 10 Cltyof ~Colli~ Planning, Development & Transportation Community Development & Neighborhood Services 281 North College Avenue, P.O. Box 580 Fort CoDlns, CO 80622.0580 970A16.2740 970.224.8134- fax fcgov.com REQUEST FOR HEARING BY THE BUILDING REVIEW BOARD (Code Hearing) Affected Property: ___ 2_1_2_s_c_a_n_·b_o_u_D_r_iv_e_F_o_rt_c_o_ll_in_s ________________ _ Owner: Jason Jones - NoCO Custom Homes Address: 4181 Grand Park Drive Timnath Appellant Name: Jason Jones Address: 4181 Grand Park Drive Timnath Phone #: ------- Mobile # 970-581-0481 E-mail: ~ason@NoCOCustomHomes.com Description of request and mitigating factors ( attach additional information and/or materials): ------ 1 request a one time exemption for the requirement to hold a "C" license for the construction of this 4-plex unit. I currently hold a "D" license in good standing with the City. I have the knowledge and resources necessary to successfully construct this building while conforming with all code requirements. This 4-plex building will be held personally upon completion as a rental property, we are not building this to sell. Applicable Code Sections:. __________________________ _ =Appell =-==~ ~ Signature ~ 2/12/19 Date Appellant may appear in person, in writing, or by agent and should be prepared to present all relevant details, specifications and plans, or other evidence in support of this hearing request at the hearing time indicated below. Regular meetings are scheduled for the last Thursday of each month at 1 :00 p.m. In the Council Chambers at 300 LaPorte Avenue. Applications must be flled by the last day of the month prior to the desired hearing date to ensure consideration. A docket fee of $50.00 must accompany this hearing request. OFFICE USE ONLY Hearing Date ___________ _ Hearing Time ___________ _ Re~ewedby _________________________________________ ~ Distribution: Original - Appellant, Copy - File ITEM 2, ATTACHMENT 1 Packet Pg. 11 NoCO Custom Homes PO BOX 187 Timnath CO 80547 www.NoCOCustomHomes.com Jason@NoCOCustomHomes.com To whom it may concern: I am requesting a one-time exemption to the City of Fort Collins building services appeals board to build a 4-plex unit without the proper licensure. I currently hold a “D” license in good standing with the City since February of 2015. I have successfully completed numerous complex, high end single family residential projects within the city and dozens more in jurisdictions around the city since 2007. I have owned and operated NoCO Custom Homes since 2012 and have built a reputation of quality and attention to detail since day one. The 4-plex is located at 2126 Caribou dr Fort Collins and it is a building that we will be holding, upon completion as a rental property. I’m requesting to pull permits and manage this project myself and believe I have the experience and resources necessary to complete this project successfully. I commonly work closely with the architect, engineer and building department if there are any code or plan questions. The size and scope of this project is no different than what we build on a regular basis. Over the last 4 years we’ve averaged 10 high end custom homes per year that are often larger and more complex than the 4-plex we are requesting to build through this appeals process. The below link is my website portfolio for examples of these types of projects that I regularly manage: https://nococustomhomes.com/portfolio/ I appreciate your consideration to my appeal. As I’m not building this 4-plex for a client or to sell, no one will benefit more than me for a speedy and successful project completion. I also believe that if my appeal is not granted, I would be putting another license holder in a position of liability that would make it inequitable to pull the permit on my behalf with my company listed as the supervisor. For these reasons I’m requesting a one-time exemption so that my company can pull the permits and build this 4-plex. Thank you Jason Jones Owner ITEM 2, ATTACHMENT 2 Packet Pg. 12 FORT COLLINS, CO 12.07.11 PERMIT A1.0 ARCHITECTURAL SITE PLAN A2.0 FOUNDATION PLAN (ARCHITECTURAL) A2.1 MAIN FLOOR PLAN A2.2 UPPER FLOOR PLAN A2.3 ROOF PLAN A3.0 EXTERIOR ELEVATIONS A3.1 EXTERIOR ELEVATIONS A4.0 BUILDING SECTIONS A4.1 MISC. DETAILS A4.2 MISC. DETAILS A6.1 MAIN FLOOR ELECT PLAN A6.2 UPPER FLOOR ELECT PLAN 0.0 COVER SHEET PROJECT INFORMATION: PROJECT NAME: SUNSTONE 4-PLEX LOCATION: LOT 13 SUNSTONE SUBDIVISION, 2126 CARIBOU DRIVE, FORT COLLINS, COLORADO OWNER: NOCO CUSTOM HOMES, RE: JASON JONES APPLICABLE CODES & REQUIREMENTS: 2015 International Building Code with local Amendments 2015 International Residential Code with local Amendments 2015 International Energy Conservation Code with local Amendments 2015 International Mechanical Code with local Amendments 2015 International Fuel Gas Code with local Amendments 2015 International Plumbing Code 2017 National Electrical Code (effective July 3, 2017) 2006 International Property Maintenance Code with local Amendments Accessibility: State Law CRS 9-5 and ICC A117.1-2017 Snow Load - Live Load: 30 PSF / Ground Snow Load 30 PSF Frost Depth 30 inches Wind Load: 129 mph Vult, or 100 mph Vasd - Exposure B Seismic Design Category B BUILDING CODE SUMARY: OCCUPANCY GROUP R-2 SECTION 310 ALLOWABLE FLOOR AREA 7,000 PER STORY TABLE 503 SPRINKLER SYSTEM INCREASE 200% (Is=2) SECTION 506.3 ALLOWED 14,000 SF PER STORY PROVIDED <4,000 SF PER STORY PROVIDED BUILDING AREA (2-STORY) SECTION 503 1ST FLOOR FINISHED AREA 630 SF 1ST FLOOR UN-FINISHED AREA 345 SF TOTAL 1ST FLOOR AREA 975 SF 2ND FLOOR FINISHED AREA 880 SF 2ND FLOOR UN-FINISHED FINISHED AREA 0 SF TOTAL 2ND FLOOR AREA 880 SF UNIT AREA TOTAL 1855 SF (UNIT TOTAL FINISHED SF=1,510 SF) NUMBER OF UNITS 4 TOTAL BUILDING AREA 7420 SF (14,000 SF ALLOWED BY TABLE 503, NO AREA INCREASE NECESSARY) ALLOWABLE BUILDING HEIGHT IN STORIES 2 TABLE 503 (SPRINKLER SYSTEM INCREASE +1 STORY, +20 FT PER SECTION 504.2, NO HEIGHT INCREASE NECESSARY) IN FEET MAX (UNKNOWN) IN STORIES 3 MAX PER ZONING ORDINANCE CITY OF FORT COLLINS PROVIDED BUILDING HEIGHT IN STORIES 2 IN FEET 32'-0" CONSTRUCTION CLASSIFICATION 5'-6" 6'-0" 7'-6" 6'-8" 13'-0" 5'-5" 12'-0" 5'-2" 12'-0" 5'-6" 1'-4" 5'-0" 5'-5" 12'-0" 5'-2" 12'-0" 5'-0" LANDSCAPE AREA NEW CONCRETE SHOWN WITH HATCH PATTERN LANDSCAPE AREA BUILDER TO VERIFY BUILDING ENVELOPE LOCATION, SETBACKS AND PROPERTY LINE PRIOR TO CONSTRUCTION 4'-0" 5'-0" 4'-0" 5'-0" 20'-0" EXISTING PAVED ALLEY EXISTING PAVED DRIVE 56'-8" 26'-6" 30'-0" 70'-7" 25'-8" 27'-2" ATTIC AREA 1,780 SF ATTIC AREA 1,780 SF 71'-0" 57'-6" 92'-71 2" 4'-111 2" 16'-8" 17'-5 1 2" 7'-4 1 2" ASSUMED PROPERTY LINE BUILDING ENVELOPE EXISTING UTILITY EASEMENT SIDEWALK SLOPE GRADE AWAY FROM STRUCTURE AT 1:3 MAX SLOPE GRADE AWAY FROM UNIT (1) UNIT (2) UNIT (3) UNIT (4) UNEXCAVATED 4" THICK CONCRETE SLAB ON GRADE UNEXC'TED 4" THICK CONCRETE UNEXCAVATED 4" THICK CONCRETE SLAB ON GRADE 1 4.0 1 4.0 2 4.0 2 4.0 UNEXCAVATED SLOPE 4" THICK CONCRETE TOWARD GARAGE DOORS SLAB ON GRADE 1 3 SIM 3 2 1 3 2 5'-31 2" 56'-8" UNEXCAVATED SLOPE 4" THICK CONCRETE TOWARD GARAGE DOORS SLAB ON GRADE UNEXCAVATED 4" THICK CONCRETE SLAB ON GRADE UNEXCAVATED 4" THICK CONCRETE SLAB ON GRADE UNEXCAVATED SLOPE 4" THICK CONCRETE TOWARD GARAGE DOORS SLAB ON GRADE 1 3 2 1 3 2 UNEXCAVATED SLOPE 4" THICK CONCRETE TOWARD GARAGE DOORS SLAB ON GRADE 54 54 54 54 54 54 1 4.0 1 4.0 2 4.0 2 4.0 70'-7" 56'-8" 70'-7" ENTRY 9' CLG 11'-3" 11'-21 2" 6'-5 1 2" 1'-4" 56'-8" 3'-8" 3'-0" 3'-0" 3'-0" 15'-0" 3'-10" 23'-10" PROVIDE (1) WATER RISER ROOM NEAR WATER SERVICE ENTRY ENTRY 9' CLG KITCHEN 12'-2" X 14'-0" VINYL BATH 9' CLG VINYL 9' CLG GARAGE 12'-8" X 21'-0" CONC DINETTE 12'-2" X 10'-7" CARPET 9' CLG LIVING ROOM 17'-0" X 14'-8" CARPET 9' CLG STORAGE 4'-3" X 2'-6" CONC ENTRY 9' CLG HALL 4'-0" x 8'-8" CARPET 8' CLG MECH 4'-0" X 6'-8" PLATFORM ENTRY 9' CLG FIRE RISER BEDROOM 1 17'-0" x 11'-0" CARPET 8' CLG BEDROOM 2 11'-6" x 12'-8" CARPET 8' CLG LAUN VINYL 8' CLG CLOSET 8'-7" x 8'-11" CARPET 8' CLG BATH VINYL 8' CLG MBTH VINYL 8' CLG HALL - CARPET 8' CLG SITTING LINEN 5'-01 5'-1" 12'-2" 2" 11'-9" BEDROOM 1 17'-0" x 11'-0" CARPET 8' CLG BEDROOM 2 11'-6" x 12'-8" CARPET 8' CLG LAUN VINYL 8' CLG CLOSET 8'-7" x 8'-11" CARPET 8' CLG BATH VINYL 8' CLG MBATH VINYL 8' CLG HALL - CARPET 8' CLG SITTING LINEN BEDROOM 1 17'-0" x 11'-0" CARPET 8' CLG 2'-0" 1'-6" 1'-6" 1'-6" 2'-0" 1'-6" 1'-6" 1'-6" 2'-0" 2'-0" 2'-0" 1'-0" 1'-6" 1'-6" 1'-6" 1'-0" 2'-0" 2'-0" 2'-0" 2'-0" 1'-0" 2'-0" 2'-0" 2'-0" 2'-0" 2'-0" 2'-0" 3'-0" 1'-0" 2'-0" 2'-0" 2'-0" 2'-0" 1 4.0 1 4.0 2 4.0 2 4.0 4'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 4'-0" 4'-0" 4'-0" 1'-0" 4 8 2 1 1 7 7 3 3 6 5 3 3 5 5 3 3 3 TOP OF PLATE FINISHED FLOOR FINISHED FLOOR TOP OF PLATE BUILDING HEIGHT TOP OF PLATE FINISHED FLOOR FINISHED FLOOR TOP OF PLATE BUILDING HEIGHT SLOPE GRADE FROM WALK AT 1:3 MAX TEMPERED GLASS ELECT METERS 1 FRONT SCALE: ELEVATION (SOUTH) 1/4"=1'-0" - EXTERIOR ELEVATIONS 3.0 INTERNATIONAL COPYRIGHT LAWS PROHIBIT THE USE OF THESE DRAWINGS WITHOUT THE EXPRESS WRITTEN AUTHORIZATION OF THE ARCHITECT. THE DESIGNS CONTAINED WITHIN THESE DOCUMENTS BOTH IN WHOLE AND IN PART ARE INTENTED FOR CONSTRUCTION AT THE ADDRESS LISTED ON THE TITLE BLOCK. ISSUED FOR: DATE: - SUNSTONE 4-PLEX SUNSTONE 4-PLEX STONEY CREEK DRIVE AND CARIBOU DRIVE CLIENT UPDATE 07.12.18 2ND FLR 866 SF FIRST FLR 630 SF TOTAL 1,496 SF GARAGE AND UNIT AREA UNITS 1-4 MECHANICAL 343 SF LOT 13 SUNSTONE MULTI-USE FORT COLLINS, COLORADO DOUGLAS A. SCHOONOVER ARCHITECT, NCARB www.sch2architects.com t: 970.817.5260 e: team@sch2architects.com SCH ARCHITECTS CLIENT UPDATE 12.08.18 CITY COMMENTS 01.27.19 2 RIGHT SCALE: ELEVATION (EAST) 1/4"=1'-0" - (ALL NOTES MAY NOT APPLY TO THIS SHEET) ELEVATION NOTES 1. SYNTHETIC STONE VENEER - BY BUILDER 2. CAST STONE CAP-PROVIDE SLOPE FOR DRAINAGE 3. PRECAST STONE WINDOW SILL. 4. OVERHEAD GARAGE DOOR, RE: PLAN FOR SIZE 5. TAPERED WOOD BUILT-UP COLUMN RE: 6. PROVIDE FLASHING AND DRIP CAP OVER ALL DOORS, WINDOWS AND AT ALL TRIM AC CONDENSOR TOP OF PLATE FINISHED FLOOR FINISHED FLOOR TOP OF PLATE BUILDING HEIGHT SLOPE GRADE FROM WALK AT 1:3 MAX TEMPERED GLASS ELECT METERS 1 REAR SCALE: ELEVATION (NORTH) 1/4"=1'-0" - EXTERIOR ELEVATIONS 3.1 INTERNATIONAL COPYRIGHT LAWS PROHIBIT THE USE OF THESE DRAWINGS WITHOUT THE EXPRESS WRITTEN AUTHORIZATION OF THE ARCHITECT. THE DESIGNS CONTAINED WITHIN THESE DOCUMENTS BOTH IN WHOLE AND IN PART ARE INTENTED FOR CONSTRUCTION AT THE ADDRESS LISTED ON THE TITLE BLOCK. ISSUED FOR: DATE: - SUNSTONE 4-PLEX SUNSTONE 4-PLEX STONEY CREEK DRIVE AND CARIBOU DRIVE CLIENT UPDATE 07.12.18 2ND FLR 866 SF FIRST FLR 630 SF TOTAL 1,496 SF GARAGE AND UNIT AREA UNITS 1-4 MECHANICAL 343 SF LOT 13 SUNSTONE MULTI-USE FORT COLLINS, COLORADO DOUGLAS A. SCHOONOVER ARCHITECT, NCARB www.sch2architects.com t: 970.817.5260 e: team@sch2architects.com SCH ARCHITECTS CLIENT UPDATE 12.08.18 CITY COMMENTS 01.27.19 2 LEFT SCALE: ELEVATION (WEST) 1/4"=1'-0" - (ALL NOTES MAY NOT APPLY TO THIS SHEET) ELEVATION NOTES 1. SYNTHETIC STONE VENEER - BY BUILDER 2. CAST STONE CAP-PROVIDE SLOPE FOR DRAINAGE 3. PRECAST STONE WINDOW SILL. 4. OVERHEAD GARAGE DOOR, RE: PLAN FOR SIZE 5. TAPERED WOOD BUILT-UP COLUMN RE: 6. PROVIDE FLASHING AND DRIP CAP OVER ALL DOORS, WINDOWS AND AT ALL TRIM TRANSITIONS 7. ENTRY DOOR PER BUILDER SPECIFICATIONS 8. RE: STRUCTURAL 9. CARRIAGE-TYPE GARAGE DOOR, PAINT TO TOP OF PLATE FINISHED FLOOR 9'-1" 1'-0 5 8" FINISHED FLOOR TOP OF PLATE 8'-1" 13'-8 3 4" BUILDING HEIGHT 31'-11 3 8" 6'-5" RAIL PER CODE 3'-0" 7'-2" 12'-6" 10'-2" 12 6 12 6 BATH VINYL 9' CLG LIVING ROOM 17'-0" X 14'-8" CARPET 9' CLG STOR'G 4'-3" X 2'-6" CONC HALL 4'-0" x 8'-8" CARPET 8' CLG MECH 4'-0" X 6'-8" PLATFORM FIRE RISER CONC BEDROOM 1 17'-0" x 11'-0" CARPET 8' CLG BEDROOM 2 11'-6" x 12'-8" CARPET 8' CLG HALL - CARPET 8' CLG 15 TREADS 16 RISERS 1 1 1/2"=1'-0" TYPICAL TRIM DETAIL-EXTERIOR 4.1 MISC. DETAILS 2 1 1/2"=1'-0" ATTIC ACCESS 3 1 1/2"=1'-0" STONE WAINSCOT-SILL 4 1 1/2"=1'-0" STONE WAINSCOT 6 1 1/2"=1'-0" HEAD DETAIL 5 1 1/2"=1'-0" 8 SILL DTL AT SIDING 1"=1'-0" RAILING SECTION 7 1"=1'-0" PILASTER DETAIL INTERNATIONAL COPYRIGHT LAWS PROHIBIT THE USE OF THESE DRAWINGS WITHOUT THE EXPRESS WRITTEN AUTHORIZATION OF THE ARCHITECT. THE DESIGNS CONTAINED WITHIN THESE DOCUMENTS BOTH IN WHOLE AND IN PART ARE INTENTED FOR CONSTRUCTION AT THE ADDRESS LISTED ON THE TITLE BLOCK. ISSUED FOR: DATE: - SUNSTONE 4-PLEX SUNSTONE 4-PLEX STONEY CREEK DRIVE AND CARIBOU DRIVE CLIENT UPDATE 07.12.18 2ND FLR 866 SF FIRST FLR 630 SF TOTAL 1,496 SF GARAGE AND UNIT AREA UNITS 1-4 MECHANICAL 343 SF LOT 13 SUNSTONE MULTI-USE FORT COLLINS, COLORADO DOUGLAS A. SCHOONOVER ARCHITECT, NCARB www.sch2architects.com t: 970.817.5260 e: team@sch2architects.com SCH ARCHITECTS CLIENT UPDATE 12.08.18 CITY COMMENTS 01.27.19 1x HARDITRIM AT INSIDE CORNER TYPICAL 1x6 HARDBD AT OUTSIDE CORNER TYPICAL TYPICAL EXTERIOR WALL CONSTRUCTION HARDBD SIDING WEATHER - RESISITIVE BARRIER MORTAR JOINT MORTAR SETTING BED STUD WALL STONE VENEER METAL LATH SCRATCH COAT INSULATION (WHERE OCCURS) SHEATHING WEATHER-RESISITIVE BARRIER SHEATHING SEALANT RIGHT ANGLE CONSTRUCTION ADHESIVE MORTAR SETTING BED STONE VENEER WAINSCOT METAL LATH SIDING INTERIOR FINISH METAL FLASHING (GALVANIZED) INSULATION (STUD WALL) SIDING METAL FLASHING 2x WOOD TRIM DOOR FRAME BUILDING PAPER SEALANT ML BEAMS PAINTED HARDI BOARD TRIM RE: ELEVATIONS EAVE AND HI-HEAL CONDITION MAY VARY SEE PLAN VARIES PER ELEV. 2x4 TREATED PLATES. ANCHOR SECURLY TO CONC. CAST STONE CAP HEADER. SIZE AND LOCATION PER STRUCTURAL SEE ELEV. 21 4" STONE VENEER 1x HARDI TRIM CAP HARDI PANEL 21 4" 5/8" G.B. ON 2x4 STUDS AT 16" O.C. WITH BATT INSULATION FOR SOUND 2 5 1 ENTRY 9' CLG ENTRY 9' CLG KITCHEN 12'-2" X 14'-0" VINYL BATH 9' CLG VINYL 9' CLG GARAGE 12'-8" X 21'-0" CONC DINETTE 12'-2" X 10'-7" CARPET 9' CLG LIVING ROOM 17'-0" X 14'-8" CARPET 9' CLG STORAGE 4'-3" X 2'-6" CONC ENTRY 9' CLG HALL 4'-0" x 8'-8" CARPET 8' CLG MECH 4'-0" X 6'-8" PLATFORM ENTRY 9' CLG FIRE RISER CONC UNIT (1) 1,495 SF UNIT (2) 1,495 SF UNIT (3) 1,495 SF UNIT (4) 1,495 SF KITCHEN 12'-2" X 14'-0" VINYL BATH 9' CLG VINYL 9' CLG DINETTE 12'-2" X 10'-7" CARPET 9' CLG LIVING ROOM 17'-0" X 14'-8" CARPET BEDROOM 1 17'-0" x 11'-0" CARPET 8' CLG BEDROOM 2 11'-6" x 12'-8" CARPET 8' CLG LAUN VINYL 8' CLG CLOSET 8'-7" x 8'-11" CARPET 8' CLG BATH VINYL 8' CLG MBTH VINYL 8' CLG HALL - CARPET 8' CLG SITTING LINEN BEDROOM 1 17'-0" x 11'-0" CARPET 8' CLG BEDROOM 2 11'-6" x 12'-8" CARPET 8' CLG LAUN VINYL 8' CLG CLOSET 8'-7" x 8'-11" CARPET 8' CLG BATH VINYL 8' CLG MBATH VINYL 8' CLG HALL - CARPET 8' CLG SITTING LINEN BEDROOM 1 17'-0" x 11'-0" CARPET 8' CLG BEDROOM 2 11'-6" x 12'-8" ITEM 2, EXHIBIT A Appellant Bio - Submitted at Hearing Packet Pg. 25-1 ITEM 2, EXHIBIT A Appellant Bio - Submitted at Hearing Packet Pg. 25-2 ITEM 2, EXHIBIT A Appellant Bio - Submitted at Hearing Packet Pg. 25-3 ITEM 2, EXHIBIT A Appellant Bio - Submitted at Hearing Packet Pg. 25-4 ITEM 2, EXHIBIT A Appellant Bio - Submitted at Hearing Packet Pg. 25-5 ITEM 2, EXHIBIT A Appellant Bio - Submitted at Hearing Packet Pg. 25-6 Agenda Item 3 Item 3, Page 1 Staff Report February 28, 2019 Building Review Board STAFF Russ Hovland, Chief Building Official SUBJECT PROPOSED BUILDING CODE CHANGES TO REQUIRE MIXED CONSTRUCTION AND DEMO WASTE BE SENT TO NEW COUNTY RECYCLE SORTING FACILITY EXECUTIVE SUMMARY Summary: Honore Depew, Sr. Sustainability Specialist for Waste Reduction & Recycling, will present the details of a proposed ordinance to amend the I-codes to help divert construction and demolition debris (C&D) and enable the construction of a new C&D sorting facility. This item will be considered for first reading by City Council at the March 5 regular meeting. Action Requested: Feedback from the BRB will be provided to Council in a read-before memo, or the BRB may choose to send a memo directly to City Council. Details of the proposed code change: • All co-mingled loads of C&D trash and recycling debris from building sites would have to go to a specific, County-owned facility. • Although the building code would change now, the requirement would only be triggered by an operational facility (expected 2022). • Requirement would be in effect for ten years from when the new facility begins accepting materials. • Code change would apply to the same sizes and types of projects as current recycling requirements. • New system would provide the convenience of “all in one bin” collection service. • Options still remain; separating recyclables on site would be permissible under code amendments. Staff recommendation: Because the details of how Fort Collins policy can trigger new County facility development only became clear in the last month, these proposed building code amendments were not considered during the 2018 building code update cycle. Staff recommends supporting this code amendment to the adopted 2018 IRC and IBC which will require the C&D waste in mixed containers be brought to the new county facility when operational. Board or Commission may: • Vote in support or non-support of this code change. • Give input to the Chief Building Official which may include recommending changes this code amendment proposal. • Do nothing. ATTACHMENTS 1. Staff Presentation Packet Pg. 26 1 Staff Report to Building Review Board Regional Wasteshed Project Honore Depew; Sustainability Services 2-28-19 Subject March 5 Regular Meeting: • City Council will be considering an ordinance to amend the building codes to require all mixed loads of construction and demolition waste be sent to a future County-owned sorting facility, once it is constructed (2022, expected). 1. Does the BRB have specific feedback on the proposed changes? 2. Would the BRB like that feedback delivered by staff or by direct memo to Council? 2 1 2 ITEM 3, ATTACHMENT 1 Packet Pg. 27 3 Strategic Plan Goals Impacted 3.2 Maintain and grow diverse employment opportunities 4.5 Achieve the 2020 Road to Zero Waste goals and work toward 2030 zero waste goals 4.1 Achieve Climate Action Plan (CAP) 2020 goals and continue progress toward the 2030 goals 2016 Landfill Waste - Fort Collins 4 3 4 ITEM 3, ATTACHMENT 1 Packet Pg. 28 Wasteshed Coalition TAC Technical Advisory Committee PAC Policy Advisory Committee Stakeholder Advisory Group 5 Master Plan For Solid Waste Infrastructure Stakeholder Engagement 6 • Stakeholder Advisory Group • 50+ Diverse Members • 7 Meetings over 10 Months • Strong Support for Coalition Recommendations • Multiple Meetings with: • Private Haulers • Fort Collins Chamber • Four 2018 Open Houses • Regional Elected Officials’ Meetings 5 6 ITEM 3, ATTACHMENT 1 Packet Pg. 29 Larimer County Capital Investments 7 • Over $50 million invested • No tax revenue needed • No capital expenditure from Fort Collins • Potential to address 75%+ of our landfilled waste New Landfill Central Transfer Station Yard Waste Composting Facility Construction & Demolition Debris Processing Facility Food Waste Composting Facility Recycling Center Improvement 8 • Obligations of Larimer County: • Fund, build, own, and manage new facilities • Obligations of All Parties: • Consider code changes for solid waste • Participate in a solid waste Policy Council • Coordinate data tracking and education • IGA does not obligate Fort Collins to enact new policy Intergovernmental Agreement 7 8 ITEM 3, ATTACHMENT 1 Packet Pg. 30 Code Changes Needed in Fort Collins to Enable Construction 9 New Landfill None Central Transfer Station None Yard Waste Composting Facility None Recycling Center Improvement Flow Control • for curbside “single stream” recyclables Food Waste Composting Facility Local policy needed; no flow control Construction & Demolition (C&D) Debris Sorting Facility Flow Control • for mixed loads of C&D debris Landfilled Construction Debris Recyclable Compostable 52% 27% Not Currently Recyclable 21% Fort Collins Landfilled Industrial/Construction Waste 10 • Represents 33% of progress needed to meet 2025 Zero Waste diversion goal 9 10 ITEM 3, ATTACHMENT 1 Packet Pg. 31 Mixed loads of Construction and Demolition (C&D) debris must be delivered to County-owned facility, for a period of 10 years Proposed Flow Control Ordinance 11 Proposed Flow Control Ordinance 12 • Would go into effect once new facility is built • Aligns with current construction site recycling standards • Offers “all-in-one-bin” service for jobsite convenience • Positive feedback from builders and roll-off haulers 11 12 ITEM 3, ATTACHMENT 1 Packet Pg. 32 Next Steps March 5 Regular Meeting: • City Council will be considering an ordinance to amend the building codes to require all mixed loads of construction and demolition waste be sent to a future County-owned sorting facility, once it is constructed (2022, expected). 1. Does the BRB have specific feedback on the proposed changes? 2. Would the BRB like that feedback delivered by staff or by direct memo to Council? Honore Depew, Sr. Sustainability Specialist for Waste Reduction & Recycling; hdepew@fcgov.com (970) 221-6604 13 Additional Slides link 13 14 ITEM 3, ATTACHMENT 1 Packet Pg. 33 Code Changes Needed in Fort Collins to Enable Construction 15 New Landfill None Central Transfer Station None Yard Waste Composting Facility None Recycling Center Improvement Flow Control • for curbside “single stream” recyclables Food Waste Composting Facility Local policy needed; no flow control Construction & Demolition (C&D) Debris Sorting Facility Flow Control • for mixed loads of C&D debris Regional Wasteshed Resource Recovery Center (Proposed) 16 New Landfill Construction & Demolition Debris Sorting Food Waste Composting Recycling Center Upgrades Intersection Improvement Transfer Station Yard Waste Composting 15 16 ITEM 3, ATTACHMENT 1 Packet Pg. 34 Facility Build Timeline 2019 2020 2021 2022 2023 2024 Central Transfer Station New County Landfill Yard Waste Composting Open Windrow Construction and Demolition Debris Processing Food Waste Composting Aerated Static Piles 17 Proposed Facilities 18 RECYCLING CENTER UPGRADES CONSTRUCTION & DEMOLITION DEBRIS PROCESSING FACILITY 17 18 ITEM 3, ATTACHMENT 1 Packet Pg. 35 Proposed Facilities 19 CENTRAL TRANSFER NEW LANDFILL STATION Proposed Facilities 20 FOOD WASTE COMPOSTING FACILITY YARD WASTE COMPOSTING FACILITY 19 20 ITEM 3, ATTACHMENT 1 Packet Pg. 36 Estimated Tipping Fees 21 Facility Cost per ton Current Landfill $22 Transfer Station: Trash $29 Compost: Yard $38 Compost: Food $38 Construction Debris $37 Larimer County Capital Investments 22 Facility Initial Capital New Landfill $11.7M Central Transfer Station $15.8M Recycling Center Upgrades $3.0M Yard & Food Waste Composting Facilities $11.8M Construction & Demolition Debris Processing Facility $13.7M Total: $56M No tax revenue used No capital expenditure from City 21 22 ITEM 3, ATTACHMENT 1 Packet Pg. 37 Larimer County Landfill: Remaining Air Space 23 0 2,000,000 4,000,000 6,000,000 8,000,000 10,000,000 Air Space Remaining (cubic yards)  2004 Final Expansion Wasteshed Coalition Goals 1. Establish regional materials management system • 390k tons landfilled/year (2017); 540k tons/year by 2025 • Proposed system would divert ~40% 2. Implement programs and facilities • Five facilities and supportive policies recommended 3. Develop waste diversion/reduction goals for all jurisdictions • 40% by 2025 for total material currently received at facility 4. Conduct strong, consistent public education and outreach • Part of proposed Hauler Licensing and Intergovernmental Agreement 23 24 ITEM 3, ATTACHMENT 1 Packet Pg. 38 Council-Adopted Goals 25 GHG emissions 20% below 2005 levels GHG emissions 80% below 2005 levels 90% diversion ൑ 2.8 lbs/person landfilled per day Carbon Neutral 2013 2015 2020 2025 2030 2050 Road to Zero Waste Goals Adopted 75% diversion Approaching Zero Waste Climate Action Goals Adopted 26 25 26 ITEM 3, ATTACHMENT 1 Packet Pg. 39 27 27 ITEM 3, ATTACHMENT 1 Packet Pg. 40 Agenda Item 4 Item 4, Page 1 Staff Report February 28, 2019 Building Review Board STAFF Russ Hovland, Chief Building Official SUBJECT PROPOSED BUILDING CODE CHANGE TO ALLOW SHORT-TERM RENTALS IN MULTI-FAMILY BUILDINGS EXECUTIVE SUMMARY Summary: Building Services and Poudre Fire Authority have identified a short term rental (STR) licensing policy that conflicts with current Building and Fire codes adopted by the City. In 2008, Fort Collins adopted the 2006 International Building Code. That code established transient dwellings and non-transient dwellings as two different occupancies: R-1 for hotel/motel transient occupancy and R-2 for non-transient multi-family condo/apartment occupancy. Since that time these have been identified as different occupancies and have different code requirements. Short term rentals (30 day stay or less) located within a multi-family building (3 units or more) is a change to transient R-1 use/occupancy. To change building code occupancies, the IBC requires the building must be modified with a building permit to meet the new code requirements required for that occupancy. Transient dwellings like hotels are required to be safer because transient occupants are less familiar with the building layout and emergency safety measures than permanent residents. Transient occupancies have higher, more stringent building code standards including fire safety (fire sprinkler systems), egress, accessibility, elevators, and electrical. The City has approved approximately 88 STR licenses in multi-family buildings, but a full change of occupancy process would be very expensive to make some of these buildings code compliant. Staff recommendation: The Chief Building Official (CBO) recommends adding language to the occupancy description section of Chapter 3 in the adopted 2018 IBC to allow R-2 multi-family buildings to have not more than 25% of units/dwellings with occupants that are transient in nature thereby keeping the primary use of the building permanent residents. The building would then not be considered a change occupancy. City staff will be presenting this change to City Council on March 26. Board or Commission may: • Vote in support or non-support of this code change. • Give input to the CBO which may include recommending changes this code amendment proposal. • Do nothing. ATTACHMENTS 1. Amendment to section 310.3 of the 2018 IBC. Packet Pg. 41 Draft #4 Fort Collins Amendments to the 2018 International Building Code The 2018 INTERNATIONAL BUILDING CODE adopted herein is hereby amended in the following respects: SECTION 310 RESIDENTIAL GROUP R 310.1 Residential Group R. Residential Group R includes, among others, the use of a building or structure, or a portion thereof, for sleeping purposes when not classified as an Institutional Group I or when not regulated by the International Residential Code. 310.2 Residential Group R-1. Residential Group R-1 occupancies containing sleeping units where the occupants are primarily transient in nature, including: Boarding houses (transient) with more than 10 occupants Congregate living facilities (transient) with more than 10 occupants Hotels (transient) Motels (transient) 310.3 Residential Group R-2. Residential Group R-2 occupancies containing sleeping units or more than two dwelling units where the occupants are primarily permanent in nature, including: Apartment houses Apartment houses where a maximum of 25% of the units/dwellings include occupants that are transient in nature. A three unit R-2 building is allowed to have one unit/dwelling with occupants that are transient in nature. Congregate living facilities (nontransient) with more than 16 occupants Boarding houses (nontransient) Convents Dormitories Fraternities and sororities Monasteries Hotels (nontransient) Live/work units Motels (nontransient) Vacation timeshare properties ITEM 4, ATTACHMENT 1 Packet Pg. 42 CARPET 8' CLG LAUN VINYL 8' CLG CLOSET 8'-7" x 8'-11" CARPET 8' CLG BATH VINYL 8' CLG MBTH VINYL 8' CLG HALL - CARPET 8' CLG SITTING LINEN BEDROOM 1 17'-0" x 11'-0" CARPET 8' CLG BEDROOM 2 11'-6" x 12'-8" CARPET 8' CLG LAUN VINYL 8' CLG CLOSET 8'-7" x 8'-11" CARPET 8' CLG BATH VINYL 8' CLG MBATH VINYL 8' CLG HALL - CARPET 8' CLG SITTING LINEN UNIT (1) UNIT (2) UNIT (3) UNIT (4) 1 UPPER SCALE: FLOOR ELECTRICAL PLAN 1/4"=1'-0" - UPPER FLOOR ELECT PLAN 6.2 INTERNATIONAL COPYRIGHT LAWS PROHIBIT THE USE OF THESE DRAWINGS WITHOUT THE EXPRESS WRITTEN AUTHORIZATION OF THE ARCHITECT. THE DESIGNS CONTAINED WITHIN THESE DOCUMENTS BOTH IN WHOLE AND IN PART ARE INTENTED FOR CONSTRUCTION AT THE ADDRESS LISTED ON THE TITLE BLOCK. ISSUED FOR: DATE: - SUNSTONE 4-PLEX SUNSTONE 4-PLEX STONEY CREEK DRIVE AND CARIBOU DRIVE CLIENT UPDATE 07.12.18 2ND FLR 866 SF FIRST FLR 630 SF TOTAL 1,496 SF GARAGE AND UNIT AREA UNITS 1-4 MECHANICAL 343 SF LOT 13 SUNSTONE MULTI-USE FORT COLLINS, COLORADO DOUGLAS A. SCHOONOVER ARCHITECT, NCARB www.sch2architects.com t: 970.817.5260 e: team@sch2architects.com SCH ARCHITECTS CLIENT UPDATE 12.08.18 CITY COMMENTS 01.27.19 NORTH ELECTRICAL SYMBOLS ITEM 2, ATTACHMENT 3 Packet Pg. 25 9' CLG STORAGE 4'-3" X 7'-0" CONC MECH 4'-0" X 6'-8" PLATFORM BATH VINYL 9' CLG GARAGE 12'-8" X 21'-0" CONC DINETTE 12'-2" X 10'-7" CARPET 9' CLG LIVING ROOM 17'-0" X 14'-8" CARPET 9' CLG HALL 4'-0" x 8'-8" CARPET 8' CLG MECH 4'-0" X 6'-8" PLATFORM BATH VINYL 9' CLG DINETTE 12'-2" X 10'-7" CARPET 9' CLG LIVING ROOM 17'-0" X 14'-8" CARPET 9' CLG STORAGE 4'-3" X 7'-0" CONC HALL 4'-0" x 8'-8" CARPET 8' CLG MECH 4'-0" X 6'-8" PLATFORM STORAGE 4'-3" X 7'-0" CONC HALL 4'-0" x 8'-8" CARPET 8' CLG KITCHEN 12'-2" X 14'-0" VINYL 9' CLG KITCHEN 12'-2" X 14'-0" VINYL 9' CLG KITCHEN 12'-2" X 14'-0" VINYL 9' CLG KITCHEN 12'-2" X 14'-0" VINYL 9' CLG GARAGE 12'-8" X 21'-0" CONC AC AC AC AC 1 MAIN SCALE: FLOOR ELECTRICAL PLAN 1/4"=1'-0" - MAIN FLOOR ELECT PLAN 6.1 INTERNATIONAL COPYRIGHT LAWS PROHIBIT THE USE OF THESE DRAWINGS WITHOUT THE EXPRESS WRITTEN AUTHORIZATION OF THE ARCHITECT. THE DESIGNS CONTAINED WITHIN THESE DOCUMENTS BOTH IN WHOLE AND IN PART ARE INTENTED FOR CONSTRUCTION AT THE ADDRESS LISTED ON THE TITLE BLOCK. ISSUED FOR: DATE: - SUNSTONE 4-PLEX SUNSTONE 4-PLEX STONEY CREEK DRIVE AND CARIBOU DRIVE CLIENT UPDATE 07.12.18 2ND FLR 866 SF FIRST FLR 630 SF TOTAL 1,496 SF GARAGE AND UNIT AREA UNITS 1-4 MECHANICAL 343 SF LOT 13 SUNSTONE MULTI-USE FORT COLLINS, COLORADO DOUGLAS A. SCHOONOVER ARCHITECT, NCARB www.sch2architects.com t: 970.817.5260 e: team@sch2architects.com SCH ARCHITECTS CLIENT UPDATE 12.08.18 CITY COMMENTS 01.27.19 NORTH ELECTRICAL SYMBOLS ITEM 2, ATTACHMENT 3 Packet Pg. 24 3 2 1 RE: STRUCT FOR WALL RE: STRUCT FOR ANCHORAGE ADDITIONAL SUPPORT FRAMING FOR UPPER WALL RE: STRUCT FOR ADDITIONAL SUPPORT FRAMING FOR UPPER WALL 5/8" G.B. ON 2x4 STUDS AT 16" O.C. WITH BATT INSULATION FOR SOUND RE: STRUCT FOR WALL ANCHORAGE 10" RUN WALL TO UNDERSIDE OF CLASS 'C' OR BETTER ROOFING WITH 5 8" TYPE 'X' G.B. ON UNDERSIDE OF ROOF SHEATHING, FIRE CAULK JOINT. PRE-ENGINEERED ROOF TRUSSES R-49 BATT INS. RE: STRUCT FOR ADD'L SUPPORT FRAMING FOR UPPER WALL. 5/8" G.B. ON 2x4 STUDS AT 16" O.C. RE: STRUCT FOR WALL ANCHORAGE RE: STRUCT FOR WALL ANCHORAGE DRAFT STOP 1 1 1/2"=1'-0" TYPICAL TRIM DETAIL-EXTERIOR 4.2 2 1 1/2"=1'-0" EXTERIOR TRIM DETAIL 3 1 1/2"=1'-0" EXTERIOR TRIM DETAIL 4 1 1/2"=1'-0" CRAFTSMAN COLUMN INTERNATIONAL COPYRIGHT LAWS PROHIBIT THE USE OF THESE DRAWINGS WITHOUT THE EXPRESS WRITTEN AUTHORIZATION OF THE ARCHITECT. THE DESIGNS CONTAINED WITHIN THESE DOCUMENTS BOTH IN WHOLE AND IN PART ARE INTENTED FOR CONSTRUCTION AT THE ADDRESS LISTED ON THE TITLE BLOCK. ISSUED FOR: DATE: - SUNSTONE 4-PLEX SUNSTONE 4-PLEX STONEY CREEK DRIVE AND CARIBOU DRIVE CLIENT UPDATE 07.12.18 2ND FLR 866 SF FIRST FLR 630 SF TOTAL 1,496 SF GARAGE AND UNIT AREA UNITS 1-4 MECHANICAL 343 SF LOT 13 SUNSTONE MULTI-USE FORT COLLINS, COLORADO DOUGLAS A. SCHOONOVER ARCHITECT, NCARB www.sch2architects.com t: 970.817.5260 e: team@sch2architects.com SCH ARCHITECTS CLIENT UPDATE 12.08.18 CITY COMMENTS 01.27.19 6 3/4"=1'-0" FIRE PARTITION WALL 5 1"=1'-0" FIRE PARTITION PLAN DTL MISC. DETAILS ITEM 2, ATTACHMENT 3 Packet Pg. 23 OVERBLDG WRAP OVER 7 16" OSB. SHEATHING R-30 INSULATION ATTACH INSULATION TO BACK OF ACCESS PANEL 12" INSULATION DAM GYP. BD. CEILING TRUSSES GYP. BD. CEILING PANEL CAST STONE CAP VARIES SEE ELEV. G.I. FLASHING SEALANT TYPICAL EXTERIOR WALL PRECAST STONE HARDBOARD SIDING INSTALLED PER MANUF. SPEC'S 2x6 HARDITRIM-OR OTHER SEE ELEVATIONS G.I. FLASHING TYPICAL EXTERIOR WALL VINYL WINDOW BACKER ROD AND SEALANT HARDBOARD SIDING INSTALLED PER MANUF. SPEC'S VINYL WINDOW TYPICAL EXTERIOR WALL BACKER ROD AND SEALANT HARDBOARD SIDING INSTALLED PER MANUF. SPEC'S G.I. FLASHING G.I. FLASHING VINYLWINDOW TYPICAL EXTERIOR WALL CAST STONE CAP SYNTHETIC STONE BACKER ROD AND SEALANT DEPTH PER PLAN 2x4 FRAMING HARDBD PANEL STONE VENEER STONE CAP ABOVE WIDTH PER PLAN ITEM 2, ATTACHMENT 3 Packet Pg. 22 1'-6" PREMANUFACTURED ROOF TRUSSES 2" RIGID INSULATION 2" RIGID INSULATION PLATFORM HEIGHT 12 5 LIVING ROOM 17'-0" X 14'-8" CARPET 9' CLG 4" SLAB, SUBGRADE PER SOILS RECOMENDATIONS 2" 3'-0" 6" 5'-1" 6" 9'-1" 2X RAFTER RE: STRUCT R-49 INSULATION R-20 INSULATION SOUND BATTS AT MASTER BEDROOM WALL SOUND BATTS AT MASTER BEDROOM FLOOR INSULATE FLOOR SPACE ABOVE GARAGE DRAINAGE PER SOILS REPORT 5" TOP OF PLATE FINISHED FLOOR 9'-1" 1'-0 5 8" FINISHED FLOOR TOP OF PLATE 8'-1" 13'-8 3 4" BUILDING HEIGHT 31'-11 3 8" 12 6 12 6 12 6 12 6 12 6 12 6 PREMANUFACTURED ROOF TRUSSES PREMAN'D ROOF TRUSSES R-49 INSULATION SITTING SHOWER SITTING SHOWER SHOWER SITTING SHOWER SITTING LIVING ROOM 17'-0" X 14'-8" CARPET 9' CLG LIVING ROOM 17'-0" X 14'-8" CARPET 9' CLG LIVING ROOM 17'-0" X 14'-8" CARPET 9' CLG LIVING ROOM 17'-0" X 14'-8" CARPET 9' CLG R-20 INSULATION SOUND BATTS AT MASTER BEDROOM FLOOR SOUND BATTS AT MASTER BEDROOM FLOOR SOUND BATTS AT MASTER BEDROOM FLOOR SOUND BATTS AT MASTER BEDROOM FLOOR R-13 INSUL'N EA. WALL AT PARTY WALL ROOF LINE IN FOREGROUND EXTEND PARTITION WALL TO ROOF SHEATHING EXTEND PARTITION WALL TO ROOF SHEATHING EXTEND PARTITION WALL TO ROOF SHEATHING R-20 INSULATION PARTITION WALL WITH SOUND BATTS. PARTITION WALL WITH SOUND BATTS. PARTITION WALL WITH SOUND BATTS. EXTEND PARTITION WALL TO ROOF SHEATHING AT EAST/WEST GABLE 6 12 12 6 PREMAN'D ROOF TRUSSES R-49 INSULATION PREMAN'D ROOF R-49 TRUSSES INSULATION PREMAN'D ROOF R-49 TRUSSES INSULATION 4.0 BUILDING SECTIONS 2 EAST SCALE: TO WEST ELEVATION 1/4"=1'-0" LOOKING SOUTH INTERNATIONAL COPYRIGHT LAWS PROHIBIT THE USE OF THESE DRAWINGS WITHOUT THE EXPRESS WRITTEN AUTHORIZATION OF THE ARCHITECT. THE DESIGNS CONTAINED WITHIN THESE DOCUMENTS BOTH IN WHOLE AND IN PART ARE INTENTED FOR CONSTRUCTION AT THE ADDRESS LISTED ON THE TITLE BLOCK. ISSUED FOR: DATE: - SUNSTONE 4-PLEX SUNSTONE 4-PLEX STONEY CREEK DRIVE AND CARIBOU DRIVE CLIENT UPDATE 07.12.18 2ND FLR 866 SF FIRST FLR 630 SF TOTAL 1,496 SF GARAGE AND UNIT AREA UNITS 1-4 MECHANICAL 343 SF LOT 13 SUNSTONE MULTI-USE FORT COLLINS, COLORADO DOUGLAS A. SCHOONOVER ARCHITECT, NCARB www.sch2architects.com t: 970.817.5260 e: team@sch2architects.com SCH ARCHITECTS CLIENT UPDATE 12.08.18 CITY COMMENTS 01.27.19 1 NORTH SCALE: TO SOUTH ELEVATION 1/4"=1'-0" LOOKING WEST (ALL SECTION NOTES MAY NOT APPLY NOTES TO THIS SHEET) 1. SYNTHETIC STONE VENEER - BY BUILDER 2. CAST STONE CAP-PROVIDE SLOPE FOR DRAINAGE 3. PRECAST STONE WINDOW SILL. 4. OVERHEAD GARAGE DOOR, RE: PLAN FOR SIZE 5. TAPERED WOOD BUILT-UP COLUMN RE: 6. PROVIDE FLASHING AND DRIP CAP OVER ALL DOORS, WINDOWS AND AT ALL TRIM TRANSITIONS 7. ENTRY DOOR PER BUILDER SPECIFICATIONS 1. 1X6 HARDI TRIM FRIEZE 2. 1X12 HARDI TRIM 3. 1X8 HARDI TRIM 4. HORIZONTAL SIDING-6" HARDIPLANK LAP SIDING 5. ACCENT SIDING-HARDI SHINGLESIDE SIDING STRAIGHT EDGE PANEL STYLE 6. 1X6 HARDITRIM 7. 1X4 HARDITRIM 8. 1X12 HARDITRIM 9. 20" FRIEZE BOARD AT TOWER 10. 1X2 OVER 1X4 HARDITRIM AT WINDOW SILL 11. 1X2 OVER 1X6 HARDITRIM AT WINDOW HEAD AND SILL 12. WOOD BRACKET/CORBEL 13. SURFACE MOUNTED LIGHT 1. ARCHITECTURAL GRADE ASPHALT SHINGLES 2. ROOF VENTS - SEE ROOF PLAN FOR LOCATION AND QUANTITY 3. 1X8 HARDI FASCIA (TYPICAL) 4. 1X3 SHINGLE STRIP 5. PREFINISHED GUTTERS AND DOWNSPOUTS PER BUILDER 6. SOFFIT - HARDI-SOFFIT - VENTED 7. LINE OF 3/12 VAULT B- S- R- ROOFING AND MISC. NOTES SKIN, GLAZING AND LIGHTING NOTES BASE, COLUMNS AND DOOR OPENINGS ITEM 2, ATTACHMENT 3 Packet Pg. 21 MATCH TRIM, OR WOOD STAIN. 1. 1X6 HARDI TRIM FRIEZE 2. 1X12 HARDI TRIM-BELLY BAND 3. 1X8 HARDI TRIM 4. HORIZONTAL SIDING-6" HARDIPLANK LAP SIDING W/ INDIVIDUAL METAIL CORNER TRIM 5. ACCENT SIDING-HARDI SHINGLESIDE SIDING STRAIGHT EDGE PANEL STYLE 6. 1X6 HARDI TRIM 7. 1X4 HARDI TRIM 8. 1X12 HARDI TRIM 9. NOT USED 10. 1X2 OVER 1X4 HARDITRIM AT WINDOW SILL 11. 1X2 OVER 1X6 HARDITRIM AT WINDOW HEAD AND SILL 12. WOOD BRACKET/CORBEL 13. SURFACE MOUNTED LIGHT 14. BOARD AND BATTAN SIDING 2" BATTANS AT 12" O.C. 1. ARCHITECTURAL GRADE ASPHALT SHINGLES 2. ROOF VENTS - SEE ROOF PLAN FOR LOCATION AND QUANTITY 3. 1X8 HARDI FASCIA (TYPICAL) 4. 1X3 SHINGLE STRIP 5. PREFINISHED GUTTERS AND DOWNSPOUTS PER BUILDER 6. SOFFIT - HARDI-SOFFIT - VENTED 7. LINE OF 3/12 VAULT 8. 2X8 RAFTER TAIL ENDS-PAINTED ROOFING AND MISC. NOTES SKIN, GLAZING AND LIGHTING NOTES BASE, COLUMNS AND DOOR OPENINGS R- S- B- ITEM 2, ATTACHMENT 3 Packet Pg. 20 TRANSITIONS 7. ENTRY DOOR PER BUILDER SPECIFICATIONS 8. RE: STRUCTURAL 9. CARRIAGE-TYPE GARAGE DOOR, PAINT TO MATCH TRIM, OR WOOD STAIN. 1. 1X6 HARDI TRIM FRIEZE 2. 1X12 HARDI TRIM-BELLY BAND 3. 1X8 HARDI TRIM 4. HORIZONTAL SIDING-6" HARDIPLANK LAP SIDING W/ INDIVIDUAL METAIL CORNER TRIM 5. ACCENT SIDING-HARDI SHINGLESIDE SIDING STRAIGHT EDGE PANEL STYLE 6. 1X6 HARDI TRIM 7. 1X4 HARDI TRIM 8. 1X12 HARDI TRIM 9. NOT USED 10. 1X2 OVER 1X4 HARDITRIM AT WINDOW SILL 11. 1X2 OVER 1X6 HARDITRIM AT WINDOW HEAD AND SILL 12. WOOD BRACKET/CORBEL 13. SURFACE MOUNTED LIGHT 14. BOARD AND BATTAN SIDING 2" BATTANS AT 12" O.C. 1. ARCHITECTURAL GRADE ASPHALT SHINGLES 2. ROOF VENTS - SEE ROOF PLAN FOR LOCATION AND QUANTITY 3. 1X8 HARDI FASCIA (TYPICAL) 4. 1X3 SHINGLE STRIP 5. PREFINISHED GUTTERS AND DOWNSPOUTS PER BUILDER 6. SOFFIT - HARDI-SOFFIT - VENTED 7. LINE OF 3/12 VAULT 8. 2X8 RAFTER TAIL ENDS-PAINTED ROOFING AND MISC. NOTES SKIN, GLAZING AND LIGHTING NOTES BASE, COLUMNS AND DOOR OPENINGS R- S- B- ITEM 2, ATTACHMENT 3 Packet Pg. 19 3 NOTE: ALL ROOF STOPES TO BE 6:12 U.N.O. EXTEND THIS FIRE PARTION TO UNDERSIDE OF ROOF DECK TO ACT AS DRAFT STOP WITHIN THE ATTIC SPACE ATTIC AREA 1,780 SF ATTIC AREA 1,780 SF 5:12 PITCH 5:12 PITCH 1 ROOF SCALE: PLAN 1/4"=1'-0" - ROOF PLAN 2.3 INTERNATIONAL COPYRIGHT LAWS PROHIBIT THE USE OF THESE DRAWINGS WITHOUT THE EXPRESS WRITTEN AUTHORIZATION OF THE ARCHITECT. THE DESIGNS CONTAINED WITHIN THESE DOCUMENTS BOTH IN WHOLE AND IN PART ARE INTENTED FOR CONSTRUCTION AT THE ADDRESS LISTED ON THE TITLE BLOCK. ISSUED FOR: DATE: - SUNSTONE 4-PLEX SUNSTONE 4-PLEX STONEY CREEK DRIVE AND CARIBOU DRIVE CLIENT UPDATE 07.12.18 2ND FLR 866 SF FIRST FLR 630 SF TOTAL 1,496 SF GARAGE AND UNIT AREA UNITS 1-4 MECHANICAL 343 SF LOT 13 SUNSTONE MULTI-USE FORT COLLINS, COLORADO DOUGLAS A. SCHOONOVER ARCHITECT, NCARB www.sch2architects.com t: 970.817.5260 e: team@sch2architects.com SCH ARCHITECTS CLIENT UPDATE 12.08.18 CITY COMMENTS 01.27.19 NORTH (ALL ROOF NOTES MAY NOT PLAN APPLY TO THIS NOTES SHEET) 1. RIDGE 2. VALLEY 3. GUTTER 4. ASPHALT SHINGLES 5. LINE OF FIRST FLOOR 6. LINE OF SECOND FLOOR 7. HIP RIDGE 8. VENT X ROOF PLAN NOTES ITEM 2, ATTACHMENT 3 Packet Pg. 18 BEDROOM 2 11'-6" x 12'-8" CARPET 8' CLG LAUN VINYL 8' CLG CLOSET 8'-7" x 8'-11" CARPET 8' CLG BATH VINYL 8' CLG MBTH VINYL 8' CLG HALL - CARPET 8' CLG SITTING LINEN BEDROOM 1 17'-0" x 11'-0" CARPET 8' CLG BEDROOM 2 11'-6" x 12'-8" CARPET 8' CLG LAUN VINYL 8' CLG CLOSET 8'-7" x 8'-11" CARPET 8' CLG BATH VINYL 8' CLG MBATH VINYL 8' CLG HALL - CARPET 8' CLG SITTING LINEN UNIT (1) UNIT (2) UNIT (3) UNIT (4) 4'-2" 4'-101 2" 4'-1" 4'-1 1 2" 3'-8 1 2" 4'-10 1 2" 4'-1" 4'-1 1 2" 3'-9 1 2" 4'-4 1 2" 4'-7" 4'-0 1 2" 3'-10" 4'-4 1 2" 4'-7" 4'-5 1 2" 7'-111 2" 3'-11" 5'-4 1 2" 7'-6" 3'-10 1 2" 5'-4 1 2" 5'-1" 3'-10 1 2" 7'-9 1 2" 5'-1" 3'-11" 8'-3" 3'-6" 4'-0" 9'-31 2" 10" 3'-6" 4'-0" 9'-3" 8'-111 2" 4'-3 1 2" 3'-6" 9'-0" 4'-3 1 2" 3'-6" 3'-111 2" 4'-0" 3'-11" 5'-4 1 2" 10" 3'-6" 4'-0" 3'-11" 5'-41 2" 5'-0 1 2" 3'-11" 4'-0" 3'-10" 5'-1" 3'-11" 4'-0" 4'-3" DN 16R 2'-6" 11'-101 11'-5" 2" 5'-4 1 2" 5'-4 1 2" 2'-6" 2'-6" 2'-6" 13'-2" 2'-0" 8'-9 1 2" 5'-8" 2'-41 2" 13'-51 2" 5'-111 2" 7'-31 2" 4'-11" 5'-111 2" 8'-9" 2'-41 2" 13'-51 4'-1 2" 1 2" 3'-51 2" 2'-11" 13'-3" 2'-0" 8'-9 1 2" 5'-8" 2'-4 1 2" 2'-4 1 2" 15'-5 1 2" 5'-111 2" 7'-3 1 2" 2'-11" 4'-1 1 2" 5'-11 1 2" 3'-5 1 2" 5'-3 1 2" 2'-4 1 2" 15'-5 1 2" 5'-111 2" 7'-3 1 2" 3'-11" 4'-1 1 2" 5'-11 1 2" 3'-5 1 2" 5'-3 1 2" 2'-4 1 2" 14'-5 1 2" 5'-111 2" 7'-31 2" 4'-11" 4'-11 2" 5'-11 1 2" 3'-5 1 2" 5'-3 1 2" 2'-4 1 2" 13'-5 1 2" 1 4.0 1 4.0 2 4.0 2 4.0 31 31 31 CPT VCT CPT VCT CPT VCT CPT VCT 31 12 12 10 52 17 19 13 15 51 30 41 42 17 52 14 12 52 17 19 13 15 51 30 41 42 17 52 14 31 12 12 10 52 17 19 13 15 51 30 42 41 17 52 14 52 17 19 13 15 51 30 42 41 17 52 14 CPT VCT CPT VCT CPT VCT CPT VCT CPT VCT CPT VCT CPT VCT CPT VCT 2020 FX 2020 FX 2020 FX 2020 FX 2020 FX 2020 FX 2020 FX 2020 FX 2020 FX 2020 FX NOTE: FIRST FLOOR WINDOW HEAD HEIGHT AT 8'-0" AFF SECOND FLOOR WINDOW HEAD HEIGHT AT 7'-0" AFF (2) 2650 SH (2) 2650 SH (2) 2650 SH (2) 2650 SH (2) 2650 SH (2) 2650 SH (2) 2650 SH (2) 2650 SH 2020 FX 3040 SH 2020 FX 3040 SH 2868 2668 2868 2868 2868 2668 3068 5068 BI-PARTING 2868 2868 2868 2868 2668 5068 BI-PARTING 5068 BI-PARTING 5068 BI-PARTING 2668 2668 2868 2868 3068 3068 3068 2868 2868 2868 2868 2668 2868 2668 2668 2868 EXTEND THIS FIRE PARTION TO UNDERSIDE OF ROOF DECK TO ACT AS DRAFT STOP WITHIN THE ATTIC SPACE DN 16R DN 16R DN 16R 10" 10" 10" 70'-7" 21'-101 2" 13'-3 1 2" 13'-6" 21'-11" 11'-2" 10'-81 2" 6'-7 1 2" 6'-8" 6'-10 1 2" 6'-7 1 2" 10'-9" 11'-2" 70'-7" 5'-0" 13'-1" 5'-0" 12'-4" 12'-01 2" 5'-0 1 2" 13'-1" 5'-0" 3'-6" 6'-21 2" 3'-4 1 2" 5'-0" 3'-6" 8'-10" 2'-9 1 2" 5'-9" 3'-6" 5'-0 1 2" 3'-4 1 2" 6'-2 1 2" 3'-6" 5'-0" 10" 10" 10" 10" 10" 10" 5'-0" 2'-11" 3'-0" 3'-0" 18'-11" 16'-01 2" 3'-11 1 2" 2'-0" 52'-10" 5'-0" 1'-0" 4'-0" 5'-0" 5'-0" 3'-0" 3'-0" 3'-0" 18'-10" 16'-0" 4'-0" 52'-10" 1'-0" 1'-0" 13'-2" 13'-2" 10'-91 2" 10'-91 2" 13'-2" 10'-91 2" 12'-81 2" 10'-9 1 2" 1 UPPER SCALE: FLOOR PLAN 1/4"=1'-0" - UPPER FLOOR PLAN 2.2 INTERNATIONAL COPYRIGHT LAWS PROHIBIT THE USE OF THESE DRAWINGS WITHOUT THE EXPRESS WRITTEN AUTHORIZATION OF THE ARCHITECT. THE DESIGNS CONTAINED WITHIN THESE DOCUMENTS BOTH IN WHOLE AND IN PART ARE INTENTED FOR CONSTRUCTION AT THE ADDRESS LISTED ON THE TITLE BLOCK. ISSUED FOR: DATE: - SUNSTONE 4-PLEX SUNSTONE 4-PLEX STONEY CREEK DRIVE AND CARIBOU DRIVE CLIENT UPDATE 07.12.18 2ND FLR 866 SF FIRST FLR 630 SF TOTAL 1,496 SF GARAGE AND UNIT AREA UNITS 1-4 MECHANICAL 343 SF LOT 13 SUNSTONE MULTI-USE FORT COLLINS, COLORADO DOUGLAS A. SCHOONOVER ARCHITECT, NCARB www.sch2architects.com t: 970.817.5260 e: team@sch2architects.com SCH ARCHITECTS CLIENT UPDATE 12.08.18 CITY COMMENTS 01.27.19 (ALL PLAN NOTES MAY NOT NOTES APPLY TO THIS SHEET) 1. UNEXCAVATED 4" THICK SLAB, SLOPE FLOOR MIN 4" TOWARDS DOOR 2. 4" CONCRETE SLAB. RE: STRUCT 3. DEPRESS FOUNDATION WALL AS NEEDED AT AT GARAGE DOOR OPENING 4. PROVIDE HIGH AND LOW AIR SUPPLY/RETURN, ONE WITHIN 12" OF CEILING PLANE. ONE AT 12" A.F.F., SIZE AND LOCATION PER IMC 5. FOUNDATION LINE BEYOND 6. STEP AT GARAGE/UNIT (FRAMED) 7. DUST LIP 8. GARAGE DOOR AS PER ELEVATIONS/BUILDERS SPEC 9. GARAGE SEPARATION-1 LAYER 5/8" G.W.B. ON GARAGE SIDE AND 20 MIN. DOOR WITH SELF-CLOSING HINGES. 10. TYPICAL EXTERIOR WALL ASSEMBLY-2X6 STUDS (UNLESS OTHERWISE INDICATED) AT 16" O.C. W/ 1/2" GWB OVER VAPOR BARRIER ON INTERIOR FACE AND BLDG WRAP OVER 1/2" SHEATHING ON EXTERIOR FACE-FINISH AS PER ELEVATIONS. 11. TYPICAL INTERIOR WALL ASSEMBLY - 2x4 STUDS (UNLESS OTHERWISE INDICATED) AT 16" O.C. WITH 1 2" GWB ON EACH FACE UNLESS OTHERWISE INDICATED. 12. TYPICAL 1 HOUR FIRE PARTITION ASSEMBLY - ( UL# U305 / GA. WP 3370 OR EQUAL) ONE LAYER 5/8" TYP X GWB APPLIED PARALLEL OR AT RIGHT ANGLES TO EACH SIDE OF DOUBLE ROW OF 2X4 WOOD STUDS 16" O.C. ON SEPARATE PLATES SET 1" APART WITH 6d COATED NAILS, 1 7/8" LONG, 0.0915" SHANK, 1/4" HEADS, 7" O.C.. JOINTS STAGGERED 16" OPPOSITE SIDES. HORIZONTAL BRACING REQUIRED AT MID-HEIGHT. FOR STC RATING OF >50, PLACE CONTINUOUS BLANKET OF 6" GLASS FIBER INSULATION IN STUD SPACE. DRAFTSOP AS REQUIRED 13. 60"x30" TUB/SHOWER WITH TILE SURROUND W/INDIVIDUAL PRESSURE BALANCE OR THERMOSTATIC MIXING VALVE AND HANDLE POSITION STOPS ADJUSTED PER MFR'S INSTRUCTIONS FOR 120 DEG. F MAX WATER TEMP. PER THE IPC. 14. 60"X36" SHOWER WITH INDIVIDUAL PRESSURE BALANCE OR THERMOSTATIC MIXING VALVE AND HANDLE POSITION STOPS ADJUSTED PER MFR'S INSTRUCTIONS FOR 120 DEGREE F, MAX. WATER TEMP. PER THE IPC. 15. WASHER/DRYER HOOKUPS, VENT DRYER TO EXTERIOR. 16. COUNTER TOP. 17. ROD AND SHELF. 18. DOUBLE ROD AND SHELF. - NOT USED 19. LINEN WITH 5 FIXED SHELVES. 20. PANTRY W/ 5 FIXED SHELVES 21. FROST FREE HOSE BIB. 22. LINE OF VAULT/VOLUME SPACE. 23. CONTINUOUS HANDRAIL PER CODE. 24. CONTROL JOINTS. 25. DROPPED SOFFIT. 26. SHELF. 27. FIREPLACE, VENT PER MANFR'S SPES. - NOT USED 28. WATERPROOF GYP BD AT TUB/SHOWER. 29. CASED OPENING. 30. 2x6 WALL. 31. 22"X30" ACCESS PANEL W/ PULL-CHAIN LIGHT. 32. RECESSED MEDICINE CABINET. - NOT USED 33. FLOOR DRAIN. 34. FLUE CHASE-VENT TO EXTERIOR. 35. STONE VENEER (RE: ELEV). 36. STONE/TRIM PACKOUT. 37. EGRESS WINDOW/WELL PER CODE. 38. FRAMED PLATFORM 18" AFF. 39. RE: STRUCTURAL 40. LOW WALL (36" MAX. U.N.O.) 41. LOW CABINETS 42. HIGH CABINETS 43. 1030 TRANSOM WINDOW 44. WATER HEATER 45. FURNACE 46. GWB BULKHEAD 47. MICROWAVE 48. DISH WASHER 49. REFERIGERATOR 50. RANGE 51. RAIL WITH BALLUSTERS AND NEWELL POST 52. MIRROR-BY BUILDER 53. LINE OF ROOF 54. LINE OF SLAB ON GRADE LEDGE - 2"X4" LEDGE BLOCKOUT X FOUNDATION/FLOOR PLAN NOTES NORTH ITEM 2, ATTACHMENT 3 Packet Pg. 17 CONC UNIT (1) 1,495 SF UNIT (2) 1,495 SF UNIT (3) 1,495 SF UNIT (4) 1,495 SF 1'-4" 3'-8" 6'-5" 5'-10" 101 2" 3'-3" 6'-5" 6'-5" 3'-21 2" 11" 5'-10" 6'-5" 3'-8" 1'-4" 17'-3" 10" 16'-91 2" 10" 10" 5'-41 2" 10" 5'-41 2" 5'-0" 10" 1'-4" 3'-8" 3'-0" 3'-0" 3'-0" 15'-0" 3'-10" 9'-81 2" 3'-8" UP 15R 4'-9" 12'-6" 4'-51 2" 7'-0 1 2" 5'-9" 10" 3'-111 2" 1'-9 1 2" 3'-1" 7'-3" 10" 2'-6" 2'-6" 2'-6" 2'-6" 8'-10" 4'-11" 2'-41 2" 6'-10" 4'-3 1 2" 3'-3 1 2" 2'-0" 3'-31 2" 6" 1'-4" 3'-2" 6" 1'-4" 3'-2" 5'-0" 1'-2" 2'-0" 4'-0" 2'-1" 2'-71 2" 111 2" 4'-0" CPT VCT CPT VCT 11'-51 5'-0" 2" 17'-8" 17'-7 1 2" KITCHEN 12'-2" X 14'-0" VINYL BATH 9' CLG VINYL 9' CLG DINETTE 12'-2" X 10'-7" CARPET 9' CLG LIVING ROOM 17'-0" X 14'-8" CARPET 9' CLG STORAGE 4'-3" X 7'-0" CONC MECH 4'-0" X 6'-8" PLATFORM UP 15R 4'-31 2" 12'-6" 4'-0" 8'-10" 4'-11" 2'-41 2" 6'-10" 7'-7" 3'-31 2" CPT VCT 5'-0" 3'-6" 9080 OHD 9080 OHD (2) 3060 SH 30-68 (2) 3060 SH 2020 FX 2020 FX 2020 FX 2020 FX 3060 SH 3068 3068 2868 3068 PR 2668 FD FD PR 2668 3068 2868 3068 51 25 23 40 21 HB 21 HB 48 47 50 49 17 9 9 30 45 44 25 38 10 51 25 12 23 17 9 9 30 45 44 25 38 BATH VINYL 9' CLG GARAGE 12'-8" X 21'-0" CONC DINETTE 12'-2" X 10'-7" CARPET 9' CLG LIVING ROOM 17'-0" X 14'-8" CARPET 9' CLG HALL 4'-0" x 8'-8" CARPET 8' CLG MECH 4'-0" X 6'-8" PLATFORM 17'-3" 10" 16'-91 2" UP 15R 12'-6" 4'-9" 4'-0" 3'-6" 10" 8'-7" 4'-11" 2'-41 2" 6'-10" 7'-7" 3'-31 2" 1'-2" CPT VCT 5'-0" 17'-71 17'-8" 2" BATH VINYL 9' CLG DINETTE 12'-2" X 10'-7" CARPET 9' CLG LIVING ROOM 17'-0" X 14'-8" CARPET 9' CLG STORAGE 4'-3" X 7'-0" CONC HALL 4'-0" x 8'-8" CARPET 8' CLG MECH 4'-0" X 6'-8" PLATFORM UP 15R 4'-31 12'-6" 2" 4'-0" 8'-10" 4'-11" 2'-41 2" 6'-10" 7'-7" 3'-31 2" CPT 3'-6" 1'-2" 9080 OHD 9080 OHD (2) 3060 SH (2) 3060 SH 2020 FX 2020 FX 2020 FX 2020 FX 3060 SH 3068 3068 2868 PR 2668 FD FD 3068 2868 3068 51 25 23 17 9 9 30 45 44 25 38 51 25 23 17 9 9 30 45 44 25 38 10 11'-2" 11'-21 2" LANDSCAPE AREA LANDSCAPE AREA LANDSCAPE AREA SIDEWALK BUILDING ENVELOPE NEW CONCRETE SHOWN WITH HATCH PATTERN 12 12 STORAGE 4'-3" X 7'-0" CONC HALL 4'-0" x 8'-8" CARPET 8' CLG EXTEND THIS FIRE PARTION TO UNDERSIDE OF ROOF DECK TO ACT AS DRAFT STOP WITHIN THE ATTIC SPACE NOTE: FIRST FLOOR FINISHED FLOOR ELEVATION TO BE DETERMINED UPON COMPLETION OF SITE TOPOGRAPHIC SURVEY BY BUILDER. 16 5'-111 2" 111 2" 20 20 KITCHEN 12'-2" X 14'-0" VINYL 9' CLG CPT VCT 40 48 47 50 49 16 1'-2" 1'-91 2" 3'-1" 7'-3" 7'-0" 5'-91 2" 2'-1" 2'-7 1 2" 111 2" 4'-0" KITCHEN 12'-2" X 14'-0" VINYL 9' CLG 7'-01 5'-9" 2" 1'-91 7'-3" 3'-1" 2" 2'-0" 4'-0" 2'-0" 2'-4" 2'-71 2" 111 2" 4'-0" CPT VCT KITCHEN 12'-2" X 14'-0" VINYL 9' CLG 40 48 47 50 49 16 5'-111 2" 111 2" 20 KITCHEN 12'-2" X 14'-0" VINYL 9' CLG CPT 40 VCT 48 47 50 49 16 1'-91 2" 7'-3" 3'-1" 5'-91 7'-0" 2" 2'-1" 2'-7 1 2" 111 2" 4'-0" 20 5'-61 2" 111 2" 5'-6" 111 2" 30-68 30-68 30-68 VCT 3010 FX TRANS ABOVE 17'-3" 10" 16'-91 2" 10" 16'-9 1 2" 10" 17'-3" 10" 6'-5" 6'-5" 6'-51 2" GARAGE 12'-8" X 21'-0" CONC 14'-11 2" 10 1 2" 6" 1'-4" 13'-1" 5'-0" 12'-2 1 2" 101 2" 5'-0" 6" 1'-4" 12'-21 13'-1" 5'-0" 2" 3010 FX TRANS ABOVE 3010 FX TRANS ABOVE 3010 FX TRANS ABOVE 5'-0" 20'-2" PR 2668 SLOPED CEILING BELOW STAIRS RATED ASSEMBLY SLOPED CEILING BELOW STAIRS RATED ASSEMBLY SLOPED CEILING BELOW STAIRS RATED ASSEMBLY SLOPED CEILING BELOW STAIRS RATED ASSEMBLY CONCRETE CONTROL JOINTS PER BUILDER SPEC. SIDEWALK SIDEWALK AC 7'-0" 7'-0" AC AC AC COORDINATE EXACT AC CONDENSOR LOCATION WITH BUILDER PREFERENCE ELECTRICAL METERS GAS METERS 4'-0" 1 MAIN SCALE: FLOOR PLAN 1/4"=1'-0" - MAIN FLOOR PLAN 2.1 INTERNATIONAL COPYRIGHT LAWS PROHIBIT THE USE OF THESE DRAWINGS WITHOUT THE EXPRESS WRITTEN AUTHORIZATION OF THE ARCHITECT. THE DESIGNS CONTAINED WITHIN THESE DOCUMENTS BOTH IN WHOLE AND IN PART ARE INTENTED FOR CONSTRUCTION AT THE ADDRESS LISTED ON THE TITLE BLOCK. ISSUED FOR: DATE: - SUNSTONE 4-PLEX SUNSTONE 4-PLEX STONEY CREEK DRIVE AND CARIBOU DRIVE CLIENT UPDATE 07.12.18 2ND FLR 866 SF FIRST FLR 630 SF TOTAL 1,496 SF GARAGE AND UNIT AREA UNITS 1-4 MECHANICAL 343 SF LOT 13 SUNSTONE MULTI-USE FORT COLLINS, COLORADO DOUGLAS A. SCHOONOVER ARCHITECT, NCARB www.sch2architects.com t: 970.817.5260 e: team@sch2architects.com SCH ARCHITECTS CLIENT UPDATE 12.08.18 CITY COMMENTS 01.27.19 (ALL PLAN NOTES MAY NOT NOTES APPLY TO THIS SHEET) 1. UNEXCAVATED 4" THICK SLAB, SLOPE FLOOR MIN 4" TOWARDS DOOR 2. 4" CONCRETE SLAB. RE: STRUCT 3. DEPRESS FOUNDATION WALL AS NEEDED AT AT GARAGE DOOR OPENING 4. PROVIDE HIGH AND LOW AIR SUPPLY/RETURN, ONE WITHIN 12" OF CEILING PLANE. ONE AT 12" A.F.F., SIZE AND LOCATION PER IMC 5. FOUNDATION LINE BEYOND 6. STEP AT GARAGE/UNIT (FRAMED) 7. DUST LIP 8. GARAGE DOOR AS PER ELEVATIONS/BUILDERS SPEC 9. GARAGE SEPARATION-1 LAYER 5/8" G.W.B. ON GARAGE SIDE AND 20 MIN. DOOR WITH SELF-CLOSING HINGES. 10. TYPICAL EXTERIOR WALL ASSEMBLY-2X6 STUDS (UNLESS OTHERWISE INDICATED) AT 16" O.C. W/ 1/2" GWB OVER VAPOR BARRIER ON INTERIOR FACE AND BLDG WRAP OVER 1/2" SHEATHING ON EXTERIOR FACE-FINISH AS PER ELEVATIONS. 11. TYPICAL INTERIOR WALL ASSEMBLY - 2x4 STUDS (UNLESS OTHERWISE INDICATED) AT 16" O.C. WITH 1 2" GWB ON EACH FACE UNLESS OTHERWISE INDICATED. 12. TYPICAL 1 HOUR FIRE PARTITION ASSEMBLY - ( UL# U305 / GA. WP 3370 OR EQUAL) ONE LAYER 5/8" TYP X GWB APPLIED PARALLEL OR AT RIGHT ANGLES TO EACH SIDE OF DOUBLE ROW OF 2X4 WOOD STUDS 16" O.C. ON SEPARATE PLATES SET 1" APART WITH 6d COATED NAILS, 1 7/8" LONG, 0.0915" SHANK, 1/4" HEADS, 7" O.C.. JOINTS STAGGERED 16" OPPOSITE SIDES. HORIZONTAL BRACING REQUIRED AT MID-HEIGHT. FOR STC RATING OF >50, PLACE CONTINUOUS BLANKET OF 6" GLASS FIBER INSULATION IN STUD SPACE. DRAFTSOP AS REQUIRED 13. 60"x30" TUB/SHOWER WITH TILE SURROUND W/INDIVIDUAL PRESSURE BALANCE OR THERMOSTATIC MIXING VALVE AND HANDLE POSITION STOPS ADJUSTED PER MFR'S INSTRUCTIONS FOR 120 DEG. F MAX WATER TEMP. PER THE IPC. 14. 60"X36" SHOWER WITH INDIVIDUAL PRESSURE BALANCE OR THERMOSTATIC MIXING VALVE AND HANDLE POSITION STOPS ADJUSTED PER MFR'S INSTRUCTIONS FOR 120 DEGREE F, MAX. WATER TEMP. PER THE IPC. 15. WASHER/DRYER HOOKUPS, VENT DRYER TO EXTERIOR. 16. COUNTER TOP. 17. ROD AND SHELF. 18. DOUBLE ROD AND SHELF. - NOT USED 19. LINEN WITH 5 FIXED SHELVES. 20. PANTRY W/ 5 FIXED SHELVES 21. FROST FREE HOSE BIB. 22. LINE OF VAULT/VOLUME SPACE. 23. CONTINUOUS HANDRAIL PER CODE. 24. CONTROL JOINTS. 25. DROPPED SOFFIT. 26. SHELF. 27. FIREPLACE, VENT PER MANFR'S SPES. - NOT USED 28. WATERPROOF GYP BD AT TUB/SHOWER. 29. CASED OPENING. 30. 2x6 WALL. 31. 22"X30" ACCESS PANEL W/ PULL-CHAIN LIGHT. 32. RECESSED MEDICINE CABINET. - NOT USED 33. FLOOR DRAIN. 34. FLUE CHASE-VENT TO EXTERIOR. 35. STONE VENEER (RE: ELEV). 36. STONE/TRIM PACKOUT. 37. EGRESS WINDOW/WELL PER CODE. 38. FRAMED PLATFORM 18" AFF. 39. RE: STRUCTURAL 40. LOW WALL (36" MAX. U.N.O.) 41. LOW CABINETS 42. HIGH CABINETS 43. 1030 TRANSOM WINDOW 44. WATER HEATER 45. FURNACE 46. GWB BULKHEAD 47. MICROWAVE 48. DISH WASHER 49. REFERIGERATOR 50. RANGE 51. RAIL WITH BALLUSTERS AND NEWELL POST 52. MIRROR-BY BUILDER 53. LINE OF ROOF 54. LINE OF SLAB ON GRADE LEDGE - 2"X4" LEDGE BLOCKOUT X FOUNDATION/FLOOR PLAN NOTES NORTH ITEM 2, ATTACHMENT 3 Packet Pg. 16 54 54 54 54 54 54 54 54 54 54 54 54 54 UNEXC'TED 4" THICK CONCRETE UNEXC'TED 4" THICK CONCRETE UNEXC'TED 4" THICK CONCRETE 3'-7" 13'-0" 8" 5" 5" 56'-8" 70'-7" 11'-3" 11'-21 2" 6'-5 1 2" 11'-2" 11'-2 1 2" 17'-3" 10" 16'-91 2" 10" 16'-9 1 2" 10" 17'-3" 6'-5" 6'-5" 6'-51 2" 70'-7" 5'-0" 13'-1" 5'-0" 12'-21 2" 12'-2 5'-0" 13'-1" 5'-0" 1 10" 2" 10" 3'-91 2" 13'-0" 10" 13'-0" 3'-91 2" 10" 13'-0" 3'-7" 8" 5'-0" 30'-5" 7'-11 2" 14'-1 1 2" 5'-0" 30'-5" 7'-11 2" 14'-1 1 2" 5'-0" 30'-5" 7'-11 2" 14'-1 1 2" 5'-0" 30'-5" 7'-11 2" 14'-1 1 2" 1 FOUNDATION SCALE: PLAN (ARCHITECTURAL) 1/4"=1'-0" - FOUNDATION PLAN (ARCHITECTURAL) 2.0 INTERNATIONAL COPYRIGHT LAWS PROHIBIT THE USE OF THESE DRAWINGS WITHOUT THE EXPRESS WRITTEN AUTHORIZATION OF THE ARCHITECT. THE DESIGNS CONTAINED WITHIN THESE DOCUMENTS BOTH IN WHOLE AND IN PART ARE INTENTED FOR CONSTRUCTION AT THE ADDRESS LISTED ON THE TITLE BLOCK. ISSUED FOR: DATE: - SUNSTONE 4-PLEX SUNSTONE 4-PLEX STONEY CREEK DRIVE AND CARIBOU DRIVE CLIENT UPDATE 07.12.18 2ND FLR 866 SF FIRST FLR 630 SF TOTAL 1,496 SF GARAGE AND UNIT AREA UNITS 1-4 MECHANICAL 343 SF LOT 13 SUNSTONE MULTI-USE FORT COLLINS, COLORADO DOUGLAS A. SCHOONOVER ARCHITECT, NCARB www.sch2architects.com t: 970.817.5260 e: team@sch2architects.com SCH ARCHITECTS CLIENT UPDATE 12.08.18 CITY COMMENTS 01.27.19 (ALL PLAN NOTES MAY NOT NOTES APPLY TO THIS SHEET) 1. UNEXCAVATED 4" THICK SLAB, SLOPE FLOOR MIN 4" TOWARDS DOOR 2. 4" CONCRETE SLAB. RE: STRUCT 3. DEPRESS FOUNDATION WALL AS NEEDED AT AT GARAGE DOOR OPENING 4. PROVIDE HIGH AND LOW AIR SUPPLY/RETURN, ONE WITHIN 12" OF CEILING PLANE. ONE AT 12" A.F.F., SIZE AND LOCATION PER IMC 5. FOUNDATION LINE BEYOND 6. STEP AT GARAGE/UNIT (FRAMED) 7. DUST LIP 8. GARAGE DOOR AS PER ELEVATIONS/BUILDERS SPEC 9. GARAGE SEPARATION-1 LAYER 5/8" G.W.B. ON GARAGE SIDE AND 20 MIN. DOOR WITH SELF-CLOSING HINGES. 10. TYPICAL EXTERIOR WALL ASSEMBLY-2X6 STUDS (UNLESS OTHERWISE INDICATED) AT 16" O.C. W/ 1/2" GWB OVER VAPOR BARRIER ON INTERIOR FACE AND BLDG WRAP OVER 1/2" SHEATHING ON EXTERIOR FACE-FINISH AS PER ELEVATIONS. 11. TYPICAL INTERIOR WALL ASSEMBLY - 2x4 STUDS (UNLESS OTHERWISE INDICATED) AT 16" O.C. WITH 1 2" GWB ON EACH FACE UNLESS OTHERWISE INDICATED. 12. TYPICAL 1 HOUR FIRE PARTITION ASSEMBLY - ( UL# U305 / GA. WP 3370 OR EQUAL) ONE LAYER 5/8" TYP X GWB APPLIED PARALLEL OR AT RIGHT ANGLES TO EACH SIDE OF DOUBLE ROW OF 2X4 WOOD STUDS 16" O.C. ON SEPARATE PLATES SET 1" APART WITH 6d COATED NAILS, 1 7/8" LONG, 0.0915" SHANK, 1/4" HEADS, 7" O.C.. JOINTS STAGGERED 16" OPPOSITE SIDES. HORIZONTAL BRACING REQUIRED AT MID-HEIGHT. FOR STC RATING OF >50, PLACE CONTINUOUS BLANKET OF 6" GLASS FIBER INSULATION IN STUD SPACE. DRAFTSOP AS REQUIRED 13. 60"x30" TUB/SHOWER WITH TILE SURROUND W/INDIVIDUAL PRESSURE BALANCE OR THERMOSTATIC MIXING VALVE AND HANDLE POSITION STOPS ADJUSTED PER MFR'S INSTRUCTIONS FOR 120 DEG. F MAX WATER TEMP. PER THE IPC. 14. 60"X36" SHOWER WITH INDIVIDUAL PRESSURE BALANCE OR THERMOSTATIC MIXING VALVE AND HANDLE POSITION STOPS ADJUSTED PER MFR'S INSTRUCTIONS FOR 120 DEGREE F, MAX. WATER TEMP. PER THE IPC. 15. WASHER/DRYER HOOKUPS, VENT DRYER TO EXTERIOR. 16. COUNTER TOP. 17. ROD AND SHELF. 18. DOUBLE ROD AND SHELF. - NOT USED 19. LINEN WITH 5 FIXED SHELVES. 20. PANTRY W/ 5 FIXED SHELVES 21. FROST FREE HOSE BIB. 22. LINE OF VAULT/VOLUME SPACE. 23. CONTINUOUS HANDRAIL PER CODE. 24. CONTROL JOINTS. 25. DROPPED SOFFIT. 26. SHELF. 27. FIREPLACE, VENT PER MANFR'S SPES. - NOT USED 28. WATERPROOF GYP BD AT TUB/SHOWER. 29. CASED OPENING. 30. 2x6 WALL. 31. 22"X30" ACCESS PANEL W/ PULL-CHAIN LIGHT. 32. RECESSED MEDICINE CABINET. - NOT USED 33. FLOOR DRAIN. 34. FLUE CHASE-VENT TO EXTERIOR. 35. STONE VENEER (RE: ELEV). 36. STONE/TRIM PACKOUT. 37. EGRESS WINDOW/WELL PER CODE. 38. FRAMED PLATFORM 18" AFF. 39. RE: STRUCTURAL 40. LOW WALL (36" MAX. U.N.O.) 41. LOW CABINETS 42. HIGH CABINETS 43. 1030 TRANSOM WINDOW 44. WATER HEATER 45. FURNACE 46. GWB BULKHEAD 47. MICROWAVE 48. DISH WASHER 49. REFERIGERATOR 50. RANGE 51. RAIL WITH BALLUSTERS AND NEWELL POST 52. MIRROR-BY BUILDER 53. LINE OF ROOF 54. LINE OF SLAB ON GRADE LEDGE - 2"X4" LEDGE BLOCKOUT X FOUNDATION/FLOOR PLAN NOTES NORTH ITEM 2, ATTACHMENT 3 Packet Pg. 15 STRUCTURE AT 1:3 MAX PRUNE AND PROTECT ALL EXISTING SITE SHRUBS AND TREES SIDEWALK SIDEWALK LANDSCAPE AREA EXISTING UTILITY EASEMENT ASSUMED PROPERTY LINE BUILDING ENVELOPE CONCRETE CONTROL JOINTS PER BUILDER SPEC. ELECTRICAL METERS GAS METERS NEW SIDEWALK NEW SIDEWALK NEW SIDEWALK ACCESSIBLE RAMP PER CITY STANDARDS NEW SIDEWALK NEW SIDEWALK 1 ARCHITECTURAL SCALE: SITE PLAN 1/8"=1'-0" - ARCHITECTURAL SITE PLAN 1.0 INTERNATIONAL COPYRIGHT LAWS PROHIBIT THE USE OF THESE DRAWINGS WITHOUT THE EXPRESS WRITTEN AUTHORIZATION OF THE ARCHITECT. THE DESIGNS CONTAINED WITHIN THESE DOCUMENTS BOTH IN WHOLE AND IN PART ARE INTENTED FOR CONSTRUCTION AT THE ADDRESS LISTED ON THE TITLE BLOCK. ISSUED FOR: DATE: - SUNSTONE 4-PLEX SUNSTONE 4-PLEX STONEY CREEK DRIVE AND CARIBOU DRIVE CLIENT UPDATE 07.12.18 2ND FLR 866 SF FIRST FLR 630 SF TOTAL 1,496 SF GARAGE AND UNIT AREA UNITS 1-4 MECHANICAL 343 SF LOT 13 SUNSTONE MULTI-USE FORT COLLINS, COLORADO DOUGLAS A. SCHOONOVER ARCHITECT, NCARB www.sch2architects.com t: 970.817.5260 e: team@sch2architects.com SCH ARCHITECTS CLIENT UPDATE 12.08.18 CITY COMMENTS 01.27.19 NORTH ITEM 2, ATTACHMENT 3 Packet Pg. 14 V-B, WITH AUTOMATIC SPRINKLER SYSTEM 13R SECTION 602.5 AREA SEPARATION CHAPTER 7 FIRE PARTITION SECTION 420.2 BETWEEN DWELLINGS UNITS 1 HR W/ SPRINK. SYSTEM SECTION 709.3.2 CORRIDOR WALLS (>10 OCC) 1 HR W/ SPRINK. SYSTEM NA TABLE 1018.1 CONTINUITY NOT REQUIRED AS ATTIC SPACE IS SUBDIVIDED INTO AREAS OF <3,000 SF. SECTION 709.4.5 (1-HR WALL PROVIDED, GA WP 3370/UL U305 CONTINUOUS TO ROOF BETWEEN CENTER UNITS RE: PLANS) HORIZONTAL SEPARATION SECTION 420.3 BETWEEN DWELLING UNITS 1 HR W/ SPRINK. SYSTEM SECTION 712.3 (exception) FIRE RESISTIVE REQUIREMENTS FOR V-B CHAPTER 6 STRUCTURAL FRAME 0 HR TABLE 601 BEARING WALLS EXT. & INT. 0 HR. NONBEARING WALLS EXT. 0 HR. NONBEARING WALLS INT. 0 HR. FLOOR CONSTRUCTION 0 HR. ROOF CONSTRUCTION 0 HR. FIRE RESISTIVE REQUIREMENTS FOR EXT. WALLS BASED ON SEP. DIST. TABLE 602 WITHIN 10 TO 30 FEET OF THE PROPERTY LINE FOR V-B CONSTRUCTION 0 HR. OPENING PROTECTIVES DOORS IN CORRIDOR 20 MIN NA SECTION 715.4.3 FIRE PROTECTION SYSTEM REQUIREMENTS CHAPTER 9 FIRE SPRINKLER YES SECTION 903.2.8 EXTINGUISHERS YES (1 PER UNIT) SECTION 906.1.1 FIRE ALARM SYSTEM YES SECTION 907.2.9.1 SMOKE ALARM SYSTEM YES SECTION 907.2.11.2 VISIBLE ALARM NOTIFICATIONS APPLIANCES YES SECTION 907.5.2.3.4 EGRESS REQUIREMENTS CORRIDOR WIDTH 44" NA SECTION 1018.2 WITHIN DWELING UNITS 36" PROVIDED SECTION 1018.2.2 STAIRS WIDTH (> 50 OCC) 36" WITHIN UNIT SECTION 1009.1 RISER 4"-7" SECTION 1009.4.2 TREAD 10" HANDRAIL HT. 34"-38" SECTION 1012.2 BUILDING OCCUPANT LOAD (RESIDENTIAL) TABLE 1004.1.1 200 SF GROSS PER OCCUPANT PER UNIT (1,510 / 200) 8 OCCUPANTS PER BUILDING (4 x 8) 32 OCCUPANTS EGRESS WIDTH STAIRS 8 OCCUPANTS x 0.3 = 2.4" REQUIRED SECTION 1005.1 36" PROVIDED EXIT DOOR 8 OCCUPANTS x 0.2 = 1.6" REQUIRED (2) 36" WIDE DOORS = 72" PROVIDED PROJECT LOCATION SITE LOCATION TRAVEL DISTANCE TABLE 1016.1 R OCC. W/ SPRINKLER SYSTEM 250' NA CPET W/ SPRINKLER SYSTEM 125' NA SECTION 1014.3.4 CPET: COMMON PATH OF EGRESS TRAVEL EMERGENCY ESCAPE & RESCUE SECTION 1029 SIZE MIN 5.7 SF, HEIGHT 24", WIDTH 20", MAX 44" AFF ACCESSIBILITY CHAPTER 10 TYPE A UNITS (>20 UNITS) MIN 2% OF ALL UNITS, (MIN 1) SECTION 1107.6.2.1.1 NOT REQUIRED, STRUCTURE WITH 4 UNITS TOTAL TYPE B UNITS SECTION 1107.6.2.1.2 STRUCTURES WITHOUT ELEVATOR SECTION 1107.7.1 - 1ST STORY ALL- B TYPE UNITS REQ'D SECTION 1107.7.1.1 - 2ND STORY NO - B TYPE UNITS REQ'D SECTION 1107.7.2 PLUMBING SYSTEM CHAPTER 29 FIXTURE REQ'D PROVIDED TABLE 2902.1 WATER CLOSET 1 PER UNIT 3 LAVATORY 1 PER UNIT 3 TUB OR SHOWER 1 PER UNIT 2 KITCHEN SINK 1 PER UNIT 1 WASHER CONNECTION 1 PER 20 UNITS 1 IN EACH UNIT STC RATINGS: FIRE PARTITION WALL WP 3370 (UL U305) WITH 6" SOUND BATTS CONTINUOUS WITH STAGGERED STUDS HORIZONTAL SEPARATION NA (NO HORIZONTAL SEPARATION NEC'Y IN SINGLE UNITS) LOAD CALCULATIONS: Snow Load - Live Load: 30 PSF / Ground Snow Load: 30 PSF Frost Depth: 30 inches Wind Load: 100 MPH - 3 Second Gust Exposure B Seismic Design Category B SUNSTONE LOT 13 SUNSTONE MULTI-4-PLEX USE 2126 CARIBOU DRIVE FORT COLLINS, COLORADO ARCHITECT SCH2 ARCHITECTS P: 970.817.5260 E: TEAM@SCH2ARCHITECTS.COM WWW.SCH2ARCHITECTS.COM BUILDER PROJECT DATA SITE MAP PROJECT DIRECTORY SHEET INDEX VICINITY MAP ARCHITECTURAL: 5'-6" 6'-0" 7'-6" 6'-8" 13'-0" 5'-5" CARIBOU STREET TIMBERLINE ROAD STONEY CREEK DRIVE THE STANDARD GENERAL SPECIFICATIONS OF THE BUILDER. SHALL GOVERN EXCEPT AS MODIFIED AND SUPPLEMENTED BY THESE PLANS. CONTRACTOR TO VERIFY EXISTING CONDITIONS ON SITE PRIOR TO CONSTRUCTION. DIMENSIONS TAKE PRECEDENCE OVER DRAWINGS. DO NOT SCALE. ALL DIMENSIONS GIVEN TO FACE OF STUDS UNLESS OTHERWISE INDICATED ON PLANS. ALL WORK TO BE PERFORMED IN COMPLIANCE WITH ALL STATE AND LOCAL CODES. SECURE ALL REQUIRED PERMITS AND APPROVALS PRIOR TO ANY CONSTRUCTION. COMPONENT SUPPLIER/FABRICATOR SHALL BE RESPONSIBLE FOR FINAL ENGINEERING AND COMPLIANCE WITH BUILDERS WARRANTY SPECIFICATIONS. FIRESTOP ALL FLUES ALL G.W.B. TO BE INSTALLED PROVIDE TILE (SIMILAR) TO 70" ABOVE SHOWER/TUB DRAIN. WOOD LESS THAN 6" ABOVE GRADE OR IN CONTACT WITH CONCRETE SHALL BE TREATED OR WOOD OF NATURAL RESISTANCE TO DECAY INSULATE PER THE FOLLOWING -MIN R-20 HIGH DENSITY BATT, IN ALL EXTERIOR WALLS. -MIN R-49 IN ALL ROOF AREAS -MIN R-30 IN JOIST SPACES NEXT TO UNHEATED AREAS PROVIDE GUTTERS, DOWNSPOUTS TO CREATE POSITIVE DRAINAGE AWAY FROM BUILDING/FOUNDATION (MIN. 5'-0" REMOVAL DISTANCE FROM FACE OF STRUCTURE). CONTRACTOR TO FIELD VERIFY LOCATION OF DOWNSPOUTS PRIOR TO INSTALLATION. ALL WINDOWS WITH GRIDS AS SELECTED BY BUILDER. WEATHERSTRIPPED AND DOUBLE GLAZED. ATRIUM AND SLIDING GLASS DOORS AT HAZARDOUS LOCATIONS TO BE TEMPERED GLASS LOCATION OF METERS, UTILITIES AND MAJOR APPLIANCES (IE FURNACE, WATER HEATER, ETC.) ARE APPROXIMATE, CONTRACTOR TO FIELD VERIFY FINAL LOCATIONS PRIOR TO INSTALLATION STAIR ASSEMBLIES SHALL HAVE A MINIMUM OF (3) STRINGERS PROVIDE TRUSS & FLOOR JOIST BLOCKING RE: STRUCTURAL STAIRS & LANDINGS HANDRAIL - WIDTH TO BE 1 1/4" - 2" MAX ADDRESS IDENTIFICATION MUST BE INSTALLED PER LOCAL CODE, ARCHITECTURAL GUIDELINES AND BUILDER SPEC. ALL FOUNDATION WALL W/ PERIMETER DRAIN ARE TO BE DAMP PROOFED RE: SOILS PROVIDE FIRESAFING AS REQUIRED EQUIVALENT TO THERMAFIBER BY USG. EXIT DOOR HARDWARE SHALL COMPLY WITH SPANJER HOMES SPECIFICATIONS. ALL EXTERIOR DOORS TO BE WEATHERSTRIPPED. INSTALL PEEPHOLE ON ENTRY DOORS AND SECURITY BAR ON SLIDING GLASS DOORS EXTERIOR OPENINGS EXPOSED TO THE WEATHER SHALL BE FLASHED IN SUCH A MANNER AS TO MAKE THEM WATERPROOF. PROVIDE FIRE BLOCKING & DRAFTSTOP AT ALL CONCEALED SPACES OF WALLS, STAIR STRINGERS, FLOOR & CEILING OPENINGS AND SOFFITS NORTH NORTH GENERAL NOTES VIEW FROM SOUTHEAST (INTERSECTION OF CARIBOU AND STONEY CREEK) VIEW FROM NORTHWEST 3D IMAGES 08.21.18 PERMIT 12.08.18 CLIENT CHANGES NoCO Custom Homes, LLC Tel: 970-581-0481 www.NoCOCustomHomes.com Re: Jason Jones jason@nococustomhomes.com 01.27.19 CITY COMMENTS INTERNATIONAL COPYRIGHT LAWS PROHIBIT THE USE OF THESE DRAWINGS WITHOUT THE EXPRESS WRITTEN AUTHORIZATION OF THE ARCHITECT. THE DESIGNS CONTAINED WITHIN THESE DOCUMENTS BOTH IN WHOLE AND IN PART ARE INTENTED FOR CONSTRUCTION AT THE ADDRESS LISTED ON THE TITLE BLOCK. ISSUED FOR: DATE: - SUNSTONE 4-PLEX SUNSTONE 4-PLEX STONEY CREEK DRIVE AND CARIBOU DRIVE CLIENT UPDATE 07.12.18 2ND FLR 866 SF FIRST FLR 630 SF TOTAL 1,496 SF GARAGE AND UNIT AREA UNITS 1-4 MECHANICAL 343 SF LOT 13 SUNSTONE MULTI-USE FORT COLLINS, COLORADO DOUGLAS A. SCHOONOVER ARCHITECT, NCARB www.sch2architects.com t: 970.817.5260 e: team@sch2architects.com SCH ARCHITECTS CLIENT UPDATE 12.08.18 CITY COMMENTS 01.27.19 COVER SHEET 0.0 ITEM 2, ATTACHMENT 3 Packet Pg. 13