HomeMy WebLinkAbout07/08/2015 - Landmark Preservation Commission - Agenda - Regular MeetingLandmark Preservation Commission Page 1 July 8, 2015
Ron Sladek, Chair
Doug Ernest, Vice Chair City Council Chambers
Maren Bzdek City Hall West
Meg Dunn 300 Laporte Avenue
Kristin Gensmer Fort Collins, Colorado
Per Hogestad
Dave Lingle Cablecast on City Cable Channel 14
Alexandra Wallace on the Comcast cable system
Belinda Zink
Laurie Kadrich Karen McWilliams Josh Weinberg Gino Campana
Staff Liaison, PDT Director Preservation Planner Preservation Planner Council Liaison
The City of Fort Collins will make reasonable accommodations for access to City services, programs, and activities
and will make special communication arrangements for persons with disabilities. Please call 221-6515 (TDD 224-
6001) for assistance.
Regular Meeting
July 8, 2015
5:30 PM
CALL TO ORDER
ROLL CALL
PUBLIC COMMENT ON ITEMS NOT ON THE AGENDA
CONSENT AGENDA
1. CONSIDERATION AND APPROVAL OF THE MINUTES OF THE JUNE 10, 2015 REGULAR
MEETING.
The purpose of this item is to approve the minutes from the June 10, 2015 regular meeting of the
Landmark Preservation Commission.
2. CONSIDERATION AND APPROVAL OF THE MINUTES OF THE JUNE 24, 2015 SPECIAL
MEETING.
The purpose of this item is to approve the minutes from the June 24, 2015 special meeting of the
Landmark Preservation Commission.
PULLED FROM CONSENT
Landmark
Preservation
Commission
City of Fort Collins Page 2
DISCUSSION AGENDA
3. 254/256 LINDEN STREET; FINAL DESIGN REVIEW OF PROPOSED SIGNS
PROJECT DESCRIPTION: This is a request for Final Design Review for proposed signage on the
building at 254/256 Linden Street, which is within the Old Town Historic
District.
APPLICANT: Brandon Silar; Lark Design/Build
4. FORRESTER BLOCK MURAL
PROJECT DESCRIPTION: This request is for a painted mural on the southeast wall of the Forrester
Block, near Walnut Street.
APPLICANT: Scott Ranweiler, Bohemian Companies
5. FIRST BANK MURAL, 100 SOUTH COLLEGE AVENUE
PROJECT DESCRIPTION: This request is for a mural to be painted on two walls behind the 1st Bank
Building, at the corner of College and Mountain Avenues. The walls are
associated with two historically designated buildings.
APPLICANT: Don Bernholtz, Architecture Plus
6. REVIEW OF DEVELOPMENT PROPOSAL - DOWNTOWN HOTEL
PROJECT DESCRIPTION: This is a Preliminary LPC Review of the Development Proposal for a 5 story,
162 room hotel/mixed-use building abutting the Old Town Fort Collins Historic
District.
APPLICANT: Cole Evans, McWhinney; Stu McMillan, Bohemian Companies
7. POLICY ON NAMING CITY-OWNED FACILITIES
PROJECT DESCRIPTION: The Landmark Preservation Commission is being asked for its
recommendation to City Council on the City’s proposed naming policies
pertaining to City-owned facilities, including streets, parks, recreational
facilities, cultural facilities, trails and civic buildings.
OTHER BUSINESS
ADJOURNMENT
Agenda Item 1
Item # 1 Page 1
AGENDA ITEM SUMMARY July 8, 2015
Landmark Preservation Commission
STAFF
Gretchen Schiager, Administrative Assistant
SUBJECT
CONSIDERATION AND APPROVAL OF THE MINUTES OF THE JUNE 10, 2015 REGULAR MEETING.
EXECUTIVE SUMMARY
The purpose of this item is to approve the minutes from the June 10, 2015 regular meeting of the Landmark
Preservation Commission.
ATTACHMENTS
1. Draft LPC June 10, 2015 Minutes (PDF)
1
Packet Pg. 3
Ron Sladek, Chair
Doug Ernest, Vice Chair City Council Chambers
Maren Bzdek City Hall West
Meg Dunn 300 Laporte Avenue
Kristin Gensmer Fort Collins, Colorado
Per Hogestad
Dave Lingle Cablecast on City Cable Channel 14
Alexandra Wallace on the Comcast cable system
Belinda Zink
Laurie Kadrich Karen McWilliams Josh Weinberg Gino Campana
Staff Liaison, CDNS Director Preservation Planner Preservation Planner Council Liaison
The City of Fort Collins will make reasonable accommodations for access to City services, programs, and activities
and will make special communication arrangements for persons with disabilities. Please call 221-6515 (TDD 224-
6001) for assistance.
Regular Meeting
June 10, 2015
Minutes
• CALL TO ORDER
Chair Sladek called the meeting to order at 5:33 p.m.
• ROLL CALL
PRESENT: Dunn, Zink, Bzdek, Hogestad, Wallace, Gensmer, Lingle, Ernest, Sladek
ABSENT: None
STAFF: McWilliams, Weinberg, Schiager
• PUBLIC COMMENT ON ITEMS NOT ON THE AGENDA
None.
• CONSENT AGENDA
1. CONSIDERATION AND APPROVAL OF THE MINUTES OF THE APRIL 8, 2015 REGULAR
MEETING.
The purpose of this item is to approve the minutes from the April 8, 2015 regular meeting of the
Landmark Preservation Commission.
Landmark
Preservation
Commission
Landmark Preservation Commission Page 1 December 10, 2014
1.a
Packet Pg. 4
Attachment: Draft LPC June 10, 2015 Minutes (3308 : Minutes of June 10, 2015)
2. CONSIDERATION AND APPROVAL OF THE MINUTES OF THE APRIL 22, 2015 REGULAR
MEETING.
The purpose of this item is to approve the minutes from the April 22, 2015 regular meeting of the
Landmark Preservation Commission.
3. CONSIDERATION AND APPROVAL OF THE MINUTES OF THE MAY 13, 2015 REGULAR
MEETING.
The purpose of this item is to approve the minutes from the May 13, 2015 regular meeting of the
Landmark Preservation Commission.
Mr. Ernest moved that the Landmark Preservation Commission accept the Consent Agenda
presented at the meeting of June 10, including all items on that agenda. Ms. Bzdek seconded.
Motion passed unanimously.
[Timestamp: 5:36 p.m.]
• PULLED FROM CONSENT
None
• DISCUSSION AGENDA
4. 714 WEST MOUNTAIN AVENUE FORT COLLINS LANDMARK DESIGNATION
PROJECT DESCRIPTION: Staff is pleased to present for your consideration the Thode House located at
714 West Mountain Avenue. The property has significance to Fort Collins
under Landmark Preservation Standard C.
APPLICANT: Henry Thode III
Staff Report
Mr. Weinberg presented the staff report.
Applicant Presentation
None
Public Input
None
Commission Questions and Discussion
A Member asked about the porch, whether it was screened in, and if it was original. Mr. Weinberg
stated that no building permits were found that would document any additions. Mr. Thode stated the
front porch was already screened in 1955 when they moved in, but he had found a picture from a tax
assessment in 1948 where the porch was not screened. Mr. Weinberg also mentioned that there is
an approved plan for an addition to the back of the house, which was approved through the demo/alt
process several months ago.
Another Member asked whether Standard B was considered in the nomination because of Alexander
Ault. Mr. Weinberg said they didn’t have enough information to support a strong connection to him.
Chair Sladek said he felt strongly that the designation should be approved, but was concerned about
the quality of the nomination and would like to see some additional research and changes. He
detailed a number of specific concerns, and said he would send his notes to Staff.
In response to a Commission question, Mr. Weinberg clarified that a designation would not impact the
previous decision in the demo/alt review.
Members discussed that the entire property would be designated, not just the house, despite what the
name “Thode House” might imply.
City of Fort Collins Page 2
1.a
Packet Pg. 5
Attachment: Draft LPC June 10, 2015 Minutes (3308 : Minutes of June 10, 2015)
The Commission questioned the integrity of the carriage house. Members were not in agreement
about whether the carport was reversible since it is attached. There was discussion about why the
carriage house had shingles rather than siding, and how old it might be. There was a comment that
the carriage house was not addressed at all in the nomination or staff report. Members were unable
to determine whether the carriage house was contributing or non-contributing to the designation
without more documentation.
Members discussed whether the designation could be approved with a caveat that Staff make the
requested changes, but ultimately the Commission felt the decision should to be tabled until the next
regular meeting in order to allow Staff to make the necessary improvements to the nomination.
Commission Deliberation
Mr. Ernest moved that the Landmark Preservation Commission request that Preservation Staff
do additional research on the Thode House property at 714 West Mountain Avenue to answer
questions raised by the Commission at the meeting of June 10, 2015. Ms. Wallace seconded.
Mr. Lingle suggested amending the motion to say that the Commission is tabling the landmark
designation of 714 West Mountain Avenue to the regular meeting of July 2015. The
amendment to the motion was accepted by Mr. Ernest and seconded by Ms. Wallace. Motion
passed 9-0.
[Timestamp: 6:10 p.m.]
5. REQUEST TO RENAME THE LANDMARK PROPERTY AT 1009 WEST MOUNTAIN AVENUE
PROJECT DESCRIPTION: This is a request to rename the Fort Collins Landmark property located at
1009 West Mountain Avenue, currently known as the Wiggins House and
Garage, to the Wiggins/Taylor Property, in recognition of long-time owner
Patricia Taylor.
APPLICANT: Patricia Taylor
Staff Report
Ms. McWilliams presented the staff report.
Applicant Presentation
Ms. Taylor addressed the Commission. She clarified the date she acquired the home was actually
August of 1974. The deed of trust had the names George and Patricia Dickson. In the 1980’s,
she changed her name to Patricia Lynn Dickson Taylor.
Ms. Taylor explained her connection to the Wiggins family, stating that she was a nurse at Poudre
Valley Hospital and Orla Mae Wiggins was a long term patient whom she cared for until she passed.
During that time, she and her husband were looking for a home in which to raise their family.
Conversations with the Wiggins’ about her house search resulted in an opportunity for her to
purchase the house at the age of 26.
After leaving Poudre Valley Hospital, Ms. Taylor worked as the nurse for The Point, which was the
first free clinic in Fort Collins, at 503 Remington. It was also the first free legal aid and the start of the
Fort Collins Food Co-op. After funding ran out for The Point, she resumed her career as an
investigator for abuse and neglect with Social Services until she retired to pursue another career.
Ms. Taylor distributed pictures of the interior of the home to the Commission. She explained that she
has removed the window bench in the back bedroom and put in sliding glass doors and a deck. The
landscaping in the back yard includes many of the same flowers planted by the Wiggins’.
Public Input
None
Commission Questions and Discussion
City of Fort Collins Page 3
1.a
Packet Pg. 6
Attachment: Draft LPC June 10, 2015 Minutes (3308 : Minutes of June 10, 2015)
A Member asked about the criteria for naming designated properties. Ms. McWilliams said there are
no set standards for naming, but they often use earliest long term resident, or another resident who is
historically significant. Members commented that it would strengthen the request if Ms. Taylor’s
history and association with the Wiggins’ family were included in the documentation before forwarding
to City Council.
One Member inquired about the pineapple tiles, and Ms. Taylor she added them as a welcome to the
home.
Commission Deliberation
Ms. Bzdek moved that the Landmark Preservation Commission rename the Fort Collins
Landmark property located at 1009 West Mountain Avenue currently known as the Wiggins
House and Garage, to the Wiggins/Taylor Property, which will recognize long-time owner
Patricia Taylor and her historical connection to the Wiggins family.
Mr. Ernest suggested that the motion should be a recommendation to the Council. Ms. Bzdek
agreed with the amendment. Ms. Gensmer seconded. Motion passed 9-0.
[Timestamp: 6:27 p.m.]
• OTHER BUSINESS
None
• ADJOURNMENT
Chair Sladek adjourned the meeting at 6:27 p.m.
Minutes respectfully submitted by Gretchen Schiager.
City of Fort Collins Page 4
1.a
Packet Pg. 7
Attachment: Draft LPC June 10, 2015 Minutes (3308 : Minutes of June 10, 2015)
Agenda Item 2
Item # 2 Page 1
AGENDA ITEM SUMMARY July 8, 2015
Landmark Preservation Commission
STAFF
Gretchen Schiager, Administrative Assistant
SUBJECT
CONSIDERATION AND APPROVAL OF THE MINUTES OF THE JUNE 24, 2015 SPECIAL MEETING.
EXECUTIVE SUMMARY
The purpose of this item is to approve the minutes from the June 24, 2015 special meeting of the Landmark
Preservation Commission.
ATTACHMENTS
1. Draft LPC June 24, 2015 Minutes (PDF)
2
Packet Pg. 8
Ron Sladek, Chair
Doug Ernest, Vice Chair Council Information Center (CIC)
Maren Bzdek City Hall West
Meg Dunn 300 Laporte Avenue
Kristin Gensmer Fort Collins, Colorado
Per Hogestad
Dave Lingle Cablecast on City Cable Channel 14
Alexandra Wallace on the Comcast cable system
Belinda Zink
Laurie Kadrich Karen McWilliams Josh Weinberg Gino Campana
Staff Liaison, PDT Director Preservation Planner Preservation Planner Council Liaison
The City of Fort Collins will make reasonable accommodations for access to City services, programs, and activities
and will make special communication arrangements for persons with disabilities. Please call 221-6515 (TDD 224-
6001) for assistance.
Special Meeting
June 24, 2015
MINUTES
• CALL SPECIAL MEETING TO ORDER
Chair Sladek called the meeting to order at 5:33 p.m.
• ROLL CALL
PRESENT: Dunn, Zink, Bzdek, Hogestad, Wallace, Gensmer, Sladek
ABSENT: Ernest, Lingle
STAFF: McWilliams, Weinberg, Schiager
• PUBLIC COMMENT ON ITEMS NOT ON THE AGENDA
None
• DISCUSSION AGENDA
1. 714 WEST MOUNTAIN AVENUE FORT COLLINS LANDMARK DESIGNATION - CONTINUATION
PROJECT DESCRIPTION: Staff is pleased to present for your consideration the Ault/Thode Property
located at 714 West Mountain Avenue. The property has significance to Fort
Collins under Landmark Preservation Standard C. This is the continuation of
the discussion that was tabled at the Commission’s June 10th Regular
Meeting. The Commission’s comments from that meeting have been
addressed in the revised Landmark Designation application.
Landmark
Preservation
Commission
City of Fort Collins Page 1 June 24, 2015
2.a
Packet Pg. 9
Attachment: Draft LPC June 24, 2015 Minutes (3309 : Minutes of June 24, 2015)
APPLICANT: Henry P. Thode III
Staff Report
Mr. Weinberg presented the staff report, addressing the concerns raised by the Commission at the
last meeting. Background information about the property’s relationship to Alexander Ault has been
added to the designation documentation. Staff did not find strong enough evidence to recommend
the property be deemed significant under Standard B based on its association with him. The integrity
of the carriage house and the impact of the carport have been addressed in the updated
documentation. Additional details about the architecture have also been added to the documentation.
Applicant Presentation
There was no presentation. However, Mr. Thode commented that, in response to Commission
questions at the previous meeting, he had provided additional information to Staff about his father’s
medical career, and Staff had updated the documentation accordingly.
Public Input
None
Commission Questions and Discussion
A Member asked if there was new information about the wood shingles on the garage. Staff said the
shingles had been there as long as the Applicant could remember, but there is no substantial
documentation to indicate whether the shingles were original. Another Member pointed out a minor
error of a missing word (graduate) in the last paragraph of page 8. Chair Sladek stated that Staff had
adequately addressed his concerns and questions from the last meeting. He suggested Mr.
Weinberg add his own name to the application as a preparer.
Chair Sladek asked the Commission if they felt the carriage house was contributing or non-
contributing to the eligibility. Members were in agreement that in terms of the integrity criteria, the
carriage house leans toward being contributing. They also discussed the carport, noting that since it
could be removed, and on its own has no significance, it could be excluded from the designation.
Ms. Dunn asked for clarification on the timeline of the naming of the town of Ault in relation to when
Alexander Ault purchased the property. Staff said it was unclear exactly when the town was named,
but it was prior to the Ault family purchasing this property in 1909.
The Applicant read a quote from Coloradotown.com, stating that “Ault, Co. was incorporated in 1904
and was first named McAllister. The town’s name was changed to Burgdorff Siding before it acquired
its current name in 1897."
Commission Deliberation
Ms. Zink moved that the Landmark Preservation Commission recommend to City Council that
they pass an ordinance designating the Ault/Thode Property located at 714 West Mountain
Avenue as a Fort Collins Landmark according to City Code Chapter 14, under Designation
Standard C, with the exception that the carport is recognized as a non-contributing element.
Ms. Gensmer seconded. Motion passed 7-0.
[Timestamp: 5:50 p.m.]
• OTHER BUSINESS
None
• ADJOURNMENT
Chair Sladek adjourned the meeting at 5:51 p.m.
Minutes respectfully submitted by Gretchen Schiager.
City of Fort Collins Page 2 June 24, 2015
2.a
Packet Pg. 10
Attachment: Draft LPC June 24, 2015 Minutes (3309 : Minutes of June 24, 2015)
Agenda Item 3
Item # 3 Page 1
STAFF REPORT July 8, 2015
Landmark Preservation Commission
PROJECT NAME
254/256 LINDEN STREET; FINAL DESIGN REVIEW OF PROPOSED SIGNS
STAFF
Josh Weinberg, City Planner
PROJECT INFORMATION
PROJECT DESCRIPTION: This is a request for Final Design Review for proposed signage on the
building at 254/256 Linden Street, which is within the Old Town Historic
District.
APPLICANT: Brandon Silar; Lark Design/Build
EXECUTIVE SUMMARY
BACKGROUND: The building at 252/254/256 Linden Street is a non-contributing element of the Old Town Historic
District. The non-contributing status is a result of the alterations the building has undergone. It is, however, the
oldest building in the historic district according to the County Assessor, with an 1867 construction date.
PROJECT DESCRIPTION: The applicant is requesting to add signage to the building in multiple locations: a
lighted marquee and vertical cabinet sign on the building’s northern corner; poster cabinet and door locators on the
northwestern elevation; and rectangular lighted cabinet sign on the northeastern elevation. The applicant was
recently granted several variances from the Zoning Board of Appeals, allowing for the sizes and types of signs
proposed in this application from a zoning perspective. Please reference the enclosed packet from the applicant for
sketches and photographs of the proposed project, and also the following statement and project description from
the applicant that was included when this item was reviewed by the Commission in March, 2015 as a Conceptual
Design Review (please note that some of the proposal has changed slightly following zoning variances):
“The Downtown Artery is going through an exciting transition! The entire downstairs of the current 252/254/256
Linden Building is being remodeled to support a café and toast bar, a recording studio and practice space for local
musicians, and a 225-person live music venue. Work is underway on this 7,000 sqft change-of-occupancy and
tenant finish project, and is expected to wrap up by the summer months.
To identify the cluster of businesses both at sidewalk level and above - and to bring exterior interest to an
otherwise non-descript building - the approximately twenty businesses located in the Artery building are proposing
to add signage to the various faces of the building to highlight their ecosystem of artists, musicians, support
businesses, and shared resources. Instead of individual signs identifying each of the twenty businesses, the Artery
folks want to put forward a consolidated brand around the building name (aka: “The Downtown Artery”), with a
modest cluster of smaller way-finding and support signage, such as poster cabinets to display art, band posters, or
event announcements.
The keystone of the signage concept is a large corner sign to highlight the heart of the building’s draw to the
public: the live music venue. An intended secondary goal of this sign is also to highlight Linden as a major
3
Packet Pg. 11
Agenda Item 3
Item # 3 Page 2
downtown circulation element from the Jefferson route, and to draw passing traffic out either direction on Linden to
patronize our growing end of downtown. While the signage concept is significantly smaller than the signage area
allowance for this building, the marquee/flag sign does exceed a few of the massing constraints outlined in the sign
code, and the Artery is concurrently seeking approval of these variances through the zoning process.
Due to the vintage of the Linden street façade and an overall drive to keep consistent with the authentic feel of the
architectural inventory in downtown Fort Collins, the businesses are proposing a vintage concept - a deco-inspired
marquee with corner-flag signage. Both the form and technology have drawn heavily from research into vintage
signs from the beginning of the 20th century. The proposed Artery sign would be a metal cabinet marquee with
vintage extruded letters (clip-in). The marquee would wrap the corner of the building in the location of the original
signage used in the middle of the last century. The lighted marquee would be backlit with a simple white to
highlight the black or red marquee letters at night. Above the marquee, mounted to a gloss-painted metal panel,
the “Artery” text would be constructed of individually riveted, gloss-painted, boxed letters made from sheet metal.
These letters, at about 2’ in height (each), would be lit with a double-stroke neon pattern, and would glow a warm
red at night. These “Artery” letters would gently skew toward both frontages on either side of the center panel, so
as to be readable from as many angles as possible around the intersection of Linden and Jefferson. Above the
“Artery” letters and panel, the Artery flourish would cap the flag, also traced in double-stroke neon. Additional
neon-style accents would be added to the edge of the panel, and as modest striping to ad glow to the entire sign at
night. To attain that neon-look throughout the sign while staying consistent with the Artery’s energy-conservation
goals, the entire sign is designed to be lighted with a new LED technology that exactly mimics neon at a fraction of
the energy use, and without the inclusion of mercury-filled tubing; the Artery folks will demonstrate this technology
during the review process.
Additional address-specific signage on the Linden facade would remain consistent with the marquee/flag in color,
material and height from ground, but would be purely diminutive in stature with their purpose being for door
identification. We are also asking approval for sidewalk-level poster cabinets which consist of shallow, lit, lockable
glass display cabinets to house rotating artwork or event advertising."
STANDARDS/GUIDELINES: Typically, when the Commission reviews alterations to non-contributing buildings in
a historic district, their concern is the impact changes will have on the character of the district, as a whole.
Alterations to properties in Fort Collins Landmark Districts are reviewed for compliance with Municipal Code
Section 14-48, “Approval of Proposed Work;” the Secretary of the Interior’s standards for Rehabilitation; and
applicable sections of the Old Town Design Standards (http://www.fcgov.com/historicpreservation/pdf/old-town-
design-guidelines.pdf).
Sec. 14-48. Approval of proposed work.
In determining the decision to be made concerning the issuance of a report of acceptability, the Commission shall
consider the following criteria:
(1) The effect of the proposed work upon the general historical and/or architectural character of the landmark
or landmark district;
(2) The architectural style, arrangement, texture and materials of existing and proposed improvements, and
their relation to the sites, structures and objects in the district;
(3) The effects of the proposed work in creating, changing or destroying the exterior characteristics of the site,
structure or object upon which such work is to be done;
(4) The effect of the proposed work upon the protection, enhancement, perpetuation and use of the landmark
or landmark district;
(5) The extent to which the proposed work meets the standards of the city and the United States Secretary of
the Interior then in effect for the preservation, reconstruction, restoration or rehabilitation of historic
resources.
3
Packet Pg. 12
Agenda Item 3
Item # 3 Page 3
Secretary of the Interior’s Standards for Rehabilitation
Rehabilitation is defined as the act or process of making possible a compatible use for a property through repair,
alterations, and additions while preserving those portions or features which convey its historical, cultural, or
architectural values.
1. Rehabilitation Standard 1. A property will be used as it was historically or be given a new use that requires
minimal change to its distinctive materials, features, spaces, and spatial relationships;
2. Rehabilitation Standard 2. The historic character of a property will be retained and preserved. The removal
of distinctive materials or alteration of features, spaces, and spatial relationships that characterize a
property will be avoided.
3. Rehabilitation Standard 3. Each property will be recognized as a physical record of its time, place, and
use. Changes that create a false sense of historical development, such as adding conjectural features or
elements from other historic properties, will not be undertaken.
4. Rehabilitation Standard 4. Changes to a property that have acquired historic significance in their own right
will be retained and preserved.
5. Rehabilitation Standard 5. Distinctive materials, features, finishes, and construction techniques or
examples of craftsmanship that characterize a property will be preserved.
6. Rehabilitation Standard 6. Deteriorated historic features will be repaired rather than replaced. Where the
severity of deterioration requires replacement of a distinctive feature, the new feature will match the old in
design, color, texture, and, where possible, materials. Replacement of missing features will be
substantiated by documentary and physical evidence.
7. Rehabilitation Standard 7. Chemical or physical treatments, if appropriate, will be undertaken using the
gentlest means possible. Treatments that cause damage to historic materials will not be used.
8. Rehabilitation Standard 8. Archeological resources will be protected and preserved in place. If such
resources must be disturbed, mitigation measures will be undertaken.
9. Rehabilitation Standard 9. New additions, exterior alterations, or related new construction will not destroy
historic materials, features, and spatial relationships that characterize the property. The new work shall be
differentiated from the old and will be compatible with the historic materials, features, size, scale and
proportion, and massing to protect the integrity of the property and its environment.
10. Rehabilitation Standard 10. New additions and adjacent or related new construction will be undertaken in
such a manner that, if removed in the future, the essential form and integrity of the historic property and its
environment would be unimpaired.
ATTACHMENTS
1. 150624_VenueCafe_SignageVariance_StdRenderings (PDF)
2. 150624_VenueCafe_SignageVariance_CornerNight (PDF)
3
Packet Pg. 13
LARK DESIGN/BUILD
www.larkdesignbuild.com
ph: 970.682.5110
607 E 5th Street
Loveland, CO 80537
Properties Creations
252 Linden Avenue
Fort Collins, CO 80524
attn: Kent Bradley
ph: (970) 581-2607
254/256 LINDEN FACADE IMPROVEMENT - Corner Signage Concept July 8, 2015
Lighted Cabinet
Marquee
(frosted acrylic)
Lighted Flourish
(both facades)
Extruded Clip-in Le�ers
(black acrylic; movable)
Individual Le�ers
(lighted hollow aluminum;
w/ red 2-stripe LED “neon”)
Aluminum Cabinet
(box aluminum; w/ 3-stripe LED
“neon” accents at edge, and near top)
3.a
Packet Pg. 14
Attachment: 150624_VenueCafe_SignageVariance_StdRenderings (3311 : 254/256 Linden Street; Final Design Review of Proposed Signs)
LARK DESIGN/BUILD
www.larkdesignbuild.com
ph: 970.682.5110
607 E 5th Street
Loveland, CO 80537
Properties Creations
252 Linden Avenue
Fort Collins, CO 80524
attn: Kent Bradley
ph: (970) 581-2607
[new address] JEFFERSON FACADE IMPROVEMENT - Jefferson Business Signage Concept July 8, 2015
Bandwidth Sign
(basic lighted cabinet w/
printed logo and text)
3.a
Packet Pg. 15
Attachment: 150624_VenueCafe_SignageVariance_StdRenderings (3311 : 254/256 Linden Street; Final Design Review of Proposed Signs)
LARK DESIGN/BUILD
www.larkdesignbuild.com
ph: 970.682.5110
607 E 5th Street
Loveland, CO 80537
Properties Creations
252 Linden Avenue
Fort Collins, CO 80524
attn: Kent Bradley
ph: (970) 581-2607
254/256 LINDEN FACADE IMPROVEMENT - Studio/Cafe/Venue Door Signage Concept July 8, 2015
Door Locators (typ.)
(basic lighted cabinet w/
black painted text)
Poster Cabinets (typ.)
(interior light; showing
rota�ng band, ar�st, and
event posters)
3.a
Packet Pg. 16
Attachment: 150624_VenueCafe_SignageVariance_StdRenderings (3311 : 254/256 Linden Street; Final Design Review of Proposed Signs)
LARK DESIGN/BUILD
www.larkdesignbuild.com
ph: 970.682.5110
607 E 5th Street
Loveland, CO 80537
Properties Creations
252 Linden Avenue
Fort Collins, CO 80524
attn: Kent Bradley
ph: (970) 581-2607
254/256 LINDEN FACADE IMPROVEMENT - Corner Signage Concept (Night Study) July 8, 2015
3.b
Packet Pg. 17
Attachment: 150624_VenueCafe_SignageVariance_CornerNight (3311 : 254/256 Linden Street; Final Design Review of Proposed Signs)
Agenda Item 4
Item # 4 Page 1
STAFF REPORT July 8, 2015
Landmark Preservation Commission
PROJECT NAME
FORRESTER BLOCK MURAL
STAFF
Karen McWilliams, Historic Preservation Planner
PROJECT INFORMATION
PROJECT DESCRIPTION: This request is for a painted mural on the southeast wall of the Forrester
Block, near Walnut Street.
APPLICANT: Scott Ranweiler, Bohemian Companies
OWNER: Bohemian Companies
RECOMMENDATION: N/A
EXECUTIVE SUMMARY
Description of Proposed Work: The proposal is for the creation of a painted mural, in the trompe l’oeil style. The
mural would generally depict the wall of the building as it would likely look if it were not covered over with plaster.
The existing plaster appears to be a cementitious material, applied to the underlying brick. The plaster is integral to
the structural stability of the brick wall, and cannot be removed without damaging the brick face. The proposed
paint is a water-based, latex, exterior house paint. This is a high resolution, low fade, UV resistant, semi-gloss
product.
The mural artist is Fort Collins resident Terry McNerney. McNerney began his career as an art student at the
University of Northern Colorado, but switched his focus to History, earning a degree from CSU. His interests in
history are his main inspiration for his works. McNerney has been painting murals since 1997, and has transformed
many a blank wall and transformer ox in Northern Colorado over the past 10+ years. One of his best known
murals is “Jazz Alley,” a 2-story, 1,500 square foot mural located between Mountain and Walnut in the narrow alley
separating the Bohemian Companies from the Fort Collins Food Co-op.
History: Designed by E. M. Cole, architect and builder, and constructed in 1905 for a cost of $5,000, the Forrester
Block is a contributing element of the Old Town Fort Collins National Register District (1978) and of the locally
landmarked Old Town District (1979). Built close to the intersection of Walnut and East Mountain Avenue,
historically the Forrester Block had a Walnut Street address. More recently associated with the former
EDAW/AECOM offices and the Food Coop, it now is addressed as 240 East Mountain Avenue.
Applicable Processes and Codes: Alterations to designated Landmark properties are reviewed for compliance with
the standards and criteria contained in Municipal Code Section 14-48, “Report of Acceptability”:
A) If … the Commission finds that the proposed work is of a nature that will not erode the authenticity or destroy
any distinctive exterior feature or characteristic of the improvements or site and is compatible with the distinctive
characteristics of the landmark or landmark district and with the spirit and purpose of this Chapter, the Commission
shall advise the applicant in writing by issuing a report of acceptability….
4
Packet Pg. 18
Agenda Item 4
Item # 4 Page 2
B) In determining the decision to be made concerning the issuance of a report of acceptability, the Commission
shall consider the following criteria:
(1) The effect of the proposed work upon the general historical and/or architectural character of the
landmark or landmark district;
(2) The architectural style, arrangement, texture and materials of existing and proposed improvements,
and their relation to the landmark or the sites, structures and objects in the district;
(3) The effects of the proposed work in creating, changing, obscuring or destroying the exterior
characteristics of the site, structure or object upon which such work is to be done;
(4) The effect of the proposed work upon the protection, enhancement, perpetuation and use of the
landmark or landmark district;
(5) The extent to which the proposed work meets the standards of the City and the United States
Secretary of the Interior for the preservation, reconstruction, restoration or rehabilitation of historic resources.
Of the ten Secretary of the Interior’s Standards for Rehabilitation, staff feels that #s 9 and 10 would be applicable
to this proposal:
• Rehabilitation Standard 9. New additions, exterior alterations, or related new construction will not destroy
historic materials, features, and spatial relationships that characterize the property. The new work shall be
differentiated from the old and will be compatible with the historic materials, features, size, scale and proportion,
and massing to protect the integrity of the property and its environment.
• Rehabilitation Standard 10. New additions and adjacent or related new construction will be undertaken in
such a manner that, if removed in the future, the essential form and integrity of the historic property and its
environment would be unimpaired.
ATTACHMENTS
1. 240 E Mountain Mural (PDF)
4
Packet Pg. 19
4.a
Packet Pg. 20
Attachment: 240 E Mountain Mural (3317 : Forrester Block Mural)
0
4.a
Packet Pg. 21
Attachment: 240 E Mountain Mural (3317 : Forrester Block Mural)
4.a
Packet Pg. 22
Attachment: 240 E Mountain Mural (3317 : Forrester Block Mural)
Agenda Item 5
Item # 5 Page 1
STAFF REPORT July 8, 2015
Landmark Preservation Commission
PROJECT NAME
FIRST BANK MURAL, 100 SOUTH COLLEGE AVENUE
STAFF
Karen McWilliams, Historic Preservation Planner
PROJECT INFORMATION
PROJECT DESCRIPTION: This request is for a mural to be painted on two walls behind the 1st Bank
Building, at the corner of College and Mountain Avenues. The walls are
associated with two historically designated buildings.
APPLICANT: Don Bernholtz, Architecture Plus
OWNER: First Bank Colorado
RECOMMENDATION: N/A
EXECUTIVE SUMMARY
Description of Proposed Work: The proposal is for the creation of a painted mural on the common wall forming the
west elevation of the Kissock Block, 115-121 East Mountain; and the wall forming the north elevation of the Brinker
Grocery/Shanahan Building (Starry Night) at 112 South College. The mural would generally depict flowers. The
existing walls are integral to the structural stability of the historic brick walls, and likely cannot be removed without
damaging the brick faces. The proposed paint is “Paramount”, a water-based, latex paint, in satin sheen,
manufactured by Diamond Vogel.
The mural artist is Fort Collins resident Gale Whitman. Whitman earned a BA in biology with a minor in art from
Hastings College in 1988. In 1991, she moved to Fort Collins to attend graduate school at CSU, and she received
an MS in anatomy / medical illustration in 1993. She then worked as a medical illustrator for 10 years in Fort
Collins. Whitman enjoys drawing inspiration from nature and the human spirit. An Art in Public Places
spokesperson, Whitman has painted several transformers and pianos located throughout Fort Collins.
Applicable Processes and Codes: Constructed circa 1907, the Brinker Grocery/Shanahan Building was
designated as a Fort Collins Landmark in 1992. The Kissock Block dates to 1895, and is designated individually on
the National Register of Historic Places (1985), but is not designated as a Fort Collins Landmark.
Alterations to designated Landmark properties (the Brinker Grocery/Shanahan Building, 112 South College
Avenue) are reviewed for compliance with the standards and criteria contained in Municipal Code Section 14-48,
“Report of Acceptability”:
A) If … the Commission finds that the proposed work is of a nature that will not erode the authenticity or destroy
any distinctive exterior feature or characteristic of the improvements or site and is compatible with the distinctive
characteristics of the landmark or landmark district and with the spirit and purpose of this Chapter, the Commission
shall advise the applicant in writing by issuing a report of acceptability….
B) In determining the decision to be made concerning the issuance of a report of acceptability, the Commission
5
Packet Pg. 23
Agenda Item 5
Item # 5 Page 2
shall consider the following criteria:
(1) The effect of the proposed work upon the general historical and/or architectural character of the
landmark or landmark district;
(2) The architectural style, arrangement, texture and materials of existing and proposed improvements,
and their relation to the landmark or the sites, structures and objects in the district;
(3) The effects of the proposed work in creating, changing, obscuring or destroying the exterior
characteristics of the site, structure or object upon which such work is to be done;
(4) The effect of the proposed work upon the protection, enhancement, perpetuation and use of the
landmark or landmark district;
(5) The extent to which the proposed work meets the standards of the City and the United States
Secretary of the Interior for the preservation, reconstruction, restoration or rehabilitation of historic resources.
Of the ten Secretary of the Interior’s Standards for Rehabilitation, staff feels that #s 9 and 10 would be applicable
to this proposal:
• Rehabilitation Standard 9. New additions, exterior alterations, or related new construction will not destroy
historic materials, features, and spatial relationships that characterize the property. The new work shall be
differentiated from the old and will be compatible with the historic materials, features, size, scale and proportion,
and massing to protect the integrity of the property and its environment.
• Rehabilitation Standard 10. New additions and adjacent or related new construction will be undertaken in
such a manner that, if removed in the future, the essential form and integrity of the historic property and its
environment would be unimpaired.
ATTACHMENTS
1. 1st Bank_Mural Wall Presentation (PDF)
2. 1stBank_Title Info (PDF)
5
Packet Pg. 24
5.a
Packet Pg. 25
Attachment: 1st Bank_Mural Wall Presentation (3324 : First Bank Mural, 100 South College Avenue)
Northwest View –Existing from Corner 1st Bank, 100 S. College Ave
1
5.a
Packet Pg. 26
Attachment: 1st Bank_Mural Wall Presentation (3324 : First Bank Mural, 100 South College Avenue)
Northwest View –Existing 1st Bank, 100 S. College Ave
2
5.a
Packet Pg. 27
Attachment: 1st Bank_Mural Wall Presentation (3324 : First Bank Mural, 100 South College Avenue)
Northwest View –New Mural and New Site Work 1st Bank, 100 S. College Ave
3
5.a
Packet Pg. 28
Attachment: 1st Bank_Mural Wall Presentation (3324 : First Bank Mural, 100 South College Avenue)
North‐Northwest View –Proposed Mural 1st Bank, 100 S. College Ave
4
5.a
Packet Pg. 29
Attachment: 1st Bank_Mural Wall Presentation (3324 : First Bank Mural, 100 South College Avenue)
North View –Proposed Mural 1st Bank, 100 S. College Ave
5
5.a
Packet Pg. 30
Attachment: 1st Bank_Mural Wall Presentation (3324 : First Bank Mural, 100 South College Avenue)
West View –Proposed Mural 1st Bank, 100 S. College Ave
6
5.a
Packet Pg. 31
Attachment: 1st Bank_Mural Wall Presentation (3324 : First Bank Mural, 100 South College Avenue)
Proposal
Date
6/9/2015
Estimate #
246
Name / Address
1st Bank
100 S. College Ave.
Fort Collins, CO.
80524
The Finishers llc
116 Rutgers Ave.
Fort Collins, CO
80525
Project
Basecoat of mural w...
Job address
100 S. College ave.
Square footage
4200
E-mail
paintco98@msn.com
Total
Description Rate
Exterior painting of 2 walls for preparation of mural. To Include:
-Walls to be painted are east and south walls of parking lot. ends of walls, facing the street, are also included.
-Removal of unused hooks and hardware on walls. Fill of holes.
-Power wash of walls to clean, prior to priming or painting.
-Scrape of any loose paint, including water leaks on south wall.
-Caulk of cracks with an elastomeric caulk.
-Prime of all patches.
-Prime of any rust on gate to alley.
-Mask of windows and any surfaces not to be painted.
-Spray and back roll with two (2) coats of exterior latex paint. Color to be selected by artist.
-Paint will be 'Diamond Vogel', 'Paramount'. Satin sheen.
-This proposal includes the cost of all labor, Materials and equipment to complete to project as outlined above.
4,160.00
$4,160.00
5.a
Packet Pg. 32
Attachment: 1st Bank_Mural Wall Presentation (3324 : First Bank Mural, 100 South College Avenue)
Proposal
Date
6/12/2015
Estimate #
247
Name / Address
1st Bank
100 S. College Ave.
Fort Collins, CO.
80524
The Finishers llc
116 Rutgers Ave.
Fort Collins, CO
80525
Project
Painting of Mural
Job address
100 S. College Ave.
Square footage
4200
E-mail
paintco98@msn.com
Total
Description Rate
Painting of Mural on south and east walls of parking lot at 100 S. College ave.. To include:
-Artwork will be supplied by Gale Whitman.
-Color selections will be made by artist. Color samples will be provided by The Finishers LLC, and submitted to both the artist
and the customer to be approved prior to the start of the project.
-This proposal does not include preparation or basecoat of walls. (please see additional proposal)
-Any approval required by the City of Fort Collins will be the responsibility of First Bank. I (Markell Young) will be available
to attend city council meetings, if needed.
-Insurance certificates will be provided to the customer.
- Image supplied by the artist will be transferred to the walls by a combination of a grid system and possibly projection of
images.
-Mural will be created, one color at a time.
-Color blocks will be sketched on walls and outlined with tape and masking.
-Color will be sprayed onto walls. Each color will be given two (2) coats of paint.
-Paint will be 'Diamond Vogel', 'Paramount. Satin sheen.
-Gale Whitman will be consulted throughout the process to ensure that the layout and color placements are correct.
-We will be responsible for keeping a clean and organized jobsite. Used masking materials will be disposed of by the Finishers.
-Equipment and materials will be stored in southwest corner of parking lot when not in use.
-Vehicles, planter boxes, neighboring buildings, etc. will be protected from overspray.
-All efforts will be made to keep the parking lot accessible to customers during business hours. But occasional closures may be
unavoidable.
-Due to the requirement to keep the parking lot open for customer use, we will need to be able to work on occasional weekends
and evenings. This will require us to have key(s) to gain access.
-Upon completion of the mural, touch-up paint will be clearly labeled and provided to 1st Bank.
-This proposal includes the cost of all labor, materials and equipment to complete the project as outlined above.
-We estimate the mural to take 2 months or less to install. I believe this will allow for delays due to inclement weather. The
earlier in the summer that we can start the project the better. Cold weather could shut the entire project down until the spring of
2016.
-We would require a downpayment of 25% of the proposal total, prior to start of the project. An additional percentage (30 to 50
percent) will be billed after approximately one month of start of project. Balance will be billed upon completion.
-We will warranty all work to be free from defects in application for 2 years from product completion. Although we can not
extend the manufacturers warranty on material, my experience with this paint makes me confident that the mural will look
good and resist fading for 15 to 20 years.
-Any damage to the mural by others or by structural failure of substrate, is not covered by any warranty.
27,000.00
Page 1
5.a
Proposal
Date
6/12/2015
Estimate #
247
Name / Address
1st Bank
100 S. College Ave.
Fort Collins, CO.
80524
The Finishers llc
116 Rutgers Ave.
Fort Collins, CO
80525
Project
Painting of Mural
Job address
100 S. College Ave.
Square footage
4200
E-mail
paintco98@msn.com
Total
Description Rate
Page 2
$27,000.00
5.a
Packet Pg. 34
Attachment: 1st Bank_Mural Wall Presentation (3324 : First Bank Mural, 100 South College Avenue)
5.b
Packet Pg. 35
Attachment: 1stBank_Title Info (3324 : First Bank Mural, 100 South College Avenue)
5.b
Packet Pg. 36
Attachment: 1stBank_Title Info (3324 : First Bank Mural, 100 South College Avenue)
5.b
Packet Pg. 37
Attachment: 1stBank_Title Info (3324 : First Bank Mural, 100 South College Avenue)
5.b
Packet Pg. 38
Attachment: 1stBank_Title Info (3324 : First Bank Mural, 100 South College Avenue)
5.b
Packet Pg. 39
Attachment: 1stBank_Title Info (3324 : First Bank Mural, 100 South College Avenue)
Agenda Item 6
Item # 6 Page 1
STAFF REPORT July 8, 2015
Landmark Preservation Commission
PROJECT NAME
REVIEW OF DEVELOPMENT PROPOSAL - DOWNTOWN HOTEL
STAFF
Karen McWilliams, Historic Preservation Planner
PROJECT INFORMATION
PROJECT DESCRIPTION: This is a Preliminary LPC Review of the Development Proposal for a 5 story,
162 room hotel/mixed-use building abutting the Old Town Fort Collins
Historic District.
APPLICANT: Cole Evans, McWhinney; Stu McMillan, Bohemian Companies
OWNER: Bohemian Companies
EXECUTIVE SUMMARY
The proposed development is for a 5 story, 162 room hotel/mixed-use building to also contain a 3,100 sq. ft.
restaurant, 3,000 sq. ft. of meeting/ballroom space, 3,100 sq. ft. of retail area, and a 1,500 sq. ft. rooftop bar. The
5th story would be stepped back from the masonry facade. The building would be located at 354 Walnut Street &
363 Jefferson Street. The existing site contains several buildings, which have all previously been determined to not
be individually eligible for Landmark recognition: the former Armadillo Restaurant, a former industrial/church
building, and the "ghost garage" building, along with associated parking lots. The property is located in the (D)
Downtown zone district.
Land Use Code Section 3.4.7(F)(6) requires that developments affecting historic structures be reviewed by the
Landmark Preservation Commission, and that the Commission provide the decision maker with a written
recommendation on the project, which shall be considered by the decision maker in making its decision. The
decision maker for this project is the Planning and Zoning Board.
Applicable review criteria would include Land Use Code Section 3.4.7, and the Old Town Historic District Design
Standards, which can serve as guidelines for development near the Historic District.
ATTACHMENTS
1. LPC Submittal_2015_July_08 (PDF)
6
Packet Pg. 40
Downtown Fort Collins Hotel
LPC Submittal
page 1
Bohemian Companies
Sage Hospitality
McWhinney
Downtown
Fort Collins Hotel
Landmark Preservation
Committee (LPC) Submittal
Fort Collins, Colorado
01 July 2015
6.a
Packet Pg. 41
Attachment: LPC Submittal_2015_July_08 (3325 : Review of Development Proposal - Downtown Hotel)
Downtown Fort Collins Hotel
LPC Submittal
page 2
Jeerson Street
Walnut Street
Mountain Ave
Chestnut Street
Service Access - AC paving
Hotel - Ground Floor
Main
Entrance
Flexible Lawn Area
Low screen wall
Large Planter Pot , typ
Diagonal Parking
Shared paver plaza/parking/
hotel access
At grade access /shared street
concept
Surface Parking - 107 total spaces
Compact Parking -32 spaces
Enhanced Alley with String
Lights, Pavers, planted edges,
and seating
Planted edge to raised outdoor
seating area
Outdoor Seating Area
Corner Plaza Space
Colored concrete with seatwall
Hotel Valet
Chestnut Street Parking
Proposed Parking: 44 Spaces
Existing: 60 spaces
Net loss: 16 spaces
0 10’ 20’ 40’
6.a
Packet Pg. 42
Attachment: LPC Submittal_2015_July_08 (3325 : Review of Development Proposal - Downtown Hotel)
Downtown Fort Collins Hotel
LPC Submittal
page 3
Hotel as Ambassador - Framing the Gateway to Old Town
Addressing the Street Realm
6.a
Packet Pg. 43
Attachment: LPC Submittal_2015_July_08 (3325 : Review of Development Proposal - Downtown Hotel)
Downtown Fort Collins Hotel
LPC Submittal
page 4
Embracing the Views and the Sun with Sculpted Mass
Activating Walnut Street with Vibrant Public Uses
Addressing the Street Realm
6.a
Packet Pg. 44
Attachment: LPC Submittal_2015_July_08 (3325 : Review of Development Proposal - Downtown Hotel)
Downtown Fort Collins Hotel
LPC Submittal
page 5
Expand the Energy of Old Town
6.a
Packet Pg. 45
Attachment: LPC Submittal_2015_July_08 (3325 : Review of Development Proposal - Downtown Hotel)
Downtown Fort Collins Hotel
LPC Submittal
page 6
Expand the Energy of Old Town
Transparency and Porosity of the Ground Floor Uses
Recessing the Restaurant Corner to Announce the Entry
Downtown Fort Collins Hotel
LPC Submittal
page 6
6.a
Packet Pg. 46
Attachment: LPC Submittal_2015_July_08 (3325 : Review of Development Proposal - Downtown Hotel)
Downtown Fort Collins Hotel
LPC Submittal
page 7
Transition from Old Town to River District
The neutral color of the metal panel, large
percentage of glazing and a playful pattern
create an impression of a light structure
resting on the heavier masonry base.
Addressing the Street Realm
6.a
Packet Pg. 47
Attachment: LPC Submittal_2015_July_08 (3325 : Review of Development Proposal - Downtown Hotel)
Downtown Fort Collins Hotel
LPC Submittal
page 8
Material Transition
Metal Panel Explorations
6.a
Packet Pg. 48
Attachment: LPC Submittal_2015_July_08 (3325 : Review of Development Proposal - Downtown Hotel)
Downtown Fort Collins Hotel
LPC Submittal
page 9
Hotel Guest Courtyard
Private Spaces Common Spaces
Floor Plan Revisions
6.a
Packet Pg. 49
Attachment: LPC Submittal_2015_July_08 (3325 : Review of Development Proposal - Downtown Hotel)
Downtown Fort Collins Hotel
LPC Submittal
page 10
Roof Terrace Plan
Floor 2- Revisions
Roof Terrace Plan
Floor 2- Revisions
6.a
Packet Pg. 50
Attachment: LPC Submittal_2015_July_08 (3325 : Review of Development Proposal - Downtown Hotel)
Downtown Fort Collins Hotel
LPC Submittal
page 11
Roof Terrace Plan
Floor 2- Revisions
Downtown Fort Collins Hotel
LPC Submittal
page 11
6.a
Packet Pg. 51
Attachment: LPC Submittal_2015_July_08 (3325 : Review of Development Proposal - Downtown Hotel)
Downtown Fort Collins Hotel
LPC Submittal
page 12
Roof Terrace Plan
The Intimate Scale of the Courtyard
6.a
Packet Pg. 52
Attachment: LPC Submittal_2015_July_08 (3325 : Review of Development Proposal - Downtown Hotel)
Downtown Fort Collins Hotel
LPC Submittal
page 13
Vertical
composition
Vertical
composition
Horizontal
composition
Fluctuating
composition
Compositional Language of the Facades
6.a
Packet Pg. 53
Attachment: LPC Submittal_2015_July_08 (3325 : Review of Development Proposal - Downtown Hotel)
Downtown Fort Collins Hotel
LPC Submittal
page 14
Window in Brick
Chestnut & Walnut Facades
Large Lights open in
40% Window
Window in Metal & Brick
Service alley facade
Non-opening windows
40% Window
Juliet Balcony
Firehouse Alley Facade
Sliding Door
59% Window
Step Out Balcony
Courtyard Facade
Sliding Door
59% Window
Window in Metal
Firehouse & Chestnut facades, 5th floor
Large Light opens in
45% Window
Window Types
6.a
Packet Pg. 54
Attachment: LPC Submittal_2015_July_08 (3325 : Review of Development Proposal - Downtown Hotel)
Downtown Fort Collins Hotel
LPC Submittal
page 15
Window in Brick
Visually Connecting to Old Town
with similar window proportion, scale and detail
Walnut St. Chestnut St.
OLD TOWN
6.a
Packet Pg. 55
Attachment: LPC Submittal_2015_July_08 (3325 : Review of Development Proposal - Downtown Hotel)
Downtown Fort Collins Hotel
LPC Submittal
page 16
SERVICE ALLEY
Window in Metal & Brick
Vertically grouped windows visually connect to Old Town &
River District. Provide insulated glass and non-operable
windows to mitigate noise from the service alley.
Walnut st.
6.a
Packet Pg. 56
Attachment: LPC Submittal_2015_July_08 (3325 : Review of Development Proposal - Downtown Hotel)
Downtown Fort Collins Hotel
LPC Submittal
page 17
Juliet Balconies Along Old Firehouse Alley
Opening the rooms alongside Old Fire House Alley to
connect (and add) to its vibrant activity.
FIREHOUSE ALLEY
6.a
Packet Pg. 57
Attachment: LPC Submittal_2015_July_08 (3325 : Review of Development Proposal - Downtown Hotel)
Downtown Fort Collins Hotel
LPC Submittal
page 18
GARDEN COURT
Step Out Balconies Along Garden Court
Rooms along the private quiet garden court will have a
step out balcony that shares the garden.
Walnut St.
6.a
Packet Pg. 58
Attachment: LPC Submittal_2015_July_08 (3325 : Review of Development Proposal - Downtown Hotel)
Downtown Fort Collins Hotel
LPC Submittal
page 19
River District
Windows in Metal
Along the fifth floor and the NE corner, the facade is treated in metal and has a higher percentage of glass.
This is to dematerialize the 5th floor and to connect the NE corner to the more industrial River District.
These Rooms will generally have great long views and the windows will connect the rooms to the mountains
and prairie.
Chestnut St.
6.a
Packet Pg. 59
Attachment: LPC Submittal_2015_July_08 (3325 : Review of Development Proposal - Downtown Hotel)
Downtown Fort Collins Hotel
LPC Submittal
page 20
Compositional Language of the Facades
Materiality, Rhythm & Harmony
STONE
Stone as underlying Rhythm
Drums
6.a
Packet Pg. 60
Attachment: LPC Submittal_2015_July_08 (3325 : Review of Development Proposal - Downtown Hotel)
Downtown Fort Collins Hotel
LPC Submittal
page 21
Brick as layered Rhythm , low end of melody
Bass & Rhythm Guitar
Compositional Language of the Facades
Materiality, Rhythm & Harmony
BRICK
6.a
Packet Pg. 61
Attachment: LPC Submittal_2015_July_08 (3325 : Review of Development Proposal - Downtown Hotel)
Downtown Fort Collins Hotel
LPC Submittal
page 22
Metal panel as layered Rhythm , ‘high’ end of melody
Electric Guitar
Compositional Language of the Facades
Materiality, Rhythm & Harmony
METAL PANEL / METAL
6.a
Packet Pg. 62
Attachment: LPC Submittal_2015_July_08 (3325 : Review of Development Proposal - Downtown Hotel)
Downtown Fort Collins Hotel
LPC Submittal
page 23
Perforated panel as lyrical
immediate effect
understandable
Vocals
The panel, located always in high visibility / high touch
areas and possessing a dramatic and interesting effect,
will be a tangible effect which is immediately and viscerally
understood.
It will be an opportunity to bring intimate hand-scaled de-
tail to the guest, and it will always be placed near the hand.
Compositional Language of the Facades
Materiality, Rhythm & Harmony
PERFORATED SCREEN
6.a
Packet Pg. 63
Attachment: LPC Submittal_2015_July_08 (3325 : Review of Development Proposal - Downtown Hotel)
Downtown Fort Collins Hotel
LPC Submittal
page 24
Downtown Fort Collins Hotel
LPC Submittal
page 24
The screen satisfies two desires:
6.a
Packet Pg. 64
Attachment: LPC Submittal_2015_July_08 (3325 : Review of Development Proposal - Downtown Hotel)
Downtown Fort Collins Hotel
LPC Submittal
page 25
1: a want to incorporate a historical sense of
detail and filigree,
2: a want to exploit the great beauty of Colorado Light
6.a
Packet Pg. 65
Attachment: LPC Submittal_2015_July_08 (3325 : Review of Development Proposal - Downtown Hotel)
Downtown Fort Collins Hotel
LPC Submittal
page 26
The perforated concrete screen in Clifford Museum
softens, modulates and articulates intense Colorado light.
The Aspen Art Museum and CSU’s
Danforth Chapel play with light as
well....
6.a
Packet Pg. 66
Attachment: LPC Submittal_2015_July_08 (3325 : Review of Development Proposal - Downtown Hotel)
Downtown Fort Collins Hotel
LPC Submittal
page 27
6.a
Packet Pg. 67
Attachment: LPC Submittal_2015_July_08 (3325 : Review of Development Proposal - Downtown Hotel)
Downtown Fort Collins Hotel
LPC Submittal
page 28
Elevation: South East (Chestnut Street)
60’ -0”
49’ -2”
Brick Stone Perforated Metal Screen Metal Panel
6.a
Packet Pg. 68
Attachment: LPC Submittal_2015_July_08 (3325 : Review of Development Proposal - Downtown Hotel)
Downtown Fort Collins Hotel
LPC Submittal
page 29
Elevation: South West (Walnut Street)
60’ -0”
49’ -2”
Brick Metal Panel Stone Perforated Metal Screen
6.a
Packet Pg. 69
Attachment: LPC Submittal_2015_July_08 (3325 : Review of Development Proposal - Downtown Hotel)
Downtown Fort Collins Hotel
LPC Submittal
page 30
Elevation : Courtyards
Courtyard: North West
Courtyard: South East
Brick Metal Panel Perforated Metal Screen
Perforated Metal Screen Brick Metal Panel
6.a
Packet Pg. 70
Attachment: LPC Submittal_2015_July_08 (3325 : Review of Development Proposal - Downtown Hotel)
Downtown Fort Collins Hotel
LPC Submittal
page 31
Elevation: North West (City Parcel/Service Alley)
60’ -0”
49’ -2”
Brick Metal Panel Perforated Metal Screen
6.a
Packet Pg. 71
Attachment: LPC Submittal_2015_July_08 (3325 : Review of Development Proposal - Downtown Hotel)
Downtown Fort Collins Hotel
LPC Submittal
page 32
Elevation:North East (Firehouse Alley)
60’ -0”
Metal Panel Brick Stone Perforated Metal Screen Metal Panel
6.a
Packet Pg. 72
Attachment: LPC Submittal_2015_July_08 (3325 : Review of Development Proposal - Downtown Hotel)
Downtown Fort Collins Hotel
LPC Submittal
page 33
elevation of Mitchell Building Setback:
49’ - 6” +/-
elevation of Mitchell Building parapet:
60’ - 6” +/-
elevation of hotel parapet:
60’ - 0” +/-
elevation of Hotel Setback:
49’ - 2” +/-
60’ -0”
49’ -2”
49’ -6” +/-
60’ -6” +/-
6.a
Packet Pg. 73
Attachment: LPC Submittal_2015_July_08 (3325 : Review of Development Proposal - Downtown Hotel)
Downtown Fort Collins Hotel
LPC Submittal
page 34
Designing on a Gradient
Old Town
River District
chestnut st elevation
6.a
Packet Pg. 74
Attachment: LPC Submittal_2015_July_08 (3325 : Review of Development Proposal - Downtown Hotel)
Downtown Fort Collins Hotel
LPC Submittal
page 35
Jefferson Street
Chestnut street
Walnut street
Mountain Ave.
OLD TOWN RIVER DISTRICT
Garage Site
How can we relate to both?
How can we add to both?
Bridging two distinct zones
6.a
Packet Pg. 75
Attachment: LPC Submittal_2015_July_08 (3325 : Review of Development Proposal - Downtown Hotel)
Downtown Fort Collins Hotel
LPC Submittal
page 36
6.a
Packet Pg. 76
Attachment: LPC Submittal_2015_July_08 (3325 : Review of Development Proposal - Downtown Hotel)
Downtown Fort Collins Hotel
LPC Submittal
page 37
6.a
Packet Pg. 77
Attachment: LPC Submittal_2015_July_08 (3325 : Review of Development Proposal - Downtown Hotel)
Downtown Fort Collins Hotel
LPC Submittal
page 38
Firehouse alley
20’ - 0”
2nd floor
3rd floor
4th floor
5th floor
Lounge Patio Garage
Retail
15’
11’ - 4”
6’
24’ +/-
49’ - 6”
29’ - 10”
12’
Section of Fire House Alley side:
6.a
Packet Pg. 78
Attachment: LPC Submittal_2015_July_08 (3325 : Review of Development Proposal - Downtown Hotel)
Agenda Item 7
Item # 7 Page 1
STAFF REPORT July 8, 2015
Landmark Preservation Commission
PROJECT NAME
POLICY ON NAMING CITY-OWNED FACILITIES
STAFF
Karen McWilliams, Historic Preservation Planner
PROJECT INFORMATION
PROJECT DESCRIPTION: The Landmark Preservation Commission is being asked for its
recommendation to City Council on the City’s proposed naming policies
pertaining to City-owned facilities, including streets, parks, recreational
facilities, cultural facilities, trails and civic buildings.
APPLICANT: Dan Weinheimer, Policy and Project Manager
EXECUTIVE SUMMARY
On July 21, 2015, Council will be considering proposals that would amend the existing codes or administrative
policies regarding the official naming of city-owned facilities, including streets, parks, recreational facilities, cultural
facilities, trails and civic buildings. The purpose of a naming policy is to establish a systematic and consistent
approach for official naming. At this meeting, staff is seeking a recommendation from the Landmark Preservation
Commission to City Council on proposed changes to the City’s naming policy for properties and facilities.
7
Packet Pg. 79
Packet Pg. 33
Attachment: 1st Bank_Mural Wall Presentation (3324 : First Bank Mural, 100 South College Avenue)