Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout05/14/2015 - Planning And Zoning Board - Agenda - Regular MeetingJennifer Carpenter, Chair City Council Chambers
Kristin Kirkpatrick, Vice Chair City Hall West
Jeff Hansen 300 Laporte Avenue
Gerald Hart Fort Collins, Colorado
Emily Heinz
Michael Hobbs Cablecast on City Cable Channel 14
Jeffrey Schneider on the Comcast cable system
The City of Fort Collins will make reasonable accommodations for access to City services, programs, and activities
and will make special communication arrangements for persons with disabilities. Please call 221-6515 (TDD 224-
6001) for assistance.
Regular Hearing
May 14, 2015
• ROLL CALL
• AGENDA REVIEW
• CITIZEN PARTICIPATION (30 minutes total for non-agenda topics)
• CONSENT AGENDA
1. Draft April 9, 2015, P&Z Hearing Minutes
The purpose of this item is to review and approve the Draft April 9, 2015, Planning and Zoning
Board Hearing Minutes.
• DISCUSSION AGENDA
2. CSU Parking Lot at Research Boulevard SPAR #150002
PROJECT
DESCRIPTION:
This a request for a Site Plan Advisory Review (SPAR) by Colorado State
University to construct a new surface parking lot at 2400 Research Boulevard
(parcel #'s 9723300901and 9723400906). The parking lot will contain
approximately 900 parking stalls, with access points on Research Boulevard,
Centre Avenue and Gillette Drive.
Parcel 9723300901 is approximately 7.5 acres (area shown with the white
background the vicinity map) and is located in the Employment (E) zone district.
The second parcel is approximately 3.5 acres and is on the CSU south campus.
Planning and Zoning
Board Agenda
Planning and Zoning Board Page 1 May 14, 2015
1
This portion of the project has remained in the Fourth College Annexation, and in
Board of Governor's ownership from 1965 to today, and is not subject to a SPAR
review. The total project area is approximately 11 acres. The 7.5 acre parcel in
the Employment zone is a part of the CSURF Centre for Advanced Technology
Overall Development Plan (ODP). A copy of this ODP is attached with this staff
report.
APPLICANT: David Hansen
Colorado State University Landscape Architect
Facilities Management
6030 Campus Delivery
Fort Collins, CO 80523
3. CSU South College Parking Garage SPAR #150003
PROJECT
DESCRIPTION:
This is a request for a Site Plan Advisory Review (SPAR) by Colorado State
University to construct a new parking garage adjacent to the CSU campus
(Parcel #9714413904). The site is located at the southeast corner of West Pitkin
Street and the Mason BRT. The site is 2.6 acres and is located in the
Community Commercial (CC) zone district.
The proposed garage is four stories with a total of approximately 662 parking
spaces. The garage will replace an existing portion of a CSU surface parking lot,
resulting in a net gain of approximately 450 parking spaces. The University
Alumni Center and University Square office buildings are adjacent to the
structure to the east while the Mason Trail and MAX BRT are adjacent to the
west. The structure would be managed by CSU Parking and Transportation
Services (PTS) and access would require a permit or meter payment.
A proposed CSU Medical Center is located south of this parking garage at the
northwest corner of Prospect and College, and will likely utilize a portion of the
garage parking spaces. The Medical Center building will be submitted to the
Planning and Zoning Board as a separate project and is also subject to a SPAR
review.
APPLICANT: David Hansen
Colorado State University Landscape Architect
Facilities Management
6030 Campus Delivery
Fort Collins, CO 80523
4. 2015 Spring Round of the Bi-Annual Revisions, Clarifications and Additions to the Land Use Code
PROJECT
DESCRIPTION:
This is a request for a Recommendation to City Council regarding the bi-annual
update to the Land Use Code. There are proposed revisions, clarifications and
additions to the Code that address a variety of subject areas that have arisen
since the last bi-annual update in December of 2014.
APPLICANT: City of Fort Collins
5. Harmony & Strauss Cabin Convenience Shopping Center
PROJECT
DESCRIPTION:
This is a request for a Project Development Plan (PDP) for commercial
development on 13 acres located at the southeast corner of East Harmony Road
and Strauss Cabin Road in the H-C, Harmony Corridor zone district. The project
proposes 9 buildings, with potential uses of bank, restaurant, retail, and health
and membership club. Buildings are one and two stories. Total proposed floor
area is 84,000 square feet. The plan includes improvements to the Harmony
Road & Strauss Cabin Road intersection.
City of Fort Collins Page 2
2
APPLICANT: Joseph J Kish
Post Modern Development
144 N Mason St. Unit #4
Fort Collins, CO 80524
• OTHER BUSINESS
• ADJOURNMENT
City of Fort Collins Page 3
3
Agenda Item 1
AGENDA ITEM SUMMARY May 14, 2015
Planning and Zoning Board
STAFF
Cindy Cosmas, Administrative Assistant
SUBJECT
Draft April 9, 2015, P&Z Hearing Minutes
EXECUTIVE SUMMARY
The purpose of this item is to review and approve the Draft April 9, 2015, Planning and Zoning Board Hearing
Minutes.
ATTACHMENTS
1. Draft April 9, 2015, P&Z Minutes (DOC)
Item # 1 Page 1
4
Jennifer Carpenter, Chair City Council Chambers
Kristin Kirkpatrick, Vice Chair City Hall West
Jeff Hansen 300 Laporte Avenue
Gerald Hart Fort Collins, Colorado
Emily Heinz
Michael Hobbs Cablecast on City Cable Channel 14
Jeffrey Schneider on the Comcast cable system
The City of Fort Collins will make reasonable accommodations for access to City services, programs, and activities and will make special
communication arrangements for persons with disabilities. Please call 221-6515 (TDD 224-6001) for assistance.
Regular Hearing
April 9, 2015
Chair Carpenter called the meeting to order at 6:00 p.m.
Roll Call: Carpenter, Kirkpatrick, Hansen, Hart, Heinz, Hobbs and Schneider
Absent: None
Staff Present: Kadrich, Eckman, Gloss, Beals, Everette, Langenberger, Olson, and Cosmas
Agenda Review
Chair Carpenter provided background on the board’s role and what the audience could expect as to the
order of business. She described the following processes:
• While the City staff provides comprehensive information about each project under consideration,
citizen input is valued and appreciated.
• The Board is here to listen to citizen comments. Each citizen may address the Board once for
each item.
• Decisions on development projects are based on judgment of compliance or non-compliance with
city Land Use Code.
• Should a citizen wish to address the Board on items other than what is on the agenda, time will
be allowed for that as well.
• This is a legal hearing, and the Chair will moderate for the usual civility and fairness to ensure
that everyone who wishes to speak can be heard.
Planning and Zoning
Board Minutes
5
Planning & Zoning Board
April 9, 2015
Page 2
Director Kadrich reviewed the items on the Consent and Discussion agendas, and she explained the
process for each. She also explained that 201 E. Elizabeth was removed from the agenda and the
various way citizens can express their opinions on that project.
Public Input on Items Not on the Agenda:
Mark Havens, 215 E. Elizabeth, stated his opposition to the 201 E. Elizabeth project’s intent to convert a
home to a fraternity house and encouraged the City to perform due diligence.
Tom Laupa, 1003 Remington Street, stated that the neighborhood had changed over the years and how
putting in a fraternity house would not be beneficial in the long run.
Amanda Giuliani, 331 Locust Street, stated her frustration with the transitioning of the 201 E. Elizabeth
project and feels that her she does not have a true voice in the process.
Cindy Laupa, 1003 Remington Street, stated that the City codes have not been properly updated to
reflect current parking standards and that they should not be based on 1963 codes.
Jerry Gavaldon, 1252 Solstice, stated his concern with the process for projects such as 201 E. Elizabeth
and feels this process should be reviewed and revised if necessary.
Staff Response
Director Kadrich addressed the citizen’s concerns regarding 201 E. Elizabeth, acknowledging that the
project process had been restarted because it was determined to have been inaccurately submitted.
She also confirmed that she will be reviewing the Planning Department’s internal processes to ensure
similar situations do not occur. She acknowledged the comments that had been received regarding the
parking and occupancy issues related to fraternities. She reminded the group that she, Noah Beals, and
Cameron Gloss would be on hand after this hearing to hear citizen comments and concerns. Chair
Carpenter reiterated those remarks, and she commended Staff on their efforts to make this process as
transparent as possible. Deputy City Attorney Eckman stated that, while there will be a specific process
for this project, the outcome will not be determined by the P&Z Board. The CDNS Director would be
making an administrative decision, and this decision could be appealed to the Zoning Board of Appeals.
Vice Chair Kirkpatrick also stated her empathy with the situation and the related frustrations by both
neighbors and applicants.
Consent Agenda:
1. Draft Minutes from March 12, 2015, P&Z Hearing
Public Input on Consent Agenda:
None noted.
Member Hart made a motion that the Planning and Zoning Board approve the April 9, 2015,
Consent agenda, including the minutes from the March 12, 2015, Planning and Zoning Board
hearing. Member Heinz seconded. Vote: 7:0.
6
Planning & Zoning Board
April 9, 2015
Page 3
Discussion Agenda:
2. Young People’s Learning Center PDP with Additional Permitted Use (APU)
Project: Young People’s Learning Center PDP with Additional Permitted Use (APU)
Project Description: This is a request for approval of a Project Development Plan (PDP) with Addition
of a Permitted Use (APU) for the expansion of the Young Peoples Learning Center. The project is
located at 209 E. Plum St., Fort Collins, CO 80524. The property is split over two zone districts – the
Neighborhood Conservation Medium Density (NCM) district on the eastern lot and the Neighborhood
Conservation Buffer (NCB) district on the western lot.
The project proposes to add approximately 1721 square feet to the second story of the existing building.
Some of the new space would continue to be used for child care purposes, with the rest of the space
dedicated to office use. Child care is permitted in both the NCM and NCB districts, subject to basic
development review. The new use, professional office, is permitted in the NCB district, subject to
Planning and Zoning Board review. Professional offices are not permitted in the NCM district, and so
would require an Addition of Permitted Use (APU).
Additional site and building improvements are proposed to comply with current standards, including the
addition of a trash/recycling enclosure, covered bicycle parking, upgrades to the building’s exterior, and
the relocation of a fence that currently extends beyond the property line. No additional vehicle parking
spaces are proposed, and a Modification of Standard to the off-street parking requirements is requested.
Twenty (20) bicycle parking spaces are proposed.
Recommendation: Approval
Staff and Applicant Presentations
Secretary Cosmas reported that one item had been received since the work session – a hand-drawn
depiction from the Applicant of the proposed building changes.
Planner Everette gave an overall presentation of this project. She included the conditions that would be
present with the APU and the modification to the parking plan. She included some of the public
comments related to the modification request, including citizen concerns over parking, visibility,
combined effect of spillover parking from CSU students, and increased traffic generation.
Heather Griffith, Applicant and Executive Director of the Center, gave a separate presentation of the
project, including a history of the project. She reviewed the reasons behind the proposed expansion, the
benefits of having an on-site child service center, and the logic supporting the number of offices
proposed. She also stated that she is open to suggestions for improvement, and she mentioned that she
doesn’t believe that the future parking will be an issue.
7
Planning & Zoning Board
April 9, 2015
Page 4
Staff/Applicant Response to Citizen Concerns
Board members asked questions on the hours restrictions for both the daycare center and the office
employees. Ms. Griffith responded that she did not anticipate impacts with specific hours of operation
and that the offices may not be open during the same time as the daycare center. Planner Everette also
stated that staff was recommending a limited number of hours for operation to match daycare center and
to preserve compatibility with the neighborhood. Board members also asked about the relationships
between office employees and the daycare center. Ms. Griffith responded that the office employees will
be connected to the daycare center in some type of related capacity (i.e. occupational therapists, speech
therapists, family therapists, etc.). In addition, that space could be utilized by art classrooms or by Front
Range Community College for cohort work with teachers and parents. However, the office space has not
been firmly defined, so it is still unclear as to how many employees will be filling that space. Most of the
employees will be part-time; only the occupational therapist will be present full-time.
Board members also inquired as to what had been considered for a building design. Ms. Griffith
explained that the current design had been developed with the help of the City Design Assistance
program. She also responded to questions about the playground by saying she would prefer not to alter
the parking area to encroach onto the playground; any playground reduction would require removal of
the sand box or trike circle, and she is trying to avoid raising the child care rates. Planner Everette
reviewed the parking space requirements and the changes with consideration to the possible increase in
staffing levels.
Public Input
Dennis Griffith, Owner of the Center, stated that he believes that this project is a great opportunity to
improve the overall beauty of the building. In addition, he stated that the playground is extremely
important, and he is not in favor of reducing this space with more parking area. He believes that the
current parking situation is adequate for both present and future needs.
Jennifer Petrik, 334 East Oak Street, stated her support of this project, because the hours will be very
beneficial to her family with respect to work schedules. She stated that she feels the future increases to
the neighborhood density will be positive in the long run.
Aaron Oberndorf, 3416 Killarney Court, a registered Occupational Therapist, spoke in support of this
project. His reasons included the number of under-privileged families needing flexible hours to promote
parental involvement and that the Center playground is also a part of the therapeutic process.
Jessica Kramer, 637 Peterson Street, has a son who attends this facility. She spoke in support of this
project and the variances they are requesting, because she feels they are appropriate and does not want
to see the size of the playground reduced.
Board Questions and Staff Response
Board members asked more questions about the hours of operation and the traffic considerations. Joe
Olson, City Traffic Operations Department, stated he did not project a significant increase in traffic
generation with this project. There was more discussion of appropriate hours of operations with respect
to family schedules, neighborhood compatibility, and situational needs.
8
Planning & Zoning Board
April 9, 2015
Page 5
Board Deliberation
Member Hobbs stated that the community feeling about this project indicates to him that this is overall a
good project, and he would prefer not to legislate how they run their business. Vice Chair Kirkpatrick
stated her desire to make consistent decisions with this and other projects that promote outside play in
an urban setting. Member Heinz agrees and recognizes that the time frames should not be limited; she
is in favor of the flexibility of hours of operation. Member Schneider stated that he understands the
neighborhood perspective of predictability but also doesn’t want to restrict the hours. Member Hart
would also like to see consistency of hours to promote predictability for neighbors. Member Hansen
questioned whether other impacts are possible, like traffic issues. He also feels that, while the APU is
appropriate and the parking modification appears inconsequential, he still has a concern with the
aesthetic look of the building and its compatibility with the neighborhood. Chair Carpenter does not have
significant issues with reducing the parking restrictions.
Member Hart made a motion that the Planning and Zoning Board approve the Addition of a
Permitted Use request to add a professional office use to the Young People’s Learning Center,
based on the findings of fact and conclusions on page 13 of the Staff Report, in that the request
as amended with dropping condition B, addressing the time of hours of operation, and that the
use complies with Section 1.34(A),(B) and (C) of the Land Use Code, and that, based on Section
1.34 (F) of the LUC, the conditions A and C shall be required. Member Hobbs seconded the
motion. Vice Chair Kirkpatrick asked to amend the motion to indicate that it would be condition C
that would be dropped, not condition B. Member Heinz seconded. Vote: 7:0.
Member Hart made a motion that the Planning and Zoning Board approve the modification of
standard request to Section 3.2.2(K)(1)(h), because the granting of the modification will not be
detrimental to the public good and the plan will not diverge from the standard except in a nominal
and inconsequential way, because the existing parking serving the daycare center has proven to
serve the existing need and the use is not expanding to any substantial degree. Vice Chair
Kirkpatrick seconded the motion. Vote: 7:0.
Member Hart made a motion that the Planning and Zoning Board approve the Young People’s
Learning Center PDP #140012, based upon the findings of fact on pages 12 and 13 of the Staff
Report as amended. Vice Chair Kirkpatrick seconded the motion. Vote: 6:1 with Member Hansen
dissenting.
Member Hobbs made a final comment about the APU and acknowledged that he still believes it is an
excellent overall tool for neighborhood issues.
Other Business
None noted.
The meeting was adjourned at 7:22pm.
Laurie Kadrich, CDNS Director Jennifer Carpenter, Chair
9
Agenda Item 2
STAFF REPORT May 14, 2015
Planning and Zoning Board
PROJECT NAME
CSU PARKING LOT AT RESEARCH BOULEVARD SPAR #150002
STAFF
Jason Holland, City Planner
PROJECT INFORMATION
PROJECT
DESCRIPTION:
This a request for a Site Plan Advisory Review (SPAR) by
Colorado State University to construct a new surface parking lot at
2400 Research Boulevard (parcel #'s 9723300901and
9723400906). The parking lot will contain approximately 900
parking stalls, with access points on Research Boulevard, Centre
Avenue and Gillette Drive.
Parcel 9723300901 is approximately 7.5 acres (area shown with
the white background the vicinity map) and is located in the
Employment (E) zone district. The second parcel is approximately
3.5 acres and is on the CSU south campus. This portion of the
project has remained in the Fourth College Annexation, and in
Board of Governor's ownership from 1965 to today, and is not
subject to a SPAR review. The total project area is approximately
11 acres. The 7.5 acre parcel in the Employment zone is a part of
the CSURF Centre for Advanced Technology Overall Development
Plan (ODP). A copy of this ODP is attached with this staff report.
APPLICANT: David Hansen
Colorado State University Landscape Architect
Facilities Management
6030 Campus Delivery
Fort Collins, CO 80523
OWNER: Board of Governors of the Colorado State University System
01 Administration Building
Fort Collins, CO 80523
RECOMMENDATION: Approval
Item # 2 Page 1
10
Agenda Item 2
EXECUTIVE SUMMARY
COMMENTS:
1. Background:
The surrounding zoning and land uses are as follows:
Direction Zone District Existing Land Uses
North CSU Natural Resources Research Center
(NRRC)
South Employment (E) Offices
East CSU Veterinary Teaching Hospital (CSU South
Campus)
West Employment (E) Existing Offices; Undeveloped Parcel B of
the CSURF Centre for Advanced
Technology Overall Development Plan
In 1965, the entire 11 acre project boundary was included in the Fourth College Annexation.
In 1988, the 7.5 acre portion of the project west of the existing tennis courts was first included in
the Centre for Advanced Technology Master Plan, which received numerous revisions from
1988 to 2012 as the Centre for Advanced Technology Overall Development Plan.
2. Right of Advisory Review:
Colorado Revised Statutes provide two specific references which allow the City to review the
planning and location of public facilities:
Section 31-23-209, C.R.S. provides that no public building shall be constructed or authorized in
a city until the “location, character and extent thereof” has been submitted for approval by the
Planning and Zoning Board. In the case of disapproval, the Planning and Zoning Board shall
communicate its findings to the applicant’s governing body. The disapproval of the Planning
and Zoning Board may be overruled by the Colorado State University Board of Governors by a
vote of not less than two-thirds of its membership.
3. Site Plan Advisory Review Procedures:
The processing and evaluation of Site Plan Advisory Review applications is governed by
Division 2.16 or Article 2 of the Fort Collins Land Use Code. The section further defines the
evaluation criteria for the “location, character and extent” of Site Plan Advisory Review
applications.
Item # 2 Page 2
11
Agenda Item 2
Evaluation criteria:
(1) The site location for the proposed use shall be consistent with the land use
designation described by the City Structure Plan Map, which is an element of the City's
Comprehensive Plan.
(2) The site development plan shall conform to architectural, landscape and other
design standards and guidelines adopted by the applicant's governing body. Absent
adopted design standards and guidelines, the design character of the site development
plan shall be consistent with the stated purpose of the respective land use designation
as set forth in the City's Comprehensive Plan.
(3) The site development plan shall identify the level of functional and visual impacts to
public rights-of-way, facilities and abutting private land caused by the development,
including, but not limited to, streets, sidewalks, utilities, lighting, screening and noise, and
shall mitigate such impacts to the extent reasonably feasible.
4. Evaluation
A. Location (Criterion 1)
The proposed site meets this requirement with a proposed use that is consistent with the
City’s land use designation. The site is within the Employment District, and Parking Lots
are listed as a permitted principal Type 1 use in this district.
B. Character (Criterion 2)
The proposed parking lot meets this requirement by conforming to the landscape and
other design standards established by the Colorado State University Aesthetic Guideline
and CSU Facilities Construction Standards Manual.
The site layout contains four access points - one from Centre Avenue, two from
Research Boulevard, and one from Gillette Drive - in order to provide acceptable traffic
patterns into and out of the site and improve access to the Veterinary Facility. The
proposal provides perimeter sidewalks for access to two Transfort bus routes that
currently serve the area in 15 minute intervals (Routes 7 and 34).
The parking lot layout is similar to the City’s parking lot layout dimensional standards,
providing stall widths of 8.5 feet, lane widths of 24 feet and landscape island widths of 9
feet.
The parking lot’s perimeter and interior are adequately landscaped. Perimeter
landscaping along the Research and Centre frontages is enhanced, serving to both
soften views of the parking and provide a naturalized buffer into the drainage and
detention areas to the west and north. This perimeter buffer is a minimum of 40 feet
along Research and Centre with a deeper buffer on the project site at the southeast
corner of this intersection. The existing trees along this perimeter are proposed to
Item # 2 Page 3
12
Agenda Item 2
remain and be incorporated into the perimeter landscape buffer. All lighting provided will
be fully shielded and down-directional in conformance with CSU standards.
CSU Facilities staff is also coordinating with city staff to meet the City’s detention pond
and bio-swale landscaping standards by providing enhanced, naturalized landscaping
and water infiltration methods.
C. Extent (Criterion 3)
The primary focus has been to mitigate the proposal’s functional and visual impacts to
surrounding transportation infrastructure and utility services.
The impacts were evaluated by CSU and City staff and the following measures were
identified and incorporated into the final plans:
Traffic Operations:
Colorado State University provided a Traffic Impact Study (TIS) that evaluated the
impact of the parking lot on a daily basis (different from the Stadium study that
evaluated the parking lot function on game days).
1) The TIS identified westbound right turn volumes at Drake/Research well in excess
of the volume standards in LCUASS. The daily parking lot traffic will add to this
movement. CSU will construct a new westbound right turn lane on the north side
of Drake Road at the Drake/Research intersection.
2) CSU and City staff will continue to evaluate options for improving the southbound
left turn movement from Research onto Drake. Dual lefts at this location are
identified as needed with the proposed CSU Stadium, which will use this parking
lot on game day. If possible, intersection improvements could include shortening
the existing median on Research and reconfiguring the intersection to incorporate
permanent dual lefts. If not feasible, the dual left movement may be incorporated
operationally with temporary traffic control on game days, without permanent dual
left turn lanes.
3) CSU is coordinating with the City to ensure adequate operations and sight
distance for the access points to the parking lot.
Drainage Features:
4) Based on discussions with City staff, the main drainage area west and north of the
parking lot has been updated to incorporate current City drainage and landscape
practices. Updates incorporated into the SPAR plan include:
a. Removing the proposed concrete drain pan along Research and providing
a more naturalized bio-swale drainage feature that mimics natural
infiltration systems.
b. Providing a more naturalized landscaping theme to complement the bio-
swale design.
c. Partnering with City utilities to provide interpretive signage along the
drainage area.
Item # 2 Page 4
13
Agenda Item 2
d. Providing a more varied detention system with more natural
grading/landform patterns in the detention area.
e. Providing flush landscape islands in some areas of the parking lot (with no
curb and gutter), to provide additional alternative water quality treatment.
Other Considerations:
5) Incorporating an additional perimeter sidewalk along the western edge of the
parking lot to provide additional connectivity to the bus stop on Centre Avenue
and other destinations
6) Incorporation of an enhanced bus stop within the parking lot.
7) Preserving the existing trees along Centre and Research.
5. Neighborhood Meeting:
A neighborhood information meeting was held on April 1, 2015. In general, the focus of the
discussion centered on issues related to potential traffic and other impacts in the immediate
vicinity of the proposed parking lot.
The issues and CSU responses from the neighborhood meeting are summarized as follows:
• Preference for new parking to occur on campus, in parking garages or under
buildings if possible.
CSU acknowledged that this would be a more efficient use of space, but
due to ground water typically present at 12 feet below surface elevations,
and the high cost of underground parking (typically $30,000 per parking
space underground and $15,000 per parking space in structured parking),
the surface spaces proposed are the most feasible option.
• Concern with the impacts on air quality in the immediate vicinity of the proposed
parking lot, and will there be monitoring of air quality at the parking lot.
CSU staff did not comment specifically on whether the proposal would
affect air quality in the area, but did explain that the parking provided is
intended to replace parking lost on campus, due to CSU losing +/-2000
parking spaces with future campus improvements.
• Concern with solar heat gain and preference for light colored asphalt or concrete.
Costs were discussed as a concern with providing an all-concrete parking
lot.
• Concerns with the increase in bus traffic and automobile traffic on Centre,
Research and Drake.
Generally the discussion on this topic acknowledged that there would be an
increase in vehicular traffic and that the multiple access points into the
parking lot helped to mitigate these impacts.
Item # 2 Page 5
14
Agenda Item 2
• Preference for a traffic signal or round-about at the Research / Centre intersection
was expressed.
The general discussion on this topic was that neither of these options was
warranted by the traffic analysis.
• Continued accommodation of parking for the tennis courts was requested.
The general response from CSU staff was that parking spaces for the
tennis courts would be incorporated into the parking lot and that these
spaces would be open to the public and metered. The number of metered
spaces will be based on demand.
• Concern with potential light pollution, preference for less light.
CSU staff explained that the light poles used for the parking lot will likely be
their first use of LED parking lights, that the lights will be shielded, and that
the illumination levels will likely be less than the levels required by City
standards.
• Concern with parking overflow into neighborhoods and a preference that the south
campus be internally parked.
CSU staff explained that that the new parking lot may help mitigate parking
overflow in surrounding neighborhoods.
• Concern with existing on-street parking on Research Blvd. and cars parked in
close proximity to the entrance drives along the west side of Research.
City staff has discussed this concern and is evaluating the impact.
Currently “no parking” signs are in place at these drive entrances.
Additional options such as marking the drive entrance curbs with red paint
are being evaluated.
6. Findings of Fact/Conclusions:
A. The CSU Parking Lot SPAR is subject to evaluation by the Planning and Zoning Board,
pursuant to State Statute Section 31-23-209, C.R.S. and Fort Collins Land Use Code
Section 2.16.
B. The location of the CSU Parking Lot is consistent with the permitted uses described in
the City’s Structure Plan Map, an element of the City’s Comprehensive Plan.
C. The character of the CSU Parking Lot conforms to the landscape and other design
standards and guidelines adopted by CSU.
D. The extent of the proposed CSU Parking Lot is integrated into the surrounding context
Item # 2 Page 6
15
Agenda Item 2
though the use of naturalized drainage features, onsite and perimeter landscaping,
adequate pedestrian circulation, acceptable integration with existing transit routes, and
the construction of a new dedicated right-turn lane on West Drake Road.
E. The proposal is in conformance with the existing CSURF Centre for Advanced
Technology Overall Development Plan (ODP).
RECOMMENDATION:
Staff recommends Planning and Zoning Board approval with the following motion:
Approve the CSU Parking Lot at Research Boulevard, Site Plan Advisory Review #SPA150002
based on the findings of fact.
ATTACHMENTS
1. CSU SPAR Submittal Narrative (PDF)
2. Vicinity Map (PDF)
3. Area Zoning Map (PDF)
4. Site Plan and Response to Staff Comments (PDF)
5. Landscape Plans (PDF)
6. Parking Lot Traffic Study (PDF)
7. Centre for Advanced Technology ODP (PDF)
8. Neighborhood Meeting Notes (PDF)
Item # 2 Page 7
16
Office of Facilities Management
Fort Collins, Colorado 80523‐6030
6030 Campus Delivery
March 18, 2015
Jason Holland
Current Planning
Development Review Center
281 North College Avenue
Fort Collins, CO 80524
RE: CSU Research Boulevard Parking Lot
Dear Jason,
The Research Boulevard Parking lot would be a new +/- 900 space surface lot on the CSU south
campus. As redevelopment occurs in the core of the campus, parking relocates to the periphery of the
campus per the University Master Plan approved by the Board of Governors.
The site is approximately 11 acres in total. The north and portions of the east edges of the project are
adjacent to the Larimer #2 ditch system. Approximately 3.5 acres of the 11 have been under the
continued ownership of Colorado State University. The remaining 7.5 acres have transferred ownership
over the years between Colorado State University and Colorado State University Research Foundation.
Currently all 11 acres are under the ownership and control of Colorado State University and its Board of
Governors.
The proposed parking lot would not only serve the immediate south campus veterinary medical campus
but also the greater campus community. Parking in these lots would be managed by CSU Parking and
Transportation Services and would require permits or payment at meters. Currently there are 2 Transfort
bus routes that serve this area, 1 specifically funded by CSU, with a combined 15 minute headway. The
parking lot as proposed includes a bus pull out area and a shelter with bathrooms at our existing Tennis
Court complex. Users of the lot could access either of these busses and connect to the main campus
via this service.
A new connection between Research Boulevard and the Veterinary Medical Campus is proposed in
these plans. This will allow for greater access to the Medical Campus and supports access for the
Transfort bus system. Future plans of Drake Road suggest that access to the facility from its current
entry point will be greatly limited by a median. This connection becomes a critical access point in the
future for staff and clientele of the campus.
17
This project addresses the Character, Location and Extent requirements of pertinent State Statute and
evolving City of Fort Collins SPAR requirements in the following ways:
Location- the parking lot is situated along two major city collector streets, Research Boulevard to the
West, Centre Avenue to the North. North and East of the project site is the Larimer #2 ditch. East of
the project is the existing CSU Tennis Court Complex.
Character- The project will conform to the landscape, lighting standards, and materials spelled out in the
CSU Aesthetic Guideline and CSU Facilities Construction Standards Manual. Landscape character
would be compatible with the existing west parking lot of the adjacent Veterinary Medical Center and a
mature landscape along Research Boulevard is preserved.
Extent- The site will be a change from existing open space to a paved parking surface. Traffic patterns
are expected to change in the area with the addition of this lot. The parking lot will be in support of
immediately adjacent CSU functions as well as the Main CSU campus.
Sincerely,
David Hansen,
Campus Landscape Architect
Facilities Services Center North
Colorado State University
Fort Collins, Colorado 80523-6030
970.491.0318 970.491.0105 - fax
18
Colorado State University
Beattie Elementary
Rocky Mountain Sr High
Har Shalom Preschool And Kindergarten
Kindercare Learning Centers
Spring Creek Country Day School
Creekside Park
Woodwest Park
Lilac Park
Rolland Moore Community Park
Beattie Park
Spring Creek
«¬287
Bay Rd
Frontage Rd
Shire Ct
Eagle Dr
Sheely Dr
Mcclelland Dr
Redwing Rd
W
a
g
onw
h
eel
D
r
Worthington Ave
Rolland Moore Dr
Birky Pl
Killd
eer Dr
R
o
c
k
y
Mountain
W
a
y
H
i
l
l
P
on
d
R
d
Juniper Ln
A
v
ocet Rd
M
o
r
s
m
Colorado State University
Har Shalom Preschool And Kindergarten
Kindercare Learning Centers
Rocky Mountain Sr High
Woodwest Park
Rolland Moore Community Park
Creekside Park
SpringPark Creek Lilac
Rolland Moore Pond
Bay Rd
Shire Ct
Worthington Ave
Rolland Moore Dr
Birky Pl
Wagonwheel Dr
Sheely Dr
Killdeer Dr
Hi
l
l
P
o
n
d
R
d
Redwing Rd
Avocet Rd
Powderhorn Dr
Mcclelland Dr
Wallenberg Dr
Fl
i
c
k
e
r
D
r
G
il
g
alad
W
a
y
Davidson Dr
Winchester Dr
W
o
r
t
h
i
n
gton Cir
Perennial Ln
Eagle Dr
M
or
RELOCATED
BUS STOP
BUS STOP
BIKE PARKING
BRIDGE
PROPOSED
LIGHTING
454 STALLS
448 STALLS
TENNIS COURTS
EXISTING
DETENTION
BASIN
EXPAND
DETENTION
BASIN
CENTRE AVENUE
GILETTE DRIVE
LARIMER #2 DITCH
RESEARCH BOULEVARD
DRAKE ROAD
BU BUUUS BUU BBBUU US U STOP STO S ST SSTOP SS P
BIK BIKKKKKE KEE KE KKKKKE KKKEE E PAR PAAR PARRRRR AR ARRRRRRRRKING KING K KKKKING KKIN KINNN INN II G
BRID RID RIDD ID IDDDDDDDDGE GE GEE GEEEE G
448 STALLS
TTTE TTE TE TTT NNNNN NNNNNNNN NNNN NNNNISSS ISSSSSS ISSSS IS CCCCCCCCCCCCCCCOOOU OOOU OU OUUUUUUUUU OUURRT RT RRT RRRRRRRRRR SSSSSSSSSSSSSSSSS
EX EEX EEEEE IS ISSS ISSTI TI T NG NNG N
DDE DE DDDEETE TE TENT NT NNT NTT NTIO IO IOO IIONNNNNNN
BA BBAAASI SI S NNNNNNNNNNNNNNN
GI GG LE LEE L TT T EE E EEE DR DRRR DRIV IV IVV IVEEEEEEEEEEE
LARI L R MER MEE ME #2 D DD ITCH ITCHH TCH
BBBAAAASSS NNNNNNNN
FOURTH COLLEGE
ANNEXATION - NOT
SUBJECT TO REVIEW
Q
H
O O
P
L
R
A
G
B
C
L
L
L
L
L
J
J
H
L
LEGEND
A Flag Note Corresponds to CSU Response Letter to City Staff
Dated 4/13/2015
Proposed Underdrain Connections to Bioswales
Proposed Future Sidewalk along the West Side of VTH
RESEARCH BOULEVARD PARKING LOT
Office of Facilities Management
Fort Collins, Colorado 80523‐6030
April 13, 2015
Jason Holland
City Planner
Development Review Center
281 North College Avenue
Fort Collins, CO 80524
RE: Research Boulevard Parking Lot –Review, SPA150002. Response to Staff comments of April 6th, 2015.
Dear Jason,
The Research Boulevard parking lot is still in design, with drawings due to the university and city on April
29th. The general components of the parking lot plan are unchanged in location, and scope from the SPAR
submittal. Specific details regarding the engineering of the lot are being further developed based on city
staff and neighborhood comments. Most of these changes are documented and addressed in the
following responses.
Components of the Master Plan
Beginning with the master plan of the 1970’s, the University began suggesting that parking would eventually
need to move to the periphery of campus creating a more pedestrian friendly core. Forthcoming new
construction on both main and south campus is predominantly occurring on existing surface parking lots.
As these lots come off line, new parking is needed to replace them.
This proposed parking lot would not only serve the immediate south campus veterinary medical campus but
also the greater campus community. Daily access to this lot is leveraged through the use of public
transportation, of which Route 34 is funded exclusively by CSU. In addition to daily University needs, this
parking lot is also a required component of the City/ CSU Stadium IGA.
A new connection between Research Boulevard and the Veterinary Medical Campus is proposed in this
parking lot. This will allow for greater access to the Medical Campus and supports access for the Transfort
bus system. Future plans of Drake Road suggest that access to the facility from its current entry point will
be greatly limited by a median. This connection becomes a critical access point in the future for staff and
clientele of the campus.
Response to Staff Comments - *Note: Comments below are alphabetically coordinated with the attached
parking lot site plan. Please see the site plan for further information.
Planning Services (Jason Holland):
A. Detention and swale slopes should not exceed 4:1. We believe we have capacity in our detention
area to accommodate this adjustment to plan. 4:1 is a maintainable slope and is what CSU would
typically require in design.
B. We believe that the convergence of drive aisles can be managed through a close look at signage
considerations, safely giving priority to the appropriate user.
22
C. Lighting will be provided via full cut-off fixtures as well as a dimming system that has motion
detection on it. Lighting will be via LED fixtures and will meet CSU foot-candle standards.
D. A landscape plant list will be provided as requested. Landscape plant material and design will
meet CSU standards.
Engineering Development Review (Sheri Langenberger)
E. A utility plan as well as a separate site plan set will be provided to the city for approval and signature
per city requirements. These will include all requested information from comments where
applicable.
F. Drive and sidewalk modifications along Centre Avenue and Research Boulevard will meet LCUAS
requirements as well as current ADA design standards, and will be constructed as suggested in the
comments.
G. The project engineer will complete a visibility study for the drive aisle off of Centre Avenue. Site
distances will be studied to determine if there is a potential issue.
H. It is the intent that new driveways on Research align with existing driveways to the west. Additional
information will be provided to document this accordingly.
Environmental Planning (Stephanie Blochowiak)
I. Colorado State University is not subject to the Land Codes referenced in these comments as the
area in question is not subject to review. CSU has its own standards that address tree protection,
landscaping, and site lighting. Although different from City code, these standard address the same
issues and have the same intent. We believe that the vegetated storm water quality pond planned
for this property will have much greater ecological benefit than a ditch buffer that will be impacted
annually by ditch maintenance.
J. All existing landscape along Research Boulevard will be maintained in the project. This will be
enhanced with a landscape backdrop that screens the parking lot.
PFA (Jim Lynxweiler)
K. Design Engineer will provide turning templates for the parking lot design to show what has been
accommodated.
Stormwater Engineering (Basil Hamdan)
L. Per the meeting with City staff on 4/08/15. The design team will look at alternative design solutions
to provide a more “naturalized design”. Some strategies discussed were sculpting the detention
area with undulating forms, buffer plantings along slopes of the detention basin. Water quality
plantings and infiltration wells* in the base of the detention providing microclimates. Physical
design changes to allow parking lot sheet flow into landscape islands through cut curbs. These
islands would have underdrains that flow to bioswales where water would be treated. In a joint
23
agreement with city staff, interpretive signage would be provided highlighting the features of the
parking lot design and its benefits to storm water quality as a demonstration project.
*NOTE: In review of the geotechnical report after this meeting, at a depth of about 10’ there
appears to be an impenetrable clay layer. Further discussion needs to be had regarding infiltration
wells and whether they are a feasible design solution as no alluvial layer is immediately apparent.
Technical Services (Jeff County)
No staff comments provided
Traffic Operations (Martina Wilkinson)
M. Sidewalk ramps will be detailed per LCUAS standards
N. Parking lot lane widths will meet CSU standards
O. Intersection improvements along Drake Research are under further evaluation with City staff and
CSU’s traffic consultant as an outcome of the City/ CSU Stadium IGA. An additional lane at Gillette
is potentially feasible. Adjustments to the existing entry island were recently made and may already
accommodate this comment.
P. A sidewalk will be added on the west side of the parking lot this will aid getting users to the
relocated Centre Avenue bus stop as well as existing sidewalks. Outside of the scope of this
project, additional internal sidewalks are to be constructed along the west side of the VTH that will
accommodate access from this parking lot to the main entry of the facility.
Water-Wastewater Engineering (Basil Hamdan)
Q. An irrigation tap will not be needed. CSU has existing irrigation infrastructure at the adjacent
tennis court facility. This infrastructure is tied to our non-potable system and will be expanded to
provide water to the parking lot and streetscape.
R. Grading plans call for 5’ of cover over the existing sanitary line in the bottom of the pond. This was
determined by potholing efforts that were completed for the design.
Sincerely,
David Hansen, LEED AP
Campus Landscape Architect
Facilities Services Center North
Colorado State University
Fort Collins, Colorado 80523-6030
24
25
26
27
28
Traffic Impact Study
Colorado State University
South Campus Parking Lot
Fort Collins, Colorado
Prepared for:
Colorado State University
29
TRAFFIC IMPACT STUDY
Colorado State University
South Campus Parking Lot
Fort Collins, Colorado
Prepared for
Colorado State University
251 Edison Drive
Fort Collins, Colorado 80523
Prepared by
Kimley-Horn and Associates, Inc.
990 South Broadway
Suite 200
Denver, Colorado 80209
(303) 228-2300
February 2015
This document, together with the concepts and designs presented herein, as an instrument of
service, is intended only for the specific purpose and client for which it was prepared. Reuse of
and improper reliance on this document without written authorization and adaptation by Kimley-
Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.
02/10/15
30
Kimley-Horn and Associates, Inc.
096336002 – Colorado State University South Campus Parking Lot Page i
TABLE OF CONTENTS
TABLE OF CONTENTS ................................................................................................... i
APPENDICES .................................................................................................................. i
LIST OF TABLES .............................................................................................................ii
LIST OF FIGURES ...........................................................................................................ii
1.0 INTRODUCTION ....................................................................................................... 1
2.0 EXISTING AND FUTURE CONDITIONS .................................................................. 4
2.1 Study Area and Roadway Network ....................................................................................4
2.2 Existing Roadway and Intersection Configuration ..............................................................4
2.3 Existing Traffic Volumes ....................................................................................................7
2.4 Unspecified Development Traffic Growth ...........................................................................7
3.0 PARKING LOT REDISTRIBUTED TRAFFIC .......................................................... 10
3.1 South Campus Parking Lot Trip Redistribution ................................................................10
3.2 Trip Redistribution ...........................................................................................................11
3.3 Traffic Assignment ...........................................................................................................11
3.4 Total Traffic Volumes .......................................................................................................11
4.0 TRAFFIC OPERATIONS ANALYSIS ...................................................................... 16
4.1 Analysis Methodology ......................................................................................................16
4.2 Key Intersection Operational Analysis .............................................................................17
5.0 CONCLUSIONS AND RECOMMENDATIONS ....................................................... 27
APPENDICES
Appendix A – Intersection Count Sheets
Appendix B – Intersection Analysis Worksheets
Appendix C – Conceptual Site Plan
31
Kimley-Horn and Associates, Inc.
096336002 – Colorado State University South Campus Parking Lot Page ii
LIST OF TABLES
Table 1 – CSU South Campus Parking Lot Trip Generation ......................................................10
Table 2 – Level of Service Definitions .......................................................................................16
Table 3 – 2015 Existing Intersection Delay and Level of Service...............................................17
Table 4 – 2025 Expected Background Intersection Delay and Level of Service ........................18
Table 5 – 2015 Expected Background Plus Project Intersection Delay and Level of Service .....19
Table 6 – 2025 Expected Background Plus Project Intersection Delay and Level of Service .....20
LIST OF FIGURES
Figure 1 – Vicinity Map ................................................................................................................3
Figure 2 – Existing Lanes and Control ........................................................................................6
Figure 3 – Existing Traffic Volumes .............................................................................................8
Figure 4 – 2025 Background Traffic Volumes..............................................................................9
Figure 5 – Project Trip Distribution ............................................................................................12
Figure 6 – Project Traffic Assignment .......................................................................................13
Figure 7 – 2015 Background Plus Project Traffic Volumes ........................................................14
Figure 8 – 2025 Background Plus Project Traffic Volumes ........................................................15
Figure 9 – 2015 Existing Level of Service .................................................................................23
Figure 10 – 2025 Background Expected Level of Service .........................................................24
Figure 11 – 2015 Level of Service with Recommended Improvements .....................................25
Figure 12 – 2025 Level of Service with Recommended Improvements .....................................26
32
Kimley-Horn and Associates, Inc.
096336002 – Colorado State University South Campus Parking Lot Page 1
1.0 INTRODUCTION
Kimley-Horn and Associates, Inc. (Kimley-Horn) has prepared this report to document the
results of a Traffic Impact Study of future traffic conditions associated with the surface parking
lot project to be located at Colorado State University (CSU) South Campus on the southeast
corner of the Centre Avenue and Research Boulevard intersection on the CSU campus in Fort
Collins, Colorado. A vicinity map showing the location of the project site is shown in Figure 1.
Kimley-Horn previously prepared the Parking and Transportation Master Plan (April 2014) which
studied the future traffic conditions associated with the CSU 2020 Transit Plan prepared by
CSU’s parking and transportation management team. The CSU 2020 Transit Plan includes
construction of seven (7) new parking structures on campus which would allow for a net
increase of 5,896 parking spaces available for use by faculty, staff, and students of CSU. CSU
is now proposing to construct an additional on-campus surface parking lot not previously
included in the 2020 Transit Plan at the site of the existing CSU tennis courts. The additional
parking lot is needed based on the projected increase in student admissions and thus
increasing demand for parking on campus as described in the CSU 2020 Transit Plan.
The project is anticipated to develop with a surface parking lot containing up to 1,077 parking
spaces located adjacent to the existing CSU tennis courts. The surface parking lot will have two
access drives off of Research Boulevard, one access off of Centre Avenue, and one access off
of Gilette Drive. It is expected that project construction will be completed within 2015. Analysis
was therefore completed for the 2015 short-term horizon, as well as the 2025 long-term horizon.
A conceptual site plan illustrating the proposed surface parking lot and access locations is
provided in Appendix C.
The purpose of this study is to identify project traffic generation characteristics, to identify
potential project traffic related impacts on the local street system, and to develop mitigation
measures required for identified impacts. The following intersections were incorporated into this
traffic study in accordance with Colorado State University and the City of Fort Collins standards
and requirements:
· Prospect Road and Center Avenue
· Centre Avenue and Shields Street
· Centre Avenue and Research Boulevard
33
Kimley-Horn and Associates, Inc.
096336002 – Colorado State University South Campus Parking Lot Page 2
· Drake Road and Research Boulevard
· Drake Road and Gilette Drive South Campus Access
In addition, the proposed access drives along Centre Avenue, Research Boulevard, and Gilette
Drive were included for evaluation.
34
35
Kimley-Horn and Associates, Inc.
096336002 – Colorado State University South Campus Parking Lot Page 4
2.0 EXISTING AND FUTURE CONDITIONS
The following section outlines existing and future conditions in the vicinity of the CSU South
Campus parking lot.
2.1 Study Area and Roadway Network
The study area is located around the existing CSU tennis courts bound between Centre
Avenue, Research Boulevard, Drake Road, and Gilette Drive. Developed areas of the CSU
South Campus surround the study area and the proposed parking lot. Transportation modes
used by commuters traveling to and from campus include driving, biking, walking, carpooling,
and taking the bus. This study focuses on the driving (automobile) commuters.
2.2 Existing Roadway and Intersection Configuration
The roadways providing access to the CSU South Campus parking lot project are described
below.
Prospect Road
Prospect Road is an arterial roadway at the southern edge of the CSU Main Campus. It
provides two through lanes in each direction, eastbound and westbound, with a posted speed
limit of 35 miles per hour east of Shields Street through the study area. The intersection of
Prospect Road and Center Avenue is signalized with separate left turn lanes on all approaches
along with designated right turn lanes on the northbound and southbound approaches. Two-
way left-turn lanes occur along Prospect Road and on the northbound approach along Centre
Avenue.
Centre Avenue
Centre Avenue provides access between the CSU Main Campus and CSU South Campus. It
provides a single northbound and southbound through lane with a posted speed limit of 35 miles
per hour on the northern portion and 30 miles per hour on the southern portion. The Centre
Avenue intersections with Prospect Road and Shields Street are signalized. A two-way left-turn
lane occurs along Centre Avenue.
36
Kimley-Horn and Associates, Inc.
096336002 – Colorado State University South Campus Parking Lot Page 5
Shields Street
The western boundary of the Colorado State University Main Campus is Shields Street. It
provides two through lanes in each direction (northbound and southbound) with a posted speed
limit of 40 miles per hour.
Research Boulevard
Research Boulevard is a two lane roadway with a posted speed limit of 30 miles per hour. It
provides access to the CSU tennis courts and other South Campus buildings. The Drake
Road/Research Boulevard intersection is signalized with designated left turn lanes on all
approaches. The Centre Avenue/Research Boulevard intersection is unsignalized with stop
control on the northbound approach.
Drake Road
Drake Road is a four lane roadway that has a two-way left-turn lane along almost the entire
length of the roadway from Ziegler Road to Taft Hill Road with a speed limit of 40 miles per
hour. The Drake Road/Gilette Drive Access intersection is unsignalized with stop control on the
southbound approach.
Gilette Drive
Gilette Drive is a north-south roadway providing access through the CSU South Campus.
Gilette Drive is a two lane roadway with a speed limit of 35 mile per hour. A dedicated bike lane
also exists along the entire length of the roadway, from Drake Road to Phemister Road, in both
the north and southbound direction.
The intersection lane configurations and control for the study area are shown in Figure 2.
37
38
Kimley-Horn and Associates, Inc.
096336002 – Colorado State University South Campus Parking Lot Page 7
2.3 Existing Traffic Volumes
Existing peak hour turning movement counts were conducted at the existing study intersections
on Tuesday, January 20, 2015 during the morning and afternoon peak hours. The weekday
counts were conducted in 15-minute intervals during the AM and PM peak hours of adjacent
street traffic from 7:30 AM to 9:30 AM and 3:00 PM to 5:00 PM. These time intervals are
anticipated to coincide with morning and afternoon peaks of CSU traffic. Existing turning
movement counts are shown in Figure 3 with intersection count sheets provided in Appendix
A.
2.4 Unspecified Development Traffic Growth
According to the CSU 2020 Transit Plan, the CSU student population may grow by
approximately 8,000 students, from 27,000 to 35,000 students, which equates to a 29.6 percent
increase between the years of 2013 and 2025. This equates to an annual growth rate of
approximately 2.4 percent per year. Based on this growth factor, the projected automobile 2025
background values for the study’s key intersections have been calculated and are provided in
Figure 4.
39
51(69)
208(79)
229(289)
18(122)
37(154)
16(76)
132(47)
857(902)
94(32)
117(42)
529(839)
276(207)
41(71)
913(902)
273(107)
58(112)
727(1094)
103(89)
104(101)
172(107)
32(122)
31(80)
31(118)
48(169)
28(46)
157(123)
424(155)
44(54)
137(337)
65(205)
38(18)
96(27)
81(44)
10(54)
15(117)
32(167)
62(28)
934(845)
20(19)
169(96)
519(1232)
38(72)
18(64)
14(60)
98(22)
920(1074)
167(30)
715(1350)
10(4)
181(150)
17(7)
88(261)
3(9)
3(7)
73(35)
256(118)
23(14)
42(253)
3(22)
22(86)
65(87)
264(100)
290(366)
23(155)
47(195)
20(96)
167(60)
1086(1143)
119(41)
148(53)
671(1064)
350(262)
52(90)
1157(1143)
346(136)
74(142)
922(1387)
131(113)
132(128)
218(136)
41(155)
39(101)
39(150)
61(214)
35(58)
199(156)
537(196)
56(68)
174(427)
82(260)
48(23)
122(34)
103(56)
13(68)
19(148)
41(212)
79(35)
1184(1071)
25(24)
214(122)
658(1562)
48(91)
23(81)
18(76)
124(28)
1166(1361)
212(38)
906(1711)
13(5)
229(190)
22(9)
112(331)
4(11)
4(9)
93(44)
325(150)
29(18)
53(321)
4(28)
28(109)
Kimley-Horn and Associates, Inc.
096336002 – Colorado State University South Campus Parking Lot Page 10
3.0 PARKING LOT DISTRIBUTED TRAFFIC
3.1 South Campus Parking Lot Trip Distribution
The CSU Parking and Transportation Master Plan used traffic count data from existing CSU
parking lots as well as the number of total existing parking spaces on-campus to calculate
average rates of traffic generated per parking space. It was determined that the existing
average morning and afternoon total trips per parking space on the CSU campus are 0.192 and
0.306 trips per parking space, respectively.
Based on the anticipated CSU population increase of 29.6 percent from 2012 to 2025, it is
expected that the average trips per parking space will also increase over the same time frame.
Future parking structure/lot trip generation rates were determined by multiplying the percent
population increase by the existing averages for trips per parking space. As shown in Table 1,
the total peak hour trips per parking space for the morning and afternoon were calculated to be
0.249 and 0.396 trips per parking space respectively. In other words, 25 percent of the parking
spaces generate a vehicle trip during the morning peak hour and 40 percent of the parking
spaces generate a vehicle trip during the afternoon peak hour.
Based on these calculated trip generation rates, the predicted trip generation for the proposed
CSU South Campus parking lot may be calculated based on the increase of 1,077 parking
spaces to the campus with this project. This increase in parking spaces was used in the trip
generation calculation. Table 1 provides the anticipated increase of vehicle trips entering and
exiting the south campus parking lot during the morning and afternoon peak hours.
Table 1 – CSU South Campus Parking Lot Trip Generation
Parking
Lot
Number
of
Parking
Spaces
Increase in AM Peak Hour
Trips
Increase in PM Peak Hour
Trips
Enter Exit Total Enter Exit Total
0.166
trips/
space
0.083
trips/
space
0.249
trips/
space
0.172
trips/
space
0.224
trips/
space
0.396
trips/
space
South
Campus
Parking Lot 1,077 179 89 268 185 241 426
42
Kimley-Horn and Associates, Inc.
096336002 – Colorado State University South Campus Parking Lot Page 11
3.2 Trip Distribution
The distribution of the traffic generated by the proposed CSU South Campus parking lot onto
the existing street network was based on the area street network characteristics, the existing
traffic patterns and volumes, and the proposed accesses for the CSU South Campus parking
lot. The directional distribution of traffic is a means to quantify the percentage of traffic that
approaches the CSU South Campus parking lot from a given direction and departs the South
Campus parking lot in the original source direction. Figure 5 illustrates the expected trip
redistribution with the proposed CSU South Campus parking lot.
3.3 Traffic Assignment
The 2015 and 2025 proposed CSU South Campus parking lot traffic assignment volumes were
obtained by applying the trip distributions shown in Figure 5 to the projected parking lot trip
generation calculated in Table 1. The resultant 2015 and 2025 parking lot traffic assignment
volumes are provided in Figure 6 for each of the study’s key intersections and the four
proposed CSU South Campus parking lot accesses.
3.4 Total Traffic Volumes
The 2015 and 2025 proposed CSU South Campus parking lot traffic assignment volumes were
then added to the 2015 and 2025 background volumes to find the projected 2015 and 2025 total
traffic volumes. Figures 7 and 8 illustrate the projected total traffic volumes for the 2015 and
2025 horizon years.
43
[15%]
15%
[5%]
5%
[10%]
10%
[10%]
[20%]
10%
20%
[10%]
10%
[10%]
10%
[10%]
[20%]
20%
10%
[10%]
10%
30%
15%
[15%]
[30%]
17%
[17%]
[17%]
[5%]
[10%]
10%
5%
17%
[8%]
[17%]
8%
17%
8%
[8%]
20%
[20%]
[15%]
15%
44
9(24)
4(12)
13(36)
9(9)
18(19)
27(28)
18(19)
36(37)
18(48)
9(24)
18(48)
9(24)
18(19)
36(37)
9(24)
18(19)
9(9)
9(24)
4(12)
15(41)
18(19)
30(31)
7(19)
15(41)
14(15)
30(31)
27(28)
54(56)
27(72)
13(36)
27(28)
30(31)
13(36)
15(41)
9(24)
18(19)
18(19)
36(37)
18(48)
9(24)
14(15)
7(19)
45
60(93)
212(91)
242(325)
18(122)
46(163)
16(76)
132(47)
857(902)
112(51)
117(42)
529(839)
303(235)
41(71)
913(902)
291(126)
58(112)
727(1094)
139(126)
104(101)
172(107)
32(122)
49(128)
31(118)
57(193)
46(94)
166(147)
442(174)
80(91)
146(361)
83(224)
38(18)
105(36)
81(44)
19(78)
19(129)
47(208)
80(47)
934(845)
20(19)
199(127)
519(1232)
38(72)
18(64)
21(79)
98(22)
935(1115)
181(45)
745(1381)
10(4)
181(150)
27(28)
17(7)
88(261)
54(56)
3(9)
3(7)
27(72)
13(36)
73(35)
283(146)
74(111)
268(112)
303(402)
23(155)
56(204)
20(96)
167(60)
1086(1143)
137(60)
148(53)
671(1064)
377(290)
52(90)
1157(1143)
364(155)
74(142)
922(1387)
167(150)
132(128)
218(136)
41(155)
57(149)
39(150)
70(238)
53(106)
208(180)
555(215)
92(105)
183(451)
100(279)
48(23)
131(43)
103(56)
22(92)
23(160)
56(253)
97(54)
1184(1071)
25(24)
244(153)
658(1562)
48(91)
23(81)
25(95)
124(28)
1181(1402)
226(53)
936(1742)
13(5)
229(190)
27(28)
22(9)
112(331)
54(56)
4(11)
4(9)
27(72)
13(36)
93(44)
352(178)
Kimley-Horn and Associates, Inc.
096336002 – Colorado State University South Campus Parking Lot Page 16
4.0 TRAFFIC OPERATIONS ANALYSIS
An analysis of traffic operations in the site vicinity was conducted to determine potential capacity
deficiencies in the 2015 and 2025 development horizons at the identified key intersections. The
acknowledged source for determining overall capacity is the current edition of the Highway
Capacity Manual (HCM)1.
4.1 Analysis Methodology
Capacity analysis results are listed in terms of Level of Service (LOS). LOS is a qualitative term
describing operating conditions a driver will experience while traveling on a particular street or
highway during a specific time interval. It ranges from A (very little delay) to F (long delays and
congestion). For intersections and roadways in this study area, LOS D is recommended as the
minimum threshold for acceptable operation. Table 2 shows the definition of LOS for signalized
and unsignalized intersections.
Table 2 – Level of Service Definitions
Level of
Service
Signalized Intersection
Average Total Delay
(sec/veh)
Unsignalized Intersection
Average Total Delay
(sec/veh)
A ≤ 10 ≤ 10
B > 10 and ≤ 20 > 10 and ≤ 15
C > 20 and ≤ 35 > 15 and ≤ 25
D > 35 and ≤ 55 > 25 and ≤ 35
E > 55 and ≤ 80 > 35 and ≤ 50
F > 80 > 50
_______________
Definitions provided from the Highway Capacity Manual, Special Report 209, Transportation Research Board, 2010.
The study’s key intersections were analyzed based on average total delay analysis for
signalized and unsignalized intersections. Under the unsignalized analysis, the LOS for a two-
way stop controlled intersection is determined by the computed or measured control delay and
is defined for each minor movement. LOS for a two-way stop-controlled intersection is not
defined for the intersection as a whole. LOS for a signalized and four-way stop controlled
intersection is defined for each approach and for the intersection.
1 Transportation Research Board, Highway Capacity Manual, Special Report 209, Washington DC, 2010.
48
Kimley-Horn and Associates, Inc.
096336002 – Colorado State University South Campus Parking Lot Page 17
4.2 Key Intersection Operational Analysis
Calculations for the level of service at the key intersections for the study area are provided in
Appendix B. The existing 2015 analysis is based on the lane geometry and intersection control
shown in Figure 2. All signalized intersection analyses utilize the existing observed 110-second
cycle lengths and existing signal phasing of the intersection provided by the City of Fort Collins.
LOS for the intersections was calculated using Synchro analysis software reporting the HCM
results. A summary of the existing intersection delay and LOS is provided in Table 3 and
summarized graphically in Figure 9. A summary of the background intersection delay and LOS
in 2025 is provided in Table 4 and summarized graphically in Figure 10. A summary of the
expected intersection delay and LOS in 2015 and 2025 with the proposed project is provided in
Tables 5 and 6 and summarized graphically in Figures 11 and 12.
Table 3 – Existing Intersection Delay and Level of Service
Intersection
AM Peak Hour PM Peak Hour
Delay
(sec/veh) LOS
Delay
(sec/veh) LOS
Prospect/Center 24.9 C 23.4 C
Shields/Centre 21.7 C 25.8 C
Centre/Research
Westbound Left 9.1 A 8.3 A
Northbound Approach 17.0 C 12.5 B
Drake/Research 14.9 B 19.1 B
Drake/Gilette Access
Eastbound Left 6.1 A 2.3 A
Southbound Approach 17.0 C 67.6 F
Research North Access
Eastbound Approach 10.0 B 11.2 B
Northbound Left 7.5 A 7.9 A
Research South Access
Eastbound Approach 10.0 B 12.6 B
Northbound Left 7.5 A 8.0 A
49
Kimley-Horn and Associates, Inc.
096336002 – Colorado State University South Campus Parking Lot Page 18
Table 4 – 2025 Expected Background Intersection Delay and Level of Service
Intersection
AM Peak Hour PM Peak Hour
Delay
(sec/veh) LOS
Delay
(sec/veh) LOS
Prospect/Center 50.0 D 33.0 C
Shields/Centre 36.9 D 40.7 D
Centre/Research
Westbound Left 9.9 A 8.8 A
Northbound Approach 29.4 D 15.4 C
Drake/Research 16.5 B 23.5 C
Drake/Gilette Drive Access
Eastbound Left 11.4 B 4.8 A
Southbound Approach 24.0 C 360.1 F
Research North Access
Eastbound Approach 10.7 B 12.3 B
Northbound Approach 7.6 A 8.1 A
Research South Access
Eastbound Approach 11.0 B 15.5 C
Northbound Left 7.6 A 8.3 A
50
Kimley-Horn and Associates, Inc.
096336002 – Colorado State University South Campus Parking Lot Page 19
Table 5 – 2015 Expected Background Plus Project Intersection Delay and Level of Service
Intersection
AM Peak Hour PM Peak Hour
Delay
(sec/veh) LOS
Delay
(sec/veh) LOS
Prospect/Center 28.7 C 25.6 C
Shields/Centre 23.3 C 27.7 C
Centre/Research
Westbound Left 9.5 A 8.7 A
Northbound Approach 19.1 C 16.6 C
Drake/Research 15.9 B 21.5 C
Drake/Gilette Drive Access
Eastbound Left 6.5 A 2.4 A
Southbound Approach 19.3 C 122.4 F
Drake/Gilette Drive Access #
Eastbound Left 6.5 A 2.4 A
Southbound Left 26.6 C 70.1 F
Southbound Right 13.9 B 21.7 C
Research North Access
Eastbound Approach 11.5 B 14.1 B
Westbound Approach 11.3 B 12.6 B
Northbound Left 7.5 A 7.9 A
Southbound Left 7.9 A 7.8 A
Research South Access
Eastbound Left 12.2 B 14.5 B
Eastbound Right 8.7 A 10.7 B
Westbound Approach 19.7 C 28.6 D
Northbound Left 7.6 A 8.1 A
Centre Access
Westbound Approach 15.4 C 15.0 C
Southbound Left 9.1 A 8.1 A
Gilette Access
Eastbound Approach 8.8 A 8.7 A
Westbound Approach 9.6 A 9.4 A
Northbound Left 7.5 A 7.4 A
Southbound Left 7.4 A 7.4 A
# Southbound designated left turn and right turn lanes
51
Kimley-Horn and Associates, Inc.
096336002 – Colorado State University South Campus Parking Lot Page 20
Table 6 – 2025 Expected Background Plus Project Intersection Delay and Level of Service
Intersection
AM Peak Hour PM Peak Hour
Delay
(sec/veh) LOS
Delay
(sec/veh) LOS
Prospect/Center 57.2 E 39.2 D
Prospect/Center * 58.9 E 48.3 D
Shields/Centre 44.6 D 45.8 D
Centre/Research
Westbound Left 10.5 A 9.3 A
Northbound Approach 37.2 E 25.0 C
Drake/Research 18.7 B 27.0 C
Drake/Gilette Drive Access
Eastbound Left 12.4 B 5.2 A
Southbound Approach 28.3 D 522.6 F
Drake/Gilette Drive Access #
Eastbound Left 12.4 B 5.2 A
Southbound Left 33.0 D 306.3 F
Southbound Right 23.5 C 40.7 E
Research North Access
Eastbound Approach 12.5 B 16.2 C
Westbound Approach 12.3 B 14.2 B
Northbound Left 7.8 A 8.1 A
Southbound Left 8.1 A 7.9 A
Research South Access
Eastbound Left 14.3 B 18.0 C
Eastbound Right 8.8 A 11.6 B
Westbound Approach 26.3 D 51.4 F
Northbound Left 7.7 A 8.4 A
Centre Access
Westbound Approach 19.0 C 18.6 C
Southbound Left 9.7 A 8.3 A
Gilette Access
Eastbound Approach 9.0 A 8.8 A
Westbound Approach 9.9 A 9.6 A
Northbound Left 7.5 A 7.4 A
Southbound Left 7.5 A 7.4 A
* Northbound and southbound dual left turn lanes
# Southbound designated left turn and right turn lanes
52
Kimley-Horn and Associates, Inc.
096336002 – Colorado State University South Campus Parking Lot Page 21
The intersections with LOS values of E or below were analyzed in further detail. These
analyses provide recommendations for what improvements may be needed at the intersections
to improve the LOS, allowing them to better handle the anticipated 2015 and 2025 traffic
volumes. The following provides a description of the recommended intersection improvements
for consideration by CSU and the City of Fort Collins:
Drake Road and Gilette Drive Access
The only capacity deficiency found during the existing condition is the southbound approach of
Gillette Drive to Drake Road during the afternoon peak hour. To improve the Drake Road/Gilette
Drive unsignalized intersection, the southbound Gilette Drive Access approach would benefit
from a separate left turn and right turn lanes. Currently there is one shared left turn/right turn
lane with a width of roughly 20 feet. With separate left turn and right turn lanes, long delays on
the southbound could still occur. If delays are too excessive for drivers it is expected that traffic
will reroute on the street network. Otherwise, a traffic signal could be considered at this
intersection. It is located approximately halfway (approximately 800 feet) between the Drake
Road/Research Boulevard and Drake Road/Redwing Road signalized intersections.
Research Boulevard South Access
With the completion of the CSU South Campus parking lot, the existing Research Boulevard
south driveway that provides access to the tennis courts will be modified to provide access to
the parking lot. It is recommended that the approach be constructed with a sufficient width to
include separate shared left turn/through and right turn lanes. It is anticipated that the
eastbound approach from the credit union will also function with two approach lanes as well
since it has an adequate driveway width. In addition, it is recommended that the southbound
Research Boulevard approach be restriped to include a left turn lane to shadow the northbound
left turn lane. It is believed that a left turn lane length of 75 feet would be sufficient. With this
configuration, acceptable level of service is anticipated for all movements with the addition of
the parking lot traffic in the near term 2015 horizon. In the 2025 horizon, the westbound left turn
movement may operate at a 51 second LOS F during the afternoon peak hour. It is believed
that during times of heavy adjacent street traffic, drivers will reroute on the street network. This
will occur either by vehicles turning right at this access or by traffic suing alternate driveways
from the parking lot.
53
Kimley-Horn and Associates, Inc.
096336002 – Colorado State University South Campus Parking Lot Page 22
Prospect Road and Center Avenue
By 2025, the existing signalized intersection of Prospect Road and Center Avenue may operate
at LOS E. This intersection was also identified as operating with poor LOS in the Parking and
Transportation Master Plan (April 2014), prepared by Kimley-Horn, which studied the future
traffic conditions associated with the CSU 2020 Transit Plan prepared by CSU’s parking and
transportation management team. Within the previous study it was recommended that the
northbound and southbound approaches include dual left turn lanes.
The above mentioned improvements at the Drake Road/Gilette Drive Access, Research
Boulevard/South Access, and Prospect Road/Center Avenue intersections were incorporated
into the operational analysis. The expected intersection delay and LOS in 2015 and 2025 with
the project and the recommended intersection improvements for each of the study’s key
intersections is provided in Tables 5 and 6 previously and summarized graphically in Figures
11 and 12.
54
55
56
57
58
Kimley-Horn and Associates, Inc.
096336002 – Colorado State University South Campus Parking Lot Page 27
5.0 CONCLUSIONS AND RECOMMENDATIONS
Based on the analysis presented in this report, Kimley-Horn believes the proposed CSU South
Campus parking lot project will be successfully incorporated into the roadway network. The
proposed South Campus Parking Lot project development and expected traffic volumes resulted
in the following recommendations:
· The access proposed for the surface parking lot project is recommended to include four
full movement access driveways; two access drives off of Research Boulevard, one
access off of Centre Avenue, and one access off of Gilette Drive.
· At the proposed Centre Avenue access, the westbound approach exiting the parking lot
is recommended to have a combined left turn/right turn lane. It is recommended that this
approach operate with stop control with the installation of a R1-1 “STOP” sign.
· At the proposed access along Gilette Drive, the eastbound approach exiting the
development is recommended to have a combined left turn/through/right turn lane. It is
believed that a new access to the parking lot on the east side of Gilette Drive will be
constructed to align with this access. It is recommended that the parking lot approaches
operate with stop control with the installation of R1-1 “STOP” signs.
· With the completion of the South Campus Parking Lot, an access will be located to align
with the existing Centre Tech development. This Research Boulevard North Access will
include a stop controlled westbound approach and is recommended to have a combined
left turn/through/right turn lane. It is recommended that this approach operate with stop
control with the installation of a R1-1 “STOP” sign.
· The existing access to the tennis courts along Research Boulevard will be reconstructed
with the parking lot project. It is recommended that the westbound approach exiting the
parking lot include shared left turn/through lane and a separate right turn lane. It is
recommended that this approach operate with stop control with the installation of a R1-1
“STOP” sign. It is further recommended that southbound Research Boulevard include
59
Kimley-Horn and Associates, Inc.
096336002 – Colorado State University South Campus Parking Lot Page 28
restriping a 75-foot left turn lane at the access to shadow the existing northbound left
turn lane.
· To improve the Drake Road/Gilette Drive Access unsignalized intersection, the
southbound Gilette Drive Access approach would benefit from designating separate left
turn and right turn lanes. Currently there is one shared approach lane with a width of
approximately 20 feet which could be striped to provide two 10-foot turn lanes.
· To improve LOS conditions in the 2025 horizon at the intersection of Prospect
Road/Center Avenue and remain consistent with the Parking and Transportation Master
Plan (April 2014), prepared by Kimley-Horn, it is recommended that the northbound and
southbound approaches be constructed with dual left turn lanes.
· All on-site and off-site signing and striping improvements should be incorporated into the
project civil drawings, and conform to City of Fort Collins standards as well as the
Manual on Uniform Traffic Control Devices – 2009 Edition (MUTCD).
60
Kimley-Horn and Associates, Inc.
096336002 – Colorado State University South Campus Parking Lot
APPENDICES
61
Kimley-Horn and Associates, Inc.
096336002 – Colorado State University South Campus Parking Lot
APPENDIX A
Intersection Count Sheets
62
File Name : CentreResearchAM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 1
Fort Collins, CO
CSU South Parking Lot
AM Peak
Centre Ave and Research Blvd
Groups Printed- Unshifted
Centre Ave
Eastbound
Centre Ave
Westbound
Research Blvd
Northbound
Start Time Thru Right App. Total Left Thru App. Total Left Right App. Total Int. Total
07:30 AM 133 10 143 15 28 43 8 36 44 230
07:45 AM 136 2 138 17 38 55 10 58 68 261
Total 269 12 281 32 66 98 18 94 112 491
08:00 AM 79 21 100 17 32 49 7 36 43 192
08:15 AM 76 11 87 16 39 55 3 27 30 172
08:30 AM 111 11 122 16 34 50 13 31 44 216
08:45 AM 96 14 110 20 36 56 20 30 50 216
Total 362 57 419 69 141 210 43 124 167 796
09:00 AM 51 7 58 18 42 60 4 30 34 152
09:15 AM 57 6 63 10 21 31 7 27 34 128
Grand Total 739 82 821 129 270 399 72 275 347 1567
Apprch % 90 10 32.3 67.7 20.7 79.3
Total % 47.2 5.2 52.4 8.2 17.2 25.5 4.6 17.5 22.1
Morrison, CO 80465
63
File Name : CentreResearchAM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 2
Fort Collins, CO
CSU South Parking Lot
AM Peak
Centre Ave and Research Blvd
Centre Ave
Centre Ave
Research Blvd
Thru
270
Left
129
Out In Total
1014 399 1413
Left
72
Right
275
Out In Total
211 347 558
Thru
739
Right
82
Out In Total
342 821 1163
1/20/2015 07:30 AM
1/20/2015 09:15 AM
Unshifted
North
Morrison, CO 80465
64
File Name : CentreResearchAM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 3
Fort Collins, CO
CSU South Parking Lot
AM Peak
Centre Ave and Research Blvd
Centre Ave
Eastbound
Centre Ave
Westbound
Research Blvd
Northbound
Start Time Thru Right App. Total Left Thru App. Total Left Right App. Total Int. Total
Peak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:30 AM
07:30 AM 133 10 143
15 28 43 8 36 44 230
07:45 AM 136
2 138 17
38 55 10 58 68 261
08:00 AM 79 21
100 17 32 49 7 36 43 192
08:15 AM 76 11 87 16 39
55 3 27 30 172
Total Volume 424 44 468 65 137 202 28 157 185 855
% App. Total 90.6 9.4 32.2 67.8 15.1 84.9
PHF .779 .524 .818 .956 .878 .918 .700 .677 .680 .819
Centre Ave
Centre Ave
Research Blvd
Thru
137
Left
65
Out In Total
581 202 783
Left
28
Right
157
Out In Total
109 185 294
Thru
424
Right
44
Out In Total
165 468 633
Peak Hour Begins at 07:30 AM
Unshifted
Peak Hour Data
North
Morrison, CO 80465
65
File Name : CentreResearchAM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 4
Fort Collins, CO
CSU South Parking Lot
AM Peak
Centre Ave and Research Blvd
Image 1
Morrison, CO 80465
66
File Name : CentreResearchPM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 1
Fort Collins, CO
CSU South Parking Lot
PM Peak
Centre Ave and Research Blvd
Groups Printed- Unshifted
Centre Ave
Eastbound
Centre Ave
Westbound
Research Blvd
Northbound
Start Time Thru Right App. Total Left Thru App. Total Left Right App. Total Int. Total
03:00 PM 54 17 71 41 54 95 11 19 30 196
03:15 PM 41 17 58 36 71 107 17 28 45 210
03:30 PM 53 17 70 40 77 117 11 31 42 229
03:45 PM 53 23 76 43 66 109 11 12 23 208
Total 201 74 275 160 268 428 50 90 140 843
04:00 PM 34 20 54 42 72 114 14 34 48 216
04:15 PM 33 13 46 52 85 137 13 28 41 224
04:30 PM 45 12 57 57 81 138 8 26 34 229
04:45 PM 43 9 52 54 99 153 11 35 46 251
Total 155 54 209 205 337 542 46 123 169 920
Grand Total 356 128 484 365 605 970 96 213 309 1763
Apprch % 73.6 26.4 37.6 62.4 31.1 68.9
Total % 20.2 7.3 27.5 20.7 34.3 55 5.4 12.1 17.5
Morrison, CO 80465
67
File Name : CentreResearchPM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 2
Fort Collins, CO
CSU South Parking Lot
PM Peak
Centre Ave and Research Blvd
Centre Ave
Centre Ave
Research Blvd
Thru
605
Left
365
Out In Total
569 970 1539
Left
96
Right
213
Out In Total
493 309 802
Thru
356
Right
128
Out In Total
701 484 1185
1/20/2015 03:00 PM
1/20/2015 04:45 PM
Unshifted
North
Morrison, CO 80465
68
File Name : CentreResearchPM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 3
Fort Collins, CO
CSU South Parking Lot
PM Peak
Centre Ave and Research Blvd
Centre Ave
Eastbound
Centre Ave
Westbound
Research Blvd
Northbound
Start Time Thru Right App. Total Left Thru App. Total Left Right App. Total Int. Total
Peak Hour Analysis From 03:00 PM to 04:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:00 PM
04:00 PM 34 20
54 42 72 114 14
34 48
216
04:15 PM 33 13 46 52 85 137 13 28 41 224
04:30 PM 45
12 57 57
81 138 8 26 34 229
04:45 PM 43 9 52 54 99 153
11 35
46 251
Total Volume 155 54 209 205 337 542 46 123 169 920
% App. Total 74.2 25.8 37.8 62.2 27.2 72.8
PHF .861 .675 .917 .899 .851 .886 .821 .879 .880 .916
Centre Ave
Centre Ave
Research Blvd
Thru
337
Left
205
Out In Total
278 542 820
Left
46
Right
123
Out In Total
259 169 428
Thru
155
Right
54
Out In Total
383 209 592
Peak Hour Begins at 04:00 PM
Unshifted
Peak Hour Data
North
Morrison, CO 80465
69
File Name : CentreResearchPM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 4
Fort Collins, CO
CSU South Parking Lot
PM Peak
Centre Ave and Research Blvd
Image 1
Morrison, CO 80465
70
File Name : CentreShieldsAM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 1
Fort Collins, CO
CSU South Parking Lot
AM Peak
Centre Ave and Shields St
Groups Printed- Unshifted
Centre Ave
Eastbound
Centre Ave
Westbound
Shields St
Northbound
Shields St
Southbound
Start Time Left Thru Right
App.
Total
Left Thru Right
App.
Total
Left Thru Right
App.
Total
Left Thru Right
App.
Total
Int.
Total
07:30 AM 45 45 8 98 12 1 12 25 9 263 82 354 26 204 6 236 713
07:45 AM 23 69 4 96 10 7 7 24 9 278 81 368 36 176 15 227 715
Total 68 114 12 194 22 8 19 49 18 541 163 722 62 380 21 463 1428
08:00 AM 18 30 13 61 12 9 4 25 14 188 50 252 21 163 21 205 543
08:15 AM 18 28 7 53 14 14 8 36 9 184 60 253 20 184 16 220 562
08:30 AM 26 23 5 54 19 9 13 41 22 234 81 337 23 198 13 234 666
08:45 AM 19 27 9 55 16 18 17 51 20 203 69 292 33 209 23 265 663
Total 81 108 34 223 61 50 42 153 65 809 260 1134 97 754 73 924 2434
09:00 AM 12 15 12 39 22 14 7 43 26 222 48 296 16 137 15 168 546
09:15 AM 21 21 21 63 9 12 13 34 26 176 41 243 9 150 27 186 526
Grand Total 182 258 79 519 114 84 81 279 135 1748 512 2395 184 1421 136 1741 4934
Apprch % 35.1 49.7 15.2 40.9 30.1 29 5.6 73 21.4 10.6 81.6 7.8
Total % 3.7 5.2 1.6 10.5 2.3 1.7 1.6 5.7 2.7 35.4 10.4 48.5 3.7 28.8 2.8 35.3
Morrison, CO 80465
71
File Name : CentreShieldsAM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 2
Fort Collins, CO
CSU South Parking Lot
AM Peak
Centre Ave and Shields St
Shields St
Centre Ave
Centre Ave
Shields St
Right
136
Thru
1421
Left
184
Out In Total
2011 1741 3752
Right
81
Thru
84
Left
114
Out In Total
954 279 1233
Left
135
Thru
1748
Right
512
Out In Total
1614 2395 4009
Left
182
Thru
258
Right
79
Out In Total
355 519 874
1/20/2015 07:30 AM
1/20/2015 09:15 AM
Unshifted
North
Morrison, CO 80465
72
File Name : CentreShieldsAM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 3
Fort Collins, CO
CSU South Parking Lot
AM Peak
Centre Ave and Shields St
Centre Ave
Eastbound
Centre Ave
Westbound
Shields St
Northbound
Shields St
Southbound
Start Time Left Thru Right
App.
Total
Left Thru Right
App.
Total
Left Thru Right
App.
Total
Left Thru Right
App.
Total
Int.
Total
Peak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:30 AM
07:30 AM 45
45 8 98
12 1 12
25 9 263 82
354 26 204
6 236
713
07:45 AM 23 69
4 96 10 7 7 24 9 278
81 368 36
176 15 227 715
08:00 AM 18 30 13
61 12 9 4 25 14
188 50 252 21 163 21
205 543
08:15 AM 18 28 7 53 14 14
8 36
9 184 60 253 20 184 16 220 562
Total
Volume
104 172 32 308 48 31 31 110 41 913 273 1227 103 727 58 888 2533
% App.
Total
33.8 55.8 10.4 43.6 28.2 28.2 3.3 74.4 22.2 11.6 81.9 6.5
PHF .578 .623 .615 .786 .857 .554 .646 .764 .732 .821 .832 .834 .715 .891 .690 .941 .886
Shields St
Centre Ave
Centre Ave
File Name : CentreShieldsAM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 4
Fort Collins, CO
CSU South Parking Lot
AM Peak
Centre Ave and Shields St
Image 1
Morrison, CO 80465
74
File Name : CentreShieldsPM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 1
Fort Collins, CO
CSU South Parking Lot
PM Peak
Centre Ave and Shields St
Groups Printed- Unshifted
Centre Ave
Eastbound
Centre Ave
Westbound
Shields St
Northbound
Shields St
Southbound
Start Time Left Thru Right
App.
Total
Left Thru Right
App.
Total
Left Thru Right
App.
Total
Left Thru Right
App.
Total
Int.
Total
03:00 PM 28 17 34 79 39 18 27 84 13 250 36 299 15 233 22 270 732
03:15 PM 28 19 32 79 44 18 17 79 11 237 26 274 16 268 19 303 735
03:30 PM 35 63 42 140 51 34 18 103 15 185 39 239 22 245 27 294 776
03:45 PM 19 19 35 73 34 21 20 75 23 240 40 303 34 300 38 372 823
Total 110 118 143 371 168 91 82 341 62 912 141 1115 87 1046 106 1239 3066
04:00 PM 20 13 22 55 47 35 17 99 19 236 15 270 17 258 27 302 726
04:15 PM 27 12 23 62 37 28 25 90 14 241 13 268 16 291 20 327 747
04:30 PM 21 16 9 46 49 30 31 110 16 222 21 259 9 245 21 275 690
04:45 PM 26 8 20 54 50 36 28 114 14 226 24 264 14 300 31 345 777
Total 94 49 74 217 183 129 101 413 63 925 73 1061 56 1094 99 1249 2940
Grand Total 204 167 217 588 351 220 183 754 125 1837 214 2176 143 2140 205 2488 6006
Apprch % 34.7 28.4 36.9 46.6 29.2 24.3 5.7 84.4 9.8 5.7 86 8.2
Total % 3.4 2.8 3.6 9.8 5.8 3.7 3 12.6 2.1 30.6 3.6 36.2 2.4 35.6 3.4 41.4
Morrison, CO 80465
75
File Name : CentreShieldsPM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 2
Fort Collins, CO
CSU South Parking Lot
PM Peak
Centre Ave and Shields St
Shields St
Centre Ave
Centre Ave
Shields St
Right
205
Thru
2140
Left
143
Out In Total
2224 2488 4712
Right
183
Thru
220
Left
351
Out In Total
524 754 1278
Left
125
Thru
1837
Right
214
Out In Total
2708 2176 4884
Left
204
Thru
167
Right
217
Out In Total
550 588 1138
1/20/2015 03:00 PM
1/20/2015 04:45 PM
Unshifted
North
Morrison, CO 80465
76
File Name : CentreShieldsPM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 3
Fort Collins, CO
CSU South Parking Lot
PM Peak
Centre Ave and Shields St
Centre Ave
Eastbound
Centre Ave
Westbound
Shields St
Northbound
Shields St
Southbound
Start Time Left Thru Right
App.
Total
Left Thru Right
App.
Total
Left Thru Right
App.
Total
Left Thru Right
App.
Total
Int.
Total
Peak Hour Analysis From 03:00 PM to 04:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 03:30 PM
03:30 PM 35 63 42 140 51
34 18 103
15 185 39 239 22 245 27 294 776
03:45 PM 19 19 35 73 34 21 20 75 23
240 40 303 34 300 38 372 823
04:00 PM 20 13 22 55 47 35
17 99 19 236 15 270 17 258 27 302 726
04:15 PM 27 12 23 62 37 28 25
90 14 241
13 268 16 291 20 327 747
Total
Volume
101 107 122 330 169 118 80 367 71 902 107 1080 89 1094 112 1295 3072
% App.
Total
30.6 32.4 37 46 32.2 21.8 6.6 83.5 9.9 6.9 84.5 8.6
PHF .721 .425 .726 .589 .828 .843 .800 .891 .772 .936 .669 .891 .654 .912 .737 .870 .933
Shields St
Centre Ave
Centre Ave
Shields St
Right
112
Thru
1094
Left
89
Out In Total
File Name : CentreShieldsPM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 4
Fort Collins, CO
CSU South Parking Lot
PM Peak
Centre Ave and Shields St
Image 1
Morrison, CO 80465
78
File Name : DrakeResearchAM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 1
Fort Collins, CO
CSU South Parking Lot
AM Peak
Drake Rd and Research Blvd
Groups Printed- Unshifted
Drake Rd
Eastbound
Drake Rd
Westbound
Research Blvd
Northbound
Research Blvd
Southbound
Start Time Left Thru Right
App.
Total
Left Thru Right
App.
Total
Left Thru Right
App.
Total
Left Thru Right
App.
Total
Int.
Total
07:30 AM 9 285 2 296 5 113 39 157 6 34 15 55 9 4 1 14 522
07:45 AM 23 242 0 265 13 166 60 239 6 31 21 58 7 3 1 11 573
Total 32 527 2 561 18 279 99 396 12 65 36 113 16 7 2 25 1095
08:00 AM 17 195 6 218 4 108 44 156 13 18 11 42 4 6 5 15 431
08:15 AM 13 212 12 237 16 132 26 174 13 13 34 60 12 2 3 17 488
08:30 AM 9 231 3 243 7 151 29 187 10 24 18 52 11 6 2 19 501
08:45 AM 20 263 5 288 5 166 35 206 4 24 11 39 28 4 1 33 566
Total 59 901 26 986 32 557 134 723 40 79 74 193 55 18 11 84 1986
09:00 AM 11 191 4 206 10 121 17 148 3 14 15 32 15 5 8 28 414
09:15 AM 3 187 8 198 6 124 33 163 1 12 7 20 19 3 7 29 410
Grand Total 105 1806 40 1951 66 1081 283 1430 56 170 132 358 105 33 28 166 3905
Apprch % 5.4 92.6 2.1 4.6 75.6 19.8 15.6 47.5 36.9 63.3 19.9 16.9
Total % 2.7 46.2 1 50 1.7 27.7 7.2 36.6 1.4 4.4 3.4 9.2 2.7 0.8 0.7 4.3
Morrison, CO 80465
79
File Name : DrakeResearchAM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 2
Fort Collins, CO
CSU South Parking Lot
AM Peak
Drake Rd and Research Blvd
Research Blvd
Drake Rd
Drake Rd
Research Blvd
Right
28
Thru
33
Left
105
Out In Total
558 166 724
Right
283
Thru
1081
Left
66
Out In Total
2043 1430 3473
Left
56
Thru
170
Right
132
Out In Total
139 358 497
Left
105
Thru
1806
Right
40
Out In Total
1165 1951 3116
1/20/2015 07:30 AM
1/20/2015 09:15 AM
Unshifted
North
Morrison, CO 80465
80
File Name : DrakeResearchAM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 3
Fort Collins, CO
CSU South Parking Lot
AM Peak
Drake Rd and Research Blvd
Drake Rd
Eastbound
Drake Rd
Westbound
Research Blvd
Northbound
Research Blvd
Southbound
Start Time Left Thru Right
App.
Total
Left Thru Right
App.
Total
Left Thru Right
App.
Total
Left Thru Right
App.
Total
Int.
Total
Peak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:30 AM
07:30 AM 9 285
2 296
5 113 39 157 6 34
15 55 9 4 1 14 522
07:45 AM 23
242 0 265 13 166 60 239
6 31 21 58 7 3 1 11 573
08:00 AM 17 195 6 218 4 108 44 156 13
18 11 42 4 6 5
15 431
08:15 AM 13 212 12
237 16
132 26 174 13 13 34 60 12
2 3 17
488
Total
Volume
62 934 20 1016 38 519 169 726 38 96 81 215 32 15 10 57 2014
% App.
Total
6.1 91.9 2 5.2 71.5 23.3 17.7 44.7 37.7 56.1 26.3 17.5
PHF .674 .819 .417 .858 .594 .782 .704 .759 .731 .706 .596 .896 .667 .625 .500 .838 .879
Research Blvd
Drake Rd
Drake Rd
Research Blvd
Right
10
File Name : DrakeResearchAM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 4
Fort Collins, CO
CSU South Parking Lot
AM Peak
Drake Rd and Research Blvd
Image 1
Morrison, CO 80465
82
File Name : DrakeResearchPM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 1
Fort Collins, CO
CSU South Parking Lot
PM Peak
Drake Rd and Research Blvd
Groups Printed- Unshifted
Drake Rd
Eastbound
Drake Rd
Westbound
Research Blvd
Northbound
Research Blvd
Southbound
Start Time Left Thru Right
App.
Total
Left Thru Right
App.
Total
Left Thru Right
App.
Total
Left Thru Right
App.
Total
Int.
Total
03:00 PM 4 209 18 231 21 260 21 302 10 5 13 28 43 24 14 81 642
03:15 PM 7 217 6 230 7 255 40 302 9 8 22 39 44 15 9 68 639
03:30 PM 8 229 8 245 14 277 26 317 5 8 10 23 34 19 7 60 645
03:45 PM 5 240 6 251 13 335 24 372 4 3 13 20 36 20 16 72 715
Total 24 895 38 957 55 1127 111 1293 28 24 58 110 157 78 46 281 2641
04:00 PM 12 200 3 215 22 285 24 331 5 9 9 23 45 32 12 89 658
04:15 PM 4 221 6 231 14 326 27 367 2 6 12 20 40 26 16 82 700
04:30 PM 7 184 4 195 23 286 21 330 7 9 10 26 46 39 10 95 646
04:45 PM 5 206 10 221 21 356 21 398 4 7 10 21 33 21 13 67 707
Total 28 811 23 862 80 1253 93 1426 18 31 41 90 164 118 51 333 2711
Grand Total 52 1706 61 1819 135 2380 204 2719 46 55 99 200 321 196 97 614 5352
Apprch % 2.9 93.8 3.4 5 87.5 7.5 23 27.5 49.5 52.3 31.9 15.8
Total % 1 31.9 1.1 34 2.5 44.5 3.8 50.8 0.9 1 1.8 3.7 6 3.7 1.8 11.5
Morrison, CO 80465
83
File Name : DrakeResearchPM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 2
Fort Collins, CO
CSU South Parking Lot
PM Peak
Drake Rd and Research Blvd
Research Blvd
Drake Rd
Drake Rd
Research Blvd
Right
97
Thru
196
Left
321
Out In Total
311 614 925
Right
204
Thru
2380
Left
135
Out In Total
2126 2719 4845
Left
46
Thru
55
Right
99
Out In Total
392 200 592
Left
52
Thru
1706
Right
61
Out In Total
2523 1819 4342
1/20/2015 03:00 PM
1/20/2015 04:45 PM
Unshifted
North
Morrison, CO 80465
84
File Name : DrakeResearchPM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 3
Fort Collins, CO
CSU South Parking Lot
PM Peak
Drake Rd and Research Blvd
Drake Rd
Eastbound
Drake Rd
Westbound
Research Blvd
Northbound
Research Blvd
Southbound
Start Time Left Thru Right
App.
Total
Left Thru Right
App.
Total
Left Thru Right
App.
Total
Left Thru Right
App.
Total
Int.
Total
Peak Hour Analysis From 03:00 PM to 04:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 03:45 PM
03:45 PM 5 240 6 251
13 335
24 372
4 3 13
20 36 20 16
72 715
04:00 PM 12
200 3 215 22 285 24 331 5 9
9 23 45 32 12 89 658
04:15 PM 4 221 6 231 14 326 27
367 2 6 12 20 40 26 16 82 700
04:30 PM 7 184 4 195 23
286 21 330 7
9 10 26 46 39
10 95
646
Total
Volume
28 845 19 892 72 1232 96 1400 18 27 44 89 167 117 54 338 2719
% App.
Total
3.1 94.7 2.1 5.1 88 6.9 20.2 30.3 49.4 49.4 34.6 16
PHF .583 .880 .792 .888 .783 .919 .889 .941 .643 .750 .846 .856 .908 .750 .844 .889 .951
Research Blvd
Drake Rd
Drake Rd
Research Blvd
Right
File Name : DrakeResearchPM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 4
Fort Collins, CO
CSU South Parking Lot
PM Peak
Drake Rd and Research Blvd
Image 1
Morrison, CO 80465
86
File Name : DrakeSouthCampusAM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 1
Fort Collins, CO
CSU South Parking Lot
AM Peak
Drake Rd and South Campus Access
Groups Printed- Unshifted
Drake Rd
Eastbound
Drake Rd
Westbound
South Campus Access
Southbound
Start Time Left Thru App. Total Thru Right App. Total Left Right App. Total Int. Total
07:30 AM 26 280 306 158 40 198 3 4 7 511
07:45 AM 35 226 261 228 55 283 3 10 13 557
Total 61 506 567 386 95 481 6 14 20 1068
08:00 AM 19 186 205 200 43 243 3 1 4 452
08:15 AM 18 228 246 129 29 158 5 3 8 412
08:30 AM 9 260 269 179 14 193 0 4 4 466
08:45 AM 4 298 302 204 25 229 3 5 8 539
Total 50 972 1022 712 111 823 11 13 24 1869
09:00 AM 10 207 217 152 19 171 0 2 2 390
09:15 AM 9 204 213 155 18 173 4 5 9 395
Grand Total 130 1889 2019 1405 243 1648 21 34 55 3722
Apprch % 6.4 93.6 85.3 14.7 38.2 61.8
Total % 3.5 50.8 54.2 37.7 6.5 44.3 0.6 0.9 1.5
Morrison, CO 80465
87
File Name : DrakeSouthCampusAM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 2
Fort Collins, CO
CSU South Parking Lot
AM Peak
Drake Rd and South Campus Access
South Campus Access
Drake Rd
Drake Rd
Right
34
Left
21
Out In Total
373 55 428
Right
243
Thru
1405
Out In Total
1910 1648 3558
Left
130
Thru
1889
Out In Total
1439 2019 3458
1/20/2015 07:30 AM
1/20/2015 09:15 AM
Unshifted
North
Morrison, CO 80465
88
File Name : DrakeSouthCampusAM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 3
Fort Collins, CO
CSU South Parking Lot
AM Peak
Drake Rd and South Campus Access
Drake Rd
Eastbound
Drake Rd
Westbound
South Campus Access
Southbound
Start Time Left Thru App. Total Thru Right App. Total Left Right App. Total Int. Total
Peak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:30 AM
07:30 AM 26 280 306
158 40 198 3 4 7 511
07:45 AM 35
226 261 228 55 283
3 10 13 557
08:00 AM 19 186 205 200 43 243 3 1 4 452
08:15 AM 18 228 246 129 29 158 5
3 8 412
Total Volume 98 920 1018 715 167 882 14 18 32 1932
% App. Total 9.6 90.4 81.1 18.9 43.8 56.2
PHF .700 .821 .832 .784 .759 .779 .700 .450 .615 .867
South Campus Access
Drake Rd
Drake Rd
Right
18
Left
14
Out In Total
265 32 297
Right
167
Thru
715
Out In Total
934 882 1816
Left
98
Thru
920
Out In Total
733 1018 1751
Peak Hour Begins at 07:30 AM
Unshifted
Peak Hour Data
North
Morrison, CO 80465
89
File Name : DrakeSouthCampusAM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 4
Fort Collins, CO
CSU South Parking Lot
AM Peak
Drake Rd and South Campus Access
Image 1
Morrison, CO 80465
90
File Name : DrakeSouthCampusPM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 1
Fort Collins, CO
CSU South Parking Lot
PM Peak
Drake Rd and South Campus Access
Groups Printed- Unshifted
Drake Rd
Eastbound
Drake Rd
Westbound
South Campus Access
Southbound
Start Time Left Thru App. Total Thru Right App. Total Left Right App. Total Int. Total
03:00 PM 5 262 267 307 6 313 19 5 24 604
03:15 PM 6 282 288 294 6 300 7 7 14 602
03:30 PM 3 270 273 304 6 310 14 7 21 604
03:45 PM 4 291 295 371 7 378 10 4 14 687
Total 18 1105 1123 1276 25 1301 50 23 73 2497
04:00 PM 8 251 259 311 12 323 20 29 49 631
04:15 PM 7 262 269 364 5 369 16 24 40 678
04:30 PM 5 241 246 287 14 301 24 23 47 594
04:45 PM 5 248 253 386 9 395 25 21 46 694
Total 25 1002 1027 1348 40 1388 85 97 182 2597
Grand Total 43 2107 2150 2624 65 2689 135 120 255 5094
Apprch % 2 98 97.6 2.4 52.9 47.1
Total % 0.8 41.4 42.2 51.5 1.3 52.8 2.7 2.4 5
Morrison, CO 80465
91
File Name : DrakeSouthCampusPM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 2
Fort Collins, CO
CSU South Parking Lot
PM Peak
Drake Rd and South Campus Access
South Campus Access
Drake Rd
Drake Rd
Right
120
Left
135
Out In Total
108 255 363
Right
65
Thru
2624
Out In Total
2242 2689 4931
Left
43
Thru
2107
Out In Total
2744 2150 4894
1/20/2015 03:00 PM
1/20/2015 04:45 PM
Unshifted
North
Morrison, CO 80465
92
File Name : DrakeSouthCampusPM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 3
Fort Collins, CO
CSU South Parking Lot
PM Peak
Drake Rd and South Campus Access
Drake Rd
Eastbound
Drake Rd
Westbound
South Campus Access
Southbound
Start Time Left Thru App. Total Thru Right App. Total Left Right App. Total Int. Total
Peak Hour Analysis From 03:00 PM to 04:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 03:30 PM
03:30 PM 3 270 273 304 6 310 14 7 21 604
03:45 PM 4 291 295 371
7 378
10 4 14 687
04:00 PM 8
251 259 311 12
323 20 29 49
631
04:15 PM 7 262 269 364 5 369 16 24 40 678
Total Volume 22 1074 1096 1350 30 1380 60 64 124 2600
% App. Total 2 98 97.8 2.2 48.4 51.6
PHF .688 .923 .929 .910 .625 .913 .750 .552 .633 .946
South Campus Access
Drake Rd
Drake Rd
Right
64
Left
60
Out In Total
52 124 176
Right
30
Thru
1350
Out In Total
1134 1380 2514
Left
22
Thru
1074
Out In Total
1414 1096 2510
Peak Hour Begins at 03:30 PM
Unshifted
Peak Hour Data
North
Morrison, CO 80465
93
File Name : DrakeSouthCampusPM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 4
Fort Collins, CO
CSU South Parking Lot
PM Peak
Drake Rd and South Campus Access
Image 1
Morrison, CO 80465
94
File Name : GiletteAM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 1
Fort Collins, CO
CSU South Parking Lot
AM Peak
Gilette Dr North/Southbound only
Groups Printed- Unshifted
Gilette Dr
Northbound
Gilette Dr
Southbound
Start Time Thru App. Total Thru App. Total Int. Total
07:30 AM 24 24 27 27 51
07:45 AM 13 13 44 44 57
Total 37 37 71 71 108
08:00 AM 29 29 14 14 43
08:15 AM 11 11 14 14 25
08:30 AM 11 11 8 8 19
08:45 AM 16 16 8 8 24
Total 67 67 44 44 111
09:00 AM 13 13 6 6 19
09:15 AM 10 10 6 6 16
Grand Total 127 127 127 127 254
Apprch % 100 100
Total % 50 50 50 50
Morrison, CO 80465
95
File Name : GiletteAM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 2
Fort Collins, CO
CSU South Parking Lot
AM Peak
Gilette Dr North/Southbound only
Gilette Dr
Gilette Dr
Thru
127
Out In Total
127 127 254
Thru
127
Out In Total
127 127 254
1/20/2015 07:30 AM
1/20/2015 09:15 AM
Unshifted
North
Morrison, CO 80465
96
File Name : GiletteAM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 3
Fort Collins, CO
CSU South Parking Lot
AM Peak
Gilette Dr North/Southbound only
Gilette Dr
Northbound
Gilette Dr
Southbound
Start Time Thru App. Total Thru App. Total Int. Total
Peak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:30 AM
07:30 AM 24 24 27 27 51
07:45 AM 13 13 44 44 57
08:00 AM 29 29
14 14 43
08:15 AM 11 11 14 14 25
Total Volume 77 77 99 99 176
% App. Total 100 100
PHF .664 .664 .563 .563 .772
Gilette Dr
Gilette Dr
Thru
99
Out In Total
77 99 176
Thru
77
Out In Total
99 77 176
Peak Hour Begins at 07:30 AM
Unshifted
Peak Hour Data
North
Morrison, CO 80465
97
File Name : GiletteAM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 4
Fort Collins, CO
CSU South Parking Lot
AM Peak
Gilette Dr North/Southbound only
Image 1
Morrison, CO 80465
98
File Name : GilettePM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 1
Fort Collins, CO
CSU South Parking Lot
PM Peak
Gilette North/Southbound Only
Groups Printed- Unshifted
Gilette Dr
Northbound
Gilette Dr
Southbound
Start Time Thru App. Total Thru App. Total Int. Total
03:00 PM 8 8 14 14 22
03:15 PM 6 6 6 6 12
03:30 PM 13 13 11 11 24
03:45 PM 8 8 7 7 15
Total 35 35 38 38 73
04:00 PM 11 11 24 24 35
04:15 PM 11 11 10 10 21
04:30 PM 15 15 14 14 29
04:45 PM 21 21 17 17 38
Total 58 58 65 65 123
Grand Total 93 93 103 103 196
Apprch % 100 100
Total % 47.4 47.4 52.6 52.6
Morrison, CO 80465
99
File Name : GilettePM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 2
Fort Collins, CO
CSU South Parking Lot
PM Peak
Gilette North/Southbound Only
Gilette Dr
Gilette Dr
Thru
103
Out In Total
93 103 196
Thru
93
Out In Total
103 93 196
1/20/2015 03:00 PM
1/20/2015 04:45 PM
Unshifted
North
Morrison, CO 80465
100
File Name : GilettePM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 3
Fort Collins, CO
CSU South Parking Lot
PM Peak
Gilette North/Southbound Only
Gilette Dr
Northbound
Gilette Dr
Southbound
Start Time Thru App. Total Thru App. Total Int. Total
Peak Hour Analysis From 03:00 PM to 04:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:00 PM
04:00 PM 11 11 24 24
35
04:15 PM 11 11 10 10 21
04:30 PM 15 15 14 14 29
04:45 PM 21 21
17 17 38
Total Volume 58 58 65 65 123
% App. Total 100 100
PHF .690 .690 .677 .677 .809
Gilette Dr
Gilette Dr
Thru
65
Out In Total
58 65 123
Thru
58
Out In Total
65 58 123
Peak Hour Begins at 04:00 PM
Unshifted
Peak Hour Data
North
Morrison, CO 80465
101
File Name : GilettePM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 4
Fort Collins, CO
CSU South Parking Lot
PM Peak
Gilette North/Southbound Only
Image 1
Morrison, CO 80465
102
File Name : ProspectCenterAM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 1
Fort Collins, CO
CSU South Parking Lot
AM Peak
Prospect Rd and Center Ave
Groups Printed- Unshifted
Prospect Rd
Eastbound
Prospect Rd
Westbound
Center Ave
Northbound
Center Ave
Southbound
Start Time Left Thru Right
App.
Total
Left Thru Right
App.
Total
Left Thru Right
App.
Total
Left Thru Right
App.
Total
Int.
Total
07:30 AM 43 203 26 272 61 157 36 254 11 58 70 139 4 5 3 12 677
07:45 AM 52 258 29 339 97 134 41 272 19 77 76 172 5 11 3 19 802
Total 95 461 55 611 158 291 77 526 30 135 146 311 9 16 6 31 1479
08:00 AM 23 201 23 247 54 129 20 203 15 46 40 101 2 8 8 18 569
08:15 AM 14 195 16 225 64 109 20 193 6 27 43 76 5 13 4 22 516
08:30 AM 43 209 25 277 49 146 26 221 11 60 61 132 2 12 5 19 649
08:45 AM 32 246 32 310 53 127 30 210 13 47 69 129 6 11 7 24 673
Total 112 851 96 1059 220 511 96 827 45 180 213 438 15 44 24 83 2407
09:00 AM 34 173 17 224 44 129 33 206 12 47 41 100 5 11 10 26 556
09:15 AM 23 131 5 159 33 137 14 184 17 44 34 95 12 23 22 57 495
Grand Total 264 1616 173 2053 455 1068 220 1743 104 406 434 944 41 94 62 197 4937
Apprch % 12.9 78.7 8.4 26.1 61.3 12.6 11 43 46 20.8 47.7 31.5
Total % 5.3 32.7 3.5 41.6 9.2 21.6 4.5 35.3 2.1 8.2 8.8 19.1 0.8 1.9 1.3 4
Morrison, CO 80465
103
File Name : ProspectCenterAM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 2
Fort Collins, CO
CSU South Parking Lot
AM Peak
Prospect Rd and Center Ave
Center Ave
Prospect Rd
Prospect Rd
Center Ave
Right
62
Thru
94
Left
41
Out In Total
890 197 1087
Right
220
Thru
1068
Left
455
Out In Total
2091 1743 3834
Left
104
Thru
406
Right
434
Out In Total
722 944 1666
Left
264
Thru
1616
Right
173
Out In Total
1234 2053 3287
1/20/2015 07:30 AM
1/20/2015 09:15 AM
Unshifted
North
Morrison, CO 80465
104
File Name : ProspectCenterAM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 3
Fort Collins, CO
CSU South Parking Lot
AM Peak
Prospect Rd and Center Ave
Prospect Rd
Eastbound
Prospect Rd
Westbound
Center Ave
Northbound
Center Ave
Southbound
Start Time Left Thru Right
App.
Total
Left Thru Right
App.
Total
Left Thru Right
App.
Total
Left Thru Right
App.
Total
Int.
Total
Peak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:30 AM
07:30 AM 43 203 26 272 61 157
36 254 11 58 70 139 4 5 3 12 677
07:45 AM 52 258 29 339 97
134 41 272 19 77 76 172 5
11 3 19 802
08:00 AM 23 201 23 247 54 129 20 203 15 46 40 101 2 8 8
18 569
08:15 AM 14 195 16 225 64 109 20 193 6 27 43 76 5 13
4 22
516
Total
Volume
132 857 94 1083 276 529 117 922 51 208 229 488 16 37 18 71 2564
% App.
Total
12.2 79.1 8.7 29.9 57.4 12.7 10.5 42.6 46.9 22.5 52.1 25.4
PHF .635 .830 .810 .799 .711 .842 .713 .847 .671 .675 .753 .709 .800 .712 .563 .807 .799
Center Ave
Prospect Rd
Prospect Rd
Center Ave
Right
18
Thru
37
Left
16
Out In Total
File Name : ProspectCenterAM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 4
Fort Collins, CO
CSU South Parking Lot
AM Peak
Prospect Rd and Center Ave
Image 1
Morrison, CO 80465
106
File Name : ProspectCenterPM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 1
Fort Collins, CO
CSU South Parking Lot
PM Peak
Prospect Rd and Center Ave
Groups Printed- Unshifted
Prospect Rd
Eastbound
Prospect Rd
Westbound
Center Ave
Northbound
Center Ave
Southbound
Start Time Left Thru Right
App.
Total
Left Thru Right
App.
Total
Left Thru Right
App.
Total
Left Thru Right
App.
Total
Int.
Total
03:00 PM 9 198 13 220 42 188 7 237 16 24 80 120 25 37 20 82 659
03:15 PM 14 248 12 274 51 218 12 281 21 13 60 94 25 38 35 98 747
03:30 PM 12 215 8 235 60 192 10 262 17 30 83 130 20 38 29 87 714
03:45 PM 17 241 9 267 43 228 14 285 10 24 68 102 14 30 17 61 715
Total 52 902 42 996 196 826 43 1065 64 91 291 446 84 143 101 328 2835
04:00 PM 4 198 3 205 53 201 6 260 21 12 78 111 17 48 41 106 682
04:15 PM 5 200 8 213 69 259 8 336 22 10 53 85 13 36 21 70 704
04:30 PM 11 195 9 215 40 214 4 258 19 19 74 112 12 45 14 71 656
04:45 PM 9 233 14 256 63 252 12 327 14 15 69 98 16 49 30 95 776
Total 29 826 34 889 225 926 30 1181 76 56 274 406 58 178 106 342 2818
Grand Total 81 1728 76 1885 421 1752 73 2246 140 147 565 852 142 321 207 670 5653
Apprch % 4.3 91.7 4 18.7 78 3.3 16.4 17.3 66.3 21.2 47.9 30.9
Total % 1.4 30.6 1.3 33.3 7.4 31 1.3 39.7 2.5 2.6 10 15.1 2.5 5.7 3.7 11.9
Morrison, CO 80465
107
File Name : ProspectCenterPM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 2
Fort Collins, CO
CSU South Parking Lot
PM Peak
Prospect Rd and Center Ave
Center Ave
Prospect Rd
Prospect Rd
Center Ave
Right
207
Thru
321
Left
142
Out In Total
301 670 971
Right
73
Thru
1752
Left
421
Out In Total
2435 2246 4681
Left
140
Thru
147
Right
565
Out In Total
818 852 1670
Left
81
Thru
1728
Right
76
Out In Total
2099 1885 3984
1/20/2015 03:00 PM
1/20/2015 04:45 PM
Unshifted
North
Morrison, CO 80465
108
File Name : ProspectCenterPM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 3
Fort Collins, CO
CSU South Parking Lot
PM Peak
Prospect Rd and Center Ave
Prospect Rd
Eastbound
Prospect Rd
Westbound
Center Ave
Northbound
Center Ave
Southbound
Start Time Left Thru Right
App.
Total
Left Thru Right
App.
Total
Left Thru Right
App.
Total
Left Thru Right
App.
Total
Int.
Total
Peak Hour Analysis From 03:00 PM to 04:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 03:15 PM
03:15 PM 14 248 12 274
51 218 12 281 21
13 60 94 25
38 35 98 747
03:30 PM 12 215 8 235 60
192 10 262 17 30 83 130
20 38 29 87 714
03:45 PM 17
241 9 267 43 228 14 285
10 24 68 102 14 30 17 61 715
04:00 PM 4 198 3 205 53 201 6 260 21 12 78 111 17 48 41 106
682
Total
Volume
47 902 32 981 207 839 42 1088 69 79 289 437 76 154 122 352 2858
% App.
Total
4.8 91.9 3.3 19 77.1 3.9 15.8 18.1 66.1 21.6 43.8 34.7
PHF .691 .909 .667 .895 .863 .920 .750 .954 .821 .658 .870 .840 .760 .802 .744 .830 .956
Center Ave
Prospect Rd
Prospect Rd
Center Ave
Right
122
Thru
154
Left
File Name : ProspectCenterPM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 4
Fort Collins, CO
CSU South Parking Lot
PM Peak
Prospect Rd and Center Ave
Image 1
Morrison, CO 80465
110
File Name : ResearchNorthAccessAM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 1
Fort Collins, CO
CSU South Parking Lot
AM Peak
Research Blvd Northern Access
Groups Printed- Unshifted
Northern Access
Eastbound
Research Blvd
Northbound
Research Blvd
Southbound
Start Time Left Right App. Total Left Thru App. Total Thru Right App. Total Int. Total
07:30 AM 0 0 0 1 53 54 15 3 18 72
07:45 AM 2 2 4 5 63 68 22 4 26 98
Total 2 2 4 6 116 122 37 7 44 170
08:00 AM 1 0 1 3 38 41 22 1 23 65
08:15 AM 0 0 0 1 31 32 21 8 29 61
08:30 AM 0 1 1 1 49 50 23 4 27 78
08:45 AM 1 0 1 6 52 58 31 2 33 92
Total 2 1 3 11 170 181 97 15 112 296
09:00 AM 0 0 0 2 30 32 21 3 24 56
09:15 AM 0 1 1 1 34 35 12 3 15 51
Grand Total 4 4 8 20 350 370 167 28 195 573
Apprch % 50 50 5.4 94.6 85.6 14.4
Total % 0.7 0.7 1.4 3.5 61.1 64.6 29.1 4.9 34
Morrison, CO 80465
111
File Name : ResearchNorthAccessAM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 2
Fort Collins, CO
CSU South Parking Lot
AM Peak
Research Blvd Northern Access
Research Blvd
Northern Access
Research Blvd
Right
28
Thru
167
Out In Total
354 195 549
Left
20
Thru
350
Out In Total
171 370 541
Left
4
Right
4
Out In Total
48 8 56
1/20/2015 07:30 AM
1/20/2015 09:15 AM
Unshifted
North
Morrison, CO 80465
112
File Name : ResearchNorthAccessAM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 3
Fort Collins, CO
CSU South Parking Lot
AM Peak
Research Blvd Northern Access
Northern Access
Eastbound
Research Blvd
Northbound
Research Blvd
Southbound
Start Time Left Right App. Total Left Thru App. Total Thru Right App. Total Int. Total
Peak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:45 AM
07:45 AM 2 2 4 5 63 68
22 4 26 98
08:00 AM 1 0 1 3 38 41 22 1 23 65
08:15 AM 0 0 0 1 31 32 21 8 29
61
08:30 AM 0 1 1 1 49 50 23
4 27 78
Total Volume 3 3 6 10 181 191 88 17 105 302
% App. Total 50 50 5.2 94.8 83.8 16.2
PHF .375 .375 .375 .500 .718 .702 .957 .531 .905 .770
Research Blvd
Northern Access
Research Blvd
Right
17
Thru
88
Out In Total
184 105 289
Left
10
Thru
181
Out In Total
91 191 282
Left
3
Right
3
Out In Total
27 6 33
Peak Hour Begins at 07:45 AM
Unshifted
Peak Hour Data
North
Morrison, CO 80465
113
File Name : ResearchNorthAccessAM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 4
Fort Collins, CO
CSU South Parking Lot
AM Peak
Research Blvd Northern Access
Image 1
Morrison, CO 80465
114
File Name : ResearchNorthAccessPM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 1
Fort Collins, CO
CSU South Parking Lot
PM Peak
Research Blvd Northern Access
Groups Printed- Unshifted
Northern Access
Eastbound
Research Blvd
Northbound
Research Blvd
Southbound
Start Time Left Right App. Total Left Thru App. Total Thru Right App. Total Int. Total
03:00 PM 4 2 6 0 24 24 58 2 60 90
03:15 PM 1 1 2 0 43 43 50 3 53 98
03:30 PM 2 1 3 0 41 41 53 1 54 98
03:45 PM 2 3 5 0 24 24 61 4 65 94
Total 9 7 16 0 132 132 222 10 232 380
04:00 PM 3 2 5 1 38 39 63 2 65 109
04:15 PM 4 1 5 1 37 38 64 2 66 109
04:30 PM 1 1 2 1 29 30 73 1 74 106
04:45 PM 1 3 4 1 46 47 61 2 63 114
Total 9 7 16 4 150 154 261 7 268 438
Grand Total 18 14 32 4 282 286 483 17 500 818
Apprch % 56.2 43.8 1.4 98.6 96.6 3.4
Total % 2.2 1.7 3.9 0.5 34.5 35 59 2.1 61.1
Morrison, CO 80465
115
File Name : ResearchNorthAccessPM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 2
Fort Collins, CO
CSU South Parking Lot
PM Peak
Research Blvd Northern Access
Research Blvd
Northern Access
Research Blvd
Right
17
Thru
483
Out In Total
300 500 800
Left
4
Thru
282
Out In Total
497 286 783
Left
18
Right
14
Out In Total
21 32 53
1/20/2015 03:00 PM
1/20/2015 04:45 PM
Unshifted
North
Morrison, CO 80465
116
File Name : ResearchNorthAccessPM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 3
Fort Collins, CO
CSU South Parking Lot
PM Peak
Research Blvd Northern Access
Northern Access
Eastbound
Research Blvd
Northbound
Research Blvd
Southbound
Start Time Left Right App. Total Left Thru App. Total Thru Right App. Total Int. Total
Peak Hour Analysis From 03:00 PM to 04:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:00 PM
04:00 PM 3 2 5 1
38 39 63 2
65 109
04:15 PM 4
1 5 1 37 38 64 2 66 109
04:30 PM 1 1 2 1 29 30 73
1 74
106
04:45 PM 1 3
4 1 46 47
61 2 63 114
Total Volume 9 7 16 4 150 154 261 7 268 438
% App. Total 56.2 43.8 2.6 97.4 97.4 2.6
PHF .563 .583 .800 1.00 .815 .819 .894 .875 .905 .961
Research Blvd
Northern Access
Research Blvd
Right
7
Thru
261
Out In Total
159 268 427
Left
4
Thru
150
Out In Total
268 154 422
Left
9
Right
7
Out In Total
11 16 27
Peak Hour Begins at 04:00 PM
Unshifted
Peak Hour Data
North
Morrison, CO 80465
117
File Name : ResearchNorthAccessPM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 4
Fort Collins, CO
CSU South Parking Lot
PM Peak
Research Blvd Northern Access
Image 1
Morrison, CO 80465
118
File Name : ResearchSouthAccessAM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 1
Fort Collins, CO
CSU South Parking Lot
AM Peak
Research Blvd Southern Access/Tennis
Groups Printed- Unshifted
Southern Access
Eastbound
Tennis Courts
Westbound
Research Blvd
Northbound
Research Blvd
Southbound
Start Time Left Thru Right
App.
Total
Left Thru Right
App.
Total
Left Thru Right
App.
Total
Left Thru Right
App.
Total
Int.
Total
07:30 AM 0 0 5 5 0 0 0 0 12 69 0 81 0 10 4 14 100
07:45 AM 1 0 3 4 0 0 0 0 25 92 0 117 0 12 6 18 139
Total 1 0 8 9 0 0 0 0 37 161 0 198 0 22 10 32 239
08:00 AM 0 0 6 6 0 0 0 0 17 61 0 78 0 8 6 14 98
08:15 AM 2 0 8 10 0 0 0 0 19 34 0 53 0 12 7 19 82
08:30 AM 6 0 7 13 0 0 0 0 20 43 0 63 0 13 9 22 98
08:45 AM 3 0 7 10 0 0 0 0 21 52 0 73 0 24 4 28 111
Total 11 0 28 39 0 0 0 0 77 190 0 267 0 57 26 83 389
09:00 AM 2 0 13 15 0 0 0 0 13 33 0 46 0 11 4 15 76
09:15 AM 4 0 22 26 0 0 0 0 16 31 0 47 0 11 0 11 84
Grand Total 18 0 71 89 0 0 0 0 143 415 0 558 0 101 40 141 788
Apprch % 20.2 0 79.8 0 0 0 25.6 74.4 0 0 71.6 28.4
Total % 2.3 0 9 11.3 0 0 0 0 18.1 52.7 0 70.8 0 12.8 5.1 17.9
Morrison, CO 80465
119
File Name : ResearchSouthAccessAM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 2
Fort Collins, CO
CSU South Parking Lot
AM Peak
Research Blvd Southern Access/Tennis
Research Blvd
Southern Access
Tennis Courts
Research Blvd
Right
40
Thru
101
Left
0
Out In Total
433 141 574
Right
0
Thru
0
Left
0
Out In Total
0 0 0
Left
143
Thru
415
Right
0
Out In Total
172 558 730
Left
18
Thru
0
Right
71
Out In Total
183 89 272
1/20/2015 07:30 AM
1/20/2015 09:15 AM
Unshifted
North
Morrison, CO 80465
120
File Name : ResearchSouthAccessAM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 3
Fort Collins, CO
CSU South Parking Lot
AM Peak
Research Blvd Southern Access/Tennis
Southern Access
Eastbound
Tennis Courts
Westbound
Research Blvd
Northbound
Research Blvd
Southbound
Start Time Left Thru Right
App.
Total
Left Thru Right
App.
Total
Left Thru Right
App.
Total
Left Thru Right
App.
Total
Int.
Total
Peak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:30 AM
07:30 AM 0 0 5 5 0 0 0 0 12 69 0 81 0 10 4 14 100
07:45 AM 1 0 3 4 0 0 0 0 25 92
0 117
0 12
6 18 139
08:00 AM 0 0 6 6 0 0 0 0 17 61 0 78 0 8 6 14 98
08:15 AM 2
0 8 10
0 0 0 0 19 34 0 53 0 12 7 19
82
Total
Volume
3 0 22 25 0 0 0 0 73 256 0 329 0 42 23 65 419
% App.
Total
12 0 88 0 0 0 22.2 77.8 0 0 64.6 35.4
PHF .375 .000 .688 .625 .000 .000 .000 .000 .730 .696 .000 .703 .000 .875 .821 .855 .754
Research Blvd
Southern Access
Tennis Courts
Research Blvd
Right
23
Thru
42
Left
0
Out In Total
File Name : ResearchSouthAccessAM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 4
Fort Collins, CO
CSU South Parking Lot
AM Peak
Research Blvd Southern Access/Tennis
Image 1
Morrison, CO 80465
122
File Name : ResearchSouthAccessPM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 1
Fort Collins, CO
CSU South Parking Lot
PM Peak
Research Blvd Southern Access/Tennis
Groups Printed- Unshifted
Southern Access
Eastbound
Tennis Courts
Westbound
Research Blvd
Northbound
Research Blvd
Southbound
Start Time Left Thru Right
App.
Total
Left Thru Right
App.
Total
Left Thru Right
App.
Total
Left Thru Right
App.
Total
Int.
Total
03:00 PM 4 0 22 26 0 0 0 0 11 18 0 29 0 59 3 62 117
03:15 PM 7 0 18 25 0 0 0 0 14 39 0 53 0 45 2 47 125
03:30 PM 2 0 17 19 0 0 0 0 9 34 0 43 0 46 0 46 108
03:45 PM 2 0 25 27 0 0 0 0 9 25 0 34 0 50 4 54 115
Total 15 0 82 97 0 0 0 0 43 116 0 159 0 200 9 209 465
04:00 PM 2 0 21 23 0 0 0 0 12 33 0 45 0 64 6 70 138
04:15 PM 6 0 24 30 0 0 0 0 10 27 0 37 0 59 3 62 129
04:30 PM 3 0 22 25 0 0 0 0 9 27 0 36 0 73 2 75 136
04:45 PM 11 0 19 30 0 0 0 0 4 31 0 35 0 57 3 60 125
Total 22 0 86 108 0 0 0 0 35 118 0 153 0 253 14 267 528
Grand Total 37 0 168 205 0 0 0 0 78 234 0 312 0 453 23 476 993
Apprch % 18 0 82 0 0 0 25 75 0 0 95.2 4.8
Total % 3.7 0 16.9 20.6 0 0 0 0 7.9 23.6 0 31.4 0 45.6 2.3 47.9
Morrison, CO 80465
123
File Name : ResearchSouthAccessPM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 2
Fort Collins, CO
CSU South Parking Lot
PM Peak
Research Blvd Southern Access/Tennis
Research Blvd
Southern Access
Tennis Courts
Research Blvd
Right
23
Thru
453
Left
0
Out In Total
271 476 747
Right
0
Thru
0
Left
0
Out In Total
0 0 0
Left
78
Thru
234
Right
0
Out In Total
621 312 933
Left
37
Thru
0
Right
168
Out In Total
101 205 306
1/20/2015 03:00 PM
1/20/2015 04:45 PM
Unshifted
North
Morrison, CO 80465
124
File Name : ResearchSouthAccessPM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 3
Fort Collins, CO
CSU South Parking Lot
PM Peak
Research Blvd Southern Access/Tennis
Southern Access
Eastbound
Tennis Courts
Westbound
Research Blvd
Northbound
Research Blvd
Southbound
Start Time Left Thru Right
App.
Total
Left Thru Right
App.
Total
Left Thru Right
App.
Total
Left Thru Right
App.
Total
Int.
Total
Peak Hour Analysis From 03:00 PM to 04:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:00 PM
04:00 PM 2 0 21 23 0 0 0 0 12 33
0 45
0 64 6
70 138
04:15 PM 6 0 24 30
0 0 0 0 10 27 0 37 0 59 3 62 129
04:30 PM 3 0 22 25 0 0 0 0 9 27 0 36 0 73
2 75
136
04:45 PM 11
0 19 30 0 0 0 0 4 31 0 35 0 57 3 60 125
Total
Volume
22 0 86 108 0 0 0 0 35 118 0 153 0 253 14 267 528
% App.
Total
20.4 0 79.6 0 0 0 22.9 77.1 0 0 94.8 5.2
PHF .500 .000 .896 .900 .000 .000 .000 .000 .729 .894 .000 .850 .000 .866 .583 .890 .957
Research Blvd
Southern Access
Tennis Courts
Research Blvd
Right
14
Thru
253
Left
0
File Name : ResearchSouthAccessPM
Site Code : IPO 72
Start Date : 1/20/2015
Page No : 4
Fort Collins, CO
CSU South Parking Lot
PM Peak
Research Blvd Southern Access/Tennis
Image 1
Morrison, CO 80465
126
Kimley-Horn and Associates, Inc.
096336002 – Colorado State University South Campus Parking Lot
APPENDIX B
Intersection Analysis Worksheets
127
HCM 2010 Signalized Intersection Summary 2015 Existing AM.syn
1: Centre Avenue & Prospect Road 2/2/2015
2015 Existing AM 1/26/2015 Synchro 8 Report
Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 132 857 94 276 529 117 51 208 229 16 37 18
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow veh/h/ln 186.3 186.3 190.0 186.3 186.3 190.0 186.3 186.3 186.3 186.3 186.3 186.3
Lanes 1 2 0 1 2 0 1 1 1 1 1 1
Cap, veh/h 508 1759 197 430 1645 430 349 441 375 138 441 375
Arrive On Green 0.07 0.53 0.53 0.12 0.58 0.58 0.24 0.24 0.24 0.24 0.24 0.24
Sat Flow, veh/h 1774 3291 369 1774 2849 745 1308 1863 1583 807 1863 1583
Grp Volume(v), veh/h 206 584 565 389 412 383 76 306 305 20 52 32
Grp Sat Flow(s),veh/h/ln 1774 1863 1798 1774 1863 1731 1308 1863 1583 807 1863 1583
Q Serve(g_s), s 5.5 22.5 22.5 9.1 12.7 12.7 5.1 15.9 19.2 2.5 2.3 1.7
Cycle Q Clear(g_c), s 5.5 22.5 22.5 9.1 12.7 12.7 7.4 15.9 19.2 18.3 2.3 1.7
Prop In Lane 1.00 0.21 1.00 0.43 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 508 995 961 430 1075 999 349 441 375 138 441 375
V/C Ratio(X) 0.41 0.59 0.59 0.91 0.38 0.38 0.22 0.69 0.81 0.14 0.12 0.09
Avail Cap(c_a), veh/h 580 995 961 695 1075 999 349 441 375 138 441 375
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 9.7 16.7 16.7 18.3 12.1 12.1 34.6 36.8 38.1 45.2 31.7 31.4
Incr Delay (d2), s/veh 0.5 2.5 2.6 10.1 1.0 1.1 1.4 8.7 17.4 2.2 0.5 0.4
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile Back of Q (50%), veh/ln 2.1 10.3 10.0 7.0 5.6 5.2 1.8 8.4 9.3 0.6 1.1 0.7
Lane Grp Delay (d), s/veh 10.2 19.2 19.3 28.4 13.2 13.2 36.0 45.6 55.6 47.4 32.2 31.9
Lane Grp LOS B B B C B B D D E D C C
Approach Vol, veh/h 1355 1184 687 104
Approach Delay, s/veh 17.9 18.2 48.9 35.0
Approach LOS B B D D
Timer
Assigned Phs 7 4 3 8 2 6
Phs Duration (G+Y+Rc), s 11.7 60.5 16.2 65.0 29.0 29.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 12.0 45.0 28.0 61.0 25.0 25.0
Max Q Clear Time (g_c+I1), s 7.5 24.5 11.1 14.7 21.2 20.3
Green Ext Time (p_c), s 0.2 12.8 1.1 19.7 1.4 1.6
Intersection Summary
HCM 2010 Ctrl Delay 24.9
HCM 2010 LOS C
Notes
128
HCM 2010 Signalized Intersection Summary 2015 Existing PM.syn
1: Centre Avenue & Prospect Road 2/2/2015
2015 Existing PM 1/26/2015 Synchro 8 Report
Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 47 902 32 207 839 42 69 79 289 76 154 122
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow veh/h/ln 186.3 186.3 190.0 186.3 186.3 190.0 186.3 186.3 186.3 186.3 186.3 186.3
Lanes 1 2 0 1 2 0 1 1 1 1 1 1
Cap, veh/h 396 2021 98 411 2126 131 229 459 390 248 459 390
Arrive On Green 0.03 0.57 0.57 0.07 0.61 0.61 0.25 0.25 0.25 0.25 0.25 0.25
Sat Flow, veh/h 1774 3525 171 1774 3474 213 1020 1863 1583 935 1863 1583
Grp Volume(v), veh/h 68 524 515 241 489 479 84 120 332 100 192 165
Grp Sat Flow(s),veh/h/ln 1774 1863 1833 1774 1863 1825 1020 1863 1583 935 1863 1583
Q Serve(g_s), s 1.7 18.3 18.3 5.2 15.1 15.1 8.3 5.7 21.9 10.6 9.5 9.6
Cycle Q Clear(g_c), s 1.7 18.3 18.3 5.2 15.1 15.1 17.7 5.7 21.9 16.2 9.5 9.6
Prop In Lane 1.00 0.09 1.00 0.12 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 396 1068 1051 411 1140 1117 229 459 390 248 459 390
V/C Ratio(X) 0.17 0.49 0.49 0.59 0.43 0.43 0.37 0.26 0.85 0.40 0.42 0.42
Avail Cap(c_a), veh/h 405 1068 1051 626 1140 1117 229 459 390 248 459 390
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 9.5 13.9 13.9 10.6 11.2 11.2 42.1 33.2 39.3 39.8 34.6 34.7
Incr Delay (d2), s/veh 0.2 1.6 1.6 1.3 1.2 1.2 4.5 1.4 20.2 4.8 2.8 3.3
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile Back of Q (50%), veh/ln 0.7 8.0 7.9 2.0 6.6 6.5 2.4 2.8 10.7 2.8 4.7 4.1
Lane Grp Delay (d), s/veh 9.7 15.5 15.5 12.0 12.4 12.4 46.6 34.6 59.5 44.6 37.4 38.0
Lane Grp LOS A B B B B B D C E D D D
Approach Vol, veh/h 1107 1209 536 457
Approach Delay, s/veh 15.1 12.3 51.9 39.2
Approach LOS B B D D
Timer
Assigned Phs 7 4 3 8 2 6
Phs Duration (G+Y+Rc), s 7.5 66.8 11.7 71.0 31.0 31.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 4.0 50.0 21.0 67.0 27.0 27.0
Max Q Clear Time (g_c+I1), s 3.7 20.3 7.2 17.1 23.9 18.2
Green Ext Time (p_c), s 0.0 16.5 0.6 20.8 1.4 2.8
Intersection Summary
HCM 2010 Ctrl Delay 23.4
HCM 2010 LOS C
Notes
129
HCM 2010 Signalized Intersection Summary 2015 Background + Project AM.syn
1: Centre Avenue & Prospect Road 2/9/2015
2015 Background + Project AM 1/26/2015 Synchro 8 Report
Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 132 857 112 303 529 117 60 212 242 16 46 18
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow veh/h/ln 186.3 186.3 190.0 186.3 186.3 190.0 186.3 186.3 186.3 186.3 186.3 186.3
Lanes 1 2 0 1 2 0 1 1 1 1 1 1
Cap, veh/h 513 1596 213 467 1637 428 337 439 373 132 439 373
Arrive On Green 0.08 0.50 0.50 0.16 0.57 0.57 0.24 0.24 0.24 0.24 0.24 0.24
Sat Flow, veh/h 1774 3220 430 1774 2849 745 1293 1863 1583 789 1863 1583
Grp Volume(v), veh/h 206 597 574 427 412 383 90 312 323 20 65 32
Grp Sat Flow(s),veh/h/ln 1774 1863 1787 1774 1863 1731 1293 1863 1583 789 1863 1583
Q Serve(g_s), s 6.0 25.3 25.3 13.4 12.8 12.8 6.3 16.3 20.8 2.5 2.9 1.7
Cycle Q Clear(g_c), s 6.0 25.3 25.3 13.4 12.8 12.8 9.2 16.3 20.8 18.9 2.9 1.7
Prop In Lane 1.00 0.24 1.00 0.43 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 513 923 886 467 1070 995 337 439 373 132 439 373
V/C Ratio(X) 0.40 0.65 0.65 0.91 0.38 0.39 0.27 0.71 0.87 0.15 0.15 0.09
Avail Cap(c_a), veh/h 577 923 886 675 1070 995 337 439 373 132 439 373
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 11.1 19.9 19.9 24.7 12.3 12.3 35.8 37.3 39.0 45.9 32.1 31.7
Incr Delay (d2), s/veh 0.5 3.5 3.7 13.1 1.0 1.1 1.9 9.4 22.7 2.4 0.7 0.5
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile Back of Q (50%), veh/ln 2.4 11.8 11.4 8.1 5.7 5.3 2.2 8.7 10.4 0.6 1.4 0.7
Lane Grp Delay (d), s/veh 11.6 23.4 23.5 37.8 13.4 13.5 37.7 46.7 61.7 48.3 32.9 32.1
Lane Grp LOS B C C D B B D D E D C C
Approach Vol, veh/h 1377 1222 725 117
Approach Delay, s/veh 21.7 21.9 52.2 35.3
Approach LOS C C D D
Timer
Assigned Phs 7 4 3 8 2 6
Phs Duration (G+Y+Rc), s 12.1 56.6 20.5 65.0 29.0 29.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 12.0 44.0 29.0 61.0 25.0 25.0
Max Q Clear Time (g_c+I1), s 8.0 27.3 15.4 14.8 22.8 20.9
Green Ext Time (p_c), s 0.2 11.3 1.1 20.1 0.9 1.6
Intersection Summary
HCM 2010 Ctrl Delay 28.7
HCM 2010 LOS C
Notes
130
HCM 2010 Signalized Intersection Summary 2015 Background + Project PM.syn
1: Centre Avenue & Prospect Road 2/9/2015
2015 Background + Project PM 1/26/2015 Synchro 8 Report
Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 47 902 51 235 839 42 93 91 325 76 163 122
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow veh/h/ln 186.3 186.3 190.0 186.3 186.3 190.0 186.3 186.3 186.3 186.3 186.3 186.3
Lanes 1 2 0 1 2 0 1 1 1 1 1 1
Cap, veh/h 387 1884 144 402 2082 128 235 481 409 242 481 409
Arrive On Green 0.03 0.55 0.55 0.08 0.60 0.60 0.26 0.26 0.26 0.26 0.26 0.26
Sat Flow, veh/h 1774 3417 262 1774 3474 213 1009 1863 1583 885 1863 1583
Grp Volume(v), veh/h 68 540 527 273 489 479 113 138 374 100 204 165
Grp Sat Flow(s),veh/h/ln 1774 1863 1817 1774 1863 1825 1009 1863 1583 885 1863 1583
Q Serve(g_s), s 1.8 19.9 19.9 6.0 15.5 15.5 11.4 6.4 24.9 11.1 9.9 9.4
Cycle Q Clear(g_c), s 1.8 19.9 19.9 6.0 15.5 15.5 21.3 6.4 24.9 17.5 9.9 9.4
Prop In Lane 1.00 0.14 1.00 0.12 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 387 1027 1002 402 1116 1094 235 481 409 242 481 409
V/C Ratio(X) 0.18 0.53 0.53 0.68 0.44 0.44 0.48 0.29 0.92 0.41 0.42 0.40
Avail Cap(c_a), veh/h 412 1027 1002 653 1116 1094 235 481 409 242 481 409
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 10.3 15.4 15.4 12.9 11.8 11.8 42.4 32.2 39.1 39.3 33.5 33.3
Incr Delay (d2), s/veh 0.2 1.9 2.0 2.0 1.3 1.3 6.9 1.5 27.6 5.1 2.7 3.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile Back of Q (50%), veh/ln 0.7 9.0 8.7 3.2 6.8 6.6 3.3 3.2 12.8 2.8 4.9 4.0
Lane Grp Delay (d), s/veh 10.5 17.3 17.3 14.9 13.1 13.1 49.3 33.7 66.7 44.4 36.3 36.3
Lane Grp LOS B B B B B B D C E D D D
Approach Vol, veh/h 1135 1241 625 469
Approach Delay, s/veh 16.9 13.5 56.3 38.0
Approach LOS B B E D
Timer
Assigned Phs 7 4 3 8 2 6
Phs Duration (G+Y+Rc), s 7.5 63.8 12.7 69.0 32.0 32.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 5.0 46.0 24.0 65.0 28.0 28.0
Max Q Clear Time (g_c+I1), s 3.8 21.9 8.0 17.5 26.9 19.5
Green Ext Time (p_c), s 0.0 14.8 0.7 21.0 0.6 3.1
Intersection Summary
HCM 2010 Ctrl Delay 25.6
HCM 2010 LOS C
Notes
131
HCM 2010 Signalized Intersection Summary 2025 Background AM.syn
1: Centre Avenue & Prospect Road 2/2/2015
2015 Background AM 1/26/2015 Synchro 8 Report
Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 167 1086 119 350 671 148 65 264 290 20 47 23
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow veh/h/ln 186.3 186.3 190.0 186.3 186.3 190.0 186.3 186.3 186.3 186.3 186.3 186.3
Lanes 1 2 0 1 2 0 1 1 1 1 1 1
Cap, veh/h 472 1408 158 517 1624 423 309 407 346 74 407 346
Arrive On Green 0.10 0.43 0.43 0.24 0.57 0.57 0.22 0.22 0.22 0.22 0.22 0.22
Sat Flow, veh/h 1774 3292 368 1774 2852 742 1281 1863 1583 693 1863 1583
Grp Volume(v), veh/h 261 737 718 493 522 485 97 388 387 25 66 41
Grp Sat Flow(s),veh/h/ln 1774 1863 1798 1774 1863 1732 1281 1863 1583 693 1863 1583
Q Serve(g_s), s 8.9 41.2 41.8 24.8 18.4 18.4 7.3 22.6 24.0 1.4 3.2 2.3
Cycle Q Clear(g_c), s 8.9 41.2 41.8 24.8 18.4 18.4 10.4 22.6 24.0 24.0 3.2 2.3
Prop In Lane 1.00 0.20 1.00 0.43 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 472 797 769 517 1060 986 309 407 346 74 407 346
V/C Ratio(X) 0.55 0.93 0.93 0.95 0.49 0.49 0.31 0.95 1.12 0.34 0.16 0.12
Avail Cap(c_a), veh/h 580 797 769 519 1060 986 309 407 346 74 407 346
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 14.3 29.8 29.9 35.5 14.2 14.2 39.0 42.4 42.9 54.7 34.8 34.5
Incr Delay (d2), s/veh 1.0 18.2 19.8 28.2 1.6 1.8 2.6 34.4 84.5 11.8 0.9 0.7
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile Back of Q (50%), veh/ln 3.7 22.2 22.0 17.7 8.3 7.8 2.6 14.3 17.5 0.9 1.5 1.0
Lane Grp Delay (d), s/veh 15.3 47.9 49.7 63.7 15.8 15.9 41.7 76.7 127.5 66.5 35.6 35.1
Lane Grp LOS B D D E B B D E F E D D
Approach Vol, veh/h 1716 1500 872 132
Approach Delay, s/veh 43.7 31.6 95.4 41.3
Approach LOS D C F D
Timer
Assigned Phs 7 4 3 8 2 6
Phs Duration (G+Y+Rc), s 15.3 51.0 30.9 66.6 28.0 28.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 18.0 47.0 27.0 56.0 24.0 24.0
Max Q Clear Time (g_c+I1), s 10.9 43.8 26.8 20.4 26.0 26.0
Green Ext Time (p_c), s 0.4 3.0 0.0 24.2 0.0 0.0
Intersection Summary
HCM 2010 Ctrl Delay 50.0
HCM 2010 LOS D
Notes
132
HCM 2010 Signalized Intersection Summary 2025 Background PM.syn
1: Centre Avenue & Prospect Road 2/2/2015
2025 Background PM 1/26/2015 Synchro 8 Report
Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 60 1143 41 262 1064 53 87 100 366 96 195 155
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow veh/h/ln 186.3 186.3 190.0 186.3 186.3 190.0 186.3 186.3 186.3 186.3 186.3 186.3
Lanes 1 2 0 1 2 0 1 1 1 1 1 1
Cap, veh/h 320 1985 96 350 2125 130 185 449 381 212 449 381
Arrive On Green 0.04 0.56 0.56 0.08 0.61 0.61 0.24 0.24 0.24 0.24 0.24 0.24
Sat Flow, veh/h 1774 3524 171 1774 3475 213 934 1863 1583 836 1863 1583
Grp Volume(v), veh/h 87 663 654 305 620 608 106 152 421 126 244 209
Grp Sat Flow(s),veh/h/ln 1774 1863 1833 1774 1863 1825 934 1863 1583 836 1863 1583
Q Serve(g_s), s 2.2 26.1 26.1 6.4 20.9 21.0 12.1 7.3 26.0 15.8 12.4 12.5
Cycle Q Clear(g_c), s 2.2 26.1 26.1 6.4 20.9 21.0 24.4 7.3 26.0 23.1 12.4 12.5
Prop In Lane 1.00 0.09 1.00 0.12 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 320 1049 1032 350 1139 1116 185 449 381 212 449 381
V/C Ratio(X) 0.27 0.63 0.63 0.87 0.54 0.54 0.57 0.34 1.10 0.60 0.54 0.55
Avail Cap(c_a), veh/h 354 1049 1032 562 1139 1116 185 449 381 212 449 381
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 10.5 16.0 16.0 19.2 12.2 12.2 46.5 33.9 41.0 43.4 35.8 35.8
Incr Delay (d2), s/veh 0.5 2.9 3.0 8.6 1.9 1.9 12.3 2.0 77.1 11.7 4.7 5.6
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile Back of Q (50%), veh/ln 0.9 11.9 11.7 5.8 9.0 8.9 3.5 3.6 18.3 4.0 6.3 5.5
Lane Grp Delay (d), s/veh 11.0 18.9 19.0 27.7 14.1 14.1 58.8 35.9 118.1 55.2 40.5 41.4
Lane Grp LOS B B B C B B E D F E D D
Approach Vol, veh/h 1404 1533 679 579
Approach Delay, s/veh 18.4 16.8 90.4 44.0
Approach LOS B B F D
Timer
Assigned Phs 7 4 3 8 2 6
Phs Duration (G+Y+Rc), s 7.9 64.8 13.1 70.0 30.0 30.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 6.0 50.0 22.0 66.0 26.0 26.0
Max Q Clear Time (g_c+I1), s 4.2 28.1 8.4 23.0 28.0 25.1
Green Ext Time (p_c), s 0.0 17.1 0.7 28.1 0.0 0.5
Intersection Summary
HCM 2010 Ctrl Delay 33.0
HCM 2010 LOS C
Notes
133
HCM 2010 Signalized Intersection Summary 2025 Background + Project AM.syn
1: Centre Avenue & Prospect Road 2/3/2015
2025 Background + Project AM 1/26/2015 Synchro 8 Report
Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 167 1086 137 377 671 148 74 268 303 20 56 23
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow veh/h/ln 186.3 186.3 190.0 186.3 186.3 190.0 186.3 186.3 186.3 186.3 186.3 186.3
Lanes 1 2 0 1 2 0 1 1 1 1 1 1
Cap, veh/h 473 1353 174 524 1622 422 298 406 345 71 406 345
Arrive On Green 0.10 0.42 0.42 0.25 0.57 0.57 0.22 0.22 0.22 0.22 0.22 0.22
Sat Flow, veh/h 1774 3237 416 1774 2852 742 1266 1863 1583 678 1863 1583
Grp Volume(v), veh/h 261 749 728 531 522 485 110 394 404 25 79 41
Grp Sat Flow(s),veh/h/ln 1774 1863 1789 1774 1863 1732 1266 1863 1583 678 1863 1583
Q Serve(g_s), s 9.1 43.1 43.9 28.0 18.5 18.5 8.5 23.1 24.0 0.9 3.8 2.3
Cycle Q Clear(g_c), s 9.1 43.1 43.9 28.0 18.5 18.5 12.4 23.1 24.0 24.0 3.8 2.3
Prop In Lane 1.00 0.23 1.00 0.43 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 473 779 748 524 1059 985 298 406 345 71 406 345
V/C Ratio(X) 0.55 0.96 0.97 1.01 0.49 0.49 0.37 0.97 1.17 0.35 0.19 0.12
Avail Cap(c_a), veh/h 563 779 748 524 1059 985 298 406 345 71 406 345
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 14.8 31.2 31.4 36.6 14.2 14.2 40.1 42.6 43.0 54.9 35.1 34.5
Incr Delay (d2), s/veh 1.0 24.2 26.8 42.7 1.6 1.8 3.5 37.6 102.9 13.1 1.1 0.7
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile Back of Q (50%), veh/ln 3.8 24.6 24.6 20.8 8.3 7.8 3.0 15.0 19.3 1.0 1.9 1.0
Lane Grp Delay (d), s/veh 15.8 55.4 58.2 79.4 15.9 16.0 43.6 80.3 145.9 68.0 36.2 35.2
Lane Grp LOS B E E F B B D F F E D D
Approach Vol, veh/h 1738 1538 908 145
Approach Delay, s/veh 50.6 37.8 105.0 41.4
Approach LOS D D F D
Timer
Assigned Phs 7 4 3 8 2 6
Phs Duration (G+Y+Rc), s 15.4 50.0 32.0 66.6 28.0 28.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 17.0 46.0 28.0 57.0 24.0 24.0
Max Q Clear Time (g_c+I1), s 11.1 45.9 30.0 20.5 26.0 26.0
Green Ext Time (p_c), s 0.4 0.1 0.0 25.0 0.0 0.0
Intersection Summary
HCM 2010 Ctrl Delay 57.2
HCM 2010 LOS E
Notes
134
HCM 2010 Signalized Intersection Summary 2025 Background + Project PM.syn
1: Centre Avenue & Prospect Road 2/3/2015
2025 Background + Project PM 1/26/2015 Synchro 8 Report
Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 60 1143 60 290 1064 53 111 112 402 96 204 155
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow veh/h/ln 186.3 186.3 190.0 186.3 186.3 190.0 186.3 186.3 186.3 186.3 186.3 186.3
Lanes 1 2 0 1 2 0 1 1 1 1 1 1
Cap, veh/h 316 1796 128 373 2089 128 187 465 395 205 465 395
Arrive On Green 0.04 0.52 0.52 0.12 0.60 0.60 0.25 0.25 0.25 0.25 0.25 0.25
Sat Flow, veh/h 1774 3436 246 1774 3475 213 925 1863 1583 792 1863 1583
Grp Volume(v), veh/h 87 680 666 337 620 608 135 170 462 126 255 209
Grp Sat Flow(s),veh/h/ln 1774 1863 1819 1774 1863 1825 925 1863 1583 792 1863 1583
Q Serve(g_s), s 2.4 29.7 29.8 9.9 21.5 21.6 14.1 8.1 27.0 16.9 12.9 12.3
Cycle Q Clear(g_c), s 2.4 29.7 29.8 9.9 21.5 21.6 27.0 8.1 27.0 25.1 12.9 12.3
Prop In Lane 1.00 0.14 1.00 0.12 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 316 973 951 373 1120 1097 187 465 395 205 465 395
V/C Ratio(X) 0.28 0.70 0.70 0.90 0.55 0.55 0.72 0.37 1.17 0.62 0.55 0.53
Avail Cap(c_a), veh/h 347 973 951 527 1120 1097 187 465 395 205 465 395
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 11.9 19.4 19.4 26.1 12.9 12.9 47.7 33.5 40.6 43.8 35.3 35.1
Incr Delay (d2), s/veh 0.5 4.2 4.3 14.5 2.0 2.0 21.2 2.2 99.9 13.1 4.6 5.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile Back of Q (50%), veh/ln 1.0 13.8 13.5 6.9 9.6 9.4 4.8 4.1 21.5 4.1 6.5 5.3
Lane Grp Delay (d), s/veh 12.4 23.6 23.7 40.6 14.9 14.9 68.9 35.7 140.5 57.0 39.9 40.1
Lane Grp LOS B C C D B B E D F E D D
Approach Vol, veh/h 1433 1565 767 590
Approach Delay, s/veh 23.0 20.4 104.7 43.6
Approach LOS C C F D
Timer
Assigned Phs 7 4 3 8 2 6
Phs Duration (G+Y+Rc), s 8.1 60.5 16.6 69.0 31.0 31.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 6.0 49.0 22.0 65.0 27.0 27.0
Max Q Clear Time (g_c+I1), s 4.4 31.8 11.9 23.6 29.0 27.1
Green Ext Time (p_c), s 0.0 14.2 0.7 27.9 0.0 0.0
Intersection Summary
HCM 2010 Ctrl Delay 39.2
HCM 2010 LOS D
Notes
135
HCM 2010 Signalized Intersection Summary 2025 Background + Project AM Imp.syn
1: Centre Avenue & Prospect Road 2/9/2015
2025 Background + Project AM Imp 1/26/2015 Synchro 8 Report
Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 167 1086 137 377 671 148 74 268 303 20 56 23
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow veh/h/ln 186.3 186.3 190.0 186.3 186.3 190.0 186.3 186.3 186.3 186.3 186.3 190.0
Lanes 1 2 0 1 2 0 2 1 1 2 1 0
Cap, veh/h 473 1353 174 524 1622 422 125 406 345 142 168 87
Arrive On Green 0.10 0.42 0.42 0.25 0.57 0.57 0.04 0.22 0.22 0.15 0.15 0.15
Sat Flow, veh/h 1774 3237 416 1774 2852 742 3442 1863 1583 1316 1157 600
Grp Volume(v), veh/h 261 749 728 531 522 485 110 394 404 25 0 120
Grp Sat Flow(s),veh/h/ln 1774 1863 1789 1774 1863 1732 1721 1863 1583 658 0 1757
Q Serve(g_s), s 9.1 43.1 43.9 28.0 18.5 18.5 3.5 23.1 24.0 0.9 0.0 6.9
Cycle Q Clear(g_c), s 9.1 43.1 43.9 28.0 18.5 18.5 3.5 23.1 24.0 16.0 0.0 6.9
Prop In Lane 1.00 0.23 1.00 0.43 1.00 1.00 1.00 0.34
Lane Grp Cap(c), veh/h 473 779 748 524 1059 985 125 406 345 142 0 256
V/C Ratio(X) 0.55 0.96 0.97 1.01 0.49 0.49 0.88 0.97 1.17 0.18 0.00 0.47
Avail Cap(c_a), veh/h 563 779 748 524 1059 985 125 406 345 142 0 256
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 14.8 31.2 31.4 36.6 14.2 14.2 52.8 42.6 43.0 54.8 0.0 43.1
Incr Delay (d2), s/veh 1.0 24.2 26.8 42.7 1.6 1.8 45.9 37.6 102.9 2.7 0.0 6.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile Back of Q (50%), veh/ln 3.8 24.6 24.6 20.8 8.3 7.8 2.3 15.0 19.3 0.4 0.0 3.5
Lane Grp Delay (d), s/veh 15.8 55.4 58.2 79.4 15.9 16.0 98.7 80.3 145.9 57.5 0.0 49.2
Lane Grp LOS B E E F B B F F F E D
Approach Vol, veh/h 1738 1538 908 145
Approach Delay, s/veh 50.6 37.8 111.7 50.6
Approach LOS D D F D
Timer
Assigned Phs 7 4 3 8 5 2 6
Phs Duration (G+Y+Rc), s 15.4 50.0 32.0 66.6 8.0 28.0 20.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 17.0 46.0 28.0 57.0 4.0 24.0 16.0
Max Q Clear Time (g_c+I1), s 11.1 45.9 30.0 20.5 5.5 26.0 18.0
Green Ext Time (p_c), s 0.4 0.1 0.0 25.0 0.0 0.0 0.0
Intersection Summary
HCM 2010 Ctrl Delay 58.9
HCM 2010 LOS E
Notes
136
HCM 2010 Signalized Intersection Summary 2025 Background + Project PM Imp.syn
1: Centre Avenue & Prospect Road 2/9/2015
2025 Background + Project PM Imp 1/26/2015 Synchro 8 Report
Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 60 1143 60 290 1064 53 111 112 402 96 204 155
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow veh/h/ln 186.3 186.3 190.0 186.3 186.3 190.0 186.3 186.3 186.3 186.3 186.3 190.0
Lanes 1 2 0 1 2 0 2 1 1 2 1 0
Cap, veh/h 263 1351 97 364 1764 108 157 630 536 525 243 199
Arrive On Green 0.04 0.39 0.39 0.16 0.51 0.51 0.05 0.34 0.34 0.26 0.26 0.26
Sat Flow, veh/h 1774 3436 246 1774 3475 213 3442 1863 1583 1536 948 777
Grp Volume(v), veh/h 87 680 666 337 620 608 135 170 462 126 0 464
Grp Sat Flow(s),veh/h/ln 1774 1863 1819 1774 1863 1825 1721 1863 1583 768 0 1726
Q Serve(g_s), s 3.2 38.1 38.3 15.3 26.8 26.9 4.3 7.3 29.8 7.3 0.0 28.0
Cycle Q Clear(g_c), s 3.2 38.1 38.3 15.3 26.8 26.9 4.3 7.3 29.8 7.3 0.0 28.0
Prop In Lane 1.00 0.14 1.00 0.12 1.00 1.00 1.00 0.45
Lane Grp Cap(c), veh/h 263 733 715 364 946 927 157 630 536 525 0 442
V/C Ratio(X) 0.33 0.93 0.93 0.92 0.66 0.66 0.86 0.27 0.86 0.24 0.00 1.05
Avail Cap(c_a), veh/h 298 733 715 375 946 927 157 630 536 525 0 442
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 19.4 31.7 31.8 34.6 19.9 19.9 51.8 26.3 33.8 33.0 0.0 40.7
Incr Delay (d2), s/veh 0.7 19.7 20.5 27.9 3.5 3.6 34.7 1.1 16.6 1.1 0.0 56.6
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile Back of Q (50%), veh/ln 1.4 21.2 20.9 12.2 12.5 12.3 2.6 3.5 13.9 1.5 0.0 19.0
Lane Grp Delay (d), s/veh 20.1 51.4 52.2 62.5 23.4 23.5 86.6 27.4 50.4 34.0 0.0 97.2
Lane Grp LOS C D D E C C F C D C F
Approach Vol, veh/h 1433 1565 767 590
Approach Delay, s/veh 49.9 31.9 51.7 83.7
Approach LOS D C D F
Timer
Assigned Phs 7 4 3 8 5 2 6
Phs Duration (G+Y+Rc), s 8.8 47.0 21.3 59.5 9.0 41.0 32.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 7.0 43.0 18.0 54.0 5.0 37.0 28.0
Max Q Clear Time (g_c+I1), s 5.2 40.3 17.3 28.9 6.3 31.8 30.0
Green Ext Time (p_c), s 0.0 2.5 0.1 19.3 0.0 2.8 0.0
Intersection Summary
HCM 2010 Ctrl Delay 48.3
HCM 2010 LOS D
Notes
137
HCM 2010 Signalized Intersection Summary 2015 Existing AM.syn
2: Shields Street & Raintree Drive/Centre Avenue 2/2/2015
2015 Existing AM 1/26/2015 Synchro 8 Report
Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 104 172 32 48 31 31 41 913 273 103 727 58
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow veh/h/ln 186.3 186.3 186.3 186.3 186.3 186.3 186.3 186.3 190.0 186.3 186.3 190.0
Lanes 1 1 1 1 1 1 1 2 0 1 2 0
Cap, veh/h 356 328 279 170 217 185 414 1609 470 268 1996 205
Arrive On Green 0.10 0.18 0.18 0.04 0.12 0.12 0.03 0.58 0.58 0.05 0.60 0.60
Sat Flow, veh/h 1774 1863 1583 1774 1863 1583 1774 2773 810 1774 3324 342
Grp Volume(v), veh/h 179 277 52 56 56 48 56 743 699 145 458 443
Grp Sat Flow(s),veh/h/ln 1774 1863 1583 1774 1863 1583 1774 1863 1720 1774 1863 1802
Q Serve(g_s), s 8.2 14.9 2.9 2.8 2.8 2.9 1.3 28.8 29.6 3.2 13.4 13.4
Cycle Q Clear(g_c), s 8.2 14.9 2.9 2.8 2.8 2.9 1.3 28.8 29.6 3.2 13.4 13.4
Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.47 1.00 0.19
Lane Grp Cap(c), veh/h 356 328 279 170 217 185 414 1081 998 268 1119 1082
V/C Ratio(X) 0.50 0.84 0.19 0.33 0.26 0.26 0.14 0.69 0.70 0.54 0.41 0.41
Avail Cap(c_a), veh/h 356 433 368 172 325 276 428 1081 998 367 1119 1082
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 29.4 41.2 36.2 38.5 41.5 41.5 8.7 15.1 15.3 14.9 10.9 10.9
Incr Delay (d2), s/veh 1.1 11.2 0.3 1.1 0.6 0.7 0.1 3.6 4.1 1.7 1.1 1.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile Back of Q (50%), veh/ln 3.7 8.1 1.2 1.3 1.4 1.2 0.5 13.0 12.4 1.6 5.8 5.6
Lane Grp Delay (d), s/veh 30.5 52.4 36.6 39.6 42.1 42.3 8.9 18.7 19.4 16.6 12.0 12.1
Lane Grp LOS C D D D D D A B B B B B
Approach Vol, veh/h 508 160 1498 1046
Approach Delay, s/veh 43.1 41.3 18.7 12.7
Approach LOS D D B B
Timer
Assigned Phs 7 4 3 8 5 2 1 6
Phs Duration (G+Y+Rc), s 14.0 22.2 7.9 16.1 7.2 63.9 9.3 66.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 10.0 24.0 4.0 18.0 4.0 55.0 11.0 62.0
Max Q Clear Time (g_c+I1), s 10.2 16.9 4.8 4.9 3.3 31.6 5.2 15.4
Green Ext Time (p_c), s 0.0 1.3 0.0 1.9 0.0 16.7 0.2 25.9
Intersection Summary
HCM 2010 Ctrl Delay 21.7
HCM 2010 LOS C
Notes
138
HCM 2010 Signalized Intersection Summary 2015 Existing PM.syn
2: Shields Street & Raintree Drive/Centre Avenue 2/2/2015
2015 Existing PM 1/26/2015 Synchro 8 Report
Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 101 107 122 169 118 80 71 902 107 89 1094 112
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow veh/h/ln 186.3 186.3 186.3 186.3 186.3 186.3 186.3 186.3 190.0 186.3 186.3 190.0
Lanes 1 1 1 1 1 1 1 2 0 1 2 0
Cap, veh/h 350 317 269 296 403 342 242 1591 265 316 1704 213
Arrive On Green 0.06 0.17 0.17 0.11 0.22 0.22 0.04 0.51 0.51 0.06 0.52 0.52
Sat Flow, veh/h 1774 1863 1583 1774 1863 1583 1774 3115 519 1774 3247 407
Grp Volume(v), veh/h 140 255 167 204 140 100 92 574 546 137 688 665
Grp Sat Flow(s),veh/h/ln 1774 1863 1583 1774 1863 1583 1774 1863 1771 1774 1863 1791
Q Serve(g_s), s 6.0 13.3 9.9 8.6 6.4 5.3 2.5 22.0 22.0 3.6 28.1 28.4
Cycle Q Clear(g_c), s 6.0 13.3 9.9 8.6 6.4 5.3 2.5 22.0 22.0 3.6 28.1 28.4
Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.29 1.00 0.23
Lane Grp Cap(c), veh/h 350 317 269 296 403 342 242 951 904 316 977 940
V/C Ratio(X) 0.40 0.81 0.62 0.69 0.35 0.29 0.38 0.60 0.60 0.43 0.70 0.71
Avail Cap(c_a), veh/h 350 406 345 319 516 439 292 951 904 428 977 940
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 32.8 40.3 38.9 27.2 33.5 33.1 15.4 17.5 17.5 13.4 18.1 18.2
Incr Delay (d2), s/veh 0.7 8.9 2.3 5.7 0.5 0.5 1.0 2.8 3.0 0.9 4.2 4.5
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile Back of Q (50%), veh/ln 3.1 7.1 4.2 4.6 3.1 2.2 1.0 10.2 9.7 1.4 13.2 12.8
Lane Grp Delay (d), s/veh 33.5 49.3 41.2 32.9 34.1 33.6 16.3 20.3 20.5 14.3 22.3 22.6
Lane Grp LOS C D D C C C B C C B C C
Approach Vol, veh/h 562 444 1212 1490
Approach Delay, s/veh 42.9 33.4 20.1 21.7
Approach LOS D C C C
Timer
Assigned Phs 7 4 3 8 5 2 1 6
Phs Duration (G+Y+Rc), s 10.0 21.2 14.7 25.9 8.2 55.6 9.6 57.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 6.0 22.0 12.0 28.0 7.0 48.0 12.0 53.0
Max Q Clear Time (g_c+I1), s 8.0 15.3 10.6 8.4 4.5 24.0 5.6 30.4
Green Ext Time (p_c), s 0.0 1.9 0.1 3.1 0.0 17.6 0.2 16.9
Intersection Summary
HCM 2010 Ctrl Delay 25.8
HCM 2010 LOS C
Notes
139
HCM 2010 Signalized Intersection Summary 2015 Background + Project AM.syn
2: Shields Street & Raintree Drive/Centre Avenue 2/2/2015
2015 Background + Project AM 1/26/2015 Synchro 8 Report
Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 104 172 32 57 31 49 41 913 291 139 727 58
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow veh/h/ln 186.3 186.3 186.3 186.3 186.3 186.3 186.3 186.3 190.0 186.3 186.3 190.0
Lanes 1 1 1 1 1 1 1 2 0 1 2 0
Cap, veh/h 348 323 274 166 217 184 417 1571 489 277 2016 207
Arrive On Green 0.09 0.17 0.17 0.04 0.12 0.12 0.03 0.58 0.58 0.06 0.61 0.61
Sat Flow, veh/h 1774 1863 1583 1774 1863 1583 1774 2728 848 1774 3324 342
Grp Volume(v), veh/h 179 277 52 66 56 75 56 755 709 196 458 443
Grp Sat Flow(s),veh/h/ln 1774 1863 1583 1774 1863 1583 1774 1863 1713 1774 1863 1802
Q Serve(g_s), s 8.4 15.2 3.0 3.4 2.9 4.6 1.4 30.5 31.6 4.2 13.5 13.5
Cycle Q Clear(g_c), s 8.4 15.2 3.0 3.4 2.9 4.6 1.4 30.5 31.6 4.2 13.5 13.5
Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.50 1.00 0.19
Lane Grp Cap(c), veh/h 348 323 274 166 217 184 417 1073 987 277 1130 1093
V/C Ratio(X) 0.51 0.86 0.19 0.40 0.26 0.41 0.13 0.70 0.72 0.71 0.41 0.41
Avail Cap(c_a), veh/h 348 388 330 166 283 240 430 1073 987 387 1130 1093
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 30.5 42.4 37.3 39.6 42.5 43.2 9.0 15.9 16.2 18.8 10.8 10.8
Incr Delay (d2), s/veh 1.3 15.1 0.3 1.5 0.6 1.4 0.1 3.9 4.5 3.5 1.1 1.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile Back of Q (50%), veh/ln 3.9 8.7 1.2 1.6 1.4 1.9 0.5 13.7 13.2 5.4 5.8 5.6
Lane Grp Delay (d), s/veh 31.8 57.4 37.6 41.2 43.1 44.7 9.1 19.8 20.7 22.3 11.9 11.9
Lane Grp LOS C E D D D D A B C C B B
Approach Vol, veh/h 508 197 1520 1097
Approach Delay, s/veh 46.4 43.1 19.8 13.8
Approach LOS D D B B
Timer
Assigned Phs 7 4 3 8 5 2 1 6
Phs Duration (G+Y+Rc), s 14.0 22.3 8.0 16.3 7.2 64.8 10.5 68.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 10.0 22.0 4.0 16.0 4.0 55.0 13.0 64.0
Max Q Clear Time (g_c+I1), s 10.4 17.2 5.4 6.6 3.4 33.6 6.2 15.5
Green Ext Time (p_c), s 0.0 1.0 0.0 1.6 0.0 15.8 0.3 26.9
Intersection Summary
HCM 2010 Ctrl Delay 23.3
HCM 2010 LOS C
Notes
140
HCM 2010 Signalized Intersection Summary 2015 Background + Project PM.syn
2: Shields Street & Raintree Drive/Centre Avenue 2/2/2015
2015 Background + Project PM 1/26/2015 Synchro 8 Report
Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 101 107 122 193 118 128 71 902 126 126 1094 112
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow veh/h/ln 186.3 186.3 186.3 186.3 186.3 186.3 186.3 186.3 190.0 186.3 186.3 190.0
Lanes 1 1 1 1 1 1 1 2 0 1 2 0
Cap, veh/h 360 315 268 317 407 346 237 1462 286 317 1664 208
Arrive On Green 0.07 0.17 0.17 0.12 0.22 0.22 0.04 0.48 0.48 0.07 0.51 0.51
Sat Flow, veh/h 1774 1863 1583 1774 1863 1583 1774 3029 592 1774 3247 407
Grp Volume(v), veh/h 140 255 167 233 140 160 92 590 558 194 688 665
Grp Sat Flow(s),veh/h/ln 1774 1863 1583 1774 1863 1583 1774 1863 1758 1774 1863 1791
Q Serve(g_s), s 6.6 13.4 9.9 9.9 6.4 8.9 2.6 24.3 24.4 5.1 29.0 29.2
Cycle Q Clear(g_c), s 6.6 13.4 9.9 9.9 6.4 8.9 2.6 24.3 24.4 5.1 29.0 29.2
Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.34 1.00 0.23
Lane Grp Cap(c), veh/h 360 315 268 317 407 346 237 899 849 317 955 918
V/C Ratio(X) 0.39 0.81 0.62 0.74 0.34 0.46 0.39 0.66 0.66 0.61 0.72 0.72
Avail Cap(c_a), veh/h 360 385 328 351 514 437 283 899 849 451 955 918
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 32.0 40.6 39.2 26.8 33.5 34.5 16.5 19.9 19.9 16.0 19.1 19.2
Incr Delay (d2), s/veh 0.7 10.2 2.5 7.1 0.5 1.0 1.0 3.7 4.0 1.9 4.7 5.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile Back of Q (50%), veh/ln 3.0 7.3 4.2 6.6 3.1 3.7 1.1 11.4 10.9 2.1 13.7 13.3
Lane Grp Delay (d), s/veh 32.7 50.8 41.7 33.8 34.0 35.5 17.5 23.6 23.8 17.9 23.8 24.2
Lane Grp LOS C D D C C D B C C B C C
Approach Vol, veh/h 562 533 1240 1547
Approach Delay, s/veh 43.6 34.4 23.3 23.2
Approach LOS D C C C
Timer
Assigned Phs 7 4 3 8 5 2 1 6
Phs Duration (G+Y+Rc), s 11.0 21.1 16.0 26.2 8.3 53.0 11.3 56.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 7.0 21.0 14.0 28.0 7.0 44.0 15.0 52.0
Max Q Clear Time (g_c+I1), s 8.6 15.4 11.9 10.9 4.6 26.4 7.1 31.2
Green Ext Time (p_c), s 0.0 1.8 0.1 3.2 0.0 14.0 0.3 16.0
Intersection Summary
HCM 2010 Ctrl Delay 27.7
HCM 2010 LOS C
Notes
141
HCM 2010 Signalized Intersection Summary 2025 Background AM.syn
2: Shields Street & Raintree Drive/Centre Avenue 2/2/2015
2015 Background AM 1/26/2015 Synchro 8 Report
Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 132 218 41 61 39 39 52 1157 346 131 922 74
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow veh/h/ln 186.3 186.3 186.3 186.3 186.3 186.3 186.3 186.3 190.0 186.3 186.3 190.0
Lanes 1 1 1 1 1 1 1 2 0 1 2 0
Cap, veh/h 346 356 302 147 288 245 324 1548 440 210 1977 204
Arrive On Green 0.07 0.19 0.19 0.04 0.15 0.15 0.03 0.55 0.55 0.07 0.60 0.60
Sat Flow, veh/h 1774 1863 1583 1774 1863 1583 1774 2792 793 1774 3322 343
Grp Volume(v), veh/h 228 352 67 71 71 60 71 922 906 185 581 562
Grp Sat Flow(s),veh/h/ln 1774 1863 1583 1774 1863 1583 1774 1863 1723 1774 1863 1802
Q Serve(g_s), s 8.0 20.7 3.9 3.7 3.7 3.7 1.9 48.1 54.3 6.3 20.2 20.2
Cycle Q Clear(g_c), s 8.0 20.7 3.9 3.7 3.7 3.7 1.9 48.1 54.3 6.3 20.2 20.2
Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.46 1.00 0.19
Lane Grp Cap(c), veh/h 346 356 302 147 288 245 324 1033 955 210 1108 1072
V/C Ratio(X) 0.66 0.99 0.22 0.48 0.25 0.25 0.22 0.89 0.95 0.88 0.52 0.52
Avail Cap(c_a), veh/h 346 356 302 147 288 245 348 1033 955 210 1108 1072
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 35.9 44.4 37.6 38.6 40.9 40.9 11.1 21.6 23.0 33.4 13.1 13.1
Incr Delay (d2), s/veh 4.5 44.9 0.4 2.4 0.4 0.5 0.3 11.7 19.0 32.3 1.8 1.8
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile Back of Q (50%), veh/ln 2.6 14.3 1.6 1.8 1.8 1.5 0.8 23.6 26.2 7.0 8.9 8.7
Lane Grp Delay (d), s/veh 40.5 89.3 38.0 41.0 41.3 41.4 11.4 33.3 42.0 65.7 14.9 14.9
Lane Grp LOS D F D D D D B C D E B B
Approach Vol, veh/h 647 202 1899 1328
Approach Delay, s/veh 66.8 41.2 36.6 22.0
Approach LOS E D D C
Timer
Assigned Phs 7 4 3 8 5 2 1 6
Phs Duration (G+Y+Rc), s 12.0 25.0 8.0 21.0 7.5 65.0 12.0 69.5
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 8.0 21.0 4.0 17.0 5.0 61.0 8.0 64.0
Max Q Clear Time (g_c+I1), s 10.0 22.7 5.7 5.7 3.9 56.3 8.3 22.2
Green Ext Time (p_c), s 0.0 0.0 0.0 2.3 0.0 4.5 0.0 33.1
Intersection Summary
HCM 2010 Ctrl Delay 36.9
HCM 2010 LOS D
Notes
142
HCM 2010 Signalized Intersection Summary 2025 Background PM.syn
2: Shields Street & Raintree Drive/Centre Avenue 2/2/2015
2025 Background PM 1/26/2015 Synchro 8 Report
Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 128 136 155 214 150 101 90 1143 136 113 1387 142
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow veh/h/ln 186.3 186.3 186.3 186.3 186.3 186.3 186.3 186.3 190.0 186.3 186.3 190.0
Lanes 1 1 1 1 1 1 1 2 0 1 2 0
Cap, veh/h 344 339 288 267 389 331 169 1556 258 246 1684 209
Arrive On Green 0.08 0.18 0.18 0.11 0.21 0.21 0.05 0.50 0.50 0.06 0.52 0.52
Sat Flow, veh/h 1774 1863 1583 1774 1863 1583 1774 3117 517 1774 3250 404
Grp Volume(v), veh/h 178 324 212 258 179 126 117 724 695 174 865 851
Grp Sat Flow(s),veh/h/ln 1774 1863 1583 1774 1863 1583 1774 1863 1771 1774 1863 1791
Q Serve(g_s), s 9.0 19.0 13.9 12.0 9.2 7.5 3.5 35.0 35.6 5.0 46.0 48.0
Cycle Q Clear(g_c), s 9.0 19.0 13.9 12.0 9.2 7.5 3.5 35.0 35.6 5.0 46.0 48.0
Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.29 1.00 0.23
Lane Grp Cap(c), veh/h 344 339 288 267 389 331 169 930 884 246 965 928
V/C Ratio(X) 0.52 0.96 0.74 0.97 0.46 0.38 0.69 0.78 0.79 0.71 0.90 0.92
Avail Cap(c_a), veh/h 344 339 288 267 389 331 169 930 884 309 965 928
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 33.4 44.6 42.5 32.5 38.1 37.4 25.0 22.6 22.7 21.7 23.8 24.3
Incr Delay (d2), s/veh 1.3 37.4 9.5 45.4 0.8 0.7 11.3 6.4 7.0 5.4 12.7 15.2
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile Back of Q (50%), veh/ln 4.1 12.5 6.4 8.9 4.5 3.1 3.8 16.9 16.6 5.2 23.1 23.5
Lane Grp Delay (d), s/veh 34.7 82.0 52.0 77.9 38.9 38.1 36.3 29.0 29.7 27.1 36.5 39.5
Lane Grp LOS C F D E D D D C C C D D
Approach Vol, veh/h 714 563 1536 1890
Approach Delay, s/veh 61.3 56.6 29.9 37.0
Approach LOS E E C D
Timer
Assigned Phs 7 4 3 8 5 2 1 6
Phs Duration (G+Y+Rc), s 13.0 24.0 16.0 27.0 9.0 58.9 11.1 61.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 9.0 20.0 12.0 23.0 5.0 51.0 11.0 57.0
Max Q Clear Time (g_c+I1), s 11.0 21.0 14.0 11.2 5.5 37.6 7.0 50.0
Green Ext Time (p_c), s 0.0 0.0 0.0 3.4 0.0 12.4 0.2 6.7
Intersection Summary
HCM 2010 Ctrl Delay 40.7
HCM 2010 LOS D
Notes
143
HCM 2010 Signalized Intersection Summary 2025 Background + Project AM.syn
2: Shields Street & Raintree Drive/Centre Avenue 2/2/2015
2025 Background + Project AM 1/26/2015 Synchro 8 Report
Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 132 218 41 70 39 57 52 1157 364 167 922 74
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow veh/h/ln 186.3 186.3 186.3 186.3 186.3 186.3 186.3 186.3 190.0 186.3 186.3 190.0
Lanes 1 1 1 1 1 1 1 2 0 1 2 0
Cap, veh/h 342 356 302 147 288 245 324 1455 433 243 1976 204
Arrive On Green 0.07 0.19 0.19 0.04 0.15 0.15 0.03 0.53 0.53 0.10 0.59 0.59
Sat Flow, veh/h 1774 1863 1583 1774 1863 1583 1774 2759 822 1774 3322 343
Grp Volume(v), veh/h 228 352 67 81 71 88 71 932 918 235 581 562
Grp Sat Flow(s),veh/h/ln 1774 1863 1583 1774 1863 1583 1774 1863 1718 1774 1863 1802
Q Serve(g_s), s 8.0 20.7 3.9 4.0 3.7 5.5 2.0 52.1 58.0 10.4 20.2 20.2
Cycle Q Clear(g_c), s 8.0 20.7 3.9 4.0 3.7 5.5 2.0 52.1 58.0 10.4 20.2 20.2
Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.48 1.00 0.19
Lane Grp Cap(c), veh/h 342 356 302 147 288 245 324 982 906 243 1108 1072
V/C Ratio(X) 0.67 0.99 0.22 0.55 0.25 0.36 0.22 0.95 1.01 0.97 0.52 0.52
Avail Cap(c_a), veh/h 342 356 302 147 288 245 348 982 906 243 1108 1072
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 36.0 44.4 37.6 39.7 40.9 41.6 12.0 24.6 26.0 39.0 13.1 13.1
Incr Delay (d2), s/veh 4.8 44.9 0.4 4.3 0.4 0.9 0.3 18.8 33.2 48.5 1.8 1.8
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile Back of Q (50%), veh/ln 2.6 14.3 1.6 2.1 1.8 2.3 0.8 27.4 31.0 9.8 8.9 8.7
Lane Grp Delay (d), s/veh 40.8 89.3 38.0 43.9 41.3 42.5 12.3 43.4 59.2 87.5 14.9 15.0
Lane Grp LOS D F D D D D B D F F B B
Approach Vol, veh/h 647 240 1921 1378
Approach Delay, s/veh 66.9 42.6 49.8 27.3
Approach LOS E D D C
Timer
Assigned Phs 7 4 3 8 5 2 1 6
Phs Duration (G+Y+Rc), s 12.0 25.0 8.0 21.0 7.6 62.0 15.0 69.4
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 8.0 21.0 4.0 17.0 5.0 58.0 11.0 64.0
Max Q Clear Time (g_c+I1), s 10.0 22.7 6.0 7.5 4.0 60.0 12.4 22.2
Green Ext Time (p_c), s 0.0 0.0 0.0 2.2 0.0 0.0 0.0 33.4
Intersection Summary
HCM 2010 Ctrl Delay 44.6
HCM 2010 LOS D
Notes
144
HCM 2010 Signalized Intersection Summary 2025 Background + Project PM.syn
2: Shields Street & Raintree Drive/Centre Avenue 2/2/2015
2025 Background + Project PM 1/26/2015 Synchro 8 Report
Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 128 136 155 238 150 149 90 1143 155 150 1387 142
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow veh/h/ln 186.3 186.3 186.3 186.3 186.3 186.3 186.3 186.3 190.0 186.3 186.3 190.0
Lanes 1 1 1 1 1 1 1 2 0 1 2 0
Cap, veh/h 347 339 288 283 406 345 164 1425 269 260 1655 206
Arrive On Green 0.08 0.18 0.18 0.12 0.22 0.22 0.05 0.47 0.47 0.09 0.51 0.51
Sat Flow, veh/h 1774 1863 1583 1774 1863 1583 1774 3049 575 1774 3250 404
Grp Volume(v), veh/h 178 324 212 287 179 186 117 739 708 231 865 851
Grp Sat Flow(s),veh/h/ln 1774 1863 1583 1774 1863 1583 1774 1863 1761 1774 1863 1791
Q Serve(g_s), s 9.0 19.0 13.9 13.0 9.1 11.4 3.8 38.5 39.4 7.5 46.8 48.9
Cycle Q Clear(g_c), s 9.0 19.0 13.9 13.0 9.1 11.4 3.8 38.5 39.4 7.5 46.8 48.9
Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.33 1.00 0.23
Lane Grp Cap(c), veh/h 347 339 288 283 406 345 164 870 823 260 948 912
V/C Ratio(X) 0.51 0.96 0.74 1.01 0.44 0.54 0.71 0.85 0.86 0.89 0.91 0.93
Avail Cap(c_a), veh/h 347 339 288 283 406 345 164 870 823 283 948 912
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 33.3 44.6 42.5 30.9 37.2 38.1 25.4 25.9 26.1 27.1 24.7 25.2
Incr Delay (d2), s/veh 1.3 37.4 9.5 56.8 0.8 1.7 13.4 10.1 11.4 25.7 14.4 17.4
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile Back of Q (50%), veh/ln 4.1 12.5 6.4 10.3 4.4 4.8 3.9 19.3 18.9 5.0 24.0 24.5
Lane Grp Delay (d), s/veh 34.6 82.0 52.0 87.7 37.9 39.8 38.8 36.0 37.5 52.8 39.2 42.7
Lane Grp LOS C F D F D D D D D D D D
Approach Vol, veh/h 714 652 1564 1947
Approach Delay, s/veh 61.3 60.4 36.9 42.3
Approach LOS E E D D
Timer
Assigned Phs 7 4 3 8 5 2 1 6
Phs Duration (G+Y+Rc), s 13.0 24.0 17.0 28.0 9.0 55.4 13.6 60.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 9.0 20.0 13.0 24.0 5.0 50.0 11.0 56.0
Max Q Clear Time (g_c+I1), s 11.0 21.0 15.0 13.4 5.8 41.4 9.5 50.9
Green Ext Time (p_c), s 0.0 0.0 0.0 3.4 0.0 8.2 0.1 5.0
Intersection Summary
HCM 2010 Ctrl Delay 45.8
HCM 2010 LOS D
Notes
145
HCM Unsignalized Intersection Capacity Analysis 2015 Existing AM.syn
3: Research Boulevard & Centre Avenue 2/3/2015
2015 Existing AM 1/26/2015 Synchro 8 Report
Page 1
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Volume (veh/h) 424 44 65 137 28 157
Sign Control Free Free Stop
Grade 0% 0% 0%
Peak Hour Factor 0.78 0.52 0.96 0.88 0.70 0.68
Hourly flow rate (vph) 544 85 68 156 40 231
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh) 4
Median type TWLTL TWLTL
Median storage veh) 2 2
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 628 877 586
vC1, stage 1 conf vol 586
vC2, stage 2 conf vol 291
vCu, unblocked vol 628 877 586
tC, single (s) 4.1 6.4 6.2
tC, 2 stage (s) 5.4
tF (s) 2.2 3.5 3.3
p0 queue free % 93 92 55
cM capacity (veh/h) 954 493 510
Direction, Lane # EB 1 WB 1 WB 2 NB 1
Volume Total 628 68 156 271
Volume Left 0 68 0 40
Volume Right 85 0 0 231
cSH 1700 954 1700 599
Volume to Capacity 0.37 0.07 0.09 0.45
Queue Length 95th (ft) 0 6 0 59
Control Delay (s) 0.0 9.1 0.0 17.0
Lane LOS A C
Approach Delay (s) 0.0 2.7 17.0
Approach LOS C
Intersection Summary
Average Delay 4.7
Intersection Capacity Utilization 41.9% ICU Level of Service A
Analysis Period (min) 15
146
HCM Unsignalized Intersection Capacity Analysis 2015 Existing PM.syn
3: Research Boulevard & Centre Avenue 2/3/2015
2015 Existing PM 1/26/2015 Synchro 8 Report
Page 1
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Volume (veh/h) 155 54 205 337 46 123
Sign Control Free Free Stop
Grade 0% 0% 0%
Peak Hour Factor 0.86 0.68 0.90 0.85 0.82 0.88
Hourly flow rate (vph) 180 79 228 396 56 140
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh) 4
Median type TWLTL TWLTL
Median storage veh) 2 2
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 260 1072 220
vC1, stage 1 conf vol 220
vC2, stage 2 conf vol 852
vCu, unblocked vol 260 1072 220
tC, single (s) 4.1 6.4 6.2
tC, 2 stage (s) 5.4
tF (s) 2.2 3.5 3.3
p0 queue free % 83 83 83
cM capacity (veh/h) 1305 331 820
Direction, Lane # EB 1 WB 1 WB 2 NB 1
Volume Total 260 228 396 196
Volume Left 0 228 0 56
Volume Right 79 0 0 140
cSH 1700 1305 1700 1149
Volume to Capacity 0.15 0.17 0.23 0.17
Queue Length 95th (ft) 0 16 0 15
Control Delay (s) 0.0 8.3 0.0 12.5
Lane LOS A B
Approach Delay (s) 0.0 3.0 12.5
Approach LOS B
Intersection Summary
Average Delay 4.0
Intersection Capacity Utilization 36.1% ICU Level of Service A
Analysis Period (min) 15
147
HCM Unsignalized Intersection Capacity Analysis 2015 Background + Project AM.syn
3: Research Boulevard & Centre Avenue 2/3/2015
2015 Background + Project AM 1/26/2015 Synchro 8 Report
Page 1
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Volume (veh/h) 442 80 83 146 46 166
Sign Control Free Free Stop
Grade 0% 0% 0%
Peak Hour Factor 0.78 0.52 0.96 0.88 0.70 0.68
Hourly flow rate (vph) 567 154 86 166 66 244
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh) 4
Median type TWLTL TWLTL
Median storage veh) 2 2
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 721 982 644
vC1, stage 1 conf vol 644
vC2, stage 2 conf vol 339
vCu, unblocked vol 721 982 644
tC, single (s) 4.1 6.4 6.2
tC, 2 stage (s) 5.4
tF (s) 2.2 3.5 3.3
p0 queue free % 90 85 48
cM capacity (veh/h) 881 453 473
Direction, Lane # EB 1 WB 1 WB 2 NB 1
Volume Total 721 86 166 310
Volume Left 0 86 0 66
Volume Right 154 0 0 244
cSH 1700 881 1700 600
Volume to Capacity 0.42 0.10 0.10 0.52
Queue Length 95th (ft) 0 8 0 74
Control Delay (s) 0.0 9.5 0.0 19.1
Lane LOS A C
Approach Delay (s) 0.0 3.3 19.1
Approach LOS C
Intersection Summary
Average Delay 5.3
Intersection Capacity Utilization 46.1% ICU Level of Service A
Analysis Period (min) 15
148
HCM Unsignalized Intersection Capacity Analysis 2015 Background + Project PM.syn
3: Research Boulevard & Centre Avenue 2/3/2015
2015 Background + Project PM 1/26/2015 Synchro 8 Report
Page 1
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Volume (veh/h) 174 91 224 361 94 147
Sign Control Free Free Stop
Grade 0% 0% 0%
Peak Hour Factor 0.86 0.68 0.90 0.85 0.82 0.88
Hourly flow rate (vph) 202 134 249 425 115 167
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh) 4
Median type TWLTL TWLTL
Median storage veh) 2 2
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 336 1192 269
vC1, stage 1 conf vol 269
vC2, stage 2 conf vol 922
vCu, unblocked vol 336 1192 269
tC, single (s) 4.1 6.4 6.2
tC, 2 stage (s) 5.4
tF (s) 2.2 3.5 3.3
p0 queue free % 80 61 78
cM capacity (veh/h) 1223 295 769
Direction, Lane # EB 1 WB 1 WB 2 NB 1
Volume Total 336 249 425 282
Volume Left 0 249 0 115
Volume Right 134 0 0 167
cSH 1700 1223 1700 725
Volume to Capacity 0.20 0.20 0.25 0.39
Queue Length 95th (ft) 0 19 0 46
Control Delay (s) 0.0 8.7 0.0 16.6
Lane LOS A C
Approach Delay (s) 0.0 3.2 16.6
Approach LOS C
Intersection Summary
Average Delay 5.3
Intersection Capacity Utilization 42.3% ICU Level of Service A
Analysis Period (min) 15
149
HCM Unsignalized Intersection Capacity Analysis 2025 Background AM.syn
3: Research Boulevard & Centre Avenue 2/3/2015
2015 Background AM 1/26/2015 Synchro 8 Report
Page 1
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Volume (veh/h) 537 56 82 174 35 199
Sign Control Free Free Stop
Grade 0% 0% 0%
Peak Hour Factor 0.78 0.52 0.96 0.88 0.70 0.68
Hourly flow rate (vph) 688 108 85 198 50 293
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh) 4
Median type TWLTL TWLTL
Median storage veh) 2 2
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 796 1111 742
vC1, stage 1 conf vol 742
vC2, stage 2 conf vol 369
vCu, unblocked vol 796 1111 742
tC, single (s) 4.1 6.4 6.2
tC, 2 stage (s) 5.4
tF (s) 2.2 3.5 3.3
p0 queue free % 90 88 30
cM capacity (veh/h) 826 409 415
Direction, Lane # EB 1 WB 1 WB 2 NB 1
Volume Total 796 85 198 343
Volume Left 0 85 0 50
Volume Right 108 0 0 293
cSH 1700 826 1700 486
Volume to Capacity 0.47 0.10 0.12 0.70
Queue Length 95th (ft) 0 9 0 137
Control Delay (s) 0.0 9.9 0.0 29.4
Lane LOS A D
Approach Delay (s) 0.0 3.0 29.4
Approach LOS D
Intersection Summary
Average Delay 7.7
Intersection Capacity Utilization 50.6% ICU Level of Service A
Analysis Period (min) 15
150
HCM Unsignalized Intersection Capacity Analysis 2025 Background PM.syn
3: Research Boulevard & Centre Avenue 2/3/2015
2025 Background PM 1/26/2015 Synchro 8 Report
Page 1
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Volume (veh/h) 196 68 260 427 58 156
Sign Control Free Free Stop
Grade 0% 0% 0%
Peak Hour Factor 0.86 0.68 0.90 0.85 0.82 0.88
Hourly flow rate (vph) 228 100 289 502 71 177
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh) 4
Median type TWLTL TWLTL
Median storage veh) 2 2
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 328 1358 278
vC1, stage 1 conf vol 278
vC2, stage 2 conf vol 1080
vCu, unblocked vol 328 1358 278
tC, single (s) 4.1 6.4 6.2
tC, 2 stage (s) 5.4
tF (s) 2.2 3.5 3.3
p0 queue free % 77 71 77
cM capacity (veh/h) 1232 240 761
Direction, Lane # EB 1 WB 1 WB 2 NB 1
Volume Total 328 289 502 248
Volume Left 0 289 0 71
Volume Right 100 0 0 177
cSH 1700 1232 1700 841
Volume to Capacity 0.19 0.23 0.30 0.29
Queue Length 95th (ft) 0 23 0 31
Control Delay (s) 0.0 8.8 0.0 15.4
Lane LOS A C
Approach Delay (s) 0.0 3.2 15.4
Approach LOS C
Intersection Summary
Average Delay 4.7
Intersection Capacity Utilization 42.2% ICU Level of Service A
Analysis Period (min) 15
151
HCM Unsignalized Intersection Capacity Analysis 2025 Background + Project AM.syn
3: Research Boulevard & Centre Avenue 2/3/2015
2025 Background + Project AM 1/26/2015 Synchro 8 Report
Page 1
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Volume (veh/h) 555 92 100 183 53 208
Sign Control Free Free Stop
Grade 0% 0% 0%
Peak Hour Factor 0.78 0.52 0.96 0.88 0.70 0.68
Hourly flow rate (vph) 712 177 104 208 76 306
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh) 4
Median type TWLTL TWLTL
Median storage veh) 2 2
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 888 1216 800
vC1, stage 1 conf vol 800
vC2, stage 2 conf vol 416
vCu, unblocked vol 888 1216 800
tC, single (s) 4.1 6.4 6.2
tC, 2 stage (s) 5.4
tF (s) 2.2 3.5 3.3
p0 queue free % 86 80 21
cM capacity (veh/h) 762 376 385
Direction, Lane # EB 1 WB 1 WB 2 NB 1
Volume Total 888 104 208 382
Volume Left 0 104 0 76
Volume Right 177 0 0 306
cSH 1700 762 1700 480
Volume to Capacity 0.52 0.14 0.12 0.79
Queue Length 95th (ft) 0 12 0 182
Control Delay (s) 0.0 10.5 0.0 37.2
Lane LOS B E
Approach Delay (s) 0.0 3.5 37.2
Approach LOS E
Intersection Summary
Average Delay 9.7
Intersection Capacity Utilization 54.3% ICU Level of Service A
Analysis Period (min) 15
152
HCM Unsignalized Intersection Capacity Analysis 2025 Background + Project PM.syn
3: Research Boulevard & Centre Avenue 2/3/2015
2025 Background + Project PM 1/26/2015 Synchro 8 Report
Page 1
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Volume (veh/h) 215 105 279 451 106 180
Sign Control Free Free Stop
Grade 0% 0% 0%
Peak Hour Factor 0.86 0.68 0.90 0.85 0.82 0.88
Hourly flow rate (vph) 250 154 310 531 129 205
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh) 4
Median type TWLTL TWLTL
Median storage veh) 2 2
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 404 1478 327
vC1, stage 1 conf vol 327
vC2, stage 2 conf vol 1151
vCu, unblocked vol 404 1478 327
tC, single (s) 4.1 6.4 6.2
tC, 2 stage (s) 5.4
tF (s) 2.2 3.5 3.3
p0 queue free % 73 39 71
cM capacity (veh/h) 1154 212 714
Direction, Lane # EB 1 WB 1 WB 2 NB 1
Volume Total 404 310 531 334
Volume Left 0 310 0 129
Volume Right 154 0 0 205
cSH 1700 1154 1700 547
Volume to Capacity 0.24 0.27 0.31 0.61
Queue Length 95th (ft) 0 27 0 102
Control Delay (s) 0.0 9.3 0.0 25.0
Lane LOS A C
Approach Delay (s) 0.0 3.4 25.0
Approach LOS C
Intersection Summary
Average Delay 7.1
Intersection Capacity Utilization 49.0% ICU Level of Service A
Analysis Period (min) 15
153
HCM 2010 Signalized Intersection Summary 2015 Existing AM.syn
4: Meadowlark Avenue/Research Boulevard & Drake Road 2/2/2015
2015 Existing AM 1/26/2015 Synchro 8 Report
Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 62 934 20 38 519 169 38 96 81 32 15 10
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow veh/h/ln 186.3 186.3 190.0 186.3 186.3 190.0 186.3 186.3 186.3 186.3 186.3 190.0
Lanes 1 2 0 1 2 0 1 1 1 1 1 0
Cap, veh/h 451 2302 97 351 1685 611 320 385 327 228 194 162
Arrive On Green 0.04 0.65 0.65 0.03 0.65 0.65 0.21 0.21 0.21 0.21 0.21 0.21
Sat Flow, veh/h 1774 3550 150 1774 2612 946 1357 1863 1583 1105 941 784
Grp Volume(v), veh/h 93 598 589 64 474 432 52 135 135 48 0 44
Grp Sat Flow(s),veh/h/ln 1774 1863 1836 1774 1863 1696 1357 1863 1583 1105 0 1724
Q Serve(g_s), s 1.9 17.7 17.7 1.3 12.9 12.9 3.5 6.6 7.9 4.1 0.0 2.2
Cycle Q Clear(g_c), s 1.9 17.7 17.7 1.3 12.9 12.9 5.7 6.6 7.9 10.7 0.0 2.2
Prop In Lane 1.00 0.08 1.00 0.56 1.00 1.00 1.00 0.45
Lane Grp Cap(c), veh/h 451 1208 1191 351 1202 1094 320 385 327 228 0 357
V/C Ratio(X) 0.21 0.49 0.49 0.18 0.39 0.39 0.16 0.35 0.41 0.21 0.00 0.12
Avail Cap(c_a), veh/h 539 1208 1191 411 1202 1094 320 385 327 228 0 357
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 6.6 9.7 9.7 7.4 9.0 9.0 36.7 36.1 36.6 40.7 0.0 34.3
Incr Delay (d2), s/veh 0.2 1.4 1.5 0.2 1.0 1.1 1.1 2.5 3.8 2.1 0.0 0.7
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile Back of Q (50%), veh/ln 0.7 7.5 7.4 0.5 5.3 4.9 1.3 3.4 3.4 1.3 0.0 1.0
Lane Grp Delay (d), s/veh 6.8 11.1 11.2 7.6 10.0 10.1 37.7 38.6 40.4 42.8 0.0 35.1
Lane Grp LOS A B B A A B D D D D D
Approach Vol, veh/h 1280 970 322 92
Approach Delay, s/veh 10.8 9.8 39.2 39.1
Approach LOS B A D D
Timer
Assigned Phs 7 4 3 8 2 6
Phs Duration (G+Y+Rc), s 7.7 73.0 7.4 72.7 26.0 26.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 9.0 69.0 7.0 67.0 22.0 22.0
Max Q Clear Time (g_c+I1), s 3.9 19.7 3.3 14.9 9.9 12.7
Green Ext Time (p_c), s 0.1 21.6 0.0 22.0 1.4 1.2
Intersection Summary
HCM 2010 Ctrl Delay 14.9
HCM 2010 LOS B
Notes
154
HCM 2010 Signalized Intersection Summary 2015 Existing PM.syn
4: Meadowlark Avenue/Research Boulevard & Drake Road 2/2/2015
2015 Existing PM 1/26/2015 Synchro 8 Report
Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 28 845 19 72 1232 96 18 27 44 167 117 54
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow veh/h/ln 186.3 186.3 190.0 186.3 186.3 190.0 186.3 186.3 186.3 186.3 186.3 190.0
Lanes 1 2 0 1 2 0 1 1 1 1 1 0
Cap, veh/h 242 2148 54 385 2047 165 245 483 410 385 326 134
Arrive On Green 0.03 0.59 0.59 0.04 0.60 0.60 0.26 0.26 0.26 0.26 0.26 0.26
Sat Flow, veh/h 1774 3619 90 1774 3404 274 1156 1863 1583 1304 1256 515
Grp Volume(v), veh/h 48 494 490 92 731 716 28 36 52 184 0 220
Grp Sat Flow(s),veh/h/ln 1774 1863 1847 1774 1863 1814 1156 1863 1583 1304 0 1772
Q Serve(g_s), s 1.1 15.9 15.9 2.1 27.8 28.1 2.3 1.6 2.7 13.4 0.0 11.3
Cycle Q Clear(g_c), s 1.1 15.9 15.9 2.1 27.8 28.1 13.6 1.6 2.7 15.0 0.0 11.3
Prop In Lane 1.00 0.05 1.00 0.15 1.00 1.00 1.00 0.29
Lane Grp Cap(c), veh/h 242 1106 1096 385 1121 1092 245 483 410 385 0 459
V/C Ratio(X) 0.20 0.45 0.45 0.24 0.65 0.66 0.11 0.07 0.13 0.48 0.00 0.48
Avail Cap(c_a), veh/h 274 1106 1096 420 1121 1092 245 483 410 385 0 459
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 11.9 12.1 12.1 9.0 14.1 14.2 39.6 30.2 30.7 35.9 0.0 33.9
Incr Delay (d2), s/veh 0.4 1.3 1.3 0.3 3.0 3.1 0.9 0.3 0.6 4.2 0.0 3.6
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile Back of Q (50%), veh/ln 0.4 6.9 6.8 0.8 12.5 12.3 0.7 0.8 1.1 4.9 0.0 5.6
Lane Grp Delay (d), s/veh 12.3 13.4 13.5 9.3 17.1 17.3 40.6 30.5 31.3 40.1 0.0 37.4
Lane Grp LOS B B B A B B D C C D D
Approach Vol, veh/h 1032 1539 116 404
Approach Delay, s/veh 13.4 16.7 33.3 38.6
Approach LOS B B C D
Timer
Assigned Phs 7 4 3 8 2 6
Phs Duration (G+Y+Rc), s 7.1 68.1 7.9 69.0 32.0 32.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 5.0 64.0 6.0 65.0 28.0 28.0
Max Q Clear Time (g_c+I1), s 3.1 17.9 4.1 30.1 15.6 17.0
Green Ext Time (p_c), s 0.0 26.7 0.0 22.6 1.9 1.8
Intersection Summary
HCM 2010 Ctrl Delay 19.1
HCM 2010 LOS B
Notes
155
HCM 2010 Signalized Intersection Summary 2015 Background + Project AM.syn
4: Meadowlark Avenue/Research Boulevard & Drake Road 2/2/2015
2015 Background + Project AM 1/26/2015 Synchro 8 Report
Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 80 934 20 38 519 199 38 105 81 47 19 19
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow veh/h/ln 186.3 186.3 190.0 186.3 186.3 190.0 186.3 186.3 186.3 186.3 186.3 190.0
Lanes 1 2 0 1 2 0 1 1 1 1 1 0
Cap, veh/h 432 2269 96 345 1560 666 310 403 342 230 165 202
Arrive On Green 0.04 0.64 0.64 0.03 0.63 0.63 0.22 0.22 0.22 0.22 0.22 0.22
Sat Flow, veh/h 1774 3550 150 1774 2480 1059 1326 1863 1583 1092 763 935
Grp Volume(v), veh/h 119 598 589 64 500 449 52 148 135 70 0 69
Grp Sat Flow(s),veh/h/ln 1774 1863 1836 1774 1863 1676 1326 1863 1583 1092 0 1698
Q Serve(g_s), s 2.4 18.1 18.2 1.3 14.5 14.5 3.5 7.2 7.8 6.2 0.0 3.5
Cycle Q Clear(g_c), s 2.4 18.1 18.2 1.3 14.5 14.5 7.1 7.2 7.8 13.4 0.0 3.5
Prop In Lane 1.00 0.08 1.00 0.63 1.00 1.00 1.00 0.55
Lane Grp Cap(c), veh/h 432 1191 1174 345 1172 1054 310 403 342 230 0 367
V/C Ratio(X) 0.28 0.50 0.50 0.19 0.43 0.43 0.17 0.37 0.39 0.30 0.00 0.19
Avail Cap(c_a), veh/h 575 1191 1174 405 1172 1054 310 403 342 230 0 367
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 7.2 10.2 10.2 7.9 10.0 10.0 37.0 35.5 35.7 41.2 0.0 34.1
Incr Delay (d2), s/veh 0.3 1.5 1.5 0.3 1.1 1.3 1.2 2.6 3.4 3.4 0.0 1.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile Back of Q (50%), veh/ln 0.9 7.8 7.7 0.5 6.2 5.6 1.3 3.7 3.3 1.9 0.0 1.6
Lane Grp Delay (d), s/veh 7.6 11.7 11.7 8.2 11.1 11.3 38.1 38.1 39.1 44.6 0.0 35.2
Lane Grp LOS A B B A B B D D D D D
Approach Vol, veh/h 1306 1013 335 139
Approach Delay, s/veh 11.3 11.0 38.5 39.9
Approach LOS B B D D
Timer
Assigned Phs 7 4 3 8 2 6
Phs Duration (G+Y+Rc), s 8.5 72.0 7.4 70.9 27.0 27.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 13.0 68.0 7.0 62.0 23.0 23.0
Max Q Clear Time (g_c+I1), s 4.4 20.2 3.3 16.5 9.8 15.4
Green Ext Time (p_c), s 0.2 22.1 0.0 21.6 1.8 1.3
Intersection Summary
HCM 2010 Ctrl Delay 15.9
HCM 2010 LOS B
Notes
156
HCM 2010 Signalized Intersection Summary 2015 Background + Project PM.syn
4: Meadowlark Avenue/Research Boulevard & Drake Road 2/2/2015
2015 Background + Project PM 1/26/2015 Synchro 8 Report
Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 47 845 19 72 1232 127 18 36 44 208 129 78
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow veh/h/ln 186.3 186.3 190.0 186.3 186.3 190.0 186.3 186.3 186.3 186.3 186.3 190.0
Lanes 1 2 0 1 2 0 1 1 1 1 1 0
Cap, veh/h 230 2077 52 372 1910 203 232 517 440 400 316 171
Arrive On Green 0.03 0.57 0.57 0.04 0.58 0.58 0.28 0.28 0.28 0.28 0.28 0.28
Sat Flow, veh/h 1774 3619 90 1774 3312 352 1110 1863 1583 1290 1139 616
Grp Volume(v), veh/h 81 494 490 92 750 732 28 48 52 229 0 265
Grp Sat Flow(s),veh/h/ln 1774 1863 1847 1774 1863 1801 1110 1863 1583 1290 0 1754
Q Serve(g_s), s 2.0 16.6 16.6 2.3 30.8 31.3 2.4 2.1 2.6 17.3 0.0 13.9
Cycle Q Clear(g_c), s 2.0 16.6 16.6 2.3 30.8 31.3 16.3 2.1 2.6 19.4 0.0 13.9
Prop In Lane 1.00 0.05 1.00 0.20 1.00 1.00 1.00 0.35
Lane Grp Cap(c), veh/h 230 1069 1060 372 1074 1039 232 517 440 400 0 487
V/C Ratio(X) 0.35 0.46 0.46 0.25 0.70 0.70 0.12 0.09 0.12 0.57 0.00 0.54
Avail Cap(c_a), veh/h 316 1069 1060 404 1074 1039 232 517 440 400 0 487
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 14.4 13.3 13.3 10.1 16.2 16.3 40.1 28.9 29.1 36.1 0.0 33.2
Incr Delay (d2), s/veh 0.9 1.4 1.5 0.3 3.8 4.0 1.1 0.4 0.5 5.8 0.0 4.3
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile Back of Q (50%), veh/ln 0.8 7.4 7.4 0.9 13.8 13.8 0.7 1.0 1.1 6.3 0.0 6.8
Lane Grp Delay (d), s/veh 15.4 14.8 14.8 10.4 20.0 20.3 41.2 29.3 29.7 41.9 0.0 37.5
Lane Grp LOS B B B B B C D C C D D
Approach Vol, veh/h 1065 1574 128 494
Approach Delay, s/veh 14.8 19.6 32.1 39.6
Approach LOS B B C D
Timer
Assigned Phs 7 4 3 8 2 6
Phs Duration (G+Y+Rc), s 7.7 66.0 8.0 66.3 34.0 34.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 9.0 62.0 6.0 59.0 30.0 30.0
Max Q Clear Time (g_c+I1), s 4.0 18.6 4.3 33.3 18.3 21.4
Green Ext Time (p_c), s 0.1 26.4 0.0 18.6 2.3 2.0
Intersection Summary
HCM 2010 Ctrl Delay 21.5
HCM 2010 LOS C
Notes
157
HCM 2010 Signalized Intersection Summary 2025 Background AM.syn
4: Meadowlark Avenue/Research Boulevard & Drake Road 2/2/2015
2015 Background AM 1/26/2015 Synchro 8 Report
Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 79 1184 25 48 658 214 48 122 103 41 19 13
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow veh/h/ln 186.3 186.3 190.0 186.3 186.3 190.0 186.3 186.3 186.3 186.3 186.3 190.0
Lanes 1 2 0 1 2 0 1 1 1 1 1 0
Cap, veh/h 380 2365 98 279 1725 624 282 349 297 176 176 147
Arrive On Green 0.04 0.67 0.67 0.03 0.66 0.66 0.19 0.19 0.19 0.19 0.19 0.19
Sat Flow, veh/h 1774 3552 147 1774 2613 945 1341 1863 1583 1032 938 786
Grp Volume(v), veh/h 118 756 748 81 601 549 66 172 172 61 0 57
Grp Sat Flow(s),veh/h/ln 1774 1863 1837 1774 1863 1696 1341 1863 1583 1032 0 1724
Q Serve(g_s), s 2.2 24.3 24.5 1.6 17.3 17.3 4.6 8.8 10.6 6.0 0.0 3.0
Cycle Q Clear(g_c), s 2.2 24.3 24.5 1.6 17.3 17.3 7.6 8.8 10.6 14.8 0.0 3.0
Prop In Lane 1.00 0.08 1.00 0.56 1.00 1.00 1.00 0.46
Lane Grp Cap(c), veh/h 380 1240 1223 279 1230 1120 282 349 297 176 0 323
V/C Ratio(X) 0.31 0.61 0.61 0.29 0.49 0.49 0.23 0.49 0.58 0.35 0.00 0.18
Avail Cap(c_a), veh/h 493 1240 1223 335 1230 1120 282 349 297 176 0 323
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 6.9 10.0 10.0 8.7 9.1 9.1 39.6 38.8 39.5 45.4 0.0 36.4
Incr Delay (d2), s/veh 0.5 2.2 2.3 0.6 1.4 1.5 1.9 4.9 8.0 5.3 0.0 1.2
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile Back of Q (50%), veh/ln 0.8 10.2 10.1 0.6 7.3 6.7 1.7 4.7 4.8 1.9 0.0 1.4
Lane Grp Delay (d), s/veh 7.4 12.3 12.3 9.3 10.5 10.6 41.5 43.7 47.5 50.7 0.0 37.6
Lane Grp LOS A B B A B B D D D D D
Approach Vol, veh/h 1622 1231 410 118
Approach Delay, s/veh 11.9 10.5 44.9 44.4
Approach LOS B B D D
Timer
Assigned Phs 7 4 3 8 2 6
Phs Duration (G+Y+Rc), s 8.2 75.0 7.6 74.4 24.0 24.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 11.0 71.0 7.0 67.0 20.0 20.0
Max Q Clear Time (g_c+I1), s 4.2 26.5 3.6 19.3 12.6 16.8
Green Ext Time (p_c), s 0.1 29.7 0.0 31.1 1.5 0.8
Intersection Summary
HCM 2010 Ctrl Delay 16.5
HCM 2010 LOS B
Notes
158
HCM 2010 Signalized Intersection Summary 2025 Background PM.syn
4: Meadowlark Avenue/Research Boulevard & Drake Road 2/2/2015
2025 Background PM 1/26/2015 Synchro 8 Report
Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 35 1071 24 91 1562 122 23 34 56 212 148 68
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow veh/h/ln 186.3 186.3 190.0 186.3 186.3 190.0 186.3 186.3 186.3 186.3 186.3 190.0
Lanes 1 2 0 1 2 0 1 1 1 1 1 0
Cap, veh/h 175 2176 54 318 2087 167 183 460 391 357 310 127
Arrive On Green 0.03 0.60 0.60 0.04 0.61 0.61 0.25 0.25 0.25 0.25 0.25 0.25
Sat Flow, veh/h 1774 3621 89 1774 3406 272 1097 1863 1583 1277 1255 516
Grp Volume(v), veh/h 60 626 621 117 920 915 36 45 66 233 0 278
Grp Sat Flow(s),veh/h/ln 1774 1863 1847 1774 1863 1815 1097 1863 1583 1277 0 1772
Q Serve(g_s), s 1.4 22.1 22.1 2.7 41.3 43.1 3.3 2.0 3.6 18.8 0.0 15.3
Cycle Q Clear(g_c), s 1.4 22.1 22.1 2.7 41.3 43.1 18.6 2.0 3.6 20.9 0.0 15.3
Prop In Lane 1.00 0.05 1.00 0.15 1.00 1.00 1.00 0.29
Lane Grp Cap(c), veh/h 175 1120 1110 318 1141 1112 183 460 391 357 0 437
V/C Ratio(X) 0.34 0.56 0.56 0.37 0.81 0.82 0.20 0.10 0.17 0.65 0.00 0.64
Avail Cap(c_a), veh/h 186 1120 1110 389 1141 1112 183 460 391 357 0 437
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 18.2 13.1 13.1 10.4 16.2 16.5 45.1 31.8 32.4 39.8 0.0 36.8
Incr Delay (d2), s/veh 1.1 2.0 2.0 0.7 6.1 6.9 2.4 0.4 0.9 8.9 0.0 6.9
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile Back of Q (50%), veh/ln 0.8 9.7 9.6 1.0 19.1 19.4 1.1 1.0 1.5 7.0 0.0 7.8
Lane Grp Delay (d), s/veh 19.3 15.1 15.1 11.1 22.3 23.5 47.5 32.2 33.3 48.8 0.0 43.7
Lane Grp LOS B B B B C C D C C D D
Approach Vol, veh/h 1307 1952 147 511
Approach Delay, s/veh 15.3 22.2 36.4 46.0
Approach LOS B C D D
Timer
Assigned Phs 7 4 3 8 2 6
Phs Duration (G+Y+Rc), s 7.4 69.7 8.6 71.0 31.0 31.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 4.0 62.0 9.0 67.0 27.0 27.0
Max Q Clear Time (g_c+I1), s 3.4 24.1 4.7 45.1 20.6 22.9
Green Ext Time (p_c), s 0.0 31.2 0.1 19.4 1.7 1.2
Intersection Summary
HCM 2010 Ctrl Delay 23.5
HCM 2010 LOS C
Notes
159
HCM 2010 Signalized Intersection Summary 2025 Background + Project AM.syn
4: Meadowlark Avenue/Research Boulevard & Drake Road 2/2/2015
2025 Background + Project AM 1/26/2015 Synchro 8 Report
Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 97 1184 25 48 658 244 48 131 103 56 23 22
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow veh/h/ln 186.3 186.3 190.0 186.3 186.3 190.0 186.3 186.3 186.3 186.3 186.3 190.0
Lanes 1 2 0 1 2 0 1 1 1 1 1 0
Cap, veh/h 349 2232 93 257 1540 635 312 419 356 210 175 208
Arrive On Green 0.05 0.63 0.63 0.03 0.61 0.61 0.23 0.23 0.23 0.23 0.23 0.23
Sat Flow, veh/h 1774 3552 147 1774 2509 1034 1312 1863 1583 1020 776 923
Grp Volume(v), veh/h 145 756 748 81 626 567 66 185 172 84 0 81
Grp Sat Flow(s),veh/h/ln 1774 1863 1837 1774 1863 1680 1312 1863 1583 1020 0 1700
Q Serve(g_s), s 3.1 27.1 27.2 1.8 20.8 21.0 4.6 9.1 10.1 8.2 0.0 4.1
Cycle Q Clear(g_c), s 3.1 27.1 27.2 1.8 20.8 21.0 8.7 9.1 10.1 17.3 0.0 4.1
Prop In Lane 1.00 0.08 1.00 0.62 1.00 1.00 1.00 0.54
Lane Grp Cap(c), veh/h 349 1170 1154 257 1143 1031 312 419 356 210 0 383
V/C Ratio(X) 0.42 0.65 0.65 0.31 0.55 0.55 0.21 0.44 0.48 0.40 0.00 0.21
Avail Cap(c_a), veh/h 462 1170 1154 313 1143 1031 312 419 356 210 0 383
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 9.5 12.4 12.4 11.0 12.0 12.0 37.2 35.5 35.9 43.0 0.0 33.6
Incr Delay (d2), s/veh 0.8 2.8 2.8 0.7 1.9 2.1 1.5 3.3 4.6 5.6 0.0 1.3
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile Back of Q (50%), veh/ln 1.2 11.8 11.7 0.7 9.1 8.3 1.7 4.7 4.4 2.5 0.0 1.9
Lane Grp Delay (d), s/veh 10.3 15.2 15.3 11.7 13.9 14.1 38.7 38.9 40.5 48.6 0.0 34.9
Lane Grp LOS B B B B B B D D D D C
Approach Vol, veh/h 1649 1274 423 165
Approach Delay, s/veh 14.8 13.8 39.5 41.9
Approach LOS B B D D
Timer
Assigned Phs 7 4 3 8 2 6
Phs Duration (G+Y+Rc), s 9.2 71.0 7.6 69.5 28.0 28.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 12.0 67.0 7.0 62.0 24.0 24.0
Max Q Clear Time (g_c+I1), s 5.1 29.2 3.8 23.0 12.1 19.3
Green Ext Time (p_c), s 0.2 27.1 0.0 27.7 2.1 1.2
Intersection Summary
HCM 2010 Ctrl Delay 18.7
HCM 2010 LOS B
Notes
160
HCM 2010 Signalized Intersection Summary 2025 Background + Project PM.syn
4: Meadowlark Avenue/Research Boulevard & Drake Road 2/2/2015
2025 Background + Project PM 1/26/2015 Synchro 8 Report
Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 54 1071 24 91 1562 153 23 43 56 253 160 92
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow veh/h/ln 186.3 186.3 190.0 186.3 186.3 190.0 186.3 186.3 186.3 186.3 186.3 190.0
Lanes 1 2 0 1 2 0 1 1 1 1 1 0
Cap, veh/h 171 2122 52 311 1975 197 164 483 410 365 300 155
Arrive On Green 0.04 0.59 0.59 0.04 0.59 0.59 0.26 0.26 0.26 0.26 0.26 0.26
Sat Flow, veh/h 1774 3621 89 1774 3334 333 1052 1863 1583 1263 1159 598
Grp Volume(v), veh/h 93 626 621 117 937 933 36 57 66 278 0 323
Grp Sat Flow(s),veh/h/ln 1774 1863 1847 1774 1863 1804 1052 1863 1583 1263 0 1757
Q Serve(g_s), s 2.3 22.6 22.7 2.8 44.6 47.1 3.5 2.5 3.5 23.3 0.0 18.0
Cycle Q Clear(g_c), s 2.3 22.6 22.7 2.8 44.6 47.1 21.5 2.5 3.5 25.8 0.0 18.0
Prop In Lane 1.00 0.05 1.00 0.18 1.00 1.00 1.00 0.34
Lane Grp Cap(c), veh/h 171 1092 1082 311 1104 1069 164 483 410 365 0 455
V/C Ratio(X) 0.54 0.57 0.57 0.38 0.85 0.87 0.22 0.12 0.16 0.76 0.00 0.71
Avail Cap(c_a), veh/h 203 1092 1082 382 1104 1069 164 483 410 365 0 455
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 23.2 13.9 13.9 11.1 18.1 18.6 46.1 30.6 30.9 40.4 0.0 36.3
Incr Delay (d2), s/veh 2.7 2.2 2.2 0.8 8.2 9.8 3.1 0.5 0.8 14.0 0.0 9.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile Back of Q (50%), veh/ln 2.6 10.1 10.0 1.1 21.3 22.1 1.1 1.3 1.5 8.9 0.0 9.2
Lane Grp Delay (d), s/veh 25.9 16.1 16.2 11.8 26.2 28.4 49.1 31.1 31.8 54.5 0.0 45.3
Lane Grp LOS C B B B C C D C C D D
Approach Vol, veh/h 1340 1987 159 601
Approach Delay, s/veh 16.8 26.4 35.4 49.6
Approach LOS B C D D
Timer
Assigned Phs 7 4 3 8 2 6
Phs Duration (G+Y+Rc), s 8.0 67.3 8.7 68.0 32.0 32.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 6.0 61.0 9.0 64.0 28.0 28.0
Max Q Clear Time (g_c+I1), s 4.3 24.7 4.8 49.1 23.5 27.8
Green Ext Time (p_c), s 0.0 30.5 0.1 13.7 1.6 0.1
Intersection Summary
HCM 2010 Ctrl Delay 27.0
HCM 2010 LOS C
Notes
161
HCM Unsignalized Intersection Capacity Analysis 2015 Existing AM.syn
5: Drake Road & Gilette Drive Access 2/3/2015
2015 Existing AM 1/26/2015 Synchro 8 Report
Page 1
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Volume (veh/h) 98 920 715 167 14 18
Sign Control Free Free Stop
Grade 0% 0% 0%
Peak Hour Factor 0.70 0.82 0.78 0.76 0.70 0.45
Hourly flow rate (vph) 140 1122 917 220 20 40
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type TWLTL TWLTL
Median storage veh) 2 2
Upstream signal (ft) 823
pX, platoon unblocked 0.82
vC, conflicting volume 1136 1868 568
vC1, stage 1 conf vol 1027
vC2, stage 2 conf vol 841
vCu, unblocked vol 1136 1624 568
tC, single (s) 4.1 6.8 6.9
tC, 2 stage (s) 5.8
tF (s) 2.2 3.5 3.3
p0 queue free % 77 92 91
cM capacity (veh/h) 611 247 466
Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1
Volume Total 514 748 611 525 60
Volume Left 140 0 0 0 20
Volume Right 0 0 0 220 40
cSH 611 1700 1700 1700 359
Volume to Capacity 0.23 0.44 0.36 0.31 0.17
Queue Length 95th (ft) 22 0 0 0 15
Control Delay (s) 6.1 0.0 0.0 0.0 17.0
Lane LOS A C
Approach Delay (s) 2.5 0.0 17.0
Approach LOS C
Intersection Summary
Average Delay 1.7
Intersection Capacity Utilization 66.7% ICU Level of Service C
Analysis Period (min) 15
162
HCM Unsignalized Intersection Capacity Analysis 2015 Existing PM.syn
5: Drake Road & Gilette Drive Access 2/3/2015
2015 Existing PM 1/26/2015 Synchro 8 Report
Page 1
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Volume (veh/h) 22 1074 1350 30 60 64
Sign Control Free Free Stop
Grade 0% 0% 0%
Peak Hour Factor 0.69 0.92 0.91 0.62 0.75 0.55
Hourly flow rate (vph) 32 1167 1484 48 80 116
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type TWLTL TWLTL
Median storage veh) 2 2
Upstream signal (ft) 823
pX, platoon unblocked 0.84
vC, conflicting volume 1532 2155 766
vC1, stage 1 conf vol 1508
vC2, stage 2 conf vol 647
vCu, unblocked vol 1532 1998 766
tC, single (s) 4.1 6.8 6.9
tC, 2 stage (s) 5.8
tF (s) 2.2 3.5 3.3
p0 queue free % 93 50 66
cM capacity (veh/h) 430 161 345
Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1
Volume Total 421 778 989 543 196
Volume Left 32 0 0 0 80
Volume Right 0 0 0 48 116
cSH 430 1700 1700 1700 235
Volume to Capacity 0.07 0.46 0.58 0.32 0.83
Queue Length 95th (ft) 6 0 0 0 162
Control Delay (s) 2.3 0.0 0.0 0.0 67.6
Lane LOS A F
Approach Delay (s) 0.8 0.0 67.6
Approach LOS F
Intersection Summary
Average Delay 4.9
Intersection Capacity Utilization 59.3% ICU Level of Service B
Analysis Period (min) 15
163
HCM Unsignalized Intersection Capacity Analysis 2015 Background + Project AM Imp.syn
5: Drake Road & Gilette Drive Access 2/3/2015
2015 Background + Project AM Imp 1/26/2015 Synchro 8 Report
Page 1
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Volume (veh/h) 98 935 745 181 21 18
Sign Control Free Free Stop
Grade 0% 0% 0%
Peak Hour Factor 0.70 0.82 0.78 0.76 0.70 0.45
Hourly flow rate (vph) 140 1140 955 238 30 40
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type TWLTL TWLTL
Median storage veh) 2 2
Upstream signal (ft) 823
pX, platoon unblocked 0.82
vC, conflicting volume 1193 1924 597
vC1, stage 1 conf vol 1074
vC2, stage 2 conf vol 850
vCu, unblocked vol 1193 1685 597
tC, single (s) 4.1 6.8 6.9
tC, 2 stage (s) 5.8
tF (s) 2.2 3.5 3.3
p0 queue free % 76 87 91
cM capacity (veh/h) 581 235 446
Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1 SB 2
Volume Total 520 760 637 557 30 40
Volume Left 140 0 0 0 30 0
Volume Right 0 0 0 238 0 40
cSH 581 1700 1700 1700 235 446
Volume to Capacity 0.24 0.45 0.37 0.33 0.13 0.09
Queue Length 95th (ft) 23 0 0 0 11 7
Control Delay (s) 6.5 0.0 0.0 0.0 22.6 13.9
Lane LOS A C B
Approach Delay (s) 2.7 0.0 17.6
Approach LOS C
Intersection Summary
Average Delay 1.8
Intersection Capacity Utilization 68.4% ICU Level of Service C
Analysis Period (min) 15
164
HCM Unsignalized Intersection Capacity Analysis 2015 Background + Project PM Imp.syn
5: Drake Road & Gilette Drive Access 2/3/2015
2015 Background + Project PM Imp 1/26/2015 Synchro 8 Report
Page 1
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Volume (veh/h) 22 1115 1381 45 79 64
Sign Control Free Free Stop
Grade 0% 0% 0%
Peak Hour Factor 0.69 0.92 0.91 0.62 0.75 0.55
Hourly flow rate (vph) 32 1212 1518 73 105 116
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type TWLTL TWLTL
Median storage veh) 2 2
Upstream signal (ft) 823
pX, platoon unblocked 0.84
vC, conflicting volume 1590 2224 795
vC1, stage 1 conf vol 1554
vC2, stage 2 conf vol 670
vCu, unblocked vol 1590 2071 795
tC, single (s) 4.1 6.8 6.9
tC, 2 stage (s) 5.8
tF (s) 2.2 3.5 3.3
p0 queue free % 92 31 65
cM capacity (veh/h) 409 152 330
Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1 SB 2
Volume Total 436 808 1012 578 105 116
Volume Left 32 0 0 0 105 0
Volume Right 0 0 0 73 0 116
cSH 409 1700 1700 1700 152 330
Volume to Capacity 0.08 0.48 0.60 0.34 0.69 0.35
Queue Length 95th (ft) 6 0 0 0 101 39
Control Delay (s) 2.4 0.0 0.0 0.0 70.1 21.7
Lane LOS A F C
Approach Delay (s) 0.9 0.0 44.7
Approach LOS E
Intersection Summary
Average Delay 3.6
Intersection Capacity Utilization 57.5% ICU Level of Service B
Analysis Period (min) 15
165
HCM Unsignalized Intersection Capacity Analysis 2015 Background + Project AM.syn
5: Drake Road & Gilette Drive Access 2/3/2015
2015 Background + Project AM 1/26/2015 Synchro 8 Report
Page 1
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Volume (veh/h) 98 935 745 181 21 18
Sign Control Free Free Stop
Grade 0% 0% 0%
Peak Hour Factor 0.70 0.82 0.78 0.76 0.70 0.45
Hourly flow rate (vph) 140 1140 955 238 30 40
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type TWLTL TWLTL
Median storage veh) 2 2
Upstream signal (ft) 823
pX, platoon unblocked 0.82
vC, conflicting volume 1193 1924 597
vC1, stage 1 conf vol 1074
vC2, stage 2 conf vol 850
vCu, unblocked vol 1193 1685 597
tC, single (s) 4.1 6.8 6.9
tC, 2 stage (s) 5.8
tF (s) 2.2 3.5 3.3
p0 queue free % 76 87 91
cM capacity (veh/h) 581 235 446
Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1
Volume Total 520 760 637 557 70
Volume Left 140 0 0 0 30
Volume Right 0 0 0 238 40
cSH 581 1700 1700 1700 322
Volume to Capacity 0.24 0.45 0.37 0.33 0.22
Queue Length 95th (ft) 23 0 0 0 20
Control Delay (s) 6.5 0.0 0.0 0.0 19.3
Lane LOS A C
Approach Delay (s) 2.7 0.0 19.3
Approach LOS C
Intersection Summary
Average Delay 1.9
Intersection Capacity Utilization 68.4% ICU Level of Service C
Analysis Period (min) 15
166
HCM Unsignalized Intersection Capacity Analysis 2015 Background + Project PM.syn
5: Drake Road & Gilette Drive Access 2/3/2015
2015 Background + Project PM 1/26/2015 Synchro 8 Report
Page 1
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Volume (veh/h) 22 1115 1381 45 79 64
Sign Control Free Free Stop
Grade 0% 0% 0%
Peak Hour Factor 0.69 0.92 0.91 0.62 0.75 0.55
Hourly flow rate (vph) 32 1212 1518 73 105 116
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type TWLTL TWLTL
Median storage veh) 2 2
Upstream signal (ft) 823
pX, platoon unblocked 0.84
vC, conflicting volume 1590 2224 795
vC1, stage 1 conf vol 1554
vC2, stage 2 conf vol 670
vCu, unblocked vol 1590 2071 795
tC, single (s) 4.1 6.8 6.9
tC, 2 stage (s) 5.8
tF (s) 2.2 3.5 3.3
p0 queue free % 92 31 65
cM capacity (veh/h) 409 152 330
Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1
Volume Total 436 808 1012 578 222
Volume Left 32 0 0 0 105
Volume Right 0 0 0 73 116
cSH 409 1700 1700 1700 212
Volume to Capacity 0.08 0.48 0.60 0.34 1.05
Queue Length 95th (ft) 6 0 0 0 244
Control Delay (s) 2.4 0.0 0.0 0.0 122.4
Lane LOS A F
Approach Delay (s) 0.9 0.0 122.4
Approach LOS F
Intersection Summary
Average Delay 9.2
Intersection Capacity Utilization 61.5% ICU Level of Service B
Analysis Period (min) 15
167
HCM Unsignalized Intersection Capacity Analysis 2025 Background AM.syn
5: Drake Road & Gilette Drive Access 2/3/2015
2015 Background AM 1/26/2015 Synchro 8 Report
Page 1
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Volume (veh/h) 124 1166 906 212 18 23
Sign Control Free Free Stop
Grade 0% 0% 0%
Peak Hour Factor 0.70 0.82 0.78 0.76 0.70 0.45
Hourly flow rate (vph) 177 1422 1162 279 26 51
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type TWLTL TWLTL
Median storage veh) 2 2
Upstream signal (ft) 823
pX, platoon unblocked 0.74
vC, conflicting volume 1440 2366 720
vC1, stage 1 conf vol 1301
vC2, stage 2 conf vol 1065
vCu, unblocked vol 1440 2146 720
tC, single (s) 4.1 6.8 6.9
tC, 2 stage (s) 5.8
tF (s) 2.2 3.5 3.3
p0 queue free % 62 85 86
cM capacity (veh/h) 467 169 370
Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1
Volume Total 651 948 774 666 77
Volume Left 177 0 0 0 26
Volume Right 0 0 0 279 51
cSH 467 1700 1700 1700 265
Volume to Capacity 0.38 0.56 0.46 0.39 0.29
Queue Length 95th (ft) 44 0 0 0 29
Control Delay (s) 11.4 0.0 0.0 0.0 24.0
Lane LOS B C
Approach Delay (s) 4.6 0.0 24.0
Approach LOS C
Intersection Summary
Average Delay 3.0
Intersection Capacity Utilization 81.0% ICU Level of Service D
Analysis Period (min) 15
168
HCM Unsignalized Intersection Capacity Analysis 2025 Background PM.syn
5: Drake Road & Gilette Drive Access 2/3/2015
2025 Background PM 1/26/2015 Synchro 8 Report
Page 1
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Volume (veh/h) 28 1361 1711 38 76 81
Sign Control Free Free Stop
Grade 0% 0% 0%
Peak Hour Factor 0.69 0.92 0.91 0.62 0.75 0.55
Hourly flow rate (vph) 41 1479 1880 61 101 147
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type TWLTL TWLTL
Median storage veh) 2 2
Upstream signal (ft) 823
pX, platoon unblocked 0.76
vC, conflicting volume 1942 2732 971
vC1, stage 1 conf vol 1911
vC2, stage 2 conf vol 821
vCu, unblocked vol 1942 2647 971
tC, single (s) 4.1 6.8 6.9
tC, 2 stage (s) 5.8
tF (s) 2.2 3.5 3.3
p0 queue free % 86 0 42
cM capacity (veh/h) 298 98 253
Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1
Volume Total 534 986 1253 688 249
Volume Left 41 0 0 0 101
Volume Right 0 0 0 61 147
cSH 298 1700 1700 1700 153
Volume to Capacity 0.14 0.58 0.74 0.40 1.62
Queue Length 95th (ft) 12 0 0 0 433
Control Delay (s) 4.8 0.0 0.0 0.0 360.1
Lane LOS A F
Approach Delay (s) 1.7 0.0 360.1
Approach LOS F
Intersection Summary
Average Delay 24.8
Intersection Capacity Utilization 73.4% ICU Level of Service D
Analysis Period (min) 15
169
HCM Unsignalized Intersection Capacity Analysis 2025 Background + Project AM Imp.syn
5: Drake Road & Gilette Drive Access 2/3/2015
2025 Background + Project AM Imp 1/26/2015 Synchro 8 Report
Page 1
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Volume (veh/h) 124 1181 936 226 25 23
Sign Control Free Free Stop
Grade 0% 0% 0%
Peak Hour Factor 0.70 0.82 0.78 0.76 0.70 0.45
Hourly flow rate (vph) 177 1440 1200 297 36 51
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type TWLTL TWLTL
Median storage veh) 2 2
Upstream signal (ft) 823
pX, platoon unblocked 0.71
vC, conflicting volume 1497 2423 749
vC1, stage 1 conf vol 1349
vC2, stage 2 conf vol 1074
vCu, unblocked vol 1497 2193 749
tC, single (s) 4.1 6.8 6.9
tC, 2 stage (s) 5.8
tF (s) 2.2 3.5 3.3
p0 queue free % 60 78 86
cM capacity (veh/h) 444 164 355
Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1 SB 2
Volume Total 657 960 800 697 36 51
Volume Left 177 0 0 0 36 0
Volume Right 0 0 0 297 0 51
cSH 444 1700 1700 1700 164 355
Volume to Capacity 0.40 0.56 0.47 0.41 0.22 0.14
Queue Length 95th (ft) 47 0 0 0 20 12
Control Delay (s) 12.4 0.0 0.0 0.0 33.0 16.9
Lane LOS B D C
Approach Delay (s) 5.1 0.0 23.5
Approach LOS C
Intersection Summary
Average Delay 3.2
Intersection Capacity Utilization 82.7% ICU Level of Service E
Analysis Period (min) 15
170
HCM Unsignalized Intersection Capacity Analysis 2025 Background + Project PM Imp.syn
5: Drake Road & Gilette Drive Access 2/3/2015
2025 Background + Project PM Imp 1/26/2015 Synchro 8 Report
Page 1
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Volume (veh/h) 28 1402 1742 53 95 81
Sign Control Free Free Stop
Grade 0% 0% 0%
Peak Hour Factor 0.69 0.92 0.91 0.62 0.75 0.55
Hourly flow rate (vph) 41 1524 1914 85 127 147
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type TWLTL TWLTL
Median storage veh) 2 2
Upstream signal (ft) 823
pX, platoon unblocked 0.76
vC, conflicting volume 2000 2800 1000
vC1, stage 1 conf vol 1957
vC2, stage 2 conf vol 843
vCu, unblocked vol 2000 2735 1000
tC, single (s) 4.1 6.8 6.9
tC, 2 stage (s) 5.8
tF (s) 2.2 3.5 3.3
p0 queue free % 86 0 39
cM capacity (veh/h) 283 92 242
Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1 SB 2
Volume Total 549 1016 1276 724 127 147
Volume Left 41 0 0 0 127 0
Volume Right 0 0 0 85 0 147
cSH 283 1700 1700 1700 92 242
Volume to Capacity 0.14 0.60 0.75 0.43 1.38 0.61
Queue Length 95th (ft) 12 0 0 0 235 90
Control Delay (s) 5.2 0.0 0.0 0.0 306.3 40.7
Lane LOS A F E
Approach Delay (s) 1.8 0.0 163.5
Approach LOS F
Intersection Summary
Average Delay 12.4
Intersection Capacity Utilization 70.6% ICU Level of Service C
Analysis Period (min) 15
171
HCM Unsignalized Intersection Capacity Analysis 2025 Background + Project AM.syn
5: Drake Road & Gilette Drive Access 2/3/2015
2025 Background + Project AM 1/26/2015 Synchro 8 Report
Page 1
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Volume (veh/h) 124 1181 936 226 25 23
Sign Control Free Free Stop
Grade 0% 0% 0%
Peak Hour Factor 0.70 0.82 0.78 0.76 0.70 0.45
Hourly flow rate (vph) 177 1440 1200 297 36 51
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type TWLTL TWLTL
Median storage veh) 2 2
Upstream signal (ft) 823
pX, platoon unblocked 0.71
vC, conflicting volume 1497 2423 749
vC1, stage 1 conf vol 1349
vC2, stage 2 conf vol 1074
vCu, unblocked vol 1497 2193 749
tC, single (s) 4.1 6.8 6.9
tC, 2 stage (s) 5.8
tF (s) 2.2 3.5 3.3
p0 queue free % 60 78 86
cM capacity (veh/h) 444 164 355
Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1
Volume Total 657 960 800 697 87
Volume Left 177 0 0 0 36
Volume Right 0 0 0 297 51
cSH 444 1700 1700 1700 240
Volume to Capacity 0.40 0.56 0.47 0.41 0.36
Queue Length 95th (ft) 47 0 0 0 39
Control Delay (s) 12.4 0.0 0.0 0.0 28.3
Lane LOS B D
Approach Delay (s) 5.1 0.0 28.3
Approach LOS D
Intersection Summary
Average Delay 3.3
Intersection Capacity Utilization 82.7% ICU Level of Service E
Analysis Period (min) 15
172
HCM Unsignalized Intersection Capacity Analysis 2025 Background + Project PM.syn
5: Drake Road & Gilette Drive Access 2/3/2015
2025 Background + Project PM 1/26/2015 Synchro 8 Report
Page 1
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Volume (veh/h) 28 1402 1742 53 95 81
Sign Control Free Free Stop
Grade 0% 0% 0%
Peak Hour Factor 0.69 0.92 0.91 0.62 0.75 0.55
Hourly flow rate (vph) 41 1524 1914 85 127 147
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type TWLTL TWLTL
Median storage veh) 2 2
Upstream signal (ft) 823
pX, platoon unblocked 0.76
vC, conflicting volume 2000 2800 1000
vC1, stage 1 conf vol 1957
vC2, stage 2 conf vol 843
vCu, unblocked vol 2000 2735 1000
tC, single (s) 4.1 6.8 6.9
tC, 2 stage (s) 5.8
tF (s) 2.2 3.5 3.3
p0 queue free % 86 0 39
cM capacity (veh/h) 283 92 242
Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1
Volume Total 549 1016 1276 724 274
Volume Left 41 0 0 0 127
Volume Right 0 0 0 85 147
cSH 283 1700 1700 1700 138
Volume to Capacity 0.14 0.60 0.75 0.43 1.99
Queue Length 95th (ft) 12 0 0 0 543
Control Delay (s) 5.2 0.0 0.0 0.0 522.6
Lane LOS A F
Approach Delay (s) 1.8 0.0 522.6
Approach LOS F
Intersection Summary
Average Delay 38.0
Intersection Capacity Utilization 75.6% ICU Level of Service D
Analysis Period (min) 15
173
HCM 2010 TWSC 2015 Existing AM.syn
6: Research Boulevard & North Access 2/2/2015
2015 Existing AM 1/26/2015 Synchro 8 Report
Page 1
Intersection
Intersection Delay, s/veh 0.8
Movement EBL EBR NBL NBT SBT SBR
Vol, veh/h 3 3 10 181 88 17
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 38 38 50 72 96 53
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 8 8 20 251 92 32
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 399 108 124 0 - 0
Stage 1 108 - - - - -
Stage 2 291 - - - - -
Follow-up Headway 3.518 3.318 2.218 - - -
Pot Capacity-1 Maneuver 607 946 1463 - - -
Stage 1 916 - - - - -
Stage 2 759 - - - - -
Time blocked-Platoon, % - - -
Mov Capacity-1 Maneuver 597 946 1463 - - -
Mov Capacity-2 Maneuver 597 - - - - -
Stage 1 916 - - - - -
Stage 2 747 - - - - -
Approach EB NB SB
HCM Control Delay, s 10 0.6 0
HCM LOS B
Minor Lane / Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 1463 - 732 - -
HCM Lane V/C Ratio 0.014 - 0.022 - -
HCM Control Delay (s) 7.495 0 10 - -
HCM Lane LOS A A B
HCM 95th %tile Q(veh) 0.042 - 0.066 - -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
174
HCM 2010 TWSC 2015 Existing PM.syn
6: Research Boulevard & North Access 2/2/2015
2015 Existing PM 1/26/2015 Synchro 8 Report
Page 1
Intersection
Intersection Delay, s/veh 0.7
Movement EBL EBR NBL NBT SBT SBR
Vol, veh/h 9 7 4 150 261 7
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 56 58 100 81 89 88
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 16 12 4 185 293 8
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 490 297 301 0 - 0
Stage 1 297 - - - - -
Stage 2 193 - - - - -
Follow-up Headway 3.518 3.318 2.218 - - -
Pot Capacity-1 Maneuver 537 742 1260 - - -
Stage 1 754 - - - - -
Stage 2 840 - - - - -
Time blocked-Platoon, % - - -
Mov Capacity-1 Maneuver 535 742 1260 - - -
Mov Capacity-2 Maneuver 535 - - - - -
Stage 1 754 - - - - -
Stage 2 837 - - - - -
Approach EB NB SB
HCM Control Delay, s 11.2 0.2 0
HCM LOS B
Minor Lane / Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 1260 - 608 - -
HCM Lane V/C Ratio 0.003 - 0.046 - -
HCM Control Delay (s) 7.866 0 11.2 - -
HCM Lane LOS A A B
HCM 95th %tile Q(veh) 0.01 - 0.145 - -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
175
HCM 2010 TWSC 2015 Background + Project AM.syn
6: Research Boulevard & North Access 2/2/2015
2015 Background + Project AM 1/26/2015 Synchro 8 Report
Page 1
Intersection
Intersection Delay, s/veh 2.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 3 0 3 13 0 27 10 181 27 54 88 17
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 38 92 38 92 92 92 50 72 92 92 96 53
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 8 0 8 14 0 29 20 251 29 59 92 32
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 546 546 108 535 547 266 124 0 0 281 0 0
Stage 1 225 225 - 306 306 - - - - - - -
Stage 2 321 321 - 229 241 - - - - - - -
Follow-up Headway 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Capacity-1 Maneuver 448 445 946 456 445 773 1463 - - 1282 - -
Stage 1 778 718 - 704 662 - - - - - - -
Stage 2 691 652 - 774 706 - - - - - - -
Time blocked-Platoon, % - - - -
Mov Capacity-1 Maneuver 410 416 946 430 416 773 1463 - - 1282 - -
Mov Capacity-2 Maneuver 410 416 - 430 416 - - - - - - -
Stage 1 766 682 - 693 651 - - - - - - -
Stage 2 654 642 - 729 671 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 11.5 11.3 0.5 2.6
HCM LOS B B
Minor Lane / Major Mvmt NBL NBT NBR EBLn1 WBLn1 SBL SBT SBR
Capacity (veh/h) 1463 - - 572 614 1282 - -
HCM Lane V/C Ratio 0.014 - - 0.028 0.071 0.046 - -
HCM Control Delay (s) 7.495 0 - 11.5 11.3 7.943 0 -
HCM Lane LOS A A B B A A
HCM 95th %tile Q(veh) 0.042 - - 0.085 0.228 0.144 - -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
176
HCM 2010 TWSC 2015 Background + Project PM.syn
6: Research Boulevard & North Access 2/2/2015
2015 Background + Project PM 1/26/2015 Synchro 8 Report
Page 1
Intersection
Intersection Delay, s/veh 3.3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 9 0 7 36 0 72 4 150 28 56 261 7
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 56 92 58 92 92 92 100 81 92 92 89 88
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 16 0 12 39 0 78 4 185 30 61 293 8
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 667 643 297 633 631 200 301 0 0 216 0 0
Stage 1 419 419 - 208 208 - - - - - - -
Stage 2 248 224 - 425 423 - - - - - - -
Follow-up Headway 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Capacity-1 Maneuver 372 392 742 392 398 841 1260 - - 1354 - -
Stage 1 612 590 - 794 730 - - - - - - -
Stage 2 756 718 - 607 588 - - - - - - -
Time blocked-Platoon, % - - - -
Mov Capacity-1 Maneuver 322 369 742 369 375 841 1260 - - 1354 - -
Mov Capacity-2 Maneuver 322 369 - 369 375 - - - - - - -
Stage 1 610 558 - 791 727 - - - - - - -
Stage 2 683 715 - 565 556 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 14.1 12.6 0.1 1.3
HCM LOS B B
Minor Lane / Major Mvmt NBL NBT NBR EBLn1 WBLn1 SBL SBT SBR
Capacity (veh/h) 1260 - - 425 590 1354 - -
HCM Lane V/C Ratio 0.003 - - 0.066 0.199 0.045 - -
HCM Control Delay (s) 7.866 0 - 14.1 12.6 7.784 0 -
HCM Lane LOS A A B B A A
HCM 95th %tile Q(veh) 0.01 - - 0.212 0.736 0.141 - -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
177
HCM 2010 TWSC 2025 Background AM.syn
6: Research Boulevard & North Access 2/2/2015
2015 Background AM 1/26/2015 Synchro 8 Report
Page 1
Intersection
Intersection Delay, s/veh 0.8
Movement EBL EBR NBL NBT SBT SBR
Vol, veh/h 4 4 13 229 112 22
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 38 38 50 72 96 53
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 11 11 26 318 117 42
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 507 137 158 0 - 0
Stage 1 137 - - - - -
Stage 2 370 - - - - -
Follow-up Headway 3.518 3.318 2.218 - - -
Pot Capacity-1 Maneuver 525 911 1422 - - -
Stage 1 890 - - - - -
Stage 2 699 - - - - -
Time blocked-Platoon, % - - -
Mov Capacity-1 Maneuver 513 911 1422 - - -
Mov Capacity-2 Maneuver 513 - - - - -
Stage 1 890 - - - - -
Stage 2 684 - - - - -
Approach EB NB SB
HCM Control Delay, s 10.7 0.6 0
HCM LOS B
Minor Lane / Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 1422 - 656 - -
HCM Lane V/C Ratio 0.018 - 0.032 - -
HCM Control Delay (s) 7.579 0 10.7 - -
HCM Lane LOS A A B
HCM 95th %tile Q(veh) 0.056 - 0.099 - -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
178
HCM 2010 TWSC 2025 Background PM.syn
6: Research Boulevard & North Access 2/2/2015
2025 Background PM 1/26/2015 Synchro 8 Report
Page 1
Intersection
Intersection Delay, s/veh 0.7
Movement EBL EBR NBL NBT SBT SBR
Vol, veh/h 11 9 5 190 331 9
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 56 58 100 81 89 88
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 20 16 5 235 372 10
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 622 377 382 0 - 0
Stage 1 377 - - - - -
Stage 2 245 - - - - -
Follow-up Headway 3.518 3.318 2.218 - - -
Pot Capacity-1 Maneuver 450 670 1176 - - -
Stage 1 694 - - - - -
Stage 2 796 - - - - -
Time blocked-Platoon, % - - -
Mov Capacity-1 Maneuver 448 670 1176 - - -
Mov Capacity-2 Maneuver 448 - - - - -
Stage 1 694 - - - - -
Stage 2 792 - - - - -
Approach EB NB SB
HCM Control Delay, s 12.3 0.2 0
HCM LOS B
Minor Lane / Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 1176 - 525 - -
HCM Lane V/C Ratio 0.004 - 0.067 - -
HCM Control Delay (s) 8.074 0 12.3 - -
HCM Lane LOS A A B
HCM 95th %tile Q(veh) 0.013 - 0.215 - -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
179
HCM 2010 TWSC 2025 Background + Project AM.syn
6: Research Boulevard & North Access 2/2/2015
2025 Background + Project AM 1/26/2015 Synchro 8 Report
Page 1
Intersection
Intersection Delay, s/veh 2.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 4 0 4 13 0 27 13 229 27 54 112 22
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 38 92 38 92 92 92 50 72 92 92 96 53
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 11 0 11 14 0 29 26 318 29 59 117 42
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 654 654 137 645 661 333 158 0 0 347 0 0
Stage 1 255 255 - 385 385 - - - - - - -
Stage 2 399 399 - 260 276 - - - - - - -
Follow-up Headway 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Capacity-1 Maneuver 380 386 911 385 383 709 1422 - - 1212 - -
Stage 1 749 696 - 638 611 - - - - - - -
Stage 2 627 602 - 745 682 - - - - - - -
Time blocked-Platoon, % - - - -
Mov Capacity-1 Maneuver 343 357 911 359 354 709 1422 - - 1212 - -
Mov Capacity-2 Maneuver 343 357 - 359 354 - - - - - - -
Stage 1 732 658 - 623 597 - - - - - - -
Stage 2 587 588 - 697 645 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 12.5 12.3 0.5 2.2
HCM LOS B B
Minor Lane / Major Mvmt NBL NBT NBR EBLn1 WBLn1 SBL SBT SBR
Capacity (veh/h) 1422 - - 498 538 1212 - -
HCM Lane V/C Ratio 0.018 - - 0.042 0.081 0.048 - -
HCM Control Delay (s) 7.579 0 - 12.5 12.3 8.121 0 -
HCM Lane LOS A A B B A A
HCM 95th %tile Q(veh) 0.056 - - 0.132 0.263 0.153 - -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
180
HCM 2010 TWSC 2025 Background + Project PM.syn
6: Research Boulevard & North Access 2/2/2015
2025 Background + Project PM 1/26/2015 Synchro 8 Report
Page 1
Intersection
Intersection Delay, s/veh 3.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 11 0 9 36 0 72 5 190 28 56 331 9
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 56 92 58 92 92 92 100 81 92 92 89 88
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 20 0 16 39 0 78 5 235 30 61 372 10
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 798 774 377 767 764 250 382 0 0 265 0 0
Stage 1 499 499 - 260 260 - - - - - - -
Stage 2 299 275 - 507 504 - - - - - - -
Follow-up Headway 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Capacity-1 Maneuver 304 329 670 319 334 789 1176 - - 1299 - -
Stage 1 554 544 - 745 693 - - - - - - -
Stage 2 710 683 - 548 541 - - - - - - -
Time blocked-Platoon, % - - - -
Mov Capacity-1 Maneuver 260 308 670 296 312 789 1176 - - 1299 - -
Mov Capacity-2 Maneuver 260 308 - 296 312 - - - - - - -
Stage 1 551 511 - 741 690 - - - - - - -
Stage 2 636 680 - 503 509 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 16.2 14.2 0.1 1.1
HCM LOS C B
Minor Lane / Major Mvmt NBL NBT NBR EBLn1 WBLn1 SBL SBT SBR
Capacity (veh/h) 1176 - - 356 507 1299 - -
HCM Lane V/C Ratio 0.004 - - 0.099 0.232 0.047 - -
HCM Control Delay (s) 8.074 0 - 16.2 14.2 7.908 0 -
HCM Lane LOS A A C B A A
HCM 95th %tile Q(veh) 0.013 - - 0.326 0.888 0.147 - -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
181
HCM 2010 TWSC 2015 Existing AM.syn
7: Research Boulevard & South Access 2/2/2015
2015 Existing AM 1/26/2015 Synchro 8 Report
Page 1
Intersection
Intersection Delay, s/veh 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 3 0 22 0 0 0 73 256 0 0 42 23
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - 75 - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 38 25 69 25 25 25 73 70 25 25 88 82
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 8 0 32 0 0 0 100 366 0 0 48 28
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 628 628 62 644 642 366 76 0 0 366 0 0
Stage 1 62 62 - 566 566 - - - - - - -
Stage 2 566 566 - 78 76 - - - - - - -
Follow-up Headway 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Capacity-1 Maneuver 395 400 1003 386 392 679 1523 - - 1193 - -
Stage 1 949 843 - 509 507 - - - - - - -
Stage 2 509 507 - 931 832 - - - - - - -
Time blocked-Platoon, % - - - -
Mov Capacity-1 Maneuver 375 374 1003 355 366 679 1523 - - 1193 - -
Mov Capacity-2 Maneuver 375 374 - 355 366 - - - - - - -
Stage 1 887 843 - 476 474 - - - - - - -
Stage 2 476 474 - 901 832 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 10 0 1.6 0
HCM LOS B A
Minor Lane / Major Mvmt NBL NBT NBR EBLn1 WBLn1 SBL SBT SBR
Capacity (veh/h) 1523 - - 753 0 1193 - -
HCM Lane V/C Ratio 0.066 - - 0.053 + - - -
HCM Control Delay (s) 7.53 - - 10 0 0 - -
HCM Lane LOS A B A A
HCM 95th %tile Q(veh) 0.211 - - 0.167 + 0 - -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
182
HCM 2010 TWSC 2015 Existing PM.syn
7: Research Boulevard & South Access 2/2/2015
2015 Existing PM 1/26/2015 Synchro 8 Report
Page 1
Intersection
Intersection Delay, s/veh 3.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 22 0 86 0 0 0 35 118 0 0 253 14
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - 75 - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 50 25 90 25 25 25 73 89 25 25 87 58
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 44 0 96 0 0 0 48 133 0 0 291 24
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 531 531 303 579 543 133 315 0 0 133 0 0
Stage 1 303 303 - 228 228 - - - - - - -
Stage 2 228 228 - 351 315 - - - - - - -
Follow-up Headway 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Capacity-1 Maneuver 459 454 737 426 447 916 1245 - - 1452 - -
Stage 1 706 664 - 775 715 - - - - - - -
Stage 2 775 715 - 666 656 - - - - - - -
Time blocked-Platoon, % - - - -
Mov Capacity-1 Maneuver 445 436 737 360 430 916 1245 - - 1452 - -
Mov Capacity-2 Maneuver 445 436 - 360 430 - - - - - - -
Stage 1 679 664 - 745 687 - - - - - - -
Stage 2 745 687 - 580 656 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 12.6 0 2.1 0
HCM LOS B A
Minor Lane / Major Mvmt NBL NBT NBR EBLn1 WBLn1 SBL SBT SBR
Capacity (veh/h) 1245 - - 611 0 1452 - -
HCM Lane V/C Ratio 0.039 - - 0.228 + - - -
HCM Control Delay (s) 8.007 - - 12.6 0 0 - -
HCM Lane LOS A B A A
HCM 95th %tile Q(veh) 0.12 - - 0.875 + 0 - -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
183
HCM 2010 TWSC 2015 Background + Project AM.syn
7: Research Boulevard & South Access 2/9/2015
2015 Background + Project AM 1/26/2015 Synchro 8 Report
Page 1
Intersection
Intersection Delay, s/veh 2.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 3 0 22 15 0 0 73 283 30 0 55 23
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 0 - - - 75 - - 100 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 38 25 69 25 25 25 73 70 25 25 88 82
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 8 0 32 60 0 0 100 404 120 0 62 28
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 741 801 77 741 755 464 91 0 0 524 0 0
Stage 1 77 77 - 664 664 - - - - - - -
Stage 2 664 724 - 77 91 - - - - - - -
Follow-up Headway 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Capacity-1 Maneuver 332 318 984 332 338 598 1504 - - 1043 - -
Stage 1 932 831 - 450 458 - - - - - - -
Stage 2 450 430 - 932 820 - - - - - - -
Time blocked-Platoon, % - - - -
Mov Capacity-1 Maneuver 315 297 984 305 316 598 1504 - - 1043 - -
Mov Capacity-2 Maneuver 315 297 - 305 316 - - - - - - -
Stage 1 870 831 - 420 428 - - - - - - -
Stage 2 420 401 - 902 820 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 10.3 19.7 1.2 0
HCM LOS B C
Minor Lane / Major Mvmt NBL NBT NBR EBLn1 EBLn2 WBLn1 SBL SBT SBR
Capacity (veh/h) 1504 - - 516 984 305 1043 - -
HCM Lane V/C Ratio 0.066 - - 0.036 0.022 0.197 - - -
HCM Control Delay (s) 7.564 - - 12.2 8.7 19.7 0 - -
HCM Lane LOS A B A C A
HCM 95th %tile Q(veh) 0.213 - - 0.112 0.066 0.718 0 - -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
184
HCM 2010 TWSC 2015 Background + Project PM.syn
7: Research Boulevard & South Access 2/9/2015
2015 Background + Project PM 1/26/2015 Synchro 8 Report
Page 1
Intersection
Intersection Delay, s/veh 6.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 22 0 86 41 0 0 35 146 31 0 289 14
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 0 - - - 75 - - 100 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 50 25 90 25 25 25 73 89 25 25 87 58
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 44 0 96 164 0 0 48 164 124 0 332 24
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 666 728 344 666 678 226 356 0 0 288 0 0
Stage 1 344 344 - 322 322 - - - - - - -
Stage 2 322 384 - 344 356 - - - - - - -
Follow-up Headway 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Capacity-1 Maneuver 373 350 699 373 374 813 1203 - - 1274 - -
Stage 1 671 637 - 690 651 - - - - - - -
Stage 2 690 611 - 671 629 - - - - - - -
Time blocked-Platoon, % - - - -
Mov Capacity-1 Maneuver 362 336 699 312 359 813 1203 - - 1274 - -
Mov Capacity-2 Maneuver 362 336 - 312 359 - - - - - - -
Stage 1 644 637 - 662 625 - - - - - - -
Stage 2 662 587 - 579 629 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 12.8 28.6 1.2 0
HCM LOS B D
Minor Lane / Major Mvmt NBL NBT NBR EBLn1 EBLn2 WBLn1 SBL SBT SBR
Capacity (veh/h) 1203 - - 454 699 312 1274 - -
HCM Lane V/C Ratio 0.04 - - 0.167 0.091 0.526 - - -
HCM Control Delay (s) 8.117 - - 14.5 10.7 28.6 0 - -
HCM Lane LOS A B B D A
HCM 95th %tile Q(veh) 0.124 - - 0.594 0.3 2.877 0 - -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
185
HCM 2010 TWSC 2025 Background AM.syn
7: Research Boulevard & South Access 2/2/2015
2015 Background AM 1/26/2015 Synchro 8 Report
Page 1
Intersection
Intersection Delay, s/veh 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 4 0 28 0 0 0 93 325 0 0 53 29
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - 75 - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 38 25 69 25 25 25 73 70 25 25 88 82
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 11 0 41 0 0 0 127 464 0 0 60 35
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 797 797 78 817 815 464 96 0 0 464 0 0
Stage 1 78 78 - 719 719 - - - - - - -
Stage 2 719 719 - 98 96 - - - - - - -
Follow-up Headway 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Capacity-1 Maneuver 305 319 983 295 312 598 1498 - - 1097 - -
Stage 1 931 830 - 420 433 - - - - - - -
Stage 2 420 433 - 908 815 - - - - - - -
Time blocked-Platoon, % - - - -
Mov Capacity-1 Maneuver 285 292 983 264 286 598 1498 - - 1097 - -
Mov Capacity-2 Maneuver 285 292 - 264 286 - - - - - - -
Stage 1 852 830 - 384 396 - - - - - - -
Stage 2 384 396 - 871 815 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 11 0 1.6 0
HCM LOS B A
Minor Lane / Major Mvmt NBL NBT NBR EBLn1 WBLn1 SBL SBT SBR
Capacity (veh/h) 1498 - - 653 0 1097 - -
HCM Lane V/C Ratio 0.085 - - 0.078 + - - -
HCM Control Delay (s) 7.626 - - 11 0 0 - -
HCM Lane LOS A B A A
HCM 95th %tile Q(veh) 0.278 - - 0.254 + 0 - -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
186
HCM 2010 TWSC 2025 Background PM.syn
7: Research Boulevard & South Access 2/2/2015
2025 Background PM 1/26/2015 Synchro 8 Report
Page 1
Intersection
Intersection Delay, s/veh 4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 28 0 109 0 0 0 44 150 0 0 321 18
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - 75 - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 50 25 90 25 25 25 73 89 25 25 87 58
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 56 0 121 0 0 0 60 169 0 0 369 31
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 673 673 384 734 689 169 400 0 0 169 0 0
Stage 1 384 384 - 289 289 - - - - - - -
Stage 2 289 289 - 445 400 - - - - - - -
Follow-up Headway 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Capacity-1 Maneuver 369 377 664 336 369 875 1159 - - 1409 - -
Stage 1 639 611 - 719 673 - - - - - - -
Stage 2 719 673 - 592 602 - - - - - - -
Time blocked-Platoon, % - - - -
Mov Capacity-1 Maneuver 354 357 664 264 350 875 1159 - - 1409 - -
Mov Capacity-2 Maneuver 354 357 - 264 350 - - - - - - -
Stage 1 606 611 - 682 638 - - - - - - -
Stage 2 682 638 - 484 602 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 15.5 0 2.2 0
HCM LOS C A
Minor Lane / Major Mvmt NBL NBT NBR EBLn1 WBLn1 SBL SBT SBR
Capacity (veh/h) 1159 - - 520 0 1409 - -
HCM Lane V/C Ratio 0.052 - - 0.341 + - - -
HCM Control Delay (s) 8.276 - - 15.5 0 0 - -
HCM Lane LOS A C A A
HCM 95th %tile Q(veh) 0.164 - - 1.497 + 0 - -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
187
HCM 2010 TWSC 2025 Background + Project AM.syn
7: Research Boulevard & South Access 2/9/2015
2025 Background + Project AM 1/26/2015 Synchro 8 Report
Page 1
Intersection
Intersection Delay, s/veh 3.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 4 0 28 15 0 0 93 352 30 0 66 29
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 0 - - - 75 - - 100 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 38 25 69 25 25 25 73 70 25 25 88 82
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 11 0 41 60 0 0 127 503 120 0 75 35
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 911 971 93 911 928 563 110 0 0 623 0 0
Stage 1 93 93 - 818 818 - - - - - - -
Stage 2 818 878 - 93 110 - - - - - - -
Follow-up Headway 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Capacity-1 Maneuver 255 253 964 255 268 526 1480 - - 958 - -
Stage 1 914 818 - 370 390 - - - - - - -
Stage 2 370 366 - 914 804 - - - - - - -
Time blocked-Platoon, % - - - -
Mov Capacity-1 Maneuver 238 231 964 228 245 526 1480 - - 958 - -
Mov Capacity-2 Maneuver 238 231 - 228 245 - - - - - - -
Stage 1 836 818 - 338 357 - - - - - - -
Stage 2 338 335 - 876 804 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 11.4 26.3 1.3 0
HCM LOS B D
Minor Lane / Major Mvmt NBL NBT NBR EBLn1 EBLn2 WBLn1 SBL SBT SBR
Capacity (veh/h) 1480 - - 413 964 228 958 - -
HCM Lane V/C Ratio 0.086 - - 0.058 0.028 0.263 - - -
HCM Control Delay (s) 7.661 - - 14.3 8.8 26.3 0 - -
HCM Lane LOS A B A D A
HCM 95th %tile Q(veh) 0.282 - - 0.185 0.087 1.022 0 - -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
188
HCM 2010 TWSC 2025 Background + Project PM.syn
7: Research Boulevard & South Access 2/9/2015
2025 Background + Project PM 1/26/2015 Synchro 8 Report
Page 1
Intersection
Intersection Delay, s/veh 9.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 28 0 109 41 0 0 44 178 31 0 357 18
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 0 - - - 75 - - 100 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 50 25 90 25 25 25 73 89 25 25 87 58
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 56 0 121 164 0 0 60 200 124 0 410 31
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 809 871 426 809 824 262 441 0 0 324 0 0
Stage 1 426 426 - 383 383 - - - - - - -
Stage 2 383 445 - 426 441 - - - - - - -
Follow-up Headway 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Capacity-1 Maneuver 299 289 628 299 308 777 1119 - - 1236 - -
Stage 1 606 586 - 640 612 - - - - - - -
Stage 2 640 575 - 606 577 - - - - - - -
Time blocked-Platoon, % - - - -
Mov Capacity-1 Maneuver 287 274 628 231 291 777 1119 - - 1236 - -
Mov Capacity-2 Maneuver 287 274 - 231 291 - - - - - - -
Stage 1 574 586 - 606 579 - - - - - - -
Stage 2 606 544 - 489 577 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 15.1 51.4 1.3 0
HCM LOS C F
Minor Lane / Major Mvmt NBL NBT NBR EBLn1 EBLn2 WBLn1 SBL SBT SBR
Capacity (veh/h) 1119 - - 372 628 231 1236 - -
HCM Lane V/C Ratio 0.054 - - 0.259 0.129 0.71 - - -
HCM Control Delay (s) 8.4 - - 18 11.6 51.4 0 - -
HCM Lane LOS A C B F A
HCM 95th %tile Q(veh) 0.171 - - 1.019 0.44 4.703 0 - -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
189
HCM 2010 TWSC 2015 Background + Project AM.syn
8: Centre Avenue & Centre Access 2/2/2015
2015 Background + Project AM 1/26/2015 Synchro 8 Report
Page 1
Intersection
Intersection Delay, s/veh 0.8
Movement WBL WBR NBT NBR SBL SBT
Vol, veh/h 9 18 590 18 36 220
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - 100 -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 10 20 641 20 39 239
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 968 651 0 0 661 0
Stage 1 651 - - - - -
Stage 2 317 - - - - -
Follow-up Headway 3.518 3.318 - - 2.218 -
Pot Capacity-1 Maneuver 282 469 - - 927 -
Stage 1 519 - - - - -
Stage 2 738 - - - - -
Time blocked-Platoon, % - - -
Mov Capacity-1 Maneuver 270 469 - - 927 -
Mov Capacity-2 Maneuver 270 - - - - -
Stage 1 519 - - - - -
Stage 2 707 - - - - -
Approach WB NB SB
HCM Control Delay, s 15.4 0 1.3
HCM LOS C
Minor Lane / Major Mvmt NBT NBR WBLn1 SBL SBT
Capacity (veh/h) - - 377 927 -
HCM Lane V/C Ratio - - 0.078 0.042 -
HCM Control Delay (s) - - 15.4 9.055 -
HCM Lane LOS C A
HCM 95th %tile Q(veh) - - 0.252 0.132 -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
190
HCM 2010 TWSC 2015 Background + Project PM.syn
8: Centre Avenue & Centre Access 2/2/2015
2015 Background + Project PM 1/26/2015 Synchro 8 Report
Page 1
Intersection
Intersection Delay, s/veh 1.4
Movement WBL WBR NBT NBR SBL SBT
Vol, veh/h 24 48 302 19 37 561
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - 100 -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 26 52 328 21 40 610
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 1029 339 0 0 349 0
Stage 1 339 - - - - -
Stage 2 690 - - - - -
Follow-up Headway 3.518 3.318 - - 2.218 -
Pot Capacity-1 Maneuver 259 703 - - 1210 -
Stage 1 722 - - - - -
Stage 2 498 - - - - -
Time blocked-Platoon, % - - -
Mov Capacity-1 Maneuver 250 703 - - 1210 -
Mov Capacity-2 Maneuver 250 - - - - -
Stage 1 722 - - - - -
Stage 2 482 - - - - -
Approach WB NB SB
HCM Control Delay, s 15 0 0.5
HCM LOS C
Minor Lane / Major Mvmt NBT NBR WBLn1 SBL SBT
Capacity (veh/h) - - 438 1210 -
HCM Lane V/C Ratio - - 0.179 0.033 -
HCM Control Delay (s) - - 15 8.077 -
HCM Lane LOS C A
HCM 95th %tile Q(veh) - - 0.643 0.103 -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
191
HCM 2010 TWSC 2025 Background + Project AM.syn
8: Centre Avenue & Centre Access 2/2/2015
2025 Background + Project AM 1/26/2015 Synchro 8 Report
Page 1
Intersection
Intersection Delay, s/veh 0.8
Movement WBL WBR NBT NBR SBL SBT
Vol, veh/h 9 18 745 18 36 274
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - 100 -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 10 20 810 20 39 298
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 1196 820 0 0 829 0
Stage 1 820 - - - - -
Stage 2 376 - - - - -
Follow-up Headway 3.518 3.318 - - 2.218 -
Pot Capacity-1 Maneuver 206 375 - - 803 -
Stage 1 433 - - - - -
Stage 2 694 - - - - -
Time blocked-Platoon, % - - -
Mov Capacity-1 Maneuver 196 375 - - 803 -
Mov Capacity-2 Maneuver 196 - - - - -
Stage 1 433 - - - - -
Stage 2 660 - - - - -
Approach WB NB SB
HCM Control Delay, s 19 0 1.1
HCM LOS C
Minor Lane / Major Mvmt NBT NBR WBLn1 SBL SBT
Capacity (veh/h) - - 287 803 -
HCM Lane V/C Ratio - - 0.102 0.049 -
HCM Control Delay (s) - - 19 9.713 -
HCM Lane LOS C A
HCM 95th %tile Q(veh) - - 0.338 0.153 -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
192
HCM 2010 TWSC 2025 Background + Project PM.syn
8: Centre Avenue & Centre Access 2/2/2015
2025 Background + Project PM 1/26/2015 Synchro 8 Report
Page 1
Intersection
Intersection Delay, s/veh 1.4
Movement WBL WBR NBT NBR SBL SBT
Vol, veh/h 24 48 376 19 37 706
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - 100 -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 26 52 409 21 40 767
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 1267 419 0 0 429 0
Stage 1 419 - - - - -
Stage 2 848 - - - - -
Follow-up Headway 3.518 3.318 - - 2.218 -
Pot Capacity-1 Maneuver 186 634 - - 1130 -
Stage 1 664 - - - - -
Stage 2 420 - - - - -
Time blocked-Platoon, % - - -
Mov Capacity-1 Maneuver 179 634 - - 1130 -
Mov Capacity-2 Maneuver 179 - - - - -
Stage 1 664 - - - - -
Stage 2 405 - - - - -
Approach WB NB SB
HCM Control Delay, s 18.6 0 0.4
HCM LOS C
Minor Lane / Major Mvmt NBT NBR WBLn1 SBL SBT
Capacity (veh/h) - - 343 1130 -
HCM Lane V/C Ratio - - 0.228 0.036 -
HCM Control Delay (s) - - 18.6 8.303 -
HCM Lane LOS C A
HCM 95th %tile Q(veh) - - 0.864 0.111 -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
193
HCM 2010 TWSC 2015 Background + Project AM.syn
9: Gilette Drive & Gilette Access 2/2/2015
2015 Background + Project AM 1/26/2015 Synchro 8 Report
Page 1
Intersection
Intersection Delay, s/veh 1.8
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 0 0 7 10 0 10 14 77 10 10 99 0
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 0 0 8 11 0 11 15 84 11 11 108 0
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 254 254 108 253 249 89 108 0 0 95 0 0
Stage 1 129 129 - 120 120 - - - - - - -
Stage 2 125 125 - 133 129 - - - - - - -
Follow-up Headway 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Capacity-1 Maneuver 699 650 946 700 654 969 1483 - - 1499 - -
Stage 1 875 789 - 884 796 - - - - - - -
Stage 2 879 792 - 870 789 - - - - - - -
Time blocked-Platoon, % - - - -
Mov Capacity-1 Maneuver 681 638 946 684 642 969 1483 - - 1499 - -
Mov Capacity-2 Maneuver 681 638 - 684 642 - - - - - - -
Stage 1 865 783 - 874 787 - - - - - - -
Stage 2 860 783 - 856 783 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 8.8 9.6 1 0.7
HCM LOS A A
Minor Lane / Major Mvmt NBL NBT NBR EBLn1 WBLn1 SBL SBT SBR
Capacity (veh/h) 1483 - - 946 802 1499 - -
HCM Lane V/C Ratio 0.01 - - 0.008 0.027 0.007 - -
HCM Control Delay (s) 7.453 0 - 8.8 9.6 7.419 0 -
HCM Lane LOS A A A A A A
HCM 95th %tile Q(veh) 0.031 - - 0.024 0.084 0.022 - -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
194
HCM 2010 TWSC 2015 Background + Project PM.syn
9: Gilette Drive & Gilette Access 2/2/2015
2015 Background + Project PM 1/26/2015 Synchro 8 Report
Page 1
Intersection
Intersection Delay, s/veh 2.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 0 0 19 10 0 10 15 58 10 10 65 0
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 0 0 21 11 0 11 16 63 11 11 71 0
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 199 199 71 204 193 68 71 0 0 74 0 0
Stage 1 92 92 - 101 101 - - - - - - -
Stage 2 107 107 - 103 92 - - - - - - -
Follow-up Headway 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Capacity-1 Maneuver 760 697 991 754 702 995 1529 - - 1526 - -
Stage 1 915 819 - 905 811 - - - - - - -
Stage 2 898 807 - 903 819 - - - - - - -
Time blocked-Platoon, % - - - -
Mov Capacity-1 Maneuver 741 684 991 728 689 995 1529 - - 1526 - -
Mov Capacity-2 Maneuver 741 684 - 728 689 - - - - - - -
Stage 1 905 812 - 895 802 - - - - - - -
Stage 2 878 798 - 877 812 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 8.7 9.4 1.3 1
HCM LOS A A
Minor Lane / Major Mvmt NBL NBT NBR EBLn1 WBLn1 SBL SBT SBR
Capacity (veh/h) 1529 - - 991 841 1526 - -
HCM Lane V/C Ratio 0.011 - - 0.021 0.026 0.007 - -
HCM Control Delay (s) 7.38 0 - 8.7 9.4 7.376 0 -
HCM Lane LOS A A A A A A
HCM 95th %tile Q(veh) 0.032 - - 0.064 0.08 0.022 - -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
195
HCM 2010 TWSC 2025 Background + Project AM.syn
9: Gilette Drive & Gilette Access 2/2/2015
2025 Background + Project AM 1/26/2015 Synchro 8 Report
Page 1
Intersection
Intersection Delay, s/veh 1.5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 0 0 7 10 0 10 14 100 10 10 129 0
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 0 0 8 11 0 11 15 109 11 11 140 0
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 312 312 140 311 307 114 140 0 0 120 0 0
Stage 1 162 162 - 145 145 - - - - - - -
Stage 2 150 150 - 166 162 - - - - - - -
Follow-up Headway 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Capacity-1 Maneuver 641 603 908 642 607 939 1443 - - 1468 - -
Stage 1 840 764 - 858 777 - - - - - - -
Stage 2 853 773 - 836 764 - - - - - - -
Time blocked-Platoon, % - - - -
Mov Capacity-1 Maneuver 624 592 908 627 596 939 1443 - - 1468 - -
Mov Capacity-2 Maneuver 624 592 - 627 596 - - - - - - -
Stage 1 831 758 - 849 768 - - - - - - -
Stage 2 834 764 - 822 758 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 9 9.9 0.8 0.5
HCM LOS A A
Minor Lane / Major Mvmt NBL NBT NBR EBLn1 WBLn1 SBL SBT SBR
Capacity (veh/h) 1443 - - 908 752 1468 - -
HCM Lane V/C Ratio 0.011 - - 0.008 0.029 0.007 - -
HCM Control Delay (s) 7.521 0 - 9 9.9 7.471 0 -
HCM Lane LOS A A A A A A
HCM 95th %tile Q(veh) 0.032 - - 0.025 0.089 0.022 - -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
196
HCM 2010 TWSC 2025 Background + Project PM.syn
9: Gilette Drive & Gilette Access 2/2/2015
2025 Background + Project PM 1/26/2015 Synchro 8 Report
Page 1
Intersection
Intersection Delay, s/veh 2.3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 0 0 19 10 0 10 15 75 10 10 85 0
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 0 0 21 11 0 11 16 82 11 11 92 0
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 239 239 92 244 234 87 92 0 0 92 0 0
Stage 1 114 114 - 120 120 - - - - - - -
Stage 2 125 125 - 124 114 - - - - - - -
Follow-up Headway 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Capacity-1 Maneuver 715 662 965 710 666 971 1503 - - 1503 - -
Stage 1 891 801 - 884 796 - - - - - - -
Stage 2 879 792 - 880 801 - - - - - - -
Time blocked-Platoon, % - - - -
Mov Capacity-1 Maneuver 697 649 965 685 653 971 1503 - - 1503 - -
Mov Capacity-2 Maneuver 697 649 - 685 653 - - - - - - -
Stage 1 881 795 - 874 787 - - - - - - -
Stage 2 860 783 - 854 795 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 8.8 9.6 1.1 0.8
HCM LOS A A
Minor Lane / Major Mvmt NBL NBT NBR EBLn1 WBLn1 SBL SBT SBR
Capacity (veh/h) 1503 - - 965 803 1503 - -
HCM Lane V/C Ratio 0.011 - - 0.021 0.027 0.007 - -
HCM Control Delay (s) 7.421 0 - 8.8 9.6 7.413 0 -
HCM Lane LOS A A A A A A
HCM 95th %tile Q(veh) 0.033 - - 0.066 0.083 0.022 - -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
197
Kimley-Horn and Associates, Inc.
096336002 – Colorado State University South Campus Parking Lot
APPENDIX C
Conceptual Site Plan
198
503 STALLS
383 STALLS
191 STALLS
DETENTION
BASIN
DETENTION
BASIN
EXISTING
DETENTION
BASIN
TENNIS COURTS
EXISTING
PEDESTRIAN
BRIDGE
PROPOSED
LIGHTING
BRIDGE
SIPHON UNDER
LARIMER #2 DITCH
WEST DRAKE ROAD
SOUTH CAMPUS
SURFACE PARKING LOT CONCEPT
NOVEMBER 1, 2013
N
199
200
NEIGHBORHOOD MEETING NOTES
PROJECT: CSU Parking Lot Site Plan Advisory Review
DATE: April 1, 2015
APPLICANT: Colorado State University
CITY PLANNER: Jason Holland
The meeting began with Jason Holland providing an explanation of the Site Plan Advisory
Review Process, next steps in the review, and an overview of the neighborhood meeting
agenda and ground rules.
Fred Haberecht, Assistant Director of Landscape and Planning for Colorado State University,
explained that overall, CSU is losing about 2,000 parking spaces to accommodate various
campus improvements. Background information was presented for the overall campus master
plan as well as the details for the parking lot concept site and landscape plan.
QUESTIONS, CONCERNS, COMMENTS AND RESPONSES:
1. Question: (Citizen) With new campus construction, can parking be put under the
buildings or in parking garages?
Response: (CSU) CSU acknowledged that this would be a more efficient use of space,
but due to ground water typically present at 12 feet below surface elevations, and the
high cost of underground parking (typically $30,000 per parking space underground and
$15,000 per parking space in structured parking), the surface spaces proposed are the
most feasible option.
2. Question: (Citizen) The American Lung Association has given Fort Collins an “F” air
quality rating. How is the project addressing air quality? Will there be an air monitor
device placed at the site?
Response: (CSU) CSU explained that that the parking provided is intended to replace
parking lost on campus, due to CSU losing +/-2000 parking spaces with future campus
improvements, and that the net trips would be equal. They also responded that they
don’t have plans to add an air monitor device to the site, and that the closest air monitor
they were aware of is on the main campus.
3. Question: (Citizen) I’m still concerned with air quality impacts in the immediate vicinity
of the site.
Response: (CSU) The general response was acknowledgement of the concern and that
there is a desire by CSU to shift to alternative modes of transportation.
4. Question: (Citizen) What is being done with the landscaping? Will there be soft
surfaces, other surfaces other than asphalt?
1
201
Response: (CSU) Mr. Haberecht explained that the City’s low impact development
standards (LID) will be incorporated using bioswale enhancements in the parking lot
islands and buffer space along Research and Centre. Costs were discussed as a
concern with providing an all-concrete parking lot or pavers, but the project will be
recycling asphalt from other places on campus and rolling it into a new surface at the
site.
5. Question: (Citizen) Isn’t there construction equipment on the site now, what is
happening with that?
Response: (CSU) This will be shifted south closer to Drake Road.
6. Question: (Citizen) Will the existing trees along Centre and Research stay?
Response: (CSU) Some cottonwoods and russian olives will be removed but the main
line of trees will remain.
7. Question: (Citizen) Concern was expressed with overuse of on-street parking on
Research Blvd. and cars parked in close proximity to the entrance drives along the west
side of Research.
Response: (City) City staff agreed to look into this concern and discuss it with other city
departments. Additional options such as marking the drive entrance curbs with red paint
were discussed.
8. Question: (Citizen) Will there be lighting spillover, what will the lighting look like?
Response: (CSU) 30 foot pole-mounted lights will be used. This will be the first CSU
parking to use LED lights. We will provide a lighting plan to the city. There was a
general discussion of CSU lighting standards and that the parking lights will be full cut-
off and with an overall lighting level that is less than what is required by city standards
9. Question: (Citizen) What is the timing of the project?
Response: (CSU) Fall 2015.
10. Question: (Citizen) Asphalt vs. concrete? Light colored asphalt?
Response: (CSU) Costs are a concern.
11. Question: (Citizen) What is the frequency of the bus routes? Concerned was expressed
about an increase in bus traffic funneling through Centre Avenue.
Response: (CSU) Two existing bus routes on 30 minute routes, overlapping with a bus
available every 15 minutes.
12. Question: (Citizen) What will the traffic impact be for the Meadowlark neighborhood?
We already have a difficult time with traffic backing up on Meadowlark. The timing of the
traffic lights should be looked at.
Response: (CSU) The traffic study is showing the flow coming from the arterials.
Response: (City) I can talk with traffic operations staff about evaluating the timing.
2
202
13. Question: (Citizen) Will there still be parking available for the tennis courts?
Response: (CSU) Parking spaces will be incorporated into the lot for the tennis courts
and the spaces would be open to the public and metered. The number of metered
spaces will be based on demand.
14. Question: (Citizen) Security cameras?
Response: (CSU) Unsure at this time. There was a general discussion about new
phone applications that can tell students what parking lots are open.
15. Question: (Citizen) Will there be a traffic light at Drake/Centre?
Response: (CSU) Not likely.
16. Comment: (Citizen) Concern was expressed about added traffic on Research.
Response: (CSU) We think the four access points help and the added access to Gillette
Drive will help distribute traffic. Response: (City) Jason offered to post the traffic study
online with the hearing documents.
With no more questions, the meeting adjourned and there were informal discussions in
various groups.
3
203
Agenda Item 3
STAFF REPORT May 14, 2015
Planning and Zoning Board
PROJECT NAME
CSU SOUTH COLLEGE PARKING GARAGE SPAR #150003
STAFF
Jason Holland, City Planner
PROJECT INFORMATION
PROJECT DESCRIPTION: This is a request for a Site Plan Advisory Review (SPAR) by Colorado State
University to construct a new parking garage adjacent to the CSU campus
(Parcel #9714413904). The site is located at the southeast corner of West Pitkin
Street and the Mason BRT. The site is 2.6 acres and is located in the
Community Commercial (CC) zone district.
The proposed garage is four stories with a total of approximately 662 parking
spaces. The garage will replace an existing portion of a CSU surface parking lot,
resulting in a net gain of approximately 450 parking spaces. The University
Alumni Center and University Square office buildings are adjacent to the
structure to the east while the Mason Trail and MAX BRT are adjacent to the
west. The structure would be managed by CSU Parking and Transportation
Services (PTS) and access would require a permit or meter payment.
A proposed CSU Medical Center is located south of this parking garage at the
northwest corner of Prospect and College, and will likely utilize a portion of the
garage parking spaces. The Medical Center building will be submitted to the
Planning and Zoning Board as a separate project and is also subject to a SPAR
review.
APPLICANT: David Hansen
Colorado State University Landscape Architect
Facilities Management
6030 Campus Delivery
Fort Collins, CO 80523
OWNER: Board of Governors of the Colorado State University System
01 Administration Building
Fort Collins, CO 80523
RECOMMENDATION: Approval
Item # 3 Page 1
204
Agenda Item 3
EXECUTIVE SUMMARY
The Site Plan Advisory Review complies with Land Use Code Section 2.16, Site Plan Advisory
Review (SPAR).
COMMENTS:
1. Background:
The surrounding zoning and land uses are as follows:
Direction Zone District Existing Land Uses
North N/A CSU Main Campus
South Community Commercial
(CC)
Residential and Offices
East Community Commercial
(CC)
CSU Alumni and University Square buildings
West N/A CSU Main Campus
In 1921, the project boundary was included in the LC Moores Annexation.
In 1973, the project boundary was incorporated into the University Square PUD, and an office
building, motel and convention center were planned on the site with a zoning of “Planned
Business”.
In 1983, the University Square plans were changed to show a Residence Inn, apartments and
offices.
The site is currently configured as a surface parking lot for CSU. It is not clear when the existing
parking lot was constructed.
2. Right of Advisory Review:
Colorado Revised Statutes provide two specific references which allow the City to review the
planning and location of public facilities:
Section 31-23-209, C.R.S. provides that no public building shall be constructed or authorized in
a city until the “location, character and extent thereof” has been submitted for approval by the
Planning and Zoning Board. In the case of disapproval, the Planning and Zoning Board shall
communicate its findings to the applicant’s governing body. The disapproval of the Planning
and Zoning Board may be overruled by the Colorado State University Board of Governors by a
vote of not less than two-thirds of its membership.
3. Site Plan Advisory Review Procedures:
The processing and evaluation of Site Plan Advisory Review applications is governed by
Division 2.16 or Article 2 of the Fort Collins Land Use Code. The section further defines the
Item # 3 Page 2
205
Agenda Item 3
evaluation criteria for the “location, character and extent” of Site Plan Advisory Review
applications.
Evaluation criteria:
(1) The site location for the proposed use shall be consistent with the land use
designation described by the City Structure Plan Map, which is an element of the City's
Comprehensive Plan.
(2) The site development plan shall conform to architectural, landscape and other
design standards and guidelines adopted by the applicant's governing body. Absent
adopted design standards and guidelines, the design character of the site development
plan shall be consistent with the stated purpose of the respective land use designation
as set forth in the City's Comprehensive Plan.
(3) The site development plan shall identify the level of functional and visual impacts to
public rights-of-way, facilities and abutting private land caused by the development,
including, but not limited to, streets, sidewalks, utilities, lighting, screening and noise, and
shall mitigate such impacts to the extent reasonably feasible.
4. Evaluation
A. Location (Criterion 1)
The proposed site meets this requirement with a proposed use that is consistent with the
City’s land use designation. The site is within the Community Commercial District, and
Parking Garages and Parking Lots are listed as a permitted principal Type 2 use in this
district.
B. Character (Criterion 2)
The proposed parking lot meets this requirement by conforming to the landscape and
other design standards established by the Colorado State University Aesthetic Guideline
and CSU Facilities Construction Standards Manual.
The design character of the site development plan is also consistent with the stated
purpose of the City’s Community Commercial District by providing a higher density
parking component within an overall setting of offices, civic uses and services.
Primary automobile access into the garage is from West Pitkin Street and an existing
access from South College Avenue. The garage will also be accessible from West Lake
Street through the existing parking lot to the south. Sidewalks and shared bicycle routes
are provided around the perimeter of the structure linking the South College trail
underpass, and the Mason Trail / MAX transit corridor.
The garage will also include covered bicycle parking, but at this time it is unknown how
many bicycle spaces CSU will be able to accommodate in the structure.
Item # 3 Page 3
206
Agenda Item 3
Foundation landscaping and street trees are adequately provided around the perimeter
of the structure and two rain gardens are proposed on the east and west side of the
structure. All lighting provided will be fully shielded and down-directional in conformance
with CSU standards.
The architectural character of the parking structure is consistent with recent campus
construction. The use of colored precast concrete, random ashlar sandstone, red
sandstone shiners, and glass-enclosed stairwells are similar to the existing CSU parking
structure on Lake Street. Variation in overall massing is satisfied by breaking up the
building mass into a series of intersecting wall planes in a module format, similar to other
buildings on campus. Variations in massing, juxtaposed materials and forms, and
repeated patterns of mass/void provide vertical and horizontal interest, breaking down
the overall scale of the structure.
The use of building materials and patterns is balanced, with colors and textures helping
to emphasize and articulate overall building forms and make the structure clearly
identifiable as a CSU campus building.
C. Extent (Criterion 3)
The primary focus has been to integrate the parking structure into the surrounding
transportation modes, and mitigate impacts including refinements to the circulation route
of the trail connection east of the parking structure.
The following measures were identified and are incorporated into City staff’s
recommendation:
1) Colorado State University provided a Traffic Impact Study (TIS) that evaluated the
vehicular impact of the parking garage on area City transportation facilities. The
eastbound approach of Pitkin to College Avenue is recommended for
improvement (lengthening turn lanes).
2) Original plans proposed that the east trail connection would be re-routed north
and intersect mid-block with West Pitkin Street. This would give users the option
to cross West Pitkin Street or continue west along a detached walk, ultimately to
connect with campus and the Mason Trail.
Staff recommended revising the circulation around the garage to bring the trail
from the underpass and along the south side of the garage to the Mason Trail.
This revised route is illustrated on the SPAR plans as the “Alternative
Bike/Pedestrian Connection Concept”. The goal of this revision is to eliminate
conflicts with the significant vehicular traffic expected on West Pitkin.
3) Visibility at the two main access points into the parking structure is also a
consideration. Landscaping will be kept low in these areas and appropriate
signage will be considered to mitigate conflicts.
4) CSU Facilities staff is continuing to coordinate with City staff and CDOT to provide
Item # 3 Page 4
207
Agenda Item 3
final utility plans and other approvals/easements in conjunction with the parking
structure. Utility plans will show the final details for elements such as curb cuts,
sidewalk ramps with truncated domes, water quality infiltration and rain garden
details, etc.
5) Signage shown on the parking structure will be scaled back to meet the City sign
code.
6) Several existing trees will be removed in the existing parking lot and along West
Pitkin Street to accommodate the parking structure and new sidewalk
connections. A tree mitigation plan will be provided with the final plan set.
5. Neighborhood Meeting:
A neighborhood information meeting was held on April 6, 2015. One resident attended the
meeting and there were no concerns expressed.
6. Findings of Fact:
A. The CSU South College Avenue Parking Garage SPAR is subject to evaluation by the
Planning and Zoning Board, pursuant to State Statute Section 31-23-209, C.R.S. and
Fort Collins Land Use Code Section 2.16.
B. The location of the CSU Parking Garage is consistent with the permitted uses described
in the City’s Structure Plan Map, an element of the City’s Comprehensive Plan.
C. The character of the CSU Parking Garage conforms to the landscape and other design
standards and guidelines adopted by CSU.
D. The extent of the proposed CSU Parking Garage is integrated into the surrounding
context though the use of appropriate perimeter landscaping, architectural design
consistent with CSU standards, and acceptable integration into existing pedestrian and
bicycle circulation patterns.
RECOMMENDATION:
Staff recommends Planning and Zoning Board approval with the following motion:
Approve the CSU South College Avenue Parking Garage, Site Plan Advisory Review
#SPA150003 based on the findings of fact.
Item # 3 Page 5
208
Agenda Item 3
ATTACHMENTS
1. CSU Submittal Narrative (PDF)
2. Vicinity Map (PDF)
3. Area Zoning Map (PDF)
4. Site Photos (PDF)
5. SPAR Site Plan (PDF)
6. SPAR Landscape Plan (PDF)
7. SPAR Parking Garage Elevations (PDF)
8. Traffic Study (PDF)
Item # 3 Page 6
209
Office of Facilities Management
Fort Collins, Colorado 80523-6030
6030 Campus Delivery
April 16, 2015
Jason Holland
Planner
Development Review Center
281 North College Avenue
Fort Collins, CO 80524
RE: CSU South College Avenue Parking Structure
Dear Jason,
The South College Avenue Parking Structure would be a new +/- 660 space, 4-story, parking structure
on the CSU main campus. As redevelopment occurs in the core of the campus, parking relocates to the
periphery of the campus per the University Master Plan approved by the Board of Governors.
Constructing additional parking inventory is needed for daily campus users and is also a requirement of
the City/ CSU Stadium IGA. The structure would be managed by CSU Parking and Transportation
Services (PTS) and would require a permit or meter payment in order to utilize it. Essentially following
the precedent set by the Lake Street Parking structure on campus.
The site is approximately 2.6 acres in total and is currently a surface parking lot in the PTS inventory.
The University Alumni Center and University Square office buildings will be adjacent to the structure to
the East while the Mason Trail and MAX BRT are adjacent to the West. The structure would force a
redirect of a community bike and pedestrian connection between the College Avenue underpass and the
Mason trail.
The projected major egress point of the garage would be off of Pitkin Street to the north. Existing
parking lot access points off of College Avenue would be maintained and would provide access to the
south entry of the garage as well as the remaining surface parking lot. While circuitous, access to Pitkin
Street can be made through the garage by parking lot users. The garage would also include covered
bike parking as an amenity to members of the campus community.
Stormwater on this site was accounted for with the development of the MAX project and is designed to
handle this redevelopment. The project will provide water quality treatment on either side of the garage
prior to water reaching inlets that connect to onsite detention as well as an existing storm line on the
west.
Architectural detailing of the building takes its clues from the existing Lake Street parking structure. A
mix of colored precast concrete, random ashlar sandstone, red sandstone shiners, and glass enclosed
210
stairwells are all part of the established character. Inside the garage, LED lighting and painted
overheads provide a brighter and a safer feeling environment.
This project addresses the Character, Location and Extent requirements of pertinent State Statute and
evolving City of Fort Collins SPAR requirements in the following ways:
Location- the parking lot is situated along the east perimeter of campus immediately adjacent to US 287
and Pitkin Street. Adjacent connectivity to The Horn and MAX transit, as well as the Mason Trail,
provides campus users with additional mobility alternatives.
Character- The project will conform to the landscape, lighting standards, and materials spelled out in the
CSU Aesthetic Guidelines and CSU Facilities Construction Standards Manual. The garage follows the
architectural aesthetic and material quality already established by the Lake Street Parking Structure.
This existing structure has successfully blended into the campus and has become a signature building at
the south campus entry.
Extent- The site will not be a change in use, only in vehicle density from a paved parking surface to
structured parking. Traffic patterns are expected to change in the area with the additional concentration
of vehicles. Providing a substantial setback off of College Avenue, maintains the goals of the campus
master plan with College Avenue being the iconic campus frontage
Sincerely,
David Hansen,
Campus Landscape Architect
Facilities Services Center North
Colorado State University
Fort Collins, Colorado 80523-6030
970.491.0318 970.491.0105 - fax
211
Colorado State University
Colorado State University
Trinity Lutheran Church Preschool
Harris Bilingual Immersion
Centennial Sr High
Open Arms Christian Preschool
Spring Creek Country Day School
Young Peoples Learning Center
Spring Park
Creekside Park
Lilac Park
Spring Creek
Spring Creek Park Pond
«¬287
Whedbee St
Smith St
Peterson St
East Dr
Mathews St
Bay Rd
W Myrtle St
Parker St
Locust St
Meridian Ave
E Lake St
E Plum St
Garfield St
E Myrtle St
S Mason St
Edwards St
South Dr
W Pitkin St
Circle Dr
Oval Dr
Alpert Ave
W Plum St
A St
Busch Ct
Smith Pl
Birky Pl
S Meldrum St
Bay Dr
University Ave
Old Main Dr
S Sherwood St
S Whitcomb St
Sheely Dr
Peterson Pl
Balsam Ln
Johnson Dr
Juniper Ln
Buckeye St
Wallenber
g
Dr
Choice Center Dr
Person Ct
Braiden Dr
Morningside Dr
Gilgalad Way
Colorado State University
«¬287
East Dr
W Pitkin St
Edison Dr
S Mason St
E La
k
e St
W Lake St
E Pitkin St
S College Ave
©
CSU Parking Garage
These map products and all underlying data are developed for use by the City of Fort Collins for its internal purposes only, and were not designed or intended for general use by members
of the public. The City makes no representation or warranty as to its accuracy, timeliness, or completeness, and in particular, its accuracy in labeling or displaying dimensions, contours,
property boundaries, or placement of location of any map features thereon. THE CITY OF FORT COLLINS MAKES NO WARRANTY OF MERCHANTABILITY OR WARRANTY FOR
FITNESS OF USE FOR PARTICULAR PURPOSE, EXPRESSED OR IMPLIED, WITH RESPECT TO THESE MAP PRODUCTS OR THE UNDERLYING DATA. Any users of these map
products, map applications, or data, accepts same AS IS, WITH ALL FAULTS, and assumes all responsibility of the use thereof, and further covenants and agrees to hold the City harmless
from and against all damage, loss, or liability arising from any use of this map product, in consideration of the City's having made this information available. Independent verification
of all data
contained herein should be obtained by any users of these products, or underlying data. The City disclaims, and shall not be held liable for any and all damage, loss, or liability, whether
direct,
indirect, or consequential, which arises or may arise from these map products or the use thereof by any person or entity.
1 inch = 167 feet
^_
¤£287
¤£287
¤£287
VU14
«¬1
¦¨§25
¦¨§25
¦¨§25
Douglas
Vine
Mountain Vista
Mulberry
Trilby
Lemay
Shields
Harmony
Taft Hill
Prospect
Horsetooth
Drake
Timberline
CC
CSU
NCL
Colorado State University
¤£287
W Pitkin St
S Mason St
W Lake St
E Pitkin St
S
Col
l
ege
ACADEMIC
VILLAGE
HONORS
ACADEMIC
VILLAGE
ENGINEERING
ACADEMIC
VILLAGE
ASPEN
BLDG
THERMAL
PLANT
ACADEMIC
VILLAGE
COMMONS
LORY
STUDENT
CENTER
MORGAN
LIBRARY
GLENN MORRIS
FIELD HOUSE
WEED
RESEARCH
LAB
NRRC E
NRRC D
NRRC C
NRRC B
PROPERTY
583
CHILL
PLANT
S.C.A.V.M.A.
540
(2) 8x20
CONTAINERS
590
543
546
544
582
(22) 8x40 CONTAINERS
(15) 8x40 SEMI TRAILERS
547
549
706
557
705
139
563
204 209 214
550
704
703
702
566
565
581
NRRC A
NORTH
SOUTH COLLEGE PARKING STRUCTURE
04.16.2015
SPAR SUBMITTAL
EXISTING CONDITIONS/ SITE PHOTOS
EXISTING CONDITIONS
A B
C
FG
D
E
A
C
F
E
G
WEST LAKE STREET
MASON BRT
PITKIN STREET
SOUTH COLLEGE AVENUE
B
D
215
NORTH
SOUTH COLLEGE PARKING STRUCTURE
04.16.2015
SPAR SUBMITTAL
EXISTING CONDITIONS/ SITE PHOTOS
EXISTING CONDITIONS
I
J
K
H
EXISTING CONDITIONS
H
I
J
K
WEST LAKE STREET
MASON BRT
PITKIN STREET
SOUTH COLLEGE AVENUE
216
South College Avenue Parking Structure
Overall Site Plan April 29, 2015 0’ 10’ 20’ 40’ NORTH
W. LAKE ST.
MASON TRAIL
W. PITKIN ST.
S. COLLEGE AVE.
6’ Sidewalk
New switchback
in trail
Existing Parking Lot Entrance
Existing Parking Lot Exit
Existing Underpass Trail
Garage
Entry
Garage
Entry
Entry to Alumni
Center Parking Lot
Bikeway Connects
Mason Trail
Striped Sharrows
in Parking Lot
Drive Lane
MASON BRT
MASON TRAIL
MASON BRT
New Detached
Sidewalk
217
DESCRIPTION
PROJECT MGR.
ISSUED/ DATE
REV. NO.
DESIGN ENG.
DRAWN BY
South College
Colorado State
Fort Collins, Colorado
University
Parking Structure
The Drawings are the property of Carl
Walker, Inc. and are not to be reused or
reproduced without written permission
from Carl Walker, Inc.
N1-2015-142
TONY FLORES
DAVID HANSEN
03/31/15 BASIS OF DESIGN DOCUMENTS
Parking
Planning Engineering Restoration
Carl Walker, Inc.
14045 Ballantyne Corporate
Place - Suite 380
Charlotte, NC 28277
Tel. 704.716.8000
Fax 704.527.0343
www.carlwalker.com
LANDSCAPE LEGEND:
LANDSCAPE PLAN
L100
SUGGESTED PLANT LIST:
218
04.16.2015
SPAR SUBMITTAL
SOUTH COLLEGE PARKING STRUCTURE
ARCHITECTURAL VIEWS 219
04.16.2015
SPAR SUBMITTAL
SOUTH COLLEGE PARKING STRUCTURE
ARCHITECTURAL VIEWS 220
04.16.2015
SPAR SUBMITTAL
SOUTH COLLEGE PARKING STRUCTURE
ARCHITECTURAL VIEWS 221
222
223
224
225
226
227
Traffic Impact Study
Colorado State University
University Square
Parking Structure
Fort Collins, Colorado
Prepared for:
Colorado State University
228
TRAFFIC IMPACT STUDY
Colorado State University
University Square Parking Structure
Fort Collins, Colorado
Prepared for
Colorado State University
251 Edison Drive
Fort Collins, Colorado 80523
Prepared by
Kimley-Horn and Associates, Inc.
990 South Broadway
Suite 200
Denver, Colorado 80209
(303) 228-2300
April 2015
This document, together with the concepts and designs presented herein, as an instrument of
service, is intended only for the specific purpose and client for which it was prepared. Reuse of
and improper reliance on this document without written authorization and adaptation by Kimley-
Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.
04/07/2015
229
Kimley-Horn and Associates, Inc.
096336003 – Colorado State University – University Square Parking Structure Page i
TABLE OF CONTENTS
TABLE OF CONTENTS ................................................................................................... i
APPENDICES .................................................................................................................. i
LIST OF TABLES .............................................................................................................ii
LIST OF FIGURES ...........................................................................................................ii
1.0 INTRODUCTION ....................................................................................................... 1
2.0 EXISTING AND FUTURE CONDITIONS .................................................................. 4
2.1 Study Area and Roadway Network ....................................................................................4
2.2 Existing Roadway and Intersection Configuration ..............................................................4
2.3 Existing Traffic Volumes ....................................................................................................5
2.4 Unspecified Development Traffic Growth ...........................................................................5
Figure 3 – 2016 Background Traffic Volumes ..........................................................................7
3.0 PARKING STRUCTURE REDISTRIBUTED TRAFFIC ........................................... 11
3.1 Parking Structure Trip Redistribution ...............................................................................11
3.2 Trip Redistribution ...........................................................................................................12
3.3 Traffic Assignment ...........................................................................................................12
3.4 Total Traffic Volumes .......................................................................................................12
4.0 TRAFFIC OPERATIONS ANALYSIS ...................................................................... 17
4.1 Analysis Methodology ......................................................................................................17
4.2 Key Intersection Operational Analysis .............................................................................18
4.3 Queueing Analysis ...........................................................................................................20
5.0 CONCLUSIONS AND RECOMMENDATIONS ....................................................... 24
APPENDICES
Appendix A – Intersection Count Sheets
Appendix B – Intersection Analysis Worksheets
Appendix C – Queue Analysis Worksheets
Appendix D – Conceptual Site Plan
230
Kimley-Horn and Associates, Inc.
096336003 – Colorado State University – University Square Parking Structure Page ii
LIST OF TABLES
Table 1 – New University Square Parking Structure Trip Generation ........................................11
Table 2 – Level of Service Definitions .......................................................................................17
Table 3 – 2016 Expected Intersection Delay and Level of Service ............................................18
Table 4 – 2025 Expected Intersection Delay and Level of Service ............................................19
Table 5 –Turn Lane Length Analysis Results ............................................................................20
LIST OF FIGURES
Figure 1 – Vicinity Map ................................................................................................................2
Figure 2 – Existing Lanes and Control ........................................................................................6
Figure 3 – 2016 Background Traffic Volumes..............................................................................7
Figure 4 – 2025 Background Traffic Volumes..............................................................................8
Figure 5 – 2016 Background Bicycle and Pedestrian Volumes ...................................................9
Figure 6 – 2025 Background Bicycle and Pedestrian Volumes .................................................10
Figure 7 – Project Trip Redistribution ........................................................................................13
Figure 8 – Project Traffic Assignment .......................................................................................14
Figure 9 – 2016 Background Plus Project Traffic Volumes ........................................................15
Figure 10 – 2025 Background Plus Project Traffic Volumes ......................................................16
Figure 11 – 2016 Expected Level of Service with Recommended Improvements ......................22
Figure 12 – 2025 Expected Level of Service with Recommended Improvements ......................23
231
Kimley-Horn and Associates, Inc.
096336003 – Colorado State University – University Square Parking Structure Page 1
1.0 INTRODUCTION
Kimley-Horn and Associates, Inc. (Kimley-Horn) has prepared this report to document the
results of a Traffic Impact Study of future traffic conditions associated with the proposed
Colorado State University (CSU), University Square Parking Structure project proposed at the
existing Lot 575 surface parking lot, southwest of the Pitkin Street and College Avenue (US-
287) intersection on the CSU campus in Fort Collins, Colorado. A vicinity map showing the
location of the project site is shown in Figure 1.
Kimley-Horn previously prepared the Parking and Transportation Master Plan (April 2014) which
studied the future traffic conditions associated with the CSU 2020 Transit Plan prepared by
CSU’s parking and transportation management team. The CSU 2020 Transit Plan included
construction of seven (7) new parking structures on campus which would allow for a net
increase of 5,896 parking spaces available for use by faculty, staff, and students of CSU. The
University is now proposing to move forward with the construction of a parking structure on the
existing Lot 575 surface parking lot called the University Square Parking Structure. This parking
structure was previously included in the 2020 Transit Plan and studied in the overall main
campus Parking and Transportation Master Plan prepared by Kimley-Horn and Associates, Inc.
in April 2014. The size of the proposed University Square Parking Structure will include
approximately 910 parking spaces. The additional parking structure is needed based on the
projected increase in student admissions and thus increasing demand for parking on campus as
described in the CSU 2020 Transit Plan.
The project is anticipated to develop with a four-level, above ground parking structure with 910
parking spaces. The existing Lot 575 surface parking lot has approximately 520 parking spaces.
For purposes of this study, it has been approximated that the new parking structure will contain
910 new parking spaces, replacing 520 existing surface parking spaces for a net increase of
400 parking spaces with this project.
It is expected that project construction will be completed within 2016. Analysis was therefore
completed for the 2016 short-term horizon, as well as the 2025 long-term horizon to match the
CSU 35,000 student enrollment planning year. A conceptual site plan illustrating the proposed
parking structure and access locations is provided in Appendix D.
232
233
Kimley-Horn and Associates, Inc.
096336003 – Colorado State University – University Square Parking Structure Page 3
The purpose of this study is to identify project traffic generation characteristics, to identify
potential project traffic related impacts on the local street system, and to develop mitigation
measures required for identified impacts. The Lake Street/College Avenue and Pitkin
Street/College Avenue intersections were incorporated into this traffic study in accordance with
Colorado State University and the City of Fort Collins standards and requirements. In addition,
the access to the proposed parking structure along Pitkin Street and the right-in/right-out access
along College Avenue were included for evaluation. An access also exists to the 575 Lot along
Lake Street. Since the parking structure is proposed on the northern portion of the site, it is
believed that this access will continue to serve the surface parking occurring in the southern
portion of the lot.
234
Kimley-Horn and Associates, Inc.
096336003 – Colorado State University – University Square Parking Structure Page 4
2.0 EXISTING AND FUTURE CONDITIONS
The following provides a description of existing and future conditions in the vicinity of the CSU
University Square Parking Structure project.
2.1 Study Area and Roadway Network
The study area includes developed areas on and surrounding the CSU campus in the vicinity of
the proposed parking structure. Transportation modes used by commuters traveling to and from
campus include driving, biking, walking, carpooling, and transit. This study focuses on the
driving (automobile), biking (bicycle), and walking (pedestrian) commuting modes.
2.2 Existing Roadway and Intersection Configuration
The roadways providing access to the CSU University Square Parking Structure project are
described below.
College Avenue (US-287)
College Avenue is a north-south arterial on the east side of campus, owned and maintained by
the State of Colorado Department of Transportation (CDOT). It carries the US-287 highway
designation. College Avenue is a raised median island divided roadway providing primarily
three through lanes in each direction with a 35 mile per hour posted speed limit adjacent to
Colorado State University. Separate left turn lanes exist at the Pitkin Street intersection as well
as on the northbound approach at the Lake Street intersection. The intersection of Lake Street
and College Avenue provides three-quarter turning movements for the west leg and right-
in/right-out restricted turning movements for the east leg of the intersection. The intersection of
Pitkin Street with College Avenue is signalized with protected/permissive left turn phasing for
the northbound and southbound approaches and permissive only left turn phasing for the
eastbound and westbound approaches.
Pitkin Street
Pitkin Street provides a single lane in each direction, eastbound and westbound, with a speed
limit of 20 miles per hour. Pitkin Street is not continuous through campus as it terminates in the
pedestrian core area due to the Central Avenue Mall. The Pitkin Street eastbound approach to
College Avenue includes separate left and right turn lanes, while the westbound approach
includes a separate left turn lane.
235
Kimley-Horn and Associates, Inc.
096336003 – Colorado State University – University Square Parking Structure Page 5
Lake Street
Lake Street is continuous east-west roadway through campus and provides a single through
lane eastbound and westbound. Parallel parking exists along Lake Street in both directions,
although it is understood that this parking is proposed to be removed to incorporate bicycle
lanes and a left turn lane where possible. Lake Street has a posted speed limit of 25 miles per
hour. The Lake Street eastbound and westbound approaches to College Avenue operate with
stop control and right turn movements only onto College Avenue (US-287).
The intersection lane configurations and control for the study area are shown in Figure 2.
2.3 Existing Traffic Volumes
Existing peak hour turning movement counts conducted at the study’s key intersections for the
CSU Parking and Transportation Master Plan have been used for this study. These counts
were taken between the dates of Tuesday, February 19, 2013 and Thursday, February 21,
2013. The counts were obtained during the morning and afternoon peak hours in 15-minute
intervals from 7:30 AM to 9:30 AM and 3:00 PM to 5:00 PM, respectively. These time intervals
coincide with morning and afternoon peaks of CSU traffic. The intersection count sheets are
provided in Appendix A.
2.4 Unspecified Development Traffic Growth
According to the CSU 2020 Transit Plan, the CSU student population may grow by
approximately 8,000 students, from 27,000 to 35,000 students, which equates to a 29.6 percent
increase between the years of 2013 and 2025, which is identified as the ten-year planning
horizon for this student enrollment. This equates to an annual growth rate of approximately 2.4
percent per year. Based on this growth factor, the projected automobile, bicycle, and pedestrian
2016 and 2025 background values for the study’s key intersections have been calculated and
are provided in Figures 3 through 6. The 2025 background volumes include a redistribution of
traffic due to other parking structures and modifications proposed on campus as identified in the
Parking and Transportation Master Plan (April 2014).
236
237
163(53)
1651(1433)
65(56)
70(53)
919(1745)
29(232)
12(44)
209(81)
1394(1459)
35(27)
58(34)
1019(1790)
27(31)
23(84)
25(58)
15(103)
17(26)
59(33)
44(89)
24(65)
39(180)
48(50)
278(98)
0(0)
0(0)
1683(1658)
1022(1837)
5(1)
0(25)
238
215(83)
2023(1796)
79(67)
127(109)
1113(2116)
44(305)
14(53)
258(102)
1707(1822)
43(32)
82(55)
1275(2209)
32(38)
33(118)
30(70)
20(132)
21(31)
71(40)
53(108)
24(65)
59(255)
48(50)
363(147)
0(0)
0(0)
2034(2004)
1236(2221)
6(1)
0(30)
239
[4(13)]
[28(8)]
[0(3)]
[6(23)]
[2(10)]
[0(0)]
[2(5)]
[0(1)]
0(5)
1(5)
3(5)
33(23)
8(10)
8(2)
6(1)
5(1)
[3(14)]
[0(0)]
[0(0)]
[0(0)]
0(0)
1(7)
0(0)
0(0)
240
[5(16)]
[34(9)]
[0(4)]
[8(27)]
[3(6)]
[0(1)]
[3(12)]
[0(0)]
0(6)
1(6)
4(6)
40(27)
9(12)
9(3)
8(1)
6(1)
[4(18)]
[0(0)]
[0(0)]
[0(0)]
0(0)
1(8)
0(0)
0(0)
241
Kimley-Horn and Associates, Inc.
096336003 – Colorado State University – University Square Parking Structure Page 11
3.0 PARKING STRUCTURE REDISTRIBUTED TRAFFIC
3.1 Parking Structure Trip Redistribution
The CSU Parking and Transportation Master Plan used traffic count data from existing CSU
parking lots as well as the number of total existing parking spaces on-campus to calculate
average rates of traffic generated per parking space. It was determined that the existing
average morning and afternoon trips generated per parking space on the CSU campus were
0.192 and 0.306 trips per parking space, respectively.
Based on the anticipated CSU population increase of 29.6 percent from 2012 to 2025, it is
expected that the average trips per parking space will also increase over the same time frame
by this same rate. Future parking structure trip generation rates were determined by multiplying
the percent population increase by the existing averages for trips per parking space. As shown
in Table 1, the peak hour trip rates per parking space for the morning and afternoon were
calculated to be 0.249 and 0.396 trips per parking space, respectively. In other words, 25
percent of the parking spaces generate a vehicle trip during the morning peak hour and 40
percent of the parking spaces generate a vehicle trip during the afternoon peak hour.
Based on these calculated trip generation rates, the predicted trip generation for the proposed
University Square Parking Structure was calculated based on the net increase of 400 parking
spaces to the campus with this project. The net increase in parking spaces was used in the trip
generation calculation as the existing parking spaces being removed is already represented in
the existing traffic counts. Table 1 provides the anticipated increase of vehicle trips entering and
exiting the structure during the morning and afternoon peak hours.
Table 1 – New University Square Parking Structure Trip Generation
Parking
Structure
Number of
Parking
Spaces
Existing
Spaces
Removed
Net
New
Parking
Spaces
Increase in AM Peak Hour
Trips
Increase in PM Peak Hour
Trips
Enter Exit Total Enter Exit Total
0.166
trips/
space
0.083
trips/
space
0.249
trips/
space
0.172
trips/
space
0.224
trips/
space
0.396
trips/
space
University
Kimley-Horn and Associates, Inc.
096336003 – Colorado State University – University Square Parking Structure Page 12
As shown in the table, a parking structure on the University Square Lot 575 adding 400 parking
spaces is anticipated to generate 100 morning peak hour trips and 159 afternoon peak hour
trips to the surrounding street network.
3.2 Trip Redistribution
Redistribution of traffic generated by the proposed University Square Parking Structure onto the
existing street network was based on the area street network characteristics, the existing traffic
patterns and volumes, and the proposed accesses for the parking structure. The directional
distribution of traffic is a means to quantify the percentage of traffic that approaches the parking
structure from a given direction and departs the parking structure in the original source direction.
Figure 7 illustrates the expected trip redistribution with the proposed University Square Parking
Structure for the 2016 and 2025 design horizon.
3.3 Traffic Assignment
The 2016 and 2025 proposed University Square Parking Structure traffic assignment volumes
were obtained by applying the trip distribution shown in Figure 7 to the projected parking
structure trip generation calculated in Table 1. The resultant parking structure traffic assignment
volumes are provided in Figure 8 for each of the study’s key intersections and the proposed
parking structure access.
3.4 Total Traffic Volumes
The 2016 and 2025 proposed parking structure traffic assignment volumes were then added to
the 2016 and 2025 background volumes to find the projected 2016 and 2025 total traffic
volumes. Figures 9 and 10 illustrate the projected total traffic volumes for the 2016 and 2025
horizon years.
243
[10%]
5%
20%
[35%]
55%
[55%]
55%
[25%]
80%
[70%]
15%
5%
20%
55%
[30%]
[25%]
244
37(38)
13(14)
10(10)
12(32)
3(9)
8(23)
3(3)
3(3)
37(38)
13(14)
8(23)
10(27)
37(38)
18(50)
23(63)
54(55)
245
277(98)
0(0)
39(181)
0(0)
163(53)
1688(1471)
65(56)
70(53)
937(1795)
29(232)
12(44)
246(119)
1394(1459)
35(27)
71(48)
1029(1800)
27(31)
35(116)
28(67)
23(126)
17(26)
62(36)
47(92)
47(128)
102(105)
1720(1696)
18(15)
1030(1860)
10(52)
246
362(147)
0(0)
59(256)
0(0)
215(83)
2060(1834)
79(67)
127(109)
1131(2166)
44(305)
14(53)
295(140)
1707(1822)
43(32)
95(69)
1285(2219)
32(38)
45(150)
33(79)
28(155)
21(31)
74(43)
56(111)
47(128)
102(105)
2071(2042)
19(15)
1244(2244)
10(57)
247
Kimley-Horn and Associates, Inc.
096336003 – Colorado State University – University Square Parking Structure Page 17
4.0 TRAFFIC OPERATIONS ANALYSIS
An analysis of traffic operations in the site vicinity was conducted to determine potential capacity
deficiencies in the 2016 and 2025 development horizons at the identified key intersections. The
acknowledged source for determining overall capacity is the current edition of the Highway
Capacity Manual (HCM)1.
4.1 Analysis Methodology
Capacity analysis results are listed in terms of Level of Service (LOS). LOS is a qualitative term
describing operating conditions a driver will experience while traveling on a particular street or
highway during a specific time interval. It ranges from A (very little delay) to F (long delays and
congestion). For intersections and roadways in this study area, LOS D is recommended as the
minimum threshold for acceptable operation. Table 2 shows the definition of LOS for signalized
and unsignalized intersections.
Table 2 – Level of Service Definitions
Level of
Service
Signalized Intersection
Average Total Delay
(sec/veh)
Unsignalized Intersection
Average Total Delay
(sec/veh)
A ≤ 10 ≤ 10
B > 10 and ≤ 20 > 10 and ≤ 15
C > 20 and ≤ 35 > 15 and ≤ 25
D > 35 and ≤ 55 > 25 and ≤ 35
E > 55 and ≤ 80 > 35 and ≤ 50
F > 80 > 50
_______________
Definitions provided from the Highway Capacity Manual, Special Report 209, Transportation Research Board, 2010.
The study’s key intersections were analyzed based on average total delay analysis for
signalized and unsignalized intersections. Under the unsignalized analysis, the LOS for a two-
way stop controlled intersection is determined by the computed or measured control delay and
is defined for each minor movement. LOS for a two-way stop-controlled intersection is not
defined for the intersection as a whole. LOS for a signalized and four-way stop controlled
intersection is defined for each approach and for the intersection.
1 Transportation Research Board, Highway Capacity Manual, Special Report 209, Washington DC, 2010.
248
Kimley-Horn and Associates, Inc.
096336003 – Colorado State University – University Square Parking Structure Page 18
4.2 Key Intersection Operational Analysis
LOS calculations for each of the study’s key intersections for the existing 2013 horizon were
provided in the CSU Parking and Transportation Master Plan. LOS calculations for each of the
study’s key intersections for the 2016 and 2025 horizons are provided in Appendix B. The LOS
analyses are based on the lane geometry and intersection control shown in Figures 2. A
summary of the expected intersection delay and LOS in 2016 with the proposed project is
provided in Tables 3 and summarized graphically in Figure 11. A summary of the expected
intersection delay and LOS in 2025 with the proposed project is provided in Table 4 and
summarized graphically in Figure 12.
Table 3 – 2016 Expected Intersection Delay and Level of Service
Intersection
AM Peak Hour PM Peak Hour
Delay
(sec/veh) LOS
Delay
(sec/veh) LOS
Lake/College
Eastbound Right Turn 10.1 B 10.8 B
Westbound Right Turn 14.3 B 13.8 B
Northbound Left Turn 12.2 B 15.9 C
Pitkin/College 8.3 A 14.4 B
Pitkin Access
Westbound Left/Through 7.5 A 7.9 A
Northbound Approach 8.7 A 10.2 B
College RIRO Access
Eastbound Right Turn 14.3 B 29.8 D
249
Kimley-Horn and Associates, Inc.
096336003 – Colorado State University – University Square Parking Structure Page 19
Table 4 – 2025 Expected Intersection Delay and Level of Service
Intersection
AM Peak Hour PM Peak Hour
Delay
(sec/veh) LOS
Delay
(sec/veh) LOS
Lake/College
Eastbound Right Turn 9.1 A 14.3 B
Westbound Right Turn 16.7 C 16.3 C
Northbound Left Turn 14.0 B 21.4 C
Pitkin/College 12.5 B 19.0 B
Pitkin Access
Westbound Left/Through 7.5 A 8.1 A
Northbound Approach 8.8 A 10.9 B
College RIRO Access
Eastbound Right Turn 16.1 C 46.7 E
As provided in these tables, the Pitkin Street and College Avenue signalized intersection and
the unsignalized approaches/movements are all anticipated to operate acceptably with level of
service of LOS D or better throughout the 2025 horizon with construction of the University
Square Parking Structure with the exception of the eastbound right turn movement at the right-
in/right-out access along College Avenue (US-287). However, it is believed that this movement
will operate better than predicted due to the existing additional roadway width likely being used
as an acceleration lane along southbound College Avenue at this access. This additional
roadway width also serves a bus stop with a turnout for the stop location approximately 100 feet
south of the driveway access. Therefore, it is believed that no improvements are needed to the
off-site study area intersections and accesses to serve University Square Parking Structure
project traffic.
250
Kimley-Horn and Associates, Inc.
096336003 – Colorado State University – University Square Parking Structure Page 20
4.3 Queueing Analysis
A queuing analysis was conducted for the study area intersections of Lake Street/College
Avenue, Pitkin Street/College Avenue, and the accesses along Pitkin Street and College
Avenue. Turn lanes are recommended to be constructed providing the recommended storage
length based on the queuing analysis. Results were obtained from the 95th percentile queue
lengths obtained from the Synchro analysis. Results are shown in the following Table 5 with
calculations provided within the level of service operational sheets of Appendix B for the
unsignalized intersections and Appendix C for signalized intersections.
Table 5 –Turn Lane Length Analysis Results
Intersection
Turn Lane
Existing
Turn Lane
Length
(feet)
2016 Total
Queue
Length
(feet)
2016
Recommended
Turn Lane
Length (feet)
2025
Total Queue
Length
(feet)
2025
Recommended
Turn Lane
Length (feet)
Lake & College
Northbound Left 250’ 26’ 250’ 42’ 250’
Pitkin & College
Eastbound Left
Eastbound Right
Westbound Left
Northbound Left
Southbound Left
75’
75’
175’
225’
200’
152’
54’
123’
95’
15’
150’
75’
175’
225’
200’
195’
91’
146’
193
Kimley-Horn and Associates, Inc.
096336003 – Colorado State University – University Square Parking Structure Page 21
completion of the University Square Parking Structure, the eastbound left turn and right turn
exclusive lanes are anticipated to experience queues of 200 feet and 100 feet, respectively.
Therefore, it is recommended that the eastbound approach be reconstructed to include a 200-
foot left turn lane and a 100-foot right turn lane.
It is recommended that the northbound approach of the access to Pitkin Street provide a
minimum throat depth of 25 feet. Likewise, the eastbound approach of the right-in/right-out
access to College Avenue should provide a throat depth of 50 feet, which is currently provided
with existing conditions with a driveway length of approximately 150 feet.
252
253
254
Kimley-Horn and Associates, Inc.
096336003 – Colorado State University – University Square Parking Structure Page 24
5.0 CONCLUSIONS AND RECOMMENDATIONS
Based on the analysis presented in this report, Kimley-Horn believes the proposed CSU
University Square Parking Structure project will be successfully incorporated into the roadway
network. The proposed project development and expected traffic volumes resulted in the
following recommendations:
· With completion of the CSU University Square Parking Structure, it is recommended that
the eastbound left turn lane at the Pitkin Street and College Avenue (US-287)
intersection be reconstructed/restriped to include 150 feet of storage for the near term
horizon. By the 2035 horizon, the eastbound left turn lane is recommended to provide a
storage length of 200 feet.
· By 2035, it is recommended that the eastbound right turn lane at the Pitkin Street and
College Avenue provide 100 feet of length.
· At the proposed Pitkin Street access, it is recommended that the northbound exiting
approach from the parking structure operate with stop control. It is recommended that
the northbound approach include an R1-1 “STOP” sign. It is also recommended that the
northbound approach of the access to Pitkin Street provide a minimum throat depth of
25 feet.
· All on-site and off-site signing and striping improvements should be incorporated into the
project civil drawings, and conform to City of Fort Collins standards as well as the
Manual on Uniform Traffic Control Devices – 2009 Edition (MUTCD).
255
Kimley-Horn and Associates, Inc.
096336003 – Colorado State University – University Square Parking Structure
APPENDICES
256
Kimley-Horn and Associates, Inc.
096336003 – Colorado State University – University Square Parking Structure
APPENDIX A
Intersection Count Sheets
257
Ridgeview Data Collection
6392 Starlight Drive
Morrison, CO 80465 File Name : LakeCollegeAM
Site Code : 00000095
Start Date : 2/19/2013
Page No : 1
CSU
Fort Collins, CO
7:30 am to 9:30 am
Lake Street and College Ave
Groups Printed- Class 1
Lake Street
Eastbound
Lake Street
Westbound
College Ave
Northbound
College Ave
Southbound
Start Time Left Thru Rght App. Total Left Thru Rght App. Total Left Thru Rght App. Total Left Thru Rght App. Total Int. Total
07:30 AM 10 0 0 10 0 0 5 5 48 417 12 477 0 159 13 172 664
07:45 AM 5 0 0 5 0 0 6 6 54 434 20 508 0 224 19 243 762
Total 15 0 0 15 0 0 11 11 102 851 32 985 0 383 32 415 1426
08:00 AM 6 0 0 6 0 0 2 2 25 409 10 444 0 197 11 208 660
08:15 AM 9 0 0 9 0 0 2 2 30 332 12 374 0 207 13 220 605
08:30 AM 7 0 0 7 0 0 1 1 43 363 19 425 0 228 22 250 683
08:45 AM 17 0 0 17 0 0 4 4 49 395 18 462 0 161 30 191 674
Total 39 0 0 39 0 0 9 9 147 1499 59 1705 0 793 76 869 2622
09:00 AM 13 0 0 13 0 0 4 4 40 318 13 371 0 158 14 172 560
09:15 AM 14 0 0 14 0 0 2 2 45 304 21 370 0 152 22 174 560
Grand Total 81 0 0 81 0 0 26 26 334 2972 125 3431 0 1486 144 1630 5168
Apprch % 100 0 0 0 0 100 9.7 86.6 3.6 0 91.2 8.8
Total % 1.6 0 0 1.6 0 0 0.5 0.5 6.5 57.5 2.4 66.4 0 28.8 2.8 31.5
258
Ridgeview Data Collection
6392 Starlight Drive
Morrison, CO 80465 File Name : LakeCollegeAM
Site Code : 00000095
Start Date : 2/19/2013
Page No : 2
CSU
Fort Collins, CO
7:30 am to 9:30 am
Lake Street and College Ave
College Ave
Lake Street
Lake Street
College Ave
Rght
144
Thru
1486
Left
0
Out In Total
3079 1630 4709
Rght
26
Thru
0
Left
0
Out InTotal
125 26 151
Left
334
Thru
2972
Rght
125
Out In Total
1486 3431 4917
Left
81
Thru
0
Rght
0
OutTotal In
478 81 559
2/19/2013 07:30 AM
2/19/2013 09:15 AM
Class 1
North
259
Ridgeview Data Collection
6392 Starlight Drive
Morrison, CO 80465 File Name : LakeCollegeAM
Site Code : 00000095
Start Date : 2/19/2013
Page No : 3
CSU
Fort Collins, CO
7:30 am to 9:30 am
Lake Street and College Ave
Lake Street
Eastbound
Lake Street
Westbound
College Ave
Northbound
College Ave
Southbound
Start Time Left Thru Rght
App. Total Left Thru Rght
App. Total Left Thru Rght
App. Total Left Thru Rght
App. Total Int. Total
Peak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:45 AM
07:45 AM 5 0 0 5 0 0 6 6 54 434 20 508 0 224 19 243
762
08:00 AM 6 0 0 6 0 0 2 2 25 409 10 444 0 197 11 208 660
08:15 AM 9 0 0
9 0 0 2 2 30 332 12 374 0 207 13 220 605
08:30 AM 7 0 0 7 0 0 1 1 43 363 19 425 0 228 22 250 683
Total Volume 27 0 0 27 0 0 11 11 152 1538 61 1751 0 856 65 921 2710
% App. Total 100 0 0 0 0 100 8.7 87.8 3.5 0 92.9 7.1
PHF .750 .000 .000 .750 .000 .000 .458 .458 .704 .886 .763 .862 .000 .939 .739 .921 .889
College Ave
Lake Street
Lake Street
College Ave
Rght
65
Thru
856
Left
0
Out In Total
1576 921 2497
Rght
11
Thru
0
Left
0
Out InTotal
61 11 72
Left
152
Thru
1538
Rght
61
Ridgeview Data Collection
6392 Starlight Drive
Morrison, CO 80465 File Name : LakeCollegeAM
Site Code : 00000095
Start Date : 2/19/2013
Page No : 4
CSU
Fort Collins, CO
7:30 am to 9:30 am
Lake Street and College Ave
Image 1
261
Ridgeview Data Collection
6392 Starlight Drive
Morrison, CO 80465 File Name : LakeCollegePM
Site Code : 0000095
Start Date : 2/19/2013
Page No : 1
CSU
Fort Collins, CO
PM Peak
Lake Street and College Ave
Groups Printed- Unshifted
Lake Street
Eastbound
Lake Street
Westbound
College Ave
Northbound
College Ave
Southbound
Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total
03:00 PM 72 0 0 72 0 0 9 9 13 303 14 330 0 353 11 364 775
03:15 PM 63 0 0 63 0 0 14 14 10 357 17 384 0 402 8 410 871
03:30 PM 70 0 0 70 0 0 8 8 15 320 18 353 0 401 7 408 839
03:45 PM 34 0 0 34 0 0 8 8 15 370 7 392 0 420 20 440 874
Total 239 0 0 239 0 0 39 39 53 1350 56 1459 0 1576 46 1622 3359
04:00 PM 49 0 0 49 0 0 11 11 9 288 10 307 0 402 14 416 783
04:15 PM 33 0 0 33 0 0 4 4 7 308 14 329 0 460 11 471 837
04:30 PM 47 0 0 47 0 0 6 6 13 308 11 332 0 459 10 469 854
04:45 PM 50 0 0 50 0 0 8 8 7 337 11 355 0 456 15 471 884
Total 179 0 0 179 0 0 29 29 36 1241 46 1323 0 1777 50 1827 3358
Grand Total 418 0 0 418 0 0 68 68 89 2591 102 2782 0 3353 96 3449 6717
Apprch % 100 0 0 0 0 100 3.2 93.1 3.7 0 97.2 2.8
Total % 6.2 0 0 6.2 0 0 1 1 1.3 38.6 1.5 41.4 0 49.9 1.4 51.3
262
Ridgeview Data Collection
6392 Starlight Drive
Morrison, CO 80465 File Name : LakeCollegePM
Site Code : 0000095
Start Date : 2/19/2013
Page No : 2
CSU
Fort Collins, CO
PM Peak
Lake Street and College Ave
College Ave
Lake Street
Lake Street
College Ave
Right
96
Thru
3353
Left
0
Out In Total
3077 3449 6526
Right
68
Thru
0
Left
0
Out InTotal
102 68 170
Left
89
Thru
2591
Right
102
Out In Total
3353 2782 6135
Left
418
Thru
0
Right
0
OutTotal In
185 418 603
2/19/2013 03:00 PM
2/19/2013 04:45 PM
Unshifted
North
263
Ridgeview Data Collection
6392 Starlight Drive
Morrison, CO 80465 File Name : LakeCollegePM
Site Code : 0000095
Start Date : 2/19/2013
Page No : 3
CSU
Fort Collins, CO
PM Peak
Lake Street and College Ave
Lake Street
Eastbound
Lake Street
Westbound
College Ave
Northbound
College Ave
Southbound
Start Time Left Thru Right
App. Total Left Thru Right
App. Total Left Thru Right
App. Total Left Thru Right
App. Total Int. Total
Peak Hour Analysis From 03:00 PM to 04:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 03:15 PM
03:15 PM 63 0 0 63 0 0 14 14 10 357 17 384 0 402 8 410 871
03:30 PM 70 0 0
70 0 0 8 8 15
320 18 353 0 401 7 408 839
03:45 PM 34 0 0 34 0 0 8 8 15 370 7
392 0 420 20 440 874
04:00 PM 49 0 0 49 0 0 11 11 9 288 10 307 0 402 14 416 783
Total Volume 216 0 0 216 0 0 41 41 49 1335 52 1436 0 1625 49 1674 3367
% App. Total 100 0 0 0 0 100 3.4 93 3.6 0 97.1 2.9
PHF .771 .000 .000 .771 .000 .000 .732 .732 .817 .902 .722 .916 .000 .967 .613 .951 .963
College Ave
Lake Street
Lake Street
College Ave
Right
49
Thru
1625
Left
0
Out In Total
1592 1674 3266
Right
41
Thru
0
Left
0
Out InTotal
52 41 93
Left
49
Thru
1335
Right
Ridgeview Data Collection
6392 Starlight Drive
Morrison, CO 80465 File Name : LakeCollegePM
Site Code : 0000095
Start Date : 2/19/2013
Page No : 4
CSU
Fort Collins, CO
PM Peak
Lake Street and College Ave
Image 1
265
Ridgeview Data Collection
6392 Starlight Drive
Morrison, CO 80465 File Name : PitkinCollegeAM
Site Code : 00000095
Start Date : 2/19/2013
Page No : 1
CSU
Fort Collins, CO
7:30 am to 9:30 am
Pitkin Street and College Ave
Groups Printed- Class 1
Pitkin Street
Eastbound
Pitkin Street
Westbound
College Ave
Northbound
College Ave
Southbound
Start Time Left Thru Rght App. Total Left Thru Rght App. Total Left Thru Rght App. Total Left Thru Rght App. Total Int. Total
07:30 AM 3 7 2 12 11 16 6 33 83 335 8 426 5 160 12 177 648
07:45 AM 5 8 3 16 13 20 2 35 73 367 10 450 2 243 13 258 759
Total 8 15 5 28 24 36 8 68 156 702 18 876 7 403 25 435 1407
08:00 AM 5 0 1 6 5 18 2 25 56 356 7 419 2 216 10 228 678
08:15 AM 3 4 3 10 6 8 5 19 36 291 11 338 6 239 13 258 625
08:30 AM 6 7 1 14 13 12 2 27 53 292 6 351 4 241 14 259 651
08:45 AM 7 12 9 28 17 17 7 41 50 359 9 418 13 253 17 283 770
Total 21 23 14 58 41 55 16 112 195 1298 33 1526 25 949 54 1028 2724
09:00 AM 14 3 5 22 17 17 4 38 32 299 9 340 5 222 17 244 644
09:15 AM 10 5 7 22 7 14 5 26 22 282 5 309 10 258 14 282 639
Grand Total 53 46 31 130 89 122 33 244 405 2581 65 3051 47 1832 110 1989 5414
Apprch % 40.8 35.4 23.8 36.5 50 13.5 13.3 84.6 2.1 2.4 92.1 5.5
Total % 1 0.8 0.6 2.4 1.6 2.3 0.6 4.5 7.5 47.7 1.2 56.4 0.9 33.8 2 36.7
266
Ridgeview Data Collection
6392 Starlight Drive
Morrison, CO 80465 File Name : PitkinCollegeAM
Site Code : 00000095
Start Date : 2/19/2013
Page No : 2
CSU
Fort Collins, CO
7:30 am to 9:30 am
Pitkin Street and College Ave
College Ave
Pitkin Street
Pitkin Street
College Ave
Rght
110
Thru
1832
Left
47
Out In Total
2667 1989 4656
Rght
33
Thru
122
Left
89
Out InTotal
158 244 402
Left
405
Thru
2581
Rght
65
Out In Total
1952 3051 5003
Left
53
Thru
46
Rght
31
OutTotal In
637 130 767
2/19/2013 07:30 AM
2/19/2013 09:15 AM
Class 1
North
267
Ridgeview Data Collection
6392 Starlight Drive
Morrison, CO 80465 File Name : PitkinCollegeAM
Site Code : 00000095
Start Date : 2/19/2013
Page No : 3
CSU
Fort Collins, CO
7:30 am to 9:30 am
Pitkin Street and College Ave
Pitkin Street
Eastbound
Pitkin Street
Westbound
College Ave
Northbound
College Ave
Southbound
Start Time Left Thru Rght
App. Total Left Thru Rght
App. Total Left Thru Rght
App. Total Left Thru Rght
App. Total Int. Total
Peak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 08:00 AM
08:00 AM 5 0 1 6 5 18 2 25
56 356 7 419
2 216 10 228 678
08:15 AM 3 4 3 10 6 8 5 19 36 291 11 338 6 239 13 258 625
08:30 AM 6 7 1 14 13 12 2 27 53 292 6 351 4 241 14 259 651
08:45 AM 7 12 9 28 17 17
7 41 50 359
9 418 13 253 17 283 770
Total Volume 21 23 14 58 41 55 16 112 195 1298 33 1526 25 949 54 1028 2724
% App. Total 36.2 39.7 24.1 36.6 49.1 14.3 12.8 85.1 2.2 2.4 92.3 5.3
PHF .750 .479 .389 .518 .603 .764 .571 .683 .871 .904 .750 .911 .481 .938 .794 .908 .884
College Ave
Pitkin Street
Pitkin Street
College Ave
Rght
54
Thru
949
Left
25
Out In Total
1335 1028 2363
Rght
16
Thru
55
Left
41
Out InTotal
81 112 193
Left
195
Thru
1298
Ridgeview Data Collection
6392 Starlight Drive
Morrison, CO 80465 File Name : PitkinCollegeAM
Site Code : 00000095
Start Date : 2/19/2013
Page No : 4
CSU
Fort Collins, CO
7:30 am to 9:30 am
Pitkin Street and College Ave
Image 1
269
Ridgeview Data Collection
6392 Starlight Drive
Morrison, CO 80465 File Name : PitkinCollegePm
Site Code : 0000095
Start Date : 2/19/2013
Page No : 1
CSU
Fort Collins, CO
PM Peak
Pitkin Street and College Ave
Groups Printed- Unshifted
Pitkin Street
Eastbound
Pitkin Street
Westbound
College Ave
Northbound
College Ave
Southbound
Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total
03:00 PM 21 4 26 51 28 5 4 37 17 314 6 337 4 378 9 391 816
03:15 PM 18 14 31 63 10 6 6 22 21 362 7 390 11 452 9 472 947
03:30 PM 24 26 14 64 19 8 9 36 22 322 4 348 8 408 4 420 868
03:45 PM 15 10 25 50 26 12 5 43 15 361 8 384 6 429 10 445 922
Total 78 54 96 228 83 31 24 138 75 1359 25 1459 29 1667 32 1728 3553
04:00 PM 16 14 20 50 25 8 7 40 7 307 7 321 11 376 7 394 805
04:15 PM 16 8 27 51 21 6 3 30 10 299 2 311 12 444 8 464 856
04:30 PM 21 17 26 64 25 9 8 42 25 320 7 352 3 372 8 383 841
04:45 PM 22 20 35 77 23 9 10 42 21 347 4 372 8 513 11 532 1023
Total 75 59 108 242 94 32 28 154 63 1273 20 1356 34 1705 34 1773 3525
Grand Total 153 113 204 470 177 63 52 292 138 2632 45 2815 63 3372 66 3501 7078
Apprch % 32.6 24 43.4 60.6 21.6 17.8 4.9 93.5 1.6 1.8 96.3 1.9
Total % 2.2 1.6 2.9 6.6 2.5 0.9 0.7 4.1 1.9 37.2 0.6 39.8 0.9 47.6 0.9 49.5
270
Ridgeview Data Collection
6392 Starlight Drive
Morrison, CO 80465 File Name : PitkinCollegePm
Site Code : 0000095
Start Date : 2/19/2013
Page No : 2
CSU
Fort Collins, CO
PM Peak
Pitkin Street and College Ave
College Ave
Pitkin Street
Pitkin Street
College Ave
Right
66
Thru
3372
Left
63
Out In Total
2837 3501 6338
Right
52
Thru
63
Left
177
Out InTotal
221 292 513
Left
138
Thru
2632
Right
45
Out In Total
3753 2815 6568
Left
153
Thru
113
Right
204
OutTotal In
267 470 737
2/19/2013 03:00 PM
2/19/2013 04:45 PM
Unshifted
North
271
Ridgeview Data Collection
6392 Starlight Drive
Morrison, CO 80465 File Name : PitkinCollegePm
Site Code : 0000095
Start Date : 2/19/2013
Page No : 3
CSU
Fort Collins, CO
PM Peak
Pitkin Street and College Ave
Pitkin Street
Eastbound
Pitkin Street
Westbound
College Ave
Northbound
College Ave
Southbound
Start Time Left Thru Right
App. Total Left Thru Right
App. Total Left Thru Right
App. Total Left Thru Right
App. Total Int. Total
Peak Hour Analysis From 03:00 PM to 04:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 03:00 PM
03:00 PM 21 4 26 51 28 5 4 37 17 314 6 337 4 378 9 391 816
03:15 PM 18 14 31 63 10 6 6 22 21
362 7 390 11 452
9 472 947
03:30 PM 24 26 14
64 19 8 9
36 22 322 4 348 8 408 4 420 868
03:45 PM 15 10 25 50 26 12 5
43 15 361 8
384 6 429 10 445 922
Total Volume 78 54 96 228 83 31 24 138 75 1359 25 1459 29 1667 32 1728 3553
% App. Total 34.2 23.7 42.1 60.1 22.5 17.4 5.1 93.1 1.7 1.7 96.5 1.9
PHF .813 .519 .774 .891 .741 .646 .667 .802 .852 .939 .781 .935 .659 .922 .800 .915 .938
College Ave
Pitkin Street
Pitkin Street
College Ave
Right
32
Thru
1667
Left
29
Out In Total
1461 1728 3189
Right
24
Thru
31
Left
83
Out InTotal
108 138 246
Left
75
Ridgeview Data Collection
6392 Starlight Drive
Morrison, CO 80465 File Name : PitkinCollegePm
Site Code : 0000095
Start Date : 2/19/2013
Page No : 4
CSU
Fort Collins, CO
PM Peak
Pitkin Street and College Ave
Image 1
273
Ridgeview Data Collection
6392 Starlight Drive
Morrison, CO 80465 File Name : RIROCollegeAM
Site Code : 00000095
Start Date : 2/19/2013
Page No : 1
CSU
Fort Collins, CO
7:30 am to 9:30 am
RIRO and College Ave
Groups Printed- Class 1
RIRO
Eastbound
College Ave
Northbound
College Ave
Southbound
Start Time Left Rght App. Total Left Thru App. Total Thru Rght App. Total Int. Total
07:30 AM 0 0 0 0 429 429 171 0 171 600
07:45 AM 0 0 0 0 448 448 253 3 256 704
Total 0 0 0 0 877 877 424 3 427 1304
08:00 AM 0 0 0 0 418 418 214 1 215 633
08:15 AM 0 0 0 0 340 340 234 0 234 574
08:30 AM 0 0 0 0 361 361 251 1 252 613
08:45 AM 0 1 1 0 417 417 233 2 235 653
Total 0 1 1 0 1536 1536 932 4 936 2473
09:00 AM 0 0 0 0 342 342 201 7 208 550
09:15 AM 0 2 2 0 320 320 220 3 223 545
Grand Total 0 3 3 0 3075 3075 1777 17 1794 4872
Apprch % 0 100 0 100 99.1 0.9
Total % 0 0.1 0.1 0 63.1 63.1 36.5 0.3 36.8
274
Ridgeview Data Collection
6392 Starlight Drive
Morrison, CO 80465 File Name : RIROCollegeAM
Site Code : 00000095
Start Date : 2/19/2013
Page No : 2
CSU
Fort Collins, CO
7:30 am to 9:30 am
RIRO and College Ave
College Ave
RIRO
College Ave
Rght
17
Thru
1777
Out In Total
3075 1794 4869
Left
0
Thru
3075
Out In Total
1780 3075 4855
Left
0
Rght
3
OutTotal In
17 3 20
2/19/2013 07:30 AM
2/19/2013 09:15 AM
Class 1
North
275
Ridgeview Data Collection
6392 Starlight Drive
Morrison, CO 80465 File Name : RIROCollegeAM
Site Code : 00000095
Start Date : 2/19/2013
Page No : 3
CSU
Fort Collins, CO
7:30 am to 9:30 am
RIRO and College Ave
RIRO
Eastbound
College Ave
Northbound
College Ave
Southbound
Start Time Left Rght App. Total Left Thru App. Total Thru Rght App. Total Int. Total
Peak Hour Analysis From 07:30 AM to 09:15 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:45 AM
07:45 AM 0 0 0 0 448 448 253 3 256 704
08:00 AM 0 0 0 0 418 418 214 1 215 633
08:15 AM 0 0 0 0 340 340 234 0 234 574
08:30 AM 0 0 0 0 361 361 251 1 252 613
Total Volume 0 0 0 0 1567 1567 952 5 957 2524
% App. Total 0 0 0 100 99.5 0.5
PHF .000 .000 .000 .000 .874 .874 .941 .417 .935 .896
College Ave
RIRO
College Ave
Rght
5
Thru
952
Out In Total
1567 957 2524
Left
0
Thru
1567
Out In Total
952 1567 2519
Left
0
Rght
0
OutTotal In
5 0 5
Peak Hour Begins at 07:45 AM
Class 1
Peak Hour Data
North
276
Ridgeview Data Collection
6392 Starlight Drive
Morrison, CO 80465 File Name : RIROCollegeAM
Site Code : 00000095
Start Date : 2/19/2013
Page No : 4
CSU
Fort Collins, CO
7:30 am to 9:30 am
RIRO and College Ave
Image 1
277
Ridgeview Data Collection
6392 Starlight Drive
Morrison, CO 80465 File Name : RIROCollegePM
Site Code : 0000095
Start Date : 2/19/2013
Page No : 1
CSU
Fort Collins, CO
PM Peak
RIRO and College Ave
Groups Printed- Unshifted
RIRO
Eastbound
College Ave
Northbound
College Ave
Southbound
Start Time Left Right App. Total Left Thru App. Total Thru Right App. Total Int. Total
03:00 PM 0 5 5 0 361 361 393 0 393 759
03:15 PM 0 8 8 0 412 412 444 0 444 864
03:30 PM 0 5 5 0 373 373 419 0 419 797
03:45 PM 0 5 5 0 398 398 455 1 456 859
Total 0 23 23 0 1544 1544 1711 1 1712 3279
04:00 PM 0 3 3 0 335 335 415 0 415 753
04:15 PM 0 3 3 0 328 328 479 0 479 810
04:30 PM 0 5 5 0 356 356 441 0 441 802
04:45 PM 0 11 11 0 383 383 509 0 509 903
Total 0 22 22 0 1402 1402 1844 0 1844 3268
Grand Total 0 45 45 0 2946 2946 3555 1 3556 6547
Apprch % 0 100 0 100 100 0
Total % 0 0.7 0.7 0 45 45 54.3 0 54.3
278
Ridgeview Data Collection
6392 Starlight Drive
Morrison, CO 80465 File Name : RIROCollegePM
Site Code : 0000095
Start Date : 2/19/2013
Page No : 2
CSU
Fort Collins, CO
PM Peak
RIRO and College Ave
College Ave
RIRO
College Ave
Right
1
Thru
3555
Out In Total
2946 3556 6502
Left
0
Thru
2946
Out In Total
3600 2946 6546
Left
0
Right
45
OutTotal In
1 45 46
2/19/2013 03:00 PM
2/19/2013 04:45 PM
Unshifted
North
279
Ridgeview Data Collection
6392 Starlight Drive
Morrison, CO 80465 File Name : RIROCollegePM
Site Code : 0000095
Start Date : 2/19/2013
Page No : 3
CSU
Fort Collins, CO
PM Peak
RIRO and College Ave
RIRO
Eastbound
College Ave
Northbound
College Ave
Southbound
Start Time Left Right App. Total Left Thru App. Total Thru Right App. Total Int. Total
Peak Hour Analysis From 03:00 PM to 04:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 03:00 PM
03:00 PM 0 5 5 0 361 361 393 0 393 759
03:15 PM 0 8 8 0
412 412 444 0 444 864
03:30 PM 0 5 5 0 373 373 419 0 419 797
03:45 PM 0 5 5 0 398 398 455 1 456 859
Total Volume 0 23 23 0 1544 1544 1711 1 1712 3279
% App. Total 0 100 0 100 99.9 0.1
PHF .000 .719 .719 .000 .937 .937 .940 .250 .939 .949
College Ave
RIRO
College Ave
Right
1
Thru
1711
Out In Total
1544 1712 3256
Left
0
Thru
1544
Out In Total
1734 1544 3278
Left
0
Right
23
OutTotal In
1 23 24
Peak Hour Begins at 03:00 PM
Unshifted
Peak Hour Data
North
280
Ridgeview Data Collection
6392 Starlight Drive
Morrison, CO 80465 File Name : RIROCollegePM
Site Code : 0000095
Start Date : 2/19/2013
Page No : 4
CSU
Fort Collins, CO
PM Peak
RIRO and College Ave
Image 1
281
Pitkin/College
EB WB NB SB
Bikes Peds Bikes Peds Bikes Peds Bikes Peds
7 :45 0 0 0 2 2 0 3 7
8 :00 0 1 0 3 6 0 12 11
8 :15 0 1 0 4 9 0 13 15
8 :30 1 1 1 6 9 0 17 17
8 :45 3 2 1 6 9 1 21 23
9 :00 3 2 1 6 10 2 26 32
9 :15 3 2 1 6 13 3 30 39
9 :30 5 2 1 6 15 3 43 48
Hour
Total Total
7 :45 0 0 0 2 2 0 3 7 14 52
8 :00 0 1 0 1 4 0 9 4 19 52
8 :15 0 0 0 1 3 0 1 4 9 49
8 :30 1 0 1 2 0 0 4 2 10 55
8 :45 2 1 0 0 0 1 4 6 14 71 Peak Hour
9 :00 0 0 0 0 1 1 5 9 16
9 :15 0 0 0 0 3 1 4 7 15
9 :30 2 0 0 0 2 0 13 9 26
Total 5 2 1 6 15 3 43 48 71
Peak Hour 4 1 0 0 6 3 26 31 71
3 :15 0 2 0 0 4 1 3 6
3 :30 4 2 1 1 14 3 4 13
3 :45 8 3 1 4 17 4 4 18
4 :00 12 5 3 5 21 5 7 21
4 :15 14 6 3 7 25 5 9 24
4 :30 15 7 4 8 28 5 9 30
4 :45 18 9 4 9 31 6 10 34
5 :00 22 9 5 10 35 6 12 38
Hour
Total Total
3 :15 0 2 0 0 4 1 3 6 16 79 Peak Hour
3 :30 4 0 1 1 10 2 1 7 26 77
3 :45 4 1 0 3 3 1 0 5 17 64
4 :00 4 2 2 1 4 1 3 3 20 62
4 :15 2 1 0 2 4 0 2 3 14 58
4 :30 1 1 1 1 3 0 0 6 13
4 :45 3 2 0 1 3 1 1 4 15
5 :00 4 0 1 1 4 0 2 4 16
Total 22 9 5 10 35 6 12 38 79
Peak Hour 12 5 3 5 21 5 7 21 79
282
Lake/College
EB WB NB SB
Bikes Peds Bikes Peds Bikes Peds Bikes Peds
7 :45 0 1 0 2 0 1 0 2
8 :00 1 3 0 4 0 2 0 4
8 :15 1 3 0 4 0 2 0 5
8 :30 2 7 2 7 0 6 0 5
8 :45 3 7 2 7 0 8 0 5
9 :00 3 7 2 7 0 8 0 8
9 :15 3 7 2 7 0 8 0 9
9 :30 4 7 2 10 0 9 0 10
Hour
Total Total
7 :45 0 1 0 2 0 1 0 2 6 29 Peak Hour
8 :00 1 2 0 2 0 1 0 2 8 26
8 :15 0 0 0 0 0 0 0 1 1 21
8 :30 1 4 2 3 0 4 0 0 14 21
8 :45 1 0 0 0 0 2 0 0 3 13
9 :00 0 0 0 0 0 0 0 3 3
9 :15 0 0 0 0 0 0 0 1 1
9 :30 1 0 0 3 0 1 0 1 6
Total 4 7 2 10 0 9 0 10 29
AM Peak Hour 2 7 2 7 0 6 0 5 29
3 :15 1 0 0 5 0 1 0 0
3 :30 4 0 3 6 0 1 0 1
3 :45 7 1 3 9 0 1 0 1
4 :00 9 2 5 9 1 1 0 1
4 :15 11 2 7 9 1 1 0 2
4 :30 12 3 8 11 1 1 0 2
4 :45 17 3 8 13 1 2 0 2
5 :00 18 4 10 13 1 2 0 4
Hour
Total Total
3 :15 1 0 0 5 0 1 0 0 7 28 Peak Hour
3 :30 3 0 3 1 0 0 0 1 8 26
3 :45 3 1 0 3 0 0 0 0 7 23
4 :00 2 1 2 0 1 0 0 0 6 24
4 :15 2 0 2 0 0 0 0 1 5 24
4 :30 1 1 1 2 0 0 0 0 5
4 :45 5 0 0 2 0 1 0 0 8
5 :00 1 1 2 0 0 0 0 2 6
Total 18 4 10 13 1 2 0 4 28
PM Peak Hour 9 2 5 9 1 1 0 1 28
283
RIRO/College
West Leg East Leg South Leg North Leg
Bikes Peds Bikes Peds Bikes Peds Bikes Peds
7 :45 0 1
8 :00 0 1
8 :15 0 2
8 :30 1 2
8 :45 3 2
9 :00 3 2
9 :15 3 2
9 :30 5 2
Hour
Total Total
7 :45 0 1 0 0 0 0 0 0 1 3
8 :00 0 0 0 0 0 0 0 0 0 4 Peak Hour
8 :15 0 1 0 0 0 0 0 0 1 4 Peak Hour
8 :30 1 0 0 0 0 0 0 0 1 3
8 :45 2 0 0 0 0 0 0 0 2 4 Peak Hour
9 :00 0 0 0 0 0 0 0 0 0
9 :15 0 0 0 0 0 0 0 0 0
9 :30 2 0 0 0 0 0 0 0 2
Total 5 2 0 0 0 0 0 0 4
Peak Hour 3 1 0 0 0 0 0 0 4
3 :15 1 1
3 :30 4 1
3 :45 8 2
4 :00 12 4
4 :15 14 7
4 :30 15 8
4 :45 20 9
5 :00 22 9
Hour
Total Total
3 :15 1 1 0 0 0 0 0 0 2 16
3 :30 3 0 0 0 0 0 0 0 3 19 Peak Hour
3 :45 4 1 0 0 0 0 0 0 5 18
4 :00 4 2 0 0 0 0 0 0 6 19 Peak Hour
4 :15 2 3 0 0 0 0 0 0 5 15
4 :30 1 1 0 0 0 0 0 0 2
4 :45 5 1 0 0 0 0 0 0 6
5 :00 2 0 0 0 0 0 0 0 2
Total 22 9 0 0 0 0 0 0 19
Peak Hour 13 6 0 0 0 0 0 0 19
284
Kimley-Horn and Associates, Inc.
096336003 – Colorado State University – University Square Parking Structure
APPENDIX B
Intersection Analysis Worksheets
285
HCM Unsignalized Intersection Capacity Analysis 2016 Project + Background AM.syn
1: College Avenue & Lake Street 4/7/2015
2016 Background + Project AM 2/24/2015 Synchro 8 Report
Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 0 0 29 0 0 12 163 1688 65 0 937 70
Sign Control Stop Stop Free Free
Grade 0% 0% 0% 0%
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Hourly flow rate (vph) 0 0 32 0 0 13 177 1835 71 0 1018 76
Pedestrians 8 8 6 5
Lane Width (ft) 12.0 12.0 12.0 12.0
Walking Speed (ft/s) 4.0 4.0 4.0 4.0
Percent Blockage 1 1 1 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft) 831
pX, platoon unblocked 0.96 0.96 0.96 0.96 0.96 0.96
vC, conflicting volume 2049 3332 392 2609 3335 660 1103 1913
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 1952 3286 230 2535 3289 660 969 1913
tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1
tC, 2 stage (s)
tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2
p0 queue free % 100 100 96 100 100 97 74 100
cM capacity (veh/h) 28 6 734 10 6 401 676 304
Direction, Lane # EB 1 WB 1 NB 1 NB 2 NB 3 NB 4 SB 1 SB 2 SB 3
Volume Total 32 13 177 734 734 438 407 407 280
Volume Left 0 0 177 0 0 0 0 0 0
Volume Right 32 13 0 0 0 71 0 0 76
cSH 734 401 676 1700 1700 1700 1700 1700 1700
Volume to Capacity 0.04 0.03 0.26 0.43 0.43 0.26 0.24 0.24 0.16
Queue Length 95th (ft) 3 3 26 0 0 0 0 0 0
Control Delay (s) 10.1 14.3 12.2 0.0 0.0 0.0 0.0 0.0 0.0
Lane LOS B B B
Approach Delay (s) 10.1 14.3 1.0 0.0
Approach LOS B B
Intersection Summary
Average Delay 0.8
Intersection Capacity Utilization 45.3% ICU Level of Service A
Analysis Period (min) 15
286
HCM Unsignalized Intersection Capacity Analysis 2016 Project + Background PM.syn
1: College Avenue & Lake Street 4/7/2015
2016 Background + Project PM 2/24/2015 Synchro 8 Report
Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 0 0 232 0 0 44 53 1471 56 0 1795 53
Sign Control Stop Stop Free Free
Grade 0% 0% 0% 0%
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Hourly flow rate (vph) 0 0 252 0 0 48 58 1599 61 0 1951 58
Pedestrians 2 10 1 1
Lane Width (ft) 12.0 12.0 12.0 12.0
Walking Speed (ft/s) 4.0 4.0 4.0 4.0
Percent Blockage 0 1 0 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft) 832
pX, platoon unblocked 0.80 0.80 0.80 0.80 0.80 0.80
vC, conflicting volume 2679 3767 682 2658 3765 574 2011 1670
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 2235 3588 0 2209 3586 574 1404 1670
tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1
tC, 2 stage (s)
tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2
p0 queue free % 100 100 71 100 100 90 85 100
cM capacity (veh/h) 15 4 870 12 4 457 387 378
Direction, Lane # EB 1 WB 1 NB 1 NB 2 NB 3 NB 4 SB 1 SB 2 SB 3
Volume Total 252 48 58 640 640 381 780 780 448
Volume Left 0 0 58 0 0 0 0 0 0
Volume Right 252 48 0 0 0 61 0 0 58
cSH 870 457 387 1700 1700 1700 1700 1700 1700
Volume to Capacity 0.29 0.10 0.15 0.38 0.38 0.22 0.46 0.46 0.26
Queue Length 95th (ft) 30 9 13 0 0 0 0 0 0
Control Delay (s) 10.8 13.8 15.9 0.0 0.0 0.0 0.0 0.0 0.0
Lane LOS B B C
Approach Delay (s) 10.8 13.8 0.5 0.0
Approach LOS B B
Intersection Summary
Average Delay 1.1
Intersection Capacity Utilization 57.0% ICU Level of Service B
Analysis Period (min) 15
287
HCM Unsignalized Intersection Capacity Analysis 2025 Project + Background AM.syn
1: College Avenue & Lake Street 4/7/2015
2025 Background + Project AM 2/24/2015 Synchro 8 Report
Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 0 0 44 0 0 14 215 2060 79 0 1131 127
Sign Control Stop Stop Free Free
Grade 0% 0% 0% 0%
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Hourly flow rate (vph) 0 0 48 0 0 15 234 2239 86 0 1229 138
Pedestrians 9 9 8 6
Lane Width (ft) 12.0 12.0 12.0 12.0
Walking Speed (ft/s) 4.0 4.0 4.0 4.0
Percent Blockage 1 1 1 1
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft) 832
pX, platoon unblocked 0.88 0.88 0.88 0.88 0.88 0.88
vC, conflicting volume 2542 4109 496 3224 4135 804 1376 2334
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 2264 4053 0 3043 4083 804 932 2334
tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1
tC, 2 stage (s)
tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2
p0 queue free % 100 100 95 100 100 95 63 100
cM capacity (veh/h) 13 1 936 3 1 322 634 207
Direction, Lane # EB 1 WB 1 NB 1 NB 2 NB 3 NB 4 SB 1 SB 2 SB 3
Volume Total 48 15 234 896 896 534 492 492 384
Volume Left 0 0 234 0 0 0 0 0 0
Volume Right 48 15 0 0 0 86 0 0 138
cSH 936 322 634 1700 1700 1700 1700 1700 1700
Volume to Capacity 0.05 0.05 0.37 0.53 0.53 0.31 0.29 0.29 0.23
Queue Length 95th (ft) 4 4 42 0 0 0 0 0 0
Control Delay (s) 9.1 16.7 14.0 0.0 0.0 0.0 0.0 0.0 0.0
Lane LOS A C B
Approach Delay (s) 9.1 16.7 1.3 0.0
Approach LOS A C
Intersection Summary
Average Delay 1.0
Intersection Capacity Utilization 53.4% ICU Level of Service A
Analysis Period (min) 15
288
HCM Unsignalized Intersection Capacity Analysis 2025 Project + Background PM.syn
1: College Avenue & Lake Street 4/7/2015
2025 Background + Project PM 2/24/2015 Synchro 8 Report
Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 0 0 305 0 0 53 83 1834 67 0 2166 109
Sign Control Stop Stop Free Free
Grade 0% 0% 0% 0%
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Hourly flow rate (vph) 0 0 332 0 0 58 90 1993 73 0 2354 118
Pedestrians 3 6 1 1
Lane Width (ft) 12.0 12.0 12.0 12.0
Walking Speed (ft/s) 4.0 4.0 4.0 4.0
Percent Blockage 0 1 0 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft) 831
pX, platoon unblocked 0.66 0.66 0.66 0.66 0.66 0.66
vC, conflicting volume 3320 4669 848 3334 4692 708 2476 2072
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 2716 4756 0 2736 4791 708 1440 2072
tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1
tC, 2 stage (s)
tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2
p0 queue free % 100 100 54 100 100 85 71 100
cM capacity (veh/h) 4 0 715 3 0 375 308 264
Direction, Lane # EB 1 WB 1 NB 1 NB 2 NB 3 NB 4 SB 1 SB 2 SB 3
Volume Total 332 58 90 797 797 472 942 942 589
Volume Left 0 0 90 0 0 0 0 0 0
Volume Right 332 58 0 0 0 73 0 0 118
cSH 715 375 308 1700 1700 1700 1700 1700 1700
Volume to Capacity 0.46 0.15 0.29 0.47 0.47 0.28 0.55 0.55 0.35
Queue Length 95th (ft) 62 13 30 0 0 0 0 0 0
Control Delay (s) 14.3 16.3 21.4 0.0 0.0 0.0 0.0 0.0 0.0
Lane LOS B C C
Approach Delay (s) 14.3 16.3 0.9 0.0
Approach LOS B C
Intersection Summary
Average Delay 1.5
Intersection Capacity Utilization 70.0% ICU Level of Service C
Analysis Period (min) 15
289
HCM Signalized Intersection Capacity Analysis 2016 Project + Background AM.syn
2: College Avenue & Pitkin Street 4/7/2015
2016 Background + Project AM 2/24/2015 Synchro 8 Report
Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (vph) 35 28 23 47 62 17 246 1394 35 27 1029 71
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 0.91 1.00 0.91
Frpb, ped/bikes 1.00 1.00 0.97 1.00 0.97 1.00 1.00 1.00 1.00
Flpb, ped/bikes 0.94 1.00 1.00 0.99 1.00 1.00 1.00 1.00 1.00
Frt 1.00 1.00 0.85 1.00 0.97 1.00 1.00 1.00 0.99
Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 0.95 1.00
Satd. Flow (prot) 1666 1863 1529 1759 1748 1769 5067 1770 5028
Flt Permitted 0.62 1.00 1.00 0.74 1.00 0.20 1.00 0.15 1.00
Satd. Flow (perm) 1093 1863 1529 1366 1748 364 5067 285 5028
Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Adj. Flow (vph) 38 30 25 51 67 18 267 1515 38 29 1118 77
RTOR Reduction (vph) 0 0 23 0 10 0 0 2 0 0 4 0
Lane Group Flow (vph) 38 30 2 51 75 0 267 1551 0 29 1191 0
Confl. Peds. (#/hr) 33 3 3 33 1 1
Confl. Bikes (#/hr) 6 28 4
Turn Type Perm NA Perm Perm NA pm+pt NA pm+pt NA
Protected Phases 4 4 5 2 1 6
Permitted Phases 4 4 4 2 6
Actuated Green, G (s) 9.0 9.0 9.0 9.0 9.0 93.0 85.4 81.5 77.9
Effective Green, g (s) 9.0 9.0 9.0 9.0 9.0 93.0 85.4 81.5 77.9
Actuated g/C Ratio 0.08 0.08 0.08 0.08 0.08 0.85 0.78 0.74 0.71
Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Lane Grp Cap (vph) 89 152 125 111 143 449 3933 259 3560
v/s Ratio Prot 0.02 c0.04 c0.06 0.31 0.00 0.24
v/s Ratio Perm 0.03 0.00 0.04 c0.44 0.08
v/c Ratio 0.43 0.20 0.02 0.46 0.52 0.59 0.39 0.11 0.33
Uniform Delay, d1 48.0 47.1 46.4 48.2 48.4 2.9 4.0 3.8 6.1
Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Incremental Delay, d2 3.3 0.6 0.1 3.0 3.4 2.1 0.3 0.2 0.3
Delay (s) 51.3 47.8 46.5 51.2 51.9 5.0 4.3 3.9 6.4
Level of Service D D D D D A A A A
Approach Delay (s) 48.9 51.6 4.4 6.3
Approach LOS D D A A
Intersection Summary
HCM 2000 Control Delay 8.3 HCM 2000 Level of Service A
HCM 2000 Volume to Capacity ratio 0.60
Actuated Cycle Length (s) 110.0 Sum of lost time (s) 12.0
Intersection Capacity Utilization 57.1% ICU Level of Service B
Analysis Period (min) 15
c Critical Lane Group
290
HCM Signalized Intersection Capacity Analysis 2016 Project + Background PM.syn
2: College Avenue & Pitkin Street 4/7/2015
2016 Background + Project PM 2/24/2015 Synchro 8 Report
Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (vph) 116 67 126 92 36 26 119 1459 27 31 1800 48
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 0.91 1.00 0.91
Frpb, ped/bikes 1.00 1.00 0.94 1.00 0.97 1.00 1.00 1.00 1.00
Flpb, ped/bikes 0.95 1.00 1.00 0.99 1.00 1.00 1.00 1.00 1.00
Frt 1.00 1.00 0.85 1.00 0.94 1.00 1.00 1.00 1.00
Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 0.95 1.00
Satd. Flow (prot) 1686 1863 1493 1752 1692 1770 5068 1769 5060
Flt Permitted 0.71 1.00 1.00 0.70 1.00 0.06 1.00 0.13 1.00
Satd. Flow (perm) 1266 1863 1493 1285 1692 118 5068 249 5060
Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Adj. Flow (vph) 126 73 137 100 39 28 129 1586 29 34 1957 52
RTOR Reduction (vph) 0 0 117 0 23 0 0 1 0 0 2 0
Lane Group Flow (vph) 126 73 20 100 44 0 129 1614 0 34 2007 0
Confl. Peds. (#/hr) 23 5 5 23 5 5 5 5
Confl. Bikes (#/hr) 23 8 3 13
Turn Type Perm NA Perm Perm NA pm+pt NA pm+pt NA
Protected Phases 4 4 5 2 1 6
Permitted Phases 4 4 4 2 6
Actuated Green, G (s) 17.8 17.8 17.8 17.8 17.8 94.2 87.1 83.6 80.5
Effective Green, g (s) 17.8 17.8 17.8 17.8 17.8 94.2 87.1 83.6 80.5
Actuated g/C Ratio 0.15 0.15 0.15 0.15 0.15 0.79 0.73 0.70 0.67
Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Lane Grp Cap (vph) 187 276 221 190 250 226 3678 212 3394
v/s Ratio Prot 0.04 0.03 c0.05 0.32 0.00 c0.40
v/s Ratio Perm c0.10 0.01 0.08 0.40 0.11
v/c Ratio 0.67 0.26 0.09 0.53 0.18 0.57 0.44 0.16 0.59
Uniform Delay, d1 48.4 45.3 44.1 47.2 44.7 15.9 6.6 5.8 10.8
Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Incremental Delay, d2 9.2 0.5 0.2 2.6 0.3 3.5 0.4 0.4 0.8
Delay (s) 57.6 45.8 44.3 49.8 45.0 19.4 7.0 6.1 11.5
Level of Service E D D D D B A A B
Approach Delay (s) 49.6 47.9 7.9 11.5
Approach LOS D D A B
Intersection Summary
HCM 2000 Control Delay 14.4 HCM 2000 Level of Service B
HCM 2000 Volume to Capacity ratio 0.60
Actuated Cycle Length (s) 120.0 Sum of lost time (s) 12.0
Intersection Capacity Utilization 65.6% ICU Level of Service C
Analysis Period (min) 15
c Critical Lane Group
291
HCM Signalized Intersection Capacity Analysis 2025 Project + Background AM.syn
2: College Avenue & Pitkin Street 4/7/2015
2025 Background + Project AM 2/24/2015 Synchro 8 Report
Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (vph) 45 33 28 56 74 21 295 1707 43 32 1285 95
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 0.91 1.00 0.91
Frpb, ped/bikes 1.00 1.00 0.96 1.00 0.97 1.00 1.00 1.00 1.00
Flpb, ped/bikes 0.93 1.00 1.00 0.99 1.00 1.00 1.00 1.00 1.00
Frt 1.00 1.00 0.85 1.00 0.97 1.00 1.00 1.00 0.99
Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 0.95 1.00
Satd. Flow (prot) 1651 1863 1525 1756 1738 1770 5066 1770 5024
Flt Permitted 0.57 1.00 1.00 0.73 1.00 0.12 1.00 0.11 1.00
Satd. Flow (perm) 993 1863 1525 1356 1738 223 5066 196 5024
Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Adj. Flow (vph) 49 36 30 61 80 23 321 1855 47 35 1397 103
RTOR Reduction (vph) 0 0 27 0 10 0 0 2 0 0 5 0
Lane Group Flow (vph) 49 36 3 61 93 0 321 1900 0 35 1495 0
Confl. Peds. (#/hr) 40 4 4 40 1 1
Confl. Bikes (#/hr) 8 34 5
Turn Type Perm NA Perm Perm NA pm+pt NA pm+pt NA
Protected Phases 4 4 5 2 1 6
Permitted Phases 4 4 4 2 6
Actuated Green, G (s) 11.5 11.5 11.5 11.5 11.5 90.5 83.2 70.8 67.5
Effective Green, g (s) 11.5 11.5 11.5 11.5 11.5 90.5 83.2 70.8 67.5
Actuated g/C Ratio 0.10 0.10 0.10 0.10 0.10 0.82 0.76 0.64 0.61
Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Lane Grp Cap (vph) 103 194 159 141 181 450 3831 173 3082
v/s Ratio Prot 0.02 c0.05 c0.12 0.38 0.01 0.30
v/s Ratio Perm 0.05 0.00 0.04 c0.46 0.12
v/c Ratio 0.48 0.19 0.02 0.43 0.51 0.71 0.50 0.20 0.49
Uniform Delay, d1 46.4 45.0 44.2 46.2 46.6 18.6 5.2 8.5 11.7
Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Incremental Delay, d2 3.4 0.5 0.1 2.1 2.5 5.3 0.5 0.6 0.5
Delay (s) 49.8 45.4 44.2 48.3 49.1 23.9 5.7 9.1 12.2
Level of Service D D D D D C A A B
Approach Delay (s) 47.0 48.8 8.3 12.2
Approach LOS D D A B
Intersection Summary
HCM 2000 Control Delay 12.5 HCM 2000 Level of Service B
HCM 2000 Volume to Capacity ratio 0.71
Actuated Cycle Length (s) 110.0 Sum of lost time (s) 12.0
Intersection Capacity Utilization 65.7% ICU Level of Service C
Analysis Period (min) 15
c Critical Lane Group
292
HCM Signalized Intersection Capacity Analysis 2025 Project + Background PM.syn
2: College Avenue & Pitkin Street 4/7/2015
2025 Background + Project PM 2/24/2015 Synchro 8 Report
Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (vph) 150 79 155 111 43 31 140 1822 32 38 2219 69
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 0.91 1.00 0.91
Frpb, ped/bikes 1.00 1.00 0.94 1.00 0.97 1.00 1.00 1.00 1.00
Flpb, ped/bikes 0.95 1.00 1.00 0.99 1.00 1.00 1.00 1.00 1.00
Frt 1.00 1.00 0.85 1.00 0.94 1.00 1.00 1.00 1.00
Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 0.95 1.00
Satd. Flow (prot) 1676 1863 1490 1749 1685 1770 5068 1770 5054
Flt Permitted 0.68 1.00 1.00 0.67 1.00 0.05 1.00 0.07 1.00
Satd. Flow (perm) 1202 1863 1490 1230 1685 92 5068 138 5054
Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Adj. Flow (vph) 163 86 168 121 47 34 152 1980 35 41 2412 75
RTOR Reduction (vph) 0 0 105 0 22 0 0 1 0 0 2 0
Lane Group Flow (vph) 163 86 63 121 59 0 152 2014 0 41 2485 0
Confl. Peds. (#/hr) 27 6 6 27 6 6 6 6
Confl. Bikes (#/hr) 27 9 4 16
Turn Type Perm NA Perm Perm NA pm+pt NA pm+pt NA
Protected Phases 4 4 5 2 1 6
Permitted Phases 4 4 4 2 6
Actuated Green, G (s) 20.8 20.8 20.8 20.8 20.8 91.2 82.8 81.3 76.9
Effective Green, g (s) 20.8 20.8 20.8 20.8 20.8 91.2 82.8 81.3 76.9
Actuated g/C Ratio 0.17 0.17 0.17 0.17 0.17 0.76 0.69 0.68 0.64
Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Lane Grp Cap (vph) 208 322 258 213 292 213 3496 153 3238
v/s Ratio Prot 0.05 0.03 c0.06 0.40 0.01 c0.49
v/s Ratio Perm c0.14 0.04 0.10 0.48 0.17
v/c Ratio 0.78 0.27 0.24 0.57 0.20 0.71 0.58 0.27 0.77
Uniform Delay, d1 47.4 43.0 42.8 45.5 42.5 32.3 9.6 7.8 15.2
Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Incremental Delay, d2 17.3 0.4 0.5 3.5 0.3 10.8 0.7 0.9 1.8
Delay (s) 64.8 43.4 43.3 48.9 42.8 43.1 10.3 8.7 17.0
Level of Service E D D D D D B A B
Approach Delay (s) 51.7 46.5 12.6 16.9
Approach LOS D D B B
Intersection Summary
HCM 2000 Control Delay 19.0 HCM 2000 Level of Service B
HCM 2000 Volume to Capacity ratio 0.77
Actuated Cycle Length (s) 120.0 Sum of lost time (s) 12.0
Intersection Capacity Utilization 77.2% ICU Level of Service D
Analysis Period (min) 15
c Critical Lane Group
293
HCM 2010 TWSC 2016 Project + Background AM.syn
3: North Access & Pitkin Street 4/7/2015
2016 Background + Project AM 2/24/2015 Synchro 8 Report
Page 1
Intersection
Intersection Delay, s/veh 2.5
Movement EBT EBR WBL WBT NBL NBR
Vol, veh/h 39 0 102 277 0 47
Conflicting Peds, #/hr 0 3 3 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 42 0 111 301 0 51
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 42 0 565 45
Stage 1 - - - - 42 -
Stage 2 - - - - 523 -
Follow-up Headway - - 2.218 - 3.518 3.318
Pot Capacity-1 Maneuver - - 1567 - 486 1025
Stage 1 - - - - 980 -
Stage 2 - - - - 595 -
Time blocked-Platoon, % - - -
Mov Capacity-1 Maneuver - - 1563 - 444 1022
Mov Capacity-2 Maneuver - - - - 444 -
Stage 1 - - - - 980 -
Stage 2 - - - - 543 -
Approach EB WB NB
HCM Control Delay, s 0 2 8.7
HCM LOS A
Minor Lane / Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 1022 - - 1563 -
HCM Lane V/C Ratio 0.05 - - 0.071 -
HCM Control Delay (s) 8.7 - - 7.479 0
HCM Lane LOS A A A
HCM 95th %tile Q(veh) 0.158 - - 0.229 -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
294
HCM 2010 TWSC 2016 Project + Background PM.syn
3: North Access & Pitkin Street 4/7/2015
2016 Background + Project PM 2/24/2015 Synchro 8 Report
Page 1
Intersection
Intersection Delay, s/veh 4.2
Movement EBT EBR WBL WBT NBL NBR
Vol, veh/h 181 0 105 98 0 128
Conflicting Peds, #/hr 0 5 5 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 197 0 114 107 0 139
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 197 0 532 202
Stage 1 - - - - 197 -
Stage 2 - - - - 335 -
Follow-up Headway - - 2.218 - 3.518 3.318
Pot Capacity-1 Maneuver - - 1376 - 508 839
Stage 1 - - - - 836 -
Stage 2 - - - - 725 -
Time blocked-Platoon, % - - -
Mov Capacity-1 Maneuver - - 1370 - 461 836
Mov Capacity-2 Maneuver - - - - 461 -
Stage 1 - - - - 836 -
Stage 2 - - - - 658 -
Approach EB WB NB
HCM Control Delay, s 0 4.1 10.2
HCM LOS B
Minor Lane / Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 836 - - 1370 -
HCM Lane V/C Ratio 0.166 - - 0.083 -
HCM Control Delay (s) 10.2 - - 7.866 0
HCM Lane LOS B A A
HCM 95th %tile Q(veh) 0.595 - - 0.272 -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
295
HCM 2010 TWSC 2025 Project + Background AM.syn
3: North Access & Pitkin Street 4/7/2015
2025 Background + Project AM 2/24/2015 Synchro 8 Report
Page 1
Intersection
Intersection Delay, s/veh 2.1
Movement EBT EBR WBL WBT NBL NBR
Vol, veh/h 59 0 102 362 0 47
Conflicting Peds, #/hr 0 4 4 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 64 0 111 393 0 51
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 64 0 679 68
Stage 1 - - - - 64 -
Stage 2 - - - - 615 -
Follow-up Headway - - 2.218 - 3.518 3.318
Pot Capacity-1 Maneuver - - 1538 - 417 995
Stage 1 - - - - 959 -
Stage 2 - - - - 539 -
Time blocked-Platoon, % - - -
Mov Capacity-1 Maneuver - - 1533 - 377 992
Mov Capacity-2 Maneuver - - - - 377 -
Stage 1 - - - - 959 -
Stage 2 - - - - 487 -
Approach EB WB NB
HCM Control Delay, s 0 1.7 8.8
HCM LOS A
Minor Lane / Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 992 - - 1533 -
HCM Lane V/C Ratio 0.051 - - 0.072 -
HCM Control Delay (s) 8.8 - - 7.531 0
HCM Lane LOS A A A
HCM 95th %tile Q(veh) 0.163 - - 0.234 -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
296
HCM 2010 TWSC 2025 Project + Background PM.syn
3: North Access & Pitkin Street 4/7/2015
2025 Background + Project PM 2/24/2015 Synchro 8 Report
Page 1
Intersection
Intersection Delay, s/veh 3.5
Movement EBT EBR WBL WBT NBL NBR
Vol, veh/h 256 0 105 147 0 128
Conflicting Peds, #/hr 0 6 6 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 278 0 114 160 0 139
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 278 0 666 284
Stage 1 - - - - 278 -
Stage 2 - - - - 388 -
Follow-up Headway - - 2.218 - 3.518 3.318
Pot Capacity-1 Maneuver - - 1285 - 425 755
Stage 1 - - - - 769 -
Stage 2 - - - - 686 -
Time blocked-Platoon, % - - -
Mov Capacity-1 Maneuver - - 1279 - 381 751
Mov Capacity-2 Maneuver - - - - 381 -
Stage 1 - - - - 769 -
Stage 2 - - - - 616 -
Approach EB WB NB
HCM Control Delay, s 0 3.4 10.9
HCM LOS B
Minor Lane / Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 751 - - 1279 -
HCM Lane V/C Ratio 0.185 - - 0.089 -
HCM Control Delay (s) 10.9 - - 8.09 0
HCM Lane LOS B A A
HCM 95th %tile Q(veh) 0.676 - - 0.293 -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
297
HCM 2010 TWSC 2016 Project + Background AM.syn
4: College Avenue & RIRO 4/7/2015
2016 Background + Project AM 2/24/2015 Synchro 8 Report
Page 1
Intersection
Intersection Delay, s/veh 0.1
Movement EBL EBR NBL NBT SBT SBR
Vol, veh/h 0 10 0 1720 1030 18
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 11 0 1870 1120 20
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1877 570 1139 0 - 0
Stage 1 1129 - - - - -
Stage 2 748 - - - - -
Follow-up Headway 3.82 3.92 3.12 - - -
Pot Capacity-1 Maneuver 109 398 335 - - -
Stage 1 202 - - - - -
Stage 2 389 - - - - -
Time blocked-Platoon, % - - -
Mov Capacity-1 Maneuver 109 398 335 - - -
Mov Capacity-2 Maneuver 109 - - - - -
Stage 1 202 - - - - -
Stage 2 389 - - - - -
Approach EB NB SB
HCM Control Delay, s 14.3 0 0
HCM LOS B
Minor Lane / Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 335 - 398 - -
HCM Lane V/C Ratio - - 0.027 - -
HCM Control Delay (s) 0 - 14.3 - -
HCM Lane LOS A B
HCM 95th %tile Q(veh) 0 - 0.084 - -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
298
HCM 2010 TWSC 2016 Project + Background PM.syn
4: College Avenue & RIRO 4/7/2015
2016 Background + Project PM 2/24/2015 Synchro 8 Report
Page 1
Intersection
Intersection Delay, s/veh 0.4
Movement EBL EBR NBL NBT SBT SBR
Vol, veh/h 0 52 0 1696 1860 15
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 57 0 1843 2022 16
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 2767 1019 2038 0 - 0
Stage 1 2030 - - - - -
Stage 2 737 - - - - -
Follow-up Headway 3.82 3.92 3.12 - - -
Pot Capacity-1 Maneuver 35 201 120 - - -
Stage 1 54 - - - - -
Stage 2 394 - - - - -
Time blocked-Platoon, % - - -
Mov Capacity-1 Maneuver 35 201 120 - - -
Mov Capacity-2 Maneuver 35 - - - - -
Stage 1 54 - - - - -
Stage 2 394 - - - - -
Approach EB NB SB
HCM Control Delay, s 29.8 0 0
HCM LOS D
Minor Lane / Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 120 - 201 - -
HCM Lane V/C Ratio - - 0.281 - -
HCM Control Delay (s) 0 - 29.8 - -
HCM Lane LOS A D
HCM 95th %tile Q(veh) 0 - 1.106 - -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
299
HCM 2010 TWSC 2025 Project + Background AM.syn
4: College Avenue & RIRO 4/7/2015
2025 Background + Project AM 2/24/2015 Synchro 8 Report
Page 1
Intersection
Intersection Delay, s/veh 0
Movement EBL EBR NBL NBT SBT SBR
Vol, veh/h 0 10 0 2071 1244 19
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 11 0 2251 1352 21
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 2263 686 1373 0 - 0
Stage 1 1363 - - - - -
Stage 2 900 - - - - -
Follow-up Headway 3.82 3.92 3.12 - - -
Pot Capacity-1 Maneuver 67 334 257 - - -
Stage 1 144 - - - - -
Stage 2 323 - - - - -
Time blocked-Platoon, % - - -
Mov Capacity-1 Maneuver 67 334 257 - - -
Mov Capacity-2 Maneuver 67 - - - - -
Stage 1 144 - - - - -
Stage 2 323 - - - - -
Approach EB NB SB
HCM Control Delay, s 16.1 0 0
HCM LOS C
Minor Lane / Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 257 - 334 - -
HCM Lane V/C Ratio - - 0.033 - -
HCM Control Delay (s) 0 - 16.1 - -
HCM Lane LOS A C
HCM 95th %tile Q(veh) 0 - 0.101 - -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
300
HCM 2010 TWSC 2025 Project + Background PM.syn
4: College Avenue & RIRO 4/7/2015
2025 Background + Project PM 2/24/2015 Synchro 8 Report
Page 1
Intersection
Intersection Delay, s/veh 0.6
Movement EBL EBR NBL NBT SBT SBR
Vol, veh/h 0 57 0 2042 2244 15
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 62 0 2220 2439 16
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 3335 1228 2455 0 - 0
Stage 1 2447 - - - - -
Stage 2 888 - - - - -
Follow-up Headway 3.82 3.92 3.12 - - -
Pot Capacity-1 Maneuver 17 146 73 - - -
Stage 1 29 - - - - -
Stage 2 328 - - - - -
Time blocked-Platoon, % - - -
Mov Capacity-1 Maneuver 17 146 73 - - -
Mov Capacity-2 Maneuver 17 - - - - -
Stage 1 29 - - - - -
Stage 2 328 - - - - -
Approach EB NB SB
HCM Control Delay, s 46.7 0 0
HCM LOS E
Minor Lane / Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 73 - 146 - -
HCM Lane V/C Ratio - - 0.424 - -
HCM Control Delay (s) 0 - 46.7 - -
HCM Lane LOS A E
HCM 95th %tile Q(veh) 0 - 1.876 - -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
301
Kimley-Horn and Associates, Inc.
096336003 – Colorado State University – University Square Parking Structure
APPENDIX C
Queue Analysis Worksheets
302
Queues 2016 Project + Background AM.syn
2: College Avenue & Pitkin Street 4/7/2015
2016 Background + Project AM 2/24/2015 Synchro 8 Report
Page 1
Lane Group EBL EBT EBR WBL WBT NBL NBT SBL SBT
Lane Group Flow (vph) 38 30 25 51 85 267 1553 29 1195
v/c Ratio 0.38 0.17 0.11 0.40 0.49 0.59 0.38 0.10 0.33
Control Delay 56.2 46.5 1.0 55.2 49.9 8.2 4.7 3.7 7.5
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 56.2 46.5 1.0 55.2 49.9 8.2 4.7 3.7 7.5
Queue Length 50th (ft) 26 20 0 35 50 26 123 2 103
Queue Length 95th (ft) 58 48 0 71 97 66 183 9 189
Internal Link Dist (ft) 236 219 236 366
Turn Bay Length (ft) 50 50 175 150 200
Base Capacity (vph) 198 338 353 248 329 707 4079 301 3597
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.19 0.09 0.07 0.21 0.26 0.38 0.38 0.10 0.33
Intersection Summary
303
Queues 2016 Project + Background PM.syn
2: College Avenue & Pitkin Street 4/7/2015
2016 Background + Project PM 2/24/2015 Synchro 8 Report
Page 1
Lane Group EBL EBT EBR WBL WBT NBL NBT SBL SBT
Lane Group Flow (vph) 126 73 137 100 67 129 1615 34 2009
v/c Ratio 0.67 0.27 0.40 0.53 0.25 0.57 0.43 0.14 0.59
Control Delay 65.0 45.7 10.4 55.9 29.3 24.9 7.4 5.8 12.9
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 65.0 45.7 10.4 55.9 29.3 24.9 7.4 5.8 12.9
Queue Length 50th (ft) 93 51 0 72 27 28 180 5 282
Queue Length 95th (ft) 152 91 54 123 66 95 236 15 434
Internal Link Dist (ft) 216 219 216 366
Turn Bay Length (ft) 50 50 175 150 200
Base Capacity (vph) 253 372 411 257 360 298 3749 245 3397
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.50 0.20 0.33 0.39 0.19 0.43 0.43 0.14 0.59
Intersection Summary
304
Queues 2025 Project + Background AM.syn
2: College Avenue & Pitkin Street 4/7/2015
2025 Background + Project AM 2/24/2015 Synchro 8 Report
Page 1
Lane Group EBL EBT EBR WBL WBT NBL NBT SBL SBT
Lane Group Flow (vph) 49 36 30 61 103 321 1902 35 1500
v/c Ratio 0.48 0.19 0.12 0.43 0.54 0.71 0.49 0.17 0.49
Control Delay 60.0 45.2 1.1 54.2 50.9 23.8 6.0 7.7 13.9
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 60.0 45.2 1.1 54.2 50.9 23.8 6.0 7.7 13.9
Queue Length 50th (ft) 33 24 0 41 63 95 176 3 194
Queue Length 95th (ft) 70 52 0 80 112 193 250 13 328
Internal Link Dist (ft) 236 219 226 366
Turn Bay Length (ft) 50 50 175 150 200
Base Capacity (vph) 162 304 325 222 295 633 3907 208 3088
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.30 0.12 0.09 0.27 0.35 0.51 0.49 0.17 0.49
Intersection Summary
305
Queues 2025 Project + Background PM.syn
2: College Avenue & Pitkin Street 4/7/2015
2025 Background + Project PM 2/24/2015 Synchro 8 Report
Page 1
Lane Group EBL EBT EBR WBL WBT NBL NBT SBL SBT
Lane Group Flow (vph) 163 86 168 121 81 152 2015 41 2487
v/c Ratio 0.78 0.27 0.46 0.57 0.26 0.71 0.57 0.24 0.77
Control Delay 72.0 43.6 16.6 55.3 29.9 44.0 10.9 8.8 18.6
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 72.0 43.6 16.6 55.3 29.9 44.0 10.9 8.8 18.6
Queue Length 50th (ft) 119 57 27 85 35 65 298 7 496
Queue Length 95th (ft) 195 103 91 146 79 138 348 18 618
Internal Link Dist (ft) 216 219 226 366
Turn Bay Length (ft) 50 50 175 150 200
Base Capacity (vph) 250 388 412 256 372 250 3531 169 3239
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.65 0.22 0.41 0.47 0.22 0.61 0.57 0.24 0.77
Intersection Summary
306
Kimley-Horn and Associates, Inc.
096336003 – Colorado State University – University Square Parking Structure
APPENDIX D
Conceptual Site Plan
307
308
Agenda Item 4
STAFF REPORT May 14, 2015
Planning and Zoning Board
PROJECT NAME
2015 SPRING ROUND OF THE BI-ANNUAL REVISIONS, CLARIFICATIONS AND ADDITIONS TO THE LAND
USE CODE
STAFF
Ted Shepard, Chief Planner
PROJECT INFORMATION
PROJECT DESCRIPTION: This is a request for a Recommendation to City Council regarding the bi-annual
update to the Land Use Code. There are proposed revisions, clarifications and
additions to the Code that address a variety of subject areas that have arisen
since the last bi-annual update in December of 2014.
APPLICANT: City of Fort Collins
RECOMMENDATION: Approval
EXECUTIVE SUMMARY
There are 12 proposed items that change, clarify or add to the Land Use Code. The revisions, by Article, are
summarized as follows:
• Article One - Organization - zero changes;
• Article Two - Administration - zero changes;
• Article Three - General Development Standards - seven changes;
• Article Four - Districts - two changes;
• Article Five - Definitions - three changes.
ATTACHMENTS
1. LUC Issues (PDF)
2. Annotated Issues List (PDF)
3. Annotated Ordinance Index (PDF)
4. Ordinance (DOCX)
5. Letter of Support (DOCX)
Item # 4 Page 1
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
ORDINANCE NO. ___, 2015
OF THE COUNCIL OF THE CITY OF FORT COLLINS
MAKING VARIOUS AMENDMENTS
TO THE CITY OF FORT COLLINS LAND USE CODE
WHEREAS, on March 18, 1997, by its adoption of Ordinance No. 051, 1997, the City
Council enacted the Fort Collins Land Use Code (the "Land Use Code"); and
WHEREAS, at the time of the adoption of the Land Use Code, it was the understanding
of staff and the City Council that the Land Use Code would most likely be subject to future
amendments, not only for the purpose of clarification and correction of errors, but also for the
purpose of ensuring that the Land Use Code remains a dynamic document capable of responding
to issues identified by staff, other land use professionals and citizens of the City; and
WHEREAS, City staff and the Planning and Zoning Board have reviewed the Land Use
Code and identified and explored various issues related to the Land Use Code and have made
recommendations to the Council regarding such issues; and
WHEREAS, the City Council has determined that the recommended Land Use Code
amendments are in the best interests of the City and its citizens.
NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF
FORT COLLINS as follows:
Section 1. That Section 3.2.2(K)(1)(e) of the Land Use Code is hereby amended to
read as follows:
. . .
(e) Fraternity and Sorority Houses: For each fraternity or sorority house,
there shall be two (2) parking spaces per three (3) bedsrooms, plus one
(1) parking space per two (2) employees. The alternative compliance
provisions of Section 3.2.2(K)(1)(a)(2) may be applied to vary this
standard.
. . .
Section 2. That Section 3.3.1(A) of the Land Use Code is hereby amended to read as
follows:
3.3.1 Plat and Development Plan Standards
(A) General Provisions.
(1) Applicability. No (1) final plat of a subdivision or (2) development plan,
shall be approved and accepted by the city unless it conforms to the
provisions of this Land Use Code.
1
325
. . .
Section 3. That Section 3.3.1(B)(1) of the Land Use Code is hereby amended to read
as follows:
(B) Lots.
(1) No lot in a subdivision shall have less area than required under the applicable
zoning requirements of the city. Each lot must have vehicular access to a
public street. Lots with both front and rear frontage on a street shall not be
permitted except where necessary to provide separation from arterial streets
or from incompatible land uses, or to take access from an alley. Side lot lines
shall be substantially at right angles or radial to street lines.
. . .
Section 4. That Section 3.5.2(E)(3) of the Land Use Code is hereby amended to read
as follows:
(E) Residential Building Setbacks, Lot Width and Size.
. . .
(3) Side and Rear Yard Setbacks. The minimum side yard setback for all
residential buildings and for all detached accessory buildings that are
incidental to the residential building shall be five (5) feet from the property
line, except for alley-accessed garages, for which the minimum setback from
an alley shall be eight (8) feet. If a zero-lot-line development plan is
proposed, a single six-foot minimum side yard is required. Rear yard set-
backs in residential areas shall be a minimum of eight (8) feet from the rear
property line, except for garages and storage sheds not exceeding eight (8)
feet in height, where the minimum setback shall be zero (0) feet.
. . .
Section 5. That Section 3.6.5 of the Land Use Code is hereby amended to read as
follows:
3.6.5 Transit FacilitiesBus Stop Design Standards
(A) Purpose. The purpose of this Section is to ensure that new development
adequately accommodates existing and planned transit service by integrating
facilities designed and located appropriately for transit into the development plan.
(B) General Standard. All development located on an existing or planned transit route
shall accommodateinstall or construct a transit stop and other associated facilities
on an easement or right-of-way dedicated to the City as prescribed by the City of
Fort Collins TransitBus Stop Design Standards and Guidelines in effect at the time
2
326
of installation, unless the Director of Community Services determines that adequate
transit facilities consistent with the TransitBus Stop Design Standards already exist
to serve the needs of the development. All development located on existing transit
routes will accommodate the transit facilities by providing the same at the time of
construction. All development located on planned routes will accommodate said
facilities by including the same in the development plan and escrowing funds in
order to enable the city or its agents to construct the transit facilities at the time
transit service is provided to the development. All facilities installed or constructed
shall, upon acceptance by the City, become the property of the City and shall be
maintained by the City or its agent.
(C) Location of Existing and Planned Transit Routes. For the purposes of application
of this standard, the location of existing transit routes shall be defined by the
Transfort Route Map in effect at the time the application is approved. The location
of planned transit routes shall be defined according to the City Structure
PlanTransfort Strategic Operating Plan, as amended.
Section 6. That Section 3.8.25 of the Land Use Code is hereby amended to read as
follows:
3.8.25 Permitted Uses: Abandonment Period/Reconstruction of Permitted Uses
(A) If, after June 25, 1999 (the effective date of the ordinance adopting this Section),
active operations are not carried on in a permitted use during a period of twelve
(12) consecutive months, the building, other structure or tract of land where such
permitted use previously existed shall thereafter be re-occupied and used only
after the building or other structure, as well as the tract of land upon which such
building or other structure is located, have, to the extent reasonably feasible, been
brought into compliance with the applicable general development standards
contained in Article 3 and the applicable district standards contained in Article 4
of this Code as determined by the Director. This requirement shall not apply to
any permitted use conducted in a building that was less than ten (10) years old at
the time that active operations ceased. Intent to resume active operations shall not
affect the foregoing.
(B) A building or structure containing a permitted use which has been damaged by
fire or other accidental cause or natural catastrophe may be reconstructed to its
previous condition, provided that such work is started within twelve (12) months
of the date of the occurrence of such damage. In the event such work is started
later than twelve (12) months from the date of the occurrence, then the building or
structure may be reconstructed, provided that, to the extent reasonably feasible,
such reconstruction complies with the applicable standards of Article 3 and
Article 4 of this Code as determined by the Director.
(C) Any determination of the Director under this Section shall constitute a building
permit decision and as such shall be appealable as a building permit under Section
2.11(B)(9).
3
327
Section 7. That Section 3.8.30(F)(1) of the Land Use Code is hereby amended to read
as follows:
(F) Design Standards for Multi-Family Dwellings.
(1) Orientation and Buffer Yards. Buffer yards along the property line of
abutting property containing single- and two-family dwellings shall be
twenty-five (25) feet. This provision shall not apply to structures within the
Neighborhood Conservation Buffer (NCB) district and the Neighborhood
Conservation Medium Density (NCM) district.
Section 8. That Division 3.8 of Article 3 of the Land Use Code is hereby amended by
the addition of a new Section 3.8.33 which reads in its entirety as follows:
3.8.33 Seasonal Overflow Shelters
(A) Applicability. These standards shall apply to all seasonal overflow shelters.
(B) Purpose. The purpose of this section is to allow for the siting and approval of
seasonal overflow shelters while helping to ensure that such shelters are
compatible with the adjacent neighborhoods.
(C) Standards.
(1) General Standards. Seasonal overflow shelters shall be allowed as a
permitted use, provided that all of the following conditions are met:
(a) Occupancy limit. No more than fifty (50) persons may be housed
at any one seasonal overflow shelter.
(b) Plan of operation. The application for approval of a seasonal
overflow shelter shall include a plan of operation prepared by the
shelter operator and the owner of the real property upon which the
seasonal overflow shelter is located. The plan of operation shall
describe to the satisfaction of the Director the roles of the owner
and operator, their plans to provide adequate parking and staffing,
proposed hours of operation, responsibility for site cleanup,
prevention of loitering, and designated contact persons for both the
owner and operator.
(c) Transportation. If the seasonal overflow shelter is more than two
(2) miles from a homeless shelter, then transportation to and from
the seasonal overflow shelter and the homeless shelter shall be
provided by the operator of the seasonal overflow shelter.
(d) Neighborhood meeting requirement. The Director will convene a
neighborhood meeting for each application for approval of a
4
328
seasonal overflow shelter in accordance with the time requirements
in Section 2.2.2(A) of this Land Use Code.
Section 9. That Section 4.3(B)(1)(d) of the Land Use Code is hereby amended by the
addition of a new subparagraph 2 which reads in its entirety as follows:
2. Seasonal overflow shelter.
Section 10. That Section 4.4(B)(1)(e) of the Land Use Code is hereby amended by the
addition of a new subparagraph 2 which reads in its entirety as follows:
2. Seasonal overflow shelter (provided it is located on property that
abuts an arterial street).
Section 11. That Section 4.5(B)(1)(d) of the Land Use Code is hereby amended by the
addition of a new subparagraph 2 which reads in its entirety as follows:
2. Seasonal overflow shelter (provided it is located on property that
abuts an arterial street).
Section 12. That Section 4.5(B)(3)(d) of the Land Use Code is hereby amended to
read as follows:
(d) Industrial Uses (provided they are located within five hundred [500]
feet of East Vine Drive):
1. Workshops and custom small industry.
2. Light industrial (production, assembly, packaging).
3. Small-scale and medium-scale solar energy systems.
Section 13. That Section 4.5(B)(3) of the Land Use Code is hereby amended to read as
follows:
. . .
(e) Industrial Uses:
1. Small scale and medium scale solar energy systems.
(ef) Accessory/Miscellaneous Uses:
1. Wireless telecommunication equipment.
Section 14. That Section 4.6(B)(1)(d) of the Land Use Code is hereby amended by the
addition of a new subparagraph 2 which reads in its entirety as follows:
2. Seasonal overflow shelter.
5
329
Section 15. That Section 4.9(B)(1)(b) of the Land Use Code is hereby amended by the
addition of a new subparagraph 4 which reads in its entirety as follows:
4. Seasonal overflow shelter.
Section 16. That Section 4.10(B)(1)(d) of the Land Use Code is hereby amended by
the addition of a new subparagraph 2 which reads in its entirety as follows:
2. Seasonal overflow shelter.
Section 17. That Section 4.16(B)(1)(d) of the Land Use Code is hereby amended by
the addition of a new subparagraph 2 which reads in its entirety as follows:
2. Seasonal overflow shelter.
Section 18. That the table contained Section 4.16(B)(2) of the Land Use Code is
hereby amended to read as follows:
Land Use Old City Center Canyon Avenue Civic Center
B. INSTITUTIONAL/CIVIC/PUBLIC
. . . . . . . . . . . .
Homeless shelter Type 2 Type 2 Type 2
. . .
Section 19. That Section 4.17(B)(1)(d) of the Land Use Code is hereby amended by
the addition of a new subparagraph 2 which reads in its entirety as follows:
2. Seasonal overflow shelter.
Section 20. That Section 4.17(B)(3)(b) of the Land Use Code is hereby amended by
the addition of a new subparagraph 2 which reads in its entirety as follows:
2. Homeless shelter.
Section 21. That Section 4.18(B)(1)(d) of the Land Use Code is hereby amended by
the addition of a new subparagraph 2 which reads in its entirety as follows:
2. Seasonal overflow shelter.
Section 22. That Section 4.18(B)(3)(b) of the Land Use Code is hereby amended by
the addition of a new subparagraph 4 which reads in its entirety as follows:
4. Homeless shelter.
Section 23. That Section 4.19(B)(1)(d) of the Land Use Code is hereby amended by
the addition of a new subparagraph 2 which reads in its entirety as follows:
6
330
2. Seasonal overflow shelter.
Section 24. That Section 4.20(B)(1)(d) of the Land Use Code is hereby amended by
the addition of a new subparagraph 2 which reads in its entirety as follows:
2. Seasonal overflow shelter.
Section 25. That Section 4.21(B)(1)(d) of the Land Use Code is hereby amended by
the addition of a new paragraph (2) which reads in its entirety as follows:
(2) Institutional/Civic/Public Uses:
1. Seasonal overflow shelter.
Section 26_. That the table contained in Section 4.21(B)(2)of the Land Use is hereby
amended to read as follows:
Land Use I-25/SH 392 (CAC)
General Commercial District
(C-G)
A. RESIDENTIAL
. . . . . . . . .
B. INSTITUTIONAL/CIVIC/PUBLIC
. . . . . . . .
Homeless shelter Not permitted Type 2
C. COMMERCIAL/RETAIL
. . . . . . . . .
D. INDUSTRIAL USES
. . . . . . . . .
Light industrial – no outside storage Not permitted Type 2
. . .
Section 27. That Section 4.22(B)(3)(b) of the Land Use Code is hereby amended by
the addition of a new subparagraph 2 which reads in its entirety as follows:
2. Homeless shelter.
Section 28. That the table contained in Section 4.24(B)(2) of the Land Use Code is
hereby amended to read as follows:
Land Use Riverside Area All Other Areas
B. INSTITUTIONAL/CIVIC/PUBLIC
. . . . . . . . .
7
331
Seasonal overflow shelter BDR BDR
. . .
Section 29. That Section 4.26(B)(1)(d) of the Land Use Code is hereby amended by
the addition of a new subparagraph 2 which reads in its entirety as follows:
2. Seasonal overflow shelter.
Section 30. That Section 4.26(D)(2) of the Land Use Code is hereby amended by the
addition of a new subparagraph (t) which reads in its entirety as follows:
(t) Seasonal overflow shelter.
Section 31. That Section 4.27(B)(1)(d) of the Land Use Code is hereby amended by
the addition of a new subparagraph 2 which reads in its entirety as follows:
2. Seasonal overflow shelter.
Section 32. That Section 4.27(B)(3)(b) of the Land Use Code is hereby amended by
the addition of a new subparagraph 8 which reads in its entirety as follows:
8. Homeless shelter.
Section 33. That Section 4.27(D)(2) of the Land Use Code is hereby amended by the
addition of new subparagraphs (z) and (aa) which reads in their entirety as follows:
(z) Seasonal overflow shelter.
(aa) Homeless shelter.
Section 34. That Section 4.28(B)(3)(B) of the Land Use Code is hereby amended by
the addition of a new subparagraph 7 which reads in its entirety as follows:
7. Homeless shelter.
Section 35. That the definition of “Child Care Center” contained in Section 5.1.2 of
the Land Use Code is hereby amended to read as follows:
Child care center shall mean a facility, by whatever name known, which is maintained
for the whole or part of a day for the care of seven (7) or more children under the age of
sixteen (16) years who are not related to the owner, operator or manager, whether such
facility is operated with or without compensation for such care and with or without stated
educational purposes, except that a child care center shall not include any of the
following three (3)five (5) types of family child care homes as defined by the State of
Colorado: family child care homeregular family child care home, three under two family
child care home, infant/toddler home, or experienced family child care provider home or
large family child care home. The term includes, but is not limited to, facilities
commonly known as day care centers, day nurseries, nursery schools, preschools, play
8
332
groups, day camps, summer camps, large child care homes as defined by the State of
Colorado, centers for developmentally disabled children and those facilities which give
twenty-four-hour-per-day care for dependent and neglected children. Child care centers
are also those facilities for children under the age of six (6) years with stated educational
purposes which are operated in conjunction with a public, private or parochial college or
a private or parochial school, except that the term shall not apply to a kindergarten
maintained in connection with a public, private or parochial elementary school system of
at least six (6) grades.
Section 36. That the definition of “Development plan” contained in Section 5.1.2 of
the Land Use is hereby amended to read as follows:
Development plan shall mean an application submitted to the City for approval of a
permitted use which depicts the details of a proposed development. Development plan
includes an overall development plan, a project development plan, and/or a final plan,
and/or an amendment of any such plan.
Section 37. That the definition of “Dwelling” contained in Section 5.1.2 of the Land
Use Code is hereby amended to read as follows:
Dwelling shall mean a building used exclusively for residential occupancy and for
permitted accessory uses, including single-family dwellings, two-family dwellings and
multi-family dwellings, and in the case of a dwelling to be constructed on the rear portion
of a lot in the L-M-N, M-M-N, N-C-L, N-C-M, N-C-B, C-C-N, C-C-R, H-C or E zone
districts, a minimum of four hundred (400) square feet of floor area, so long as a dwelling
already exists on the front portion of such lot. The term dwelling shall not include hotels,
motels, tents or other structures designed or used primarily for temporary occupancy.
Any dwelling shall be deemed to be a principal building.
Section 38. That Section 5.1.2 of the Land Use Code is hereby amended by the
addition of a new definition “Homeless shelter” which reads in its entirety as follows:
Homeless shelter shall mean a fully enclosed building suitable for habitation by homeless
persons and that may provide residency for homeless persons at any time during the year.
Section 39. That Section 5.1.2 of the Land Use Code is hereby amended by the
addition of a new definition “Seasonal overflow shelter” which reads in its entirety as follows:
Seasonal overflow shelter shall mean a homeless shelter that provides residency for
homeless persons but only between November 1 and April 30.
Introduced, considered favorably on first reading, and ordered published this ___ day of
___________, A.D. 2015, and to be presented for final passage on the ___ day of ______, A.D.
2015.
9
333
__________________________________
Mayor
ATTEST:
_____________________________
City Clerk
Passed and adopted on final reading on this ____ day of ________, A.D. 2015.
__________________________________
Mayor
ATTEST:
_____________________________
City Clerk
10
334
Agenda Item 5
STAFF REPORT May 14, 2015
Planning and Zoning Board
PROJECT NAME
HARMONY & STRAUSS CABIN CONVENIENCE SHOPPING CENTER
STAFF
Clark Mapes, City Planner
PROJECT INFORMATION
PROJECT DESCRIPTION: This is a request for a Project Development Plan (PDP) for
commercial development on 13 acres located at the southeast
corner of East Harmony Road and Strauss Cabin Road in the H-C,
Harmony Corridor zone district. The project proposes 9 buildings,
with potential uses of bank, restaurant, retail, and health and
membership club. Buildings are one and two stories. Total
proposed floor area is 84,000 square feet. The plan includes
improvements to the Harmony Road & Strauss Cabin Road
intersection.
APPLICANT: Joseph J Kish
Post Modern Development
144 N Mason St. Unit #4
Fort Collins, CO 80524
OWNER: Firstier Bank
115 S. Walnut Street
Kimball, NE 69145
RECOMMENDATION: Staff recommends approval of Harmony & Strauss Cabin
Convenience Shopping Center #PDP140022.
EXECUTIVE SUMMARY
EXECUTIVE SUMMARY:
This PDP proposes the first development within the Harmony & I-25 Overall Development Plan
(ODP) for the southwest quadrant of the I-25/Harmony interchange. The ODP was approved
by the Planning and Zoning Board on August 14, 2014. Staff finds that this PDP is consistent
with the ODP.
Item # 5 Page 1
335
Agenda Item 5
The entire ODP, including this PDP, is located in the floodplain of the Poudre River. The
buildings in this PDP would be elevated above the base flood elevation consistent with City
requirements.
This PDP is intended to enable the developer to seek users for the buildings. Implementation
of the PDP would occur through a series of minor or major amendments that would incorporate
the needs of each user and provide details of building entrance arrangements, plazas, patios,
bike parking for each building, detailed landscaping around each building, final architecture, and
all other needed details. Future minor amendments will be subject to staff review unless the
proposal results in a change in character from the approved plan. Future major amendments
which are determined by staff to be a change in character will require review by the Planning
and Zoning Board.
Staff has evaluated the request under applicable sections of the Land Use Code (code), and
finds that all issues have been adequately addressed in compliance with the code.
Key issues evaluated by staff have included specific zoning limitations on land uses;
connectivity to future development; responsiveness to the context of the river valley and city
gateway location; and traffic improvements needed on Strauss Cabin and Harmony Roads.
STAFF COMMENTS:
1. PROJECT BACKGROUND
The southwest quadrant of the I-25/Harmony interchange was annexed in the 2009 with the
Riverwalk annexation of 264 acres, and placed in the H-C zoning district. That annexation and
zoning included the subject property.
Surrounding zoning and land uses are as follows:
Direction Zone District Existing Land Uses
North P-O-L, Public Open Lands; County
Commercial
Harmony Transportation Transfer Center (park-
n-ride); Arapaho Bend Natural Area
West H-C, Harmony Corridor Vacant 27-acre investment/development
property at NW corner of Strauss Cabin and
Harmony Roads
South H-C, Harmony Corridor Gravel mine pond currently in the review
process for filling to eliminate the open water
East H-C, Harmony Corridor Harmony Gardens plant nursery
Item # 5 Page 2
336
Agenda Item 5
2. COMPLIANCE WITH ZONING DISTRICT STANDARDS
Article 4 of the Land Use Code contains standards for zoning districts throughout the City. Staff
finds that the PDP complies with the applicable zoning district standards.
The H-C, Harmony Corridor zone district is Division 4.26 in the code. H-C zoning is intended to
implement the design concepts and land use vision of the Harmony Corridor Plan to create an
attractive and complete mixed-use area with a major employment base.
Permitted Uses
The proposed uses are permitted as “secondary uses” in the H-C zone. The proposed uses are
classified as a convenience shopping center, standard restaurant, and health and membership
club.
Secondary uses are limited to 25% of a development plan, and must be integrated in function
and appearance into a larger employment-based development plan that emphasizes primary
uses comprising non-retail employment uses. In this case, the governing development plan is
the ODP. It provides the basis for this PDP by designating space for primary and secondary uses
consistent with the 75-25 zoning requirement.
The required primary uses are designated on a 42-acre area abutting this PDP to the south. That area
currently consists of a gravel mine pond which is proposed to be filled to eliminate the open water in
order to comply with State water requirements, and to allow for future development.
Requirements for the Convenience Shopping Center Use
Retail commercial uses in the Harmony Corridor are permitted only in several types of shopping
centers, one of which is Convenience Shopping Center. The requirements for these centers
are found in the definition of the use in Article 5 of the Land Use Code:
Convenience shopping center shall mean a shopping and service center situated on seven (7) or fewer
acres with four (4) or more business establishments with separate exterior entrances, located in a
complex which is planned, developed and managed as a single unit, and located within and intended to
primarily serve the consumer demands of adjacent employment areas. The principal uses permitted
include retail stores; business services; convenience retail stores with fuel sales (possibly including an
accessory one-bay automatic carwash); personal business and service shops; standard or fast food
restaurants (without drive-up windows); vehicle minor repair, servicing and maintenance uses; liquor sales
(for on- or off-premise consumption); beauty or barber shops; dry-cleaning outlets; equipment rental (not
including outdoor storage); limited indoor recreational uses; pet shops; and uses of similar character.
Secondary uses may include professional offices; limited banking services such as branch banks (with
limited drive-up facilities) and automated teller machines; multi-family dwellings; medical offices and
clinics; small animal veterinary clinics; child care centers; and elderly day care facilities.
Lot 1 of the PDP fits this definition.
Item # 5 Page 3
337
Agenda Item 5
3. COMPLIANCE WITH GENERAL DEVELOPMENT STANDARDS FOR ALL
DEVELOPMENT
Article 3 of the Land Use Code contains standards for all development city-wide to be used in
conjunction with zoning district standards. Staff finds that the project complies with all applicable
General Development Standards, with the following comments listed in the order of standards found
in the code.
Landscaping and Tree Protection Standards
Code Section 3.2.1 requires a fully developed landscape plan with full tree stocking and other
functional landscaping. The PDP provides required tree plantings and addresses relationships
of landscaping to streets, drives, and sidewalks in a manner appropriate to the Poudre river
valley and city gateway context.
Landscaping is crucial for this development complement the river valley setting and community
gateway location. The landscape plan is designed to complement the park-n-ride and Natural
Areas across Harmony Road on the north, with plantings of cottonwood trees and native shrubs
in groupings to express the river valley setting.
A 160-foot-wide setback is provided along Harmony Road for the purpose of accommodating
likely future changes to flood flows within the floodplain, related to the larger ODP. This area
allows for a generous landscaped edge to reinforce the existing naturalistic landscape along the
north side of Harmony Road, which has cottonwoods in a generous setback along the park-n-
ride and the edge of Arapaho Bend Natural Area.
The image of development as seen from Harmony road will be different than typical highway
commercial exit development that relies on very high visibility corporate image with limited
emphasis on landscaping. For this project, visibility will be in openings between trees that
frame intermittent views of buildings, and any signs that may be located closer to the street.
Where appropriate, naturalistic groups of native cottonwoods and thickets of native shrubs
transition to a more refined, manageable commercial landscaping in the interior of the site
where landscape areas are smaller and closer to buildings.
Access, Circulation and Parking Standards
Section 3.2.2 requires safe, convenient, efficient parking and circulation improvements that add
to the attractiveness of the development.
The PDP provides the initial phase of a gridded network of streets (or street-like private drives
that function like streets), and sidewalks, consistent with the ODP. This PDP is accessed from
Strauss Cabin Road by a street-like private drive called Hacienda Drive with diagonal parking
and street trees in cutouts in an attached sidewalk.
The PDP provides a direct, central sidewalk connection to Harmony Road across the 160-foot
setback area; and provides a standard detached sidewalk along Strauss Cabin Road. In
Item # 5 Page 4
338
Agenda Item 5
addition, the internal sidewalk network will connect directly to any future development of primary
uses southward from this PDP.
Emergency access is adequately provided throughout the site and a second emergency access
point is provided to Strauss Cabin Road in accordance with requirements.
Bike Parking Standards
A total of 134 bicycle parking spaces are required for the commercial space in the PDP, under
subsection 3.2.2(C)(4). The proposed project reserves adequate space for these required
facilities, with bike parking locations to be determined adjacent to individual buildings at the time
of subsequent plan amendments for each building.
Parking Standards
No vehicular parking requirements apply to this PDP because it was submitted prior to recently
established minimum parking requirements for retail commercial uses. Rather, the plan is
subject to maximum limits on parking, of 600 spaces.
Nevertheless, the plan provides 503 spaces, or 6 spaces per 1,000 square feet, which exceeds
the current minimum requirements that would be applicable if the plan was submitted today.
Site Lighting Standards
The PDP provides lighting with down-directional, sharp cutoff fixtures in full compliance with
standards in Section 3.2.4, and with no light trespass onto off-site areas. Lighting levels are
adequate for security and aesthetics without excessive brightness on site.
Trash and Recycling Enclosures
The PDP provides generous space for the collection and storage of refuse and recyclable
materials associated with buildings throughout the site. Enclosures allow walk-in access and
screen the function from public view. Enclosures are masonry to match associated buildings.
Section 3.2.5 contains the applicable requirements.
Right-of-Way Dedication
The plan dedicates additional street right-of-way along its Strauss Cabin and Harmony Road frontages to
increase the width to the current standard, as required in Section 3.3.1.
Building and Project Compatibility Standards
Standards in Section 3.5.1 require that in areas where an existing architectural character is not
definitively established or is not consistent with the purposes of the code, the architecture of
new development must set an enhanced standard of quality for future projects. This Section
requires color shades to be used to facilitate blending into the neighborhood and unifying the
development.
Item # 5 Page 5
339
Agenda Item 5
This Section is most clearly applicable to urban development proposed within an urban context
where sensitive compatibility issues can arise; and the subject site has very little existing urban
development context. Nevertheless, the PDP sets an enhanced standard and unifies the
development with use of stone, metal roofs, and stucco used in a consistent theme.
Commercial Building Standards
Proposed buildings provide a high level of architectural interest with variation in massing and
ground floor facades that comport with a pedestrian scale to establish attractive street fronts
and walkways, as required in Section 3.5.3. Buildings are designed with a unifying theme to
establish a sense of place.
Proposed buildings meet build-to requirements along Strauss Cabin Road and along the street-
like private drive, which functions in lieu of a street as allowed by code; and along Connecting
Walkways as defined in the code. These are fundamental requirements for development found
in subsection 3.5.3(C).
NEIGHBORHOOD MEETING:
A neighborhood meeting was held January 5, 2015. 12 people attended.
Discussion at the meeting involved basic questions and answers about the plan. A prior
meeting on the ODP had previously addressed most questions about the proposed
development. No particular issues or topics emerged at the meeting, with one exception
involving a request for staff to investigate a street connection across property to the west
spanning the bluff that defines the edge of the river valley. Staff followed through and
confirmed that the street connection is not feasible nor within the scope of the PDP.
FINDINGS OF FACT AND CONCLUSIONS:
In evaluating the request for the Harmony & Strauss Cabin Convenience Shopping Center, staff
makes the following findings of fact and conclusions regarding Land Use Code requirements:
A. The PDP complies with the process outlined in Article 2, Division 2.2 - Common
Development Review Procedures for Development Applications.
B. The PDP complies with applicable standards in Article 3 - General Development Standards.
C. The PDP complies with applicable standards for the H-C, Harmony Corridor zone district in
Article 4, Division 4.26.
Item # 5 Page 6
340
Agenda Item 5
RECOMMENDATION:
Staff recommends that the Planning and Zoning Board approve the Harmony & Strauss Cabin
Convenience Shopping Center PDP, with the following motion:
Approve the Harmony & Strauss Cabin Convenience Shopping Center Project Development
Plan based on the Findings of Fact.
ATTACHMENTS
1. Att 1 Site Plan - 3 pages (PDF)
2. Att2 Renderings - 3 pages (PDF)
3. Att3a Archit Elevations Page 1 (JPG)
4. Att3b Archit Elevations Page 2 (JPG)
5. Att3c Archit Elevations Page 3 (JPG)
6. Att3d Archit Elevations Page 4 (JPG)
7. Att3e Archit Elevations Page 5 (JPG)
8. Att3f Archit Elevations Page 6 (JPG)
9. Att4 Landscape Plan (PDF)
Item # 5 Page 7
341
342
VICINITY MAP
OWNER'S CERTIFICATION
THE UNDERSIGNED DOES/DO HEREBY CERTIFY THAT I/WE ARE THE LAWFUL OWNERS OF REAL PROPERTY
DESCRIBED ON THIS SITE PLAN AND DO HEREBY CERTIFY THAT I/WE ACCEPT THE CONDITIONS AND RESTRICTIONS
SET FORTH ON SAID PROJECT DEVELOPMENT PLAN WITHIN THE LIMIT OF DEVELOPMENT BOUNDARY.
PARCELS 1-4
FIRSTIER BANK NEBRASKA
NAME DATE
MY COMMISSION EXPIRES:
NOTARY PUBLIC
STATE OF COLORADO )
)SS
NOTARIAL CERTIFICATE
DIRECTOR OF COMMUNITY DEVELOPMENT
AND NEIGHBORHOOD SERVICES
APPROVED BY THE COMMUNITY DEVELOPMENT AND NEIGHBORHOOD SERVICES DIRECTOR ON THIS
DAY OF , A.D., 2015.
COMMUNITY DEVELOPMENT AND NEIGHBORHOOD SERVICES DIRECTOR
COUNTY OF LARIMER )
THE FOREGOING INSTRUMENT WAS ACKNOWLEDGED BEFORE ME
BY , THIS DAY OF , 2015.
APPLICANT / DEVELOPER
PROPERTY OWNER
PLANNER / CIVIL ENGINEER
SITE PLAN NOTES
POST MODERN DEVELOPMENT
144 NORTH MASON STREET SUITE 5
FORT COLLINS, CO 80524
(970) 407-7808
TST, INC. CONSULTING ENGINEERS
760 WHALERS WAY
BUILDING C, SUITE 200
FORT COLLINS, CO 80525
(970) 226-0557
LEGAL DESCRIPTION
FIRSTIER BANK NEBRASKA
115 SOUTH WALNUT STREET
KIMBALL, NE 69145
1. THIS PROJECT SITE IS LOCATED WITHIN FEMA REGULATED FLOODWAY AND FLOODPLAINS, PER FEMA FIRM MAPS
08069C0994F AND 08069C1013F, DATED DECEMBER 19, 2006.
2. PORTIONS OF THIS SITE ARE LOCATED IN THE FEMA - REGULATORY 100- AND 500-YEAR FLOOD PLAINS, AND THE 1
2 -FOOT
RISE FLOODWAY.
3. EFFECTIVE FLOODPLAIN INFORMATION SHOWN ON THIS PLAN IS BASED UPON LOMR 14-08-058OP, DATED DECEMBER 15,
2014.
4. ALL AREAS IN THE FLOODPLAIN AND FLOODWAY ARE SUBJECT TO THE STANDARDS OF CHAPTER 10 OF THE FORT COLLINS
MUNICIPAL CODE.
5. NO WORK MAY COMMENCE IN THE FLOODWAY UNTIL A FLOODPLAIN USE PERMIT AND NO-RISE CERTIFICATION HAVE BEEN
APPROVED BY THE CITY OF FORT COLLINS FLOODPLAIN ADMINISTRATION DIVISION. NO-RISE CERTIFICATIONS MUST BE
RE-CERTIFIED POST PROJECT.
6. ALL WORK IN THE FLOOD FRINGE MUST BE PRECEDED BY AN APPROVED FLOODPLAIN USE PERMIT.
7. CRITICAL FACILITIES ARE PROHIBITED IN THE POUDRE RIVER FLOODPLAIN.
8. NO NEW STRUCTURES OR ADDITIONS MAY BE ADDED TO THE FLOODWAY.
9. ALL STRUCTURES IN THE FLOODWAY AND FLOOD FRINGE MUST HAVE AN EMERGENCY RESPONSE PREPAREDNESS PLAN.
10. WITHIN THE FLOODWAY, A CONDITIONAL LETTER OF MAP REVISION (CLOMR) MUST BE APPROVED BY FEMA PRIOR TO
ISSUANCE OF ANY BUILDING OR GRADING PERMITS.
11. NON-RESIDENTIAL STRUCTURES OR ADDITIONS IN THE 100-YR FLOOD FRINGE MUST HAVE THEIR LOWEST FLOOR AND ALL
ELECTRICAL, MECHANICAL AND HVAC ELEVATED OR FLOODPROOFED 2.0 FEET ABOVE THE 100-YR BASE FLOOD ELEVATION
(BFE). STRUCTURAL CONSTRUCTION MUST BE FOLLOWED WITH AN AS-BUILT ELEVATION CERTIFICATE. STRUCTURES
OPTING FOR FLOODPROOFING IN LIEU OF ELEVATION MUST PROVIDE A FLOODPROOFING CERTIFICATE AFTER
344
7.00'
TIE INTO EXISTING WALK
7.00'
EXISTING WALK 5'
ATTACHED WALK
345
HARMONY AND STRAUSS CABIN | PDP P&Z SITE PLAN
346
HARMONY AND STRAUSS CABIN | PDP P&Z AERIAL VIEW
347
V
HARMONY AND STRAUSS CABIN | PDP P&Z PERSPECTIVE VIEW
348
349
350
351
352
353
354
10' SIDEWALK
PEDESTRIAN CONNECTION
EFFECTIVE 1/2 FOOT RISE
EFFECTIVE 100 YEAR
FLOODWAY LINE
TREES IN TREE
GRATES (TYP)
DIAGONAL PARKING
URBAN STREET SECTION:
DIAGONAL PARKING, PLAZA AND PATIO SPACES,
TREES AND PLANTINGS TYP.
PLANTER, TYP.
6' SIDEWALK.
SHADE TREE, TYP.
ORNAMENTAL TREE, TYP.
PARKING, TYP.
WALKWAY CONNECTION
SHRUB /PERENNIAL PLANTING
EVERGREEN SCREENING
NATIVE ORNAMENTALS
COTTONWOODS, TYP.
NATIVE GRASS SEEDING
EVERGREEN SCREENING
10' SIDEWALK
PLANTER, TYP.
ASPHALT PARKING, TYP.
WALKWAY CONNECTION
SHRUB/PERENNIAL PLANTING, TYP.
SHADE TREE, TYP.
ORNAMENTAL TREE, TYP.
PARKING (TYP.)
ASPHALT PARKING, TYP.
DIAGONAL PARKING
RAIN GARDEN
RAIN GARDEN
RAIN GARDEN
RAIN GARDEN
EXISTING TREES TO BE PRESERVED.
SEE MITIGATION PLAN, SHEET #6
EXISTING TREES TO BE PRESERVED. SEE
MITIGATION PLAN, SHEET #6
EMERGENCY ACCESS POINT
SHRUB BED, TYP.
POSSIBLE TRANSPLANT LOCATION FOR
MITIGATION TREES
HARMONY ROAD
EXISTING HARMONY ROAD SIDEWALK
ASPHALT PARKING, TYP.
ASPHALT PARKING, TYP.
1. ALL PLANT MATERIALS SHALL BE IN ACCORDANCE WITH AAN SPECIFICATIONS FOR #1 GRADE
2. ALL TREES TO MEET CITY OF FORT COLLINS LAND USE CODE STANDARDS FOR SIZE.
3. CONTRACTOR SHALL MAINTAIN ALL LANDSCAPING FOR A TWO YEAR PERIOD COMMENCING
FROM DATE OF SUBSTANTIAL COMPLETION, INCLUDING MOWING, WEEDING, WINTER
WATERING AND PRUNING.
4. CONTRACTOR TO MINIMIZE ALL DISTURBANCE TO NON-IMPACTED AREAS. ALL DISTURBED
AREAS NOT RECEIVING TURF SHALL BE RESEEDED WITH THE NATIVE PRAIRIE SEED MIX
SPECIFIED ON THIS SHEET.
5. MINOR CHANGES IN SPECIES AND PLANT LOCATIONS MAY BE MADE DURING CONSTRUCTION
AS REQUIRED BY SITE CONDITIONS WITH APPROVAL OF OWNER'S REPRESENTATIVE. OVERALL
QUANTITY AND QUALITY TO BE CONSISTENT WITH APPROVED PLANS.
OUR DESIGN APPROACH IS TO INITIATE A SENSE OF ENTRY INTO THE FORT COLLINS COMMUNITY, CREATES A
COMPELLING SHOPPING EXPERIENCE, WHILE MAINTAINING THE FEEL OF A LANDSCAPE, INFORMED BY THE EXISTING RIVER
VALLEY CHARACTER. THE HARMONY AND STRAUSS CABIN CONVENIENCE SHOPPING CENTER WILL INVITE THE USER WITH
SHADE, TEXTURE AND COLOR FROM THE NATIVE ENVIRONMENT, WHILE REMAINING CONSISTENT WITH THE FORT COLLINS,
HARMONY CORRIDOR PLAN. OUR DRIVING GOALS ARE FOR PEOPLE TO EXPERIENCE THE RIVER VALLEY CHARACTER, ENJOY
RESPITE FROM WESTERN SUNLIGHT AND SOFTEN THE IMPACT OF BUILT ELEMENTS WITHIN THE LANDSCAPE FOR A COMPLETE
AND IMMERSIVE EXPERIENCE.
THE PROPOSED PLANT PALETTE IS BASED ON BOTH RIPARIAN, XERIC AND NATIVE PLANTINGS PRODUCING A RIVER
VALLEY FEEL THROUGHOUT THE ENTIRE SITE. THESE PLANTINGS INCLUDE: LANCELEAF, PLAINS COTTONWOODS, DWARF
ARCTIC WILLOW AND NATIVE GRASS SEEDING. NATIVE AREAS WILL TRANSITION INTO A MORE TRADITIONAL LANDSCAPE AS
PEOPLE MOVE INTO THE CENTER'S INTERIOR . HOWEVER, IT IS IMPORTANT TO NOTE, NATIVE SPECIMENS WILL STILL BE USED
FOR THE DEVELOPMENT'S INTERIOR LANDSCAPE BUT WITH A MORE JUDICIOUS MIX OF XERIC PLANTINGS SUCH AS BUR OAK,
HACKBERRY, SENSATION BOXELDER AND HONEYLOCUST. ORNAMENTAL TREES CONSISTING OF TATARIAN MAPLE, TOBA
HAWTHORNS, CRABAPPLES AND CLEVELAND SELECT PEARS WILL PROVIDE SPRING BLOOM AND FALL INTEREST. HARDSCAPES
WILL BE SOFTENED WITH A MIX OF NATIVE AND DROUGHT TOLERANT SHRUBS, PERENNIALS AND GRASSES. SHRUB
SELECTIONS TO BE SERVICEBERRY, COLUMNAR BUCKTHORN, CURRANT, BROOM, BURNING BUSH, NATIVE NINEBARK AND
BUTTERFLY BUSHES. PERENNIALS, INCLUDING GAILLARDIA, BLACK EYED SUSAN'S, BLOODY CRANESBILL, SAGE,
SNOW-IN-SUMMER AND LAMB'S EAR, WILL PROVIDE SPRING, SUMMER AND FALL COLOR. GRASSES SUCH AS INDIAN GRASS,
TUFTED HAIR GRASS AND SWITCH GRASS MASSINGS WILL CONTINUE THE RIVER VALLEY FEEL THROUGHOUT THE
DEVELOPMENT'S INTERIOR.
THIS PROJECT DOES PRESENT ENGAGING OPPORTUNITIES. WHILE THE LANDSCAPE PLAN WILL BE STRUCTURAL BY
DEFINITION, WE FEEL IT IS VITAL TO PRESERVE THE VALUE AND CONTEXT OF THE POUDRE RIVER CORRIDOR THROUGHOUT
THIS SITE. WE ARE KEENLY AWARE OF BALANCING A RIVER VALLEY PLANTING CONCEPT AND PROVIDING CORRIDORS OF
VISIBILITY FROM HARMONY ROAD AS A WAY TO INVITE PEOPLE INTO THE SHOPPING SPACE. FINALLY, WE UNDERSTAND THIS
SPACE WILL ACT AS A GATEWAY INTO OUR FORT COLLINS COMMUNITY AND SHOULD PROVIDE AN IMPACT BEYOND A VISIT TO
THIS DEVELOPMENT.
APPLICANT / DEVELOPER
PROPERTY OWNER
PLANNER / CIVIL ENGINEER
SITE PLAN NOTES
POST MODERN DEVELOPMENT
144 NORTH MASON STREET SUITE 5
FORT COLLINS, CO 80524
(970) 407-7808
TST, INC. CONSULTING ENGINEERS
760 WHALERS WAY
BUILDING C, SUITE 200
FORT COLLINS, CO 80525
(970) 226-0557
FIRSTIER BANK NEBRASKA
115 SOUTH WALNUT STREET
KIMBALL, NE 69145
1. THIS SITE IS LOCATED WITHIN THE HARMONY CORRIDOR ZONE DISTRICT (H-C).
2. THIS SITE IS LOCATED OUTSIDE OF THE EFFECTIVE 1/2 FOOT RISE FLOODWAY.
3. THE PROPOSED LAND USES FOR THE HARMONY AND STRAUSS CABIN CONVENIENCE SHOPPING AREA
INCLUDE NEIGHBORHOOD COMMERCIAL OUTLOTS, OUTSIDE OF THE NEIGHBORHOOD COMMERCIAL AREA.
(LOT 1) AND LOT 2 ARE RESERVED FOR A FUTURE DRAINAGE CHANNEL AND FUTURE DEVELOPMENT.
4. THIS PROJECT DEVELOPMENT PLAN IS ACCOMPANIED BY AN ECOLOGICAL CHARACTERIZATION STUDY (ECS).
THIS ECS DOCUMENTS THE EXISTING SIGNIFICANT ECOLOGICAL VALUE OF THE SITE. PROPOSED MITIGATION
FOR THE IMPACTS OF THE DEVELOPMENT ARE SHOWN IN CONCEPT ON THE MITIGATION PLAN (SHEET 6 OF
THIS SET). THE ECS REPORT AND THE PROTECTION AND MITIGATION WILL BE CONSISTENT WITH THE CITY OF
FORT COLLINS LUC SECTION 3.4.1.
FLOODPLAIN NOTES
PROPOSED PLANT PALETTE
LANDSCAPE DESIGN NARRATIVE
*NOTE: 27 TREES TO BE UP-SIZED PER MITIGATION PLAN
AND NOTES BELOW (SEE SHEET6)
x SHADE TREES TO BE 3" CALIPER B&B
x ORNAMENTAL TREES TO BE 2.5" B&B
x EVERGREEN TREES TO BE 8' B&B
6 5 4 3
13 12 11 10 9 8 7
17 16 15 14
20 19 18
28 27 26 25 24 23 22 21
36 35 34 33 32 31 30 29
39 38 37
41 40
43
44
45
46
48
49
50
54
56
57
59
60
61
62 63
47
51
52
53
55
SEE HARMONY & 1-25 PDP SOUTH FOR DETAIL
STRAUSS CABIN ROAD
58
PROPOSED CURB LINE
PROPOSED BUILDING ENVELOPE
64
65
42
HALF OF DRIP LINE MIN.
6' T-POST WITH 4 STAKES
PER TREE DRIVEN (MIN. 18")
FIRMLY INTO SUBGRADE
PRIOR TO CONSTRUCTION
VERTICAL
NOTES:
1. FENCING TO CONSIST OF 5'
HEIGHT ORANGE PLASTIC
CONSTRUCTION FENCING TIED
TO POST WITH METAL WIRE.
FENCING SHALL REMAIN UNTIL
CONSTRUCTION IS
COMPLELTELY FINISHED.
2. SEE PLANT PROTECTION
NOTES THIS SHEET.
CONSTRUCTION BARRIER FENCING NTS
4 TREE PROTECTION
Tree Protection Specifications The
following tree protection specifications
should be followed to the maximum extent
feasible.
(1) Within the drip line of any protected
existing tree, there shall be no cut or fill
over a four-inch depth unless a qualified
arborist or forester has evaluated and
approved the disturbance.
(2) All protected existing trees shall be
pruned to the City of Fort Collins Forestry
standards.
(3) Prior to and during construction,
barriers shall be erected around all
protected existing trees with such barriers
to be of orange fencing a minimum of four
(4) feet in height, secured with metal
T-posts, no closer than six (6) feet from
WKHWUXQNRURQHKDOI ò
RIWKHGULSOLQH
whichever is greater. There shall be no
storage or movement of equipment,
material, debris or fill within the fenced
tree protection zone.
(4) During the construction stage of
development, the applicant shall prevent
the cleaning of equipment or material or
the storage and disposal of waste material
such as paints, oils, solvents, asphalt,
concrete, motor oil or any other material
harmful to the life of a tree within the drip
line of any protected tree or group of trees.
(5) No damaging attachment, wires, signs
or permits may be fastened to any
protected tree.
(6) Large property areas containing
protected trees and separated from
construction or land clearing areas, road
rights-of-way and utility easements may be
"ribboned off," rather than erecting
protective fencing around each tree as
required in subsection (G)(3) above. This
may be accomplished by placing metal
t-post stakes a maximum of fifty (50) feet
apart and tying ribbon or rope from
stake-to-stake along the outside
perimeters of such areas being cleared.
(7) The installation of utilities, irrigation
lines or any underground fixture requiring
excavation deeper than six (6) inches shall
be accomplished by boring under the root
system of protected existing trees at a
minimum depth of twenty-four (24) inches.
The auger distance is established from the
face of the tree (outer bark) and is scaled
from tree diameter at breast height as
described in the chart in section 3.2.1 g of
the Fort Collins Land Use Code.
Tree Transplanting notes:
1. All trees to be reviewed by
Representative of the City of Fort
Collins Forestry Division prior to
Transplanting or Removal. If any
trees that are schedule for
Removal are able to be
transplanted, or trees scheduled
for Transplant need to be removed,
please contact the Landscape
Architect for coordination.
2. Timing of season, transplanting
technique and aftercare including
watering shall follow
recommendations of a qualified
tree transplanting consultant.
Mitigation trees shall meet the following minimum size
requirements:
(a) Canopy Shade Trees 3.0" caliper balled and burlap
or equivalent
(b) Ornamental Trees 2.5" caliper balled and burlap
or equivalent
(c) Evergreen Trees 8' height balled and burlap or
equivalent
357
SPECIFIC TREE LOCATIONS TO BE DETERMINED AT THE
TIME OF FINAL PLANS.
x ALL DIVERSITY STANDARDS OF SECTIONS 3.2.1 D 3
OF THE CITY OF FORT COLLINS LAND USE CODE
SHALL BE MET AT THAT TIME.
x THE SPECIES GROUPING STANDARDS FROM SECTION
4.1.2 OF THE CITY OF FORT COLLINS LAND USE CODE
AND APPENDIX C OF THE LARIMER COUNTY URBAN
AREA STREET STANDARDS WILL BE MET AT THAT
TIME.
1. THIS PROJECT SITE IS LOCATED WITHIN FEMA REGULATED FLOODWAY AND FLOODPLAINS, PER FEMA FIRM MAPS
08069C0994F AND 08069C1013F, DATED DECEMBER 19, 2006.
2. PORTIONS OF THIS SITE ARE LOCATED IN THE FEMA - REGULATORY 100- AND 500-YEAR FLOOD PLAINS, AND THE 1
2 -FOOT
RISE FLOODWAY.
3. EFFECTIVE FLOODPLAIN INFORMATION SHOWN ON THIS PLAN IS BASED UPON LOMR 14-08-058OP, DATED DECEMBER 15,
2014.
4. ALL AREAS IN THE FLOODPLAIN AND FLOODWAY ARE SUBJECT TO THE STANDARDS OF CHAPTER 10 OF THE FORT COLLINS
MUNICIPAL CODE.
5. NO WORK MAY COMMENCE IN THE FLOODWAY UNTIL A FLOODPLAIN USE PERMIT AND NO-RISE CERTIFICATION HAVE BEEN
APPROVED BY THE CITY OF FORT COLLINS FLOODPLAIN ADMINISTRATION DIVISION. NO-RISE CERTIFICATIONS MUST BE
RE-CERTIFIED POST PROJECT.
6. ALL WORK IN THE FLOOD FRINGE MUST BE PRECEDED BY AN APPROVED FLOODPLAIN USE PERMIT.
7. CRITICAL FACILITIES ARE PROHIBITED IN THE POUDRE RIVER FLOODPLAIN.
8. NO NEW STRUCTURES OR ADDITIONS MAY BE ADDED TO THE FLOODWAY.
9. ALL STRUCTURES IN THE FLOODWAY AND FLOOD FRINGE MUST HAVE AN EMERGENCY RESPONSE PREPAREDNESS PLAN.
10. WITHIN THE FLOODWAY, A CONDITIONAL LETTER OF MAP REVISION (CLOMR) MUST BE APPROVED BY FEMA PRIOR TO
ISSUANCE OF ANY BUILDING OR GRADING PERMITS.
11. NON-RESIDENTIAL STRUCTURES OR ADDITIONS IN THE 100-YR FLOOD FRINGE MUST HAVE THEIR LOWEST FLOOR AND ALL
ELECTRICAL, MECHANICAL AND HVAC ELEVATED OR FLOODPROOFED 2.0 FEET ABOVE THE 100-YR BASE FLOOD ELEVATION
(BFE). STRUCTURAL CONSTRUCTION MUST BE FOLLOWED WITH AN AS-BUILT ELEVATION CERTIFICATE. STRUCTURES
OPTING FOR FLOODPROOFING IN LIEU OF ELEVATION MUST PROVIDE A FLOODPROOFING CERTIFICATE AFTER
CONSTRUCTION.
12. NO WORK MAY COMMENCE UNTIL ALL FILL FROM THE FLOODWAY IN THE LOMR-F AREA HAS BEEN REMOVED.
STREET TREE NOTES
1. A PERMIT MUST BE OBTAINED FROM THE CITY FORESTER BEFORE ANY TREES OR SHRUBS AS NOTED ON THIS PLAN ARE PLANTED, PRUNED OR REMOVED ON THE PUBLIC
RIGHT_OF_WAY. THIS INCLUDES ZONES BETWEEN THE SIDEWALK AND CURB, MEDIANS AND OTHER CITY PROPERTY. THIS PERMIT SHALL APPROVE THE LOCATION AND
SPECIES TO BE PLANTED. FAILURE TO OBTAIN THIS PERMIT MAY RESULT IN REPLACING OR RELOCATING TREES AND A HOLD ON CERTIFICATE OF OCCUPANCY.
2. CONTACT THE CITY FORESTER TO INSPECT ALL STREET TREE PLANTINGS AT THE COMPLETION OF EACH PHASE OF THE DEVELOPMENT. ALL TREES NEED TO HAVE BEEN
INSTALLED AS SHOWN ON THE LANDSCAPE PLAN. APPROVAL OF STREET TREE PLANTING IS REQUIRED BEFORE FINAL APPROVAL OF EACH PHASE.
3. STREET TREES SHALL BE SUPPLIED AND PLANTED BY THE DEVELOPER USING A QUALIFIED LANDSCAPE CONTRACTOR.
4. THE DEVELOPER SHALL REPLACE ALL DEAD AND DYING STREET TREES AFTER PLANTING UNTIL FINAL MAINTENANCE INSPECTION AND ACCEPTANCE BY THE CITY OF
FORT COLLINS FORESTRY DIVISION. ALL STREET TREES IN THE PROJECT MUST BE ESTABLISHED OF AN APPROVED SPECIES AND OF ACCEPTABLE CONDITION PRIOR TO
ACCEPTANCE.
5. STREET TREE LOCATIONS AND NUMBERS MAY BE ADJUSTED TO ACCOMMODATE DRIVEWAY LOCATIONS, UTILITY STANDARDS, SEPARATION BETWEEN TREES, STREET
SIGNS AND STREET LIGHTS. STREET TREES SHALL BE CENTERED IN THE MIDDLE OF THE PARKWAY. QUANTITIES SHOWN ON PLAN MUST BE INSTALLED UNLESS A
REDUCTION OCCURS TO MEET SEPARATION STANDARDS.
356
6. THE IRRIGATION SYSTEM FOR LANDSCAPED AREAS SHALL BE REVIEWED AND APPROVED BY
THE CITY OF FORT COLLINS WATER UTILITIES. IRRIGATION PLANS TO BE REVIEWED AS PART
OF THE CONSTRUCTION PERMIT REVIEW PROCESS. THE IRRIGATION SYSTEM MUST BE
INSTALLED ACCORDING TO APPROVED PLANS, OR AN ACCEPTABLE FINANCIAL SECURITY
DEPOSITED WITH THE CITY PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
7. ALL TURF AREAS SHALL BE IRRIGATED WITH AN AUTOMATED, POP-UP IRRIGATION SYSTEM.
ALL SHRUB BEDS TO BE IRRIGATED WITH A DRIP SYSTEM. ALL PERENNIAL BEDS TO BE
IRRIGATED WITH XERI-POP SPRAY HEADS. NATIVE SEED AREAS TO BE IRRIGATED UNTIL FULLY
ESTABLISHED (SOD IS FORMED) (MIN 1-3 YEARS).
8. TREES SHALL NOT BE PLANTED CLOSER THAN 4 FEET TO ANY GAS LINE, 6 FEET FROM ANY
WATER OR SEWER SERVICE LINE, 10 FEET TO ANY WATER OR SEWER MAIN, AND NOCLOSER
THAN 8 FEET TO A DRIVEWAY OR ALLEY. A HORIZONTAL DISTANCE OF 40 FEET BETWEEN
STANDARD STREET TREES AND STREET LIGHTS AND 15 FEET BETWEEN ORNAMENTAL TREES
AND STREET LIGHTS SHALL BE MAINTAINED. TREES SHALL NOT BE PLANTED ANY CLOSER
THAN 20 FEET FROM A TRAFFIC CONTROL SIGN OR DEVISE.
9. TO THE MAXIMUM EXTENT FEASIBLE, TOPSOIL THAT IS REMOVED DURING CONSTRUCTION
ACTIVITY SHALL BE CONSERVED FOR LATER USE ON AREAS REQUIRING REVEGETATION AND
LANDSCAPING.
10. CONTRACTOR IS RESPONSIBLE FOR SETUP OF BARRICADES, WARNING SIGNAGE, OR OTHER
PROTECTIVE DEVICES IF ANY EXCAVATIONS ARE LEFT EXPOSED AFTER ON-SITE WORK
HOURS.
11. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ACQUIRE ALL NECESSARY PERMITS FOR
CONSTRUCTION OPERATIONS IN PUBLIC RIGHTS-OF-WAY.
12. PRIOR TO INSTALLATION OF PLANT MATERIALS, THE SOIL IN ALL LANDSCAPE AREAS,
INCLUDING PARKWAYS AND MEDIANS, SHALL BE THOROUGHLY LOOSENED TO A DEPTH OF
NOT LESS THAN EIGHTEEN (18) INCHES AND SOIL AMENDMENT SHALL BE THOROUGHLY
INCORPORATED INTO THE SOIL OF ALL LANDSCAPE AREAS TO A DEPTH OF SIX (6) INCHES BY
TILLING, DISCING OR OTHER SUITABLE METHOD, AT A RATE OF AT LEAST THREE (3) CUBIC
YARDS OF SOIL AMENDMENT PER ONE THOUSAND (1,000) SQUARE FEET OF LANDSCAPED
AREA.
13. EXISTING TREES SHOWN ON THIS PLAN ARE TO BE PROTECTED IN PLACE. SEE THE TREE
MITIGATION PLAN FOR SPECIFIC PROTECTION REQUIREMENTS. ALL TREE TRIMMING AND
REMOVAL IS TO BE PERFORMED BY A LICENSED FORT COLLINS ARBORIST PER THE CITY OF
FORT COLLINS LAND USE CODE.
14. PROTECT ALL ROOTS THAT ARE ENCOUNTERED DURING SIDEWALK DEMOLITION AND
CONSTRUCTION.
15. DO NOT REMOVE MORE THAN 3" OF SOIL WITHIN THE TREE PROTECTION ZONE IN ORDER TO
LAY NEW SOD.
16. LANDSCAPING MUST BE INSTALLED OR SECURED WITH AN IRREVOCABLE LETTER OF CREDIT,
PERFORMANCE BOND, OR ESCROW AMOUNT FOR 125% OF THE VALUATION OF THE MATERIALS
AND LABOR PRIOR TO ISSUANCE OF CERTIFICATE OF OCCUPANCY.
WATER USE AND MAINTENANCE TABLE
A FREE PERMIT MUST BE OBTAINED FROM THE CITY FORESTER BEFORE
ANY STREET TREES ARE PLANTED IN PARKWAYS BETWEEN THE SIDEWALK
AND CURB OR IN THE RIGHT OF WAY. STREET TREE LOCATIONS AND
NUMBERS MAY CHANGE TO MEET ACTUAL UTILITY/TREE SEPARATION
STANDARDS. LANDSCAPE CONTRACTOR MUST OBTAIN APPROVAL OF
STREET TREE LOCATION AFTER UTILITY LOCATES. STREET TREES MUST BE
INSPECTED AND APPROVED BEFORE PLANTING. FAILURE TO OBTAIN THIS
PERMIT IS A VIOLATION OF THE CODE OF THE CITY OF FORT COLLINS.
TREES COMMON NAME QTY
CONIFER / EVERGREEN 18
COTTONWOODS 35
ORNAMENTAL TREE 84
SHADE TREE-DECIDUOUS 95
PLANT SCHEDULE
GROUND COVERS COMMON NAME
IRRIGATED BLUEGRASS TURF
NATIVE MIX
SHRUBS AND ORNAMENTAL GRASSES
355
CONSTRUCTION.
12. NO WORK MAY COMMENCE UNTIL ALL FILL FROM THE FLOODWAY IN THE LOMR-F AREA HAS BEEN REMOVED.
1. THIS SITE IS LOCATED WITHIN THE HARMONY CORRIDOR ZONE DISTRICT (H-C).
2. THIS SITE IS LOCATED OUTSIDE OF THE EFFECTIVE 1/2 FOOT RISE FLOODWAY.
3. THE PROPOSED LAND USES FOR THE HARMONY AND STRAUSS CABIN CONVENIENCE SHOPPING CENTER AREA INCLUDE
NEIGHBORHOOD COMMERCIAL. OUTLOTS OUTSIDE OF THE NEIGHBORHOOD COMMERCIAL AREA (LOT 1) AND LOT 2 ARE
RESERVED FOR A FUTURE DRAINAGE CHANNEL AND FUTURE DEVELOPMENT.
4. THIS PROJECT DEVELOPMENT PLAN IS ACCOMPANIED BY AN ECOLOGICAL CHARACTERIZATION STUDY (ECS). THIS ECS
DOCUMENTS THE EXISTING SIGNIFICANT ECOLOGICAL VALUE OF THE SITE, AND PROPOSES MITIGATION FOR THE IMPACTS
THE DEVELOPMENT WILL HAVE TO THE ECOLOGICAL VALUE ON THE SITE. THE ECS REPORT AND THE PROTECTION AND
MITIGATION WILL BE CONSISTENT WITH THE CITY OF FORT COLLINS LUC SECTION 3.4.1.
FLOODPLAIN NOTES
PROJECT
LOCATION
INDEX TO PLANS
1 - COVER
2 - SITE PLAN OVERALL
3 - SITE PLAN DETAIL
4 - LANDSCAPE COVER
5 - LANDSCAPE OVERVIEW
6 - TREE MITIGATION PLAN
7 - PHOTOMETRIC PLAN
8 - LIGHTING DETAILS
9 - BUILDING ELEVATIONS
10 - BUILDING ELEVATIONS
11 - BUILDING ELEVATIONS
12 - BUILDING ELEVATIONS
13 - TRASH ENCLOSURE DETAILS
LOTS 1, 2 & TRACT B, HARMONY & STRAUSS CABIN CONVENIENCE SHOPPING CENTER SUBDIVISION FILING NO. 1
343
Thru
1359
Right
25
Out In Total
1846 1459 3305
Left
78
Thru
54
Right
96
OutTotal In
138 228 366
Peak Hour Begins at 03:00 PM
Unshifted
Peak Hour Data
North
272
Rght
33
Out In Total
1004 1526 2530
Left
21
Thru
23
Rght
14
OutTotal In
304 58 362
Peak Hour Begins at 08:00 AM
Class 1
Peak Hour Data
North
268
52
Out In Total
1625 1436 3061
Left
216
Thru
0
Right
0
OutTotal In
98 216 314
Peak Hour Begins at 03:15 PM
Unshifted
Peak Hour Data
North
264
Out In Total
856 1751 2607
Left
27
Thru
0
Rght
0
OutTotal In
217 27 244
Peak Hour Begins at 07:45 AM
Class 1
Peak Hour Data
North
260
18’
200’
100’
175’
225’
200’
Pitkin Access
Northbound Approach - 25’ 25’ 25’ 25’
College RIRO Access
Eastbound Approach 150’ 50’ 150’ 50’ 150’
As shown in the table representing the queuing results in 2016, all anticipated queues are
accommodated or managed within existing turn bay lengths except for the eastbound left turn
queue at the Pitkin Street and College Avenue intersection. The eastbound left turn lane
currently has storage of 75 feet and the future traffic volume with completion of the University
Square Parking Structure is anticipated to experience a queue of 150 feet. Therefore, it is
recommended that the eastbound left turn lane be reconstructed/restriped to include 150 feet of
storage for the near term horizon.
By 2025, all anticipated queues are anticipated to be accommodated or managed within existing
turn bay lengths except for the eastbound left turn and eastbound right turn queues at the Pitkin
Street and College Avenue intersection. The eastbound left turn and right turn exclusive turn
lanes currently have storage lengths of 75 feet. With future traffic volumes that include
251
Square Parking
Structure
910 520 400 67 33 100 69 90 159
242
701
431
577
BARNS
555 554
HOSPITAL
VETERINARY TEACHING
578
567 568
562
553
580
559 560 570
561
558
425
PUMP HOUSE
422 423
USDA
424
USFW
HEADHOUSE
HILTON
(21) (20) (19)
(23)
(26) (25)
(30) (29)
(27) (28)
(22)
311
312
CROP RESEARCH
U.S.D.A.
380
308
306
304 303 302
305
309
310
313
SURPLUS
136
137
BOOK STORAGE
318
(34) (24) 301 (18)
317 307
206
221 223 229 231
201 202 203
207
211
212 213
210
205
208
217 216 215
256
257
258
259
260
261
262
263
252
253
254
255
264
250
Parking
Garage
(Bldg K)
(Bldg J)
(Bldg L)
(Bldg H)
(Bldg H)
(Bldg P5)
(Bldg P3)
(Bldg P2)
(Bldg C)
(Bldg U)
(Bldg A)
(Bldg A)
(Bldg B)
548
DIAGNOSTIC MEDICINE CENTER
BSL-3
539
Bus Barn
(Bldg K2)
UNIVERSITY
TENNIS
COMPLEX
AGGIE
VILLAGE
NORTH
AGGIE
VILLAGE
SOUTH
314 (31) 315 (32) 316 (33)
391
569
TUBE STEEL STRUCTURE FOR
SNOW MELT EQUIPMENT
183
179
187
185
Gail Holmes
Equine Orthopaedic
Research Center
APHI
Lab
Orthopaedic
Research Lab
S. COLLEGE AVENUE
CENTRE AVENUE
SEE ENLARGEMENT
WEST PROSPECT ROAD
PITKIN STREET
WEST LAKE STREET
COLORADO STATE UNIVERSITY
MAIN CAMPUS
COLORADO STATE UNIVERSITY
SOUTH CAMPUS
CAMPUS CONTEXT MAP ENLARGED VICINITY MAP
SOUTH COLLEGE AVENUE
MASON BRT
NORTH
SOUTH COLLEGE PARKING STRUCTURE
04.16.2015
SPAR SUBMITTAL
VICINITY MAP 214
Ave
Vicinity Map Aerial Site Map
Zoning Map
1 inch = 250 feet
1 inch = 17,493 feet
213
Blevins Ct
Tamasag Dr
Mathews St
Smith St
W Pitkin St
University Ave
Peterson St
Mathews St
S Whitcomb St
W Lake St
E Pitkin St
E Laurel St
E Stuart St
E Elizabeth St
C
e
n
t
r
e
A
v
e
Center Ave
S Loomis Ave
S
pring Park Dr
Remington St
S College Ave
Remington St
W Laurel St
W Prospect Rd
E Prospect Rd
S Mason St
S Howes St
CSU Parking Garage -
West Pitkin St. & Mason
1 inch = 800 feet
800 400 0 800 Feet
Site
212
Out In Total
140 267 407
Right
0
Thru
0
Left
0
Out In Total
0 0 0
Left
35
Thru
118
Right
0
Out In Total
339 153 492
Left
22
Thru
0
Right
86
Out In Total
49 108 157
Peak Hour Begins at 04:00 PM
Unshifted
Peak Hour Data
North
Morrison, CO 80465
125
259 65 324
Right
0
Thru
0
Left
0
Out In Total
0 0 0
Left
73
Thru
256
Right
0
Out In Total
64 329 393
Left
3
Thru
0
Right
22
Out In Total
96 25 121
Peak Hour Begins at 07:30 AM
Unshifted
Peak Hour Data
North
Morrison, CO 80465
121
76
Out In Total
168 352 520
Right
42
Thru
839
Left
207
Out In Total
1267 1088 2355
Left
69
Thru
79
Right
289
Out In Total
393 437 830
Left
47
Thru
902
Right
32
Out In Total
1030 981 2011
Peak Hour Begins at 03:15 PM
Unshifted
Peak Hour Data
North
Morrison, CO 80465
109
457 71 528
Right
117
Thru
529
Left
276
Out In Total
1102 922 2024
Left
51
Thru
208
Right
229
Out In Total
407 488 895
Left
132
Thru
857
Right
94
Out In Total
598 1083 1681
Peak Hour Begins at 07:30 AM
Unshifted
Peak Hour Data
North
Morrison, CO 80465
105
54
Thru
117
Left
167
Out In Total
151 338 489
Right
96
Thru
1232
Left
72
Out In Total
1056 1400 2456
Left
18
Thru
27
Right
44
Out In Total
208 89 297
Left
28
Thru
845
Right
19
Out In Total
1304 892 2196
Peak Hour Begins at 03:45 PM
Unshifted
Peak Hour Data
North
Morrison, CO 80465
85
Thru
15
Left
32
Out In Total
327 57 384
Right
169
Thru
519
Left
38
Out In Total
1047 726 1773
Left
38
Thru
96
Right
81
Out In Total
73 215 288
Left
62
Thru
934
Right
20
Out In Total
567 1016 1583
Peak Hour Begins at 07:30 AM
Unshifted
Peak Hour Data
North
Morrison, CO 80465
81
1083 1295 2378
Right
80
Thru
118
Left
169
Out In Total
303 367 670
Left
71
Thru
902
Right
107
Out In Total
1385 1080 2465
Left
101
Thru
107
Right
122
Out In Total
301 330 631
Peak Hour Begins at 03:30 PM
Unshifted
Peak Hour Data
North
Morrison, CO 80465
77
Shields St
Right
58
Thru
727
Left
103
Out In Total
1048 888 1936
Right
31
Thru
31
Left
48
Out In Total
548 110 658
Left
41
Thru
913
Right
273
Out In Total
807 1227 2034
Left
104
Thru
172
Right
32
Out In Total
130 308 438
Peak Hour Begins at 07:30 AM
Unshifted
Peak Hour Data
North
Morrison, CO 80465
73
30(31)
29(18)
66(357)
4(28)
28(109)
15(41)
745(376)
18(19)
274(706)
36(37)
18(48)
9(24)
14(15)
7(19)
100(75)
129(85)
47
30(31)
23(14)
55(289)
3(22)
22(86)
15(41)
590(302)
18(19)
220(561)
36(37)
18(48)
9(24)
14(15)
7(19)
77(58)
99(65)
46
41
77(58)
99(65)
40
0’ 75’ 150’ 300’ APRIL 29, 2015
RESPONSE TO CITY STAFF COMMENTS
21
s
m
an
Dr
Waters Edge
S Whitcomb St
C
h
a
p
a
r
r
al Dr
N
a
tiv
e
P
la
n
t
W
a
y
Ringneck Dr
Botanical Ln
Stagec
o
a
ch Ct
Mirrormere Cir
Sundering Dr
Northerland Dr
Centre Ave
Research Blvd
Meadowlark Ave
S Shields St
W Drake Rd
©
CSU Parking Lot
These map products and all underlying data are developed for use by the City of Fort Collins for its internal purposes only, and were not designed or intended for general use by members
of the public. The City makes no representation or warranty as to its accuracy, timeliness, or completeness, and in particular, its accuracy in labeling or displaying dimensions, contours,
property boundaries, or placement of location of any map features thereon. THE CITY OF FORT COLLINS MAKES NO WARRANTY OF MERCHANTABILITY OR WARRANTY FOR
FITNESS OF USE FOR PARTICULAR PURPOSE, EXPRESSED OR IMPLIED, WITH RESPECT TO THESE MAP PRODUCTS OR THE UNDERLYING DATA. Any users of these map
products, map applications, or data, accepts same AS IS, WITH ALL FAULTS, and assumes all responsibility of the use thereof, and further covenants and agrees to hold the City harmless
from and against all damage, loss, or liability arising from any use of this map product, in consideration of the City's having made this information available. Independent verification
of all data
contained herein should be obtained by any users of these products, or underlying data. The City disclaims, and shall not be held liable for any and all damage, loss, or liability, whether
direct,
indirect, or consequential, which arises or may arise from these map products or the use thereof by any person or entity.
1 inch = 667 feet
^_
^_
^_
¤£287
¤£287
¤£287
VU14
«¬1
¦¨§25
¦¨§25
¦¨§25
Douglas
Vine
Mountain Vista
Mulberry
Trilby
Lemay
Shields
Harmony
Taft Hill
Prospect
Horsetooth
Drake
Timberline
E
CSU
RL E
CG
MMN
Colorado State University
Bay Rd
Avocet
R
d
R
edwing Rd
Centre Ave
Research Blvd
W Drake Rd
Vicinity Map Aerial Site Map
Zoning Map
1 inch = 833 feet
1 inch = 17,493 feet
20
a
n Dr
Har
v
ar
d
S
t
Powder
ho
r
n
Dr
R
i
n
g
neck
D
r
Wallenberg Dr
G
i
l
g
al
a
d
W
a
y
Fli
c
k
e
r
D
r
Hobbit St
D
av
i
d
s
o
n
Dr
Bay Dr
Worth
i
n
gton
C
i
r
S Whitcomb St
W Harvard St
Vassar Ave
Perennial Ln
Johnson Dr
Parker St
W Thunderbird Dr
Remington St
Choice Center Dr
R
utgers Ave
Princeto
n
R
d
Bluejay St
Nighthawk Dr
Arthur Dr
Botanical Ln
Wind Trl
Frontage Rd
Frontage Rd
Centre Ave
Meadowlark Ave
Research Blvd
E Stuart St
Remington St
S Shields St
S College Ave
W Drake Rd
CSU Parking Lot Vicinity Map -
1 inch = 800 feet
800 400 0 800 Feet
Site
19