MINUTES OF JULY 11, 1996 REGULAR MEETING
The Board of Directors of the Downtown Development Authority
met in regular session at 7:30 a.m., July 11, 1996 in the
conference room at 201 South College Avenue, One West
Contemporary Art Center.
PRESENT There were present:
Stephen Slezak, Chair presiding
Bonnie Bixler Szidon, Vice Chair
Mary Brayton, Secretary
Carey Hewitt, Treasurer
Chuck Wanner
Kermit Allard
Bill Attwooll
Jason Meadors
Lucia Liley, Counsel
Absent:
Greg Belcher
Staff:
chip Steiner, Consultant
Anne Garrison
Bud Frick, LPC Liaison
Guests:
Dawn Sinnard, Vaught Frye, Maggie Kunze, Project
Coordinator - Wall Mural
CALL TO ORDER Mr. Slezak called the meeting to order, and entertained a
motion to approve the minutes of June 6, 1996. Me. Brayton
moved to approve the minutes as written, seconded by Mr.
Hewitt and the motion carried unanimously.
WALL MURAL Maggie Kunze addressed the Board seeking support and funding
for this project.
C�
•
DDA MINUTES
PAGE 2
COURTHOUSE
• Both City personnel and the Landmark Preservation
Commission have indicated their interest in this project
• The services of a nationally renowned Artist have been
retained
• The core group of workers will be young people culled from
the Youth Activity Center and Boys and Girls Club, and from
concept to completion they will work in concert with Darrell
Anderson.
• The theme will attempt to capture "downtown" in all its
representative facets
• Carol Ann Hixon of Poudre R1 will make arrangements for
students interested in obtaining credit hours
• The Wright Life building has been designated as the
backdrop for this work
• Mural will be constructed in segments on wallboard so as
to be movable
• Four to six weeks is the projected completion time, with
an estimated cost of $20 - $25,000
Concerns expressed by the Board referred to the need for
ownership by an entity such as the City, DDA, etc., so the
mural could be properly maintained and kept downtown,
particularly if it is to qualify for DDA funding.
Counsel validated the concerns and suggested a contractual
agreement or covenant be reached with Wright Life, that the
mural remain at said location for a given period of time,
and that the City or other entity be allowed to remove it if
necessary.
Ms. Runze requested that whatever DDA's financial commitment
to this project it be paid up front, but the Board advised
that DDA funding is paid as reimbursement of costs. It was
suggested that a collection box might be on hand while the
work was in progress so the public could be allowed to
contribute.
Concluding the discussion, Mr. Hewitt moved that DDA commit
$2,000 contingent upon ownership being determined, an
agreement that the project remain downtown, and repair and
maintenance questions be resolved. Ms. Szidon seconded and
the motion carried with the exception of Mr. Allard who was
opposed.
Mr. Slezak excused himself from the meeting due to a
business requirement outside of the meeting, and Ms.
Szidon, Vice Chair, continued.
Deni LaRue used a flip chart to outline Project SAFE. The
presentation outlined only the most critical needs and is
therefore not comprehensive.
The Justice Center is to be located on Block 031. The
current Courthouse was built in 1956 with no expansion seen
in 26 years. The proposal calls for a mixed use facility
encompassing retail stores, office space and a parking
structure. There are plans to work in partnership with
Loveland which make it more economically efficient, although
Loveland will have its own facility.
Phase II calls for moving the Sheriff's headquarters to the
jail to solve issues such as travel and communication.
DDA MINUTES
PAGE 3
Phase III will occur only when the other two are complete.
It will require remodeling the existing courthouse to bring
all other related services, currently housed around town,
under one roof.
Ms. LaRue shared the the County has a legal obligation to
provide court space and adequate jail facilities. Security
is an ongoing concern with no separation of prisoners from
the public and employees, and no security check for weapons
on the main floor. Other needs cited were holding cells,
juror work rooms and private areas for children. Presently
there is only one booking window, and prisoners must be held
in cars to await this process.
A team should be in place by month and and the projected
timeframe is as follows: Phase 1 - 1997 - 1998; Phase II -
1998 at the earliest; Phase III - 1999 - 2000. It will go
to the voters in November. Ms. LaRue concluded that the
cost of Phase I is approximately twenty seven million
dollars, but in consideration of $300,000 being spent each
year to house employees in off site spaces, it makes
economic sense. The total project is slated to cost sixty
million dollars.
BRISTOL FLORAL
Dawn Sinnard of Vaught Frye represented the owners of this
building in their quest for funding for facade improvements.
Total cost of the renovation is estimated at approximately
$85,000 of which $14,000 is ascribed to the restoration of
the facade. It is planned to remove the metal siding and
return to the original brick design with more glass.
Following the remodel a new tenant will occupy the premises.
Work is slated to begin at the and of July.
Although this property does not lie within the historic
boundaries, it was suggested to Ms. Sinnard that the owners
should be aware of the benefits in designating a building.
Mr. Meadors moved to provide funding in the amount of $8,500
this was seconded by Mr. Hewitt and carried unanimously.
RESOLUTION 96-4
The subject of this resolution was the operation and
security of downtown parking structures. Counsel inquired
if there were revenues available in the Parking Fund to
offset the cost of providing this security. The
recollection was that when the Parking Commission was
disbanded, funds were used for crossing guards and are now
depleted. In the meantime it was learned that the review by
City Council has been postponed until August 20, 1996.
Mr. Wanner requested a signed copy of the resolution, and
Mr. Hewitt moved we pass Resolution 96-4 and provide Mr.
Wanner with a copy as requested. Ms. Brayton seconded the
motion which was carried unanimously.
POUDRE RIVER
Mr. Meadors moved to table this issue until the next
CORRIDOR
meeting, seconded by Mr. Wanner and the motion carried
unanimously.
TAX INCREMENT
Ms. Liley advised that upon reviewing the Assessor's sheets
there was some concern that DDA was not receiving enough of
the tax increment. In company with Mr. Steiner and Mr.
Allard, Counsel examined the method of calculation and
DDA MINUTES
PAGE 4
found the value attached to a finished project to be
different from our assessment. When the debt is serviced in
the year 2006 we should have a surplus of one million
dollars. It is possible to carefully program and phase in
the use of these dollars. They could be spent in increments
up to the year 2006.
Me. Brayton felt it timely to advise that the DBA Board of
Directors had appointed Ed Stoner as their representative to
the BID committee
ADJOURN There being no further business, the meeting adjourned at
9:15 a.m.
Mary Brayton, Secretary
ddDOWNTOWN
DEVELOPMENT
AUTHORITY
ONE WEST CONTEMPORARY ART CENTER
201 SOUTH COLLEGE AVENUE, FORT COLLINS, CO 80524
TO: DDA Board of Di ctors
FROM: Chip Steiner /^,
DATE: July 30, 1996 /'
RE: Poudre River Discussion
A few months ago the Board was to
recommendations for the Poudre River
central business district. Because of
has remained tabled until this meeting.
•
Telephone (303) 484-2020
Telefax (303) 484-2069
consider the City Plan
as it flows through the
lengthy agendas this item
As far as I can tell, City Plan addresses the river corridor in the
central business district only tangentially. Maps depict a green
swath but it is difficult to determine how wide this swath is or
what is/is not permitted to occur within it.
The Poudre River has always been considered a key element in the
future of downtown. Gene Mitchell, et.al., set up the Poudre River
Trust in 1984 anticipating the River's formal incorporation into
the central business district. Both the DDA and City Council
adopted resolutions establishing as the main downtown development
priority the incorporation "of the Poudre River into the fabric of
the central business district."
Perhaps the key issue in any discussion of the Poudre River as it
passes through downtown Fort Collins is whether it has, can have,
or should have, a relationship with the human (urban) environment
around it.
The relationship exists and has done so since this community was
founded. Should it continue? Can they be separated? What are the
consequences of a mandatory separation? What are the consequences
of unregulated merger?
The fact that the River passes through an urban area cannot
reasonably be changed. The fact that the River represents a
wonderful, natural (kind -of) resource should be respected.
Some thoughts:
1. If inter -action between the River and people is severely
restricted--i.e. if we are to mandate that the corridor
is for "wildlife" only --the corridor may become a haven
for undesirable human activities. This problem already
exists.
2. Inter -action between an urban world and a "natural" world
is neither impossible nor even uncommon.
3. An abandoned mill race exists along the south bank of the
River. This may present an opportunity to bring water
and high -density urban development together.
DOWNTOWN �
DEVELOPMENT
AUTHORITY
ONE WEST CONTEMPORARY ART CENTER
201 SOUTH COLLEGE AVENUE, FORT COLLINS, CO 80524
Telephone (303) 484-2020
Telefax (303) 484-2069
TO: DDA Board of Dir tors
FROM: Chip Steiner
DATE: July 30, 1996
RE: Coppersmith Bulk Ma t Silos
Coppersmiths Pub is proposing to install two 30-foot bulk malt
silos at the right side of the eastern -most entry into Old Town
Square.
According to the attached information, the need for these silos is
primarily economic. Bulk delivery may also reduce traffic tie ups
resulting from delivery vehicles parked in the street.
An alternative location considered for the silos was at the rear
of the west half of Coppersmith's in a recess along the J.L.
Hohnstein Building. This site was rejected because the silos would
block historic Coca -cola and Angel Is Deli signs painted on the wall
of the Hohnstein building.
Coppersmith's has played, and continues to play, an important part
in the rejuvenation of Historic Old Town. It was one of the
earlier tenants into Old Town Square (when the prospects for
survival were risky) and it helped start the mini -brewing movement
in Fort Collins.
On the other hand, Old Town Square is a commercial, not industrial,
district. It has never been an industrial area. Grain silos
introduce a land -use and a land use type that has no historical
reference. It does not constitute adaptive -reuse. The
construction materials have little context with the surrounding
improvements. The silos dwarf the building next to them and
because they are stand-alone features, they seem to overwhelm this
entryway into Old Town Square.
If the silos are permitted, the location at the rear of the
Hohnstein building makes more sense. Although the historic signs
will be partially blocked, the size of the building would help
lessen the intrusive nature of the silos. They would also be
tucked into a niche and away from an entryway to the Square.
If the DDA approves of the silos, ownership of the land beneath
them must be resolved.
This project has not yet been considered by the Landmarks
Preservation Commission.
• 0
COOPERSMITITS BULK MALT SILO PROPOSAL
MARKET DRIVEN INCENTIVES
Cooper5mith'e Pub & Brewing is proposing to locate two bulk malt silos next to our Pool Hall
facility off the East Mountain Avenue entrance to Old Town Square. The motivation to install
these grain handling devices is two fold. The primary -reason is the price of malted barley has
increased by roughly 80% in the last two years making the move to a bulk delivery system ever
more attractive. While Cooper5mith's has always taken deliveries of Pale Malt in 110 LB or 55
LB bags the price for this bagged product has increased to the point where we can not stay
competitive in the ever expanding micro -brewing market unless we take every step to minimize
our costs. The installation of bulk malt storage and delivery will allow us to purchase quantities
at levels that allow us to remain a healthy business. This proposal is not a first step in
expanding our production facilities but a step to allow us to be more efficient.
The secondary reason for proposing this bulk silo system is the amount of labor that
goes into handling over 160,000 pounds of Pale Malted Barley per year to produce 2300
barrels of beer. We currently receive approximately 12,000 Ibs of malt every 4 weeks in 55 LB
bags. This has an economic as well as a physical impact upon Coopersmith's. The bagged
deliveries are more frequent and tie up traffic for longer periods of time than it would take for
less frequent bulk deliveries.
DE51GN CON5IDEPATION5
When considering this project several factors came into play. The first design
consideration was to have the silos situated to allow the transference of the Malted 5ariey to
our milling room located in the basement of the original pub building. While a location next to
the building would be the easiest from an engineering standpoint the blockage of the historic
Coca Cola and Angel's Delicatessen sign was considered a clear obstacle. The next option was
the location we are proposing, up against the existing pool hall building that will allow us to build
a chase under ground and transport the product via an auger. The auger is encased in 4' PVC
pipe and would be poured in concrete under the existing walkway. After completion of the
project there would be no change from the present visible condition except new slabs where
there are presently cracked slabs.
The primary consideration with this proposed location was the restriction of traffic flow
and the proposal deals with this by designing the silos as narrow as possible. The proposed
diameter is six feet which would not impede existing traffic flows into the plaza. The main
consideration would then be the aesthetic impact of one silo being 30 feet tall and the other
26 feet tall. The present height of the building is approximately 16 feet. The building across the
r
walkway, the J.L. Hohnstein building, is also approximately 30 feet tall making the addition of
the silos create a gateway effect. The company constructing the silos has installed other units
at local breweries in Ft. Collins and is aware of the 100 m.p.h.. wind requirements and will design
an appropriate slab which will adequately meet the structural concerns. We invision installing a
fence similar to the existing patio fences which would provide more bike parking and protect the
equipment.
MALT 51LO A5 20TH CENTURY ARCHITECTURAL FEATURE
The overwhelming growth of the craft beer industry has been parallel with the resurgence
of historical downtown renovation. Cities such as Portland Oregon, Denver Colorado Austin
Texas, and 5eattle Washington have experienced booms in Urban renewal that have been
fostered with the comeback of local traditional breweries. These renewals have a emphasized
the participation of citizens in the manufacturing of products they are consuming as well as an
environment that was, in most cases, originally built around manufacturing. What as recently
as ten years ago was seen as decaying warehouse areas have become the most vibrant
locations for development and activity in a number of American Cities.
The BrewPubs that reside in these areas have begun turning to bulk malt silos as a way
to stay more competitive in the industry they helped revive. This has led to a common sight
across the country and a new architectural feature of the 199019.
CONCLU51ON
Cooper5mith'e is proposing this project as a way to stay competitive in an industry it
helped create and stay an integral part of a vibrant downtown Ft. Collins. We understand the
aesthetic questions and want to do whatever necessary to mitigate any concerns that might
arise.
Please feel free to call me if you have any questions or concerns. My phone number is:
495-0483 ext. 22
Thank You,
Brad Page
Brewmasterffreaeurer
No Text
-M 9 r 1
0
J W
Qu
z
ZELL
a
2
U
zQ
f. J
W
zJW
WW
xWW
WELL
W
1-
W
WQ
O�
J
O
Z10
,qlL
nE.9
z
►_ fa
y0
U.
Q
N
1 ',T 1°C�f
A�2 ,
_ � ai Ala- •�
- � �,._�
� ,_--�:.
'�i
'�
` ��
v
e
!� ���, � I����
' 1.
0
Wynkoop Brewing Co.
163418th 5t.
Lower Downtown, Denver
Mixed use area
Residential, Entertainment
Retaii