HomeMy WebLinkAbout10/09/2003 - ZONING BOARD OF APPEALS - AGENDA - Regular Meeting Zoning Board of Appeals
Agenda
Regular Meeting
Thursday,October 09,2003
Roll Call
Approval of the Minutes from the July 10,2003 Meeting
Appeal: 2443 1501 Emigh St
The variance would reduce the required side-yard setback along the south lot line from 5'to 3' in order to
allow the construction of a patio cover over an existing concrete patio.
Code Sections: 4.3(D)(2)(d)
Petitioner: Dean and Julie McCollum
ZoningDistrict RL
Appeal: 2444 1604 Richards Place
The variance would reduce the required rear-yard setback along the north lot line from 15'to 14'--l" in
order to allow a screened porch to be constructed over the existing concrete patio slab. The porch will
line up with the existing north wall of the house which is already at a 14'-- 1"setback.
Code Sections: 4.6(E)(3)
Petitioner. Leslie Jones
ZoningDistrict NCL
Appeal: 2445 220 E Oak St
The variance would reduce the required rear-yard setback from the north lot line from 15'to 5.6'and
reduce the required street-side setback along the east lot line(Mathews Street)from 15'to 0' in order to
allow the previously existing church gymnasium to be reconstructed in the same location as it existed
before it was destroyed by the March 2003 snow storm.
Code Sections: 4.8(D)(3)(C),4.8(D)(3)(d)
Petitioner: Earnie Garner
ZoningDistrict NCB
Other Business:
Zoning Board of Appeals
Agenda
Regular Meeting
Thursday, October 09, 2003
Appeal 2443
Address 1501 Emigh St
Petitioner Dean and Julie McCollum
Zoning District RL
Section 4.3(D)(2)(d)
Description The variance would reduce the required side-yard setback along the south
lot line from 5'to 3' in order to allow the construction of a patio cover over an
existing concrete patio.
Hardship See petitioner's letter.
Staff Comments It may be difficult to consider this appeal as a hardship variance since there
is nothing unusual about the situation. With regards to porch covers, the
setback is measured from the support posts to the property line, and the
roof overhang is allowed to encroach 2' into the required setback. In this
particular instance, the petitioner's want to put the posts at a 3' setback, with
no overhang. Moving the posts in 2'would result in a structure that
complies with the code, and the roof would be in the same location as
proposed. This is similar to an appeal heard at the September 11,2003 ZBA
meeting wherein a trellis structure was constructed over an existing concrete
patio and the posts were 3.5'from the lot line. The Board determined that
situation to be "equal to or better than", based on the design of the
structure, including the roof, being very open and thereby meeting the intent
of the setback standard with regards to light and ventilation. This particular
proposal differs from the September item because this proposed roof is a
solid roof rather than open trellis.
o
r:
Appeal 2444
Address 1604 Richards Place
Petitioner Leslie Jones
Zoning District NCL
Section 4.6(E)(3)
Description The variance would reduce the required rear-yard setback along the north
lot line from 15' to 14'--1" in order to allow a screened porch to be
constructed over the existing concrete patio slab. The porch will line up with
the existing north wall of the house which is already at a 14'— 1" setback.
Hardship The petioner believes that lining the new porch up with the existing wall of
the house would look better. Additionally, tieing the new roof into the
existing roof is accomplished better by lining it up. The lot is only 90' in
depth, so it is a shallow lot.
Staff Comments It is a shallow lot, and the porch will line up with the existing wall, so there
may be some consideration for a hardship.
Wl "V--L ',L
v
i
Appeal 2445
- Address 220 E Oak St
Petitioner Earnie Gamer
Zoning District NCB
Section 4.8(D)(3)(C), 4.8(D)(3)(d)
Description The variance would reduce the required rear-yard setback from the north lot
line from 15'to 5.6' and reduce the required street-side setback along the
east lot line (Mathews Street) from 15' to 0' in order to allow the previously
existing church gymnasium to be reconstructed in the same location as it
existed before it was destroyed by the March 2003 snow storm.
Hardship See petitioner's letter.
Staff Comments None.
6
Ly - -
Other Business