Loading...
HomeMy WebLinkAbout04/17/2025 - Planning and Zoning Commission - SUPPLEMENTAL DOCUMENTS - HearingCity of Fort Collins Planning and Zoning Commission Hearing Date: April 17, 2025 Supplemental Documents SUPPLEMENTAL DOCUMENTS Liberty Common Junior High Phase 2 Site Plan Advisory Review (#SPA250001) 2 Location & Vicinity •South of Prospect Rd. & East of Timberline •Adjacent to Cottonwood Hollow Natural Area and Poudre Trail •Active Bald Eagle nest, ¼ mile •Zoning: I – Industrial •City Plan: R&D Flex •Expands existing Liberty Common campus 1 2 SUPPLEMENTAL DOCUMENTS Aerial Site Photos 3 Site Photos 4 Sharp Point Dr. (2-Lane Collector) SiteNatural Area & Poudre Trail 3 4 SUPPLEMENTAL DOCUMENTS Site Plan 5 •55,640 SF – 2 Existing Bldgs + New connection •384 Students •138 Parking (existing) •No busses, parent drop off lanes only •“Front Door” faces interior to block Architectural Elevations 6 5 6 SUPPLEMENTAL DOCUMENTS Architectural Elevations 7 Sharp Point Rd NE Elevation “Front Door” SW Elevation Site Plan Advisory Review Criteria •describe location, character, and extent of improvements; •with respect to… schools, the review has as its purpose, as far as is feasible, that the proposed school facility conforms to the City’s Comprehensive Plan; •consistent with land use designation described by the City Structure Plan Map; 8 •consistent with the stated purpose of the respective land use designation as set forth in the City's Comprehensive Plan; •identify the level of functional and visual impacts to public rights-of-way, facilities and abutting private land caused by the development, including, but not limited to, streets, sidewalks, utilities, lighting, screening and noise, and shall mitigate such impacts to the extent reasonably feasible. LUC §6.2.3(F) & 6.11.2(Q) 7 8 SUPPLEMENTAL DOCUMENTS Applicant Presentation Summary of Recommendations 10 •Architectural wall/fence to frontage – extend urban edge, screen parking •Show safe walkway connections from streets to school •Participate in enhanced Pedestrian crossing at Sharp Point. •Participate in signalization needs at Prospect Rd. & Sharp Point. •Update landscaping - no turf, plants in raingarden •Update lighting plan to ensure no glare and light spillage •Updated engineering plans – Riverbend Court, stormwater and utilities •Work with CPW to mitigate impact to Bald Eagle nest 9 10 SUPPLEMENTAL DOCUMENTS Screening Options 12 11 12 SUPPLEMENTAL DOCUMENTS