Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout03/26/2025 - Planning and Zoning Commission - SUPPLEMENTAL DOCUMENTS - Regular MeetingCity of Fort Collins Planning and Zoning Commission
Hearing Date: March 26, 2025
Supplemental
Documents
SUPPLEMENTAL DOCUMENTS
Supplemental Docs Pg.1
Page 1 of 1
LAW RENCE CUSTER GRASMICK JONES & DONOVAN, LLP
ATTORNEYS AT LAW
March 26, 2025
City of Fort Collins
Director of Community Development and Neighborhood Services
Attn: Clay Frickey
VIA EMAIL ONLY: cfrickey@fcgov.com
RE: Withdrawal of Appeal Regarding Planning Manager’s Decision – Montava
Phase D Core and Irrigation Pond, BDR 240006
Dear Mr. Frickey,
On January 22, 2025, our law firm, on behalf of the Larimer and Weld Irrigation Company and
WRCC, Inc., filed an appeal of your January 8, 2025 approval, with conditions, of Montava Phase
D Core and Irrigation Pond, BDR240006.
Since the filing of the appeal, Larimer and Weld Irrigation Company and WRCC, Inc. have entered
into a settlement agreement with Montava. As such, please accept this letter as notice that Larimer
and Weld Irrigation Company and WRCC, Inc. withdraw their appeal.
Please contact me with any questions.
Sincerely,
LAWRENCE CUSTER GRASMICK JONES & DONOVAN, LLP
___________________________
Ryan M. Donovan
Linda P. Bower
Attorneys for Larimer and Weld Irrigation Company and WRCC, Inc.
5245 Ronald Reagan Blvd., Suite 1
Johnstown, COLORADO 80534
TELEPHONE: 970-622-8181 ryan@lcwaterlaw.com
Bradley C. Grasmick • David P. Jones • Ryan M. Donovan • Wesley S. Knoll • Richard T. LiPuma (Of Counsel)
David L. Strait • Linda Preslan Bower • Jacklyn P. Gunn • Nicholas P. Espenan
SUPPLEMENTAL DOCUMENTS
Supplemental Docs Pg.2
Planning and
Zoning
Commission
March 26, 2025 Overall Development Plan
(ODP)
SUPPLEMENTAL DOCUMENTS
Supplemental Docs Pg.3
•Heritage Christian Academy has purchased property west of the school to supportschool growth
•The intent is to expand and develop new school facilities which may include:
•Additional classrooms
•Athletic facilities (playground, gymnasium, track, soccer field)
•Additional parking and improved parent drop-off areas
•Initial steps require an Overall Development Plan since the expansion will likely bephased
•Additional city reviews will be required for any future design/development plans
Project Summary
SUPPLEMENTAL DOCUMENTS
Supplemental Docs Pg.4
Site Location
•North of International
Blvd between Munich Way
and Mexico Way
•Includes the existing
Heritage Christian
Academy at 2506 Zurich
Drive
SUPPLEMENTAL DOCUMENTS
Supplemental Docs Pg.5
Overall Development Plan
SUPPLEMENTAL DOCUMENTS
Supplemental Docs Pg.6
•The Overall Development Plan complies with Section 1.2.2(A) of the Land
Use Code and the City Plan Structure Plan, City Plan Principles and Policies,
and associated policies and goals of the East Mulberry Plan.
•The Overall Development Plan complies with applicable procedural and
administrative requirements of Article 6 of the Land Use Code.
•The Overall Development Plan complies with the applicable review standards
for Overall Development Plans of Section 6.5.2(I)(1) through (7).
Findings of Fact
SUPPLEMENTAL DOCUMENTS
Supplemental Docs Pg.7
•Consistent with the permitted uses and zone district standards for the Edistrict
•Consistent with the required densities
•Conforms to the Master Street Plan pursuant to Sections 5.4.5 and 5.4.7(A-F)
•Shall provide for the location of transportation connection to adjoiningproperties pursuant to Sections 5.4.7(F) and 5.9.1.(C)(6)
•Shall show the general locations of and buffer zones for all natural habitatsand features
•Shall be consistent with the Drainage Basin Master Plan
•Standards relating to housing density and mix of uses shall be applied overthe entire ODP
Compliance with Land Use Code (6.5.2.I)
SUPPLEMENTAL DOCUMENTS
Supplemental Docs Pg.8
Planning and
Zoning
Commission
March 26, 2025 Questions?
SUPPLEMENTAL DOCUMENTS
Supplemental Docs Pg.9
SUPPLEMENTAL DOCUMENTS
Supplemental Docs Pg.10
Conceptual Master Plan
•Early Concept Plan to
assist with fundraising
•Campus plans will
likely be phased
SUPPLEMENTAL DOCUMENTS
Supplemental Docs Pg.11
Ensuring that all growth and development which occurs is consistent with this
Code, City Plan and its adopted elements, including, but not limited to, the
Structure Plan, Principles and Policies and associated sub-area plans:
City Plan (updated 2019)
East Mulberry Plan (updated December 5, 2023)
Land Use Code Phase 1 Update (effective May 17, 2024), and
Potential Land Use Code Phase 2 Updates (in progress)
Compliance with Land Use Code (1.2.2.A)
SUPPLEMENTAL DOCUMENTS
Supplemental Docs Pg.12
Neighborhood Livability and Social Health
• PRINCIPLE LIV 1: Maintain a compact pattern of growth that is well served by public facilities
and encourages the efficient use of land. The Overall Development Plan aligns with and helps to
achieve applicable policies in this category.
• PRINCIPLE LIV 1: Maintain a compact pattern of growth that is well served by public facilities
and encourages the efficient use of land. The Overall Development Plan aligns with and helps to
achieve applicable policies in this category.
• POLICY LIV 1.2 - AMENDMENTS TO THE GROWTH MANAGEMENT AREA The proposed
ODP maintains the GMA as currently configured.
City Plan Principles and Policies achieved:
SUPPLEMENTAL DOCUMENTS
Supplemental Docs Pg.13
Neighborhood Livability and Social Health
• POLICY LIV 1.5 - CAPITAL IMPROVEMENT POLICIES The proposed ODP allows for the use of
standard City policies for public improvements to be implemented including developer
participation in infrastructure upgrades.
• POLICY LIV 1.6 - ADEQUATE PUBLIC FACILITIES The proposed ODP includes developed
properties already served by public utilities including water and sewer. Stormwater facilities exist
on the site and will be modified as needed with future site development to meet City
requirements. Public roads within the ODP area already exist, and future site development will
allow additional pedestrian and bicycle improvements to be made based on City requirements.
City Plan Principles and Policies achieved:
SUPPLEMENTAL DOCUMENTS
Supplemental Docs Pg.14
Environmental Health
• POLICY ENV 1.6 – WILDLIFE CORRIDORS The ODP identifies and protects the adjacent Lake
Canal corridor and implements a 50’ buffer for any future development or redevelopment.
Safe Community
• POLICY SC 3 – FLOODPLAIN DEVELOPMENT The ODP does not allow for development within
any mapped 100-year floodplain or hazard area.
City Plan Principles and Policies achieved:
SUPPLEMENTAL DOCUMENTS
Supplemental Docs Pg.15
Goal 1: COMMERCIAL & INDUSTRIAL HUB by fostering a healthy and prosperous
commercial and industrial hub for the City, while remaining viable for small
businesses and industry, and
1.T.1 by maintaining flexibility for future land uses that act as a buffer between
industrial and residential areas, thereby supporting the continued viability of
industrial and commercial areas.
East Mulberry Corridor Plan goals achieved:
SUPPLEMENTAL DOCUMENTS
Supplemental Docs Pg.16
SUPPLEMENTAL DOCUMENTS
Supplemental Docs Pg.17
SUPPLEMENTAL DOCUMENTS
Supplemental Docs Pg.18
SUPPLEMENTAL DOCUMENTS
Supplemental Docs Pg.19
SUPPLEMENTAL DOCUMENTS
Supplemental Docs Pg.20