HomeMy WebLinkAbout02/19/2025 - Historic Preservation Commission - SUPPLEMENTAL DOCUMENTS - Regular Meeting
SUPPLEMENTAL
DOCUMENTS
Historic Preservation
Commission
19 February 2025
300 E. MOUNTAIN AVENUE
HISTORICAL PRESERVATION COMMITTEE | MEETING 1 | 02.19.25 PACKET
1
SUPPLEMENTAL DOCUMENTS
ITEM 5, APPLICANT PRESENTATION
Supplemental Documents 1
SITE
SITE CONTEXT
300 E. MOUNTAIN AVENUE | 02.19.25
SITE
ELIZABETH
HOTEL
MOUNTAIN AVE.
OLD TOWN
SQUARE
CO
L
L
E
G
E
A
V
E
.
HISTORIC
ARMORY
MUSIC
VENUE
2
SUPPLEMENTAL DOCUMENTS
ITEM 5, APPLICANT PRESENTATION
Supplemental Documents 2
ZONING MAPS
3
300 E. MOUNTAIN AVENUE | 02.19.25
SUPPLEMENTAL DOCUMENTS
ITEM 5, APPLICANT PRESENTATION
Supplemental Documents 3
Project Summary
The proposed project is a new two story building that will
serve as interior enhancements to the Armory and a
secondary office tenant. The office tenant is undetermined at
this time. The construction will include a basement level. One
of the main drivers of the project is to provide an ADA green
room for performers and an expanded bar space to serve
patrons during concerts and events.
Building Size
Overall, the building is a very small footprint of 3,650 sf and
the entire project consists of 11,000 sf.
Existing Conditions
The existing site contained a one story building that
previously housed an independent movie theater. It was
deemed non-historic and it was demolished in the summer of
2024. The site currently contains no structures and is
covered in gravel.
Parking
Parking is provided with existing on-street parking and the
adjacent Firehouse Parking Garage.
PROJECT DESCRIPTION
Site Plan
The site is a very small lot at 3,650 sf. The building occupies
the entire lot from property line to property line. Insets are
created at the main entry and ticket window to create covered
areas for people during inclement weather. The sidewalk will
be updated along Chestnut and Mountain Avenue as we
anticipate damage to the sidewalk concrete during
construction. The Chestnut sidewalk will mirror characteristics
of the new adjacent alley by the DDA. The existing trees are
planned to remain and will be protected during construction.
Architecture
The proposed two story building has an architectural style and
of the adjacent Armory Building (1907). The building is clad in
full depth brick, High Pressure Laminate accent panel (HPL),
metal panel, and storefront glass. The gentle arch of the
cornice of the building is meant to create a transition of height
from the two story Armory to the adjacent 5 story buildings
that surround the proposed building.
300 E. MOUNTAIN AVENUE | 02.19.25
4
SUPPLEMENTAL DOCUMENTS
ITEM 5, APPLICANT PRESENTATION
Supplemental Documents 4
SITE PLAN
300 E. MOUNTAIN AVENUE | 02.19.25
5
SUPPLEMENTAL DOCUMENTS
ITEM 5, APPLICANT PRESENTATION
Supplemental Documents 5
300 E. MOUNTAIN HISTORY
300 E. MOUNTAIN AVENUE | 02.19.25
6
CIRCA 1950
AUTOMOTIVE GARAGE
CIRCA 1969
COMMERCIAL DRY CLEANERS
SUPPLEMENTAL DOCUMENTS
ITEM 5, APPLICANT PRESENTATION
Supplemental Documents 6
CORNER OF MOUNTAIN & CHESTNUT
MOUNTAIN AVENUE
CHESTNUT STREET ELEVATION
SITE CONTEXT
MOUNTAIN AVENUE
PRIOR TO DEMOLITION AFTER DEMOLITION
300 E. MOUNTAIN AVENUE | 02.19.25
7
SUPPLEMENTAL DOCUMENTS
ITEM 5, APPLICANT PRESENTATION
Supplemental Documents 7
ARMORY
MOUNTAIN AVENUE ELEVATION MOUNTAIN AVENUE ELEVATION
300 E. MOUNTAIN AVENUE | 02.19.25
8
SUPPLEMENTAL DOCUMENTS
ITEM 5, APPLICANT PRESENTATION
Supplemental Documents 8
ARMORY
CHESTNUT SIDE CHESTNUT ELEVATION
300 E. MOUNTAIN AVENUE | 02.19.25
9
SUPPLEMENTAL DOCUMENTS
ITEM 5, APPLICANT PRESENTATION
Supplemental Documents 9
ADJACENT BUILDING CHARACTER
HAHN PLUMBING
ELIZABETH HOTEL AND FIREHOUSE PARKING GARAGE
VIBRANT CHARACTER
FRONT ROW AND ELEVATIONS CREDIT UNION BUILDING
ORGANIC ALTERNATIVES BLACK TIMBER BUILDERS
300 E. MOUNTAIN AVENUE | 02.19.25
10
SUPPLEMENTAL DOCUMENTS
ITEM 5, APPLICANT PRESENTATION
Supplemental Documents 10
DDA ALLEY IMPROVEMENT
RUSTIC AESTHETIC
We have met with the DDA
about the Chestnut Alley
improvement project and are
actively coordinating the two
projects. Some of the
materials are being
coordinated to create a
cohesive aesthetic.
300 E. MOUNTAIN AVENUE | 02.19.25
11
SUPPLEMENTAL DOCUMENTS
ITEM 5, APPLICANT PRESENTATION
Supplemental Documents 11
EXTERIOR PERSPECTIVE
MOUNTAIN AVENUE
300 E. MOUNTAIN AVENUE | 02.19.25
12
SUPPLEMENTAL DOCUMENTS
ITEM 5, APPLICANT PRESENTATION
Supplemental Documents 12
EXTERIOR PERSPECTIVE
CHESTNUT STREET
300 E. MOUNTAIN AVENUE | 02.19.25
13
SUPPLEMENTAL DOCUMENTS
ITEM 5, APPLICANT PRESENTATION
Supplemental Documents 13
EXTERIOR PERSPECTIVE
AERIAL
300 E. MOUNTAIN AVENUE | 02.19.25
14
SUPPLEMENTAL DOCUMENTS
ITEM 5, APPLICANT PRESENTATION
Supplemental Documents 14
EXTERIOR ELEVATIONS
MOUNTAIN AVENUE ELEVATION
CHESTNUT STREET ELEVATION
-
-
-
300 E. MOUNTAIN AVENUE | 02.19.25
15
SUPPLEMENTAL DOCUMENTS
ITEM 5, APPLICANT PRESENTATION
Supplemental Documents 15
AERIAL VIEW
BUILDING SCALE
300 E. MOUNTAIN AVENUE | 02.19.25
16
SUPPLEMENTAL DOCUMENTS
ITEM 5, APPLICANT PRESENTATION
Supplemental Documents 16
COMPARISON ELEVATIONS
BUILDING SCALE
300 E. MOUNTAIN AVENUE | 02.19.25
17
MOUNTAIN AVE.
ELIZABETH HOTEL
SUPPLEMENTAL DOCUMENTS
ITEM 5, APPLICANT PRESENTATION
Supplemental Documents 17
COMPARISON ELEVATIONS
BUILDING SCALE
300 E. MOUNTAIN AVENUE | 02.19.25
18
ELIZABETH HOTEL
SUPPLEMENTAL DOCUMENTS
ITEM 5, APPLICANT PRESENTATION
Supplemental Documents 18
FLOOR PLANS
MOUNTAIN AVENUEFIRST FLOOR PLAN BASEMENT FLOOR PLAN
ARMORY ARMORY
300
MOUNTAIN
300 E. MOUNTAIN AVENUE | 02.19.25
19
300
MOUNTAIN
SUPPLEMENTAL DOCUMENTS
ITEM 5, APPLICANT PRESENTATION
Supplemental Documents 19
FLOOR PLANS
SECOND FLOOR PLAN
ARMORY
300
MOUNTAIN
300 E. MOUNTAIN AVENUE | 02.19.25
20
SUPPLEMENTAL DOCUMENTS
ITEM 5, APPLICANT PRESENTATION
Supplemental Documents 20
PROPOSED BUILDING MATERIALS
BROWN GREY BRICK MATERIALS AT ARMORY BUILDING
METAL PANEL SIDING HIGH PRESSURE LAMINATE (HPL)
RAINSCREEN PANEL
EXTERIOR DOWN LIGHT ARMORY BRICK
BLACK STOREFRONT FRAMES
300 E. MOUNTAIN AVENUE | 02.19.25
21
SUPPLEMENTAL DOCUMENTS
ITEM 5, APPLICANT PRESENTATION
Supplemental Documents 21
DESIGN TEAM APPROACH
LAND USE CODE 5.8.1 (FORMER 3.4.7)
MASSING AND BUILDING ARTICULATION
-
1. New construction shall be similar in width or, if larger, be
articulated into massing reflective or the mass and scale of historic
resources on the development site, abutting, or across a side alley.
2. Stepbacks must be located on new buildings to create gradual
massing transitions at the same height or one story above the height
of historic resources on the development site, abutting or across a
side alley.
Response to #1. The proposed massing of the building is to
compliment and acknowledge the two story Armory Building.
The building is zoned for four stories and the team strategically
selected two stories to be mindful of the existing Armory
Building.
Response to #2. No stepbacks are provided since the proposed
building is the same height as the historic resource.
300 E. MOUNTAIN AVENUE | 02.19.25
22
SUPPLEMENTAL DOCUMENTS
ITEM 5, APPLICANT PRESENTATION
Supplemental Documents 22
Response to #3. Since the building is only 2 stories, no
stepbacks are proposed on the facades of the building. The roof
screen is off set from the edge of the building to minimize the
view from the street.
Response to #4. Nominal size grey/brown brick is used
throughout the elevations of the proposed building. The scale
of the proposed brick matches the scale of the brick on the
Armory. Brick details of soldier courses, headers and vertical
running stack bond will be used as details on the brickwork.
Type = 3D Texture =
Scale = Pattern =
Color = No
ENDICOTT BRICK MAGNESIUM VELOUR ARMORY BRICK
LAND USE CODE 5.8.1 (FORMER 3.4.7)
3. The lower story facades until any step-backs (required or
otherwise) must be constructed of authentic, durable, high-quality
materials (brick, stone, glass, terra cotta, stucco (non EFIS), precast
concrete, wood, cast iron, architectural metal) installed to industry
standards.
4. New construction shall reference one or more of the predominate
material(s) on historic resources on the development site, abutting, or
across a side alley, by using at least two of the following to select the
primary material(s) for any one to three story building or the lower
story facades until any step-backs. Type, scale, color, 3D texture,
pattern.
DESIGN TEAM APPROACHBUILDING MATERIALS
MATERIAL PALETTE WITH ARMORY BRICK
300 E. MOUNTAIN AVENUE | 02.19.25
23
SUPPLEMENTAL DOCUMENTS
ITEM 5, APPLICANT PRESENTATION
Supplemental Documents 23
Response to #5. We utilized the window proportion and spacing
for a portion of the proposed building. This solid and void
pattern was used on the portion of the building next to the
--
LAND USE CODE 5.8.1 (FORMER 3.4.7)
5. Use at least one of the following: 1) Similar window pattern 2)
Similar window proportion of height to width 3)Similar solid-to-void
pattern as found on historic resources on the development site,
abutting, or across a side alley.
DESIGN TEAM APPROACHFAÇADE DETAILS
-
300 E. MOUNTAIN AVENUE | 02.19.25
24
SUPPLEMENTAL DOCUMENTS
ITEM 5, APPLICANT PRESENTATION
Supplemental Documents 24
Response to #6. The benefit of the finish floors aligning within
the building, is that windows and massing lines can align is
strategic locations. The cornice of the proposed building sits
slightly lower to give the Armory prominence on the elevation.
Window heads and sills align to create a cohesive solid and void
pattern along the façade.
LAND USE CODE 5.8.1 (FORMER 3.4.7)
6. Use select horizontal or vertical reference lines or elements (such
as rooflines, cornices, and belt courses) to relate the new construction
to historic resources on the development site, abutting or across a
side alley.
DESIGN TEAM APPROACHFAÇADE DETAILS
300 E. MOUNTAIN AVENUE | 02.19.25
25
SUPPLEMENTAL DOCUMENTS
ITEM 5, APPLICANT PRESENTATION
Supplemental Documents 25
Response to #7. The primary façade facing Mountain Avenue
will remain in full view and will not be covered up by the
proposed building.
The west elevation will be covered by a two story new building,
but that side of the Armory has no contributing historical
client has hired a mason to fix holes in the existing brick wall.
Matching brick was selected to replace areas that were
damaged or in need of repair.
LAND USE CODE 5.8.1 (FORMER 3.4.7)
300 E. MOUNTAIN AVENUE | 02.19.25
7. New construction shall not cover or obscure character-defining
architectural elements, such as windows or primary design features, of
historic resources on the development site, abutting or across a side alley
DESIGN TEAM APPROACHVISIBILITY OF HISTORIC FEATURES
PREVIOUS ONE STORY BUILDING ON SITE
PROPOSED TWO STORY BUILDINGCURRENT CONDITION OF SITE
26
SUPPLEMENTAL DOCUMENTS
ITEM 5, APPLICANT PRESENTATION
Supplemental Documents 26
PANELIZED MATERIALS IN THE ZONE DISTRICT
300 E. MOUNTAIN AVENUE | 02.19.25
27
METAL PANEL ELIZABETH HOTEL METAL PANEL ELIZABETH HOTEL
ADJACENT BUILDING CHARACTER
SUPPLEMENTAL DOCUMENTS
ITEM 5, APPLICANT PRESENTATION
Supplemental Documents 27
PANELIZED MATERIALS IN THE ZONE DISTRICT
300 E. MOUNTAIN AVENUE | 02.19.25
28
METAL PANEL ELIZABETH HOTEL
ADJACENT BUILDING CHARACTER
SUPPLEMENTAL DOCUMENTS
ITEM 5, APPLICANT PRESENTATION
Supplemental Documents 28
PANELIZED MATERIALS IN THE ZONE DISTRICT
300 E. MOUNTAIN AVENUE | 02.19.25
29
METAL PANEL 221 MOUNTAIN AVE. ELEVATIONS CREDIT BUILDING
ADJACENT BUILDING CHARACTER
SUPPLEMENTAL DOCUMENTS
ITEM 5, APPLICANT PRESENTATION
Supplemental Documents 29
PANELIZED MATERIALS IN THE ZONE DISTRICT
300 E. MOUNTAIN AVENUE | 02.19.25
30
CEMENTITIOUS PANEL POUDRE GARAGE EXPOSED FASTENERS
ADJACENT BUILDING CHARACTER
SUPPLEMENTAL DOCUMENTS
ITEM 5, APPLICANT PRESENTATION
Supplemental Documents 30
ACCENT MATERIALS IN THE ZONE DISTRICT
300 E. MOUNTAIN AVENUE | 02.19.25
31
OAK 140 - METAL PANEL OAK 140 - METAL PANEL
ADJACENT BUILDING CHARACTER
SUPPLEMENTAL DOCUMENTS
ITEM 5, APPLICANT PRESENTATION
Supplemental Documents 31
LAND USE CODE 5.8.1 (FORMER 3.4.7)
MATERIAL PERCENTAGES
300 E. MOUNTAIN AVENUE | 02.19.25
32
BRICK: 752 SF = 35%
GLASS: 617 SF = 28%
HPL PANEL: 515 SF = 23%
METAL PANEL: 305 SF = 14%
MOUNTAIN AVE. ELEVATION
SUPPLEMENTAL DOCUMENTS
ITEM 5, APPLICANT PRESENTATION
Supplemental Documents 32
LAND USE CODE 5.8.1 (FORMER 3.4.7)
HPL & SUSTAINABILITY
300 E. MOUNTAIN AVENUE | 02.19.25
33
WOOD BASED PRODUCT SEQUESTER CO2
PANELS ARE MADE WITH 70% WOOD FIBERS WHICH CAPTURE AND
STORE CARBON CONTRIBUTING TO C02 REDUCTION. WOOD IS
SUSTAINABLE AND NATURAL AND RENEWABLE RESOURCE.
100% RENEWABLE ELECTRICITY
SINCE 2020, ALL OF THE MANUFACTURING HAS BEEN POWERED BY
RENEWABLE ENERGY, REDUCING OPERATIONAL CARBON FOOTPRINT.
JOURNEY TO DO MORE AND BETTER
TRESPA IS ON A MISSION TO ACHIEVE NET ZERO EMISSIONS.
TRESPA SECOND LIFE PROGRAM
REUSE PROGRAM IS COMMITTED TO A CIRCULAR ECONOMY. PANELS
CAN BE REUSED INTO NEW PANELS WHICH REDUCES CO2 EMISSIONS
BY 25%.
SUPPLEMENTAL DOCUMENTS
ITEM 5, APPLICANT PRESENTATION
Supplemental Documents 33
LAND USE CODE 5.8.1 (FORMER 3.4.7)
HIGH PRESSURE LAMINATE -TRESPA
300 E. MOUNTAIN AVENUE | 02.19.25
34
TRESPA ON THE LINCOLN CENTERTRESPA ON WINDSOR FIRE
SUPPLEMENTAL DOCUMENTS
ITEM 5, APPLICANT PRESENTATION
Supplemental Documents 34
LAND USE CODE 5.8.1 (FORMER 3.4.7)
HPL CASE STUDIES
300 E. MOUNTAIN AVENUE | 02.19.25
35
CENTER FOR CIVIL & HUMAN RIGHTS
ATLANTA, GEORGIA
COMPLETED: 2014
ARCHITECT: HOK
FOREST PARK MEDICAL CENTER
FORT WORTH, TEXAS
COMPLETED: 2014
ARCHITECT: PERKINS + WILL
SUPPLEMENTAL DOCUMENTS
ITEM 5, APPLICANT PRESENTATION
Supplemental Documents 35
THANK YOU.
300 E. MOUNTAIN AVENUE | 02.19.25
36
SUPPLEMENTAL DOCUMENTS
ITEM 5, APPLICANT PRESENTATION
Supplemental Documents 36