Loading...
HomeMy WebLinkAbout02/19/2025 - Historic Preservation Commission - SUPPLEMENTAL DOCUMENTS - Regular Meeting SUPPLEMENTAL DOCUMENTS Historic Preservation Commission 19 February 2025 300 E. MOUNTAIN AVENUE HISTORICAL PRESERVATION COMMITTEE | MEETING 1 | 02.19.25 PACKET 1 SUPPLEMENTAL DOCUMENTS ITEM 5, APPLICANT PRESENTATION Supplemental Documents 1 SITE SITE CONTEXT 300 E. MOUNTAIN AVENUE | 02.19.25 SITE ELIZABETH HOTEL MOUNTAIN AVE. OLD TOWN SQUARE CO L L E G E A V E . HISTORIC ARMORY MUSIC VENUE 2 SUPPLEMENTAL DOCUMENTS ITEM 5, APPLICANT PRESENTATION Supplemental Documents 2 ZONING MAPS 3 300 E. MOUNTAIN AVENUE | 02.19.25 SUPPLEMENTAL DOCUMENTS ITEM 5, APPLICANT PRESENTATION Supplemental Documents 3 Project Summary The proposed project is a new two story building that will serve as interior enhancements to the Armory and a secondary office tenant. The office tenant is undetermined at this time. The construction will include a basement level. One of the main drivers of the project is to provide an ADA green room for performers and an expanded bar space to serve patrons during concerts and events. Building Size Overall, the building is a very small footprint of 3,650 sf and the entire project consists of 11,000 sf. Existing Conditions The existing site contained a one story building that previously housed an independent movie theater. It was deemed non-historic and it was demolished in the summer of 2024. The site currently contains no structures and is covered in gravel. Parking Parking is provided with existing on-street parking and the adjacent Firehouse Parking Garage. PROJECT DESCRIPTION Site Plan The site is a very small lot at 3,650 sf. The building occupies the entire lot from property line to property line. Insets are created at the main entry and ticket window to create covered areas for people during inclement weather. The sidewalk will be updated along Chestnut and Mountain Avenue as we anticipate damage to the sidewalk concrete during construction. The Chestnut sidewalk will mirror characteristics of the new adjacent alley by the DDA. The existing trees are planned to remain and will be protected during construction. Architecture The proposed two story building has an architectural style and of the adjacent Armory Building (1907). The building is clad in full depth brick, High Pressure Laminate accent panel (HPL), metal panel, and storefront glass. The gentle arch of the cornice of the building is meant to create a transition of height from the two story Armory to the adjacent 5 story buildings that surround the proposed building. 300 E. MOUNTAIN AVENUE | 02.19.25 4 SUPPLEMENTAL DOCUMENTS ITEM 5, APPLICANT PRESENTATION Supplemental Documents 4 SITE PLAN 300 E. MOUNTAIN AVENUE | 02.19.25 5 SUPPLEMENTAL DOCUMENTS ITEM 5, APPLICANT PRESENTATION Supplemental Documents 5 300 E. MOUNTAIN HISTORY 300 E. MOUNTAIN AVENUE | 02.19.25 6 CIRCA 1950 AUTOMOTIVE GARAGE CIRCA 1969 COMMERCIAL DRY CLEANERS SUPPLEMENTAL DOCUMENTS ITEM 5, APPLICANT PRESENTATION Supplemental Documents 6 CORNER OF MOUNTAIN & CHESTNUT MOUNTAIN AVENUE CHESTNUT STREET ELEVATION SITE CONTEXT MOUNTAIN AVENUE PRIOR TO DEMOLITION AFTER DEMOLITION 300 E. MOUNTAIN AVENUE | 02.19.25 7 SUPPLEMENTAL DOCUMENTS ITEM 5, APPLICANT PRESENTATION Supplemental Documents 7 ARMORY MOUNTAIN AVENUE ELEVATION MOUNTAIN AVENUE ELEVATION 300 E. MOUNTAIN AVENUE | 02.19.25 8 SUPPLEMENTAL DOCUMENTS ITEM 5, APPLICANT PRESENTATION Supplemental Documents 8 ARMORY CHESTNUT SIDE CHESTNUT ELEVATION 300 E. MOUNTAIN AVENUE | 02.19.25 9 SUPPLEMENTAL DOCUMENTS ITEM 5, APPLICANT PRESENTATION Supplemental Documents 9 ADJACENT BUILDING CHARACTER HAHN PLUMBING ELIZABETH HOTEL AND FIREHOUSE PARKING GARAGE VIBRANT CHARACTER FRONT ROW AND ELEVATIONS CREDIT UNION BUILDING ORGANIC ALTERNATIVES BLACK TIMBER BUILDERS 300 E. MOUNTAIN AVENUE | 02.19.25 10 SUPPLEMENTAL DOCUMENTS ITEM 5, APPLICANT PRESENTATION Supplemental Documents 10 DDA ALLEY IMPROVEMENT RUSTIC AESTHETIC We have met with the DDA about the Chestnut Alley improvement project and are actively coordinating the two projects. Some of the materials are being coordinated to create a cohesive aesthetic. 300 E. MOUNTAIN AVENUE | 02.19.25 11 SUPPLEMENTAL DOCUMENTS ITEM 5, APPLICANT PRESENTATION Supplemental Documents 11 EXTERIOR PERSPECTIVE MOUNTAIN AVENUE 300 E. MOUNTAIN AVENUE | 02.19.25 12 SUPPLEMENTAL DOCUMENTS ITEM 5, APPLICANT PRESENTATION Supplemental Documents 12 EXTERIOR PERSPECTIVE CHESTNUT STREET 300 E. MOUNTAIN AVENUE | 02.19.25 13 SUPPLEMENTAL DOCUMENTS ITEM 5, APPLICANT PRESENTATION Supplemental Documents 13 EXTERIOR PERSPECTIVE AERIAL 300 E. MOUNTAIN AVENUE | 02.19.25 14 SUPPLEMENTAL DOCUMENTS ITEM 5, APPLICANT PRESENTATION Supplemental Documents 14 EXTERIOR ELEVATIONS MOUNTAIN AVENUE ELEVATION CHESTNUT STREET ELEVATION - - - 300 E. MOUNTAIN AVENUE | 02.19.25 15 SUPPLEMENTAL DOCUMENTS ITEM 5, APPLICANT PRESENTATION Supplemental Documents 15 AERIAL VIEW BUILDING SCALE 300 E. MOUNTAIN AVENUE | 02.19.25 16 SUPPLEMENTAL DOCUMENTS ITEM 5, APPLICANT PRESENTATION Supplemental Documents 16 COMPARISON ELEVATIONS BUILDING SCALE 300 E. MOUNTAIN AVENUE | 02.19.25 17 MOUNTAIN AVE. ELIZABETH HOTEL SUPPLEMENTAL DOCUMENTS ITEM 5, APPLICANT PRESENTATION Supplemental Documents 17 COMPARISON ELEVATIONS BUILDING SCALE 300 E. MOUNTAIN AVENUE | 02.19.25 18 ELIZABETH HOTEL SUPPLEMENTAL DOCUMENTS ITEM 5, APPLICANT PRESENTATION Supplemental Documents 18 FLOOR PLANS MOUNTAIN AVENUEFIRST FLOOR PLAN BASEMENT FLOOR PLAN ARMORY ARMORY 300 MOUNTAIN 300 E. MOUNTAIN AVENUE | 02.19.25 19 300 MOUNTAIN SUPPLEMENTAL DOCUMENTS ITEM 5, APPLICANT PRESENTATION Supplemental Documents 19 FLOOR PLANS SECOND FLOOR PLAN ARMORY 300 MOUNTAIN 300 E. MOUNTAIN AVENUE | 02.19.25 20 SUPPLEMENTAL DOCUMENTS ITEM 5, APPLICANT PRESENTATION Supplemental Documents 20 PROPOSED BUILDING MATERIALS BROWN GREY BRICK MATERIALS AT ARMORY BUILDING METAL PANEL SIDING HIGH PRESSURE LAMINATE (HPL) RAINSCREEN PANEL EXTERIOR DOWN LIGHT ARMORY BRICK BLACK STOREFRONT FRAMES 300 E. MOUNTAIN AVENUE | 02.19.25 21 SUPPLEMENTAL DOCUMENTS ITEM 5, APPLICANT PRESENTATION Supplemental Documents 21 DESIGN TEAM APPROACH LAND USE CODE 5.8.1 (FORMER 3.4.7) MASSING AND BUILDING ARTICULATION - 1. New construction shall be similar in width or, if larger, be articulated into massing reflective or the mass and scale of historic resources on the development site, abutting, or across a side alley. 2. Stepbacks must be located on new buildings to create gradual massing transitions at the same height or one story above the height of historic resources on the development site, abutting or across a side alley. Response to #1. The proposed massing of the building is to compliment and acknowledge the two story Armory Building. The building is zoned for four stories and the team strategically selected two stories to be mindful of the existing Armory Building. Response to #2. No stepbacks are provided since the proposed building is the same height as the historic resource. 300 E. MOUNTAIN AVENUE | 02.19.25 22 SUPPLEMENTAL DOCUMENTS ITEM 5, APPLICANT PRESENTATION Supplemental Documents 22 Response to #3. Since the building is only 2 stories, no stepbacks are proposed on the facades of the building. The roof screen is off set from the edge of the building to minimize the view from the street. Response to #4. Nominal size grey/brown brick is used throughout the elevations of the proposed building. The scale of the proposed brick matches the scale of the brick on the Armory. Brick details of soldier courses, headers and vertical running stack bond will be used as details on the brickwork. Type = 3D Texture = Scale = Pattern = Color = No ENDICOTT BRICK MAGNESIUM VELOUR ARMORY BRICK LAND USE CODE 5.8.1 (FORMER 3.4.7) 3. The lower story facades until any step-backs (required or otherwise) must be constructed of authentic, durable, high-quality materials (brick, stone, glass, terra cotta, stucco (non EFIS), precast concrete, wood, cast iron, architectural metal) installed to industry standards. 4. New construction shall reference one or more of the predominate material(s) on historic resources on the development site, abutting, or across a side alley, by using at least two of the following to select the primary material(s) for any one to three story building or the lower story facades until any step-backs. Type, scale, color, 3D texture, pattern. DESIGN TEAM APPROACHBUILDING MATERIALS MATERIAL PALETTE WITH ARMORY BRICK 300 E. MOUNTAIN AVENUE | 02.19.25 23 SUPPLEMENTAL DOCUMENTS ITEM 5, APPLICANT PRESENTATION Supplemental Documents 23 Response to #5. We utilized the window proportion and spacing for a portion of the proposed building. This solid and void pattern was used on the portion of the building next to the -- LAND USE CODE 5.8.1 (FORMER 3.4.7) 5. Use at least one of the following: 1) Similar window pattern 2) Similar window proportion of height to width 3)Similar solid-to-void pattern as found on historic resources on the development site, abutting, or across a side alley. DESIGN TEAM APPROACHFAÇADE DETAILS - 300 E. MOUNTAIN AVENUE | 02.19.25 24 SUPPLEMENTAL DOCUMENTS ITEM 5, APPLICANT PRESENTATION Supplemental Documents 24 Response to #6. The benefit of the finish floors aligning within the building, is that windows and massing lines can align is strategic locations. The cornice of the proposed building sits slightly lower to give the Armory prominence on the elevation. Window heads and sills align to create a cohesive solid and void pattern along the façade. LAND USE CODE 5.8.1 (FORMER 3.4.7) 6. Use select horizontal or vertical reference lines or elements (such as rooflines, cornices, and belt courses) to relate the new construction to historic resources on the development site, abutting or across a side alley. DESIGN TEAM APPROACHFAÇADE DETAILS 300 E. MOUNTAIN AVENUE | 02.19.25 25 SUPPLEMENTAL DOCUMENTS ITEM 5, APPLICANT PRESENTATION Supplemental Documents 25 Response to #7. The primary façade facing Mountain Avenue will remain in full view and will not be covered up by the proposed building. The west elevation will be covered by a two story new building, but that side of the Armory has no contributing historical client has hired a mason to fix holes in the existing brick wall. Matching brick was selected to replace areas that were damaged or in need of repair. LAND USE CODE 5.8.1 (FORMER 3.4.7) 300 E. MOUNTAIN AVENUE | 02.19.25 7. New construction shall not cover or obscure character-defining architectural elements, such as windows or primary design features, of historic resources on the development site, abutting or across a side alley DESIGN TEAM APPROACHVISIBILITY OF HISTORIC FEATURES PREVIOUS ONE STORY BUILDING ON SITE PROPOSED TWO STORY BUILDINGCURRENT CONDITION OF SITE 26 SUPPLEMENTAL DOCUMENTS ITEM 5, APPLICANT PRESENTATION Supplemental Documents 26 PANELIZED MATERIALS IN THE ZONE DISTRICT 300 E. MOUNTAIN AVENUE | 02.19.25 27 METAL PANEL ELIZABETH HOTEL METAL PANEL ELIZABETH HOTEL ADJACENT BUILDING CHARACTER SUPPLEMENTAL DOCUMENTS ITEM 5, APPLICANT PRESENTATION Supplemental Documents 27 PANELIZED MATERIALS IN THE ZONE DISTRICT 300 E. MOUNTAIN AVENUE | 02.19.25 28 METAL PANEL ELIZABETH HOTEL ADJACENT BUILDING CHARACTER SUPPLEMENTAL DOCUMENTS ITEM 5, APPLICANT PRESENTATION Supplemental Documents 28 PANELIZED MATERIALS IN THE ZONE DISTRICT 300 E. MOUNTAIN AVENUE | 02.19.25 29 METAL PANEL 221 MOUNTAIN AVE. ELEVATIONS CREDIT BUILDING ADJACENT BUILDING CHARACTER SUPPLEMENTAL DOCUMENTS ITEM 5, APPLICANT PRESENTATION Supplemental Documents 29 PANELIZED MATERIALS IN THE ZONE DISTRICT 300 E. MOUNTAIN AVENUE | 02.19.25 30 CEMENTITIOUS PANEL POUDRE GARAGE EXPOSED FASTENERS ADJACENT BUILDING CHARACTER SUPPLEMENTAL DOCUMENTS ITEM 5, APPLICANT PRESENTATION Supplemental Documents 30 ACCENT MATERIALS IN THE ZONE DISTRICT 300 E. MOUNTAIN AVENUE | 02.19.25 31 OAK 140 - METAL PANEL OAK 140 - METAL PANEL ADJACENT BUILDING CHARACTER SUPPLEMENTAL DOCUMENTS ITEM 5, APPLICANT PRESENTATION Supplemental Documents 31 LAND USE CODE 5.8.1 (FORMER 3.4.7) MATERIAL PERCENTAGES 300 E. MOUNTAIN AVENUE | 02.19.25 32 BRICK: 752 SF = 35% GLASS: 617 SF = 28% HPL PANEL: 515 SF = 23% METAL PANEL: 305 SF = 14% MOUNTAIN AVE. ELEVATION SUPPLEMENTAL DOCUMENTS ITEM 5, APPLICANT PRESENTATION Supplemental Documents 32 LAND USE CODE 5.8.1 (FORMER 3.4.7) HPL & SUSTAINABILITY 300 E. MOUNTAIN AVENUE | 02.19.25 33 WOOD BASED PRODUCT SEQUESTER CO2 PANELS ARE MADE WITH 70% WOOD FIBERS WHICH CAPTURE AND STORE CARBON CONTRIBUTING TO C02 REDUCTION. WOOD IS SUSTAINABLE AND NATURAL AND RENEWABLE RESOURCE. 100% RENEWABLE ELECTRICITY SINCE 2020, ALL OF THE MANUFACTURING HAS BEEN POWERED BY RENEWABLE ENERGY, REDUCING OPERATIONAL CARBON FOOTPRINT. JOURNEY TO DO MORE AND BETTER TRESPA IS ON A MISSION TO ACHIEVE NET ZERO EMISSIONS. TRESPA SECOND LIFE PROGRAM REUSE PROGRAM IS COMMITTED TO A CIRCULAR ECONOMY. PANELS CAN BE REUSED INTO NEW PANELS WHICH REDUCES CO2 EMISSIONS BY 25%. SUPPLEMENTAL DOCUMENTS ITEM 5, APPLICANT PRESENTATION Supplemental Documents 33 LAND USE CODE 5.8.1 (FORMER 3.4.7) HIGH PRESSURE LAMINATE -TRESPA 300 E. MOUNTAIN AVENUE | 02.19.25 34 TRESPA ON THE LINCOLN CENTERTRESPA ON WINDSOR FIRE SUPPLEMENTAL DOCUMENTS ITEM 5, APPLICANT PRESENTATION Supplemental Documents 34 LAND USE CODE 5.8.1 (FORMER 3.4.7) HPL CASE STUDIES 300 E. MOUNTAIN AVENUE | 02.19.25 35 CENTER FOR CIVIL & HUMAN RIGHTS ATLANTA, GEORGIA COMPLETED: 2014 ARCHITECT: HOK FOREST PARK MEDICAL CENTER FORT WORTH, TEXAS COMPLETED: 2014 ARCHITECT: PERKINS + WILL SUPPLEMENTAL DOCUMENTS ITEM 5, APPLICANT PRESENTATION Supplemental Documents 35 THANK YOU. 300 E. MOUNTAIN AVENUE | 02.19.25 36 SUPPLEMENTAL DOCUMENTS ITEM 5, APPLICANT PRESENTATION Supplemental Documents 36