HomeMy WebLinkAbout02/11/2022 - Planning and Zoning Commission - AGENDA - Work Session
* Work session times are approximate and are subject to change without notice.
Michelle Haefele, Chair Virtual Meeting
Ted Shepard, Vice Chair Zoom Webinar
Per Hogestad
David Katz
Adam Sass
Jeff Schneider
Julie Stackhouse
Planning and Zoning Hearing will be held on Thursday, February 17, 2022 in City Hall Chambers or online.
Regular Work Session
February 11, 2022
Virtual Meeting
Noon – 4:15 p.m.
Planning and Zoning Commission
Work Session Agenda
Participation for this remote Planning and Zoning Commission work session will be available online or by phone.
Commission members and staff may be present in-person but interested members of the public and applicant
teams are strongly encouraged to participate via Zoom. No public comment is accepted during work sessions.
Public Attendance (Online): Individuals who wish to attend the Planning and Zoning work session via remote
public participation can do so through Zoom at https://fcgov.zoom.us/j/96379887929. Individuals participating in
the Zoom session should also watch the meeting through that site.
The meeting will be available to join beginning at 11:45 a.m. on February 11, 2022. Attendees should try to sign in
prior to 12:00 p.m. if possible.
In order to attend:
Use a laptop, computer, or internet-enabled smartphone. (Using earphones with a microphone will greatly
improve your audio).
You need to have access to the internet.
Keep yourself on muted status.
If you have any technical difficulties during the work session, please email kclaypool@fcgov.com.
Public Attendance (Phone): If you do not have access to the internet, you can call into the work session via phone.
Please dial: 1-253-215-8782 or 1-346-248-7799, with Webinar ID: 963 7988 7929.
(Continued on next page)
Packet pg. 1
City of Fort Collins Page 2
TOPICS: PROJECTED TIMES:
Consent:
1. December 16, 2021 Hearing Draft Minutes
12:00 – 12:05
Discussion:
2. Ziegler-Corbett Overall Development Plan (Mounce)
12:05 – 12:35
Policy and Legislation:
• Additions and Substantial Improvements in FEMA Floodplains
(Hilmes-Robinson)
• Land Use Code Phase 1 (Overton/Beals)
• N College MAX Plan (Lorson)
• 1041 Regulations (Smith)
• Oil & Gas Update (Smith)
12:35 – 3:30
Commission Topics:
• Discuss Election of Officers (Sizemore)
• 2021 Annual Report (Sizemore)
• Upcoming Hearing Calendar (Sizemore)
• Commission Updates (Sizemore)
• Public Engagement Updates (Stephens)
• Transportation Board Liaison Update (Gavaldon)
3:30 – 4:15
The meeting will be available beginning at 11:45 a.m. Please call in to the meeting prior to 12:00 p.m., if possible.
Once you join the meeting: keep yourself on muted status. If you have any technical difficulties during the
meeting, please email kclaypool@fcgov.com.
The February 17 Planning and Zoning Commission regular meeting will be available online, remotely and in-
person. Information on participating in the February 17 Planning and Zoning regular meeting is contained in the
agenda for the February 17 meeting available at https://www.fcgov.com/cityclerk/planning-zoning.php. Members
of the public wishing to submit documents, visual presentations, or written comments for the Commission to
consider regarding any item on the agenda must be emailed to kclaypool@fcgov.com at least 24 hours prior to
the February 17 meeting.
Packet pg. 2
Planning and Zoning Agenda Item
Page 1
STAFF
Marsha Hilmes-Robinson, Floodplain Administrator
Ken Sampley, Director, Stormwater Water Wastewater Engineering
SUBJECT
ADDITIONS AND SUBSTANTIAL IMPROVEMENT CODE CHANGE FOR FEMA FLOODPLAINS
EXECUTIVE SUMMARY
Fort Collins Utilities is conducting outreach related to a proposed regulatory change to Chapter 10 of
City Code to come into compliance with minimum regulations from the Federal Emergency
Management Agency (FEMA) regarding additions and substantial improvements in FEMA floodplains.
BACKGROUND
The Federal Emergency Management Agency (FEMA) has determined that a current provision of
our Floodplain Management Ordinance does not meet the minimum requirements of the National
Flood Insurance Program. Therefore, the City needs to bring Chapter 10 of City Code into
Compliance.
The proposed change involves how additions are included in the calculation of Substantial
Improvement. Under the new provision, the applicant will have two choices:
1. Design and certify the addition as “structurally independent” and elevate the addition.
The cost of the addition will not be included in the calculation of substantial
improvement.
2. Include the addition in the calculation of substantial improvement. The addition will be
required to be elevated.
- If the value of improvements, including the cost of the addition, is more than
50% of the value of the structure, then the existing structure will be considered
substantially improved and will need to be elevated.
Definition - Structurally Independent Addition - shall mean an addition that involves no alteration of
the load-bearing structure of the existing building, is attached to the building with minimal
connection, and has a doorway as the only modification to the common wall. A nonstructural
addition shall not transfer loads exerted on the addition to the existing building and thus shall not
share a foundation or other building elements that would create a load path between the addition
and the existing building. Shared heating, ventilation, and air conditioning (HVAC), electrical, and
plumbing between the addition and existing structure does not result in a structural connection.
This proposed regulation change does not apply to City-designated floodplains, such as Old Town.
Packet pg. 3
Planning and Zoning Agenda Item
Page 2
ATTACHMENTS
1. Fort Collins Utilities presentation
2. Draft Code Language
3. Floodplain Quick Guide for all Floodplains Other than the Poudre River
4. Floodplain Quick Guide for the Poudre River
5. Annual Mailer to Floodplain Residents and Owners (PDF version)
Packet pg. 4
Additions and Substantial Improvement Code Change for FEMA Floodplains2022Marsha Hilmes-Robinson, Floodplain Administrator, CFMADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 1Packet pg. 5
Protect peopleMinimize property damageEnsure development doesn’t exacerbate existing problemsFloodplain Management GoalsHigh Water Mark sign at Creekside Park along Spring Creek.ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 1Packet pg. 6
City and FEMA Floodplains100-year Floodplain – 1% chance of being equaled or exceeded in any given yeardark blue and light blue500-year Floodplain – 0.2% chance of being equaled or exceeded in any given yearlight greenFlood Risk Mappingfcgov.com/floodplain-mapsADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 1Packet pg. 7
Floodplains in Fort Collins4City Floodplains FEMA Floodplains Poudre FloodplainOld Town Spring Creek Poudre RiverFossil Creek Boxelder CreekCanal Importation Cooper SloughMcClellands Creek Dry CreekMail CreekFoothills ChannelWest VineFFFFEMA FloodplainsPoudre FloodplainADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 1Packet pg. 8
5Substantial Improvement?Cost of ImprovementMarket Value of StructureSubstantially Improved Example:$200,000$350,000If substantial improvement occurs, then the existing structure must be brought into compliance (elevated).ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 1Packet pg. 9
6Construction of an Addition• New Addition must be elevated to freeboard requirement.• Currently we are not including the cost of the addition in the substantial improvement calculation. • FEMA recently flagged this as not being compliant with minimum FEMA standards• FEMA requires the addition cost to be included unless it is stand-alone (structurally independent addition).• Does notimpact City-floodplainsADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 1Packet pg. 10
7What is the change?xIn FEMA-designated floodplains, applicants will have two choices:1. Design and certify the addition as “structurally independent” and elevate the addition. The cost of the addition will not be included in the calculation of substantial improvement.2. Include the addition in the calculation of substantial improvement. The addition will be elevated.-If the value of improvements, including the cost of the addition, is more WKDQRIWKHYDOXHRIWKHVWUXFWXUHWKHQWKHexisting structure will be considered substantially improved and will need to be elevated. ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 1Packet pg. 11
Examples8ResidentialStructurally Independent AdditionNon-ResidentialStructurally Independent AdditionLowest Floor Elevated to Regulatory Flood Protection ElevationADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 1Packet pg. 12
9CertificationThe addition meets the definition of a structurally independent addition:1. Involves no alteration of the load-bearing structure of the existing building; 2. Is attached to the existing building with minimal connection; 3. Has a doorway as the only modification to the common wall; and 4. Will not transfer loads exerted on the addition to the existing building and will thus not share a foundation or other building elements that would create a load path between the addition and the existing building. By Colorado Architect or EngineerADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 1Packet pg. 13
10Who Does this Impact?xThis change only impacts FEMA-designated floodplains.xThis change will not impact City-designated floodplains, such as Old Town, where the majority of additions take place. xFEMA and the State consider the regulation of City floodplains as a higher standard.ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 1Packet pg. 14
115-year Permit Analysis• Reviewed permits from 2014 - mid 2020• 13 permits included an addition• 4 permits in FEMA Floodplain• 2 permits met Subst. Impv. due to remodel cost of existing structure. Existing structure and addition protected.• 1 would have met Subst. Impv. if addition cost was included. It is no longer mapped in the floodplain.• 1 permit would not have met Subst. Impv. if addition cost was included.Minimal number of permits impacted.ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 1Packet pg. 15
For Questions or Comments, Please Contact:THANK YOU!Marsha Hilmes-Robinsonmhilmesrobinson@fcgov.com, 970-224-6036ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 1Packet pg. 16
DRAFT FOR DISCUSSION ONLY -
SUBJECT TO FURTHER REVIEW AND REVISION
ORDINANCE NO. , 2021
OF THE COUNCIL OF THE CITY OF FORT COLLINS
AMENDING CHAPTER 10 OF THE CODE OF THE CITY OF FORT COLLINS
REGARDING __________________
WHEREAS, ________________ and
WHEREAS, ________________; and
WHEREAS, ________________; and
WHEREAS, ________________.
NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF FORT
COLLINS as follows:
Section 1. That the City Council hereby makes and adopts the determinations and
findings contained in the recitals set forth above.
Section 2. That Section 10-16 of the Code of the City of Fort Collins is hereby
amended to read as follows:
Sec. 10-16. Definitions.
. . .
Cumulative substantial improvement shall mean any combination of repairs, demolition,
reconstruction, rehabilitation, addition, or other improvements of a structure taking place during
the time the structure has been located in a designated floodplain, the cumulative cost of which
equals or exceeds fifty (50) percent of the market value of the structure before the start of
construction of the improvement, provided that the footprint of the structure is not increased. The
term cumulative substantial improvement shall include any repair or reconstruction work on
structures that have incurred substantial damage. It shall not include any project for improvement
of a structure to correct violations of state or local health, sanitary or safety code specifications
that have been identified by the local code enforcement official, including only the minimum
improvements necessary to assure safe living conditions. Cumulative substantial improvement
shall not include the cost of any structurally independent addition. Also, cumulative substantial
improvement shall not include ordinary maintenance activities, such as interior or exterior painting
or decoration, replacement of windows, doors or other nonstructural elements, repair or
replacement of heating or air conditioning appliances or hot water heaters, reroofing, and utility
connections, provided that such improvements shall not be excluded from the overall work when
carried out in connection with structural improvements.
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 2
Packet pg. 17
DRAFT FOR DISCUSSION ONLY -
SUBJECT TO FURTHER REVIEW AND REVISION
. . .
Structurally independent addition shall mean an addition that involves no alteration of the load-
bearing structure of the existing building, is attached to the building with minimal connection, and
has a doorway as the only modification to the common wall. A structurally independent addition
shall not transfer loads exerted on the addition to the existing building and thus shall not share a
foundation or other building elements that would create a load path between the addition and the
existing building. Shared heating, ventilation, and air conditioning (HVAC), electrical, and
plumbing between the addition and existing structure does not result in a structural connection.
. . .
Substantial improvement shall mean any combination of repairs, demolition, reconstruction,
rehabilitation, addition, or other improvements of a structure for which the actual start of
construction occurred during the twelve-month period preceding the floodplain use permit
application date, the cumulative cost of which equals or exceeds fifty (50) percent of the market
value of the structure before the start of construction of the improvement, provided that the
footprint of the structure is not increased. Substantial improvement shall include any repair or
reconstruction work performed within said period of time on structures that have incurred
substantial damage. A substantial improvement that meets the definition of redevelopment shall
be regulated hereunder as redevelopment. The term substantial improvement shall not include any
project for improvement of a structure to correct violations of state or local health, sanitary or
safety code specifications that have been identified by the local code enforcement official,
including only the minimum improvements necessary to assure safe living conditions. Substantial
improvement shall not include the cost of any structurally independent addition and in City basin
floodplains shall also not include the cost of any addition that meets the regulatory flood protection
standard set forth in Section 10-37. Also, substantial improvement shall not include ordinary
maintenance activities, such as interior or exterior painting or decoration, replacement of windows,
doors or other nonstructural elements, repair or replacement of heating or air conditioning
appliances or hot water heaters, reroofing and utility connections, provided that such
improvements shall not be excluded from the overall work when carried out in connection with
structural improvements.
. . .
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 2
Packet pg. 18
DRAFT FOR DISCUSSION ONLY -
SUBJECT TO FURTHER REVIEW AND REVISION
Section 3. That Section 10-26 of the Code of the City of Fort Collins is hereby
amended by the addition of a new subparagraph (6) which reads in its entirety as follows and all
subsequent subparagraphs shall be renumbered accordingly:
Sec. 10-26. - Utilities executive director's powers and duties.
The duties and responsibilities of the Utilities Executive Director shall include but are not
limited to:
. . .
(6)Require certification by a Colorado registered professional engineer and/or
architect that any addition proposed as a structurally independent addition meets the
definitions and requirements of this Chapter.
. . .
Section 4. That Section 10-27(b) of the Code of the City of Fort Collins is hereby
amended to read as follows:
Sec. 10-27. - Floodplain use permit.
. . .
(b)The following information is specifically required and must be submitted by any floodplain
permit applicant:
. . .
(4)Certification by a Colorado registered professional engineer and/or architect that
any addition proposed as a structurally independent addition: (1) involves no alteration of
the load-bearing structure of the existing building; (2) is attached to the existing building
with minimal connection; (3) has a doorway as the only modification to the common wall;
and (4) will not transfer loads exerted on the addition to the existing building and will thus
not share a foundation or other building elements that would create a load path between
the addition and the existing building.
(45)Description of the extent to which any watercourse will be altered or relocated as a
result of proposed development.
Section 5. That Section 10-75(7) of the Code of the City of Fort Collins is hereby
amended by the addition of a new subparagraph b. which reads in its entirety as follows and all
subsequent subparagraphs shall be renumbered accordingly:
Sec. 10-75. - Specific standards for residential development in Poudre River flood fringe.
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 2
Packet pg. 19
DRAFT FOR DISCUSSION ONLY -
SUBJECT TO FURTHER REVIEW AND REVISION
. . .
(7) Accessory structures.
. . .
b. Any new addition must either be designed and certified by a Colorado
registered professional engineer and/or architect as being a structurally independent
addition or the value of the addition shall be included in the determination of
cumulative substantial improvement.
. . .
Section 6. That Section 10-76 of the Code of the City of Fort Collins is hereby
amended to read as follows:
Sec. 10-76. - Specific standards for nonresidential development in Poudre River flood fringe.
. . .
(2) Additions.
a. Addition to a nonresidential structure is allowed, provided that all appliable
requirements, including, but not limited to, the requirements of § 10-37, are met.
b. Any new addition must either be designed and certified by a Colorado
registered professional engineer and/or architect as being a structurally independent
addition or the value of the addition shall be included in the determination of
cumulative substantial improvement.
bc. For an addition to a nonresidential structure, compliance with the
requirements of § 10-38 may be substituted for compliance with the applicable
requirements of Subsection 10-37(b).
cd. A new basement may be constructed below the regulatory flood protection
elevation in an addition to a nonresidential structure, provided that all applicable
requirements, including, but not limited to, the requirements of § 10-38, are met.
. . .
(6) Attached garages.
a. Addition of an attached garage to a nonresidential structure is allowed,
provided that all applicable requirements, including, but not limited to, the
requirements of § 10-37, are met by the attached garage.
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 2
Packet pg. 20
DRAFT FOR DISCUSSION ONLY -
SUBJECT TO FURTHER REVIEW AND REVISION
b. Any new addition must either be designed and certified by a Colorado
registered professional engineer and/or architect as being a structurally independent
addition or the value of the addition shall be included in the determination of
cumulative substantial improvement.
bc. For a garage attached to a nonresidential structure, compliance with the
requirements of § 10-38 or the requirements of § 10-39 may be substituted for
compliance with the applicable requirements of Subsection 10-37(b).
(7) Accessory structures.
a. Construction of a new accessory structure or addition to an accessory
structure is allowed, provided that all applicable requirements, including, but not
limited to, the requirements of § 10-37, are met.
b. Any new addition must either be designed and certified by a Colorado
registered professional engineer and/or architect as being a structurally independent
addition or the value of the addition shall be included in the determination of
cumulative substantial improvement.
bc. Remodeling or repair of an accessory structure, including reconstruction of
an accessory structure that has been substantially damaged, is allowed, provided
that, after completion of any cumulative substantial improvement, all applicable
requirements, including, but not limited to, the requirements of § 10-37, are met.
cd. Redevelopment of an accessory structure is allowed, provided that all
applicable requirements, including, but not limited to, the requirements of § 10-37,
are met.
de. For an accessory structure, compliance with the requirements of § 10-38 or
the requirements of § 10-39 may be substituted for compliance with the applicable
requirements of Subsection 10-37(b).
ef. A new basement may be constructed below the regulatory flood protection
elevation in an accessory structure, provided that all applicable requirements,
including, but not limited to, the requirements of § 10-38, are met.
fg. A nonconforming basement below the regulatory flood protection elevation
may remain in an accessory structure, provided that, after completion of any
cumulative substantial improvement or redevelopment, all applicable requirements,
including, but not limited to, the requirements of § 10-38, are met.
. . .
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 2
Packet pg. 21
DRAFT FOR DISCUSSION ONLY -
SUBJECT TO FURTHER REVIEW AND REVISION
Section 7. That Section 10-77 of the Code of the City of Fort Collins is hereby
amended to read as follows:
Sec. 10-77. - Specific standards for mixed-use development in Poudre River flood fringe.
. . .
(2) Additions.
a. An addition to a mixed-use structure is prohibited, except that an addition
to a mixed use structure that results in expansion of only non-residential floors of
said structure is allowed, provided that all applicable requirements, including, but
not limited to, the requirements of § 10-37, are met.
b. Any new addition must either be designed and certified by a Colorado
registered professional engineer and/or architect as being a structurally independent
addition or the value of the addition shall be included in the determination of
cumulative substantial improvement.
bc. For an addition to a mixed-use structure, compliance with the requirements
of § 10-38 may be substituted for compliance with the applicable requirement of
Subsection 10-37(b).
cd. A new basement may be constructed below the regulatory flood protection
elevation in an addition to a mixed-use structure, provided that:
1. All residential use is on a floor completely above the regulatory
flood protection elevation; and
2. All applicable requirements, including, but not limited to, the
requirements of § 10-38, are met.
. . .
(5) Attached garages.
a. Addition of an attached garage to a mixed-use structure is allowed, provided
that all applicable requirements, including, but not limited to, the requirements of
§ 10-37, are met by the attached garage.
b. Any new addition must either be designed and certified by a Colorado
registered professional engineer and/or architect as being a structurally independent
addition or the value of the addition shall be included in the determination of
cumulative substantial improvement.
bc. For a garage attached to a mixed-use structure, compliance with the
requirements of § 10-38 or the requirements of § 10-39 may be substituted for
compliance with the applicable requirements of Subsection 10-37(b).
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 2
Packet pg. 22
DRAFT FOR DISCUSSION ONLY -
SUBJECT TO FURTHER REVIEW AND REVISION
(6) Accessory structures.
a. Construction of a new accessory structure or addition to an accessory
structure is allowed, provided that all applicable requirements, including, but not
limited to, the requirements of § 10-37, are met.
b. Any new addition must either be designed and certified by a Colorado
registered professional engineer and/or architect as being a structurally independent
addition or the value of the addition shall be included in the determination of
cumulative substantial improvement.
bc. Remodeling or repair of an accessory structure, including reconstruction of
an accessory structure that has been substantially damaged, is allowed, provided
that, after completion of any cumulative substantial improvement, all applicable
requirements, including, but not limited to, the requirements of § 10-37, are met.
cd. Redevelopment of an accessory structure is allowed, provided that all
applicable requirements, including, but not limited to, the requirements of § 10-37,
are met.
de. For an accessory structure, compliance with the requirements of § 10-38 or
the requirements of § 10-39 may be substituted for compliance with the applicable
requirements of Subsection 10-37(b).
ef. A new basement may be constructed below the regulatory flood protection
elevation in an accessory structure, provided that all applicable requirements,
including, but not limited to, the requirements of § 10-38, are met.
fg. A nonconforming basement below the regulatory flood protection elevation
may remain in an accessory structure, provided that, after completion of any
cumulative substantial improvement or redevelopment, all applicable requirements,
including, but not limited to, the requirements of § 10-38, are met.
Section 8. That Section 10-80(b)(1) of the Code of the City of Fort Collins is hereby
amended by the addition of a new subparagraph e. which reads in its entirety as follows and all
subsequent subparagraphs shall be renumbered accordingly:
Sec. 10-80. - Removal of property from Poudre River flood fringe.
. . .
(b) LOMR-F. Property located in the flood fringe of the Poudre River shall be considered
removed from the flood fringe if a FEMA Letter of Map Revision based on Fill (LOMR-F)
removing the property from the flood fringe based on fill has been issued by FEMA and remains
in effect.
(1) LOMR-F Review and Approval. The Utilities Executive Director shall review any
application for a LOMR-F removing property from the flood fringe, and the following
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 2
Packet pg. 23
DRAFT FOR DISCUSSION ONLY -
SUBJECT TO FURTHER REVIEW AND REVISION
conditions shall apply to any LOMR-F certified by the City as reasonably safe from
flooding:
. . .
e. Any new addition must either be designed and certified by a Colorado
registered professional engineer and/or architect as being a structurally independent
addition or the value of the addition shall be included in the determination of
cumulative substantial improvement.
. . .
Section 9. That Section 10-102 of the Code of the City of Fort Collins is hereby
amended to read as follows:
Sec. 10-102. - Specific standards for residential development in floodways.
. . .
(6) Attached garages.
a. Addition of an attached garage to a residential structure is allowed, provided
that all applicable requirements, including, but not limited to, the requirements of
§ 10-45 and the requirements of § 10-37, are met by the garage portion of the
structure.
b. In FEMA basin floodplains, any new addition must either be designed and
certified by a Colorado registered professional engineer and/or architect as being a
structurally independent addition or the value of the addition shall be included in
the determination of substantial improvement.
c. In City basin floodplains, the value of the addition shall not be included in
the determination of substantial improvement so long as the addition meets the
regulatory flood protection standard set forth in §10-37.
bd. For a garage attached to a residential structure, compliance with the
requirements of § 10-38 or the requirements of § 10-39 may be substituted for
compliance with the applicable requirements of Subsection 10-37(b).
(7) Accessory structures.
a. Construction of a new accessory structure or addition to an accessory
structure is allowed, provided that all applicable requirements, including, but not
limited to, the requirements of § 10-45 and the requirements of § 10-37, are met by
the accessory structure.
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 2
Packet pg. 24
DRAFT FOR DISCUSSION ONLY -
SUBJECT TO FURTHER REVIEW AND REVISION
b. In FEMA basin floodplains, any new addition must either be designed and
certified by a Colorado registered professional engineer and/or architect as being a
structurally independent addition or the value of the addition shall be included in
the determination of substantial improvement.
c. In City basin floodplains, the value of the addition shall not be included in
the determination of substantial improvement so long as the addition meets the
regulatory flood protection standard set forth in §10-37.
bd. Remodeling and repair of an accessory structure is allowed, provided that,
after completion of any substantial improvement, all applicable requirements,
including, but not limited to, the requirements of § 10-37, are met.
ce. Redevelopment of an accessory structure is allowed, provided that all
applicable requirements, including, but not limited to, the requirements of § 10-37,
are met.
df. For an accessory structure, compliance with the requirements of § 10-38 or
the requirements of § 10-39 may be substituted for compliance with the applicable
requirements of Subsection 10-37(b).
eg. No new basement may be constructed below the regulatory flood protection
elevation in any accessory structure.
fh. A nonconforming basement below the regulatory flood protection elevation
may remain in an accessory structure, provided that, after completion of any
substantial improvement or redevelopment, all applicable requirements, including,
but not limited to, the requirements of § 10-38, are met.
. . .
Section 9. That Section 10-103 of the Code of the City of Fort Collins is hereby
amended to read as follows:
Sec. 10-103. - Specific standards for nonresidential development in floodways.
. . .
(2) Addition.
a. Addition to a nonresidential structure is allowed, provided that all
applicable requirements, including, but not limited to, the requirements of § 10-45
and the requirements of § 10-37, are met.
b. In FEMA basin floodplains, any new addition must either be designed and
certified by a Colorado registered professional engineer and/or architect as being a
structurally independent addition or the value of the addition shall be included in
the determination of substantial improvement.
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 2
Packet pg. 25
DRAFT FOR DISCUSSION ONLY -
SUBJECT TO FURTHER REVIEW AND REVISION
c. In City basin floodplains, the value of the addition shall not be included in
the determination of substantial improvement so long as the addition meets the
regulatory flood protection standard set forth in §10-37.
bd. For an addition to a nonresidential structure, compliance with the
requirements of § 10-38 may be substituted for compliance with the applicable
requirements of Subsection 10-37(b).
ce. No new basement may be constructed below the regulatory flood protection
elevation in an addition to a nonresidential structure.
. . .
(6) Attached garages.
a. Addition of an attached garage to a nonresidential structure is allowed,
provided that all applicable requirements, including, but not limited to, the
requirements of § 10-45 and the requirements of § 10-37, are met by the attached
garage.
b. In FEMA basin floodplains, any new addition must either be designed and
certified by a Colorado registered professional engineer and/or architect as being a
structurally independent addition or the value of the addition shall be included in
the determination of substantial improvement.
c. In City basin floodplains, the value of the addition shall not be included in
the determination of substantial improvement so long as the addition meets the
regulatory flood protection standard set forth in § 10-37.
bd. For a garage attached to a nonresidential structure, compliance with the
requirements of §10-38 or the requirements of § 10-39 may be submitted for
compliance with the applicable requirements of Subsection 10-37(b).
(7) Accessory structures.
a. Construction of a new accessory structure or addition to an accessory
structure is allowed, provided that all applicable requirements, including, but not
limited to, the requirements of § 10-45 and the requirements of § 10-37, are met by
the accessory structure.
b. In FEMA basin floodplains, any new addition must either be designed and
certified by a Colorado registered professional engineer and/or architect as being a
structurally independent addition or the value of the addition shall be included in
the determination of substantial improvement.
c. In City basin floodplains, the value of the addition shall not be included in
the determination of substantial improvement so long as the addition meets the
regulatory flood protection standard set forth in §10-37.
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 2
Packet pg. 26
DRAFT FOR DISCUSSION ONLY -
SUBJECT TO FURTHER REVIEW AND REVISION
bd. Remodeling and repair of an accessory structure is allowed, provided that,
after completion of any substantial improvement, all applicable requirements,
including, but not limited to, the requirements of § 10-37, are met.
ce. Redevelopment of an accessory structure is allowed, provided that all
applicable requirements, including, but not limited to, the requirements of § 10-37,
are met.
df. For an accessory structure, compliance with the requirements of § 10-38 or
the requirements of § 10-39 may be substituted for compliance with the applicable
requirements of Subsection 10-37(b).
eg. No new basement may be constructed below the regulatory flood protection
elevation in any accessory structure.
fh. A nonconforming basement below the regulatory flood protection elevation
may remain in an accessory structure, provided that, after completion of any
substantial improvement or redevelopment, all applicable requirements, including,
but not limited to, the requirements of § 10-38, are met.
. . .
Section 10. That Section 10-104 of the Code of the City of Fort Collins is hereby
amended to read as follows:
Sec. 10-104. - Specific standards for mixed-use development in floodways.
. . .
(2) Addition.
a. Addition to a mixed-use structure for residential use is prohibited.
b. Addition to the nonresidential use portions of a mixed-use structure is
allowed, provided that all applicable requirements, including, but not limited to, the
requirements of § 10-45 and the requirements of § 10-37, are met.
c. In FEMA basin floodplains, any new addition must either be designed and
certified by a Colorado registered professional engineer and/or architect as being a
structurally independent addition or the value of the addition shall be included in
the determination of substantial improvement.
d. In City basin floodplains, the value of the addition shall not be included in
the determination of substantial improvement so long as the addition meets the
regulatory flood protection standard set forth in Section 10-37.
ce. For an addition to a mixed-use structure, compliance with the
requirements of § 10-38 may be substituted for compliance with the applicable
requirements of Subsection 10-37(b).
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 2
Packet pg. 27
DRAFT FOR DISCUSSION ONLY -
SUBJECT TO FURTHER REVIEW AND REVISION
df. No new basement may be constructed below the regulatory flood
protection elevation in an addition to a mixed-use structure.
. . .
(5) Attached garages.
a. Addition of a new attached garage to a mixed-use structure is allowed,
provided that all applicable requirements, including, but not limited to, the
requirements of § 10-45 and the requirements of § 10-37, are met by the attached
garage.
b. In FEMA basin floodplains, any new addition must either be designed and
certified by a Colorado registered professional engineer and/or architect as being a
structurally independent addition or the value of the addition shall be included in
the determination of substantial improvement.
c. In City basin floodplains, the value of the addition shall not be included in
the determination of substantial improvement so long as the addition meets the
regulatory flood protection standard set forth in §10-37.
bd. For a garage attached to a mixed-use structure, compliance with the
requirements of § 10-38 or the requirements of § 10-39 may be substituted for
compliance with the applicable requirements of Section 10-37(b).
(6) Accessory structures.
a. Construction of a new accessory structure or addition to an accessory
structure is allowed, provided that all applicable requirements, including, but not
limited to, the requirements of § 10-45 and the requirements of § 10-37, are met by
the accessory structure.
b. In FEMA basin floodplains, any new addition must either be designed and
certified by a Colorado registered professional engineer and/or architect as being a
structurally independent addition or the value of the addition shall be included in
the determination of substantial improvement.
c. In City basin floodplains, the value of the addition shall not be included in
the determination of substantial improvement so long as the addition meets the
regulatory flood protection standard set forth in Section 10-37.
bd. Remodeling and repair of an accessory structure is allowed, provided that,
after completion of any substantial improvement, all applicable requirements,
including, but not limited to, the requirements of § 10-37, are met.
ce. Redevelopment of an accessory structure is allowed, provided that all
applicable requirements, including, but not limited to, the requirements of § 10-37,
are met.
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 2
Packet pg. 28
DRAFT FOR DISCUSSION ONLY -
SUBJECT TO FURTHER REVIEW AND REVISION
df. For an accessory structure, compliance with the requirements of § 10-38 or
the requirements of § 10-39 may be substituted for compliance with the applicable
requirements of Subsection 10-37(b).
eg. No new basement may be constructed below the regulatory flood protection
elevation in any accessory structure.
fh. A nonconforming basement below the regulatory flood protection elevation
may remain in an accessory structure, provided that, after completion of any
substantial improvement or redevelopment, all applicable requirements, including,
but not limited to, the requirements of § 10-38, are met.
. . .
Section 11. That Section 10-108 of the Code of the City of Fort Collins is hereby
amended to read as follows:
Sec. 10-108. - Specific standards for residential development in flood fringe.
. . .
(2) Additions.
a. An addition to a residential structure is allowed, provided that all applicable
requirements, including, but not limited to, the requirements of § 10-37, are met.
b. In FEMA basin floodplains, any new addition must either be designed and
certified by a Colorado registered professional engineer and/or architect as being a
structurally independent addition or the value of the addition shall be included in
the determination of substantial improvement.
c. In City basin floodplains, the value of the addition shall not be included in
the determination of substantial improvement so long as the addition meets the
regulatory flood protection standard set forth in Section 10-37.
bd. No new basement may be constructed below the regulatory flood protection
elevation in any addition to a residential structure.
. . .
(6) Attached garages.
a. Addition of an attached garage to a residential structure is allowed, provided
that all applicable requirements, including, but not limited to, the requirements of
§ 10-37, are met by the attached garage.
b. In FEMA basin floodplains, any new addition must either be designed and
certified by a Colorado registered professional engineer and/or architect as being a
structurally independent addition or the value of the addition shall be included in
the determination of substantial improvement.
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 2
Packet pg. 29
DRAFT FOR DISCUSSION ONLY -
SUBJECT TO FURTHER REVIEW AND REVISION
c. In City basin floodplains, the value of the addition shall not be included in
the determination of substantial improvement so long as the addition meets the
regulatory flood protection standard set forth in Section 10-37.
bd. For a garage attached to a residential structure, compliance with the
requirements of § 10-38 or the requirements of § 10-39 may be substituted for
compliance with the applicable requirements of Subsection 10-37(b).
(7) Accessory structures.
a. Construction of a new accessory structure or addition to an accessory
structure is allowed, provided that all applicable requirements, including, but not
limited to, the requirements of § 10-37, are met.
b. In FEMA basin floodplains, any new addition must either be designed and
certified by a Colorado registered professional engineer and/or architect as being a
structurally independent addition or the value of the addition shall be included in
the determination of substantial improvement.
c. In City basin floodplains, the value of the addition shall not be included in
the determination of substantial improvement so long as the addition meets the
regulatory flood protection standard set forth in Section 10-37.
bd. Remodeling and repair of an accessory structure is allowed, provided that,
after completion of any substantial improvement, all applicable requirements,
including, but not limited to, the requirements of § 10-37, are met.
ce. Redevelopment of an accessory structure is allowed, provided that all
applicable requirements, including, but not limited to, the requirements of § 10-37,
are met.
df. For an accessory structure, compliance with the requirements of § 10-38 or
the requirements of § 10-39 may be substituted for compliance with the applicable
requirements of Subsection 10-37(b).
eg. A new basement may be constructed below the regulatory flood protection
elevation in an accessory structure, provided that all applicable requirements,
including, but not limited to, the requirements of § 10-38, are met.
fh. A nonconforming basement below the regulatory flood protection elevation
may remain in an accessory structure, provided that, after completion of any
substantial improvement or redevelopment, all applicable requirements, including,
but not limited to, the requirements of § 10-38, are met.
. . .
Section 12. That Section 10-109 of the Code of the City of Fort Collins is hereby
amended to read as follows:
Sec. 10-109. - Specific standards for nonresidential development in flood fringe.
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 2
Packet pg. 30
DRAFT FOR DISCUSSION ONLY -
SUBJECT TO FURTHER REVIEW AND REVISION
. . .
(2) Additions.
a. Addition to a nonresidential structure is allowed, provided that all
applicable requirements, including, but not limited to, the requirements of § 10-37,
are met.
b. In FEMA basin floodplains, any new addition must either be designed and
certified by a Colorado registered professional engineer and/or architect as being a
structurally independent addition or the value of the addition shall be included in
the determination of substantial improvement.
c. In City basin floodplains, the value of the addition shall not be included in
the determination of substantial improvement so long as the addition meets the
regulatory flood protection standard set forth in Section 10-37.
bd. For an addition to a nonresidential structure, compliance with the
requirements of § 10-38 may be substituted for compliance with the applicable
requirements of Subsection 10-37(b).
ce. A new basement may be constructed below the regulatory flood protection
elevation in an addition to a nonresidential structure, provided that all applicable
requirements, including, but not limited to, the requirements of § 10-38, are met.
. . .
(6) Attached garages.
a. Addition of an attached garage to a nonresidential structure is allowed,
provided that all applicable requirements, including, but not limited to, the
requirements of § 10-37, are met by the attached garage.
b. In FEMA basin floodplains, any new addition must either be designed and
certified by a Colorado registered professional engineer and/or architect as being a
structurally independent addition or the value of the addition shall be included in
the determination of substantial improvement.
c. In City basin floodplains, the value of the addition shall not be included in
the determination of substantial improvement so long as the addition meets the
regulatory flood protection standard set forth in Section 10-37.
bd. For a garage attached to a nonresidential structure, compliance with the
requirements of § 10-38 or the requirements of § 10-39 may be substituted for
compliance with the applicable requirements of Subsection 10-37(b).
(7) Accessory structures.
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 2
Packet pg. 31
DRAFT FOR DISCUSSION ONLY -
SUBJECT TO FURTHER REVIEW AND REVISION
a. Construction of a new accessory structure or addition to an accessory
structure is allowed, provided that all applicable requirements, including, but not
limited to, the requirements of § 10-37, are met.
b. In FEMA basin floodplains, any new addition must either be designed and
certified by a registeredColorado registered professional engineer and/or architect
as being a structurally independent addition or the value of the addition shall be
included in the determination of substantial improvement.
c. In City basin floodplains, the value of the addition shall not be included in
the determination of substantial improvement so long as the addition meets the
regulatory flood protection standard set forth in Section 10-37.
bd. Remodeling and repair of an accessory structure is allowed, provided that,
after completion of any substantial improvement, all applicable requirements,
including, but not limited to, the requirements of § 10-37, are met.
ce. Redevelopment of an accessory structure is allowed, provided that all
applicable requirements, including, but not limited to, the requirements of § 10-37,
are met.
df. For an accessory structure, compliance with the requirements of § 10-38 or
the requirements of § 10-39 may be substituted for compliance with the applicable
requirements of Subsection 10-37(b).
eg. A new basement may be constructed below the regulatory flood protection
elevation in an accessory structure, provided that all applicable requirements,
including, but not limited to, the requirements of § 10-38, are met.
fh. A nonconforming basement below the regulatory flood protection elevation
may remain in an accessory structure, provided that, after completion of any
substantial improvement or redevelopment, all applicable requirements, including,
but not limited to, the requirements of § 10-38, are met.
. . .
Section 13. That Section 10-110 of the Code of the City of Fort Collins is hereby
amended to read as follows:
Sec. 10-110. - Specific standards for mixed-use development in flood fringe.
. . .
(2) Additions.
a. Addition to a mixed-use structure is allowed, provided that all applicable
requirements, including, but not limited to, the requirements of § 10-37, are met.
b. In FEMA basin floodplains, any new addition must either be designed and
certified by a registeredColorado registered professional engineer and/or architect
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 2
Packet pg. 32
DRAFT FOR DISCUSSION ONLY -
SUBJECT TO FURTHER REVIEW AND REVISION
as being a structurally independent addition or the value of the addition shall be
included in the determination of substantial improvement.
c. In City basin floodplains, the value of the addition shall not be included in
the determination of substantial improvement so long as the addition meets the
regulatory flood protection standard set forth in Section 10-37.
bd. For an addition to a mixed-use structure, in the event that all residential use
is on a floor completely above the regulatory flood protection elevation, compliance
with the requirements of § 10-38 may be substituted for compliance with the
applicable requirements of Subsection 10-37(b).
ce. A new basement may be constructed below the regulatory flood protection
elevation in an addition to a mixed-use structure, provided that:
1. All residential use is on a floor completely above the regulatory
flood protection elevation; and
2. All applicable requirements, including, but not limited to, the
requirements of § 10-38, are met.
. . .
(5) Attached garages.
a. Addition of an attached garage to a mixed-use structure is allowed, provided
that all applicable requirements, including, but not limited to, the requirements of
§ 10-37, are met by the attached garage.
b. In FEMA basin floodplains, any new addition must either be designed and
certified by a Colorado registered professional engineer and/or architect as being a
structurally independent addition or the value of the addition shall be included in
the determination of substantial improvement.
c. In City basin floodplains, the value of the addition shall not be included in
the determination of substantial improvement so long as the addition meets the
regulatory flood protection standard set forth in Section 10-37.
bd. For a garage attached to a mixed-use structure, compliance with the
requirements of § 10-38 or the requirements of § 10-39 may be substituted for
compliance with the applicable requirements of Subsection 10-37(b).
(6) Accessory structures.
a. Construction of a new accessory structure or addition to an accessory
structure is allowed, provided that all applicable requirements, including, but not
limited to, the requirements of § 10-37, are met.
b. In FEMA basin floodplains, any new addition must either be designed and
certified by a Colorado registered professional engineer and/or architect as being a
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 2
Packet pg. 33
DRAFT FOR DISCUSSION ONLY -
SUBJECT TO FURTHER REVIEW AND REVISION
structurally independent addition or the value of the addition shall be included in
the determination of substantial improvement.
c. In City basin floodplains, the value of the addition shall not be included in
the determination of substantial improvement so long as the addition meets the
regulatory flood protection standard set forth in Section 10-37.
bd. Remodeling and repair of an accessory structure is allowed, provided that,
after completion of any substantial improvement, all applicable requirements,
including, but not limited to, the requirements of § 10-37, are met.
ce. Redevelopment of an accessory structure is allowed, provided that all
applicable requirements, including, but not limited to, the requirements of § 10-37,
are met.
df. For an accessory structure, compliance with the requirements of § 10-38 or
the requirements of § 10-39 may be substituted for compliance with the applicable
requirements of Subsection 10-37(b).
eg. A new basement may be constructed below the regulatory flood protection
elevation in an accessory structure, provided that all applicable requirements,
including, but not limited to, the requirements of § 10-38, are met.
fh. A nonconforming basement below the regulatory flood protection elevation
may remain in an accessory structure, provided that, after completion of any
substantial improvement or redevelopment, all applicable requirements, including,
but not limited to, the requirements of § 10-38, are met.
. . .
Section 14. That Section 10-113(b) of the Code of the City of Fort Collins is hereby
amended to read as follows:
Sec. 10-113. Removal of property from flood fringe of FEMA basin floodplains.
. . .
(b) LOMR-F. Property located in the flood fringe of a FEMA basin floodplain shall be
considered removed from the flood fringe if a FEMA Letter of Map Revision based on Fill
(LOMR-F) removing the property from the flood fringe has been issued by FEMA and remains in
effect.
(1) LOMR-F Review and Approval. The Utilities Executive Director shall review any
application for a LOMR-F removing property from the flood fringe based on fill, and the
following conditions shall apply to any LOMR-F certified by the City as reasonably safe
from flooding:
a. A floodplain use permit shall be obtained for any development in a LOMR-
F area.
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 2
Packet pg. 34
DRAFT FOR DISCUSSION ONLY -
SUBJECT TO FURTHER REVIEW AND REVISION
b. Any new structure, accessory structure, attached garage, or addition,
substantial improvement or redevelopment must meet all applicable requirements,
including, but not limited to, the requirements of § 10-37, except that for
nonresidential structures and mixed-use structures with all residential use on a floor
completely above the regulatory flood protection elevation, compliance with the
requirements of § 10-38 may be substituted for compliance with the applicable
requirements of Subsection 10-37(b).
c. Any new addition must either be designed and certified by a Colorado
registered professional engineer and/or architect as being a structurally independent
addition or the value of the addition shall be included in the determination of
substantial improvement.
cd. Critical facilities and expansions of critical facilities are prohibited.
de. Manufactured homes and mobile buildings other than a nonconforming
manufactured home or mobile building are prohibited, except that:
1. A manufactured home or mobile building may be replaced, provided
that the replacement manufactured home or mobile building complies with
all applicable requirements, including, but not limited to, the requirements
of § 10-41.
2. Manufactured home parks and mobile building developments, other
than nonconforming manufactured home parks and mobile building
developments, are prohibited.
3. Expansion of a manufactured home park or a mobile building
development is prohibited.
(2) Unconditional or Annexed LOMR-F Approvals. For any development in an area
removed from the flood fringe through a LOMR-F that did not include the conditions
described in Paragraph (b)(1), or that was approved prior to annexation to the City, the
development must meet all requirements of Paragraph (b)(1) in addition to meeting all
conditions of the LOMR-F approval, except that, for properties annexed to the city prior to
January 1, 2014, only the following shall apply:
a. The development must meet all conditions of the LOMR-F approval; and
b. For any new structure, accessory structure, attached garage or addition,
substantial improvement or redevelopment, the development must also meet
requirements of § 10-37, except that:
1. The applicable flood protection elevation required shall be twelve
(12) inches above the base flood elevation, regardless of the elevation level
stated in § 10-37; and
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 2
Packet pg. 35
DRAFT FOR DISCUSSION ONLY -
SUBJECT TO FURTHER REVIEW AND REVISION
2. For nonresidential structures and mixed-use structures with all
residential use on a floor completely above the regulatory flood protection
elevation, compliance with the requirements of § 10-38 may be substituted
for compliance with the elevation requirement in Subparagraph (b)(2)b.1.
c. Any new addition must either be designed and certified by a Colorado
registered professional engineer and/or architect as being a structurally independent
addition or the value of the addition shall be included in the determination of
substantial improvement.
Introduced, considered favorably on first reading, and ordered published this ___ day of
________, A.D. 2021, and to be presented for final passage on the ___ day of _____, A.D. 2021.
__________________________________
Mayor
ATTEST:
_____________________________
City Clerk
Passed and adopted on final reading on this _____ day of ____, A.D. 2021.
__________________________________
Mayor
ATTEST:
_____________________________
City Clerk
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 2
Packet pg. 36
City of Fort Collins Floodplain Regulations
FOR ALL FLOODPLAINS other than the Poudre River
Quick GuideQuick Guide
Note: This guide was prepared as an educational tool to help explain portions of the floodplain regulations, and is not intended as
a complete or detailed explanation of the legal requirements that may apply to a particular property. Article II of Chapter 10 of the
City Code specifies the requirements and prohibitions that are outlined generally in this guide and is the controlling legal document
in the event of any conflict or inconsistency between this guide and the City Code. The Code provisions can be found at
http://www.colocode.com/ftcollins/municipal/chapter10.htm.
Prepared by Fort Collins Utilities, PO Box 580, 700 Wood St., Fort Collins, CO 80522-0580
970-416-2632 • fcgov.com/stormwater/fldplain.php
3/18
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3
Packet pg. 37
2
Table of Odds for Different Events
Floodplain Facts
• Property in the 100-year floodplain has a 1 percent chance in any given year of being flooded.
• Over a 30-year period, there is a 26 percent chance that a property in the 100-year floodplain will be flooded. For comparison,
there is only a 5 percent chance that the building will catch fire during that same 30-year period.
• Some properties have an even higher risk of flooding because they are in areas where smaller, more frequent floods cause damage.
Purpose of Floodplain Regulations
Event Odds
Structure in the 100-year floodplain being flooded in any given year
Matching one number plus Powerball in the Powerball Lottery
Structure in the 500-year floodplain being flooded in any given year
Annual chance of being killed in a car accident if you drive 10,000 miles/year
Being struck by lightning
Winning the Powerball Lottery jackpot (matching five numbers and the Powerball)
1 in 100
1 in 124
1 in 500
1 in 4,000
1 in 600,000
1 in 120,526,770
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3
Packet pg. 38
3
Types of Floodplains
Floodplain Name
Poudre River
Spring Creek
Dry Creek
Cooper Slough
Boxelder Creek
Fossil Creek
Old Town
Canal Importation
McClellands Creek
Mail Creek
Foothills Channel
West Vine
FEMA-Basin
X
X
X
X
City-BasinPoudre River
X
X
X
X
X
X
X
X
Floodplain Designations
• In Fort Collins, floodplains are designated by the City as well as by the Federal Emergency Management Agency (FEMA).
• The FEMA-basin floodplains cover only the major drainages. Changes in these floodplains must be approved by FEMA (p. 5).
• The City-basin floodplains further identify the flood hazard. Some of the flooding in City-basin floodplains is from irrigation ditch
spills or undersized storm sewers that result in overland flooding. Changes in these floodplains can be approved by the City (p. 5).
• For floodplain regulation purposes, a floodplain property is either in a FEMA-basin floodplain, a City-basin floodplain or the Poudre
River floodplain.
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3
Packet pg. 39
4
• The floodway is the portion of the floodplain with the greatest depths and velocities.
• The floodway is the area of highest risk.
• The floodway must be preserved to allow the floodwater to pass through without being obstructed.
• Areas along the flood fringe are allowed to be filled and developed, but this raises the 100-year flood level.
The City has set an allowable rise of 0.5 feet.
Floodway
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3
Packet pg. 40
5
Floodway Modifications
• Floodways can be modified, but the applicant must be able to show that the project casues no-rise in the 100-year flood level.
• In FEMA-basin floodplains, the applicant must submit information to FEMA for approval before construction and after construction
if certain changes are being made.
If the applicant’s project causes a rise, there are two options:
1. In FEMA-basin floodplains, the applicant must show the entire rise is on their property or obtain easements from other property
owners. No structures can be impacted by a rise in the flood level.
2. In City-basin floodplains, the applicant must show that the entire rise is on their property or obtain easements from other
property owners.
Example of a Floodway Modification
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3
Packet pg. 41
6
Summary of Floodway Development Regulations
Residential Development
• New residential development is not allowed.
• Fill is not allowed unless the applicant can
show no-rise (Floodway Modifications, p. 5).
• Residential additions are not allowed.
• Remodels are allowed subject to the
substantial improvement requirements
(p. 14-15).
• Manufactured homes are allowed only in
existing manufactured home parks.
• Redevelopment (rebuild) of an existing
structure is allowed (p. 14-15). Must meet the
freeboard requirements for redevelopments
(p. 10).
• Detached garages and sheds are allowed
if the applicant can show no-rise (p. 17 and
Floodway Modifications, p. 5).
Non-Residential Development
• New non-residential development is allowed
if the applicant can show no-rise (Floodway
Modifications, p. 5). Must meet the freeboard
requirements (p. 10-11).
• Fill is not allowed unless the applicant can
show no-rise (Floodway Modifications, p. 5).
• Non-residential additions are allowed if
the applicant can show no-rise (Floodway
Modifications, p. 6). Must meet the freeboard
requirements (p. 10-11).
• Remodels are allowed subject to the
substantial improvement requirements
(p. 14-16).
• Mobile buildings (modular offices) are allowed
only in existing mobile building developments.
• Redevelopment (rebuild) of an existing
structure is allowed (p. 14-16). Must meet the
freeboard requirements for redevelopments
(p. 10-11).
• Attached garages, detached garages and
sheds are allowed if the applicant can show
no-rise (p. 17 and Floodway Modifications,
p.5).
Mixed-Use Development
• New mixed-use development is not allowed.
• Fill is not allowed unless the applicant can
show no-rise (Floodway Modifications, p. 5).
• Residential additions are not allowed to a
mixed-use structure. Non-residential additions
are allowed to a mixed-use structure if
the applicant can show no-rise (Floodway
Modifications, p. 5). Must meet the freeboard
requirements (p. 10-11).
• Remodels are allowed subject to the substantial
improvement requirements (p. 14-16).
• Redevelopment (rebuild) of an existing
structure is allowed (p. 14-16). Must meet the
freeboard requirements for redevelopments
(p. 10-11).
• Detached garages and sheds are allowed if the
applicant can show no-rise (p. 17 and Floodway
Modifications, p. 5).
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3
Packet pg. 42
7
• Critical facilities are not allowed (p. 18).
• New basements are not allowed below the
freeboard level (p. 10). An existing basement
in a redeveloped or substantially improved
structure is not allowed to remain (p. 10 and
14-15).
• Critical facilities are not allowed (p. 18).
• New basements are not allowed below
the freeboard level (p. 10-11). An existing
basement in a redeveloped or substantially
improved structure can remain if floodproofed
(p. 10-11 and 14-16).
• New outside storage of equipment or
materials is not allowed unless the applicant
can show no rise (Floodway Modifications,
p.5).
• Critical facilities are not allowed (p. 18).
• New basements are not allowed below
the freeboard level (p. 10-11). An existing
basement in a redeveloped or substantially
improved structure is not allowed to remain
if it is in residential use (p. 10 and 14-15).
An existing basement in a redeveloped or
substantially improved structure is allowed
to remain if it is in nonresidential use and
floodproofed (p. 10-11 and 14-16).
• New outside storage of equipment or
materials is not allowed unless the applicant
can show no rise (Floodway Modifications,
p.5)
Summary of Floodway Development Regulations (continued)
Residential Development Non-Residential Development Mixed-Use Development
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3
Packet pg. 43
8
Summary of Floodplain Fringe Development Regulations
Residential Development
• New residential development is allowed.
Must meet the freeboard requirements
(p. 10).
• Fill is allowed.
• Residential additions are allowed. Must meet
the freeboard requirements (p. 10).
• Remodels are allowed subject to the
substantial improvement requirements
(p. 14-15).
• Manufactured homes are allowed only to
replace an existing manufactured home or
fill a vacant lot in an existing manufactured
home park.
• Redevelopment (rebuild) of an existing
structure is allowed (p. 14-15). Must meet the
freeboard requirements for redevelopments
(p. 10).
• Attached garages, detached garages and
sheds are allowed (p. 17).
• Critical facilities are not allowed (p. 18).
Non-Residential Development
• New non-residential development is allowed.
Must meet the freeboard requirements
(p. 10-11).
• Fill is allowed.
• Non-residential additions are allowed. Must
meet the freeboard requirements (p. 10-11).
• Remodels are allowed subject to the
substantial improvement requirements
(p. 14-16).
• Mobile buidlings (modular offices) are allowed
only to replace an existing mobile building or
fill a vacant lot in an existing mobile building
development.
• Redevelopment (rebuild) of an existing
structure is allowed (p. 14-16). Must meet the
freeboard requirements for redevelopments
(p. 10-11).
• Attached garages, detached garages and
sheds are allowed (p. 17).
• Critical facilities are not allowed (p. 18).
Mixed-Use Development
• New mixed-use development is allowed. Must
meet the freeboard requirements (p. 10-11).
• Fill is allowed.
• Mixed-use additions are allowed. Must meet
the freeboard requirements (p. 10-11).
• Remodels are allowed subject to the
substantial improvement requirements
(p. 14-16).
• Redevelopment (rebuild) of an existing
structure is allowed (p. 14-16). Must meet the
freeboard requirements for redevelopments
(p. 10-11).
• Attached garages, detached garages and
sheds are allowed (p. 17).
• Critical facilities are not allowed (p. 18).
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3
Packet pg. 44
9
Mixed-Use Development
• New basements are not allowed below the
freeboard level for residential portions of
mixed-use structures (p. 10). An existing
basement in a redeveloped or substantially
improved structure is not allowed to remain if
it is in residential use (p. 10 and 14-15).
New basements are allowed for non-
residential portions of mixed-use structures.
Must meet freeboard requirements and be
floodproofed (p. 10-11). An existing basement
in a redeveloped or substantially improved
structure is allowed to remain if it is in non-
residential use and floodproofed (p. 10-11
and 14-16).
Non-Residential Development
• New basements are allowed. Must meet
freeboard requirements and be floodproofed
(p. 10-11). An existing basement below
the freeboard level in a redeveloped or
substantially improved structure can remain
if floodproofed (p. 10-11 and 14-16).
Residential Development
• New basements are not allowed below the
freeboard level (p. 10). An existing basement
in a redeveloped or substantially improved
structure is not allowed to remain (p. 10 and
14-15).
Summary of Floodplain Fringe Development Regulations (continued)
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3
Packet pg. 45
10
Freeboard
• Freeboard is a factor of safety that accounts for the allowed rise in flood level due to development in the flood fringe and for larger
floods and debris that may cause the flood elevation to be higher.
• Freeboard is a measure of how high above the flood level the structure must be built or floodproofed.
Residential Structures and Residential Portions of Mixed-Use Structures
• Freeboard for new development and redevelopment of an existing structure, including any attached garages, is 18 inches;
• Freeboard for additions and substantial improvements (including attached garages) is 12 inches;
• Freeboard for new detached garages or sheds that are accessory to an existing structure is 12 inches (p. 17);
• Must elevate the structure; not allowed to floodproof; and
• The lowest floor of the structure (p. 12-13), including the basement, all HVAC and electrical, must be elevated above the
freeboard height.
Example of new development residential elevation
(See p. 12-13 for detailed foundation designs)
Slab on grade foundation Crawl space foundation
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3
Packet pg. 46
11
Freeboard continued
Floodproofing uses various techniques to make a
building water tight:
• Sealants and waterproof membranes;
• Closure shields in front of doorways; and
• Mini-walls to protect window or stair wells.
Floodproofing generally works only when flood
depths are less than 3 feet.
elevated 12”
Example of new development
non-residential floodproofing
Example of residential addition
Non-Residential Structures and
Non-Residential Portions of Mixed-Use Structures
• Freeboard for new development and redevelopment of
an existing structure, including any attached garages, is
18 inches;
• Freeboard for additions and substantial improvements
(including attached garages) is 12 inches;
• Freeboard for new detached garages or sheds that are
accessory to an existing structure is 12 inches (p 17);
• Allowed to either elevate or floodproof the structure;
• In the floodway, new basements are not allowed;
• If elevating, the lowest floor of the structure (p. 12-13),
including the basement, all HVAC and electrical, must be
elevated above the freeboard height; and
• If floodproofing, the structure as well as all HVAC and
electrical, must be floodproofed to the freeboard height.
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3
Packet pg. 47
12
Determination of Lowest Floor Based on Type of Foundation
Slab on Grade
The lowest floor elevation of a slab on
grade structure is measured at the top
of the slab.
Basement
The lowest floor elevation of
a structure with a basement
is measured at the top of the
basement slab.
Enclosure (above grade crawl space)
2. The lowest floor
elevation of a structure
with an enclosure that is
not built in accordance
with the venting criteria
(p. 17) is measured at
the lowest interior grade
of the enclosure.
Lowest floor
elevation Freeboard
Floor slab
on grade
Freeboard
Vents
Enclosure
Lowest floor
elevation
Unfinished area
no HVAC
Vents
Lowest floor
elevation Freeboard
Basement
Basement slab
Freeboard
Can have HVAC in enclosed area
Lowest floor elevation
Enclosure
1. The lowest floor elevation of a
structure with an enclosure
that is built in accordance
with the venting criteria
(p. 17) is measured
at the floor of the
first finished
floor.
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3
Packet pg. 48
13
Determination of Lowest Floor Based on Type of Foundation continued
Crawl Space (below grade)
The lowest floor of a structure with a crawl space is measured
at the lowest finished floor if the following conditions are met:
a. The velocity of the flood flows hitting the structure is less that
5 feet per second;
b. The interior grade elevation that is below the flood elevation
is no lower than 2 feet below the lowest adjacent grade;
c. The height of the crawl space, as measured from the lowest
interior grade of the crawl space to the top of the foundation
wall, does not exceed 4 feet at any point;
d. An adequate drainage system is in place, including a totally
immersible pump;
e. All ductwork, HVAC, hot water heater and electrical is
elevated to the regulatory flood protection elevation; and
f. Venting requirements (p. 17) are met.
If the above conditions are not met, the lowest floor is
determined based on the criteria for a basement (p. 12).
Pump
f Vent
b Maximum
2 feet
Freeboard
a Velocity < 5 ft. per sec.
c No more than
4 feet to top of
foundation wall
Crawl space
e Duct Work
d
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3
Packet pg. 49
14
Ve rtical
(Pop-top)
addition
All remodel work,
including vertical
addition, counts
toward substantial
improvement
Remodels or Repair of Damaged Buildings
Remodels and repairs are allowed subject to the substantial improvement requirements (p. 15-16).
Vertical additions (pop-tops) are considered a remodel and are subject to the substantial improvement
requirements (p. 15-16).
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3
Packet pg. 50
15
Substantial Improvement and Redevelopment
Residential Structures and Residential Portions
of Mixed-Use Structures
If a substantial improvement occurs, the lowest
floor (p. 12-13) of a non-conforming structure,
including the basement, and all HVAC, electrical
and utilities, must be elevated 12 inches above the
flood elevation. After improvements, the structure
will be protected from flood damage.
If a redevelopment occurs, the lowest floor
(p. 12-13) of a non-conforming structure, including
the basement, all HVAC, electrical and utilities,
must be elevated 18 inches above the flood
elevation. After improvements, the structure will be
protected from flood damage.
elevated
12" or 18"
Substantial improvement occurs when all of the following conditions are met:
1. A building permit is requested for any repair, reconstruction or improvement to a non-conforming structure, involving alteration of
any wall, ceiling, floor or other structural part of the building;
2. The cost of the improvement, or the amount of damage, equals or exceeds 50 percent of the market value of the structure either
before the improvement or repair is started or before the building was damaged; and
3. The cost is calculated on a per project basis. A project is based on all building permits issued during the 12-month period
preceeding the floodplain permit application date.
A substantial improvement policy ensures that non-conforming structures are brought into conformance over time and are therefore,
protected from flood damage and the risk to occupants is reduced.
Redevelopment occurs when there is a substantial improvement and more than 50 percent of the wall perimeter of any floor of a
structure that is partially or completely below the flood elevation is removed or replaced and the building footprint is not increased.
Example of residential substantial improvement or redevelopment
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3
Packet pg. 51
16
Non-Residential Structures and Non-Residential Portion of Mixed-Use Structures
If a substantial improvement occurs, the lowest floor (p. 12-13) of a non-conforming structure, including
the basement and all HVAC and electrical, must be elevated or floodproofed 12 inches above the flood
elevation. After improvements, the structure will be protected from flood damage.
Store StoreStore
Store
Basement
Store
Store
Basement
Apartments Apartments
Substantial Improvement and Redevelopment continued
Example of non-residential and mixed-use substantial improvements or redevelopments
If a redevelopment occurs, the lowest floor (p. 12-13) of a non-conforming structure, including
the basement and all HVAC and electrical, must be elevated or floodproofed 18 inches above the
flood elevation. After improvements, the structure will be protected from flood damage.
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3
Packet pg. 52
17
Example of attached structure
Example of detached structure
Use flood resistant
materials to 18"
above flood level
• Used only for parking or storage;
• Is an accessory to a main structure;
• Must be anchored to resist flotation;
• Can either elevate to freeboard level (p. 10-11) or be
built at grade;
• If not elevated to freeboard level, the garage or shed
must meet the following requirements:
–Must have 1 square inch of venting for every
square foot of enclosed area;
–Must have at least two vents located on different
sides of the structure;
–Have at least one vent on the upstream side
of the structure;
–Bottom of vents cannot be higher than 1 foot
above grade;
–Flood resistant materials must be used below the
freeboard level (p. 10-11); and
–All HVAC and electrical must be elevated to the
freeboard level (p. 10-11).
Garages, Sheds and Accessory Structures
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3
Packet pg. 53
18
Critical Facilities
COMMUNICATIONS HUB
POLICE
or FIRE STATION
HOSPITAL, URGENT CARE, SURGICAL CENTER
JAIL LIBRARY
At-Risk Populations Critical Facilities
Government Services
Critical Facilities
Essential Services
Critical Facilities
Hazardous Materials
Critical Facilities
Critical facilities are not allowed in the floodplain fringe or floodway. Examples of critical facilities are shown below:
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3
Packet pg. 54
19
Letter of Map Revision Based on Fill
• A Letter of Map Revision Based on Fill (LOMR-Fill) is a FEMA process whereby a property in the flood fringe can be filled and is no
longer considered in the floodplain for insurance requirements.
• A community must sign-off on the application to FEMA and certify that all existing and future structures will be “reasonably safe from
flooding.”
• To meet this “reasonably safe from flooding” standard, all floodplain requirements (p. 8-9) must be met even if fill is placed and the
property is “removed” from the floodplain by FEMA.
Example of fill placed in the flood fringe
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3
Packet pg. 55
20
Erosion Buffer Limits
• Erosion hazard areas occur where the channel bed and banks are unstable, causing the stream to move over time.
• Migration is a natural characteristic of a stream. Some streams are more prone to migration than others depending on the type of
material that makes up the bed and banks.
• Urbanization can have a pronounced impact on these natural processes, resulting in accelerated erosion.
• Erosion buffer limits have been delineated for those streams that are subject to severe erosion hazards. These include Fossil Creek,
Boxelder Creek, McClellands Creek and Mail Creek.
• If development is restricted from these unstable areas, there will be less need in the future to defend the development from the
stream. Defending the development may solve one problem but could create another upstream or downstream.
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3
Packet pg. 56
21
Requirements within erosion buffer limits
• Structures are not allowed.
• Irrigated grasses or shrubs are not allowed.
• Detention ponds or water quality ponds are not allowed.
• Parking lots are not allowed.
• Temporary or permanent storage of materials is not allowed.
• The area within the buffer must not be used for construction traffic for any development.
• All utilities must be kept out except for necessary stream crossings.
• Bike paths must be kept out except for necessary stream crossings.
• Road bridges must span the entire buffer limit. If there is no possibility of spanning the entire limit, the location
crossing and design of abutments must be done so as to limit disturbance of the channel banks.
• Grading or excavation is not allowed in the buffer unless associated with a bridge or utility crossing as noted above.
• A stability study may be required.
Erosion Buffer Limits continued
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3
Packet pg. 57
22
Building Permit and Development Review Approval Requirements
• Floodplain Use Permit for any work being done on a structure or property in the floodplain. The permit fees are shown in the table
on page 23.
• Building plans showing foundation design, flood elevation, floor elevations, HVAC elevations, size and locations of vents,
floodproofing design, emergency response and preparedness plan and other relevant information.
• No-Rise certification if working in the floodway.
• Floodplain Modeling Report if doing a floodway modification (p. 5). (See separate modeling guidelines handout.)
• Other plans or reports to document information such as grading, fill, channel stability and floodplain boundaries.
Certificate of Occupancy Approval Requirements
• FEMA Elevation Certificate or FEMA Floodproofing Certificate for any new structure, addition, substantial improvement or
redevelopment built in any floodplain. Allow two weeks for review and approval. Requires licensed surveyor for elevation certificate;
requires licensed engineer or architect for floodproofing certificate.
• No-Rise certification if working in the floodway.
• As-built modeling report, if applicable.
Variances
The Fort Collins Water Board has the authority to issue variances to the floodplain regulations if certain requirements are met. The
Board meets the third Thursday of the month. An application packet must be submitted three weeks prior to the board meeting, with a
$1,000 application fee. (See separate variance submittal handout for documentation and justification requirements.)
Floodplain Information and Assistance
Call Fort Collins Utilities at (970) 416-2632 or e-mail utilities@fcgov.com to determine if a property is in the floodplain or to discuss
floodplain regulations. More information about floodplain managment in Fort Collins is available at fcgov.com/stormwater/flooding.
Required Documentation and Submittals
(Note: Some items may require a registered professional engineer.)
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3
Packet pg. 58
23
Floodplain Permit Fees
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3
Packet pg. 59
24
Flood Insurance Information
Who needs flood insurance? EVERYONE. Flood Insurance is available for ALL properties in the City of Fort Collins,
regardless of location. Approximately 25% of damages occur in low risk areas.
Flood Insurance is required by lenders for any structure in a
FEMA 100-year floodplain.Lenders have the option of requiring
it in any other area.
• New flood insurance policies will require a FEMA Elevation
Certificate documenting the elevation of the structure.
• Fort Collins Utilities has elevation certificates on file for many
structures in the City of Fort Collins, free of charge, by calling
970-416-2632 or visiting www.fcgov.com/elevation-certificate.
• Documenting the elevation of the structure allows the flood
insurance premium to be calculated based on the risk.
• The higher the structure is elevated above the 100-year flood
level, the lower the insurance premium.
Flood Insurance is not mandatory in City-designated
floodplains. However, it is strongly recommended.
• Look into a “Preferred Risk” Flood Insurance Policy. It
combines structural coverage and contents coverage at a more
affordable price.
Important Considerations
• There is a 30-day waiting period before flood insurance
becomes effective.
• Disaster assistance is only available for major flood events
and does not cover the entire cost to rebuild your home or
business.
• Fort Collins is subject to flash flooding—there is little warning
time to move your contents to safer locations.
You can receive up to a 40% discount on your
flood insurance premiums.
• Fort Collins has some of the lowest flood insurance
premiums in the United States due to its proactive floodplain
management program.
• Check with your insurance agent to make sure you are
receiving the FEMA Community Rating System (CRS)
Discount for Fort Collins being a Class 4 Community.
To learn more, visit http://www.floodsmart.gov/, contact your
insurance agent, or call FEMA at 1-888-379-9531.
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3
Packet pg. 60
25
Example of Flood Risk Map
WELCH ST
E STUART STS LEMAY AVE
E PROSPECT RDLUKE STEMIGH STYOUNT STPATTON STPAWNEE DR
EDORA RDLAKE PL ESEMINOLE DR
E LAKE ST
SOLSTICE LNMEEKER DRCOMMANCHE DRSTONEHENGE DRBRUMAL CTE LAKE STPrinted: 04/07/2015.All floodplain boundaries are approximate.This information is based on the Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map (FIRM) and the City of Fort Collins Master Drainageway Plans. This letter does not imply that the referenced property will or will not be free from flooding or damage. A property not in the Special Flood Hazard Area or in a City Designated Floodplain may be damaged by a flood greater than that predicted on the map or from a local drainage problem not shown on the map. This map does not create liability on the part of the City, or any officer or employee thereof, for any damage that results from reliance on this information.FEMA Flood Risk MapModerate RiskMay include:- Areas of FEMA 500-year floodplain (FEMA Zone X-shaded).- Areas of FEMA or City 100-year floodplain (sheet flow) with average depths of less than 1 foot.- Areas protected by levees from the 100-year flood.Low RiskAreas outside of FEMA and City mapped 100-year and 500-year floodplains. Local drainage problems may still exist.FEMA Flood Fringe - May Include:- Areas of FEMA 100-year floodplain (FEMA Zones A, AE, AO, and AH)- Areas of City 100-year floodplain including ponding areas and sheet flow areas with average depths of 1-3 feet.There is a 1% annual chance that these areas will be flooded.High RiskFEMA Floodway - Area of 100-year floodplain with greatest depths and fastest velocities.0 190 380 570 76095FeetADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3
Packet pg. 61
City of Fort Collins
Floodplain Regulations for the POUDRE RIVER
Note: This guide was prepared as an educational tool to help explain portions of the floodplain regulations, and is not intended as
a complete or detailed explanation of the legal requirements that may apply to a particular property. Article II of Chapter 10 of the
City Code specifies the requirements and prohibitions that are outlined generally in this guide and is the controlling legal document
in the event of any conflict or inconsistency between this guide and the City Code. The Code provisions can be found at
http://www.colocode.com/ftcollins/municipal/chapter10.htm.
Prepared by Fort Collins Utilities, PO Box 580, 700 Wood St., Fort Collins, CO 80522-0580
970-416-2632 • fcgov.com/stormwater/fldplain.php 3/18
Quick GuideQuick Guide
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4
Packet pg. 62
2
Table of Odds for Different Events
Floodplain Facts
• Property in the 100-year floodplain has a 1 percent chance in any given year of being flooded.
• Over a 30-year period, there is a 26 percent chance that a property in the 100-year floodplain will be flooded. For comparison,
there is only a 5 percent chance that the building will catch fire during that same 30-year period.
• Some properties have an even higher risk of flooding because they are in areas where smaller, more frequent floods cause damage.
Purpose of Floodplain Regulations
Event Odds
Structure in the 100-year floodplain being flooded in any given year
Matching one number plus Powerball in the Powerball Lottery
Structure in the 500-year floodplain being flooded in any given year
Annual chance of being killed in a car accident if you drive 10,000 miles/year
Being struck by lightning
Winning the Powerball Lottery jackpot (matching five numbers and the Powerball)
1 in 100
1 in 124
1 in 500
1 in 4,000
1 in 600,000
1 in 120,526,770
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4
Packet pg. 63
3
Types of Floodplains
Floodplain Name
Poudre River
Spring Creek
Dry Creek
Cooper Slough
Boxelder Creek
Fossil Creek
Old Town
Canal Importation
McClellands Creek
Mail Creek
Foothills Channel
West Vine
FEMA-Basin
X
X
X
X
City-BasinPoudre River
X
X
X
X
X
X
X
X
Floodplain Designations
• In Fort Collins, floodplains are designated by the City as well as by the Federal Emergency Management Agency (FEMA).
• The FEMA-basin floodplains cover only the major drainages. Changes in these floodplains must be approved by FEMA (p. 5).
• The City-basin floodplains further identify the flood hazard. Some of the flooding in City-basin floodplains is from irrigation ditch
spills or undersized storm sewers that result in overland flooding. Changes in these floodplains can be approved by the City (p. 5).
• For floodplain regulation purposes, a floodplain property is either in a FEMA-basin floodplain, a City-basin floodplain or the Poudre
River floodplain.
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4
Packet pg. 64
4
• The floodway is the portion of the floodplain with the greatest depths and velocities.
• The floodway is the area of highest risk.
• The floodway must be preserved to allow the floodwater to pass through without being obstructed.
• Areas along the flood fringe are allowed to be filled and developed, but this raises the 100-year flood level.
The City has set an allowable rise of 0.5 feet.
Floodway
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4
Packet pg. 65
5
Floodway Modifications
• Floodways can be modified, but the applicant must be able to show that the project casues no-rise in the 100-year flood level.
• In FEMA-basin floodplains, the applicant must submit information to FEMA for approval before construction and after construction
if certain changes are being made.
If the applicant’s project causes a rise, there are two options:
1. In FEMA-basin floodplains, the applicant must show the entire rise is on their property or obtain easements from other property
owners. No structures can be impacted by a rise in the flood level.
2. In City-basin floodplains, the applicant must show that the entire rise is on their property or obtain easements from other
property owners.
Example of a Floodway Modification
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4
Packet pg. 66
6
Summary of Floodway Development Regulations
Residential Development
• New residential development is not
allowed.
• Fill is not allowed unless the
applicant can show no-rise (Floodway
Modifications, p. 5).
• Residential additions are not allowed.
• Remodels are allowed subject to the
substantial improvement requirements
(p. 14-15).
• Manufactured homes are allowed only in
existing manufactured home parks.
• Redevelopment (rebuild) of an existing
structure is not allowed.
• Reconstruction of a substantially
damaged structure is prohibited
• Detached garages and sheds are not
allowed.
Non-Residential Development
• New non-residential development is not
allowed.
• Fill is not allowed unless the
applicant can show no-rise (Floodway
Modifications, p. 5).
• Non-residential additions are not
allowed.
• Remodels are allowed subject to the
substantial improvement requirements
(p. 14-16).
• Mobile buildings (modular offices) are
allowed only in existing mobile building
developments.
• Redevelopment (rebuild) of an existing
structure is not allowed.
• Reconstruction of a substantially
damaged structure is prohibited
• Detached garages and sheds are
not allowed.
Mixed-Use Development (Residential
and Non-Residential in the same building)
• New mixed-use development is not
allowed.
• Fill is not allowed unless the applicant can
show no-rise (Floodway Modifications, p.
5).
• Additions are not allowed to a mixed-use
structure.
• Remodels are allowed subject to the
substantial improvement requirements (p.
14-16).
• Redevelopment (rebuild) of an existing
structure is not allowed.
• Reconstruction of a substantially
damaged structure is prohibited
• Detached garages and sheds are not
allowed.
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4
Packet pg. 67
7
• Critical facilities are not allowed (See
proposed alternatives on p. 18).
• New basements are not allowed below
the freeboard level (p. 10). An existing
basement in a substantially improved
structure is not allowed to remain
(p. 10 and 14-15).
• Critical facilities are not allowed (See
proposed alternatives on p. 18).
• An emergency response and
preparedness plan is required (p. 19).
• New basements are not allowed below
the freeboard level (p. 10-11). An
existing basement in a substantially
improved structure can remain if
floodproofed (p. 10-11 and 14-16).
• New outside storage of material or
equipment, including flotable materials,
is not allowed (p. 21).
• Critical facilities are not allowed (See
proposed alternatives on p. 18).
• An emergency response and
preparedness plan is required (p. 19).
• New basements are not allowed below
the freeboard level (p. 10-11). An
existing basement in a substantially
improved structure is not allowed to
remain if it is in residential use (p. 10
and 14-15). An existing basement
in a substantially improved structure
is allowed to remain if it is in non-
residential use and floodproofed
(p. 10-11 and 14-16).
• New outside storage of material or
equipment, including flotable materials,
is not allowed (p. 21).
Summary of Floodway Development Regulations (continued)
Residential Development Non-Residential Development Mixed-Use Development (Residential
and Non-Residential in the same building)
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4
Packet pg. 68
8
Summary of Floodplain Fringe Development Regulations
Residential Development
• New residential development is not
allowed.
• Fill is allowed.
• Residential additions are not allowed.
• Remodels are allowed subject to the
substantial improvement requirements
(p. 14-15).
• Manufactured homes are allowed only
to replace an existing manufactured
home or fill a vacant lot in an existing
manufactured home park.
• Redevelopment (rebuild) of an existing
structure is allowed (p. 14-15). Must
meet the freeboard requirements
(p. 10).
• Attached garages are not allowed.
Detached garages and sheds are
allowed (p. 17).
• Critical facilities are not allowed (See
proposed alternatives on p. 18).
Non-Residential Development
• New non-residential development
is allowed. Must meet the freeboard
requirements (p. 10-11).
• Fill is allowed.
• Non-residential additions are allowed.
Must meet the freeboard requirements
(p. 10-11).
• Remodels are allowed subject to the
substantial improvement requirements
(p. 14-16).
• Mobile buildings (modular offices) are
allowed only to replace an existing
mobile building or fill a vacant lot in an
existing mobile building development.
• Redevelopment (rebuild) of an existing
structure is allowed (p. 14-16). Must
meet the freeboard requirements.
(p. 10-11).
• Attached garages, detached garages
and sheds are allowed (p. 17).
• Critical facilities are not allowed (See
proposed alternatives on p. 18).
Mixed-Use Development (Residential
and Non-Residential in the same building)
• New mixed-use development is
not allowed.
• Fill is allowed.
• Residential additions are not allowed to
a mixed-use structure. Non-residential
additions are allowed to a mixed-use
structure. Must meet the freeboard
requirements (p. 10-11).
• Remodels are allowed subject to the
substantial improvement requirements
(p. 14-16).
• Redevelopment (rebuild) of an existing
structure is allowed (p. 14-16). Must
meet the freeboard requirements
(p. 10-11).
• Attached garages, detached garages
and sheds are allowed (p. 17).
• Critical facilities are not allowed (See
proposed alternatives on p. 18).
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4
Packet pg. 69
9
Non-Residential Development
• New outside storage of equipment or
materials that are considered “floatable”
is not allowed (p. 21).
• New basements are allowed. Must
meet freeboard requirements and be
floodproofed (p. 10-11). An existing
basement below the freeboard level in
a redeveloped or substantially improved
structure can remain if floodproofed
(p. 10-11 and 14-16).
• An emergency response and
preparedness plan is required (p. 19).
Residential Development
• New basements are not allowed
below the freeboard level (p. 10). An
existing basement in a redeveloped or
substantially improved structure is not
allowed to remain (p. 10 and 14-15).
Summary of Floodplain Fringe Development Regulations (continued)
Summary of 500-Year Floodplain Development Regulations
Residential Development
• At-risk populations and essential
services critical facilities are not allowed
(p. 18).
Non-Residential Development
• At-risk populations and essential
services critical facilities are not allowed
(p. 18).
Mixed-Use Development Residential
and Non-Residential in the same building)
• At-risk populations and essential
services critical facilities are not allowed
(p. 18).
Mixed-Use Development (Residential
and Non-Residential in the same building)
• New outside storage of equipment or
materials that are considered “floatable”
is not allowed (p. 21).
• New basements are not allowed below
the freeboard level for residential
portions of mixed-use structures (p. 10).
An existing basement in a redeveloped
or substantially improved structure
is not allowed to remain if it is in
residential use (p. 10 and 14-15).
New basements are allowed for
non-residential portions of mixed-
use structures. Must meet freeboard
requirements and be floodproofed
(p. 10-11). An existing basement in a
redeveloped or substantially improved
structure is allowed to remain if it is in
non-residential use and floodproofed
(p. 10-11 and 14-16).
• An emergency response and
preparedness plan is required (p. 19).
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4
Packet pg. 70
10
Freeboard
• Freeboard is a factor of safety that accounts for the allowed rise in flood level due to development in the flood fringe and for larger
floods and debris that may cause the flood elevation to be higher.
• Freeboard is a measure of how high above the flood level the structure must be built or floodproofed.
Residential Structures and Residential Portions of Mixed-Use Structures
• Freeboard is 24 inches;
• Must elevate the structure; not allowed to floodproof; and
• The lowest floor of the structure (p. 12-13), including the basement, all HVAC and electrical, must be elevated above the
freeboard height.
Example of redevelopment residential elevation
(See p. 12-13 for detailed foundation designs)
Slab on grade foundation Crawl space foundation
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4
Packet pg. 71
11
Freeboard continued
Floodproofing uses various techniques to make a
building water tight:
•Sealants and waterproof membranes;
•Closure shields in front of doorways; and
•Mini-walls to protect window or stair wells.
Floodproofing generally works only when flood
depths are less than 3 feet.
Example of new development
non-residential floodproofing
Non-Residential Structures and
Non-Residential Portions of Mixed-Use Structures
• Freeboard is 24 inches;
• Allowed to either elevate or floodproof the structure;
• In the floodway, new basements are not allowed;
• If elevating, the lowest floor of the structure (p. 12-13),
including the basement, all HVAC and electrical, must be
elevated above the freeboard height; and
• If floodproofing, the structure as well as all HVAC and
electrical, must be floodproofed to the freeboard height.
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4
Packet pg. 72
12
Determination of Lowest Floor Based on Type of Foundation
Slab on Grade
The lowest floor elevation of a slab on
grade structure is measured at the top
of the slab.
Basement
The lowest floor elevation of
a structure with a basement
is measured at the top of the
basement slab.
Enclosure (above grade crawl space)
2. The lowest floor
elevation of a structure
with an enclosure that is
not built in accordance
with the venting criteria
(p. 17) is measured at
the lowest interior grade
of the enclosure.
Lowest floor
elevation Freeboard
Floor slab
on grade
Freeboard
Vents
Enclosure
Lowest floor
elevation
Unfinished area
no HVAC
Vents
Lowest floor
elevation Freeboard
Basement
Basement slab
Freeboard
Can have HVAC in enclosed area
Lowest floor elevation
Enclosure
1. The lowest floor elevation of a
structure with an enclosure
that is built in accordance
with the venting criteria
(p. 17) is measured
at the floor of the
first finished
floor.
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4
Packet pg. 73
13
Determination of Lowest Floor Based on Type of Foundation continued
Crawl Space (below grade)
The lowest floor of a structure with a crawl space is measured
at the lowest finished floor if the following conditions are met:
a. The velocity of the flood flows hitting the structure is less
that 5 feet per second;
b. The interior grade elevation that is below the flood
elevation is no lower than 2 feet below the lowest
adjacent grade;
c. The height of the crawl space, as measured from the
lowest interior grade of the crawl space to the top of the
foundation wall, does not exceed 4 feet at any point;
d. An adequate drainage system is in place, including a totally
immersible pump;
e. All ductwork, HVAC, hot water heater and electrical is
elevated to the regulatory flood protection elevation; and
f. Venting requirements (p. 17) are met.
If the above conditions are not met, the lowest floor is
determined based on the criteria for a basement (p. 12).
Pump
f Vent
b Maximum
2 feet
Freeboard
a Velocity < 5 ft. per sec.
c No more than
4 feet to top of
foundation wall
Crawl space
e Duct Work
d
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4
Packet pg. 74
14
Ve rtical
(Pop-top)
addition
All remodel work,
including vertical
addition, counts
toward substantial
improvement
Remodels or Repair of Damaged Buildings
• Remodels and repairs are allowed subject to the substantial improvement requirements (p. 15-16).
• Vertical additions (pop-tops) are considered a remodel and are subject to the substantial improvement requirements (p. 15-16).
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4
Packet pg. 75
15
Substantial Improvement and Redevelopment
Residential Structures and Residential
Portions of Mixed-Use Structures
If a substantial improvement occurs, the lowest
floor (p. 12-13) of a non-conforming structure,
including the basement, and all HVAC, electrical
and utilities, must be elevated 24 inches above the
flood elevation. After improvements, the structure
will be protected from flood damage.
If a redevelopment occurs, the lowest floor (p.
12-13) of a non-conforming structure, including the
basement, all HVAC, electrical and utilities, must be
elevated 24 inches above the flood elevation. After
improvements, the structure will be protected from
flood damage.
Substantial improvement occurs when all of the following conditions are met:
1. A building permit is requested for any repair, reconstruction or improvement to a non-conforming structure, involving alteration of
any wall, ceiling, floor or other structural part of the building;
2. The cost of the improvement, or the amount of damage, equals or exceeds 50 percent of the market value of the structure either
before the improvement or repair is started or before the building was damaged; and
3. The cost is calculated cumulatively over the life of the structure during the time the structure has been located in a designated
floodplain.
A substantial improvement policy ensures that non-conforming structures are brought into conformance over time and are therefore
protected from flood damage and the risk to occupants is reduced.
Redevelopment occurs when there is a substantial improvement and more than 50 percent of the wall perimeter of any floor of a
structure that is partially or completely below the flood elevation is removed or replaced and the building footprint is not increased.
Example of residential substantial improvement or redevelopment
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4
Packet pg. 76
16
Non-Residential Structures and Non-Residential Portion of Mixed-Use Structures
If a substantial improvement occurs, the lowest floor (p. 12-13) of a non-conforming structure,
including the basement and all HVAC and electrical, must be elevated or floodproofed 24 inches above
the flood elevation. After improvements, the structure will be protected from flood damage.
Substantial Improvement and Redevelopment continued
Example of non-residential and mixed-use substantial improvements or redevelopments
If a redevelopment occurs, the lowest floor (p. 12-13) of a non-conforming structure, including
the basement and all HVAC and electrical, must be elevated or floodproofed 24 inches above the
flood elevation. After improvements, the structure will be protected from flood damage.
Store StoreStore
Store
Basement
Store
Store
Basement
artments artments
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4
Packet pg. 77
17
Example of attached structure
Example of detached structure
• Used only for parking or storage;
• Is an accessory to a main structure;
• Must be anchored to resist flotation;
• All HVAC and electrical must be elevated to the
freeboard level (p. 10-11);
• Can either elevate to freeboard level (p. 10-11) or be
built at grade; and
• If not elevated to freeboard level, the garage or shed
must meet the following requirements:
• Must have 1 square inch of venting for every
square foot of enclosed area;
• Must have at least two vents located on different
sides of the structure;
• Have at least one vent on the upstream side
of the structure;
• Bottom of vents cannot be higher than 1 foot
above grade; and
• Flood resistant materials must be used below the
freeboard level (p. 10-11).
Garages, Sheds and Accessory Structures
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4
Packet pg. 78
18
Critical Facilities
COMMUNICATIONS HUB
POLICE
or FIRE STATION
HOSPITAL, URGENT CARE, SURGICAL CENTER
JAIL LIBRARY
At-Risk Populations Critical Facilities
Government Services
Critical Facilities
Essential Services
Critical Facilities
Hazardous Materials
Critical Facilities
100-year floodplain:
• All Critical Facilities not allowed in the 100-year floodplain.
500-year floodplain:
• At-risk Populations and Essential Services Critical
Facilities are not allowed in the 500-year floodplain.
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4
Packet pg. 79
19
• Required for new non-residential or mixed-use structure,
addition, cumulative substantial improvement, redevelopment
or change of occupancy
• The following must be included in the plan:
– Flood Risk Assessment
– Method of receiving a flood warning
– Identification and assignment of personnel to implement
the plan
– Procedures for notifying employees, customers and other
building occupants
– Description of procedures for evacuation and
shelter-in-place
– Procedures for protecting the building from damage or
hazardous conditions
– Process for distribution of the plan, evacuation routes and
shelter-in-place instructions
– Description of mandatory training and practice drills
– Description of post-recovery measures
– Designation of responsible party
• Plan and documentation of training and drills to remain on file
• The plan must be reviewed in the first quarter of every year and
documentation submitted to the City
Emergency Response and Preparedness Plan
Emergency Response and Preparedness Plan (ERPP)
In order to mitigate life-safety hazards to occupants of private property within the Poudre River floodplain,
Chapter 10 of City Code requires for non-residential and mixed-use additions, substantial improvements,
change of use, redevelopment and/or new development that private property owners demonstrate flood-
preparedness through the development and implementation of a site-specific Emergency Response and
Preparedness Plan (ERPP). The plan includes, at a minimum, conditions and methods for emergency
preparedness and evacuation from the property. If desired by the property owner, additional measures for flood
protection may be included.
Applicant Information
Name of Business:Type of Business:
Address:
Street Address Unit #
City State ZIP Code
County Parcel ID #:Business Phone Number:( )
Reason for Review:Redevelopment Annual Update
New Structure Addition
Change of Occupancy Other:
Substantial Improvement
Authorized Persons (Staff Contacts)
These persons will be the responsible parties in the event of an emergency. They will redirect resources and, ultimately,
shut down operations, if necessary. These persons will also initiate evacuation in the event of an emergency.
Primary Person:E-Mail Address:
(Name)
Title:Work Phone:()
Cell Phone:( )
Other Contact:( )
The back-up person should be trained to fulfill all the duties of the primary person (monitor weather radio, have necessary
apps/programs installed on personal devices).
Back-Up Person:E-Mail Address:
(Name)
Title:Work Phone:( )
Cell Phone:( )
Other Contact:( )
1
Sample: page 1 of Emergency Response and
Preparedness Plan
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4
Packet pg. 80
20
Letter of Map Revision Based on Fill
• A Letter of Map Revision Based on Fill (LOMR-Fill) is a FEMA process whereby a property in the flood fringe can be filled and is no
longer considered in the floodplain for insurance requirements.
• A community must sign-off on the application to FEMA and certify that all existing and future structures will be “reasonably safe from
flooding.”
• To meet this “reasonably safe from flooding” standard, all floodplain requirements (p. 8-9) must be met even if fill is placed and the
property is “removed” from the floodplain by FEMA.
Example of fill placed in the flood fringe
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4
Packet pg. 81
21
Outside Storage of Materials or Equipment and Floatable Materials
• “Floatable material” is defined as material that is not secured in place or completely enclosed in a structure so that it could float
off-site during a flood and potentially cause harm to downstream property owners or that could cause blockage of a culvert, bridge
or other drainage facility.
•In the floodway, all outside storage of material or equipment, including floatable materials, associated with any non-residential use is
not allowed.
•In the flood fringe, floatable materials associated with any non-residential use is not allowed.
•In the flood fringe, outside storage of material or equipment that is not considered “floatable material” is allowed.
Stacks of Lumber Containers and Drums Fleet Vehicles
Equipment Material Stockpile
All of these examples are
floatable materials if not
adequately secured.
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4
Packet pg. 82
22
Required Documentation and Submittals
(Note: Some items may require a registered professional engineer.)
Building Permit and Development Review Approval Requirements
• Floodplain Use Permit for any work being done on a structure or property in the floodplain. The permit fees are shown in the table
on page 23.
• Building plans showing foundation design, flood elevation, floor elevations, HVAC elevations, size and locations of vents,
floodproofing design and other relevant information.
•Emergency Response and Preparedness Plan (p. 19).
• No-Rise certification if working in the floodway.
• Floodplain Modeling Report if doing a floodway modification (p. 5). (See separate modeling guidelines handout.)
• Other plans or reports to document information such as grading, fill, channel stability and floodplain boundaries.
Certificate of Occupancy Approval Requirements
• FEMA Elevation Certificate or FEMA Floodproofing Certificate for any new structure, addition, substantial improvement or
redevelopment built in any floodplain. Allow two weeks for review and approval. Requires licensed surveyor for elevation certificate;
requires licensed engineer or architect for floodproofing certificate.
• No-rise certification if working in the floodway.
• As-built modeling report, if applicable.
Variances
The Fort Collins Water Board has the authority to issue variances to the floodplain regulations if certain requirements are met. The
Board meets the third Thursday of the month. An application packet must be submitted three weeks prior to the board meeting, with a
$1,000 application fee. (See separate variance submittal handout for documentation and justification requirements.)
Floodplain Information and Assistance
Call Fort Collins Utilities at (970) 416-2632 or e-mail utilities@fcgov.com to determine if a property is in the floodplain or to discuss
floodplain regulations. More information about floodplain managment in Fort Collins is available at fcgov.com/stormwater/flooding.
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4
Packet pg. 83
23
Floodplain Permit Fees
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4
Packet pg. 84
24
Flood Insurance Information
Who needs flood insurance? EVERYONE. Flood Insurance is available for ALL properties in the City of Fort Collins,
regardless of location. Approximately 25% of damages occur in low risk areas.
Flood Insurance is required by lenders for any structure in a
FEMA 100-year floodplain.Lenders have the option of requiring
it in any other area.
• New flood insurance policies will require a FEMA Elevation
Certificate documenting the elevation of the structure.
• Fort Collins Utilities has elevation certificates on file for many
structures in the City of Fort Collins, free of charge, by calling
970-416-2632 or visiting www.fcgov.com/elevation-certificate.
• Documenting the elevation of the structure allows the flood
insurance premium to be calculated based on the risk.
• The higher the structure is elevated above the 100-year flood
level, the lower the insurance premium.
Flood Insurance is not mandatory in City-designated
floodplains. However, it is strongly recommended.
• Look into a “Preferred Risk” Flood Insurance Policy. It
combines structural coverage and contents coverage at a more
affordable price.
Important Considerations
• There is a 30-day waiting period before flood insurance
becomes effective.
• Disaster assistance is only available for major flood events
and does not cover the entire cost to rebuild your home or
business.
• Fort Collins is subject to flash flooding—there is little warning
time to move your contents to safer locations.
You can receive up to a 40% discount on your
flood insurance premiums.
• Fort Collins has some of the lowest flood insurance
premiums in the United States due to its proactive floodplain
management program.
• Check with your insurance agent to make sure you are
receiving the FEMA Community Rating System (CRS)
Discount for Fort Collins being a Class 4 Community.
To learn more, visit http://www.floodsmart.gov/, contact your
insurance agent, or call FEMA at 1-888-379-9531.
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4
Packet pg. 85
25
Example of Flood Risk Map
E VINE DRN COLLEGE AVE
LI
N
D
E
N
S
TWILLOW STPI
N
E
S
TMAPLE STCHERRY STPOUDRE STJEROME ST
Printed: 04/07/2015.All floodplain boundaries are approximate.This information is based on the Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map (FIRM) and the City of Fort Collins Master Drainageway Plans. This letter does not imply that the referenced property will or will not be free from flooding or damage. A property not in the Special Flood Hazard Area or in a City Designated Floodplain may be damaged by a flood greater than that predicted on the map or from a local drainage problem not shown on the map. This map does not create liability on the part of the City, or any officer or employee thereof, for any damage that results from reliance on this information.FEMA Flood Risk MapModerate RiskMay include:- Areas of FEMA 500-year floodplain (FEMA Zone X-shaded).- Areas of FEMA or City 100-year floodplain (sheet flow) with average depths of less than 1 foot.- Areas protected by levees from the 100-year flood.Low RiskAreas outside of FEMA and City mapped 100-year and 500-year floodplains. Local drainage problems may still exist.FEMA Flood Fringe - May Include:- Areas of FEMA 100-year floodplain (FEMA Zones A, AE, AO, and AH)- Areas of City 100-year floodplain including ponding areas and sheet flow areas with average depths of 1-3 feet.There is a 1% annual chance that these areas will be flooded.High RiskFEMA Floodway - Area of 100-year floodplain with greatest depths and fastest velocities.0 160 320 480 64080FeetADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4
Packet pg. 86
FORT COLLINS: ˏˏFlooding on College Avenue south of Drake Road, May 31, 2020..ˏ)º/ˏ%*"+.)%ĥ*ˏ!.ˏ !ˏ%*1* %+*!/ȑˏ2%/%0!ˏ"#+2Ȑ+)ȩ%*1* %+*ȐADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 5Packet pg. 87
*+3(! #!ˏ%/ˏ+3!.ȗˏ05ˏ *"+.)! ˏ1.%*#ˏ(++ /
%!3ˏ!(ȥ%)!ˏ%*"((ˏ* ˏ0.!)fl+3ˏ0
Have you ever wondered how much rain is falling near your house or what the
flow is in on the Poudre River? Real-time data is available from the City’s early
flood warning system, which includes the same streamflow and precipitation
gauges monitored by City staff. Visit "#+2Ȑ+)ȩ floodw.*%*#/5/0!).
0$!.ˏ+1.!/ˏ+"ˏ!0$!.ˏ* ˏ)!.#!*5ˏ *"+.)0%+*
• National Weather Service – online or via an NOAA Weather Radio
• Local TV and radio
• LETA911 – Sign up for emergency notifications at (!0ȏȆȆȐ +.#.
• To report general flooding, call 970-221-6700. +ˏ*+0 call 911 for information.
*+3ˏ0$!ˏ%ff!.!*!ˏ!03!!*ˏˏȝ0$Ȟˏ* ˏˏȝ.*%*#Ȟ
(5ˏ 0ˏ"!ˏ+*ˏ0$!ˏ+1 .!ˏȦˏ*+3ˏ!"+.!ˏ+1ˏ+
With the new Poudre River Whitewater Park open on the Poudre River, it is
important to respect the power of water – Play It Safe. Make sure to wear a life
vest. Know the flow and weather conditions. Plan where you are going and
especially where your take-out location is located. Find more safety information
at "#+2Ȑ+)ȩȥ.%2!.ȥ/"!05.
5'!./ˏ0ˏ0$!ˏ*!3ˏ$%0!30!.ˏ.'Ȑ !ˏ(!.0ˏ"+.ˏ$6. /Ȑ
(++ ˏ.*%*#
• Flooding is happening
or will happen soon.
• Take immediate action.
(++ ˏ0$
• Flooding is possible.
• Be alert and prepared.
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 5
Packet pg. 88
+),(!0! ˏ%*ˏȇȅȆȋȑˏ0$%/ˏ/!0%+*ˏ+"ˏ+//%(ˏ.!!'ȑˏ1,/0.!)ˏ+"ˏ!)5ˏ2!*1!ȑˏ3/ˏ,.0ˏ+"ˏ
0$!ˏ%05Ȟ/ˏ/0.!)ˏ.!$%(%00%+*ˏ,.+#.)Ȑˏ$!ˏ/0.!)ˏ*'/ˏ3!.!ˏ(% ˏ'ˏ"+.ˏ/"!05ȑˏ* ˏ
0$!ˏ)!* !./ˏ+"ˏ0$!ˏ/0.!)ˏ3!.!ˏ.!/0+.! Ȑˏ!#!00%+*ˏ*+3ˏ,.+0!0/ˏ0$!ˏ/0.!)ˏ*'/ˏ
".+)ˏ!.+/%+*Ȑ
.+0!0ˏ!0(* /ȑˏ0!.35/ȑˏ* ˏ0$!ˏ*'/ˏ+"ˏ
%2!./ˏ* ˏ0.!)/ˏȐȐȐˏ$!5ˏ.+0!0ˏ+1
Flooding is a natural process. A healthy ecosystem along the river relies upon
frequent inundations to survive and thrive. Floodplains help reduce flood
damage by allowing water to spread out over a large area. This reduces the
speed of floodwater as it is soaked up in wetlands like a sponge, lowering peak
flows downstream.
You can experience the natural beauty and wildlife habitats that help Fort Collins
be flood ready at over 17 conserved natural areas along the Cache la Poudre
River. Learn more at "#+2Ȑ+)ȩ*01.(.!/.
There are many City-conserved open spaces that also
reduce the flood hazard along Spring Creek, Fossil
Creek and other drainages.
Open space along waterways provides natural flood and erosion control, as
well as a place for us to enjoy the outdoors. Look for birds such as kingfishers,
great blue herons, redtail hawks, great horned owls and a diversity of migratory
songbirds that use drainage corridors, too.
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 5
Packet pg. 89
!.*ˏ+3ˏ0+ˏ.+0!0ˏ+1.ˏ.+,!.05ˏ* ˏ)%(5
ˏˏ ˏˏˏˏ
1.chase flood
%*/1.*!Ȑ
+ˏ*+0ˏ .%2!ˏ0$.+1#$ˏ
floodw0!.Ȑ
$!'ˏ"+.ˏ/0.101.(ˏ
)#!ˏ0+ˏ5+1.ˏ
1%( %*#Ȑˏ
'!ˏ*ˏ!)!.#!*5ˏ
,(*Ȑ
+2!ˏ0o upper floors
+"ˏ5+1.ˏ$+)!ˏ+.ˏ(%)ˏ
0+ˏ$%#$!.ˏ#.+1* Ȑ
+1)!*0ˏ((ˏ )#!/Ȑ
+1)!*0ˏ5+1.ˏ
!(+*#%*#/Ȑ
+*Ȟ0ˏ3('ˏ0$.+1#$ˏ
flo3%*#ˏ30!.Ȑ
!)+2!ˏ((ˏ3!0ˏ%0!)/Ȑ
0+.!ˏ2(1(!ˏ%0!)/ˏ
Ȭ+),10!./ȑˏ")%(5ˏ
,$+0+/ȑˏ$!%.(++)/ȑˏ
!0Ȑȭˏ0ˏ$%#$!.ˏ
(+0%+*/ˏ%*ˏ5+1.ˏ$+)!Ȑˏ
%/0!*ˏ"+.ˏ!)!.#!*5ˏ
1, 0!/Ȑ
!0ˏˏ(++ ,(%*ˏ/!ˏ
!.)%0ˏ* ˏˏ1%( %*#ˏ
!.)%0ˏ!"+.!ˏ)'%*#ˏ
*5ˏ.!,%./Ȑ
%#*ˏ1,ˏ"+.ˏ!)!.#!*5ˏ
)!//#!/ˏ0ˏ(!0ȏȆȆȐ+.#Ȑ
urn off elec0.%%05ˏ0ˏ0$!ˏ
)%*ˏ,+3!.ˏ/3%0$ˏ* ˏˏ
shut off w0!.ˏ* ˏ#/Ȑ
+*00ˏ5+1.ˏ%*/1.*!ˏ
#!*t and file a flood
%*/1.*!ˏ(%)Ȑ
!ˏ! ˏ.+//ˏ! 5Ȑˏ!0ˏˏ'%0Ȑˏ
'!ˏˏ,(*Ȑˏ!ˏ%*"+.)! Ȑˏˏ
!0%(/Ȓˏ.! .+//Ȑ+.#ȩ,.!,.!
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 5
Packet pg. 90
*(5ˏ(++ ˏ */1.*!ˏ+2!./ˏ(++ /ˏȦˏ
1.$/!ˏ(++ ˏ */1.*!
Flood insurance is highly recommended and covers all surface floods. Most
standard property insurance policies do not cover flood damage. +1ˏ +*Ȟ0ˏ$2!ˏ
0+ˏ(%2e in a floodplain or high-risk ar!ˏ0+ˏ,1.chase flood insur*!.
Any walled and roofed
structure can be insured,
and separate coverage
is available for building
contents.
Renters can purchase
insurance for their
belongings, even if the
owner has not purchased
structural coverage.
Don’t wait for the next flood
to buy insurance – there is a
30-day waiting period before
National Flood Insurance
takes effect. Insurance
agents sell policies under
rules and rates set by the
federal government.
$!ˏ%05ˏ+"ˏ+.0ˏ+((%*/ˏ/ˏ+)!ˏ+"ˏ0$!ˏ+3!/0ˏ(++ ˏ
*/1.*!ˏ.!)%1)/ˏ
The Community Rating System (CRS) provides reduced flood insurance
premiums to communities that exceed the minimum federal NFIP requirements.
Fort Collins floodplain residents
receive one of the lowest flood
insurance rates in the country as
a result of Fort Collins Utilities’
Floodplain Management Program and
from several drainage improvement
projects constructed using
stormwater fees.
15ˏ3$!*ˏ%0Ȟ/ˏ .5Ȑˏ+*Ȟ0ˏ3%0ˏ0+ˏ#!t flood insur*!Ȑ
Residents and businesses in
Fort Collins can receive up
to a 40% discount on flood
insurance premiums.
Call 970-416-2632 to learn
more about flood insurance.
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 5
Packet pg. 91
1%( ˏ!/,+*/%(5Ȓˏˏ
*+3ˏ0$!ˏ(++ ,(%*ˏ!#1(0%+*/
Before you begin any construction (new development, addition, remodel, filling,
grading, etc.) on your building or property, contact Fort Collins Utilities for
specific floodplain regulation requirements. Some important considerations are
listed below.
!0ˏˏ(++ ,(%*ˏ/!ˏ!.)%0ˏ!"+.!ˏ+1ˏ1%( ˏ+.ˏ. !
These required permits ensure that structures are protected from flood damage
and that construction projects do not cause flooding problems for existing
properties. According to Fort Collins City Code, all new residential structures
and additions built in the 100-year floodplain must be elevated above the 100-
year water surface elevation. New non-residential buildings and additions also
must be elevated or floodproofed above the 100-year flood elevation.
(++ 35ˏ!-1%.!)!*0/
The floodway is the most dangerous section of the floodplain. New residential
development is not allowed and commercial development is very restricted. For
all other permitted development, an engineering analysis that shows no-rise in
the 100-year flood elevation is required.
1/0*0%(ˏ ),.+2!)!*0ˏ!-1%.!)!*0
If the cost of reconstruction, rehabilitation or other improvements to a building
equals or exceeds 50% of the existing market value, the structure must meet
some of the same requirements as those of a new building. Substantially
damaged buildings must meet the same standards upon reconstruction.
Improvement requirements are addressed during the floodplain development
permitting process.
For more information, call 970-416-2632 or email 10%(%0%!/Ȳ"#+2Ȑ+).
1'5Ȟ/ˏ
.'!0ˏ)!0ˏ0$!ˏ
/1/0*0%(ˏ%),.+2!)!*0ˏ
.!-1%.!)!*0/ˏ* ˏ.%/! ˏ
0$!ˏ%*0erior floor b5ˏ
,,.+4%)0!(5ˏȌˏ%*$!/Ȑˏ
$%/ˏ1%( %*#ˏ*+3ˏ%/ˏˏ
!00!.ˏ,.+0!0! ˏ".+)ˏ
flood damageȐ
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 5
Packet pg. 92
.+0!0ˏ0$!ˏ*2%.+*)!*0
You may think it’s OK for little things to be put down the storm drain, but it all
adds up and can create problems. Our storm drains run directly into our lakes
and streams and eventually to the Cache la Poudre River. To help keep them
clean, properly dispose of motor oil, pick up
grass clippings and pet waste, and use car
washes instead of washing your car at home.
Do not dump or throw anything into ditches
or streams. Obstruction and pollution of our
waterways and ditches are violations of Fort
Collins City Code.
Report any debris or dumping in ditches or
streams to Fort Collins Utilities at
970-221-6700 or email 10%(%0%!/Ȳ"#+2Ȑ+).
1.*ˏ.+1* ȑˏ+*Ȟ0ˏ.+3*
Do you really know how deep the water is? It only takes 12 inches of water to
sweep a car away and 18-24 inches for a large truck or SUV.
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 5
Packet pg. 93
+.0ˏ+((%*/ˏ/ˏˏ(++ ˏ%/0+.5Ȓˏ
0Ȟ/ˏ+0ˏ "ȑˏ10ˏ$!*
Fort Collins has experienced numerous floods. The table below lists some of the
more notable floods in each of the city’s 12 drainage basins. Fort Collins is subject
to flooding from snowmelt on the Poudre River and flash flooding due to intense
thunderstorms. Typically, monsoon season runs from mid-July to mid-August, often
bringing heavy rainfall to Fort Collins. Some past floods, like the July 28, 1997 Spring
Creek Flood, are hard to forget. There are high water mark reminders along the
Spring Creek Trail, which document the 1997 flood. However, it does not take a large
flood to cause problems. Afternoon or evening thunderstorms can cause issues in
isolated areas, including street and basement flooding.
.*ˏ(++ %*#ˏȦˏ*+3ˏ0$!ˏ%/'
On May 22, 2018, an intense rain and hail storm tracked through Fort Collins.
Areas of town received 1.8 inches of rain in 30 minutes and hail accumulations to
depths of more than a foot. The hail clogged inlets, which resulted in localized
flooding. Numerous buildings were flooded in Old Town and on the CSU campus.
Motorists were stranded and had to be rescued. The following photos document
a few of these smaller floods that caused problems for motorists, homeowners
and businesses.
June 24, 1992 – An intense thunderstorm in Old Town caused the flooding of basements and many roads,
including near Moby Arena, pictured left.
August 2, 2007 – Street flooding near Shields Street
and Horsetooth Road.
June 6, 2009 – Flooding on Plum Street west of CSU.
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 5
Packet pg. 94
May 14, 2020 – Flooding due to poor drainage along the Mulberry Frontage Road near I-25.
August 10, 2017 – A quick rainstorm resulted in
street flooding.
May 22, 2018 – Flooding along Oak Street due to rain
and hail.
June 28, 2020 – Flooding along the Spring Creek Trail west of Lemay Avenue.
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 5
Packet pg. 95
Drainage Basins DatesDescriptionsCache la Poudre River1844, 1864, 1891, 1904, 1923, 1930, 1976, 1983, 1999, 2010, 2011, 2013 and 2014The three largest floods occurred in 1864, 1891 and 1904, with peaks of approximately 21,000 cubic feet per second (cfs). For comparison, the discharge of the Poudre River at “flood stage” is about 4,000 cfs. Flooding on the Poudre is primarily from snowmelt in late May and June. However, flash flooding can occur at any time. A severe flood has not occurred in more than 100 years.Spring Creek1902, 1904, 1938, 1949, 1951, 1961, 1977, 1983 and 1997The 1997 flood resulted in five deaths, destruction of 120 mobile homes and damage to 2,000 homes and businesses. This flood was considered to be greater than a 500-year event.Dry CreekNo serious flooding since about 1950The absence of even minor flooding is generally attributed to the network of irrigation canals that have some capacity for intercepting small to moderate Dry Creek flows.Fossil Creek1902, 1938, 1965, 1977, 1979, 1997, 1999 and 2007Fossil Creek is relatively undeveloped and past floods have gone unnoticed. In addition to flooding hazards, Fossil Creek also is susceptible to bank erosion.Boxelder Creek/ Cooper Slough 1909, 1922, 1930, 1937, 1947, 1963, 1967, 1969 and 2007Boxelder Creek has a drainage area of 251 square miles, and 176 square miles now are controlled by Soil Conservation Service flood control dams near Wellington.Old Town Basin1904, 1933, 1938, 1951, 1977, 1983, 1988, 1992, 1997, 2009 and 2018Street flooding is the primary problem in this basin.Canal Importation Basin1938, 1951, 1975, 1992, 1997, 1999 and 2009There are several small drainage areas in this basin. Development prior to drainage criteria encroached on the channels, reduced the flow capacity and caused flooding. The irrigation canals also overflow their banks and cause flooding.West Vine Basin1980, 1997 and 1999 (Past floods were not well documented.)Localized flooding occurs due to encroachment on drainages and from irrigation ditch spills.(++ ˏ%/0+.5ˏ *"+.)0%+*.+0!0%*#ˏ"+.ˏ0$!ˏ101.!The Master Drainage Plan includes plans for the 12 stormwater basins across the city. The purpose is to identify stormwater management issues and develop solutions that reduce flood risk, improve stormwater quality and promote stream rehabilitation. Each plan looks at the unique characteristics of the basin, identifies potential problems, and provides an alternative analysis and recommended improvements. Utilities prioritizes all stormwater and stream rehabilitation projects on an annual basis. The main categories used to evaluate each project include protection of structures from flooding, road overtopping, cost-benefit ratio, health and safety, water quality and habitat improvement. Left: A new storm pipe enters Spring Creek just downstream of Remington Street. Above: A stream rehabilitation project on Mail Creek just after completion in May 2020.ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 5Packet pg. 96
2!.5+*!ˏ/ˏ(++ ˏ%/'/Ȓˏ*+3ˏ+1./
This map represents Fort Collins’ floodplains and is continuously updated. To determine if a property is within a floodplain, call Fort Collins Utilities at 970-416-2632,
email 10%(%0%!/Ȳ"#+2Ȑ+) or view a detailed map atˏ"#+2Ȑ+)ȩ floodplain-map/. Additional map information, such as erosion buffer zones, flood elevations and
historic flood data is available.
All rivers, streams, tributaries and canals – regardless of size – have the potential to flood. In Fort Collins, major sources of flooding include the Cache la Poudre River,
Spring Creek, Dry Creek, Fossil Creek and Boxelder Creek. Urban street flooding also is a hazard. All drainage basins flow to the Cache la Poudre River.OverlandTrlLaurel St
Country Club Rd
Drake Rd
Riverside
Ave
Willox Ln
Mountain Ave
Trilby Rd
Mulberr y St TurnberryRdShieldsStNLemayAveTimberlineRdLaporte Ave LincolnAveTerryaLkeRdGregory
Rd
Kechter Rd
County
Road54G
State Highway 392
Vine Dr
Prospect Rd
Harmony Rd
LemayAveTaftHillRdHorsetooth Rd
TimberlineRdCarpenter Rd
Horsetooth Rd
Harmony Rd
USHighway287Ziegler Rd
S
mu
mit
Vie
w
D
r
M u lberry St
Mountain Vista Dr
Richards Lake Rd
Douglas Rd
ShieldsStE Vine DrTaftHillRd Interstate25U
S
High
w
a
y
2
8
7
TaftHillRdCountyRoad38 E
StraussCabinRdInterstate25C
a
c
h
e
La
Poudr
eRi
ver
Cache LaPoudreRiver
CooperSloughL a k e CanalF
ossil
C
reekSpringC reekDryCreekBoxel
der
CreekS p ring Cr e e k
oF o th ills Channel
McClellands Creek
Mail
Cr
e
ek
Clearview Channel
Plum Channel
Fairbro
o
k
e
C
h
a
n
n
el
Boxelder/Cooper Slough BasinDry Creek
Basin
Canal Importation
Basin
Spring Creek
Basin
Fox Meadows
BasinMail Creek
Basin
McClellands
Basin
West Vine
Basin
Old Town
Basin
Foothills
Basin
Fossil Creek
Basin
Legend
High Risk Floodway
High Risk
100-year floodplain
Moderate Risk
100-year sheet flow and 500-year floodplain
Water Features
-
+1 .!ˏ(++ ,(%*ˏ
,/ˏ.!ˏ$*#%*#
The Poudre River floodplain maps are old and need updating. Updated
mapping provides a better evaluation of flood risk, which helps protect
lives and properties. View the new, preliminary maps at:
fcgov.com/riskmap
Elevation certificates are available for some
properties. Call 970-416-2632 to learn more.
14%(%.5ˏ% /ˏȖˏ/!.2%!/ˏ.!ˏ2%((!ˏ"+.ˏ,!./+*/ˏ3%0$ˏ %/%(%0%!/ȐˏȩˏȍȆȆȐˏ /0ˏ%*"+.)%ĥ*ˏ,1! !ˏ/!.ˏ0. 1% ȑˏ/%*ˏ+/0+ˏ,.ˏ1/0! Ȑ
ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 5
Packet pg. 97
www.fcgov.com/northcollegemaxNorth College MAX PlanPlanning and Zoning CommissionFebruary 11, 2022N COLLEGE MAX PLANPacket pg. 98
www.fcgov.com/northcollegemaxNorth College MAX PlanAgenda •Phase 1 Community Engagement•Past engagement activities •What we heard•Phase 2 Engagement•Destinations •Density & transportation •Overall priorities •Next Steps N COLLEGE MAX PLANPacket pg. 99
www.fcgov.com/northcollegemaxNorth College MAX PlanProject ObjectiveThis project is to create a plan to bring MAX to North College Avenue from Downtown to Highway 1/Terry Lake Rd.N COLLEGE MAX PLANPacket pg. 100
www.fcgov.com/northcollegemaxNorth College MAX PlanOverall Timeline Plan Adoption (2022)Improvements to transit service, walkways, bikeways (2022-2025)MAX Line Extension (5-10+ years) N COLLEGE MAX PLANPacket pg. 101
www.fcgov.com/northcollegemaxNorth College MAX PlanJuly 2021September 2021January 2022Alternatives Development & EvaluationPreferred DesignAdoptionExisting Conditions & VisioningMarch 2022AdoptionExisting Conditions & VisioningProject ScheduleAugust 2022N COLLEGE MAX PLANPacket pg. 102
www.fcgov.com/northcollegemaxNorth College MAX PlanPhase 1 Community Engagement SummaryN COLLEGE MAX PLANPacket pg. 103
www.fcgov.com/northcollegemaxNorth College MAX PlanCommunity Engagement Summary 311Community Members 124 Online Surveys(English & Spanish)114 Mapping Comments52Organizations & Businesses74 Community Members 6 Focus Groups(English & Spanish)2 Public Workshops (English & Spanish)Direct Engagement 1In-Depth Involvement 2723 Unique Webpage Views75 Video Views4,957 Social Post Reach517Social Engagements1short presentations & conversations245-90-minute focus groups & workshopsN COLLEGE MAX PLANPacket pg. 104
www.fcgov.com/northcollegemaxNorth College MAX PlanCommunity BenefitsOverall support for extending MAX to North Fort Collins, bringing increased mobility to youth, seniors, and greater connectivity to businesses and services in the area. Gentrification & Land UseConcerns about gentrification and high-end densification, desire to preserve affordability for residents and businesses alike, equity as a guiding principle Infrastructure ConsiderationsInclude parking for those coming from the North, address east to west connectivity in the area including crossing College, eliminate Mason Street extension option; minimize impact to existing businesses. Routes, Stops & FrequencyDesire for continuous service form Terry Lake Rd. to S. Transit Station, connect to key destinations across the city, maintain service along Spruce and Redwood (8 & 81). Rider ExperienceImprove ease navigating the transit system, sheltered stops, assure a welcoming and safe environment for all, managing challenging rider behaviors.KEY THEMES N COLLEGE MAX PLANPacket pg. 105
www.fcgov.com/northcollegemaxNorth College MAX PlanPlanning and Zoning – 8/13/21•Generally like the idea of MAX on North College•Will it impede traffic?•How well does the 8 & 81 serve the area?•How will it be integrated into the North College Corridor?•Dedicated bus lane?N COLLEGE MAX PLANPacket pg. 106
www.fcgov.com/northcollegemaxNorth College MAX PlanPhase 2: Community EngagementCurrent Questions N COLLEGE MAX PLANPacket pg. 107
www.fcgov.com/northcollegemaxNorth College MAX PlanConnectionsWhat are the top two destinations where you would like to see transit service to/from North College? (pick 2)1. Downtown Fort Collins2. Walmart and Home Depot on Lemay Avenue3. CSU Campus4. Poudre Valley Hospital or Safeway on Lemay Avenue5. Midtown & Foothills Mall6. Shopping, dining, and services on Harmony Road 7. South Transit Center 8. Other (Please describe)N COLLEGE MAX PLANPacket pg. 108
www.fcgov.com/northcollegemaxNorth College MAX PlanHousing, Jobs & Transit Improvements in public transit such as more buses per hour, better bus stops and dedicated bus lanes and increased density in housing and jobs go hand in hand. Knowing there is a relationship between these factors, which of the following options would you like to see for the future of the North College corridor? N COLLEGE MAX PLANPacket pg. 109
www.fcgov.com/northcollegemaxNorth College MAX PlanOption A: Full MAX ServiceSimilar to the MAX on Mason South of CSU…•Dedicated bus lanes•10 to 15-minute bus frequency, all day, 7 days per week•High investment in transit amenities at all stops•Increasing the number of three to five story residential, commercial, and office buildingsN COLLEGE MAX PLANPacket pg. 110
www.fcgov.com/northcollegemaxNorth College MAX PlanOption B: MAX light service Similar to the MAX on Mason between CSU & Downtown…•Buses operate in general travel lanes, but get ahead of vehicle traffic at intersections•15 to 30-minute bus frequency, all day, reduced service on weekends•Some investments in transit amenities at all stops, high investment in amenities at major transit stations•Adding more three-story residential, commercial, and office buildingsN COLLEGE MAX PLANPacket pg. 111
www.fcgov.com/northcollegemaxNorth College MAX PlanOption C: Minor Service Improvements Minor Improvements to existing bus service•Buses operate in general purpose travel lanes•30-minute bus frequency, reduced service off-peak and on weekends•Limited investment in transit amenities at stops•One to three-story residential, commercial, and office buildingsN COLLEGE MAX PLANPacket pg. 112
www.fcgov.com/northcollegemaxNorth College MAX PlanSummary of Options (pick one)A. Full MAX Service – most transit amenities, highest density for new homes and jobs B. MAX light – medium amenities, medium density of new homes and jobsC. Minor Service Improvements –small changes to improve service, lower density of homes and jobs N COLLEGE MAX PLANPacket pg. 113
www.fcgov.com/northcollegemaxNorth College MAX PlanN COLLEGE MAX PLANPacket pg. 114
www.fcgov.com/northcollegemaxNorth College MAX PlanWhat uses would you most like to see on the North College corridor? (pick 5)a. Affordable housingb. Mixed income housing c. Local small business incubatord. Hispanic/Latino community centere. Affordable childcare centerf. Retail stores (e.g., hardware, clothing, furniture, etc.)g. Service shops (e.g., salon/barbershop, dry cleaner, dentist, gym)h. Restaurantsi. Hotel or Motel j. Arts & Entertainmentk. Preserve existing affordable housing, including mobile home parks l. Preserve affordable commercial business spaces m. None of the aboven. Other (please describe)N COLLEGE MAX PLANPacket pg. 115
www.fcgov.com/northcollegemaxNorth College MAX PlanWhere are you most open to seeing new development occur, particularly if it meets your priorities? (pick one) a. Throughout the entire North College area b. Properties facing or next to College Avenuec. Mostly on vacant lots and buildingsd. Mostly on vacant lots and buildings, focused on areas around transit stops and transportation hubse. Redeveloping existing commercial areas, but not existing housing areasf. I do not want to see new developmentg. Other (please describe)N COLLEGE MAX PLANPacket pg. 116
www.fcgov.com/northcollegemaxNorth College MAX PlanWhat height of buildings would be most acceptable to you, if it meets your priorities? (pick one) a. Current allowable building heights (3 to 5 stories) b. Predominantly 4 to 5 storiesc. New allowable building heights of 5 to 8 storiesd. Other (please describe)N COLLEGE MAX PLANPacket pg. 117
www.fcgov.com/northcollegemaxNorth College MAX PlanAdditional Questions•Do we have the right balance of housing and jobs in the corridor? Should this change over time?•How much does the visual character matter?N COLLEGE MAX PLANPacket pg. 118
www.fcgov.com/northcollegemaxNorth College MAX PlanNext Steps •Workshops •Online questionnaire•Additional technical analysis of routes, stops, turnaround, etc. •Phase 3 Engagement (March/April): Comment on proposed design solution(s)N COLLEGE MAX PLANPacket pg. 119
www.fcgov.com/northcollegemaxNorth College MAX PlanThank You! N COLLEGE MAX PLANPacket pg. 120
11041 RegulationsKelly SmithFebruary 20221041 REGULATIONSPacket pg. 121
1041 RegsProject Background2MayJulySeptemberOctober2021ENGAGEMENT, ANALYSIS & OPTIONSWater/Sewer Providers30 CommunitiesPUBLIC HEARING &ENGAGEMENT Boards/CommissionsChamberCity UtilitiesWater/Sewer ProvidersMORATORIUM & ENGAGEMENTWater/Sewer ProvidersPFARESOLUTIONStudy 1041 Powers1041 REGULATIONSPacket pg. 122
1041 RegulationsToday’s Discussion3DesignationsMoratorium ApplicabilityExemption ProcessScheduleEngagement Plan & Key Dates11223344551041 REGULATIONSPacket pg. 123
Mineral Resource Areas• Gravel MiningNatural Hazard Areas• Flood• Geologic• WildfireHistorical/Natural/ Archaeological Resource Areas• Irrigated areasAreas Around Key Facilities• Highways• Airports• Utility InfrastructureAreas of State Interest41041 REGULATIONSPacket pg. 124
New/Expanded Water/Sewer TreatmentMunicipal/ Industrial Water TreatmentHighways and InterchangesPublic UtilitiesActivities of State Interest5New CommunitiesSolid Waste DisposalMass TransitAirportsGeothermal ResourcesNuclear Detonation1041 REGULATIONSPacket pg. 125
Designations611041 REGULATIONSPacket pg. 126
Moratorium Options7OPTION 1: Designate Now• Highest certainty for City until regulations are adopted• Lowest certainty for water providers, developers, regional partners• Longest moratorium• Potential project delays at regional scale • Consistent with First Reading2021OctNovDecJanFebMarAprMayJunJulAugSepOctNovDecMoratorium Duration: 1 yearOPTION 2: Designate @ Draft• Known regulatory framework• Opportunity to further engage• Cuts moratorium in half• Allows projects to move forward for 6 mosMoratorium Duration: 6 monthsOPTION 3:Designate @ Adoption•No moratorium• Lowest certainty for City until regulations are adopted• Highest certainty for developers, water providers, regional partners 202120221041 REGULATIONSPacket pg. 127
Moratorium Applicability8(1) Water and Sewer System Activity subject to the Moratorium shall beprojects that:(i) Meet the term domestic water and sewage treatment system as definedin C.R.S. Section 24-65.1-104(5), and set forth in Exhibit “A”;(ii) Consist of pipelines designed fortransmission of treated or untreatedwater or sewage that require a 30’ wide easement or greater; and(iii) Are proposed to be located entirely or in part within a City park or NaturalArea221041 REGULATIONSPacket pg. 128
Conceptual Review MeetingConceptual Review ApplicationComplete Application SubmittedExemptionQuasi-Judicial Council HearingNo ExemptionExemption ProcessSPARStaff Meeting w/ Applicant31041 REGULATIONSPacket pg. 129
Exemption Criteria101. The potential for the project to result in significant adverse impactsthat could otherwise be mitigated through a binding review process; or 2. The project meaningfully addresses an important community need and delaying the project until the moratorium is terminated would result in substantial hardship to the community.31041 REGULATIONSPacket pg. 130
Project Timeline11Public UtilitiesSolid Waste DisposalMass TransitAirportsOCTNOVDECJANFEBMARAPRMAYJUNJULYAUGSEPTOCTNOVDECHEARING/FUNDING APPROP/CONTRACTINGCODE DEVELOPMENTENGAGEMENTDRAFT CODECOUNCIL WORK SESSIONCODE ADOPTIONIMPLEMENTATION41041 REGULATIONSPacket pg. 131
Engagement Plan & Key Dates125EnvironmentalAdvocacy GroupsEXTERNAL STAKEHOLDERSCDOTHomebuilders/ Chamber/Towns/ CSULarimer CountyBoards/CommissionsWater Providers/ Sanitation Districts1041 REGULATIONSPacket pg. 132
Engagement Plan & Key Dates135Natural Areas/ ParksINTERNAL STAKEHOLDERSEngineeringHistoric PreservationWater/ WastewaterEnvironmental Regulatory AffairsWater Conservation1041 REGULATIONSPacket pg. 133
Engagement Plan & Key Dates1451. Static2. Our CityFeb 23rdNoon6pmSocial mediaPress releaseNewslettersWebsitesPublic MtgsOutlets1041 REGULATIONSPacket pg. 134
Engagement Topics155Project CategoriesThresholdsDefinitionsApproval ProcessReview Criteria1041 REGULATIONSPacket pg. 135
Questions?161041 REGULATIONSPacket pg. 136
1Oil and Gas RegulationsFebruary 2022OIL & GAS UPDATEPacket pg. 137
Oil and Gas RegulationsToday’s Discussion2Immediate ScheduleOrganizational StructurePrevious Engagement and City Council DirectionAbove State RequirementsNext Steps1122334455OIL & GAS UPDATEPacket pg. 138
Immediate ScheduleDevelop Draft Code• Vet with Legal and LUC Team• Inter-Department/Service Area EngagementCOGCC Rulemakings• Joined Party Status/TestifiedMarch 22, 2022 Council work session on Draft code language311OIL & GAS UPDATEPacket pg. 139
Organizational Structure422City CodeRegistrationReference Operational Standards ManualLand Use CodeProcedural RequirementsSetbacks/ZoningReciprocal SetbacksDesign StandardsApplication RequirementsReclamationPlugging and AbandoningOperational Standards ManualOngoing Air MonitoringNotification RequirementsOngoing Inspection RequirementsOngoing Noise MonitoringOngoing Water TestingCommunity EngagementSafetyFinancial AssuranceOIL & GAS UPDATEPacket pg. 140
Previous Engagement5ZONINGSETBACKPublic Support• No new Oil and Gas in City • No new Oil and Gas in NAs• Industrial Zone District• 2,000’+ no exceptionsIndustry Support• No ban of new development • Zoning not applied • Align with COGCCOther Considerations• Setbacks from buildings of other land uses• Setbacks from recreation trails, parking lots, recreation fields33OIL & GAS UPDATEPacket pg. 141
Previous City Council Direction6• Industrial Zone District• 2000’ Res Building Units• 2000’ High Occupancy Buildings• 0% LAND AVAILABLEDrillable AreasMontavaFTC Oil Field33OIL & GAS UPDATEPacket pg. 142
New COGCC Setbacks7“regulating in a manner that protects public health, safety & environment”BUILDINGSETBACK JUSTIFICATIONSCHOOLS/ CHILDCARE CENTERS2000’• CDPHE’s Health Impact Assessment• Children are more vulnerable• Noise and other nuisances (truck traffic) would impact learning and safetyHOBs& RBUsPresumptive 2000'500’-2000’ Variance• CDPHE study, other studies, complaints• Apply for varianceOIL & GAS UPDATEPacket pg. 143
Above State Requirements8• Industrial Zone District• 2000’ Res Building Units• 2000’ High Occupancy Buildings• 2000’ City Parks, Trails, Outdoor Gathering Areas, Natural Areas• 2000’ Buildings Approved for Human OccupationDrillable AreasMontavaFTC Oil Field44OIL & GAS UPDATEPacket pg. 144
Above State Requirements9• Alternatives Analysis• Annual Registration• Repairs for Leaks• Reporting and Notification• Air and Noise Monitoring• Containment Berms• Safety• Lighting• Reclamation44OIL & GAS UPDATEPacket pg. 145
Reciprocal Setbacks10201320182018Example: Hearthfire• Match setbacks of new development near existing wells (active and abandoned)• Disclosure to future property owners• No development within floodplain• Fencing, landscaping and screening measures44OIL & GAS UPDATEPacket pg. 146
Estimated Project Timeline11OCTNOVDECJANFEBMARAPRMAYJUNJULYAUGSEPTCODE DEVELOPMENTENGAGEMENTDRAFT CODECOUNCIL WORK SESSIONCODE ADOPTIONIMPLEMENTATION5OIL & GAS UPDATEPacket pg. 147
P&Z Discussion12• Feedback on reciprocal setbacks: same as OG?• Questions or concernsOIL & GAS UPDATEPacket pg. 148
PLANNING & ZONING COMMISSION
2021 Annual Report
February 8, 2022
2021 ANNUAL REPORT Page 1
Summary
Chair Michelle Haefele and Vice-Chair Ted Shepard were elected in February 2021. This year the
Planning and Zoning Commission held 12 regular hearings acting on an average of 3-4 items per
meeting. The Commission also held 12 work sessions. In addition to the regular hearings, two
special meetings were held (in May and in June) to accommodate the Commission’s project load.
The Commission continued to make adaptations in order to conduct business while remaining
compliant with COVID-19 public health measures and accommodate public participation through
a variety of methods. Meetings in January, February, March, April, and May were held online with
commission members participating remotely and with public participation available online or by
phone. Meetings in June, July, August, September, October, November, and December were
held in a hybrid format with some or all Commissioners participating in the Council Chambers and
public participation available online, by phone, or in-person.
1. DEVELOPMENT REVIEW
The development review agenda volume for 2021 included:
• 15 Project Development Plans
• 1 Stand Alone Modification of Standard
• 3 Major Amendments
• 4 Additions of Permitted Use
• 3 Site Plan Advisory Reviews
• 4 Annexations and Zonings
• 3 Minor Amendments
• 1 Basic Development Review
• 2 Overall Development Plans
• 1 Planned Unit Development (PUD) Master Plan
2. POLICY & LEGISLATION
The Commission provided recommendations to City Council on the following policy and
legislative items:
• Residential Metro District Evaluation Process
• Housing Strategic Plan
• Outdoor Lighting Land Use Code Amendment
• Water Conservation Land Use Code Amendment
• Wireless Telecommunications Master Plan
Packet pg. 149
PLANNING & ZONING COMMISSION
2021 Annual Report
2021 ANNUAL REPORT Page 2
• 3 Mile Plan Update
3. APPEALS TO CITY COUNCIL
• In 2021, two Planning and Zoning Commission decisions were appealed to City
Council. City Council upheld the Planning and Zoning Commission’s decision to
approve the Guardian Self Storage Project Development Plan. Council also upheld the
Planning and Zoning Commission’s decision to deny the Sam’s Club Fuel Station
Addition of Permitted Use and Major Amendment.
Packet pg. 150
Community Development &
Neighborhood Services
Planning & Development Services
281 North College Avenue
P.O. Box 580
Fort Collins, CO 80522.0580
970.221.6376
970.224.6111- fax
MEMORANDUM
Date: February 2, 2022
To: Chair Haefele and Members of the Planning & Zoning Commission
From: Alyssa Stephens, Neighborhood Development Liaison
Re: February Public Engagement Update
_____________________________________________________________________
The purpose of this memo is to provide an update on public engagement in development review.
Recent Public Engagement by the Numbers
•Neighborhood meetings — 4
•Educational events – 0
News and Updates
•The Commission requested information on phone lines provided to assist individuals with
remote technology during virtual hearings. Currently:
o Mailed notices include the Development Review Liaison phone number, which can be
reached prior to or during the hearing.
o The Planning & Zoning Commission website includes an alert with a phone number and
email address for assistance during the hearing.
o A slide is shown during the hearing with a phone number and email address for
assistance during the hearing.
•Analysis of attendance from in-person neighborhood meetings is ongoing, but poses a challenge
because record-keeping practices were inconsistent.
•The 2022 Neighborhood Mini Grant application opened for Round 1 on February 1 and will close
February 14. These grants, typically $150 - $1000 are intended to promote positive neighboring
activities and community improvements.
PUBLIC ENGAGEMENT UPDATES
Packet pg. 151