Loading...
HomeMy WebLinkAbout02/11/2022 - Planning and Zoning Commission - AGENDA - Work Session * Work session times are approximate and are subject to change without notice. Michelle Haefele, Chair Virtual Meeting Ted Shepard, Vice Chair Zoom Webinar Per Hogestad David Katz Adam Sass Jeff Schneider Julie Stackhouse Planning and Zoning Hearing will be held on Thursday, February 17, 2022 in City Hall Chambers or online. Regular Work Session February 11, 2022 Virtual Meeting Noon – 4:15 p.m. Planning and Zoning Commission Work Session Agenda Participation for this remote Planning and Zoning Commission work session will be available online or by phone. Commission members and staff may be present in-person but interested members of the public and applicant teams are strongly encouraged to participate via Zoom. No public comment is accepted during work sessions. Public Attendance (Online): Individuals who wish to attend the Planning and Zoning work session via remote public participation can do so through Zoom at https://fcgov.zoom.us/j/96379887929. Individuals participating in the Zoom session should also watch the meeting through that site. The meeting will be available to join beginning at 11:45 a.m. on February 11, 2022. Attendees should try to sign in prior to 12:00 p.m. if possible. In order to attend: Use a laptop, computer, or internet-enabled smartphone. (Using earphones with a microphone will greatly improve your audio). You need to have access to the internet. Keep yourself on muted status. If you have any technical difficulties during the work session, please email kclaypool@fcgov.com. Public Attendance (Phone): If you do not have access to the internet, you can call into the work session via phone. Please dial: 1-253-215-8782 or 1-346-248-7799, with Webinar ID: 963 7988 7929. (Continued on next page) Packet pg. 1 City of Fort Collins Page 2 TOPICS: PROJECTED TIMES: Consent: 1. December 16, 2021 Hearing Draft Minutes 12:00 – 12:05 Discussion: 2. Ziegler-Corbett Overall Development Plan (Mounce) 12:05 – 12:35 Policy and Legislation: • Additions and Substantial Improvements in FEMA Floodplains (Hilmes-Robinson) • Land Use Code Phase 1 (Overton/Beals) • N College MAX Plan (Lorson) • 1041 Regulations (Smith) • Oil & Gas Update (Smith) 12:35 – 3:30 Commission Topics: • Discuss Election of Officers (Sizemore) • 2021 Annual Report (Sizemore) • Upcoming Hearing Calendar (Sizemore) • Commission Updates (Sizemore) • Public Engagement Updates (Stephens) • Transportation Board Liaison Update (Gavaldon) 3:30 – 4:15 The meeting will be available beginning at 11:45 a.m. Please call in to the meeting prior to 12:00 p.m., if possible. Once you join the meeting: keep yourself on muted status. If you have any technical difficulties during the meeting, please email kclaypool@fcgov.com. The February 17 Planning and Zoning Commission regular meeting will be available online, remotely and in- person. Information on participating in the February 17 Planning and Zoning regular meeting is contained in the agenda for the February 17 meeting available at https://www.fcgov.com/cityclerk/planning-zoning.php. Members of the public wishing to submit documents, visual presentations, or written comments for the Commission to consider regarding any item on the agenda must be emailed to kclaypool@fcgov.com at least 24 hours prior to the February 17 meeting. Packet pg. 2 Planning and Zoning Agenda Item Page 1 STAFF Marsha Hilmes-Robinson, Floodplain Administrator Ken Sampley, Director, Stormwater Water Wastewater Engineering SUBJECT ADDITIONS AND SUBSTANTIAL IMPROVEMENT CODE CHANGE FOR FEMA FLOODPLAINS EXECUTIVE SUMMARY Fort Collins Utilities is conducting outreach related to a proposed regulatory change to Chapter 10 of City Code to come into compliance with minimum regulations from the Federal Emergency Management Agency (FEMA) regarding additions and substantial improvements in FEMA floodplains. BACKGROUND The Federal Emergency Management Agency (FEMA) has determined that a current provision of our Floodplain Management Ordinance does not meet the minimum requirements of the National Flood Insurance Program. Therefore, the City needs to bring Chapter 10 of City Code into Compliance. The proposed change involves how additions are included in the calculation of Substantial Improvement. Under the new provision, the applicant will have two choices: 1. Design and certify the addition as “structurally independent” and elevate the addition. The cost of the addition will not be included in the calculation of substantial improvement. 2. Include the addition in the calculation of substantial improvement. The addition will be required to be elevated. - If the value of improvements, including the cost of the addition, is more than 50% of the value of the structure, then the existing structure will be considered substantially improved and will need to be elevated. Definition - Structurally Independent Addition - shall mean an addition that involves no alteration of the load-bearing structure of the existing building, is attached to the building with minimal connection, and has a doorway as the only modification to the common wall. A nonstructural addition shall not transfer loads exerted on the addition to the existing building and thus shall not share a foundation or other building elements that would create a load path between the addition and the existing building. Shared heating, ventilation, and air conditioning (HVAC), electrical, and plumbing between the addition and existing structure does not result in a structural connection. This proposed regulation change does not apply to City-designated floodplains, such as Old Town. Packet pg. 3 Planning and Zoning Agenda Item Page 2 ATTACHMENTS 1. Fort Collins Utilities presentation 2. Draft Code Language 3. Floodplain Quick Guide for all Floodplains Other than the Poudre River 4. Floodplain Quick Guide for the Poudre River 5. Annual Mailer to Floodplain Residents and Owners (PDF version) Packet pg. 4 Additions and Substantial Improvement Code Change for FEMA Floodplains2022Marsha Hilmes-Robinson, Floodplain Administrator, CFMADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 1Packet pg. 5 Protect peopleMinimize property damageEnsure development doesn’t exacerbate existing problemsFloodplain Management GoalsHigh Water Mark sign at Creekside Park along Spring Creek.ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 1Packet pg. 6 City and FEMA Floodplains100-year Floodplain – 1% chance of being equaled or exceeded in any given yeardark blue and light blue500-year Floodplain – 0.2% chance of being equaled or exceeded in any given yearlight greenFlood Risk Mappingfcgov.com/floodplain-mapsADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 1Packet pg. 7 Floodplains in Fort Collins4City Floodplains FEMA Floodplains Poudre FloodplainOld Town Spring Creek Poudre RiverFossil Creek Boxelder CreekCanal Importation Cooper SloughMcClellands Creek Dry CreekMail CreekFoothills ChannelWest VineFFFFEMA FloodplainsPoudre FloodplainADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 1Packet pg. 8 5Substantial Improvement?Cost of Improvement•Market Value of StructureSubstantially Improved Example:$200,000•$350,000If substantial improvement occurs, then the existing structure must be brought into compliance (elevated).ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 1Packet pg. 9 6Construction of an Addition• New Addition must be elevated to freeboard requirement.• Currently we are not including the cost of the addition in the substantial improvement calculation. • FEMA recently flagged this as not being compliant with minimum FEMA standards• FEMA requires the addition cost to be included unless it is stand-alone (structurally independent addition).• Does notimpact City-floodplainsADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 1Packet pg. 10 7What is the change?xIn FEMA-designated floodplains, applicants will have two choices:1. Design and certify the addition as “structurally independent” and elevate the addition. The cost of the addition will not be included in the calculation of substantial improvement.2. Include the addition in the calculation of substantial improvement. The addition will be elevated.-If the value of improvements, including the cost of the addition, is more WKDQRIWKHYDOXHRIWKHVWUXFWXUHWKHQWKHexisting structure will be considered substantially improved and will need to be elevated. ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 1Packet pg. 11 Examples8ResidentialStructurally Independent AdditionNon-ResidentialStructurally Independent AdditionLowest Floor Elevated to Regulatory Flood Protection ElevationADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 1Packet pg. 12 9CertificationThe addition meets the definition of a structurally independent addition:1. Involves no alteration of the load-bearing structure of the existing building; 2. Is attached to the existing building with minimal connection; 3. Has a doorway as the only modification to the common wall; and 4. Will not transfer loads exerted on the addition to the existing building and will thus not share a foundation or other building elements that would create a load path between the addition and the existing building. By Colorado Architect or EngineerADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 1Packet pg. 13 10Who Does this Impact?xThis change only impacts FEMA-designated floodplains.xThis change will not impact City-designated floodplains, such as Old Town, where the majority of additions take place. xFEMA and the State consider the regulation of City floodplains as a higher standard.ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 1Packet pg. 14 115-year Permit Analysis• Reviewed permits from 2014 - mid 2020• 13 permits included an addition• 4 permits in FEMA Floodplain• 2 permits met Subst. Impv. due to remodel cost of existing structure. Existing structure and addition protected.• 1 would have met Subst. Impv. if addition cost was included. It is no longer mapped in the floodplain.• 1 permit would not have met Subst. Impv. if addition cost was included.Minimal number of permits impacted.ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 1Packet pg. 15 For Questions or Comments, Please Contact:THANK YOU!Marsha Hilmes-Robinsonmhilmesrobinson@fcgov.com, 970-224-6036ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 1Packet pg. 16 DRAFT FOR DISCUSSION ONLY - SUBJECT TO FURTHER REVIEW AND REVISION ORDINANCE NO. , 2021 OF THE COUNCIL OF THE CITY OF FORT COLLINS AMENDING CHAPTER 10 OF THE CODE OF THE CITY OF FORT COLLINS REGARDING __________________ WHEREAS, ________________ and WHEREAS, ________________; and WHEREAS, ________________; and WHEREAS, ________________. NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF FORT COLLINS as follows: Section 1. That the City Council hereby makes and adopts the determinations and findings contained in the recitals set forth above. Section 2. That Section 10-16 of the Code of the City of Fort Collins is hereby amended to read as follows: Sec. 10-16. Definitions. . . . Cumulative substantial improvement shall mean any combination of repairs, demolition, reconstruction, rehabilitation, addition, or other improvements of a structure taking place during the time the structure has been located in a designated floodplain, the cumulative cost of which equals or exceeds fifty (50) percent of the market value of the structure before the start of construction of the improvement, provided that the footprint of the structure is not increased. The term cumulative substantial improvement shall include any repair or reconstruction work on structures that have incurred substantial damage. It shall not include any project for improvement of a structure to correct violations of state or local health, sanitary or safety code specifications that have been identified by the local code enforcement official, including only the minimum improvements necessary to assure safe living conditions. Cumulative substantial improvement shall not include the cost of any structurally independent addition. Also, cumulative substantial improvement shall not include ordinary maintenance activities, such as interior or exterior painting or decoration, replacement of windows, doors or other nonstructural elements, repair or replacement of heating or air conditioning appliances or hot water heaters, reroofing, and utility connections, provided that such improvements shall not be excluded from the overall work when carried out in connection with structural improvements. ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 2 Packet pg. 17 DRAFT FOR DISCUSSION ONLY - SUBJECT TO FURTHER REVIEW AND REVISION . . . Structurally independent addition shall mean an addition that involves no alteration of the load- bearing structure of the existing building, is attached to the building with minimal connection, and has a doorway as the only modification to the common wall. A structurally independent addition shall not transfer loads exerted on the addition to the existing building and thus shall not share a foundation or other building elements that would create a load path between the addition and the existing building. Shared heating, ventilation, and air conditioning (HVAC), electrical, and plumbing between the addition and existing structure does not result in a structural connection. . . . Substantial improvement shall mean any combination of repairs, demolition, reconstruction, rehabilitation, addition, or other improvements of a structure for which the actual start of construction occurred during the twelve-month period preceding the floodplain use permit application date, the cumulative cost of which equals or exceeds fifty (50) percent of the market value of the structure before the start of construction of the improvement, provided that the footprint of the structure is not increased. Substantial improvement shall include any repair or reconstruction work performed within said period of time on structures that have incurred substantial damage. A substantial improvement that meets the definition of redevelopment shall be regulated hereunder as redevelopment. The term substantial improvement shall not include any project for improvement of a structure to correct violations of state or local health, sanitary or safety code specifications that have been identified by the local code enforcement official, including only the minimum improvements necessary to assure safe living conditions. Substantial improvement shall not include the cost of any structurally independent addition and in City basin floodplains shall also not include the cost of any addition that meets the regulatory flood protection standard set forth in Section 10-37. Also, substantial improvement shall not include ordinary maintenance activities, such as interior or exterior painting or decoration, replacement of windows, doors or other nonstructural elements, repair or replacement of heating or air conditioning appliances or hot water heaters, reroofing and utility connections, provided that such improvements shall not be excluded from the overall work when carried out in connection with structural improvements. . . . ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 2 Packet pg. 18 DRAFT FOR DISCUSSION ONLY - SUBJECT TO FURTHER REVIEW AND REVISION Section 3. That Section 10-26 of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph (6) which reads in its entirety as follows and all subsequent subparagraphs shall be renumbered accordingly: Sec. 10-26. - Utilities executive director's powers and duties. The duties and responsibilities of the Utilities Executive Director shall include but are not limited to: . . . (6)Require certification by a Colorado registered professional engineer and/or architect that any addition proposed as a structurally independent addition meets the definitions and requirements of this Chapter. . . . Section 4. That Section 10-27(b) of the Code of the City of Fort Collins is hereby amended to read as follows: Sec. 10-27. - Floodplain use permit. . . . (b)The following information is specifically required and must be submitted by any floodplain permit applicant: . . . (4)Certification by a Colorado registered professional engineer and/or architect that any addition proposed as a structurally independent addition: (1) involves no alteration of the load-bearing structure of the existing building; (2) is attached to the existing building with minimal connection; (3) has a doorway as the only modification to the common wall; and (4) will not transfer loads exerted on the addition to the existing building and will thus not share a foundation or other building elements that would create a load path between the addition and the existing building. (45)Description of the extent to which any watercourse will be altered or relocated as a result of proposed development. Section 5. That Section 10-75(7) of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph b. which reads in its entirety as follows and all subsequent subparagraphs shall be renumbered accordingly: Sec. 10-75. - Specific standards for residential development in Poudre River flood fringe. ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 2 Packet pg. 19 DRAFT FOR DISCUSSION ONLY - SUBJECT TO FURTHER REVIEW AND REVISION . . . (7) Accessory structures. . . . b. Any new addition must either be designed and certified by a Colorado registered professional engineer and/or architect as being a structurally independent addition or the value of the addition shall be included in the determination of cumulative substantial improvement. . . . Section 6. That Section 10-76 of the Code of the City of Fort Collins is hereby amended to read as follows: Sec. 10-76. - Specific standards for nonresidential development in Poudre River flood fringe. . . . (2) Additions. a. Addition to a nonresidential structure is allowed, provided that all appliable requirements, including, but not limited to, the requirements of § 10-37, are met. b. Any new addition must either be designed and certified by a Colorado registered professional engineer and/or architect as being a structurally independent addition or the value of the addition shall be included in the determination of cumulative substantial improvement. bc. For an addition to a nonresidential structure, compliance with the requirements of § 10-38 may be substituted for compliance with the applicable requirements of Subsection 10-37(b). cd. A new basement may be constructed below the regulatory flood protection elevation in an addition to a nonresidential structure, provided that all applicable requirements, including, but not limited to, the requirements of § 10-38, are met. . . . (6) Attached garages. a. Addition of an attached garage to a nonresidential structure is allowed, provided that all applicable requirements, including, but not limited to, the requirements of § 10-37, are met by the attached garage. ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 2 Packet pg. 20 DRAFT FOR DISCUSSION ONLY - SUBJECT TO FURTHER REVIEW AND REVISION b. Any new addition must either be designed and certified by a Colorado registered professional engineer and/or architect as being a structurally independent addition or the value of the addition shall be included in the determination of cumulative substantial improvement. bc. For a garage attached to a nonresidential structure, compliance with the requirements of § 10-38 or the requirements of § 10-39 may be substituted for compliance with the applicable requirements of Subsection 10-37(b). (7) Accessory structures. a. Construction of a new accessory structure or addition to an accessory structure is allowed, provided that all applicable requirements, including, but not limited to, the requirements of § 10-37, are met. b. Any new addition must either be designed and certified by a Colorado registered professional engineer and/or architect as being a structurally independent addition or the value of the addition shall be included in the determination of cumulative substantial improvement. bc. Remodeling or repair of an accessory structure, including reconstruction of an accessory structure that has been substantially damaged, is allowed, provided that, after completion of any cumulative substantial improvement, all applicable requirements, including, but not limited to, the requirements of § 10-37, are met. cd. Redevelopment of an accessory structure is allowed, provided that all applicable requirements, including, but not limited to, the requirements of § 10-37, are met. de. For an accessory structure, compliance with the requirements of § 10-38 or the requirements of § 10-39 may be substituted for compliance with the applicable requirements of Subsection 10-37(b). ef. A new basement may be constructed below the regulatory flood protection elevation in an accessory structure, provided that all applicable requirements, including, but not limited to, the requirements of § 10-38, are met. fg. A nonconforming basement below the regulatory flood protection elevation may remain in an accessory structure, provided that, after completion of any cumulative substantial improvement or redevelopment, all applicable requirements, including, but not limited to, the requirements of § 10-38, are met. . . . ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 2 Packet pg. 21 DRAFT FOR DISCUSSION ONLY - SUBJECT TO FURTHER REVIEW AND REVISION Section 7. That Section 10-77 of the Code of the City of Fort Collins is hereby amended to read as follows: Sec. 10-77. - Specific standards for mixed-use development in Poudre River flood fringe. . . . (2) Additions. a. An addition to a mixed-use structure is prohibited, except that an addition to a mixed use structure that results in expansion of only non-residential floors of said structure is allowed, provided that all applicable requirements, including, but not limited to, the requirements of § 10-37, are met. b. Any new addition must either be designed and certified by a Colorado registered professional engineer and/or architect as being a structurally independent addition or the value of the addition shall be included in the determination of cumulative substantial improvement. bc. For an addition to a mixed-use structure, compliance with the requirements of § 10-38 may be substituted for compliance with the applicable requirement of Subsection 10-37(b). cd. A new basement may be constructed below the regulatory flood protection elevation in an addition to a mixed-use structure, provided that: 1. All residential use is on a floor completely above the regulatory flood protection elevation; and 2. All applicable requirements, including, but not limited to, the requirements of § 10-38, are met. . . . (5) Attached garages. a. Addition of an attached garage to a mixed-use structure is allowed, provided that all applicable requirements, including, but not limited to, the requirements of § 10-37, are met by the attached garage. b. Any new addition must either be designed and certified by a Colorado registered professional engineer and/or architect as being a structurally independent addition or the value of the addition shall be included in the determination of cumulative substantial improvement. bc. For a garage attached to a mixed-use structure, compliance with the requirements of § 10-38 or the requirements of § 10-39 may be substituted for compliance with the applicable requirements of Subsection 10-37(b). ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 2 Packet pg. 22 DRAFT FOR DISCUSSION ONLY - SUBJECT TO FURTHER REVIEW AND REVISION (6) Accessory structures. a. Construction of a new accessory structure or addition to an accessory structure is allowed, provided that all applicable requirements, including, but not limited to, the requirements of § 10-37, are met. b. Any new addition must either be designed and certified by a Colorado registered professional engineer and/or architect as being a structurally independent addition or the value of the addition shall be included in the determination of cumulative substantial improvement. bc. Remodeling or repair of an accessory structure, including reconstruction of an accessory structure that has been substantially damaged, is allowed, provided that, after completion of any cumulative substantial improvement, all applicable requirements, including, but not limited to, the requirements of § 10-37, are met. cd. Redevelopment of an accessory structure is allowed, provided that all applicable requirements, including, but not limited to, the requirements of § 10-37, are met. de. For an accessory structure, compliance with the requirements of § 10-38 or the requirements of § 10-39 may be substituted for compliance with the applicable requirements of Subsection 10-37(b). ef. A new basement may be constructed below the regulatory flood protection elevation in an accessory structure, provided that all applicable requirements, including, but not limited to, the requirements of § 10-38, are met. fg. A nonconforming basement below the regulatory flood protection elevation may remain in an accessory structure, provided that, after completion of any cumulative substantial improvement or redevelopment, all applicable requirements, including, but not limited to, the requirements of § 10-38, are met. Section 8. That Section 10-80(b)(1) of the Code of the City of Fort Collins is hereby amended by the addition of a new subparagraph e. which reads in its entirety as follows and all subsequent subparagraphs shall be renumbered accordingly: Sec. 10-80. - Removal of property from Poudre River flood fringe. . . . (b) LOMR-F. Property located in the flood fringe of the Poudre River shall be considered removed from the flood fringe if a FEMA Letter of Map Revision based on Fill (LOMR-F) removing the property from the flood fringe based on fill has been issued by FEMA and remains in effect. (1) LOMR-F Review and Approval. The Utilities Executive Director shall review any application for a LOMR-F removing property from the flood fringe, and the following ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 2 Packet pg. 23 DRAFT FOR DISCUSSION ONLY - SUBJECT TO FURTHER REVIEW AND REVISION conditions shall apply to any LOMR-F certified by the City as reasonably safe from flooding: . . . e. Any new addition must either be designed and certified by a Colorado registered professional engineer and/or architect as being a structurally independent addition or the value of the addition shall be included in the determination of cumulative substantial improvement. . . . Section 9. That Section 10-102 of the Code of the City of Fort Collins is hereby amended to read as follows: Sec. 10-102. - Specific standards for residential development in floodways. . . . (6) Attached garages. a. Addition of an attached garage to a residential structure is allowed, provided that all applicable requirements, including, but not limited to, the requirements of § 10-45 and the requirements of § 10-37, are met by the garage portion of the structure. b. In FEMA basin floodplains, any new addition must either be designed and certified by a Colorado registered professional engineer and/or architect as being a structurally independent addition or the value of the addition shall be included in the determination of substantial improvement. c. In City basin floodplains, the value of the addition shall not be included in the determination of substantial improvement so long as the addition meets the regulatory flood protection standard set forth in §10-37. bd. For a garage attached to a residential structure, compliance with the requirements of § 10-38 or the requirements of § 10-39 may be substituted for compliance with the applicable requirements of Subsection 10-37(b). (7) Accessory structures. a. Construction of a new accessory structure or addition to an accessory structure is allowed, provided that all applicable requirements, including, but not limited to, the requirements of § 10-45 and the requirements of § 10-37, are met by the accessory structure. ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 2 Packet pg. 24 DRAFT FOR DISCUSSION ONLY - SUBJECT TO FURTHER REVIEW AND REVISION b. In FEMA basin floodplains, any new addition must either be designed and certified by a Colorado registered professional engineer and/or architect as being a structurally independent addition or the value of the addition shall be included in the determination of substantial improvement. c. In City basin floodplains, the value of the addition shall not be included in the determination of substantial improvement so long as the addition meets the regulatory flood protection standard set forth in §10-37. bd. Remodeling and repair of an accessory structure is allowed, provided that, after completion of any substantial improvement, all applicable requirements, including, but not limited to, the requirements of § 10-37, are met. ce. Redevelopment of an accessory structure is allowed, provided that all applicable requirements, including, but not limited to, the requirements of § 10-37, are met. df. For an accessory structure, compliance with the requirements of § 10-38 or the requirements of § 10-39 may be substituted for compliance with the applicable requirements of Subsection 10-37(b). eg. No new basement may be constructed below the regulatory flood protection elevation in any accessory structure. fh. A nonconforming basement below the regulatory flood protection elevation may remain in an accessory structure, provided that, after completion of any substantial improvement or redevelopment, all applicable requirements, including, but not limited to, the requirements of § 10-38, are met. . . . Section 9. That Section 10-103 of the Code of the City of Fort Collins is hereby amended to read as follows: Sec. 10-103. - Specific standards for nonresidential development in floodways. . . . (2) Addition. a. Addition to a nonresidential structure is allowed, provided that all applicable requirements, including, but not limited to, the requirements of § 10-45 and the requirements of § 10-37, are met. b. In FEMA basin floodplains, any new addition must either be designed and certified by a Colorado registered professional engineer and/or architect as being a structurally independent addition or the value of the addition shall be included in the determination of substantial improvement. ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 2 Packet pg. 25 DRAFT FOR DISCUSSION ONLY - SUBJECT TO FURTHER REVIEW AND REVISION c. In City basin floodplains, the value of the addition shall not be included in the determination of substantial improvement so long as the addition meets the regulatory flood protection standard set forth in §10-37. bd. For an addition to a nonresidential structure, compliance with the requirements of § 10-38 may be substituted for compliance with the applicable requirements of Subsection 10-37(b). ce. No new basement may be constructed below the regulatory flood protection elevation in an addition to a nonresidential structure. . . . (6) Attached garages. a. Addition of an attached garage to a nonresidential structure is allowed, provided that all applicable requirements, including, but not limited to, the requirements of § 10-45 and the requirements of § 10-37, are met by the attached garage. b. In FEMA basin floodplains, any new addition must either be designed and certified by a Colorado registered professional engineer and/or architect as being a structurally independent addition or the value of the addition shall be included in the determination of substantial improvement. c. In City basin floodplains, the value of the addition shall not be included in the determination of substantial improvement so long as the addition meets the regulatory flood protection standard set forth in § 10-37. bd. For a garage attached to a nonresidential structure, compliance with the requirements of §10-38 or the requirements of § 10-39 may be submitted for compliance with the applicable requirements of Subsection 10-37(b). (7) Accessory structures. a. Construction of a new accessory structure or addition to an accessory structure is allowed, provided that all applicable requirements, including, but not limited to, the requirements of § 10-45 and the requirements of § 10-37, are met by the accessory structure. b. In FEMA basin floodplains, any new addition must either be designed and certified by a Colorado registered professional engineer and/or architect as being a structurally independent addition or the value of the addition shall be included in the determination of substantial improvement. c. In City basin floodplains, the value of the addition shall not be included in the determination of substantial improvement so long as the addition meets the regulatory flood protection standard set forth in §10-37. ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 2 Packet pg. 26 DRAFT FOR DISCUSSION ONLY - SUBJECT TO FURTHER REVIEW AND REVISION bd. Remodeling and repair of an accessory structure is allowed, provided that, after completion of any substantial improvement, all applicable requirements, including, but not limited to, the requirements of § 10-37, are met. ce. Redevelopment of an accessory structure is allowed, provided that all applicable requirements, including, but not limited to, the requirements of § 10-37, are met. df. For an accessory structure, compliance with the requirements of § 10-38 or the requirements of § 10-39 may be substituted for compliance with the applicable requirements of Subsection 10-37(b). eg. No new basement may be constructed below the regulatory flood protection elevation in any accessory structure. fh. A nonconforming basement below the regulatory flood protection elevation may remain in an accessory structure, provided that, after completion of any substantial improvement or redevelopment, all applicable requirements, including, but not limited to, the requirements of § 10-38, are met. . . . Section 10. That Section 10-104 of the Code of the City of Fort Collins is hereby amended to read as follows: Sec. 10-104. - Specific standards for mixed-use development in floodways. . . . (2) Addition. a. Addition to a mixed-use structure for residential use is prohibited. b. Addition to the nonresidential use portions of a mixed-use structure is allowed, provided that all applicable requirements, including, but not limited to, the requirements of § 10-45 and the requirements of § 10-37, are met. c. In FEMA basin floodplains, any new addition must either be designed and certified by a Colorado registered professional engineer and/or architect as being a structurally independent addition or the value of the addition shall be included in the determination of substantial improvement. d. In City basin floodplains, the value of the addition shall not be included in the determination of substantial improvement so long as the addition meets the regulatory flood protection standard set forth in Section 10-37. ce. For an addition to a mixed-use structure, compliance with the requirements of § 10-38 may be substituted for compliance with the applicable requirements of Subsection 10-37(b). ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 2 Packet pg. 27 DRAFT FOR DISCUSSION ONLY - SUBJECT TO FURTHER REVIEW AND REVISION df. No new basement may be constructed below the regulatory flood protection elevation in an addition to a mixed-use structure. . . . (5) Attached garages. a. Addition of a new attached garage to a mixed-use structure is allowed, provided that all applicable requirements, including, but not limited to, the requirements of § 10-45 and the requirements of § 10-37, are met by the attached garage. b. In FEMA basin floodplains, any new addition must either be designed and certified by a Colorado registered professional engineer and/or architect as being a structurally independent addition or the value of the addition shall be included in the determination of substantial improvement. c. In City basin floodplains, the value of the addition shall not be included in the determination of substantial improvement so long as the addition meets the regulatory flood protection standard set forth in §10-37. bd. For a garage attached to a mixed-use structure, compliance with the requirements of § 10-38 or the requirements of § 10-39 may be substituted for compliance with the applicable requirements of Section 10-37(b). (6) Accessory structures. a. Construction of a new accessory structure or addition to an accessory structure is allowed, provided that all applicable requirements, including, but not limited to, the requirements of § 10-45 and the requirements of § 10-37, are met by the accessory structure. b. In FEMA basin floodplains, any new addition must either be designed and certified by a Colorado registered professional engineer and/or architect as being a structurally independent addition or the value of the addition shall be included in the determination of substantial improvement. c. In City basin floodplains, the value of the addition shall not be included in the determination of substantial improvement so long as the addition meets the regulatory flood protection standard set forth in Section 10-37. bd. Remodeling and repair of an accessory structure is allowed, provided that, after completion of any substantial improvement, all applicable requirements, including, but not limited to, the requirements of § 10-37, are met. ce. Redevelopment of an accessory structure is allowed, provided that all applicable requirements, including, but not limited to, the requirements of § 10-37, are met. ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 2 Packet pg. 28 DRAFT FOR DISCUSSION ONLY - SUBJECT TO FURTHER REVIEW AND REVISION df. For an accessory structure, compliance with the requirements of § 10-38 or the requirements of § 10-39 may be substituted for compliance with the applicable requirements of Subsection 10-37(b). eg. No new basement may be constructed below the regulatory flood protection elevation in any accessory structure. fh. A nonconforming basement below the regulatory flood protection elevation may remain in an accessory structure, provided that, after completion of any substantial improvement or redevelopment, all applicable requirements, including, but not limited to, the requirements of § 10-38, are met. . . . Section 11. That Section 10-108 of the Code of the City of Fort Collins is hereby amended to read as follows: Sec. 10-108. - Specific standards for residential development in flood fringe. . . . (2) Additions. a. An addition to a residential structure is allowed, provided that all applicable requirements, including, but not limited to, the requirements of § 10-37, are met. b. In FEMA basin floodplains, any new addition must either be designed and certified by a Colorado registered professional engineer and/or architect as being a structurally independent addition or the value of the addition shall be included in the determination of substantial improvement. c. In City basin floodplains, the value of the addition shall not be included in the determination of substantial improvement so long as the addition meets the regulatory flood protection standard set forth in Section 10-37. bd. No new basement may be constructed below the regulatory flood protection elevation in any addition to a residential structure. . . . (6) Attached garages. a. Addition of an attached garage to a residential structure is allowed, provided that all applicable requirements, including, but not limited to, the requirements of § 10-37, are met by the attached garage. b. In FEMA basin floodplains, any new addition must either be designed and certified by a Colorado registered professional engineer and/or architect as being a structurally independent addition or the value of the addition shall be included in the determination of substantial improvement. ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 2 Packet pg. 29 DRAFT FOR DISCUSSION ONLY - SUBJECT TO FURTHER REVIEW AND REVISION c. In City basin floodplains, the value of the addition shall not be included in the determination of substantial improvement so long as the addition meets the regulatory flood protection standard set forth in Section 10-37. bd. For a garage attached to a residential structure, compliance with the requirements of § 10-38 or the requirements of § 10-39 may be substituted for compliance with the applicable requirements of Subsection 10-37(b). (7) Accessory structures. a. Construction of a new accessory structure or addition to an accessory structure is allowed, provided that all applicable requirements, including, but not limited to, the requirements of § 10-37, are met. b. In FEMA basin floodplains, any new addition must either be designed and certified by a Colorado registered professional engineer and/or architect as being a structurally independent addition or the value of the addition shall be included in the determination of substantial improvement. c. In City basin floodplains, the value of the addition shall not be included in the determination of substantial improvement so long as the addition meets the regulatory flood protection standard set forth in Section 10-37. bd. Remodeling and repair of an accessory structure is allowed, provided that, after completion of any substantial improvement, all applicable requirements, including, but not limited to, the requirements of § 10-37, are met. ce. Redevelopment of an accessory structure is allowed, provided that all applicable requirements, including, but not limited to, the requirements of § 10-37, are met. df. For an accessory structure, compliance with the requirements of § 10-38 or the requirements of § 10-39 may be substituted for compliance with the applicable requirements of Subsection 10-37(b). eg. A new basement may be constructed below the regulatory flood protection elevation in an accessory structure, provided that all applicable requirements, including, but not limited to, the requirements of § 10-38, are met. fh. A nonconforming basement below the regulatory flood protection elevation may remain in an accessory structure, provided that, after completion of any substantial improvement or redevelopment, all applicable requirements, including, but not limited to, the requirements of § 10-38, are met. . . . Section 12. That Section 10-109 of the Code of the City of Fort Collins is hereby amended to read as follows: Sec. 10-109. - Specific standards for nonresidential development in flood fringe. ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 2 Packet pg. 30 DRAFT FOR DISCUSSION ONLY - SUBJECT TO FURTHER REVIEW AND REVISION . . . (2) Additions. a. Addition to a nonresidential structure is allowed, provided that all applicable requirements, including, but not limited to, the requirements of § 10-37, are met. b. In FEMA basin floodplains, any new addition must either be designed and certified by a Colorado registered professional engineer and/or architect as being a structurally independent addition or the value of the addition shall be included in the determination of substantial improvement. c. In City basin floodplains, the value of the addition shall not be included in the determination of substantial improvement so long as the addition meets the regulatory flood protection standard set forth in Section 10-37. bd. For an addition to a nonresidential structure, compliance with the requirements of § 10-38 may be substituted for compliance with the applicable requirements of Subsection 10-37(b). ce. A new basement may be constructed below the regulatory flood protection elevation in an addition to a nonresidential structure, provided that all applicable requirements, including, but not limited to, the requirements of § 10-38, are met. . . . (6) Attached garages. a. Addition of an attached garage to a nonresidential structure is allowed, provided that all applicable requirements, including, but not limited to, the requirements of § 10-37, are met by the attached garage. b. In FEMA basin floodplains, any new addition must either be designed and certified by a Colorado registered professional engineer and/or architect as being a structurally independent addition or the value of the addition shall be included in the determination of substantial improvement. c. In City basin floodplains, the value of the addition shall not be included in the determination of substantial improvement so long as the addition meets the regulatory flood protection standard set forth in Section 10-37. bd. For a garage attached to a nonresidential structure, compliance with the requirements of § 10-38 or the requirements of § 10-39 may be substituted for compliance with the applicable requirements of Subsection 10-37(b). (7) Accessory structures. ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 2 Packet pg. 31 DRAFT FOR DISCUSSION ONLY - SUBJECT TO FURTHER REVIEW AND REVISION a. Construction of a new accessory structure or addition to an accessory structure is allowed, provided that all applicable requirements, including, but not limited to, the requirements of § 10-37, are met. b. In FEMA basin floodplains, any new addition must either be designed and certified by a registeredColorado registered professional engineer and/or architect as being a structurally independent addition or the value of the addition shall be included in the determination of substantial improvement. c. In City basin floodplains, the value of the addition shall not be included in the determination of substantial improvement so long as the addition meets the regulatory flood protection standard set forth in Section 10-37. bd. Remodeling and repair of an accessory structure is allowed, provided that, after completion of any substantial improvement, all applicable requirements, including, but not limited to, the requirements of § 10-37, are met. ce. Redevelopment of an accessory structure is allowed, provided that all applicable requirements, including, but not limited to, the requirements of § 10-37, are met. df. For an accessory structure, compliance with the requirements of § 10-38 or the requirements of § 10-39 may be substituted for compliance with the applicable requirements of Subsection 10-37(b). eg. A new basement may be constructed below the regulatory flood protection elevation in an accessory structure, provided that all applicable requirements, including, but not limited to, the requirements of § 10-38, are met. fh. A nonconforming basement below the regulatory flood protection elevation may remain in an accessory structure, provided that, after completion of any substantial improvement or redevelopment, all applicable requirements, including, but not limited to, the requirements of § 10-38, are met. . . . Section 13. That Section 10-110 of the Code of the City of Fort Collins is hereby amended to read as follows: Sec. 10-110. - Specific standards for mixed-use development in flood fringe. . . . (2) Additions. a. Addition to a mixed-use structure is allowed, provided that all applicable requirements, including, but not limited to, the requirements of § 10-37, are met. b. In FEMA basin floodplains, any new addition must either be designed and certified by a registeredColorado registered professional engineer and/or architect ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 2 Packet pg. 32 DRAFT FOR DISCUSSION ONLY - SUBJECT TO FURTHER REVIEW AND REVISION as being a structurally independent addition or the value of the addition shall be included in the determination of substantial improvement. c. In City basin floodplains, the value of the addition shall not be included in the determination of substantial improvement so long as the addition meets the regulatory flood protection standard set forth in Section 10-37. bd. For an addition to a mixed-use structure, in the event that all residential use is on a floor completely above the regulatory flood protection elevation, compliance with the requirements of § 10-38 may be substituted for compliance with the applicable requirements of Subsection 10-37(b). ce. A new basement may be constructed below the regulatory flood protection elevation in an addition to a mixed-use structure, provided that: 1. All residential use is on a floor completely above the regulatory flood protection elevation; and 2. All applicable requirements, including, but not limited to, the requirements of § 10-38, are met. . . . (5) Attached garages. a. Addition of an attached garage to a mixed-use structure is allowed, provided that all applicable requirements, including, but not limited to, the requirements of § 10-37, are met by the attached garage. b. In FEMA basin floodplains, any new addition must either be designed and certified by a Colorado registered professional engineer and/or architect as being a structurally independent addition or the value of the addition shall be included in the determination of substantial improvement. c. In City basin floodplains, the value of the addition shall not be included in the determination of substantial improvement so long as the addition meets the regulatory flood protection standard set forth in Section 10-37. bd. For a garage attached to a mixed-use structure, compliance with the requirements of § 10-38 or the requirements of § 10-39 may be substituted for compliance with the applicable requirements of Subsection 10-37(b). (6) Accessory structures. a. Construction of a new accessory structure or addition to an accessory structure is allowed, provided that all applicable requirements, including, but not limited to, the requirements of § 10-37, are met. b. In FEMA basin floodplains, any new addition must either be designed and certified by a Colorado registered professional engineer and/or architect as being a ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 2 Packet pg. 33 DRAFT FOR DISCUSSION ONLY - SUBJECT TO FURTHER REVIEW AND REVISION structurally independent addition or the value of the addition shall be included in the determination of substantial improvement. c. In City basin floodplains, the value of the addition shall not be included in the determination of substantial improvement so long as the addition meets the regulatory flood protection standard set forth in Section 10-37. bd. Remodeling and repair of an accessory structure is allowed, provided that, after completion of any substantial improvement, all applicable requirements, including, but not limited to, the requirements of § 10-37, are met. ce. Redevelopment of an accessory structure is allowed, provided that all applicable requirements, including, but not limited to, the requirements of § 10-37, are met. df. For an accessory structure, compliance with the requirements of § 10-38 or the requirements of § 10-39 may be substituted for compliance with the applicable requirements of Subsection 10-37(b). eg. A new basement may be constructed below the regulatory flood protection elevation in an accessory structure, provided that all applicable requirements, including, but not limited to, the requirements of § 10-38, are met. fh. A nonconforming basement below the regulatory flood protection elevation may remain in an accessory structure, provided that, after completion of any substantial improvement or redevelopment, all applicable requirements, including, but not limited to, the requirements of § 10-38, are met. . . . Section 14. That Section 10-113(b) of the Code of the City of Fort Collins is hereby amended to read as follows: Sec. 10-113. Removal of property from flood fringe of FEMA basin floodplains. . . . (b) LOMR-F. Property located in the flood fringe of a FEMA basin floodplain shall be considered removed from the flood fringe if a FEMA Letter of Map Revision based on Fill (LOMR-F) removing the property from the flood fringe has been issued by FEMA and remains in effect. (1) LOMR-F Review and Approval. The Utilities Executive Director shall review any application for a LOMR-F removing property from the flood fringe based on fill, and the following conditions shall apply to any LOMR-F certified by the City as reasonably safe from flooding: a. A floodplain use permit shall be obtained for any development in a LOMR- F area. ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 2 Packet pg. 34 DRAFT FOR DISCUSSION ONLY - SUBJECT TO FURTHER REVIEW AND REVISION b. Any new structure, accessory structure, attached garage, or addition, substantial improvement or redevelopment must meet all applicable requirements, including, but not limited to, the requirements of § 10-37, except that for nonresidential structures and mixed-use structures with all residential use on a floor completely above the regulatory flood protection elevation, compliance with the requirements of § 10-38 may be substituted for compliance with the applicable requirements of Subsection 10-37(b). c. Any new addition must either be designed and certified by a Colorado registered professional engineer and/or architect as being a structurally independent addition or the value of the addition shall be included in the determination of substantial improvement. cd. Critical facilities and expansions of critical facilities are prohibited. de. Manufactured homes and mobile buildings other than a nonconforming manufactured home or mobile building are prohibited, except that: 1. A manufactured home or mobile building may be replaced, provided that the replacement manufactured home or mobile building complies with all applicable requirements, including, but not limited to, the requirements of § 10-41. 2. Manufactured home parks and mobile building developments, other than nonconforming manufactured home parks and mobile building developments, are prohibited. 3. Expansion of a manufactured home park or a mobile building development is prohibited. (2) Unconditional or Annexed LOMR-F Approvals. For any development in an area removed from the flood fringe through a LOMR-F that did not include the conditions described in Paragraph (b)(1), or that was approved prior to annexation to the City, the development must meet all requirements of Paragraph (b)(1) in addition to meeting all conditions of the LOMR-F approval, except that, for properties annexed to the city prior to January 1, 2014, only the following shall apply: a. The development must meet all conditions of the LOMR-F approval; and b. For any new structure, accessory structure, attached garage or addition, substantial improvement or redevelopment, the development must also meet requirements of § 10-37, except that: 1. The applicable flood protection elevation required shall be twelve (12) inches above the base flood elevation, regardless of the elevation level stated in § 10-37; and ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 2 Packet pg. 35 DRAFT FOR DISCUSSION ONLY - SUBJECT TO FURTHER REVIEW AND REVISION 2. For nonresidential structures and mixed-use structures with all residential use on a floor completely above the regulatory flood protection elevation, compliance with the requirements of § 10-38 may be substituted for compliance with the elevation requirement in Subparagraph (b)(2)b.1. c. Any new addition must either be designed and certified by a Colorado registered professional engineer and/or architect as being a structurally independent addition or the value of the addition shall be included in the determination of substantial improvement. Introduced, considered favorably on first reading, and ordered published this ___ day of ________, A.D. 2021, and to be presented for final passage on the ___ day of _____, A.D. 2021. __________________________________ Mayor ATTEST: _____________________________ City Clerk Passed and adopted on final reading on this _____ day of ____, A.D. 2021. __________________________________ Mayor ATTEST: _____________________________ City Clerk ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 2 Packet pg. 36 City of Fort Collins Floodplain Regulations FOR ALL FLOODPLAINS other than the Poudre River Quick GuideQuick Guide Note: This guide was prepared as an educational tool to help explain portions of the floodplain regulations, and is not intended as a complete or detailed explanation of the legal requirements that may apply to a particular property. Article II of Chapter 10 of the City Code specifies the requirements and prohibitions that are outlined generally in this guide and is the controlling legal document in the event of any conflict or inconsistency between this guide and the City Code. The Code provisions can be found at http://www.colocode.com/ftcollins/municipal/chapter10.htm. Prepared by Fort Collins Utilities, PO Box 580, 700 Wood St., Fort Collins, CO 80522-0580 970-416-2632 • fcgov.com/stormwater/fldplain.php 3/18 ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3 Packet pg. 37 2 Table of Odds for Different Events Floodplain Facts • Property in the 100-year floodplain has a 1 percent chance in any given year of being flooded. • Over a 30-year period, there is a 26 percent chance that a property in the 100-year floodplain will be flooded. For comparison, there is only a 5 percent chance that the building will catch fire during that same 30-year period. • Some properties have an even higher risk of flooding because they are in areas where smaller, more frequent floods cause damage. Purpose of Floodplain Regulations Event Odds Structure in the 100-year floodplain being flooded in any given year Matching one number plus Powerball in the Powerball Lottery Structure in the 500-year floodplain being flooded in any given year Annual chance of being killed in a car accident if you drive 10,000 miles/year Being struck by lightning Winning the Powerball Lottery jackpot (matching five numbers and the Powerball) 1 in 100 1 in 124 1 in 500 1 in 4,000 1 in 600,000 1 in 120,526,770 ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3 Packet pg. 38 3 Types of Floodplains Floodplain Name Poudre River Spring Creek Dry Creek Cooper Slough Boxelder Creek Fossil Creek Old Town Canal Importation McClellands Creek Mail Creek Foothills Channel West Vine FEMA-Basin X X X X City-BasinPoudre River X X X X X X X X Floodplain Designations • In Fort Collins, floodplains are designated by the City as well as by the Federal Emergency Management Agency (FEMA). • The FEMA-basin floodplains cover only the major drainages. Changes in these floodplains must be approved by FEMA (p. 5). • The City-basin floodplains further identify the flood hazard. Some of the flooding in City-basin floodplains is from irrigation ditch spills or undersized storm sewers that result in overland flooding. Changes in these floodplains can be approved by the City (p. 5). • For floodplain regulation purposes, a floodplain property is either in a FEMA-basin floodplain, a City-basin floodplain or the Poudre River floodplain. ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3 Packet pg. 39 4 • The floodway is the portion of the floodplain with the greatest depths and velocities. • The floodway is the area of highest risk. • The floodway must be preserved to allow the floodwater to pass through without being obstructed. • Areas along the flood fringe are allowed to be filled and developed, but this raises the 100-year flood level. The City has set an allowable rise of 0.5 feet. Floodway ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3 Packet pg. 40 5 Floodway Modifications • Floodways can be modified, but the applicant must be able to show that the project casues no-rise in the 100-year flood level. • In FEMA-basin floodplains, the applicant must submit information to FEMA for approval before construction and after construction if certain changes are being made. If the applicant’s project causes a rise, there are two options: 1. In FEMA-basin floodplains, the applicant must show the entire rise is on their property or obtain easements from other property owners. No structures can be impacted by a rise in the flood level. 2. In City-basin floodplains, the applicant must show that the entire rise is on their property or obtain easements from other property owners. Example of a Floodway Modification ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3 Packet pg. 41 6 Summary of Floodway Development Regulations Residential Development • New residential development is not allowed. • Fill is not allowed unless the applicant can show no-rise (Floodway Modifications, p. 5). • Residential additions are not allowed. • Remodels are allowed subject to the substantial improvement requirements (p. 14-15). • Manufactured homes are allowed only in existing manufactured home parks. • Redevelopment (rebuild) of an existing structure is allowed (p. 14-15). Must meet the freeboard requirements for redevelopments (p. 10). • Detached garages and sheds are allowed if the applicant can show no-rise (p. 17 and Floodway Modifications, p. 5). Non-Residential Development • New non-residential development is allowed if the applicant can show no-rise (Floodway Modifications, p. 5). Must meet the freeboard requirements (p. 10-11). • Fill is not allowed unless the applicant can show no-rise (Floodway Modifications, p. 5). • Non-residential additions are allowed if the applicant can show no-rise (Floodway Modifications, p. 6). Must meet the freeboard requirements (p. 10-11). • Remodels are allowed subject to the substantial improvement requirements (p. 14-16). • Mobile buildings (modular offices) are allowed only in existing mobile building developments. • Redevelopment (rebuild) of an existing structure is allowed (p. 14-16). Must meet the freeboard requirements for redevelopments (p. 10-11). • Attached garages, detached garages and sheds are allowed if the applicant can show no-rise (p. 17 and Floodway Modifications, p.5). Mixed-Use Development • New mixed-use development is not allowed. • Fill is not allowed unless the applicant can show no-rise (Floodway Modifications, p. 5). • Residential additions are not allowed to a mixed-use structure. Non-residential additions are allowed to a mixed-use structure if the applicant can show no-rise (Floodway Modifications, p. 5). Must meet the freeboard requirements (p. 10-11). • Remodels are allowed subject to the substantial improvement requirements (p. 14-16). • Redevelopment (rebuild) of an existing structure is allowed (p. 14-16). Must meet the freeboard requirements for redevelopments (p. 10-11). • Detached garages and sheds are allowed if the applicant can show no-rise (p. 17 and Floodway Modifications, p. 5). ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3 Packet pg. 42 7 • Critical facilities are not allowed (p. 18). • New basements are not allowed below the freeboard level (p. 10). An existing basement in a redeveloped or substantially improved structure is not allowed to remain (p. 10 and 14-15). • Critical facilities are not allowed (p. 18). • New basements are not allowed below the freeboard level (p. 10-11). An existing basement in a redeveloped or substantially improved structure can remain if floodproofed (p. 10-11 and 14-16). • New outside storage of equipment or materials is not allowed unless the applicant can show no rise (Floodway Modifications, p.5). • Critical facilities are not allowed (p. 18). • New basements are not allowed below the freeboard level (p. 10-11). An existing basement in a redeveloped or substantially improved structure is not allowed to remain if it is in residential use (p. 10 and 14-15). An existing basement in a redeveloped or substantially improved structure is allowed to remain if it is in nonresidential use and floodproofed (p. 10-11 and 14-16). • New outside storage of equipment or materials is not allowed unless the applicant can show no rise (Floodway Modifications, p.5) Summary of Floodway Development Regulations (continued) Residential Development Non-Residential Development Mixed-Use Development ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3 Packet pg. 43 8 Summary of Floodplain Fringe Development Regulations Residential Development • New residential development is allowed. Must meet the freeboard requirements (p. 10). • Fill is allowed. • Residential additions are allowed. Must meet the freeboard requirements (p. 10). • Remodels are allowed subject to the substantial improvement requirements (p. 14-15). • Manufactured homes are allowed only to replace an existing manufactured home or fill a vacant lot in an existing manufactured home park. • Redevelopment (rebuild) of an existing structure is allowed (p. 14-15). Must meet the freeboard requirements for redevelopments (p. 10). • Attached garages, detached garages and sheds are allowed (p. 17). • Critical facilities are not allowed (p. 18). Non-Residential Development • New non-residential development is allowed. Must meet the freeboard requirements (p. 10-11). • Fill is allowed. • Non-residential additions are allowed. Must meet the freeboard requirements (p. 10-11). • Remodels are allowed subject to the substantial improvement requirements (p. 14-16). • Mobile buidlings (modular offices) are allowed only to replace an existing mobile building or fill a vacant lot in an existing mobile building development. • Redevelopment (rebuild) of an existing structure is allowed (p. 14-16). Must meet the freeboard requirements for redevelopments (p. 10-11). • Attached garages, detached garages and sheds are allowed (p. 17). • Critical facilities are not allowed (p. 18). Mixed-Use Development • New mixed-use development is allowed. Must meet the freeboard requirements (p. 10-11). • Fill is allowed. • Mixed-use additions are allowed. Must meet the freeboard requirements (p. 10-11). • Remodels are allowed subject to the substantial improvement requirements (p. 14-16). • Redevelopment (rebuild) of an existing structure is allowed (p. 14-16). Must meet the freeboard requirements for redevelopments (p. 10-11). • Attached garages, detached garages and sheds are allowed (p. 17). • Critical facilities are not allowed (p. 18). ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3 Packet pg. 44 9 Mixed-Use Development • New basements are not allowed below the freeboard level for residential portions of mixed-use structures (p. 10). An existing basement in a redeveloped or substantially improved structure is not allowed to remain if it is in residential use (p. 10 and 14-15). New basements are allowed for non- residential portions of mixed-use structures. Must meet freeboard requirements and be floodproofed (p. 10-11). An existing basement in a redeveloped or substantially improved structure is allowed to remain if it is in non- residential use and floodproofed (p. 10-11 and 14-16). Non-Residential Development • New basements are allowed. Must meet freeboard requirements and be floodproofed (p. 10-11). An existing basement below the freeboard level in a redeveloped or substantially improved structure can remain if floodproofed (p. 10-11 and 14-16). Residential Development • New basements are not allowed below the freeboard level (p. 10). An existing basement in a redeveloped or substantially improved structure is not allowed to remain (p. 10 and 14-15). Summary of Floodplain Fringe Development Regulations (continued) ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3 Packet pg. 45 10 Freeboard • Freeboard is a factor of safety that accounts for the allowed rise in flood level due to development in the flood fringe and for larger floods and debris that may cause the flood elevation to be higher. • Freeboard is a measure of how high above the flood level the structure must be built or floodproofed. Residential Structures and Residential Portions of Mixed-Use Structures • Freeboard for new development and redevelopment of an existing structure, including any attached garages, is 18 inches; • Freeboard for additions and substantial improvements (including attached garages) is 12 inches; • Freeboard for new detached garages or sheds that are accessory to an existing structure is 12 inches (p. 17); • Must elevate the structure; not allowed to floodproof; and • The lowest floor of the structure (p. 12-13), including the basement, all HVAC and electrical, must be elevated above the freeboard height. Example of new development residential elevation (See p. 12-13 for detailed foundation designs) Slab on grade foundation Crawl space foundation ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3 Packet pg. 46 11 Freeboard continued Floodproofing uses various techniques to make a building water tight: • Sealants and waterproof membranes; • Closure shields in front of doorways; and • Mini-walls to protect window or stair wells. Floodproofing generally works only when flood depths are less than 3 feet. elevated 12” Example of new development non-residential floodproofing Example of residential addition Non-Residential Structures and Non-Residential Portions of Mixed-Use Structures • Freeboard for new development and redevelopment of an existing structure, including any attached garages, is 18 inches; • Freeboard for additions and substantial improvements (including attached garages) is 12 inches; • Freeboard for new detached garages or sheds that are accessory to an existing structure is 12 inches (p 17); • Allowed to either elevate or floodproof the structure; • In the floodway, new basements are not allowed; • If elevating, the lowest floor of the structure (p. 12-13), including the basement, all HVAC and electrical, must be elevated above the freeboard height; and • If floodproofing, the structure as well as all HVAC and electrical, must be floodproofed to the freeboard height. ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3 Packet pg. 47 12 Determination of Lowest Floor Based on Type of Foundation Slab on Grade The lowest floor elevation of a slab on grade structure is measured at the top of the slab. Basement The lowest floor elevation of a structure with a basement is measured at the top of the basement slab. Enclosure (above grade crawl space) 2. The lowest floor elevation of a structure with an enclosure that is not built in accordance with the venting criteria (p. 17) is measured at the lowest interior grade of the enclosure. Lowest floor elevation Freeboard Floor slab on grade Freeboard Vents Enclosure Lowest floor elevation Unfinished area no HVAC Vents Lowest floor elevation Freeboard Basement Basement slab Freeboard Can have HVAC in enclosed area Lowest floor elevation Enclosure 1. The lowest floor elevation of a structure with an enclosure that is built in accordance with the venting criteria (p. 17) is measured at the floor of the first finished floor. ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3 Packet pg. 48 13 Determination of Lowest Floor Based on Type of Foundation continued Crawl Space (below grade) The lowest floor of a structure with a crawl space is measured at the lowest finished floor if the following conditions are met: a. The velocity of the flood flows hitting the structure is less that 5 feet per second; b. The interior grade elevation that is below the flood elevation is no lower than 2 feet below the lowest adjacent grade; c. The height of the crawl space, as measured from the lowest interior grade of the crawl space to the top of the foundation wall, does not exceed 4 feet at any point; d. An adequate drainage system is in place, including a totally immersible pump; e. All ductwork, HVAC, hot water heater and electrical is elevated to the regulatory flood protection elevation; and f. Venting requirements (p. 17) are met. If the above conditions are not met, the lowest floor is determined based on the criteria for a basement (p. 12). Pump f Vent b Maximum 2 feet Freeboard a Velocity < 5 ft. per sec. c No more than 4 feet to top of foundation wall Crawl space e Duct Work d ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3 Packet pg. 49 14 Ve rtical (Pop-top) addition All remodel work, including vertical addition, counts toward substantial improvement Remodels or Repair of Damaged Buildings Remodels and repairs are allowed subject to the substantial improvement requirements (p. 15-16). Vertical additions (pop-tops) are considered a remodel and are subject to the substantial improvement requirements (p. 15-16). ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3 Packet pg. 50 15 Substantial Improvement and Redevelopment Residential Structures and Residential Portions of Mixed-Use Structures If a substantial improvement occurs, the lowest floor (p. 12-13) of a non-conforming structure, including the basement, and all HVAC, electrical and utilities, must be elevated 12 inches above the flood elevation. After improvements, the structure will be protected from flood damage. If a redevelopment occurs, the lowest floor (p. 12-13) of a non-conforming structure, including the basement, all HVAC, electrical and utilities, must be elevated 18 inches above the flood elevation. After improvements, the structure will be protected from flood damage. elevated 12" or 18" Substantial improvement occurs when all of the following conditions are met: 1. A building permit is requested for any repair, reconstruction or improvement to a non-conforming structure, involving alteration of any wall, ceiling, floor or other structural part of the building; 2. The cost of the improvement, or the amount of damage, equals or exceeds 50 percent of the market value of the structure either before the improvement or repair is started or before the building was damaged; and 3. The cost is calculated on a per project basis. A project is based on all building permits issued during the 12-month period preceeding the floodplain permit application date. A substantial improvement policy ensures that non-conforming structures are brought into conformance over time and are therefore, protected from flood damage and the risk to occupants is reduced. Redevelopment occurs when there is a substantial improvement and more than 50 percent of the wall perimeter of any floor of a structure that is partially or completely below the flood elevation is removed or replaced and the building footprint is not increased. Example of residential substantial improvement or redevelopment ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3 Packet pg. 51 16 Non-Residential Structures and Non-Residential Portion of Mixed-Use Structures If a substantial improvement occurs, the lowest floor (p. 12-13) of a non-conforming structure, including the basement and all HVAC and electrical, must be elevated or floodproofed 12 inches above the flood elevation. After improvements, the structure will be protected from flood damage. Store StoreStore Store Basement Store Store Basement Apartments Apartments Substantial Improvement and Redevelopment continued Example of non-residential and mixed-use substantial improvements or redevelopments If a redevelopment occurs, the lowest floor (p. 12-13) of a non-conforming structure, including the basement and all HVAC and electrical, must be elevated or floodproofed 18 inches above the flood elevation. After improvements, the structure will be protected from flood damage. ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3 Packet pg. 52 17 Example of attached structure Example of detached structure Use flood resistant materials to 18" above flood level • Used only for parking or storage; • Is an accessory to a main structure; • Must be anchored to resist flotation; • Can either elevate to freeboard level (p. 10-11) or be built at grade; • If not elevated to freeboard level, the garage or shed must meet the following requirements: –Must have 1 square inch of venting for every square foot of enclosed area; –Must have at least two vents located on different sides of the structure; –Have at least one vent on the upstream side of the structure; –Bottom of vents cannot be higher than 1 foot above grade; –Flood resistant materials must be used below the freeboard level (p. 10-11); and –All HVAC and electrical must be elevated to the freeboard level (p. 10-11). Garages, Sheds and Accessory Structures ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3 Packet pg. 53 18 Critical Facilities COMMUNICATIONS HUB POLICE or FIRE STATION HOSPITAL, URGENT CARE, SURGICAL CENTER JAIL LIBRARY At-Risk Populations Critical Facilities Government Services Critical Facilities Essential Services Critical Facilities Hazardous Materials Critical Facilities Critical facilities are not allowed in the floodplain fringe or floodway. Examples of critical facilities are shown below: ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3 Packet pg. 54 19 Letter of Map Revision Based on Fill • A Letter of Map Revision Based on Fill (LOMR-Fill) is a FEMA process whereby a property in the flood fringe can be filled and is no longer considered in the floodplain for insurance requirements. • A community must sign-off on the application to FEMA and certify that all existing and future structures will be “reasonably safe from flooding.” • To meet this “reasonably safe from flooding” standard, all floodplain requirements (p. 8-9) must be met even if fill is placed and the property is “removed” from the floodplain by FEMA. Example of fill placed in the flood fringe ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3 Packet pg. 55 20 Erosion Buffer Limits • Erosion hazard areas occur where the channel bed and banks are unstable, causing the stream to move over time. • Migration is a natural characteristic of a stream. Some streams are more prone to migration than others depending on the type of material that makes up the bed and banks. • Urbanization can have a pronounced impact on these natural processes, resulting in accelerated erosion. • Erosion buffer limits have been delineated for those streams that are subject to severe erosion hazards. These include Fossil Creek, Boxelder Creek, McClellands Creek and Mail Creek. • If development is restricted from these unstable areas, there will be less need in the future to defend the development from the stream. Defending the development may solve one problem but could create another upstream or downstream. ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3 Packet pg. 56 21 Requirements within erosion buffer limits • Structures are not allowed. • Irrigated grasses or shrubs are not allowed. • Detention ponds or water quality ponds are not allowed. • Parking lots are not allowed. • Temporary or permanent storage of materials is not allowed. • The area within the buffer must not be used for construction traffic for any development. • All utilities must be kept out except for necessary stream crossings. • Bike paths must be kept out except for necessary stream crossings. • Road bridges must span the entire buffer limit. If there is no possibility of spanning the entire limit, the location crossing and design of abutments must be done so as to limit disturbance of the channel banks. • Grading or excavation is not allowed in the buffer unless associated with a bridge or utility crossing as noted above. • A stability study may be required. Erosion Buffer Limits continued ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3 Packet pg. 57 22 Building Permit and Development Review Approval Requirements • Floodplain Use Permit for any work being done on a structure or property in the floodplain. The permit fees are shown in the table on page 23. • Building plans showing foundation design, flood elevation, floor elevations, HVAC elevations, size and locations of vents, floodproofing design, emergency response and preparedness plan and other relevant information. • No-Rise certification if working in the floodway. • Floodplain Modeling Report if doing a floodway modification (p. 5). (See separate modeling guidelines handout.) • Other plans or reports to document information such as grading, fill, channel stability and floodplain boundaries. Certificate of Occupancy Approval Requirements • FEMA Elevation Certificate or FEMA Floodproofing Certificate for any new structure, addition, substantial improvement or redevelopment built in any floodplain. Allow two weeks for review and approval. Requires licensed surveyor for elevation certificate; requires licensed engineer or architect for floodproofing certificate. • No-Rise certification if working in the floodway. • As-built modeling report, if applicable. Variances The Fort Collins Water Board has the authority to issue variances to the floodplain regulations if certain requirements are met. The Board meets the third Thursday of the month. An application packet must be submitted three weeks prior to the board meeting, with a $1,000 application fee. (See separate variance submittal handout for documentation and justification requirements.) Floodplain Information and Assistance Call Fort Collins Utilities at (970) 416-2632 or e-mail utilities@fcgov.com to determine if a property is in the floodplain or to discuss floodplain regulations. More information about floodplain managment in Fort Collins is available at fcgov.com/stormwater/flooding. Required Documentation and Submittals (Note: Some items may require a registered professional engineer.) ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3 Packet pg. 58 23 Floodplain Permit Fees ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3 Packet pg. 59 24 Flood Insurance Information Who needs flood insurance? EVERYONE. Flood Insurance is available for ALL properties in the City of Fort Collins, regardless of location. Approximately 25% of damages occur in low risk areas. Flood Insurance is required by lenders for any structure in a FEMA 100-year floodplain.Lenders have the option of requiring it in any other area. • New flood insurance policies will require a FEMA Elevation Certificate documenting the elevation of the structure. • Fort Collins Utilities has elevation certificates on file for many structures in the City of Fort Collins, free of charge, by calling 970-416-2632 or visiting www.fcgov.com/elevation-certificate. • Documenting the elevation of the structure allows the flood insurance premium to be calculated based on the risk. • The higher the structure is elevated above the 100-year flood level, the lower the insurance premium. Flood Insurance is not mandatory in City-designated floodplains. However, it is strongly recommended. • Look into a “Preferred Risk” Flood Insurance Policy. It combines structural coverage and contents coverage at a more affordable price. Important Considerations • There is a 30-day waiting period before flood insurance becomes effective. • Disaster assistance is only available for major flood events and does not cover the entire cost to rebuild your home or business. • Fort Collins is subject to flash flooding—there is little warning time to move your contents to safer locations. You can receive up to a 40% discount on your flood insurance premiums. • Fort Collins has some of the lowest flood insurance premiums in the United States due to its proactive floodplain management program. • Check with your insurance agent to make sure you are receiving the FEMA Community Rating System (CRS) Discount for Fort Collins being a Class 4 Community. To learn more, visit http://www.floodsmart.gov/, contact your insurance agent, or call FEMA at 1-888-379-9531. ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3 Packet pg. 60 25 Example of Flood Risk Map WELCH ST E STUART STS LEMAY AVE E PROSPECT RDLUKE STEMIGH STYOUNT STPATTON STPAWNEE DR EDORA RDLAKE PL ESEMINOLE DR E LAKE ST SOLSTICE LNMEEKER DRCOMMANCHE DRSTONEHENGE DRBRUMAL CTE LAKE STPrinted: 04/07/2015.All floodplain boundaries are approximate.This information is based on the Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map (FIRM) and the City of Fort Collins Master Drainageway Plans. This letter does not imply that the referenced property will or will not be free from flooding or damage. A property not in the Special Flood Hazard Area or in a City Designated Floodplain may be damaged by a flood greater than that predicted on the map or from a local drainage problem not shown on the map. This map does not create liability on the part of the City, or any officer or employee thereof, for any damage that results from reliance on this information.FEMA Flood Risk MapModerate RiskMay include:- Areas of FEMA 500-year floodplain (FEMA Zone X-shaded).- Areas of FEMA or City 100-year floodplain (sheet flow) with average depths of less than 1 foot.- Areas protected by levees from the 100-year flood.Low RiskAreas outside of FEMA and City mapped 100-year and 500-year floodplains. Local drainage problems may still exist.FEMA Flood Fringe - May Include:- Areas of FEMA 100-year floodplain (FEMA Zones A, AE, AO, and AH)- Areas of City 100-year floodplain including ponding areas and sheet flow areas with average depths of 1-3 feet.There is a 1% annual chance that these areas will be flooded.High RiskFEMA Floodway - Area of 100-year floodplain with greatest depths and fastest velocities.0 190 380 570 76095FeetADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 3 Packet pg. 61 City of Fort Collins Floodplain Regulations for the POUDRE RIVER Note: This guide was prepared as an educational tool to help explain portions of the floodplain regulations, and is not intended as a complete or detailed explanation of the legal requirements that may apply to a particular property. Article II of Chapter 10 of the City Code specifies the requirements and prohibitions that are outlined generally in this guide and is the controlling legal document in the event of any conflict or inconsistency between this guide and the City Code. The Code provisions can be found at http://www.colocode.com/ftcollins/municipal/chapter10.htm. Prepared by Fort Collins Utilities, PO Box 580, 700 Wood St., Fort Collins, CO 80522-0580 970-416-2632 • fcgov.com/stormwater/fldplain.php 3/18 Quick GuideQuick Guide ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4 Packet pg. 62 2 Table of Odds for Different Events Floodplain Facts • Property in the 100-year floodplain has a 1 percent chance in any given year of being flooded. • Over a 30-year period, there is a 26 percent chance that a property in the 100-year floodplain will be flooded. For comparison, there is only a 5 percent chance that the building will catch fire during that same 30-year period. • Some properties have an even higher risk of flooding because they are in areas where smaller, more frequent floods cause damage. Purpose of Floodplain Regulations Event Odds Structure in the 100-year floodplain being flooded in any given year Matching one number plus Powerball in the Powerball Lottery Structure in the 500-year floodplain being flooded in any given year Annual chance of being killed in a car accident if you drive 10,000 miles/year Being struck by lightning Winning the Powerball Lottery jackpot (matching five numbers and the Powerball) 1 in 100 1 in 124 1 in 500 1 in 4,000 1 in 600,000 1 in 120,526,770 ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4 Packet pg. 63 3 Types of Floodplains Floodplain Name Poudre River Spring Creek Dry Creek Cooper Slough Boxelder Creek Fossil Creek Old Town Canal Importation McClellands Creek Mail Creek Foothills Channel West Vine FEMA-Basin X X X X City-BasinPoudre River X X X X X X X X Floodplain Designations • In Fort Collins, floodplains are designated by the City as well as by the Federal Emergency Management Agency (FEMA). • The FEMA-basin floodplains cover only the major drainages. Changes in these floodplains must be approved by FEMA (p. 5). • The City-basin floodplains further identify the flood hazard. Some of the flooding in City-basin floodplains is from irrigation ditch spills or undersized storm sewers that result in overland flooding. Changes in these floodplains can be approved by the City (p. 5). • For floodplain regulation purposes, a floodplain property is either in a FEMA-basin floodplain, a City-basin floodplain or the Poudre River floodplain. ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4 Packet pg. 64 4 • The floodway is the portion of the floodplain with the greatest depths and velocities. • The floodway is the area of highest risk. • The floodway must be preserved to allow the floodwater to pass through without being obstructed. • Areas along the flood fringe are allowed to be filled and developed, but this raises the 100-year flood level. The City has set an allowable rise of 0.5 feet. Floodway ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4 Packet pg. 65 5 Floodway Modifications • Floodways can be modified, but the applicant must be able to show that the project casues no-rise in the 100-year flood level. • In FEMA-basin floodplains, the applicant must submit information to FEMA for approval before construction and after construction if certain changes are being made. If the applicant’s project causes a rise, there are two options: 1. In FEMA-basin floodplains, the applicant must show the entire rise is on their property or obtain easements from other property owners. No structures can be impacted by a rise in the flood level. 2. In City-basin floodplains, the applicant must show that the entire rise is on their property or obtain easements from other property owners. Example of a Floodway Modification ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4 Packet pg. 66 6 Summary of Floodway Development Regulations Residential Development • New residential development is not allowed. • Fill is not allowed unless the applicant can show no-rise (Floodway Modifications, p. 5). • Residential additions are not allowed. • Remodels are allowed subject to the substantial improvement requirements (p. 14-15). • Manufactured homes are allowed only in existing manufactured home parks. • Redevelopment (rebuild) of an existing structure is not allowed. • Reconstruction of a substantially damaged structure is prohibited • Detached garages and sheds are not allowed. Non-Residential Development • New non-residential development is not allowed. • Fill is not allowed unless the applicant can show no-rise (Floodway Modifications, p. 5). • Non-residential additions are not allowed. • Remodels are allowed subject to the substantial improvement requirements (p. 14-16). • Mobile buildings (modular offices) are allowed only in existing mobile building developments. • Redevelopment (rebuild) of an existing structure is not allowed. • Reconstruction of a substantially damaged structure is prohibited • Detached garages and sheds are not allowed. Mixed-Use Development (Residential and Non-Residential in the same building) • New mixed-use development is not allowed. • Fill is not allowed unless the applicant can show no-rise (Floodway Modifications, p. 5). • Additions are not allowed to a mixed-use structure. • Remodels are allowed subject to the substantial improvement requirements (p. 14-16). • Redevelopment (rebuild) of an existing structure is not allowed. • Reconstruction of a substantially damaged structure is prohibited • Detached garages and sheds are not allowed. ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4 Packet pg. 67 7 • Critical facilities are not allowed (See proposed alternatives on p. 18). • New basements are not allowed below the freeboard level (p. 10). An existing basement in a substantially improved structure is not allowed to remain (p. 10 and 14-15). • Critical facilities are not allowed (See proposed alternatives on p. 18). • An emergency response and preparedness plan is required (p. 19). • New basements are not allowed below the freeboard level (p. 10-11). An existing basement in a substantially improved structure can remain if floodproofed (p. 10-11 and 14-16). • New outside storage of material or equipment, including flotable materials, is not allowed (p. 21). • Critical facilities are not allowed (See proposed alternatives on p. 18). • An emergency response and preparedness plan is required (p. 19). • New basements are not allowed below the freeboard level (p. 10-11). An existing basement in a substantially improved structure is not allowed to remain if it is in residential use (p. 10 and 14-15). An existing basement in a substantially improved structure is allowed to remain if it is in non- residential use and floodproofed (p. 10-11 and 14-16). • New outside storage of material or equipment, including flotable materials, is not allowed (p. 21). Summary of Floodway Development Regulations (continued) Residential Development Non-Residential Development Mixed-Use Development (Residential and Non-Residential in the same building) ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4 Packet pg. 68 8 Summary of Floodplain Fringe Development Regulations Residential Development • New residential development is not allowed. • Fill is allowed. • Residential additions are not allowed. • Remodels are allowed subject to the substantial improvement requirements (p. 14-15). • Manufactured homes are allowed only to replace an existing manufactured home or fill a vacant lot in an existing manufactured home park. • Redevelopment (rebuild) of an existing structure is allowed (p. 14-15). Must meet the freeboard requirements (p. 10). • Attached garages are not allowed. Detached garages and sheds are allowed (p. 17). • Critical facilities are not allowed (See proposed alternatives on p. 18). Non-Residential Development • New non-residential development is allowed. Must meet the freeboard requirements (p. 10-11). • Fill is allowed. • Non-residential additions are allowed. Must meet the freeboard requirements (p. 10-11). • Remodels are allowed subject to the substantial improvement requirements (p. 14-16). • Mobile buildings (modular offices) are allowed only to replace an existing mobile building or fill a vacant lot in an existing mobile building development. • Redevelopment (rebuild) of an existing structure is allowed (p. 14-16). Must meet the freeboard requirements. (p. 10-11). • Attached garages, detached garages and sheds are allowed (p. 17). • Critical facilities are not allowed (See proposed alternatives on p. 18). Mixed-Use Development (Residential and Non-Residential in the same building) • New mixed-use development is not allowed. • Fill is allowed. • Residential additions are not allowed to a mixed-use structure. Non-residential additions are allowed to a mixed-use structure. Must meet the freeboard requirements (p. 10-11). • Remodels are allowed subject to the substantial improvement requirements (p. 14-16). • Redevelopment (rebuild) of an existing structure is allowed (p. 14-16). Must meet the freeboard requirements (p. 10-11). • Attached garages, detached garages and sheds are allowed (p. 17). • Critical facilities are not allowed (See proposed alternatives on p. 18). ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4 Packet pg. 69 9 Non-Residential Development • New outside storage of equipment or materials that are considered “floatable” is not allowed (p. 21). • New basements are allowed. Must meet freeboard requirements and be floodproofed (p. 10-11). An existing basement below the freeboard level in a redeveloped or substantially improved structure can remain if floodproofed (p. 10-11 and 14-16). • An emergency response and preparedness plan is required (p. 19). Residential Development • New basements are not allowed below the freeboard level (p. 10). An existing basement in a redeveloped or substantially improved structure is not allowed to remain (p. 10 and 14-15). Summary of Floodplain Fringe Development Regulations (continued) Summary of 500-Year Floodplain Development Regulations Residential Development • At-risk populations and essential services critical facilities are not allowed (p. 18). Non-Residential Development • At-risk populations and essential services critical facilities are not allowed (p. 18). Mixed-Use Development Residential and Non-Residential in the same building) • At-risk populations and essential services critical facilities are not allowed (p. 18). Mixed-Use Development (Residential and Non-Residential in the same building) • New outside storage of equipment or materials that are considered “floatable” is not allowed (p. 21). • New basements are not allowed below the freeboard level for residential portions of mixed-use structures (p. 10). An existing basement in a redeveloped or substantially improved structure is not allowed to remain if it is in residential use (p. 10 and 14-15). New basements are allowed for non-residential portions of mixed- use structures. Must meet freeboard requirements and be floodproofed (p. 10-11). An existing basement in a redeveloped or substantially improved structure is allowed to remain if it is in non-residential use and floodproofed (p. 10-11 and 14-16). • An emergency response and preparedness plan is required (p. 19). ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4 Packet pg. 70 10 Freeboard • Freeboard is a factor of safety that accounts for the allowed rise in flood level due to development in the flood fringe and for larger floods and debris that may cause the flood elevation to be higher. • Freeboard is a measure of how high above the flood level the structure must be built or floodproofed. Residential Structures and Residential Portions of Mixed-Use Structures • Freeboard is 24 inches; • Must elevate the structure; not allowed to floodproof; and • The lowest floor of the structure (p. 12-13), including the basement, all HVAC and electrical, must be elevated above the freeboard height. Example of redevelopment residential elevation (See p. 12-13 for detailed foundation designs) Slab on grade foundation Crawl space foundation ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4 Packet pg. 71 11 Freeboard continued Floodproofing uses various techniques to make a building water tight: •Sealants and waterproof membranes; •Closure shields in front of doorways; and •Mini-walls to protect window or stair wells. Floodproofing generally works only when flood depths are less than 3 feet. Example of new development non-residential floodproofing Non-Residential Structures and Non-Residential Portions of Mixed-Use Structures • Freeboard is 24 inches; • Allowed to either elevate or floodproof the structure; • In the floodway, new basements are not allowed; • If elevating, the lowest floor of the structure (p. 12-13), including the basement, all HVAC and electrical, must be elevated above the freeboard height; and • If floodproofing, the structure as well as all HVAC and electrical, must be floodproofed to the freeboard height. ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4 Packet pg. 72 12 Determination of Lowest Floor Based on Type of Foundation Slab on Grade The lowest floor elevation of a slab on grade structure is measured at the top of the slab. Basement The lowest floor elevation of a structure with a basement is measured at the top of the basement slab. Enclosure (above grade crawl space) 2. The lowest floor elevation of a structure with an enclosure that is not built in accordance with the venting criteria (p. 17) is measured at the lowest interior grade of the enclosure. Lowest floor elevation Freeboard Floor slab on grade Freeboard Vents Enclosure Lowest floor elevation Unfinished area no HVAC Vents Lowest floor elevation Freeboard Basement Basement slab Freeboard Can have HVAC in enclosed area Lowest floor elevation Enclosure 1. The lowest floor elevation of a structure with an enclosure that is built in accordance with the venting criteria (p. 17) is measured at the floor of the first finished floor. ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4 Packet pg. 73 13 Determination of Lowest Floor Based on Type of Foundation continued Crawl Space (below grade) The lowest floor of a structure with a crawl space is measured at the lowest finished floor if the following conditions are met: a. The velocity of the flood flows hitting the structure is less that 5 feet per second; b. The interior grade elevation that is below the flood elevation is no lower than 2 feet below the lowest adjacent grade; c. The height of the crawl space, as measured from the lowest interior grade of the crawl space to the top of the foundation wall, does not exceed 4 feet at any point; d. An adequate drainage system is in place, including a totally immersible pump; e. All ductwork, HVAC, hot water heater and electrical is elevated to the regulatory flood protection elevation; and f. Venting requirements (p. 17) are met. If the above conditions are not met, the lowest floor is determined based on the criteria for a basement (p. 12). Pump f Vent b Maximum 2 feet Freeboard a Velocity < 5 ft. per sec. c No more than 4 feet to top of foundation wall Crawl space e Duct Work d ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4 Packet pg. 74 14 Ve rtical (Pop-top) addition All remodel work, including vertical addition, counts toward substantial improvement Remodels or Repair of Damaged Buildings • Remodels and repairs are allowed subject to the substantial improvement requirements (p. 15-16). • Vertical additions (pop-tops) are considered a remodel and are subject to the substantial improvement requirements (p. 15-16). ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4 Packet pg. 75 15 Substantial Improvement and Redevelopment Residential Structures and Residential Portions of Mixed-Use Structures If a substantial improvement occurs, the lowest floor (p. 12-13) of a non-conforming structure, including the basement, and all HVAC, electrical and utilities, must be elevated 24 inches above the flood elevation. After improvements, the structure will be protected from flood damage. If a redevelopment occurs, the lowest floor (p. 12-13) of a non-conforming structure, including the basement, all HVAC, electrical and utilities, must be elevated 24 inches above the flood elevation. After improvements, the structure will be protected from flood damage. Substantial improvement occurs when all of the following conditions are met: 1. A building permit is requested for any repair, reconstruction or improvement to a non-conforming structure, involving alteration of any wall, ceiling, floor or other structural part of the building; 2. The cost of the improvement, or the amount of damage, equals or exceeds 50 percent of the market value of the structure either before the improvement or repair is started or before the building was damaged; and 3. The cost is calculated cumulatively over the life of the structure during the time the structure has been located in a designated floodplain. A substantial improvement policy ensures that non-conforming structures are brought into conformance over time and are therefore protected from flood damage and the risk to occupants is reduced. Redevelopment occurs when there is a substantial improvement and more than 50 percent of the wall perimeter of any floor of a structure that is partially or completely below the flood elevation is removed or replaced and the building footprint is not increased. Example of residential substantial improvement or redevelopment ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4 Packet pg. 76 16 Non-Residential Structures and Non-Residential Portion of Mixed-Use Structures If a substantial improvement occurs, the lowest floor (p. 12-13) of a non-conforming structure, including the basement and all HVAC and electrical, must be elevated or floodproofed 24 inches above the flood elevation. After improvements, the structure will be protected from flood damage. Substantial Improvement and Redevelopment continued Example of non-residential and mixed-use substantial improvements or redevelopments If a redevelopment occurs, the lowest floor (p. 12-13) of a non-conforming structure, including the basement and all HVAC and electrical, must be elevated or floodproofed 24 inches above the flood elevation. After improvements, the structure will be protected from flood damage. Store StoreStore Store Basement Store Store Basement artments artments ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4 Packet pg. 77 17 Example of attached structure Example of detached structure • Used only for parking or storage; • Is an accessory to a main structure; • Must be anchored to resist flotation; • All HVAC and electrical must be elevated to the freeboard level (p. 10-11); • Can either elevate to freeboard level (p. 10-11) or be built at grade; and • If not elevated to freeboard level, the garage or shed must meet the following requirements: • Must have 1 square inch of venting for every square foot of enclosed area; • Must have at least two vents located on different sides of the structure; • Have at least one vent on the upstream side of the structure; • Bottom of vents cannot be higher than 1 foot above grade; and • Flood resistant materials must be used below the freeboard level (p. 10-11). Garages, Sheds and Accessory Structures ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4 Packet pg. 78 18 Critical Facilities COMMUNICATIONS HUB POLICE or FIRE STATION HOSPITAL, URGENT CARE, SURGICAL CENTER JAIL LIBRARY At-Risk Populations Critical Facilities Government Services Critical Facilities Essential Services Critical Facilities Hazardous Materials Critical Facilities 100-year floodplain: • All Critical Facilities not allowed in the 100-year floodplain. 500-year floodplain: • At-risk Populations and Essential Services Critical Facilities are not allowed in the 500-year floodplain. ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4 Packet pg. 79 19 • Required for new non-residential or mixed-use structure, addition, cumulative substantial improvement, redevelopment or change of occupancy • The following must be included in the plan: – Flood Risk Assessment – Method of receiving a flood warning – Identification and assignment of personnel to implement the plan – Procedures for notifying employees, customers and other building occupants – Description of procedures for evacuation and shelter-in-place – Procedures for protecting the building from damage or hazardous conditions – Process for distribution of the plan, evacuation routes and shelter-in-place instructions – Description of mandatory training and practice drills – Description of post-recovery measures – Designation of responsible party • Plan and documentation of training and drills to remain on file • The plan must be reviewed in the first quarter of every year and documentation submitted to the City Emergency Response and Preparedness Plan Emergency Response and Preparedness Plan (ERPP) In order to mitigate life-safety hazards to occupants of private property within the Poudre River floodplain, Chapter 10 of City Code requires for non-residential and mixed-use additions, substantial improvements, change of use, redevelopment and/or new development that private property owners demonstrate flood- preparedness through the development and implementation of a site-specific Emergency Response and Preparedness Plan (ERPP). The plan includes, at a minimum, conditions and methods for emergency preparedness and evacuation from the property. If desired by the property owner, additional measures for flood protection may be included. Applicant Information Name of Business:Type of Business: Address: Street Address Unit # City State ZIP Code County Parcel ID #:Business Phone Number:( ) Reason for Review:Redevelopment Annual Update New Structure Addition Change of Occupancy Other: Substantial Improvement Authorized Persons (Staff Contacts) These persons will be the responsible parties in the event of an emergency. They will redirect resources and, ultimately, shut down operations, if necessary. These persons will also initiate evacuation in the event of an emergency. Primary Person:E-Mail Address: (Name) Title:Work Phone:() Cell Phone:( ) Other Contact:( ) The back-up person should be trained to fulfill all the duties of the primary person (monitor weather radio, have necessary apps/programs installed on personal devices). Back-Up Person:E-Mail Address: (Name) Title:Work Phone:( ) Cell Phone:( ) Other Contact:( ) 1 Sample: page 1 of Emergency Response and Preparedness Plan ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4 Packet pg. 80 20 Letter of Map Revision Based on Fill • A Letter of Map Revision Based on Fill (LOMR-Fill) is a FEMA process whereby a property in the flood fringe can be filled and is no longer considered in the floodplain for insurance requirements. • A community must sign-off on the application to FEMA and certify that all existing and future structures will be “reasonably safe from flooding.” • To meet this “reasonably safe from flooding” standard, all floodplain requirements (p. 8-9) must be met even if fill is placed and the property is “removed” from the floodplain by FEMA. Example of fill placed in the flood fringe ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4 Packet pg. 81 21 Outside Storage of Materials or Equipment and Floatable Materials • “Floatable material” is defined as material that is not secured in place or completely enclosed in a structure so that it could float off-site during a flood and potentially cause harm to downstream property owners or that could cause blockage of a culvert, bridge or other drainage facility. •In the floodway, all outside storage of material or equipment, including floatable materials, associated with any non-residential use is not allowed. •In the flood fringe, floatable materials associated with any non-residential use is not allowed. •In the flood fringe, outside storage of material or equipment that is not considered “floatable material” is allowed. Stacks of Lumber Containers and Drums Fleet Vehicles Equipment Material Stockpile All of these examples are floatable materials if not adequately secured. ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4 Packet pg. 82 22 Required Documentation and Submittals (Note: Some items may require a registered professional engineer.) Building Permit and Development Review Approval Requirements • Floodplain Use Permit for any work being done on a structure or property in the floodplain. The permit fees are shown in the table on page 23. • Building plans showing foundation design, flood elevation, floor elevations, HVAC elevations, size and locations of vents, floodproofing design and other relevant information. •Emergency Response and Preparedness Plan (p. 19). • No-Rise certification if working in the floodway. • Floodplain Modeling Report if doing a floodway modification (p. 5). (See separate modeling guidelines handout.) • Other plans or reports to document information such as grading, fill, channel stability and floodplain boundaries. Certificate of Occupancy Approval Requirements • FEMA Elevation Certificate or FEMA Floodproofing Certificate for any new structure, addition, substantial improvement or redevelopment built in any floodplain. Allow two weeks for review and approval. Requires licensed surveyor for elevation certificate; requires licensed engineer or architect for floodproofing certificate. • No-rise certification if working in the floodway. • As-built modeling report, if applicable. Variances The Fort Collins Water Board has the authority to issue variances to the floodplain regulations if certain requirements are met. The Board meets the third Thursday of the month. An application packet must be submitted three weeks prior to the board meeting, with a $1,000 application fee. (See separate variance submittal handout for documentation and justification requirements.) Floodplain Information and Assistance Call Fort Collins Utilities at (970) 416-2632 or e-mail utilities@fcgov.com to determine if a property is in the floodplain or to discuss floodplain regulations. More information about floodplain managment in Fort Collins is available at fcgov.com/stormwater/flooding. ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4 Packet pg. 83 23 Floodplain Permit Fees ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4 Packet pg. 84 24 Flood Insurance Information Who needs flood insurance? EVERYONE. Flood Insurance is available for ALL properties in the City of Fort Collins, regardless of location. Approximately 25% of damages occur in low risk areas. Flood Insurance is required by lenders for any structure in a FEMA 100-year floodplain.Lenders have the option of requiring it in any other area. • New flood insurance policies will require a FEMA Elevation Certificate documenting the elevation of the structure. • Fort Collins Utilities has elevation certificates on file for many structures in the City of Fort Collins, free of charge, by calling 970-416-2632 or visiting www.fcgov.com/elevation-certificate. • Documenting the elevation of the structure allows the flood insurance premium to be calculated based on the risk. • The higher the structure is elevated above the 100-year flood level, the lower the insurance premium. Flood Insurance is not mandatory in City-designated floodplains. However, it is strongly recommended. • Look into a “Preferred Risk” Flood Insurance Policy. It combines structural coverage and contents coverage at a more affordable price. Important Considerations • There is a 30-day waiting period before flood insurance becomes effective. • Disaster assistance is only available for major flood events and does not cover the entire cost to rebuild your home or business. • Fort Collins is subject to flash flooding—there is little warning time to move your contents to safer locations. You can receive up to a 40% discount on your flood insurance premiums. • Fort Collins has some of the lowest flood insurance premiums in the United States due to its proactive floodplain management program. • Check with your insurance agent to make sure you are receiving the FEMA Community Rating System (CRS) Discount for Fort Collins being a Class 4 Community. To learn more, visit http://www.floodsmart.gov/, contact your insurance agent, or call FEMA at 1-888-379-9531. ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4 Packet pg. 85 25 Example of Flood Risk Map E VINE DRN COLLEGE AVE LI N D E N S TWILLOW STPI N E S TMAPLE STCHERRY STPOUDRE STJEROME ST Printed: 04/07/2015.All floodplain boundaries are approximate.This information is based on the Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map (FIRM) and the City of Fort Collins Master Drainageway Plans. This letter does not imply that the referenced property will or will not be free from flooding or damage. A property not in the Special Flood Hazard Area or in a City Designated Floodplain may be damaged by a flood greater than that predicted on the map or from a local drainage problem not shown on the map. This map does not create liability on the part of the City, or any officer or employee thereof, for any damage that results from reliance on this information.FEMA Flood Risk MapModerate RiskMay include:- Areas of FEMA 500-year floodplain (FEMA Zone X-shaded).- Areas of FEMA or City 100-year floodplain (sheet flow) with average depths of less than 1 foot.- Areas protected by levees from the 100-year flood.Low RiskAreas outside of FEMA and City mapped 100-year and 500-year floodplains. Local drainage problems may still exist.FEMA Flood Fringe - May Include:- Areas of FEMA 100-year floodplain (FEMA Zones A, AE, AO, and AH)- Areas of City 100-year floodplain including ponding areas and sheet flow areas with average depths of 1-3 feet.There is a 1% annual chance that these areas will be flooded.High RiskFEMA Floodway - Area of 100-year floodplain with greatest depths and fastest velocities.0 160 320 480 64080FeetADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 4 Packet pg. 86 FORT COLLINS: ˏ ˏFlooding on College Avenue south of Drake Road, May 31, 2020..ˏ)º/ˏ%*"+.)%ĥ*ˏ!.ˏ !ˏ%*1* %+*!/ȑˏ2%/%0!ˏ"#+2Ȑ+)ȩ%*1* %+*ȐADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 5Packet pg. 87 *+3(! #!ˏ%/ˏ+3!.ȗˏ05ˏ *"+.)! ˏ1.%*#ˏ(++ / %!3ˏ!(ȥ%)!ˏ%*"((ˏ* ˏ0.!)fl+3ˏ0 Have you ever wondered how much rain is falling near your house or what the flow is in on the Poudre River? Real-time data is available from the City’s early flood warning system, which includes the same streamflow and precipitation gauges monitored by City staff. Visit "#+2Ȑ+)ȩ floodw.*%*#/5/0!). 0$!.ˏ+1.!/ˏ+"ˏ!0$!.ˏ* ˏ)!.#!*5ˏ *"+.)0%+* • National Weather Service – online or via an NOAA Weather Radio • Local TV and radio • LETA911 – Sign up for emergency notifications at (!0ȏȆȆȐ +.#. • To report general flooding, call 970-221-6700. +ˏ*+0 call 911 for information. *+3ˏ0$!ˏ%ff!.!*!ˏ!03!!*ˏˏȝ0$Ȟˏ* ˏˏȝ.*%*#Ȟ (5ˏ 0ˏ"!ˏ+*ˏ0$!ˏ+1 .!ˏȦˏ *+3ˏ!"+.!ˏ+1ˏ+ With the new Poudre River Whitewater Park open on the Poudre River, it is important to respect the power of water – Play It Safe. Make sure to wear a life vest. Know the flow and weather conditions. Plan where you are going and especially where your take-out location is located. Find more safety information at "#+2Ȑ+)ȩȥ.%2!.ȥ/"!05. 5'!./ˏ0ˏ0$!ˏ*!3ˏ$%0!30!.ˏ.'Ȑ !ˏ(!.0ˏ"+.ˏ$6. /Ȑ (++ ˏ.*%*# • Flooding is happening or will happen soon. • Take immediate action. (++ ˏ0$ • Flooding is possible. • Be alert and prepared. ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 5 Packet pg. 88 +),(!0! ˏ%*ˏȇȅȆȋȑˏ0$%/ˏ/!0%+*ˏ+"ˏ+//%(ˏ.!!'ȑˏ1,/0.!)ˏ+"ˏ !)5ˏ2!*1!ȑˏ3/ˏ,.0ˏ+"ˏ 0$!ˏ%05Ȟ/ˏ/0.!)ˏ.!$%(%00%+*ˏ,.+#.)Ȑˏ$!ˏ/0.!)ˏ*'/ˏ3!.!ˏ(% ˏ'ˏ"+.ˏ/"!05ȑˏ* ˏ 0$!ˏ)!* !./ˏ+"ˏ0$!ˏ/0.!)ˏ3!.!ˏ.!/0+.! Ȑˏ!#!00%+*ˏ*+3ˏ,.+0!0/ˏ0$!ˏ/0.!)ˏ*'/ˏ ".+)ˏ!.+/%+*Ȑ .+0!0ˏ!0(* /ȑˏ0!.35/ȑˏ* ˏ0$!ˏ*'/ˏ+"ˏ %2!./ˏ* ˏ0.!)/ˏȐȐȐˏ$!5ˏ.+0!0ˏ+1 Flooding is a natural process. A healthy ecosystem along the river relies upon frequent inundations to survive and thrive. Floodplains help reduce flood damage by allowing water to spread out over a large area. This reduces the speed of floodwater as it is soaked up in wetlands like a sponge, lowering peak flows downstream. You can experience the natural beauty and wildlife habitats that help Fort Collins be flood ready at over 17 conserved natural areas along the Cache la Poudre River. Learn more at "#+2Ȑ+)ȩ*01.(.!/. There are many City-conserved open spaces that also reduce the flood hazard along Spring Creek, Fossil Creek and other drainages. Open space along waterways provides natural flood and erosion control, as well as a place for us to enjoy the outdoors. Look for birds such as kingfishers, great blue herons, redtail hawks, great horned owls and a diversity of migratory songbirds that use drainage corridors, too. ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 5 Packet pg. 89 !.*ˏ+3ˏ0+ˏ.+0!0ˏ+1.ˏ.+,!.05ˏ* ˏ)%(5 ˏˏ   ˏˏ ˏˏ  1.chase flood %*/1.*!Ȑ +ˏ*+0ˏ .%2!ˏ0$.+1#$ˏ floodw0!.Ȑ $!'ˏ"+.ˏ/0.101.(ˏ )#!ˏ0+ˏ5+1.ˏ 1%( %*#Ȑˏ '!ˏ*ˏ!)!.#!*5ˏ ,(*Ȑ +2!ˏ0o upper floors +"ˏ5+1.ˏ$+)!ˏ+.ˏ(%)ˏ 0+ˏ$%#$!.ˏ#.+1* Ȑ +1)!*0ˏ((ˏ )#!/Ȑ +1)!*0ˏ5+1.ˏ !(+*#%*#/Ȑ +*Ȟ0ˏ3('ˏ0$.+1#$ˏ flo3%*#ˏ30!.Ȑ !)+2!ˏ((ˏ3!0ˏ%0!)/Ȑ 0+.!ˏ2(1(!ˏ%0!)/ˏ Ȭ+),10!./ȑˏ")%(5ˏ ,$+0+/ȑˏ$!%.(++)/ȑˏ !0Ȑȭˏ0ˏ$%#$!.ˏ (+0%+*/ˏ%*ˏ5+1.ˏ$+)!Ȑˏ %/0!*ˏ"+.ˏ!)!.#!*5ˏ 1, 0!/Ȑ !0ˏˏ(++ ,(%*ˏ/!ˏ !.)%0ˏ* ˏˏ1%( %*#ˏ !.)%0ˏ!"+.!ˏ)'%*#ˏ *5ˏ.!,%./Ȑ %#*ˏ1,ˏ"+.ˏ!)!.#!*5ˏ )!//#!/ˏ0ˏ(!0ȏȆȆȐ+.#Ȑ urn off elec0.%%05ˏ0ˏ0$!ˏ )%*ˏ,+3!.ˏ/3%0$ˏ* ˏˏ shut off w0!.ˏ* ˏ#/Ȑ +*00ˏ5+1.ˏ%*/1.*!ˏ #!*t and file a flood %*/1.*!ˏ(%)Ȑ !ˏ! ˏ.+//ˏ! 5Ȑˏ!0ˏˏ'%0Ȑˏ '!ˏˏ,(*Ȑˏ!ˏ%*"+.)! Ȑˏˏ !0%(/Ȓˏ.! .+//Ȑ+.#ȩ,.!,.! ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 5 Packet pg. 90 *(5ˏ(++ ˏ */1.*!ˏ+2!./ˏ(++ /ˏȦˏ 1.$/!ˏ(++ ˏ */1.*! Flood insurance is highly recommended and covers all surface floods. Most standard property insurance policies do not cover flood damage. +1ˏ +*Ȟ0ˏ$2!ˏ 0+ˏ(%2e in a floodplain or high-risk ar!ˏ0+ˏ,1.chase flood insur*!. Any walled and roofed structure can be insured, and separate coverage is available for building contents. Renters can purchase insurance for their belongings, even if the owner has not purchased structural coverage. Don’t wait for the next flood to buy insurance – there is a 30-day waiting period before National Flood Insurance takes effect. Insurance agents sell policies under rules and rates set by the federal government. $!ˏ%05ˏ+"ˏ+.0ˏ+((%*/ˏ/ˏ+)!ˏ+"ˏ0$!ˏ +3!/0ˏ(++ ˏ */1.*!ˏ.!)%1)/ˏ The Community Rating System (CRS) provides reduced flood insurance premiums to communities that exceed the minimum federal NFIP requirements. Fort Collins floodplain residents receive one of the lowest flood insurance rates in the country as a result of Fort Collins Utilities’ Floodplain Management Program and from several drainage improvement projects constructed using stormwater fees. 15ˏ3$!*ˏ%0Ȟ/ˏ .5Ȑˏ+*Ȟ0ˏ3%0ˏ0+ˏ#!t flood insur*!Ȑ Residents and businesses in Fort Collins can receive up to a 40% discount on flood insurance premiums. Call 970-416-2632 to learn more about flood insurance. ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 5 Packet pg. 91 1%( ˏ!/,+*/%(5Ȓˏˏ *+3ˏ0$!ˏ(++ ,(%*ˏ!#1(0%+*/ Before you begin any construction (new development, addition, remodel, filling, grading, etc.) on your building or property, contact Fort Collins Utilities for specific floodplain regulation requirements. Some important considerations are listed below. !0ˏˏ(++ ,(%*ˏ/!ˏ!.)%0ˏ!"+.!ˏ+1ˏ1%( ˏ+.ˏ. ! These required permits ensure that structures are protected from flood damage and that construction projects do not cause flooding problems for existing properties. According to Fort Collins City Code, all new residential structures and additions built in the 100-year floodplain must be elevated above the 100- year water surface elevation. New non-residential buildings and additions also must be elevated or floodproofed above the 100-year flood elevation. (++ 35ˏ!-1%.!)!*0/ The floodway is the most dangerous section of the floodplain. New residential development is not allowed and commercial development is very restricted. For all other permitted development, an engineering analysis that shows no-rise in the 100-year flood elevation is required. 1/0*0%(ˏ ),.+2!)!*0ˏ!-1%.!)!*0 If the cost of reconstruction, rehabilitation or other improvements to a building equals or exceeds 50% of the existing market value, the structure must meet some of the same requirements as those of a new building. Substantially damaged buildings must meet the same standards upon reconstruction. Improvement requirements are addressed during the floodplain development permitting process. For more information, call 970-416-2632 or email 10%(%0%!/Ȳ"#+2Ȑ+). 1'5Ȟ/ˏ .'!0ˏ)!0ˏ0$!ˏ /1/0*0%(ˏ%),.+2!)!*0ˏ .!-1%.!)!*0/ˏ* ˏ.%/! ˏ 0$!ˏ%*0erior floor b5ˏ ,,.+4%)0!(5ˏȌˏ%*$!/Ȑˏ $%/ˏ1%( %*#ˏ*+3ˏ%/ˏˏ !00!.ˏ,.+0!0! ˏ".+)ˏ flood damageȐ ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 5 Packet pg. 92 .+0!0ˏ0$!ˏ*2%.+*)!*0 You may think it’s OK for little things to be put down the storm drain, but it all adds up and can create problems. Our storm drains run directly into our lakes and streams and eventually to the Cache la Poudre River. To help keep them clean, properly dispose of motor oil, pick up grass clippings and pet waste, and use car washes instead of washing your car at home. Do not dump or throw anything into ditches or streams. Obstruction and pollution of our waterways and ditches are violations of Fort Collins City Code. Report any debris or dumping in ditches or streams to Fort Collins Utilities at 970-221-6700 or email 10%(%0%!/Ȳ"#+2Ȑ+). 1.*ˏ.+1* ȑˏ+*Ȟ0ˏ.+3* Do you really know how deep the water is? It only takes 12 inches of water to sweep a car away and 18-24 inches for a large truck or SUV. ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 5 Packet pg. 93 +.0ˏ+((%*/ˏ/ˏˏ(++ ˏ%/0+.5Ȓˏ 0Ȟ/ˏ+0ˏ "ȑˏ10ˏ$!* Fort Collins has experienced numerous floods. The table below lists some of the more notable floods in each of the city’s 12 drainage basins. Fort Collins is subject to flooding from snowmelt on the Poudre River and flash flooding due to intense thunderstorms. Typically, monsoon season runs from mid-July to mid-August, often bringing heavy rainfall to Fort Collins. Some past floods, like the July 28, 1997 Spring Creek Flood, are hard to forget. There are high water mark reminders along the Spring Creek Trail, which document the 1997 flood. However, it does not take a large flood to cause problems. Afternoon or evening thunderstorms can cause issues in isolated areas, including street and basement flooding. .*ˏ(++ %*#ˏȦˏ *+3ˏ0$!ˏ%/' On May 22, 2018, an intense rain and hail storm tracked through Fort Collins. Areas of town received 1.8 inches of rain in 30 minutes and hail accumulations to depths of more than a foot. The hail clogged inlets, which resulted in localized flooding. Numerous buildings were flooded in Old Town and on the CSU campus. Motorists were stranded and had to be rescued. The following photos document a few of these smaller floods that caused problems for motorists, homeowners and businesses. June 24, 1992 – An intense thunderstorm in Old Town caused the flooding of basements and many roads, including near Moby Arena, pictured left. August 2, 2007 – Street flooding near Shields Street and Horsetooth Road. June 6, 2009 – Flooding on Plum Street west of CSU. ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 5 Packet pg. 94 May 14, 2020 – Flooding due to poor drainage along the Mulberry Frontage Road near I-25. August 10, 2017 – A quick rainstorm resulted in street flooding. May 22, 2018 – Flooding along Oak Street due to rain and hail. June 28, 2020 – Flooding along the Spring Creek Trail west of Lemay Avenue. ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 5 Packet pg. 95 Drainage Basins DatesDescriptionsCache la Poudre River1844, 1864, 1891, 1904, 1923, 1930, 1976, 1983, 1999, 2010, 2011, 2013 and 2014The three largest floods occurred in 1864, 1891 and 1904, with peaks of approximately 21,000 cubic feet per second (cfs). For comparison, the discharge of the Poudre River at “flood stage” is about 4,000 cfs. Flooding on the Poudre is primarily from snowmelt in late May and June. However, flash flooding can occur at any time. A severe flood has not occurred in more than 100 years.Spring Creek1902, 1904, 1938, 1949, 1951, 1961, 1977, 1983 and 1997The 1997 flood resulted in five deaths, destruction of 120 mobile homes and damage to 2,000 homes and businesses. This flood was considered to be greater than a 500-year event.Dry CreekNo serious flooding since about 1950The absence of even minor flooding is generally attributed to the network of irrigation canals that have some capacity for intercepting small to moderate Dry Creek flows.Fossil Creek1902, 1938, 1965, 1977, 1979, 1997, 1999 and 2007Fossil Creek is relatively undeveloped and past floods have gone unnoticed. In addition to flooding hazards, Fossil Creek also is susceptible to bank erosion.Boxelder Creek/ Cooper Slough 1909, 1922, 1930, 1937, 1947, 1963, 1967, 1969 and 2007Boxelder Creek has a drainage area of 251 square miles, and 176 square miles now are controlled by Soil Conservation Service flood control dams near Wellington.Old Town Basin1904, 1933, 1938, 1951, 1977, 1983, 1988, 1992, 1997, 2009 and 2018Street flooding is the primary problem in this basin.Canal Importation Basin1938, 1951, 1975, 1992, 1997, 1999 and 2009There are several small drainage areas in this basin. Development prior to drainage criteria encroached on the channels, reduced the flow capacity and caused flooding. The irrigation canals also overflow their banks and cause flooding.West Vine Basin1980, 1997 and 1999 (Past floods were not well documented.)Localized flooding occurs due to encroachment on drainages and from irrigation ditch spills.(++ ˏ%/0+.5ˏ *"+.)0%+*.+0!0%*#ˏ"+.ˏ0$!ˏ101.!The Master Drainage Plan includes plans for the 12 stormwater basins across the city. The purpose is to identify stormwater management issues and develop solutions that reduce flood risk, improve stormwater quality and promote stream rehabilitation. Each plan looks at the unique characteristics of the basin, identifies potential problems, and provides an alternative analysis and recommended improvements. Utilities prioritizes all stormwater and stream rehabilitation projects on an annual basis. The main categories used to evaluate each project include protection of structures from flooding, road overtopping, cost-benefit ratio, health and safety, water quality and habitat improvement. Left: A new storm pipe enters Spring Creek just downstream of Remington Street. Above: A stream rehabilitation project on Mail Creek just after completion in May 2020.ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 5Packet pg. 96 2!.5+*!ˏ/ˏ(++ ˏ%/'/Ȓˏ *+3ˏ+1./ This map represents Fort Collins’ floodplains and is continuously updated. To determine if a property is within a floodplain, call Fort Collins Utilities at 970-416-2632, email 10%(%0%!/Ȳ"#+2Ȑ+) or view a detailed map atˏ"#+2Ȑ+)ȩ floodplain-map/. Additional map information, such as erosion buffer zones, flood elevations and historic flood data is available. All rivers, streams, tributaries and canals – regardless of size – have the potential to flood. In Fort Collins, major sources of flooding include the Cache la Poudre River, Spring Creek, Dry Creek, Fossil Creek and Boxelder Creek. Urban street flooding also is a hazard. All drainage basins flow to the Cache la Poudre River.OverlandTrlLaurel St Country Club Rd Drake Rd Riverside Ave Willox Ln Mountain Ave Trilby Rd Mulberr y St TurnberryRdShieldsStNLemayAveTimberlineRdLaporte Ave LincolnAveTerryaLkeRdGregory Rd Kechter Rd County Road54G State Highway 392 Vine Dr Prospect Rd Harmony Rd LemayAveTaftHillRdHorsetooth Rd TimberlineRdCarpenter Rd Horsetooth Rd Harmony Rd USHighway287Ziegler Rd S mu mit Vie w D r M u lberry St Mountain Vista Dr Richards Lake Rd Douglas Rd ShieldsStE Vine DrTaftHillRd Interstate25U S High w a y 2 8 7 TaftHillRdCountyRoad38 E StraussCabinRdInterstate25C a c h e La Poudr eRi ver Cache LaPoudreRiver CooperSloughL a k e CanalF ossil C reekSpringC reekDryCreekBoxel der CreekS p ring Cr e e k oF o th ills Channel McClellands Creek Mail Cr e ek Clearview Channel Plum Channel Fairbro o k e C h a n n el Boxelder/Cooper Slough BasinDry Creek Basin Canal Importation Basin Spring Creek Basin Fox Meadows BasinMail Creek Basin McClellands Basin West Vine Basin Old Town Basin Foothills Basin Fossil Creek Basin Legend High Risk Floodway High Risk 100-year floodplain Moderate Risk 100-year sheet flow and 500-year floodplain Water Features - +1 .!ˏ(++ ,(%*ˏ ,/ˏ.!ˏ$*#%*# The Poudre River floodplain maps are old and need updating. Updated mapping provides a better evaluation of flood risk, which helps protect lives and properties. View the new, preliminary maps at: fcgov.com/riskmap Elevation certificates are available for some properties. Call 970-416-2632 to learn more. 14%(%.5ˏ% /ˏȖˏ/!.2%!/ˏ.!ˏ2%((!ˏ"+.ˏ,!./+*/ˏ3%0$ˏ %/%(%0%!/ȐˏȩˏȍȆȆȐˏ /0ˏ%*"+.)%ĥ*ˏ,1! !ˏ/!.ˏ0. 1% ȑˏ/%*ˏ+/0+ˏ,.ˏ1/0! Ȑ ADDITIONS & SUBSTANTIAL IMPROVEMENTS IN FEMA FLOODPLAINS, ATTACHMENT 5 Packet pg. 97 www.fcgov.com/northcollegemaxNorth College MAX PlanPlanning and Zoning CommissionFebruary 11, 2022N COLLEGE MAX PLANPacket pg. 98 www.fcgov.com/northcollegemaxNorth College MAX PlanAgenda •Phase 1 Community Engagement•Past engagement activities •What we heard•Phase 2 Engagement•Destinations •Density & transportation •Overall priorities •Next Steps N COLLEGE MAX PLANPacket pg. 99 www.fcgov.com/northcollegemaxNorth College MAX PlanProject ObjectiveThis project is to create a plan to bring MAX to North College Avenue from Downtown to Highway 1/Terry Lake Rd.N COLLEGE MAX PLANPacket pg. 100 www.fcgov.com/northcollegemaxNorth College MAX PlanOverall Timeline Plan Adoption (2022)Improvements to transit service, walkways, bikeways (2022-2025)MAX Line Extension (5-10+ years) N COLLEGE MAX PLANPacket pg. 101 www.fcgov.com/northcollegemaxNorth College MAX PlanJuly 2021September 2021January 2022Alternatives Development & EvaluationPreferred DesignAdoptionExisting Conditions & VisioningMarch 2022AdoptionExisting Conditions & VisioningProject ScheduleAugust 2022N COLLEGE MAX PLANPacket pg. 102 www.fcgov.com/northcollegemaxNorth College MAX PlanPhase 1 Community Engagement SummaryN COLLEGE MAX PLANPacket pg. 103 www.fcgov.com/northcollegemaxNorth College MAX PlanCommunity Engagement Summary 311Community Members 124 Online Surveys(English & Spanish)114 Mapping Comments52Organizations & Businesses74 Community Members 6 Focus Groups(English & Spanish)2 Public Workshops (English & Spanish)Direct Engagement 1In-Depth Involvement 2723 Unique Webpage Views75 Video Views4,957 Social Post Reach517Social Engagements1short presentations & conversations245-90-minute focus groups & workshopsN COLLEGE MAX PLANPacket pg. 104 www.fcgov.com/northcollegemaxNorth College MAX PlanCommunity BenefitsOverall support for extending MAX to North Fort Collins, bringing increased mobility to youth, seniors, and greater connectivity to businesses and services in the area. Gentrification & Land UseConcerns about gentrification and high-end densification, desire to preserve affordability for residents and businesses alike, equity as a guiding principle Infrastructure ConsiderationsInclude parking for those coming from the North, address east to west connectivity in the area including crossing College, eliminate Mason Street extension option; minimize impact to existing businesses. Routes, Stops & FrequencyDesire for continuous service form Terry Lake Rd. to S. Transit Station, connect to key destinations across the city, maintain service along Spruce and Redwood (8 & 81). Rider ExperienceImprove ease navigating the transit system, sheltered stops, assure a welcoming and safe environment for all, managing challenging rider behaviors.KEY THEMES N COLLEGE MAX PLANPacket pg. 105 www.fcgov.com/northcollegemaxNorth College MAX PlanPlanning and Zoning – 8/13/21•Generally like the idea of MAX on North College•Will it impede traffic?•How well does the 8 & 81 serve the area?•How will it be integrated into the North College Corridor?•Dedicated bus lane?N COLLEGE MAX PLANPacket pg. 106 www.fcgov.com/northcollegemaxNorth College MAX PlanPhase 2: Community EngagementCurrent Questions N COLLEGE MAX PLANPacket pg. 107 www.fcgov.com/northcollegemaxNorth College MAX PlanConnectionsWhat are the top two destinations where you would like to see transit service to/from North College? (pick 2)1. Downtown Fort Collins2. Walmart and Home Depot on Lemay Avenue3. CSU Campus4. Poudre Valley Hospital or Safeway on Lemay Avenue5. Midtown & Foothills Mall6. Shopping, dining, and services on Harmony Road 7. South Transit Center 8. Other (Please describe)N COLLEGE MAX PLANPacket pg. 108 www.fcgov.com/northcollegemaxNorth College MAX PlanHousing, Jobs & Transit Improvements in public transit such as more buses per hour, better bus stops and dedicated bus lanes and increased density in housing and jobs go hand in hand. Knowing there is a relationship between these factors, which of the following options would you like to see for the future of the North College corridor? N COLLEGE MAX PLANPacket pg. 109 www.fcgov.com/northcollegemaxNorth College MAX PlanOption A: Full MAX ServiceSimilar to the MAX on Mason South of CSU…•Dedicated bus lanes•10 to 15-minute bus frequency, all day, 7 days per week•High investment in transit amenities at all stops•Increasing the number of three to five story residential, commercial, and office buildingsN COLLEGE MAX PLANPacket pg. 110 www.fcgov.com/northcollegemaxNorth College MAX PlanOption B: MAX light service Similar to the MAX on Mason between CSU & Downtown…•Buses operate in general travel lanes, but get ahead of vehicle traffic at intersections•15 to 30-minute bus frequency, all day, reduced service on weekends•Some investments in transit amenities at all stops, high investment in amenities at major transit stations•Adding more three-story residential, commercial, and office buildingsN COLLEGE MAX PLANPacket pg. 111 www.fcgov.com/northcollegemaxNorth College MAX PlanOption C: Minor Service Improvements Minor Improvements to existing bus service•Buses operate in general purpose travel lanes•30-minute bus frequency, reduced service off-peak and on weekends•Limited investment in transit amenities at stops•One to three-story residential, commercial, and office buildingsN COLLEGE MAX PLANPacket pg. 112 www.fcgov.com/northcollegemaxNorth College MAX PlanSummary of Options (pick one)A. Full MAX Service – most transit amenities, highest density for new homes and jobs B. MAX light – medium amenities, medium density of new homes and jobsC. Minor Service Improvements –small changes to improve service, lower density of homes and jobs N COLLEGE MAX PLANPacket pg. 113 www.fcgov.com/northcollegemaxNorth College MAX PlanN COLLEGE MAX PLANPacket pg. 114 www.fcgov.com/northcollegemaxNorth College MAX PlanWhat uses would you most like to see on the North College corridor? (pick 5)a. Affordable housingb. Mixed income housing c. Local small business incubatord. Hispanic/Latino community centere. Affordable childcare centerf. Retail stores (e.g., hardware, clothing, furniture, etc.)g. Service shops (e.g., salon/barbershop, dry cleaner, dentist, gym)h. Restaurantsi. Hotel or Motel j. Arts & Entertainmentk. Preserve existing affordable housing, including mobile home parks l. Preserve affordable commercial business spaces m. None of the aboven. Other (please describe)N COLLEGE MAX PLANPacket pg. 115 www.fcgov.com/northcollegemaxNorth College MAX PlanWhere are you most open to seeing new development occur, particularly if it meets your priorities? (pick one) a. Throughout the entire North College area b. Properties facing or next to College Avenuec. Mostly on vacant lots and buildingsd. Mostly on vacant lots and buildings, focused on areas around transit stops and transportation hubse. Redeveloping existing commercial areas, but not existing housing areasf. I do not want to see new developmentg. Other (please describe)N COLLEGE MAX PLANPacket pg. 116 www.fcgov.com/northcollegemaxNorth College MAX PlanWhat height of buildings would be most acceptable to you, if it meets your priorities? (pick one) a. Current allowable building heights (3 to 5 stories) b. Predominantly 4 to 5 storiesc. New allowable building heights of 5 to 8 storiesd. Other (please describe)N COLLEGE MAX PLANPacket pg. 117 www.fcgov.com/northcollegemaxNorth College MAX PlanAdditional Questions•Do we have the right balance of housing and jobs in the corridor? Should this change over time?•How much does the visual character matter?N COLLEGE MAX PLANPacket pg. 118 www.fcgov.com/northcollegemaxNorth College MAX PlanNext Steps •Workshops •Online questionnaire•Additional technical analysis of routes, stops, turnaround, etc. •Phase 3 Engagement (March/April): Comment on proposed design solution(s)N COLLEGE MAX PLANPacket pg. 119 www.fcgov.com/northcollegemaxNorth College MAX PlanThank You! N COLLEGE MAX PLANPacket pg. 120 11041 RegulationsKelly SmithFebruary 20221041 REGULATIONSPacket pg. 121 1041 RegsProject Background2MayJulySeptemberOctober2021ENGAGEMENT, ANALYSIS & OPTIONSWater/Sewer Providers30 CommunitiesPUBLIC HEARING &ENGAGEMENT Boards/CommissionsChamberCity UtilitiesWater/Sewer ProvidersMORATORIUM & ENGAGEMENTWater/Sewer ProvidersPFARESOLUTIONStudy 1041 Powers1041 REGULATIONSPacket pg. 122 1041 RegulationsToday’s Discussion3DesignationsMoratorium ApplicabilityExemption ProcessScheduleEngagement Plan & Key Dates11223344551041 REGULATIONSPacket pg. 123 Mineral Resource Areas• Gravel MiningNatural Hazard Areas• Flood• Geologic• WildfireHistorical/Natural/ Archaeological Resource Areas• Irrigated areasAreas Around Key Facilities• Highways• Airports• Utility InfrastructureAreas of State Interest41041 REGULATIONSPacket pg. 124 New/Expanded Water/Sewer TreatmentMunicipal/ Industrial Water TreatmentHighways and InterchangesPublic UtilitiesActivities of State Interest5New CommunitiesSolid Waste DisposalMass TransitAirportsGeothermal ResourcesNuclear Detonation1041 REGULATIONSPacket pg. 125 Designations611041 REGULATIONSPacket pg. 126 Moratorium Options7OPTION 1: Designate Now• Highest certainty for City until regulations are adopted• Lowest certainty for water providers, developers, regional partners• Longest moratorium• Potential project delays at regional scale • Consistent with First Reading2021OctNovDecJanFebMarAprMayJunJulAugSepOctNovDecMoratorium Duration: 1 yearOPTION 2: Designate @ Draft• Known regulatory framework• Opportunity to further engage• Cuts moratorium in half• Allows projects to move forward for 6 mosMoratorium Duration: 6 monthsOPTION 3:Designate @ Adoption•No moratorium• Lowest certainty for City until regulations are adopted• Highest certainty for developers, water providers, regional partners 202120221041 REGULATIONSPacket pg. 127 Moratorium Applicability8(1) Water and Sewer System Activity subject to the Moratorium shall beprojects that:(i) Meet the term domestic water and sewage treatment system as definedin C.R.S. Section 24-65.1-104(5), and set forth in Exhibit “A”;(ii) Consist of pipelines designed fortransmission of treated or untreatedwater or sewage that require a 30’ wide easement or greater; and(iii) Are proposed to be located entirely or in part within a City park or NaturalArea221041 REGULATIONSPacket pg. 128 Conceptual Review MeetingConceptual Review ApplicationComplete Application SubmittedExemptionQuasi-Judicial Council HearingNo ExemptionExemption ProcessSPARStaff Meeting w/ Applicant31041 REGULATIONSPacket pg. 129 Exemption Criteria101. The potential for the project to result in significant adverse impactsthat could otherwise be mitigated through a binding review process; or 2. The project meaningfully addresses an important community need and delaying the project until the moratorium is terminated would result in substantial hardship to the community.31041 REGULATIONSPacket pg. 130 Project Timeline11Public UtilitiesSolid Waste DisposalMass TransitAirportsOCTNOVDECJANFEBMARAPRMAYJUNJULYAUGSEPTOCTNOVDECHEARING/FUNDING APPROP/CONTRACTINGCODE DEVELOPMENTENGAGEMENTDRAFT CODECOUNCIL WORK SESSIONCODE ADOPTIONIMPLEMENTATION41041 REGULATIONSPacket pg. 131 Engagement Plan & Key Dates125EnvironmentalAdvocacy GroupsEXTERNAL STAKEHOLDERSCDOTHomebuilders/ Chamber/Towns/ CSULarimer CountyBoards/CommissionsWater Providers/ Sanitation Districts1041 REGULATIONSPacket pg. 132 Engagement Plan & Key Dates135Natural Areas/ ParksINTERNAL STAKEHOLDERSEngineeringHistoric PreservationWater/ WastewaterEnvironmental Regulatory AffairsWater Conservation1041 REGULATIONSPacket pg. 133 Engagement Plan & Key Dates1451. Static2. Our CityFeb 23rdNoon6pmSocial mediaPress releaseNewslettersWebsitesPublic MtgsOutlets1041 REGULATIONSPacket pg. 134 Engagement Topics155Project CategoriesThresholdsDefinitionsApproval ProcessReview Criteria1041 REGULATIONSPacket pg. 135 Questions?161041 REGULATIONSPacket pg. 136 1Oil and Gas RegulationsFebruary 2022OIL & GAS UPDATEPacket pg. 137 Oil and Gas RegulationsToday’s Discussion2Immediate ScheduleOrganizational StructurePrevious Engagement and City Council DirectionAbove State RequirementsNext Steps1122334455OIL & GAS UPDATEPacket pg. 138 Immediate ScheduleDevelop Draft Code• Vet with Legal and LUC Team• Inter-Department/Service Area EngagementCOGCC Rulemakings• Joined Party Status/TestifiedMarch 22, 2022 Council work session on Draft code language311OIL & GAS UPDATEPacket pg. 139 Organizational Structure422City CodeRegistrationReference Operational Standards ManualLand Use CodeProcedural RequirementsSetbacks/ZoningReciprocal SetbacksDesign StandardsApplication RequirementsReclamationPlugging and AbandoningOperational Standards ManualOngoing Air MonitoringNotification RequirementsOngoing Inspection RequirementsOngoing Noise MonitoringOngoing Water TestingCommunity EngagementSafetyFinancial AssuranceOIL & GAS UPDATEPacket pg. 140 Previous Engagement5ZONINGSETBACKPublic Support• No new Oil and Gas in City • No new Oil and Gas in NAs• Industrial Zone District• 2,000’+ no exceptionsIndustry Support• No ban of new development • Zoning not applied • Align with COGCCOther Considerations• Setbacks from buildings of other land uses• Setbacks from recreation trails, parking lots, recreation fields33OIL & GAS UPDATEPacket pg. 141 Previous City Council Direction6• Industrial Zone District• 2000’ Res Building Units• 2000’ High Occupancy Buildings• 0% LAND AVAILABLEDrillable AreasMontavaFTC Oil Field33OIL & GAS UPDATEPacket pg. 142 New COGCC Setbacks7“regulating in a manner that protects public health, safety & environment”BUILDINGSETBACK JUSTIFICATIONSCHOOLS/ CHILDCARE CENTERS2000’• CDPHE’s Health Impact Assessment• Children are more vulnerable• Noise and other nuisances (truck traffic) would impact learning and safetyHOBs& RBUsPresumptive 2000'500’-2000’ Variance• CDPHE study, other studies, complaints• Apply for varianceOIL & GAS UPDATEPacket pg. 143 Above State Requirements8• Industrial Zone District• 2000’ Res Building Units• 2000’ High Occupancy Buildings• 2000’ City Parks, Trails, Outdoor Gathering Areas, Natural Areas• 2000’ Buildings Approved for Human OccupationDrillable AreasMontavaFTC Oil Field44OIL & GAS UPDATEPacket pg. 144 Above State Requirements9• Alternatives Analysis• Annual Registration• Repairs for Leaks• Reporting and Notification• Air and Noise Monitoring• Containment Berms• Safety• Lighting• Reclamation44OIL & GAS UPDATEPacket pg. 145 Reciprocal Setbacks10201320182018Example: Hearthfire• Match setbacks of new development near existing wells (active and abandoned)• Disclosure to future property owners• No development within floodplain• Fencing, landscaping and screening measures44OIL & GAS UPDATEPacket pg. 146 Estimated Project Timeline11OCTNOVDECJANFEBMARAPRMAYJUNJULYAUGSEPTCODE DEVELOPMENTENGAGEMENTDRAFT CODECOUNCIL WORK SESSIONCODE ADOPTIONIMPLEMENTATION5OIL & GAS UPDATEPacket pg. 147 P&Z Discussion12• Feedback on reciprocal setbacks: same as OG?• Questions or concernsOIL & GAS UPDATEPacket pg. 148 PLANNING & ZONING COMMISSION 2021 Annual Report February 8, 2022 2021 ANNUAL REPORT Page 1 Summary Chair Michelle Haefele and Vice-Chair Ted Shepard were elected in February 2021. This year the Planning and Zoning Commission held 12 regular hearings acting on an average of 3-4 items per meeting. The Commission also held 12 work sessions. In addition to the regular hearings, two special meetings were held (in May and in June) to accommodate the Commission’s project load. The Commission continued to make adaptations in order to conduct business while remaining compliant with COVID-19 public health measures and accommodate public participation through a variety of methods. Meetings in January, February, March, April, and May were held online with commission members participating remotely and with public participation available online or by phone. Meetings in June, July, August, September, October, November, and December were held in a hybrid format with some or all Commissioners participating in the Council Chambers and public participation available online, by phone, or in-person. 1. DEVELOPMENT REVIEW The development review agenda volume for 2021 included: • 15 Project Development Plans • 1 Stand Alone Modification of Standard • 3 Major Amendments • 4 Additions of Permitted Use • 3 Site Plan Advisory Reviews • 4 Annexations and Zonings • 3 Minor Amendments • 1 Basic Development Review • 2 Overall Development Plans • 1 Planned Unit Development (PUD) Master Plan 2. POLICY & LEGISLATION The Commission provided recommendations to City Council on the following policy and legislative items: • Residential Metro District Evaluation Process • Housing Strategic Plan • Outdoor Lighting Land Use Code Amendment • Water Conservation Land Use Code Amendment • Wireless Telecommunications Master Plan Packet pg. 149 PLANNING & ZONING COMMISSION 2021 Annual Report 2021 ANNUAL REPORT Page 2 • 3 Mile Plan Update 3. APPEALS TO CITY COUNCIL • In 2021, two Planning and Zoning Commission decisions were appealed to City Council. City Council upheld the Planning and Zoning Commission’s decision to approve the Guardian Self Storage Project Development Plan. Council also upheld the Planning and Zoning Commission’s decision to deny the Sam’s Club Fuel Station Addition of Permitted Use and Major Amendment. Packet pg. 150 Community Development & Neighborhood Services Planning & Development Services 281 North College Avenue P.O. Box 580 Fort Collins, CO 80522.0580 970.221.6376 970.224.6111- fax MEMORANDUM Date: February 2, 2022 To: Chair Haefele and Members of the Planning & Zoning Commission From: Alyssa Stephens, Neighborhood Development Liaison Re: February Public Engagement Update _____________________________________________________________________ The purpose of this memo is to provide an update on public engagement in development review. Recent Public Engagement by the Numbers •Neighborhood meetings — 4 •Educational events – 0 News and Updates •The Commission requested information on phone lines provided to assist individuals with remote technology during virtual hearings. Currently: o Mailed notices include the Development Review Liaison phone number, which can be reached prior to or during the hearing. o The Planning & Zoning Commission website includes an alert with a phone number and email address for assistance during the hearing. o A slide is shown during the hearing with a phone number and email address for assistance during the hearing. •Analysis of attendance from in-person neighborhood meetings is ongoing, but poses a challenge because record-keeping practices were inconsistent. •The 2022 Neighborhood Mini Grant application opened for Round 1 on February 1 and will close February 14. These grants, typically $150 - $1000 are intended to promote positive neighboring activities and community improvements. PUBLIC ENGAGEMENT UPDATES Packet pg. 151