HomeMy WebLinkAbout12/16/2021 - Building Review Commission - AGENDA - Regular MeetingPage 1
Alan Cram, Chair Location:
Tim Johnson, Vice Chair This meeting will be held
Brad Massey remotely via Zoom
Katharine Penning
Eric Richards Staff Liaison:
Mark Teplitsky Russ Hovland
Vacant Seat Interim Chief Building Official
AGENDA
December 16, 2021
9:00 AM
Building Review Commission
Pursuant to City Council Ordinance 079, 2020, a determination has been made by the Chair after consultation with the
City staff liaison that conducting the hearing using remote technology would be prudent.
This remote Building Review Commission meeting will be available online via Zoom or by phone. No Board members will
attend in person. The meeting will be available to join beginning at 8:30 a.m. Participants should try to join at least 15 minutes
prior to the 9:00 a.m.. start time.
ONLINE PUBLIC PARTICIPATION:
You will need an internet connection on a laptop, computer, or smartphone, and may join the meeting through Zoom at
https://zoom.us/j/92080227997. (Using earphones with a microphone will greatly improve your audio). Keep yourself on
muted status.
For public comments, the Chair will ask participants to click the “Raise Hand” button to indicate you would like to speak at
that time. Staff will moderate the Zoom session to ensure all participants have an opportunity to comment.
PUBLIC PARTICIPATION BY PHONE:
Please dial 253-215-8782 and enter Webinar ID 920 8022 7997. Keep yourself on muted status.
For public comments, when the Chair asks participants to click the “Raise Hand” button if they wish to speak, phone
participants will need to hit *9 to do this. Staff will be moderating the Zoom session to ensure all participants have an
opportunity to address the Board. When you are called, hit *6 to unmute yourself.
IF YOU ARE UNABLE TO PARTICIPATE ONLINE OR BY PHONE:
Individuals who are uncomfortable or unable to access the Zoom platform or participate by phone may:
1) Email comments to abrennan@fcgov.com at least 24 hours prior to the meeting. If your comments are specific to any
of the discussion items on the agenda, please indicate that in the subject line of your email. Staff will ensure your
comments are provided to the Board.
2) Come in person to 281 N. College Avenue to utilize City technology to participate in the meeting. Please arrive 15
minutes prior to the meeting and ring the doorbell at the north entrance so that staff may escort you into the building.
Masks and social distancing may be required. To participate this way, it is strongly recommended that you contact us at
least 24 hours prior to the meeting so that arrangements for proper social distancing and appropriate technology can be
put in place to protect the health and safety of the public and staff. Contact Aubrie Brennan at abrennan@fcgov.com or
970-416-4390.
Documents to Share: Any document or presentation a member of the public wishes to provide to the Board for its
consideration must be emailed to abrennan@fcgov.com at least 24 hours before the meeting.
Packet Pg. 1
Page 2
The City of Fort Collins will make reasonable accommodations for access to City services, programs, and activities and will
make special communication arrangements for persons with disabilities. Please call 221-6515 (TDD 224-6001) for assistance.
CALL TO ORDER
ROLL CALL
AGENDA REVIEW
PUBLIC COMMENT ON ITEMS NOT ON THE AGENDA
DISCUSSION AGENDA
1. MINUTES OF SEPTEMBER 30, 2021
The purpose of this item is to consider approval of the minutes from the September 30, 2021 regular
meeting of the Building Review Commission.
2. GRANT EVERITT APPEAL OF DENIAL OF ONE TIME EXCEPTION TO BUILD A CLASS C2
LICENSE-LEVEL PROJECT (5-PLEX MULTI-FAMILY)
DESCRIPTION: The purpose of this item is to seek a determination from the Building Reivew
Commission to whether or not Mr. Everitt should be approved as the permit
holder and general contractor (GC) to build a 5-unit multi-family building (5-plex)
which requires a higher-level license than his current D1, a Class C2 license.
STAFF: Sharlene Manno, Admin Services Manager
3. CONSIDERATION AND APPROVAL OF THE BUILDING REVIEW COMMISSION’S 2022 ANNUAL
WORK PLAN
DESCRIPTION: The purpose of this item is to approve the 2022 Annual Work Plan of the
Building Review Commission.
STAFF: Russ Hovland, Interim Chief Building Official
4. PRESENTATION OF THE BUILDING REVIEW COMMISSION’S 2021 ANNUAL REPORT
DESCRIPTION: The purpose of this item is to review the 2021 Annual Report of the
Building Review Commission.
STAFF: Russ Hovland, Interim Chief Building Official
OTHER BUSINESS
ADJOURNMENT
Packet Pg. 2
Agenda Item 1
Item 1, Page 1
AGENDA ITEM SUMMARY December 16, 2021
Building Review Commission
STAFF
Aubrie Brennan, Administrative Assistant
SUBJECT
CONSIDERATION AND APPROVAL OF THE MINUTES OF THE SEPTEMBER 30, 2021 BRC
MEETING
EXECUTIVE SUMMARY
The purpose of this item is to approve the minutes of the September 30, 2021 meeting of the Building
Review Commission.
ATTACHMENTS
1. BRC September 30, 2021 Minutes – DRAFT
Packet Pg. 3
DRAFTCity of Fort Collins Page 1 September 30, 2021
Alan Cram, Chair
Tim Johnson, Vice Chair
Brad Massey
Katharine Penning
Eric Richards
Justin Robinson Staff Liaison:
Mark Teplitsky Russ Hovland
Interim Chief Building Official
Meeting Minutes
September 30, 2021
A regular meeting of the Building Review Commission was held on Thursday, September 30, 2021,
remotely, via Zoom.
CALL TO ORDER
Chair Cram called the meeting to order at 9:01 a.m.
ROLL CALL
PRESENT: Cram, Massey, Richards, Teplitsky, Penning
ABSENT: Robinson, Johnson
STAFF: Manno, Dustin, Hovland, Brennan
PUBLIC COMMENT ON ITEMS NOT ON THE AGENDA
None.
DISCUSSION AGENDA
1. CONSIDERATION AND APPROVAL OF THE MINUTES OF THE AUGUST 26, 2021 MEETING.
Member Richards moved to approve the minutes of the August 26, 2021 meeting with the suggested
amendments. Member Teplitsky seconded. The motion passed 5-0.
Building Review
Commission
ITEM 1, ATTACHMENT 1
Packet Pg. 4
DRAFTCity of Fort Collins Page 2 September 30, 2021
2. AFFINITY REMODELING, INC REQUEST FOR REINSTATEMENT OF LICENSE WITHOUT
PROVIDING REQUIRED TESTING
DESCRIPTION: The purpose of this item is to seek a determination from the Building Review
Commission to whether or not a license and supervisor’s certificate should be
reinstated to Affinity Remodeling, Inc. and Gary York without required testing.
Chair Cram outlined the time allotments for each aspect of the hearing.
Staff Report
Ms. Manno stated the purpose of this item is to seek a determination from the Commission as to
whether a license and supervisor certificate should be reinstated to Affinity Remodeling and Gary York
without required testing. She discussed Mr. York’s 35-year testing and education history with the City
and stated his license expired in February of 2020, did apply for a renewal, and had communication
with staff regarding some missing application items which has lead to this hearing. She stated the staff
recommendation is denial.
Appellant Presentation
Gary York, appellant, stated he was unaware his license had expired until June of 2021 when he
contacted the City regarding the reinstatement process. He stated he did not work for seven months
due to the lack of building inspections during COVID and never had any plan to not renew his license
as he has kept up with it for 35 years. He described his main source of income as doing remodels for
Medicaid patients and he therefore does not necessarily need the commercial license. He stated he
plans to retire in two years.
Appellant Rebuttal
None.
Staff Rebuttal
Ms. Manno stated courtesy renewal notices are typically sent one to two month prior to the scheduled
expiration of an license or supervisor certificate; however, if that notice is not sent or received, it is the
responsibility of the contractor to ensure the license is renewed and kept current. She noted renewals
can occur up to 60 days past the expiration date and once that 60 days has passed, a new application
must be submitted subject to the current licensing process and procedures outlined under the expiration
section. Testing is required if there are any Code updates or if a license goes into expiration status.
She also noted testing is required for any change in license, including if Mr. York no longer needed the
commercial license.
Public Input
None.
Board Questions and Discussion
Member Richards asked if there are records the City sent Mr. York the renewal notice. Ms. Manno
replied the letter is auto-generated and it is on record as having been sent via the postal service.
Member Massey noted Mr. York has provided some information regarding things he has done to keep
current on the Codes and asked if he has any additional information to provide. Mr. York replied he
keeps current on Codes pertinent to his work in various jurisdictions and all work he does for Medicaid
patients is required to meet ADA codes, which he also keeps up with. He stated any required permits
for a certain jurisdiction are required to be filed with the state for Medicaid work as well.
Member Penning asked Mr. York if he primarily does exterior and interior upgrade work. Mr. York
replied his main work is interior upgrades and most exterior work is limited to wheelchair ramps.
Member Penning asked Mr. York if he ever widens doorways on the exterior envelope or if he ever
does work that may affect energy codes. Mr. York replied he has widened about three exterior doors
during his 23 years of this work, usually in mobile homes.
Member Teplitsky stated, given the nature of the work done by Mr. York and his 35-year history of
having a license with the City, he is inclined to waive the test requirement unless there is severe
objection, despite usually denying these requests.
Member Richards asked if Mr. York has had any permit or license issues in the past. Ms. Manno replied
there are no negative remarks on his record.
ITEM 1, ATTACHMENT 1
Packet Pg. 5
DRAFTCity of Fort Collins Page 3 September 30, 2021
Member Richards concurred with Member Teplitsky and stated it may be appropriate to grant this
request despite typically denying them.
Chair Cram asked Mr. York if he has any pending projects in Fort Collins. Mr. York replied in the
negative and stated most of his work is in Weld County and unincorporated Larimer County.
Chair Cram stated he is not inclined to grant the request for reinstatement as it has been ten years
since Mr. York has had any Code education and there have been significant changes in the three cycles
that have happened in that time. He stated he does not want to set a precedent in granting the
reinstatement.
Mr. Hovland asked Ms. Manno if she has researched Mr. York’s past permit history and whether it
matches the scope of work described. Ms. Manno replied Mr. York has pulled permits for a residential
basement finish in 2016 and a commercial general alteration in 2008, both of which were completed in
good standing.
Mr. Hovland stated the level of license held by Mr. York, prior to its expiration, is higher than the level
of work he has been completing.
Member Massey asked if Mr. York would consider a downgrade to his license type and asked Mr. York
to describe the turning radius for a wheelchair in a remodel versus new construction, as per the recent
Code change. Mr. York replied the minimum width is 60” and described a five foot by five foot turning
radius requirement.
Member Massey stated those were the correct measurements for remodels but asked Mr. York about
new construction requirements. Mr. York replied he was unaware as he does not do any new
construction. He also noted his plumber frequently takes care of any necessary permits when plumbing
changes are the only thing requiring a permit.
Member Massey asked Mr. York if he would be willing to consider a downgrade to his license type. Mr.
York replied in the affirmative and stated that would actually be his preference.
Member Massey stated he would support downgrading the license to a D2 without the testing
requirement.
Chair Cram asked Ms. Manno to address that possibility. Ms. Manno replied the Commission could
make that recommendation and the information from his C2 license would be transferred to a D2 license
per that recommendation.
Board Deliberation
Member Massey made a motion to approve Mr. York’s request to not have to retest provided
that his current C2 license is downgraded to a D2 license. Member Penning seconded. The
motion passed 5-0.
Mr. York accepted the license downgrade.
3. PROPOSED CHANGES TO THE WATER SUPPLY REQUIREMENT CASH IN LIEU FEE
DESCRIPTION: The purpose of this item is to present proposed changes to the Water Supply
Requirement Cash in Lieu Fee to the Board for informational purposes.
Staff Report
Donnie Dustin, Water Resources Manager, discussed development fees charged within the Water
Utility service area, specifically the cash in lieu fee related to water supply requirements. He stated the
main proposed change is to increase the cash in lieu fee to $68,200 per acre foot, which is about a
60% increase over the current cost, due to significant water supply cost increases and increasing
uncertainties in developing water. He stated the proposed changes only apply to new development or
redevelopment within the Fort Collins Utilities service area.
Dustin discussed water supply requirements and the associated calculation that covers the impact of
additional demand incurred by development. Dustin detailed the current hybrid method used to
calculate the cash in lieu fee, noting its three components are: the cost of future infrastructure, the cost
of future water rights, and buying in to the existing water supply. He discussed the impacts of the
proposed changes to different types of developments and compared the new proposed rates to those
of other providers.
ITEM 1, ATTACHMENT 1
Packet Pg. 6
DRAFTCity of Fort Collins Page 4 September 30, 2021
Dustin summarized by stating the proposed cash in lieu fee reflects the cost of providing reliable
supplies, ensures that development pays its own way, considers various uncertainties, and more
accurately reflects use per a data-driven, more equitable approach. He noted the water supply and
demand management plan is slated for an update in the coming years and the plan is to integrate
potential climate change impacts as part of that.
Member Massey supported the proposed changes and stated it makes sense to ensure the rates are
constantly adjusted.
Member Richards stated the 60% increase seems large and asked if the rates are typically examined
on a two-year basis. Dustin replied in the affirmative and noted appropriate changes were not made in
2019 as the Halligan cost update information was not received until all outreach was already complete;
therefore, a higher cost was not incorporated at that time.
Member Richards asked if there has been any consideration given to incrementally adjusting the
increase given housing affordability concerns. Dustin agreed affordability is a concern but stated this
increase is directly related to the cost of service to provide reliable supplies.
Member Teplitsky asked if all customers would pay more for metered water if this increase were not
passed. Dustin replied in the affirmative, particularly if additional water rights are purchased to ensure
reliability and security of the City’s water supplies.
Member Teplitsky asked how much rates would likely increase if that were to occur. Dustin replied he
was unsure of those exact numbers but could provide that.
Member Teplitsky stated he would be interested in seeing alternatives to this one proposal as the
dramatic increase affects housing affordability.
4. PROPOSED ADOPTION OF THE 2021 INTERNATIONAL CODES
DESCRIPTION: The purpose of this item is to present proposed Building Code
Changes based upon the 2021 International Building Codes to the
Board for informational purposes.
Staff Report
Russ Hovland, Interim Chief Building Official, discussed the recommendation by City staff to adopt the
2021 series of International Building Codes in early 2022. He stated this is part of the outreach to
prepare for the Council work session on November 9th.
Kirk Longstein, Energy Services Project Manager, stated staff is seeking feedback from the
Commission on the recommendations. He noted the International Codes are adopted on a three-year
basis and he outlined the recommended local amendments that align with existing City policies,
including the Strategic Plan, Our Climate Future, the Housing Strategic Plan, and the Water Efficiency
Plan. He discussed the Code Review Committee recommendations and triple bottom-line analysis.
He discussed the benefits of adopting the International Codes and local amendments.
Longstein requested Commission input regarding the 2021 International Code and local amendment
proposals as well as their alignment with community objectives.
Hovland noted the existing local amendment to delete fire sprinklers in new detached houses was
supported by the majority of the Committee for retention; however, Poudre Fire Authority staff members
do not support keeping that local amendment.
Member Richards asked if other area municipalities require sprinklers in detached homes. Hovland
replied he only knows of two jurisdictions in Colorado that have that requirement and all other
jurisdictions amend the requirement out, as has Fort Collins.
Member Teplitsky asked if the domestic water tap would be used for sprinkling new homes. Hovland
replied a residential combination system would be used and would be installed into the plumbing system
of home.
Member Penning suggested higher energy goals should be encouraged with regard to installing EV
charging stations in multi-family developments. Longstein replied the EV charging station requirements
for new multi-family construction are based on the parking area; 5% of new spaces are required to have
an EV charger, 15-20% would need to be EV ready, and 15-40% would need to be EV capable spaces.
He stated feedback on these requirements has been directly around the cost. Member Penning stated
it makes sense to strive for EV capable spaces, at a minimum.
ITEM 1, ATTACHMENT 1
Packet Pg. 7
DRAFTCity of Fort Collins Page 5 September 30, 2021
Chair Cram stated he was on the Code Review Committee, and one of the major concerns was related
to whether the Utilities are ready to provide the additional load on circuits for these stations, and what
would be required in terms of additional underground wiring.
Hovland noted the definition of EV capable is just having empty infrastructure to then install the chargers
in the future.
Member Massey asked about adoption of efficient electric equipment and potential plans related to
electric heat. Brad Smith, Energy Services Project Manager, replied electric readiness involves
providing circuits for future fuel switching and looking to involve heat pump technology.
Member Massey asked about adoption of the solar-ready Code appendix. Smith replied the cost has
been shown to be almost neutral and the requirement would change from requiring infrastructure to
requiring a design on the roof.
Member Teplitsky asked if the 9% and 5.4% energy improvements would be achieved through heat
pumps and requested additional details on the improved U-factor requirements. Smith replied the
percentages are based of analysis that has been done by the Department of Energy and are what the
proposed energy use reduction would be over several different building models; however, they are not
specific to heat pumps. He provided additional details on the improved U-factor requirements. He also
noted this is just the prescriptive path to Code compliance and there are three other available paths
that allow for tradeoffs.
Longstein asked members to describe any areas for which additional information should be provided.
Member Teplitsky stated he is not convinced about the mitigations presented and stated the increase
in the construction costs might be a bit understated. He noted there are a number of sub-contractors
that will not work in Fort Collins due to extra requirements. He questioned the impacts to individuals
versus community initiatives of a 5-10% energy savings number. Longstein stated staff is estimating
the proposed Code changes could increase costs per unit of $8,000, which is a high estimate, and
assuming an average sales price of $515,000, the change would result in approximately a $16 per
month increase to the monthly mortgage and utilities costs for the average homeowner.
Member Teplitsky replied the individual homeowner may not be seeing the mitigation in their comfort
or in the utility bills they are paying.
Smith discussed the decrease in construction costs for multi-family developments.
Member Richards expressed support for the energy efficiency changes; however, he questioned how
the initial cost increases, while beneficial to the homeowner and the Climate Action Plan in the long
run, impact the bottom line for a first-time home buyer. Longstein replied there are plans to present
this information to the Affordable Housing Board. He stated all strategies should be addressing
affordable housing challenges and the upgrading of existing homes should be incentivized. Smith
agreed with Member Richards’ point and noted the increased cost of housing city-wide is far outpacing
any Code-related increases. He also noted there will be expenditures years from now to mitigate the
effects of climate change.
Member Teplitsky rejected the supply and demand argument that arises whenever conversations come
up about housing affordability. He stated the increase in the cost of housing is directly due to the
increase in construction costs. He stated profitability for builders has been decreasing and asked if it
may be more beneficial to retrofit existing buildings rather than impose incremental, marginal changes
on new construction. Smith stated there are plans to look at energy use within existing buildings and
score those, which will hopefully spur some type of action to improve the buildings.
Member Teplitsky expressed concern about expressing support for the entire package as some of the
figures and costs have been understated. He also noted there are other challenges in building,
including supply chain issues and getting equipment; therefore, the requirement for exclusive materials,
methods, and equipment, would add another layer of complexity to building. He noted Fort Collins
already has one of the most robust Energy Codes in the region and questioned whether the proposed
changes would result in a 5 to 9% improvement and whether the initial cost would justify any actual
improvement.
Member Massey stated the 2021 International Codes will ultimately be adopted as Council has clearly
directed the City should be current with Code adoption, particularly the Energy Code. He stated he
believes it is the right thing to do to continue to increase requirements as technology advances and
stated he is in general support of the proposed changes.
ITEM 1, ATTACHMENT 1
Packet Pg. 8
DRAFTCity of Fort Collins Page 6 September 30, 2021
Hovland noted the past Council and past City staff directors have provided direction to adopt the new
Codes every three years to make the adjustments and cost increases smaller. He also noted staff is
currently required to present the Energy Code for adoption every three years. He also noted the ISO
insurance rating would go down if three Code cycles are skipped. He also noted the Codes do
reference each other; therefore, it becomes problematic if different years are adopted for each Code.
Member Richards agreed with maintaining the three-year Code cycle with incremental changes. He
stated the cost increases are small as compared with the previous cash in lieu item related to water.
He stated he is in support of the changes, particularly those related to energy. He encouraged staff to
continue to find ways to provide support to homeowners who want to make energy improvements to
help keep costs in check.
Member Penning expressed support for sharing the information that gets others to support the EV
capable parking spaces, at least on commercial and multi-family properties.
Chair Cram stated he has been part of the last five Code cycles and has consistently expressed
concerns about increased costs. He also expressed concern about capacity for the increased electrical
demand. He suggested the possibility of putting together a statement that indicates general support
for adopting the 2021 Codes, but expressing concern about some of the increased costs incurred.
Member Teplitsky stated he is not convinced that particularly the proposed Energy Code changes are
really getting to the best solution for the goals that are to be accomplished. He also stated it is difficult
to agree with the proposed changes without additional conversation given the large consequences.
Member Massey made a motion that the Building Review Commission recommend the approval
of the adoption of the 2021 International Building Codes and proposed local amendments as
presented, with the understanding that there have been concerns raised by Commission
members about the cost of housing in Fort Collins and encouraging staff to consider those as
this process moves forward. Member Richards seconded.
Member Teplitsky stated he would prefer the motion to also acknowledge whether the proposed
changes are really providing the solutions to the strategic initiatives of the City.
Member Teplitsky requested a friendly amendment to also encourage staff to review the cost
implications of whether other solutions need to be considered in addition to adopting these
Code changes to meet City goals. Member Massey accepted the amendment as friendly.
Chair Cram read the full motion: Member Massey made a motion that the Building Review Commission
recommend the approval of the adoption of the 2021 International Building Codes and proposed local
amendments as presented; however, recognizing that the benefits of the adoption of these Codes are
likely to increase construction costs, and further noting that other ways to improve housing efficiency
should be examined.
Member Teplitsky disagreed with the last portions of the motion wording and stated he would prefer it
address the examining of other methods toward total building efficiency to create policy to help meet
the goals of the Climate Action Plan.
Chair Cram read the revised last portion of the motion: noting that other strategies to increase total
housing efficiency, in line with the City’s Climate Action Plan, should be examined.
City Attorney Guin suggested the phrase ‘benefits of the adoption’ should be ‘results of the adoption.’
Chair Cram concurred.
Hovland asked if the Housing Strategic Plan should also be mentioned with the Climate Action Plan.
Members discussed other wording changes to the motion.
Members Massey and Teplitsky accepted the revised motion.
Member Massey made a revised motion that the Commission recommend approval of the
adoption of the 2021 International Building Codes, including recommended City amendments,
requesting the joint Code Adoption Review Committee and/or City staff to determine if the
estimated increased construction costs are accurate, and further noting that other strategies to
increase total building efficiency in line with City-wide policies should be examined with the
goal of maximum impact. Member Teplitsky seconded.
ITEM 1, ATTACHMENT 1
Packet Pg. 9
DRAFTCity of Fort Collins Page 7 September 30, 2021
The vote on the motion was as follows: Yeas: Teplitsky, Penning, Richards, Massey and Cram.
Nays: none.
THE MOTION CARRIED.
OTHER BUSINESS
Chair Cram noted Members Massey, Penning, and Robinson have appointments expiring in December
and they will be made aware of options for either reapplying or resigning.
ADJOURNMENT
Chair Cram adjourned the meeting at 11:50 a.m.
Minutes prepared by TriPoint Data and respectfully submitted by Aubrie Brennan.
Minutes approved by a vote of the Board on
_________________________________ ______________________________
Marcus Coldiron, Chief Building Official Alan Cram, Chair
ITEM 1, ATTACHMENT 1
Packet Pg. 10
Agenda Item 2
Item 2, Page 1
STAFF REPORT December 16, 2021
Building Review Commission
STAFF
Sharlene Manno – Manager, Administration Services
SUBJECT
GRANT EVERITT APPEAL OF DENIAL OF ONE TIME EXCEPTION TO BUILD A CLASS C2 LICENSE-LEVEL
PROJECT (5-PLEX MULTI-FAMILY)
EXECUTIVE SUMMARY
Grant Everitt currently has a Class D1 license allowing him to build new housing of not more than two (2) dwelling
units. Grant has built 30 new single-family detached homes in city limits and is in good standing. Grant would
like to be approved as the permit holder and general contractor (GC) to build a 5-unit multi-family building (5-
plex) which requires a higher-level Class C2 license.
BACKGROUND
Grant requested from the Chief Building Official (CBO) a one-time exemption for a Class C2 level license to be
allowed to perform as the GC for a new 5-plex using his existing Class D1 license. This request was denied by
the CBO on November 4, 2021. Grant feels strongly that based on his knowledge and resources he can
successfully complete such a project and feels the request should be approved.
The Board’s jurisdiction for this appeal is Municipal Code Section 5-27(11) Section 113.1, which empowers this
Board to hear and decide appeals of decisions by the CBO relative to the application and interpretation of the
Municipal Code and Section 15-158(a)(2), which relates to the contractor licensing requirements of the City of
Fort Collins.
This will be the second such project that Everitt Construction has completed of this nature. Grant Everitt was
previously granted a one-time exception on June 27, 2019, under the mentorship program, to build a new 5-plex
at 909 Blondel. This project was completed with little to no issues.
RECOMMENDATION
Staff recommendations are as follows:
1. The Commission may choose to approve Mr. Everitt’s request for a license and supervisor’s certificate
upgrade to a Class C2 based on the successful completion of the previous mentorship program project.
a. This to include a new signed mentor agreement with a fully licensed Class C2 general
contractor.
2. The Commission may choose to deny Mr. Everitt’s request for a license and supervisor’s certificate
upgrad to a Class C2 to complete this project.
ATTACHMENTS
1. Appeal Form
2. Plans PDF
3. Summary and Site Plan PDF
4. Email request string
Packet Pg. 11
&RQWUDFWRU/LFHQVLQJ
1&ROOHJH$YH32%R[
)RUW&ROOLQV&2
3KRQH)D[
ZZZIFJRYFRPQEVFRQ WUDFWRUSKS
BUILDING REVIEW &200,66,21 APPEAL FORM
(Contractor Hearing)
Appellant Name: d/b/a
Address:
Phone #: Mobile #
Action Requested:
Exam Waiver License Upgrade
License approval (denied by staff) Other
Description of request/problem and other mitigating factors (attach additional information and/or materials):
Appellant Signature Date
Appellant may appear in person, in writing, or by agent and should be prepared to present all relevant details, or other
evidence in support of this hearing request at the hearing time indicated below.
Regular meetings are scheduled for the last Thursday of each month at 9:00 a.m. in the Council Chambers at 300
LaPorte Avenue. Applications must be filed one month prior to the desired hearing date to ensure consideration.
OFFICE USE ONLY
Hearing Date Hearing Time
Reviewed by
Distribution: Original – Appellant, Copy -- File
Grant Everitt Everitt Construction
2809 E. Harmony Rd #310 Fort Collins, CO 80528
970-310-4988 970-310-4988
I am appealing the board to allow Everitt Construction to build a 5-plex unit in Old Town North Fort Collins. I have a D License
and an E license but require a C-2 License to build this building. I am requesting a 1 time variance from my license at this time.
License Variance
In 2019 Everitt Construction built a 5-plex building at 903 Blondel. I hope to build the same 5-plex building at
909 Blondel. The building we built in 2019 was completed with excellence and have had no issues. I want to
build the same building for the same owner on the vacant lot next door.
11.10.21
'HFHPEHUDP
Russell Hovland Digitally signed by Russell Hovland
Date: 2021.11.10 08:37:33 -07'00'
ITEM 2, ATTACHMENT 1
Packet Pg. 12
DD
EE
CC
BB
AA
1
1
9
9
2
2
8
8
D.8
D.7
D.2
C.2
B.8B.8
A.2
A.8
A.3
37
7
10
10 LIVING / DINING201KITCHEN303BEDRM.308CL.309BATHRM.306BATHRM.210BEDRM.208HALL203CL.302DINING305PatioPatioPatio321879 s.f.1130 s.f.1262 s.f.2.2
4208107B111205204212104109BBEDRM.109BEDRM.107RISER108BATHRM.111CL.110MECH.104CL.103BATHRM.106BEDRM.211CL.212MECH.206LIVING / DINING101BATHRM.205CL.204CL.209KITCHEN202KITCHEN1051
A-5.2
1
A-5.2
2
A-5.5
1
A-5.5
3
A-5.4
1
A-5.1
1
A-5.1
307MECH.307
2
A-5.1
2
A-5.1 102304CL.102CL.304206300103211200LIVING301306308106
3
A-5.2
4
A-5.4TANKLESS WATER HEATER- SEE MECH. DRW'GS.TANKLESS WATER HEATER- SEE MECH. DRW'GS.TANKLESS WATER HEAT-ER - SEE MECH. DRW'GS.GAS METERS - SEEMECH. DRW'GS.ELEC. METER - SEE ELEC.DRW'GS.ROOF CANOPY ELEMENTABOVE - TYP.ROD & SHELVES - TYP. @ALL CLOSETSW./D.W./D.W./D.FURN.FURN.FURN.REF.OVENREF.REF.OVENOVENSINKSINKPLASTIC LAM. FINISHEDDESK @ 30" A.F.F. - TYP.36"X36" SHOWER BASE W/GLASS SHOWER DOOR -SEE PLUMB'G. DRW'GS. -TYP.W-WS6STW-WS6STW-WS6STW-WS6STW-WS6STW-WS6STW-WS6STW-WS6STW-WS6MSW-WS6MSW-WS6MSW-WS6MSW-WS6MSW-WS6ST
W-WS6ST
W-WS6ST
W-WS6ST
W-WS6ST
W-CMUW-WS6MS
W-WS6MS
W-WS6MS
W-WS6MS
W-WS6ST
W-WS6ST
W-WS6ST
W-WS6ST
ALL SHADED WALLS AREBEARING WALLS WHICH ARETO BE PROTECTED W/ 1-HR.CONSTRUCTION - SEESYSTEM NOTES - TYP.INSUL. SYMBOL IS SHOWN@ ALL WALLS WHICH ARE TOBE INSULATED - SEE SYSTEMNOTES - TYP.W-WS6INTW-WS6INTW-WS6INTW-WS6INTW-WS4DW-WS4DW-WS4D
W-WS4D
W-WS4D
W-WS4D
W-WS4D
W-WS4D
W-WS6D
NOTE: ALL INTERIOR WALLSARE TYPE W-WS4INT U.N.O.BUILT-UP STUD COLUMN INWALL - PROVIDE 5/8" TYPE'X' GYP. BD. TO BOTH FACESOF WALL - TYP.DOOR BELOW STAIRLANDING - TYP. OF 2UPUPSTL. COLUMN - SEESTRUCT. DRW'GS. - TYP.
309ACCESSIBILITYREQM'TS.A-6.1
2
A-6.1
3ACCESSIBILITY REQM'TS.F-C4UELEC. METERS - SEE ELEC.DRW'GS.
A-6.1
1ACCESSIBILITY REQM'TS.(VERIFY W/ KITCHEN CAB. MANUF.)
(VERIFY W/ KITCHEN CAB. MANUF.)
(VERIFY W/ KITCHEN CAB. MANUF.)
302W-WS6INT
W-WS6D
W-WS6D
401101A301501201203305WINDOW ABOVE 109AW-WS6D
SINK
101B TYPE B ACCESSIBLE UNITFULLY ACCESSIBLE UNITTYPE B ACCESSIBLE UNIT
W-WS6ST
WALKWAY SLOPED @ 1:20 MAX.DN. 2 RISERSSLOPE DN. @ 1:20 MAX.ACCESSIBLEENTRANCEACCESSIBLEENTRANCEACCESSIBLEENTRANCE107C1085
2102093036 SOLID SURFACE COUNTEREXTENDED ON BRACKETS TOFORM SIT-UP BAR - PROVIDE"WATERFALL END" ON HALLWAYEND - TYP.SOLID SURFACE COUNTEREXTENDED ON BRACKETS TOFORM SIT-UP BAR - PROVIDE"WATERFALL END" ON HALLWAYEND - TYP.107
PROVIDE DRAINAGE SWALEIN CONC. HERE FOR DRAINSFROM FRONT ROOF TERRACEHALL112PROVIDE CHASE FORTERRACE DRAINS - SEEMECH. DRW'GS.(4) SHELVESSYSTEM NOTES:FLOORS:WALLS:WALL NOTES:GENERAL NOTES:1. FIELD VERIFY ALL DIMENSIONS. NOTIFY ARCHITECT OF ANY DISCREPANCIES.2. ALL DIMENSIONS ARE TO OUTSIDE FACE OF CONC., FACE OF STUD, FACE OF MASONRY OR GRIDLINE UNLESS INDICATED W/ A CENTERLINE ( ) SYMBOLOR UNLESS NOTED OTHERWISE.3. ALL GRIDLINES ARE LOCATED @ OUTSIDE FACE OF WALL SHEATHING OR @ CENTERLINES OF ELEMENTS UNLESS NOTED OTHERWISE.4. SEE WALL SECTIONS FOR FURTHER DIMENSIONAL RELATIONSHIPS.5. INSTALL ALL PRODUCTS PER MANUF. REC'S.CEILINGS:ROOFS:INSULATION & MOISTURE RESISTANCE:1. PROVIDE R-10 RIGID INSUL. @ FOUNDATION PERIMETER.2. PROVIDE 6 MIL. VAPOR BARRIER BENEATH MAIN LEVELFLOOR SLABS SEALED TO FOUNDATION.3. PROVIDE R-21 MIN. BLOWN-IN INSULATION @ ALLPERIMETER WALLS EXCEPT @ RATED WALLS WHICH ARETO RECEIVE R-21 MINERAL WOOL.4. PROVIDE R-49 MIN. BLOWN-IN INSUL. @ ALL VENTEDATTIC CONDITIONS.5. PROVIDE R-25 MIN. CLOSED CELL SPRAYFOAM PLUSBLOWN-IN INSUL. FILLING REMAINING RAFTER CAVITYFOR R-49 MIN. @ ALL UNVENTED RAFTER CONDITIONS.6. PROVIDE TYVEK OR EQUAL AIR BARRIER @ ALLEXTERIOR WALLS COMPLETE W/ OPENING SEALINGCOMPONENTS. TAPE ALL JOINTS.7. PROVIDE DRAINAGE MATT @ ALL STUCCO CONDITIONS.8. PROVIDE CLASS III VAPOR RETARDER (LATEX PAINT)@ ALL INTERIOR PERIMETER WALL & CEILING CONDITIONS.9. ALL WINDOWS TO HAVE A U-VALUE OF .30 OR LESS.10. ALL WINDOW & DOOR TO BE WRAPPED, TAPED & SEALEDW/ OPENING COMPONENTS PER WINDOW & AIR BARRIERMANUF. REQM'TS.11. PROVIDE R-20 MIN. CLOSED CELL SPRAY FOAM INSUL.@ ALL RIM JOIST CONDITIONS.12. PROVIDE SOUND INSUL. BATTS @ ALL FLOOR & DE-MISING WALL CONDITIONS.13. ALL CONCEALED SPACES W/IN HEADERS & WALL INTER-SECTION CONDITIONS TO BE INSULATED W/ RIGID INSUL.OR SPRAY FOAM.14. PROVIDE THERMO-PLY OR EQUAL AIR BARRIER @ THEOUTSIDE OF BATHTUBS, FIREPLACES OR SOFFITSPLACED @ PERIMETER WALLS OR ROOFS PRIOR TOINSTALLATION.1. ALL INTERIOR WALLS ARE TYPE W-S4INT UNLESS NOTEDOTHERWISE.2. SEE ELEVATIONS & ROOM FINISH SCHEDULE FOR FURTHER FINISH MATERIAL INFORMATION. ALL INTERIOR WALLS ARE TO HAVE "SLICK" FINISH (NO TEXTURE).3. SEE STRUCT. DRW'GS. FOR FURTHER BRACING & LAT-ERAL REQMTS.4. PROVIDE MOISTURE RESISTANT GYP. BD. @ ALL BATH-ROOM WALLS & EXTERIOR GYP. BD. @ ALL EXTERIOR CONDITIONS.5. PROVIDE BACKING WITHIN WALLS AS REQ'D. FOR IN-STALLING ALL EQUIPMENT, MILLWORK & TOILET ACCES-SORIES.6. SEE SHEET A-2.1 & MECH. DRW'GS. FOR LOCATIONS WHERE DUCTS OR VENTS PENETRATE RATED MEM- BRANES REQUIRING GYP. BD. WRAP WITHIN WALL & JOIST CAVITIES.W-CMU 8"X8"X16" (NOMINAL) INTEGRALLY COLORED CONCRETE MASONRY UNITS W/ 2" SOLID "SOAP" CAPS REINFORCED PER STRUCT. DRWG'S.W-WS6ST HARDCOAT STUCCO OVER DRAINAGE MATT OVEROVER AIR BARRIER OVER 1/2" OSB SHEATHING OVER 2X6STUDS @ 16" O.C. W/ R-20 MIN. BLOWN-IN INSUL. W/ 1/2"GYP. BD. TO INSIDE FACE OF ALL WALLS OTHER THANLOWER LEVEL BEARING WALLS (SHADED IN FLOORPLANS) WHICH ARE TO HAVE 5/8" TYPE 'X' GYP. BD. (1-HR.ASSEMBLY)W-WS6ST-1HR SAME ASSEMBLY AS W-WS6ST BUT SUBSTI-TUTE LP FLAMEBLOCK SHEATHING FOR OSB SHEATHINGW-WS4ST HARDCOAT STUCCO SYSTEM OVER 2 LAYERS OF FELT PAPER OVER 1/2" OSB SHEATHING OVER BOTH SIDES OF 2X4 STUDS @ 16". FRAMING TO BE ATTACHED TO STEEL POSTS EMBEDDED INTO CONC. PIERS PER STRUCT. DRW'GS. WHERE LATERALLY UNSUPPORTED.W-WS6MS METAL SIDING (GALVANIZED CORRUGATED OVERAIR BARRIER OVER 2X6 STUDS @ 16" O.C. W/ R-20 MIN.BLOWN-IN INSUL. W/ 1/2" GYP. BD. TO INSIDE FACE OF ALLWALLS OTHER THAN LOWER LEVEL BEARING WALLS(SHADED IN FLOOR PLANS) WHICH ARE TO HAVE 5/8" TYPE'X' GYP. BD. TO INTERIOR FACE & EXT. 5/8" TYPE 'X' GYP.BD. TO EXTERIOR (1-HR. ASSEMBLY)W-WS4D 5/8" TYPE 'X' GYP. BD. TO EACH INTERIOR FACE OFDOUBLE ROW OF 2X4 STUDS @ 16" O.C. ON SEPARATEPLATES 1" APART W/ SOUND BATT INSUL. (1-HR.ASSEMBLY)W-WS4INT 1/2" GYP. BD. TO EACH EXPOSED FINISHED FACEOF 2X4 STUDS @ 16" O.C.. SUBSTITUTE 5/8" TYPE 'X' GYP.BD. @ LOWER LEVEL BEARING WALLS (SHADED IN FLOORPLANS) (1-HR. ASSEMBLY)W-WS6INT 1/2" GYP. BD. TO EACH EXPOSED FINISHED FACE0F 2X6 STUDS @ 16" O.C.C-GBF 2 LAYERS OF 1/2" TYPE X GYP. BD. TO UNDERSIDE OF FURRING CHANNELS & FLOOR FRAMINGC-GBS 5/8" GYP. BD. TO UNDERSIDE OF 2X4 STUDS @ 24"O.C. FRAMED BELOW ROOF OR FLOOR FRAMING TOCREATE SOFFIT (SHOWN AS STIPLED ON CEILINGPLANS).C-GBR 5/8" GYP. BD. TO UNDERSIDE OF ROOF FRAMING.C-CFS CEMENT FIBER SIDING W/ CONT. GALV. STL. SOFFITVENTS TO UNDERSIDE OF ROOF FRAM'G.C-MD EXPOSED UNDERSIDE OF METAL DECKING IN STL.FRAMEC-MR EXPOSED UNDERSIDE OF CORRUGATED GALV. STL.ROOFING.C-ST HARDCOAT STUCCO OVER AIR BARRIER OVER 1/2"OSB SHEATHING OVER FLOOR FRAMING PER STRUCT.DRW'GS.ROOF NOTES:1. PROVIDE GRACE ICE & WATER SHIELD OR EQUAL ONALL ROOFS W/ A PITCH OF LESS THAN 3:12 & FROMOUTSIDE EDGE OF ROOF TO EXTERIOR BUILDING FACE.2. PROVIDE METAL FLASH'G. (MIN. 24 GA.) AT ALL VALLEYS& WHERE ABUTTING WALLS PER SMACNA REC'S.R-AS ASPHALT SHINGLES (30 YR.) OVER 1 LAYER OF 15# FELT W/ ICE SHIELD @ OVERHANGS & EAVES OVER1/2" OSB SHEATHING OVER ROOF FRAM'G. PER STRUCT.DRW'GS. W/ INSUL. PER NOTES BELOWR-MD STUCTURAL MTL. DECK PER STRUCT. DRAW'GS.R-MR CORRUGATED GALV. STL. ROOFING OVER STL. ROOF FRAM'G. PER STRUCT. DRW'GS. & ARCH. SECTIONS.R-SPM SINGLE-PLY RUBBER MEMBRANE FULLY ADHERED TO RIGID INSUL. TAPERED TO SLOPE TO DRAINS OVER 1/2" OSB SHEATHING OVER ROOF FRAM'G. PER STRUCT.DRW'GS. W/ THERMAL INSUL. PER NOTES BELOWF-C4R 4" CONC. SLAB REINFORCED W/ 6X6, 10/10 W.W.F.0VER SUBGRADE PER SOILS REPORT RECOMEND- ATIONS.F-C4U 4" UN-REINFORCED CONC. SLAB OVER SUBGRADEPER SOILS REPORT RECOMENDATIONS.F-GC 1 1/2" GYPCRETE OVER 3/4" WD. DECKING & WD. I JOISTS PER STRUCT. DRWG'S W/ 2 LAYERS OF 1/2" TYPE X GYP. BD. W/ OPTIONAL STEEL FURRING CHANNELS TO UNDERSIDE OF JOISTS & W/ SOUND BATT INSULATION (GA FILE NO. FC 5513).F-CL 4" CONC. LANDING OVER FULLY ADHERED SINGLE-PLY MEMBRANE OVER WOOD FLOOR FRAM'G. PER STRUCT. DRW'GS.F-CT 3 1/2" CONC. TERRACE SLAB SLOPED TO DRAIN OVER DRAINAGE MATT OVER FULLY ADHERED SINGLE-PLY MEMBRANE OVER PROTECTION BD. OVER TAPERED RIGID INSUL. SLOPED TO DRAIN OVER WOOD FLOOR FRAM'G. PER STRUCT. DRAW'GS. SLOPE @ 1/4" PER FT.CL
Architect3070 Terry Lake Road | Fort Collins, CO 80524 | 90.484.8433
3/3/2021 11:17:16 AM&')"$)("(! $ &*%&')"+&')
&$$#%(
MAIN LEVEL FLOOR PLAN1/4" = 1'-0"NORTHITEM 2, ATTACHMENT 2
Packet Pg. 13
DN
DN
DD
EE
CC
BB
AA
1
1
9
9
2
2
8
8
D.8
D.7
D.2
C.2
B.8
A.2
A.8A.8
A.3A.3
37
7
10
10 LIVING / DINING503KITCHEN505NOOK504BATHRM.408CL.410KITCHEN404STAIR501BEDRM.412BEDRM.511BATHRM.509BEDRM.506CL.502541547 s.f.1539 s.f.CL.514PANTRY516BATHRM.513CL.507CL.407HALL403BATHRM.414BEDRM.406
2.2
4
4
1
A-5.2
1
A-5.2 Terrace2
A-5.5
1
A-5.5
3
A-5.4
1
A-5.1
1
A-5.1
2
A-5.1
2A-5.1 502410506509511507406408A407412B414408BLIVING / DINING402STAIR401Terrace409
413MECH.409CL.413PANTRY411
3
A-5.2
TANKLESS WATER HEATER- SEE MECH. DRW'GS.MECH.510HALL508W-WS6STW-WS6STW-WS6ST
W-WS6MS
W-WS6STW-WS6STW-WS6STW-WS6MSW-WS6MSW-WS6ST
W-WS6MS
W-WS6MS
W-WS6MS
W-WS6STW-WS6MSW-WS6ST
W-WS6ST W-WS6MSW-WS6MS
W-WS6ST W-WS6STW-WS6MSW-WS6MSW-WS6ST
W-WS6MS W-WS6ST
W-WS6MS
W-WS6STW-WS4D
W-WS6INT
W-WS6INT
W-WS6INTW-WS6INTNOTE: ALL INTERIOR WALLSARE TYPE W-WS4INT U.N.O.SOLID SURFACE COUNTEREXTENDED ON BRACKETS TOFORM SIT-UP BAR - PROVIDE"WATERFALL END" ON HALLWAYEND - TYP.ROOF CANOPYELELMENT ABOVE - TYP.ROD & SHELVES - TYP. @ALL CLOSETS36"X72" SHOWERBASE - SEE PLUMB'GDRW'GS.ALL SHADED WALLS ARETO BE PROTECTED W/ 1-HR.CONSTRUCTION - TYP.INSUL. SYMBOL IS SHOWN@ ALL WALLS WHICH ARE TOBE INSULATED - SEE SYSTEMNOTES - TYP.PLASTIC LAM. FINISHEDDESK @ 30" A.F.F. - TYP.ROOF CANOPY BELOW - TYP.CONC. DECK TO BE SLOPEDTO DRAIN @ 1/4" PER FT. MIN.-TYP.FLOOR DRAINS - SEE PLUMB'G.DRW'GS. - TYP.
FURN.FURN.REF.OVENSINKREF.OVENSINKR-MDR-MRSHOWER CURB FINISHEDW/ SOLID SURFACE MATERIALOVER SINGLE-PLY MEMBRANE- TYP.OVERFLOW DRAIN - SEEPLUMB'G. DRW'GS.12"W. X 4" H. PRE-FIN. STL.SCUPPER LOCATED 2" ABOVEADJACENT TERRACE SURFACE- TYP. OF 2 LOCATIONS
(VERIFY W/ KITCHEN CAB. MANUF.)
W-WS6D
412A402515AW-WS6INT W-WS6INT
W-WS6ST
W-WS6STW-WS6STW-WS6INT5
W-WS6D
W-WS6INT
W/D.34"X60" SHOWERBASE - SEE PLUMB'GDRW'GS.CONC. DECK TO BE SLOPEDTO DRAIN @ 1/4" PER FT. MIN.-TYP.TerraceWINDOW ABOVE
6 411416415BDEN/BR.415CL.416
5 SHELVES
NOTE: METAL ROOFING TO BELEFT OUT OF AREAS ABOVE WINDOWS415A
A-5.4
5
CL.512BEDRM.515510513515B516512503BRACKET DESIGN HERETO BE MODIFIED TO BEABOVE DOOR OPENING- SEE SECT. 1/A-5.4W/DSHELVES HERE
TANKLESS WATER HEATER- SEE MECH. DRW'GS.SYSTEM NOTES:FLOORS:WALLS:WALL NOTES:GENERAL NOTES:1. FIELD VERIFY ALL DIMENSIONS. NOTIFY ARCHITECT OF ANY DISCREPANCIES.2. ALL DIMENSIONS ARE TO OUTSIDE FACE OF CONC., FACE OF STUD, FACE OF MASONRY OR GRIDLINE UNLESS INDICATED W/ A CENTERLINE ( ) SYMBOL OR UNLESS NOTED OTHERWISE.3. ALL GRIDLINES ARE LOCATED @ OUTSIDE FACE OF WALL SHEATHING OR @ CENTERLINES OF ELEMENTS UNLESS NOTED OTHERWISE.4. SEE WALL SECTIONS FOR FURTHER DIMENSIONAL RELATIONSHIPS.5. INSTALL ALL PRODUCTS PER MANUF. REC'S.CEILINGS:ROOFS:INSULATION & MOISTURE RESISTANCE:1. PROVIDE R-10 RIGID INSUL. @ FOUNDATION PERIMETER.2. PROVIDE 6 MIL. VAPOR BARRIER BENEATH MAIN LEVEL FLOOR SLABS SEALED TO FOUNDATION.3. PROVIDE R-21 MIN. BLOWN-IN INSULATION @ ALL PERIMETER WALLS EXCEPT @ RATED WALLS WHICH ARE TO RECEIVE R-21 MINERAL WOOL.4. PROVIDE R-49 MIN. BLOWN-IN INSUL. @ ALL VENTED ATTIC CONDITIONS.5. PROVIDE R-25 MIN. CLOSED CELL SPRAYFOAM PLUS BLOWN-IN INSUL. FILLING REMAINING RAFTER CAVITY FOR R-49 MIN. @ ALL UNVENTED RAFTER CONDITIONS.6. PROVIDE TYVEK OR EQUAL AIR BARRIER @ ALL EXTERIOR WALLS COMPLETE W/ OPENING SEALING COMPONENTS. TAPE ALL JOINTS.7. PROVIDE DRAINAGE MATT @ ALL STUCCO CONDITIONS.8. PROVIDE CLASS III VAPOR RETARDER (LATEX PAINT) @ ALL INTERIOR PERIMETER WALL & CEILING CONDITIONS.9. ALL WINDOWS TO HAVE A U-VALUE OF .30 OR LESS.10. ALL WINDOW & DOOR TO BE WRAPPED, TAPED & SEALED W/ OPENING COMPONENTS PER WINDOW & AIR BARRIER MANUF. REQM'TS.11. PROVIDE R-20 MIN. CLOSED CELL SPRAY FOAM INSUL. @ ALL RIM JOIST CONDITIONS.12. PROVIDE SOUND INSUL. BATTS @ ALL FLOOR & DE- MISING WALL CONDITIONS.13. ALL CONCEALED SPACES W/IN HEADERS & WALL INTER- SECTION CONDITIONS TO BE INSULATED W/ RIGID INSUL. OR SPRAY FOAM.14. PROVIDE THERMO-PLY OR EQUAL AIR BARRIER @ THE OUTSIDE OF BATHTUBS, FIREPLACES OR SOFFITS PLACED @ PERIMETER WALLS OR ROOFS PRIOR TO INSTALLATION.1. ALL INTERIOR WALLS ARE TYPE W-S4INT UNLESS NOTED OTHERWISE.2. SEE ELEVATIONS & ROOM FINISH SCHEDULE FOR FURTHER FINISH MATERIAL INFORMATION. ALL INTERIOR WALLS ARE TO HAVE "SLICK" FINISH (NO TEXTURE).3. SEE STRUCT. DRW'GS. FOR FURTHER BRACING & LAT- ERAL REQMTS.4. PROVIDE MOISTURE RESISTANT GYP. BD. @ ALL BATH- ROOM WALLS & EXTERIOR GYP. BD. @ ALL EXTERIOR CONDITIONS.5. PROVIDE BACKING WITHIN WALLS AS REQ'D. FOR IN- STALLING ALL EQUIPMENT, MILLWORK & TOILET ACCES- SORIES.6. SEE SHEET A-2.1 & MECH. DRW'GS. FOR LOCATIONS WHERE DUCTS OR VENTS PENETRATE RATED MEM- BRANES REQUIRING GYP. BD. WRAP WITHIN WALL & JOIST CAVITIES.W-CMU 8"X8"X16" (NOMINAL) INTEGRALLY COLORED CONCRETE MASONRY UNITS W/ 2" SOLID "SOAP" CAPS REINFORCED PER STRUCT. DRWG'S.W-WS6ST HARDCOAT STUCCO OVER DRAINAGE MATT OVER OVER AIR BARRIER OVER 1/2" OSB SHEATHING OVER 2X6 STUDS @ 16" O.C. W/ R-20 MIN. BLOWN-IN INSUL. W/ 1/2" GYP. BD. TO INSIDE FACE OF ALL WALLS OTHER THAN LOWER LEVEL BEARING WALLS (SHADED IN FLOOR PLANS) WHICH ARE TO HAVE 5/8" TYPE 'X' GYP. BD. (1-HR. ASSEMBLY)W-WS6ST-1HR SAME ASSEMBLY AS W-WS6ST BUT SUBSTI- TUTE LP FLAMEBLOCK SHEATHING FOR OSB SHEATHINGW-WS4ST HARDCOAT STUCCO SYSTEM OVER 2 LAYERS OF FELT PAPER OVER 1/2" OSB SHEATHING OVER BOTH SIDES OF 2X4 STUDS @ 16". FRAMING TO BE ATTACHED TO STEEL POSTS EMBEDDED INTO CONC. PIERS PER STRUCT. DRW'GS. WHERE LATERALLY UNSUPPORTED.W-WS6MS METAL SIDING (GALVANIZED CORRUGATED OVER AIR BARRIER OVER 2X6 STUDS @ 16" O.C. W/ R-20 MIN. BLOWN-IN INSUL. W/ 1/2" GYP. BD. TO INSIDE FACE OF ALL WALLS OTHER THAN LOWER LEVEL BEARING WALLS (SHADED IN FLOOR PLANS) WHICH ARE TO HAVE 5/8" TYPE 'X' GYP. BD. TO INTERIOR FACE & EXT. 5/8" TYPE 'X' GYP. BD. TO EXTERIOR (1-HR. ASSEMBLY)W-WS4D 5/8" TYPE 'X' GYP. BD. TO EACH INTERIOR FACE OF DOUBLE ROW OF 2X4 STUDS @ 16" O.C. ON SEPARATE PLATES 1" APART W/ SOUND BATT INSUL. (1-HR. ASSEMBLY)W-WS4INT 1/2" GYP. BD. TO EACH EXPOSED FINISHED FACE OF 2X4 STUDS @ 16" O.C.. SUBSTITUTE 5/8" TYPE 'X' GYP. BD. @ LOWER LEVEL BEARING WALLS (SHADED IN FLOOR PLANS) (1-HR. ASSEMBLY)W-WS6INT 1/2" GYP. BD. TO EACH EXPOSED FINISHED FACE 0F 2X6 STUDS @ 16" O.C.C-GBF 2 LAYERS OF 1/2" TYPE X GYP. BD. TO UNDERSIDE OF FURRING CHANNELS & FLOOR FRAMINGC-GBS 5/8" GYP. BD. TO UNDERSIDE OF 2X4 STUDS @ 24" O.C. FRAMED BELOW ROOF OR FLOOR FRAMING TO CREATE SOFFIT (SHOWN AS STIPLED ON CEILING PLANS).C-GBR 5/8" GYP. BD. TO UNDERSIDE OF ROOF FRAMING.C-CFS CEMENT FIBER SIDING W/ CONT. GALV. STL. SOFFIT VENTS TO UNDERSIDE OF ROOF FRAM'G.C-MD EXPOSED UNDERSIDE OF METAL DECKING IN STL. FRAMEC-MR EXPOSED UNDERSIDE OF CORRUGATED GALV. STL. ROOFING.C-ST HARDCOAT STUCCO OVER AIR BARRIER OVER 1/2" OSB SHEATHING OVER FLOOR FRAMING PER STRUCT. DRW'GS.ROOF NOTES:1. PROVIDE GRACE ICE & WATER SHIELD OR EQUAL ON ALL ROOFS W/ A PITCH OF LESS THAN 3:12 & FROM OUTSIDE EDGE OF ROOF TO EXTERIOR BUILDING FACE.2. PROVIDE METAL FLASH'G. (MIN. 24 GA.) AT ALL VALLEYS & WHERE ABUTTING WALLS PER SMACNA REC'S.R-AS ASPHALT SHINGLES (30 YR.) OVER 1 LAYER OF 15# FELT W/ ICE SHIELD @ OVERHANGS & EAVES OVER 1/2" OSB SHEATHING OVER ROOF FRAM'G. PER STRUCT. DRW'GS. W/ INSUL. PER NOTES BELOWR-MD STUCTURAL MTL. DECK PER STRUCT. DRAW'GS.R-MR CORRUGATED GALV. STL. ROOFING OVER STL. ROOF FRAM'G. PER STRUCT. DRW'GS. & ARCH. SECTIONS.R-SPM SINGLE-PLY RUBBER MEMBRANE FULLY ADHERED TO RIGID INSUL. TAPERED TO SLOPE TO DRAINS OVER 1/2" OSB SHEATHING OVER ROOF FRAM'G. PER STRUCT. DRW'GS. W/ THERMAL INSUL. PER NOTES BELOWF-C4R 4" CONC. SLAB REINFORCED W/ 6X6, 10/10 W.W.F. 0VER SUBGRADE PER SOILS REPORT RECOMEND- ATIONS.F-C4U 4" UN-REINFORCED CONC. SLAB OVER SUBGRADE PER SOILS REPORT RECOMENDATIONS.F-GC 1 1/2" GYPCRETE OVER 3/4" WD. DECKING & WD. I JOISTS PER STRUCT. DRWG'S W/ 2 LAYERS OF 1/2" TYPE X GYP. BD. W/ OPTIONAL STEEL FURRING CHANNELS TO UNDERSIDE OF JOISTS & W/ SOUND BATT INSULATION (GA FILE NO. FC 5513).F-CL 4" CONC. LANDING OVER FULLY ADHERED SINGLE-PLY MEMBRANE OVER WOOD FLOOR FRAM'G. PER STRUCT. DRW'GS.F-CT 3 1/2" CONC. TERRACE SLAB SLOPED TO DRAIN OVER DRAINAGE MATT OVER FULLY ADHERED SINGLE-PLY MEMBRANE OVER PROTECTION BD. OVER TAPERED RIGID INSUL. SLOPED TO DRAIN OVER WOOD FLOOR FRAM'G. PER STRUCT. DRAW'GS. SLOPE @ 1/4" PER FT.CL
Architect3070 Terry Lake Road | Fort Collins, CO 80524 | 90.484.8433
3/3/2021 11:17:17 AM&')"$)("(! $ &*%&')"+&')
&$$#%(
UPPER LEVEL FLOOR PLAN1/4" = 1'-0"NORTHITEM 2, ATTACHMENT 2
Packet Pg. 14
DD
EE
CC
BB
AA
1
1
9
9
2
2
8
8
D.8
D.7
D.2
C.2
B.8
A.2
A.8A.8
A.3A.3
37
7
10
10
2.2
4
SHEET NOTES:1. ALL CEILINGS SHOWN AS NON- STIPLED WHITE ARE TYPE C-GBF & ARE @ 10'-1 1/8" A.F.F.2. ALL CEILINGS SHOWN W/ STIPLE PATTERN ARE TYPE C-GBS & ARE LOWERED CEILINGS @ 9'-0 5/8" A.F.F.2X2 STL. TUBE PURLINS OVER2X2 STL. TUBE FRAMES - SEESECTIONS - TYP.R-MR - TYP.TUBE STL. FRAME & PURLINS-SEE SECTIONS -TYP.R-MDR-MDWALL MTD. LIGHT FIXTURE- SEE ELEC. DRW'GS. - TYP.COLUMN MTD. UP LIGHTFIXTURE - SEE ELEC. DRW'GS.-TYP.LINEAR PENDANT LIGHT FIXTURE- SEE ELEC. DRW'GS. - TYP.DECORATIVE PENDANT TYPELIGHT FIXTURE - SEE ELEC.DRW'GS. - TYP.DECORATIVE CEILING FAN -SEE ELEC. DRW'GS. - TYP.DECORATIVE VANITY FIXTURE- SEE ELEC. DRW'GS. - TYP.EXHAUST FAN - SEE MECH.DRW'GS. - TYP.RECESSED DOWN-LIGHT - SEE ELEC.DRW'GS. - TYP.UTILITY DRUM TYPE LIGHT FIXTURE- SEE ELEC. DRW'GS. - TYP.DECORATIVE PENDANT TYPELIGHT FIXTURE - SEE ELEC.DRW'GS. - TYP.LINE DUCT WALL PENETRATION W/2 LAYERS OF 5/8" TYPE 'X' GYP. BD.TO PROTECT DUCT - SEE MECH.DRW'GS. - TYP. OF 3 LOCATIONSIN THIS WALL PLANE INDICATED BYCROSS HATCHNOTE: METAL ROOFING TO BELEFT OUT OF AREAS ABOVE WINDOWS5
6 C-ST - TYP. @ UNDERSIDE OF DECK@ 109' - 11 1/8"CEILING BELOW ROOF TERRACE@ 109' - 11 1/8" - TYP.CEILING BELOW ROOF TERRACE@ 109' - 11 1/8" - TYP.CEILING BELOW ROOF TERRACE@ 109' - 11 1/8" - TYP.SYSTEM NOTES:FLOORS:WALLS:WALL NOTES:GENERAL NOTES:1. FIELD VERIFY ALL DIMENSIONS. NOTIFY ARCHITECT OF ANY DISCREPANCIES.2. ALL DIMENSIONS ARE TO OUTSIDE FACE OF CONC., FACE OF STUD, FACE OF MASONRY OR GRIDLINE UNLESS INDICATED W/ A CENTERLINE ( ) SYMBOL OR UNLESS NOTED OTHERWISE.3. ALL GRIDLINES ARE LOCATED @ OUTSIDE FACE OF WALL SHEATHING OR @ CENTERLINES OF ELEMENTS UNLESS NOTED OTHERWISE.4. SEE WALL SECTIONS FOR FURTHER DIMENSIONAL RELATIONSHIPS.5. INSTALL ALL PRODUCTS PER MANUF. REC'S.CEILINGS:ROOFS:INSULATION & MOISTURE RESISTANCE:1. PROVIDE R-10 RIGID INSUL. @ FOUNDATION PERIMETER.2. PROVIDE 6 MIL. VAPOR BARRIER BENEATH MAIN LEVEL FLOOR SLABS SEALED TO FOUNDATION.3. PROVIDE R-21 MIN. BLOWN-IN INSULATION @ ALL PERIMETER WALLS EXCEPT @ RATED WALLS WHICH ARE TO RECEIVE R-21 MINERAL WOOL.4. PROVIDE R-49 MIN. BLOWN-IN INSUL. @ ALL VENTED ATTIC CONDITIONS.5. PROVIDE R-25 MIN. CLOSED CELL SPRAYFOAM PLUS BLOWN-IN INSUL. FILLING REMAINING RAFTER CAVITY FOR R-49 MIN. @ ALL UNVENTED RAFTER CONDITIONS.6. PROVIDE TYVEK OR EQUAL AIR BARRIER @ ALL EXTERIOR WALLS COMPLETE W/ OPENING SEALING COMPONENTS. TAPE ALL JOINTS.7. PROVIDE DRAINAGE MATT @ ALL STUCCO CONDITIONS.8. PROVIDE CLASS III VAPOR RETARDER (LATEX PAINT) @ ALL INTERIOR PERIMETER WALL & CEILING CONDITIONS.9. ALL WINDOWS TO HAVE A U-VALUE OF .30 OR LESS.10. ALL WINDOW & DOOR TO BE WRAPPED, TAPED & SEALED W/ OPENING COMPONENTS PER WINDOW & AIR BARRIER MANUF. REQM'TS.11. PROVIDE R-20 MIN. CLOSED CELL SPRAY FOAM INSUL. @ ALL RIM JOIST CONDITIONS.12. PROVIDE SOUND INSUL. BATTS @ ALL FLOOR & DE- MISING WALL CONDITIONS.13. ALL CONCEALED SPACES W/IN HEADERS & WALL INTER- SECTION CONDITIONS TO BE INSULATED W/ RIGID INSUL. OR SPRAY FOAM.14. PROVIDE THERMO-PLY OR EQUAL AIR BARRIER @ THE OUTSIDE OF BATHTUBS, FIREPLACES OR SOFFITS PLACED @ PERIMETER WALLS OR ROOFS PRIOR TO INSTALLATION.1. ALL INTERIOR WALLS ARE TYPE W-S4INT UNLESS NOTED OTHERWISE.2. SEE ELEVATIONS & ROOM FINISH SCHEDULE FOR FURTHER FINISH MATERIAL INFORMATION. ALL INTERIOR WALLS ARE TO HAVE "SLICK" FINISH (NO TEXTURE).3. SEE STRUCT. DRW'GS. FOR FURTHER BRACING & LAT- ERAL REQMTS.4. PROVIDE MOISTURE RESISTANT GYP. BD. @ ALL BATH- ROOM WALLS & EXTERIOR GYP. BD. @ ALL EXTERIOR CONDITIONS.5. PROVIDE BACKING WITHIN WALLS AS REQ'D. FOR IN- STALLING ALL EQUIPMENT, MILLWORK & TOILET ACCES- SORIES.6. SEE SHEET A-2.1 & MECH. DRW'GS. FOR LOCATIONS WHERE DUCTS OR VENTS PENETRATE RATED MEM- BRANES REQUIRING GYP. BD. WRAP WITHIN WALL & JOIST CAVITIES.W-CMU 8"X8"X16" (NOMINAL) INTEGRALLY COLORED CONCRETE MASONRY UNITS W/ 2" SOLID "SOAP" CAPS REINFORCED PER STRUCT. DRWG'S.W-WS6ST HARDCOAT STUCCO OVER DRAINAGE MATT OVER OVER AIR BARRIER OVER 1/2" OSB SHEATHING OVER 2X6 STUDS @ 16" O.C. W/ R-20 MIN. BLOWN-IN INSUL. W/ 1/2" GYP. BD. TO INSIDE FACE OF ALL WALLS OTHER THAN LOWER LEVEL BEARING WALLS (SHADED IN FLOOR PLANS) WHICH ARE TO HAVE 5/8" TYPE 'X' GYP. BD. (1-HR. ASSEMBLY)W-WS6ST-1HR SAME ASSEMBLY AS W-WS6ST BUT SUBSTI- TUTE LP FLAMEBLOCK SHEATHING FOR OSB SHEATHINGW-WS4ST HARDCOAT STUCCO SYSTEM OVER 2 LAYERS OF FELT PAPER OVER 1/2" OSB SHEATHING OVER BOTH SIDES OF 2X4 STUDS @ 16". FRAMING TO BE ATTACHED TO STEEL POSTS EMBEDDED INTO CONC. PIERS PER STRUCT. DRW'GS. WHERE LATERALLY UNSUPPORTED.W-WS6MS METAL SIDING (GALVANIZED CORRUGATED OVER AIR BARRIER OVER 2X6 STUDS @ 16" O.C. W/ R-20 MIN. BLOWN-IN INSUL. W/ 1/2" GYP. BD. TO INSIDE FACE OF ALL WALLS OTHER THAN LOWER LEVEL BEARING WALLS (SHADED IN FLOOR PLANS) WHICH ARE TO HAVE 5/8" TYPE 'X' GYP. BD. TO INTERIOR FACE & EXT. 5/8" TYPE 'X' GYP. BD. TO EXTERIOR (1-HR. ASSEMBLY)W-WS4D 5/8" TYPE 'X' GYP. BD. TO EACH INTERIOR FACE OF DOUBLE ROW OF 2X4 STUDS @ 16" O.C. ON SEPARATE PLATES 1" APART W/ SOUND BATT INSUL. (1-HR. ASSEMBLY)W-WS4INT 1/2" GYP. BD. TO EACH EXPOSED FINISHED FACE OF 2X4 STUDS @ 16" O.C.. SUBSTITUTE 5/8" TYPE 'X' GYP. BD. @ LOWER LEVEL BEARING WALLS (SHADED IN FLOOR PLANS) (1-HR. ASSEMBLY)W-WS6INT 1/2" GYP. BD. TO EACH EXPOSED FINISHED FACE 0F 2X6 STUDS @ 16" O.C.C-GBF 2 LAYERS OF 1/2" TYPE X GYP. BD. TO UNDERSIDE OF FURRING CHANNELS & FLOOR FRAMINGC-GBS 5/8" GYP. BD. TO UNDERSIDE OF 2X4 STUDS @ 24" O.C. FRAMED BELOW ROOF OR FLOOR FRAMING TO CREATE SOFFIT (SHOWN AS STIPLED ON CEILING PLANS).C-GBR 5/8" GYP. BD. TO UNDERSIDE OF ROOF FRAMING.C-CFS CEMENT FIBER SIDING W/ CONT. GALV. STL. SOFFIT VENTS TO UNDERSIDE OF ROOF FRAM'G.C-MD EXPOSED UNDERSIDE OF METAL DECKING IN STL. FRAMEC-MR EXPOSED UNDERSIDE OF CORRUGATED GALV. STL. ROOFING.C-ST HARDCOAT STUCCO OVER AIR BARRIER OVER 1/2" OSB SHEATHING OVER FLOOR FRAMING PER STRUCT. DRW'GS.ROOF NOTES:1. PROVIDE GRACE ICE & WATER SHIELD OR EQUAL ON ALL ROOFS W/ A PITCH OF LESS THAN 3:12 & FROM OUTSIDE EDGE OF ROOF TO EXTERIOR BUILDING FACE.2. PROVIDE METAL FLASH'G. (MIN. 24 GA.) AT ALL VALLEYS & WHERE ABUTTING WALLS PER SMACNA REC'S.R-AS ASPHALT SHINGLES (30 YR.) OVER 1 LAYER OF 15# FELT W/ ICE SHIELD @ OVERHANGS & EAVES OVER 1/2" OSB SHEATHING OVER ROOF FRAM'G. PER STRUCT. DRW'GS. W/ INSUL. PER NOTES BELOWR-MD STUCTURAL MTL. DECK PER STRUCT. DRAW'GS.R-MR CORRUGATED GALV. STL. ROOFING OVER STL. ROOF FRAM'G. PER STRUCT. DRW'GS. & ARCH. SECTIONS.R-SPM SINGLE-PLY RUBBER MEMBRANE FULLY ADHERED TO RIGID INSUL. TAPERED TO SLOPE TO DRAINS OVER 1/2" OSB SHEATHING OVER ROOF FRAM'G. PER STRUCT. DRW'GS. W/ THERMAL INSUL. PER NOTES BELOWF-C4R 4" CONC. SLAB REINFORCED W/ 6X6, 10/10 W.W.F. 0VER SUBGRADE PER SOILS REPORT RECOMEND- ATIONS.F-C4U 4" UN-REINFORCED CONC. SLAB OVER SUBGRADE PER SOILS REPORT RECOMENDATIONS.F-GC 1 1/2" GYPCRETE OVER 3/4" WD. DECKING & WD. I JOISTS PER STRUCT. DRWG'S W/ 2 LAYERS OF 1/2" TYPE X GYP. BD. W/ OPTIONAL STEEL FURRING CHANNELS TO UNDERSIDE OF JOISTS & W/ SOUND BATT INSULATION (GA FILE NO. FC 5513).F-CL 4" CONC. LANDING OVER FULLY ADHERED SINGLE-PLY MEMBRANE OVER WOOD FLOOR FRAM'G. PER STRUCT. DRW'GS.F-CT 3 1/2" CONC. TERRACE SLAB SLOPED TO DRAIN OVER DRAINAGE MATT OVER FULLY ADHERED SINGLE-PLY MEMBRANE OVER PROTECTION BD. OVER TAPERED RIGID INSUL. SLOPED TO DRAIN OVER WOOD FLOOR FRAM'G. PER STRUCT. DRAW'GS. SLOPE @ 1/4" PER FT.CL
Architect3070 Terry Lake Road | Fort Collins, CO 80524 | 90.484.8433
3/3/2021 11:17:18 AM&')"$)("(! $ &*%&')"+&')
&$$#%(
MAIN LEVEL CEILING PLAN1/4" = 1'-0"NORTHITEM 2, ATTACHMENT 2
Packet Pg. 15
DD
EE
CC
BB
1
1
9
9
2
2
8
8
D.8
D.7
D.2
A.8A.8
A.3A.3
37
7
2.2
4
1
A-5.2
1
A-5.2
1
A-5.5
1
A-5.1
1
A-5.1
2
A-5.1
2
A-5.1 SHEET NOTES:1. ALL CEILINGS SHOWN AS NON- STIPLED WHITE ARE TYPE C-GBR.2. ALL CEILINGS SHOWN W/ STIPLE PATTERN ARE TYPE C-GBS & ARE LOWERED CEILINGS @ 8'-0 5/8" A.F.F.2X2 STL. TUBE PURLINS OVER3X3 STL. TUBE FRAMES - SEESECTIONS - TYP.WALL MTD. LIGHT FIXTURE- SEE ELEC. DRW'GS. - TYP.LINEAR PENDANT LIGHT FIXTURE- SEE ELEC. DRW'GS. - TYP.DECORATIVE PENDANT TYPELIGHT FIXTURE - SEE ELEC.DRW'GS. - TYP.DECORATIVE CEILING FAN -SEE ELEC. DRW'GS. - TYP.DECORATIVE VANITY FIXTURE- SEE ELEC. DRW'GS. - TYP.EXHAUST FAN - SEE MECH.DRW'GS. - TYP.RECESSED DOWNLIGHT - SEE ELEC.DRW'GS. - TYP.UTILITY DRUM TYPE LIGHTFIXTURE - SEE ELEC. DRW'GS. -TYP.EXPOSED SPIRAL DUCTWORK- SEE MECH. DRW'GS. - TYP.C-CFS. - TYP. @ ROOF EAVES
DECORATIVE PENDANT FIXTURE- SEE ELEC. DRW'GS.
3"3"10' - 0"1' - 0"3"3"SOFFIT DROPPED HERE TO8' - 0" A.F.F.
5
6 BRACKET DESIGN HERETO BE MODIFIED TO BEABOVE DOOR & WINDOWOPENING - SEE SECT. 1/A-5.4SYSTEM NOTES:FLOORS:WALLS:WALL NOTES:GENERAL NOTES:1. FIELD VERIFY ALL DIMENSIONS. NOTIFY ARCHITECT OF ANY DISCREPANCIES.2. ALL DIMENSIONS ARE TO OUTSIDE FACE OF CONC., FACE OF STUD, FACE OF MASONRY OR GRIDLINE UNLESS INDICATED W/ A CENTERLINE ( ) SYMBOL OR UNLESS NOTED OTHERWISE.3. ALL GRIDLINES ARE LOCATED @ OUTSIDE FACE OF WALL SHEATHING OR @ CENTERLINES OF ELEMENTS UNLESS NOTED OTHERWISE.4. SEE WALL SECTIONS FOR FURTHER DIMENSIONAL RELATIONSHIPS.5. INSTALL ALL PRODUCTS PER MANUF. REC'S.CEILINGS:ROOFS:INSULATION & MOISTURE RESISTANCE:1. PROVIDE R-10 RIGID INSUL. @ FOUNDATION PERIMETER.2. PROVIDE 6 MIL. VAPOR BARRIER BENEATH MAIN LEVEL FLOOR SLABS SEALED TO FOUNDATION.3. PROVIDE R-21 MIN. BLOWN-IN INSULATION @ ALL PERIMETER WALLS EXCEPT @ RATED WALLS WHICH ARE TO RECEIVE R-21 MINERAL WOOL.4. PROVIDE R-49 MIN. BLOWN-IN INSUL. @ ALL VENTED ATTIC CONDITIONS.5. PROVIDE R-25 MIN. CLOSED CELL SPRAYFOAM PLUS BLOWN-IN INSUL. FILLING REMAINING RAFTER CAVITY FOR R-49 MIN. @ ALL UNVENTED RAFTER CONDITIONS.6. PROVIDE TYVEK OR EQUAL AIR BARRIER @ ALL EXTERIOR WALLS COMPLETE W/ OPENING SEALING COMPONENTS. TAPE ALL JOINTS.7. PROVIDE DRAINAGE MATT @ ALL STUCCO CONDITIONS.8. PROVIDE CLASS III VAPOR RETARDER (LATEX PAINT) @ ALL INTERIOR PERIMETER WALL & CEILING CONDITIONS.9. ALL WINDOWS TO HAVE A U-VALUE OF .30 OR LESS.10. ALL WINDOW & DOOR TO BE WRAPPED, TAPED & SEALED W/ OPENING COMPONENTS PER WINDOW & AIR BARRIER MANUF. REQM'TS.11. PROVIDE R-20 MIN. CLOSED CELL SPRAY FOAM INSUL. @ ALL RIM JOIST CONDITIONS.12. PROVIDE SOUND INSUL. BATTS @ ALL FLOOR & DE- MISING WALL CONDITIONS.13. ALL CONCEALED SPACES W/IN HEADERS & WALL INTER- SECTION CONDITIONS TO BE INSULATED W/ RIGID INSUL. OR SPRAY FOAM.14. PROVIDE THERMO-PLY OR EQUAL AIR BARRIER @ THE OUTSIDE OF BATHTUBS, FIREPLACES OR SOFFITS PLACED @ PERIMETER WALLS OR ROOFS PRIOR TO INSTALLATION.1. ALL INTERIOR WALLS ARE TYPE W-S4INT UNLESS NOTED OTHERWISE.2. SEE ELEVATIONS & ROOM FINISH SCHEDULE FOR FURTHER FINISH MATERIAL INFORMATION. ALL INTERIOR WALLS ARE TO HAVE "SLICK" FINISH (NO TEXTURE).3. SEE STRUCT. DRW'GS. FOR FURTHER BRACING & LAT- ERAL REQMTS.4. PROVIDE MOISTURE RESISTANT GYP. BD. @ ALL BATH- ROOM WALLS & EXTERIOR GYP. BD. @ ALL EXTERIOR CONDITIONS.5. PROVIDE BACKING WITHIN WALLS AS REQ'D. FOR IN- STALLING ALL EQUIPMENT, MILLWORK & TOILET ACCES- SORIES.6. SEE SHEET A-2.1 & MECH. DRW'GS. FOR LOCATIONS WHERE DUCTS OR VENTS PENETRATE RATED MEM- BRANES REQUIRING GYP. BD. WRAP WITHIN WALL & JOIST CAVITIES.W-CMU 8"X8"X16" (NOMINAL) INTEGRALLY COLORED CONCRETE MASONRY UNITS W/ 2" SOLID "SOAP" CAPS REINFORCED PER STRUCT. DRWG'S.W-WS6ST HARDCOAT STUCCO OVER DRAINAGE MATT OVER OVER AIR BARRIER OVER 1/2" OSB SHEATHING OVER 2X6 STUDS @ 16" O.C. W/ R-20 MIN. BLOWN-IN INSUL. W/ 1/2" GYP. BD. TO INSIDE FACE OF ALL WALLS OTHER THAN LOWER LEVEL BEARING WALLS (SHADED IN FLOOR PLANS) WHICH ARE TO HAVE 5/8" TYPE 'X' GYP. BD. (1-HR. ASSEMBLY)W-WS6ST-1HR SAME ASSEMBLY AS W-WS6ST BUT SUBSTI- TUTE LP FLAMEBLOCK SHEATHING FOR OSB SHEATHINGW-WS4ST HARDCOAT STUCCO SYSTEM OVER 2 LAYERS OF FELT PAPER OVER 1/2" OSB SHEATHING OVER BOTH SIDES OF 2X4 STUDS @ 16". FRAMING TO BE ATTACHED TO STEEL POSTS EMBEDDED INTO CONC. PIERS PER STRUCT. DRW'GS. WHERE LATERALLY UNSUPPORTED.W-WS6MS METAL SIDING (GALVANIZED CORRUGATED OVER AIR BARRIER OVER 2X6 STUDS @ 16" O.C. W/ R-20 MIN. BLOWN-IN INSUL. W/ 1/2" GYP. BD. TO INSIDE FACE OF ALL WALLS OTHER THAN LOWER LEVEL BEARING WALLS (SHADED IN FLOOR PLANS) WHICH ARE TO HAVE 5/8" TYPE 'X' GYP. BD. TO INTERIOR FACE & EXT. 5/8" TYPE 'X' GYP. BD. TO EXTERIOR (1-HR. ASSEMBLY)W-WS4D 5/8" TYPE 'X' GYP. BD. TO EACH INTERIOR FACE OF DOUBLE ROW OF 2X4 STUDS @ 16" O.C. ON SEPARATE PLATES 1" APART W/ SOUND BATT INSUL. (1-HR. ASSEMBLY)W-WS4INT 1/2" GYP. BD. TO EACH EXPOSED FINISHED FACE OF 2X4 STUDS @ 16" O.C.. SUBSTITUTE 5/8" TYPE 'X' GYP. BD. @ LOWER LEVEL BEARING WALLS (SHADED IN FLOOR PLANS) (1-HR. ASSEMBLY)W-WS6INT 1/2" GYP. BD. TO EACH EXPOSED FINISHED FACE 0F 2X6 STUDS @ 16" O.C.C-GBF 2 LAYERS OF 1/2" TYPE X GYP. BD. TO UNDERSIDE OF FURRING CHANNELS & FLOOR FRAMINGC-GBS 5/8" GYP. BD. TO UNDERSIDE OF 2X4 STUDS @ 24" O.C. FRAMED BELOW ROOF OR FLOOR FRAMING TO CREATE SOFFIT (SHOWN AS STIPLED ON CEILING PLANS).C-GBR 5/8" GYP. BD. TO UNDERSIDE OF ROOF FRAMING.C-CFS CEMENT FIBER SIDING W/ CONT. GALV. STL. SOFFIT VENTS TO UNDERSIDE OF ROOF FRAM'G.C-MD EXPOSED UNDERSIDE OF METAL DECKING IN STL. FRAMEC-MR EXPOSED UNDERSIDE OF CORRUGATED GALV. STL. ROOFING.C-ST HARDCOAT STUCCO OVER AIR BARRIER OVER 1/2" OSB SHEATHING OVER FLOOR FRAMING PER STRUCT. DRW'GS.ROOF NOTES:1. PROVIDE GRACE ICE & WATER SHIELD OR EQUAL ON ALL ROOFS W/ A PITCH OF LESS THAN 3:12 & FROM OUTSIDE EDGE OF ROOF TO EXTERIOR BUILDING FACE.2. PROVIDE METAL FLASH'G. (MIN. 24 GA.) AT ALL VALLEYS & WHERE ABUTTING WALLS PER SMACNA REC'S.R-AS ASPHALT SHINGLES (30 YR.) OVER 1 LAYER OF 15# FELT W/ ICE SHIELD @ OVERHANGS & EAVES OVER 1/2" OSB SHEATHING OVER ROOF FRAM'G. PER STRUCT. DRW'GS. W/ INSUL. PER NOTES BELOWR-MD STUCTURAL MTL. DECK PER STRUCT. DRAW'GS.R-MR CORRUGATED GALV. STL. ROOFING OVER STL. ROOF FRAM'G. PER STRUCT. DRW'GS. & ARCH. SECTIONS.R-SPM SINGLE-PLY RUBBER MEMBRANE FULLY ADHERED TO RIGID INSUL. TAPERED TO SLOPE TO DRAINS OVER 1/2" OSB SHEATHING OVER ROOF FRAM'G. PER STRUCT. DRW'GS. W/ THERMAL INSUL. PER NOTES BELOWF-C4R 4" CONC. SLAB REINFORCED W/ 6X6, 10/10 W.W.F. 0VER SUBGRADE PER SOILS REPORT RECOMEND- ATIONS.F-C4U 4" UN-REINFORCED CONC. SLAB OVER SUBGRADE PER SOILS REPORT RECOMENDATIONS.F-GC 1 1/2" GYPCRETE OVER 3/4" WD. DECKING & WD. I JOISTS PER STRUCT. DRWG'S W/ 2 LAYERS OF 1/2" TYPE X GYP. BD. W/ OPTIONAL STEEL FURRING CHANNELS TO UNDERSIDE OF JOISTS & W/ SOUND BATT INSULATION (GA FILE NO. FC 5513).F-CL 4" CONC. LANDING OVER FULLY ADHERED SINGLE-PLY MEMBRANE OVER WOOD FLOOR FRAM'G. PER STRUCT. DRW'GS.F-CT 3 1/2" CONC. TERRACE SLAB SLOPED TO DRAIN OVER DRAINAGE MATT OVER FULLY ADHERED SINGLE-PLY MEMBRANE OVER PROTECTION BD. OVER TAPERED RIGID INSUL. SLOPED TO DRAIN OVER WOOD FLOOR FRAM'G. PER STRUCT. DRAW'GS. SLOPE @ 1/4" PER FT.CL
Architect3070 Terry Lake Road | Fort Collins, CO 80524 | 90.484.8433
3/3/2021 11:17:19 AM&')"$)("(! $ &*%&')"+&')
&$$#%(
UPPER LEVEL CEILING PLAN1/4" = 1'-0"NORTHITEM 2, ATTACHMENT 2
Packet Pg. 16
DD
EE
CC
BB
A
1
1
9
9
2
2
8
8
D.8
D.7
A.8A.8
A.3
37
7 2.24
1
A-5.2
1
A-5.2
1
A-5.1
1
A-5.1
2
A-5.1
2
A-5.1 4:12 PITCH4:12 PITCH1/4:12 PITCH1/4:12 PITCH1/4:12 PITCH
1/4:12 PITCH1/4:12 PITCH
1/4:12 PITCH
CONDENSING UNIT - SEE MECH.DRW'GS. - TYP.
PITCH
GALV. STL. CONDUCTOR HEAD& SCUPPER - TYP.R-SPM - TYP.R-AS - TYP.GALV STL. CAP FLASH'G. - SEESECTIONS - TYP.R-MR - TYP.R-SPM2 CRICKET BEHINDPARAPET WALLGALV. HALF ROUNDGUTTER - TYP.GALV. ROUND DOWNSPOUTLOCATION - SEE ELEVS. - TYP.GALV. ROUND DOWNSPOUTLOCATION - SEE ELEVS. - TYP.GALV. STL. ROOF VENT- TYP.INSTALL SNOW JACKSHERE TO PROTECT ROOFBELOWINSTALL SNOW JACKSHERE TO PROTECT ROOFBELOW1' - 3"
3"
1' - 0"7' - 0"1' - 0"
3"3"
1' - 0"
3"3"10' - 0"6"6"
3"
3"
5
6 1/4:12 PITCHBRACKET DESIGN HERETO BE MODIFIED TO BEABOVE DOOR OPENING- SEE SECT. 1/A-5.4SYSTEM NOTES:FLOORS:WALLS:WALL NOTES:GENERAL NOTES:1. FIELD VERIFY ALL DIMENSIONS. NOTIFY ARCHITECT OF ANY DISCREPANCIES.2. ALL DIMENSIONS ARE TO OUTSIDE FACE OF CONC., FACE OF STUD, FACE OF MASONRY OR GRIDLINE UNLESS INDICATED W/ A CENTERLINE ( ) SYMBOL OR UNLESS NOTED OTHERWISE.3. ALL GRIDLINES ARE LOCATED @ OUTSIDE FACE OF WALL SHEATHING OR @ CENTERLINES OF ELEMENTS UNLESS NOTED OTHERWISE.4. SEE WALL SECTIONS FOR FURTHER DIMENSIONAL RELATIONSHIPS.5. INSTALL ALL PRODUCTS PER MANUF. REC'S.CEILINGS:ROOFS:INSULATION & MOISTURE RESISTANCE:1. PROVIDE R-10 RIGID INSUL. @ FOUNDATION PERIMETER.2. PROVIDE 6 MIL. VAPOR BARRIER BENEATH MAIN LEVEL FLOOR SLABS SEALED TO FOUNDATION.3. PROVIDE R-21 MIN. BLOWN-IN INSULATION @ ALL PERIMETER WALLS EXCEPT @ RATED WALLS WHICH ARE TO RECEIVE R-21 MINERAL WOOL.4. PROVIDE R-49 MIN. BLOWN-IN INSUL. @ ALL VENTED ATTIC CONDITIONS.5. PROVIDE R-25 MIN. CLOSED CELL SPRAYFOAM PLUS BLOWN-IN INSUL. FILLING REMAINING RAFTER CAVITY FOR R-49 MIN. @ ALL UNVENTED RAFTER CONDITIONS.6. PROVIDE TYVEK OR EQUAL AIR BARRIER @ ALL EXTERIOR WALLS COMPLETE W/ OPENING SEALING COMPONENTS. TAPE ALL JOINTS.7. PROVIDE DRAINAGE MATT @ ALL STUCCO CONDITIONS.8. PROVIDE CLASS III VAPOR RETARDER (LATEX PAINT) @ ALL INTERIOR PERIMETER WALL & CEILING CONDITIONS.9. ALL WINDOWS TO HAVE A U-VALUE OF .30 OR LESS.10. ALL WINDOW & DOOR TO BE WRAPPED, TAPED & SEALED W/ OPENING COMPONENTS PER WINDOW & AIR BARRIER MANUF. REQM'TS.11. PROVIDE R-20 MIN. CLOSED CELL SPRAY FOAM INSUL. @ ALL RIM JOIST CONDITIONS.12. PROVIDE SOUND INSUL. BATTS @ ALL FLOOR & DE- MISING WALL CONDITIONS.13. ALL CONCEALED SPACES W/IN HEADERS & WALL INTER- SECTION CONDITIONS TO BE INSULATED W/ RIGID INSUL. OR SPRAY FOAM.14. PROVIDE THERMO-PLY OR EQUAL AIR BARRIER @ THE OUTSIDE OF BATHTUBS, FIREPLACES OR SOFFITS PLACED @ PERIMETER WALLS OR ROOFS PRIOR TO INSTALLATION.1. ALL INTERIOR WALLS ARE TYPE W-S4INT UNLESS NOTED OTHERWISE.2. SEE ELEVATIONS & ROOM FINISH SCHEDULE FOR FURTHER FINISH MATERIAL INFORMATION. ALL INTERIOR WALLS ARE TO HAVE "SLICK" FINISH (NO TEXTURE).3. SEE STRUCT. DRW'GS. FOR FURTHER BRACING & LAT- ERAL REQMTS.4. PROVIDE MOISTURE RESISTANT GYP. BD. @ ALL BATH- ROOM WALLS & EXTERIOR GYP. BD. @ ALL EXTERIOR CONDITIONS.5. PROVIDE BACKING WITHIN WALLS AS REQ'D. FOR IN- STALLING ALL EQUIPMENT, MILLWORK & TOILET ACCES- SORIES.6. SEE SHEET A-2.1 & MECH. DRW'GS. FOR LOCATIONS WHERE DUCTS OR VENTS PENETRATE RATED MEM- BRANES REQUIRING GYP. BD. WRAP WITHIN WALL & JOIST CAVITIES.W-CMU 8"X8"X16" (NOMINAL) INTEGRALLY COLORED CONCRETE MASONRY UNITS W/ 2" SOLID "SOAP" CAPS REINFORCED PER STRUCT. DRWG'S.W-WS6ST HARDCOAT STUCCO OVER DRAINAGE MATT OVER OVER AIR BARRIER OVER 1/2" OSB SHEATHING OVER 2X6 STUDS @ 16" O.C. W/ R-20 MIN. BLOWN-IN INSUL. W/ 1/2" GYP. BD. TO INSIDE FACE OF ALL WALLS OTHER THAN LOWER LEVEL BEARING WALLS (SHADED IN FLOOR PLANS) WHICH ARE TO HAVE 5/8" TYPE 'X' GYP. BD. (1-HR. ASSEMBLY)W-WS6ST-1HR SAME ASSEMBLY AS W-WS6ST BUT SUBSTI- TUTE LP FLAMEBLOCK SHEATHING FOR OSB SHEATHINGW-WS4ST HARDCOAT STUCCO SYSTEM OVER 2 LAYERS OF FELT PAPER OVER 1/2" OSB SHEATHING OVER BOTH SIDES OF 2X4 STUDS @ 16". FRAMING TO BE ATTACHED TO STEEL POSTS EMBEDDED INTO CONC. PIERS PER STRUCT. DRW'GS. WHERE LATERALLY UNSUPPORTED.W-WS6MS METAL SIDING (GALVANIZED CORRUGATED OVER AIR BARRIER OVER 2X6 STUDS @ 16" O.C. W/ R-20 MIN. BLOWN-IN INSUL. W/ 1/2" GYP. BD. TO INSIDE FACE OF ALL WALLS OTHER THAN LOWER LEVEL BEARING WALLS (SHADED IN FLOOR PLANS) WHICH ARE TO HAVE 5/8" TYPE 'X' GYP. BD. TO INTERIOR FACE & EXT. 5/8" TYPE 'X' GYP. BD. TO EXTERIOR (1-HR. ASSEMBLY)W-WS4D 5/8" TYPE 'X' GYP. BD. TO EACH INTERIOR FACE OF DOUBLE ROW OF 2X4 STUDS @ 16" O.C. ON SEPARATE PLATES 1" APART W/ SOUND BATT INSUL. (1-HR. ASSEMBLY)W-WS4INT 1/2" GYP. BD. TO EACH EXPOSED FINISHED FACE OF 2X4 STUDS @ 16" O.C.. SUBSTITUTE 5/8" TYPE 'X' GYP. BD. @ LOWER LEVEL BEARING WALLS (SHADED IN FLOOR PLANS) (1-HR. ASSEMBLY)W-WS6INT 1/2" GYP. BD. TO EACH EXPOSED FINISHED FACE 0F 2X6 STUDS @ 16" O.C.C-GBF 2 LAYERS OF 1/2" TYPE X GYP. BD. TO UNDERSIDE OF FURRING CHANNELS & FLOOR FRAMINGC-GBS 5/8" GYP. BD. TO UNDERSIDE OF 2X4 STUDS @ 24" O.C. FRAMED BELOW ROOF OR FLOOR FRAMING TO CREATE SOFFIT (SHOWN AS STIPLED ON CEILING PLANS).C-GBR 5/8" GYP. BD. TO UNDERSIDE OF ROOF FRAMING.C-CFS CEMENT FIBER SIDING W/ CONT. GALV. STL. SOFFIT VENTS TO UNDERSIDE OF ROOF FRAM'G.C-MD EXPOSED UNDERSIDE OF METAL DECKING IN STL. FRAMEC-MR EXPOSED UNDERSIDE OF CORRUGATED GALV. STL. ROOFING.C-ST HARDCOAT STUCCO OVER AIR BARRIER OVER 1/2" OSB SHEATHING OVER FLOOR FRAMING PER STRUCT. DRW'GS.ROOF NOTES:1. PROVIDE GRACE ICE & WATER SHIELD OR EQUAL ON ALL ROOFS W/ A PITCH OF LESS THAN 3:12 & FROM OUTSIDE EDGE OF ROOF TO EXTERIOR BUILDING FACE.2. PROVIDE METAL FLASH'G. (MIN. 24 GA.) AT ALL VALLEYS & WHERE ABUTTING WALLS PER SMACNA REC'S.R-AS ASPHALT SHINGLES (30 YR.) OVER 1 LAYER OF 15# FELT W/ ICE SHIELD @ OVERHANGS & EAVES OVER 1/2" OSB SHEATHING OVER ROOF FRAM'G. PER STRUCT. DRW'GS. W/ INSUL. PER NOTES BELOWR-MD STUCTURAL MTL. DECK PER STRUCT. DRAW'GS.R-MR CORRUGATED GALV. STL. ROOFING OVER STL. ROOF FRAM'G. PER STRUCT. DRW'GS. & ARCH. SECTIONS.R-SPM SINGLE-PLY RUBBER MEMBRANE FULLY ADHERED TO RIGID INSUL. TAPERED TO SLOPE TO DRAINS OVER 1/2" OSB SHEATHING OVER ROOF FRAM'G. PER STRUCT. DRW'GS. W/ THERMAL INSUL. PER NOTES BELOWF-C4R 4" CONC. SLAB REINFORCED W/ 6X6, 10/10 W.W.F. 0VER SUBGRADE PER SOILS REPORT RECOMEND- ATIONS.F-C4U 4" UN-REINFORCED CONC. SLAB OVER SUBGRADE PER SOILS REPORT RECOMENDATIONS.F-GC 1 1/2" GYPCRETE OVER 3/4" WD. DECKING & WD. I JOISTS PER STRUCT. DRWG'S W/ 2 LAYERS OF 1/2" TYPE X GYP. BD. W/ OPTIONAL STEEL FURRING CHANNELS TO UNDERSIDE OF JOISTS & W/ SOUND BATT INSULATION (GA FILE NO. FC 5513).F-CL 4" CONC. LANDING OVER FULLY ADHERED SINGLE-PLY MEMBRANE OVER WOOD FLOOR FRAM'G. PER STRUCT. DRW'GS.F-CT 3 1/2" CONC. TERRACE SLAB SLOPED TO DRAIN OVER DRAINAGE MATT OVER FULLY ADHERED SINGLE-PLY MEMBRANE OVER PROTECTION BD. OVER TAPERED RIGID INSUL. SLOPED TO DRAIN OVER WOOD FLOOR FRAM'G. PER STRUCT. DRAW'GS. SLOPE @ 1/4" PER FT.CL
Architect3070 Terry Lake Road | Fort Collins, CO 80524 | 90.484.8433
3/3/2021 11:17:19 AM&')"$)("(! $ &*%&')"+&')
&$$#%(
ROOF PLAN1/4" = 1'-0"NORTHITEM 2, ATTACHMENT 2
Packet Pg. 17
T.O. CONC. SLAB100'-0"T.O. WALL 1110'-1 1/8"T.O. PLYWD.111'-5 7/8"T.O. WALL FRAM'G. 4115'-8 3/4"T.O. WALL FRAM'G. 3114'-8 7/8"T.O. WALL FRAM'G. 6122'-11 7/8"LANDING105'-7 3/8"DECBAD.8D.2C.2B.8A.2A.8A.31A-5.22A-5.51A-5.5DOOR/WIN. HEAD 3118'-7 3/8"DOOR/WIN. HEAD 1107'-0"WINDOW HEAD 4120'-8 1/2"WINDOW HEAD 2109'-0"4A-5.4124 TYP.W-WS6ST - AREAS SHOWN ASSTIPLED ARE TO BE COLOR 1, AREASSHOWN W/O STIPLE ARE TO BECOLOR 2 - TYP.W-WS6MS - TYP.W-CMU - TYP.EXPANDED MTL. MESH OVERSTL. ANGLE FRAME BOLTED TODECK PERIMETER ANGLE - SEEFLR. PLANS FOR WIDTHSR-MR OVER STL. FRAME- SEE SECTIONS - TYP.GALV. STL. CAP FLASH'G. - TYP.WINDOW - SEE SCHED. - TYP.1X10 CEMENT FIBER FACIA - TYP.FOUND. - SEE STRUCT. DRW'GS.-TYP.ROUND GALV. STL. DOWNSPOUTBEYOND - TYP.STL. FRAME CANOPY - SEESECTIONS & PLANS - TYP.F3648F3624F3624F1824F1848F3648F1848F1824F1818A3618A3618F1818F3648F3624F3624F1824F1848F3648F1848F1824F1818A3618A3618F1818FC72FC18401F1824F3624F3648F1848F1818A3618F1824F3624F3648F1848F1818A3618F3042F3024F2424C2442FC18301F3042F3024FC18201101AFC18FC6024109AFC24FC18501FC6024515AF3024F6024F6042C3042FC72FC18105'-9 5/8"FC6024415A503T.O. CONC. SLAB100'-0"T.O. WALL 1110'-1 1/8"T.O. PLYWD.111'-5 7/8"T.O. WALL FRAM'G. 3114'-8 7/8"T.O. WALL FRAM'G. 6122'-11 7/8"DECBAD.7A.31A-5.2DOOR/WIN. HEAD 3118'-7 3/8"DOOR/WIN. HEAD 1107'-0"WINDOW HEAD 4120'-8 1/2"124 TYP.W-WS6ST - AREAS SHOWN ASSTIPLED ARE TO BE COLOR 1,AREAS SHOWN W/O STIPLE ARETO BE COLOR 2 - TYP.W-WS6MS - TYP.R-MR OVER STL. FRAME - SEESECTIONS - TYP.GALV. STL. CAP FLASH'G. - TYP.WINDOWS - SEE SCHED. - TYP.1x10 CEMENT FIBER FACIA - TYP.FOUND. - SEE STRUCT. DRW'GS. - TYP.R-MD @ CARPORT - TYP.TUBE STL. FRAME CANOPY- SEE SECTIONS & UPPER LEVELFLOOR PLANSTL. TUBE CARPORT COLUMNS& FRAMES - SEE STRUCT.DRW'GS. - TYP.F2424C3048F4248F2424F2424F2424F2424C3048F4248F3019F3018F3018C3048F4248F3019F4224F3024F3024C3048F4224C3048203FC18FC18FC48FC24108WALL MTD. LIGHT FIXTURE -SEE ELEC. DRW'GS. - TYP.107305FC18SYSTEM NOTES:FLOORS:WALLS:WALL NOTES:GENERAL NOTES:1. FIELD VERIFY ALL DIMENSIONS. NOTIFY ARCHITECT OF ANY DISCREPANCIES.2. ALL DIMENSIONS ARE TO OUTSIDE FACE OF CONC., FACE OF STUD, FACE OF MASONRY OR GRIDLINE UNLESS INDICATED W/ A CENTERLINE ( ) SYMBOL OR UNLESS NOTED OTHERWISE.3. ALL GRIDLINES ARE LOCATED @ OUTSIDE FACE OF WALL SHEATHING OR @ CENTERLINES OF ELEMENTS UNLESS NOTED OTHERWISE.4. SEE WALL SECTIONS FOR FURTHER DIMENSIONAL RELATIONSHIPS.5. INSTALL ALL PRODUCTS PER MANUF. REC'S.CEILINGS:ROOFS:INSULATION & MOISTURE RESISTANCE:1. PROVIDE R-10 RIGID INSUL. @ FOUNDATION PERIMETER.2. PROVIDE 6 MIL. VAPOR BARRIER BENEATH MAIN LEVEL FLOOR SLABS SEALED TO FOUNDATION.3. PROVIDE R-21 MIN. BLOWN-IN INSULATION @ ALL PERIMETER WALLS EXCEPT @ RATED WALLS WHICH ARE TO RECEIVE R-21 MINERAL WOOL.4. PROVIDE R-49 MIN. BLOWN-IN INSUL. @ ALL VENTED ATTIC CONDITIONS.5. PROVIDE R-25 MIN. CLOSED CELL SPRAYFOAM PLUS BLOWN-IN INSUL. FILLING REMAINING RAFTER CAVITY FOR R-49 MIN. @ ALL UNVENTED RAFTER CONDITIONS.6. PROVIDE TYVEK OR EQUAL AIR BARRIER @ ALL EXTERIOR WALLS COMPLETE W/ OPENING SEALING COMPONENTS. TAPE ALL JOINTS.7. PROVIDE DRAINAGE MATT @ ALL STUCCO CONDITIONS.8. PROVIDE CLASS III VAPOR RETARDER (LATEX PAINT) @ ALL INTERIOR PERIMETER WALL & CEILING CONDITIONS.9. ALL WINDOWS TO HAVE A U-VALUE OF .30 OR LESS.10. ALL WINDOW & DOOR TO BE WRAPPED, TAPED & SEALED W/ OPENING COMPONENTS PER WINDOW & AIR BARRIER MANUF. REQM'TS.11. PROVIDE R-20 MIN. CLOSED CELL SPRAY FOAM INSUL. @ ALL RIM JOIST CONDITIONS.12. PROVIDE SOUND INSUL. BATTS @ ALL FLOOR & DE- MISING WALL CONDITIONS.13. ALL CONCEALED SPACES W/IN HEADERS & WALL INTER- SECTION CONDITIONS TO BE INSULATED W/ RIGID INSUL. OR SPRAY FOAM.14. PROVIDE THERMO-PLY OR EQUAL AIR BARRIER @ THE OUTSIDE OF BATHTUBS, FIREPLACES OR SOFFITS PLACED @ PERIMETER WALLS OR ROOFS PRIOR TO INSTALLATION.1. ALL INTERIOR WALLS ARE TYPE W-S4INT UNLESS NOTED OTHERWISE.2. SEE ELEVATIONS & ROOM FINISH SCHEDULE FOR FURTHER FINISH MATERIAL INFORMATION. ALL INTERIOR WALLS ARE TO HAVE "SLICK" FINISH (NO TEXTURE).3. SEE STRUCT. DRW'GS. FOR FURTHER BRACING & LAT- ERAL REQMTS.4. PROVIDE MOISTURE RESISTANT GYP. BD. @ ALL BATH- ROOM WALLS & EXTERIOR GYP. BD. @ ALL EXTERIOR CONDITIONS.5. PROVIDE BACKING WITHIN WALLS AS REQ'D. FOR IN- STALLING ALL EQUIPMENT, MILLWORK & TOILET ACCES- SORIES.6. SEE SHEET A-2.1 & MECH. DRW'GS. FOR LOCATIONS WHERE DUCTS OR VENTS PENETRATE RATED MEM- BRANES REQUIRING GYP. BD. WRAP WITHIN WALL & JOIST CAVITIES.W-CMU 8"X8"X16" (NOMINAL) INTEGRALLY COLORED CONCRETE MASONRY UNITS W/ 2" SOLID "SOAP" CAPS REINFORCED PER STRUCT. DRWG'S.W-WS6ST HARDCOAT STUCCO OVER DRAINAGE MATT OVER OVER AIR BARRIER OVER 1/2" OSB SHEATHING OVER 2X6 STUDS @ 16" O.C. W/ R-20 MIN. BLOWN-IN INSUL. W/ 1/2" GYP. BD. TO INSIDE FACE OF ALL WALLS OTHER THAN LOWER LEVEL BEARING WALLS (SHADED IN FLOOR PLANS) WHICH ARE TO HAVE 5/8" TYPE 'X' GYP. BD. (1-HR. ASSEMBLY)W-WS6ST-1HR SAME ASSEMBLY AS W-WS6ST BUT SUBSTI- TUTE LP FLAMEBLOCK SHEATHING FOR OSB SHEATHINGW-WS4ST HARDCOAT STUCCO SYSTEM OVER 2 LAYERS OF FELT PAPER OVER 1/2" OSB SHEATHING OVER BOTH SIDES OF 2X4 STUDS @ 16". FRAMING TO BE ATTACHED TO STEEL POSTS EMBEDDED INTO CONC. PIERS PER STRUCT. DRW'GS. WHERE LATERALLY UNSUPPORTED.W-WS6MS METAL SIDING (GALVANIZED CORRUGATED OVER AIR BARRIER OVER 2X6 STUDS @ 16" O.C. W/ R-20 MIN. BLOWN-IN INSUL. W/ 1/2" GYP. BD. TO INSIDE FACE OF ALL WALLS OTHER THAN LOWER LEVEL BEARING WALLS (SHADED IN FLOOR PLANS) WHICH ARE TO HAVE 5/8" TYPE 'X' GYP. BD. TO INTERIOR FACE & EXT. 5/8" TYPE 'X' GYP. BD. TO EXTERIOR (1-HR. ASSEMBLY)W-WS4D 5/8" TYPE 'X' GYP. BD. TO EACH INTERIOR FACE OF DOUBLE ROW OF 2X4 STUDS @ 16" O.C. ON SEPARATE PLATES 1" APART W/ SOUND BATT INSUL. (1-HR. ASSEMBLY)W-WS4INT 1/2" GYP. BD. TO EACH EXPOSED FINISHED FACE OF 2X4 STUDS @ 16" O.C.. SUBSTITUTE 5/8" TYPE 'X' GYP. BD. @ LOWER LEVEL BEARING WALLS (SHADED IN FLOOR PLANS) (1-HR. ASSEMBLY)W-WS6INT 1/2" GYP. BD. TO EACH EXPOSED FINISHED FACE 0F 2X6 STUDS @ 16" O.C.C-GBF 2 LAYERS OF 1/2" TYPE X GYP. BD. TO UNDERSIDE OF FURRING CHANNELS & FLOOR FRAMINGC-GBS 5/8" GYP. BD. TO UNDERSIDE OF 2X4 STUDS @ 24" O.C. FRAMED BELOW ROOF OR FLOOR FRAMING TO CREATE SOFFIT (SHOWN AS STIPLED ON CEILING PLANS).C-GBR 5/8" GYP. BD. TO UNDERSIDE OF ROOF FRAMING.C-CFS CEMENT FIBER SIDING W/ CONT. GALV. STL. SOFFIT VENTS TO UNDERSIDE OF ROOF FRAM'G.C-MD EXPOSED UNDERSIDE OF METAL DECKING IN STL. FRAMEC-MR EXPOSED UNDERSIDE OF CORRUGATED GALV. STL. ROOFING.C-ST HARDCOAT STUCCO OVER AIR BARRIER OVER 1/2" OSB SHEATHING OVER FLOOR FRAMING PER STRUCT. DRW'GS.ROOF NOTES:1. PROVIDE GRACE ICE & WATER SHIELD OR EQUAL ON ALL ROOFS W/ A PITCH OF LESS THAN 3:12 & FROM OUTSIDE EDGE OF ROOF TO EXTERIOR BUILDING FACE.2. PROVIDE METAL FLASH'G. (MIN. 24 GA.) AT ALL VALLEYS & WHERE ABUTTING WALLS PER SMACNA REC'S.R-AS ASPHALT SHINGLES (30 YR.) OVER 1 LAYER OF 15# FELT W/ ICE SHIELD @ OVERHANGS & EAVES OVER 1/2" OSB SHEATHING OVER ROOF FRAM'G. PER STRUCT. DRW'GS. W/ INSUL. PER NOTES BELOWR-MD STUCTURAL MTL. DECK PER STRUCT. DRAW'GS.R-MR CORRUGATED GALV. STL. ROOFING OVER STL. ROOF FRAM'G. PER STRUCT. DRW'GS. & ARCH. SECTIONS.R-SPM SINGLE-PLY RUBBER MEMBRANE FULLY ADHERED TO RIGID INSUL. TAPERED TO SLOPE TO DRAINS OVER 1/2" OSB SHEATHING OVER ROOF FRAM'G. PER STRUCT. DRW'GS. W/ THERMAL INSUL. PER NOTES BELOWF-C4R 4" CONC. SLAB REINFORCED W/ 6X6, 10/10 W.W.F. 0VER SUBGRADE PER SOILS REPORT RECOMEND- ATIONS.F-C4U 4" UN-REINFORCED CONC. SLAB OVER SUBGRADE PER SOILS REPORT RECOMENDATIONS.F-GC 1 1/2" GYPCRETE OVER 3/4" WD. DECKING & WD. I JOISTS PER STRUCT. DRWG'S W/ 2 LAYERS OF 1/2" TYPE X GYP. BD. W/ OPTIONAL STEEL FURRING CHANNELS TO UNDERSIDE OF JOISTS & W/ SOUND BATT INSULATION (GA FILE NO. FC 5513).F-CL 4" CONC. LANDING OVER FULLY ADHERED SINGLE-PLY MEMBRANE OVER WOOD FLOOR FRAM'G. PER STRUCT. DRW'GS.F-CT 3 1/2" CONC. TERRACE SLAB SLOPED TO DRAIN OVER DRAINAGE MATT OVER FULLY ADHERED SINGLE-PLY MEMBRANE OVER PROTECTION BD. OVER TAPERED RIGID INSUL. SLOPED TO DRAIN OVER WOOD FLOOR FRAM'G. PER STRUCT. DRAW'GS. SLOPE @ 1/4" PER FT.CL
Architect3070 Terry Lake Road | Fort Collins, CO 80524 | 90.484.8433
3/3/2021 11:17:21 AM &')"$)("(! $ &*%&')"+&')
&$$#%(
1/4" = 1'-0"2FRONT ELEVATION1/4" = 1'-0"1REAR ELEVATIONITEM 2, ATTACHMENT 2
Packet Pg. 18
T.O. CONC. SLAB100'-0"T.O. WALL 1110'-1 1/8"T.O. PLYWD.111'-5 7/8"T.O. WALL FRAM'G. 5120'-10"T.O. WALL FRAM'G. 4115'-8 3/4"T.O. WALL FRAM'G. 3114'-8 7/8"T.O. WALL FRAM'G. 6122'-11 7/8"CARPORT BR'G. 1107'-0"LANDING105'-7 3/8"192837101A-5.1DOOR/WIN. HEAD 3118'-7 3/8"DOOR/WIN. HEAD 1107'-0"WINDOW HEAD 4120'-8 1/2"WINDOW HEAD 2109'-0"2A-5.13A-5.2GAS METER LOCATION - CENTERBETWEEN WINDOWS122ROUND GALV. STL. DOWNSPOUT-TYP.R-AS - TYP.W-WS6ST - AREAS SHOWN ASSTIPLED ARE TO BE COLOR 1,AREAS SHOWN W/O STIPLE ARETO BE COLOR 2 - TYP.W-WS6MS - TYP.EXPANDED MTL. MESH OVERSTL. ANGLE FRAME GUARD-RAIL - SEE STAIR SECTIONR-MR OVER STL. FRAME- SEE SECTIONS - TYP.GALV. STL. CAP FLASH'G. - TYP.FOUND. - SEE STRUCT.DRW'GS.1X10 CEMENT FIBER FACIA - TYP.STL. FRAME CANOPY - SEESECTIONS & PLANS - TYP.WALL MTD. LIGHT FIXTURE -SEE ELEC. DRW'GS. - TYP.VENT - SEE MECH. DRW'GS.F3624F3024C3042C3642C3048F3024F3024F3048F2424F3024F5424F5424F3024F5424F3024F5424F3024F5424F3024F5418A3018A3018F5418F5418A3018F3048F5448F5448F3048F5448F3048F3048F5448F5448F3048F5418A3018F5418A3018105'-9 5/8"56T.O. CONC. SLAB100'-0"T.O. WALL 1110'-1 1/8"T.O. PLYWD.111'-5 7/8"T.O. WALL FRAM'G. 4115'-8 3/4"T.O. WALL FRAM'G. 3114'-8 7/8"T.O. WALL FRAM'G. 6122'-11 7/8"CARPORT BR'G. 1107'-0"19287102.243A-5.41A-5.1DOOR/WIN. HEAD 3118'-7 3/8"DOOR/WIN. HEAD 1107'-0"WINDOW HEAD 4120'-8 1/2"WINDOW HEAD 2109'-0"WINDOW HEAD 5125'-8 1/2"2A-5.1122W-WS6ST - AREAS SHOWN ASSTIPLED ARE TO BE COLOR 1,AREAS SHOWN W/O STIPLE ARETO BE COLOR 2 - TYP.W-WS6MS - TYP.R-MR OVER STL. FRAME- SEE SECTIONS - TYP.FOUND. - SEE STRUCT. DRW'GS.- TYP.1X10 CEMENT FIBER FACIA - TYP.EXPANDED MTL. MESH OVERSTL. ANGLE FRAME GUARD-RAIL - SEE STAIR SECTIONGALV. STL. CAP FLASH'G. - TYP.WALL MTD. LIGHT FIXTURE -SEE ELEC. DRW'GS. - TYP.VENTS - SEE MECH.DRW'GS. - TYP.12"W. X 4" H. PRE-FIN. STL.OVERFLOW SCUPPER LOCATED2" ABOVE ADJACENT TERRACESURFACEC3048F2424F2424F8424101BFC6024FC6024402412AFC6024F3624F3624F3624F3624TELEPHONE & CATV PANELS TOBE LOCATED HERE - SEE ELEC.DRW'GS.F842456GALV. STL. CONDUCTOR HEAD,SCUPPER & ROUND DOWNSPOUT-TYP.
C3048C3048F3018F3018ELEC. METER LOCATION -CENTER BETWEEN WINDOWSGALV. STL. CONDUCTOR HEAD &ROUND DOWNSPOUT FROMTERRACE DRAINS - SEE MECH.DRW'GS.SYSTEM NOTES:FLOORS:WALLS:WALL NOTES:GENERAL NOTES:1. FIELD VERIFY ALL DIMENSIONS. NOTIFY ARCHITECT OF ANY DISCREPANCIES.2. ALL DIMENSIONS ARE TO OUTSIDE FACE OF CONC., FACE OF STUD, FACE OF MASONRY OR GRIDLINE UNLESS INDICATED W/ A CENTERLINE ( ) SYMBOL OR UNLESS NOTED OTHERWISE.3. ALL GRIDLINES ARE LOCATED @ OUTSIDE FACE OF WALL SHEATHING OR @ CENTERLINES OF ELEMENTS UNLESS NOTED OTHERWISE.4. SEE WALL SECTIONS FOR FURTHER DIMENSIONAL RELATIONSHIPS.5. INSTALL ALL PRODUCTS PER MANUF. REC'S.CEILINGS:ROOFS:INSULATION & MOISTURE RESISTANCE:1. PROVIDE R-10 RIGID INSUL. @ FOUNDATION PERIMETER.2. PROVIDE 6 MIL. VAPOR BARRIER BENEATH MAIN LEVEL FLOOR SLABS SEALED TO FOUNDATION.3. PROVIDE R-21 MIN. BLOWN-IN INSULATION @ ALL PERIMETER WALLS EXCEPT @ RATED WALLS WHICH ARE TO RECEIVE R-21 MINERAL WOOL.4. PROVIDE R-49 MIN. BLOWN-IN INSUL. @ ALL VENTED ATTIC CONDITIONS.5. PROVIDE R-25 MIN. CLOSED CELL SPRAYFOAM PLUS BLOWN-IN INSUL. FILLING REMAINING RAFTER CAVITY FOR R-49 MIN. @ ALL UNVENTED RAFTER CONDITIONS.6. PROVIDE TYVEK OR EQUAL AIR BARRIER @ ALL EXTERIOR WALLS COMPLETE W/ OPENING SEALING COMPONENTS. TAPE ALL JOINTS.7. PROVIDE DRAINAGE MATT @ ALL STUCCO CONDITIONS.8. PROVIDE CLASS III VAPOR RETARDER (LATEX PAINT) @ ALL INTERIOR PERIMETER WALL & CEILING CONDITIONS.9. ALL WINDOWS TO HAVE A U-VALUE OF .30 OR LESS.10. ALL WINDOW & DOOR TO BE WRAPPED, TAPED & SEALED W/ OPENING COMPONENTS PER WINDOW & AIR BARRIER MANUF. REQM'TS.11. PROVIDE R-20 MIN. CLOSED CELL SPRAY FOAM INSUL. @ ALL RIM JOIST CONDITIONS.12. PROVIDE SOUND INSUL. BATTS @ ALL FLOOR & DE- MISING WALL CONDITIONS.13. ALL CONCEALED SPACES W/IN HEADERS & WALL INTER- SECTION CONDITIONS TO BE INSULATED W/ RIGID INSUL. OR SPRAY FOAM.14. PROVIDE THERMO-PLY OR EQUAL AIR BARRIER @ THE OUTSIDE OF BATHTUBS, FIREPLACES OR SOFFITS PLACED @ PERIMETER WALLS OR ROOFS PRIOR TO INSTALLATION.1. ALL INTERIOR WALLS ARE TYPE W-S4INT UNLESS NOTED OTHERWISE.2. SEE ELEVATIONS & ROOM FINISH SCHEDULE FOR FURTHER FINISH MATERIAL INFORMATION. ALL INTERIOR WALLS ARE TO HAVE "SLICK" FINISH (NO TEXTURE).3. SEE STRUCT. DRW'GS. FOR FURTHER BRACING & LAT- ERAL REQMTS.4. PROVIDE MOISTURE RESISTANT GYP. BD. @ ALL BATH- ROOM WALLS & EXTERIOR GYP. BD. @ ALL EXTERIOR CONDITIONS.5. PROVIDE BACKING WITHIN WALLS AS REQ'D. FOR IN- STALLING ALL EQUIPMENT, MILLWORK & TOILET ACCES- SORIES.6. SEE SHEET A-2.1 & MECH. DRW'GS. FOR LOCATIONS WHERE DUCTS OR VENTS PENETRATE RATED MEM- BRANES REQUIRING GYP. BD. WRAP WITHIN WALL & JOIST CAVITIES.W-CMU 8"X8"X16" (NOMINAL) INTEGRALLY COLORED CONCRETE MASONRY UNITS W/ 2" SOLID "SOAP" CAPS REINFORCED PER STRUCT. DRWG'S.W-WS6ST HARDCOAT STUCCO OVER DRAINAGE MATT OVER OVER AIR BARRIER OVER 1/2" OSB SHEATHING OVER 2X6 STUDS @ 16" O.C. W/ R-20 MIN. BLOWN-IN INSUL. W/ 1/2" GYP. BD. TO INSIDE FACE OF ALL WALLS OTHER THAN LOWER LEVEL BEARING WALLS (SHADED IN FLOOR PLANS) WHICH ARE TO HAVE 5/8" TYPE 'X' GYP. BD. (1-HR. ASSEMBLY)W-WS6ST-1HR SAME ASSEMBLY AS W-WS6ST BUT SUBSTI- TUTE LP FLAMEBLOCK SHEATHING FOR OSB SHEATHINGW-WS4ST HARDCOAT STUCCO SYSTEM OVER 2 LAYERS OF FELT PAPER OVER 1/2" OSB SHEATHING OVER BOTH SIDES OF 2X4 STUDS @ 16". FRAMING TO BE ATTACHED TO STEEL POSTS EMBEDDED INTO CONC. PIERS PER STRUCT. DRW'GS. WHERE LATERALLY UNSUPPORTED.W-WS6MS METAL SIDING (GALVANIZED CORRUGATED OVER AIR BARRIER OVER 2X6 STUDS @ 16" O.C. W/ R-20 MIN. BLOWN-IN INSUL. W/ 1/2" GYP. BD. TO INSIDE FACE OF ALL WALLS OTHER THAN LOWER LEVEL BEARING WALLS (SHADED IN FLOOR PLANS) WHICH ARE TO HAVE 5/8" TYPE 'X' GYP. BD. TO INTERIOR FACE & EXT. 5/8" TYPE 'X' GYP. BD. TO EXTERIOR (1-HR. ASSEMBLY)W-WS4D 5/8" TYPE 'X' GYP. BD. TO EACH INTERIOR FACE OF DOUBLE ROW OF 2X4 STUDS @ 16" O.C. ON SEPARATE PLATES 1" APART W/ SOUND BATT INSUL. (1-HR. ASSEMBLY)W-WS4INT 1/2" GYP. BD. TO EACH EXPOSED FINISHED FACE OF 2X4 STUDS @ 16" O.C.. SUBSTITUTE 5/8" TYPE 'X' GYP. BD. @ LOWER LEVEL BEARING WALLS (SHADED IN FLOOR PLANS) (1-HR. ASSEMBLY)W-WS6INT 1/2" GYP. BD. TO EACH EXPOSED FINISHED FACE 0F 2X6 STUDS @ 16" O.C.C-GBF 2 LAYERS OF 1/2" TYPE X GYP. BD. TO UNDERSIDE OF FURRING CHANNELS & FLOOR FRAMINGC-GBS 5/8" GYP. BD. TO UNDERSIDE OF 2X4 STUDS @ 24" O.C. FRAMED BELOW ROOF OR FLOOR FRAMING TO CREATE SOFFIT (SHOWN AS STIPLED ON CEILING PLANS).C-GBR 5/8" GYP. BD. TO UNDERSIDE OF ROOF FRAMING.C-CFS CEMENT FIBER SIDING W/ CONT. GALV. STL. SOFFIT VENTS TO UNDERSIDE OF ROOF FRAM'G.C-MD EXPOSED UNDERSIDE OF METAL DECKING IN STL. FRAMEC-MR EXPOSED UNDERSIDE OF CORRUGATED GALV. STL. ROOFING.C-ST HARDCOAT STUCCO OVER AIR BARRIER OVER 1/2" OSB SHEATHING OVER FLOOR FRAMING PER STRUCT. DRW'GS.ROOF NOTES:1. PROVIDE GRACE ICE & WATER SHIELD OR EQUAL ON ALL ROOFS W/ A PITCH OF LESS THAN 3:12 & FROM OUTSIDE EDGE OF ROOF TO EXTERIOR BUILDING FACE.2. PROVIDE METAL FLASH'G. (MIN. 24 GA.) AT ALL VALLEYS & WHERE ABUTTING WALLS PER SMACNA REC'S.R-AS ASPHALT SHINGLES (30 YR.) OVER 1 LAYER OF 15# FELT W/ ICE SHIELD @ OVERHANGS & EAVES OVER 1/2" OSB SHEATHING OVER ROOF FRAM'G. PER STRUCT. DRW'GS. W/ INSUL. PER NOTES BELOWR-MD STUCTURAL MTL. DECK PER STRUCT. DRAW'GS.R-MR CORRUGATED GALV. STL. ROOFING OVER STL. ROOF FRAM'G. PER STRUCT. DRW'GS. & ARCH. SECTIONS.R-SPM SINGLE-PLY RUBBER MEMBRANE FULLY ADHERED TO RIGID INSUL. TAPERED TO SLOPE TO DRAINS OVER 1/2" OSB SHEATHING OVER ROOF FRAM'G. PER STRUCT. DRW'GS. W/ THERMAL INSUL. PER NOTES BELOWF-C4R 4" CONC. SLAB REINFORCED W/ 6X6, 10/10 W.W.F. 0VER SUBGRADE PER SOILS REPORT RECOMEND- ATIONS.F-C4U 4" UN-REINFORCED CONC. SLAB OVER SUBGRADE PER SOILS REPORT RECOMENDATIONS.F-GC 1 1/2" GYPCRETE OVER 3/4" WD. DECKING & WD. I JOISTS PER STRUCT. DRWG'S W/ 2 LAYERS OF 1/2" TYPE X GYP. BD. W/ OPTIONAL STEEL FURRING CHANNELS TO UNDERSIDE OF JOISTS & W/ SOUND BATT INSULATION (GA FILE NO. FC 5513).F-CL 4" CONC. LANDING OVER FULLY ADHERED SINGLE-PLY MEMBRANE OVER WOOD FLOOR FRAM'G. PER STRUCT. DRW'GS.F-CT 3 1/2" CONC. TERRACE SLAB SLOPED TO DRAIN OVER DRAINAGE MATT OVER FULLY ADHERED SINGLE-PLY MEMBRANE OVER PROTECTION BD. OVER TAPERED RIGID INSUL. SLOPED TO DRAIN OVER WOOD FLOOR FRAM'G. PER STRUCT. DRAW'GS. SLOPE @ 1/4" PER FT.CL
Architect3070 Terry Lake Road | Fort Collins, CO 80524 | 90.484.8433
3/3/2021 11:17:22 AM &')"$)("(! $ &*%&')"+&')
&$$#%(
1/4" = 1'-0"2RIGHT SIDE ELEVATION1/4" = 1'-0"1LEFT SIDE ELEVATIONWindow ScheduleTypeMarkCount Operation Material Width Height CommentsA3018 5 Awning Vinyl 2' - 6" 1' - 6"A3618 6 Awning Vinyl 3' - 0" 1' - 6"C2442 1 Casement Vinyl 2' - 0" 3' - 6"C3042 2 Casement Vinyl 2' - 6" 3' - 6"C3048 9 Casement Vinyl 2' - 6" 4' - 0"C3642 1 Fixed Vinyl 3' - 0" 3' - 6"F1818 6 Fixed Vinyl 1' - 6" 1' - 6"F1824 6 Fixed Vinyl 1' - 6" 2' - 0"F1848 6 Fixed Vinyl 1' - 6" 4' - 0"F2424 9 Fixed Vinyl 2' - 0" 2' - 0"F3018 4 Fixed Vinyl 2' - 6" 1' - 6"F3019 2 Fixed Vinyl 3' - 6" 1' - 6"F3020 1 Fixed Vinyl 3' - 0" 1' - 6"F3024 13 Fixed Vinyl 2' - 6" 2' - 0"F3042 2 Fixed Vinyl 2' - 6" 3' - 6"F3048 6 Fixed Vinyl 2' - 6" 4' - 0"F3624 16 Fixed Vinyl 3' - 0" 2' - 0"F3648 7 Fixed Vinyl 3' - 0" 4' - 0"F4224 2 Fixed Vinyl 3' - 6" 2' - 0"F4248 3 Fixed Vinyl 3' - 6" 4' - 0"F5418 5 Fixed Vinyl 4' - 6" 1' - 6"F5424 5 Fixed Vinyl 4' - 6" 2' - 0"F5448 5 Fixed Vinyl 4' - 6" 4' - 0"F6024 1 Fixed Vinyl 5' - 0" 2' - 0"F6042 1 Fixed Vinyl 5' - 0" 3' - 6"F7218 1 Fixed Vinyl 6' - 0" 1' - 6"F7224 1 Fixed Vinyl 6' - 0" 2' - 0"F7248 1 Fixed Vinyl 6' - 0" 4' - 0"F8424 2 Fixed Vinyl 7' - 0" 2' - 0"FC18 8 Fixed Vinyl 3' - 2" 1' - 6" Custom width tomatch door belowFC24 2 Fixed Vinyl 3' - 2" 2' - 0" Custom width tomatch door belowFC48 1 Fixed Vinyl 3' - 2" 4' - 0" Custom width tomatch door belowFC72 2 Fixed Vinyl 3' - 2" 6' - 0" Custom width tomatch door belowFC6024 6 Fixed Vinyl 5' - 0" 2' - 0"
ITEM 2, ATTACHMENT 2
Packet Pg. 19
VICINITY MAPNORTACTARUS, LLC2614 S. TIMBERLINE ROAD, SUITE 105FORT COLLINS, CO 80525CONTACT: CHRISTOPHE ATTARDwelcometorealty@gmail.comGREG D. FISHER, ARCHITECT3070 TERRY LAKE ROADFORT COLLINS, CO 80524(970) 484-8433CONTACT: GREG FISHERgreg@gregdfisherarchitect.comJR ENGINEERING2900 SOUTH COLLEGE AVE., STE. 3DFORT COLLINS, CO 80525(970) 817-1010CONTACT: TIM HALOPOFFthalopoff@jrengineering.comA-1.1A-1.2A-2.1A-2.2A-3.1A-4.1A-4.2A-5.1A-5.2A-5.3A-5.4A-5.5A-6.1MAIN LEVEL FLOOR PLANUPPER LEVEL FLOOR PLANMAIN LEVEL CEILING PLANUPPER LEVEL CEILING PLANROOF PLANBUILDING ELEVATIONSBUILDING ELEVATIONSBUILDING SECTIONSBUILDING SECTIONSWALL SECTIONSSECTIONSSTAIR / WALL SECTIONSSCHEDULES / PLAN OPTIONSPROJECT TEAMDRAWING INDEXCODE ANALYSIS / LEGALOWNER / DEVELOPER:ARCHITECT / PLANNER:CIVIL ENGINEER:TD STRUCTURAL ENGINEERING2902 OXFORD COURTFORT COLLINS, CO 80525(970) 372-1140CONTACT: WENDY DWORAKwendy@tdstructural.comAPS, INC.7726 PARK RIDGE CIRCLEFORT COLLINS, CO 80528(970) 206-0269CONTACT: RANDY BREMMERrandyb@apsinc.bizINTEGRATED MECHANICAL, LLC2601 SOUTH LEMAY, #7-421FORT COLLINS, CO 80525(970) 556-0570CONTACT: JOSH MILLERjosh-m@int-mech.comSTRUCTURAL ENGINEER:MECHANICAL ENGINEER:ELECTRICAL ENGINEER:ARCHITECTURALSTRUCTURALM0.1M2.1M2.2M2.3M3.1M4.1NOTES, LEGEND & DETAILSMAIN LEVEL HVAC PLANUPPER LEVEL HVAC PLANROOF HVAC PLANDUCTWORK ISOMETRIC PLANSHVAC SCHEDULESHVACE0E0.1E1.1E1.2E3.1E4.1E4.2LEGEND, SPECIFICATIONS & INDEXELECTRICAL SITE PLANMAIN LEVEL ELECTRICAL PLANUPPER LEVEL ELECTRICAL PLANONE-LINE DIAGRAMS & SCHEDULESCATV / INT. / TELE. CONNECTION DETAILSCATV / INT. / TELE. DISTRIBUTION DETAILSELECTRICALAPPLICABLE BUILDING CODES: 2018 I-CODESOCCUPANCY CLASSIFICATION: R-1 & R-2: SRT'S / CONDOMINIUMSTYPE OF CONSTRUCTION:RESIDENTIAL BUILDING: VB (SPRINKLED - NFPA 13)CARPORT: VB (UN-SPRINKLED)**LOCATION FROM PROPERTY LINES: NORTH: VARIES - 5' MIN.*SOUTH: VARIES - 5' MIN.EAST: VARIES - 9' MIN.WEST: VARIES - 9' MIN.ALLOWABLE FLOOR AREA: 7,000 S.F.ACTUAL FLOOR AREA: 5,900 S.F.ALLOWABLE BUILDING HEIGHT: 40'ACTUAL BUILDING HEIGHT: 32' MAX.ALLOWABLE STORIES: 2 STORIESACTUAL STORIES: 2 STORIESFIRE RESISTIVE CONSTRUCTION: WALLS & FLOORS SEPARATING DWELLING UNITS IN THE SAME BUILDINGSHALL NOT BE OF LESS THAN ONE-HOUR FIRE-RESISTIVE CONSTRUCTION PER SECTION 420.2 & 420.3 & 708.3.WALLS SUPPORTING SUCH FLOORS SHALL ARE NOT REQUIRED IN BUILDINGS OF TYPE VB CONSTRUCTION.* NORTH EXTERIOR WALLS OF BLDG'S. E & F ARE TO BE 1-HOUR RATED DUE TO PROXIMITY TO PROPERTYLINES** CARPORT IS AN INDEPENDANT STRUCTURE SEPERATED FROM THE RESIDENTIAL BUILDING BY 1" MIN.ACCESSIBILITY REQUIREMENTS:NUMBER OF UNITS WITHIN THE PROJECT: 20 UNITSACCESSIBILITY POINTS REQUIRED: 12 POINTSACCESSIBILITY POINTS PROVIDED: 50 POINTS (11 TYPE B GROUND FLOOR UNITS + 1 FULLYACCESSIBLE UNIT)PERMIT SUBMITTAL: 3/2/2021P0.1P2.1P2.2P2.3P4.1P4.2P4.3P5.1P5.2NOTES, LEGEND & DETAILSBLDG. C,D,G & H MAIN LEVEL PLUMBING PLANUPPER LEVEL PLUMBING PLANBLDG. A,B,E & F MAIN LEVEL PLUMBING PLANISOMETRIC PLAN 'A'ISOMETRIC PLAN 'B'ISOMETRIC PLAN 'C'MAIN LEVEL WASTE & VENT PLANUPPER LEVEL WASTE & VENT PLANPLUMBINGR DESIGN1200 BANNOCKDENVER, CO 80204(303) 600-8795CONTACT: RANSOM BEEGLESransomb@rdesignstudios.comLANDSCAPE ARCHITECT:SITEPascalOsiander St.Cajetan St.Blondel St.JeromeVine Dr.North College Ave.Lemay Ave.ConiferSP-1.1SP-1.2SITE PLANSITE DETAILSSITE PLANC-1C-2C-3C-4C-5C-6UTILITY PLAN COVER SHEETGENERAL & CONSTRUCTION NOTESEXISTING CONDITIONS PLANHORIZONTAL CONTROL PLANFINAL GRADING & EROSION CONTROL PLANOVERALL UTILITY PLANCIVILP-1P-2PLAT COVER SHEETPLATPLATL-1L-2LANDSCAPE PLANLANDSCAPE DETAILS & NOTESLANDSCAPE ARCHITECTURALNORTH FLATS SUBDIVISION BEING A REPLAT OF LOTS M-10 THROUGH M-17 OF BLOCK 2, LOTS M-9 THROUGHM-16 OF BLOCK 4, LOTS M-42 THROUGH M-49 OF BLOCK 7, LOTS M-22 THROUGH M-20 OF BLOCK 8 ALL OF THEFINAL PLAT OF OLD TOWN NORTH, CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO.LEGAL DESCRIPTION:S1.1S2.1S2.2S3.1S3.2S4.1FOUNDATION PLANSECOND FLOOR FRAMING PLANUPPER ROOF FRAMING PLANFOUNDATION DETAILSFRAMING DETAILSSHEAR WALL PLANSPHASE 4Architect3/3/2021 11:36:04 AMITEM 2, ATTACHMENT 3
Packet Pg. 20
49634 9 6 3
49634 9 6 3
496249614 9 6 1
4961
S
W
O
W
W
S
W OS
S
STOP
VB
W
STOP
STOP
S
W
O
W
W
S
WO
S
W
O
W
S
WO
W
S
W
STOP
W
S
W OP
S
W
O
W
STOP
W
S
W
O
W
W
W
W
W
W
W
E
E
E
E
E
E
E BUILDING GBUILDING EBUILDING CBUILDING ABUILDING DBUILDING BBUILDING HBUILDING FB l o n d e l S t r e e tC a j e t a n S t r e e t
O s i a n d e r S t r e e t
P a s c a l S t r e e t T.E.TRASH ENCLOSURE - TYP. OF4 LOCATIONSPATIO - TYP.COURTYARD -TYP.STEPS TO UPPER UNIT - TYP.UTILITY EASEMENT - TYP.UTILITY EASEMENT - TYP.DRAINAGE & UTILITY EASEMENT - TYP.7676B.CARPORT ROOF ABOVE - TYP.H.B.C.C. C. C.B.T.E.B.CARPORT COLUMNS - TYP.NEW PARKING STALL STRIPINGW/IN EXIST. STRET - TYP.BENCHES W/IN CRUSHEDGRANITE BED - SEE LAND-SCAPE DRW'GS. - TYP.EXIST. ELEC. VAULT - TYP. OF 2EXIST. STREETS, CURB, GUTTER &DETACHED SIDEWALKS - TYP.EXIST. ALLEYS - TYP.PORTION OF DRAINAGE EASEMENVACATED FOR CARPORT COLUMNS- TYP. OF 6 LOCATIONS - SEE PLATH. C.C. C. C.H. C.C. C. C.H. C.C. C. C.H. C.C. C. C.H. C.C. C. C.H. C.C. C. C.H. C.C. C. C.9.0'77.0'5.0' 5.0'77.0'9.0'76.0'9.0'13.5'7.0'18.0'9.0'27.0'16.5'16.5'18.0'9.0'27.0'4.0'16.0'7.0'
10.5'30.0'10.5'9.0'72.0'4.0' 27.0' 9.0' 18.0' 16.5' 16.5'27.0' 9.0' 18.0'20.5'9.0'77.0'5.0' 5.0'77.0'9.0'3 @ 9.0' = 27.0'2 @ 9.0'3 @ 9.0' = 27.0'2 @ 9.0'2 @ 9.0'3 @ 9.0' = 27.0'2 @ 9.0'3 @ 9.0' = 27.0'12.5'138.0'12.5'6 @ 23.0' = 138.0'EQUALEQUAL1.0'161.0'1.0'7 @ 23.0' = 161.0'EQUALEQUAL10.5'77.0'5.0'5.0'77.0'10.5'4.0'18.0'9.0'27.0'33.0'18.0'9.0'27.0'7.0'15.0'19.0'19.0'87.5'5.0'5.0'77.0'10.5'4.0'18.0'9.0'27.0'16.5'16.5'18.0'9.0'27.0'7.0'15.0'2 @ 9.0'3 @ 9.0' = 27.0'2 @ 9.0'3 @ 9.0' = 27.0'2 @ 9.0'3 @ 9.0' = 27.0'2 @ 9.0'3 @ 9.0' = 27.0'14.0'138.0'14.0'6 @ 23.0' = 138.0'EQUALEQUAL2.5'161.0'2.5'7 @ 23.0' = 161.0'EQUALEQUAL19.0'19.0'55555555T.E.ADJACENT PARKING & LANDSCAPEIMPROVEMENTS BY OTHERS - TYP.T.E.0.50' 16.00'12.67' 5.33'12.67' 5.33'16.00'0.50'3.0'7.7'
7.7'2222BLOCK 3BLOCK 1BLOCK 4BLOCK 2EXIST. WATER METER TO BERELOCATED - SEE CIVIL DRWG'S.
G G G G GGGG
G GGG
GGGG
G G G G G G G
G G G G GGG
GGGGGGGGGGGGGGGGGGG
E E
E E E EEEEEEEEEEEEEE
E
E E EEE
E E E
EEET T T T T T T
TCTVTCTVS
S SSSSSSSSSSSSSSSSSSS
W W WWWWW
WWWWWWWWWWWWWWWW
W W WW
W WWW W W WWS SSSCONC. WHEEL STOPS - TYP.TRACT T-N OLD TOWN NORTH SUB.TRACT T-O OLD TOWN NORTH SUB.TRACT T-AA OLD TOWN NORTH SUB.TRACT T-VV OLD TOWN NORTH SUB.TRACT T-UU OLD TOWN NORTH SUB.ELEC. METER GROUPINGS &SERVICE BETWEEN BLD'GS. - TYP.EXIST. LIGHT POLE- TYP. OF 3 LOCATIONSCONC. TRICKLE CHANNEL - SEECIVIL DRW'GS. - TYP.GAS METER GROUPINGS & SERVICE@ OUTSIDE BLD'G. ENDS - TYP.
E
E
E
E
E
E
E
ENEW ELEC. VAULT - TYP. OF 2RAISED PATIORAISED PATIORAISED PATIORAISED PATIORAISED PATIORAISED PATIORAISED PATIORAISED PATIOFREE STANDING STL. TRELLIS ELEMENTBETWEEN BLD'GS. - TYP.SEE LANDSCAPE DRW'GS.FOR HARDSCAPE PATTERNS& MATERIALS - TYP.LOOP STYLE BICYCLERACK - TYP. OF 4RAISED PATIO SLAB TOBE POLISHED TOMATCH INTERIORSLABS - TYP.PHASE 1-COMPLETEDPHASE 1-COMPLETEDSLOPED SWITCHBACK WALK@ 1:20 - TYP. @ UNIT TYPE 1PHASE 2-COMPLETEDPROVIDE DRAINAGE SWALEIN CONC. @ ROOF TERRACEDRAIN LOCATION - TYP.PHASE 3-COMPLETED
Architect3070 Terry Lake Rd. | Fort Collins, CO 80524 | 90.484.8433
3/3/2021 11:36:05 AM&')"$)("(! $ &*%&')"+&')
&$$#%(
S I T E P L A NNORTH1" = 20'1. REFER TO UTILITY PLANS PREPARED BY JR ENGINEERING FOR ALL UTILITY, DRAINAGE, GRADING & EROSION CONTROL DESIGN REQUIREMENTS.2. REFER TO LANDSCAPE PLANS PREPARED BY R DESIGN FOR ALL LANDSCAPE REQUIREMENTS.3. REFER TO SUBDIVSION PLAT PREPARED BY KING SURVEYORS FOR ALL PROPERTY LINE & EASEMENT DESCRIPTIONS.4. COORDINATE ALL ELECTRICAL REQUIREMENTS WITH FORT COLLINS LIGHT & POWER.5. COORDINATE ALL GAS REQUIREMENTS WITH XCEL ENERGY.6. COORDINATE ALL PHONE & CABLE TV REQUIREMENTS WITH APPROPRIATE AGENCIES.GENERAL SITE903 Blondel built by Everitt Construction in 2019/2020.909 Blondel: Currently requesting to build with a 1-time variance to my license. ITEM 2, ATTACHMENT 3
Packet Pg. 21
From:Russell Hovland
To:Aubrie Brennan; Grant Everitt
Cc:Kiana Carter; Marcus Coldiron; Sharlene Manno
Subject:RE: 909 Blondel - SW Erosions
Date:Monday, November 8, 2021 5:12:58 PM
Grant wants to build both the 5-plex and the carport for 909 Blondel.
Grant please follow Aubries directions below.
Russ Hovland
Interim Chief Building Official
City of Fort Collins
970-416-2341
rhovland@fcgov.com
From: Aubrie Brennan <abrennan@fcgov.com>
Sent: Monday, November 8, 2021 3:22 PM
To: Grant Everitt <grant@everittconstructionco.com>; Russell Hovland <RHovland@fcgov.com>
Cc: Kiana Carter <kcarter@fcgov.com>; Marcus Coldiron <mcoldiron@fcgov.com>; Sharlene Manno
<smanno@fcgov.com>
Subject: RE: 909 Blondel - SW Erosions
Hi Grant,
The next two scheduled Building Review Commission meetings are December 16th and January 27th,
both at 9 am. Depending on the current situation, the meeting may be in person at Council
Chambers, 300 LaPorte or online via Zoom.
I’m attaching the form you would need to submit for your appeal, as well as make payment of $50, a
month in advance of the hearing. Under reason for the appeal, check other and fill in your reason.
Please let me know if you have any other questions.
Best,
Aubrie
From: Grant Everitt <grant@everittconstructionco.com>
Sent: Monday, November 8, 2021 2:54 PM
To: Russell Hovland <RHovland@fcgov.com>
Cc: Aubrie Brennan <abrennan@fcgov.com>; Kiana Carter <kcarter@fcgov.com>; Marcus Coldiron
<mcoldiron@fcgov.com>; Sharlene Manno <smanno@fcgov.com>
Subject: [EXTERNAL] Re: 909 Blondel - SW Erosions
Good afternoon Aubrie.
ITEM 2, ATTACHMENT 4
Packet Pg. 22
Can you send me info on how to get on the next building review board meeting please.
Thanks
Grant
Sent from my iPhone
On Nov 5, 2021, at 11:38 AM, Russell Hovland <RHovland@fcgov.com> wrote:
Aubrie what is the deadline for applying to the Nov BRB?
Russ Hovland
Interim Chief Building Official
City of Fort Collins
970-416-2341
rhovland@fcgov.com
From: Grant Everitt <grant@everittconstructionco.com>
Sent: Thursday, November 4, 2021 5:08 PM
To: Russell Hovland <RHovland@fcgov.com>
Cc: Kiana Carter <kcarter@fcgov.com>; Marcus Coldiron <mcoldiron@fcgov.com>;
Sharlene Manno <smanno@fcgov.com>
Subject: [EXTERNAL] Re: 909 Blondel - SW Erosions
Russ
Should i use the same mentorship form? See attached. When is the next board
meeting? How do i sign up for that meeting?
Thanks
Grant Everitt
EverittConstructionCo.com
970-310-4988
2809 E. Harmony RD #310
Fort Collins, Co 80528
On Nov 4, 2021, at 3:20 PM, Russell Hovland <RHovland@fcgov.com>
wrote:
Grant,
After consulting the City Attorney we have the following answer: Your
ITEM 2, ATTACHMENT 4
Packet Pg. 23
current license does not allow you to construct this level of
building/occupancy. You can request to use the mentorship agreement
again thru the Building Review Commission like you did the previous time.
Russ Hovland
Interim Chief Building Official
City of Fort Collins
970-416-2341
rhovland@fcgov.com
From: Grant Everitt <grant@everittconstructionco.com>
Sent: Friday, October 29, 2021 11:32 AM
To: Russell Hovland <RHovland@fcgov.com>
Cc: Kiana Carter <kcarter@fcgov.com>; Marcus Coldiron
<mcoldiron@fcgov.com>; Sharlene Manno <smanno@fcgov.com>
Subject: [EXTERNAL] Re: 909 Blondel - SW Erosions
I did not hear back from anyone regarding this. I don’t have anything
signed I just thought someone signed off on it in the system.
Can you approve a one time variance for this project?
Thanks
Grant
Sent from my iPhone
On Oct 29, 2021, at 11:25 AM, Russell Hovland
<RHovland@fcgov.com> wrote:
Grant,
Do you have a signed/dated copy of this from me or Rich
approving this?
Don’t remember seeing this.
The 903 approval was from the Building Review Board.
Russ Hovland
Interim Chief Building Official
City of Fort Collins
970-416-2341
rhovland@fcgov.com
From: Grant Everitt <grant@everittconstructionco.com>
Sent: Friday, October 29, 2021 10:25 AM
ITEM 2, ATTACHMENT 4
Packet Pg. 24
To: Russell Hovland <RHovland@fcgov.com>
Cc: Kiana Carter <kcarter@fcgov.com>
Subject: [EXTERNAL] Re: 909 Blondel - SW Erosions
Russ
Attached is my variance request letter.
I built the 5-plex next door for the same owner last year. This
one is pretty much the same thing.
Thanks
Grant
Sent from my iPhone
On Oct 29, 2021, at 9:43 AM, Russell Hovland
<RHovland@fcgov.com> wrote:
Grant I do not recall seeing this.
Shar do you have some background on this?
Is 909 Blondel a R-2 multi-family building?
Russ Hovland
Interim Chief Building Official
City of Fort Collins
970-416-2341
rhovland@fcgov.com
From: Grant Everitt
<grant@everittconstructionco.com>
Sent: Friday, October 29, 2021 8:37 AM
To: Kiana Carter <kcarter@fcgov.com>
Cc: Russell Hovland <RHovland@fcgov.com>
Subject: [EXTERNAL] Re: 909 Blondel - SW
Erosions
Kiana
ITEM 2, ATTACHMENT 4
Packet Pg. 25
Here is the email i sent to the licensing
department back in April.
A few weeks ago i came into check on the
permit status and i asked if my license was ok
to pull the permit. You said it's all signed off. I
did not receive any confirmation letter so i
assumed it was all good to go.
We are trying to get the permit pulled before
the end of the year so we don’t have to
resubmit new plans for any updated codes. Do
you think this is still possible?
Grant Everitt
EverittConstructionCo.com
970-310-4988
2809 E. Harmony RD #310
Fort Collins, Co 80528
<image001.png>
On Oct 29, 2021, at 8:27 AM,
Kiana Carter
<kcarter@fcgov.com> wrote:
I don’t see anything can you
send me an email of approval if
you have one? I will also need
you sub contractors.
Best Regards,
Kiana Carter
Lead Building & Development
Review Technician
Planning & Development Services
281 N. College Ave.
Fort Collins, CO 80524
970.416.2886 |kcarter@fcgov.com
Tell us about our service, we want to
know!
ITEM 2, ATTACHMENT 4
Packet Pg. 26
“The City of Fort Collins is an
organization that supports equity
for all, leading with race. We
acknowledge the role of local
government in helping create
systems of oppression and racism
and are committed to dismantling
those same systems in pursuit of
racial justice. Learn more.”
<image001.png>
From: Grant Everitt
<grant@everittconstructionco.co
m>
Sent: Friday, October 29, 2021
8:26 AM
To: Kiana Carter
<kcarter@fcgov.com>
Cc: Russell Hovland
<RHovland@fcgov.com>
Subject: [EXTERNAL] Re: 909
Blondel - SW Erosions
I sent it off a few months ago and
thought it was signed off. I
thought that’s what it said in the
system.
Do i need to do something?
Thanks
Grant Everitt
EverittConstructionCo.com
970-310-4988
2809 E. Harmony RD #310
Fort Collins, Co 80528
On Oct 29, 2021, at
8:23 AM, Kiana
Carter
ITEM 2, ATTACHMENT 4
Packet Pg. 27
<kcarter@fcgov.com
> wrote:
Hey Grant,
Did you happen to
get a variance from
Russ to use your D
license on 909
Blondel?
Best Regards,
Kiana Carter
Lead Building &
Development
Review Technician
Planning & Development
Services
281 N. College Ave.
Fort Collins, CO 80524
970.416.2886
|kcarter@fcgov.com
Tell us about our service,
we want to know!
“The City of Fort
Collins is an
organization that
supports equity for
all, leading with race.
We acknowledge the
role of local
government in
helping create
systems of
oppression and
racism and are
committed to
dismantling those
same systems in
pursuit of racial
justice. Learn more.”
<image001.png>
ITEM 2, ATTACHMENT 4
Packet Pg. 28
From: Grant Everitt
<grant@everittconst
ructionco.com>
Sent: Monday,
October 18, 2021
8:41 AM
To: Kiana Carter
<kcarter@fcgov.com
>
Subject: [EXTERNAL]
Re: 909 Blondel - SW
Erosions
I am working on that
this week. Thanks
Kiana
Sent from my iPhone
On Oct
18,
2021,
at 7:35
AM,
Kiana
Carter
<kcarte
r@fcgo
v.com>
wrote:
Hi
Grant,
ITEM 2, ATTACHMENT 4
Packet Pg. 29
It looks
like
this is
the last
remain
ing
hold.
Has
this
been
taken
care
of?
Erosio
n
Contro
l
Escro
w in
the
amoun
t of
$3,000
dollars
will
need
to be
collect
ed
before
an
Initial
erosio
n
control
inspect
ion
can be
reques
ted -
Contac
t erosi
on@fc
gov.co
m to
sched
ITEM 2, ATTACHMENT 4
Packet Pg. 30
ule an
erosio
n
control
inspect
ion
Best
Regards,
Kiana
Carter
Lead
Building
&
Develop
ment
Review
Technicia
n
Planning
&
Develop
ment
Services
281 N.
College
Ave.
Fort
Collins,
CO 80524
970.416.
2886
|kcarter
@fcgov.c
om
Tell us
about our
service,
we want
to know!
“The
City of
Fort
Collins
is an
organiz
ation
that
ITEM 2, ATTACHMENT 4
Packet Pg. 31
support
s equity
for all,
leading
with
race.
We
acknow
ledge
the role
of local
govern
ment in
helping
create
system
s of
oppress
ion and
racism
and are
commit
ted to
disman
tling
those
same
system
s in
pursuit
of racial
justice.
Learn
more.”
<image
001.pn
g>
ITEM 2, ATTACHMENT 4
Packet Pg. 32
Agenda Item 3
Item 3, Page 1
AGENDA ITEM SUMMARY December 16, 2021
Building Review Commission
STAFF
Russ Hovland, Interim Chief Building Official
SUBJECT
CONSIDERATION AND APPROVAL OF THE BUILDING REVIEW COMMISSION’S 2022 ANNUAL
WORK PLAN
EXECUTIVE SUMMARY
The purpose of this item is to approve the 2022 Annual Work Plan of the Building Review Commission.
ATTACHMENTS
1. BRC 2022 Annual Work Plan – DRAFT
2. BRC 2021 Annual Work Plan
Packet Pg. 33
DRAFTCommunity Development &
Neighborhood Services
Planning
281 North College Avenue
P.O. Box 580
Fort Collins, CO 80522.0580
970.221.6376
970.224.6111- fax
2022 Annual Work Plan
Building Review Commission
The Building Review Commission will continue to meet on the last Thursday of each
month when there are public discussion or hearing items placed on the regular monthly
agenda. The Commission may also meet as needed in order to convene special hearings.
Staff anticipates that the Building Review Commission will hear several appeals by
contractor license applicants who do not strictly meet the qualification criteria specified in
the City Code. Under its quasi-judicial review authority, the Commission is empowered to
grant variances from such criteria when it determines there are practical difficulties or that
an undue hardship would be imposed on the applicant; or, when the Commission
determines the applicant has sufficient specialized training, education, or additional
relevant experience.
The Commission is also empowered to render disciplinary action, including suspension or
revocation of regulated contractor licenses, under which any specified infractions listed in
the regulations are committed.
Additionally, in its code appellate function, the Commission may hear appeals from strict
application of the building codes or from an interpretation of the codes by the Building
Official. The Commission will continue to hear cases involving challenges to the Building
Official’s interpretation of the adopted building codes, as well as the adopted International
Property Maintenance Code (IPMC).
In its advisory capacity, the Commission is expected to participate as a member of the
Code Adoption Review Committee, in the review of the international series of codes. The
Commission will be asked to make recommendations to Council regarding any suggested
revisions based on local conditions and community priorities.
2022 Agenda:
1. Fill vacant seats for this commission.
2. The new 2021 international codes have been reviewed and will be presented to Council
for adoption in early 2022.
3. Update contractor licensing ordinance to allow the Building Official more authority to
approve permits and temp licenses.
_____________________________________ ___________________________
Alan Cram, Building Review Board Chair Date of Approval
ITEM 3, ATTACHMENT 1
Packet Pg. 34
ITEM 3, ATTACHMENT 2
Packet Pg. 35
Agenda Item 4
Item 4, Page 1
AGENDA ITEM SUMMARY December 16, 2021
Building Review Commission
STAFF
Russ Hovland, Interim Chief Building Official
SUBJECT
PRESENTATION OF THE BUILDING REVIEW COMMISSION’S 2021 ANNUAL REPORT
EXECUTIVE SUMMARY
The purpose of this item is to review the 2021 Annual Report of the Building Review Commission.
ATTACHMENTS
1. None
Packet Pg. 36