HomeMy WebLinkAboutNatural Resources Advisory Board - Minutes - 10/20/2021
NATURAL RESOURCES ADVISORY BOARD
TYPE OF MEETING – REGULAR
October 20, 2021 6:00 – 8:30 pm
Via Zoom
8/18/21 – MINUTES Page 1
1. CALL TO ORDER
6:03 pm
2. ROLL CALL
• List of Board Members Present -
− Danielle Buttke – chair
− Kevin Krause – vice-chair
− Barry Noon
− John Skogman
− Drew Derderian
− Dawson Metcalf
− Samantha Williams
− Hillary Mizia
• List of Board Members Absent – Excused or Unexcused; if no contact with Chair
has been made
− N/A
• List of Staff Members Present
− Lindsay Ex, Staff Liaison
− Honore Depew, Climate Program Manager
− Donnie Dustin, Water Resources Manager
− Kirk Longstein, Energy Services Project Manager
− Russ Hovland, Interim chief Building Official
− Brad Smith, Energy Code -Compliance Officer
• List of Guests
− Sydney Ziegler
3. AGENDA REVIEW
• No changes
4. PUBLIC PARTICIPATION
• N/A
NATURAL RESOURCES ADVISORY BOARD
TYPE OF MEETING – REGULAR
10/20 /21 – MINUTES Page 2
5. APPROVAL OF MINUTES
• September minutes approved unanimously
6. NEW BUSINESS
a. Utilities Water Supply Requirements Cash-in-Lieu Fee Changes - Donnie Dustin
− The proposal is to increase the Water Supply Requirements Cash-in-Lieu (CIL)
fee to $68,200 per acre-foot from the current cost of ~$42,500 per acre-foot at
the tap. The reasons for this increase are because of significant water supply
cost increases and future uncertainties in developing water.
− Water supply planning has many uncertainties such as increased
competition, permitting issues, changing growth, and climate change.
These uncertainties will require additional water supply (e.g., Halligan
Water Supply Project) and continued water conservation to address the
cost to plan and manage our water.
− There are several water districts in the Fort Collins area. The proposed
changes would only apply to new development and re-development within
Fort Collins Utilities water service area.
− Development within the City pays for water through Fort Collins Water
Supply Requirements (WSR) that includes source of supply (Horsetooth
Reservoir and Cache La Poudre River), water rights, storage and
transmission, and Plant Investment Fees (water treatment and distribution).
− Development requires additional water demand. The water supply
requirements to meet that additional water demand is the Total Water
Supply Cost. It is designed to ensure adequate water and that developers
pay their own way.
− City Council adopted water supply requirement changes on October 5, to
change from a tap size-based to a business type based-assessment of
water, and to require separate irrigation taps based on landscape use.
− The cost of the water supply (Cash-in-Lieu Fee) would apply to new
development but would also translate to water allotments for commercial
and irrigation customers.
− The proposed $519.9 million ($68,200/acre foot) cost (a 60% increase to current
cost of at the tap demand) to increase water reliability consists of:
− The cost of future infrastructure and water rights
− Including building Halligan Water Supply Project. additional
NATURAL RESOURCES ADVISORY BOARD
TYPE OF MEETING – REGULAR
10/20 /21 – MINUTES Page 3
infrastructure needs, and engineering contingency fees. Other costs
would include increasing costs of current water shares and
contingency
− The proportional buy-in to existing water supplies. This portfolio is being
updated to reevaluate all water sources
− A 20% factor of safety of the reliability of the system due to uncertainties
including climate change.
− The Excess Water Use Surcharge per 1,000 gallons over allotment will also
go up 60% from $10.39 to $16.67.
− Summary:
− The proposed CIL fee reflects cost to provide reliable supplies, assures
development pays its own way, and considers various uncertainties
− The revised WSR calculations more accurately reflect use through a data-
driven approach, (higher use pays more, lower use pays less), and flexibility
to lower use/costs.
− Next steps:
− Outreach in September-October and Council consideration November
2 and 16.
− This is part of a two-year rate/fee change cycle
− The Water Supply & Demand Management Policy to be updated in
2023 to reflect potential impacts of climate change
− Discussion
− Danielle - Q - Regarding the drought impact on the river and climate
change, is a 20% uncertainty factor enough? A - The 20% in this report
reflects a traditional factor as part of this package. When the Water Supply
and Demand Management Policy is updated, this factor will be carefully
evaluated and integrated into the policy.
− Barry - Q - Suggested the City consider that water will set the limit to growth
and needs to considered. The availability of water is not static with
increased demand, but the availability of water is decreasing with increased
demand. When will the City realize there should be an end to growth? A -
Climate change is impacting water supplies. However, this question would
need to be discussed and evaluated at a higher level.
− Barry - Q - The city needs a planning horizon with projections of future
conditions and the City should work towards those projections. A - We
NATURAL RESOURCES ADVISORY BOARD
TYPE OF MEETING – REGULAR
10/20 /21 – MINUTES Page 4
have seen lower water use over time. The City's Water Resources group is
using that trend to project future water needs.
− Kevin - Agreed that a 20% uncertainty factor may be too low and suggested
water issues are too important to underestimate the unknowns to help give
citizens more confidence in water protections.
− Danielle - Q - Seeing how Fort Collins' rates compare to other cities in the
region, it seems there is room to safely increase the protective uncertainty
factor. She suggests preparing for the time when conservation will no
longer provide any benefit to demand for water. A - Our current planning
criteria under the current policy is to prepare for a 1/50 drought. There is
still a lot of opportunity for conservation of outdoor water usage.
− Danielle - Q - When was the policy last updated? What is the timeline ask
of the NRAB? A - The policy was last updated in 2012 and it is anticipated
to update it again in 2023-2025. However, there are ongoing studies on
various things in anticipation of that update. The presentation is
informational, but if the NRAB wants to give feedback it would need to be
soon. First reading by Council will be November 2.
− Drew moved and Kevin seconded a motion to support an increase in
the Water Supply Requirements Cash-in-Lieu (CIL) fee. In addition, the
board expressed that this step is important for future water
sustainability. Motion passed unanimously 8-0-0
b. 2021 Building Code Update
− Background
− The International Building Code (ICC or I-Codes) is updated every 3 years.
City staff is recommending City Council update the current 2018 codes to
the 2021 I-codes to be consistent with City Plans and Policies (e.g. City
strategic Plan, Our Climate Future, Housing Strategic Plan, and Water
Efficiency Plan.
− The I-Codes is a family of 9 codes: Building Code, Residential Code,
Mechanical Code, Fuel gas Code, Energy Conservation Code, Existing
Building Code, Swimming Pool and Spa Code, Property Maintenance
Code, and Plumbing Code.
− The adoption process
− The ICC Code is reviewed by a technical review committee, staff then does
outreach to 12 boards and commissions, and will present to Council at their
NATURAL RESOURCES ADVISORY BOARD
TYPE OF MEETING – REGULAR
10/20 /21 – MINUTES Page 5
November 9 work session.
− Benefits of adopting the recommendations
− We will stay on track with code cycle to maintain steady improvements
− Alignment with Citywide polices for energy, health and resilience, and
growth and modernization
− New codes increase energy efficiency
− Proposals to Council by the technical review committee
− Support I-Code package of nine codes
− Support Change in the new 2021 building codes for the City
− Includes improved insulation, lighting, solar-ready code, initial radon
test
− Support existing amendments
− Some current local amendments are now incorporated into the new
2021 codes so they will be deleted with adoption of the new code
− New local amendments include improving building envelope, electric
readiness for space and water heating, water conservation, electric
vehicle charging, increased fines for no permit, remove vapor retarder
in walls and improved accessibility to new housing.
− Impacts on building industry
− No studies have been done in our market for the overall cost of construction
increases for the 9 codes, but staff has estimated it would be approximately
1% - 2% that would likely be passed on to the consumer.
− The National Association of Homebuilders estimates an increase of $8,326
for energy efficiency upgrades which would add an average of $16/month to
mortgages.
− Review Committee feedback
− Concerns - increased first year construction costs, Utilities Light and
Power's ability to meet EV and increased electricity requirements, and
housing affordability
− Support - Alignment with City Plans and policies, more resilient building
product and avoided retrofit costs, and reduce utility bill cost burden
− The local amendments were also reviewed relative to the triple bottom line:
Environmental, Social and Economic direct and indirect impacts to the
NATURAL RESOURCES ADVISORY BOARD
TYPE OF MEETING – REGULAR
10/20 /21 – MINUTES Page 6
community.
− Discussion
− Dawson - Q - Can you expand on the concern around EV infrastructure in
homes? A - Making a single-family home EV ready would be an
incremental construction cost. Making a commercial facility EV ready would
be determined by the size of the parking lot. Retrofits would be more
expensive than initial infrastructure installation.
− Kevin - Q - Can you expand on electric baseboard heat. Are the additional
envelope measures still required? A - Part of the larger changes to electric
readiness is so Utilities can plan for future appliance fuel switching from fuel
fired appliances to electric. If electric heat is to be used it has to be a cold
climate heat pump or ground source heat pump. Electric resistance heat is
only allowed on very low energy use homes.
− Kevin - Q - Can you expand on whether or not the increased R values for
electric heat will still be required or not? A – With the increased envelope
provisions in the new code and with a requirement that electric heat now be
heat pump technology we’ve removed the electric resistance heat envelope
requirements.
− Kevin Q - Comparing this conversation to our previous conversation about
the increasing cost of water, he is concerned the City is being too
conservative about addressing future energy needs and trends and should
not recommend energy uses like natural gas that will decline in availability
in the future. The proposed incremental changes need to pay their way and
they are not getting us to our goal of emissions-free. He thinks the City
should push for tighter buildings. A - The City is planning for adaption but
there is some hesitation because the technology isn't there yet. There are
some issues with manufacturing not being ready to accept electric
appliances to be the future. It should become more mainstream in the next
several years.
− Kevin - Q - What about remodels? Are these requirements like what are in
Boulder County? A - Included as a proposal to the International Energy
Conservation Code is a requirement for increased efficiency requirements
to homes that add additions. Boulder has different requirements that are
more like renewable energy mandates that considerably drive up the price
of homes. Fort Collins is considering remodels to have increased
efficiency.
− Danielle - It would be nice to be able to reduce the public health impacts of
fossil fuel emissions through the building code. Affordability of homes in
NATURAL RESOURCES ADVISORY BOARD
TYPE OF MEETING – REGULAR
10/20 /21 – MINUTES Page 7
this community is very important, however, new construction homes are not
affordable to many who can't afford them. We need to understand these
policies apply to a different audience. Q - Do Colorado plumbing standards
include gray water? A - We currently do have gray water standards in the
proposed code. However, current City ordinance do not allow the use of
gray water. Moving forward, the City needs to first approve the use of gray
water, and then we can use the current provisions in the building code to
use gray water for toilet flushing. However, that system will be expensive,
compared to the amount of water it will save.
− Kevin moved and Danielle seconded a motion to support the full set of
proposed building code amendments as presented. In addition, the
board expresses that these codes are important minimal standards for
future progress. Motion passed unanimously 8-0-0
c. 2022 City Manager's Recommended Budget Recommendation
d. NRAB 2022 Work Plan
7. OTHER BUSINESS/UPDATES
a.
8. BOARD MEMBER AND STAFF REPORTS
STAFF
•
BOARD
•
•
9. OTHER BUSINESS
a. 6-month Calendar review
• N/A
b. Agenda planning
10. ADJOURNMENT